Main Street Station Upgrades

Size: px
Start display at page:

Download "Main Street Station Upgrades"

Transcription

1 Main Street Station Upgrades Public Meeting Hope United Church 1

2 Main Street Station Upgrades Bus diversions Planned improvements Construction staging Pedestrian flows 2

3 Main Street Station Aerial Bar ring. Ave S ton Mai sho reet Chi n St n Mai S t e tre n o i t ta ve. lm A fo n a D Ja n u a ry 17, e v rth A 3

4 TTC work bus diversion Phase 1: Station loop closed, Main St. one-way SB (approx. 30 calendar days) Phase 2: Intersection Closure (one weekend) 62 Mortimer and 87 Cosburn northbound on Chisholm Avenue 87 Cosburn and 64 Main interlined 23 Dawes extended to Woodbine Station VICTORIA PARK MAIN STREET BUS/STREETCAR LOOP CLOSED 113 Danforth shortened to Victoria Park Station 62 Mortimer and 20 Cliffside interlined 135 Danforth shortened to Victoria Park Station 506 Carlton shuttle buses to Victoria Park Station 4

5 TTC work bus diversion Phase 3: Loop closed, two-way Main St. maintained (110 calendar days) 23 Dawes extended to Woodbine Station VICTORIA PARK 87 Cosburn and 64 Main interlined MAIN STREET BUS/STREETCAR LOOP CLOSED 113 Danforth shortened to Victoria Park Station 62 Mortimer and 20 Cliffside interlined 135 Danforth shortened to Victoria Park Station 506 Carlton shuttle buses to Victoria Park Station GERRARD ST 5

6 Hydro work bus diversion Hydro One Work Main Street closed between Station and Doncaster 62 Mortimer Both ways via Chisholm and Danforth 87 Cosburn Southbound via Barrington, Northbound via Chisholm Main Street Closure between Main Street Station and Doncaster Ave MAIN STREET 6

7 Planned improvements Taper brick wall Concrete laneway Concrete laneway Reduce height of brick wall to improve visibility Barrington Ave. Main Street Main Street Station Eliminate narrow walkway Improved lighting Proposed anytime taxi stand (Option A) New accessible pedestrian walkway Proposed anytime taxi stand (Option B) Danforth Ave. Ja n u a ry 17,

8 Taxi Stand Proposed taxicab stand on Barrington Avenue Main Street Station Barrington Ave. 1-hr parking 10:00 a.m. to 6:00 p.m. Monday to Friday Proposed taxi stand anytime (Option A) Proposed walkway No parking anytime Proposed taxi stand anytime (Option B) No parking anytime Danforth Ave. City-proposed location for taxis on Barrington Ave TTC to install wayfinding signage along accessible path 8

9 South laneway 9

10 Main Street Station North wall East Current Proposed 10

11 Main Street Station Stage 1 Scope Stage 3 Replacing Streetcar Tracks, concrete and grease lubricator. Affected zone spans from north of Danforth Avenue to loop entrances. Concrete and rail replaced in front of station Concrete only replaced south of laneway Main Street Main Street Station Barrington Ave. Timing Construction duration is 30 calendar days (Tentatively Mid May-Mid June/2018) Impact Both Northbound lanes will remain closed. Main Street restricted to 1 southbound lane Stage 1 Stage 2 Danforth Ave. TTC Streetcar/Bus loop will be closed. Diversion plan in effect. Station entrance will remain open for subways service. 24 hr construction required to meet schedule Selective construction activity during night to minimize impact Buses diverted to Chisolm other diversions will take place on streets which are already accustomed to bus service 11

12 Main Street Station Stage 2 Scope Concrete removal and replacement adjacent to streetcar tracks Timing Stage days during a Weekend (Tentatively Mid June/2018) Impact Main Street Main Street Station Barrington Ave. EB/WB one lane in either direction NB/SB two-way-single lane restriction north of intersection No left turns 24/7 operation with advance notice to the community TTC buses and streetcars to be diverted during this construction Stage 1 Buses diverted to Chisolm other diversions will take place on streets which are already accustomed to bus service Stage 2 Danforth Ave. 12

13 TTC commitment during construction Scope On Grade and Structural Paving of roadway surface and bus platform Streetcar track replacement and track relocation along south side Stage 3 Roof Replacement of Station Building Station lighting upgrades with additional poles Main Street Main Street Station Barrington Ave. Chain link fence and pedestrian walkway to be permanently removed. TTC exploring options to re-instate east-west walkway Timing 110 Calendar days (Tentatively Mid May Early September/2018) Impact Stage 1 Streetcar/bus loop will be closed during this phase. Diversion plan will be in place Stage 2 Danforth Ave. Station entrance will remain open for fare media sales and subway service 13

14 Pedestrian safety Passenger Refuge Median Main St. Danforth Ave. Proposed refuge island for pedestrian safety In discussions with City Transportation 14

15 Main Street Station Schedule March 2018 May 2018 September 2018 Contract award Construction begins Complete 15

Astoria Boulevard ADA Upgrade and Station Renewal. January 7, 2019

Astoria Boulevard ADA Upgrade and Station Renewal. January 7, 2019 Astoria Boulevard ADA Upgrade and Station Renewal January 7, 2019 Major Scope of Work Replace Street and Platform Stairs Work Description Install Two Street-to-Mezzanine Elevators Install Two Mezzanine-to-Platform

More information

St. Clair West Station Easier Access Project Community Update Open House

St. Clair West Station Easier Access Project Community Update Open House St. Clair West Station Easier Access Project Community Update Open House 1 Easier Access Program Wide Committed to making all 69 stations accessible by 2025 31 stations completed - almost halfway there

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: SUBJECT: Resubmitted December 19, 2012 November 21, 2012 MODERNIZING THE TTC A NEW APPROACH TO COMMUNICATIONS, COMMUNITY

More information

Wellesley Station Second Exit and Automatic Entrance Public Open House. Tuesday, September 23, 2014 Central YMCA 20 Grosvenor Street

Wellesley Station Second Exit and Automatic Entrance Public Open House. Tuesday, September 23, 2014 Central YMCA 20 Grosvenor Street Wellesley Station Second Exit and Automatic Entrance Public Open House Tuesday, September 23, 2014 Central YMCA 20 Grosvenor Street 1 What are Second Exits? Second exits serve three functions: As a primary

More information

Astoria Boulevard ADA and Station Renewal Track Improvements. January 30, 2019

Astoria Boulevard ADA and Station Renewal Track Improvements. January 30, 2019 Astoria Boulevard ADA and Station Renewal Track Improvements January 30, 2019 Major Scope of Work Replace Street and Platform Stairs Work Description Install Two Street-to-Mezzanine Elevators Install Two

More information

LESLIE BARNS & CONNECTION TRACK. Project Update Construction and Traffic Management Consultation

LESLIE BARNS & CONNECTION TRACK. Project Update Construction and Traffic Management Consultation LESLIE BARNS & CONNECTION TRACK Project Update Construction and Traffic Management Consultation PRESENTATION SUMMARY Part 1 Brief Project Update (New Streetcars & Streetscape Improvements) Part 2 Construction

More information

WORKING WITH BIAS ON TTC PROJECTS

WORKING WITH BIAS ON TTC PROJECTS WORKING WITH BIAS ON TTC PROJECTS David Nagler Manager Community Relations, TTC November 17, 2015 TABIA-CITY meeting Nov, 17, 2015 November 17, 2015 1 OVERVIEW 1. Working with BIAs on major construction

More information

June-December TBD, to be coordinated with Accessibility Ramps Project

June-December TBD, to be coordinated with Accessibility Ramps Project TTC Updates St. Clair Coordinated Projects TTC is coordinating various accessibility and infrastructure improvement projects along the St. Clair streetcar route which are expected to begin this summer.

More information

LESLIE BARNS & CONNECTION TRACK. Leslieville BIA Meeting May 2, 2014

LESLIE BARNS & CONNECTION TRACK. Leslieville BIA Meeting May 2, 2014 LESLIE BARNS & CONNECTION TRACK Leslieville BIA Meeting May 2, 2014 1 OVERVIEW Communications Queen/Leslie Intersection Closure Overview Next Steps - Coordination of TTC Track Upgrades (Queen streetcar

More information

Long water shutdown scheduled for Tuesday, September 18

Long water shutdown scheduled for Tuesday, September 18 Thank you for your interest in the Center City Connector Streetcar. In this weekly update, you ll find information about ongoing construction for the 1st phase of utility work in Pioneer Square. Utility

More information

Ossington Station Easier Access Project - Construction & Public Art Concept Update

Ossington Station Easier Access Project - Construction & Public Art Concept Update Ossington Station Easier Access Project Construction & Public Art Concept Update Open House College/Shaw Library 1 Easier Access Program Wide Committed to making all stations accessible by 2025 34 stations

More information

SAN RAFAEL City Council January 20, 2015

SAN RAFAEL City Council January 20, 2015 SONOMA MARIN AREA RAIL TRANSIT SMART CENTRAL SAN RAFAEL STATUS UPDATE SAN RAFAEL City Council January 20, 2015 CENTRAL SAN RAFAEL SMART SOUTH OF PUERTO SUELLO TUNNEL 1. Active Construction 2. Construction

More information

PennDOT Interstate Work next week March 30-April 3:

PennDOT Interstate Work next week March 30-April 3: PennDOT Interstate Work next week March 30-April 3: Interstate 80 Interstate 81 DELAYS THIS WEEK: Exit 256 to the Schuylkill County line. Eastbound & Westbound. Bridge cleaning Monday (3/30), Tuesday (3/31)

More information

ARRIVAL AND DEPARTURE FROM PEARSON INTERNATIONAL AIRPORT

ARRIVAL AND DEPARTURE FROM PEARSON INTERNATIONAL AIRPORT ARRIVAL AND DEPARTURE FROM PEARSON INTERNATIONAL AIRPORT By Taxi Your hotel name and address should be enough for the cab driver to get you where you need to go. Note: many of the taxis charge a flat rate

More information

Woodbine Station Easier Access Project Public Open House January 27, :30 pm 8:30 pm Consultation Summary Report

Woodbine Station Easier Access Project Public Open House January 27, :30 pm 8:30 pm Consultation Summary Report Woodbine Station Easier Access Project Public Open House January 27, 2014 6:30 pm 8:30 pm Consultation Summary Report Danforth Mennonite Church 2174 Danforth Ave Prepared by Lito Romano February 18, 2014

More information

Construction Staging Area Blue Jays Way (357 King Street West)

Construction Staging Area Blue Jays Way (357 King Street West) REPORT FOR ACTION Construction Staging Area Blue Jays Way (357 King Street West) Date: June 8, 2018. To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto

More information

M-F. Old New Old New Old New Old New Old New Old New Miscellaneous Changes

M-F. Old New Old New Old New Old New Old New Old New Miscellaneous Changes , September 3, 2017 Miscellaneous Changes Wheel Trans 6 Bay and 63 Ossington 22/322 Coxwell Wheel Trans will now serve bus bay 3 at Coxwell Station, and bus bay 2 at Woodbine Station. Scheduled travel

More information

As the Toronto Transit Commission (TTC) operates a transit service on Bay Street, City Council approval of this report is required.

As the Toronto Transit Commission (TTC) operates a transit service on Bay Street, City Council approval of this report is required. REPORT FOR ACTION Construction Staging Area - 81 Bay Street Date: December 11, 2017 To: Toronto and East York, Community Council From: Acting Director, Transportation Services Toronto and East York District

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: November 18, 2013 SUBJECT: ISLINGTON STATION TEMPORARY BUS TERMINAL ACTION ITEM RECOMMENDATIONS It is recommended that the Board: 1.

More information

Design Meeting Presentation

Design Meeting Presentation Contract No. 17ECS-TI-05SP April November 2017 Design Meeting Presentation November 2015 Agenda Items: Introduction (5 min) Overview (10 min) Scope of work (60 min): Schedule and Traffic Staging / Closures

More information

Construction Staging Area 19 Western Battery Road

Construction Staging Area 19 Western Battery Road REPORT FOR ACTION Construction Staging Area 19 Western Battery Road Date: December 6, 2017 To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto and East York

More information

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015 EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015 1 SEGMENT 1 2 THE WISHBONE Connects the TEXpress Managed Toll System to the 35Express Managed Toll System Limits: Crown Road (near Royal Lane) to Valley

More information

EXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015

EXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015 EXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015 35EXPRESS PROJECT OVERVIEW 2 SEGMENT 1 3 SOUTH OF I-635 May Shift northbound mainlane traffic east in the southeast quadrant Miscellaneous frontage

More information

STAGE 2 & 3 Pavement reconstruction within viaduct footprint, pavement widening and resurfacing N/S of viaduct footprint, sidewalk

STAGE 2 & 3 Pavement reconstruction within viaduct footprint, pavement widening and resurfacing N/S of viaduct footprint, sidewalk STAGE 1 Viaduct removal, deck replacement on the River Bridge, and approach of the Chicago River Bridge north to Roscoe) Maintain local access roadways - 1 lane in each direction A signed alternate route

More information

Crenshaw/LAX Transit Project Construction Update Community Meeting. November 15, 2018

Crenshaw/LAX Transit Project Construction Update Community Meeting. November 15, 2018 Crenshaw/LAX Transit Project Construction Update Community Meeting November 15, 2018 Project Overview Walsh Shea Corridor Constructors (WSCC) Main Line & Stations Contractor Hensel Phelps Herzog (HPH)

More information

RECONSTRUCT/REHABILITATE TRANSIENT APRON AND TAXIWAY 'A' PHASING PLAN - PHASE 1

RECONSTRUCT/REHABILITATE TRANSIENT APRON AND TAXIWAY 'A' PHASING PLAN - PHASE 1 PHASING PLAN - PHASE 1 2 Weeks PHASE 1 SCOPE OF WORK Phase 1 consists of the reconstruction of a portion of Taxiway 'A' and the crack seal and seal coat of the North Apron. The portion of Taxiway 'A' to

More information

Old New Old New Old New M-F Saturday Sunday

Old New Old New Old New M-F Saturday Sunday 2 Bloor-Danforth M-F Midday / Weekend Afternoon 3'22" 3'20" 2 4'31" 4'30" 2 4'52" 4'52" 2 Additional running time for reliability Early Evening 3'42" 3'42" 2 192 Airport Rocket Seasonal changes and Ten

More information

State Route 8 Corridor. Northern Summit County s Path to Success

State Route 8 Corridor. Northern Summit County s Path to Success State Route 8 Corridor Northern Summit County s Path to Success Construction Guide: 2008-2009 State Route 8 corridor work description State Route 8 Corridor 10 projects $262 million With its close proximity

More information

Improving Transit Service to Major Music Festivals

Improving Transit Service to Major Music Festivals For Action Improving Transit Service to Major Music Festivals Date: May 8, 2018 To: TTC Board From: Chief Operating Officer Summary The purpose of this report is to respond to the Board s request to report

More information

Northeast Corridor Transportation Update

Northeast Corridor Transportation Update Northeast Corridor Transportation Update Presented by: Stuart Basham Division 10 Planning Engineer North Carolina Department of Transportation October 2, 2014 Today s presentation includes: I-485 Outer

More information

172 Cherry Midday Seasonal change; frequent Pan-Am service discontinued 172A to Carlaw 25' 172B to Carlaw via Cherry Beach 10'

172 Cherry Midday Seasonal change; frequent Pan-Am service discontinued 172A to Carlaw 25' 172B to Carlaw via Cherry Beach 10' Route Period Headway Veh Headway Veh Headway Veh "Old" headways are May 2015 unless noted otherwise 192 Airport Rocket AM Peak / S-S Early Morning 8'30" 10' -1 10' 10' M-F Midday / S-S Late Morning 8'30"

More information

Palm Beach County Traffic Report July 13 through July 20, 2012

Palm Beach County Traffic Report July 13 through July 20, 2012 For Immediate Release July 13, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report July 13 through July 20, 2012 Palm Beach County Palm Beach County traffic will be

More information

Hospital Link Project Project Update Winter 2018

Hospital Link Project Project Update Winter 2018 Hospital Link Project Project Update Winter 2018 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction of the Hospital Link facility is open

More information

The Light Rail System Safety & Grade Crossing Equipment

The Light Rail System Safety & Grade Crossing Equipment The Light Rail System Safety & Grade Crossing Equipment A Peer Review Provided by the American Public Transportation Association (APTA) Presented by: Mark Benedict, Director, Light Rail Operations and

More information

Crenshaw/LAX Transit Project Construction Update Community Meeting September 27 th, 2017

Crenshaw/LAX Transit Project Construction Update Community Meeting September 27 th, 2017 Crenshaw/LAX Transit Project Construction Update Community Meeting September 27 th, 2017 1 Project Overview Mainline Design-Build Contractor: Walsh Shea Corridor Constructors (WSCC) Southwestern Yard Maintenance

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: November 18, 2013 SUBJECT: YONGE-EGLINTON AND EGLINTON WEST INTERCHANGE STATIONS METROLINX EGLINTON CROSSTOWN LIGHT RAIL TRANSIT PROJECT

More information

SERVICE SUMMARY Introduction

SERVICE SUMMARY Introduction Introduction This is a summary of all transit service operated by the Toronto Transit Commission for the period indicated. All rapid transit, streetcar, bus, and community bus routes and services are listed.

More information

Public Workshop Preliminary Plans Review. Projects PW 1605, 1701, & 1702

Public Workshop Preliminary Plans Review. Projects PW 1605, 1701, & 1702 Queens Mirror Circle Pedestrian Safety Improvements Quail Pond Circle Complete Street/Pedestrian Connectivity Improvements Southcot Drive Bicycle/Pedestrian Improvements Public Workshop Preliminary Plans

More information

Review of Overnight Services. January 2005

Review of Overnight Services. January 2005 Review of Overnight Services January 2005 Review of Overnight Services - 3 - Table of contents Table of contents 1. Background...4 History of overnight service... 4 Changes since the mid-1990s... 5 Present

More information

NEW YORK CITY TRANSIT AND INFRASTRUCTURE THE G LOOP

NEW YORK CITY TRANSIT AND INFRASTRUCTURE THE G LOOP NEW YORK CITY TRANSIT AND INFRASTRUCTURE THE G LOOP 1 THE G LOOP The G Loop will connect New York like never before, solving the L train closure by linking Williamsburg, Bedford-Stuyvesant, and Greenpoint

More information

NFTA Access Enhancement Study for Canalside and Cobblestone Alternatives Discussion. Alternative A South Park Avenue

NFTA Access Enhancement Study for Canalside and Cobblestone Alternatives Discussion. Alternative A South Park Avenue Alternative A South Park Avenue Alternative A Summary Alternative A extends Metro Rail service around the foot of Main Street east along South Park Avenue to serve a new station platform located along

More information

Route 29 Solutions Projects

Route 29 Solutions Projects Your guide to the Route 29 Solutions Projects For full details & continued engagement please visit www.route29solutions.org The Route 29 Solutions Package is a $230 million investment into the improvement

More information

Map showing location of public transport projects in vicinity of railway station

Map showing location of public transport projects in vicinity of railway station Map showing location of public transport projects in vicinity of railway station Market Town Transport Strategy 2013 39 ID PT1a Specific Location Approach at Detail of Project Develop Area Master plan

More information

This report recommends two new TTC transit services in southwest Toronto.

This report recommends two new TTC transit services in southwest Toronto. Report for Action New TTC Services - Southwest Toronto Date: March 20, 2018 To: TTC Board From: Chief Customer Officer Summary This report recommends two new TTC transit services in southwest Toronto.

More information

Improving Directional Signage for TTC Services at Pearson Airport

Improving Directional Signage for TTC Services at Pearson Airport For Action Improving Directional Signage for TTC Services at Pearson Airport Date: May 8, 2018 To: TTC Board From: Executive Director Corporate Communications Summary This report outlines the signage and

More information

Service Summary June 24, 2018 to September 1, Data compiled by the Strategy and Service Planning Department

Service Summary June 24, 2018 to September 1, Data compiled by the Strategy and Service Planning Department Service Summary June 24, 2018 to September 1, 2018 Data compiled by the Strategy and Service Planning Department Introduction This is a summary of all transit service operated by the Toronto Transit Commission

More information

SERVICE SUMMARY Introduction

SERVICE SUMMARY Introduction Introduction This is a summary of all transit service operated by the Toronto Transit Commission for the period indicated. All rapid transit, streetcar, bus, and community bus routes and services are listed.

More information

Chicago St. Louis High-Speed Rail. Braidwood Construction. Local Officials Briefing August 7, 2014

Chicago St. Louis High-Speed Rail. Braidwood Construction. Local Officials Briefing August 7, 2014 Chicago St. Louis High-Speed Rail Braidwood Construction Local Officials Briefing August 7, 2014 1 Chicago-St. Louis Corridor Goals and Benefits» Reduction in travel time by about an hour» Enhanced reliability»

More information

Northeast Anthony Henday Drive Edmonton Ring Road Update. Strathcona Chamber of Commerce March 18, 2015

Northeast Anthony Henday Drive Edmonton Ring Road Update. Strathcona Chamber of Commerce March 18, 2015 Northeast Anthony Henday Drive Edmonton Ring Road Update Strathcona Chamber of Commerce March 18, 2015 Project Background 2 Edmonton Ring Road Northwest opened Nov 2011 Northeast to open Oct 2016 Southwest

More information

Pre-Construction Public Meeting July 2017

Pre-Construction Public Meeting July 2017 Pre-Construction Public Meeting July 2017 Agenda Introduction to Project Team Project Description Schedule Impacts Communication/Public Outreach 2 Contractor Walsh Construction Design Team HDR Lead City

More information

25 th Avenue Grade Separation. September 13, 2017

25 th Avenue Grade Separation. September 13, 2017 25 th Avenue Grade Separation September 13, 2017 Agenda I. Overview II. III. IV. Project Description Project Benefits Project Construction V. Next Steps VI. Questions 2 Overview Project Location 4 E. 25

More information

EP8.2 Presentation Exhibition GO Station Improvements

EP8.2 Presentation Exhibition GO Station Improvements EP8.2 Presentation Exhibition GO Station Improvements JANUARY 30, 2018 WORKING TOGETHER Metrolinx is working collaboratively with the City of Toronto, Exhibition Place, and the TTC to co-ordinate efforts

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: March 26, 2014 SUBJECT: KENNEDY INTERCHANGE STATION: METROLINX EGLINTON CROSSTOWN LIGHT RAIL TRANSIT PROJECT - PRELIMINARY CONCEPT

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO. : 10.4 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving various parking and traffic modifications associated

More information

M-F. Old New Old New Old New Old New Old New Old New Miscellaneous Changes

M-F. Old New Old New Old New Old New Old New Old New Miscellaneous Changes , June 18, 2017 Miscellaneous Changes 2 Bloor-Danforth Keele Yard will now store four trains seven days/week. These will enter service at the beginning of morning operations and leave service at the end

More information

WHO IS METROLINX?

WHO IS METROLINX? CROSSTOWN LRT WHO IS METROLINX? Construction of the Eglinton Crosstown LRT Line Background In September 2008, Metrolinx launched a regional transportation plan a 25-year, $50 billion plan -- to coordinate

More information

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016 March 25, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016 TREASURE COAST Construction and maintenance-related

More information

Construction Staging Adelaide Street West

Construction Staging Adelaide Street West REPORT FOR ACTION Construction Staging Adelaide Street West Date: October 6, 2016 To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto and East York District

More information

Cell: (408) Release MA June 25, 2012

Cell: (408) Release MA June 25, 2012 VTA NEWS CONTACT: Bernice Alaniz FOR IMMEDIATE RELEASE Cell: (408) 888-9983 Release MA 12 06 08 Bernice.Alaniz@vta.org June 25, 2012 Construction Activities Underway For BART Silicon Valley The Santa Clara

More information

East Link Project Update. Maintenance of Traffic During Construction. April 21, 2015

East Link Project Update. Maintenance of Traffic During Construction. April 21, 2015 East Link Project Update Maintenance of Traffic During Construction April 21, 2015 1 Agenda TFP project 242 Bellevue Way HOV Bellevue Way - Maintenance of Traffic During Construction Early Work Utilities

More information

Trail # NW Tuesday, June DESIGN. Provide an Review the Provide an. Project Goals: System system. wayfinding

Trail # NW Tuesday, June DESIGN. Provide an Review the Provide an. Project Goals: System system. wayfinding I. Welcome / Introductions Bethany Creek Trail #2 Segment 3 Neighborhood Meeting #1 Bethany Presbyterian Church 15505 NW Springville Road, Portland, OR 97229 Tuesday, June 26, 2018 @ 6:00PM Meeting Minutes

More information

PRESENTED TO Town of Middlebury, VT. PRESENTED BY VTrans, VHB, Fitzgerald & Halliday, Inc., and Kubricky Construction

PRESENTED TO Town of Middlebury, VT. PRESENTED BY VTrans, VHB, Fitzgerald & Halliday, Inc., and Kubricky Construction PRESENTED TO Town of Middlebury, VT PRESENTED BY VTrans, VHB, Fitzgerald & Halliday, Inc., and Kubricky Construction Meeting with you today Brian Carpenter, Middlebury Selectboard Chair Jim Gish, Middlebury

More information

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 June 19, 2015 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 TREASURE COAST Construction and maintenance-related lane

More information

Chicago St. Louis High-Speed Rail. Enos Park Neighborhood Association May 13, 2014

Chicago St. Louis High-Speed Rail. Enos Park Neighborhood Association May 13, 2014 Chicago St. Louis High-Speed Rail Enos Park Neighborhood Association May 13, 2014 1 Illinois High-Speed Rail Program 2 Chicago-St. Louis Corridor» IDOT has actively developed the corridor since the mid1980

More information

25 th Avenue Grade Separation. Community Meeting November 13, 2018

25 th Avenue Grade Separation. Community Meeting November 13, 2018 25 th Avenue Grade Separation Community Meeting November 13, 2018 Agenda I. Project Need II. Project Benefits III. Project Description IV. Funding V. Schedule VI. Construction VII. Next Steps 2 Project

More information

CONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018

CONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018 FOR IMMEDIATE RELEASE Wednesday March 28, 2018 CONTACT: Nichole Lawrence CELL: 731-225-6041 West Tennessee Construction March 28-April 4, 2018 Per TDOT Specifications, there will be no temporary lane closures

More information

Frequently Asked Questions on the Route 29 Solutions Improvements Projects

Frequently Asked Questions on the Route 29 Solutions Improvements Projects Frequently Asked Questions on the Route 29 Solutions Improvements Projects Background What are the Route 29 Solutions improvement projects? These projects include the Route 29/250 Interchange ( Best Buy

More information

Pardon Our Dust Public Information Meeting

Pardon Our Dust Public Information Meeting Pardon Our Dust Public Information Meeting Robert G. Ridgell, P.E. Virginia Department of Transportation, Fredericksburg District Area Construction Engineer July 12, 2018 Project Team and Leadership Virginia

More information

PROGRESS PARK CONNECTOR

PROGRESS PARK CONNECTOR PROGRESS PARK CONNECTOR Project No. 9999 098 R65, P102 ALTERNATIVES ANALYSIS 6 April 2015 Revised for updated dates PROGRESS PARK CONNECTOR ROAD ALTERNATIVES ALTERNATIVE # 1 West from the intersection

More information

Full I-35E Mainlane Closure at Beckley Avenue - July 27-30

Full I-35E Mainlane Closure at Beckley Avenue - July 27-30 July 20, 2018 Media Contact: Keith Bilbrey Public Involvement Manager The Southern Gateway Project kbilbrey@kstrategies.com 972-989-9995 Full I-35E Mainlane Closure at Beckley Avenue - July 27-30 DALLAS

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: March 26, 2014 SUBJECT: UNION PRECINCT STATUS REPORT UPDATE ON CONSTRUCTION INFORMATION ITEM RECOMMENDATION It is recommended that

More information

Atlantic Street Bridge Project CTDOT Project Nos & (Phase 2)

Atlantic Street Bridge Project CTDOT Project Nos & (Phase 2) Atlantic Street Bridge Project CTDOT Project Nos. 135-301 & 301-163 (Phase 2) Reconstruction of Atlantic Street & Metro North RR Bridge Replacement Track & Station Infrastructure Improvements City of Stamford

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: March 30, 2012 SUBJECT: TTC SERVICE TO GEORGE BROWN COLLEGE WATERFRONT CAMPUS ACTION ITEM: RECOMMENDATIONS It is recommended

More information

US 19 Sunset Point Rd to Countryside Blvd.

US 19 Sunset Point Rd to Countryside Blvd. Frontage Lanes Alternative Six-Lane Roadway Two-Lane, One-Way Frontage Lanes Close All Median Openings w/ Concrete Median Barrier Construct Within Existing Right-of-Way Status Update Construction started

More information

Pedestrian Safety Review Spadina Avenue

Pedestrian Safety Review Spadina Avenue STAFF REPORT ACTION REQUIRED Pedestrian Safety Review Spadina Avenue Date: October 13, 2015 To: Toronto and East York Community Council From: Director, Transportation Services, Toronto and East York District

More information

3. COLTA / HUGA CONNECTIONS - PRELIMINARY

3. COLTA / HUGA CONNECTIONS - PRELIMINARY 9 3. COLTA / HUGA CONNECTIONS - PRELIMINARY 3.1 COLTA The Chain of Lakes Trail Association (COLTA) trail, formerly identified as the Chester Spur Line, was completed and opened for use in June 2011. The

More information

Service Summary February 18, 2018 to March 31, Data compiled by the Strategy and Service Planning Department

Service Summary February 18, 2018 to March 31, Data compiled by the Strategy and Service Planning Department Service Summary February 18, 2018 to March 31, 2018 Data compiled by the Strategy and Service Planning Department Introduction This is a summary of all transit service operated by the Toronto Transit Commission

More information

San Martin Drive. January 2016 Pre-Project Update

San Martin Drive. January 2016 Pre-Project Update San Martin Drive January 2016 Pre-Project Update Overview The San Martin Drive Pedestrian Improvements project has the goal of providing a continuous pedestrian pathway on San Martin Drive from University

More information

3529 Souris River Flood Plan (Phase MI-1)

3529 Souris River Flood Plan (Phase MI-1) Date: September 28, 2018 To: Derek Hackett, Public Information Officer From: Grant Goldader, Civil Engineering Specialist Re: Traffic Control Report for the week of 10/01/2018 3529 Souris River Flood Plan

More information

Crenshaw/LAX Transit Project Construction Update Community Meeting November 29 th, 2017

Crenshaw/LAX Transit Project Construction Update Community Meeting November 29 th, 2017 Crenshaw/LAX Transit Project Construction Update Community Meeting November 29 th, 2017 1 Project Overview Design-Build Contractor: Walsh Shea Corridor Constructors (WSCC) Southwestern Yard Maintenance

More information

Sydney CBD - Partnering with the coach industry for solutions

Sydney CBD - Partnering with the coach industry for solutions Sydney CBD - Partnering with the coach industry for solutions Steve Issa Executive Director Operations and Planning Transport for NSW 16 June 2017 Tomorrow s Sydney Responding to growth: Sydney s population

More information

Boston Redevelopment Authority 2/26/ Chestnut Hill Avenue Boston/Brookline, MA

Boston Redevelopment Authority 2/26/ Chestnut Hill Avenue Boston/Brookline, MA Boston Redevelopment Authority 2/26/2014 Cassidy Playground Waterworks Design revisions made since the DPIR submission March 2013 Massing - Reduced project 16,030 SF, for a total project area of 218,520

More information

York Street Pedestrian Promenade Plan, Front Street West to Queens Quay West

York Street Pedestrian Promenade Plan, Front Street West to Queens Quay West STAFF REPORT ACTION REQUIRED York Street Pedestrian Promenade Plan, Front Street West to Queens Quay West Date: November 13, 2007 To: From: Wards: Reference Number: Toronto and East York Community Council

More information

PRIORITIES COMMITTEE MEETING

PRIORITIES COMMITTEE MEETING PRIORITIES COMMITTEE MEETING Meeting Date: 05/13/14 Agenda Item #: 13.1 Northeast Anthony Henday Drive Update Report Purpose To update the Priorities Committee on the progress of the Northeast Anthony

More information

JANUARY MODERNIZATION UPDATE: MAJOR PROJECTS ON TAP AT LAX AS NEW YEAR BEGINS

JANUARY MODERNIZATION UPDATE: MAJOR PROJECTS ON TAP AT LAX AS NEW YEAR BEGINS For Immediate Release January 2, 2018 Contact: Charles H. Pannunzio (424) 646-5260 JANUARY MODERNIZATION UPDATE: MAJOR PROJECTS ON TAP AT LAX AS NEW YEAR BEGINS Access to Parking Structure 4 from the Upper/Departure

More information

FDOT Treasure Coast Traffic Report through

FDOT Treasure Coast Traffic Report through FDOT Treasure Coast Traffic Report 02 26 16 through 03 04 16 Kathleen Dempsey Fri 2/26/2016 2:56 PM To:Kathleen Dempsey ; 1 attachment 355 KB CR 714_Median Access Modifications.pdf;

More information

Construction Staging Area 197 Redpath Avenue

Construction Staging Area 197 Redpath Avenue REPORT FOR ACTION Construction Staging Area 197 Redpath Avenue Date: January 31, 2017 To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto and East York District

More information

Construction Staging Area 700 Bay Street - Elizabeth Street and Walton Street

Construction Staging Area 700 Bay Street - Elizabeth Street and Walton Street REPORT FOR ACTION Construction Staging Area 700 Bay Street - Elizabeth Street and Walton Street Date: March 7, 2017 To: Toronto and East York Community Council From: Acting Director, Transportation Services,

More information

Guide to. Road Construction Projects

Guide to. Road Construction Projects Guide to Road Construction Projects 2018 Spring is here and so is road construction season. This year PennDOT District 11-0 will invest an estimated $208 million on 68 projects to improve, preserve or

More information

Public Information Center August 12, 2010

Public Information Center August 12, 2010 Route 52 Causeway Bridge Replacement & Somers Point Circle Elimination Project Somers Point Atlantic County Public Information Center August 12, 2010 Ocean City Cape May County Presentation Overview General

More information

Ohio Department of Transportation Construction Update

Ohio Department of Transportation Construction Update Ohio Department of Transportation Construction Update DISTRICT 5 DAVE RAY, P.E., P.S., DISTRICT DEPUTY DIRECTOR 9600 Jacksontown Road Jacksontown, OH 43030 www.transportation.ohio.gov/dist5 ODOT District

More information

BATHURST December 1, 1938 To September 25, 1949

BATHURST December 1, 1938 To September 25, 1949 BATHURST December 1, 1938 To September 25, 1949 Dufferin Briar Hill Av FARE ZOE BOUDARY (Established June 1, 194) Holy Blossom Temple Initial route began at. Clair Av and operated to. On July 22, 1940,

More information

35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS

35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS 35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS 35EXPRESS PROJECT OVERVIEW 2 ABOUT THE 35EXPRESS PROJECT 3 DESIGN-BUILD TEAM 4 PROJECT PARTNERS Great partnerships make this project work Collaboration

More information

25 th Avenue Grade Separation. December 13, 2017

25 th Avenue Grade Separation. December 13, 2017 25 th Avenue Grade Separation December 13, 2017 Agenda I. Overview II. III. IV. Project Description Project Benefits Project Construction V. Next Steps VI. Questions 2 Overview Project Location 4 E. 25

More information

SCOPING INFORMATION PACKET

SCOPING INFORMATION PACKET SCOPING INFORMATION PACKET Project Description The proposed project would provide a direct link connecting several light rail lines in operation or in construction, including the Metro Gold Line to Pasadena,

More information

FEDERAL HIGHWAY ADMINISTRATION NEVADA DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL IMPACT STATEMENT RE-EVALUATION

FEDERAL HIGHWAY ADMINISTRATION NEVADA DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL IMPACT STATEMENT RE-EVALUATION FEDERAL HIGHWAY ADMINISTRATION NEVADA DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL IMPACT STATEMENT RE-EVALUATION Project Name: Boulder City/US 93 Corridor Study (Boulder City Bypass) Project Location: The

More information

Public Open House. Chief Peguis Trail Project

Public Open House. Chief Peguis Trail Project Public Open House Chief Peguis Trail Project CHIEF PEGUIS TRAIL OPEN HOUSE Welcome! Please browse the display boards Project Engineers and City of Winnipeg representatives are available to address your

More information

DALLAS HORSESHOE PROJECT. Project Update including the Margaret McDermott Bridge Transportation and Trinity River Project Committee February 22, 2016

DALLAS HORSESHOE PROJECT. Project Update including the Margaret McDermott Bridge Transportation and Trinity River Project Committee February 22, 2016 DALLAS HORSESHOE PROJECT Project Update including the Margaret McDermott Bridge Transportation and Trinity River Project Committee February 22, 2016 Agenda 1. Horseshoe Project 2. Purpose and Need 3. Construction

More information

SINGAPORE AIRSHOW 2018 TRAFFIC ARRANGEMENTS AND TRANSPORTATION ADVISORY

SINGAPORE AIRSHOW 2018 TRAFFIC ARRANGEMENTS AND TRANSPORTATION ADVISORY FOR IMMEDIATE RELEASE 26 JANUARY 2018 SINGAPORE AIRSHOW 2018 TRAFFIC ARRANGEMENTS AND TRANSPORTATION ADVISORY The Singapore Airshow will take place at Changi Exhibition Centre from Tuesday, 6 February

More information

May 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015

May 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015 May 1, 2015 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report May 1 through May 8, 2015 Palm Beach County Palm Beach County traffic will be affected this week by ongoing