1 4.1 INTRODUCTION The previous chapters have described the existing facilities and provided planning guidelines as well as a forecast of demand for aviation activity at North Perry Airport. The demand/capacity analysis examines the capability of the existing airfield to satisfy the forecasted operational demands of the Airport. This analysis will be expressed in terms of the Airport s annual service volume and hourly capacities. FAA Advisory Circular 150/5060-5, Change 2, Airport Capacity and Delay, provides the methodologies used to conduct airfield analysis, which will establish the existing capacity of the Airport. For this Master Plan Update, airfield capacity will be calculated using two methods, and identified in the terms of: Hourly capacities of the runways defined as the maximum number of aircraft operations (both landings and takeoffs) which can be accommodated on the airport during in an hour. Annual service volume (ASV) of the airfield, which is a reasonable estimate of the capacity of the airport accounting for the overall usage patterns over a year s time. The existing capacity will be then be compared with the demand to determine any airfield deficiencies within the planning period. 4.2 AIRFIELD CHARACTERISTICS According to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the elements that affect airfield capacity include: Runway Use Configuration and Instrumentation the alignment of the runways; Taxiway Configuration the location and spacing of the taxiway connectors; Airfield Operational Characteristics, including: Arrival/Departure Balance the percent of arrivals and departures during typical operations; Touch and Go Operations the percent of training operations where aircraft land and immediately takeoff without stopping during typical operations; Aircraft Mix Index the distribution of aircraft fleet by aircraft category that use the airport; and Meteorological Conditions direction, speed, ceiling, and visibility conditions. The analysis of these elements provides the basis for establishing the operational capacity of the airport RUNWAY USE CONFIGURATION AND INSTRUMENTATION The airfield configuration for North Perry Airport includes two sets of intersecting parallel runways, two aligned in the north-south direction, and the other two aligned in the east-west direction. Due to the intersecting configuration, only one set of runways can be used at a given time. The distance from centerline to centerline between the north/south runways (Runway 18R-36L and 18L-36R) is 1,450 feet. The distance from centerline to centerline between the east/west runways (Runway 9R-27L and 9L-27R) is 1,466 feet. For each operational configuration, only one runway is used for arriving and/or departing aircraft. Montgomery Consulting Group August 11, 2009 Page 4-1
2 Runway 9R-27L is the primary runway for the Airport, and Runway 9R is the only non-precision approach for the Airport. The other seven approaches to the Airport are visual TAXIWAY CONFIGURATION As detailed in the inventory section, all four runways at North Perry Airport have at least one associated parallel taxiway. Runways 9R-27L, 9L-27R, and 18L-36R have parallel taxiways on both sides of the runway. Based on the FAA criteria contained in FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the exit factor is maximized when a runway has four exit taxiways within a range determined by the operations using that runway. At North Perry Airport, this range is 2,000 to 4,000 feet from the landing threshold and each exit must be separated by at least 750 feet. Using this criterion, Runways 9R-27L, 9L- 27R, and 18L-36R have at least four exit taxiways in either runway direction that fall within the criteria. Runway 18R-36L has only two exit taxiways in either runway direction that meet the criteria AIRFIELD OPERATIONAL CHARACTERISTICS Operational characteristics such as the percentage of aircraft arrivals and departures, and the percentage of touch and go operations can have an affect on the airfield s overall capacity ARRIVAL/DEPARTURE BALANCE The hourly capacity of the airfield is affected by the number of arrivals versus departures because arrivals require more runway time than a departure. Based on discussions with the airport s tower, arrivals and departures at the Airport are typically balanced (50 percent arrivals, 50 percent departures) during normal operating conditions. These percentages are anticipated to remain consistent throughout the planning period. Pilots currently perform run-ups on the taxiways prior to entering the designated runway. There are not designated run-up areas at or near every end on each runway that would allow an aircraft to by-pass a delayed aircraft. This constraint may impact capacity, but can not be modeled using the FAA s methodology for airfield capacity. To date, the Airport s Air Traffic Control Tower (ATCT) has not identified any constraints due to lack of a separate run-up area TOUCH AND GO OPERATIONS A touch and go is a practice maneuver where a pilot touches down, slows to an exit speed, and then accelerates for take-off without exiting the runway. Two operations are counted for each touch and go; one operation for landing, and one operation for the takeoff. Airfield capacity is greater if touch and go activity occurs since it takes less time for the same aircraft to land and depart than it does for one aircraft to land and another to depart. Touch and go operations are normally associated with flight training. Based on discussions with the Airport s ATCT, approximately 50 percent of operations at North Perry Airport are touch and go operations, indicating a high percentage of training operations occurring at the Airport. Touch and go operations are anticipated to remain between 40 to 50 percent during the planning period. Montgomery Consulting Group August 11, 2009 Page 4-2
3 4.2.4 AIRCRAFT MIX INDEX The fleet mix of the different aircraft types that use the Airport affects the overall capacity of the airport. The approach speed and weight of an aircraft impact the length of time the aircraft will occupy the runway. The FAA has established a classification system for the various sizes, weights, and performance of aircraft as shown in Table 4.1. TABLE 4.1 AIRCRAFT CLASSIFICATION SYSTEM FOR AIRFIELD CAPACITY ANALYSIS Classification Maximum Certified Takeoff Weight (lbs.) Number of Engines Wake Turbulence Classification Class A 12,500 or less Single Small Class B 12,500 or less Multi Small Class C 12,500 to 300,000 Multi Large Class D over 300,000 Multi Heavy Source: FAA AC 150/5060-5, Change 2, Airport Capacity and Delay Broward County s current ordinance restricts operations at North Perry Airport to aircraft weighing 12,500 pounds or less. This weight restriction provides that only Class A and Class B aircraft may use the Airport. Illustrations of the types of aircraft by class that operate at the North Perry Airport are shown in Figure 4.1. The forecasted activity indicates the Airport will continue to serve Class A and Class B aircraft operations. No Class C or Class D aircraft operations are forecasted at North Perry Airport. Using the FAA formula for aircraft mix, the existing and future mix index for North Perry Airport is zero (the FAA formula does not count Class A or Class B aircraft in determining aircraft mix). Montgomery Consulting Group August 11, 2009 Page 4-3
4 FIGURE 4.1 ILLUSTRATION OF AIRCRAFT TYPES BY CLASS AT NORTH PERRY AIRPORT Source: Aircraft manufacturer records METEOROLOGICAL CONDITIONS FAA recognizes three measures of cloud ceiling and visibility in calculating the capacity of an airport, including: Visual Flight Rules (VFR) conditions - occur whenever the cloud ceiling is at least 1,000 feet above ground level (AGL) and visibility is at least three statute miles. Instrument Flight Rules (IFR) conditions - occur when the cloud ceiling is at least 500 feet AGL and less than 1,000 feet AGL and visibility is between one and three statue miles. Poor Visibility and Ceiling (PVC) occur when the cloud ceiling is less than 500 feet AGL or visibility is less than one statue mile. IFR or PVC conditions reduce airfield capacity because IFR conditions require a greater separation distance during operations. Based on information provided by the Airport s tower, it is estimated that North Perry Airport experiences VFR conditions 95 percent of the time, IFR conditions exist 4.5 percent of the time, and PVC conditions exist 0.5 percent of the time. These conditions are expected to remain consistent throughout the planning window. Montgomery Consulting Group August 11, 2009 Page 4-4
5 4.3 AIRFIELD CAPACITY ANALYSIS The characteristics of the airfield were used in conjunction with the methodologies contained in FAA Advisory Circular 150/5060, Airport Capacity and Delay, to generate values for airfield capacity for this Master Plan Update. These values include the hourly capacity of the runways and the annual service volume HOURLY CAPACITY OF THE RUNWAYS Hourly capacity of the runways are determined by analyzing the appropriate VFR and IFR figures for the airport s runway configuration contained in FAA Advisory Circular 150/5060, Airport Capacity and Delay. From these figures, the aircraft mix index and percentage of aircraft arrivals are used to determine the base hourly capacity. A touch and go factor is determined based on the percentage of touch and go operations combined with the aircraft mix index. The FAA figures also consider the taxiway exit factor, which is determined by the aircraft mix index, percent of aircraft arrivals, and the number of exit taxiways that are within the specified exit range. The hourly capacity for runways is determined by the following equation: Where: Hourly capacity = C* x T x E C* is equal to the hourly capacity base; T is equal to the touch and go factor; and E is equal to the exit factor. The aircraft mix can change the value of the hourly capacity. However, since all planning years are assumed to have a mix index of zero (only Class A and Class B aircraft), there is no anticipated changes in the hourly capacities of the Airport over the planning horizon. A weighted hourly capacity is calculated by taking the VFR and IFR calculations and applying them to the percentage these conditions occur at the airport. The following hourly capacity values were calculated for North Perry Airport: VFR Conditions = 195 Operations/Hour IFR Conditions = 24 Operations/Hour Weighted Hourly Capacity = 186 Operations/Hour ANNUAL SERVICE VOLUME The annual service volume (ASV) represents the approximate number of total operations that the airport can support in one year. The ASV is the theoretical capacity or limit of operations that the airport can safely accommodate. Using the methodology contained in FAA Advisory Circular 150/5060, Airport Capacity and Delay, the annual service volume equation is as follows: Where: Cw D H Annual Service Volume = Cw x D x H is equal to the weighted hourly capacity; is equal to the ratio of annual demand to average daily demand during the peak month; and is equal to the ratio of daily demand to average peak hour demand during the peak month. Montgomery Consulting Group August 11, 2009 Page 4-5
6 The ASV takes into account differences in forecasted activity levels, runway use, aircraft mix, weather conditions, and other factors that may vary within a single year. For North Perry Airport, these factors will remain relatively the same. Additionally, the other factors (ratios D and H) are very similar since the same methodology for calculating the percent of average day peak month and peak hour operations was used for each year in the forecast chapter. The ASV of North Perry Airport was based on the most conservative calculations contained in FAA Advisory Circular 150/5060, Airport Capacity and Delay. The ASV for the Airport was estimated to be 440,000 operations. 4.4 COMPARISON OF AIRFIELD CAPACITY VS. DEMAND The airfield capacity analysis for North Perry Airport was compared to the projected demand for aviation operations to identify any present or potential deficiencies in the airfield system. Table 4.2 lists the demand versus airfield capacity for the peak hour and annual service volume (ASV) for the study period. According to FAA Order B, Field Formulation of the National Plan of Integrated Airport Systems (NPIAS), eligibility for federal funding to address capacity limitations is available once the airfield has reached 60 percent of its current capacity. Starting planning at this level should allow for improvements to be made prior to demand levels exceeding capacity of facility. A demand that exceeds the annual service volume is likely to result in significant delays on the airfield. Table 4.2 also illustrates the future capacity levels for the airport based on the forecasted annual operations and the ASV for the airport. TABLE 4.2 DEMAND VS. AIRFIELD CAPACITY CHART ANNUAL SERVICE VOLUME (ASV) NORTH PERRY AIRPORT Forecast Year Forecast Demand Existing Capacity Operational Deficiency Capacity Level , ,000 No 33.3% , ,000 No 36.1% , ,000 No 40.0% , ,000 No 43.8% Source: Montgomery Consulting Group, Inc. Figure 4.2 graphically illustrates the ASV versus the forecasted total operations. This figure shows a theoretical timeline when the planning and construction thresholds may be crossed; however, it is important to understand that the actual demand for the facilities will be the driver of the development rather than the year itself. This concept will enable the Broward County Aviation Department to accelerate, maintain, or decelerate facility improvements as the airport continues to operate. Montgomery Consulting Group August 11, 2009 Page 4-6
7 4.5 SUMMARY OF Figure 4.2 illustrates that even if no improvements are made to the airfield, North Perry Airport should not experience any capacity related problems during the planning period. Overall, the current airfield capacity is considered to be sufficient to accommodate the forecast airport operations. However, as conditions change in the future, the capacity of the airfield may decrease enough to reach the 60 percent planning threshold. If and when this milestone is reached, capacity improvement projects will need to be evaluated to enhance the overall capacity of the airport. The hourly capacity of IFR operations without an instrument landing system or precision approach is substantially reduced from a runway with a precision instrument landing system. Although, IFR operations have generally accounted for a small percentage (less than 2 percent) of the overall operations, adding instrument approach capabilities would increase the hourly capacity under IFR conditions, and slightly increase the annual service volume. The alternatives analysis section of the plan will explore options to add precision instrument capabilities to the airport. FIGURE 4.2 FORECAST DEMAND VERSUS EXISTING ASV CAPACITY GRAPH NORTH PERRY AIRPORT Sources: Forecast Demand Terminal Area Forecast, March 2006 ASV estimate Montgomery Consulting Group, Inc. based on FAA Advisory Circular 150/5060, Airport Capacity and Delay Montgomery Consulting Group August 11, 2009 Page 4-7
The purpose of this Demand/Capacity. The airfield configuration for SPG. Methods for determining airport AIRPORT DEMAND CAPACITY. Runway Configuration
Chapter 4 Page 65 AIRPORT DEMAND CAPACITY The purpose of this Demand/Capacity Analysis is to examine the capability of the Albert Whitted Airport (SPG) to meet the needs of its users. In doing so, this
More informationCHAPTER 4 DEMAND/CAPACITY ANALYSIS
CHAPTER DEMAND/CAPACITY ANALYSIS INTRODUCTION The demand/capacity analysis examines the capability of the airfield system at Blue Grass Airport (LEX) to address existing levels of activity as well as determine
More informationAppendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis
Appendix B ULTIMATE AIRPORT CAPACITY & DELAY SIMULATION MODELING ANALYSIS B TABLE OF CONTENTS EXHIBITS TABLES B.1 Introduction... 1 B.2 Simulation Modeling Assumption and Methodology... 4 B.2.1 Runway
More informationINTRODUCTION. General
CHAPTER FOUR Airfield Demand/Capacity Analysis & Facility Requirements INTRODUCTION A key step in the master plan process is the determination of airport facility requirements to allow airside and landside
More informationWashington Dulles International Airport (IAD) Aircraft Noise Contour Map Update
Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update Ultimate ASV, Runway Use and Flight Tracks 4th Working Group Briefing 8/13/18 Meeting Purpose Discuss Public Workshop input
More informationFacility Requirements
4. This chapter presents the airside and landside facility requirements necessary to accommodate existing and forecasted demand at Erie International Airport (ERI or the Airport) in accordance with Federal
More informationTable of Contents. Overview Objectives Key Issues Process...1-3
Table of Contents Chapter One Introduction Overview...1-1 Objectives...1-1 Key Issues...1-2 Process...1-3 Chapter Two Inventory of Existing Conditions Airport Setting...2-1 Locale...2-1 Airport Surroundings...2-5
More informationAirport Master Plan for. Brown Field Municipal Airport PAC Meeting #3
Airport Master Plan for Brown Field Municipal Airport PAC Meeting #3 Public Meeting #1 > 8/24/17 from 5:30 to 8:00 pm > 41 attendees signed-in > Comments: > EAA area > Environmental constraints > Focus
More information3.1 Facility Requirements Overview Airfield Facility Requirements... 1
Table of Contents 3.1 Overview... 1 3.2 Airfield... 1 Airspace Capacity...1 Airside Capacity... 2 Aircraft Mix Index... 3 Arrivals Percentage... 4 Touch-and-Go Percentage... 4 Taxiway Access Factors...
More informationChapter 5 Facility Requirements
Chapter 5 Facility Requirements 50 INTRODUCTION This chapter describes the airside and landside facility requirements necessary to accommodate existing and forecasted demand in accordance with Federal
More informationThe demand/capacity analysis was performed utilizing Federal Aviation Administration (FAA) publications, including the following:
Chapter Three To properly plan for the future of Monterey Regional Airport, it is necessary to examine the capacities of the key airport systems. This chapter uses the results of the forecasts prepared
More informationChapter III - Demand/Capacity and Facility Requirements
Chapter III - Demand/Capacity and Facility Requirements The facility requirements identified in this chapter are summarized on Exhibit III.1. The future requirements serve to determine which airport facilities
More informationFACILITY REQUIREMENTS
FACILITY REQUIREMENTS In order to ensure that Bradley International Airport (BDL) is capable of supporting the expected increase in passenger traffic, care must be taken to ensure that the recommendations
More informationPlanning Horizon Activity Levels Airfield Capacity and Delay Airport Physical Planning Criteria Airfield and Landside Facility Requirements
Proper airport planning requires the translation of forecast aviation demand into the specific types and quantities of facilities that can adequately serve the identified demand. This chapter will analyze
More information1. Background and Proposed Action
1. Background and Proposed Action This chapter describes Hillsboro Airport and the planning background for the proposed project. The Port of Portland (the Port) is the sponsor for the Hillsboro Airport
More informationPORT OF PORTLAND. Chapter Four AVIATION FACILITY REQUIREMENTS
PORT OF PORTLAND Chapter Four AVIATION FACILITY REQUIREMENTS CHAPTER FOUR PORT OF PORTLAND AVIATION FACILITY REQUIREMENTS In this chapter, existing components of the airport are evaluated to identify the
More information4. Demand/Capacity Assessment and Facility Requirements
4. This chapter presents an evaluation of the existing airfield facilities, buildings, and other facilities at the Airport and an assessment of their potential use under the demand scenarios defined for
More informationCapacity Analysis and Facility Requirements
Capacity Analysis and Facility Requirements Introduction The capacity analysis for Paine Field is composed of two distinct elements: the ability of airport facilities to accommodate existing and projected
More informationHartford-Brainard Airport Potential Runway Closure White Paper
Hartford-Brainard Airport Potential Runway 11-29 Closure White Paper June 2012 In recent years there has been discussion regarding the necessity of Runway 11-29 to the Hartford- Brainard Airport (HFD)
More informationAirport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3
Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3 Agenda > Introductions > Public Meetings Overview > Working Paper 3 - Facility Requirements > Working Paper 4 - Environmental Baseline
More informationC > Capacity Analysis and Facility Requirements
Buchanan Field Buchanan Field Airport Master Planning Program C. CAPACITY ANALYSIS & FACILITY REQUIREMENTS C > Capacity Analysis and Facility Requirements INTRODUCTION. The capacity of an airfield is primarily
More informationMerritt Island Airport
TABLE OF CONTENTS CHAPTER 1 INTRODUCTION... 1-1 INTRODUCTION AND PROJECT OVERVIEW... 1-1 General Guidelines... 1-1 Prior Planning Documentation... 1-2 Key Issues... 1-2 Goals and Objectives... 1-2 Regulatory
More informationRSAT RUNUP ANALYSIS 1. INTRODUCTION 2. METHODOLOGY
RSAT RUNUP ANALYSIS 1. INTRODUCTION The FAA Runway Safety Action Team (RSAT) is a team of FAA staff that works with airports to address existing and potential runway safety problems and issues. The RSAT
More informationRunway Length Analysis Prescott Municipal Airport
APPENDIX 2 Runway Length Analysis Prescott Municipal Airport May 11, 2009 Version 2 (draft) Table of Contents Introduction... 1-1 Section 1 Purpose & Need... 1-2 Section 2 Design Standards...1-3 Section
More informationCHAPTER 5 - FACILITY REQUIREMENTS
CHAPTER 5 - FACILITY REQUIREMENTS This chapter identifies the requirements for airfield and landside facilities to accommodate the forecast demand level. Facility requirements have been developed for the
More informationAPPENDIX X: RUNWAY LENGTH ANALYSIS
APPENDIX X: RUNWAY LENGTH ANALYSIS Purpose For this Airport Master Plan study, the FAA has requested a runway length analysis to be completed to current FAA AC 150/5325-4B, Runway Length Requirements for
More informationTable of Contents Facility Requirements Overview Airport Capacity and Delay Analysis... 1
Table of Contents Table of Contents... 2 3.1 Overview... 1 3.2 Airport Capacity and Delay Analysis... 1 Airspace Capacity... 1 Aircraft Mix Index... 3 Arrivals Percentage... 3 Touch-and-Go Percentage...
More informationChapter 5 Facility Requirements
Chapter 5 Facility Requirements 5.0 INTRODUCTION The Facility Requirements chapter of this Sustainable Master Plan Update describes airside and landside facilities, which are needed to accommodate existing
More informationKey Purpose & Need Issues
Key Purpose & Need Issues Efficiently meet demand through the 2025 planning horizon 864,000+ annual operations 180-200 operations during peak daytime hours Balance peak hour arrival/departure capability
More informationDEMAND/CAPACITY ANALYSIS St. Petersburg-Clearwater International Airport
DEMAND/CAPACITY ANALYSIS St. Petersburg-Clearwater International Airport 5.1 GENERAL OVERVIEW The next step in the Master Plan process is analyzing the capacity of existing airport facilities against forecasted
More informationFacility Requirements
C H A P T E R T H R E E Facility Requirements 3.0 OVERVIEW Airport planning for facility requirements is based upon addressing any existing issues and accommodating the probable demand that may occur over
More informationChapter 3. Demand/Capacity & Facility Requirements
Chapter 3. Demand/Capacity & Facility Requirements Chapter 3. DEMAND/CAPACITY & FACILITY REQUIREMENTS This chapter provides an assessment of future airport development requirements based upon the forecasts
More informationCATCODE ] CATCODE
Runways. FAC: 1111 CATCODE: 111111 OPR: AFCEC/COS OCR: AF/A3O-A 1.1. Description. The runway is the paved surface provided for normal aircraft landings and take offs. Runways are classified as either Class
More informationFORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT ENVIRONMENTAL IMPACT STATEMENT DRAFT
D.3 RUNWAY LENGTH ANALYSIS Appendix D Purpose and Need THIS PAGE INTENTIONALLY LEFT BLANK Appendix D Purpose and Need APPENDIX D.3 AIRFIELD GEOMETRIC REQUIREMENTS This information provided in this appendix
More informationLas Vegas McCarran International Airport. Capacity Enhancement Plan
Las Vegas McCarran International Airport Capacity Enhancement Plan Las Vegas McCarran International Airport Capacity Enhancement Plan September 1994 Prepared jointly by the U.S. Department of Transportation,
More information1.1.3 Taxiways. Figure 1-15: Taxiway Data. DRAFT Inventory TYPICAL PAVEMENT CROSS-SECTION LIGHTING TYPE LENGTH (FEET) WIDTH (FEET) LIGHTING CONDITION
1.1.3 Taxiways EWN has an extensive network of taxiways and taxilanes connecting the terminal, air cargo, and general aviation areas with the runways as listed in Figure 1-15. A 50-foot wide parallel taxiway
More informationChapter 5 Facility Requirements
Chapter 5 Facility Requirements Chapter 5 Facility Requirements INTRODUCTION Chapter 4 produced a forecast of traffic volumes estimated to be generated at the airport during the 20- year forecast period.
More informationDraft Concept Alternatives Analysis for the Inaugural Airport Program September 2005
Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 1 - Introduction This report describes the development and analysis of concept alternatives that would accommodate
More informationSECTION 4 DEMAND/CAPACITY ANALYSIS AND FACILITY REQUIREMENTS
SECTION 4 DEMAND/CAPACITY ANALYSIS AND FACILITY REQUIREMENTS This Section compares the projected demand and the existing capacity for the major elements of the Airport and establishes the facility requirements
More informationB GEORGIA INFRASTRUCTURE REPORT CARD AVIATION RECOMMENDATIONS DEFINITION OF THE ISSUE. Plan and Fund for the Future:
2014 GEORGIA INFRASTRUCTURE REPORT CARD B + RECOMMENDATIONS Plan and Fund for the Future: While the system continues to enjoy excess capacity and increased accessibility it still needs continued focus
More informationAIRFIELD CAPACITY AND FACILITY REQUIREMENTS
CHAPTER FOUR: AIRFIELD CAPACITY AND FACILITY REQUIREMENTS 4.1 INTRODUCTION A key step in the Airport Master Plan Update (AMPU) process is determining future requirements for airport facilities that will
More informationStudy Committee Meeting. September 2015
W ki P T / Working Paper Two/ Study Committee Meeting September 2015 Agenda Introductions and Opening Comments Project Overview, Process, and Schedule Review Materials from Working Paper Two Comments,
More information4.0 AIRFIELD CAPACITY & FACILITY REQUIREMENTS
4.0 AIRFIELD CAPACITY & FACILITY REQUIREMENTS A key step in the Airport Master Plan (AMP) process is determining future requirements for airport facilities that will allow for airside and landside development
More informationChapter 3 FACILITY REQUIREMENTS
Chapter 3 FACILITY REQUIREMENTS Chapter Three Facility Requirements To properly plan for the future of Ryan Airfield, it is necessary to translate forecast aviation demand into the specific types and quantities
More informationThe forecasts evaluated in this appendix are prepared for based aircraft, general aviation, military and overall activity.
Chapter 3: Forecast Introduction Forecasting provides an airport with a general idea of the magnitude of growth, as well as fluctuations in activity anticipated, over a 20-year forecast period. Forecasting
More informationExecutive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport
Executive Summary MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport As a general aviation and commercial service airport, Fort Collins- Loveland Municipal Airport serves as an important niche
More informationAirfield Capacity Prof. Amedeo Odoni
Airfield Capacity Prof. Amedeo Odoni Istanbul Technical University Air Transportation Management M.Sc. Program Air Transportation Systems and Infrastructure Module 10 May 27, 2015 Airfield Capacity Objective:
More information3.1 CRITICAL AIRCRAFT
The purpose of the demand capacity analysis is to determine an airport s capacity and its ability to support the forecasted aviation demand. Facility requirements identify development, replacement, and/or
More informationChapter 4: Facility Requirements
Chapter 4: Facility Requirements 1 Rapid City Regional Airport Master Plan Update Chapter 4 Facility Requirements Introduction This chapter of the Airport Master Plan analyzes the existing and anticipated
More informationTABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved
TABLE OF CONTENTS Description Page Number LIST OF ACRONYMS... a CHAPTER ONE INTRODUCTION General... 1-1 Study Objectives... 1-1 Public Involvement... 1-2 Issues to Be Resolved... 1-2 CHAPTER TWO EXISTING
More informationAirport Engineering Lectures
Airport II- Airport. II-1 Definitions System capacity: Ability efficiently process the transported units. Aircrafts Passengers Baggage cargo Public access facilitation Runway Taxiway Gate Terminal Building
More informationIDENTIFICATION AND EVALUATION OF ALTERNATIVES ST. PETERSBURG-CLEARWATER INTERNATIONAL AIRPORT
IDENTIFICATION AND EVALUATION OF ALTERNATIVES ST. PETERSBURG-CLEARWATER INTERNATIONAL AIRPORT 7 7.1 GENERAL The primary objective of this chapter is to evaluate potential development alternatives and identify
More informationCHAPTER D Capacity Analysis and Facility Requirements INTRODUCTION
CHAPTER D Capacity Analysis and Facility Requirements INTRODUCTION The capacity of an airfield is primarily a function of the major aircraft operating surfaces that compose the facility and the configuration
More information1 DRAFT. General Aviation Terminal Services Aircraft Hangars Aircraft Parking Aprons Airport Support Facilities
To properly plan for improvements at Dallas Executive Airport, it is necessary to translate forecast aviation demand into the specific types and quantities of facilities that can adequately serve the demand.
More informationAIRSIDE CAPACITY AND FACILITY REQUIREMENTS
AIRSIDE CAPACITY AND FACILITY REQUIREMENTS This Section investigates the capacity of the airport, its ability to meet current demand, and the facilities required to meet forecasted needs as established
More informationSECTION 4 DEMAND/CAPACITY ANALYSIS AND FACILITY REQUIREMENTS
SECTION 4 DEMAND/CAPACITY ANALYSIS AND FACILITY REQUIREMENTS 4.1 INTRODUCTION This section provides a technical presentation of demand/capacity and facility requirements analysis for Nampa Municipal Airport.
More informationMASTER PLAN UPDATE WORKING PAPER NO. 3. Demand/Capacity Analysis and Facility Requirements. March 18, 2013
MASTER PLAN UPDATE WORKING PAPER NO. 3 Demand/Capacity Analysis and Facility Requirements March 18, 2013 Contents 4 Demand/Capacity Analysis and Facility Requirements... 4 1 4.1 Summary of Aviation Demand
More informationAPPENDIX D MSP Airfield Simulation Analysis
APPENDIX D MSP Airfield Simulation Analysis This page is left intentionally blank. MSP Airfield Simulation Analysis Technical Report Prepared by: HNTB November 2011 2020 Improvements Environmental Assessment/
More informationPLU Airport Master Plan. Master Plan Advisory Committee (MPAC) Meeting #4 March 19, 2018
PLU Airport Master Plan Master Plan Advisory Committee (MPAC) Meeting #4 March 19, 2018 Meeting Agenda 1. Master Plan Status [5 Minutes] 2. Preferred Forecasts [15 Minutes] 3. Runway Length Options [45
More informationTallahassee International Airport Master Plan. Technical Advisory Committee Meeting #2 October 19, 2016
Tallahassee International Airport Master Plan Technical Advisory Committee Meeting #2 October 19, 2016 Agenda Welcome / Introductions Master Plan Process and Project Status Forecast of Aviation Demand
More informationFACILITY REQUIREMENTS SUMMARY OF KEY ISSUES OVERVIEW
FACILITY REQUIREMENTS SUMMARY OF KEY ISSUES OVERVIEW This summary is intended to provide a brief overview of the key issues associated with conformance to FAA standards at Methow Valley State Airport.
More information6.1 INTRODUCTION 6.2 AIRSIDE ALTERNATIVES NORTH PERRY AIRPORT MASTER PLAN UPDATE RUNWAY LENGTH REQUIREMENTS SECTION 6: ALTERNATIVES ANALYSIS
6.1 INTRODUCTION In the previous chapter, facility needs for the 20-year planning horizon were identified. The next step in the planning process is to identify and evaluate the various ways certain facilities
More informationSource: Chippewa Valley Regional Airport ASOS, Period of Record
Chapter 1 Inventory Runway wind coverage is the percentage of time a runway can be used without exceeding allowable crosswind velocities. Allowable crosswind velocities vary depending on aircraft size
More informationCHAPTER 1 BACKGROUND AND PROPOSED ACTION
CHAPTER 1 BACKGROUND AND PROPOSED ACTION 1.0 INTRODUCTION An Environmental Assessment (EA) evaluates the effects of a proposed Federal action on the surrounding environment and is prepared in compliance
More informationTABLE OF CONTENTS. Washington Aviation System Plan Update July 2017 i
TABLE OF CONTENTS Chapter 1 Overview... 1-1 1.1 Background... 1-1 1.2 Overview of 2015 WASP... 1-1 1.2.1 Aviation System Performance... 1-2 1.3 Prior WSDOT Aviation Planning Studies... 1-3 1.3.1 2009 Long-Term
More informationPrepared By: Mead & Hunt, Inc Port Lansing Road Lansing, MI 48906
Master Plan The preparation of this document was financed in part through a planning grant from the Federal Aviation Administration (FAA) as provided under Section 505 of the Airport and Airway Improvement
More informationAgenda: SASP SAC Meeting 3
Agenda: SASP SAC Meeting 3 Date: 04/12/18 Public Involvement Plan Update Defining the System Recommended Classifications Discussion Break Review current system Outreach what we heard Proposed changes Classification
More informationAnalysis of Operational Impacts of Continuous Descent Arrivals (CDA) using runwaysimulator
Analysis of Operational Impacts of Continuous Descent Arrivals (CDA) using runwaysimulator Camille Shiotsuki Dr. Gene C. Lin Ed Hahn December 5, 2007 Outline Background Objective and Scope Study Approach
More informationDRAFT MASTER PLAN UPDATE
DRAFT MASTER PLAN UPDATE CHAPTER VI: AIRPORT LAYOUT PLAN NARRATIVE DRAFT REPORT APRIL 2017 PREPARED BY: Table of Contents WESTCHESTER COUNTY AIRPORT 6 AIRPORT LAYOUT PLAN NARRATIVE REPORT... 6-1 6.1 AGIS
More informationFPAW Summer CFR Part 135 Automated Surface Weather Observation Factors. Federal Aviation Administration
FPAW Summer 2012 14 CFR Part 135 Automated Surface Weather Observation Factors Presented by: Roger Sultan, FAA, AFS-400 Date: August 8, 2012 Regulatory Information 135.213 Weather reports and forecasts
More informationCHAPTER FOUR. Airport Facility Requirements. Introduction Page 4-2. Airfield Capacity Analysis Page 4-2. Skylark Field Airport Airport Master Plan
Skylark Field Airport Airport Master Plan CHAPTER FOUR Airport Facility Requirements Introduction Page 4-2 Airfield Capacity Analysis Page 4-2 Skylark Field Airport Airport Master Plan Skylark Field Airport
More informationCHAPTER 3 ALTERNATIVES CONSIDERED
CHAPTER 3 ALTERNATIVES CONSIDERED 3.0 ALTERNATIVES The 2010 Stevensville Airport Master Plan contained five (5) airside development options designed to meet projected demands. Each of the options from
More informationMaster Plan Update Technical Advisory Committee Meeting
Nashville International Airport Master Plan Update Technical Advisory Committee Meeting February 14, 2019 Agenda Welcome and Introductions Aviation Activity Forecast Facility Requirements Alternatives
More informationThursday, May 2 nd, 2013 South St. Paul Municipal Airport Meeting Room 4:00 p.m. 5:30 p.m. MEETING NOTES
SOUTH ST. PAUL MUNICIPAL AIRPORT FLEMING FIELD MASTER PLAN ADVISORY GROUP MEETING #2 Thursday, May 2 nd, 2013 South St. Paul Municipal Airport Meeting Room 4:00 p.m. 5:30 p.m. MEETING NOTES The purpose
More informationAERONAUTICAL SURVEYS & INSTRUMENT FLIGHT PROCEDURES
AERONAUTICAL SURVEYS & INSTRUMENT FLIGHT PROCEDURES Current as of November 2012 ALASKA AVIATION SYSTEM PLAN UPDATE Prepared for: State of Alaska Department of Transportation & Public Facilities Division
More informationSection 3: Demand/Capacity Analysis and Facility Requirements
3.0 INTRODUCTION In the previous section, aviation demand forecasts were presented for FDK through the year 2025. These forecasts included projections of aircraft operations, based aircraft, aircraft fleet
More information1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan
TABLE OF CONTENTS CHAPTER 1 INTRODUCTION 10 Project Background 1-1 11 Mission Statement and Goals 1-1 12 Objectives of this Sustainable Master Plan 1-2 CHAPTER 2 INVENTORY 20 Airport Background 2-1 201
More informationAirport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal
Airport Master Plan Rapid City Regional Airport October 2015 FAA Submittal Rapid City Regional Airport Master Plan Update Table of Contents Executive Summary... i Scope & Timeline... i Forecasts... i Preferred
More informationCHAPTER FOUR AIRPORT ALTERNATIVES
4.0 INTRODUCTION CHAPTER FOUR The goal of the master planning process is to provide the City of New Smyrna Beach with an assessment of the adequacy and capabilities of the Airport as well as to identify
More informationAirport Master Plan. Brookings Regional Airport. Runway Runway 17-35
Runway 17-35 Airport Master Plan Runway 12-30 Brookings Regional Airport Table of Contents Table of Contents Chapter 1: Master Plan Goals... 1-1 1.1. Introduction... 1 1.2. Objective 1 Identify improvements
More informationApril 4, McKinney Airport Advisory Committee Airport Master Plan Update.
McKinney Airport Advisory Committee Airport Master Plan Update http://mckinney.airportstudy.com/project-documents April 4, 2017 Paul Hendricks phendricks@fairviewtexas.org McKinney National Airport (TKI)
More informationWATTS ANTENNA COMPANY
WATTS ANTENNA COMPANY...the Industry Leader in Advanced Instrument Landing System (ILS) Antenna Products and Development Re-evaluating ILS Sensitive and Critical Areas As a result of its broad customer
More informationRaleigh-Durham International Airport Airport Capacity Enhancement Plan. August 1991
ii Raleigh-Durham International Airport Airport Capacity Enhancement Plan August 1991 Prepared jointly by the U.S. Department of Transportation, Federal Aviation Administration, Raleigh-Durham Airport
More informationWorking Paper #5 Facility Requirements
Working Paper #5 March 2018 Table of Contents Contents 5....5-1 5.1. Airfield and Airspace Requirements...5-4 5.1.1. Airfield Capacity...5-4 5.1.2. Approach Capability...5-7 5.1.3. Airspace Protection...5-9
More informationAIRPORT WITH NO RUNWAYS IS A MALL
RUNWAY EXTENSION INITIATIVE AT FT. LAUDERDALE HOLLYWOOD INTERNATIONAL AIRPORT ISMAEL IZZY BONILLA DEPUTY DIRECTOR BROWARD COUNTY AVIATION AUTHORITY AIRPORT WITH NO RUNWAYS IS A MALL Runway Business Case
More informationAppendix 6.1: Hazard Worksheet
Appendix 6.1: Appendix 6.1: Ref. Condition, real or potential; that can cause injury, illness, etc. This is a prerequisite for an Airfield Hazards 1. Taxiway Geometry Direct access to runway from ramp
More informationAddendum - Airport Development Alternatives (Chapter 6)
Bowers Field Addendum - Airport Development Alternatives (Chapter 6) This addendum to the Airport Development Alternatives chapter includes the preferred airside development alternative and the preliminary
More informationTime-series methodologies Market share methodologies Socioeconomic methodologies
This Chapter features aviation activity forecasts for the Asheville Regional Airport (Airport) over a next 20- year planning horizon. Aviation demand forecasts are an important step in the master planning
More informationAPPENDIX B: NPIAS CANDIDATE AIRPORT ANALYSIS
APPENDIX B: NPIAS CANDIDATE AIRPORT ANALYSIS The National Plan of Integrated Airport Systems (NPIAS) is the Federal Aviation Administration s (FAA) national airport plan. The NPIAS includes nearly 3,500
More informationCapacity Analysis & Facility Requirements
CHAPTER C Capacity Analysis & Facility Requirements 1. Introduction This chapter considers the ability of facilities at Friedman Memorial Airport (SUN) to accommodate existing and projected activity. Current
More informationAppendix C AIRPORT LAYOUT PLANS
Appendix C AIRPORT LAYOUT PLANS Appendix C AIRPORT LAYOUT PLANS Airport Master Plan Santa Barbara Airport As part of this Airport Master Plan, the Federal Aviation Administration (FAA) requires the development
More informationMilton. PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton.
Milton GeneralAviationAirport PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton. Existing Facilities Peter Prince Airport is served by one runway, Runway 18/36, 3,700 feet
More informationLONG BEACH, CALIFORNIA
LONG BEACH, CALIFORNIA 1 LONG BEACH, CALIFORNIA Airside Capacity Evaluation Techniques Matt Davis Assistant Director of Planning Hartsfield-Jackson Atlanta International Airport Matt.Davis@Atlanta-Airport.com
More informationAIRPORT MASTER PLAN FOR. charles B. WHEELER DOWNTOWN AIRPORT KANSAS CITY, MISSOURI
AIRPORT MASTER PLAN FOR charles B. WHEELER DOWNTOWN AIRPORT KANSAS CITY, MISSOURI Prepared For The City of Kansas City, Missouri By Coffman Associates, Inc. January 2004 "The contents of these documents
More informationIFR SEPARATION USING RADAR
IFR SEPARATION USING RADAR 1. Introduction When flying IFR inside controlled airspace, air traffic controllers either providing a service to an aircraft under their control or to another controller s traffic,
More informationSTUDY WORK GROUP MEETING No. 3. November 29, 2016
STUDY WORK GROUP MEETING No. 3 November 29, 2016 Agenda Welcome and introductions Update project schedule Brief overview of previous SWG meeting Update on aviation forecasts Introduction to airfield demand/capacity
More informationMASTER PLAN CONCEPT 1 DRAFT
The Airport Master Plan Update for Dallas Executive Airport has included the development of aviation demand forecasts, an assessment of future facility needs, and the evaluation of airport development
More informationChapter 4 Airport Facility Requirements
Chapter 4 Airport Facility Requirements Introduction CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-1 Organization of Materials CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-2 RPZ - ROAD RPZ - NON-AIRPORT
More informationChapter Three AIRPORT FACILITY REQUIREMENTS/ALTERNATIVES
Chapter Three AIRPORT FACILITY REQUIREMENTS/ALTERNATIVES Airport Layout Plan Report In this chapter, existing components of the Airport are evaluated so that the capacities of the overall system are identified.
More informationDraft Concept Alternatives Analysis for the Inaugural Airport Program September 2005
Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 3 - Refinement of the Ultimate Airfield Concept Using the Base Concept identified in Section 2, IDOT re-examined
More information