IARO report Extending your rail link at a growing airport

Size: px
Start display at page:

Download "IARO report Extending your rail link at a growing airport"

Transcription

1 IARO report Extending your rail link at a growing airport 1

2 IARO Report 23.15: Extending your rail link at a growing airport Published by: International Air Rail Organisation Suite 3, Charter House, 26 Claremont Road, Surbiton KT6 4QZ UK Telephone +44 (0) Fax +44 (0) website enquiries@iaro.com ISBN tba International Air Rail Organisation to non-members IARO's mission is to spread world class best practice and good practical ideas among airport rail links world-wide. 2

3 Contents Chapter Page 1 Introduction 4 2 Extending the railway to a new terminal 5 3 People-mover links 10 4 Extending a terminal around a station 16 5 Adding a second railway 18 6 Relocating the terminal to a railway 23 7 Conclusions 26 IARO's Air/Rail conferences and workshops 27 3

4 1. Introduction This report is partly based on an IARO workshop held at Milan Malpensa Airport in June The contribution of participants at that workshop is acknowledged, but the report, including any errors, is entirely the responsibility of the author. Options for serving a growing airport by rail As demand increases at an airport, planners will consider alternative ways of meeting that demand. The demand for additional aircraft movements will be met by the provision of additional runway and airside capacity and, by itself, will not require additional landside access. However, growing numbers of passengers and airport employees will require more terminal capacity and lead to more demand on the surface access network. At over 200 airports worldwide, rail is part of the access network, and there are 600 more airports where plans, projects or studies are in hand for rail access. This report is concerned with the 200 airports with existing rail links, and some of those of the 600 whose plans cover growth beyond the initial provision of a rail link. Each chapter in the report considers a type of enhanced or additional rail access when airport expansion is being planned. These types are: Extending the railway to a new terminal Connecting a new terminal to an existing station by a people-mover Extending a terminal around an existing station Adding a second rail link to a new terminal Relocating the terminal closer to a railway For each of these options, a number of examples are noted, and the advantages and disadvantage are discussed. Some examples are hybrids of the options, or exhibit features of more than one option. IARO classifies air-rail links into five types, although the boundaries are sometimes not precise. These five types are long distance/high speed, airport express, regional, suburban/metro and light rail. We also consider two other types, automated people-mover or bus shuttle (connecting an airport with a more distant rail service) and cargo. 4

5 2. Extending the railway to a new terminal Four examples of airports where an existing rail link has been extended are discussed, at Kuala Lumpur, Salt Lake City, Heathrow Terminal 5 and Milan Malpensa Airport. Kuala Lumpur KL International Airport opened in A rail link opened in 2002 with two services, KLIA Ekspres, a non stop service to KL Sentral and KLIA Transit, a commuter service with three intermediate stops. The rail link is operated as a 30 year concession. Passenger numbers at the Airport have grown to 23 million in 2005 and 47 million in In 2013 the rail links carried around 5 million passengers a year, a mode share of 18%. A Low Cost Carrier Terminal (LCCT) opened in 2006, which was connected to the rail link by bus. However, the LCCT was replaced by a new terminal, KLIA2, which opened in 2014 with the rail link extended to it. The rail link extension is around 2 km and the additional journey time is 3 minutes, plus 2 minutes station stop. All trains serve both terminals. The fare is the same for either terminal although there is a 2 Malaysian Ringit fare for travel between the terminals. The rail links have recorded a 40% increase in ridership since the opening of the extension, at a time when passengers through the airport have decreased. Funding arrangements for the extension are not clear, but it is believed that it is primarily government-funded, with some contribution from the Airport. Terminal 1 KLIA2 Rail link extension A study is under way of the feasibility of extending the rail link beyond the airport to link to other Malaysian cities. One option for this is to combine it with the route of a Kuala Lumpur- Singapore high speed line, but the current preferred route for this would not serve the airport. 5

6 Salt Lake City Salt Lake City Airport handled 21 million passengers in In 2013, a light rail link of the UTA's Trax system began operations. The initial station at the Airport is at the far end of one of the landside concourses. However, a current major expansion programme at the Airport includes the redevelopment and expansion of the terminal, at which point the rail link will be extended to be in the heart of the new complex. London Heathrow Terminal 5 Heathrow's Terminal 5 opened in The Airport handled 73 million passengers in 2014, 31 million of them through Terminal 5. Heathrow currently has two rail links. The Underground Piccadilly Line originally opened in 1977 and was extended to Terminal 4 in The Heathrow Express link opened in Terminals 123 Terminal 5 4 terminals 5 terminals Terminal 4 Heathrow Express extension Piccadilly Line extension 6

7 Both rail links had planned for later extensions. The Piccadilly Line had included a straight section for a new station, but this was not in the right location for Terminal 5, so a spur was constructed. The Heathrow Express line safeguarded for an extension to Terminal 5 by constructing a junction and stub tunnel west of the Terminal 123 station. Both extensions were required as a condition of the planning approval for Terminal 5 and opened at the same time as the new terminal. The total cost of the extensions was around 400 million, including the stations at Terminal 5 and both were funded by the airport company. The Heathrow Express train service is owned and operated by the Airport, so the business case for this extension was based on an internal rate of return. The Piccadilly Line is operated by Transport for London, which pays a track access fee to the Airport to use the extension. Both links required changes to their train timetables to ensure that all terminals were served. The Piccadilly Line previously operated as a loop, but trains now alternate between the loop serving Terminal 4 and the spur to Terminal 5. Heathrow Express operates all through trains to Terminal 5 with a shuttle service between Terminals 123 and 4, although this will change in the next few years when Crossrail trains serve the Airport using the Heathrow Express infrastructure. Further extensions are planned, as the Airport continues to grow. The alignment of the extensions to the west enables the links to be extended to either the north west or the south west, or both, to link with existing rail routes, and an additional box was constructed beneath Terminal 5 for allow for two additional platforms to be built. Milan Malpensa SEA, a public-private partnership, has a 40 year concession to manage Malpensa and Linate Airports. Malpensa handled 18.7 million passengers in Terminal 2, which was the original terminal before the new Terminal 1 opened, is now occupied by Easyjet carrying more than 6 million passengers a year The Malpensa Express rail link to Terminal 1 was opened in 1999, and now provides four trains per hour alternately to Cadorna and Centrale Stations with a journey time of 29 and 43 minutes respectively, some with intermediate stops. Terminal 2 is connected by a free bus shuttle to Terminal 1 and the rail station. Current overall rail share is 14.3%, but the share at Terminal 2 is 7.9%. The station at Terminal 1 was built with four platforms and the extension was safeguarded, but the project to extend the rail link to Terminal 2 began in In fact, the project began as a concept to extend the railway to the north to provide wider connections. 7

8 T1-T2 railink : first step of the Global project Nevertheless, a number of alternatives were considered, including closing Terminal 2 and expanding Terminal 1, or connecting the terminals by a people-mover. The chosen option enabled Terminal 2 to remain open as a low cost airline terminal, while the people mover option would have required passengers to interchange, and would not have formed part of a longer term wider rail route. Several route options were considered for the rail extension, including alternative locations for the Terminal 2 station, which will safeguard for a future further extension. Funding for the 115 million extension is shared between the national government, the regional government and SEA, with a contribution from the European Union under the Trans-European Networks (TEN-T) programme. Construction is due for completion by the end of 2015, with operations starting in

9 T2 Station works Studies of the options for wider rail links are ongoing, which includes links to regional and international services, high speed lines and alternative faster routes to central Milan. Summary of rail extensions In the examples discussed, the choice of an extension of the existing rail link was made because it would provide a significantly better service for passengers choosing rail and, for three of the four examples, could potentially be part of a further extension to wider rail links. Undoubtedly, these extensions are more expensive to build, and in some the airport operator has contributed financially, but the strategic and business case for the expenditure is clearly beneficial. 9

10 3. People-mover links Five examples of people-mover links at a growing airport are discussed: London Gatwick, Paris CDG, New York JFK, Miami and Orlando. London Gatwick The current Gatwick Airport opened in 1958 with a terminal directly adjacent to a main line railway. A second terminal (named North, with the first terminal named South) opened in The North Terminal is around 1km from the rail station and was connected by a people-mover system. Alternatives of a bus link and various other technologies were considered, but the choice was made of an automatic system with rubber-tyred vehicles on an elevated concrete track (in part because the airport already had a similar system for an airside satellite), and it was funded by the airport operator. As passenger numbers have grown, additional vehicles have been added. The service operates every 2 minutes at the peak with a 90 second journey time and is provided free. There is no significant difference in the rail share of passengers at the South and North Terminals (both around 35%), which demonstrates that, despite the need for interchange, the perception of the people-mover is that it is part of the airport and does not deter passengers from using rail. Gatwick Airport has proposed expansion with a second runway and another terminal, to the south of the South Terminal. Although this expansion has not been approved, the plan would have seen a similar people-mover operation between the station and the new terminal. 10

11 Paris CDG Paris CDG opened in 1974 with Terminal 1 and an RER rail link to a central location, from where it was connected to the terminal by bus. Terminal 2 opened in stages and included a second rail station, which served TGV as well as RER services. In this respect the extended RER link is similar to the extended links described in Chapter 2 of this report, and the TGV link is similar to those described in Chapter 5. Also, future plans for CDG include the CDG Express, another rail link which will also serve the Terminal 2 RER/TGV station. However, this section describes the CDG VAL system, which connects the rail station to other areas of the airport, including Terminal 1. CDG Airport handled 63.8 million passengers in 2014 and has a rail mode share of around 28%. An initial system was installed using cable hauled technology, but this was not successful and was replaced by the rubber tyre/steel track VAL system, developed initially by Matra, now part of Siemens, which opened in The CDG VAL system has two elements. The system was funded by Aeroports de Paris and is free to use. The main route connects the Terminal 2 station to the original RER station (now called Roissy Pole) which also serves the low cost airline Terminal 3, and to Terminal 1, replacing the former bus link. A second VAL system connects Terminal 2E with the airside concourses L and M. In this example, the main peoplemover system was retrofitted to the terminal complex a long time after its initial opening, but this has undoubtedly helped the airport to obtain a relatively high rail share, especially at Terminal 1. The people-mover systems also play a key role in enabling passengers to transfer between the Terminals, and for staff and visitors to access parts of the airport. New York JFK New York's JFK Airport handled 53.3 million passengers in 2014 and has six major terminals developed over many years. Initially, access between the terminals was by bus. There has never been a direct rail access, but a 'Train to the Plane' bus link connected the Subway to the Airport until 1990, and other surface access was by bus, taxi and car, all of which suffered from traffic congestion. Various plans were considered for a 'one seat ride', including extensions from the Long Island Rail Road (LIRR) and the Subway, but the Airtrain 11

12 concept was chosen and opened in The project cost $1.9 billion and was part funded by a $4.50 per passenger facility charge which was challenged (unsuccessfully) by airlines. The system uses Bombardier steel wheel/steel rail automated trains powered by linear induction motors and has three elements. An inter terminal system enables passengers to transfer between the terminal. Two routes then join all the terminals with the LIRR and Subway at Jamaica and the Subway at Howard Beach, with intermediate stations serving rental car and parking locations. Airtrain is free to ride between the terminals and the car parks, and has a $5 fare for access to the rail stations. 12% of JFK passengers use Airtrain to the stations. The choice of a people-mover system for JFK was partly driven by the need for an inter terminal transfer system (also for rental car/car park locations), to replace the buses which were slow and added to congestion. Interchanging with the Subway or the LIRR is not as convenient as a 'one seat ride', but enables public transport to be provided to a range of downtown destinations. Miami Miami Airport handled 44.7 million passengers in The MIA Mover connects the airport terminals with Miami Central Station, from where TriRail and Metrorail services operate. The MIA Mover also links the terminals to the rental car area. The MIA Mover opened in 2011 and was funded by the Airport and the Florida Department of Transportation. It is free to use. The stations are at each end of the line, and the terminal station is centrally located, requiring a walk into each of the terminals. The disadvantage for rail users is therefore that the connection from the terminals to the station is long and involves some long walks. 12

13 Orlando The existing terminal area, with four airside satellites, is not currently connected to a rail link. The long term plan for expanding the airport is to create a new terminal area to the south, which will include a station for the All Aboard Florida regional rail link, the Sunrail commuter service, and will also be adjacent to rental car facilities. The whole complex will be connected to the existing terminal area by a people-mover system. Existing terminals and satellites Rail station and longer term terminals Summary of people-mover links People-mover links may be considered if an existing rail route is some distance from the location of the airport expansion. In particular, if the airport station is on a mainline through 13

14 railway, it may not be appropriate to have more than one airport station (which would mean longer journey times for non airport passengers), and a people-mover system can connect this one station with several terminals. Although they are not cheap, people-mover systems may be less expensive than building or moving heavy rail infrastructure to serve the expansion area, and they can also use much tighter geometry than heavy rail (curvature, gradient). By themselves, people-mover links may not be very attractive ways of getting from a station to a terminal but, if they serve more than one purpose (eg. for inter terminal transfers) they may be good value for money. They are normally funded by the airport and, while charging for their use can bring some revenue, it will also deter users, particularly if the ticketing arrangements are not integrated. 14

15 4. Extending a terminal around a station Three examples are described where the decision has been made to expand the terminal around the station, rather than build a separate terminal, which would then require an extension of the railway or a landside people-mover link Hong Kong Hong Kong was built as a two runway airport around a central terminal which includes a two level rail station, the station levels matching the respective levels in the terminal. This is one of the best passenger service layouts as it means that arriving and departing passengers do not mix and do not have to change levels. Having deposited passengers on the upper departure platform, the trains then proceed and reverse to enter the lower arrivals platform, A second terminal has been built 'back-to-back' with Terminal 1 to enable this split level arrangement to continue (with passengers disembarking the train on both sides) and is connected to the airside concourses by a people-mover system. Hong Kong's Airport Express Line is one of the most successful in the world, carrying 14.8 million passengers in 2014, representing around 22% of non-transfer air passengers. For the further expansion of the airport, a third runway is to be added to the north. An option was to build a third terminal to match the runway expansion, with an extension of the railway. However, the decision was taken to expand and reconfigure Terminal 2 and connect it to new airside concourses by a people-mover system. Again, this permits the split level rail station to continue and makes passenger decision making easier, as there is only one station. The train service will be able to accommodate the increased number of passengers by more frequent trains. 15

16 Oslo Oslo Airport's Flytoget rail link boasts one of the world's highest rail mode shares, used by around 47% of non-transfer passengers. The rail station is located centrally and the first terminal was built to one side such that, as the terminal is extended on the other side, the rail station serves both parts. The station was built with four platforms so that an increase in the number of trains is possible. Original terminal Rail station Terminal extension London Heathrow Heathrow has already been discussed in relation to the expansion from four to five terminals. The Airport has now been recommended for further expansion with a third runway, and this will include new terminals. The long term plan will see the terminals focused on the Eastern campus, currently the location of Terminals 2 and 3, and the Western campus, where a new terminal will be built 'back-to-back' with Terminal 5. A new airside concourse will occupy the space between the existing and new runways. Both the Eastern and Western Campus will be served by through rail stations. 16

17 New third runway Eastern campus Western campus Terminal 5 Given that Heathrow already has two major station locations (plus two other stations at Terminal 4 and Hatton Cross), the location of further terminals next to these existing major stations means that landside access is concentrated, and therefore much simpler in terms of rail operations and passenger wayfinding, compared with the alternative of another landside access point. However, it requires that the capacity of the stations is sufficient to accommodate the additional trains and passengers but, as noted in Chapter 2, an additional two platforms have been safeguarded by the construction of a box below the Western Campus. A very high quality of rail access will be required to meet the Airport's forecast of 26% of non transfer passengers and 12% of employees using rail in 2030, or a doubling of the number of rail passengers. 17

18 5. Adding a second railway As the airport grows, it may be appropriate to consider a second rail link, either to provide additional capacity, or a new route not served by the first link, or a choice of service type. A number of examples are discussed below, some of which have already been mentioned in earlier chapters. Milan Malpensa The extension of the existing rail link to Terminal 2 was discussed in Chapter 2, where is it was also noted that the extension was part of a project to provide wider links. In addition to the potential to provide links to other parts of Italy and Switzerland, the further extension also provides a number of options for creating links to other Milan stations, some of which could be faster than the existing route. Map of the possible railway routes linking Milano with Malpensa once implemented the rail link from the North (figures in Km) 15,35 7,35 Gallarate 3,40 MXP T2 8,00 MXP T1 Busto 9,10 5,60 Intersection RFI/FN Saronno 14,70 Junction between the branch line to Malpensa and the FN Saronno- Novara railway Legnano 30,00 28,45 14,10 28,00 Rho Junction with FN Saronno- Novara railway 5, MI Bovisa RFI Centrale Romentino junction with the HS line RFI P.ta Garibaldi FN Cadorna MILANO Barcelona El Prat Airport handled 37.6 million passengers in 2014 and has two terminals. Terminal 1 opened in 2009 and handles around 70% of passengers. Terminal 2 dates from 1968 and has a 2 trains per hour commuter rail service. Terminal 1 is linked by a shuttle bus to the Terminal 2 rail station. A new Metro line is being built to both terminals plus a stop at the cargo area. Construction of the first phase of this, including the airport stations and the line and 15 stations as far as Zona Universitaria, is now complete, with trial running under way and an expected start date for services in Although the Metro line will not initially serve the city centre direct, interchange with other Metro lines will enable wider connections to be made. 18

19 A third line is also being built, from Barcelona Sants, a major downtown station, to Terminal 1, giving a 19 minute journey. On completion in 2018, this will only serve Terminal 1, but an extension to Terminal 2 is to be added later. Munich 19 Munich Airport is 29 km from the centre of the city and opened in It handled 39.7 million passengers in The S8 S-Bahn line opened at the same time as the airport and a second S-Bahn route, S1, opened in The rail lines were built by MVV, the city and regional transport authority, with a 100 million contribution from the airport. The two lines take separate routes but both serve the Central Station, giving a train every 10 minutes and a journey time of minutes for a fare of The rail share of air passenger journeys is 31%. A plan was developed for a maglev link to the airport which would have reduced the connection time to 10 minutes. However, this project was scrapped by the Government in 2008 because of costs. Frankfurt Frankfurt Airport handled 59 million passengers in Terminal 1 opened in 1972 with a rail station serving both S Bahn and intercity trains. Terminal 2 opened in In 1999 a second rail station opened on a new high speed line between Frankfurt and Cologne, and the original station reverted to serving local and regional trains only. Both stations are directly connected to Terminal 1 and also to the AIRail terminal, which includes baggage

20 check in facilities. Some trains are operated as a code share with Lufthansa and others with through air-rail ticketing. The next stage of the Airport's development is the construction of Terminal 3, on land to the south of the airport, and due for completion in Initially, this will be connected to the rail station by a people-mover system, but the option remains for a new direct rail link Terminal 3. However, this will require significant changes to the rail network beyond the airport and is therefore not within the Airport's ability to provide. Heathrow Heathrow's rail links were discussed in Chapter 2 where it was noted that there are currently two, with plans for more. The Piccadilly Line was the first, opening in 1977, with Heathrow Express being added in A limited 2 trains per hour local service called Heathrow Connect, using the same route as Heathrow Express, began in The next major service, Crossrail, is due to start operations to the Airport in This will replace the Heathrow Connect service and will also use the same route as Heathrow Express, although it will operate (initially) at 4 trains per hour and the junction with the main line has been enhanced to provide additional capacity. More significantly, Crossrail trains will operate through London Paddington Station (the terminus of Heathrow Express and Heathrow Connect trains) to new underground stations in central London, The City and to the east of London. This will be a major enhancement to both the capacity (Crossrail trains will be 10 cars) and range of destinations and connections provided by Heathrow's rail links. Birmingham Birmingham Airport handled 9.7 million passengers in It is served by intercity, regional and local trains calling at Birmingham International Station, which is connected to the terminal by a short, cable-hauled, people-mover link. 20

21 The UK's plan for a high speed rail link from London to the Midlands and the North includes a station close to Birmingham Airport, called Birmingham Gateway, which will be connected to the terminal and the existing station by an enhanced people-mover system. This new line, to be completed in 2026, will significantly widen the Airport's catchment area. It will also be the focus of a major redevelopment area which will support the Airport's growth. Manchester Manchester Airport will also have a station on the HS2 network, currently planned for the second phase in The Airport handled 22 million passengers in 2014 and the initial heavy rail link opened in This has been enhanced by the construction of additional platforms at the Airport station and the operation of additional routes. However, in 2015, the Manchester Metrolink light rail line opened to the Airport. This takes a different route to the city from the heavy rail link, and serves residential areas where many airport staff live. The light rail link may also have a role in the development of the Airport City plan, possibly including a link to the high speed rail station. 21

22 Paris CDG The people-mover link at CDG was described in Chapter 2, along with the existing RER and TGV links. In addition to these, a dedicated express service, CDG Express, is now planned for completion in This will use a new route, partly alongside existing rail routes, and terminate at the Airport at a remodelled station at Terminal 2. The project is being developed jointly by AdP, SNCF and the regional transport authority STIF. The CDG Express will complement the existing RER and TGV services and improve penetration of rail in the air passenger market. Summary of additional rail links The examples discussed above are for additional links either to provide more capacity, or to widen the catchment area or market penetration. Although some use can be made of existing infrastructure, such links are often expensive because of the need for new construction. However, they provide significant benefits in terms of increased rail share. 22

23 6. Relocating the terminal to a railway This is perhaps the most radical solution to expanding an airport and providing a rail link at the same time. However, the examples discussed below demonstrate that it can be applied to small, medium and large airports. London Southend London Southend is a small airport handling around 1 million passengers a year, having grown from virtually nothing in The old terminal was not served by rail, so the decision was taken to build a new terminal in a location next to an existing rail line, where a new station was also built. The station is around 100 metres from the terminal entrance and the rail mode share is around 25%. Old terminal New terminal New rail station San Diego The story at San Diego is of an opportunity, not taken, to relocate the terminal at a rail station, and the current development plan for a people-mover link should perhaps be described in Chapter 3. The existing terminal area at San Diego is to the south of the runway, in a constrained area close to the environmentally sensitive harbour area. It is not served by rail and the road access is not high quality. The Airport does however own land to the north of the runway adjacent to a freeway, rail and transit corridor. There is not sufficient land to relocate all of the landside and airside activities to this northern area, and adjacent land is owned by the US military and is not available. However, there is still an opportunity to locate all of the landside facilities in the land north of the runway owned by the Airport, and to connect this to the airside gates by people-mover. However, the current plan is to provide only limited facilities to the north, including a transit centre, and connect these by a landside 23

24 people-mover to the existing airport terminals, which are to be redeveloped. Road access to this southern area will be improved. The plan has been selected because it is quicker to develop, and the need for expansion is urgent, but it clearly will not provide particularly good rail access, and is unlikely to achieve a rail mode share of more than a few percent. Land owned by Airport Freeway, rail and transit corridor Existing terminal New York EWR This is another opportunity situation, but one where long term decisions have not been taken. The concepts come from the New York Regional Plan Association, a well respected professional institute who were asked to review the future prospects for all of New York's airports in a 2011 study called 'Upgrading to World Class'. Newark has two close parallel runways and three main terminals, and is served by New Jersey Transit and Amtrak trains at Newark Liberty Airport station, connected to the terminals by the Newark Airtrain monorail. Newark Airport handles almost 40 million passengers and the rail mode share is around 5%. In order to provide space for a third parallel runway, one of the study's options is to demolish a major part of the existing terminals and relocate the terminal complex to the west, nearer or even next to the rail and transit corridor. This would indeed be a radical step but, as with the San Diego situation, the land to the west is not owned by the Airport and may not be available to acquire. However, the monorail is to be replaced as the technology is no longer supported, and the Port Authority, the Airport's owners, are also considering extending the Port Authority Trans Hudson (PATH) rail service to the Airport Station, so the opportunity remains to consider this radical plan to relocate the terminal complex next to the Station which would undoubtedly improve rail access and contribute to the achievement of a mode share which would be considered world class. 24

25 Rail and transit corridor Possible new terminal location Existing terminals Summary of relocating terminals to a railway The single example described above where this has happened is a very small airport, where the old terminal needed to be completely replaced, so it was obvious to build a new terminal in a location which would be served by rail. The other two examples are at much larger airports, where the investment in existing assets is very significant, so any decision to relocate is much more difficult. In addition, land acquisition may prevent an ideal location or sufficient space for a new terminal. It would also be right to comment that the latter two examples are from the US, where the idea of rail access to airports is not as developed as in Europe and Asia, and where the more common solution is to provide a landside peoplemover link between a rail station and a terminal. 25

26 7. Conclusions The examples discussed show that there are a number of ways of enabling rail access to be enhanced at a growing airport. A number of these not only provide the necessary additional capacity, but also an enhanced service which can increase rail made share. A summary of the advantages and disadvantages of the options is as follows: Type of link Advantages Disadvantages Extending the railway to a new terminal Straightforward May require additional rail capacity People-mover Can also serve inter-airport Requires interchange journeys Serves a single airport station on a through main line Extending a terminal around a station Least expensive rail cost Best customer service May need additional rail capacity Adding a second railway Provides additional capacity Most expensive rail cost and can widen catchment or increase penetration Relocating the terminal to a railway Least expensive rail cost Most expensive airport cost Local circumstances are often very significant in deciding between the options. In addition, the potential further development of the Airport and its rail services my influence a choice towards one which enables further extension later. 26

27 IARO s Air/Rail conferences and workshops Copies of the published reports of the earlier workshops and other research reports are available price 250 (free to IARO members). See Papers presented at more recent workshops are available on CD-ROM at the same price. Workshops are very focused, dealing in detail with a restricted number of key issues, and complement the regular Air Rail Conferences. Workshops and conferences (with site visits) have been held as follows Zürich Paris London (Heathrow Express, Stansted Express) Oslo (Airport Express Train) Hong Kong (Airport Express Line) - Frankfurt (with the AIRail station and the Cargo Sprinter) Workshop 1: Berlin (the Schönefeld link) - Copenhagen (the Øresund Link) Workshop 2: Milan (Malpensa Express) - Paris (plans for CDG Express) - Washington (Baltimore-Washington International Airport) Zürich airport: Air rail links - improving the partnership - Workshop 3: Madrid (and its airport rail links) - London Heathrow (Heathrow Express) Workshop 4: Amsterdam, for railways serving airports but not as their main job - Help - there s an airport on my railway. - New York (the Airtrain projects) Workshop 5: Barcelona. Today s design and funding issues for airport railways - Frankfurt (The AIRail project) - Workshop 6: Newark. Practical air rail intermodality Workshop 7: Oslo. Leisure passengers a market for airport railways Brussels (Thalys:Air France code-share) Chicago (Chicago s future in an era of successful air-rail intermodality) - Shanghai study tour - Workshop 8: Edinburgh. Security on airport railways Workshop 9: Baltimore (BWI). Security on airport railways. - Regional meeting 1: Stockholm - Workshop 10: Marketing and ticketing innovations (e-air-rail) Düsseldorf - Regional meeting 2: Kuala Lumpur Los Angeles: Air/Rail East/West - Baltimore: The seamless journey - Vienna (Wien): Communications October - London Gatwick. One-day conference on ticketing June - Hamburg, with site visit to the new S-Bahn - October - Vancouver: light rail to airports October - Lyon, with a site visit to the LesLYS express tram to the city - November/December - Far East study tour (with AREMA) 27

28 October - Venice September - Berlin July - Birmingham (high speed rail) - September - Gatwick (Branding) April - Dallas, Texas, (Airport stations) - June - Brussels (EU matters) - September - Stockholm (Which type of air rail link?) - November - London (Planning air rail links) April - Manchester (Airport City rail links) - June - Milan (Extending rail links at expanding airports) - October - Washington (North American best practice) Details are available from IARO, or on you can sign up for details of future events in different parts of the world on Future plans are, of course, subject to change. 28

IARO report Airport Rail Links in the Planning Stage

IARO report Airport Rail Links in the Planning Stage IARO report 21.15 Airport Rail Links in the Planning Stage The EuroCAREX cargo rail express network includes plans for links to several airports. 1 IARO Report 21.15: Airport Rail Links in the Planning

More information

IARO report The Last Mile: Connecting Stations to Airports

IARO report The Last Mile: Connecting Stations to Airports IARO report 25.17 The Last Mile: Connecting Stations to Airports London Luton Airport is planning a people mover from Luton Airport Parkway Station to the Airport 1 IARO Report 25.17: The Last Mile: Connecting

More information

Growing Size and Complexity Prof. Amedeo Odoni

Growing Size and Complexity Prof. Amedeo Odoni Growing Size and Complexity Prof. Amedeo Odoni Istanbul Technical University Air Transportation Management M.Sc. Program Airport Planning and Management Module 3 January 2016 Growing Size and Complexity

More information

Regional benefits of a major mobility hub at Toronto Pearson

Regional benefits of a major mobility hub at Toronto Pearson INFORMATION ONLY Date: October 16, 2017 Subject: Regional benefits of a major mobility hub at Toronto Pearson At the TTC Board meeting on October 16, 2017, staff from the Greater Toronto Airport Authority,

More information

Introduction to Airports and Their Characteristics Prof. Amedeo Odoni

Introduction to Airports and Their Characteristics Prof. Amedeo Odoni Introduction to Airports and Their Characteristics Prof. Amedeo Odoni Istanbul Technical University Air Transportation Management M.Sc. Program Air Transportation Systems and Infrastructure Module 3 May

More information

Birmingham Airport 2033

Birmingham Airport 2033 Over the next 15 years, we will expand and improve the Airport to maximise our potential as a single runway airport by investing 500 million in new development. Our plans take account of our forecasted

More information

Miami Orlando Passenger Rail Project Overview

Miami Orlando Passenger Rail Project Overview Miami Orlando Passenger Rail Project Overview 1 The Historical Significance of Florida East Coast Industries Henry Flagler transformed Florida when he built his railroad FEC Railway connected cities along

More information

Existing Conditions AIRPORT PROFILE Passenger Terminal Complex 57 air carrier gates 11,500 structured parking stalls Airfield Operations Area 9,000 North Runway 9L-27R 6,905 Crosswind Runway 13-31 5,276

More information

Chapter 12. HS2/HS1 Connection. Prepared by Christopher Stokes

Chapter 12. HS2/HS1 Connection. Prepared by Christopher Stokes Chapter 12 HS2/HS1 Connection Prepared by Christopher Stokes 12 HS2/HS1 CONNECTION Prepared by Christopher Stokes 12.1 This chapter relates to the following questions listed by the Committee: 3.1 Business

More information

TERMINAL DEVELOPMENT PLAN

TERMINAL DEVELOPMENT PLAN 5.0 TERMINAL DEVELOPMENT PLAN 5.0 TERMINAL DEVELOPMENT PLAN Key points The development plan in the Master Plan includes the expansion of terminal infrastructure, creating integrated terminals for international,

More information

Ground Access and Distribution Prof. Richard de Neufville

Ground Access and Distribution Prof. Richard de Neufville Ground Access and Distribution Prof. Richard de Neufville Istanbul Technical University Air Transportation Management M.Sc. Program Airport Planning and Management / RdN Airport Planning and Management

More information

KEFLAVÍK AIRPORT FROM A STROLL THROUGH CENTRAL PARK TO A SEAT ON THE LONDON EYE FACTS AND FIGURES 2017

KEFLAVÍK AIRPORT FROM A STROLL THROUGH CENTRAL PARK TO A SEAT ON THE LONDON EYE FACTS AND FIGURES 2017 N 51 30 15.5052 W 0 4 34.2336 FROM A STROLL THROUGH CENTRAL PARK Wake up in New York and drink your morning coffee at the park before you get to work. TO A SEAT ON THE LONDON EYE Enjoy in the evening a

More information

MODAIR. Measure and development of intermodality at AIRport

MODAIR. Measure and development of intermodality at AIRport MODAIR Measure and development of intermodality at AIRport M3SYSTEM ANA ENAC GISMEDIA Eurocontrol CARE INO II programme Airports are, by nature, interchange nodes, with connections at least to the road

More information

Miami Orlando Passenger Rail Project Overview

Miami Orlando Passenger Rail Project Overview Miami Orlando Passenger Rail Project Overview 1 The Historical Significance of Florida East Coast Industries Henry Flagler transformed Florida when he built his railroad FEC Railway connected cities along

More information

Appendix 12. HS2/HS1 Connection. Prepared by Christopher Stokes

Appendix 12. HS2/HS1 Connection. Prepared by Christopher Stokes Appendix 12 HS2/HS1 Connection Prepared by Christopher Stokes 12 HS2/HS1 CONNECTION Prepared by Christopher Stokes Introduction 12.1 This appendix examines the business case for through services to HS1,

More information

Airport development within VINCI

Airport development within VINCI Airport development within VINCI 1 The airport sector: a development goal since 1995 VINCI Concessions: a portfolio of outstanding airport concessions 22 airports in Mexico 2 airports in Cambodia: Phnom

More information

International Air Connectivity for Business. How well connected are UK airports to the world s main business destinations?

International Air Connectivity for Business. How well connected are UK airports to the world s main business destinations? International Air Connectivity for Business How well connected are UK airports to the world s main business destinations? 1 Summary Air transport provides the international connectivity the country needs

More information

Travelling to Liverpool

Travelling to Liverpool Travelling to Liverpool 1 2 International Airports within 45 minutes of Liverpool City Centre 226 Destinations Domestic Non EU EU 25 50 100 150 250 27.4 million passengers per year = 4 million 77 airlines

More information

TABLE OF CONTENTS. Scheduling Limits 2. Air Transport Movements 3. Total Seats and Seats per Movement 4. Airline Analysis 5.

TABLE OF CONTENTS. Scheduling Limits 2. Air Transport Movements 3. Total Seats and Seats per Movement 4. Airline Analysis 5. HEATHROW WINTER 211/12 Start of Season Report KEY STATISTICS Air Transport Movements -.4% Total Seats -1.1% Seats per Air Transport Movement -.7% TABLE OF CONTENTS Page Scheduling Limits 2 Air Transport

More information

Airport Characteristics: Part 2 Prof. Amedeo Odoni

Airport Characteristics: Part 2 Prof. Amedeo Odoni Airport Characteristics: Part 2 Prof. Amedeo Odoni Istanbul Technical University Air Transportation Management M.Sc. Program Air Transportation Systems and Infrastructure Module 4 May 25, 2015 Outline

More information

Airport Characteristics. Airport Characteristics

Airport Characteristics. Airport Characteristics Airport Characteristics Amedeo R. Odoni September 5, 2002 Airport Characteristics Objective To provide background and an overview on the diversity of airport characteristics Topics Discussion of geometric

More information

DEVELOPMENT OF TOE MIDFIELD TERMINAL IROJECT CAPACITY ENHANCEMENT REPORT DEPARTMENT OF AVIATION TOM FOERSTER CHAIRMAN BARBARA HAFER COMMISSIONER

DEVELOPMENT OF TOE MIDFIELD TERMINAL IROJECT CAPACITY ENHANCEMENT REPORT DEPARTMENT OF AVIATION TOM FOERSTER CHAIRMAN BARBARA HAFER COMMISSIONER PETE FLAHERTY COMMISSIONER TOM FOERSTER CHAIRMAN DEPARTMENT OF AVIATION BARBARA HAFER COMMISSIONER STEPHEN A. GEORGE DIRECTOR ROOM M 134, TERMINAL BUILDING GREATER PITTSBURGH INTERNATIONAL AIRPORT PITTSBURGH,

More information

Ronan Delaney. DELANEY_RONAN_AVIATION_JUN_2018.DOCX

Ronan Delaney.   DELANEY_RONAN_AVIATION_JUN_2018.DOCX Ronan Delaney Profession Structural Engineer Current Position Associate Principal Global Aviation Skills Leader Joined Arup 1988 Years of Experience 25+ Nationality Irish Qualifications Bsc (Eng), Dip

More information

Railways and Air Transport

Railways and Air Transport eature Railways and Air Transport Heathrow Express Paul Le Blond Famous for 15 Minutes In 15 minutes every 15 minutes is the slogan of the new Heathrow Express rail link between Heathrow Airport, the world

More information

Larry Leung. Anthony Loui

Larry Leung. Anthony Loui Larry Leung Director Experience The Skies Anthony Loui Community Planner Federal Transit Administration, United States Department of Transportation Improving Intermodal Connectivity and Access at Airports

More information

Airline Code-shares and Competition

Airline Code-shares and Competition Peter Wiener Associate Steer Davies Gleave Infraday Conference Berlin, October 2007 October 2007 Steer Davies Gleave 28-32 Upper Ground London, SE1 9PD, UK +44 (0)20 7919 8500 www.steerdaviesgleave.com

More information

Aviation Workshop F. Goldnadel COO and Managing Director of Paris-CDG airport F. Mereyde Director of Paris-Orly airport

Aviation Workshop F. Goldnadel COO and Managing Director of Paris-CDG airport F. Mereyde Director of Paris-Orly airport Aviation Workshop 2016-2020 F. Goldnadel COO and Managing Director of Paris-CDG airport F. Mereyde Director of Paris-Orly airport A successful airport system... optimised and more competitive Investors

More information

Submission to the Airports Commission

Submission to the Airports Commission Submission to the Airports Commission Greengauge 21 February 2013 www.greengauge21.net 1 1. Introduction Greengauge 21 is a not for profit company established to promote the debate and interest in highspeed

More information

Sunshine Coast Airport Master Plan September 2007

Sunshine Coast Airport Master Plan September 2007 Sunshine Coast Airport Master Plan September 2007 Contents CONTENTS... I ACKNOWLEDGEMENT... II DISCLAIMER... III 1 EXECUTIVE SUMMARY...IV 1 INTRODUCTION... 1 2 AVIATION DEMAND FORECAST... 5 3 AIRCRAFT

More information

The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands.

The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands. The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands. Connecting People Building Opportunities 198 Brisbane Airport Corporation CHAPTER 10

More information

Denver International Airport Opportunities for Business

Denver International Airport Opportunities for Business Denver International Airport Opportunities for Business Presented to The DIA Way Small Business Opportunities Forum by Kim Day, Manager of Aviation August 31, 2009 1 Presentation Outline An Overview of

More information

Heathrow Consultation January March 2018

Heathrow Consultation January March 2018 A briefing from HACAN Heathrow Consultation January March 2018 Heathrow launched its biggest ever consultation on 17 th January. It closes on 28 th March. In reality, it is two consultations running in

More information

How Rail, Terminal Design and Aeronautics All Combine Together: A Real Life Case Study

How Rail, Terminal Design and Aeronautics All Combine Together: A Real Life Case Study How Rail, Terminal Design and Aeronautics All Combine Together: A Real Life Case Study A Presentation to the The American Institute of Aeronautics and Astronautics by Matthew A. Coogan Principal Investigator,

More information

Response to the London Heathrow Airport Expansion Public Consultation

Response to the London Heathrow Airport Expansion Public Consultation Response to the London Heathrow Airport Expansion Public Consultation Summary This report sets out the response to the Heathrow Airport s consultation on airport expansion and airspace change. The consultation

More information

5 Rail demand in Western Sydney

5 Rail demand in Western Sydney 5 Rail demand in Western Sydney About this chapter To better understand where new or enhanced rail services are needed, this chapter presents an overview of the existing and future demand on the rail network

More information

CONCESSIONS FUTURE OPPORTUNITIES

CONCESSIONS FUTURE OPPORTUNITIES CONCESSIONS FUTURE OPPORTUNITIES MARCH 14 & 15, 2019 COLORADO S STRONG ECONOMY 2 ABOVE AVERAGE GROWTH 3 19 FORTUNE 1000 COMPANIES Fortune 1000 Companies & Major Relocations and Expansions into Metropolitan

More information

Brussels Airport Airline Issues & Route Development Breakout session 18 June

Brussels Airport Airline Issues & Route Development Breakout session 18 June Brussels Airport Airline Issues & Route Development Breakout session 18 June Léon Verhallen, Head of Aviation Marketing Geert Van Dessel, manager Aviation Marketing Brussels Airport: The Heart of Europe

More information

FLL Master Plan Update BOARD OF COUNTY COMMISSIONERS BRIEFING

FLL Master Plan Update BOARD OF COUNTY COMMISSIONERS BRIEFING (PRELIMINARY DRAFT) WORK IN PROGRESS - FOR DISCUSSION PURPOSES ONLY FLL Master Plan Update BOARD OF COUNTY COMMISSIONERS BRIEFING May 15, 2018 Master Plan Schedule Overview Progress Since Last Master Plan

More information

1. Explain the purpose of the study. 2. How it was undertaken

1. Explain the purpose of the study. 2. How it was undertaken 1. Explain the purpose of the study 2. How it was undertaken 3. Present some specific research & proposals Community forums Runway schemes Night flight restrictions Other examples 4. Answer any questions

More information

THE AIRTRAIN AIRPORT ACCESS SYSTEM JOHN F. KENNEDY INTERNATIONAL AIRPORT AIRPORT ACCESS SERVICE

THE AIRTRAIN AIRPORT ACCESS SYSTEM JOHN F. KENNEDY INTERNATIONAL AIRPORT AIRPORT ACCESS SERVICE THE AIRTRAIN AIRPORT ACCESS SYSTEM JOHN F. KENNEDY INTERNATIONAL AIRPORT AIRPORT ACCESS SERVICE The JFK AirTrain airport access system interfaces with two existing regional transit systems; the Long Island

More information

Entry of Low-Cost-Airlines in Germany - Some Lessons for the Economics of Railroads and Intermodal Competition -

Entry of Low-Cost-Airlines in Germany - Some Lessons for the Economics of Railroads and Intermodal Competition - Entry of Low-Cost-Airlines in Germany - Some Lessons for the Economics of Railroads and Intermodal Competition - Juergen Antes Deutsche Bahn Strategic Network Management Guido Friebel University of Toulouse

More information

Airport Collaborative Decision Making Michael Hoehenberger, (Munich Airport) on behalf of ACI World

Airport Collaborative Decision Making Michael Hoehenberger, (Munich Airport) on behalf of ACI World A-CDM Seminar Bahrain, 11-13 October 2015 The ACI View Airport Collaborative Decision Making Michael Hoehenberger, (Munich Airport) on behalf of ACI World SCOPE OF PRESENTATION Need for A-CDM What it is

More information

TfL Planning. 1. Question 1

TfL Planning. 1. Question 1 TfL Planning TfL response to questions from Zac Goldsmith MP, Chair of the All Party Parliamentary Group on Heathrow and the Wider Economy Heathrow airport expansion proposal - surface access February

More information

Airline Marketing Brussels Airport Léon Verhallen, Head of Airline Business Development

Airline Marketing Brussels Airport Léon Verhallen, Head of Airline Business Development Airline Marketing Brussels Airport Léon Verhallen, Head of Airline Business Development MAp Reverse Roadshow, June 2007 Top 25 European Passenger Airports Primary gateways O&D leisure & LCC Secondary gateways

More information

Aviation fuelling at its best

Aviation fuelling at its best Aviation fuelling at its best Welcome to Skytanking Into-Plane Fuelling Storage & Hydrant Management Investment Projects Engineering Skytanking is a specialist, independent aviation fuelling company providing

More information

No Hard Analysis. A critique by HACAN of the recently-published

No Hard Analysis. A critique by HACAN of the recently-published No Hard Analysis A critique by HACAN of the recently-published report, Aviation Services and the City, the City of London commissioned from York Aviation consultants about the aviation needs of the City.

More information

Plugging the greater Midlands region into global wealth

Plugging the greater Midlands region into global wealth Plugging the greater Midlands region into global wealth A great airport for a great city Birmingham Airport will be at the centre of a network of great airports delivering aviation capacity and connectivity

More information

Update on the Thameslink programme

Update on the Thameslink programme A picture of the National Audit Office logo Report by the Comptroller and Auditor General Department for Transport Update on the Thameslink programme HC 413 SESSION 2017 2019 23 NOVEMBER 2017 4 Key facts

More information

FUTURE PASSENGER PROCESSING. ACRP New Concepts for Airport Terminal Landside Facilities

FUTURE PASSENGER PROCESSING. ACRP New Concepts for Airport Terminal Landside Facilities FUTURE PASSENGER PROCESSING ACRP 07-01 New Concepts for Airport Terminal Landside Facilities In association with: Ricondo & Associates, TransSolutions, TranSecure RESEARCH Background Research Objective

More information

EAST WEST RAIL EASTERN SECTION. prospectus for growth

EAST WEST RAIL EASTERN SECTION. prospectus for growth EAST WEST RAIL EASTERN SECTION prospectus for growth September 2018 executive summary The East West Rail Consortium, a partnership of local authorities, rail operators and Network Rail, continues to promote

More information

SouthwestFloridaInternational Airport

SouthwestFloridaInternational Airport SouthwestFloridaInternational Airport SouthwestFloridaInternationalAirportislocatedinLee CountyalongtheGulfCoastofSouthFlorida,tenmiles southeastofthefortmyerscentralbusinessdistrict. Theprimaryhighwayaccesstotheairportfrom

More information

Summary Delivery Plan Control Period 4 Delivery Plan More trains, more seats. Better journeys

Summary Delivery Plan Control Period 4 Delivery Plan More trains, more seats. Better journeys Summary Delivery Plan Control Period 4 Delivery Plan 2009 More trains, more seats Better journeys Network Rail aims to deliver a railway fit for the 21st century. Over the next five years (Control Period

More information

Current and Forecast Demand

Current and Forecast Demand Existing Facilities Jacksonville International Airport (JIA) is served by a number of airside and landside facilities. There are two runways that serve the airport in an open V configuration. The Annual

More information

LSG Sky Chefs at InnoTrans Join us on a journey to new horizons

LSG Sky Chefs at InnoTrans Join us on a journey to new horizons LSG Sky Chefs at InnoTrans 2014 0 Join us on a journey to new horizons AGENDA 1. WHO WE ARE 2. OUR JOURNEY TO NEW HORIZONS 3. NEW PARTNERSHIP WITH NTV 1 Join us on a journey to new horizons WHO WE ARE

More information

LAX Specific Plan Amendment Study (SPAS) Final EIR and Related Actions. Board of Airport Commissioners February 5, 2013

LAX Specific Plan Amendment Study (SPAS) Final EIR and Related Actions. Board of Airport Commissioners February 5, 2013 LAX Specific Plan Amendment Study (SPAS) Final EIR and Related Actions Board of Airport Commissioners February 5, 2013 1 Background The LAX Master Plan Program serves as the airport s long range development

More information

STRATEGIC INVESTMENT IN MANCHESTER AIRPORT

STRATEGIC INVESTMENT IN MANCHESTER AIRPORT Report To: EXECUTIVE CABINET Date: 7 February 2018 Cabinet Deputy/Reporting Officer: Subject: Report Summary: Cllr Bill Fairfoull Executive Member (Finance & Performance) Tom Wilkinson, Assistant Director

More information

Multi-modal Integration and the Collaborative Economy

Multi-modal Integration and the Collaborative Economy to be updated in Q1-2019 Multi-modal Integration and the Collaborative Economy February 2017 bringing a world of experience to the airport industry Author: Curtis Grad 1 The Objective To explore the challenges,

More information

BUSINESS INTELLIGENCE Airport Retail Study May 2007

BUSINESS INTELLIGENCE Airport Retail Study May 2007 BUSINESS INTELLIGENCE Airport Retail Study May 2007 The pursuit of knowledge Last month Moodie International acquired the assets of acclaimed business intelligence title The Airport Retail Study from its

More information

Destination Lindbergh

Destination Lindbergh Technical Appendix 16 Destination Lindbergh Appendix Contents Destination Lindbergh... TA 16-2 2050 Regional Transportation Plan Destination Lindbergh Destination Lindbergh is a comprehensive planning

More information

Massport. Airline Route Development at Boston Logan

Massport. Airline Route Development at Boston Logan Massport Airline Route Development at Boston Logan Presentation to MLA: July 13, 2017 Airline Route Development is a Core Element of Massport s Mission Enhance the economic growth in Massachusetts and

More information

Night Flights at Heathrow. questions and answers

Night Flights at Heathrow. questions and answers Night Flights at Heathrow questions and answers Night flights: the present position at Heathrow night is defined by government as 11pm 7am, but the night quota only runs from 11.30pm 6am (it is only during

More information

Bringing a world of experience to the airport industry. Multi-modal Integration and the rise of the collaborative economy

Bringing a world of experience to the airport industry. Multi-modal Integration and the rise of the collaborative economy Multi-modal Integration and the rise of the collaborative economy Bringing a world of experience to the airport industry March 2016 The Objective To explore the challenges, opportunities, success stories

More information

Düsseldorf Airport and its Significance for the Region

Düsseldorf Airport and its Significance for the Region Fact sheet April 2018 Düsseldorf Airport and its Significance for the Region All over the world, large airports are catalysts for regional growth. They mean quick access to the local economy for the world

More information

Measure 67: Intermodality for people First page:

Measure 67: Intermodality for people First page: Measure 67: Intermodality for people First page: Policy package: 5: Intermodal package Measure 69: Intermodality for people: the principle of subsidiarity notwithstanding, priority should be given in the

More information

Passenger Facility Charge (PFC) Program: Eligibility of Ground Access Projects Meeting

Passenger Facility Charge (PFC) Program: Eligibility of Ground Access Projects Meeting This document is scheduled to be published in the Federal Register on 05/03/2016 and available online at http://federalregister.gov/a/2016-10334, and on FDsys.gov [ 4910-13] DEPARTMENT OF TRANSPORTATION

More information

Wokingham Borough Council Response to the Consultation on the Draft Airports National Policy Statement

Wokingham Borough Council Response to the Consultation on the Draft Airports National Policy Statement Wokingham Borough Council Response to the Consultation on the Draft Airports National Policy Statement The consultation Draft Airports National Policy Statement (Draft NPS) sets out Government s policy

More information

Ian Allan Newsletter April 2017

Ian Allan Newsletter April 2017 Ian Allan Newsletter April 2017 Follow us on Twitter! www.twitter.com/ianallantravel Keep up to date with all the latest news www.ianallantravel.com/latest-news Air France A Unique Experience between London

More information

High-Speed Rail Inquiry

High-Speed Rail Inquiry High-Speed Rail Inquiry Evidence from HACAN HACAN is the well-established organisation which represents residents under the Heathrow flight paths. www.hacan.org.uk There is evidence that high-speed rail

More information

Cargo Market & Turkish Cargo. Network & Fleet. Products Development and Future Plans

Cargo Market & Turkish Cargo. Network & Fleet. Products Development and Future Plans Turkish Airlines & Turkish Cargo in Brief Cargo Market & Turkish Cargo Network & Fleet Products Development and Future Plans Turkish Airlines & Turkish Cargo in Brief Cargo Market & Turkish Cargo Network

More information

4 Transport projects underway in Western Sydney

4 Transport projects underway in Western Sydney 4 Transport projects underway in Western Sydney About this chapter This chapter provides an overview of the Australian and NSW government s significant investments in road, bus and rail infrastructure

More information

Paris: Tuesday 10 & Wednesday 11 April 2018

Paris: Tuesday 10 & Wednesday 11 April 2018 15 th IARO Workshop Paris: Tuesday 10 & Wednesday 11 April 2018 A Dedicated Workshop offering participants the opportunity to learn more about the CDG Express Project and to share best-practice trends

More information

Northern Beaches Transport Action Plan

Northern Beaches Transport Action Plan Northern Beaches Transport Action Plan The NSW Government is taking action now to deliver transport improvements for the Northern Beaches, as well as planning for the future growth of the area. $633 million

More information

Passenger Flows Zurich Airport. July to November 2011

Passenger Flows Zurich Airport. July to November 2011 Passenger Flows Zurich Airport July to November 2011 Table of Contents Preface 3 Spatial distribution of passenger types 4 Graphics 5 Detailed information on gates 9 1.1. Bus Gates A01 - A10 9 1.2. Bus

More information

HIGH SPEED UK. ..connecting in London. Colin Elliff BSc CEng MICE. Quentin Macdonald BSc(Eng) CEng FIRSE MIET Systems Engineering Principal, HSUK

HIGH SPEED UK. ..connecting in London. Colin Elliff BSc CEng MICE. Quentin Macdonald BSc(Eng) CEng FIRSE MIET Systems Engineering Principal, HSUK HIGH SPEED UK..connecting in London Colin Elliff BSc CEng MICE Civil Engineering Principal, Quentin Macdonald BSc(Eng) CEng FIRSE MIET Systems Engineering Principal, www.highspeeduk.co.uk HS2+3 GL EH GL

More information

Slots. The benefits of strategic slot management. Richard Matthews Slot strategy & scheduling manager. 8 th March 2013

Slots. The benefits of strategic slot management. Richard Matthews Slot strategy & scheduling manager. 8 th March 2013 Slots The benefits of strategic slot management Richard Matthews Slot strategy & scheduling manager 8 th March 2013 1 Strategy to drive growth and returns Leverage easyjet s cost advantage, leading market

More information

Airport Planning and Terminal Design

Airport Planning and Terminal Design Airport Planning and Terminal Design Major Terminal Design Considerations Passenger Terminal Configuration Passenger Terminal Concepts Major Design Considerations 1 Terminal Configuration Centralised processing

More information

The SESAR contribution to the near and mid term Safety

The SESAR contribution to the near and mid term Safety The SESAR contribution to the near and mid term Safety Final Optics Dissemination Event 12-13 June 2017 Pierre ANDRIBET R&D and SESAR Contribution Manager EUROCONTROL Directorate Air Traffic Management

More information

Forest Hill Society response to the draft London and South East Route Utilisation Strategy (February 2011)

Forest Hill Society response to the draft London and South East Route Utilisation Strategy (February 2011) Forest Hill Society response to the draft London and South East Route Utilisation Strategy (February 2011) 1. The Forest Hill Society represents residents in and around the Forest Hill and Honor Oak Park

More information

Chapter 11. Links to Heathrow. Prepared by Christopher Stokes

Chapter 11. Links to Heathrow. Prepared by Christopher Stokes Chapter 11 Links to Heathrow Prepared by Christopher Stokes 11 LINKS TO HEATHROW Prepared by Christopher Stokes 11.1 This submission relates to the following questions listed by the Committee: 2.3 Implications

More information

Airport Slot Capacity: you only get what you give

Airport Slot Capacity: you only get what you give Airport Slot Capacity: you only get what you give Lara Maughan Head Worldwide Airport Slots 12 December 2018 Good afternoon everyone, I m Lara Maughan head of worldwide airports slots for IATA. Over the

More information

Aviation, Rail, & Trucking 6-1

Aviation, Rail, & Trucking 6-1 6-1 This chapter describes the services, facilities, and condition of air, rail, and trucking as components of the transportation system. These three intermodal areas have an impact on the factors to be

More information

Rethinking Global City Competitiveness. Jeremy Kelly, Global Research, JLL 7 th June 2018

Rethinking Global City Competitiveness. Jeremy Kelly, Global Research, JLL 7 th June 2018 Rethinking Global City Competitiveness Jeremy Kelly, Global Research, JLL 7 th June 2018 A new language of city competitiveness Source: JLL!3 A new language of city competitiveness technology diversity

More information

TRBUSINESS. It was also driven by an increase of long-haul destinations, and expanded short haul networks.

TRBUSINESS. It was also driven by an increase of long-haul destinations, and expanded short haul networks. Manchester Airports Group (MAG) which owns Manchester, London Stansted, and East Midlands airports and manages Escape Lounges in the US under its MAG USA arm, says that passenger growth drove an 11.2%

More information

Airport Landside Mobility APM Implementation Issues. David D. Little, A.I.C.P 1 and Liam Gaffney 2

Airport Landside Mobility APM Implementation Issues. David D. Little, A.I.C.P 1 and Liam Gaffney 2 Airport Landside Mobility APM Implementation Issues David D. Little, A.I.C.P 1 and Liam Gaffney 2 1 Associate Principal, Lea+Elliott, Inc., 14325 Willard Road, Suite 200, Chantilly, Virginia, 20151-2110;

More information

2011 Global Supply Benchmarking Research and Analysis

2011 Global Supply Benchmarking Research and Analysis 2011 Global Supply Benchmarking Research and Analysis Through the first quarter of 2011, companies have begun to reinvest in corporate travel with a continuing focus on cost control and efficiency. Based

More information

East West Rail Consortium

East West Rail Consortium East West Rail Consortium EWR Wider Economic Case: Refresh 18 th November 2015 Rupert Dyer Rail Expertise Ltd Rail Expertise Ltd. Tel: 01543 493533 Email: info@railexpertise.co.uk 1 Introduction 1.1 The

More information

LAX Specific Plan Amendment Study (SPAS) Update. December 3, 2012

LAX Specific Plan Amendment Study (SPAS) Update. December 3, 2012 LAX Specific Plan Amendment Study (SPAS) Update December 3, 2012 Response to the Draft Environmental Impact Report Draft EIR Release and Public Comment Official Comment Period was July 27, 2012 through

More information

A THIRD RUNWAY AT HONG KONG INTERNATIONAL AIRPORT IS CRUCIAL TO HONG KONG S ECONOMIC FUTURE

A THIRD RUNWAY AT HONG KONG INTERNATIONAL AIRPORT IS CRUCIAL TO HONG KONG S ECONOMIC FUTURE A THIRD RUNWAY AT HONG KONG INTERNATIONAL AIRPORT IS CRUCIAL TO HONG KONG S ECONOMIC FUTURE Cathay Pacific firmly believes that a third runway at Hong Kong International Airport (HKIA) is a vital component

More information

Multi-Airport Systems in Era of Low-Cost Carriers. Dr. Richard de Neufville

Multi-Airport Systems in Era of Low-Cost Carriers. Dr. Richard de Neufville Multi-Airport Systems in Era of Low-Cost Carriers Dr. Richard de Neufville Professor of Systems Engineering and of Civil and Environmental Engineering Massachusetts Institute of Technology Theme No-frills

More information

Airports Commission. Discussion Paper 04: Airport Operational Models. Response from the British Air Transport Association (BATA) June 2013

Airports Commission. Discussion Paper 04: Airport Operational Models. Response from the British Air Transport Association (BATA) June 2013 Airports Commission Discussion Paper 04: Airport Operational Models Response from the British Air Transport Association (BATA) June 2013 Introduction The British Air Transport Association (BATA) welcomes

More information

-1- Company Presentation Flughafen Wien AG Results 2007

-1- Company Presentation Flughafen Wien AG Results 2007 -1- Company Presentation Flughafen Wien AG Results 2007 March 2008 -2- Content 1. Highlights 2007 2. Financial Results 2007 and Investments 3. Results by Segment 4. Traffic Results 5. Strategy 6. International

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: November 18, 2013 SUBJECT: YONGE-EGLINTON AND EGLINTON WEST INTERCHANGE STATIONS METROLINX EGLINTON CROSSTOWN LIGHT RAIL TRANSIT PROJECT

More information

WHY INVEST IN 25HOURS. AccorHotels Global Development August 2018

WHY INVEST IN 25HOURS. AccorHotels Global Development August 2018 WHY INVEST IN 25HOURS AccorHotels Global Development August 2018 25hours hotels key figures >80% occupancy on group level ~40% +3 of overall revenue coming from food and beverages hotel openings in the

More information

ICELANDAIR. + icelandair.com

ICELANDAIR. + icelandair.com ICELANDAIR + icelandair.com OVER 80 YEARS OF EXPERIENCE Icelandair is an Icelandic airline with decades of experience under its belt. Iceland s unique position in the middle of the Atlantic makes it the

More information

CHAPTER 4: ALTERNATIVES

CHAPTER 4: ALTERNATIVES MSP Long Term Comprehensive Plan Update Metropolitan Airports Commission 4.1 INTRODUCTION CHAPTER 4: ALTERNATIVES Several alternatives were developed and evaluated based on their capability to meet the

More information

Chapter 4 Route Window NE3 Manor Park station. Transport for London

Chapter 4 Route Window NE3 Manor Park station. Transport for London Chapter 4 Route Window NE3 Manor Park station MANOR PARK STATION 4 Route Window NE3 Manor Park station 4.7 Highway access to Manor Park station is very good. A117 Station Road connects with A116 to the

More information

Airport Rail Links - A Post Audit. by David Ashley, Sinclair Knight Merz. (given at 5 th Annual Queensland Transport Infrastructure Conference, 2002)

Airport Rail Links - A Post Audit. by David Ashley, Sinclair Knight Merz. (given at 5 th Annual Queensland Transport Infrastructure Conference, 2002) Airport Rail Links - A Post Audit by David Ashley, Sinclair Knight Merz (given at 5 th Annual Queensland Transport Infrastructure Conference, 2002) Introduction Interest in airport access improvement arises

More information

Manchester Airports Group

Manchester Airports Group Manchester Airports Group WHO ARE WE? MAG is a leading UK based airport company, which owns and operates Manchester, London Stansted and East Midlands airports. MAG is privately managed on behalf of its

More information

AUCKLAND $1.2 BILLION $1.9 BILLION $149 MILLION 15% SPEND $5.7 BILLION

AUCKLAND $1.2 BILLION $1.9 BILLION $149 MILLION 15% SPEND $5.7 BILLION AUCKLAND AUCKLAND $5.7 BILLION FORECAST TOTAL AUCKLAND INVESTMENT The next 10 years are expected to underline Auckland s performance as the fastest growing major city in Australasia. The city is expected

More information

Airport Planning Area

Airport Planning Area PLANNING AREA POLICIES l AIRPORT Airport Planning Area LOCATION AND CONTEXT The Airport Planning Area ( Airport area ) is a key part of Boise s economy and transportation network; it features a multi-purpose

More information