The SESAR contribution to the near and mid term Safety
|
|
- Eugenia Lawrence
- 5 years ago
- Views:
Transcription
1 The SESAR contribution to the near and mid term Safety Final Optics Dissemination Event June 2017 Pierre ANDRIBET R&D and SESAR Contribution Manager EUROCONTROL Directorate Air Traffic Management
2 THE NEED FOR PERFORMANCE 2
3 SESAR 2020 Safety performance ambition Improving Safety by a factor of 3-4 Enabling to handle 2 times more traffic GOAL Total number of ATM-induced accidents and serious or risk bearing incidents would not increase despite traffic growth 3
4 SAFETY IN SESAR PROJECTS Projects with a Safety Focus Projects that target KPAs other than safety Safety Benefit Safety Benefit Impact on other KPAs Capacity, environmental, accessibility,. Capacity Environmental Need to consider impact on safety 4 Safety Neutral? Safety Neutral?
5 The SESAR Safety reference Material Broader Safety Approach Risk Modelling System Engineering HF integration in Safer design 5
6 SESAR 1 changes making us safer Examples Departure En-route Arrival - Sol#10 Optimised route network using A-RNP - Sol#55 GBAS Guided T/O in LVC - Sol#27 MTCD & conformance monitoring tool - Sol#105 Enhanced ACAS - Sol#10 Optimised route network using A-RNP - Sol#103 APV-SBAS - Sol#60 & 69: Enhanced STCA - Sol#55 GBAS CAT-III - Sol#64 Time Based Separation Network strategic - Sol#31 Dynamic airspace configuration - Sol#17 Advanced short-term ATFCM measures 6 Airport - Sol#1 RWSL - Sol#2 CMAC & CATC - Sol#4 Alerts to VD Traffic
7 SESAR Sol#2 Conflicting ATC Clearances (CATC) Example of a safety driven SESAR 1 Solution Automatically detecting Conflicting ATC Clearances Concept based on a supporting tool for the Tower Runway Controller The detection of CATC is applied to all mobiles under ATC control on the runway area (CATC on Aprons and Taxiways will be studied in S2020) 7
8 CATC Overview Cleared to Land 8 Conflicting ATC Clearances ALERT Cleared to Line-Up In total there are 16 different CATC situations that can be detected taking into account the clearances: Land, Take Off, Cross, Enter and Line Up.
9 CATC a solution to reduce the number of Runway Incursions A solution designed to reduce by 5% the number of Runway incursions A solution supporting the compliance of EC performance scheme Regulation Relevant to the runway incursions Safety Performance Indicators. 9
10 CATC in PCP Pilot Common Project (PCP) EU N 716/2014 defining the implementation of the six first ATM functionalities Conflicting ATC Clearances PCP ATM Functionality 2 (AF2) Airport Integration and Throughput l CATC within PCP AF2.5 Airport Safety Net 10 10
11 CATC PCP Geographical scope Brussels National Amsterdam Schiphol Oslo Gardermoen Copenhagen Kastrup Stockholm-Arlanda Dublin Manchester Ringway London-Stansted London-Heathrow London-Gatwick Berlin Brandenburg Airport Düsseldorf International Frankfurt International Munich Franz Josef Strauss Paris-CDG, Paris-Orly Nice Cote d'azur Zurich Kloten Vienna Schwechat Madrid-Barajas Palma De Mallorca Barcelona El Prat Implementation date before 01 January Milan-Malpensa Rome-Fiumicino 11
12 SESAR Sol#52 Multiple Remote Tower A non-safety driven SESAR 1 Solution Enables cost effective provision of Air Traffic Services (ATS) at two low level density airports Service provided from a control facility not located in the local ATS Tower: Cameras located at the different aerodromes Integrated controller working position Advanced visual features 12
13 Safety aspects of the Multiple Remote Tower A solution designed to be as safe as current ATS services provided from the airport tower premises: No more risk of MAC, CFIT, RI, etc., for airspace users Considering low density aerodromes with only one runway and non-complex layout Safety Requirements derived for the main following areas: Visualization system Ground Ground Communication Air Ground Communication ATCo procedure/training Potential benefits due to new tools E.g. Improvement of the runway threshold monitoring 13
14 Plotting SESAR 1 Solutions on a risk ribbon Examples SESAR Sol#64 Time Based Separation SESAR Sol#27 MTCD & conformance monitoring tool SESAR Sol#103 Approach Procedures with Vertical Guidance SESAR Sol#02 Airport safety nets SESAR Sol#52 Multiple Remote Tower SESAR Sol#16 ASAS Spacing (remains and merge behind) SESAR Sol#17 Advanced shortterm ATFCM measures SESAR Sol#60 Enhanced STCA for TMA Capping safety deterioration Ensuring Safety neutrality Getting net safety benefits 14
15 What about SESAR 2020? Departure En-route Arrival - PJ10: Improve performance in separation provision - PJ11 Enhanced ACAS (Xa; Xu; Xp) - PJ01 enhanced arrival and departure - PJ02: Increased runway - PJ01 enhanced arrival and departure throughput Airport - PJ 03 enhanced Airport safety nets for controller - PJ03 Airport safety net for pilots Network strategic - PJ 08 Advanced airspace Management - PJ 09 Advanced DCB 15 PJ01 PJ03 PJ10
16 Q & A time
SESAR Solutions. Display Options
SESAR Solutions Outputs from the SESAR Programme R&I activities which relate to an Operational Improvement (OI) step or a small group of OI steps and its/their associated enablers, which have been designed,
More informationDeployment Programme 2016
AF #1 Extended AMA and PB in high density TMA....66 AF #2 Airport Integration and Throughput...95 AF #3 Flexible ASM and Free Route... 137 AF #4 etwork Collaborative Management... 169 AF #5 Initial SWIM...200
More informationAirports& NM integration strategic fit with PCP and DP European Organisation for the Safgety of Air Navigation
Airports& NM integration strategic fit with PCP and DP 2016 European Organisation for the Safgety of Air Navigation Strategic Fit with Pilot Common Project (PCP) Implementing Regulation Airports & NM data
More informationART Workshop Airport Capacity
ART Workshop Airport Capacity Airport Research Bob Graham Head of Airport Research 21 st September 2016 Madrid Expectations The issues and opportunities for future research New solutions / directions for
More informationDMT Report. Overview for Step 1. Maturity Assessment Issue date: (OFA view) 28/01/2015
MAT Report References: Maturity Assessment Issue date: (OFA view) Integrated roadmap 26/11/2014 Dataset 13 - Baseline 5.0 DMT Report 26/01/2015 PIRM Result 19/09/2014 Updated Assessment in 2014 (Step1)
More informationENABLING GREENER FLIGHT TRAJECTORIES. David Bowen Chief of ATM SESAR JU
ENABLING GREENER FLIGHT TRAJECTORIES David Bowen Chief of ATM SESAR JU 24 November 2016 SESAR vision SESAR life cycle To define, develop and deploy the technology that is needed to increase ATM performance
More informationAirport Collaborative Decision Making Michael Hoehenberger, (Munich Airport) on behalf of ACI World
A-CDM Seminar Bahrain, 11-13 October 2015 The ACI View Airport Collaborative Decision Making Michael Hoehenberger, (Munich Airport) on behalf of ACI World SCOPE OF PRESENTATION Need for A-CDM What it is
More informationTraffic, delays and forecasts European summer traffic falls outlook for modest long-term growth
Skyway 17 Traffic, delays and forecasts European summer traffic falls outlook for modest long-term growth EUROCONTROL monitors the performance of Europe s wider air transport system and the more detailed
More informationInitial Airport Operations Plan Introduction Luc Laveyne SDM airport liaison and managing. 8 September Hosted by SDAG.
Initial Airport Operations Plan Introduction Luc Laveyne SDM airport liaison and managing director SDAG. 8 September 2017 - Hosted by SDAG. Goal of the workshop. Scenario for the meeting. SESSION 1 : Sesar
More informationSingle European Sky Awards Submission by the COOPANS Alliance. Short description of the project. (Required for website application)
Single European Sky Awards 2016 Submission by the COOPANS Alliance 27 th January 2016 Draft vfinal Short description of the project (Required for website application) The COOPANS Alliance is an international
More informationDeployment Programme 2015 (DP 2015)
Deployment Programme 2015 (DP 2015) FPA MOVE/E2/2014-717/SESAR FPA SGA MOVE/E2/2014-717/SI2-699519 Work Package B2 4.2 Deliverable 4.2.2 26 th ovember 2015 1 Control Approved by Massimo Garbini Managing
More informationThe SESAR Airport Concept
Peter Eriksen The SESAR Airport Concept Peter Eriksen EUROCONTROL 1 The Future Airport Operations Concept 1.1 Airports The aim of the future airport concept is to facilitate the safe and efficient movement
More informationRussian Federation ATM modernization program
Russian Federation ATM modernization program Alexander Vedernikov Deputy Director of Federal Air Transport Agency 20-21 March, 2012, Moscow Main strategic directions of Russian Air Navigation System development
More informationNETWORK OPERATIONS REPORT OCTOBER 2011
OBER. TRAFFIC TOTAL FLIGHTS Last months average daily traffic 8 6 4 8 6 79 5 97 44 5684 694 8786 4 4 9974 589 84 Traffic increased by.% compared to October. Compared to September, the traffic was 8. lower.
More informationThe flow centric approach :
The flow centric approach : an innovative SESAR concept Presented at EIWAC 2017 by Patrick SOUCHU SESAR program director DSNA France Agenda What is the concept of flow centric operations? Collaborative
More informationSESAR Solutions at ATC Global Surface Management
SESAR Solutions at ATC Global Surface Management Beijing 18 th September 2014 Roland Kaps-Becker, Zurich Airport SEAC Contribution Manager SESAR European Airport Consortium Overview SEAC members Airports
More informationIntra-European Seat Capacity. January February March April May June July August September October November December. Intra-European Sectors Flown
ASK's (Million) Sectors Departing Seats 80,000,000 Intra-European Seat Capacity 70,000,000 60,000,000 50,000,000 40,000,000 30,000,000 20,000,000 10,000,000 0 January February March April May June July
More informationData, Baseline and Predictability supporting the Runway Safety Team
Data, Baseline and Predictability supporting the Runway Safety Team ICAO Middle East Regional Runway Safety Seminar - Dubai Bob Graham EUROCONTROL Head of Airport Research 3rd June 2014 Scary! ICAO Middle
More informationDevelopment of the Safety Case for LPV at Monastir
Development of the Safety Case for LPV at Monastir Euromed GNSS II project/medusa Final event on GNSS for aviation Philip Church Principal Consultant philip.church@askhelios.com Your logo here MEDUSA final
More informationNew issues raised on collision avoidance by the introduction of remotely piloted aircraft (RPA) in the ATM system
New issues raised on collision avoidance by the introduction of remotely piloted aircraft (RPA) in the ATM system Jean-Marc Loscos DSNA expert on collision avoidance and airborne surveillance EIWAC 2013
More informationINTERNATIONAL VOLCANIC ASH TASK FORCE (IVATF)
IVATF/1-IP/21 23/7/10 INTERNATIONAL VOLCANIC ASH TASK FORCE (IVATF) FIRST MEETING Montréal, 27 to 30 July 2010 Agenda Item 3: Results of the EUR/NAT VATF Meeting (Plenary) 3.1: Evaluation of the Eyjafjallajokul
More informationEUROCONTROL SPECIFICATIONS SYNOPSIS
EUROCONTROL EUROCONTROL SPECIFICATIONS SYNOPSIS n EUROCONTROL Specification of Interoperability and Performance Requirements for the Flight Message Transfer Protocol (FMTP) n EUROCONTROL Specification
More informationGround movement safety systems and procedures - an overview
Ground movement safety systems and procedures - an overview Thorsten Astheimer, Fraport AG Airside System Development Purpose of Surface Movement Guidance Systems Definition of A-SMGCS Levels (ICAO): 1)
More informationGuidance Material for SESAR Deployment Programme Implementation. Planning View 2017
Guidance Material for SESAR Deployment Programme Implementation Planning View 2017 Annex A Annex B FPA MOVE/E2/2014-717/SESAR FPA SGA MOVE/E3/SUB/2016-402/SI2.745134 Deliverable D1.2 including D3.1.1 31
More informationMEPs to vote on "Better Airports" Package
EUROPEAN COMMISSION MEMO Brussels, 6 December 2012 MEPs to vote on "Better Airports" Package The European Parliament will next week debate and vote on a comprehensive package of proposed measures to help
More informationEUROCONTROL. Eric MIART Manager - Airport Operations Programme (APR)
Traffic Forecast for 20 Years Resulting Challenges for Airports Potential Solutions AIRNETH, The Hague 12 th of April 2007 EUROCONTROL Eric MIART Manager - Airport Operations Programme (APR) www.eurocontrol.int/airports
More informationRACOON PROJECT Daniele Teotino - ENAV. RACOON Project Manager Head of SESAR JU Activity Coordination
RACOON PROJECT Daniele Teotino - ENAV RACOON Project Manager Head of SESAR JU Activity Coordination RACOON in a Nutshell SESAR JU Very Large Scale Demonstration First Italian initiative on Remote TWR solutions
More informationContextual note SESAR Solution description form for deployment planning
Purpose: Release 5 SESAR Solution ID #12 Contextual note SESAR Solution description form for deployment planning This contextual note introduces a SESAR Solution (for which maturity has been assessed as
More informationFollow up to the implementation of safety and air navigation regional priorities XMAN: A CONCEPT TAKING ADVANTAGE OF ATFCM CROSS-BORDER EXCHANGES
RAAC/15-WP/28 International Civil Aviation Organization 04/12/17 ICAO South American Regional Office Fifteenth Meeting of the Civil Aviation Authorities of the SAM Region (RAAC/15) (Asuncion, Paraguay,
More informationAirports Council International, Geneva, Switzerland Airports Council International, European Region, Brussels
Source: Airports Council International, Geneva, Switzerland Airports Council International, European Region, Brussels 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 Airports London
More informationAirport Safety Initiative Networking Session Initiated by the Airport Safety Cluster. Helsinki, IST Event /11/ 2006,16:00-17:30
Airport Safety Initiative Networking Session Initiated by the Airport Safety Cluster Helsinki, IST Event 2006 22/11/ 2006,16:00-17:30 Agenda 16:00 Welcome (Andrea Kurz, Airport Safety Cluster) 16:05 Setting
More informationAdvanced Flexible Use of Airspace (AFUA) Kris DELCOURTE, EUROCONTROL Davide BARDELLI, LUFTHANSA SYSTEMS
Advanced Flexible Use of Airspace (AFUA) Kris DELCOURTE, EUROCONTROL Davide BARDELLI, LUFTHANSA SYSTEMS AFUA - the partners Initial situation Airspace reservations: TSAs/TRAs Non-optimal use of large volumes
More informationDirectorate Network Management Monthly Network Operations Report Analysis February 2013
Directorate Network Management Monthly Network Operations Report Analysis February 213 TABLE OF CONTENTS 1. TOTAL TRAFFIC... 2 2. ATFM DELAY AND ATTRIBUTIONS... 5 3. ATFM DELAYS... 6 4. AIRPORT/TMA ATFM
More informationInternational Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez
International Civil Aviation Organization PBN Airspace Concept Victor Hernandez Overview Learning Objective: at the end of this presentation you should Understand principles of PBN Airspace Concept 2 Gate
More informationRunway Safety through Standardized Stop Bars Practices
Runway Safety through Standardized Stop Bars Practices The UAE National Runway Safety Team (NRST) has identified Management of Stop Bars as one of the highest runway safety priorities in the prevention
More informationTABLE OF CONTENTS. Scheduling Limits 2. Air Transport Movements 3. Total Seats and Seats per Movement 4. Airline Analysis 5.
HEATHROW WINTER 211/12 Start of Season Report KEY STATISTICS Air Transport Movements -.4% Total Seats -1.1% Seats per Air Transport Movement -.7% TABLE OF CONTENTS Page Scheduling Limits 2 Air Transport
More informationNETWORK OPERATIONS REPORT September 2011
September 20. TRAFFIC TOTAL FLIGHTS 32000 Last 3 months average daily traffic 30000 28000 Traffic increased by 2.7% compared to September 200. 26000 24000 22000 Compared to August 20, the traffic was 2.%
More informationEuropean ATM Master Plan Level 3. Implementation View Plan 2018
2018 European ATM Master Plan Level 3 Implementation View Plan 2018 European ATM Master Plan Level 3 Implementation View Plan 2018 7 EXECUTIVE SUMMARY What is the role of the European ATM Master Plan
More informationATC automation: facts and steps ahead
ATC automation: facts and steps ahead Objectives Context Stating the problem Current solution Steps ahead Implementation constraints ATC automation: facts and steps ahead Objectives Understand why ATC
More informationWorkshop on the Performance Enhancement of the ANS through the ICAO ASBU framework. Dakar, Senegal, September 2017 presented by Emeric Osmont
Workshop on the Performance Enhancement of the ANS through the ICAO ASBU framework Dakar, Senegal, 18-22 September 2017 presented by Emeric Osmont The Aviation Community Indra 2 The Aviation Community
More informationHome LIST OF ACRONYMS
LIST OF ACRONYMS 6. List of s A/G A-CDM ADS-C AF AFP/ACH AFUA AMAN ANSP AOP APCH APV ARES ASBU ASM A-SMGCS ATC ATCO ATFCM ATM ATM MP ATN ATSP AU CBA CCO CDM CDO CEF CPDLC CPs CTM CTOT DCB DCT DL DLS DMAN
More informationEUROCONTROL Specification for Time Based Separation (TBS) for Final Approach
EUROPEAN ORGANISATION FOR THE SAFETY OF AIR NAVIGATION XXX Specification CEM Enclosure 1 EUROCONTROL Specification for Time Based Separation (TBS) for Final Approach DOCUMENT IDENTIFIER : EUROCONTROL-SPEC-XXX
More informationRETINA: Resilient synthetic vision for advanced control tower air navigation service provision
RETINA: Resilient synthetic vision for advanced control tower air navigation service provision Sara Bagassi Madrid 9 March 2017 Founding Members RETINA concept RETINA (Resilient Synthetic Vision for Advanced
More informationWORLDWIDE SYMPOSIUM ON ENABLING THE NET-CENTRIC INFORMATION ENVIRONMENT:
WORLDWIDE SYMPOSIUM ON ENABLING THE NET-CENTRIC INFORMATION ENVIRONMENT: SUPPORTING A GLOBALLY HARMONIZED AND SEAMLESS ATM SYSTEM Vince Galotti Chief/ATM ICAO 2 June 2008 Presentation Outline What is a
More informationLinking airports with European ATM
Linking airports with European ATM Christian Faber ATFCM Expert - DNM Network Operations EUROCONTROL The European Organisation for the Safety of Air Navigation Overview Regulatory Framework ATM in Europe,
More informationENVIRONMENTAL BENEFITS FROM IMPROVED OPERATIONAL MEASURES. Guido Kerkhofs Director ATM Programmes EUROCONTROL
ENVIRONMENTAL BENEFITS FROM IMPROVED OPERATIONAL MEASURES Guido Kerkhofs Director ATM Programmes EUROCONTROL EUROCONTROL Air Traffic Emissions Estimates EU 27 States 2004-2006 Tonnes of CO 2 Drop Page
More informationSESAR Release Results
2013-14 SESAR Release Results www.sesarju.eu Table of Contents 01 SESAR explained 04 3 / 02 SESAR release process 06 03 Meeting ATM performance needs 08 04 Solutions ready for industrialisation and deployment
More informationBlock 0 to Block 1 Vaughn Maiolla
Block 0 to Block 1 Vaughn Maiolla Dakar, Senegal, September 2017 Objective To show Block 1 threads as an operational evolution from Block 0 threads. 23 September 2017 2 Flight plan - Vision - ASBUs - Evolution.
More informationWhat Happened Winter A Network Perspective. Airports and Airlines Winter Operations. Directorate of Network Management
What Happened Winter 2009-10 --------- A Network Perspective Airports and Airlines Winter Operations Brian Flynn Head Network Operations unit Directorate of Network Management EUROCONTROL The European
More informationEvolving and improving landing networks with EGNOS
Evolving and improving landing networks with EGNOS Benoit Roturier - DSNA EU Space Week Marseille INTRODUCTION Satellite technology opportunities allow now ANSP and airports to complete/redesign approach
More informationDisruptive Technologies in Air Traffic Management
Disruptive Technologies in Air Traffic Management OCTOBER 21, 2016 www.thalesgroup.com Advanced Air Traffic Services Main themes for Thales Enhanced arrival and departure operations (PJ01) Extended Arrival
More informationDirectorate Network Management Monthly Network Operations Report Analysis - March 2012
Directorate Network Management Monthly Network Operations Report Analysis - March 212 TABLE OF CONTENTS 1. TOTAL TRAFFIC... 1 2. ATFM DELAY AND ATTRIBUTIONS... 4 3. EN-ROUTE ATFM DELAYS... 5 3.1. EN-ROUTE
More informationKEFLAVÍK AIRPORT FROM A STROLL THROUGH CENTRAL PARK TO A SEAT ON THE LONDON EYE FACTS AND FIGURES 2017
N 51 30 15.5052 W 0 4 34.2336 FROM A STROLL THROUGH CENTRAL PARK Wake up in New York and drink your morning coffee at the park before you get to work. TO A SEAT ON THE LONDON EYE Enjoy in the evening a
More informationEuropean Airport Movement Management by A-SMGCS > a contribution to the vision 2020 and SESAR <
European Airport Movement Management by A-SMGCS > a contribution to the vision 2020 and SESAR < Madrid Aerodays 31. March 2011 The Airport Deficiencies a short historical review 1995 Capacity Efficiency
More informationCurrent practice of separation delivery at major European airports ATM R&D Seminar, June 2015, Lisbon
Current practice of separation delivery at major European airports ATM R&D Seminar, June 2015, Lisbon Gerben van Baren (NLR) vanbaren@nlr.nl Catherine Chalon Morgan (Eurocontrol) Vincent Treve (Eurocontrol)
More informationImplementation of SESAR Pilot Common Project. - expected effects
Implementation of SESAR Pilot Common Project - expected effects (2014-2024) European Commission May 20, 2014 - Oslo 1 SESAR SESAR - Technological Pillar of the Single Technological pillar of the SES European
More informationGlobal Seat Capacity July. May. June. Global Sectors Flown July. May. June %
Jan-14 Feb-14 Mar-14 Apr-14 May-14 Jun-14 Jul-14 Aug-14 Sep-14 Oct-14 Nov-14 Dec-14 Jan-15 Feb-15 Mar-15 Apr-15 May-15 Low cost Oneworld Skyteam Star Alliance Other Billion ASKs - YTD January February
More informationCASCADE OPERATIONAL FOCUS GROUP (OFG)
CASCADE OPERATIONAL FOCUS GROUP (OFG) Use of ADS-B for Enhanced Traffic Situational Awareness by Flight Crew During Flight Operations Airborne Surveillance (ATSA-AIRB) 1. INTRODUCTION TO ATSA-AIRB In today
More informationGlobal Aviation Monitor (GAM)
Global Aviation Monitor (GAM) Analysis and Short Term Outlook of Global, European and German Air Transport Main Results of Global Air Transport Supply Analysis and Outlook Background: Covers about 3,500
More informationCranfield Safety Management and Investigation Course
Cranfield Safety Management and Investigation Course 2005 Asia-Pacific Conference on Risk Management and Safety Hong Kong, 1 December 2005 Hong Kong, 28 November 2005 Safety Management System Safety Management
More informationNext Generation Airspace Developments: Key Operational Trends and Enablers
Next Generation Airspace Developments: Key Operational Trends and Enablers ICNS 2013, Day 1 Plenary Nikos Fistas EUROCONTROL Herdon, VA, 23/04/13 Agenda Key goals of future European ATM system 4D Trajectory
More informationETSI EN V1.2.1 ( )
EN 303 213-2 V1.2.1 (2012-04) European Standard Advanced Surface Movement Guidance and Control System (A-SMGCS); Part 2: Community Specification for application under the Single European Sky Interoperability
More informationUnmanned Aircraft System (UAS): regulatory framework and challenges. NAM/CAR/SAM Civil - Military Cooperation Havana, Cuba, April 2015
Unmanned Aircraft System (UAS): regulatory framework and challenges NAM/CAR/SAM Civil - Military Cooperation Havana, Cuba, 13 17 April 2015 Overview Background Objective UAV? Assumptions Challenges Regulatory
More informationMEASUREMENT OF THE QUALITY OF TRAFFIC ORIENTATION SCHEMES REGARDING FLIGHT PLAN EFFICIENCY
Eighth USA/Europe Air Traffic Management Research and Development Seminar (ATM29) MEASUREMENT OF THE QUALITY OF TRAFFIC ORIENTATION SCHEMES REGARDING FLIGHT PLAN EFFICIENCY Dipl.-Ing. Marcus Hantschke
More informationEuropean Aviation Safety Agency
Annexes I and II to ED Decision 2018/013/R European Aviation Safety Agency Acceptable Means of Compliance and Guidance Material to Commission Regulation (EU) No 1332/2011 and Commission Implementing Regulation
More informationWorkshop. SESAR 2020 Concept. A Brief View of the Business Trajectory
SESAR 2020 Concept A Brief View of the Business Trajectory 1 The Presentation SESAR Concept: Capability Levels Key Themes: Paradigm change Business Trajectory Issues Conclusion 2 ATM Capability Levels
More informationPress release. For immediate release 10 September European airport passenger traffic up 8.3% in July
Press release ACI EUROPE 6 square de Meeûs 1000 Brussels, Belgium www.aci-europe.org For immediate release 10 September European airport passenger traffic up 8.3 in ACI EUROPE Airport Traffic Report -
More informationMonthly Network Operations Report
Monthly Network Operations Report Analysis March 213 TABLE OF CONTENTS 1. TOTAL TRAFFIC... 2 2. ATFM DELAY AND ATTRIBUTIONS... 5 3. ATFM DELAYS... 6 4. AIRPORT/TMA ATFM DELAYS... 1 5. DAILY EVOLUTION...
More informationCOLLISION AVOIDANCE FOR RPAS
COLLISION AVOIDANCE FOR RPAS Johan Pellebergs, Saab Aeronautics ICAS workshop, September 2017 This document and the information contained herein is the property of Saab AB and must not be used, disclosed
More informationGlobal Aviation Monitor (GAM)
Global Aviation Monitor (GAM) Analysis and Short Term Outlook of Global, European and German Air Transport Main Results of Global Air Transport Supply Analyses and Outlook Background: Covers about 3.5
More informationAIRSAW TF Status Report
AIRSAW TF Status Report ODIAC 24 - Brussels Patrick BOURDIER The AIRSAW Task Force Created by ODIAC in February 1998 Terms of Reference approved by ODT 20 + Members including operational experts representing
More informationContextual note SESAR Solution description form for deployment planning
Purpose: Release 4 SESAR Solution #51 Contextual note SESAR Solution description form for deployment planning This contextual note introduces a SESAR Solution (for which maturity has been assessed as sufficient
More informationModernising UK Airspace 2025 Vision for Airspace Tools and Procedures. Controller Pilot Symposium 24 October 2018
Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures Controller Pilot Symposium 24 October 2018 Our airspace Flight Information Regions London & Scottish FIRs: 1m km 2 11% of Europe s
More informationNNF Work-shop on Navigation, Safety and Technology. Dato: 2. February Gunn Marit Hernes Luftfartstilsynet
NNF Work-shop on Navigation, Safety and Technology Dato: 2. February 2016 Gunn Marit Hernes Luftfartstilsynet Scope Present an overview of the main regulatory activities currently undertaken by EASA in
More informationSurveillance Opportunities and Challenges
Services Info Days Brussels, 6-7 December 2017 Opportunities and Challenges Christos Rekkas Head of SUR Modernisation TLP: GREEN 1 SUR Applications list extending PSR/SSR Mode S Elementary Enhanced ADS-C
More informationDirectorate Network Management Monthly Network Operations Report Analysis November 2012
Directorate Network Management Monthly Network Operations Report Analysis November 212 TABLE OF CONTENTS 1. TOTAL TRAFFIC... 1 2. ATFM DELAY AND ATTRIBUTIONS... 4 3. EN-ROUTE ATFM DELAYS... 5 4. AIRPORT/TMA
More informationSEAMLESS SKY IN EUROPE. Carlo Maria Borghini Director Administration and Finance Muscat, OMAN October 2009
SEAMLESS SKY IN EUROPE Carlo Maria Borghini Director Administration and Finance Muscat, OMAN October 2009 EUROPE AND ASIA-PACIFIC FACING SIMILAR SITUATION EUROPE ASIA-PACIFIC Traffic growth (travel 4.1%,
More informationEuropean ATM Master Plan Level 3. Implementation View
European ATM Master Plan Level 3 Implementation View 2017 2017Plan European ATM Master Plan Level 3 Implementation View 2017 2017Plan EXECUTIVE SUMMARY What is the role of the European ATM Master Plan
More informationEuropean Commission. Final report. Study of certain aspects of Council Regulation 95/93
1 European Commission Study of certain aspects of Council Regulation 95/93 on common rules for the allocation of slots at Community airports Final report 20 May 2000 2 CONTENTS I II III Introduction...3
More informationNETWORK MANAGER - SISG SAFETY STUDY
NETWORK MANAGER - SISG SAFETY STUDY "Runway Incursion Serious Incidents & Accidents - SAFMAP analysis of - data sample" Edition Number Edition Validity Date :. : APRIL 7 Runway Incursion Serious Incidents
More informationGlobal Seat Capacity May. June. July. Global Sectors Flown May. June. July
Global Departing Seats (Millions) 5 45 4 35 3 25 2 15 5 4.6% 5.4% 6.3% 5.6% 5.4% 6.2% 6.8% 6.1% Global Seat Capacity 214 215 January February March April May June July August September October November
More informationUK Implementation of PBN
UK Implementation of PBN Geoff Burtenshaw Directorate of Airspace Policy UK Civil Aviation Authority 1 UK airspace context Presentation Overview Future Airspace Strategy (FAS) (FAS) Industry Implementation
More informationREMOTELY PILOTED AIRCRAFT SYSTEMS SYMPOSIUM March Detect and Avoid. DI Gerhard LIPPITSCH. ICAO RPAS Panel Detect & Avoid Rapporteur
REMOTELY PILOTED AIRCRAFT SYSTEMS SYMPOSIUM 23-25 March 2015 Detect and Avoid DI Gerhard LIPPITSCH ICAO RPAS Panel Detect & Avoid Rapporteur Remotely Piloted Aircraft Systems (RPAS) Symposium, 23 25 March
More informationATM Airport Performance (ATMAP) Framework
Report commissioned by the Performance Review Commission ATM Airport Performance (ATMAP) Framework Measuring Airport Airside and Nearby Airspace Performance December 009 EUROCONTROL BACKGROUND This report
More informationLearning Objectives. By the end of this presentation you should understand:
Designing Routes 1 Learning Objectives By the end of this presentation you should understand: Benefits of RNAV Considerations when designing airspace routes The basic principles behind route spacing The
More informationSESAR ANNUAL DEMO WORKSHOP. Toulouse, October 2014 Day 2: New Project Plans
SESAR ANNUAL DEMO WORKSHOP Toulouse, 28 29 October 2014 Day 2: New Project Plans Introduction SESAR s work programme is structured around Priority Strategic Business needs. Demonstration Projects show
More informationGlobal September 2014
Jan-13 Feb-13 Mar-13 Apr-13 May-13 Jun-13 Jul-13 Aug-13 Sep-13 Oct-13 Nov-13 Dec-13 Jan-14 Feb-14 Mar-14 Apr-14 May-14 Jun-14 Jul-14 Aug-14 Sep-14 Low cost Oneworld Skyteam Star Alliance Other Billion
More informationGlobal Seat Capacity July. May. June. Global Sectors Flown July. May. June %
Jan-14 Feb-14 Mar-14 Apr-14 May-14 Jun-14 Jul-14 Aug-14 Sep-14 Oct-14 Nov-14 Dec-14 Jan-15 Low cost Oneworld Skyteam Star Alliance Other Billion ASKs - YTD January February March April May June July August
More informationReal-time Simulations to Evaluate the RPAS Integration in Shared Airspace
Real-time Simulations to Evaluate the RPAS Integration in Shared Airspace (WP-E project ERAINT) E. Pastor M. Pérez-Batlle P. Royo R. Cuadrado C. Barrado 4 th SESAR Innovation Days Universitat Politècnica
More informationICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES
AFCAC/ICAO Joint Workshop Walter White ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES 24 JUNE 2014 Airbus ProSky Corporate Presentation 29/06/2014 PERFORMANCE-BASED NAVIGATION The implementation of Performance-Based
More informationPBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN
PBN Performance Based Navigation - PBN & Airspace Concepts - Introduction to PBN 1 Learning Objectives PBN Concept within the context of an Airspace (Operational) Concept. Introduction to PBN 2/37 Components
More informationAN-Conf/12-WP/162 TWELFTH THE CONFERENCE. The attached report
29/11/12 TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 REPORT OF THE COMMITTEE TO THE CONFERENCE ON AGENDA ITEM 2 The attached report has been approved by thee Committee for submission
More informationFor a 1309 System Approach of the Conflict Management
For a 1309 System Approach of the Conflict Management Airborne Conflict Safety Forum Eurocontrol 10/11 June 2014 Serge.LEBOURG@Dassault-Aviation.com SL2014-08 System Approach Conflict Management Eurocontrol
More informationGlobal Aviation Monitor (GAM)
Global Aviation Monitor (GAM) Analysis and Short Term Outlook of Global, European and German Air Transport Main Results of Global Air Transport Supply Analysis and Outlook Background: Covers about 3,500
More informationNetwork Operations Performance
User Forum 2013 Network Operations Performance Operations performance in 2012 Ged Boydell Head Operational Analysis & Reporting 23 January 2013 Traffic and Capacity/Delay headlines 32000 30000 28000 26000
More informationScreening Chapter 14 Transport. Single European Sky (SES) 18 December Transport
Screening Chapter 14 Single European Sky (SES) 18 December 2014 SINGLE EUROPEAN SKY OBJECTIVES: INCREASE SAFETY, EFFICIENCY, CAPACITY & PERFORMANCE Reduce fragmentation and complexity of ATM in Europe
More informationSESAR Release 1. Report: SESAR Rolls out R&D Results
2012 SESAR Release 1 Report: SESAR Rolls out R&D 2012 SESAR Rolls out R&D 1 / Table of Contents 01 General Introduction p.2 02 explained: some highlights p.3 Extended AMAN Horizon: reaching out for greener
More informationCooperative traffic management
3/17/2017 Cooperative traffic management Moderated by Peter Alty, SESAR JU #SESAR 2 Cooperative Traffic Management The Airport view 8 th March 2017 Alison Bates Head of Service Transformation and Ops Efficiency
More informationDefining and Managing capacities Brian Flynn, EUROCONTROL
Defining and Managing capacities Brian Flynn, EUROCONTROL Some Capacity Guidelines Capacity is what you know you can handle today Capacity = safe throughput capability of an individual or small team All
More informationPerformance Planning Environment. Bernhard Mayr, CM Financial and Performance Committee, 23 May 2014
Performance Planning Environment Bernhard Mayr, CM Financial and Performance Committee, 23 May 2014 0 Agenda Report Performance Environment RP 1 Environment KPI #1 RP 2 FABEC Target RP 2 FABEC Airspace
More information