1 Early May Bank Holiday Travel Summary 2012 Photo Attribution: Pete Ashton on Flickr Train service and engineering work information from National Rail Enquiries for customers travelling over the Early May Bank Holiday weekend Saturday 5 to 2012 Page 1 Last Edited 01/05/2012

2 Early May Bank Holiday service and engineering work information These pages give an overview of the services that each Train Operating Company will be providing over the Early May Bank Holiday Weekend (Saturday 5, 6 & ). The vast majority of passengers travelling by train over the May Bank Holiday weekend should experience no disruption because of planned improvements to the rail network. During holiday periods, Train Operating Companies generally amend the train plan that they run and there are a number of reasons for this: Network Rail may be carrying out essential engineering work that requires the timetable to be amended and in some cases buses may replace trains over part of the affected route. Reduction in the number of commuter passengers With many businesses closed for the holidays, passenger numbers for the Train Operating Companies that operate on commuter routes may be reduced. This may mean that the Train Operator may reduce the number of trains they run and in some cases it may be that a Saturday or level of service is offered instead of the normal weekday service. Increase in the number of leisure travellers With many people taking the opportunity to get away for the holiday period, passenger numbers for those Train Operating Companies operating on routes to and from holiday destinations may increase. As a result those Train Operating Companies may run an amended service. This may mean there are additional trains at certain times during the day and/or fewer trains at other times of the day to cater for the additional passenger numbers. In general for the Bank Holiday weekend, many operators will run an amended service on Bank Holiday Monday, usually at a weekend level of service. Major engineering work will be affecting some routes, including those to / from London Liverpool Street, to / from London Kings Cross, and at various points on the West Coast Main Line to/from London Euston. A detailed summary of the train services being provided by each Train Operating Company over the holiday and details of the engineering work affecting their services are shown on the following pages. Details of London Underground, buses, trams and river services operated by Transport for London over the Bank Holiday weekend will be available from the Transport for London website. For the latest information, and maps showing the engineering work taking, please visit the National Rail Enquiries Early May Bank Holiday Travel Summary page - Page 2 Last Edited 01/05/2012

3 Page 3 Last Edited 01/05/2012

4 Arriva Trains Wales Early May Bank Holiday Travel Summary A normal service will run, subject to engineering work. A normal weekday service will run, except for a reduced train service running between Wrexham and Bidston, with trains every two hours. Saturday and Saturday between Chester and Manchester Piccadilly between Cardiff Central and Newport (South Wales) After 17:00 on Saturday, and throughout, trains between Chester and Manchester Piccadilly will be diverted via Northwich and Stockport. Buses will replace trains between Chester and Manchester Piccadilly via Warrington Bank Quay. Trains from Cardiff Central to Manchester Piccadilly, and also from Cardiff Central to Holyhead will be retimed and will depart earlier than usual from Cardiff. Trains will run at their usual times at stations after Cwmbran. c2c Early May Bank Holiday Travel Summary A normal Saturday service will run. A normal service will run. A level of service will run. There are no engineering works planned to affect c2c services over the Early May Bank Holiday weekend. Chiltern Railways Early May Bank Holiday Travel Summary An enhanced service will run to and from Wembley Stadium for fans travelling to and from the FA Cup Final. A normal Saturday service will run on other routes A normal service will run A Saturday level of service will run There are no engineering works planned to affect Chiltern Railways services over the Early May Bank Holiday weekend. Page 4 Last Edited 01/05/2012

5 CrossCountry Early May Bank Holiday Travel Summary A normal service will run, subject to engineering work. A normal weekday service will run, subject to engineering work. Saturday to Monday and Monday at Birmingham New Street between Reading and Andover / Basingstoke between Derby and Chesterfield Trains through Birmingham New Street will be slightly retimed, and may use alternative routes around the Birmingham area. Also, on Saturday and Monday, a reduced train service will run between Birmingham New Street and Nottingham (an hourly train service will run). A reduced train service will run to / from Bournemouth, and trains will be diverted between Reading and Southampton Central via Guildford, causing journey times to be extended by approximately 45 minutes. A bus service will run between Reading, Basingstoke and Winchester, to connect with South West Trains services for Winchester and Southampton Airport Parkway. Trains between South-West England, Birmingham and Edinburgh / Scotland will be diverted between Derby and Chesterfield, and will also call additionally at Doncaster. Also, trains which usually run between Newcastle and Reading will run between Derby and Reading - customers should use alternative trains between Newcastle and Derby. Page 5 Last Edited 01/05/2012

6 East Coast Early May Bank Holiday Travel Summary A normal Saturday service will run. A normal service will run, subject to engineering work. An amended weekday service will run. between Stevenage and Peterborough between Falkirk and Perth Trains towards London Kings Cross will have journey times extended by up to 60 minutes. Trains from London will have journey times extended by up to 15 minutes. Trains between Edinburgh and Inverness will be diverted between Edinburgh and Perth. A replacement bus service will run between Edinburgh and Perth, calling at Falkirk Grahamston, Stirling and Gleneagles. East Midlands Trains Early May Bank Holiday Travel Summary A normal service will run, subject to engineering work. A normal weekday service will run, subject to engineering work. Saturday and Saturday to Monday between Liverpool Lime Street and Hunts Cross between London St Pancras and Bedford between Derby and Matlock, and also between Derby and Chesterfield Trains will be diverted between Liverpool Lime Street and Manchester Piccadilly via Newton-le-Willows, and will not call at Liverpool South Parkway, Widnes or Warrington Central. A replacement bus service will run between Newton-le-Willows and Warrington to connect with alternative services. Trains arriving and terminating at London St Pancras will be slightly retimed. Before 11:00 on trains towards London will leave slightly earlier than usual from stations north of Bedford. Trains between Nottingham and Matlock will run between Nottingham and Derby, with buses replacing trains between Derby and Matlock. Also, some trains between Sheffield and London St Pancras International will be diverted via Nottingham, not calling at Derby. Customers should use alternative services to/from Derby. Page 6 Last Edited 01/05/2012

7 Eurostar Early May Bank Holiday Travel Summary A normal Saturday service will run. A normal service will run. A normal weekday service will run. There are no engineering works planned to affect Eurostar services over the Early May Bank Holiday weekend. First Capital Connect Early May Bank Holiday Travel Summary A normal service will run, subject to engineering work. A Saturday level of service will run, subject to engineering work. No trains will run between Finsbury Park and Moorgate. Ongoing until 18 May 2012 Saturday to Monday between Herne Hill / London Bridge and London St Pancras International between London St Pancras International and Hendon Cross-London 'Thameslink' services will not run after 22:30 on weekdays, or on most weekends and Bank Holidays. Customers should use London Underground services, or replacement buses outside London Underground operating hours - An amended service will run between London St Pancras International and Luton, with some trains starting from / terminating at Kentish Town (alternative trains are available between London St Pancras and Kentish Town). - First Capital Connect trains to/from Bedford will run to/from Platforms 1-4 at London St Pancras International (the platforms usually used by East Midlands Trains services). - Also, until 07:15 on (only), buses will replace trains between London St Pancras International and Hendon. Continued Page 7 Last Edited 01/05/2012

8 First Capital Connect, continued: Saturday and Monday between Stevenage and Letchworth / Biggleswade between London Bridge and East Croydon - After 22:00 on Saturday and throughout, buses replace trains between Stevenage and Letchworth Garden City, and a reduced train service will run between Stevenage and Peterborough, not calling at Arlesey (a bus service will be provided to connect with trains at Biggleswade or Hitchin). - Also after 22:00 on Saturday, buses replace trains between Hertford North and Stevenage (except for the 00:56 (Sun) train from London Kings Cross, which will run through to Stevenage). - Until 09:30 on, buses replace trains between London Kings Cross and Stevenage via Hertford North. After 09:30 and for the rest of, buses replace trains between Hertford North and Stevenage. - Throughout, trains towards London Kings Cross will not be able to call at Hornsey or Harringay (until 08:00, trains from London Kings Cross will also not be calling at these stations). Between 06:00 and 08:00 customers should use London Bus services on routes W3 or 29 for these stations. A reduced train service will run between London Bridge and Brighton (two trains per hour will run). Page 8 Last Edited 01/05/2012

9 First Great Western Early May Bank Holiday Travel Summary Saturday to Monday Saturday and Monday A normal service will run, subject to engineering work. A Saturday level of service will run, subject to engineering work. between Reading West and Newbury between Cardiff Central and Newport (South Wales) between Didcot Parkway and Oxford between Reading and Basingstoke - After 19:00 on Saturday and throughout, trains will be diverted between Reading and Westbury via Swindon, with journey times extended by up to 30 minutes. Buses replace trains between Reading and Newbury, with a train service running between Newbury and Bedwyn. A connecting bus service will run to/from Swindon for customers travelling to/from Pewsey. - Until 07:10 on Monday, buses replace trains between Reading and Newbury. After 07:10 train services will run throughout, with some retiming. Trains from Cardiff Central will be retimed to depart a few minutes earlier than usual, and then be slightly retimed through parts of their journey. After 22:00, an amended service will run between Didcot Parkway and Oxford, with some trains between London Paddington and Didcot Parkway being extended to call additionally at Radley and Oxford. Buses replace trains between Reading and Basingstoke (generally buses will run hourly on, and half-hourly for most of the day on Monday) First Hull Trains Early May Bank Holiday Travel Summary A normal Saturday service will run An amended service will run, with trains running between Hull and Peterborough only (see below) A normal weekday service will run, except for the following trains which are withdrawn: - 06:25 Hull to London Kings Cross - 07:20 London Kings Cross to Hull between Stevenage and Biggleswade First Hull Trains services will start from and terminate at Peterborough, and will not run to/from London Kings Cross. Customers should use alternative First Capital Connect services between London Kings Cross and Peterborough. Page 9 Last Edited 01/05/2012

10 First TransPennine Express Early May Bank Holiday Travel Summary A normal service will run, subject to engineering work. A normal weekday service will run, subject to engineering work. Saturday Saturday to Monday Saturday to Monday between Warrington Central and Liverpool South Parkway between Carlisle and Glasgow Central / Haymarket between Preston / Lancaster and Carnforth / Arnside / Oxenholme Lake District between Doncaster and Barnetby Trains to/from Liverpool will start from and terminate at Hunts Cross. Customers should use Merseyrail services between Hunts Cross and Liverpool. After 12:25 on Saturday, throughout, and until 10:25 on Monday, buses will replace trains between Carlisle and Glasgow Central / Edinburgh. After 21:25 on Saturday, buses replace trains between Carnforth and Barrow-in- Furness. On, trains will run between Barrow-in-Furness and Grange-over- Sands. Buses will run between Preston and Grange-over-Sands via Carnforth & Lancaster, and a mini-bus service will run between Grange-over-Sands and Lancaster via Arnside, Silverdale & Carnforth. Also on, buses replace trains between Preston and Oxenholme Lake District, with trains running between Oxenholme and Windermere. Also on, buses replace trains between Preston and Carlisle. On and Monday, some latenight / early-morning trains between Manchester Airport and Blackpool North will be replaced by buses between Preston and Blackpool North. On Monday, the 04:35 Barrow-in- Furness to Lancaster train will be replaced by a bus. Also, the 05:46 Lancaster to Windermere train will start from Oxenholme. Until 12:00, buses replace trains between Doncaster and Cleethorpes. Page 10 Last Edited 01/05/2012

11 Gatwick Express Early May Bank Holiday Travel Summary A normal service will run, subject to engineering work. Until 16:00, a half-hourly train service will run between London Victoria and Gatwick Airport, with trains from London at 00 and 30 minutes past each hour, and trains from Gatwick at 20 and 40 minutes past each hour. There are no engineering works planned to affect Gatwick Express services over the Early May Bank Holiday weekend. Grand Central Early May Bank Holiday Travel Summary An amended service will run due to engineering work (see below) A normal weekday service will run, except for the 07:49 London Kings Cross to Sunderland service which is withdrawn. Saturday and between Seaton Carew and Stockton between Peterborough and London Kings Cross Trains to/from Sunderland will not call at Hartlepool. A bus service will be provided to/from Eaglescliffe for connections. Customers travelling between Hartlepool and Sunderland should use alternative Northern Rail services. Trains to/from Sunderland will start from / terminate at Peterborough, and will not run to/from London Kings Cross. Customers should use alternative First Capital Connect services between Peterborough and London Kings Cross. Trains to/from Bradford Interchange will only run between Bradford and Doncaster. Grand Central services between Sunderland and Peterborough will be calling additionally at Doncaster to connect with the Bradford services. Page 11 Last Edited 01/05/2012

12 Greater Anglia Early May Bank Holiday Travel Summary A normal service will run, subject to engineering work. A level of service will run, subject to engineering work. and Monday* Saturday and Saturday and and Monday and Monday between London Liverpool Street and Shenfield between Ipswich and Stowmarket between Saxmundham / Norwich and Lowestoft between Acle and Great Yarmouth between Stratford and Tottenham Hale No trains will run between London Liverpool Street and Shenfield. Customers should use London Underground Central Line services between central London and Newbury Park, with buses running between Newbury Park and Ingatestone to connect with Greater Anglia train services. A replacement bus service will also run between Romford and Shenfield. Customers for stations between London Liverpool Street and Romford should use London Bus services on route 86. *Please note that this work was originally listed as taking place from Saturday to Monday, but will only be taking place on and Monday On Saturday and, some late night train services will be replaced by buses between Ipswich and Norwich. On Saturday, buses replace trains between Halesworth and Lowestoft. On, buses replace trains between Saxmundham and Lowestoft. Also, until 11:30, buses replace trains between Norwich and Lowestoft. Trains will be diverted to run between Norwich and Great Yarmouth via Reedham. A bus service will run between Acle and Great Yarmouth. There will be no service at Lingwood station. Between 07:00 and 23:00 on and Monday, trains which usually run between Stratford and Tottenham Hale will be diverted to run to / from London Liverpool Street. Customers should use alternative services between Stratford and London Liverpool Street for connections. Page 12 Last Edited 01/05/2012

13 Heathrow Connect Early May Bank Holiday Travel Summary A normal Saturday service will run. A normal service will run. A normal weekday service will run. There are no engineering works planned to affect Heathrow Connect services over the Early May Bank Holiday weekend. Heathrow Express Early May Bank Holiday Travel Summary A normal Saturday service will run. A normal service will run. A normal weekday service will run. There are no engineering works planned to affect Heathrow Express services over the Early May Bank Holiday weekend. Island Line Trains Early May Bank Holiday Travel Summary A normal Saturday service will run. A normal service will run. A Saturday level of service will run. There are no engineering works planned to affect Island Line Trains services over the Early May Bank Holiday weekend. Page 13 Last Edited 01/05/2012

14 London Midland Early May Bank Holiday Travel Summary A normal service will run, subject to engineering work. A Saturday level of service will run on most routes, subject to engineering work. Trains between Bletchley and Bedford will not run. Saturday to Monday at Birmingham New Street; also between Birmingham New Street and Kings Norton On Saturday, the following alterations will apply: - A reduced train service will run between Birmingham New Street and Coventry / Northampton. - Trains between Birmingham New Street and Birmingham International (which start from / terminate at Birmingham International) will not run. Arriva Trains Wales services will be calling additionally at Adderley Park, Stechford and Lea Hall to replace these services. - A reduced 'Cross-City' service will run between Lichfield Trent Valley / Four Oaks and Birmingham New Street. Buses replace trains between Birmingham New Street and Longbridge / Redditch. - An amended service will run between Birmingham New Street and Worcester / Hereford via Bromsgrove, with trains slightly retimed, and diverted so not calling at University (buses will be provided to/from Birmingham New Street and Longbridge / Redditch). - A reduced service will run between Rugeley Trent Valley / Walsall and Birmingham New Street, with some trains not calling at Tame Bridge Parkway. On, 'Cross-City' services will run between Lichfield Trent Valley and Birmingham New Street. Buses replace trains between Birmingham New Street and Redditch. On Monday, the following alterations will apply: - A reduced train service will run between Birmingham New Street and Coventry / Northampton. - An amended train service will run between Birmingham New Street and London Euston, calling additionally at some stations missed by the amended Coventry / Northampton services. - Trains between Birmingham New Street and Birmingham International (which start from / terminate at Birmingham International) will not run. Arriva Trains Wales services will be calling additionally at Adderley Park, Stechford and Lea Hall to replace these services. Page 14 Last Edited 01/05/2012

15 Saturday to Monday Saturday and Monday between Crewe and Runcorn between Bletchley and Bedford between Watford Junction and St Albans Abbey between London Euston and Milton Keynes Central / Rugby / Northampton continued On Monday, continued: - A reduced 'Cross-City' service will run between Lichfield Trent Valley / Four Oaks and Birmingham New Street. Buses replace trains between Birmingham New Street and Longbridge / Redditch. - A reduced service will run between Birmingham New Street and Worcester / Hereford via Bromsgrove, with trains slightly retimed, and diverted so not calling at University (buses will be provided to/from Birmingham New Street and Longbridge / Redditch). - A reduced service will run between Rugeley Trent Valley / Walsall and Birmingham New Street, with some trains not calling at Tame Bridge Parkway. After 08:00 on Saturday, throughout and until approximately 11:00 on Monday, buses replace trains between Crewe and Liverpool Lime Street. Buses replace trains between Bletchley and Bedford. Until 15:00, buses replace trains between Watford Junction and St Albans Abbey. On, the following alterations will apply: - Until 12:00, trains between Crewe / Birmingham New Street and London Euston will start from / terminate at Rugby. Buses will run between Rugby and Northampton, connecting with buses between Northampton and London Euston. - After 12:00, trains between Crewe / Birmingham New Street and London Euston will start from / terminate at Northampton. Buses will run between Northampton and London Euston until 14:00, and between Northampton and Milton Keynes Central after 14:00. - Until 14:00, trains between London Euston and Northampton will not run. Buses will run between London Euston and Milton Keynes Central / Northampton. - After 14:00, an amended train service will run between London Euston and Milton Keynes Central. Buses replace trains between Milton Keynes Central and Northampton. On Monday, the following alterations will apply: - Until 12:00, a reduced service will run between London Euston and Tring / Milton Keynes Central / Northampton, and a slightly amended service will run between London Euston and Birmingham New Street / Crewe. - After 12:00, a Saturday level of service will run to and from London Euston. Page 15 Last Edited 01/05/2012

16 London Overground Early May Bank Holiday Travel Summary A normal Saturday service will run. A normal service will run, subject to engineering work. A Saturday level of service will run, subject to engineering work and Monday between Gunnersbury and Willesden Junction Buses replace trains between Gunnersbury and Willesden Junction. Customers should use London Underground District Line services between Richmond and Gunnersbury. Merseyrail Early May Bank Holiday Travel Summary A normal service will run, subject to engineering work. A Saturday level of service will run, subject to engineering work. Ongoing at Liverpool Central Trains will not call at Liverpool Central (until 25 August for Wirral Line services, or until 22 October for Northern Line services). A bus service will run between Liverpool Central and Moorfields / Liverpool Lime Street to connect with trains. Page 16 Last Edited 01/05/2012

17 Northern Rail Early May Bank Holiday Travel Summary A normal service will run, subject to engineering work. A normal weekday service will run. Saturday and Saturday and Saturday and Saturday and between Carlisle and Armathwaite / Wetheral between Seaton Carew and Stockton between Halewood and Edge Hill; also between Wigan and Warrington Bank Quay between Wigton and Carlisle between Doncaster and Thorne North / Thorne South between York and Poppleton between Wennington and Carnforth; also between Lancaster and Carnforth After 22:00 on Saturday, buses replace trains between Carlisle and Armathwaite, and between Carlisle and Haltwhistle. On, the following alterations will apply: - Until 11:40, buses replace trains between Carlisle and Haltwhistle (except for the 09:05 Carlisle to Newcastle train, which will start from Hexham. A bus will run at 08:15 between Carlisle and Newcastle to replace this service). - The 09:25 Carlisle to Leeds train will start from Appleby. A bus will run from Carlisle at 08:40 to connect with this train (an additional bus will run at 09:25 between Carlisle and Kirkby Stephen). Buses replace trains between Hartlepool and Middlesbrough. After 08:00 on Saturday and throughout, the following alterations will apply: - Trains between Manchester Oxford Road / Warrington Central and Liverpool Lime Street will be replaced by buses between Hunts Cross and Liverpool Lime Street. - Trains between Manchester Airport / Manchester Victoria and Liverpool Lime Street will run to/from Liverpool, with journey times slightly extended. Also on Saturday, the 18:16 Liverpool Lime Street to Warrington Bank Quay will terminate at Earlestown, and the 19:22 Warrington Bank Quay to Liverpool Lime Street will start from Earlestown. Buses will be provided to complete the journeys to/from Warrington. After 20:00 on Saturday and throughout, buses replace trains between Whitehaven/Maryport & Carlisle Until 12:00, buses will replace trains between Doncaster and Goole, with a limited train service running between Goole and Hull. Some trains will be diverted between Doncaster and Gilberdyke / Hull via Selby. Until 16:30, buses replace trains between York and Poppleton. Buses replace trains between Bentham and Carnforth, running via Lancaster / Morecambe. Also, buses replace trains between Lancaster and Grange-over-Sands. Page 17 Last Edited 01/05/2012

18 ScotRail Early May Bank Holiday Travel Summary A normal Saturday service will run. A normal service will run, subject to engineering work. A normal weekday service will run. between Wishaw and Lanark between Stirling and Gleneagles; also between Perth and Dundee Buses replace trains between Lanark, Carluke and Wishaw. Buses replace trains between Stirling and Dunblane / Perth. Trains between Glasgow Queen Street and Aberdeen / Inverness will be diverted between Glasgow and Perth, with buses running between Glasgow and Perth via Stirling. South West Trains Early May Bank Holiday Travel Summary A normal service will run, subject to engineering work. A Saturday level of service will run, subject to engineering work Saturday between Queenstown Road (Battersea) and Barnes - Buses replace trains between Clapham Junction and Barnes. - An amended train service will run between Barnes and Kingston via Richmond / Twickenham / Strawberry Hill. - Trains between London Waterloo and Reading will be diverted between Clapham Junction and Reading and will not call at stations via Richmond / Twickenham. - Trains between London Waterloo and Windsor & Eton Riverside will be diverted between Clapham Junction and Windsor and will not call at stations via Richmond / Twickenham. - Trains between Ascot and Guildford will be retimed. - There will be no service at Queenstown Road (Battersea). Customers should use alternative Southern services to/from Battersea Park. continued Page 18 Last Edited 01/05/2012

19 and Monday Monday between Queenstown Road (Battersea) and Barnes between Weybridge and Woking between Basingstoke and Eastleigh / Winchester / Andover between Queenstown Road (Battersea) and Barnes - Buses replace trains between Clapham Junction and Barnes. - Trains between London Waterloo and Reading will be diverted between Clapham Junction and Reading and will not call at stations via Richmond / Twickenham. - An amended train service will run between Barnes and Kingston via Richmond/Twickenham/Strawberry Hill. - Some trains between London Waterloo and Windsor & Eton Riverside will start from and terminate at Barnes. Other services will be diverted between Clapham Junction and Windsor. - Trains between Ascot and Guildford will be retimed. - There will be no service at Queenstown Road (Battersea). Customers should use alternative Southern services to/from Battersea Park. Trains between London Waterloo and Guildford via Woking will not call at Byfleet & New Haw. A bus service will be provided to/from Weybridge to connect with trains. On, buses replace trains between Basingstoke and Winchester / Eastleigh / Southampton Central, and between Basingstoke and Andover. Amended train services will run between Eastleigh and Poole / Portsmouth Harbour, and between Woking and Alton. On Monday, buses replace trains between Basingstoke and Farnborough Main, between Basingstoke and Winchester, and between Basingstoke and Andover. Amended train services will run between London Waterloo and Haslemere. - Buses replace trains between Clapham Junction and Barnes. - An amended train service will run between Barnes and Kingston via Richmond/Twickenham/Strawberry Hill. - Trains between London Waterloo and Reading will be diverted between Clapham Junction and Reading and will not call at stations via Richmond / Twickenham. - Trains between London Waterloo and Windsor & Eton Riverside will be diverted between Clapham Junction and Windsor and will not call at stations via Richmond / Twickenham. - Trains between Ascot and Guildford will be retimed. - There will be no service at Queenstown Road (Battersea). Customers should use alternative Southern services to/from Battersea Park. Page 19 Last Edited 01/05/2012

20 Southeastern Early May Bank Holiday Travel Summary A normal Saturday service will run. A normal service will run, subject to engineering work. A level of service will run between Sole Street / Strood and Rainham (Kent) between Tonbridge and Ashford International / Maidstone West between St Johns and Grove Park / Crayford Buses replace trains between Strood and Gillingham / Rainham, and also between Meopham and Rainham. An additional bus service will also run between Maidstone East and Rainham, calling at Chatham and Gillingham. High Speed services between London St Pancras International and Faversham will run between London and Ebbsfleet International or Strood. Trains between London Victoria and Ramsgate / Dover Priory will be diverted to run to/from Maidstone East. Bus connections will run between Maidstone East and Rainham to connect with trains to/from Canterbury East / Ramsgate / Dover Priory. Trains between London Charing Cross and Gillingham will only run between London Charing Cross and Strood, and will call additionally at Stone Crossing, Swnascombe and Northfleet. Trains between Sheerness-on-Sea and Sittingbourne will be retimed to maintain connections with trains at Sittingbourne. Buses replace trains between Tonbridge and Ashford International, and between Tonbridge and Maidstone West. Trains between London Charing Cross and Ramsgate will be diverted via Maidstone East. Trains between Strood and Paddock Wood will only run between Strood and Maidstone West. Trains will not run between London Charing Cross and Dartford / Gravesend via Sidcup. A replacement bus service will run between Lewisham and Dartford via Sidcup, calling at all stations except Albany Park (a shuttle bus service will run between Albany Park and Sidcup to connect with other bus services). Page 20 Last Edited 01/05/2012

21 Southern Early May Bank Holiday Travel Summary A normal Saturday service will run A normal service will run, subject to engineering work. A Saturday level of service will run, subject to engineering work. and Monday Between Brighton and Lewes Between Horsham and Arundel / Angmering Between Battersea Park and Balham at East Croydon Buses replace trains between Brighton and Lewes. Buses replace trains between Horsham and Littlehampton. Additional trains will run between Bognor Regis and Littlehampton. The following changes will apply: - Trains between London Victoria and Caterham / Epsom will not run. Customers to/from Caterham should use alternative services between London Victoria and Horsham, changing at Purley for connections. Customers to/from Epsom should use alternative services between London Victoria and Dorking for connections. - Trains towards London Victoria will not call at Battersea Park. Customers should circulate via London Victoria. - Trains between Clapham Junction and Watford Junction will not run. Customers should travel via central London (Southern customers will be accepted on London Midland services between London Euston and Watford Junction, and on London Underground between London Victoria and London Euston). The following changes will apply: SUNDAY: - Trains between London Bridge and East Croydon via Tulse Hill will start from / terminate at Selhurst - customers should use alternative trains between Selhurst and East Croydon. - Trains between London Bridge and Tattenham Corner will be retimed to run later than normal. MONDAY: - Until 16:00, trains between Milton Keynes Central and South Croydon will only run between Watford Junction and Clapham Junction. Customers should use alternative London Midland services between Milton Keynes Central and Watford Junction, and alternative Southern services between Clapham Junction and South Croydon. - After 16:00, trains between Milton Keynes Central and South Croydon will only run between Watford Junction and South Croydon. Customers should use alternative London Midland services between Milton Keynes Central and Watford Junction. Continued Page 21 Last Edited 01/05/2012

22 Monday, continued: - Until 16:00, trains between London Bridge and Uckfield will only run between Oxted and Uckfield. Customers should use alternative trains between London Victoria and Oxted. - Until 16:00, trains between London Bridge and Tonbridge will be withdrawn. A shuttle train service will run between Redhill and Tonbridge - customers should use alternative trains between London and Redhill. - Until 16:00, trains between London Bridge and Reigate will be withdrawn. A shuttle train service will run between Redhill and Reigate - customers should use alternative trains between London and Redhill. Page 22 Last Edited 01/05/2012

23 Virgin Trains Early May Bank Holiday Travel Summary An amended Saturday service will run due to engineering work An amended service will run due to engineering work An amended weekday service will run due to engineering work Saturday to Monday Saturday to Monday and Monday between Crewe and Liverpool Lime Street between Crewe and Warrington, and between Carlisle and Glasgow Central / Edinburgh between London Euston and Milton Keynes Central / Northampton After 08:00 on Saturday, and throughout, trains to/from Liverpool Lime Street are withdrawn. Customers should use alternative trains to/from Crewe, with buses replacing trains between Crewe and Liverpool Lime Street. After 11:00 on Saturday, buses replace trains between Carlisle and Glasgow Central / Edinburgh. Trains will run between Carlisle and Birmingham New Street, but will be diverted between Warrington Bank Quay and Crewe via Chester. Some trains will be diverted between Crewe and Preston via Manchester Piccadilly. Buses will replace trains between Crewe, Warrington Bank Quay and Wigan North Western. On, buses replace trains between Crewe and Preston, between Crewe and Carlisle, and between Carlisle and Glasgow Central / Edinburgh. On Monday, trains will start later in the day than usual. The first direct trains will be: - 07:20 Birmingham New Street - Edinburgh - 08:20 London Euston - Glasgow Central - 10:00 Glasgow - Birmingham New Street - 10:20 Glasgow - London Euston - 10:51 Edinburgh - Birmingham New Street Throughout, and until approximately 12:00 on Monday, most services which usually run to/from London Euston will start from and terminate at Rugby. Customers should use alternative routes or services between Rugby and London Euston. A limited Virgin Trains service will run between Nuneaton and London Euston via Coventry and Banbury (the route usual used by Chiltern Railways services) Continued... Page 23 Last Edited 01/05/2012

24 Additional information - Travel to and from the FA Cup Final - Due to the FA Cup Final, the few Virgin Trains services that are running from Liverpool on Saturday morning are expected to be extremely busy. Virgin Trains strongly recommend that you take an alternative route e.g. via Manchester or Chester. An additional train will be running, leaving at 09:26 from Liverpool Lime Street direct to London St Pancras International. There are extremely limited options for return travel after the match with no direct services from London Euston to Liverpool until. Network Rail have issued the following statement: "Improvement works on the railway are planned around 18 months in advance, ahead of any scheduling of sporting events and knowing which teams will compete in the final. Fewer people travel on the network at weekends and so essential works are planned for when they will be least disruptive. Unfortunately on this occasion, with the FA Cup final earlier in the month than usual and with the FA choosing a later kick-off time, it has resulted in Liverpool fans unable to return by train. Delaying the works to improve the line would mean further delays to more passengers at a later date." More information about Virgin Trains and other operators services for the FA Cup Final is available from the National Rail Enquiries website. Page 24 Last Edited 01/05/2012

LONDON CHRISTMAS & NEW YEAR TRAVEL GUIDE. Correct at time of publication

LONDON CHRISTMAS & NEW YEAR TRAVEL GUIDE. Correct at time of publication LONDON CHRISTMAS & NEW YEAR TRAVEL GUIDE Correct at time of publication 2018 Sat 22 December Sun 23 December Mon 24 December (Christmas Eve) Tues 25 December (Christmas Day) Weds 26 December (Boxing Day)

More information

Technical specification: BS 4449:2005 GRADE B500B BAR AND COIL

Technical specification: BS 4449:2005 GRADE B500B BAR AND COIL BS 4449:2005 GRADE B500B BAR AND COIL DIAMETER SIZE EXTRA* COIL EXTRA* 8 mm 40.00 15.00 10 mm 25.00 15.00 12 mm 20.00 15.00 Base price + the following extras per size and/or format (coil) 16 mm - 15.00

More information

Christmas Engineering Works

Christmas Engineering Works THE GREAT NORTH RAIL PROJECT COLLEAGUE UPDATE Christmas Engineering Works 2018 until 2019 Thursday 27 December Tuesday 01 January This past year has seen significant progress in Network Rail s Great North

More information

Notting Hill Carnival Road Closures & Travel Information Sunday 25 th /Monday 26th August 2013

Notting Hill Carnival Road Closures & Travel Information Sunday 25 th /Monday 26th August 2013 Notting Hill Carnival Road Closures & Travel Information Sunday 25 th /Monday 26th August 2013 Compiled by Paul Murphy August 2013 Correct as of Friday 23 rd August 2013 CONTENTS Road Closures & Map Changes

More information

Easter Improvement Works. London Euston Closed Friday 19 until Monday 22 April virgintrains.com/spanner nationalrail.co.

Easter Improvement Works. London Euston Closed Friday 19 until Monday 22 April virgintrains.com/spanner nationalrail.co. Easter Improvement Works London Euston Closed Friday 19 until Monday 22 April 2019 virgintrains.com/spanner nationalrail.co.uk/westcoast @virgintrains virgintrains What's happening? We recommend that

More information

Govia Thameslink Railway consultation on December 2015 timetable - APTU response

Govia Thameslink Railway consultation on December 2015 timetable - APTU response Thameslink: Bedford to Gatwick Airport and Brighton Q1 What do you think about these proposals noting that it is not possible to serve both London Bridge and London Blackfriars stations from Preston Park,

More information

GTR December 2015 timetable consultation

GTR December 2015 timetable consultation GTR December 2015 timetable consultation Date issued: 14 November 2014 December 2015 timetable consultation Introduction GTR stands for Govia Thameslink Railway. By July 2015, we ll be the largest train

More information

EMPIRE. Bromley Clydebank Newcastle Sunderland ODEON UK & IRELAND

EMPIRE. Bromley Clydebank Newcastle Sunderland ODEON UK & IRELAND CINEWORLD ABERDEEN UNION SQUARE ALDERSHOT ASHFORD ASHTON-UNDER-LYNE BEDFORD BEXLEYHEATH BIRMINGHAM BROAD STREET BOLDON BOLTON BRADFORD BRAINTREE BRIGHTON BRISTOL BURTON-ON-TRENT CARDIFF CASTLEFORD CHELTENHAM

More information

Happiness is a town called Harrogate destination named happiest place to live for THIRD year running

Happiness is a town called Harrogate destination named happiest place to live for THIRD year running Rightmove plc 3 rd & 4 th Floor 33 Soho Square London W1D 3QU Under embargo until 00.01 Thursday 6 th August Happiness is a town called Harrogate destination named happiest place to live for THIRD year

More information

WCML Service Plans. The Purpose, Background and Method

WCML Service Plans. The Purpose, Background and Method The Purpose, Background and Method WCML Service Plans This article refers to and should be read in conjunction with several other articles. Towards a High Speed Network is the original, and seeks to make

More information

Southeastern contingency timetable Issue 1

Southeastern contingency timetable Issue 1 Cannon Street Metro Services Cannon Street Gillingham Gillingham Cannon Street Cannon Street Dartford Dartford Cannon Street via Greenwich via Greenwich via Bexleyheath FIRST: 0705 then 05 & 35 past every

More information

Arriva Rail London. Arriva Trains Wales. Chiltern Railways. Abellio ScotRail. CrossCountry. Alliance Rail. Colas Rail. ESG No. c2c.

Arriva Rail London. Arriva Trains Wales. Chiltern Railways. Abellio ScotRail. CrossCountry. Alliance Rail. Colas Rail. ESG No. c2c. Abellio ScotRail Arriva Rail London Alliance Rail Arriva Trains Wales c2c Chiltern Railways Colas Rail CrossCountry DB Cargo (UK) Limited Devon & Cornwall Railway Direct Rail Services East Midlands Trains

More information

Inverness LOCH NESS CALEDONIAN LOCH OICH LOCH LOCHY WATERWAY MAP Key SCALE 0 50 kilometres Fort William Managed by British Waterways 0 10 20 30 miles Managed by British Waterways Scotland Perth Dundee

More information

GTR 2018 Timetable Consultation Results (phase one) Date issued: Monday 26 June 2017

GTR 2018 Timetable Consultation Results (phase one) Date issued: Monday 26 June 2017 GTR 2018 Timetable Consultation Results (phase one) Date issued: Monday 26 June 2017 Our consultation setting new industry standards An industry first Two phased approach Consulted the consultation process

More information

Chapter 8. Capacity and Service Disbenefits. Prepared by Christopher Stokes

Chapter 8. Capacity and Service Disbenefits. Prepared by Christopher Stokes Chapter 8 Capacity and Service Disbenefits Prepared by Christopher Stokes 8 CAPACITY AND SERVICE DISBENEFITS Prepared by Christopher Stokes 8.1 This chapter relates to the following questions listed by

More information

Appendix 8. Capacity and Service Disbenefits. Prepared by Christopher Stokes

Appendix 8. Capacity and Service Disbenefits. Prepared by Christopher Stokes Appendix 8 Capacity and Service Disbenefits Prepared by Christopher Stokes 8 CAPACITY AND SERVICE DISBENEFITS Prepared by Christopher Stokes Introduction 8.1 This appendix considers the following major

More information

Rail Travel Summary for Week 5: 25 April-May 1

Rail Travel Summary for Week 5: 25 April-May 1 Rail Travel Summary for Week 5: 25 April-May 1 Updated on: 20 April Compiled by Worldline from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of most

More information

TransPennine Express. Our webchat and webform tpexpress.co.uk Telephone or our Facebook page TPExpressTrains

TransPennine Express. Our webchat and webform tpexpress.co.uk Telephone or our Facebook page TPExpressTrains Get in touch TransPennine Express Customer Report We re ready to listen and address any problems (and any praise!) you might have about our service and have a variety of ways you can get in touch: Our

More information

Census 2011: City snapshot

Census 2011: City snapshot Census Snapshot September 2012 Census 2011: snapshot Rachel Smith, September 2012 On 16 July 2012 the first outputs from the Census 2011 for England and Wales were released, followed on 19 September 2012

More information

Rail Travel Summary for Week 21: August

Rail Travel Summary for Week 21: August Rail Travel Summary for Week 21: 16-22 August Updated on: 05 August Compiled by Worldline from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of most

More information

Rail Travel Summary for Week 33: 8-14 November

Rail Travel Summary for Week 33: 8-14 November Rail Travel Summary for Week 33: 8-14 November Updated on: 29 October Compiled by Worldline from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of

More information

City employment: An overview from the Business Register & Employment Survey (BRES)

City employment: An overview from the Business Register & Employment Survey (BRES) employment September 2012 employment: An overview from the Business Register & Employment Survey (BRES) Rachel Smith, September 2012 On 28 September, the latest employment estimates for 2011, taken from

More information

Rail Travel Summary for Week 37: December

Rail Travel Summary for Week 37: December Rail Travel Summary for Week 37: 08-14 December Updated on: 6 December 2012 Compiled by Atos from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of

More information

For further advice and information, please contact the Leisure Sales Team. RBH Groups Desk E: T:

For further advice and information, please contact the Leisure Sales Team. RBH Groups Desk E: T: For further advice and information, please contact the Leisure Sales Team RBH Groups Desk E: groups@rbhmanagement.com T: 0845 834 1126 Our Brands & s across the UK RBH Hospitality Management the UK s leading

More information

PROPOSALS FOR MEDIUM AND LONG TERM DEVELOPMENT

PROPOSALS FOR MEDIUM AND LONG TERM DEVELOPMENT MICHAEL SCHABAS FIRST CLASS PARTNERSHIPS 28 GRAND AVENUE, LONDON UNITED KINGDOM N10 3BB WWW.FCPWORLD.NET 13 July 2013 Airports Commission By email to airport.proposals@airports.gsi.gov.uk PROPOSALS FOR

More information

Rail Travel Summary for Week 05: 27 April 03 May

Rail Travel Summary for Week 05: 27 April 03 May Rail Travel Summary for Week 05: 27 April 03 May Updated on: 25 April Compiled by Atos from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of most

More information

TRANSFORMING TRANSPENNINE

TRANSFORMING TRANSPENNINE TRANSFORMING TRANSPENNINE MAY 2018 TIMETABLE We are now at a key milestone for our franchise, with the timetable change that comes into effect on Sunday 20 May 2018 the biggest and most important since

More information

Improving stations: improving passenger satisfaction. October 2016

Improving stations: improving passenger satisfaction. October 2016 Improving stations: improving passenger satisfaction October 2016 1 Contents Introduction... 3 Summary of overall satisfaction... 5 Trends over time... 7 Station-specific examples... 9 Reading station...

More information

PQ Local Authorities with exceedances of NO 2 annual mean limit value (based on 2015

PQ Local Authorities with exceedances of NO 2 annual mean limit value (based on 2015 PQ 47949 - Local Authorities with exceedances of NO 2 annual mean limit value (based on 2015 compliance assessment) Local Authorities with exceedances of NO 2 annual mean limit value (based on 2015 compliance

More information

KINGS SUTTON MILTON KEYNES C BRADFORD F SQ HOVE BROMLEY SOUTH ORPINGTON PETTS WOOD SHORTLANDS GILLINGHAM KENT ROCHESTER STROOD KENT

KINGS SUTTON MILTON KEYNES C BRADFORD F SQ HOVE BROMLEY SOUTH ORPINGTON PETTS WOOD SHORTLANDS GILLINGHAM KENT ROCHESTER STROOD KENT BANBURY GROUP BIRMINGHAM GROUP BLETCHLEY GROUP BRADFORD GROUP BRIGHTON GROUP BRISTOL GROUP BROMLEY SOUTH GROUP CHATHAM GROUP CROYDON GROUP DERBY GROUP DORKING GROUP EDINBURGH GROUP EXETER GROUP BANBURY

More information

Department for Transport (DfT) Response to the Recommendations of Passenger Focus for the New Cross Country Rail Franchise.

Department for Transport (DfT) Response to the Recommendations of Passenger Focus for the New Cross Country Rail Franchise. Department for Transport (DfT) Response to the Recommendations of Passenger Focus for the New Cross Country Rail Franchise. Introduction We welcome your input to the New Cross Country (NCC) consultation

More information

Sixth Form University Open Days

Sixth Form University Open Days Sixth Form Open Days 2017-2018 A of Aberdeen Abertay Aberystwyth Anglia Ruskin Saturday 7 th Wednesday 8 th Saturday 11 th Aston Saturday 7 th Saturday 4 th B Bangor Sunday 15 th Bath Spa of Bedfordshire

More information

CONNECTIVITY IMPROVEMENTS ACHIEVED BY HS2 AND HIGH SPEED UK FOR: (extract from HS2 High Speed to Nowhere)

CONNECTIVITY IMPROVEMENTS ACHIEVED BY HS2 AND HIGH SPEED UK FOR: (extract from HS2 High Speed to Nowhere) APPNDIX L2 CONNCTIVITY IMPROVMNTS ACHIVD BY HS2 AND HIGH SPD UK FOR: LICSTR (extract from HS2 High Speed to Nowhere) Appendix L2 : Leicester Page 262 Introduction & key results Page 263 Timeline of comparative

More information

PHASE 2 UNDER CONSTRUCTION

PHASE 2 UNDER CONSTRUCTION PRACTICAL COMPLETION SUMMER 2017 / J11 OX16 4XD INDICATIVE CGI PHASE 2 UNDER CONSTRUCTION BUILDING 7-95,000 SQ FT (8,826 SQ M) BUILDING 8-78,000 SQ FT (7,246 SQ M) www.central.co.uk / J11 BUILDING 7 SPECIFICATION

More information

75,402 sq ft. 88,866 sq ft NOTTINGHAM. panattoni park CONSTRUCTION UNDER. Two industrial/warehouse units TO LET AVAILABLE Q3 2018

75,402 sq ft. 88,866 sq ft NOTTINGHAM. panattoni park CONSTRUCTION UNDER. Two industrial/warehouse units TO LET AVAILABLE Q3 2018 panattoni park Two industrial/warehouse units 88,866 sq ft TO LET AVAILABLE Q3 2018 75,402 sq ft TO LET AVAILABLE Q4 2018 /J26 UNDER CONSTRUCTION INDICATIVE IMAGE www.pp.com panattoni park NG16 NN7 4DE

More information

Transport Focus Informed Traveller monitoring initial findings, 9 March April- 13 April

Transport Focus Informed Traveller monitoring initial findings, 9 March April- 13 April Appendix A Transport Focus Informed Traveller monitoring initial findings, 9 March 2018 1. Is the timetable correct six weeks ahead? In the first two weeks of our monitoring at T-6 Transport Focus has

More information

Oriel 2018 (2019intake) Hospital and Health Board Employers

Oriel 2018 (2019intake) Hospital and Health Board Employers Oriel 2018 (2019intake) Hospital and Health Board Employers Employer Name ABERTAWE BRO MORGANNWG UNIVERSITY HEALTH BOARD AINTREE UNIVERSITY HOSPITAL NHS FOUNDATION TRUST AIREDALE NHS FOUNDATION TRUST ALDER

More information

TIMETABLES ETC in the collection of John Hinson

TIMETABLES ETC in the collection of John Hinson TIMETABLES ETC in the collection of John Hinson Public Timetables SR all lines Summer 1948 LMS all lines Summer 1946 LNER all lines (except London suburban) Summer 1946 (damaged) Railway and Road-way holidays

More information

For further information please refer to: Allinthevenue.co.uk

For further information please refer to: Allinthevenue.co.uk For further information please refer to: Allinthevenue.co.uk Our Brands & s across the UK RBH Hospitality Management the UK s leading hotel management company, working with global brands to run great hotels

More information

Civils & Drainage Solutions

Civils & Drainage Solutions Edition 5 Now with new suppliers and products Civils & Drainage Solutions Introduction This updated version of the number one guide to Civils and Drainage Solutions contains some important changes including:

More information

Regional Spread of Inbound Tourism

Regional Spread of Inbound Tourism Regional Spread of Inbound Tourism Foresight issue 164 VisitBritain Research, January 2019 1 Contents Introduction Summary Key metrics by UK area Analysis by UK area Summary of growth by UK area Scotland

More information

Rail Travel Summary for Week 07: May

Rail Travel Summary for Week 07: May Rail Travel Summary for Week 07: 11-17 May Updated on: 08 May Compiled by Atos from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of most items are

More information

HS8/HS9 Mk2 Route Loadings

HS8/HS9 Mk2 Route Loadings S8/S9 Mk2 Route Loadings Introduction Deriving the route loadings for a given service plan can be a difficult and tedious matter, and very prone to error. Furthermore, understanding what a given loading

More information

IMPORTANT. Anyway, here is the list of the sections of routes on which passes may be used: 007 Deal Canterbury Bluewater Eltham Eltham VCS

IMPORTANT. Anyway, here is the list of the sections of routes on which passes may be used: 007 Deal Canterbury Bluewater Eltham Eltham VCS Whilst passes are not valid on most of the National Express network, on certain sections which have been registered as "local routes", they may be used for free travel. IMPORTANT Free passes are accepted

More information

CONNECTIVITY IMPROVEMENTS ACHIEVED BY HS2 AND HIGH SPEED UK FOR: and Merseyside conurbation. (extract from HS2 High Speed to Nowhere)

CONNECTIVITY IMPROVEMENTS ACHIEVED BY HS2 AND HIGH SPEED UK FOR: and Merseyside conurbation. (extract from HS2 High Speed to Nowhere) APPENDIX 3 CNNECTIVITY IMPRVEMENTS ACHIEVED BY HS2 AND HIGH SPEED UK FR: IVERP and Merseyside conurbation (extract from HS2 High Speed to Nowhere) Appendix 3 : iverpool Page 268 Introduction & key results

More information

CONNECTIVITY IMPROVEMENTS ACHIEVED BY HS2 AND HIGH SPEED UK FOR: MANCHESTER AIRPORT. (extract from HS2 High Speed to Nowhere)

CONNECTIVITY IMPROVEMENTS ACHIEVED BY HS2 AND HIGH SPEED UK FOR: MANCHESTER AIRPORT. (extract from HS2 High Speed to Nowhere) APPNDIX M2 CONNCIVIY IMPOVMNS ACHIVD BY HS2 AND HIGH SPD UK FO: MANCHS AIPO (extract from HS2 High Speed to Nowhere) Appendix M2 : Airport Page 292 Introduction & key results Page 293 imeline of comparative

More information

98 Manor Way, Beckenham, Kent BR3 3LR

98 Manor Way, Beckenham, Kent BR3 3LR 98 Manor Way, Beckenham, Kent BR3 3LR 020 8650 0667 www.westlondonlinegroup.org.uk RECOMMENDATIONS FOR HS2, CROSSRAIL AND OLD OAK COMMON INTERCHANGE DECEMBER 2013 1 1. High Speed London Birmingham BIRMINGHAM

More information

#element of bullying / harassment South West 2gether NHS FT Mental Health Small

#element of bullying / harassment South West 2gether NHS FT Mental Health Small 1 South West 2gether NHS FT Mental Health Small 3 2 0 3 0 Aintree University Hospital NHS FT Yorks and Humber Airedale NHS FT Combined Acute and Community Small 28 0 8 7 1 North West Alder Hey Children's

More information

Rail Travel Summary for Week 35: 26 November 2 December

Rail Travel Summary for Week 35: 26 November 2 December Rail Travel Summary for Week 35: 26 November 2 December Updated on: 23 November Compiled by Worldline from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the

More information

UNITS 4 & 5 AVAILABLE TO LET CV35 9JY TWO NEW INDUSTRIAL / WAREHOUSE OPPORTUNITIES ON AN ESTABLISHED PARK

UNITS 4 & 5 AVAILABLE TO LET CV35 9JY TWO NEW INDUSTRIAL / WAREHOUSE OPPORTUNITIES ON AN ESTABLISHED PARK IMMEDIATELY AVAILABLE TO LET UNITS 4 & 5 CV35 9JY TWO NEW INDUSTRIAL / WAREHOUSE OPPORTUNITIES ON AN ESTABLISHED PARK SAY HELLO TO THE SWEET SP T UNIT 5 66,500 SQ FT UNIT 4 51,500 SQ FT Strategic location

More information

GTR 2018 Timetable Consultation Phase 3 weekends & late night trains ( )

GTR 2018 Timetable Consultation Phase 3 weekends & late night trains ( ) GTR 2018 Timetable Consultation Phase 3 weekends & late night trains (2330 0500) Thank you for taking the time to read and respond to our Consultation. We ve finished phase one and two which concentrated

More information

Rail Travel Summary for Week 03: April

Rail Travel Summary for Week 03: April Rail Travel Summary for Week 03: 13-19 April Updated on: 09 April Compiled by Atos from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of most items

More information

For further advice and information, please contact the Leisure Sales Team. Redefine BDL Groups Desk E: T:

For further advice and information, please contact the Leisure Sales Team. Redefine BDL Groups Desk E: T: For further advice and information, please contact the Sales Team Redefine BDL Groups Desk E: groups@redefinebdl.com T: 0845 834 1126 Our Brands & s across the UK Redefine BDL s the UK s leading hotel

More information

Rail Travel Summary for Week 49: 1-7 March

Rail Travel Summary for Week 49: 1-7 March Rail Travel Summary for Week 49: 1-7 March Updated on: 20 February Compiled by Atos from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of most items

More information

Winners of the Exemplar Awards 2016

Winners of the Exemplar Awards 2016 Winners of the Exemplar Awards 2016 Winner of the Exemplar Award 2016 Leeds City Council Winner of the Peer Award 2016 David Lloyd, Huntingdonshire District Council Data Quality & Performance Awards 2016

More information

YouGov PlaceIndex results

YouGov PlaceIndex results YouGov PlaceIndex results PlaceIndex is an exciting new way of scoring Britain s major cities. It can help understand why people want to visit, work and live in certain cities and this information can

More information

ALL CHANGE NEW TRAIN TIMES FROM SUNDAY 20 MAY

ALL CHANGE NEW TRAIN TIMES FROM SUNDAY 20 MAY ALL CHANGE NEW TRAIN TIMES FROM SUNDAY 20 MAY From Sunday 20 May 2018 customers across the North of England and into Scotland are set to benefit from improved connectivity, new journey opportunities and

More information

Northern Powerhouse Rail

Northern Powerhouse Rail Northern Powerhouse Rail Our vision is of a thriving North of England where modern transport connections drive economic growth and support an excellent quality of life. About Northern Powerhouse Rail This

More information

PHASE 3 UNDER CONSTRUCTION

PHASE 3 UNDER CONSTRUCTION UNIT 5 AVAILABLE SPRING 2019 / J11 OX16 4XD INDICATIVE CGI PHASE 3 UNDER CONSTRUCTION BUILDING 5 333,000 SQ FT (30,937 SQ M) www.central.co.uk / J11 Gas & Elec Sub. tpa th Chalker Way Chalker Way 20 No.

More information

1.1 We note that the following WCML access applications have been made:

1.1 We note that the following WCML access applications have been made: David Wearing Track Access Executive Directorate of Railway Markets and Economics Office of Rail Regulation One Kemble Street London WC2B 4AN 5th Floor, Wellington House 39/41 Piccadilly, Manchester, M1

More information

CONNECTIVITY IMPROVEMENTS ACHIEVED BY HS2 AND HIGH SPEED UK FOR: (extract from HS2 High Speed to Nowhere)

CONNECTIVITY IMPROVEMENTS ACHIEVED BY HS2 AND HIGH SPEED UK FOR: (extract from HS2 High Speed to Nowhere) APPNIX H2 CONNCTIVITY IMPROVMNTS ACHIV BY HS2 AN HIGH SP UK FOR: HURSFIL (extract from HS2 High Speed to Nowhere) Appendix H2 : Page 244 Introduction & key results Page 245 Timeline of comparative journey

More information

Dear Louise. I can confirm that the full list of approved sites for this study is:

Dear Louise. I can confirm that the full list of approved sites for this study is: From: TOTENHOFER, Ashley (HEALTH RESEARCH AUTHORITY) Sent: 28 June 2018 13:06 To: SAVIC, Louise (LEEDS TEACHING HOSPITALS NHS TRUST) Subject: RE: DALES 232512 Dear Louise I can confirm that the full list

More information

1.6 million sq ft TO LET/FOR SALE AVAILABLE Q4 2019

1.6 million sq ft TO LET/FOR SALE AVAILABLE Q4 2019 ON SITE NOW 1.6 illion sq ft TO LET/FOR SALE AVAILABLE Q4 019 / WEEDON ROAD NN7 4DE Build-to-suit and speculative buildings Direct access to Junction 16 Clear height up to 18 Three speculatively built

More information

Rail Travel Summary for Week 31: 29 October 4 November

Rail Travel Summary for Week 31: 29 October 4 November Rail Travel Summary for Week 31: 29 October 4 November Updated on: 27 October Compiled by Worldline from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the

More information

Rail Travel Summary for Week 31: October

Rail Travel Summary for Week 31: October Rail Travel Summary for Week 31: 25-31 October Updated on: 24 October Compiled by Worldline from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of

More information

PHASE 3 UNDER CONSTRUCTION

PHASE 3 UNDER CONSTRUCTION UNIT 5 AVAILABLE SPRING 2019 / J11 OX16 4XD INDICATIVE CGI PHASE 3 UNDER CONSTRUCTION BUILDING 5 333,000 SQ FT (30,936 SQ M) www.central.co.uk / J11 Gas & Elec Sub. tpa th Chalker Way Chalker Way 20 No.

More information

Rail Travel Summary for Week 6: 3-9 May

Rail Travel Summary for Week 6: 3-9 May Rail Travel Summary for Week 6: 3-9 May Updated on: 28 April Compiled by Atos from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of most items are

More information

grade A space grade a location FOR SALE TO LET

grade A space grade a location FOR SALE TO LET grade A space grade a location FOR SALE TO LET www.lancashire.gov.uk/lancsbusinesspark Grade A space Grade A location A MAJOR NEW DEVELOPMENT Lancashire Business Park is one of the North West s premier

More information

Rail Travel Summary for Week 33: 7-13 November

Rail Travel Summary for Week 33: 7-13 November Rail Travel Summary for Week 33: 7-13 November Updated on: 27 October Compiled by Worldline from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of

More information

Doncaster Chamber of Commerce. Andy Taylor Head of Public Affairs, HS2 Ltd

Doncaster Chamber of Commerce. Andy Taylor Head of Public Affairs, HS2 Ltd Doncaster Chamber of Commerce Andy Taylor Head of Public Affairs, HS2 Ltd HS2 one railway, two phases 330 miles of new track 9 HS2 stations High speed trains running on HS2 and existing lines Up to 18

More information

CONSTRUCTION UNDER. Cross-docked warehouse/distribution unit 550,270 sq ft TO LET AVAILABLE Q M1/J26 PANATTONI PARK NOTTINGHAM NOTTINGHAM 550

CONSTRUCTION UNDER. Cross-docked warehouse/distribution unit 550,270 sq ft TO LET AVAILABLE Q M1/J26 PANATTONI PARK NOTTINGHAM NOTTINGHAM 550 UNDER CONSTRUCTION PANATTONI PARK NOTTINGHAM Cross-docked warehouse/distribution unit 550,270 sq ft TO LET AVAILABLE Q1 2019 /J26 INDICATIVE IMAGE NN7 NG16 4DE 3RY /J26 Panattoni Park Nottingham is a 55

More information

Total ABC1 C2DE Total

Total ABC1 C2DE Total NRS Readership Estimates - Newspapers and Supplements AIR - Latest 12 Months: April 2013 - March 2014 Adults Men Total ABC1 C2DE 15-34 35+ Total UNWEIGHTED SAMPLE 36102 21246 14856 8809 27293 16052 EST.POPULATION

More information

Rail Travel Summary for Week 32: 5 11 November

Rail Travel Summary for Week 32: 5 11 November Rail Travel Summary for Week 32: 5 11 November Updated on: 27 October Compiled by Worldline from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of

More information

Rail Travel Summary for Week 34: November

Rail Travel Summary for Week 34: November Rail Travel Summary for Week 34: 15-21 November Updated on: 11 November Compiled by Worldline from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of

More information

Manchester Victoria 11 day blockade Easter 2016

Manchester Victoria 11 day blockade Easter 2016 Manchester Victoria 11 day blockade Easter 2016 The Project Where and what? 1 billion investment. Between March 25 th and April 3 rd Major work will take place in the Manchester Victoria area in connection

More information

Passenger Train Services over Unusual

Passenger Train Services over Unusual Passenger Train Services over Unusual Lines listing regular passenger trains over obscure rail routes in the British Isles 2008 This page was updated on 4 June 2015 Unless otherwise indicated, trains operated

More information

550,270 sq ft TO LET AVAILABLE Q1 2019

550,270 sq ft TO LET AVAILABLE Q1 2019 UNDER CONSTRUCTION 10 EASTWOOD NG16 3UA CROSS-DOCKED WAREHOUSE/DISTRIBUTION UNIT 550,270 sq ft TO LET Q1 2019 J26-7 minutes Ample car and HGV parking with potential for more 50m yards on both sides 15m

More information

ALDERNEY GUERNSEY 3 BARRA BENBECULA 1 BELFAST CITY (GEORGE BEST) BELFAST INTERNATIONAL 17 BELFAST INTERNATIONAL LIVERPOOL (JOHN LENNON) 1

ALDERNEY GUERNSEY 3 BARRA BENBECULA 1 BELFAST CITY (GEORGE BEST) BELFAST INTERNATIONAL 17 BELFAST INTERNATIONAL LIVERPOOL (JOHN LENNON) 1 Landings Diverted To Classified by Airport of and Table 7.1 ABERDEEN DUNDEE 2 DURHAM TEES VALLEY 1 EAST MIDLANDS INTERNATIONAL 1 EDINBURGH 8 GLASGOW 7 HUMBERSIDE 3 INVERNESS 10 PRESTWICK 1 Total ABERDEEN

More information

Rail Travel Summary for Week 21: August

Rail Travel Summary for Week 21: August Rail Travel Summary for Week 21: 20-26 August Updated on: 16 August Compiled by Worldline from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of most

More information

N ewsrail. WEEK ENDING 3 November 2007 ITEM FOR TRAIN COMPANY ON RETAIL TRAIN TRAVEL ITEM SUBJECT OUTLETS STAFF AGENTS

N ewsrail. WEEK ENDING 3 November 2007 ITEM FOR TRAIN COMPANY ON RETAIL TRAIN TRAVEL ITEM SUBJECT OUTLETS STAFF AGENTS N ewsrail E X P R E S S WEEK ENDING 3 November 2007 ITEM FOR TRAIN COMPANY ON RETAIL TRAIN TRAVEL ITEM SUBJECT OUTLETS STAFF AGENTS 352 1 National Rail New TOCs and franchise map changes 2 National Rail

More information

550,270 sq ft TO LET AVAILABLE Q1 2019

550,270 sq ft TO LET AVAILABLE Q1 2019 UNDER CONSTRUCTION 10 EASTWOOD NG16 3RY CROSS-DOCKED WAREHOUSE/DISTRIBUTION UNIT,270 sq ft TO LET Q1 2019 junction 26-7 minutes Ample car & HGV parking with potential for more 50m yards on both sides 15m

More information

National Passenger Survey TOC Report for East Midlands Trains Spring 2011

National Passenger Survey TOC Report for East Midlands Trains Spring 2011 National Passenger Survey TOC Report for 11 Contacts: David Greeno Passenger Focus 1 Drummond Gate London, SW1V QY Tel: 13 83 Email: david.greeno@passengerfocus.org.uk David Chilvers BDRC Continental Kingsbourne

More information

National Report To Postcomm and Postwatch

National Report To Postcomm and Postwatch Licence Condition 4.6 (a) and (b) Licence Condition 4.9 (a) Licence Condition 5.6 (a) and (b) National Report To Postcomm and Postwatch 2008/09 Quarter 1 Report NATIONAL QUARTER 1 REPORT 2008 / 2009 CONTENT

More information

Supplementary information for Parliamentary Questions UIN : VOA Closures and UIN : VOA Staff. 15 December 2017

Supplementary information for Parliamentary Questions UIN : VOA Closures and UIN : VOA Staff. 15 December 2017 Supplementary information for Parliamentary Questions UIN 117327: VOA Closures and UIN 117328: VOA Staff 15 December 2017 Notes about this release All dates shown in the attached pack are provisional and

More information

grade A space grade a location FOR SALE TO LET

grade A space grade a location FOR SALE TO LET grade A space grade a location FOR SALE TO LET www.lancashire.gov.uk/lancsbusinesspark Grade A space Grade A location A MAJOR NEW DEVELOPMENT Lancashire Business Park is one of the North West s premier

More information

Rail Travel Summary for Week 13: 25 June-1 July

Rail Travel Summary for Week 13: 25 June-1 July Rail Travel Summary for Week 13: 25 June-1 July Updated on: 17 June Compiled by Worldline from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of most

More information

Affordability of city homes hits ten-year low

Affordability of city homes hits ten-year low NOT FOR BROADCAST OR PUBLICATION BEFORE 00.01 HRS FRIDAY 2 FEBRUARY Affordability of city homes hits ten-year low Affordability in cities has worsened with the ratio between house prices and average annual

More information

Healthwatch is the independent champion for people who use health and social care services.

Healthwatch is the independent champion for people who use health and social care services. B R I E F I N G State of Support Local Healthwatch Funding 2017/18 30 November 2017 Overview Healthwatch is the independent champion for people who use health and social care services. Across the country

More information

National Rail Passenger Survey: User Guidance Report. Spring 2014 (wave 30)

National Rail Passenger Survey: User Guidance Report. Spring 2014 (wave 30) National Rail Passenger Survey: User Guidance Report Spring 2014 (wave 30) Rebecca Joyner Director Tel: 020 7490 9148 rebecca.joyner@bdrc continental.com Contents Page No. 1. Background... 1 2. Summary

More information

MEET WITH MERCURE Venue reference guide

MEET WITH MERCURE Venue reference guide MEET WITH MERCURE Venue reference guide MEET WITH MERCURE Our commitment to quality means we take care every detail your meeting. Your dedicated meeting planner will organise every aspect your day: they

More information

National Rail Passenger Survey: User Guidance Report. Autumn 2013 (wave 29)

National Rail Passenger Survey: User Guidance Report. Autumn 2013 (wave 29) National Rail Passenger Survey: User Guidance Report Autumn 2013 (wave 29) Rebecca Joyner Research Director Tel: 020 7490 9148 rebecca.joyner@bdrc continental.com Contents Page No. 1. Background... 1 2.

More information

Programme of Asbestos Training UK dates for 2014 International courses available

Programme of Asbestos Training UK dates for 2014 International courses available Programme of Asbestos Training UK dates for 2014 International courses available Course booking form To book on any one of our Scheduled courses you can: either complete this form and email it to enquiries@aaa-training.com

More information

GTR 2018 timetable proposals

GTR 2018 timetable proposals GTR 2018 timetable proposals Wednesday 16 November 2016 Phil Hutchinson - Head of Strategic Planning and team Thameslink Programme and GTR The GTR franchise was created to deliver the Thameslink Programme.

More information

Rail Travel Summary for Week 11: June

Rail Travel Summary for Week 11: June Rail Travel Summary for Week 11: 11-17 June Updated on: 02 June Compiled by Worldline from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at the end of most items

More information

Council Performance Ratings 2010

Council Performance Ratings 2010 Council Performance Ratings 2010 Tameside Metropolitan Borough Council North West 4 - Performs excellently Wandsworth Borough Council London 4 - Performs excellently City of Westminster Council London

More information

Rail Travel Summary for Week 27: 26 September-2 October

Rail Travel Summary for Week 27: 26 September-2 October Rail Travel Summary for Week 27: 26 September-2 October Updated on: 17 September Compiled by Worldline from information supplied by Network Rail and the Train Operating Companies. The 2-alpha codes at

More information

HS2 and Classic Service Plans

HS2 and Classic Service Plans HS2 and Classic Service Plans The Initial Service Plans for HS2 and Classic Routes HS2 Ltd. has published tentative initial service plans, ( service patterns, it calls them,) to illustrate the sort of

More information

SWR December 2018 Timetable Consultation Response

SWR December 2018 Timetable Consultation Response Campaigning for better services over a bigger rail network South Western Railway Timetable feedback For the attention of Jon Hills please reply to: Mr David Brace 48 Hatch Lane Old Basing Basingstoke RG24

More information

National Rail Passenger Survey Virgin Trains East Coast TOC Report Spring 2018 (Wave 38)

National Rail Passenger Survey Virgin Trains East Coast TOC Report Spring 2018 (Wave 38) National Rail Passenger Survey TOC Report 18 (Wave 38) Contacts: David Greeno Transport Focus Fleetbank House 2-6 Salisbury Square London, EC4Y 8JX Tel: 123 837 Email: david.greeno@transportfocus.org.uk

More information

Current Contents of Website, and Version History V5.17

Current Contents of Website, and Version History V5.17 Current Contents of Website, and Version History V5.17 The current contents of the website are: Articles on High Speed Rail Towards a High Speed Network v14.3 Towards a High Speed Network the Maps v2.0

More information