Process of proposals and choosing of the traffic safety PILOTs in Vsevolozhsk and Vyborg rayons

Size: px
Start display at page:

Download "Process of proposals and choosing of the traffic safety PILOTs in Vsevolozhsk and Vyborg rayons"

Transcription

1 1 Cross-Border Road Traffic Safety (CBRTS) Project South-East Finland Russia ENPI CBC (European Neigbourhood and Partnership Instrument, Cross-Border Cooperation), Process of proposals and choosing of the traffic safety PILOTs in Vsevolozhsk and Vyborg rayons Consultant s Project Manager Juha Hyvärinen Pöyry Finland Oy

2 2 Pilot choosing principles in Vyborg and Vsevolozhsk rayon streets: 1. The pilot should be a spot with perspective if to be improved, it would give the shortest paying-back period. 2. The pilot should impact on pedestrian and cyclist safety 3. For budgetary reasons: it should be in municipality-owned road/street network 4. Maximum total summary budget for pilots (equipment like signs and road marking materials) is about 5,8 MRUR

3 Light traffic black spots on the streets of Vsevolozhsk CITY: 3

4 Light traffic black spots on the streets of Vsevolozhsk CITY: 4 Low cost measures to Alexandrovskaya street section between Octoberskaya and Doroga Zizn: - Better visibility of the pedestrian crossings high fluorescence signs (no and ) surrounded with yellow edge - making zebra- marking on ordinary road marking materials - dangerous road section warning signs - speed limit 40 km/h (from current 60 km/h and its intensive enforcement on 20 pedestrian crossings over Alexandrovskaya would - cost 0,7 MRUR - save 0,83 injured annually (worth 2 million RUR) Paying-back-period is 4 months (costs 0,7 MRUR / benefits 2 MRUR)

5 Black spots on the streets of Vsevolozhsk City 5.., 17.17

6 Black spots on the streets of Vsevolozhsk CITY 6., 17

7 Black spots on the streets of Vsevolozhsk CITY 7., 17 Low cost measure package in detailed: Renewing all horizontal and vertical road markings to whole junction with high-durable materials Making ONE pedestrian crossings more visible by: Adding high fluorescence signs (no and ) surrounded with yellow edge, Signs and to under ped crossings signs both side, Making zebra- marking on high-durable materials, Installing units of 3 rumble strips just before of the crossing Installment of dangerous road section signs Installment of additional 40 km/h speed limit signs (intensive enforcement) Installment of 1 additional yield -signs (no 2.4) Installment of 1.13 and road marking (intensifying yielding) Low cost measures RUR would Save 1,2 injured annually Have Paying-back period 1 month (cost 0,2 MRUR/benefit 2,9 MRUR)

8 Light traffic black spots on the streets of Sertolovo: 8

9 Light traffic black spots on the streets of Sertolovo: 9 Low cost measures to Larina-Tsentralnaya street section: - better visibility of the pedestrian crossings high fluorescence signs (no and ) surrounded with yellow edge - speed limit 40 km/h (from current 60 km/h and its intensive enforcement - dangerous road section warning signs - making zebra- marking on ordinary road marking materials on 15 pedestrian crossings would - cost 0,6 MRUR - save 0,09 killed and 0,67 injured annually Paying-back-period is 3 months (costs 0,6 MRUR/benefits 2,4 MRUR)

10 Black spots on the streets at the city of Svetogorsk:., 12 ( ) 10

11 Black spots on the streets at the city of Svetogorsk:., 12 ( ) 11 Low cost measure package in detailed: Renewing all horizontal and vertical road markings to whole junction with high-durable materials Making 5 pedestrian crossings over Krasnoarmeisjaya (2 current on Sportivnaya and 2 current on Lesnaya and one new on Krasnoarmeiskaya 12) more visible by: Adding high fluorescence signs (no and ) surrounded with yellow edge, Signs and to under ped crossings signs both side, Making zebra- marking on high-durable materials, Installing units of 3 rumble strips just before of the crossing Installment of dangerous road section signs Installment of additional 40 km/h speed limit signs (intensive enforcement) Installment of 1 additional yield -signs (no 2.4) Installment of 1.13 and road marking (intensifying yielding) Low cost measures RUR would Save 1,1 injured annually Have Paying-back period 4 month (cost 0,6 MRUR/benefit 1,7 MRUR)

12 Street sections risky for light traffic at Vyborg City: 12 Gagarina Street

13 Street sections risky for light traffic at Vyborg City: 13 Gagarina Street 1. Facilitation of 10 pieces of pedestrian crossing over Gagarina Street from Primorskaya Ulitsa to Pobedi: Better visibility of the pedestrian crossings by high fluorescence signs (no and ) surrounded with yellow edge making zebra- marking on ordinary road marking materials dangerous road section warning signs, speed limit 40 km/h (from current 60 km/h) and its intensive enforcement. 2. Limiting vegetation and trees obstructing the visibility of the signs and signals are to be removed and others regularly trimmed at signal controlled pedestrian crossing on Gagarina Improvements on Gagarina-Primorskaya signal controlled junction: To change signal phasing by including the early cut-off To change the current right of way signs into normal (turning traffic flow has now right of way) To install back plates to the signal heads to improve their visibility Investment costs: Saves: Paying-back perioid: 0,41 million RUR 1,1 injured annually (worth 2,5 million RUR) 2 months

14 Street sections risky for light traffic at Vyborg City: 14 Krepostnaya Street

15 Street sections risky for light traffic at Vyborg City: 15 Krepostnaya Street Facilitation of 15 pieces of pedestrian crossing over Krepatsnaya St b/w Leningradskaya St Bulvar Kutuszova: Better visibility of the pedestrian crossings by high fluorescence signs (no and ) surrounded with yellow edge and making zebra- marking on ordinary road marking materials dangerous road section warning signs, speed limit 40 km/h (from current 60 km/h) and its intensive enforcement. Investment costs: Saves: Paying-back perioid: 0,44 million RUR 0,09 killed and 0,9 injured ann. (worth 3,0 MRUR) 3 month

16 Street sections risky for light traffic at Vyborg City: 16 Primorskaya Street

17 Street sections risky for light traffic at Vyborg City: 17 Primorskaya Street

18 Street sections risky for light traffic at Vyborg City: 18 Primorskaya Street

19 Street sections risky for light traffic at Vyborg City: 19 Primorskaya Street Facilitation of 30 pieces of pedestrian crossing over Primorskaya St. b/w Len. Shosse and Gagarina: Better visibility of the pedestrian crossings by high fluorescence signs (no and ) surrounded with yellow edge and making zebra- marking on ordinary road marking materials dangerous road section warning signs, speed limit 40 km/h (from current 60 km/h) and its intensive enforcement. Investment costs: Saves: Paying-back perioid: 0,84 million RUR 0,09 killed and 2,5 injured ann. (worth 6,8 MRUR) 3 month

20 Black spots on the streets of at Vyborg City: 20 11, 22, 38 ) Photo december 2012 Photo summer 2011

21 Black spots on the streets at Vyborg City: 21 11, 22, 38 ( ) Low cost measure package in detailed: Renewing all horizontal and vertical road markings to whole junction with high-durable materials Making ONE pedestrian crossings (Primorsjaya 11) more visible by: Adding high fluorescence signs (no and ) surrounded with yellow edge, Signs and to under ped crossings signs both side, Making zebra- marking on high-durable materials, Installing units of 3 rumble strips just before of the crossing Installment of dangerous road section signs Installment of additional 40 km/h speed limit signs (intensive enforcement) Installment of 1 additional yield -signs (no 2.4) Installment of 1.13 and road marking (intensifying yielding) Low cost measures RUR would Save 0,16 killed and 0,67 injured annually Have Paying-back period 1 month (cost 0,16 MRUR/benefit 1,6 MRUR)

22 Black spots on the streets of at Vyborg City:, Photoes summer 2011

23 Black spots on the streets at Vyborg City: 23, 50 Low cost measure package in detailed: Renewing all horizontal and vertical road markings to whole junction with high-durable materials Making 1 pedestrian crossings (Leningradskaya, 50) more visible by: Adding high fluorescence signs (no and ) surrounded with yellow edge (on edges and on centre island) Signs and to under ped crossings signs both side, Making zebra- marking on high-durable materials, Installing units of 3 rumble strips just before of the crossing Installment of dangerous road section signs Installment of additional 40 km/h speed limit signs (intensive enforcement) Installment of secondary signal above the main signal on the right-hand side of the carriageway together with installing pedestrian crossing road signs on the central reservation. The secondary signals could be of 200mm size. To add back plates to the signal heads in order to improve their visibility. Low cost measures RUR would Save 0,1 killed and 0,4 injured annually Have Paying-back period 2 month (cost 0,35 MRUR/benefit 1,9 MRUR)

24 Black spots on the streets at Vyborg City: 24, 50 Pedestrian crossing at Leningradskoye shosse 50 Improvements of pedestrian crossings at Leningradskoye shosse, economical solution (measures showed on photo of Pekarnaya Pereulok Pedestrian crossing)

25 Black spots on the streets of at Vyborg City: 25

26 Black spots on the streets at Vyborg City: 26 Low cost measure package in detailed: Renewing all horizontal and vertical road markings to whole junction with high-durable materials Making 5 pedestrian crossings more visible by: Adding high fluorescence signs (no and ) surrounded with yellow edge, Making zebra- marking on high-durable materials, Installing units of 3 rumble strips just before of the crossing Installment of dangerous road section signs Installment of additional 40 km/h speed limit signs (intensive enforcement) Installment of 1 additional yield -signs (no 2.4) Installment of 1.13 and road marking (intensifying yielding) Low cost measures RUR would Save 1,45 injured annually Have Paying-back period 2 months (cost 0,6 MRUR/benefit 3,5 MRUR)

27 Black spots on the streets of at Vyborg City: 27

28 Black spots on the streets of at Vyborg City: 28

29 Black spots on the streets at Vyborg City: 29 Low cost measure package in detailed: Renewing all horizontal and vertical road markings to whole junction with high-durable materials Making 2 pedestrian crossings more visible by: Adding high fluorescence signs (no and ) surrounded with yellow edge, Signs and to under ped crossings signs both side, Making zebra- marking on high-durable materials, Installing units of 3 rumble strips just before of the crossing Installment of dangerous road section signs Installment of additional 40 km/h speed limit signs (intensive enforcement) Installment of 1 additional yield -signs (no 2.4) Installment of 1.13 and road marking (intensifying yielding) Low cost measures RUR would Save 0,1 killed and 0,6 injured annually Have Paying-back period 2 months (cost 0,6 MRUR/benefit 2,3 MRUR)

30 Summary of initially proposed pilots to Vsevolozhsk and Vyborg Rayons 30 Location Measure package Initial cost Saved lives Sertolovo city Avoided injuries Savings Paying back MRUR Annually Annually MRUR Months Tsentralnaja-Larina Package 1 (for 15 pedestrian crossings) 0,6 0,09 0,67 2,4 3 Vsevolozhsk city Alexandrovsjaya St b/w Oct-Dor Zizn Package 1 (for 20 pedestrian crossings) 0,71 0, Plotnikova 17 Package 2 (for 1 street section) 0,2 1,2 2,9 1 Svetogorsk city Package 2 (for 1 street section) 0,6 1,1 2,6 4 Krasnoarmeiskaya Street 12 Vyborg city Primorskaya St b/w Len. Sh. -Gagarina Package 1 (for 30 pedestrian crossings) 0,84 0,09 2,5 6,8 3 Krepatsnaya St b/w Leningr. Kutuszova Package 1 (for 15 pedestrian crossings) 0,44 0,09 0,9 3 3 Gagarina St b/w Primorskaya-Pobedi and improvement of Gagarina- Primorskaya junction traffic lights Package 1 (for 10 pedestrian crossings) and improvement of Gagarina-Primorskaya junction traffic lights 0,41 1,1 2,5 2 Primorsjaya 11,22,38 Package 2 for 1 pedestrian crossing 0,16 0,67 1,6 1 Leningradskaya Shosse, 50 Package 2 for 1 pedestrian crossing 0,35 0,1 0,4 1,9 2 Moskovskiy/Sadovaya Package 2 for 1 junction 0,6 1,45 3,5 2 Leningradskaya Shosse/Kuibisheva Package 2 for 1 junction 0,34 0,1 0,6 2,3 2 5,25 0,47 11,4 31,5 Aver. 2

31 The main content of Packages 1 and 2 in Vsevolozhsk and Vyborg Rayons 31 Package 1 Package 2 High fluorescence signs (no and ) with yellow edge Dangerous road section warning signs making zebra- marking on "ordinary" materials speed limit 40 km/h (from current 60 km/h) High fluorescence signs (no and ) with yellow edge Dangerous road section warning signs speed limit 40 km/h (from current 60 km/h) making zebra- marking on high-durable materials of 3 rumble strips just before of the crossings addtional yield signs 2.4 and yield markings 1.13, 1.20 if needed

32 Summary of initially proposed pilots to Vsevolozhsk and Vyborg Rayons 32 RESERVE Vsevolozhsk Alexandrovskaya/Leningradsjaya Adapted package 2 for 1 junction (exist: traffic lights) 0,35 0,99 2,3 2 Vyborg city Krepostnaya/Sovetsksya Package 2 for 1 junction 0,49 0,14 0,4 2,3 3 Gagarina 4-11 Package 2 for a section of 3 ped crossing 0,45 0,8 1,9 3 Sertolovo Zarezhnaya Streets 8A Package 2 for 1 junction 0,25 0,53 1,3 2 1,53 0,14 2,72 7,8 2

33 Black spots on the streets of at Vsevolozhsk City: 33 RESERVE:...

34 Black spots on the streets at Vaevolozhsk City: 34 RESERVE: Junction.. Low cost measure package in detailed: Renewing all horizontal and vertical road markings to whole junction with high-durable materials Making 4 pedestrian crossings more visible by: Making zebra- marking on high-durable materials, Installment of dangerous road section signs Installment of additional 40 km/h speed limit signs (intensive enforcement) Installment of 1 additional yield -signs (no 2.4) Installment of 1.13 and road marking (intensifying yielding) Installment of back plates to the current traffic light signal heads to improve their visibility Low cost measures RUR would Save 0,99 injured annually Have Paying-back period 2 months (cost 0,35 MRUR/benefit 2,3 MRUR)

35 Black spots on the streets of at Vyborg City: 35 RESERVE:..

36 Black spots on the streets of at Vyborg City: 36 RESERVE:.. Low cost measure package in detailed: Renewing all horizontal and vertical road markings to whole junction with high-durable materials Making 4 pedestrian crossings more visible by: Adding high fluorescence signs (no and ) surrounded with yellow edge, Making zebra- marking on high-durable materials, Installing units of 3 rumble strips just before of the crossing Installment of dangerous road section signs Installment of additional 40 km/h speed limit signs (intensive enforcement) Installment of 1 additional yield -signs (no 2.4) Installment of 1.13 and road marking (intensifying yielding) Low cost measures RUR would Save 0,14 killed and 0,4 injured annually Have Paying-back period 3 months (cost 0,49 MRUR/benefit 2,3 MRUR)

37 Black spots on the streets of at Vyborg City: 37 RESERVE:., 4-11

38 Black spots on the streets of at Vyborg City: 38 RESERVE:., 4-11 Low cost measure package in detailed: Renewing all horizontal and vertical road markings to whole junction with high-durable materials Making 3 pedestrian crossings more visible by: Adding high fluorescence signs (no and ) surrounded with yellow edge to two ped crossings (one already has such signs) signs and to under ped crossings signs both side, Making zebra- marking on high-durable materials, Installing units of 3 rumble strips just before of the crossing Installment of dangerous road section signs Installment of additional 40 km/h speed limit signs (intensive enforcement) Installment of 1 additional yield -signs (no 2.4) Installment of 1.13 and road marking (intensifying yielding) Low cost measures RUR would Save 0,8 injured annually Have Paying-back period 3 months (cost 0,45 MRUR/benefit 1,9 MRUR)

39 Black spots on the streets of at Sertolovo City: 39 RESERVE: Zarezhnaya Street 8A. 8

40 Black spots on the streets of at Sertolovo City: 40 RESERVE: Zarezhnaya Street 8A Low cost measure package in detailed: Renewing all horizontal and vertical road markings to whole junction with high-durable materials Making 2 pedestrian crossings more visible by: Adding high fluorescence signs (no and ) surrounded with yellow edge, Making zebra- marking on high-durable materials, Installing units of 3 rumble strips just before of the crossing Installment of dangerous road section signs Installment of additional 40 km/h speed limit signs (intensive enforcement) Installment of 1 additional yield -signs (no 2.4) Installment of 1.13 and road marking (intensifying yielding) Low cost measures RUR would Save 0,53 injured annually Have Paying-back period 2 months (cost 0,25 MRUR/benefit 1,3 MRUR)

41 Next steps in Black Spot management: 41 Detailed design of the chosen pilot implementation spots, approvals of design solutions and the final cost estimates (made for all pilots) Tendering process of the pilot implementation spots (made in Vsevolozhsk and Sertolovo pilots). Equipment installation works on the pilot spots. (is being made in Vsevolozhsk and Sertolovo) Collecting and analyzing the road accident statistics (before after) Evaluation of the results and conclusions New round of black spot management

Traffic Calming Measures

Traffic Calming Measures REPUBLIC OF GHANA MINISTRY OF TRANSPORTATION Ghana Highway Authority Road Safety and Environment Division Traffic Calming Measures Design Guideline Version 1 / July 2007 Traffic Calming Measures Page 2

More information

Subject: B579 Luton Road, Chalton

Subject: B579 Luton Road, Chalton Meeting: Traffic Management Meeting Date: 7 th June 2018 Subject: B579 Luton Road, Chalton Report of: Summary: Paul Mason, Assistant Director Highways To report to the Executive Member for Community Services

More information

Seek the Board s approval for the Donald Place kerb and channel renewal to progress to final design, tender and construction; and

Seek the Board s approval for the Donald Place kerb and channel renewal to progress to final design, tender and construction; and 3. DONALD PLACE - KERB AND CHANNEL RENEWAL General Manager responsible: General Manager City Environment Officer responsible: Transport and City Streets Manager Author: Michelle Flanagan, Streets Capital

More information

Research on Controlled Flight Into Terrain Risk Analysis Based on Bow-tie Model and WQAR Data

Research on Controlled Flight Into Terrain Risk Analysis Based on Bow-tie Model and WQAR Data 2017 Asia-Pacific Engineering and Technology Conference (APETC 2017) ISBN: 978-1-60595-443-1 Research on Controlled Flight Into Terrain Risk Analysis Based on Bow-tie Model and WQAR Data Haofeng Wang,

More information

K SIGNAGE & TRAFFIC CONTROL. Table of Contents

K SIGNAGE & TRAFFIC CONTROL. Table of Contents Table of Contents K1. ACCOMMODATION OF TRAFFIC... 1 K2. MINIMUM CONSTRUCTION SIGNING... 1 K3. SUBDIVISION SIGNS... 2 K4. TRAFFIC CONTROL DEVICES... 2 K4.1 Traffic Signs Regulations... 2 K4.2 Materials...

More information

Provincial Railway Technical Standards

Provincial Railway Technical Standards GENERAL: INDEX: The standards and requirements listed in this document are intended for use on provincially regulated railway public grade crossings. These standards are considered the minimum requirements

More information

ECTRI FEHRL FERSI Young Researchers Seminar June 17 19, 2015 Rome, Italy

ECTRI FEHRL FERSI Young Researchers Seminar June 17 19, 2015 Rome, Italy ECTRI FEHRL FERSI Young Researchers Seminar 2015 Young Researchers Seminar 2015 June 17 19, 2015 Rome, Italy Miroslav Bidovský, Pavel Skládaný, Pavlína Skládaná, Pavel Tučka First Light Barriers at Level

More information

BUSINESS ZONE - OPTION 400 (Western footpath) Have your say. Love the Bay Delivering on the Cycleway

BUSINESS ZONE - OPTION 400 (Western footpath) Have your say. Love the Bay Delivering on the Cycleway BUSINESS ZONE - OPTION 400 (Western footpath) Have your say Love the Bay Delivering on the Cycleway Consultation open from 31 July to 13 August 2017 1 Introduction After the Love the Bay community-based

More information

Attachment No. 20 RRLRT No. 1. Committee. Busway Grade Crossings STATUS/DATE OF ACTION

Attachment No. 20 RRLRT No. 1. Committee. Busway Grade Crossings STATUS/DATE OF ACTION Attachment No. 20 RRLRT No. 1 TECHNICAL COMMITTEE: Railroad / Light Rail Transit Technical Committee TOPIC: Busway Grade Crossings STATUS/DATE OF ACTION RRLRT TC Draft: 06/23/2011 RRLRT TC Approval: 06/27/2014

More information

SAFETY IMPROVEMENT OF A DANGEROUS FOUR-LEG, STOP CONTROLLED INTERSECTION IN AFRAGOLA, ITALY

SAFETY IMPROVEMENT OF A DANGEROUS FOUR-LEG, STOP CONTROLLED INTERSECTION IN AFRAGOLA, ITALY SAFETY IMPROVEMENT OF A DANGEROUS FOUR-LEG, STOP CONTROLLED INTERSECTION IN AFRAGOLA, ITALY Authors: Giuseppe Silvestro giuseppesilvestro0391@gmail.com Vincenzo Viro vincenzo.viro@gmail.com Supervisor:

More information

Road Signs, Markings and Their Meaning

Road Signs, Markings and Their Meaning Road Signs, Markings and Their Meaning FUNCTIONS OF ROAD SIGNS AND MARKINGS 1. Guides 2. Directs 3. Warns 4. Informs 5. Prohibits 6. Regulates CLASSIFICATION OF ROAD SIGNS 1. Warning 2. Regulatory 3. Informatory

More information

1. Case Study Area and Character Sections

1. Case Study Area and Character Sections ARAGO STREET 1. Case Study Area and Character Sections Case Study Area Calle Aragó is an important streets in the centre of Barcelona. The street belongs to the Eixample district. The origins of Barcelona

More information

ROAD TRAFFIC (PEDESTRIAN CROSSINGS) (JERSEY) ORDER 1982

ROAD TRAFFIC (PEDESTRIAN CROSSINGS) (JERSEY) ORDER 1982 ROAD TRAFFIC (PEDESTRIAN CROSSINGS) (JERSEY) ORDER 1982 Revised Edition Showing the law as at 1 January 2016 This is a revised edition of the law Road Traffic (Pedestrian Crossings) (Jersey) Order 1982

More information

Aurora Summit 2018, Olos The Norwegian perspective

Aurora Summit 2018, Olos The Norwegian perspective Aurora Summit 2018, Olos 16.-17.1.2018 The Norwegian perspective 31/01/2018 Foto: Torgeir Vaa, NPRA The Norwegian Public Roads Administration - responsibilities The NPRA has a broader mandate than most

More information

Monaghan County Council Jobs Initiative Smarter Travel Projects 2011 Evaluation

Monaghan County Council Jobs Initiative Smarter Travel Projects 2011 Evaluation Monaghan County Council Jobs Initiative Smarter Travel Projects 2011 Evaluation Background Monaghan County Council received funding from the Dept of Transport, Tourism and Sport for three projects during

More information

Grade Crossing Regulations

Grade Crossing Regulations Grade Crossing Regulations An Overview of Municipal Roles and Responsibilities at Federally Legislated Grade Crossings March 21, 2017 presentation to Alberta Municipal Supervisor Association, Edmonton,

More information

Improving Safety at Level Crossings - JR East Developments

Improving Safety at Level Crossings - JR East Developments Signalling Seminar in TOKYO 7 th April. 2016 Improving Safety at Level Crossings - JR East Developments Takashi Kawano (MIRSE) East Japan Railway Company Contents 1. Present Situations of Level Crossings

More information

Michigan s Engineering Safety Program for Local Roadways

Michigan s Engineering Safety Program for Local Roadways Michigan s Engineering Safety Program for Local Roadways Local Road Safety Peer Exchange October 2018 Timothy J. Gates, Ph.D., P.E., P.T.O.E. Michigan State University Andrew Ceifetz, P.E. WSP For More

More information

Saint-Petersburg, Russia

Saint-Petersburg, Russia Saint-Petersburg, Russia An attraction for everyone 15.3 MLN VISITORS ANNUALLY MEGA Dybenko is the biggest shopping mall in Saint Petersburg. Every year it welcomes over 15 million high and middleincome

More information

Dyke Road Cycle and Pedestrian Improvements 14/02/2014 Reference number PEDESTRIAN CROSSING AND GUARDRAILING ASSESSMENT

Dyke Road Cycle and Pedestrian Improvements 14/02/2014 Reference number PEDESTRIAN CROSSING AND GUARDRAILING ASSESSMENT 14/02/2014 Reference number 102470 PEDESTRIAN CROSSING AND GUARDRAILING ASSESSMENT DYKE ROAD CYCLE AND PEDESTRIAN IMPROVEMENTS PEDESTRIAN CROSSING AND GUARDRAILING ASSESSMENT IDENTIFICATION TABLE Client/Project

More information

On a Typical Day in Fiscal Year 2008,

On a Typical Day in Fiscal Year 2008, Our Mission We are the guardians of our Nation s borders. We are America s frontline. We safeguard the American homeland at and beyond our borders. We protect the American public against terrorists and

More information

For the theory test you could be asked about all of them so what are the differences?

For the theory test you could be asked about all of them so what are the differences? Pedestrian Crossings There are 7 types of pedestrian (I include animals) crossings (or configurations) in England. 1. Zebra 2. Lollipop 3. Pelican 4. Puffin 5. Toucan 6. Staggered 7. Pegasus (Equestrian)

More information

Isleworth & Brentford Area Forum Action Plan

Isleworth & Brentford Area Forum Action Plan Isleworth & Brentford Area Forum Action Plan 2015-2018 SUMMARY This document sets out the priorities of the Isleworth & Brentford Area Forum until May 2018. It will be held as a standing item on the agenda

More information

Federal Aviation Administration Flight Plan Presented at the Canadian Aviation Safety Seminar April 20, 2004

Federal Aviation Administration Flight Plan Presented at the Canadian Aviation Safety Seminar April 20, 2004 Federal Aviation Administration Flight Plan 2004-2008 Presented at the Canadian Aviation Safety Seminar April 20, 2004 Challenges Reducing an Already Low Commercial Accident Rate Building an Air Traffic

More information

This report was prepared by the Lake Zurich Police Department Traffic Safety Division. Intersection location and RLR camera approaches identified:

This report was prepared by the Lake Zurich Police Department Traffic Safety Division. Intersection location and RLR camera approaches identified: POLICE DEPARTMENT 200 Mohawk Trail Lake Zurich, Illinois 60047 (847) 719-1690 LakeZurich.org April 1, 2018 This report is being submitted regarding the red-light cameras. According to the Red Light Running

More information

2.2 USER CENSUS DATA A site census estimated on 19/01/2016, together with Sky high 9 day census March 2014.

2.2 USER CENSUS DATA A site census estimated on 19/01/2016, together with Sky high 9 day census March 2014. 2. LEVEL CROSSING USAGE 2.1 RAIL The train service over GREEN DRIFT level crossing consists of passenger and freight trains. There are 154 trains per day. The highest permissible line speed of trains is

More information

OFFERING THE UK A LIFELINE

OFFERING THE UK A LIFELINE OFFERING THE UK A LIFELINE R oad markings are the most cost-effective safety device available to road engineers. Markings guide road users, provide advance warning of potential dangers ahead and create

More information

Queen s Circus Roundabout

Queen s Circus Roundabout Stage 2 Road Safety Audit Ref: 1128-RSA-01 Prepared for: Steer Davies Gleave By: Capital Traffic Prepared by: Checked by: Approved by: Andy Haunton, Audit Team Leader Jonathan Thompson, Audit Team Member

More information

Saint-Petersburg, Russia

Saint-Petersburg, Russia Saint-Petersburg, Russia INGKA Centres An attraction for everyone 15.3 MLN VISITORS ANNUALLY MEGA Dybenko is the biggest shopping mall in Saint Petersburg. Every year it welcomes over 15 million high and

More information

School Environment Safety Guidelines Abstract

School Environment Safety Guidelines Abstract School Environment Safety Guidelines Sanjay Ram (Senior Engineer (Traffic), Qld Dept. of Main Roads) Renae Moore (Research and Development Officer), Queensland Transport) Abstract In continuing the challenge

More information

TRB 2014 Project Delivery Committee Meeting AFH15 Presentation (January 14, 2014)

TRB 2014 Project Delivery Committee Meeting AFH15 Presentation (January 14, 2014) TRB 2014 Project Delivery Committee Meeting AFH15 Presentation (January 14, 2014) Finnish Transport Agency Presented by Pekka Pakkala (Ramboll Finland Oy) 14.1.2014 Main Road Route 4 Järvenpää Lahti PPP

More information

Borough High Street Low Emission Neighbourhood

Borough High Street Low Emission Neighbourhood Borough High Street Low Emission Neighbourhood Colourful Crossings Design Brief Better Bankside Business Improvement District Brief for Graphic Consultants December 2017 Page 1 of 10 1. Introduction Borough

More information

Committee. Presentation Outline

Committee. Presentation Outline CW-33-15 11/9/2015 Community and Corporate Services Committee November 10, 2015 1 Presentation Outline Background Vision and Objectives Study Process and Timeline Public and Stakeholder Engagement Organization

More information

Education for Pedestrians at Level Crossings. Taro KITAMURA Takuji HONZAWA Transport Safety Department East Japan Railway Company

Education for Pedestrians at Level Crossings. Taro KITAMURA Takuji HONZAWA Transport Safety Department East Japan Railway Company Education for Pedestrians at Level Crossings Taro KITAMURA Takuji HONZAWA Transport Safety Department East Japan Railway Company 1 Contents 1. Outline of JR East 2. JR East Group Safety Plan 2018 (five-year

More information

Parking Amendments - Bay Street, between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal)

Parking Amendments - Bay Street, between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal) REPORT FOR ACTION between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal) Date: October 26, 2017 To: Toronto and East York Community Council From: Acting Director,

More information

Agenda Cover Memorandum

Agenda Cover Memorandum Agenda Cover Memorandum Meeting Date: April 9, 2012 Item Title: Photo Enforcement at Railroad Crossings Action Requested: Approval For discussion Feedback requested For your information Staff Contact:

More information

9 CONSTRUCTION OF BATHURST STREET FROM GREEN LANE WEST TO SOUTH OF HIGHWAY 11, TOWN OF EAST GWILLIMBURY AND TOWNSHIP OF KING

9 CONSTRUCTION OF BATHURST STREET FROM GREEN LANE WEST TO SOUTH OF HIGHWAY 11, TOWN OF EAST GWILLIMBURY AND TOWNSHIP OF KING Clause No. 9 in Report No. 9 of Committee of the Whole was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting held on May 15, 2014. 9 CONSTRUCTION OF BATHURST

More information

Evidence Based Training from a Regulator s Perspective

Evidence Based Training from a Regulator s Perspective Evidence Based Training from a Regulator s Perspective Marcelo Ureña Regional Officer, Flight Safety ICAO South American Office Evidence Based Training and Advanced Qualification Programme Workshop Lima,

More information

Evaluation of the Grade Crossing Closure Program. Transport Canada Evaluation and Advisory Services

Evaluation of the Grade Crossing Closure Program. Transport Canada Evaluation and Advisory Services Evaluation of the Grade Crossing Closure Program Transport Canada Evaluation and Advisory Services June 8, 2013 Evaluation of the Grade Crossing Closure Program The Grade Crossing Closure Program (GCCP)

More information

Commissioning Director - Environment

Commissioning Director - Environment Finchley and Golders Green Area Committee 27 April 2017 Title Report of Wards Status Urgent Key Enclosures Summers Lane,N12 Request for Pedestrian Improvements Commissioning Director - Environment Woodhouse

More information

Global Runway Safety Simposium

Global Runway Safety Simposium Global Runway Safety Simposium A DIFFERENT PERSPECTIVE OF SAFETY AND ITS RELATIONSHIP WITH SURROUNDINGS Costantino Pandolfi LIMA, 11/21/2017 Italian Civil Aviation Authority ICAO ADOP Member Panel 8 New

More information

Monitoring and data acquisition for the safety related traffic information services

Monitoring and data acquisition for the safety related traffic information services Monitoring and data acquisition for the safety related traffic information services Best Practices on Monitoring Deployment Workshop 12 th September 2013 - Helsinki Contents 1. Transport Scotland and Traffic

More information

Road Safety Audit Review State Route 245 (LM 2.13) Intersection of Southport Road Maury County Description of Project and Background This project invo

Road Safety Audit Review State Route 245 (LM 2.13) Intersection of Southport Road Maury County Description of Project and Background This project invo Road Safety Audit Review State Route 245 (LM 2.13) Intersection of Southport Road Description of Project and Background This project involves an area of concern at the intersection of State Route 245 (Campbellsville

More information

The Role of the Paramedic in Transport Medicine and Crew Resource Management

The Role of the Paramedic in Transport Medicine and Crew Resource Management The Role of the Paramedic in Transport Medicine and Crew Resource Management Approved by the IAFCCP Board of Directors October 2017 The International Association of Flight and Critical Care Paramedics

More information

REPORT A-017/2010 DATA SUMMARY

REPORT A-017/2010 DATA SUMMARY REPORT A-017/2010 DATA SUMMARY LOCATION Date and time Site Monday, 7 June 2010; 12:00 local time 1, approximately Girona Airport AIRCRAFT Registration EI-DAX Type and model BOEING 737-800 Operator Ryanair

More information

HENLEAZE, STOKE BISHOP & WESTBURY-ON-TRYM NEIGHBOURHOOD PARTNERSHIP September Chock Lane Traffic Calming scheme Monitoring Report

HENLEAZE, STOKE BISHOP & WESTBURY-ON-TRYM NEIGHBOURHOOD PARTNERSHIP September Chock Lane Traffic Calming scheme Monitoring Report HENLEAZE, STOKE BISHOP & WESTBURY-ON-TRYM NEIGHBOURHOOD PARTNERSHIP September 2015 Title: Officer: Chock Lane Traffic Calming scheme Monitoring Report Rob Grieve, Principal Officer, Highways and Traffic,

More information

Finchley and Golders Green Area Committee 27 April 2017

Finchley and Golders Green Area Committee 27 April 2017 Finchley and Golders Green Area Committee 27 April 2017 Title Report of Wards Status Urgent Key Enclosures Officer Contact Details Junction of Regents Park Road / Tillingbourne Gardens, N3 Commissioning

More information

ICAO updates. ICAO European and North Atlantic Office. 12 September 2013 Page 1

ICAO updates. ICAO European and North Atlantic Office. 12 September 2013 Page 1 ICAO updates ICAO European and North Atlantic Office 12 September 2013 Page 1 ICAO State Letters and Amendments to ICAO Annexes Reference # Title and date issued 2013/19 Adoption of Amendment 14 to Annex

More information

ASSEMBLY 39TH SESSION

ASSEMBLY 39TH SESSION International Civil Aviation Organization WORKING PAPER A39-WP/118 1 1/8/16 ASSEMBLY 39TH SESSION TECHNICAL COMMISSION Agenda Item 36: Aviation Safety and Air Navigation Implementation Support IMPACT TO

More information

John Betts School Crossing Review

John Betts School Crossing Review John Betts School Crossing Review Paddenswick Road London Borough of Hammersmith & Fulham August 2015 DOCUMENT CONTROL Project Centre has prepared this report in accordance with the instructions from the

More information

PEDESTRIAN ONLY TRAFFIC SIGNALS.

PEDESTRIAN ONLY TRAFFIC SIGNALS. colin.subryan@tfl.gov.uk www.theihe.org - Traffic Signal Control course - Conference Aston Birmingham - 18 th May to May 21 st 2015 What is POTS? POTS is a generic name for pedestrian crossings for stand-alone

More information

HIGHWAY RAIL GRADE CROSSING CONSOLIDATION PROGRAM

HIGHWAY RAIL GRADE CROSSING CONSOLIDATION PROGRAM HIGHWAY RAIL GRADE CROSSING CONSOLIDATION PROGRAM To decrease unnecessary train traffic exposure to life and property, promote public safety, and improve traffic conditions, the Texas Department of Transportation

More information

20mph Speed Limit Zones

20mph Speed Limit Zones Traffic Advisory Leaflet 7/91 May 1991 20mph Speed Limit Zones Summary This leaflet illustrates the main steps in the procedures for the implementation of 20mph zones. It provides brief details on: the

More information

Code of Practice for filming in East Lothian

Code of Practice for filming in East Lothian Code of Practice for filming in East Lothian Film Edinburgh Part of Marketing Edinburgh Ltd Tel +44 (0)131 622 7337 Email: info@filmedinburgh.org Web: www.filmedinburgh.org filmedinburgh.org In order to

More information

REPORT A-024/2012 DATA SUMMARY

REPORT A-024/2012 DATA SUMMARY REPORT A-024/2012 DATA SUMMARY LOCATION Date and time Sunday, 1 July 2012; 08:45 UTC 1 Site La Juliana Aerodrome (Seville, Spain) AIRCRAFT Registration Type and model Operator HA-NAH SMG-92 Turbo Finist

More information

Traffic Calming Special Authorisations

Traffic Calming Special Authorisations Traffic Advisory Leaflet 3/93 May 1993 Traffic Calming Special Authorisations Introduction Legislation is now available to allow a wide range of traffic calming measures to be used on public roads. Some

More information

Speed control humps - Scotland, England and Wales

Speed control humps - Scotland, England and Wales Traffic Advisory Leaflet 3/91 September 1991 Speed control humps - Scotland, England and Wales Introduction Road humps are an extremely effective means of keeping vehicle speeds low. The standard round

More information

Congratulations! WARNING! READ USER MANUAL FIRST! USE AT YOUR OWN RISK!

Congratulations! WARNING! READ USER MANUAL FIRST! USE AT YOUR OWN RISK! Congratulations! You just became the owner of the EXIT cutaway harness! We are sure that you will have ton s of fun using this product! Enjoy but use responsible and with care! WARNING! READ USER MANUAL

More information

Commissioning Director - Environment. Officer Contact Details Jane Shipman;

Commissioning Director - Environment. Officer Contact Details Jane Shipman; Chipping Barnet Area Committee 6 July 2016 Title Report of Wards Status Urgent Key Enclosures The Avenue Zebra crossing and pedestrian improvements Commissioning Director - Environment Chipping Barnet

More information

KING STREET PILOT STUDY PUBLIC MEETING

KING STREET PILOT STUDY PUBLIC MEETING KING STREET PILOT STUDY PUBLIC MEETING 2017.02.13 PUBLIC WORK with GEHL STUDIO / NEW YORK SWERHUN ASSOCIATES SAM SCHWARTZ CONSULTING LLC STARTING POINTS 17 1 - TRANSIT FIRST! Transit service is beyond

More information

London Borough of Barnet Traffic & Development Design Team

London Borough of Barnet Traffic & Development Design Team London Borough of Barnet Traffic & Development Design Team AERODROME ROAD PEDESTRIAN FACILITY AND BUS STOP INTRODUCTION FEASIBILITY REPORT Job Number: 60668 Doc Ref: S106/12-13/60668 Author: Manoj Kalair

More information

AIR Citizen s Summary

AIR Citizen s Summary w w w.ip a- cb c- 00 7. eu C om pe tit i ve ne ss To u ris m En vi ro nm en t Programme co-funded by the EUROPEAN UNION Ms. Corina Crețu, Commissioner for Regional Policy said: "I am pleased to adopt this

More information

Ecolabel Toolbox Synergie for CB partners. CB forum- June, 26th

Ecolabel Toolbox Synergie for CB partners. CB forum- June, 26th Ecolabel Toolbox Synergie for CB partners CB forum- June, 26th CONTENT 1. Ecolabel Toolbox features 2. Interface presentation 3. How can European partners use Ecolabel Toolbox 4. Toward dissemination in

More information

Transport Assessment Appendix M: Avonmouth Impacts

Transport Assessment Appendix M: Avonmouth Impacts Portishead Branch Line (MetroWest Phase 1) Environmental Impact Assessment Transport Assessment Appendix M: Avonmouth Impacts Prepared for West of England Councils December 2016 1 The Square Temple Quay

More information

Part 137. Agricultural Aircraft Operations. CAA Consolidation. 10 March Published by the Civil Aviation Authority of New Zealand

Part 137. Agricultural Aircraft Operations. CAA Consolidation. 10 March Published by the Civil Aviation Authority of New Zealand Part 137 CAA Consolidation 10 March 2017 Agricultural Aircraft Operations Published by the Civil Aviation Authority of New Zealand DESCRIPTION Part 137 prescribes rules, that are additional to and exceptions

More information

Using LiDAR for Precise Vegetation Management

Using LiDAR for Precise Vegetation Management Using LiDAR for Precise Vegetation Management Quantum Spatial is a proven partner to airport planners, engineers, facility managers, and contractors whose objective is to build, expand, and make improvements

More information

Airmen s Academic Examination

Airmen s Academic Examination Airmen s Academic Examination E4 ualification Airline Transport Pilot (Airplane, rotorcraft and airship) No. of questions; time allowed 20 questions; 40 minutes Subject Civil Aeronautics Law (subject code:

More information

Item 3.1 Attachment 1

Item 3.1 Attachment 1 Island Bay Cycleway-Working Party Report Purpose 1. To report on the outcomes of the Island Bay Cycleway community working party. Summary 2. At its 30 April 2015 meeting, Council agreed that a working

More information

Proposal for the Development of Bus Stops

Proposal for the Development of Bus Stops Proposal for the Development of Bus Stops NATIONAL TRANSPORT COMMISSION Sri Lanka 2005 Objective Providing protection for passengers from extreme weather conditions like Sun, rain, wind, splash while waiting

More information

Location Outside 27 West Street (Ladbrokes) see picture Fig4. This location seems to give most viability in both directions. West Street, Buckingham

Location Outside 27 West Street (Ladbrokes) see picture Fig4. This location seems to give most viability in both directions. West Street, Buckingham West Street, Buckingham Proposal That a Puffin crossing be installed (see crossing definitions) outside 27 West Street to ensure pedestrian s are able to cross safely (see Fig1 for proposed crossing point).

More information

Welcome Consultation Meeting for the Development of the Railway-Roadway Grade Crossings Regulations. May and June, 2012

Welcome Consultation Meeting for the Development of the Railway-Roadway Grade Crossings Regulations. May and June, 2012 Welcome Consultation Meeting for the Development of the Railway-Roadway Grade Crossings Regulations May and June, 2012 BACKGROUND Work and consultations regarding the development of the Railway-Roadway

More information

Barents Euro Arctic Council 11 th Session Rovaniemi, Finland November 2007

Barents Euro Arctic Council 11 th Session Rovaniemi, Finland November 2007 Barents Euro Arctic Council 11 th Session Rovaniemi, Finland 14 15 November 2007 Joint Communiqué The Barents Euro Arctic Council (BEAC) convened its Eleventh Session in Rovaniemi on 14 15 November 2007,

More information

AERONAUTICAL SURVEYS & INSTRUMENT FLIGHT PROCEDURES

AERONAUTICAL SURVEYS & INSTRUMENT FLIGHT PROCEDURES AERONAUTICAL SURVEYS & INSTRUMENT FLIGHT PROCEDURES Current as of November 2012 ALASKA AVIATION SYSTEM PLAN UPDATE Prepared for: State of Alaska Department of Transportation & Public Facilities Division

More information

Consultation on the draft Traffic Signs Regulations and General Directions 2015 English Heritage response, 12/06/2014

Consultation on the draft Traffic Signs Regulations and General Directions 2015 English Heritage response, 12/06/2014 Consultation on the draft Traffic Signs Regulations and General Directions 2015 English Heritage response, 12/06/2014 Please find below the English Heritage response to the DfT Consultation on the draft

More information

The region s competitiveness

The region s competitiveness The region s competitiveness Mgr. Tomáš Hybner Chairman of the Committee on Regional Development Assembly of the Karlovy Vary Region The Karlovy Vary Region Westernmost part of the Czech Republic About

More information

flightops Diminishing Skills? flight safety foundation AeroSafetyWorld July 2010

flightops Diminishing Skills? flight safety foundation AeroSafetyWorld July 2010 Diminishing Skills? 30 flight safety foundation AeroSafetyWorld July 2010 flightops An examination of basic instrument flying by airline pilots reveals performance below ATP standards. BY MICHAEL W. GILLEN

More information

The Blue Badge Scheme: Rights and Responsibilities in Wales

The Blue Badge Scheme: Rights and Responsibilities in Wales The Blue Badge Scheme: Rights and Responsibilities in Wales Please read this leaflet before using the badge and keep it in case you need to refer to it in future. 1 For initial/general Blue Badge enquiries

More information

Railway Level Crossings. Keeping you Safe! Information Pack

Railway Level Crossings. Keeping you Safe! Information Pack 1 Railway Level Crossings Keeping you Safe! Information Pack Railway Level Crossings Keeping you Safe 2 Contents Introduction 3 The golden rules 4 Types of level crossing 5 Boom gates and flashing lights

More information

AIRCRAFT INCIDENT REPORT AND EXECUTIVE SUMMARY

AIRCRAFT INCIDENT REPORT AND EXECUTIVE SUMMARY Section/division Incident and Incident Investigations Division Form Number: CA 12-12b AIRCRAFT INCIDENT REPORT AND EXECUTIVE SUMMARY Aircraft Registration Type of Aircraft Cessna 172 Reference: CA18/3/2/0766

More information

HIGHWAYS (ROAD HUMPS) (JERSEY) REGULATIONS 2002

HIGHWAYS (ROAD HUMPS) (JERSEY) REGULATIONS 2002 HIGHWAYS (ROAD HUMPS) (JERSEY) REGULATIONS 2002 Revised Edition Showing the law as at 1 January 2016 This is a revised edition of the law Highways (Road Humps) (Jersey) Regulations 2002 Arrangement HIGHWAYS

More information

"TOUCAN" - An unsegregated crossing for pedestrians and cyclists

TOUCAN - An unsegregated crossing for pedestrians and cyclists Traffic Advisory Leaflet 10/93 August 1993 "TOUCAN" - An unsegregated crossing for pedestrians and cyclists Summary This leaflet gives advice on the design and use of the Toucan signal controlled crossing,

More information

Community Highways Volunteering Cambridge City Information Pack 2017/18

Community Highways Volunteering Cambridge City Information Pack 2017/18 Community Highways Volunteering Cambridge City Information Pack 2017/18 Chief Executive Gillian Beasley www.cambridgeshire.gov.uk Contents Welcome to the Community Highways Volunteering Scheme... 2 How

More information

FOOTPATH MANAGEMENT IN ICELAND A VISUAL REFLECTION ON QUALITY CONCERNS AND FOOTPATH POLICY CONSIDERATIONS

FOOTPATH MANAGEMENT IN ICELAND A VISUAL REFLECTION ON QUALITY CONCERNS AND FOOTPATH POLICY CONSIDERATIONS FOOTPATH MANAGEMENT IN ICELAND A VISUAL REFLECTION ON QUALITY CONCERNS AND FOOTPATH POLICY CONSIDERATIONS ANDRÉS ARNALDS DECEMBER 2016 INTRODUCTION It is evident that Iceland is facing tremendous work

More information

GENERAL INFORMATION Aircraft #1 Aircraft #2

GENERAL INFORMATION Aircraft #1 Aircraft #2 GENERAL INFORMATION Identification number: 2007075 Classification: Serious incident Date and time 1 of the 2 August 2007, 10.12 hours occurrence: Location of occurrence: Maastricht control zone Aircraft

More information

MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM

MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM For services in respect of: Highway Maintenance and Management Car Parking Traffic Management Signatories: For Birmingham

More information

The Railroad Commission of California

The Railroad Commission of California Introduction to the CPUC Rail Academy Roger Clugston Deputy Director, Office of Rail Safety 1 California Public Utilities Commission Presentation to: League of California Cities Public Works Officers Institute

More information

THE NATIONAL PARK SERVICE HAS THE FINAL AUTHORITY OVER FLYING AT THE STABLES AND MORI POINT

THE NATIONAL PARK SERVICE HAS THE FINAL AUTHORITY OVER FLYING AT THE STABLES AND MORI POINT BAY AREA PARAGLIDING ASSOCIATION STABLES AND MORI POINT SITE REGULATIONS Revised December 17, 2007 IT IS EACH PILOT S RESPONSIBILITY TO KNOW, UPHOLD, AND ENFORCE THESE RULES I. Pilot Qualifications: Every

More information

02/06/2016. TSRGD 2016: Signals and cycling. Sally Gibbons Senior Engineer Traffic Division 2 June Legislation. IHE Traffic Signal Design Course

02/06/2016. TSRGD 2016: Signals and cycling. Sally Gibbons Senior Engineer Traffic Division 2 June Legislation. IHE Traffic Signal Design Course IHE Traffic Signal Design Course Legislation TSRGD 2016: Signals and cycling Sally Gibbons Senior Engineer Traffic Division 2 June 2016 Two kinds: Primary Secondary Primary: Acts of Parliament Secondary:

More information

ASSEMBLY 37TH SESSION

ASSEMBLY 37TH SESSION International Civil Aviation Organization WORKING PAPER 27/9/10 ASSEMBLY 37TH SESSION TECHNICAL COMMISSION Agenda Item 46: Other business to be considered by the Technical Commission CURRENT ASPECTS OF

More information

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy Agenda Item 7 Executive Open Report on behalf of Richard Wills, Executive Director for Environment and Economy Report to: Executive Date: 02 September 2014 Subject: Lincoln East West Link Road Phase 1

More information

Hungarian Public Road Nonprofit PLC

Hungarian Public Road Nonprofit PLC Hungarian Public Road Nonprofit PLC 2 Magyar Közút Nonprofit Zrt. The Hungarian Public Road Nonprofit PLC is responsible for the operation and maintenance of more than 31 000 km of national roads. www.kozut.hu

More information

City of Markham Staff Presentation. York Region Lake to Lake Trail. Implementation DEVELOPMENT SERVICES COMMITTEE. September 6, 2016 PRESENTATION TO

City of Markham Staff Presentation. York Region Lake to Lake Trail. Implementation DEVELOPMENT SERVICES COMMITTEE. September 6, 2016 PRESENTATION TO York Region Lake to Lake Trail Implementation City of Markham Staff Presentation PRESENTATION TO DEVELOPMENT SERVICES COMMITTEE September 6, 2016 1 Lake to Lake Route 2 Lake to Lake Route In 2008, the

More information

Sweden. Tourism in the economy. Tourism governance and funding

Sweden. Tourism in the economy. Tourism governance and funding Sweden Tourism in the economy In 2014 Sweden s GDP was SEK 3 907 billion. Tourism s share of GDP is 2.8%, and has been growing steadily for the last ten years and is an important contributor to the economy

More information

Uniclass L534+L212. August home zones. paving PRECAST CONCRETE PAVING SOLUTIONS FOR TODAY S RESIDENTIAL STREET ENVIRONMENTS.

Uniclass L534+L212. August home zones. paving PRECAST CONCRETE PAVING SOLUTIONS FOR TODAY S RESIDENTIAL STREET ENVIRONMENTS. August 2005 Uniclass L534+L212 paving home zones PRECAST CONCRETE PAVING SOLUTIONS FOR TODAY S RESIDENTIAL STREET ENVIRONMENTS www.paving.org.uk Home Zone Principles Home Zones are residential streets

More information

SCHOOL CROSSING PATROL POLICY

SCHOOL CROSSING PATROL POLICY Appendix A SCHOOL CROSSING PATROL POLICY March 2003 Page 39 SCHOOL CROSSING PATROLS IN LINCOLNSHIRE POLICY DOCUMENT INTRODUCTION 1.1 The aim of this policy is to provide an efficient and effective school

More information

Group of specialists European diploma on protected areas CoE, Strasbourg, 8 March 2017

Group of specialists European diploma on protected areas CoE, Strasbourg, 8 March 2017 RENEWAL OF THE EUROPEAN DIPLOMA TO THE KHOSTOMUKSHA STRICT NATURE RESERVE RUSSIAN FEDERATION Group of specialists European diploma on protected areas CoE, Strasbourg, 8 March 2017 Hervé LETHIER, Switzerland

More information

Proposals for the Harrogate Road / New Line Junction Improvement Scheme. August / September Supported by:

Proposals for the Harrogate Road / New Line Junction Improvement Scheme. August / September Supported by: Proposals for the Harrogate / New Line Junction Improvement Scheme August / September 2016 Supported by: Introduction Key Benefits Proposals are currently being developed for changes to the junction of

More information

INTERNAL AUDIT DIVISION REPORT 2017/051. Audit of the aviation safety programme in the African Union-United Nations Hybrid Operation in Darfur

INTERNAL AUDIT DIVISION REPORT 2017/051. Audit of the aviation safety programme in the African Union-United Nations Hybrid Operation in Darfur INTERNAL AUDIT DIVISION REPORT 2017/051 Audit of the aviation safety programme in the African Union-United Nations Hybrid Operation in Darfur There was a need to effectively address issues identified and

More information

Dangerous Goods Emergency Response

Dangerous Goods Emergency Response Dangerous Goods Emergency Response 10/23/2008 OBJECTIVES To provide an overview of the various Emergency Response Requirements. Review of the ICAO Emergency Response Requirements Review of the ICAO (Red

More information

1.2 If the Council is satisfied that traffic on a road should be prohibited for the purpose of:

1.2 If the Council is satisfied that traffic on a road should be prohibited for the purpose of: APPENDIX 2 POLICY/PROCEDURE IN REGARD TO TEMPORARY ROAD CLOSURES ON THE COUNTY ROAD NETWORK FOR EVENTS ON O'R NEAR THE HIGHWAY. (Not in respect of a footpath, bridleway, cycle track or byway) 1.0 INTRODUCTION

More information