PEDESTRIAN ONLY TRAFFIC SIGNALS.

Size: px
Start display at page:

Download "PEDESTRIAN ONLY TRAFFIC SIGNALS."

Transcription

1 - Traffic Signal Control course - Conference Aston Birmingham - 18 th May to May 21 st 2015

2 What is POTS? POTS is a generic name for pedestrian crossings for stand-alone (Mid Block) locations or a pedestrian stream associated with a junction

3 Why POTS? Changes to the Zebra, Pelican and Puffin Pedestrian Crossings Regulations and General Directions 1997 will phase out the Pelican crossing. This means that the use of the flashing green man / flashing amber will no longer be permitted as part of the light sequence.

4 When and how do we use POTS? The POTS pedestrian crossing can be used for ; Pedestrian Cycle Horse Pedestrians and cycles can be combined to create a TOUCAN crossing.

5 When and how do we use POTS? Far-side or near-side pedestrian signals can be used but NOT in combination. High level repeaters can be used with near-side signals. An unlatched pedestrian demand using kerbside detection can be used with near-side signals ONLY. There is provision for a variable blackout period with far-side signals and extending all red period with near-side signals. Zigzag markings to indicate a controlled zone on the approach and exit are required.

6 FAR-SIDE PEDESTRIAN PEDESTRIAN ONLY TRAFFIC SIGNALS TIMINGS: I PERIOD VEH PED VA MIN = 6 15 FVP = VA MAX = ii 3 sec A R iii 1 3 sec R R iv 4 9 sec stand-alone R G v 3 15 sec R BO vi 0 30 sec R VBO vii 1 3 sec R BO vii 1 3 sec R R ix 2 sec R/A R G R FACILITY MANDATORY OPTIONAL FAR SIDED SIGNALS PEDESTRIAN INDICATOR (2 BOX) AUDIBLE INDICATOR UNIT TACTILE UNIT ABOVE GROUND VEHICLE DETECTION LOOP DETECTORS SPEED DISCRIMINATION/ASSESMENT ON CROSSING DETECTION The Far-Side pedestrian Crossing operates WITHOUT the flashing green man / flashing amber and has a BLACKOUT period following the green man invitation period.

7 FAR-SIDE PEDESTRIAN TOUCAN TIMINGS: I PERIOD VEH PED VA MIN = 6 15 FVP = VA MAX = ii 3 sec A R iii 1 3 sec R R iv 4 9 sec stand-alone R G v 3 15 sec R BO vi 0 30 sec R VBO vii 1 3 sec R BO vii 1 3 sec R R ix 2 sec R/A R G R FACILITY MANDATORY OPTIONAL FAR SIDED SIGNALS PEDESTRIAN INDICATOR (2 BOX) AUDIBLE INDICATOR UNIT TACTILE UNIT ABOVE GROUND VEHICLE DETECTION LOOP DETECTORS SPEED DISCRIMINATION/ASSESMENT ON CROSSING DETECTION The Far-Side TOUCAN crossing operates WITHOUT the flashing green man / flashing amber and has a BLACKOUT period following the green man invitation period. Note that the legend on the push button is different from the Far-Side pedestrian

8 FAR-SIDE PEDESTRIAN with COUNTDOWN - PCATs TIMINGS: I PERIOD VEH PED VA MIN = 6 15 FVP = VA MAX = ii 3 sec A R iii 1 3 sec R R iv 4 9 sec stand-alone R G v 3 15 sec R BO vi 0 30 sec R VBO vii 1 3 sec R BO vii 1 3 sec R R ix 2 sec R/A R G R FACILITY MANDATORY OPTIONAL FAR SIDED SIGNALS PEDESTRIAN INDICATOR (2 BOX) AUDIBLE INDICATOR UNIT TACTILE UNIT ABOVE GROUND VEHICLE DETECTION LOOP DETECTORS SPEED DISCRIMINATION/ASSESMENT ON CROSSING DETECTION The PCATs pedestrian countdown crossing operates with a fixed invitation period (Typically 6s) and a fixed blackout period which is displayed via the countdown signal.

9 NEAR-SIDE PEDESTRIAN - PUFFIN TIMINGS PERIOD VEH PED 1 VA MIN = 6 15 FVP = VA MAX = G R 2 3 sec A R sec R R sec R G sec R R sec R XR 7 or sec/1 3 sec R R 9 2 sec R/A R FACILITY MANDATORY OPTIONAL NEAR SIDED SIGNALS KERB SIDE DETECTION AUDIBLE INDICATOR UNIT TACTILE UNIT ABOVE GROUND VEHICLE DETECTION LOOP DETECTORS SPEED DISCRIMINATION/ASSESMENT ON CROSSING DETECTION The Near-Side pedestrian Crossing operates with an Unlatched pedestrian demand using kerbside detection. There is no BLACKOUT period following the green man invitation period. A fixed or extendable red period runs after the invitation to cross.

10 NEAR-SIDE PEDESTRIAN - TOUCAN TIMINGS PERIOD VEH PED 1 VA MIN = 6 15 FVP = VA MAX = G R 2 3 sec A R sec R R sec R G sec R R sec R XR 7 or sec/1 3 sec R R 9 2 sec R/A R FACILITY MANDATORY OPTIONAL NEAR SIDED SIGNALS KERB SIDE DETECTION AUDIBLE INDICATOR UNIT TACTILE UNIT ABOVE GROUND VEHICLE DETECTION LOOP DETECTORS SPEED DISCRIMINATION/ASSESMENT ON CROSSING DETECTION The Near-Side TOUCAN Crossing can operate with an Unlatched demand using kerbside detection. There is no BLACKOUT period following the green invitation period and a fixed or extendable red period runs after the invitation to cross.

02/06/2016. TSRGD 2016: Signals and cycling. Sally Gibbons Senior Engineer Traffic Division 2 June Legislation. IHE Traffic Signal Design Course

02/06/2016. TSRGD 2016: Signals and cycling. Sally Gibbons Senior Engineer Traffic Division 2 June Legislation. IHE Traffic Signal Design Course IHE Traffic Signal Design Course Legislation TSRGD 2016: Signals and cycling Sally Gibbons Senior Engineer Traffic Division 2 June 2016 Two kinds: Primary Secondary Primary: Acts of Parliament Secondary:

More information

Location Outside 27 West Street (Ladbrokes) see picture Fig4. This location seems to give most viability in both directions. West Street, Buckingham

Location Outside 27 West Street (Ladbrokes) see picture Fig4. This location seems to give most viability in both directions. West Street, Buckingham West Street, Buckingham Proposal That a Puffin crossing be installed (see crossing definitions) outside 27 West Street to ensure pedestrian s are able to cross safely (see Fig1 for proposed crossing point).

More information

"TOUCAN" - An unsegregated crossing for pedestrians and cyclists

TOUCAN - An unsegregated crossing for pedestrians and cyclists Traffic Advisory Leaflet 10/93 August 1993 "TOUCAN" - An unsegregated crossing for pedestrians and cyclists Summary This leaflet gives advice on the design and use of the Toucan signal controlled crossing,

More information

FOREWORD. July 2006 July Release 1.0 Page 2

FOREWORD. July 2006 July Release 1.0 Page 2 FOREWORD The Government s vision for transport in the future is a high quality, environmentally sustainable, reliable and safe transport system. Efficient road network operation is crucial to achieving

More information

For the theory test you could be asked about all of them so what are the differences?

For the theory test you could be asked about all of them so what are the differences? Pedestrian Crossings There are 7 types of pedestrian (I include animals) crossings (or configurations) in England. 1. Zebra 2. Lollipop 3. Pelican 4. Puffin 5. Toucan 6. Staggered 7. Pegasus (Equestrian)

More information

The bypass is west of the current crossing, leaving only local traffic using the existing road.

The bypass is west of the current crossing, leaving only local traffic using the existing road. Paul Finch and Chris Kennett September 2018 The Cambridge Method Shuttle Working and VMS with Overheight Detection The historic City of Ely was once an island, but is now bordered to the south by a railway

More information

Trial of farside pedestrian signals at a Puffin crossing

Trial of farside pedestrian signals at a Puffin crossing Published Project Report PPR608 Trial of farside pedestrian signals at a Puffin crossing A Maxwell, C Smyth, R Hutchins and M R Crabtree Transport Research Laboratory PROJECT REPORT PPR608 Trial of farside

More information

APPENDIX A RELEVANT DOCUMENTATION

APPENDIX A RELEVANT DOCUMENTATION APPENDIX A RELEVANT DOCUMENTATION A.1 RELEVANT REFERENCE MATERIAL, LEGISLATION AND REGULATIONS All documents in this appendix are subject to amendment being superseded. Any designer installer shall be

More information

TR 2181 Issue C July 2001

TR 2181 Issue C July 2001 Traffic Systems and Signing TR 2181 Issue C July 2001 Crown Copyright 2001 Applications to reproduce this material should be made to The Controller of Her Majesty's Stationery Office First published 2000

More information

USING SCOOT MULTI-NODES TO REDUCE PEDESTRIAN DELAY AT DUAL CROSSINGS IN BRISTOL

USING SCOOT MULTI-NODES TO REDUCE PEDESTRIAN DELAY AT DUAL CROSSINGS IN BRISTOL USING SCOOT MULTI-NODES TO REDUCE PEDESTRIAN DELAY AT DUAL CROSSINGS IN BRISTOL Jackie Davies, Senior Technical Officer (UTC), Bristol City Council Traffic Signals Synopsis Bristol City Council has received

More information

Integration of Pedestrian Traffic Signal Control within SCOOT-UTC Systems

Integration of Pedestrian Traffic Signal Control within SCOOT-UTC Systems Traffic Advisory Leaflet 2/09 April 2009 Integration of Pedestrian Traffic Signal Control within SCOOT-UTC Systems Introduction SCOOT 1,2,3 (Split Cycle and Offset Optimisation Technique) is an adaptive

More information

Puffins at Junctions Design & Modelling Implications. JCT Symposium Paper 18 September 2003

Puffins at Junctions Design & Modelling Implications. JCT Symposium Paper 18 September 2003 Puffins at Junctions Design & Modelling Implications JT Symposium Paper 18 September 2003 y rian F Simmonite Director JT onsultancy Ltd JT onsultancy Ltd Unit 4, 22 The Green Nettleham Lincoln LN2 2NR

More information

ROAD TRAFFIC (PEDESTRIAN CROSSINGS) (JERSEY) ORDER 1982

ROAD TRAFFIC (PEDESTRIAN CROSSINGS) (JERSEY) ORDER 1982 ROAD TRAFFIC (PEDESTRIAN CROSSINGS) (JERSEY) ORDER 1982 Revised Edition Showing the law as at 1 January 2016 This is a revised edition of the law Road Traffic (Pedestrian Crossings) (Jersey) Order 1982

More information

FILLED WITH FACTS & ACTIVITIES. e s. t o. e f. f l BE SAFE, STAY ALIVE!

FILLED WITH FACTS & ACTIVITIES. e s. t o. e f. f l BE SAFE, STAY ALIVE! FILLED WITH FACTS & ACTIVITIES A an f l us ef e s r u ul guide to kee ping yo n the roa d. o e f a ers s h t o d BE SAFE, STAY ALIVE! Safe Walking The Green Cross Code Crossing Safely Road Signs & Signals

More information

London Borough of Barnet Traffic & Development Design Team

London Borough of Barnet Traffic & Development Design Team London Borough of Barnet Traffic & Development Design Team AERODROME ROAD PEDESTRIAN FACILITY AND BUS STOP INTRODUCTION FEASIBILITY REPORT Job Number: 60668 Doc Ref: S106/12-13/60668 Author: Manoj Kalair

More information

V6 Revised & Updated Oct 10 A Fitch A Marson D Moore J Silvester 04/11/10. V5 Revised & Updated Jun 07 A Fitch D Moore - J Silvester 08/06/07

V6 Revised & Updated Oct 10 A Fitch A Marson D Moore J Silvester 04/11/10. V5 Revised & Updated Jun 07 A Fitch D Moore - J Silvester 08/06/07 JOB NUMBER: 5094313.499 DOCUMENT REF: Guidance for Developers V7 As V6 with minor revisions requested by ECC Jan 11 A Fitch A Marson D Moore J Silvester 26/01/11 V6 Revised & Updated Oct 10 A Fitch A Marson

More information

Safer Crossings Qualitative Research October 2014

Safer Crossings Qualitative Research October 2014 Safer Crossings Qualitative Research October 2014 Contents 1. Background 4 2. Objectives 4 3. Methodology 4 Main Findings 6 4. Context 6 5. Awareness of crossing types 6 6. Zebra Crossings 7 7. Pelican

More information

Dyke Road Cycle and Pedestrian Improvements 14/02/2014 Reference number PEDESTRIAN CROSSING AND GUARDRAILING ASSESSMENT

Dyke Road Cycle and Pedestrian Improvements 14/02/2014 Reference number PEDESTRIAN CROSSING AND GUARDRAILING ASSESSMENT 14/02/2014 Reference number 102470 PEDESTRIAN CROSSING AND GUARDRAILING ASSESSMENT DYKE ROAD CYCLE AND PEDESTRIAN IMPROVEMENTS PEDESTRIAN CROSSING AND GUARDRAILING ASSESSMENT IDENTIFICATION TABLE Client/Project

More information

Gap Acceptance for Pelicans under SCOOT Implementation (GAPS) Guide Lines

Gap Acceptance for Pelicans under SCOOT Implementation (GAPS) Guide Lines Siemens Traffic Controls Limited, Sopers Lane, Poole, Dorset, BH17 7ER SYSTEM/PROJECT/PRODUCT : GAPS Gap Acceptance for Pelicans under SCOOT Implementation (GAPS) Guide Lines THIS DOCUMENT IS ELECTRONICALLY

More information

Road and street crossings for blind and partially sighted people:

Road and street crossings for blind and partially sighted people: Road and street crossings for blind and partially sighted people: The importance of being certain A paper for the Guide Dogs for the Blind Association July 2014 Bryan Matthews, Daryl Hibberd and Oliver

More information

Chapter 21 Route window W6 West Ealing station. Transport for London

Chapter 21 Route window W6 West Ealing station. Transport for London Chapter 21 Route window W6 West Ealing station WEST EALING STATION 21 Route window W6 West Ealing station Baseline conditions 21.6 West Ealing station is located in the London Borough of Ealing and is

More information

2011 No ROAD TRAFFIC. The Traffic Signs (Amendment) Regulations and General Directions 2011

2011 No ROAD TRAFFIC. The Traffic Signs (Amendment) Regulations and General Directions 2011 STATUTORY INSTRUMENTS 2011 No. 1040 ROAD TRAFFIC The Traffic Signs (Amendment) Regulations and General Directions 2011 Made - - - - 30th March 2011 Laid before Parliament 6th April 2011 Coming into force

More information

We recommend you cite the published version. The publisher s URL is

We recommend you cite the published version. The publisher s URL is Hunt, J. and Lyons, G. (1997) Enhanced operating strategies to improve pedestrian amenity and safety at midblock signalled pedestrian crossings. In: Proceedings of the 25th European Transport Forum, Traffic

More information

Road Signs, Markings and Their Meaning

Road Signs, Markings and Their Meaning Road Signs, Markings and Their Meaning FUNCTIONS OF ROAD SIGNS AND MARKINGS 1. Guides 2. Directs 3. Warns 4. Informs 5. Prohibits 6. Regulates CLASSIFICATION OF ROAD SIGNS 1. Warning 2. Regulatory 3. Informatory

More information

Nump on the Bose!! Games transposing vonsanants and cowels.

Nump on the Bose!! Games transposing vonsanants and cowels. Nump on the Bose!! Games transposing vonsanants and cowels Hodgeheg Games There is no convincing evidence that the study of traditional nor modern descriptive grammars improve children s speaking and listening

More information

GAS STOVE GUARD for natural gas and propane stoves

GAS STOVE GUARD for natural gas and propane stoves GAS STOVE GUARD for natural gas and propane stoves OPERATING INSTRUCTIONS September 18, 2017 STOVE GUARD is not designated for use with gas stoves with pilot light. STOVE GUARD is an electronic safety

More information

Low cost solutions to improve safety at level crossings in Hungary

Low cost solutions to improve safety at level crossings in Hungary 2 nd Session of Group of Experts on Safety at Level Crossings Low cost solutions to improve safety at level crossings in Hungary Alexandru Árpád MOGYORÓS Ministry of National Development - Hungary Transport

More information

Come on board. An introduction to accessible transport in London MAYOR OF LONDON. Transport for London

Come on board. An introduction to accessible transport in London MAYOR OF LONDON. Transport for London Come on board An introduction to accessible transport in London MAYOR OF LONDON Transport for London Contents 4 Plan your journey 6 Help from staff 8 Learning to use public transport 9 Fares and tickets

More information

Proposals for the Harrogate Road / New Line Junction Improvement Scheme. August / September Supported by:

Proposals for the Harrogate Road / New Line Junction Improvement Scheme. August / September Supported by: Proposals for the Harrogate / New Line Junction Improvement Scheme August / September 2016 Supported by: Introduction Key Benefits Proposals are currently being developed for changes to the junction of

More information

Alpha Systems AOA Classic & Ultra CALIBRATION PROCEDURES

Alpha Systems AOA Classic & Ultra CALIBRATION PROCEDURES Alpha Systems AOA Calibration Overview The calibration of the Alpha Systems AOA has 3 simple steps 1.) (On the Ground) Zero calibration 2.) (In-flight) Optimum Alpha Angle (OAA) calibration 3.) (In-flight)

More information

GK/GN0692. Guidance on Level Crossing Interface Requirements. Rail Industry Guidance Note for GK/RT0192. Published by

GK/GN0692. Guidance on Level Crossing Interface Requirements. Rail Industry Guidance Note for GK/RT0192. Published by GN Published by Block 2 Angel Square 1 Torrens Street London EC1V 1NY Copyright 2012 Rail Safety and Standards Board Limited GK/GN0692 Issue Two: December 2012 Rail Industry Guidance Note for GK/RT0192

More information

Accessible. Transport. Helpful advice and information about accessible travel in Guernsey. Buses

Accessible. Transport. Helpful advice and information about accessible travel in Guernsey. Buses Accessible Helpful advice and information about accessible travel in Guernsey Buses Transport Guernsey has a modern fleet of buses which are operated by CT Plus, on behalf of the Committee for the Environment

More information

HIGHWAYS PANEL held at COUNCIL OFFICES LONDON ROAD SAFFRON WALDEN at 7.30pm on 23 MARCH 2015

HIGHWAYS PANEL held at COUNCIL OFFICES LONDON ROAD SAFFRON WALDEN at 7.30pm on 23 MARCH 2015 HIGHWAYS PANEL held at COUNCIL OFFICES LONDON ROAD SAFFRON WALDEN at 7.30pm on 23 MARCH 2015 Present: Councillor A Walters (Chairman) Councillors C Cant, J Freeman and J Salmon (Uttlesford District Council).

More information

INVENTOR S KIT MAKING A PEDESTRIAN CROSSING. FOR BBC micro:bit ADDITIONAL EXPERIMENT EXPERIMENT 11.

INVENTOR S KIT MAKING A PEDESTRIAN CROSSING. FOR BBC micro:bit ADDITIONAL EXPERIMENT EXPERIMENT 11. INVENTOR S KIT FOR BBC micro:bit ADDITIONAL EXPERIMENT EXPERIMENT 11 MAKING A PEDESTRIAN CROSSING www.kitronik.co.uk/experiment11 11 EXPERIMENT ELEVEN MAKING A PEDESTRIAN CROSSING THE AIMS OF THIS EXPERIMENT

More information

CITY OF WESTMINSTER. 2. The general effects of the Orders, in relation to the implementation of Phase 2 of the Piccadilly 2 Way Scheme, would be in:

CITY OF WESTMINSTER. 2. The general effects of the Orders, in relation to the implementation of Phase 2 of the Piccadilly 2 Way Scheme, would be in: CITY OF WESTMINSTER CARLTON HOUSE TERRACE, CARLTON STREET, CHARLES II STREET, HAYMARKET, JERMYN STREET, NORRIS STREET, ORANGE STREET, PANTON STREET, REGENT STREET, ST. JAMES S MARKET, SUFFOLK PLACE, SUFFOLK

More information

Queen s Circus Roundabout

Queen s Circus Roundabout Stage 2 Road Safety Audit Ref: 1128-RSA-01 Prepared for: Steer Davies Gleave By: Capital Traffic Prepared by: Checked by: Approved by: Andy Haunton, Audit Team Leader Jonathan Thompson, Audit Team Member

More information

Disability Access Facilitation Plan ALICE SPRINGS AIRPORT

Disability Access Facilitation Plan ALICE SPRINGS AIRPORT UPDATED JUNE 2017 for Alice Springs Airport Prior to Arrival To assist in the provision of best service available and to request assistance, passengers should advise the airline or travel agent when making

More information

Context. Site Development. Brassington Avenue

Context. Site Development. Brassington Avenue 1 Context This public exhibition is being held to present NEW proposals for the development of the Brassington Ave site in Sutton Coldfield town centre. NEW Come and see proposals for We would very much

More information

Toll Booth. Build a toll booth with an arm that raises and lowers. This does not need to be very large.

Toll Booth. Build a toll booth with an arm that raises and lowers. This does not need to be very large. Toll Booth Task: You must design, build, and test a toll both that has a gate arm that raises and lowers to let cars through. The toll gate arm will be operated using limit switches to detect whether or

More information

ADVANCED WARNING SYSTEM FOR SHARED USE CROSSING ON HOWARD STREET EAST OF NORDICA AVENUE

ADVANCED WARNING SYSTEM FOR SHARED USE CROSSING ON HOWARD STREET EAST OF NORDICA AVENUE ADVANCED WARNING SYSTEM FOR SHARED USE CROSSING ON EAST RDICA AVENUE FOR THE LOCATION MAP STANDARD SYMBOLS FEATURE EISTING PROPOSED BENCHMARK BM/TBM SHEET INDE. BM/TBM TITLE SHEET CONCRETE R.O.W. MONUMENT

More information

CITY OF NEWCASTLE UPON TYNE JOHN DOBSON STREET AREA. Traffic Regulation (Consolidation) Order 2009 (John Dobson Street Area Variation) Order 2015

CITY OF NEWCASTLE UPON TYNE JOHN DOBSON STREET AREA. Traffic Regulation (Consolidation) Order 2009 (John Dobson Street Area Variation) Order 2015 CITY OF NEWCASTLE UPON TYNE JOHN DOBSON STREET AREA (I) Traffic Regulation (Consolidation) Order 2009 (John Dobson Street Area Variation) Order 2015 propose to make an Order under Sections 1, 2, 4, 29

More information

Date 24/10/2011. Date 04/11/2011. Date 25/10/2011. Date 10/11/2011. Date 25/10/2011. Date 25/10/2011. Date 10/11/2011.

Date 24/10/2011. Date 04/11/2011. Date 25/10/2011. Date 10/11/2011. Date 25/10/2011. Date 25/10/2011. Date 10/11/2011. DELEGATED POWERS REPORT NO. 1489 SUBJECT: Traffic Signal Review, Junction of Oakleigh Road North and the A1000 Control sheet All of the following actions MUST be completed at each stage of the process

More information

Improving Safety at Level Crossings - JR East Developments

Improving Safety at Level Crossings - JR East Developments Signalling Seminar in TOKYO 7 th April. 2016 Improving Safety at Level Crossings - JR East Developments Takashi Kawano (MIRSE) East Japan Railway Company Contents 1. Present Situations of Level Crossings

More information

Attachment No. 20 RRLRT No. 1. Committee. Busway Grade Crossings STATUS/DATE OF ACTION

Attachment No. 20 RRLRT No. 1. Committee. Busway Grade Crossings STATUS/DATE OF ACTION Attachment No. 20 RRLRT No. 1 TECHNICAL COMMITTEE: Railroad / Light Rail Transit Technical Committee TOPIC: Busway Grade Crossings STATUS/DATE OF ACTION RRLRT TC Draft: 06/23/2011 RRLRT TC Approval: 06/27/2014

More information

Prepared on 06/06/ :51:19

Prepared on 06/06/ :51:19 Project: Cork CC Accessibility Audits Job No: 027821 EASTING Use Type: Capita Ref: 001 Public roads / footpaths Auditor: K Craig Name: Bray Town Outskirts Date of Audit: 01/04/2008 Address: County Wicklow

More information

Grade Crossings in High Speed Rail Corridors

Grade Crossings in High Speed Rail Corridors Grade Crossings in High Speed Rail Corridors 59 th ANNUAL ILLINOIS TRAFFIC ENGINEERING & SAFETY CONFERENCE October 21, 2010 Champaign, IL Michael E. Stead Rail Safety Section Illinois Commerce Commission

More information

Toyostove Error Code EE 2 (EE 6)

Toyostove Error Code EE 2 (EE 6) Toyostove Error Code EE 2 (EE 6) WARNING Rural Energy Enterprises, Inc. does not accept liability for the improper use of this information. Installation, service, and maintenance of heating equipment should

More information

Measures of Urban Trail Use in Minneapolis

Measures of Urban Trail Use in Minneapolis Measures of Urban Trail Use in Minneapolis Midtown Greenway @ Hennepin Ave Midtown Greenway @ Cedar Ave Midtown Greenway @ West River Pkwy Lake Calhoun Pkwy trail Why Measure Trail Use? Document use of

More information

PRIOR TO ARRIVAL... 2 ACCESSIBLE PARKING... 2 TERMINAL KERBSIDE ACCESS (PICK-UP AND DROP-OFF ZONE)... 2 GROUND TRANSPORT OPTIONS...

PRIOR TO ARRIVAL... 2 ACCESSIBLE PARKING... 2 TERMINAL KERBSIDE ACCESS (PICK-UP AND DROP-OFF ZONE)... 2 GROUND TRANSPORT OPTIONS... ACCESSIBILITY GUIDE A guide for all members of the community, including passengers and visitors with a disability, which addresses all aspects of accessibility at Gold Coast Airport Contents PRIOR TO ARRIVAL...

More information

Disability Access Facilitation Plan DARWIN INTERNATIONAL AIRPORT

Disability Access Facilitation Plan DARWIN INTERNATIONAL AIRPORT Disability Access Facilitation Plan DARWIN INTERNATIONAL AIRPORT DISABILITY ACCESS FACILITATION PLAN FOR DARWIN INTERNATIONAL AIRPORT Prior to Arrival...1 Prior to Arrival Kerbside Process & Car Parking...2

More information

1.0 PURPOSE. a) Ensure safe movement with the objective of preventing collisions between aircraft, and between aircraft and obstacles;

1.0 PURPOSE. a) Ensure safe movement with the objective of preventing collisions between aircraft, and between aircraft and obstacles; 1.0 PURPOSE Page 1 of 5 The purpose of this Advisory Circular (AC) is to provide guidance to the aerodrome operators in adopting operational procedures and principles for apron management. The aerodrome

More information

HIGHWAY RAIL GRADE CROSSING 4 QUAD GATES. William H. Watson. Amtrak

HIGHWAY RAIL GRADE CROSSING 4 QUAD GATES. William H. Watson. Amtrak HIGHWAY RAIL GRADE CROSSING 4 QUAD GATES William H. Watson Amtrak Union Station 100 Gaspee Street Providence, RI 02903-1133 (617) 345-7518 (6170 345 7820 FAX watsonw@amtrak.com ABSTRACT Design, installation

More information

Transport Assessment Appendix M: Avonmouth Impacts

Transport Assessment Appendix M: Avonmouth Impacts Portishead Branch Line (MetroWest Phase 1) Environmental Impact Assessment Transport Assessment Appendix M: Avonmouth Impacts Prepared for West of England Councils December 2016 1 The Square Temple Quay

More information

Stoke Bishop, Westbury-on-Trym & Henleaze Neighbourhood Partnership

Stoke Bishop, Westbury-on-Trym & Henleaze Neighbourhood Partnership S107A S117 Stoke Bishop, Westbury-on-Trym & leaze Neighbourhood Partnership Kewstoke Road junction with Stoke Hill Shirehampton Road Transport Working Group Highway Issues - Issue 27: Open Issues (15 October

More information

HIGHWAYS (ROAD HUMPS) (JERSEY) REGULATIONS 2002

HIGHWAYS (ROAD HUMPS) (JERSEY) REGULATIONS 2002 HIGHWAYS (ROAD HUMPS) (JERSEY) REGULATIONS 2002 Revised Edition Showing the law as at 1 January 2016 This is a revised edition of the law Highways (Road Humps) (Jersey) Regulations 2002 Arrangement HIGHWAYS

More information

Mercer SCOOT Adaptive Signal Control. Karl Typolt, Transpo Group PSRC RTOC July 6th, 2017

Mercer SCOOT Adaptive Signal Control. Karl Typolt, Transpo Group PSRC RTOC July 6th, 2017 Mercer SCOOT Adaptive Signal Control Karl Typolt, Transpo Group PSRC RTOC July 6th, 2017 Our mission, vision, and core values Mission: deliver a high-quality transportation system for Seattle Vision: connected

More information

Logistical information

Logistical information Logistical information Venue International Labour Organisation (ILO) Address: 4 route des Morillons, Geneva, Switzerland Phone: +41 22 799 7646 Access to the ILO By taxi The taxi driver will need to enter

More information

APRON MANAGEMENT SERVICES

APRON MANAGEMENT SERVICES AC-AD-029 APRON MANAGEMENT SERVICES GENERAL The Ghana Civil Aviation Authority (GCAA) Advisory Circulars from Aerodrome Safety and Standards (ASAS) contain information about standards, practices and procedures

More information

Signalling Record Society - Archive Index BR(M) S and T Plans - ex Birmingham S and T (Box 515)

Signalling Record Society - Archive Index BR(M) S and T Plans - ex Birmingham S and T (Box 515) SRS200605336 BR(LM) CL16/83 11/02/1983 MECH Macclesfield - dog chart and locking table Plan also numbered OC3215L SRS200605337 BR(LM) 30/11/1986 SBD Madeley SRS200605338 BR(LM) NS865027/1 01/07/1986 SCHEME

More information

Chicago St. Louis High-Speed Rail. Braidwood Construction. Local Officials Briefing August 7, 2014

Chicago St. Louis High-Speed Rail. Braidwood Construction. Local Officials Briefing August 7, 2014 Chicago St. Louis High-Speed Rail Braidwood Construction Local Officials Briefing August 7, 2014 1 Chicago-St. Louis Corridor Goals and Benefits» Reduction in travel time by about an hour» Enhanced reliability»

More information

1. Case Study Area and Character Sections

1. Case Study Area and Character Sections ARAGO STREET 1. Case Study Area and Character Sections Case Study Area Calle Aragó is an important streets in the centre of Barcelona. The street belongs to the Eixample district. The origins of Barcelona

More information

Chapter 4 Route window W23 Taplow station. Transport for London

Chapter 4 Route window W23 Taplow station. Transport for London Chapter 4 Route window W23 Taplow station TAPLOW STATION 4 Route window W23 Taplow station 4.6 Baseline conditions Taplow station Taplow station is located in South Buckinghamshire, 1.5 km southeast of

More information

Boston Redevelopment Authority 2/26/ Chestnut Hill Avenue Boston/Brookline, MA

Boston Redevelopment Authority 2/26/ Chestnut Hill Avenue Boston/Brookline, MA Boston Redevelopment Authority 2/26/2014 Cassidy Playground Waterworks Design revisions made since the DPIR submission March 2013 Massing - Reduced project 16,030 SF, for a total project area of 218,520

More information

November 21, 2012 Barbara Kelleher, (954)

November 21, 2012 Barbara Kelleher, (954) November 21, 2012 Barbara Kelleher, (954) 777-4090 barbara.kelleher@dot.state.fl.us BROWARD COUNTY TRAFFIC IMPACT REPORT November 26 to November 30, 2012 FORT LAUDERDALE -- Construction and maintenance-related

More information

Manual for External Batch/Screw Counter (NEX-PLC) for Screw Feeder FM-36

Manual for External Batch/Screw Counter (NEX-PLC) for Screw Feeder FM-36 Manual for External Batch/Screw Counter (NEX-PLC) for Screw Feeder FM-36 1.Summary This counter can interface with Screw Feeder FM-36 by setting the number of batches/screws, to be fed, directly into this

More information

The Blue Badge Scheme in Scotland. Rights and responsibilities of a Blue Badge holder in Scotland

The Blue Badge Scheme in Scotland. Rights and responsibilities of a Blue Badge holder in Scotland The Blue Badge Scheme in Scotland Rights and responsibilities of a Blue Badge holder in Scotland Please read this leaflet carefully and keep it safe! The Blue Badge scheme is administered by your local

More information

PBN Operational Approval Continental En Route Navigation Specifications

PBN Operational Approval Continental En Route Navigation Specifications PBN Operational Approval Continental En Route Navigation Specifications Navigation Specifications Applicable to Continental En-route operations RNAV 5 RNAV 2 RNP 2 A-RNP RNP 0.3 2 RNAV 5 Flight Phase Navigation

More information

Chapter 2 Route window W25 Maidenhead station. Transport for London

Chapter 2 Route window W25 Maidenhead station. Transport for London Chapter 2 Route window W25 Maidenhead station MAIDENHEAD STATION 2 Route window W25 Maidenhead station 2.6 The drawings provided at the end of this chapter present the main features of the route window,

More information

Venue Access Information and Access Statement for Disabled Visitors

Venue Access Information and Access Statement for Disabled Visitors Venue Access Information and Access Statement for Disabled Visitors Venue: Sunderland Museum and Winter Gardens Entrance Charges Admission is free for everyone. Some exhibitions may have an additional

More information

Rockland County Safety & Quiet Zone Project. Town of Orangetown Public Meeting January 30, 2008

Rockland County Safety & Quiet Zone Project. Town of Orangetown Public Meeting January 30, 2008 ockland County Safety & Quiet Zone Project Town of Orangetown Public Meeting January 30, 2008 Agenda Welcome and Introductions Project Goals Project Area and ailroad Facts How to Establish a Quiet Zone

More information

DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION TYPE CERTIFICATE DATA SHEET NO. 3A19

DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION TYPE CERTIFICATE DATA SHEET NO. 3A19 DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION TYPE CERTIFICATE DATA SHEET NO. 3A19 3A19 Revision 44 CESSNA 150 150J 150A 150K 150B A150K 150C 150L 150D A150L 150E 150M 150F A150M 150G 152

More information

Chapter 4 Route Window NE3 Manor Park station. Transport for London

Chapter 4 Route Window NE3 Manor Park station. Transport for London Chapter 4 Route Window NE3 Manor Park station MANOR PARK STATION 4 Route Window NE3 Manor Park station 4.7 Highway access to Manor Park station is very good. A117 Station Road connects with A116 to the

More information

Shotgate Parish Council

Shotgate Parish Council Shotgate Parish Council Chairman: Keith Allen Vice Chairman: Peter Vickers MINUTES OF THE MEETING OF SHOTGATE PARISH COUNCIL HELD AT SHOTGATE BAPTIST CHURCH HALL, BRUCE GROVE, SHOTGATE, ON TUESDAY 12TH

More information

Sky Temporary Car Park Transport Statement

Sky Temporary Car Park Transport Statement 001 Issue 26 August 2016 This report takes into account the particular instructions and requirements of our client. It is not intended for and should not be relied upon by any third party and no responsibility

More information

Access Statement for. Jurys Inn Belfast

Access Statement for. Jurys Inn Belfast This access statement does not contain personal opinions as to our suitability for those with access needs, but aims to accurately describe the facilities and services that we offer all our guests/visitors.

More information

Space Based ADS-B. ICAO SAT meeting - June 2016 AIREON LLC PROPRIETARY INFORMATION

Space Based ADS-B. ICAO SAT meeting - June 2016 AIREON LLC PROPRIETARY INFORMATION Space Based ADS-B ICAO SAT meeting - June 2016 1 Options to Detect an Aircraft Position Position Accuracy / Update Interval Voice Position Reporting ADS-C Position Reporting Radar Surveillance / MLAT Space

More information

4. The Council s LTCCP decision on 30 June 2009 confirmed the extended tram route and funding.

4. The Council s LTCCP decision on 30 June 2009 confirmed the extended tram route and funding. 145 11. TRAM EXTENSION PROJECT PROPOSED PARKING CHANGES AND STREET MODIFICATIONS IN LICHFIELD STREET, MANCHESTER STREET, HIGH STREET, TUAM STREET, ASH STREET, BEDFORD ROW AND OXFORD TERRACE General Manager

More information

CHILEAN SEA LEVEL NETWORK

CHILEAN SEA LEVEL NETWORK 2 nd MEETING OF THE IHO TIDAL AND WATER LEVEL GROUP 27-29 APRIL 2010, STAVANGER, NORWAY CHILEAN SEA LEVEL NETWORK TSUNAMI FEBRUARY 27TH-2010 TSUNAMI SIGNALS IN A SEA LEVEL REGISTER Juan Fierro C. Lecture

More information

Travel safe. A guide about community safety

Travel safe. A guide about community safety Travel safe A guide about community safety 2010 2 Introduction Travel safe A guide about community safety. This book is about some of the things that you need to know to travel safely by yourself in Tyne

More information

Test of Traficon SafeWalk and C-Walk pedestrian detectors

Test of Traficon SafeWalk and C-Walk pedestrian detectors Published Project Report PPR550 Test of Traficon SafeWalk and C-Walk pedestrian detectors A Kirkham Transport Research Laboratory PUBLISHED PROJECT REPORT PPR550 Test of Traficon SafeWalk and C-Walk pedestrian

More information

Level Crossing Interface Requirements

Level Crossing Interface Requirements Level Crossing Interface Synopsis This document mandates the control, command and signalling requirements for level crossing equipment, so that level crossing functionality is compatible with infrastructure

More information

Air India Ticketing procedures

Air India Ticketing procedures Air India Ticketing procedures New Ticketing Procedures 23 rd February, 2011 We are pleased to inform that Air India Ltd, the merged entity of AI-coded flights and IC-coded flights, will move to a single

More information

212iLM Mullion (ILLUMINATED WEATHER RESISTANT) Keypad

212iLM Mullion (ILLUMINATED WEATHER RESISTANT) Keypad International Electronics, Inc. 427 Turnpike Street Canton, Massachusetts 02021 212iLM Mullion (ILLUMINATED WEATHER RESISTANT) Keypad Stand Alone Keypad-Installation Manual Features: 120 User Capability

More information

Traffic Calming and Road Safety Provision Options Woore Village

Traffic Calming and Road Safety Provision Options Woore Village Traffic Calming and Road Safety Provision Options Woore Village Contents 1 Executive Summary 4 2 Introduction 6 2.1 Background 6 3 Existing Provisions and Conditions 7 3.1 Background supporting option

More information

Commissioning Director - Environment. Officer Contact Details Jane Shipman;

Commissioning Director - Environment. Officer Contact Details Jane Shipman; Chipping Barnet Area Committee 6 July 2016 Title Report of Wards Status Urgent Key Enclosures The Avenue Zebra crossing and pedestrian improvements Commissioning Director - Environment Chipping Barnet

More information

SCOPE Chapter 2D shall Apply to Any Road or

SCOPE Chapter 2D shall Apply to Any Road or SCOPE Chapter 2D shall Apply to Any Road or Street other then Low-Volume Roads, Expressways, and Freeways Low Volume Roads: Shall be a Facility Lying Outside Built-Up Areas & Having a Traffic Volume Less

More information

SUPPORTING ECONOMIC GROWTH (Improving journey times, enabling people to get to jobs, supporting new housing growth)

SUPPORTING ECONOMIC GROWTH (Improving journey times, enabling people to get to jobs, supporting new housing growth) . APPENDIX C 2011/ 12 TRANSPORTATION CAPITAL PROGRAMME Details of progress with some of the more significant schemes in the programme is detailed below. INTEGRATED TRANSPORT SUPPORTING ECONOMIC GROWTH

More information

Appendix C Stage 1 Road Safety Audit

Appendix C Stage 1 Road Safety Audit Monaghan County Council N2 Monaghan Town to Emyvale Road Improvements Part 8 Application Description of Proposed Development Appendix C Stage 1 Road Safety Audit Draft 1 11 April 2013 \\DUBNTS03\DUBLIN_JOBS\218000\218692-00\4.

More information

Outline. 1. Timetable Development 2. Fleet Size. Nigel H.M. Wilson. 3. Vehicle Scheduling J/11.543J/ESD.226J Spring 2010, Lecture 18

Outline. 1. Timetable Development 2. Fleet Size. Nigel H.M. Wilson. 3. Vehicle Scheduling J/11.543J/ESD.226J Spring 2010, Lecture 18 Vehicle Scheduling Outline 1. Timetable Development 2. Fleet Size 3. Vehicle Scheduling 1 Timetable Development Can translate frequency into timetable by specifying headways as: equal -- appropriate if

More information

Speed control humps - Scotland, England and Wales

Speed control humps - Scotland, England and Wales Traffic Advisory Leaflet 3/91 September 1991 Speed control humps - Scotland, England and Wales Introduction Road humps are an extremely effective means of keeping vehicle speeds low. The standard round

More information

Property. Jurys Inn Cheltenham Introduction

Property. Jurys Inn Cheltenham Introduction This access statement does not contain personal opinions as to our suitability for those with access needs, but aims to accurately describe the facilities and services that we offer all our guests/visitors

More information

Chapter 6 Route Window NE5 Seven Kings station. Transport for London

Chapter 6 Route Window NE5 Seven Kings station. Transport for London Chapter 6 Route Window NE5 Seven Kings station Transport SEVEN KINGS STATION 6 Route Window NE5 Seven Kings Station Transport Introduction 6.1 All construction activities in this route window are associated

More information

CONFERENCE CENTRE ORGANISER S INFORMATION MANUAL

CONFERENCE CENTRE ORGANISER S INFORMATION MANUAL CONFERENCE CENTRE ORGANISER S INFORMATION MANUAL Sales Office Tel: 020 7828 4125/Fax: 020 7834 2072 Website: www.horticultural-halls.co.uk Mourad Messari - Assistant Conference Centre Manager Tel: 020

More information

Document Control Identification. Document History. Authorisation. Rail Safety Manager Brookfield Rail

Document Control Identification. Document History. Authorisation. Rail Safety Manager Brookfield Rail Document Control Identification Document History Authorisation Rail Safety Manager Brookfield Rail Table of Contents Glossary of this Rule... 4... 6... 6... 7... 7... 7... 8... 8... 8... 8... 9... 9...

More information

Document No: TCAA/FRM/ANS/AIS-30 Title: AIC Page 1 of 7. The following circular is hereby promulgated for information, guidance and necessary action

Document No: TCAA/FRM/ANS/AIS-30 Title: AIC Page 1 of 7. The following circular is hereby promulgated for information, guidance and necessary action FAX: (255 22) 2844300, 2844302 PHONE: (255 22) 2198100 AFS: HTDQYOYO Email: tcaa@tcaa.go.tz, ais@tcaa.go.tz Website: www.tcaa.go.tz UNITED REPUBLIC OF TANZANIA TANZANIA CIVIL AVIATION AUTHORITY Aeronautical

More information

Sunshine Coast Airport Master Plan September 2007

Sunshine Coast Airport Master Plan September 2007 Sunshine Coast Airport Master Plan September 2007 Contents CONTENTS... I ACKNOWLEDGEMENT... II DISCLAIMER... III 1 EXECUTIVE SUMMARY...IV 1 INTRODUCTION... 1 2 AVIATION DEMAND FORECAST... 5 3 AIRCRAFT

More information

Appendix 6 Fulbourn Greenway Review

Appendix 6 Fulbourn Greenway Review Appendix 6 Fulbourn Greenway Review Nigel Brigham & Associates A report for 1 Introduction This report is based on fieldwork carried out in 2016 to review the Greenway network around Cambridge as shown

More information

The Point Roundabout Improvement Scheme

The Point Roundabout Improvement Scheme The Point Roundabout Improvement Scheme Background and Existing Situation The junction of North Wall Quay, East Wall Road and the East Link Bridge, also known as the Point roundabout, is located in the

More information

TECHNICAL MEMORANDUM. DATE: August 31, Pamela Dalcin-Walling/Dokken Engineering. Daniel Yau and Victor Baltazar/Y&C

TECHNICAL MEMORANDUM. DATE: August 31, Pamela Dalcin-Walling/Dokken Engineering. Daniel Yau and Victor Baltazar/Y&C DATE: August 31, 2017 TECHICAL MEMORADUM Y&C Transportation Consultants, Inc. 3250 Ramos Circle Sacramento, CA 95827 Phone: (916) 366-8000 Fax (916) 366-8008 TO: FROM: SUBJECT: Pamela Dalcin-Walling/Dokken

More information

CAMBRIAN LINES FRANCHISE 2018

CAMBRIAN LINES FRANCHISE 2018 CAMBRIAN LINES FRANCHISE 2018 For Edwina Hart MBE CStJ AM Cllr Mansel Williams Chair Cllr Trevor Roberts Vice Chair Robert Robinson Secretary Cllr Selwyn Griffiths Chair Cllr Eryl Jones - Williams Vice

More information