1 Urban Drainage and Flood Control District Maintenance Eligibility Program Status of Projects by Local Government Aurora 10-Sep-2015 BEAR GULCH 1166 Aurora Park East 5/9/ S-64W 5/13/ Aurora Park East 5/9/ S-64W 5/13/ Aurora Park East 5/9/ S-64W 5/13/1991 CROOKED RUN 1200 CenterPort International 10/14/ ,27-3S-64W 10/16/ CenterPort International 4/16/ S-64W 4/16/1992 FIRST CREEK 3165 Aurora Commerce Center 11/24/2004 1/20/ S-66W First Creek OSP 10/23/03: Drainage study. 7/28/04; plans & 11/24/04; plans & 9/28/05; plans & 1/20/ Century 21 8/26/ S-66W First Creek MP 8/27/ E-470/I-70 Fly-by Interchange 6/16/2005 6/16/ S-66W 3/16/05; plans and 6/16/05; plans & 6/16/ Eastgate Subdivision Filing 1 2/13/2013 7/28/ S-66W First Creek OSP (1990) 2/25/03: FDP. 5/10/04; const plans & Concept conflicts with E-470 interchange plans. 4/4/05; plans & rpt, still lacks adequate coordination with E /19/08; plans & re-submittal, 2/1; Design approval issued on 7/1/13 plans because design approval letter never issued. Design changes for drop DS of Smith Rd submitted Sept AKA: First Creek Channelization_Century 21 Filing 1. 7/28/ Highpoint Filing 1 Blue Grama 1/10/2006 7/11/2006 2/12/ S-66W Pond 801 and Blue Grama Draw. 1/10/06; plans & rpt, pond from J3 and channel from SA Miro. 4/17/06: plans & 2/12/ Highpoint Filings 3 & 4 Phase 2 Blue Grama 6/19/2008 6/19/ S-66W Two roadway crossings to complete the channel. 6/19/ Majestic Commerce Center (aka Auro several 3/25/ S-66W Concept grading plan for Picadilly Pond 4/11/ Nevin/Ringsby 6/7/ S-66W First Creek MP (1977) 6/7/ Prologis Park 4/14/ S-65W 4/14/ Single DIA Blue Grama Draw 12/7/ S-66W Revision to First Creek Need drainage submittal OSP 12/7/1998 FIRST CREEK TRIB T 186 Green Valley Ranch East Several tribs. 7/23/ ,19,29-3S- 65W; 24-3S- 66W 1

2 Green Valley Ranch East 8/29/ S-66W First Creek MP (1977) 8/29/02: FDP Green Valley Ranch East 8/29/ S-65W First Creek MP (1977) 8/29/02: FDP Green Valley Ranch East 8/29/ S-65W First Creek MP (1977) 8/29/02: FDP Green Valley Ranch East 8/29/ S-65W First Creek MP (1977) 8/29/02: FDP Green Valley Ranch East 8/29/ S-65W First Creek MP (1977) 8/29/02: FDP Green Valley Ranch East 7/23/ ,29,30-3S First Creek MP Tributary to First Creek 65W; 24-3S- 66W 9/16/2002 9/16/2002 9/16/2002 9/16/2002 9/16/ Windler Homestead tributary 6/10/2004 6/10/ S-66W 2/11/04: Major drainageway in a box culvert. 4/19/04: now open channel but no drainage report. 6/10/04; plans & rpt, need MDP approval. 6/10/2004 GRANBY DITCH 26 Regency 7/16/1985 7/16/ S-66W Granby/Sable Floodplain dedicated to city... 4/24/1986 HENRY DAVID DRAW 1198 CenterPort International 4/14/ S-64W 4/16/ CenterPort International 4/14/ ,22-3S-64W 4/16/1992 IRONDALE GULCH 3038 Bolling Drive Tributary Bolling Drive 10/1/ S-66W Irondale OSP 10/1/02: Preliminary design report. 10/1/ Bolling Drive Tributary Bolling Drive 10/1/ S-66W Irondale OSP 10/1/02: Preliminary design report. Gateway Park Bolling Drive Tributary Bolling Drive 3/17/2005 3/17/ S-66W Irondale OSP 10/29/04; plans & 3/2/05; plans & Gateway Park East Pond UP-C Montbello 5/28/2002 5/28/ S-66W Irondale OSP Part of the MP Upland Pond system. 3/7/02; plans & 5/28/02; plans & rpt, see letter this date. Gateway Park East Ponds UP-B1 & B Montbello 9/6/2005 9/6/ S-66W Irondale OSP Part of the MP Upland Pond system. 9/6/05; plans & rpt, see letter this date. 10/1/2002 3/17/2005 5/28/2002 9/8/ Majestic Commerce Center (aka Auro several 4/2/ S-66W UP Realty Co. Bolling Drive 6/10/ S-66W Irondale Gulch OSP UP Realty Co. Bolling Drive 6/10/ S-66W Irondale Gulch OSP 7/1/1992 7/1/ Upland Industries 8/8/ ,21,27-3S- Comp plan amendment only. 66W MONTBELLO DRAINAGE 3760 Gateway Park IV East Filing 19 Bolling Drive Tributa 10/22/ ,0,0-3S- 10/22/2014: Single outfall to Bolling 66W; 0,0,0-- Drive Trib; returned comments 10/22/ UP Realty Co. 6/10/ ,21-3S-66W Irondale Gulch OSP 7/1/1992 NEWCOMB GULCH 1199 CenterPort International 4/14/ ,22-3S-64W 4/16/1992 SABLE DITCH 799 Mid-America 9/26/ S-66W Sable Ditch Relys on "existing pipe" - installation history not known as this is written. 2

3 Sable Ditch Channel 6/5/ ,32-3S-66W Granby/Sable Channel built by Aurora; design never submitted; horseback review indicates potential problems. Sable Ditch Revision 3/10/1982 3/10/1982 3/10/1982 3/10/ S-66W Sable Ditch Constructed by Aurora w/o District approval. Sable Ditch Revision 3/10/1982 3/10/1982 3/10/1982 3/10/ S-66W Sable Ditch Constructed by Aurora w/o District approval. Toll Gate Creek Channelization 6/15/1987 6/15/ S-66W Granby & Sable Ditch Sable Ditch confluence area contained in Toll Gate design. 9/9/1987 SAND CREEK 3507 Aurora ICE Processing Center Baranmoor Ditch 9/5/ /24/2008 4/16/2009 7/22/ S-67W Channel armoring, outfall, grouted boulder spillway and drop structure. 7/22/ Baranmor Ditch Reach 4-5 Baranmoor Ditch 4/13/ S-67W Channel improvements including 3 culverts and numerous drop structures 2/3/2015: Returned comments on final drawings 4/13/2015: Design Approved 4/13/ Baranmor Ditch Reach 6 Baranmoor Ditch 1/16/ S-67W Channel improvements, comm 1/16/13 3/4/ Buckley Rd. Bridge 5/6/1987 5/6/1987 5/25/ ,33-3S-66W Sand Creek MP Flood control elements only. Chambers Rd. Bridge Widening 6/27/1984 6/27/ ,32-3S-66W Sand Creek MBT #1 3/28/ S-67W Sand Creek Stearns-Roger 5/23/ S-66W Sand Creek Rezoning only. 6/16/ Upland Industries 8/8/ ,29-3S-66W Comp plan amendment only. SECOND CREEK 3406 Sagebrush Farm 6/8/ S-65W Second Cr 6/8/06: Drainage report. 6/22/2006 SOUTH PLATTE RIVER 807 Twenty-third Ave. Storm Sewer 23rd Ave. Storm Sew 6/19/1985 6/19/ S-67W Only part considered was the outlet to Westerly Creek at Sta in Westerly Creek (1983) TOLL GATE CREEK 1049 Potomac St. Bridge Pier Protection 2/5/1990 3/15/1990 6/4/1991 8/5/ S-66W 8/5/ Toll Gate Channel Repairs 10/23/ ,0,0-3S- 67W; 31,0,0-3S-66W Toll Gate Creek 8/22/2014: Channel Bank Repairs in 3 locations; plns had issuficient information to review 10/23/2014: Approved Design 10/23/2014 WEST FORK SECOND CREEK 3826 High Point at DIA-West Fork Second 6/16/2015 2,3,10-3S- 66W; 11,0,0-3S-66W Arch culvert improvement and ped x-ing at 64th Ave and 1200 ft of channel U/S and D/S of 64th. Returned comments: 6/16/2015 6/16/ Highpoint Filing 2, Phase I 6/2/2006 6/2/ /26/ S-66W Second Creek OSP West Fork Second Creek channelization. 4/17/06; plans & 6/2/06; plans, comments. Repair list. 11/26/2008 3

4 3391 Highpoint Filings 3 & 4, Phase 1 6/1/ /12/ S-66W Second Creek OSP West Fork Second Creek channelization. 4/17/06; plans & 6/1/06; plans & 10/10/06; plans & 11/12/06; plans & 11/12/ International Center 2/5/ S-66W 2/19/1990 WESTERLY CREEK 3423 Stapleton Aurora Filing 1 11/12/ /12/ S-67W Overflow channel, see also /12/06; plans & 11/12/ Stapleton Aurora Filing 2 11/12/ /12/ S-67W Overflow channel, see also /12/06; plans & 11/12/ Stapleton Filing 11 4/14/2004 5/10/ S-67W Overflow channel & drops, see also /10/2004 Legend Concept, design or construction approved as of the given date. Concept, design or construction reviewed but not approved as of the given date. Concept, design, construction or final eligibility not yet considered. Project not eligible for District maintenance assistance as of the given date. Project eligible for District maintenance assistance as of the given date. 4

5 Urban Drainage and Flood Control District Maintenance Eligibility Program Status of Projects by Local Government Aurora 10-Sep-2015 ANTELOPE CREEK 3434 King's Point North Filing 4 6/14/2007 2/13/ S-66W Piney Creek Tribs Floodplain preservation, one outfall & one roadway crossing. 9/12/06; plans & 1/9/07; plans & 6/14/07; plans & 10/10/07; plans & 3/25/ King's Point North Filing No. 2 4/19/2004 6/7/ S-66W Piney Creek Tribs 6/10/02: Site plan & plat. 4/19/04: CSP and plat. 10/25/04; plans & 12/1/04; plans & 1/12/05; plans & 3/9/05; plans & 4/21/05; plans & Ridgemoor 3/23/ S-66W Piney Creek Tribs. GDP Amendment 6/7/2005 3/23/1994 CHERRY CREEK 850 Bramalea Regional Mall 11/10/ S-66W Cherry Creek FPI 11/13/ Cherry Ck Low Water cross S of Arap 11/17/2010 2/1/ S-66W Cherry Creek 2003 Low water crossing at soccer complex Cornerstar 8/16/2007 8/16/2007 1/29/ S-66W Cherry Creek 5/23/06: GDP. Bank revetment Cornerstar 8/16/2007 8/16/2007 1/29/ S-66W Cherry Creek 5/23/06: GDP. Bank revetment /1/2011 1/29/2009 1/29/ Cornerstar F (Constructed Wetla 8/16/2007 8/16/2007 1/29/ S-66W 5/23/06: GDP. 1/29/ Cornerstar E (Foxfield Outfall) 8/16/2007 8/16/2007 1/29/ S-66W 5/23/06: GDP. 1/29/ Hampden Town Center Four Square Mile Ar 9/25/ S-67W 10/6/ King's Point North Filing 1 tributary 9/7/2005 3/1/ S-66W 4/20/04; prelim drainage 10/21/04; final drainage rpt & plans, substandard drainage concepts. 9/7/05; plans & rpt, concept now ok. 1/10/06; plans & 3/1/ Pioneer Hills un-named 4/8/ S-66W 4/8/99: GDP/PDP submittal needs drainage study to evaluate eligibility. 4/8/ Quincy Ave. Drainage Outfall System Reach 4 4/12/1988 8/2/ /24/ S-67W Quincy Drainage OSP Quincy Ave.Drainage Outfall System Quincy Drainage 4/12/1988 8/2/ /24/ S-67W Quincy Drainage OSP 10/30/ /30/ Quincy Convenience Center Quincy Drain 11/6/ S-66W Quincy Drain/Shop Detention pond lcoation in danger. Creek OSP 11/11/ Ridgemoor 3/23/ ,34-5S-66W GDP Amendment. 4/26/ Shop Creek Shop Creek 6/28/1988 6/28/ S-66W; Shop Creek OSP 5S-67W 6/28/ Valley Club Pointe 9/15/ S-66W Formerly Valley Country Club in Arapahoe Co. 10/2/1995 1

6 COAL CREEK (ARAPCO) 3052 Eastern Hills 10/26/ /26/ S-65W Upper Sand Creek OSP 10/30/02: Drainage report. Coal Creek stabilization plans and Flg 1 & 2 outfalls. 10/25/04; plans & 6/1/06; plans. 2/14/07; plans & FP 10/26/07; plans & 10/26/ Eastern Hills 2/17/ ,20,21-4S Sand Creek Leaving FP open. 65W Eastern Hills Conn Draw 20-4S-65W Upper Sand Creek OSP 10/30/02: Drainage report. Eastern Hills Fox Tail Run 20-4S-65W Upper Sand Creek OSP 10/30/02: Drainage report. Eastern Hills Filing 5 7/28/2004 7/28/ S-65W Upper Sand Creek OSP 3/4/1986 8/3/ Eastern Hills South 12/16/ S-65W Outside District. 1/9/1987 EAST TOLL GATE CREEK 797 Alamosa 4/4/ S-66W Proposed park and open space Buckley AFB Housing Project 9/20/2005 9/20/ S-66W Two storm sewer outsfalls. 9/20/ Buckley/State Land Board 12/16/ S-66W 1/9/ Columbia Creek Columbia Creek 5/21/1985 5/21/ S-66W Drainage plan has many problems Creekside 12/24/ S-66W 1/9/ Dueck 1/4/ S-66W Rezoning only. SE 1/4 10/9/ Golf Course on E. Toll Gate 5/21/1985 5/21/1985 5/21/ S-66W Aurora Aurora owned golf course; project has many problems Heather Ridge Village #2 4/3/ S-66W 792 Heather Ridge Village Indus. Sub. 9/28/ S-66W 791 Heather Ridge Village Indus. Sub. 9/28/ S-66W 189 Highline E. Toll Gate 2/20/1985 2/20/1985 2/20/ S-66W Project under construction; design not submitted for review and approval; design problems suspected Jewell Property 6/20/ S-66W 6/24/ Kingsborough #8 2/8/ S-66W 784 Kingsborough Filing #8 Side Creek 6/20/ S-66W Apparently built but eligibility never requested. 555 Orchard Crossing 19-5S-65W 1/9/ Panorama Heights Side Creek 2/3/ S-66W Request for after-the-fact elegibility. 3/4/ Panorama Heights Side Creek 10/25/ /25/ S-66W 3045 Pomeroy 10/8/ S-65W Upper Toll Gate Creek 10/8/02: Framework. OSP 10/8/ Quail Run Side Creek 2/3/ S-66W Request for after-the-fact eligibility. 3/4/ Sienna Side Creek 11/21/ /21/ S-66W 2859 Sleepy Hollow 11/29/ S-66W 11/29/01: PDP & replat. 11/28/2001 2

7 3021 Sorrel Ranch Filing No. 1 9/5/ /13/2003 2/26/2007 7/19/ S-65W Upper Toll Gate Creek Basin OSP 9/13/02: Contextual Site Plan. 4/9/03; plans & Question channelized approach. 9/5/03; plans & 10/28/03; plans & 7/19/ Toll Gate Creek Condominiums 3/14/ S-66W 196 Toll Gate Creek Condos 1/31/ S-66W 805 Toll Gate Villages 7/22/ ,17-4S-66W 804 Toll Gate Villages 7/22/ S-66W 806 Toll Gate Villages 7/22/ S-66W 781 Tollgate Condos 7/10/ S-66W Tollgate Crossing Filing 2 7/28/2004 7/28/ S-65W Upper Toll Gate OSP 7/28/04; plans & Tollgate Crossing Filing 6 1/5/2005 5/11/ S-65W Upper Toll Gate OSP 7/28/04; plans & 10/25/04; plans & 1/5/05; plans & 3/9/05; plans & Tollgate Crossing Filing 6 Gun Club 12/17/2004 5/11/ S-65W Upper Toll Gate OSP One outfall. 12/17/04; plans & 3/8/05; plans & Tollgate Crossing Phase 1 7/23/2002 4/10/2003 3/9/2006 8/20/ S-65W Upper Toll Gate OSP See also 3114 & /23/02: Framework amendment. Crossing at Belleview Ave. 12/4/02; plans & 2/20/03; plans & 3/11/03; plans & 11/26/08; repair list. 8/3/2004 5/11/2005 5/11/2005 8/20/ Tollgate Village #14 4/18/ S-66W 2420 Uravan Channel at Louisiana Street Uravan Channel 12/1/ /1/1998 3/25/1999 3/25/ S-66W 3/25/ Xcel Smoky Hill Substation Expansio 3/23/2011 6/9/ S-65W one outfall 12/1/2011 FIRST CREEK 3272 Adonea Filing 1 T7 5/3/2005 5/26/2005 5/10/ /19/ S-65W First Creek OSP 4/28/03: Framework. 10/18/04; plans & 2/8/05; plans & 5/3/05; plans & Drop structures. 11/19/ Adonea Filing 3, Phase 1 T7 5/26/ /3/2005 5/10/ /19/ S-65W First Creek OSP 5/26/05; plans & 9/1/05; plans & Drop structures. Repair list. Adonea Filing 3, Phase 2 T7 5/26/ /3/ S-65W First Creek OSP 5/26/05; plans & 9/1/05; plans & Phase 2 of the project.see also 3347.Remove temp check structures d/s of F.1 for final. 11/19/ /11/ Aurora Airpark un-named (2) 9/3/1986 3,4,10-4S-65W Outside District... 10/6/ Eastern Hills Main Channel 15-4S-65W First Creek OSP 10/30/02: Drainage report. Eastern Hills 15-4S-65W First Creek OSP 10/30/02: Drainage report. Eastern Hills T S-65W First Creek OSP 10/30/02: Drainage report. Eastern Hills T7 16-4S-65W First Creek OSP 10/30/02: Drainage report. 5 Eastern Hills 2/17/ S-65W Upstream from MP study limits. Aurora annexation. 3/3/ Eastern Hills T7 21-4S-65W First Creek OSP 10/30/02: Drainage report. 956 Eastview Village 8/10/ S-65W 8/12/1988 3

8 468 Gun Club Farms 10/22/ S-65W First Creek MP Proposed annexation 10/29/ Purview 3/18/ S-65W Some open floodplain and channelization; currently (3/86) outside District... 4/24/ Sand Creek Ranch T 7 12/3/ S-65W First Creek OSP 12/3/02: FDP. No drainage study. Sand Creek Ranch T /3/ S-65W First Creek OSP 12/3/02: FDP. No drainage study. 12/3/ /3/ Sand Creek Ranch Filing 1 T 7 1/24/2006 1/24/ S-65W First Creek OSP 12/3/02: FDP. No drainage study. 9/28/05; Plans & 1/24/06; plans & 1/24/ Sand Creek Ranch Filing 4 T 7 9/28/2005 9/28/ S-65W First Creek OSP 12/3/02: FDP. No drainage study. 9/28/05; Plans & 10/6/ Sand Creek Ranch Filing 9 T 7 9/28/2005 2/13/ S-65W First Creek OSP 12/3/02: FDP. No drainage study. 9/28/05; Plans & 2/13/06; plans & 2/13/ Smith Road Farms un-named 12/16/ S-65W Outside District 1/9/ Starfall T-7 1/3/ S-65W First Creek OSP 1/3/05: FDP. 4/11/05: Drainage report. Same concept. Starfall 1/3/ S-65W First Creek OSP 1/3/05: FDP. 4/11/05: changed from open space to channel. Sun Meadow 4/13/ S-65W First Creek OSP 4/13/05: Propose channelization but design Q unknown. Traditions T-4 12/12/ S-65W First Creek OSP 12/12/02: FDP Trails at First Creek 12/22/ S-65W First Creek OSP 12/22/03: Master Drainage report. 4/11/2005 4/11/2005 4/18/ /12/ /22/2003 GRANBY DITCH 1631 Buckley Specialty Center 8/9/ S-66W Granby Ditch 5/22/95: not approved. 8/9/00: plat OK. 8/9/ Monterey Point 5/19/2003 8/20/ S-66W Granby/Sable 3/12/03; plans & 5/19/03; plans & 8/22/ Sixth Ave. Detention Pond 5/2/ S-66W Temp. Pond. Maint. Eligibility not requested. 6/10/ Sunlite 2/15/ S-66W Granby/Sable Super Kmart Center 8/17/ S-66W Granby and Sable Box culvert under parking lot. 8/17/1995 IRONDALE GULCH 3642 Bolling Channel completion SCMD Bolling Drive 7/19/2012 9/11/2012 9/5/ S-66W Irondale OSP connects to RTD East Line, 4 drops, see 3641, comments 7/19/12, Sand Creek Metro Distr, folder also has Denver files 9/5/2013 MEADOWOOD DRAIN 639 Horseshoe Park 8/3/1987 8/3/1987 8/31/1990 8/31/ S-66W WTGC to Iliff. Low flow channel only. No wetlands. 8/31/1990 MURPHY CREEK 188 Gun Club Partnership 8/2/ ,30-4S Piney Creek 65W; 24-4S- 66W 1600 Murphy Creek Harvest Gulch 4/12/ S-65W Upper Sand Creek OSP ID #'s /13/1995 4

9 Murphy Creek 4/12/ /12/ ,30-4S Upper Sand Creek OSP ID #'s /28/98: endorsed 65W; 24-4S- CLOMR submittal for golf course 66W Murphy Creek Alexandra Gulch 4/12/ S-65W Upper Sand Creek OSP ID #'s Murphy Creek Murphy Creek East 4/12/ /12/ S-65W; Upper Sand Creek OSP ID #'s S-66W Murphy Creek Gun Club Creek 4/12/ ,30-4S-65W Upper Sand Creek OSP ID #'s /6/1998 4/13/ /12/1997 4/13/ Murphy Creek Metropolitan District 9/28/ /11/2005 8/28/2007 8/28/ S-66W Upper Sand Creek OSP Stream stabilization and roadway crossings. 8/28/ Murphy Creek North 5/3/ S-66W Piney Cr (1975) 5/3/06: FDP. Concept OK. FP wrong. 5/3/ Murphy Creek Subdivision 1, lot 1, bl 12/15/ S-66W Upper Sand Creek OSP Stream stabilization and one outfall 12/15/ Nevin/Ringsby 8/10/ S-66W Piney Creek Pomeroy 10/8/ S-65W Upper Sand Creek OSP 10/8/02: Framework. Sorrel Ranch 10/22/2001 2/12/2008 2/12/ S-65W Sand Creek Basin MP 8/17/00: FDP. 10/22/01: FDP. 10/1/02: Master Drainage Report. Formerly Senac. 10/27/05; plans & 3/16/06 plans & 8/9/06; plans & Southlands Filing 14 5/22/2007 9/20/ /20/ S-65W Piney et al. Stream stab and Orchard Road crossing. 5/22/07; plans & Repair list 8/12/ /8/2002 2/12/ /20/ Sunrise East 10/7/ S-66W Annexation & initial zoning. 10/8/ Tollgate Crossing Phase 1 7/23/2002 4/10/2003 3/9/2006 8/20/ S-65W Upper Sand Creek OSP See also 3006 & /23/02: Framework amendment. 12/4/02; plans & 2/20/03; plans & 3/11/03; plans & Tollgate Crossing Phase 1 7/23/2002 4/10/2003 3/9/2006 8/20/ S-65W Upper Sand Creek OSP See also 3006 & /23/02: Framework amendment. 12/4/02; plans & 2/20/03; plans & 3/11/03; plans & 11/26/08 repair list. 8/20/2009 8/20/ Vistas at Senac 6/2/ S-65W Will conform to Aurora master plan 6/10/ Wheatlands 11/26/ Piney et al. 11/26/02: Contextual Site Plan. 11/25/2002 MUTCHIE CREEK 3103 Butterfield Trails (2) 2/25/ /24/ High Plains Country Club 1/2/ /21/2004 3/23/2006 8/27/ S-65W 1/2/02: Framework. 4/21/03: Filing no. 1 no problems. 5/4/04; plans & 10/18/04; plans & Minor revision coordinated thru . 8/27/07; final repair list issued. 8/27/ High Plains Country Club 1/5/2005 1/5/2005 3/23/2006 8/27/ S-65W Two CBCs and storm sewers and channel. 10/18/04; plans & 1/4/05; plans & 8/27/07; final repair list issued. 8/27/ High Plains Country Club Filing 3 2/15/2006 7/28/2008 7/28/2008 7/28/ S-65W One storm sewer outfall to existing GSB drop. 2/15/06; plans. 4/17/06; plans. After-the-fact plan approval, no letter. 7/28/2008 NO NAME CREEK 779 Hickory Ridge 1/25/1980 1/25/ S-66W 5

10 800 Seven Hills 34-4S-66W Started pre-1980 but alot has been done since then. Need to check w/ Aurora 197 Un-named Cr. from Tower Road 7/24/1984 7/24/ S-66W West Toll Gate Creek basin... PINEY CREEK 3333 Eagle Bend Filing 9 7/26/2005 7/26/ S-66W Two storm sewer outfalls. 4/19/05; plans & 7/26/05; plans, minor comments. 7/26/ Pine Ridge Ranch 9/29/ S-66W Piney Creek Zoning and Annexation only. Promontory Park (Pine Pointe) 3/27/ S-65W Piney Creek 8/1/86: Initial zoning as Pine Pointe. 3/27/98: GDP. 9/30/1987 3/27/ Saddle Rock Golf Club South 12/22/1993 6/22/ S-66W 5/22/ Saddle Rock Golf Club South 12/22/1993 6/22/ ,26-5S-66W Piney Creek 5/22/ Saddle Rock Golf Club South F 10 6/12/2009 9/4/ S-66W Piney Creek Piney Ck outfall Pond B. 9/4/2009 SABLE DITCH 1309 ATCO Intercept channel 1/5/ S-66W Grandby/Sable MP '91 Proposal would affect MP channel. SADDLE ROCK RANCHES GUL 3065 Eagle Bend Gardens 11/25/ S-66W Piney Creek Tribs 11/25/02: Detention Pond M shows up on the site plan. Asked for more info. 1/6/ /25/ Eagle Bend Gardens Filing 2 4/16/2013 4/22/ S-66W Piney Creek Tribs 3/6/13 ( Detention Pond M) comments, Medical Center of Aurora, 4/16 plans, comments 4/22/ Saddle Rock Golf Club South 12/22/1993 6/22/ S-66W Piney Creek Tributaries 5/22/97: 3/19/98: SP & FP. No const. Drwgs. Still not approved. See also Saddle Rock Golf Club South Filing 5 12/22/1993 4/2/ /15/ S-66W Piney Creek Tributaries See also 1415, 10/28/98: channel plans not approved, checking construction status. Rehab plans for failed original design 3/11/04; plans & 10/28/ /15/2004 SAMPSON GULCH 3178 High Plains Country Club 9/22/2003 9/22/2003 6/23/2008 7/20/ S-65W One storm sewer outfall. Project also in Douglas County. 7/20/ Promontory Park (Pine Pointe) 3/27/ ,31-5S-65W Piney Creek Tribs 8/1/86: Initial zoning as Pine Pointe. 3/27/98: GDP. 3/27/ Stage Run and 3 tribs. 7/14/ ,32-5S-65W 7/16/ Tallyn's Reach 6/26/2000 6/26/ ,32-5S-65W Regional water quality pond, exceeds one square mile limit, therefore ineligible 6/26/ Tallyn's Reach Filing 15 Unamed Tributary 6/22/2006 4/2/ /8/ /8/ S-65W /23/04: Site plan & plat. FP in open space with stream stabilization. 6/22/06 plans & 7/6/06; plans & Ties into Wispering Pines project Tallyn's Reach Filing 15 Tallyn's Gulch 6/22/2006 4/2/ /8/ /8/ S-65W /23/04: Site plan & plat. FP in open space with stream stabilization. 6/22/06 plans & 7/6/06; plans & Ties into Wispering Pines project Tallyn's Reach Filing 15 6/22/2006 4/2/ /8/ /8/ S-65W Piney Cr Tribs 6/23/04: Site plan & plat. FP in open space with stream stabilization. 6/22/06 plans & 7/6/06; plans & Ties into Wispering Pines project. 10/8/ /8/ /8/2014 6

11 3449 Tallyn's Reach Filing 15 Wetland Mit. 5/2/2007 5/2/ /31/ S-65W Wetland mitigation area at confluence of Tallyn's Gulch and Sampson Gulch. 12/31/ Tallyns Reach North Robinson Gulch 10/5/ S-65W 10/5/00: Framework plan. FP in open space. 10/5/ Walker 4/13/ S-65W Piney Creek Tribs 4/13/04: Annex and initial zoning. Whispering Pines 6/22/ /26/ ,32-5S-65W Piney Tribs OSP 6/22/05: CSP and drainage report. 12/7/05; plans & 6/14/06; plans & 9/05/06; plans & 4/13/ /26/ Whispering Pines 6/22/ /26/ S-65W 6/22/05: CSP and drainage report. 12/7/05; plans & 6/14/06; plans & 9/05/06; plans & 10/26/ Whispering Pines 6/22/ /26/ S-65W Piney Tribs OSP 6/22/05: CSP and drainage report. 12/7/05; plans & 6/14/06; plans & 9/05/06; plans & 10/26/ Whispering Pines 4/11/ S-65W 4/11/05: FDP. 4/11/ Whispering Pines 4/11/ S-65W Upper Piney OSP 4/11/05: FDP. Whispering Pines F3 8/21/ ,32-5S-65W Piney Tribs OSP Previously Approved Design MEP ID: Returned design comments on: 10/31/2014, 12/30/2014, 1/8/2015, 1/13/2015, 1/23/15, 5/26/15. 8/21/2015 5/26/2015: Still needs MSP for detention basin. 8/21/2015: Made modifications to avoid improvements on Holmberg property 4/11/2005 8/21/2015 SAND CREEK 978 Cottonwood Country Club 11/10/ S-66W Sand Creek Leaving floodplain open. 11/14/ Stapleton Filing 16 5/26/2005 5/26/ S-67W One grouted boulder outfall. 5/26/ Triple Creek Trail Connections 4,0,0-4S-66W; Sand Creek 0,0,0-- 1/7/2015: 2 trail crossings with sheet pile check structures down stream of each; Returned comments 1/7/ Waterstone 11/23/ S-65W Sand Creek 11/1/04: Annex, zone and FDP. 11/23/04; (1977) master drainage study proposing open floodway. 11/23/2004 SENAC CREEK 2870 Beacon Point Two 1/2/2002 9/27/ S-65W 1/2/02: Framework. 9/27/04: Landscape plans indicate elimination of open channels. 9/27/ Eastern Hills South 12/16/ S-65W Outside District. 1/9/ Southshore at Aurora Hunter Run 11/21/ S-65W Upper Sand Creek Basin OSP 11/21/01: Framework plan. Southshore at Aurora 11/21/ S-65W Upper Sand Creek 11/21/01: Framework plan. Basin OSP Southshore at Aurora 11/21/2001 8/4/2005 7/2/ ,28-5S-65W Upper Sand Creek 11/21/01: Framework plan. 4/13/05; Basin OSP plans & 7/18/05; channel plans & 11/21/ /21/2001 7/2/ Southshore F13 28,0,0-5S f Upper Sand Creek 65W; 0,0,0-- Basin OSP 4/21/14 Design review & comments 4/21/2014 7

12 TOLL GATE CREEK 3719 RTD I-225 Rail Line Area E 6,0,0-4S-66W; Toll Gate Creek 0,0,0-- and E Toll Gate Creek Project also in Adams County (3S 66W Sec 31; 3S 67W Sec 36) 04/17/2014 Review & Comments 4/17/ Shelter America 4/5/ S-66W 41 Toll Gate Creek Channelization 9/8/1987 9/8/ S-66W; 6-4S-66W 9/8/1987 WEST TOLL GATE CREEK 798 Alamosa 4/4/1983 8,17-4S-66W Proposed for park and open space. 8/31/ Aurora Alliance 5/2/ S-66W 790 Brock/Graham 5/26/ S-66W Rezoning only Colorado High School Activities Asso 3/31/ S-66W 2:1 riprap slope covered and grassed. Need to see how it works out. Mowing could be problem. Could OK later. 4/24/ Fox Hill 3/11/ S-66W 3/23/ Horseshoe Park 8/3/1987 8/3/1987 8/31/1990 8/31/ ,29-4S-66W WTGC between Buckley Rd & Mexico Ave. Low flow channel only. Wetland areas not included. 8/31/ Horseshoe Park Spillway 8/3/1987 8/3/1987 8/31/1990 8/31/ S-66W WTGC to Iliff. Low flow channel only. No wetlands. 8/31/ Meadowood Channel Spillway 7/23/ S-66W 190 Meadowood Channel Meadowood 10/18/ /18/ S-66W 785 Quincy Res. 8/8/ S-66W 980 Plaza at Aurora Mall Aurora Mall 12/6/ S-66W Putting draiangeway in conduit. 12/7/ Pride's Crossing un-named 6/7/1985 6/7/ S-66W Proposed long box culvert; Does not meet USDCM Pride's Crossing #11 12/6/ S-66W 12/7/ Spectrum Center Aurora Mall 3/15/1990 3/15/ S-66W Channel appparently constructed without maint. elig. determination. 3/15/ Summer Breeze 4/5/ S-66W No design subbmitted for review. 803 Toll Gate Villages 7/22/ S-66W 3644 Toll Ggate Ck Bridge/Pedestrian Brid 6/19/2013 6/19/ S-66W peds bridge, comments 9/21/12 6/19/ Victoria Place 3/7/ S-66W 199 W. Toll Gate u/s Hampden 8/24/1984 8/24/ S-66W 754 West Toll Gate Channel Park 8/27/ ,33-4S-66W Plat only. No drainage info provided. 10/9/ West Toll Gate Cr. Bank 1/27/ S-66W 2/2/ West Toll Gate Creek 6/6/1985 6/6/ S-66W Preliminary design report done Whitehaven 4/3/ S-66W Left bank only. Side slopes of fill area too steep. 8

13 WESTERLY CREEK 945 Eastbrook 6/27/ S-67W Never submitted to us. Learned about by 404 public notice. 6/27/ Riverbend Village un-named 3/3/ S-67W WINDMILL CREEK 2836 Windmill Reserve Filing 1 10/3/ /3/2001 8/2/2007 8/2/ S-66W Lone Tree et. al. OSP Channel improvements and three storm sewer outfalls. 8/2/ Legend Windmill Reserve Filing 2 6/15/2005 6/15/2005 7/9/2007 7/9/ S-66W Lonetree et al OSP Drainage improvements. Concept, design or construction approved as of the given date. Concept, design or construction reviewed but not approved as of the given date. Concept, design, construction or final eligibility not yet considered. Project not eligible for District maintenance assistance as of the given date. Project eligible for District maintenance assistance as of the given date. 7/17/2007 9

District Listing. County: Arapahoe. District : All. Districts State of Colorado. Sub Total : Districts. Arapahoe. Sub Total : Congressional.

District Listing. County: Arapahoe. District : All. Districts State of Colorado. Sub Total : Districts. Arapahoe. Sub Total : Congressional. STATE CO Statewide State of Colorado COUNTY 03 Countywide Arapahoe CN 4 6 Congressional Congressional Congressional 4 Congressional 6 3 SH 3 36 37 38 40 4 42 56 9 State House State House 3 State House

More information

ARAPAHOE COUNTY TOTAL FUNDS- $1,747,290 10/13/2017

ARAPAHOE COUNTY TOTAL FUNDS- $1,747,290 10/13/2017 2018 Steam Management Work Plan ARAPAHOE COUNTY TOTAL FUNDS- 1,747,290 10/13/2017 Vegetation Management and Debris Removal General Services PLAN DRAINAGEWAY NAME- LOCAL NEARBY PLAN 1 BEAR CREEK SHERIDAN

More information

Urban Drainage and Flood Control District Final Five-Year Capital Improvement Plan November 9, 2017

Urban Drainage and Flood Control District Final Five-Year Capital Improvement Plan November 9, 2017 Number Name 2017 2018 2019 2020 2021 ADAMS COUNTY 100270 Little Dry Creek - Federal to Lowell 275.0 275.0 Westminster, Adams County 100252 Grange Hall Creek - at Washington 200.0 200.0 200.0 400.0 Northglenn

More information

City and County Incentives Summary

City and County Incentives Summary City and County Incentives Summary The Aurora Economic Development Council helps qualified businesses access each of the following opportunities. Please contact Yuriy Gorlov at 303-755-2223 or gorlov@auroraedc.com

More information

SECTION ARAPAHOE COUNTY SCHEDULE 2 STREAM MANAGEMENT SCHEDULE

SECTION ARAPAHOE COUNTY SCHEDULE 2 STREAM MANAGEMENT SCHEDULE SECTION 01320 ARAPAHOE COUNTY SCHEDULE 2 STREAM MANAGEMENT SCHEDULE CONTACTOR: VALLES CONSTRUCTION STREAM MANAGEMENT AGREEMENT NO. 18-01.04 Week starting on Monday of: BEAR CREEK Reach: Confl. w/s. Platte

More information

Public Works and Development

Public Works and Development ARAPAHOE COUNTY UTILITY COORDINATION MEETING MINUTES FOR NOVEMBER 2018 Thursday November 15, 2018 at 11 AM -- PWD Arapahoe Room, 6954 S. Lima St 1. Utility Business Items Water and Sanitation Companies-Present

More information

SECTION BOULDER COUNTY ROUTINE STREAM MANAGEMENT MASTER SCHEDULE

SECTION BOULDER COUNTY ROUTINE STREAM MANAGEMENT MASTER SCHEDULE SECTION 01320 COUNTY ROUTINE STREAM MANAGEMENT MASTER SCHEDULE CONTRACTOR: VALLES CONSTRUCTION AGREEMENT NO. 18-01.05 Week starting on Monday of: BEAR CANYON CREEK Reach: Moorhead to Lehigh St. CREEK -

More information

Authorities Taxes Receivable Douglas Chief Deputy Treasurer, Start Year: 2017, Receivable On 06/30/18, With Exemptions

Authorities Taxes Receivable Douglas Chief Deputy Treasurer, Start Year: 2017, Receivable On 06/30/18, With Exemptions Special Assessment 1100 CAMERON LID 2017 $0 $0 $4,970.79 $0.00 $0.00 $4,970.79 100% 1101 SAGEPORT 2014 LID 2017 $0 $0 $46,393.00 $0.00 $0.00 $46,393.00 100% 3010 PERRY PARK WATER &SAN... 2017 $0 $0 $2,409.68

More information

Authorities Taxes Receivable Douglas Treasurer, Start Year: 2016, Receivable On 05/31/17, With Exemptions

Authorities Taxes Receivable Douglas Treasurer, Start Year: 2016, Receivable On 05/31/17, With Exemptions Special Assessment 1100 CAMERON LID 2016 $0 $0 $4,970.79 $0.00 $1,355.65 $3,615.14 72.73% 1101 SAGEPORT 2014 LID 2016 $0 $0 $46,393.00 $0.00 $4,639.30 $41,753.70 90% 2056 SAGEPORT 2006 LID 2016 $0 $0 $41,519.92

More information

THREE MILE PLAN TOWN OF SUPERIOR COLORADO

THREE MILE PLAN TOWN OF SUPERIOR COLORADO THREE MILE PLAN TOWN OF SUPERIOR COLORADO February 23, 2015 INTRODUCTION This document has been prepared by the Town of Superior, Colorado, to address the existing and proposed land uses within an approximate

More information

NATIONWIDE PERMIT ACTIONS APR - JUN DA Number Action Type Project Name End Date Closure Method County State

NATIONWIDE PERMIT ACTIONS APR - JUN DA Number Action Type Project Name End Date Closure Method County State SPA-2008-00427-S Clear Creek ranch - stream restoration/enhancement -Clear Creek, Chaffee Co., 12-Jun-13 Chaffee SPA-2013-00127 Arkansas River Bank Stabilization Project at 352 and 354 East Sacket Avenue

More information

Final Drainage Letter Pikes Peak Community College Downtown Parking Lot Colorado Springs, Colorado

Final Drainage Letter Pikes Peak Community College Downtown Parking Lot Colorado Springs, Colorado Final Drainage Letter Pikes Peak Community College Downtown Parking Lot Colorado Springs, Colorado Prepared for: Pikes Peak Community College 5775 South Academy Boulevard Colorado Springs, CO 80906-5422

More information

APPENDIX. I. Meeting Minutes and Presentations

APPENDIX. I. Meeting Minutes and Presentations APPENDIX I. Meeting Minutes and Presentations Public Meeting Agenda 6:00-6:20 Welcome and Refreshments 6:20-6:40 Project Presentation 6:40-7:30 Facilitated Open House www.denvergov.org/parkprojects Please

More information

Introduction. The System. Model Limitations, Assumptions, and Parameters. Optional Services Tech Memo

Introduction. The System. Model Limitations, Assumptions, and Parameters. Optional Services Tech Memo Optional Services Tech Memo Introduction This technical memo evaluates the impact of a tide gate to be installed at the confluence of the Left Bank Tributary of Thalia Creek and Lake Windsor. Specifically,

More information

RIO VISTA MUNICIPAL AIRPORT

RIO VISTA MUNICIPAL AIRPORT DRAINAGE TECHNICAL MEMORANDUM RIO VISTA MUNICIPAL AIRPORT RIO VISTA, CALIFORNIA Prepared for: City of Rio Vista 1 Main Street Rio Vista, CA 94571 (707) 374-5337 Prepared by: August 2012 Copyright 2012

More information

Bear Creek Habitat Improvement Project

Bear Creek Habitat Improvement Project 06/10/10 Bear Creek Habitat Improvement Project El Paso County, Colorado Pike National Forest and Colorado Springs Utilities Owned Land Report prepared by: Eric Billmeyer Executive Director Rocky Mountain

More information

NATIONWIDE PERMIT ACTIONS JULY - SEPTEMBER Action Type Project Name Closure Method County State SPA SCO NWP River West Development

NATIONWIDE PERMIT ACTIONS JULY - SEPTEMBER Action Type Project Name Closure Method County State SPA SCO NWP River West Development DA Number Action Type Project Name Closure Method County State SPA-2013-00282- River West Development Chaffee CO SPA-2010-00457 Delbert Smith Conejos CO SPA-2010-00457 Delbert Smith Conejos CO SPA-2013-00379

More information

II. THE BOULDER CREEK DRAINAGE BASIN

II. THE BOULDER CREEK DRAINAGE BASIN II. THE BOULDER CREEK DRAINAGE BASIN This section provides an overview of the watersheds and flood hazards associated with Boulder Creek and South Boulder Creek including descriptions of the drainage basins,

More information

CITY OF PALMDALE. REPORT to the Mayor and Members of the City Council from the City Manager

CITY OF PALMDALE. REPORT to the Mayor and Members of the City Council from the City Manager .. CITY OF PALMDALE REPORT to the Mayor and Members of the City Council from the City Manager DATE: SUBJECT: June 1, 2016 Approval of City of Palmdale's 2016 Ten-Year Capital Improvement Plan ISSUING DEPARTMENT:

More information

- Countywide - Roadway Cone Zone / Lane Closure / Sidewalk Repair Schedule

- Countywide - Roadway Cone Zone / Lane Closure / Sidewalk Repair Schedule Report for Monday, September 10, 2018 through Monday, September 17, 2018 S. Perry Park Rd. (DC105) and Red Rocks Dr. Intersection Improvements Safety improvements on the S. Perry Park Road (DC 105) and

More information

Photographic Log Client: Project Number: Site Location: Site Name: Photograph ID: Date: Location: Direction: Comments: Photograph ID:

Photographic Log Client: Project Number: Site Location: Site Name: Photograph ID: Date: Location: Direction: Comments: Photograph ID: Photograph ID: 1 west View of one of the monitoring well and the large parking lot on the south side of Center Street. Photograph ID: 2 Monitoring well located in the middle of the parking lot located

More information

GILBERT & WEST TOWN INTERCOUNTY DRAIN Windsor Township, Eaton County and City of Lansing, Delhi Township, Ingham County, Michigan

GILBERT & WEST TOWN INTERCOUNTY DRAIN Windsor Township, Eaton County and City of Lansing, Delhi Township, Ingham County, Michigan GILBERT & WEST TOWN INTERCOUNTY DRAIN Windsor Township, Eaton County and City of Lansing, Delhi Township, Ingham County, Michigan PRELIMINARY ENGINEERING REPORT Abigail Eaton, Chair Intercounty Drains

More information

Havana Road through Green Valley Ranch. Recreation districts in charge: Denver Parks and Recreation Department Aurora Parks and Open Space Department

Havana Road through Green Valley Ranch. Recreation districts in charge: Denver Parks and Recreation Department Aurora Parks and Open Space Department Section Four Havana Road through Green Valley Ranch Recreation districts in charge: Denver Parks and Recreation Department Aurora Parks and Open Space Department General Information This portion became

More information

Sulphur Creek Wetlands Restoration Project in the Valles Caldera National Preserve, Sandoval County, New Mexico

Sulphur Creek Wetlands Restoration Project in the Valles Caldera National Preserve, Sandoval County, New Mexico DA Number Action Type Project Name Closure Method County State SPA-2015-00107-ABQ Sulphur Creek Wetlands Restoration Project in the Valles Caldera National Preserve, Sandoval County, New Mexico Sandoval

More information

SUBDIVISIONS EXEMPT FROM LANDSCAPE ORDINANCE Revised 06/02/15 ------------------------------------------------------------------------ ALOHA GARDENS, UNIT 6 ALTO ACRES ABERDEEN LAKES PH I ARISTIDA 1-A

More information

AND PERMITTEE DATE LOCATION OF WORK

AND PERMITTEE DATE LOCATION OF WORK 11 Sep 2003 Regulatory Branch PUBLIC NOTICE ------------- 1. Pursuant to Code of Federal Regulations 33 CFR 325.2(a)(8), the Chicago District issued permits or other approvals, withdrawals, appeals or

More information

EAST DON TRAIL ENVIRONMENTAL ASSESSMENT. Community Liaison Committee Meeting #3 July 15, :30 to 8:30 pm Flemingdon Park Library

EAST DON TRAIL ENVIRONMENTAL ASSESSMENT. Community Liaison Committee Meeting #3 July 15, :30 to 8:30 pm Flemingdon Park Library EAST DON TRAIL ENVIRONMENTAL ASSESSMENT Community Liaison Committee Meeting #3 July 15, 2013 6:30 to 8:30 pm Flemingdon Park Library Agenda 1. Welcome 2. Housekeeping and Updates a) Housekeeping b) CLC

More information

COMMUNITY GUIDE & REPORT

COMMUNITY GUIDE & REPORT Arapahoe County Open Spaces COMMUNITY GUIDE & REPORT Dear Arapahoe County Citizens, Did you know that for every $100 you spend in Arapahoe County, 25 cents is reinvested into our beautiful parks, trails

More information

12 May Regulatory Branch PUBLIC NOTICE

12 May Regulatory Branch PUBLIC NOTICE 12 May 2003 Regulatory Branch PUBLIC NOTICE ------------- 1. Pursuant to Code of Federal Regulations 33 CFR 325.2(a)(8), the Chicago District issued permits or other approvals, withdrawals, appeals or

More information

Agenda Report. Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer

Agenda Report. Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer Agenda Report Subject: Prepared By: Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer Steven M. Saunders, Director of Public Works/Village Engineer Date: August 12, 2012 On March 8, 2012

More information

Town of Danvers Planning Board

Town of Danvers Planning Board Town of Danvers Planning Board Danvers Town Hall One Sylvan Street Danvers, MA 01923 www.danvers.govoffice.com Margaret Zilinsky, Chair Kristine Cheetham William Prentiss Aaron Henry James Sears John Farmer,

More information

North Metro Rail Line Elected Officials Briefing. November 16, 2017

North Metro Rail Line Elected Officials Briefing. November 16, 2017 North Metro Rail Line Elected Officials Briefing November 16, 2017 Henry Stopplecamp, RTD Assistant General Manager, Capital Programs Eagle P3 Project The first transit project of its kind in the U.S.

More information

SECTION 3 GENERAL DESCRIPTION OF THE RIVER BASIN

SECTION 3 GENERAL DESCRIPTION OF THE RIVER BASIN SECTION 3 GENERAL DESCRIPTION OF THE RIVER BASIN SECTION 3 GENERAL DESCRIPTION OF THE RIVER BASIN River basin description. A general description of the river basin or subbasin, as appropriate, in which

More information

CITY AND COUNTY OF BROOMFIELD COMMERCIAL LAND USE ACCOUNTING SUMMARY DATA AS OF

CITY AND COUNTY OF BROOMFIELD COMMERCIAL LAND USE ACCOUNTING SUMMARY DATA AS OF CITY AND COUNTY OF BROOMFIELD COMMERCIAL LAND USE ACCOUNTING SUMMARY DATA AS OF 6-30-2016 PAGE 1 OF 2 Estimated Number of Employees Subdivision Name * Building Square Feet % of Square Feet Built At Build-Out

More information

Rail Transit Maintenance Facility

Rail Transit Maintenance Facility Rail Transit Purpose/Description Transit maintenance facilities are required for the storage, maintenance, and upkeep of transit vehicles. They typically include vehicle and supply storage, a maintenance

More information

9.4 Acres Commercial Land Interstate 70 at Strasburg, CO

9.4 Acres Commercial Land Interstate 70 at Strasburg, CO 9.4 Acres Commercial Land Interstate 70 at Strasburg, CO $895,000 This parcel is well-situated at the Strasburg exit with frontage road access and excellent visibility from I-70. It is suited for a variety

More information

Projected Advertisement Date

Projected Advertisement Date 2013 Planned s CY 2013 and CY 2014 Richmond District Schedule Preliminary Engineering Task Order Contracts SR 288/SR 145 Survey, 288 90349 Chesterfield Ramp and Signal Design 2/27/2013 $ 0.19 I-64 Over

More information

MP : Headwaters of the Fraser River

MP : Headwaters of the Fraser River MP 236 237: Headwaters of the Fraser River The mile between these two mileage posts is often just referred to as the bottom switchback or the curve at the bottom of Berthoud Pass. For many locals this

More information

(/ 12 Æ% 127 Æ% 73 Æ% 22 Æ% 21 Æ% 13 Æ% 82 Æ% 23. Æÿ B. Æÿ V. Æÿ C. Æÿ FF. ÆÿCC. Æÿ JJ. Æÿ H. Æÿ Z. Æÿ G. Æÿ J. Æÿ ZZ. Æÿ D. Æÿ F.

(/ 12 Æ% 127 Æ% 73 Æ% 22 Æ% 21 Æ% 13 Æ% 82 Æ% 23. Æÿ B. Æÿ V. Æÿ C. Æÿ FF. ÆÿCC. Æÿ JJ. Æÿ H. Æÿ Z. Æÿ G. Æÿ J. Æÿ ZZ. Æÿ D. Æÿ F. WAUSHARA ADAMS 4 Æÿ Z Existing Ice Age Trail, subject to change as it evolves toward completion Other Trail Unofficial Connecting Route (unmarked) County oundary ublic or IATA Land Miles 0 1 2 3 4 5 1

More information

Silver Creek Plunge Campground Reconstruction

Silver Creek Plunge Campground Reconstruction Silver Creek Plunge Campground Reconstruction PROPOSED ACTION REPORT Emmett Ranger District Boise National Forest 1805 Highway 16, Room 5 Emmett, Idaho 83617 November 2009 Silver Creek Plunge Campground

More information

MONTGOMERY TOWNSHIP OPEN SPACE & PATHWAYS COMMITTEE

MONTGOMERY TOWNSHIP OPEN SPACE & PATHWAYS COMMITTEE MONTGOMERY TOWNSHIP OPEN SPACE & PATHWAYS COMMITTEE Meetings: 2 nd Wednesday of each month @ 6:30 PM in the Municipal Building Questions? Call the Open Space Coordinator, Lauren Wasilauski, at (908) 359-8211

More information

DISTRICT COURT, WATER DIV. 6, COLORADO TO ALL PERSONS INTERESTED IN WATER APPLICATIONS IN WATER DIV. 6

DISTRICT COURT, WATER DIV. 6, COLORADO TO ALL PERSONS INTERESTED IN WATER APPLICATIONS IN WATER DIV. 6 DISTRICT COURT, WATER DIV. 6, COLORADO TO ALL PERSONS INTERESTED IN WATER APPLICATIONS IN WATER DIV. 6 Pursuant to C.R.S. 37-92-302, you are hereby notified that the following pages comprise a resume of

More information

Lake Wissota Access Locations within the LaFayette Township. By Chad Martin

Lake Wissota Access Locations within the LaFayette Township. By Chad Martin Lake Wissota Access Locations within the LaFayette Township By Chad Martin Anson/ Wissota Access Point # 1 Road: 195 th St. Associated Fire Numbers: 13294 Defining Characteristics: Forested from road

More information

CITY OF PALMDALE. REPORT to the Mayor and Members of the City Council from the City Manager

CITY OF PALMDALE. REPORT to the Mayor and Members of the City Council from the City Manager CITY OF PALMDALE REPORT to the Mayor and Members of the City Council from the City Manager DATE: SUBJECT: June 4, 2014 Approval of City of Palmdale's 2014 Ten-Year Capital Improvement Plan ISSUING DEPARTMENT:

More information

PUBLIC NOTICE

PUBLIC NOTICE 07 Sep 2001 Regulatory Branch PUBLIC NOTICE ------------- 1. Pursuant to Code of Federal Regulations 33 CFR 325.2(a)(8), the Chicago District issued permits or other approvals, withdrawals, appeals or

More information

AND PERMITTEE DATE LOCATION OF WORK

AND PERMITTEE DATE LOCATION OF WORK 14 Sep 2004 Regulatory Branch PUBLIC NOTICE ------------- 1. Pursuant to Code of Federal Regulations 33 CFR 325.2(a)(8), the Chicago District issued permits or other approvals, withdrawals, appeals or

More information

AOTA ArtTrek Locations

AOTA ArtTrek Locations AOTA ArtTrek Locations ArtTrek is a summer-long Grand County, CO art adventure. Highlighted by snow-covered mountain vistas and rolling meadows threaded with sparkling streams and rivers, numerous sites

More information

National Member Conference

National Member Conference National Member Conference The Summit Event Center Aurora, CO May 17-19, 2018 DWN s bi-annual conference for 2018 will be held in Aurora, CO, just a few miles away from Denver International Airport. Local

More information

MORGAN CREEK GREENWAY Final Report APPENDICES

MORGAN CREEK GREENWAY Final Report APPENDICES APPENDICES MORGAN CREEK GREENWAY Appendix A Photos of Existing Conditions in Trail Corridor Photos of existing conditions Main trail corridor - February 2009 Photos of existing conditions south bank Morgan

More information

Stormwater Management Plan

Stormwater Management Plan Stormwater Management Plan March 2010 Revision 1 (February 2011) A copy of this Stormwater Management Plan is to be kept on site at all times. Volume 1 of 1 120TH AVE. 120th AVE HUDSON RD. 120TH

More information

Folder 7 Folder Title Description (including date) Date Richard C. Proposed Humble & Pan AM Thibodaux meter Dec. 5, 1958

Folder 7 Folder Title Description (including date) Date Richard C. Proposed Humble & Pan AM Thibodaux meter Dec. 5, 1958 ACADIA PLANTATION RECORDS (Mss 4906) Appendix B Oversized materials from Series II. Legal Records Subseries 3. Pugh, Lanier, & Pugh Location: Room B6-OS:A Folder 7 Folder Title Description (including date)

More information

Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd

Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd Project ID SOA07003 Department State of Alaska Project Type Improvement Start Date December 2017 Location Assembly: Section 4, Seats F & G, Assembly:

More information

Indiana Department of Natural Resources / Division of Water

Indiana Department of Natural Resources / Division of Water The Department of Natural Resources is providing this report to satisfy the requirements of the "Procedures Concerning Certain Licenses Act", IC 14-11-4, and its associated administrative rule, 312 IAC

More information

Attachment D: PHOTO LOG CITY OF ARCATA RAIL-WITH-TRAIL CONNECTIVITY PROJECT

Attachment D: PHOTO LOG CITY OF ARCATA RAIL-WITH-TRAIL CONNECTIVITY PROJECT 01051-09004 Attachment D: PHOTO LOG CITY OF ARCATA RAIL-WITH-TRAIL CONNECTIVITY PROJECT DRAFT: June 30, 2010 Applicant: City of Arcata 736 F Street Arcata, CA 95521 Phone (707) 825-2154 Prepared by: Winzler

More information

AND PERMITTEE DATE LOCATION OF WORK

AND PERMITTEE DATE LOCATION OF WORK 01 Dec 2002 Regulatory Branch PUBLIC NOTICE ------------- 1. Pursuant to Code of Federal Regulations 33 CFR 325.2(a)(8), the Chicago District issued permits or other approvals, withdrawals, appeals or

More information

ZC08-06 Rezone request of Charles Leon Saltz from R3 High Density Single Family Residential to B-4 Business and Professional Office

ZC08-06 Rezone request of Charles Leon Saltz from R3 High Density Single Family Residential to B-4 Business and Professional Office The Planning & Zoning Commission of the City of Fairhope met Monday, August 4, 2008, at 5:00 PM at the City Administration Building, 161 N. Section Street in the Council Chambers. Present: Jean Wilson,

More information

Business Item No XXX. Proposed Action That the Metropolitan Council approve the Coon Creek Regional Trail Master Plan.

Business Item No XXX. Proposed Action That the Metropolitan Council approve the Coon Creek Regional Trail Master Plan. Business Item No. 2015-XXX Metropolitan Parks and Open Space Commission Meeting date: July 7, 2015 For the Community Development Committee meeting of July 20, 2015 For the Metropolitan Council meeting

More information

Blue River Trail Master Plan JSA to Town Hall June 2004

Blue River Trail Master Plan JSA to Town Hall June 2004 Blue River Trail Master Plan JSA to Town Hall June 2004 Prepared for: Silverthorne Town Council Silverthorne SPORT Committee Department of Recreation and Culture Silverthorne Public Works Silverthorne

More information

Hancock. Hancock. Hancock County Population 54,558. Land Area (sq mi) 1,587 Bridges 120 Highway Corridor Priority Miles HCP 1 81 HCP 2 34

Hancock. Hancock. Hancock County Population 54,558. Land Area (sq mi) 1,587 Bridges 120 Highway Corridor Priority Miles HCP 1 81 HCP 2 34 Hancock Hancock County Population 54,558 T3 ND Oqiton Twp Land Area (sq mi) 1,587 Bridges 120 Highway Corridor Priority Miles T41 MD 81 HCP 2 34 T39 MD T40 MD 141 HCP 4 62 215 Total -5 533 T32 MD Great

More information

PORTISHEAD BRANCH LINE PRELIMINARY ENVIRONMENTAL INFORMATION REPORT VOLUME 4 APPENDIX Water Receptors

PORTISHEAD BRANCH LINE PRELIMINARY ENVIRONMENTAL INFORMATION REPORT VOLUME 4 APPENDIX Water Receptors PORTISHEAD BRANCH LINE PRELIMINARY ENVIRONMENTAL INFORMATION REPORT APPENDIX 17. 3 Water Receptors Contents Section Page 1 Water Receptors... 1-1 1.1 Surface Water Features/Receptors in the Study Area

More information

Action Recommendation: Budget Impact:

Action Recommendation: Budget Impact: City of Fayetteville Staff Review Form Matt Mihalevich 1/16/2019 DEVELOPMENT SERVICES (620) Submitted By 2019 0050 Legistar File ID February 5th, 2019 City Council Meeting Date Agenda Item Only N/A for

More information

12 Jul Regulatory Branch PUBLIC NOTICE

12 Jul Regulatory Branch PUBLIC NOTICE 12 Jul 2000 Regulatory Branch PUBLIC NOTICE ------------- 1. Pursuant to Code of Federal Regulations 33 CFR 325.2(a)(8), the Chicago District issued permits or other approvals, withdrawals, appeals or

More information

City of Port St. Lucie Planning and Zoning Department ALL DATES ARE TENTATIVE AND SUBJECT TO CHANGE SCHEDULES FOR 2018

City of Port St. Lucie Planning and Zoning Department ALL DATES ARE TENTATIVE AND SUBJECT TO CHANGE SCHEDULES FOR 2018 Planning and Zoning Department ALL DATES ARE TENTATIVE AND SUBJECT TO CHANGE SCHEDULES FOR NOTE: DELIVERY DEADLINE ON ALL SUBMITTALS, INCLUDING ONLINE, IS 12:00 NOON ALL DRAWINGS SUBMITTED MUST BE BLACKLINE,

More information

Non-motorized Trail Plan & Proposal. August 8, 2014

Non-motorized Trail Plan & Proposal. August 8, 2014 Town of Star Valley Ranch, Wyoming and the Star Valley Ranch Association in partnership with the USDA Forest Service, Bridger-Teton National Forest, Greys River Ranger District Non-motorized Trail Plan

More information

AND PERMITTEE DATE LOCATION OF WORK

AND PERMITTEE DATE LOCATION OF WORK 04 Aug 2003 Regulatory Branch PUBLIC NOTICE ------------- 1. Pursuant to Code of Federal Regulations 33 CFR 325.2(a)(8), the Chicago District issued permits or other approvals, withdrawals, appeals or

More information

Section 3.6. Parklands & Recreation Areas

Section 3.6. Parklands & Recreation Areas Section 3.6: Parklands & Recreation Areas Section 3.6 Parklands & Recreation Areas 3.6 PARKLANDS AND RECREATION AREAS 3.6.1 Introduction to Analysis This section provides an overview of parklands and recreational

More information

INTRODUCTION TO RIFLE AIRPARK AND GARFIELD COUNTY AIRPORT INDUSTRIAL PARK PLANNED UNIT DEVELOPMENTS

INTRODUCTION TO RIFLE AIRPARK AND GARFIELD COUNTY AIRPORT INDUSTRIAL PARK PLANNED UNIT DEVELOPMENTS INTRODUCTION TO RIFLE AIRPARK AND GARFIELD COUNTY AIRPORT INDUSTRIAL PARK PLANNED UNIT DEVELOPMENTS MARCH 31, 2016 Offered By: Airport Land Partners Limited, a Colorado Limited Liability Corporation 312

More information

Colorado HOA's with members in the Colorado HOA Forum Alpha Listing

Colorado HOA's with members in the Colorado HOA Forum Alpha Listing 1000 South Monaco Condominium Asso. 1355 Franklin 3001 Association 400 Third 888 Logan Condominium Association AMA Americana Condominiums Antelope Heights Parker Arbors at Mountain Shadows Arrowhead Improvements

More information

18 Nov Chicago District Regulatory Branch PUBLIC NOTICE

18 Nov Chicago District Regulatory Branch PUBLIC NOTICE 18 Nov 2002 Chicago District Regulatory Branch PUBLIC NOTICE ------------- 1. Pursuant to Code of Federal Regulations 33 CFR 325.2(a)(8), the Chicago District issued permits or other approvals, withdrawals,

More information

LIV MICROMARKET REPORT. BOULDER January-September 2015 COLORADOMICROREPORTS.COM

LIV MICROMARKET REPORT. BOULDER January-September 2015 COLORADOMICROREPORTS.COM LIV MICROMARKET REPORT BOULDER January-September COLORADOMICROREPORTS.COM BOULDER COUNTY NEIGHBORHOODS 11 12 14 13 10 6 5 15 2 1 3 9 4 16 17 18 8 7 1. Central Boulder & Historic District 7. Louisville

More information

Trail Assessment Report

Trail Assessment Report Trail Assessment Report Trail Options for the Bear Creek Canyon located in Pikes Peak Ranger District, Pike National Forest and on Colorado Springs Utility Lands Due to the presence of a unique species

More information

ALPINE CITY PLANNING COMMISSION MEETING at Alpine City Hall, 20 North Main, Alpine, Utah April 15, 2014

ALPINE CITY PLANNING COMMISSION MEETING at Alpine City Hall, 20 North Main, Alpine, Utah April 15, 2014 1 I. GENERAL BUSINESS ALPINE CITY PLANNING COMMISSION MEETING at Alpine City Hall, 20 North Main, Alpine, Utah April 15, 2014 A. Welcome and Roll Call: The meeting was called to order at 7:13pm by Chairman

More information

OVERVIEW. KearneyRealty.com

OVERVIEW. KearneyRealty.com OVERVIEW City of Boulder: Population 99,070 Area 25.5 square miles Founded - 1858 Altitude - 5,430 feet Median Household Income - $57,231 Major Industries - University of Colorado, Science and Research,

More information

COMMUNITY MEETING NOVEMBER 1, Wheaton Regional Park Pine Lake Trail

COMMUNITY MEETING NOVEMBER 1, Wheaton Regional Park Pine Lake Trail COMMUNITY MEETING NOVEMBER 1, 2012 MEETING AGENDA I. Introduction of Project Team II. Trail Renovation Process III. Wheaton Regional Park IV. Pine Lake Trail Renovation Project V. Comments and Questions

More information

ADWR ISSUED DEMANDS (ADEQUATE & INADEQUATE) WITHIN MODEL DOMAIN TOTAL

ADWR ISSUED DEMANDS (ADEQUATE & INADEQUATE) WITHIN MODEL DOMAIN TOTAL ADWR ISSUED S (ADEQUATE & INADEQUATE) WITHIN MODEL DOMAIN White Wing Antelope Run Water Company 53-501681.0000 57.5 D 22 20 35 114 2/5/1980 Issued Adequate WR El Rancho Estates Arizona Water Company 53-501727.0000

More information

CULTUS LAKE PARK BOARD AMENDED AGENDA

CULTUS LAKE PARK BOARD AMENDED AGENDA CULTUS LAKE PARK BOARD AMENDED AGENDA (1) CALL TO ORDER WEDNESDAY, MARCH 18, 2015 PARK OFFICE BOARDROOM 7:00 PM Regular Meeting (2) RESOLUTION TO PROCEED IN CAMERA (4:00) THAT the meeting be closed to

More information

1/2 ACRE LOTS STARTING AT $85,000 - ALL INFO INCLUDED WASATCH COUNTY, UTAH

1/2 ACRE LOTS STARTING AT $85,000 - ALL INFO INCLUDED WASATCH COUNTY, UTAH 1/2 ACRE LOTS STARTING AT $85,000 - ALL INFO INCLUDED WASATCH COUNTY, UTAH Zachary Hartman zhartman@landadvisors.com 6443 North Business Park Loop Road, Suite 12, Park City, Utah 84098 ph. 801.573.9181

More information

Platted Single-Family Lots in the Town of Windsor as of 02/28/14

Platted Single-Family Lots in the Town of Windsor as of 02/28/14 Platted Single-Family Lots in the Town of Windsor as of /8/14 Lots Permits Issued Permit Needing Final SUBDIVISIONS Zoning 1 Total Total This Lots Ready Further School Utility Approval Lots Issued Month

More information

INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT We Protect Hoosiers and Our Environment.

INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT We Protect Hoosiers and Our Environment. INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT We Protect Hoosiers and Our Environment. Eric J. Holcomb Governor 100 N. Senate Avenue Indianapolis, IN 46204 (800) 451-6027 (317) 232-8603 www.idem.in.gov

More information

PRELIMINARY SUMMARY OF MAP ACTIONS

PRELIMINARY SUMMARY OF MAP ACTIONS To assist your community in maintaining the Flood Insurance Rate Map (FIRM), we have summarized below the previously issued Letter of Map Change () actions (i.e., Letters of Map Revision (s) and Letters

More information

CITY OF PORT ORANGE MONTHLY DEVELOPMENT ACTIVITY REPORT

CITY OF PORT ORANGE MONTHLY DEVELOPMENT ACTIVITY REPORT CITY OF PORT ORANGE MONTHLY DEVELOPMENT ACTIVITY REPORT Walmart Neighborhood Market 3811 Clyde Morris Blvd. CITY COUNCIL allen green, mayor drew bastian, vice mayor bob ford, councilman donald burnette,

More information

Capital Program Delivery

Capital Program Delivery Capital Program Delivery Transportation & Public Works Department City Council FY 2013 Budget Workshop August 23, 2012 1 TPW Capital Programs 2013 Building Facilities Storm Water Management Roadway & Bridge

More information

Lava Mountain Trail Distance: Elevation Range: Trail Type: Difficulty: Season: Driving Distance: Driving Time: USGS Maps: Pros Cons

Lava Mountain Trail Distance: Elevation Range: Trail Type: Difficulty: Season: Driving Distance: Driving Time: USGS Maps: Pros Cons Lava Mountain Trail Distance: 13.4 miles (including the side trip to North Star Lake) Elevation Range: 5900'-8330' Trail Type: singletrack Difficulty: moderate Season: late June-October Driving Distance:

More information

SUMNER COUNTY PLANNING COMMISSION MINUTES APRIL 25, :00 P.M.

SUMNER COUNTY PLANNING COMMISSION MINUTES APRIL 25, :00 P.M. SUMNER COUNTY PLANNING COMMISSION MINUTES 5:00 P.M. SUMNER COUNTY ADMINISTRATION BUILDING COMMISSION CHAMBERS 355 N. BELVEDERE DRIVE GALLATIN, TN. 37066 MEMBERS PRESENT: LUTHER BRATTON, CHAIRMAN BILLY

More information

Chapter 6 Existing and Proposed Transportation Facilities

Chapter 6 Existing and Proposed Transportation Facilities Chapter 6 Existing and Proposed Transportation Facilities Methodology As discussed in Chapter 4, the Dixie MPO s CUBE modeling platform was used to analyze future traffic demand. The CUBE Model applied

More information

Project Location MP A44.5 MP A38 PRELIMINARY. A A57 (Future Project) A42 - A44.5 (Fall Fall 2019) A38 - A42. A31 - A38 - In Design

Project Location MP A44.5 MP A38 PRELIMINARY. A A57 (Future Project) A42 - A44.5 (Fall Fall 2019) A38 - A42. A31 - A38 - In Design RECONSTRUCTION AND WIDENING PROJECT Project Location A44.5 - A57 (Future Project) MP A44.5 Steinsburg Road (Fall 2015 - Fall 2016) John Fries Highway (Fall 2017 - Fall 2019) A42 - A44.5 (Fall 2017 - Fall

More information

Figure 1 shows the evaluation area around Tailings Basin Cells 2E/1E. Two areas were evaluated for potential wetland impacts including:

Figure 1 shows the evaluation area around Tailings Basin Cells 2E/1E. Two areas were evaluated for potential wetland impacts including: Barr Engineering Company 4700 West 77th Street Minneapolis, MN 55435-4803 Phone: 952-832-2600 Fax: 952-832-2601 www.barr.com An EEO Employer Minneapolis, MN Hibbing, MN Duluth, MN Ann Arbor, MI Jefferson

More information

OFFICE OF THE CITY MANAGER MEMORANDUM August 30, 2013

OFFICE OF THE CITY MANAGER MEMORANDUM August 30, 2013 OFFICE OF THE CITY MANAGER MEMORANDUM August 30, 2013 TO: FROM: Honorable Mayor and City Council Alan Tandy, City Manager AT/ al SUBJECT: General Information In observation of Labor Day, City offices will

More information

Commercial Sales by Subdivision

Commercial Sales by Subdivision Commercial Sales by Subdivision 2017 Commercial Reappraisal Study Period: July 1, 2014 - June 30, 2016 Subdivision Filing Address 18 WILCOX 0 18 WILCOX ST R0460107 Office Building O1100 20912 Good 2005

More information

APPENDIX G. The WAP Conservation Landscape and Focal Areas

APPENDIX G. The WAP Conservation Landscape and Focal Areas APPENDIX G The WAP Conservation Landscape and Focal Areas Focal areas were identified as discrete landscape units using the natural basin and range geography of the Nevada landscape. These units were prioritized

More information

El Paso County Clerk and Recorder Surveyor Affidavits by Alpha Report

El Paso County Clerk and Recorder Surveyor Affidavits by Alpha Report El Paso County Clerk and Recorder Surveyor Affidavits by Alpha Report 24/94 BUSINESS PARK FILING NO 1 SURAFFI 217074318 6/26/2017 4 WAY RANCH FILING FILING NO 1 SURAFFI 213015237 2/4/2013 ACADEMY GATEWAY

More information

On Pistakee Bay At 1222 Old Bay Road Near McHenry In Unincorporated McHenry County, Illinois (Section 19, T45N, R9E)

On Pistakee Bay At 1222 Old Bay Road Near McHenry In Unincorporated McHenry County, Illinois (Section 19, T45N, R9E) 16 Apr 2003 Regulatory Branch PUBLIC NOTICE ------------- 1. Pursuant to Code of Federal Regulations 33 CFR 325.2(a)(8), the Chicago District issued permits or other approvals, withdrawals, appeals or

More information

Trail Beginning Elevation: 7553 ft The Poison Creek Trailhead is located at the end of National Forest Road 646E (NF-646E).

Trail Beginning Elevation: 7553 ft The Poison Creek Trailhead is located at the end of National Forest Road 646E (NF-646E). West Mountain Trails Poison Creek Trail #134 Length: 2.9 miles (4.7 km) Difficulty Horseback: A good trail for the first time west mountain rider, some steep sections Hiking: Most Difficult USGS Maps:

More information

Final Environmental Impact Statement for the Merced Wild and Scenic River. Comprehensive Management Plan, Yosemite National Park, Madera and Mariposa

Final Environmental Impact Statement for the Merced Wild and Scenic River. Comprehensive Management Plan, Yosemite National Park, Madera and Mariposa This document is scheduled to be published in the Federal Register on 02/26/2014 and available online at http://federalregister.gov/a/2014-04061, and on FDsys.gov DEPARTMENT OF THE INTERIOR 4312-FF NATIONAL

More information

meeting, focusing instead on making sure everyone participating in the meeting has an opportunity to be heard.

meeting, focusing instead on making sure everyone participating in the meeting has an opportunity to be heard. February 2, 2012 Page 2 meeting, focusing instead on making sure everyone participating in the meeting has an opportunity to be heard. SUMMARY OF PROPOSED SERVICE CHANGES Service Reductions Route 54 Montbello

More information

Piedra River Protection Workgroup Meeting #5 Feb. 21, 2012 Ross Aragon Community Center, Pagosa Springs

Piedra River Protection Workgroup Meeting #5 Feb. 21, 2012 Ross Aragon Community Center, Pagosa Springs Piedra River Protection Workgroup Meeting #5 Feb. 21, 2012 Ross Aragon Community Center, Pagosa Springs What happened at this meeting? - Identified conservation easements - Discussed In-stream Flows -

More information

CLARKSVILLE-MONTGOMERY COUNTY REGIONAL PLANNING COMMISSION - AGENDA - November 29, :00 P.M. 329 Main Street (Meeting Room - Basement)

CLARKSVILLE-MONTGOMERY COUNTY REGIONAL PLANNING COMMISSION - AGENDA - November 29, :00 P.M. 329 Main Street (Meeting Room - Basement) CLARKSVILLE-MONTGOMERY COUNTY REGIONAL PLANNING COMMISSION - AGENDA - November 29, 2017 2:00 P.M. 329 Main Street (Meeting Room - Basement) I. CALL TO ORDER/QUORUM CHECK/PLEDGE TO FLAG II. APPROVAL OF

More information

Service Performance 2017 Networked Family of Services

Service Performance 2017 Networked Family of Services Subsidy per Boarding or Effectiveness Service Performance 2017 Networked Family of Services Overview RTD s Mission is: "To meet our constituents' present and future public transit needs by offering safe,

More information

Committee Report. Community Development Committee For the Metropolitan Council meeting of August 12, Business Item No.

Committee Report. Community Development Committee For the Metropolitan Council meeting of August 12, Business Item No. Committee Report Business Item No. 2015-168 Community Development Committee For the Metropolitan Council meeting of August 12, 2015 Subject: Coon Creek Regional Trail Master Plan, Anoka County Proposed

More information

Completion: August 2011 LS #321 Design LS #8

Completion: August 2011 LS #321 Design LS #8 1 CIPNumber c350406 2 c350302 3 c350902 LEGEND PERMITTING/ BIDDING CHARLOTTE COUNTY UTILITIES Burnt Store Water Reclamation Facility (Expansion to 0.75 MGD) East Port Expansion Water Reclamation Facility

More information