PPP A WAY TO MODERNIZE CURRENT CONCESSIONS. Barcelona, November 2016

Size: px
Start display at page:

Download "PPP A WAY TO MODERNIZE CURRENT CONCESSIONS. Barcelona, November 2016"

Transcription

1 PPP A WAY TO MODERNIZE CURRENT CONCESSIONS Barcelona, November 2016

2 Index 01 Introduction 02 Autopista del Aconcagua SCADA Historical 03 Transformation Needs 04 PPP Foundations 05 Framework Agreement 06 Risk Distribution 07 Conclusions

3 01 Introduction Concessions in Chile Chile is the leading country of Latin America and the Caribbean region in private investment infrastructure. Chile Chile is an OCDE country. Highest PIB per capita (PPP) of Latin America an the Caribbean region. Chile has one of the most successful concession model with more than 20 years of experience and with a total amount of investment of MMUS 9.6. Best Infrastructure Private Investment Attractiveness Index of the region. SCADA Santiago SCADI Sources: World Economic Forum and Copsa, AG Standard & Poor Investment-grade: Foreign currency : A+ Local currency : AA Spread Treasure Bond : 110 bps.

4 01 Introduction In Chile the interurban road concessions connecting Santiago were granted in the 90s. These accesses were characterized by the typical demand for longdistance traffic. These road axes were granted through PPPs, with a focus on increasing the country s capacity and improving its connectivity. Due The State, to Santiago s throughquick the Ministry expansion, of the Public economic Works (MOP), boom, population granted private and automobile concessions covering park growth, long distances these accesses ( 200 kms). changed from being interurban connectors to the structuring axes of the city in just a few years. The initial road design lagged behind. There were strong congestion, traffic saturation and high accident rates. Second generation Urban Highways More then 40 road concessions have been awarded since 1995 to local and international consortia Rutas del Pacífico 110 kms (West Access) Autopista del Sol 109 km (West Access) SCADA 218 kms (North Access) Autopista Vespucio Norte 29 kms (Urban Highway Costanera Norte XX Km (Urban Highway) Autopista Central 32 km (Urban Highway Radial Nor Oriente XX Km (Urban Highway) This presentation describes the unique case in which the SCADA concession (Aconcagua Highway) through a city focused PPP faces a road lag in the North Access to Santiago. Ruta del Maipo 200 km (South Access)

5 02 SCADA Historical (1 out of 2) Los Vilos Km. 229 Pichidangui Toll Plaza Km. 193 SCADA Concesión Ruta 60 March 1997, Chile's Ministry of Public Works granted a concession to SCADA for the section of the North Pan American Highway(Route 5)that extends from the North Access to Santiago to the city of Los Vilos. It is almost 220 kms in length. Chile Los Vilos SCADA Santiago de Chile Valparaíso Concesión Ruta 60 Concesión Rutas del Pacífico Las Vegas Toll Plaza Km. 89 Cuesta La Dormida Lampa Toll Plaza Km. 26 Autopista Los Libertadores Km. 11 Santiago Acceso Vespucio Norte The concession started in Its original works aimed at making long distance traffic more expeditious and safer by incorporating a second road, return links and pedestrian bridges. The concession has been active for 15 years and was originally scheduled to end by Following changes in the land use of Santiago s Urban Plan, the improvement of its ring road (Vespucio Ave) and the operation of the urban highways in the city, the North Access to Santiago (15 kms of URBAN SECTION) became an industrial park for new companies, cargo distribution centers, shopping centers and new residential neighborhoods, along with new inhabitants moving to their direct surroundings. A few years after it was put into service, the URBAN SECTION is no longer a road embedded in rural areas. It has become an essential roadway within the city of Santiago. Even before the concession ended. The concession contract did not allow new investments. NEGOTIATION

6 02 SCADA Historical (2 out of 2) Urban Section Urban Section In the last 30 years, industrial growth around the URBAN SECTION has represented 48% of the accumulated industrial growth in the Metropolitan Region of Santiago. From 1990 to 2015, the automobile park went from to Santiago concentrates 56% with vehicles. The Real estate growth around the URBAN SECTION has been the highest growth in Santiago, 13% in recent years. With an increasing number of real estate projects in Santiago. Today the URBAN SECTION surroundings have 5 times more inhabitants than 20 years ago. From 41 thousand inhabitants in 1990 to 205 thousand in 2010, a 403% increase. Growth potential for 2020 is 290 thousand inhabitants.

7 03 Transformation Needs The URBAN SECTION was designed to meet long distance demand, but quickly faced purely urban demand, characterized by the typical peaks during working days. The URBAN SECTION s infrastructure and customer service lagged behind the industrial and real estate dynamics of its surroundings. A highaccident rate. 50% of accidents and 60% of pedestrian accidents were concentrated in the first 15 kms of the 218 km concession. High lateral friction. Maximum lane capacity was exceeded. Lack of connectivity with local roads. Lack of pedestrian connectivity. Bike Paths Road safety devices outdated according to current road design regulations.

8 04 PPP Foundations An early investment was required to expand and modernize the infrastructure and service level of the first 15 kms of SCADA to bringit up to the city s road standards. There was concern and pressure from citizens and industrialists towards the Ministry of Public Works and the Concessionaire regarding the high accident rate and the productivity drop caused by the existing infrastructure. Faced a lack of resources due to the 2010 earthquake (Feb 27 th ) of 8.8 Mw, had forced it to reallocate resources for reconstruction. The remaining term of the concession was still too long to re bid and include such a transformation (Negotiation with MOP) Within the framework of the PRIVATE PUBLIC PARTNERSHIP (PPP), a joint effort was required between the MOP and the Concessionaire to transform the SCADA URBAN SECTION Joint basis between the MOP and SCADA Pay for use, the main pillar of the concession system in Chile. Financed by the project itself, avoiding State contributions as much as possible. Productive leverage. Accepted and integrated into the environment. Terms and risk distribution allowing bank financing.

9 05 Agreement Framework (1 out of 4) SCADA funds, designs, executes investments, manages, controls, maintains and operates the project. The projects were reviewed and approved by the MOP. Awarded Price Contractor Road works construction Contract 163 M FCC Collection system and traffic management Contract 19 M KAPSCH The MOP approves the design, modifications and the executed works by SCADA, supervises the execution of the agreement, inspects the quality of the works, registers the executed investments and the compensations to SCADA.

10 05 Agreement Framework (2 out of 4) Construction Price Execution Deadlines Boundary Conditions Lump sum price in real amount UF (Chilean inflation indexed unit) It is the result of a private (invitation only) bidding that SCADA prepares. It is governed by preconditions established by the MOP. Maximum price allowed defined by the MOP, otherwise the bidding is not successful. Deadlines for (i) informing invitees of the bidding, opening bids and adjudications, (ii) construction of works and implementing systems, and (iii) signing contracts with contractors. The execution period start date and the completion date. Company return to the investment is included in the amount Guarantying traffic flow through a free flow electronic toll system Service changes and Environmental Mitigation are not part of the price. These are recognized as added values. Expropriations are the responsibility of the MOP, which commits to a deadline. Guarantee of full compliance: 5% of the contract price. Insurance during Construction & Exploitation: under the Concession Contract. Risks: applies the Concessions Law and the Concession Contract due to unforeseeable circumstances / force majeure. Project risks, site conditions and construction risk are transferred to the Builder. The force majeure is treated as established today in the Concession Contract. Excludes risks for acts or omissions of the MOP and other public authorities.

11 05 Agreement Framework (3 out of 4) New pricing of an urban segment embedded in a long distance road concession. Los Vilos Km. 229 Pichidangui Toll Plaza Km. 193 SCADA Concesión Ruta 60 Interurban Section Current pricing is not altered, with upfront payment in order to go through, with barriers, cash payment and in 3 trunk tolls. Single rate differentiated by type of vehicle, according to number of axles. Long distance traffic with peaks on normal or long weekends. Valparaíso Concesión Ruta 60 Concesión Rutas del Pacífico Las Vegas Toll Plaza Km. 89 Cuesta La Dormida Lampa Toll Plaza Km. 26 Km. 11 Autopista Los Libertadores Santiago Acceso Vespucio Norte Urban Section Payment by kilometer traveled with an OBU device. Free Flow gantries fee 4 per roadwaypostpaid mode to billing address. Differential rates in normal and peak hours, by type of vehicles classified by volume. Typical city traffic with working day peak schedules. Integrated & interoperable with the other urban highways with free flow system New pricing system segmented by demand characteristics. There is no cross subsidy between different sectors of the concession to finance other works in the city. Segment charging by user type (a) Frequent Users (b) Infrequent Users. The use of postpaid OBUs in the project interoperable within the urban highways of the city allows adherence to the existing collection model, which currently has a volume of more than 2 million OBUs (Database).

12 05 Agreement Framework (4 out of 4) A State insurance was agreed on for uncollectible debt those who do not pay which is 5% of the potential annual income. When smaller percentages are reached, the profit is shared between the MOP and SCADA MUF AÑO The MOP compensates the Concessionaire with: Revenues from new pricing for the Urban Section collections. A 2 year and 2 month concession extension, from February 2021 to March 2023 Investments that SCADA finances and executes and the revenues it collects are recorded month by month in the Investment and Compensation Account. Investments are recorded in the account with a negative sign. Revenues are recorded with a positive sign. The registered values are updated monthly with the agreed discount rate (NPV). MOP compensation ends when NPV = 0. The MOP pays SCADA the difference only if at the end of the concession that balance has not occurred. On the contrary, if the NPV > 0 before the end of the concession, SCADA pays the positive difference to the MOP monthly Inversión Ingresos FF Ingresos Interurbanos Opex Compensación

13 05 Risk Distribution SCADA STATE (MOP) Demand, mitigated by the "Investment and Compensation Account compensation system. Financing the project. Deadline compliance. Quality and execution of the works. Execution of financing contracts and contractors. Uncollectibility above 5%. Integration or compatibility of the execution of road works contracts and systems. If "Investment and Compensation Account" NPV < 0 at the end of the concession, the MOP will have to pay SCADA the balance. However, the MOP receives SCADA payments if there is early compensation. Changes in utility services and environmental mitigation measures. Expropriation process, legal and financial Payment of O & M costs during the extension period Payment of unpaid transits at the end of the concession period

14 06 Final Remarks How to Built Accesses to a Smart City This PPP allows works representing the 2 nd most important road investment in Stgo today. Conversion of the Urban Section of the motorway (first 15 km.): improvement and extension to additional lanes and new interchanges New Free Flow System implementation in the Urban Section (Traffic & Toll System) Incorporation of a free flow multi laneetc system at the toll plaza Others: renewal of pre existing bridges, new safety works, new works for the improvement of the serviceability, anti vandalismclosuresandchangesinaffected utilities / enclosures / environmental investments ( 58mm) 25 pedestrian bridges solutions 30 km of pedestrian roads 30 km of Bike paths 42 bus stops The i. project Certified will the achieve social relevant return by productive the Ministry leverage of Social in its Development. environment and in the city: ii. Significant increase in average speed and reduction of travel times. iii. Increases productivity and lowers operating costs to industries and citizens. Improves scheduling of trips and cargo shipments. iv. Reduces traffic accidents and pedestrian fatalities. v. Accepted by the citizens.

15 06 Final Remarks How to Built Accesses to a Smart City Infrastructure that integrates properly with its environment. 1st concession in Chile that contemplates cycle paths on both sides and throughout its length. Sidewalks and pedestrian trails throughout its length. LED panels that display hourly tariff (final rates) on each free flow gantries. Emergency center with cranes, ambulances, mobile road surveillance and user assistance. Modern control system and traffic management: 22 surveillance cameras, variable messaging. Project shared, promote & accepted by communities. Rates consider criticism of the urban highways current pricing. No saturation fee. Rates grow only by CPI, without additional real growth Service roads or local roads are competent alternative routes, developed in parallel to the layout. The concessionaire invest MMUS$1,6 informing communities the advances of civil works, contingence, detours & CSR The Project generates its own financing resources, without the need of fiscal resources. The MOP acquires the obligation of only one payment, which is eventual and would only occur in 2023, at the end of the concession. First Chilean experience of conversion from an access road concession to an urban highway. SCADA is the first concession where two tariff systems coexist for transits with different demand characterization.

16 06 Final Remarks Video

17 USA 1230 Avenue of the Americas 7 th Floor Offices 706 & 707 New York New York Phone: CHILE Rosario Norte 100 Of Edificio Rosario Norte th floor Las Condes Santiago Chile Tel IRELAND Luttrellstown Road Diswellstown Castleknock Dublin 15 Ireland Phone: +353 (0) SPAIN (Headquarters) Paseo de la Castellana rd Floor, Madrid Tel MEXICO Monte Pelvoux, 220 Int 404 Edificio Virreyes Col. Lomas de Chapultepec Del. Miguel Hidalgo Mexico D.F. Tel

Transport Infrastructure Concessions: Chilean Experience

Transport Infrastructure Concessions: Chilean Experience Critical Success Factors in Large Scale Transport Infrastructure Projects Transport Infrastructure Concessions: Chilean Experience Eduardo Bitran Colodro, Minister of Public Works, Chile March 26th, 2007

More information

DIRECT PUBLIC INVESTMENT

DIRECT PUBLIC INVESTMENT DIRECT PUBLIC INVESTMENT - Upgrade and Rehabilitation of Route 11 CH - Optimization of Route 41 CH - Improvement of Route E-30-F - Upgrade of Route 7 by sections - Provincial Hospital of Curicó - Calama

More information

Update of MDX Open Road Tolling

Update of MDX Open Road Tolling Update of MDX Open Road Tolling Citizens Transportation Advisory Committee September 11, 2013 About MDX MDX is an agency of the state created by the State Legislature and the County Commission to assure

More information

UNVEILING AND OPENING TO TRAFFIC OF THE THIRD GUADARRAMA TUNNEL ON THE AP-6 MOTORWAY

UNVEILING AND OPENING TO TRAFFIC OF THE THIRD GUADARRAMA TUNNEL ON THE AP-6 MOTORWAY Iberpistas, S.A. Concesionaria del Estado Sociedad Unipersonal Tel. +34 91 574 81 00 a6informacion@iberpistas.es THIRD GUADARRAMA TUNNEL UNVEILING AND OPENING TO TRAFFIC OF THE THIRD GUADARRAMA TUNNEL

More information

US-460 CONCEPTUAL PROPOSAL

US-460 CONCEPTUAL PROPOSAL US-460 Presentation Conceptual to VDOT Independent Review Proposal Panel Presentation to VDOT Independent Review Panel December 6, 2010 Long-Term Partnership Over 150 years, the map has changed but the

More information

Successes and Failures of the Policies of Water Supply and Wastewater Services in Argentina

Successes and Failures of the Policies of Water Supply and Wastewater Services in Argentina 4th World Water Forum, México, 2006 Session FT 3.48: Public Policies for Water and Sanitation Services Convener: Comisión Nacional del Agua, México. Successes and Failures of the Policies of Water Supply

More information

Lobbying and renegotiation of PPPs in Chile

Lobbying and renegotiation of PPPs in Chile Lobbying and renegotiation of PPPs in Chile Ronald Fischer CEA-DII Universidad de Chile Prepared for the African Conference on Public-Private Partnerships 6-7 December 2012 R. Fischer, CEA Lobbying and

More information

ITA AITES WORLD TUNNEL CONGRESS 2009

ITA AITES WORLD TUNNEL CONGRESS 2009 ITA AITES WORLD TUNNEL CONGRESS 2009 Budapest, Hungary, May 23 29, 2009 OF SAFE AND EFFICIENT UNDERGROUND URBAN ROAD AND RAIL INFRASTRUCTURES Manuel Arnáiz Ronda PhD. Civil Engineering President of AETOS

More information

ISA AND ITS BUSINESS UNITS

ISA AND ITS BUSINESS UNITS Directly and through its 30 affiliates and subsidiaries, ISA executes important projects in linear infrastructure systems that enhance continental development. For such purpose, its activities are focused

More information

MAJOR PROJECTS

MAJOR PROJECTS MAJOR PROJECTS 2017-2019 MINISTRY OF PUBLIC WORKS JUNE 2017 CONCESSIONS - The Loa Route - Route 5: Section Caldera - Antofagasta - Re-tender of Route N 5 Los Vilos La Serena and Conurbation - Interconnection

More information

May El Dorado International Airport. Aeropuerto Internacional El El Dorado

May El Dorado International Airport. Aeropuerto Internacional El El Dorado May 2018 El Dorado International Airport. Aeropuerto Internacional El El Dorado ABOUT ODINSA We are a Colombian concession company that belongs to Grupo Argos, dedicated to the structuring, promotion,

More information

CHILE: Infrastructure, The Challenges Ahead

CHILE: Infrastructure, The Challenges Ahead CHILE: Infrastructure, The Challenges Ahead Hernán de Solminihac Vice President CPI - Chile Former Minister of Public Works and Minister of Minning Professor Civil Engineering and Planning Director of

More information

The U.S. Commercial Service

The U.S. Commercial Service The U.S. Commercial Service Briefing for Americas Business Forum, UCLA, Los Angeles, California U.S. Embassy, Santo Domingo The Caribbean Region: A Sizeable Export Market Caribbean US$17.39 Italy US$16.01

More information

Asset Portfolio. Key figures and location JULY, 2018

Asset Portfolio. Key figures and location JULY, 2018 Asset Portfolio Key figures and location JULY, 2018 Index 1. ALEATICA Footprint 03 2. CHILE 04 Toll Roads Ports 06 3. COLOMBIA 09 Toll Roads 10 4. SPAIN 11 Toll Roads Ports Railways 12 5. MEXICO 18 Toll

More information

ALL ABOARD LABOR S LONG TERM PASSENGER TRANSPORT STRATEGY

ALL ABOARD LABOR S LONG TERM PASSENGER TRANSPORT STRATEGY ALL ABOARD LABOR S LONG TERM PASSENGER TRANSPORT STRATEGY Revitalising Passenger Transport Increasing traffic congestion in our cities and a lack of transport services in our regional towns is frustrating

More information

Ballston Mall Redevelopment Outline of a Public Private Agreement with Forest City Enterprises

Ballston Mall Redevelopment Outline of a Public Private Agreement with Forest City Enterprises Ballston Mall Redevelopment Outline of a Public Private Agreement with Forest City Enterprises County Manager s Report to the Arlington County Board July 21, 2015 County Board Direction June 16, 2015 The

More information

DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, FloridaExpressLanes.com

DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, FloridaExpressLanes.com DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, 2017 FloridaExpressLanes.com This page intentionally left blank. TABLE OF CONTENTS List of Figures... ii List of Tables.... ii

More information

Aviation Data and Analysis Seminar February Economics of Airports and Air Navigation Services Providers

Aviation Data and Analysis Seminar February Economics of Airports and Air Navigation Services Providers Aviation Data and Analysis Seminar 20-23 February 2017 Economics of Airports and Air Navigation Services Providers 250 7000 6000 200 5000 150 4000 Growth of air transport World recession SARS Freight Tonne

More information

Hyderabad Metro Rail in PPP Mode

Hyderabad Metro Rail in PPP Mode Hyderabad Metro Rail in PPP Mode Presentation to the 6 th Global Infrastructure Leadership Forum New York Feb 2013 NVS Reddy Managing Director w w w. h Hyderabad m r. g o Metro v. i Rail n Ltd. Hyderabad

More information

Overview. Eero Ailio European Commission

Overview. Eero Ailio European Commission Overview Eero Ailio European Commission UN/US Expert Meeting Vienna 13-17 December 2004 1 Position and Galileo key features timing Services Galileo+GPS International Public Private Partnership 2 Galileo:

More information

Tolling in Washington State. Craig J. Stone, P.E. Assistant Secretary, Toll Division

Tolling in Washington State. Craig J. Stone, P.E. Assistant Secretary, Toll Division Tolling in Washington State Craig J. Stone, P.E. Assistant Secretary, Toll Division Connecticut Department of Transportation Bridgeport, CT June 4, 2014 Tolling in Washington State Tolling is part of Washington

More information

METROBUS SERVICE GUIDELINES

METROBUS SERVICE GUIDELINES METROBUS SERVICE GUIDELINES In the late 1990's when stabilization of bus service was accomplished between WMATA and the local jurisdictional bus systems, the need for service planning processes and procedures

More information

Route 29 Solutions Projects

Route 29 Solutions Projects Your guide to the Route 29 Solutions Projects For full details & continued engagement please visit www.route29solutions.org The Route 29 Solutions Package is a $230 million investment into the improvement

More information

Financial Proposal for Gwinnett County Airport Briscoe Field

Financial Proposal for Gwinnett County Airport Briscoe Field Financial Proposal for Gwinnett County Airport Briscoe Field Financial Proposal For the Lease, Operation and Improvement RP039-11 of GWINNETT COUNTY AIRPORT BRISCOE FIELD Presented To Gwinnett County Board

More information

Dulles Corridor Improvements. Drive to Ride

Dulles Corridor Improvements. Drive to Ride Dulles Corridor Improvements Dulles Corridor Improvements Status Update v Condition assessment of Toll Road facilities is complete v Dulles Airport Access Highway/I-495 Interchange Safety Improvements

More information

Peru: Investment Opportunities Infrastructure and public services

Peru: Investment Opportunities Infrastructure and public services Peru: Investment Opportunities Infrastructure and public services 2017-2018 Carlos Ganoza Chief of Advisors Ministry of Economy and Finance April 19th 1 PERU S STRONG MACROECONOMIC CREDENTIALS ALLOW FOR

More information

For personal use only

For personal use only asx release 21 October 2015 Presentation to Morgans Queensland Conference Please find attached the presentation that Transurban CEO Scott Charlton will be delivering at today s Morgans Queensland Conference.

More information

Peru: Investment Opportunities Infrastructure and public services

Peru: Investment Opportunities Infrastructure and public services Peru: Investment Opportunities Infrastructure and public services 2017-2018 PERU S STRONG MACROECONOMIC CREDENTIALS Real GDP, 2004-2018* (%Variation) Real GDP Forecasts for Latin America 2017 (Annual Average

More information

Wellington $312 $49 $456 OVERVIEW WELLINGTON REGIONAL SUMMARY

Wellington $312 $49 $456 OVERVIEW WELLINGTON REGIONAL SUMMARY National Land Transport Programme 2015 18 Wellington WELLINGTON REGIONAL SUMMARY OVERVIEW The Wellington region is made up of a number of cities, urban areas and supporting rural hinterland. The city is

More information

UBS 14 th Global Emerging Markets Conference. New York, November 2016

UBS 14 th Global Emerging Markets Conference. New York, November 2016 UBS 14 th Global Emerging Markets Conference New York, November 2016 This presentation may include forward-looking comments regarding the Company s business outlook and anticipated financial and operating

More information

Results of Tourism Activity

Results of Tourism Activity Results of Tourism Activity Mexico, July 2016 Lago de San Miguel Regla, Hidalgo. Jardín en Hacienda San Gabriel, Morelos. Parras, Coahuila. Paseo Santa Lucía, Monterrey. Undersecretariat of Planning and

More information

Report to the Dulles Corridor Advisory Committee

Report to the Dulles Corridor Advisory Committee Report to the Dulles Corridor Advisory Committee Information Report on Dulles Toll Road Toll Rate Adjustment Process and Tentative Schedule and Overview of Traffic and Revenue Study Update May 2018 Purpose

More information

Blueways: Rivers, lakes, or streams with public access for recreation that includes fishing, nature observation, and opportunities for boating.

Blueways: Rivers, lakes, or streams with public access for recreation that includes fishing, nature observation, and opportunities for boating. Parks, Open Space and Trails PRINCE WILLIAM COUNTY 2008 COMPREHENSIVE PLAN TRAILS PLAN CONTENTS The components of the trails plan are: Intent Definitions Goals, Policies, and Action Strategies Trails Map

More information

Alianza del Pacífico. October, Germán Ríos May 2012

Alianza del Pacífico. October, Germán Ríos May 2012 Alianza del Pacífico October, 2011 Germán Ríos May 2012 Table of Contents The integration process in Latin America The future is Asia Latin America and Alianza del Pacífico The integration process in Latin

More information

Metrolinx Projects: Temporary Delegation for Long- Term Road Closures

Metrolinx Projects: Temporary Delegation for Long- Term Road Closures PW29.1 REPORT FOR ACTION Metrolinx Projects: Temporary Delegation for Long- Term Road Closures Date: April 24th, 2018 To: Public Works and Infrastructure Committee From: General Manager, Transportation

More information

Public-Private Partnerships. Mr. David Alvarez Executive Director Puerto Rico Public-Private Partnerships Authority March 29, 2011

Public-Private Partnerships. Mr. David Alvarez Executive Director Puerto Rico Public-Private Partnerships Authority March 29, 2011 Public-Private Partnerships Mr. David Alvarez Executive Director Puerto Rico Public-Private Partnerships Authority March 29, 2011 Disclaimer Today s presentation includes certain statements that are not

More information

L.F. Wade International Airport Redevelopment

L.F. Wade International Airport Redevelopment L.F. Wade International Airport Redevelopment David Burt, JP, MP Shadow Minister of Finance Lawrence Scott, JP, MP Shadow Minister of Transport Purvis Primary January 27, 2015 History of the L.F. Wade

More information

THE INTERNATIONAL GROWTH OF SPANISH HOLIDAY HOTEL CHAINS FROM A GLOBAL PERSPECTIVE: A CASE STUDY

THE INTERNATIONAL GROWTH OF SPANISH HOLIDAY HOTEL CHAINS FROM A GLOBAL PERSPECTIVE: A CASE STUDY Cuadernos de Turismo, nº 25, (2010); pp. 263-267 ISSN: 1139-7861 Universidad de Murcia THE INTERNATIONAL GROWTH OF SPANISH HOLIDAY HOTEL CHAINS FROM A GLOBAL PERSPECTIVE: A CASE STUDY Begoña Fuster García,

More information

NOVEMBER YEAR III LATIN AMERICA&CARIBBEAN MID-MARKETS: OPPORTUNITIES IN THE REGION

NOVEMBER YEAR III LATIN AMERICA&CARIBBEAN MID-MARKETS: OPPORTUNITIES IN THE REGION NOVEMBER 2011 - YEAR III MARKETWATCH LATIN AMERICA&CARIBBEAN MID-MARKETS: OPPORTUNITIES IN THE REGION THE REGION IN PERSPECTIVE LAC in Perspective - 2011 Facts % of the world 595 mi people 9,3 $ 5,8 tri

More information

CONFERÊNCIA INTERNACIONAL SOBRE CAPITAL PRIVADO EM AEROPORTOS Eduardo A. Flores ACI-LAC

CONFERÊNCIA INTERNACIONAL SOBRE CAPITAL PRIVADO EM AEROPORTOS Eduardo A. Flores ACI-LAC O REGIME JURÍDICO DA PRESTAÇÃO DO SERVIÇO AEROPORTUÁRIO E O DIREITO AEROPORTUÁRIO CONFERÊNCIA INTERNACIONAL SOBRE CAPITAL PRIVADO EM AEROPORTOS Eduardo A. Flores ACI-LAC Agenda ABOUT ACI / ACI-LAC AIRPORTS

More information

Airport Privatization:

Airport Privatization: Airport Privatization: Focus on Concessions Hemant Mistry Director, Global Airport Infrastructure and Fuel Dorian Reece Director, Government and Infrastructure, Deloitte During our AGM in Sydney last year

More information

Public transport strategy

Public transport strategy Public transport strategy Public and private sector bus efficiency in Delhi Measure DTC Private Peak period fleet utilisation (%) 83% 93% Km/bus/day 216 246 Pax/bus/day 751 1584 Staff/bus 9.6 4.6 Forms

More information

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT 5.8 FUNDING TRAILS DEVELOPMENT The City has been successful in establishing dedicated local funding sources as well as applying for grants to develop the City s trail system, having received nearly $2.4

More information

Major Projects Overview

Major Projects Overview Major Projects Overview Miami-Dade Expressway Authority February 2018 About MDX MDX operates 5 roads in Miami Dade County SR 924, SR 112, SR 836, SR 874 and SR 878 MDX Primary Source of Revenue: User Fees-Tolls

More information

Bosnia and Herzegovina

Bosnia and Herzegovina UNCTAD Compendium of Investment Laws Bosnia and Herzegovina Law on the Policy of Foreign Direct Investment (1998) Unofficial translation Note The Investment Laws Navigator is based upon sources believed

More information

The State of Spa Tourism in the South Transdanubian Region in the 21st century

The State of Spa Tourism in the South Transdanubian Region in the 21st century 3 rd Central European Conference in Regional Science CERS, 2009 468 The State of Spa Tourism in the South Transdanubian Region in the 21st century KLESCH, Gábor University of Pécs, Hungary Abstract Health

More information

Dulles Corridor Metrorail Project Update Dulles Area Transportation Association August 25, 2009

Dulles Corridor Metrorail Project Update Dulles Area Transportation Association August 25, 2009 Dulles Corridor Metrorail Project Update Dulles Area Transportation Association August 25, 2009 Patty Nicoson President Dulles Corridor Rail Association Proposed Toll Rate Increase on Dulles Toll Road

More information

Clackamas County Development Agency

Clackamas County Development Agency Clackamas County Development Agency Development Services Building, 150 Beavercreek Rd., Oregon City, OR 97045 www.clackamas.us/transportation/renewal 503-742-4323 The Clackamas County Board of Commissioners

More information

REPORT ON CHARGING FOR CAR PARKING AND THE IMPLEMENTATION OF CEL1 (2008) WITHIN NHS LOTHIAN

REPORT ON CHARGING FOR CAR PARKING AND THE IMPLEMENTATION OF CEL1 (2008) WITHIN NHS LOTHIAN NHS Lothian John Jack Director of Facilities 5th June 2008 REPORT ON CHARGING FOR CAR PARKING AND THE IMPLEMENTATION OF CEL1 (2008) WITHIN NHS LOTHIAN 1 Purpose of the Report 1.1 The purpose of this report

More information

May 15, I. Absorption-type Company Split Pursuant to the Move to a Holding Company Structure

May 15, I. Absorption-type Company Split Pursuant to the Move to a Holding Company Structure May 15, 2012 Corporate Name: ALL NIPPON AIRWAYS CO., LTD. President and C.E.O. Shinichiro Ito (Code Number: 9202, First Section of the Tokyo Stock Exchange and the Osaka Securities Exchange) Contact: Director,

More information

Summary of Global Perspectives

Summary of Global Perspectives Baja California: California`s Partner José Guadalupe Osuna Millán Baja California State Governor October 2009 World Economic Outlook Summary of Global Perspectives Percentage change last year, except interest

More information

From: OECD Tourism Trends and Policies Access the complete publication at:

From: OECD Tourism Trends and Policies Access the complete publication at: From: OECD Tourism Trends and Policies 2014 Access the complete publication at: http://dx.doi.org/10.1787/tour-2014-en Slovak Republic Please cite this chapter as: OECD (2014), Slovak Republic, in OECD

More information

WELLINGTON $422 MILLION $614 MILLION $83 MILLION 22% SPEND $1.9 BILLION

WELLINGTON $422 MILLION $614 MILLION $83 MILLION 22% SPEND $1.9 BILLION WELLINGTON WELLINGTON $1.9 BILLION FORECAST TOTAL WELLINGTON INVESTMENT The Wellington region s transport challenges are dominated by the region s concentration of population in the metropolitan cities,

More information

Corporate Presentation

Corporate Presentation Mariscal Sucre Airport Corporate Presentation March 2017 Highlights Santa Marta - Paraguachón History 1992 1994 1998 2000 2004 2005 2007 2005 2012 2013 2015 2016 Odinsa is founded by 42 companies from

More information

2006 Preliminary Results. 7 March 2007

2006 Preliminary Results. 7 March 2007 2006 Preliminary Results 7 March 2007 Anthony Rabin 16 Headline numbers 2005 2006 Revenue 4,938m 5,852m +19% Pre-tax profit* 134m 152m +13% Adjusted eps* 24.1p 27.3p +13% Full-year proposed dividend 8.1p

More information

Congestion Pricing The Latest Weapon the U.S. War on Traffic Congestion. Darren Henderson, AICP

Congestion Pricing The Latest Weapon the U.S. War on Traffic Congestion. Darren Henderson, AICP Congestion Pricing The Latest Weapon the U.S. War on Traffic Congestion Darren Henderson, AICP Today s s Discussion How bad is congestion? What has been done about it? What else can be done? How Bad is

More information

Implementation Status & Results Argentina Norte Grande Road Infrastructure (P120198)

Implementation Status & Results Argentina Norte Grande Road Infrastructure (P120198) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina Norte Grande Road Infrastructure (P120198) Operation Name: Norte Grande Road Infrastructure

More information

TRANS-TEXAS CORRIDOR (TTC-35)

TRANS-TEXAS CORRIDOR (TTC-35) TRANS-TEXAS CORRIDOR (TTC-35) Madrid, 16 December 2004 www.cintra.es TTC-35 High-Priority Trans-Texas Corridor 1 STRATEGIC OPERATION Consolidating a presence in a market of strategic importance for the

More information

Full Year 2009 Results

Full Year 2009 Results Full Year 2009 Results 1 Antonio Vázquez Chairman & Chief Executive Officer 2 Highlights 2009 Strong decrease in revenues: weak demand and yield deterioration. High competition and drop of business traffic.

More information

REVITALIZING BUFFALO S WATERFRONT

REVITALIZING BUFFALO S WATERFRONT REVITALIZING BUFFALO S WATERFRONT HIGHWAYS TO BOULEVARDS INITIATIVE CONGRESS FOR THE NEW URBANISM CENTER FOR NEIGHBORHOOD TECHNOLOGY TWO VERY DIFFERENT CHOICES BUFFALO IS A WATERFRONT CITY WITH A DEEP

More information

PPIAF Assistance in Swaziland

PPIAF Assistance in Swaziland PPIAF Assistance in Swaziland July 2012 In 2002 PPIAF support was provided to the government of Swaziland to assess the regulatory, legal, and institutional framework necessary to concession Swaziland

More information

8.INFRASTRUCTURE #INVESTINGUATEMALA. Industry in Guatemala

8.INFRASTRUCTURE #INVESTINGUATEMALA. Industry in Guatemala 8.INFRASTRUCTURE #INVESTINGUATEMALA Industry in Guatemala General information of the country Capital City Currency Exchange Rate (2013) Official Language Population Labor Force (2013) GDP (2013) FDI inflows

More information

Charlotte Regional Express Lane Facilities: I-485 and US 74. North Carolina Turnpike Authority March 21, 2018

Charlotte Regional Express Lane Facilities: I-485 and US 74. North Carolina Turnpike Authority March 21, 2018 Charlotte Regional Express Lane Facilities: I-485 and US 74 North Carolina Turnpike Authority March 21, 2018 NC Turnpike Authority Overview Created in 2002 by the General Assembly Authorized to design,

More information

Investor Update Issue Date: April 9, 2018

Investor Update Issue Date: April 9, 2018 Investor Update Issue Date: April 9, 2018 This investor update provides guidance and certain forward-looking statements about United Continental Holdings, Inc. (the Company or UAL ). The information in

More information

Santander 22 nd Annual Latin American Conference. Cancun, January 2018

Santander 22 nd Annual Latin American Conference. Cancun, January 2018 Santander 22 nd Annual Latin American Conference Cancun, January 2018 This presentation may include forward-looking comments regarding the Company s business outlook and anticipated financial and operating

More information

Citi Industrials Conference

Citi Industrials Conference Citi Industrials Conference June 13, 2017 Andrew Levy Executive Vice President and Chief Financial Officer Safe Harbor Statement Certain statements included in this presentation are forward-looking and

More information

Attachment 1 PARK & RIDE GUIDELINES

Attachment 1 PARK & RIDE GUIDELINES Attachment 1 PARK & RIDE GUIDELINES The City of Edmonton August 2018 Executive Summary Edmonton will soon be a city of a million people - not within 25 years but within the next five years. This growth

More information

L.F. Wade International Airport Redevelopment. David Burt, JP, MP Shadow Minister of Finance Lawrence Scott, JP, MP Shadow Minister of Transport

L.F. Wade International Airport Redevelopment. David Burt, JP, MP Shadow Minister of Finance Lawrence Scott, JP, MP Shadow Minister of Transport L.F. Wade International Airport Redevelopment David Burt, JP, MP Shadow Minister of Finance Lawrence Scott, JP, MP Shadow Minister of Transport History of the L.F. Wade International Airport The airfield

More information

Results of Tourism Activity Mexico, February 2017

Results of Tourism Activity Mexico, February 2017 Results of Tourism Activity Mexico, February Undersecretariat of Planning and Tourism Policy Available in http://www.datatur.sectur.gob.mx/sitepages/versionesrat.aspx DIRECTORy ENRIQUE DE LA MADRID CORDERO

More information

Aloha Stadium Conceptual Redevelopment Report. April 5, 2017

Aloha Stadium Conceptual Redevelopment Report. April 5, 2017 Aloha Stadium Conceptual Redevelopment Report April 5, 2017 THE HISTORY OF ALOHA STADIUM A Hawaii landmark since 1975 Aloha Stadium has stood for over 40 years and effectively achieved its mission as a

More information

Good morning, ladies and gentlemen. Joaquín Ayuso. Chief Executive Officer

Good morning, ladies and gentlemen. Joaquín Ayuso. Chief Executive Officer Good morning, ladies and gentlemen. Joaquín Ayuso Chief Executive Officer Ferrovial Cash flow: 650 Construction 270 Infrastructure 136 Services 187 Real Estate 17 Corporation 41 Year-end cash position:

More information

GAMA 2020 PUBLIC TRANSPORT VISION

GAMA 2020 PUBLIC TRANSPORT VISION GAMA 2020 PUBLIC TRANSPORT VISION BACKGROUND INFORMATION THE MOBILITY CHALLENGE MANIFESTED BY CONGESTION INADEQUATE INFRASTRUCTURE INDISCIPLINE PRESCRIBED SOLUTION Road Space Usage Bus & Trotro Carry 70%

More information

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization REPORT FOR ACTION 12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization Date: April 27, 2018 To: Toronto and East York Community Council From: Senior Strategic Director,

More information

ACSP 57th Annual Conference Denver, Colorado, October 2017 TRACK 14 TRANSPORTATION & INFRASTRUCTURE PLANNING

ACSP 57th Annual Conference Denver, Colorado, October 2017 TRACK 14 TRANSPORTATION & INFRASTRUCTURE PLANNING The Evolution and Spread of Fully-Integrated Regional Public Transport in Germany, Austria, and Switzerland Ralph Buehler, John Pucher, Oliver Duemmler ACSP 57th Annual Conference Denver, Colorado, October

More information

7.5 Concessions Division

7.5 Concessions Division 7.5 Concessions Division The Sacyr Group s infrastructure concessions business started up in 1996 when the Group was awarded its first concession in Chile: Los Vilos-La Serena section of Route 5. Since

More information

Capital Metro is the first stage of a light rail network that will have a transformative effect on Canberra. capitalmetro.act.gov.

Capital Metro is the first stage of a light rail network that will have a transformative effect on Canberra. capitalmetro.act.gov. Artist impression Nullabor Avenue Harrison Business Case overview Capital Metro is the first stage of a light rail network that will have a transformative effect on Canberra. capitalmetro.act.gov.au Why

More information

PUERTO RICO: PATHWAY TO THE FUTURE Opportunities of an Economic Transformation

PUERTO RICO: PATHWAY TO THE FUTURE Opportunities of an Economic Transformation PUERTO RICO: PATHWAY TO THE FUTURE Opportunities of an Economic Transformation Rebuilding Puerto Rico Mr. Omar J. Marrero, Esq. Executive Director Puerto Rico Public-Private Partnerships Authority & Central

More information

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts Macleod Trail Corridor Study Welcome Macleod Trail Corridor Study Open House Presentation of Proposed Design Concepts Study Purpose Develop a corridor plan for Macleod Trail that aligns with The City s:

More information

Investment Highlights

Investment Highlights Third Quarter 2014 Investment Highlights 1 Mexican airport portfolio positioned to take full advantage of global growth. 2 Diversified business model contributing to earnings resilience. 3 Well-defined

More information

COMMISSION OF THE EUROPEAN COMMUNITIES COMMUNICATION FROM THE COMMISSION. Developing an EU civil aviation policy towards Brazil

COMMISSION OF THE EUROPEAN COMMUNITIES COMMUNICATION FROM THE COMMISSION. Developing an EU civil aviation policy towards Brazil COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 5.5.2010 COM(2010)210 final COMMUNICATION FROM THE COMMISSION Developing an EU civil aviation policy towards Brazil COMMUNICATION FROM THE COMMISSION Developing

More information

IMPLEMENTATION OF COMPREHENSIVE DEVELOPMENT AGREEMENT (CDA) PROJECTS:

IMPLEMENTATION OF COMPREHENSIVE DEVELOPMENT AGREEMENT (CDA) PROJECTS: IMPLEMENTATION OF COMPREHENSIVE DEVELOPMENT AGREEMENT (CDA) PROJECTS: SH 130 Project, Segments 5 & 6, Travis, Caldwell and Guadalupe counties; DFW Connector, Tarrant County; North Tarrant Express (NTE),

More information

Transportation Supporting Dulles Airport

Transportation Supporting Dulles Airport Transportation Supporting Dulles Airport Committee for Dulles Economic Development and Transportation Committee July 12, 2018 Tom Biesiadny, Director Fairfax County Multiple Transportation Improvements

More information

THREE MILE PLAN TOWN OF SUPERIOR COLORADO

THREE MILE PLAN TOWN OF SUPERIOR COLORADO THREE MILE PLAN TOWN OF SUPERIOR COLORADO February 23, 2015 INTRODUCTION This document has been prepared by the Town of Superior, Colorado, to address the existing and proposed land uses within an approximate

More information

Business Growth (as of mid 2002)

Business Growth (as of mid 2002) Page 1 of 6 Planning FHWA > HEP > Planning > Econ Dev < Previous Contents Next > Business Growth (as of mid 2002) Data from two business directories was used to analyze the change in the number of businesses

More information

Word Count: 3,565 Number of Tables: 4 Number of Figures: 6 Number of Photographs: 0. Word Limit: 7,500 Tables/Figures Word Count = 2,250

Word Count: 3,565 Number of Tables: 4 Number of Figures: 6 Number of Photographs: 0. Word Limit: 7,500 Tables/Figures Word Count = 2,250 Katherine F. Turnbull, Ken Buckeye, Nick Thompson 1 Corresponding Author Katherine F. Turnbull Executive Associate Director Texas Transportation Institute Texas A&M University System 3135 TAMU College

More information

Making Public Private Partnerships Work for New Jersey

Making Public Private Partnerships Work for New Jersey T +1 (202) 466 6790 F +1 (202) 466 6797 1700 K Street NW Suite 410 WASHINGTON DC 20006 United States of America Making Public Private Partnerships Work for New Jersey T +61 (2) 9231 6862 F +61 (2) 9231

More information

March 4, Investor Conference

March 4, Investor Conference March 4, 2014 Investor Conference Disclaimer This Investor Presentation is provided for your general information and convenience only, is current only as of its date and does not constitute an offer to

More information

Treasure Island Supplemental Information Report Addendum

Treasure Island Supplemental Information Report Addendum 1 1 1 1 0 1 0 1 0 1 Treasure Island Supplemental Information Report Addendum Introduction Purpose The purpose of this Supplemental Information Report (SIR) Addendum is to determine if the current land

More information

Output volume and order backlog at record levels Renewed significant increases in net profit and operating profit Dividend bonus announced

Output volume and order backlog at record levels Renewed significant increases in net profit and operating profit Dividend bonus announced Bilfinger Berger AG Carl-Reiss-Platz 1-5 68165 Mannheim Germany www.bilfingerberger.com Contact: Sascha Bamberger Phone: +49 6 21/4 59-24 55 Fax: +49 6 21/4 59-25 00 E-mail: sbam@bilfinger.de Date: February

More information

Paseo del Bajo Road Corridor Project

Paseo del Bajo Road Corridor Project SHOWCASE PROJECTS Image courtesy of AUSA BUENOS AIRES, ARGENTINA Paseo del Bajo Road Corridor Project May 2018 PROJECT OVERVIEW The USD 700 million Paseo del Bajo project is a transformative road corridor

More information

ARGENTINA: A Strategic Investment and Business Destination

ARGENTINA: A Strategic Investment and Business Destination ARGENTINA: A Strategic Investment and Business Destination Undersecretariat for Investment Development and Trade Promotion Secretariat of International Economic Relations Ministry of Foreign Affairs and

More information

CRITICAL FACTORS FOR THE DEVELOPMENT OF AIRPORT CITIES. Mauro Peneda, Prof. Rosário Macário AIRDEV Seminar IST, 20 October 2011

CRITICAL FACTORS FOR THE DEVELOPMENT OF AIRPORT CITIES. Mauro Peneda, Prof. Rosário Macário AIRDEV Seminar IST, 20 October 2011 CRITICAL FACTORS FOR THE DEVELOPMENT OF AIRPORT CITIES Mauro Peneda, Prof. Rosário Macário AIRDEV Seminar IST, 20 October 2011 Introduction Airports are becoming new dynamic centres of economic activity.

More information

AGENCY NAME TRANSPORTATION

AGENCY NAME TRANSPORTATION TRANSPORTATION TRANSPORTATION AGENCY NAME Prince William County FY 2015 BUDGET CIP-TRANSPORTATION 561 Fuller Road/Fuller Heights Road Improvements Total Project Cost - $4.4 M This project will widen Fuller

More information

(Quito, Ecuador 17 October 2016)

(Quito, Ecuador 17 October 2016) Intervention by the Secretary General of the International Civil Aviation Organization (ICAO) Dr. Fang Liu, to the Habitat III Plenary or High-level Roundtable (Quito, Ecuador 17 October 2016) Mr. President,

More information

JAKARTA TRANSPORTATION

JAKARTA TRANSPORTATION Toward A Better TRANSPORTATION AGENCY DKI JAKARTA PROVINCIAL GOVERNMENT (INDONESIA) FERDINAND GINTING JAKARTA TRANSPORTATION Jakarta a Capital City, and many more roles! Capital City of Indonesia and Centre

More information

Arlington County Board Meeting Project Briefing. October 20, 2015

Arlington County Board Meeting Project Briefing. October 20, 2015 Arlington County Board Meeting Project Briefing October 20, 2015 Project Map 2 Project Context Only Interstate in the Country limited to HOV only traffic during rush hours Stoplight at the end of I-66

More information

Tourism strategies for the renovation of mature coastal tourist destinations in Spain

Tourism strategies for the renovation of mature coastal tourist destinations in Spain Tourism strategies for the renovation of mature coastal tourist destinations in Spain Sustainable Tourism 010, New Forest, UK. 5-7 July 010 Fernando Vera Rebollo / Isabel Rodríguez Sánchez JF.Vera@ua.es

More information

Planning Resilient Transmission Networks in Chile

Planning Resilient Transmission Networks in Chile Planning Resilient Transmission Networks in Chile Juan C. Araneda Transmission Planning Manager 1 CHILEAN NATIONAL POWER SYSTEM 2018 SEN 3,100 km Installed Capacity: Peak Demand: 24,000 MW 11,000 MW Source:

More information

Analysis and Feasibility Broward County Convention Center Master Plan Study Fort Lauderdale, FL HKS I Urban Design Studio

Analysis and Feasibility Broward County Convention Center Master Plan Study Fort Lauderdale, FL HKS I Urban Design Studio Analysis and Feasibility Broward County Convention Center Master Plan Study Fort Lauderdale, FL 04.01.14 HKS I Urban Design Studio Summary of Outreach Purpose of Stakeholder Outreach Identify and engage

More information

Non-Motorized Transportation

Non-Motorized Transportation Non-Motorized Transportation Non-motorized facilities are important components to the transportation system. They provide an environmentally-friendly, low-cost mode of travel. Some of the facilities can

More information