Aloha Stadium Conceptual Redevelopment Report. April 5, 2017
|
|
- Gabriella Ross
- 5 years ago
- Views:
Transcription
1 Aloha Stadium Conceptual Redevelopment Report April 5, 2017
2 THE HISTORY OF ALOHA STADIUM A Hawaii landmark since 1975 Aloha Stadium has stood for over 40 years and effectively achieved its mission as a gathering place and as a first-class facility. Aloha Stadium is an iconic structure for the citizens of Hawaii, as it has hosted hundreds of major events during its life. Aloha Stadium is a community asset currently hosting over 300 events per year. Aloha Stadium is where the spirit of achievement was nourished by the thrill of healthy competition. Aloha Stadium is where families gathered to share their cultural diversity with pride and a feeling of Aloha.
3 EXISTING vs. NEW STADIUM Life cycle costs Aloha Stadium requires approximately $423M in critical health and safety repairs, ADA and code compliance (2017 dollars). Or, $30M/year for 25 years. $107M spent in health and safety repairs for Aloha Stadium since 2005 but significant deferred maintenance remains. A new stadium will be an improvement over the existing stadium, and at a lower cost ($324.5M vs. $423M to maintain the existing stadium). A new stadium will facilitate up to 2.6 million square feet of ancillary development over a 25-year period. Ancillary development potential is severely limited with the existing stadium, even if renovated. A new stadium and property development will generate significant revenue and up to $1.5B in economic activity.
4 NEW STADIUM - POTENTIAL Aloha Stadium s failure to attract major events The current stadium cannot attract new events it is too big (with limited seating adjustment capabilities), it lacks premium amenities and the field is too narrow for major international soccer and rugby clubs. A new stadium with a properly dimensioned natural playing field could attract 3-4 soccer exhibition games and 1-2 rugby exhibition games each year. A new 30,000 seat stadium that can facilitate variable sized events with proper staging equipment, seating bowl and lighting and sound designed for concerts could attract 4 major annual concert events each year.
5 ALOHA STADIUM 2.0 New State of the Art Stadium Approximately 30,000-35,000 permanent seats; expandable to 40,000 with temporary seating More seating options, increased concessions, improved facility circulation Premium areas, including 22 private suites (18 private 16-seat suites and 2 30-seat party suites leased annually, 2 16-seat suites reserved for State/University use), 50 loge boxes (4 seats per box; leased annually by box), 1200 club seats (leased annually by seat), and at least one upscale lounge area (which can be rented on non-event nights) Natural grass field with dimensions for international soccer, rugby and baseball (120 yards by 80 yards) ADA compliant Decrease operational expenses (efficient building systems) Designed to increase revenues Facilitate ancillary development, leading to a robust return on investment unavailable by investing in renovations to the existing stadium
6 ALOHA STADIUM 2.0 Transit-Oriented Development Rail transit station is being built at the Aloha Stadium site. The station is only one stop from JPHHF Base and two stops from HNL. Both will generate foot traffic to the station. Unique opportunity to leverage increased transit options for stadium operations and transit oriented development. If new stadium is opened, the existing stadium would be demolished, opening up land for ancillary TOD development located in an optimal location next to the new HART station.
7 ALOHA STADIUM 2.0 Development Revenue Generating Opportunities Based on JLL s development market study, the State s $324.5 million investment in a new stadium could generate private sector mixed-use development surrounding the stadium, potentially including: 350,000 SF Retail 150,000 SF Office (50% professional, 50% medical) 200 Room Limited or Select Service Hotel 500 Multifamily units (to include allocation of affordable housing) The above represents the initial phase of the conceptual development program, totaling approximately 1.2 million square feet. Subsequent phases could add an additional 1.4 square feet of development. Overall, based on an economic & fiscal impact analysis of a new stadium and ancillary development, Victus Advisors estimates the $324.5 million investment in a new stadium could generate net new economic output over the next 25 years with a net present value of nearly $1.5 billion.
8 CONCEPTUAL SITE PLAN 1. New Halawa HART station 2. Commercial buildings above parking deck & retail podium 3. Residential buildings above parking deck & retail podium 4. Retail-entertainment oriented Main Street & plazas 5. Aloha stadium gateway (with historic volcano monument) 6. Grand entrance to stadium plaza (extended roof canopy) 7. Aloha stadium plaza 8. Entertainment district (structured parking below) 9. Residential neighborhood 10. Existing surface parking (swap meet zone 1) 11. Warriors Way (or other name): Signature promenade designed to accommodate various events, including swap meet (zone 2) 12. Hotel & conference center, with parking deck 13. Pedestrian bridges over creek, with local road access on both sides 14. District gateway: Elongated traffic roundabout with access to/from H3 and H201 via expanded Kahuapaani Street; direct access to Stadium Loop Road. 15. Expanded Salt Lake Blvd ( complete street ) with linear park and dedicated pedestrian/bike pathways 16. Garden forecourt (and limited VIP parking) for Aloha Stadium 17. Service access on south side of Stadium (lower elevation, below concourse level) 18. RR/concession blocks on east and west side concourses 19. Surface parking lot and event space 20. North end zone berm, able to accommodate temporary seating, with double-sided video board to both Stadium and plaza 21. Parking garage and two residential buildings 22. Multi-use recreational field and neighborhood park
9 ALOHA STADIUM 2.0 Projected Stadium Utilization Victus Advisors conservatively estimates that a new Aloha Stadium could host approximately 321 events per year, with an estimated annual attendance of 1,440,558 people. With a new Aloha Stadium, the Honolulu market could capture at least 8 new major sports and entertainment events each year. Event Days Average Attendees per Event Total Attendees Event Type Existing Events Runs 4 7,743 30,972 Football Games 53 6, ,197 Swap Meet 155 5, ,505 Other Events & Shows (Graduations, Parties, etc.) ,884 Annual Total ,247 1,305,558 New Events Concerts & Entertainment Acts 3 20,000 60,000 International Soccer & Rugby Exhibitions 5 15,000 75,000 Annual Total 8 35, ,000 Notes: - Represents a stabilized year of operations. - Estimates are intended to represent a conservative, base-case scenario.
10 ALOHA STADIUM 2.0 Projected Financials In a stabilized year of operations, Victus conservatively estimates that the operations of a New Aloha Stadium could generate approximately $5.2 million in net income, which represents $5.0 million of incremental revenue, after funding of a capital improvement reserve, but prior to any primary tenant revenue sharing. Note that we have exercised extreme caution in coming to this conclusion, making assumptions which make the net income estimates lower than they otherwise would be. Current Aloha Stadium Increment from New Aloha Stadium New Aloha Stadium Operations Revenues: Swap Meet 1 $4,175,578 ($835,116) $3,340,462 Parking (net) 2 $874,689 ($874,689) $0 Food & Beverage (net) $989,980 $389,311 $1,379,291 Rent $250,669 $200,000 $450,669 Stadium Naming Rights (net) 34 $0 $1,088,000 $1,088,000 Advertising & Sponsorships (net) 3 $305,032 $2,958,968 $3,264,000 Interest $25,951 $0 $25,951 Luxury Seating Premiums (net) 3 $0 $2,249,984 $2,249,984 Stadium Tours $2779 $0 $2779 Miscellaneous $274,896 $0 $274,896 Total Net Revenue: $6,899,574 $5,176,458 $12,076,032 Expenses: Personal Services $4,115,021 ($700,506) $3,414,515 Supplies $216,677 ($65,003) $151,674 Utilities $962,090 ($288,627) $673,463 Repairs & Maintenance $216,446 ($64,934) $151,512 Services on a Fee Basis $508,311 ($152,493) $355,818 Central Services Assessment $441,249 ($132,375) $308,874 Miscellaneous $218,502 ($65,551) $152,951 Total Expenses: $6,678,296 ($1,469,489) $5,208,807 Net Operating Income 8 : $221,278 $6,645,947 $6,867,225 Less: Annual Capital Reserve: ($1,622,500) NOI After Capital Reserve Funds: $5,244,725 Notes: Represents a stabilized year of operations. Shown in 2017 dollars. 1 To reflect the uncertainty at this stage of planning, we have discounted existing Swap Meet revenue by 20% 2 If parking is privatized, it is assumed that there will be no parking revenue for the Stadium Authority 3 Conservatively discounted at 15% to account for sales commissions 4 Represents new naming rights for the entire stadium, not just the field
11 NEXT STEPS Foley & Lardner recommends urgent legislative action to fund the next stage of planning. Immediate Requests: State funding needed to invest in master planning, programmatic environmental study, market study, and stadium design. This investment will: Provide deeper understanding of revenue-generating potential for development activity Minimize the effect of future cost escalation Inspire interest and confidence from private sector partners Reduce financial risks for future development Explore financing options available to the state
12 SUMMARY Stadium $423M - Aloha Stadium (repair and renovation) $324.5M - New Stadium Development 2.6 million sq ft of mixed-use development Up to $1.5B in economic activity Revenue Generation $5.2M annual revenue increase from new stadium alone Significant revenue potential from development Legislative Action Needed State-funded master plan, development financial analysis, environmental review and design for stadium This investment to yield detailed data for lawmakers and attractive conditions for investors
13 CONCEPTUAL RENDERING
14 CONCEPTUAL RENDERING
15 CONCEPTUAL RENDERING
16 CONCEPTUAL RENDERING
THE MISSION. A PUBLIC PROCESS FROM BEGINNING TO END.
THE MISSION. A PUBLIC PROCESS FROM BEGINNING TO END. URBAN DESIGN PRINCIPLES. QUALCOMM STADIUM SITE. I-5 805 15 I-8 DEVELOPMENT PATTERNS. I-5 805 I-I5 I-8 EMBRACE THE RIVER AND PARK SYSTEM. FROM THE MOUNTAINS
More informationUNLV Campus Improvement Authority Board Estimated Event Utilization and Financial Projections. May 22, 2014
UNLV Campus Improvement Authority Board Estimated Event Utilization and Financial Projections May 22, 2014 1 CIAB WORK SESSION 2 CIAB WORK SESSION RECAP KEY TAKE-AWAYS: There is a need in the market for
More informationMEDIUM SIZE STADIUM STRATEGY
MEDIUM SIZE STADIUM STRATEGY Approved by City Council on March 12, 2014 This plan is available online at www.edmonton.ca I. Executive Summary... 4 II. Medium Size Stadium Strategy... 5 1. Background...
More informationEVENT CENTRE / ARENA COMPLEX
EVENT CENTRE / ARENA COMPLEX BUSINESS CASE ANALYSIS PRESENTATION TO COUNCIL JANUARY 14, 2019 PART A: PROJECT RECAP PART B: DETAILED ASSESSMENT OF THE FACILITY OPTIONS PART C: COMPARING THE OPTIONS PART
More informationSOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************
SOUTH DAKOTA BOARD OF REGENTS Budget and Finance REVISED AGENDA ITEM: 6 F DATE: December 4-6, 2018 ****************************************************************************** SUBJECT NSU Regional Sports
More informationCAIRNS RECTANGULAR PITCH STADIUM NEEDS STUDY PART 1 CAIRNS REGIONAL COUNCIL DRAFT REPORT SEPTEMBER 2011
CAIRNS RECTANGULAR PITCH STADIUM NEEDS STUDY PART 1 CAIRNS REGIONAL COUNCIL DRAFT REPORT SEPTEMBER 2011 CAIRNS RECTANGULAR PITCH STADIUM NEEDS STUDY PART 1 Cairns Regional Council September 2011 Coffey
More informationTABLE OF CONTENTS Executive Summary. Convention Industry Overview and Trends. Convention Market Competitive and Comparable Analysis
TABLE OF CONTENTS ----------- Executive Summary Chapter 1 Appendix A Appendix B Appendix C Appendix D Appendix E Appendix F Demand and Impact Convention Industry Overview and Trends Convention Market Competitive
More informationUNLV Campus Improvement Authority Board Review of Stadium Tours, Estimated Building Costs and Proposed Calendar of Events.
UNLV Campus Improvement Authority Board Review of Stadium Tours, Estimated Building Costs and Proposed Calendar of Events April 24, 2014 table of contents 1) TOURS OF TEXAS STADIUMS... 3 2) GENSLER SUN
More informationTampa International Airport Master Plan Update. December 12, 2012
Tampa International Airport Master Plan Update December 12, 2012 1 Prior Presentation Consolidated rental car and people mover Decongest curbsides and roadways Enable rental car growth Gain long term parking
More informationImplications of Construction Cost Escalation
Implications of Construction Cost Escalation 2007 ACI-NA Economics and Finance Conference James Gill, CPA Deputy Airport Director Finance, Business & Administration Raleigh-Durham Airport Authority Presentation
More informationBallston Mall Redevelopment Outline of a Public Private Agreement with Forest City Enterprises
Ballston Mall Redevelopment Outline of a Public Private Agreement with Forest City Enterprises County Manager s Report to the Arlington County Board July 21, 2015 County Board Direction June 16, 2015 The
More informationAIRPORTS DIVISION. The Hawaii Airports System Is Self-Supporting
AIRPORTS DIVISION Department of Transportation AIRPORTS DIVISION The Hawaii Airports System Is Self-Supporting The State of Hawaii s General Fund (tax revenues) does not fund the operation of the Airports
More informationABOUT MIDLAND. Key Demographic Information MICHIGAN
ABOUT MIDLAND Midland is located 130 miles northwest of Detroit. Together with Saginaw, Bay City and Mount Pleasant, Midland is part of the Great Lakes Bay region of Northeast Michigan. As the home of
More informationNEW STADIUM LUXURY SUITES
NEW STADIUM LUXURY SUITES BE A PART OF SAN FRANCISCO 49ERS HISTORY IMAGINE THE REACTION FROM YOUR CLIENTS AND PROSPECTS when you host them in your luxury suite in the most spectacular stadium in the world.
More informationGreene County Tourism Economic Impact Analysis and Strategic Goals
Greene County Tourism Economic Impact Analysis and Strategic Goals Summary of Findings and Recommendations October 2010 Prepared by: Tourism Economics 121, St Aldates, Oxford, OX1 1HB UK 303 W Lancaster
More informationPublic Notice of Opportunity to Comment on Los Angeles World Airports Passenger Facility Charge Application at Los Angeles International Airport
Re: Public Notice of Opportunity to Comment on Los Angeles World Airports Passenger Facility Charge Application at Los Angeles International Airport Los Angeles World Airports (LAWA) intends to submit
More informationState of Hawaii Dept. of Transportation Airports Division Capital Improvement Program Update
State of Hawaii Dept. of Transportation Airports Division Capital Improvement Program Update Enabling Inter-Island Improvements for Mauka CC Honolulu International Airport Before After Mauka Concourse
More informationPublic Assembly Facilities Tacoma Dome Greater Tacoma Convention & Trade Center Cheney Stadium Pantages Rialto Theater on the Square
Public Assembly Facilities Tacoma Dome Greater Tacoma Convention & Trade Center Cheney Stadium Pantages Rialto Theater on the Square Mike Combs Director March 30, 2010 1 PAF Budget in Brief 2009/2010 Revenue
More informationSEAWORLD RAMADA LIMITED caacre.com
3747 MIDWAY DRIVE, SAN DIEGO CA 92110 INVESTMENT OFFERING SOUTHERN CALIFORNIA COASTAL 60+ ROOM HOSPITALITY OFFERING MIKE CONGER Principal Mike@caacre.com BRE Lic # 01381193 BRIAN JENKINS Principal Brian@caacre.com
More informationJAPAN AIRLINES Co., Ltd. Financial Results 1 st Quarter Mar/2017(FY2016) July 29, 2016
JAPAN AIRLINES Co., Ltd. Financial Results Mar/2017(FY2016) July 29, 2016 Today s Topics P.1 P.2 P.13 From the first quarter of this fiscal year, figures for Revenue Passengers Carried, ASK, RPK and Load
More informationThank you for participating in the financial results for fiscal 2014.
Thank you for participating in the financial results for fiscal 2014. ANA HOLDINGS strongly believes that safety is the most important principle of our air transportation business. The expansion of slots
More informationThe Coalition s Policy
The Coalition s Policy Key Commitments Townsville is a city with immense potential. With a population of around 170,000, some 16,000 regional businesses, and regional product of over $11 billion, Townsville
More informationAirplane Value Analysis Alex Philip
Airplane Value Analysis Alex Philip Istanbul Technical University Air Transportation Management M.Sc. Program Fundamentals of Airline Management Module 7: 14 October 2015 Financial evaluation of projects
More informationREGION OF WATERLOO INTERNATIONAL AIRPORT AIRPORT MASTER PLAN EXECUTIVE SUMMARY MARCH 2017
REGION OF WATERLOO INTERNATIONAL AIRPORT AIRPORT MASTER PLAN EXECUTIVE SUMMARY MARCH 2017 Contact: Chris Wood, Airport General Manager cwood@regionofwaterloo.ca (519) 648-2256 ext. 8502 Airport Master
More informationSLC Airport Project Adds New Scope; Teams Scramble to Stay on Schedule
SLC Airport Project Adds New Scope; Teams Scramble to Stay on Schedule Two sky bridges will connect the parking garage to the second level of the terminal, while an elevated roadway for depa will access
More informationNorth Denver Cornerstone Collaborative. Six Projects One Vision
North Denver Cornerstone Collaborative Six Projects One Vision Creating the NDCC: An Initiative of Mayor Michael B. Hancock Founded by Mayor Hancock in January 203. Appointed Kelly Leid as Executive Director
More informationFort Lauderdale Hollywood International Airport
ATLANTA, GEORGIA 1 2 ATLANTA, GEORGIA Fort Lauderdale Hollywood International Airport Master Plan to Master Plan Implementation Jamie McCluskie Director of Aviation Planning & Environmental Broward County
More informationMARKET. Philadelphia, PA LANDMARK DEVELOPMENT RETAIL SPACES FOR LEASE
2 4 0 0 MARKET Philadelphia, PA LANDMARK DEVELOPMENT RETAIL SPACES FOR LEASE LISTING DETAILS 2,000-15,000 SF Retail Options Flagship Retail Opportunity Located at the Epicenter of Central Business District,
More informationEstablishes a fare structure for Tacoma Link light rail, to be implemented in September 2014.
RESOLUTION NO. R2013-24 Establish a Fare Structure and Fare Level for Tacoma Link MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: PHONE: Board 09/26/2013 Final Action Ric Ilgenfritz, Executive Director,
More informationOakland A s Gondola Economic Impact
January 2019 Oakland A s Gondola Economic Impact KEY FINDING: The proposed gondola system, which will connect the A s planned stadium to downtown Oakland, will generate $685 million in total economic benefit
More informationGreat Wolf Lodge Fact Sheet & Frequently Asked Questions Potential Location in Gilroy, California 8/30/17
WHAT? Great Wolf Resorts has identified Gilroy, California as a potential location for a new Great Wolf Lodge family resort and has entered into a 60-day period of exclusivity with the City and community
More informationLink Union Station (LINK US)
Link Union Station (LINK US) Presentation for LAUS Master Commercial Developer Industry Forum October 13 th 2017 Jeanet Owens, PE Senior Executive Officer Program Management / Regional Rail Project Overview
More informationDOWNTOWN SANTA MONICA. Market Report. Edition: First Quarter, 2018
DOWNTOWN SANTA MONICA Market Report Edition: First Quarter, 2018 ABOUT DOWNTOWN SANTA MONICA, INC. Downtown Santa Monica is a dynamic, urban environment located on the bluffs overlooking the Santa Monica
More informationTEMPE BEACH PARK - RECOMMENDATIONS
TEMPE BEACH PARK - RECOMMENDATIONS Tempe Beach Park has the potential to become a regional destination park, but it suffers from a host of physical and operational problems, as well as structural flaws.
More informationMARKETBEAT RETAIL SNAPSHOT
Bil US$ MARKETBEAT RETAIL SNAPSHOT LAS VEGAS, NV A Cushman & Wakefield Research Publication Q4 2014 NATIONAL ECONOMIC OVERVIEW Like Floyd Mayweather in the final round of a championship match, the U.S
More informationFeasibility Study Federal Inspection Service Facility at Long Beach Airport
Feasibility Study Federal Inspection Service Facility at Long Beach Airport 13 December 2016 Long Beach City Council PLEASE NOTE: The information, analysis, assessments and opinions contained in this presentation
More informationANN ARBOR CONFERENCE CENTER Ann Arbor, Michigan Summary of Benefits - 24 Month Construction and 20 Years After Completion of Construction
Appendix B valiant PARTNERS LLC Summary of Benefits - 24 Month Construction and 20 Years After Completion of Construction AGGREGATE TOTAL NPV @ DIRECT BENEFITS 6.25% A. Construction $1.9M $1.8M B. Regular
More informationPORT OF SEATTLE MEMORANDUM. COMMISSION AGENDA Item No. 6a ACTION ITEM Date of Meeting August 23, 2016
PORT OF SEATTLE MEMORANDUM COMMISSION AGENDA Item No. 6a ACTION ITEM Date of Meeting August 23, 2016 DATE: TO: FROM: Michael Ehl, Director, Airport Operations Wayne Grotheer, Director, Aviation Project
More informationPlaza Park, Village Park, and Community Clubhouse
Plaza Park, Village Park, and Community Clubhouse Agenda Introduction (10 minutes) Presentation (30 minutes) Project Background Master Plan Process Site History and Context Site Analysis User Group Summary
More information3. Proposed Midwest Regional Rail System
3. Proposed Midwest Regional Rail System 3.1 Introduction The proposed Midwest Regional Rail System (MWRRS) will operate in nine states, encompass approximately 3,000 route miles and operate on eight corridors.
More informationPhiladelphia Casino Application Review September 24, 2013 AKRF.COM
Philadelphia Casino Application Review September 24, 2013 AKRF.COM AKRF s Analysis Objectives 1. Third-party review of applications 2. Normalize estimates 3. Competitive effects net fiscal revenue 4. Induced
More informationINTRODUCING RETAIL SPACE AVAILABLE IMMEDIATELY
INTRODUCING SPACE AVAILABLE IMMEDIATELY OUTDOOR SEATING A V A I L A B L E BALTIMORE, MD A Development by Leased By: 394 LUXURY RESIDENTIAL UNITS 44 STORY ON SITE PARKING 12,000+ SF OF ( SPACE AVAILABLE
More informationOffered at $3,765,000
Presenting A 9-Unit Commercial Property in the Heart of Historic Fairhaven Offered at $3,765,000 All information contained herein is supplied by the seller to the best of his/her knowledge, but is subject
More informationCITY CLERK. Toronto International Festival Caravan (Various Wards)
CITY CLERK Clause embodied in Report No. 3 of the, as adopted by the Council of the City of Toronto at its meeting held on April 16, 17 and 18, 2002. 3 Toronto International Festival Caravan (Various Wards)
More informationFOR SALE. Current CAP Rate 5.42% BROADWAY & F STREET CHULA VISTA, CA 91910
FOR SALE 303-325 BROADWAY & 582-584 F STREET CHULA VISTA, CA 91910 Current CAP Rate 5.42% Offering Price: $4,500,000 ($280/SF) Current CAP Rate: 5.42% Occupancy: 100% LEASED 8 Tenants Total Building Size:
More informationReverchon Ballpark - Proposed Redevelopment Development, Operation and Maintenance Agreement with Reverchon Sports and Entertainment, LLC
Reverchon Ballpark - Proposed Redevelopment Development, Operation and Maintenance Agreement with Reverchon Sports and Entertainment, LLC 1 Dallas Park & Recreation Park and Recreation Board June 7, 2018
More informationAIR CANADA REPORTS 2010 THIRD QUARTER RESULTS; Operating Income improved $259 million or 381 per cent from previous year s quarter
AIR CANADA REPORTS 2010 THIRD QUARTER RESULTS; Operating Income improved $259 million or 381 per cent from previous year s quarter MONTRÉAL, November 4, 2010 Air Canada today reported operating income
More informationAlternative Highest & Best Use Analysis Boutique Hotel
Alternative Highest & Best Use Analysis In response to numerous comments received from the public, as well as issues raised by the CCC in the Appeal Staff Report Substantial Issue Determination, the following
More informationHilton Rotterdam Hotel, the Netherlands
Executive Summary The Group and four other co-investors (the Consortium ) have acquired all of the issued shares in the capital of Hotelmaatschappij Rotterdam B.V. which owns the Hilton Rotterdam Hotel,
More informationNOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PROPOSED PASSENGER FACILITY CHARGE APPLICATION NOVEMBER 9 TH, 2018
NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PROPOSED PASSENGER FACILITY CHARGE APPLICATION NOVEMBER 9 TH, 2018 LAWTON-FORT SILL REGIONAL AIRPORT LAWTON, OKLAHOMA PASSENGER FACILITY CHARGE PROPOSED
More informationArea Surrounding Maplewood Manor
BAY CITY, MICHIGAN HOUSING COMMISSION Neighborhood Revitalization Plan Area Surrounding Maplewood Manor January 13, 2014 CITY COMMISSION DRAFT PLAN PRESENTATION BAY CITY, MICHIGAN 1 Planners Phil McKenna,
More informationORANGE COUNTY TRANSPORTATION AUTHORITY. Go Local Fixed-Guideway Program History and Project Update. PowerPoint 3
ORANGE COUNTY TRANSPORTATION AUTHORITY Go Local Fixed-Guideway Program History and Project Update PowerPoint 3 Santa Ana-Garden Grove Fixed Guideway Project OCTA Board of Directors September 26, 2011 Project
More informationCreating Sustainable Communities Through Public Transportation
Creating Sustainable Communities Through Public Transportation 21 st Transportation Committee January 16, 2008 Keith T. Parker Chief Executive Officer Charlotte Area Transit System (CATS) Charlotte Mecklenburg
More informationExperience the environment
Experience it. Experience the environment The Grand is where CREATIVE, STATE-OF-THE-ART OFFICE meets inviting outdoor spaces featuring vibrant landscaping, pedestrian walkways and a two acre PROMINENT
More informationSubject Property Schuster St Las Vegas, NV SW Las Vegas Ind. LOCATION Distance to Seaport:
Subject Property 6615 Schuster St Las Vegas, NV 89118 - SW Las Vegas Ind LOCATION Distance to Airport: 6.2 mi Distance to Seaport: 232.5 mi Distance to Rail Terminal: 6.7 mi Population 500 Mile Radius:
More informationRealizing the Benef ts Hudson River Park
Realizing the Benefits of Hudson River Park This report was prepared by Regional Plan Association for Friends of Hudson River Park Photo: Hudson River Park Trust 2 Realizing the Benefits of Hudson River
More informationNova Place 100 S Commons, Pittsburgh, PA novaplace.com/event-space
PITTSBURGH'S NEWEST PRIVATE EVENT & MEETING SPACE Nova Place So much more than a hotel ballroom. Nova Place is a 30 acre mixed-use, urban redevelopment project located on Pittsburgh's historic North Side,
More informationREAL ESTATE TRANSACTION ADVISORY SERVICES
REAL ESTATE TRANSACTION ADVISORY SERVICES Improving Performance and Value of Amtrak-owned Assets AMTRAK STATION DEVELOPMENT 1 New York Penn Station Moynihan Train Hall Philadelphia 30 th Street Station
More information2017/ /20 SERVICE PLAN
2017/18 2019/20 SERVICE PLAN September 2017 For more information on the B.C. Pavilion Corporation contact: B.C. PAVILION CORPORATION CORPORATE OFFICE #200-999 Canada Place Vancouver, BC V6C 3C1 Tel: (604)
More informationDowntown Stillwater. Lot 34 & 35 Redevelopment. Final Presentation / City Council Workshop. March 28, 2016
Downtown Stillwater Lot 34 & 35 Redevelopment Final Presentation / City Council Workshop March 28, 2016 Sean Garretson, AICP AJ Kirkpatrick, AICP To Be or Not to Be (a destination) that is the Question!
More informationSchiphol Group. Annual Report
Schiphol Group Annual Report 2013 Business model Business model Schiphol Group distinguishes four core activities: Aviation, Consumer Products and Services, Real Estate, and Alliances and Participations.
More informationKansas City Aviation Department. August 25, 2015
Kansas City Aviation Department August 25, 2015 KCI History Prior to the 1972 Charles B Wheeler Downtown Airport (MKC) was Kansas City s commercial airport Trans World Airlines (TWA) influenced the planning
More informationPARKING CAPACITY REQUIREMENTS
PARKING CAPACITY REQUIREMENTS Presented to: Antaramian Development Corporation 365 5 th Avenue South Naples, Florida 34102 CONTENTS Page INTRODUCTION... 1 BACKGROUND... 2 EXISTING PARKING CONDITIONS...
More informationThe Economic Contribution of Cruise Tourism to the Southeast Asia Region in Prepared for: CLIA SE Asia. September 2015
BREA Business Research & Economic Advisors The Economic Contribution of Cruise Tourism to the Southeast Asia Region in 2014 Prepared for: CLIA SE Asia September 2015 Business Research & Economic Advisors
More informationJess Linn Principal Planner, Development Services Division Miami-Dade Regulatory and Economic Resources
Eric Silva, AICP Assistant Director, Development Services Division Miami-Dade Regulatory and Economic Resources Albert Hernandez, P.E. Deputy Director, Planning and Engineering Miami-Dade Transit Jess
More informationCLSA Asia Investor Forum. January, 2008
CLSA Asia Investor Forum January, 2008 Forward Looking Statements This presentation contains forward-looking statements regarding operating trends, future results of operations and the completion of new
More informationPORT OF SEATTLE PRESENTATION TO THE WESTERN STATES INSTITUTIONAL INVESTORS CONFERENCE MAY 15, 2018
PORT OF SEATTLE PRESENTATION TO THE WESTERN STATES INSTITUTIONAL INVESTORS CONFERENCE MAY 15, 2018 Elizabeth Morrison, Port of Seattle Director of Corporate Finance 0 OVERVIEW Regional Economy Port Financial
More informationTHE ENERGY OF AUSTIN.
A 25 ACRE MIXED-USE DEVELOPMENT THE ENERGY OF AUSTIN. THE LIFE ON THE LAKE. OPEN 2014 The Arboretum The Domain 2nd Street District Southpark Meadows Cypress South Shore Pointe Site The Waterfront Amli
More informationMAXIMIZING INVESTMENT AND UTILIZATION
MAXIMIZING INVESTMENT AND UTILIZATION November 2013 Luis Ajamil Bermello, Ajamil & Partners Two perspectives How to increase use of the facility OPTIMIZATION How to improve the capacity of the facility
More informationSOUTH DAKOTA BOARD OF REGENTS. Full Board ******************************************************************************
SOUTH DAKOTA BOARD OF REGENTS Full Board AGENDA ITEM: 14 DATE: October 9-, 13 ****************************************************************************** SUBJECT: South Dakota State University New Football
More informationDallas Love Field Update. Dallas City Council Briefing February 18, 2015
Dallas Love Field Update Dallas City Council Briefing February 18, 2015 Purpose Construction Update Impacts of Wright Amendment Repeal Increase in operations/passengers/ projections Concessions performance
More informationEvaluation of Alternative Aircraft Types Dr. Peter Belobaba
Evaluation of Alternative Aircraft Types Dr. Peter Belobaba Istanbul Technical University Air Transportation Management M.Sc. Program Network, Fleet and Schedule Strategic Planning Module 5: 10 March 2014
More information0 & 20 CARLSON court THE COMPLETE OFFICE PACKAGE
0 & 20 CARLSON court THE COMPLETE OFFICE PACKAGE Introducing 10 & 20 Carlson Court, the most convenient place to work. The properties are ideally situated next to six major highway connections. With a
More informationExhibition Place Service Level Review
Exhibition Place Service Level Review Standing Committee Presentation June 30, 2015 Overview Recommended Service Levels by Program Program Map Service Levels and Service Performance Service Challenges
More informationMARKET. Philadelphia, PA LANDMARK DEVELOPMENT RETAIL SPACES FOR LEASE
2 4 0 0 MARKET Philadelphia, PA LANDMARK DEVELOPMENT RETAIL SPACES FOR LEASE LISTING DETAILS 2,000-10,500 SF Retail Options Flagship Retail Opportunity Located at the Epicenter of Central Business District,
More informationPrice: $5,250,000 ($23.38 PSF) NOI: $475,109 CAP: 9.05%
Bridgestone Distribution Center +2 3974 I-55 Frontage Rd Jackson, MS 39209 Price: $5,250,000 ($23.38 PSF) NOI: $475,109 CAP: 9.05% Phone:212.686.0072 Fax: 212.686.0078 rob@exp1031.com www.exp1031.com Industrial
More informationMUSIC CITY CENTER, NASHVILLE KAY BAILEY HUTCHINSON CONVENTION CENTER, DALLAS ALBANY CAPITAL CENTER
MUSIC CITY CENTER, NASHVILLE Metro Government Project Type Feasibility, Economic Impact, Tax Projections Years of Service 2009 2013 HVS provided feasibility and economic impact studies for the Music City
More informationDowntown Frederick Hotel and Conference Center BRIEFING.
Downtown Frederick Hotel and Conference Center BRIEFING Public-Private Partnership Team Public-Private Partnership initiated by the Chamber of Commerce and business community to retain existing employers
More informationDOWNTOWN EAST RESTAURANT AND RETAIL SPACE. Matt Friday. Senior Vice President
DOWNTOWN EAST RESTAURANT AND RETAIL SPACE AVAILABLE for lease Matt Friday Senior Vice President 612 336 4209 matt.friday@cbre.com David Daly Vice President 612 336 4319 david.daly@cbre.com Eric Sheaffer
More informationMARASCO PLAZA NORTH VERSAILLES
MARASCO PLAZA NORTH VERSAILLES 600 EAST PITTSBURGH MCKEESPORT BLVD NORTH VERSAILLES, PA 15137 Andreas Kamouyerou Associate Advisor 412.535.8062 Andreas.Kamouyerou@svn.com Bryan J. McCann Advisor 412.535.8061
More information2 N. jackson Ave. For sale or lease. ± 0.71 acre land parcel / ±30,927 Square Feet. At Alum rock Ave San Jose,CAlifornia SUBJECT N JACKSON AVE
For sale or lease At Alum rock Ave SUBJECT N JACKSON AVE ALUM ROCK AVE ± 0.71 acre land parcel / ±30,927 Square Feet JOHN B. MACHADO EXECUTIVE VICE PRESIDENT DIRECT: +1 408 282 3862 CELL: + 1 408 234 2606
More informationEconomic Impacts of Campgrounds in New York State
Economic Impacts of Campgrounds in New York State June 2017 Report Submitted to: Executive Summary Executive Summary New York State is home to approximately 350 privately owned campgrounds with 30,000
More informationSKY S THE LIMIT COMMONWEALTH STADIUM EDMONTON.ALBERTA.CANADA.
SKY S THE LIMIT COMMONWEALTH STADIUM EDMONTON.ALBERTA.CANADA. SKY S THE LIMIT Commonwealth Stadium has hosted a broad range of local and world-class spectator events from world cups to iconic concerts
More informationGreater Orlando Aviation Authority
Greater Orlando Aviation Authority Orlando International Airport & Orlando Executive Airport Budgets Fiscal Year 2017-2018 Greater Orlando Aviation Authority Orlando, Florida Greater Orlando Aviation Authority
More informationNortheast Florida Regional Council. Saratoga Springs Presentation September 7, 2006
Northeast Florida Regional Council Saratoga Springs Presentation September 7, 2006 Location Clay County, Florida SARATOGA SPRINGS 2 LandMar Founded in 1987 by Edward Burr, CEO Became an affiliate of Crescent
More informationTOURISM AS AN ECONOMIC ENGINE FOR GREATER PHILADELPHIA
TOURISM AS AN ECONOMIC ENGINE FOR GREATER PHILADELPHIA 2015 Visitation and Economic Impact Report FINAL REPORT SUBMITTED TO: VISIT PHILADELPHIA 30 S. 17 th St, Suite 2010 Philadelphia, PA 19103 FINAL REPORT
More informationJOINTLY ANNOUNCES 2017/18 INTERIM RESULTS * * * RENTAL INCOME SURGES 25% STRENGTHS RECURRING INCOME STREAMS FOR SUSTAINABLE GROWTH
[For Immediate Release] JOINTLY ANNOUNCES 2017/18 INTERIM RESULTS * * * RENTAL INCOME SURGES 25% STRENGTHS RECURRING INCOME STREAMS FOR SUSTAINABLE GROWTH (Hong Kong, 23 November, 2017) Emperor International
More informationCEDAR HOUSE Spa Road, Gloucester, GL1 1XL SOUTH WEST OFFICE INVESTMENT WITH ASSET MANAGEMENT OPPORTUNITIES
CEDAR HOUSE Spa Road,, GL XL SOUTH WEST OFFICE INVESTMENT WITH ASSET MANAGEMENT OPPORTUNITIES INVESTMENT SUMMARY An extensive office building in central providing 38,427 sq ft (3,569.98 sq m) of Office
More informationGRAND CENTRAL TERMINAL JULY 2011 RETAIL DEVELOPMENT. Page 124
RETAIL DEVELOPMENT AT GRAND CENTRAL TERMINAL JULY 2011 Page 124 Grand Central Terminal continues to be 100% leased/licensed (approximately 134,000 square feet, plus 6 Graybar Passage Kiosks). The focus
More informationASHTON GATE SPORTS & CONVENTION CENTRE. A New Home For Bristol Flyers
ASHTON GATE SPORTS & CONVENTION CENTRE A New Home For Bristol Flyers THE VISION I n 2016 Ashton Gate/ Bristol Sport delivered the 45m redevelopment of the home of Bristol City FC and Bristol Bears Rugby.
More information4Q15 and 2015 Results Presentation. March 30, 2016
4Q15 and 2015 Results Presentation March 30, 2016 Highlights Paulo Kakinoff CEO Highlights Macro Environment Even more adverse environment for the Brazilian economy, with a GDP drop of 3.8% in 2015 Devaluation
More informationMaster Commercial Developer Industry Forum
Master Commercial Developer Industry Forum Agenda 9:00 am Welcome Phil Washington, Metro CEO Metro Board Director Solis 9:15 am Introductions and Overview of the Event Jenna Hornstock, Executive Officer,
More informationRETAIL POTENTIAL ON 1/2 ACRE SITE
NO STANDING FEATURES: NEARBY: RETAIL POTENTIAL ON 1/2 ACRE SITE 20,000 SF ONE-STORY BUILDING ADJACENT TO NEWLY BUILT AUTOZONE CANARSIE - DIVISIONS AVAILABLE Building Dimensions: 200 x 100 Brooklyn Terminal
More informationCOMMUNITY LOS PRIORITIES
Part 5. Community Priority Meetings Purpose: The purpose of holding Community Priority Meetings was two-part; (1) to gather input from community members and decision makers on specific park and trail infrastructure
More informationFOR SALE. Auction Date July 28, 2014 Review Details and Register at. Days Inn Lake Havasu 1700 McCulloch Blvd North Lake Havasu City, AZ 86403
FOR SALE Days Inn Lake Havasu 1700 McCulloch Blvd North Lake Havasu City, AZ 86403 Auction Date July 28, 2014 Review Details and Register at An Exclusive Offering For further information please contact:
More informationCreating a High Quality Business District
Date Month Date Month Friday 7 November 2014 Nine Elms on the South Bank A Bilfinger Real Estate company Creating a High Quality Business District New London Architecture Introduction Nine Elms Vauxhall
More informationWEST VALLEY PLAZA S REDWOOD RD WEST VALLEY CITY, UT MULTI TENANT TRIPLE NET INVESTMENT
WEST VALLEY PLAZA 4081-4093 S REDWOOD RD WEST VALLEY CITY, UT MULTI TENANT TRIPLE NET INVESTMENT PROPERTY DETAILS PROPERTY HIGHLIGHTS LOCATION OVERVIEW WEST VALLEY CITY 1.05 acre lot with a 10,629 sq.
More informationNEW RETAIL OPPORTUNITIES
NEW RETAIL OPPORTUNITIES STAGE 1 LEASING NOW Join Coles, Kmart and ALDI plus 50+ Specialty Stores and Dining Precinct THE PORT S NEWEST RETAIL DEVELOPMENT The redevelopment of the Port Canal Shopping Centre
More informationTulsa Airports Improvement Trust Strategic Plan Update
Tulsa Airports Improvement Trust Strategic Plan Update 2016-2026 TABLE OF CONTENTS I. Background II. III. IV. Existing Conditions and Future Requirements Mission, Vision, & Goals Strengths, Weakness, Opportunities
More informationDulles Corridor Metrorail Project Update Dulles Area Transportation Association August 25, 2009
Dulles Corridor Metrorail Project Update Dulles Area Transportation Association August 25, 2009 Patty Nicoson President Dulles Corridor Rail Association Proposed Toll Rate Increase on Dulles Toll Road
More information