SOUTH DAKOTA BOARD OF REGENTS. Full Board ******************************************************************************

Size: px
Start display at page:

Download "SOUTH DAKOTA BOARD OF REGENTS. Full Board ******************************************************************************"

Transcription

1 SOUTH DAKOTA BOARD OF REGENTS Full Board AGENDA ITEM: 14 DATE: October 9-, 13 ****************************************************************************** SUBJECT: South Dakota State University New Football Stadium Facility Program Plan South Dakota State University requests approval of its New Football Stadium Facility Program Plan at an estimated cost of $60,000,000 to $65,000,000. This project was identified in SDSU s 25 Master Plan for Athletic Facilities reviewed by the Board in October. The Board approved SDSU s Preliminary Facility Statement for the new football stadium in June 11. The building committee met in September 13 and authorized the selection process for a Construction Manager at Risk for the project so better cost estimates could be developed. All costs to date were to come from private funds. The new 18,000 seat stadium will be constructed on the existing Coughlin Alumni Stadium site and will require phasing so that the existing stadium remains operational during construction of the new facilities. The new stadium will cover approximately 277,000 square feet of space. This includes 5,000 square feet of grandstand space, 62,000 square feet of enclosed seating areas, suites, and related club areas, 1,000 square feet of restroom, concession, press box, retail, support, and locker facility space. The footprint of the new stadium will be larger than the current stadium. Seating will be distributed along the west, south and east sides of the field. The west side of the stadium will encroach on the existing parking lot. The east side of the stadium will encroach on the football practice field east of the current stadium. Entrances to the stadium will be provided on the southwest, southeast and northwest corners of the stadium. An enclosed grade level concourse will direct pedestrian traffic to seating, concessions, restrooms and upper levels. (Continued) ****************************************************************************** RECOMMENDED ACTION OF THE EXECUTIVE DIRECTOR Approve SDSU s Facility Program Plan to move forward with a New Football Stadium project at an estimated cost of $60,000,000 to $65,000,000. Funding for this project will come from the sale of revenue bonds subject to approval of a viable financial plan for $,000,000 debt serviced with revenues from amenity seat agreements, season ticket sales, sponsorships, concessions, and facility use fees. The remaining $,000,000 to $15,000,000 of funds will come from continued sponsorship fund raising and private donations to the SDSU Foundation. The project scope is to include all necessary parking improvements and infrastructure needed to support the facility operations.

2 SDSU New Football Stadium Facility Program Plan October 9-, 13 Page 2 of 2 The stadium bowl will concentrate club, loge, and enclosed suite seating on the west side of the facility. Reserved seats will be available on both the east and west sides of the stadium. The west concourse will provide access to concessions, restrooms, food service support, a retail store, the University Police Department, ticketing, and game day administrative support spaces. The west concourse will also provide vertical access to club seating, suites, press box facilities, loge access, and upper level access to reserved seating. Fully enclosed concession, restroom, and support facilities will be insulated, heated, and air conditioned. Club facilities and concessions will be provided at an elevated second story level. Suites will be provided at the third story level. Suites are likely to provide outside seating that will also provide weather protection from rain and wind for loge seating. The press facilities and some suite functions will be provided at the fourth story level. Additional project information can be found in SDSU s attached Facility Program Plan document and detailed schematic drawings. Funding for this construction project will be from private donations, sponsorship revenues, and proceeds from revenue bonds. At the current time, a target of $,000,000 in revenue bond sales debt serviced by amenity seat agreements, season ticket sales, sponsorships, concessions, and facility use fees. The remaining $,000,000 to $15,000,000 of funds will come from continued sponsorship fund raising and private donations to the SDSU Foundation. Conversations are being initiated with student leadership on their possible involvement in supporting operations as authorized under Board action approving the Preliminary Facility Statement in June, 11

3 ATTACHMENT I 3 FACILITY PROGRAM PLAN NEW FOOTBALL STADIUM SOUTH DAKOTA STATE UNIVERSITY SDSU requests approval of this Facility Program Plan to continue planning a new Football Stadium that will replace Coughlin Alumni Stadium. The Preliminary Facility Statement (PFS) was approved at the June 11 Board of Regents meeting. This authorized formation of a building committee, selection of a design team, and planning only for schematic design. The Building Committee selected Architecture Incorporated, Crawford Associates (sports facility design consultant), and CH Johnson (financial consultant) in September 11. The Building Committee received a briefing on the project on September 18, 13, and has approved beginning the selection process for a Construction Manager at Risk for the project. A. PROGRAMATIC JUSTIFICATION FOR DISCRETE SPACES: South Dakota State University s plan for continued development of its intercollegiate athletic facilities includes a New Football Stadium as a priority of the future plans. Architecture Incorporated, Crawford Associates, and CH Johnson pursued architectural programming and conceptual schematic design through 11 and into 12. A draft architectural space program, schematic design and a preliminary market assessment and financial pro forma was completed in July 12. SDSU and the design consultants have been engaged in an interactive iterative process of reviewing and revising the conceptual schematic design, the market assessment and the financial pro forma for both construction and operations of the new stadium. SDSU proposes a project to build a new stadium to replace 11,000 seat Coughlin Alumni Stadium. The project will include the following program elements necessary for a modern, contemporary facility, with the amenities expected and required for its financial success. Features of the stadium will include: Seating capacity will be approximately 18,000 seats (mixture of 1,666 reserved seats (suite, club, loge, and alumni club seating), 3,000 compensatory seats, and 13,334 seats for general admission). Seating will be distributed on the west, south, and east sides of the field. The stadium will be designed for future expansion. The reserved seats include approximately 27 enclosed suites including 4 executive suites, 23 communal suites, 156 Loge seats, and 1,128 premium club seats on the west side of the stadium. Restrooms will be provided appropriate to the stadium seating capacity. Restroom facilities will exceed minimum building code requirements and be proportioned for sports facility use, particularly football game program requirements.

4 ATTACHMENT I 4 Concessions appropriate to the stadium seating capacity and combination of general admission seating, reserved seating, and suites. The number of points of sale for concessions will change dramatically. The basis for planning the stadium indicates that one point of sale for approximately 0 general seating spectators and one point for approximately 0 reserved seating spectators should be provided. The points of sale will include fixed and portable concession location points and multiple locations adjacent to or within enclosed suites. The concessions and suites will be supported by kitchen, food distribution, and loading/unloading facilities at the ground level of the stadium. Press and media areas will be required. These include radio and television broadcast spaces, writing press space, coaching observation spaces, telecommunications support, and camera support. Game day support facilities will include first aid space, administrative office areas, ticketing offices, official s locker room, and visiting team locker facilities. Two other program areas will be planned for the stadium. One will be a retail store featuring University spirit goods. Approximately 1,0 sf of space is being allocated within the program for this function. The second will be the University Safety and Security office, including the University Police Department (UPD), which will be relocated from their current location in the Alvilda Maye Sorenson Building to the new stadium. UPD plans to seek accreditation through the International Association of Campus Law Enforcement Administrators (IACLEA). The facilities will be designed to meet evidence holding, interview rooms, office space, squad rooms, and Department of Justice storage requirements appropriate to the accrediting agency. The estimate is for approximately 5,700 sf of space for UPD. The grass football field will be replaced with an artificial turf field with an under-turf drainage field. The existing scoreboard will be relocated to the south, outside the footprint of the south grandstand seating. The existing scoreboard will be relocated south of its current location. General support facilities required for the stadium will include loading dock, general storage, mechanical rooms, electrical & computer rooms, and a circulation concourse. B. GROSS SQUARE FOOTAGE: The facility will include open air concrete grandstand seating of approximately 5,000 sf. Enclosed seating areas, suites, and related club areas will total approximately 62,000 sf. Restroom, concession, press box, retail, support, and locker facilities will total 1,000 sf. The overall facility will cover or enclose approximately 277,000 sf of space. C. SITE ANALYSIS: The new stadium will be constructed on the site of Coughlin Alumni Stadium. The project will require phasing so the existing stadium remains operational during construction of the new facilities. Two potential timetables of the project are possible. A standard approach to phasing the project is estimated to result in completion in a little less than 36 months. The first phase would begin at the end of the 14 football season and would include the construction of the east and south side seating and the west infrastructure for press box and suites. A portion of the west section of the stadium (press box, suites, concourse, and concessions) lies outside the footprint of the existing stadium, so

5 ATTACHMENT I 5 can be constructed immediately, while the existing facility is occupied. The second phase would commence after the conclusion of the 15 football season. The second phase would construct the west side stadia and install the artificial turf field. Under this approach construction would be entirely completed for the opening game of the 16 football season. An accelerated approach would be to initiate the phase one construction (east seating and press box and suites on west side) as early as possible in the spring of 14, with completion of seating on the east side of the stadium prior to the 14 football season. The second phase would begin immediately upon completion of the 14 season and complete the south stands, press box, suites, west stadium, and the new turf field by the beginning of the 15 football season. The footprint of the new stadium will be larger than the current footprint. North Campus Drive, a primary street serving the campus will not require relocation due to the project. The west side of the stadium will encroach on the existing parking lot. The east side of the stadium will encroach on the football practice field east of the current stadium. Utilities serving the existing stadium will be upgraded as needed. A sanitary sewer main crosses the middle of the football field under the stadium. SDSU will examine possible relocation of this sewer main outside of the footprint of the stadium. The water service main serving the Dykhouse Student Athlete Center and the Sanford- Jackrabbit Athletic Complex will be used to serve the fire protection and water service requirements of the New Stadium. The high voltage electrical loop immediately north of the Sanford-Jackrabbit Athletic Complex will be tapped to serve the new stadium. Storm drainage will be managed through direction of building runoff, field surface drainage, and general surface drainage to underground storm sewers west of the existing stadium. Available parking space within a 15 minute walk of the stadium has been analyzed. Adequate parking is available for game day use. The project construction activities are likely to disturb all parking west and northwest of the stadium. Parking for approximately 6 vehicles will be replaced as a component of the scope of the project. As the campus continues to develop, other parking areas will be developed that will also conveniently support stadium use. Geotechnical reports have been completed. The stadia construction will be precast concrete supported by concrete columns and beams or structural steel. The construction manager at risk will assist in conducting a value engineering analysis of seating construction and structural options re: precast concrete stadia vs. steel & aluminum stadia. The concentrated loads from the structure will be supported by concrete spread footings of increased size and thickness. Further analysis of potential building deflection and uniform control of potential building settlement will determine specific sizes and any requirements for soil stabilization. D. DESCRIPTION OF KEY BUILDING FEATURES: The new stadium will be constructed in the same location as Coughlin Alumni Stadium. Existing steel scaffolding type seating on the east side, aluminum bleachers in the south end zone, and precast

6 ATTACHMENT I 6 concrete seating on the west side will be replaced. In the preliminary design phase value engineering of the types of seating will be undertaken to choose the appropriate seating for each side of the facility. The design is a modified bowl of seating with seating on three sides, and an open section in the southwest corner near the primary entrance to the Stadium. Entrances to the stadium will be provided on the southwest, southeast, and northwest corners. The stadium bowl will concentrate club, loge, and enclosed suite seating on the west side of the facility. Reserved seats will be available on both the east and west sides of the stadium. The design includes a grade level enclosed concourse to direct pedestrian traffic to seating, concessions, restrooms, and upper levels. The concourse will be connected to the seating bowl via grade level corridors. The west concourse will provide access to concessions, restrooms, game day support facilities, food service support, a retail store, the University Police Department, ticketing, and game day administrative support spaces. The west concourse will also provide vertical access to club seating, suites, press box facilities, loge access, and upper level access to reserved seating. The east and south concourse will be an exterior concourse providing access to concessions, restrooms, and visiting team locker facilities. The construction of the stadia will be structural steel or concrete columns and framing, and either steel & aluminum or precast concrete stadia. Weather protected framing will be structural steel with bar joists and structural steel decking. Most exterior and interior walls will be constructed of concrete block, with limited use of brick and prefinished metal paneling. Fully enclosed concession, restroom, and support facilities will be insulated, heated, and air conditioned. Club facilities and concessions will be provided at an elevated second story level. Suites will be provided at the third story level. Press facilities and some suite functions will be provided at the fourth story level. Suite are likely to provide outside seating that will also provide weather protection from rain and wind for loge seating. Seating between the yard lines will be chair backed self-rising fixed seats. Bench seating will be provided outside of the yard lines and in the south end zone. The design and rake of the seating stadia will provide unobstructed sight lines throughout with full view of the field from sideline to sideline and full end zone visibility for all seating. ADA and companion seating will be provided at all different types of seating locations (general admission, reserved, loge, and suite). Food preparation facilities will include receiving and storage areas, recycling area, dry storage, walk in freezers & coolers, food service staging, kitchen, dish washing, locker & uniform areas, and chair/table/kiosk storage. Food preparation and storage areas shall have separate vertical service to club and suite level food service venues. Food preparation facilities will be designed for food assembly, plating, and staging. Food preparation, cooking, and cook to serve for concessions and club level will take place off site. Food services to suites may include cook to serve equipment and facilities. Retail facilities will include a team store, portable novelty stands, and general retail storage. Press box and media facilities shall include television broadcast booth, home radio booth, visitor radio booth, internet/web based broadcast booth, public address/score keeper/statistician booth, home &

7 ATTACHMENT I 7 visiting coaches booths, press lounge, press interview space, video production space, electrical service area, and restroom facilities. Media and service access shall be independent of public access. Locker rooms will be provided for visiting teams and officials. Ticketing windows and box office facilities shall be provided for support staff. Administrative support offices will be provided for game day activities. Various spaces will be required for operational support, including custodial, telecommunications, mechanical, electrical, food services, sound system, and stadium lighting. E. ILLUSTRATIVE FLOOR PLANS: The following attachments are included to illustrate the schematic design: o Site Plan o Main Concourse Plan o Club Level Plan o Suite Level Plan o Press Level Plan o Perspective Images F. INITIAL COST ESTIMATES: The schematic cost estimate of the project is in the range of $60 to $65 million. The estimated costs are total project costs and include: o all construction costs, demolition costs, and costs for fixed seating, signage, electronic audio, video, telecommunications, computer systems, sports lighting, parking and utilities; and o soft costs including the professional design and consultant service fees, soil borings and site development, project administration and management, food service equipment, point of sales systems, furnishings and signage. Estimated costs of primary categories of costs that include all items shown above are as follows: o Building Construction - $51,000,000 to $53,000,000 o Parking/Site development - $ 1,0,000 o Furnishings & Equipment - $ 2,000,000 to $ 2,0,000 o Professional Consultants - $ 3,0,000 to $ 4,000,000 o Project Administration - $ 1,0,000 to $ 1,0,000 o Project Contingency - $ 2,000,000 to $ 2,800,000 o Total Project Costs - $61,0,000 to $64,700,000 G. IMPACT TO M&R: The Financial Plan of the stadium will have two distinct but overlapping components; a plan to finance the total project construction (hard and soft costs) of the stadium and a plan to fund operating

8 ATTACHMENT I 8 and maintenance costs. The overarching principles of the plan are to build only what is affordable and to build only what can be operated. At the current market cost of capital, annual operating costs for interest and principle can be reduced approximately $75,000 for each reduction of $1 million in bond sales because of private donations and/or sponsorship revenue. This creates the overlap between the Construction Financial Plan and the Operating Financial Plan. Based on CH Johnson study and report, the annual funding for maintenance and repair/capital renewal funding is estimate to be $2,000. SDSU HEFF M&R allocation is not affected. H. BUDGET FOR ONGOING OPERATIONAL COSTS: Operations and maintenance: For management, custodial, grounds care, and routine maintenance, a minimum of $453,000 should be allocated each year. Utilities: The additional utility expenses are estimated at $160,000. This represents only utility consumption and does not include the costs of utility connections. I. PROPOSED FUNDING SOURCES FOR COSTS OF: 1. CONSTRUCTION Funds for construction will be private donations and sponsorship revenues, and proceeds from revenue bonds. The amount of bonds sold will be a function of final cost estimates with a goal to be as close to $60 million as feasible for total project costs. Private donations and sponsorship revenues plus limited institutional funds will be included for the funding of the construction of the nonstadium space. Sponsorship revenues can be applied against the total construction costs or against the operating costs. Assuming success in achieving a verified cost estimate towards the lower end of the cost estimate range and progress to date in securing donor commitments, revenue bond sales of $ million or less are the target of the plan. Fund raising is in progress, with a check point of mid-november to validate the financial proforma and target for bond sales. Fund raising will continue through approval, design, and stadium construction. The intent is to minimize bond sales by maximizing donations and appropriate sponsorship revenues. 2. ONGOING OPERATIONS & 3. MAINTENANCE AND REPAIR Revenue streams from amenity seat agreements, season tickets sales, sponsorships, concessions, and facility use fees will support ongoing operations, maintenance, and repair costs.

9 ATTACHMENT I 9 Market scope and scale assessment and capacity analysis to forecast annual revenues and the estimated operating pro forma, which includes principle and interest payments, completed to date by financial consultant CH Johnson provides positive indications on the ability to support the O&M and M&R costs of the stadium. Financial consultant CH Johnson is completing analysis of the ability to provide revenue streams from amenity seat agreements, season tickets sales, sponsorships, concessions, facility use fees, etc. Preliminary discussions with prospects for amenity seats have been gone well. Market tests and presales are underway and will be pursued very aggressively through September and October to the beginning of the third week of November. There are target pre-sale commitments by type of inventory (suites, loge seating, club seats and ticket sales) that will guide sales efforts to determine the validity of the market assessment and capacity analysis and associated forecast revenues. This success of these activities will validate the plans and strengthen the operating pro forma and the feasibility of successfully operating the stadium once constructed. In addition to revenues from these sources, the operating pro forma includes revenues from concessions and catering, facility use fee revenues for special events, and advertising revenues. Financial consultant CH Johnson will continue their due diligence providing their rigorous assessment on the operating pro forma during the market test period.

10 SITE PLAN S E ATTACHMENT II T UP E STADIUM SD REVISIONS & B.O.R. PREP August 13 N 6

11 35 CONCOURSE EAST 12,7 SF CONCESSION 1,0 SF 43'-4" 1,0 SF 37 STORAGE 1,4 SF 1,4 SF CONCESSION 1,4 SF GAME DAY SECURITY / FIRE COMMAND 360 SF '-0" 79'-5" 49' 33 ENTRY PLAZA 35'-0" 28 PLAYER & OFFICIALS 0 SF 1,4 SF VISITING TEAM LOCKER 4,800 SF CORRIDOR 160 SF 43'-4" M 1,4 SF LOADING DOCK 3,1 SF 79'-5" 2 21 " 8'-0" 8 SF / CONCESSION 1,4 SF 1,3 SF 59'3 1,2 SF 43'-4" STORAGE 1,690 SF CONCESSION79'-5" 900 SF 79'-5" 0" 1,690 SF CONCESSION 1,0 SF 35'-6 5/8" 1,690 SF 1,3 SF ' STORAGE 1,4 SF B 43'-4" MAIN ENTRY C 1,3 SF D TEAM STORE / HALL OF FAME 1,260 SF 27 R UP TICKETS 1,0 SF 26' ANCILLARY FIRST AID 290 SF 79'-5" Q E 8 SF F G 55' LEGEND 43 '-0" O 27'-0" ADMIN 1,3 SF 59'3 TICKETS? 280 SF 79'-5" ,4 SF CONCESSION 1,4 SF 49' BACK-OF-HOUSE 35'-0" CIRCULATION SF 1,690 SF 35'-0 1/8" 55'-8 1/4" STORAGE 1,690 SF 55'-8 1/4" CONCESSION 900 SF 79 ' / 2" '-6 5/8" SPECTATOR FACILITIES " '-0 CONCOURSE SOUTH 7,490 SF 1,690 SF 76 1,2 SF " '-5 ENTRY PLAZA TENANT SPACE " '-0 41 WEST FACE OFFICES, LOCKERS, BACK-O HOUSE*: 35,980 SQ. FT. *INCL. VISITOR'S LOCKER '-0" 79'-5" P A 77 ATTACHMENT II A ADMIN 2,000 SF 35 CONCOURSE CONCESSION EAST 1,0 SF 12,7 SF 1,4 SF 79 " '-0 S 2" ANCILLARY LOCKER 4,0 SF 54 V CONCOURSE SOUTH 7,490 SF 1/ 27'-0" " '-0 1,0 SF 24 55'-8 1/4" 34 '-0" 55'-8 1/4" 2,0 SF 76 35'-0 1/8" GAME DAY TICKETS? 280 SF UNIVERSITY POLICE 4,790 SF N " '-5 OFFICIALS' TUNNEL 2,0 SF O 27'-0" 79 OFFICIALS LOCKER 890 SF G 1,3 SF MAIN CONCOURSE 19,2 SF B.O.H. CORRIDOR 1,5 SF ENTRY PLAZA '-0" 29 STORAGE 1,0 SF 22 ANCILLARY FIRST AID 290 SF 79'-5" 79'-5" KITCHEN & BACK-OF-HOUSE,4 SF F 27'-0" '-0" 1,000 SF E 55' 39 FIRST AID 4 SF 32' ' MAIN CONCOURSE PLAN HPF FUTURE EXPANSION STADIUM & : 23,0 SQ. FT. SD REVISIONS & B.O.R. PREP WEST TOWER (CLUB August 13& ABOV 77,951 SQ. FT. 7

12 CLUB LEVEL NORTH LOUNGE 2,3 SF FAMILY RR 1 SF CLUB LEVEL CIRCULATION 7,4 SF STOR. 1,3 SF P R 21 M S 48 A.0 V CLUB LOUNGE 15,3 SF A CLUB B.O.H. 1,280 SF GREEN ROOF BELOW B 1,1 SF 58 RESTROOMS 1,1 SF BAR 1,290 SF RESTROOMS 1,1 SF 1,1 SF STOR. 6 SF C CONCIERGE & COATS 8 SF UP 46 CLUB LEVEL SOUTH LOUNGE 2,3 SF 71 D Q LOWER BOWL SEATS - EAST & SOUTH SIDES 59,090 SF E F G LEGEND BACK-OF-HOUSE CIRCULATION CLUB LEVEL CLUB SEATS LOWER BOWL SEATING SPECTATOR FACILITIES CLUB LEVEL PLAN 42 O STADIUM SD REVISIONS & B.O.R. PREP August LOWER B SEATS - EA SOUTH SI 59,090 S 8 ATTACHMENT II 12

13 PARTY SUITE 1 1,2 SF 37 COM. SUITE 1 3 SF 25 COM. SUITE 2 3 SF COM. SUITE 3 3 SF COM. SUITE 5 3 SF COM. SUITE 4 0 SF E F G EXEC. SUITE SF COM. SUITE 11 3 SF COM. SUITE 12 3 SF 24 COM. SUITE 13 3 SF 74 COM. SUITE 14 3 SF S O COM. SUITE 17 0 SF 19 B C COM. SUITE 18 3 SF 41 ATTACHMENT II A COM. SUITE 16 3 SF COM. SUITE 15 3 SF 76 A V 23 EXEC. SUITE SF EXEC. SUITE SF LOGE BOXES 3,590 SF 33 SUITE LOUNGE,970 SF EXEC. SUITE SF 22 COM. SUITE 3 SF COM. SUITE 9 3 SF M COM. SUITE 8 3 SF SUITE LEVEL PLAN COM. SUITE 7 3 SF SUITE LEVEL B.O.H. 900 SF COM. SUITE 6 3 SF 21 D COM. SUITE 19 3 SF COM. SUITE 3 SF 27 P R Q PARTY SUITE 1,0 SF 43 LEGEND BACK-OF-HOUSE 18 LOGE BOXES 13 SUITES STADIUM SD REVISIONS & B.O.R. PREP 76 August 13 75

14 GREEN ROOF BELOW COACH 270 SF AUDIX/FIELD COMMUNICATIONS 280 SF RADIO 270 SF 24 CAMERA 490 SF S B 27 P R 48 C 41 ATTACHMENT II A A.0 77 PRESIDENT SUITE 3,460 SF MEN'S 58 1 SF WOMEN'S 1 SF 54 V 42 WEB 270 SF STORAGE / PANTRY 3 SF O 23 TV 7 SF MAIN SERVER ROOM 470 SF COACH 270 SF 22 RADIO 270 SF PATCH 170 SF G COPY 170 SF STATS & SCOREBOARD 270 SF OFFICIALS 270 SF F RR 1 SF RR 1 SF M E PRESS CORRIDOR CAMERA 0 SF 3,7 SF PRESS LOBBY & LOUNGE 770 SF PRESS WORK RM 1,980 SF PRESS LEVEL PLAN 2 VIDEO PRODUCTION / EDITING / MAIN CONTROL RM 1,1 SF D UP 47 46GREEN Q ROOF BELOW 43 LEGEND BACK-OF-HOUSE 18 35'-0" CIRCULATION 35'-0" 14 PRESS LEVEL SUITES STADIUM SD REVISIONS & B.O.R. PREP 76 August

15 INTERIOR VIEW: CLUB ROOM STADIUM SD REVISIONS & B.O.R. PREP August ATTACHMENT II 15

16 EXTERIOR: SOUTHEAST PERSPECTIVE STADIUM SD REVISIONS & B.O.R. PREP August ATTACHMENT II 16

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ****************************************************************************** SOUTH DAKOTA BOARD OF REGENTS Budget and Finance REVISED AGENDA ITEM: 6 F DATE: December 4-6, 2018 ****************************************************************************** SUBJECT NSU Regional Sports

More information

Agenda Item No. 3.4 AGENDA ITEM BRIEFING

Agenda Item No. 3.4 AGENDA ITEM BRIEFING Agenda Item No. 3.4 AGENDA ITEM BRIEFING Submitted by: Billy Hamilton, Executive Vice Chancellor and Chief Financial Officer The Texas A&M University System Subject: Approval to Amend the FY 2016-FY 2020

More information

THE MISSION. A PUBLIC PROCESS FROM BEGINNING TO END.

THE MISSION. A PUBLIC PROCESS FROM BEGINNING TO END. THE MISSION. A PUBLIC PROCESS FROM BEGINNING TO END. URBAN DESIGN PRINCIPLES. QUALCOMM STADIUM SITE. I-5 805 15 I-8 DEVELOPMENT PATTERNS. I-5 805 I-I5 I-8 EMBRACE THE RIVER AND PARK SYSTEM. FROM THE MOUNTAINS

More information

Aloha Stadium Conceptual Redevelopment Report. April 5, 2017

Aloha Stadium Conceptual Redevelopment Report. April 5, 2017 Aloha Stadium Conceptual Redevelopment Report April 5, 2017 THE HISTORY OF ALOHA STADIUM A Hawaii landmark since 1975 Aloha Stadium has stood for over 40 years and effectively achieved its mission as a

More information

PORT OF SEATTLE MEMORANDUM. COMMISSION AGENDA Item No. 6a ACTION ITEM Date of Meeting August 23, 2016

PORT OF SEATTLE MEMORANDUM. COMMISSION AGENDA Item No. 6a ACTION ITEM Date of Meeting August 23, 2016 PORT OF SEATTLE MEMORANDUM COMMISSION AGENDA Item No. 6a ACTION ITEM Date of Meeting August 23, 2016 DATE: TO: FROM: Michael Ehl, Director, Airport Operations Wayne Grotheer, Director, Aviation Project

More information

Room Finishing s Built-In Counter Consisting of: Cabinets (3), Small Drawers (4) and Sink Metal Lockers (2) Mirror Television (1) Private Restroom

Room Finishing s Built-In Counter Consisting of: Cabinets (3), Small Drawers (4) and Sink Metal Lockers (2) Mirror Television (1) Private Restroom G R E E N R O O M 1 GREEN ROOM #1 rtheast F430-1A 315 Square Feet Carpet Built-In Counter Consisting of: Cabinets (3), Small Drawers (4) and Sink Metal Lockers (2) Mirror Television (1) (4) 20AMP Services

More information

UNLV Campus Improvement Authority Board Review of Stadium Tours, Estimated Building Costs and Proposed Calendar of Events.

UNLV Campus Improvement Authority Board Review of Stadium Tours, Estimated Building Costs and Proposed Calendar of Events. UNLV Campus Improvement Authority Board Review of Stadium Tours, Estimated Building Costs and Proposed Calendar of Events April 24, 2014 table of contents 1) TOURS OF TEXAS STADIUMS... 3 2) GENSLER SUN

More information

UNLV Campus Improvement Authority Board Estimated Event Utilization and Financial Projections. May 22, 2014

UNLV Campus Improvement Authority Board Estimated Event Utilization and Financial Projections. May 22, 2014 UNLV Campus Improvement Authority Board Estimated Event Utilization and Financial Projections May 22, 2014 1 CIAB WORK SESSION 2 CIAB WORK SESSION RECAP KEY TAKE-AWAYS: There is a need in the market for

More information

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019 NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019 The City of Atlanta is providing an opportunity for public comment until April 25, 2019 related to the

More information

CLIVE ELEMENTARY SCHOOL

CLIVE ELEMENTARY SCHOOL CLIVE ELEMENTARY SCHOOL This narrative, in conjunction with the revised cost estimate attached, represents the opinion of the Superintendency and recommendation to the Board of Education for consideration.

More information

CAIRNS RECTANGULAR PITCH STADIUM NEEDS STUDY PART 1 CAIRNS REGIONAL COUNCIL DRAFT REPORT SEPTEMBER 2011

CAIRNS RECTANGULAR PITCH STADIUM NEEDS STUDY PART 1 CAIRNS REGIONAL COUNCIL DRAFT REPORT SEPTEMBER 2011 CAIRNS RECTANGULAR PITCH STADIUM NEEDS STUDY PART 1 CAIRNS REGIONAL COUNCIL DRAFT REPORT SEPTEMBER 2011 CAIRNS RECTANGULAR PITCH STADIUM NEEDS STUDY PART 1 Cairns Regional Council September 2011 Coffey

More information

THE FIRST-EVER SPORTS & ENTERTAINMENT SMART CITY

THE FIRST-EVER SPORTS & ENTERTAINMENT SMART CITY THE FIRST-EVER SPORTS & ENTERTAINMENT SMART CITY A SMART CITY FOR AMERICA S FAVORITE SPORT + The most inspiring place on earth + A global innovative showroom of next generation: - Products - Services -

More information

City of Redding Airports

City of Redding Airports City of Redding Airports Benton Airpark Redding Municipal Airport DEVELOPMENT AND USE GUIDELINES FOR GENERAL AVIATION HANGARS April 7, 2009 PREFACE The City of Redding, as owner of federally obligated

More information

HARP AUTHORITY GATEWAY CENTER BOATHOUSE & CHANNEL EXTENSION TO SANTA FE AVENUE. Pueblo City Council Presentation September 17, 2018

HARP AUTHORITY GATEWAY CENTER BOATHOUSE & CHANNEL EXTENSION TO SANTA FE AVENUE. Pueblo City Council Presentation September 17, 2018 HARP AUTHORITY GATEWAY CENTER BOATHOUSE & CHANNEL EXTENSION TO SANTA FE AVENUE Pueblo City Council Presentation September 17, 2018 PROJECT: 1A HARP Expansion FUNDING 1A Ballot Issue Pueblo County : $3,000,000

More information

BRYAN REGIONAL PARK. Presented by: Burditt Consultants November 13, 2018

BRYAN REGIONAL PARK. Presented by: Burditt Consultants November 13, 2018 BRYAN REGIONAL PARK Presented by: Burditt Consultants November 13, 2018 AGENDA 1. Project Purpose & Mission 2. Project Vision & Goals 3. Stakeholder Feedback 4. Program Overview 5. Phase A Plan Overview

More information

9' - 0" Locker Bay 237 SF. Elementary Reception 741 SF. Receptionist 82 SF. Work room 105 SF. In School Suspension 89 SF. Conference room 349 SF

9' - 0 Locker Bay 237 SF. Elementary Reception 741 SF. Receptionist 82 SF. Work room 105 SF. In School Suspension 89 SF. Conference room 349 SF Bu i l d i n g Co mmi t t e e T u e s d a y Au g u s t 1 3, 2 0 1 3 9' - 0" Remove Windows Fire Wall Remove Windows 1 First Floor Plan 1/8" = 1'-0" Locker Bay 237 SF Lobby 393 SF Main Vestibule 227 SF

More information

NEW STADIUM LUXURY SUITES

NEW STADIUM LUXURY SUITES NEW STADIUM LUXURY SUITES BE A PART OF SAN FRANCISCO 49ERS HISTORY IMAGINE THE REACTION FROM YOUR CLIENTS AND PROSPECTS when you host them in your luxury suite in the most spectacular stadium in the world.

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: October 29, 2009 SUBJECT: TORONTO-YORK SPADINA SUBWAY EXTENSION PROJECT STEELES WEST STATION APPROVAL OF CONCEPTUAL DESIGN

More information

CEDAR BAYOU WATER PARK and AQUATIC CENTER Feasibility Study Executive Summary November 15, 2016

CEDAR BAYOU WATER PARK and AQUATIC CENTER Feasibility Study Executive Summary November 15, 2016 CEDAR BAYOU WATER PARK and AQUATIC CENTER Feasibility Study Executive Summary November 15, 2016 INTRODUCTION The Cedar Bayou Parks, LLC project is unique in the US. The combination of the large water park

More information

Pioneer Events Center

Pioneer Events Center Planning Workshop for the Concept Design of the Pioneer Events Center Filer, Idaho May 3, 2014 With The Twin Falls County Fair Board and Staff By: Populous Architects / Planners David Forkner ASLA Principal

More information

Alternative Highest & Best Use Analysis Boutique Hotel

Alternative Highest & Best Use Analysis Boutique Hotel Alternative Highest & Best Use Analysis In response to numerous comments received from the public, as well as issues raised by the CCC in the Appeal Staff Report Substantial Issue Determination, the following

More information

These recommended actions come to the board with the recommendation of Interim President Cauce.

These recommended actions come to the board with the recommendation of Interim President Cauce. F 11 VII. STANDING COMMITTEES B. Finance and Asset Management Committee Alaska Airlines Signature Partnership RECOMMENDED ACTION These recommended actions come to the board with the recommendation of Interim

More information

EVENT CENTRE / ARENA COMPLEX

EVENT CENTRE / ARENA COMPLEX EVENT CENTRE / ARENA COMPLEX BUSINESS CASE ANALYSIS PRESENTATION TO COUNCIL JANUARY 14, 2019 PART A: PROJECT RECAP PART B: DETAILED ASSESSMENT OF THE FACILITY OPTIONS PART C: COMPARING THE OPTIONS PART

More information

GALEN CENTER OVERVIEW

GALEN CENTER OVERVIEW OVERVIEW OVERVIEW Galen Center opened its doors on October 21, 2006, realizing a 126-year dream of the USC founders: to strengthen the bond between the University of Southern California and its neighboring

More information

MEDIUM SIZE STADIUM STRATEGY

MEDIUM SIZE STADIUM STRATEGY MEDIUM SIZE STADIUM STRATEGY Approved by City Council on March 12, 2014 This plan is available online at www.edmonton.ca I. Executive Summary... 4 II. Medium Size Stadium Strategy... 5 1. Background...

More information

OVERVIEW ROY H. MURPHY COMMUNITY CENTER AND POOL. May 2016 NEW CENTER PARK NEW POOL

OVERVIEW ROY H. MURPHY COMMUNITY CENTER AND POOL. May 2016 NEW CENTER PARK NEW POOL CITY OF FIRCREST FIRCREST COMMUNITY CENTER ADDITION CONCEPT MARCH 17 2016 CENTER PARK EVENTS LAWN TRON WAY PARKING LOT 34 REGULAR STALLS 2 ADA STALLS COMMUNITY CENTER ROY H. MURPHY COMMUNITY CENTER AND

More information

Park Board Chair and Commissioners

Park Board Chair and Commissioners TO: FROM: Park Board Chair and Commissioners November 23, 2016 General Manager Vancouver Board of Parks and Recreation SUBJECT: Stanley Park Brewing at the Fish House Proposed Design and Lease Agreement

More information

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PROPOSED PASSENGER FACILITY CHARGE APPLICATION NOVEMBER 9 TH, 2018

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PROPOSED PASSENGER FACILITY CHARGE APPLICATION NOVEMBER 9 TH, 2018 NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PROPOSED PASSENGER FACILITY CHARGE APPLICATION NOVEMBER 9 TH, 2018 LAWTON-FORT SILL REGIONAL AIRPORT LAWTON, OKLAHOMA PASSENGER FACILITY CHARGE PROPOSED

More information

Lethbridge Exhibition Park. Presentation to Finance Committee Development Plan

Lethbridge Exhibition Park. Presentation to Finance Committee Development Plan Lethbridge Exhibition Park Presentation to Finance Committee Development Plan How We Got Here Review Joint Committee City of Lethbridge & Lethbridge & District Exhibition (2009-2012) Financial Review Facility

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: March 26, 2014 SUBJECT: KENNEDY INTERCHANGE STATION: METROLINX EGLINTON CROSSTOWN LIGHT RAIL TRANSIT PROJECT - PRELIMINARY CONCEPT

More information

2017 Appropriation Budget Table of Contents Board Approved August 19, 2016

2017 Appropriation Budget Table of Contents Board Approved August 19, 2016 INDIANAPOLIS AIRPORT AUTHORITY 2017 APPROPRIATION BUDGET ORDINANCE NO. 2-2016 BOARD APPROVED AUGUST 19, 2016 2017 Appropriation Budget Table of Contents Board Approved August 19, 2016 1 Appropriation Summary

More information

San Francisco International Terminal 3 /Boarding Area E San Francisco International Airport Civic Design Review Informational Package.

San Francisco International Terminal 3 /Boarding Area E San Francisco International Airport Civic Design Review Informational Package. San Francisco International Terminal 3 /Boarding Area E San Francisco International Airport Civic Design Review Informational Package Terminal 1 March, 2012 Civic Design Review_Schematic Design June 10,

More information

FINEST STAGE NEW ORLEANS NEW ORLEANS

FINEST STAGE NEW ORLEANS NEW ORLEANS FINEST STAGE L ocated on the threshold of one of America s most exciting cities, the Smoothie King Center has taken its place as the number one entertainment and sports venue in the region. Adjacent to

More information

Love Field Modernization Program Update: Master Planning Recommendations

Love Field Modernization Program Update: Master Planning Recommendations Love Field Modernization Program Update: Master Planning Recommendations Briefing to the Council Transportation and Environment Committee April 28, 2008 1 1 Briefing Objective Discuss the background and

More information

Klarman Hall & G2 Pavilion

Klarman Hall & G2 Pavilion Klarman Hall & G2 Pavilion Harvard Business School September 15, 2015 Maximize Convening Power of HBS Burden Hall Replacement 2 PROJECT INTRODUCTION The IMP included the HBS Burden Hall Replacement project,

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: November 18, 2013 SUBJECT: YONGE-EGLINTON AND EGLINTON WEST INTERCHANGE STATIONS METROLINX EGLINTON CROSSTOWN LIGHT RAIL TRANSIT PROJECT

More information

Central Beach Entertainment District. Public Engagement Workshop March 15, 2018

Central Beach Entertainment District. Public Engagement Workshop March 15, 2018 Central Beach Entertainment District Public Engagement Workshop March 15, 2018 Resolution Adopted by City Council 2/20/18 hold a public input session in the coming weeks at the Convention Center, similar

More information

REAL ESTATE TRANSACTION ADVISORY SERVICES

REAL ESTATE TRANSACTION ADVISORY SERVICES REAL ESTATE TRANSACTION ADVISORY SERVICES Improving Performance and Value of Amtrak-owned Assets AMTRAK STATION DEVELOPMENT 1 New York Penn Station Moynihan Train Hall Philadelphia 30 th Street Station

More information

tt1ll rati;a Ocala International Airport General Aviation Charrette TECHNICAL MEMORANDUM February 28, 2017 Submitted to: Ocala International Airport

tt1ll rati;a Ocala International Airport General Aviation Charrette TECHNICAL MEMORANDUM February 28, 2017 Submitted to: Ocala International Airport TECHNICAL MEMORANDUM Ocala International Airport General Aviation Charrette February 28, 2017 Submitted to: Ocala International Airport Submitted by: Michael Baker International Quest Corporation of America,

More information

SALISBURY NHS FOUNDATION TRUST

SALISBURY NHS FOUNDATION TRUST SALISBURY NHS FOUNDATION TRUST PAPER SFT 1868 TITLE CAPITAL DEVELOPMENT REPORT TO THE TRUST BOARD FOR THE PERIOD FEBRUARY 2008 MAY 2008 PURPOSE OF PAPER The purpose of this paper is to up-date the Board

More information

Implications of Construction Cost Escalation

Implications of Construction Cost Escalation Implications of Construction Cost Escalation 2007 ACI-NA Economics and Finance Conference James Gill, CPA Deputy Airport Director Finance, Business & Administration Raleigh-Durham Airport Authority Presentation

More information

RANCHO CIENEGA SPORTS COMPLEX

RANCHO CIENEGA SPORTS COMPLEX OCTOBER 21, 2015 VOLUNTEER NEIGHBORHOOD OVERSITE COMMITTEE DESIGN DATE SCHEMATIC DESIGN PHASE TICKET OFFICE CUSTODIAL SHOWER (W) TOILETS (M/W) STORAGE STAIRS STAIR TOILET (W) OFFICE GYM ADMIN BLEACHERS

More information

Financing Infrastructure: Working with your Users. Julie Garg Manager Airport & ATC Charges

Financing Infrastructure: Working with your Users. Julie Garg Manager Airport & ATC Charges Financing Infrastructure: Working with your Users Julie Garg Manager Airport & ATC Charges International Air Transport Association, who are we? Our VISION : To be the provider of global leadership and

More information

Capital Projects Funds

Capital Projects Funds Capital Projects Funds Adopted Adopted Actuals Budget Actuals Budget REVENUES 2016-2017 2017-2018 2017-2018 2018-2019 State sources CO&DS distributed to district $ 590,527 $ 494,812 $ 586,059 $ 494,812

More information

Director, Community Planning, Toronto and East York District

Director, Community Planning, Toronto and East York District STAFF REPORT October 25, 2005 To: From: : Subject: Toronto and East York Community Council Director, Community Planning, Toronto and East York District Status Report OPA & Rezoning Application 05 117524

More information

KANSAS CITY INTERNATIONAL AIRPORT NEW TERMINAL DESIGN UPDATE 24 JANUARY 2019 MICHELLE AND ASSOCIATES 3T DESIGN & DEVELOPMENT

KANSAS CITY INTERNATIONAL AIRPORT NEW TERMINAL DESIGN UPDATE 24 JANUARY 2019 MICHELLE AND ASSOCIATES 3T DESIGN & DEVELOPMENT KANSAS CITY INTERNATIONAL AIRPORT NEW TERMINAL MICHELLE AND ASSOCIATES DESIGN UPDATE 24 JANUARY 2019 3T DESIGN & DEVELOPMENT AMENITIES DESIGN GOALS 1 CONCESSIONS Providing convenient and varied food &

More information

Cambridge Avenue. Cleveland Avenue. Chicago Avenue. Chicago Avenue. Curbed planters with groundcover,

Cambridge Avenue. Cleveland Avenue. Chicago Avenue. Chicago Avenue. Curbed planters with groundcover, THE HUDSON 1'-8" 1'-8" 4'-0"4'-3 4'-0"4'-3 1/2" 1/2" Street Street trees trees in in tree tree grates grates along along Kingsbury Kingsbury Street Street - - 3" 3" caliper caliper shade shade trees trees

More information

FIRE Equipment Fire Training Equipment 105, , Total of Equipment 105, ,

FIRE Equipment Fire Training Equipment 105, , Total of Equipment 105, , FIRE Equipment Fire Training Equipment 105,000-105,000 - - - - - - - - - - Total of Equipment 105,000-105,000 - - - - - - - - - - Fire Apparatus Aerial Ladder Replacement 5,320,000 1,120,000 - - 1,400,000

More information

China Creek North Park Upgrades and Glen Pump Station. Park Board Committee Meeting Monday, July 10, 2017

China Creek North Park Upgrades and Glen Pump Station. Park Board Committee Meeting Monday, July 10, 2017 China Creek North Park Upgrades and Glen Pump Station Park Board Committee Meeting Monday, July 10, 2017 Purpose The purpose of this presentation is to: Share the results of the public engagement processes;

More information

Alpharetta Conference Center The Hotel at Avalon City Council Project Update November 7, 2016 AGENDA

Alpharetta Conference Center The Hotel at Avalon City Council Project Update November 7, 2016 AGENDA Alpharetta Conference Center The Hotel at Avalon City Council Project Update November 7, 2016 AGENDA A. Project Update: 1. Status Update: 1. Project Costs to Date 10/31/2016 2. Complete Plans & Specs Issued

More information

BRUNSWICK'S BOWLING 350 MCHENRY ROAD, BUFFALO GROVE, IL

BRUNSWICK'S BOWLING 350 MCHENRY ROAD, BUFFALO GROVE, IL EXHIBIT C 7 6 4 2 7 5 8 1 5 7 6 4 2 8 9 1 1 CULTURED STONE COLUMN BASE 4 NEW PORCELAIN TILE FINISH 7 NEW METAL SIDING 2 EXISTING PAINTED METAL STANDING SEAM ROOF 5 NEW LIGHT FIXTURES 8 NEW TRELLIS WITH

More information

RNO Master Plan Approved Alternatives, Financial Analysis, and Facilities Implementation Plan

RNO Master Plan Approved Alternatives, Financial Analysis, and Facilities Implementation Plan RNO Master Plan Approved Alternatives, Financial Analysis, and Facilities Implementation Plan Project Schedule Today Slide 40 Project Vision To provide an achievable, flexible, fiscally, and environmentally

More information

Tampa International Airport Master Plan Update. December 12, 2012

Tampa International Airport Master Plan Update. December 12, 2012 Tampa International Airport Master Plan Update December 12, 2012 1 Prior Presentation Consolidated rental car and people mover Decongest curbsides and roadways Enable rental car growth Gain long term parking

More information

OFFICIAL GUIDE LAS VEGAS CASHMAN CENTER. VegasMeansBusiness.com

OFFICIAL GUIDE LAS VEGAS CASHMAN CENTER. VegasMeansBusiness.com OFFICIAL GUIDE LAS VEGAS CASHMAN CENTER VegasMeansBusiness.com PRESENTING CASHMAN CENTER We d like to introduce you to the affordable and flexible alternative for your next meeting or event: Cashman Center,

More information

Capital Five-Year Fiscal Forecast

Capital Five-Year Fiscal Forecast Capital Five-Year Fiscal Forecast Budget Forecast Forecast Forecast Forecast REVENUES 2016-2017 2017-2018 2018-2019 2019-2020 2020-2021 State sources: CO&DS distributed to district $ 310,000 $ 310,000

More information

Wyoming Valley Airport Proposed Improvements. Presented June 26, 2012 By The WBW Airport Advisory Board & FBO

Wyoming Valley Airport Proposed Improvements. Presented June 26, 2012 By The WBW Airport Advisory Board & FBO Wyoming Valley Airport Proposed Improvements Presented June 26, 2012 By The WBW Airport Advisory Board & FBO Contents Purpose of meeting Airport overview Background of proposed improvements SWOT analysis

More information

INFORMATION PAPER TO THE STRATEGIC DEVELOPMENT COMMITTEE

INFORMATION PAPER TO THE STRATEGIC DEVELOPMENT COMMITTEE INFORMATION PAPER TO THE STRATEGIC DEVELOPMENT COMMITTEE BRIEFING ON RONALD REAGAN WASHINGTON NATIONAL AND WASHINGTON DULLES INTERNATIONAL AIRPORTS CAPITAL CONSTRUCTION PROGRAM APRIL 2015 2015 Use & Lease

More information

Link Union Station (LINK US)

Link Union Station (LINK US) Link Union Station (LINK US) Presentation for LAUS Master Commercial Developer Industry Forum October 13 th 2017 Jeanet Owens, PE Senior Executive Officer Program Management / Regional Rail Project Overview

More information

a new urban landscape class a office & retail district murfreesboro, tennessee

a new urban landscape class a office & retail district murfreesboro, tennessee a new urban landscape class a office & retail district murfreesboro, tennessee Fountains at Gateway Is Open For Business Fountains at Gateway is a new 31-acre Class A multitenant office and retail development

More information

395 Express Lanes Project Update

395 Express Lanes Project Update 395 Express Lanes Project Update Key Dates Milestone Date Limited Notice to Proceed February 2017 Early Works March-June 2017 Full Notice to Proceed July 2017 Preparatory Work Summer 2017 Draft Noise Abatement

More information

EXHIBIT K TERMINAL PROJECT PROCEDURES PHASE I - DEVELOPMENT OF TERMINAL PROGRAM & ALTERNATIVES

EXHIBIT K TERMINAL PROJECT PROCEDURES PHASE I - DEVELOPMENT OF TERMINAL PROGRAM & ALTERNATIVES EXHIBIT K TERMINAL PROJECT PROCEDURES PHASE I - DEVELOPMENT OF TERMINAL PROGRAM & ALTERNATIVES Over the term of the Master Amendment to the Airline Use and Lease Agreement, the Kansas City Aviation Department

More information

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport Executive Summary MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport As a general aviation and commercial service airport, Fort Collins- Loveland Municipal Airport serves as an important niche

More information

Appendix F International Terminal Building Main Terminal Departures Level and Boarding Areas A and G Alternatives Analysis

Appendix F International Terminal Building Main Terminal Departures Level and Boarding Areas A and G Alternatives Analysis Appendix F International Terminal Building Main Terminal Departures Level and Boarding Areas A and G Alternatives Analysis ITB MAIN TERMINAL DEPARTURES LEVEL & BOARDING AREAS A & G ALTERNATIVES ANALYSIS

More information

Purpose of Presentation. Outline of Presentation. Preliminary Design Presentation HIGHTSTOWN MUNICIPAL BUILDING Hightstown, NJ

Purpose of Presentation. Outline of Presentation. Preliminary Design Presentation HIGHTSTOWN MUNICIPAL BUILDING Hightstown, NJ Preliminary Design Presentation HIGHTSTOWN BUILDING Hightstown, NJ September 16, 2013 Eli Goldstein, AIA, PP, LEED Managing Partner, Architects 1 Purpose of Presentation The primary purpose of this Presentation

More information

Energy from Waste and Recycling Facility Trident Park, Cardiff. Planning History. January 2010 SLR Ref: B

Energy from Waste and Recycling Facility Trident Park, Cardiff. Planning History. January 2010 SLR Ref: B Energy from Waste and Recycling Facility Trident Park, Cardiff Planning History January 2010 Ref: 402-0036-0306B Viridor Ltd. i 402/0036/00306B CONTENTS 1.0 INTRODUCTION... 1 2.0 GENERAL HISTORY... 3

More information

Stakeholders Meeting

Stakeholders Meeting Stakeholders Meeting for the Expansion of Runway 9R-27L, Terminal 4 Gate Relocation and Land Acquisition for Runway 9R-27L September 22, 2011 Stakeholders Meeting AGENDA Introduction FLL Airport Improvements

More information

Public Assembly Facilities Tacoma Dome Greater Tacoma Convention & Trade Center Cheney Stadium Pantages Rialto Theater on the Square

Public Assembly Facilities Tacoma Dome Greater Tacoma Convention & Trade Center Cheney Stadium Pantages Rialto Theater on the Square Public Assembly Facilities Tacoma Dome Greater Tacoma Convention & Trade Center Cheney Stadium Pantages Rialto Theater on the Square Mike Combs Director March 30, 2010 1 PAF Budget in Brief 2009/2010 Revenue

More information

Community Park Capital Project. February 6, 2017

Community Park Capital Project. February 6, 2017 Community Park Capital Project February 6, 2017 Construction Budget Estimate Bid Recommended $10,318,690 $7,725,000 Staff Recommended +$1.1M $8,850,000 +$2.6M -$1.47M Pre-Bid Estimate 11/22/2016

More information

TRUCKEE TAHOE AIRPORT DISTRICT BOARD OF DIRECTOR STAFF REPORT

TRUCKEE TAHOE AIRPORT DISTRICT BOARD OF DIRECTOR STAFF REPORT AGENDA ITEM: 11 TRUCKEE TAHOE AIRPORT DISTRICT BOARD OF DIRECTOR STAFF REPORT AGENDA TITLE: MEETING DATE: January 24, 2018 PREPARED BY: NTPUD Agency Partnership Opportunity, Multi-Use Trailhead Access

More information

TREASURE ISLAND FERRY SHELTER & BUS SHELTERS. Arts Commission Civic Design Review APRIL 18, 2016

TREASURE ISLAND FERRY SHELTER & BUS SHELTERS. Arts Commission Civic Design Review APRIL 18, 2016 TREASURE ISLAND FERRY SHELTER & BUS SHELTERS PHASE 3 - CD Arts Commission Civic Design Review APRIL 18, 2016 PHASE 2 COMMENTS/INFORMAL SESSION FOLLOW UP 1. Lighten up the concrete base of the Ferry Shelter

More information

SAN DIEGO CONVENTION CENTER

SAN DIEGO CONVENTION CENTER SAN DIEGO CONVENTION CENTER F L O O R P L A N S VISITSANDIEGO.COM 120517 FLOOR PLANS FRONT STREET FIRST AVENUE GASLAMP QUARTER FIFTH AVENUE WEST HARBOR DRIVE UPPER LEVEL MEETING ROOMS/BALLROOMS/SAILS PAVILION

More information

Salt Lake City International Airport April 23, 2013 Budget Briefing. Page 1

Salt Lake City International Airport April 23, 2013 Budget Briefing. Page 1 Budget Briefing Fiscal Year 2014 Budget Honorable Members of the City Council April 23, 2013 Page 1 FY 2014 Budget Goals and Objectives Develop and implement a plan of execution for the terminal redevelopment

More information

Municipal and Regional District Tax Imposition Bylaw No and Metro Vancouver Letter of Support

Municipal and Regional District Tax Imposition Bylaw No and Metro Vancouver Letter of Support To: From: Re: City of Richmond General Purposes Committee Andrew Nazareth General Manager, Finance and Corporate Services Report to Committee Date: October 11, 2016 File: 08-4150-03-01/2016- Vol01 Municipal

More information

Recreation and Park Commission, Capital Committee. Through: Philip A. Ginsburg, General Manager Dawn Kamalanathan, Capital and Planning Manager

Recreation and Park Commission, Capital Committee. Through: Philip A. Ginsburg, General Manager Dawn Kamalanathan, Capital and Planning Manager Date: May 29, 2013 To: Recreation and Park Commission, Capital Committee Through: Philip A. Ginsburg, General Manager Dawn Kamalanathan, Capital and Planning Manager From: Subject: Mary Hobson, Project

More information

STAFF REPORT ACTION REQUIRED

STAFF REPORT ACTION REQUIRED STAFF REPORT ACTION REQUIRED Proposed Area-Specific Amendment to Chapter 694, Signs, General, with Respect to Ricoh Coliseum and BMO Field and a Portion of Exhibition Place Date: July 23, 2014 To: From:

More information

Facility Information Sheet

Facility Information Sheet Facility Information Sheet Western Financial Place is the premiere recreation and entertainment complex in the East and West Kootenay. The facility hosts a variety of special events throughout the year,

More information

15150 Memorial Drive 155,100 RSF OF OFFICE SPACE AVAILABLE

15150 Memorial Drive 155,100 RSF OF OFFICE SPACE AVAILABLE 15150 Memorial Drive 155,100 RSF OF SPACE AVAILABLE 15150 Memorial Drive is a Class A office building located in the Houston Energy Corridor in Houston, Texas only 3.2 miles east of Beltway 8 with immediate

More information

Public Notice of Opportunity to Comment on Los Angeles World Airports Passenger Facility Charge Application at Los Angeles International Airport

Public Notice of Opportunity to Comment on Los Angeles World Airports Passenger Facility Charge Application at Los Angeles International Airport Re: Public Notice of Opportunity to Comment on Los Angeles World Airports Passenger Facility Charge Application at Los Angeles International Airport Los Angeles World Airports (LAWA) intends to submit

More information

Sport Capital Improvement Plan. Paul Borci Manager, Campus Planning Property & Campus Services

Sport Capital Improvement Plan. Paul Borci Manager, Campus Planning Property & Campus Services Sport Capital Improvement Plan Paul Borci Manager, Campus Planning Property & Campus Services What is SCIP? Property and Campus Services (PCS) in collaboration with Melbourne University Sport (MU Sport)

More information

9 TECHNOLOGY DRIVE, WESTBOROUGH SUBLEASE

9 TECHNOLOGY DRIVE, WESTBOROUGH SUBLEASE 9 TECHNOLOGY DRIVE, WESTBOROUGH SUBLEASE A UNIQUE OPPORTUNITY RIGHT IN THE HEART OF THE SUBURBS 250,000 SF & SUBDIVIDABLE UP TO 25,000 AVAILABLE Q1 2017 1 2 PAGE 02 04 05 06 08 10 12 14 BUILDING HIGHLIGHTS

More information

Pier Enhancements April 6, 2017

Pier Enhancements April 6, 2017 Pier Enhancements April 6, 2017 Pier Enhancement Categories Pier Plaza Improvements Contingency Play Elements Destination Differentiators Water Recreation Zone Furniture, Fixtures & Equipment Transportation

More information

SLC Airport Project Adds New Scope; Teams Scramble to Stay on Schedule

SLC Airport Project Adds New Scope; Teams Scramble to Stay on Schedule SLC Airport Project Adds New Scope; Teams Scramble to Stay on Schedule Two sky bridges will connect the parking garage to the second level of the terminal, while an elevated roadway for depa will access

More information

2014 Evergreen State Fairground Report to Council

2014 Evergreen State Fairground Report to Council 2014 Evergreen State Fairground Report to Council The Fairgrounds, home to equestrian events, youth education, swap meets, car races, guns shows and many community activities was visited by 604,884 people

More information

The 14-Gate Replacement Terminal Project and Protections for Burbank

The 14-Gate Replacement Terminal Project and Protections for Burbank The 14-Gate Replacement Terminal Project and Protections for Burbank UNITED AIRPORT 1934 The Airport Needs A Safer, Modern, and More Convenient Replacement Terminal Why the Airport Needs a Replacement

More information

MELBOURNE AIRPORT AUTHORITY B R I E F REGULAR MEETING of April 27, :30 AM MELBOURNE INTERNATIONAL AIRPORT BOARD ROOM

MELBOURNE AIRPORT AUTHORITY B R I E F REGULAR MEETING of April 27, :30 AM MELBOURNE INTERNATIONAL AIRPORT BOARD ROOM MELBOURNE AIRPORT AUTHORITY B R I E F REGULAR MEETING of April 27, 2011 8:30 AM MELBOURNE INTERNATIONAL AIRPORT BOARD ROOM Pledge of Allegiance ACTION ITEMS APPROVAL OF MINUTES of the Regular Meeting of

More information

Committee. Presentation Outline

Committee. Presentation Outline CW-33-15 11/9/2015 Community and Corporate Services Committee November 10, 2015 1 Presentation Outline Background Vision and Objectives Study Process and Timeline Public and Stakeholder Engagement Organization

More information

VI. ALTERNATIVES TO THE MASTER PLAN C. RENOVATED EAST BUILDING ALTERNATIVE

VI. ALTERNATIVES TO THE MASTER PLAN C. RENOVATED EAST BUILDING ALTERNATIVE VI. ALTERNATIVES TO THE MASTER PLAN C. RENOVATED EAST BUILDING ALTERNATIVE INTRODUCTION The Renovated East Building Alternative would include the continued use of the renovated West Building and the renovation

More information

City of Redding. Redding Police Facility. Enough study! Just do it!

City of Redding. Redding Police Facility. Enough study! Just do it! City of Redding Redding Police Facility City of Redding, 777 Cypress Ave. Redding, CA. 96001 (530) 339-7220 Enough study! Just do it! Background Since 1978 Redding Police Department (RPD) has occupied

More information

MILFORD EVSD. Milford Junior High / High School BOE Worksession

MILFORD EVSD. Milford Junior High / High School BOE Worksession MILFORD EVSD Milford Junior High / High School BOE Worksession 1.28.16 AGENDA Milford JHS/HS Campus Masterplan / Completion of OSFC Program: 1. Junior High School 2. High School 3. Locally Funded Initiatives

More information

554 sq ft AFTERSALES STAFF PARKING - 21 CARS NO

554 sq ft AFTERSALES STAFF PARKING - 21 CARS NO NEW ACCESS ROAD PRE-OWNED DISPLAY - 16 CARS PRE-OWNED DISPLAY - 2 CARS SITE ANALYSIS: 1,-1,99 N.V.R. APPROX. AREA OF SITE: 182,1 ft². ( 16,97.7 m²).19 acres ( 1.69 ha) MER BLEUE ROAD NEW DISPLAY - 28 CARS

More information

RAPID CITY REGIONAL AIRPORT

RAPID CITY REGIONAL AIRPORT RAPID CITY REGIONAL AIRPORT Budget: $16,232,274 Full time Employees: 24 Mission Statement It is the mission of the Rapid City Regional Airport Board to provide safe, efficient, environmentally sensitive,

More information

RESIDENT ENGINEERING, CONSTRUCTION MANAGEMENT & QA/QC SERVICES (CONTINUOUS CONTRACTS FROM

RESIDENT ENGINEERING, CONSTRUCTION MANAGEMENT & QA/QC SERVICES (CONTINUOUS CONTRACTS FROM The Robert B. Balter Company (Balter) has an extensive and continuously active involvement with the expansion of Washington Dulles International Airport (IAD) and Ronald Reagan Washington National Airport

More information

STAFF REPORT FOR ACTION

STAFF REPORT FOR ACTION Insert TTC logo here STAFF REPORT FOR ACTION Hillcrest Complex Property Study Date: November 30, 2016 To: From: TTC Board Chief Executive Officer Summary This report outlines a plan for staff to proceed

More information

Elevating the Upstate

Elevating the Upstate Greenville-Spartanburg Int l Airport Elevating the Upstate SC Economic Developers Association October 12, 2012 Introduction/Presentation Outline Introductions Airport Overview Air Service Terminal Improvement

More information

Chapter 8.0 Implementation Plan

Chapter 8.0 Implementation Plan Chapter 8.0 Implementation Plan 8.1 Introduction This chapter is the culmination of the analytical work accomplished in the previous chapters. The result is a prioritized list of the essential projects.

More information

Media facilities, including press rooms, radio and television booths; Security facilities, including a security command center;

Media facilities, including press rooms, radio and television booths; Security facilities, including a security command center; Major League Soccer Stadium The proposed project would involve the construction of an approximately 25,000-seat outdoor stadium. The stadium would be initially built with seating for 19,621 attendees,

More information

Item # 28. Chief Capital Management Officer Report. November 20, 2008

Item # 28. Chief Capital Management Officer Report. November 20, 2008 Item # 28 Chief Capital Management Officer Report November 20, 2008 1 Metro Gold Line Eastside Extension Project Update November 2008 6 Mile Alignment 1.7 Miles of Tunnel 8 Stations (6 At-grade & 2 Underground)

More information

Executive Summary This document contains the Master Plan for T. F. Green Airport. The goal of a master plan is to provide a framework of potential future airport development in a financially feasible manner,

More information

Spadina Avenue Built Form Study Preliminary Report

Spadina Avenue Built Form Study Preliminary Report STAFF REPORT ACTION REQUIRED Spadina Avenue Built Form Study Preliminary Report Date: July 9, 2014 To: From: Wards: Reference Number: Toronto and East York Community Council Director, Community Planning,

More information

DEVELOPMENT OF TOE MIDFIELD TERMINAL IROJECT CAPACITY ENHANCEMENT REPORT DEPARTMENT OF AVIATION TOM FOERSTER CHAIRMAN BARBARA HAFER COMMISSIONER

DEVELOPMENT OF TOE MIDFIELD TERMINAL IROJECT CAPACITY ENHANCEMENT REPORT DEPARTMENT OF AVIATION TOM FOERSTER CHAIRMAN BARBARA HAFER COMMISSIONER PETE FLAHERTY COMMISSIONER TOM FOERSTER CHAIRMAN DEPARTMENT OF AVIATION BARBARA HAFER COMMISSIONER STEPHEN A. GEORGE DIRECTOR ROOM M 134, TERMINAL BUILDING GREATER PITTSBURGH INTERNATIONAL AIRPORT PITTSBURGH,

More information