1 SOUTH DAKOTA BOARD OF REGENTS Full Board AGENDA ITEM: 14 DATE: October 9-, 13 ****************************************************************************** SUBJECT: South Dakota State University New Football Stadium Facility Program Plan South Dakota State University requests approval of its New Football Stadium Facility Program Plan at an estimated cost of $60,000,000 to $65,000,000. This project was identified in SDSU s 25 Master Plan for Athletic Facilities reviewed by the Board in October. The Board approved SDSU s Preliminary Facility Statement for the new football stadium in June 11. The building committee met in September 13 and authorized the selection process for a Construction Manager at Risk for the project so better cost estimates could be developed. All costs to date were to come from private funds. The new 18,000 seat stadium will be constructed on the existing Coughlin Alumni Stadium site and will require phasing so that the existing stadium remains operational during construction of the new facilities. The new stadium will cover approximately 277,000 square feet of space. This includes 5,000 square feet of grandstand space, 62,000 square feet of enclosed seating areas, suites, and related club areas, 1,000 square feet of restroom, concession, press box, retail, support, and locker facility space. The footprint of the new stadium will be larger than the current stadium. Seating will be distributed along the west, south and east sides of the field. The west side of the stadium will encroach on the existing parking lot. The east side of the stadium will encroach on the football practice field east of the current stadium. Entrances to the stadium will be provided on the southwest, southeast and northwest corners of the stadium. An enclosed grade level concourse will direct pedestrian traffic to seating, concessions, restrooms and upper levels. (Continued) ****************************************************************************** RECOMMENDED ACTION OF THE EXECUTIVE DIRECTOR Approve SDSU s Facility Program Plan to move forward with a New Football Stadium project at an estimated cost of $60,000,000 to $65,000,000. Funding for this project will come from the sale of revenue bonds subject to approval of a viable financial plan for $,000,000 debt serviced with revenues from amenity seat agreements, season ticket sales, sponsorships, concessions, and facility use fees. The remaining $,000,000 to $15,000,000 of funds will come from continued sponsorship fund raising and private donations to the SDSU Foundation. The project scope is to include all necessary parking improvements and infrastructure needed to support the facility operations.
2 SDSU New Football Stadium Facility Program Plan October 9-, 13 Page 2 of 2 The stadium bowl will concentrate club, loge, and enclosed suite seating on the west side of the facility. Reserved seats will be available on both the east and west sides of the stadium. The west concourse will provide access to concessions, restrooms, food service support, a retail store, the University Police Department, ticketing, and game day administrative support spaces. The west concourse will also provide vertical access to club seating, suites, press box facilities, loge access, and upper level access to reserved seating. Fully enclosed concession, restroom, and support facilities will be insulated, heated, and air conditioned. Club facilities and concessions will be provided at an elevated second story level. Suites will be provided at the third story level. Suites are likely to provide outside seating that will also provide weather protection from rain and wind for loge seating. The press facilities and some suite functions will be provided at the fourth story level. Additional project information can be found in SDSU s attached Facility Program Plan document and detailed schematic drawings. Funding for this construction project will be from private donations, sponsorship revenues, and proceeds from revenue bonds. At the current time, a target of $,000,000 in revenue bond sales debt serviced by amenity seat agreements, season ticket sales, sponsorships, concessions, and facility use fees. The remaining $,000,000 to $15,000,000 of funds will come from continued sponsorship fund raising and private donations to the SDSU Foundation. Conversations are being initiated with student leadership on their possible involvement in supporting operations as authorized under Board action approving the Preliminary Facility Statement in June, 11
3 ATTACHMENT I 3 FACILITY PROGRAM PLAN NEW FOOTBALL STADIUM SOUTH DAKOTA STATE UNIVERSITY SDSU requests approval of this Facility Program Plan to continue planning a new Football Stadium that will replace Coughlin Alumni Stadium. The Preliminary Facility Statement (PFS) was approved at the June 11 Board of Regents meeting. This authorized formation of a building committee, selection of a design team, and planning only for schematic design. The Building Committee selected Architecture Incorporated, Crawford Associates (sports facility design consultant), and CH Johnson (financial consultant) in September 11. The Building Committee received a briefing on the project on September 18, 13, and has approved beginning the selection process for a Construction Manager at Risk for the project. A. PROGRAMATIC JUSTIFICATION FOR DISCRETE SPACES: South Dakota State University s plan for continued development of its intercollegiate athletic facilities includes a New Football Stadium as a priority of the future plans. Architecture Incorporated, Crawford Associates, and CH Johnson pursued architectural programming and conceptual schematic design through 11 and into 12. A draft architectural space program, schematic design and a preliminary market assessment and financial pro forma was completed in July 12. SDSU and the design consultants have been engaged in an interactive iterative process of reviewing and revising the conceptual schematic design, the market assessment and the financial pro forma for both construction and operations of the new stadium. SDSU proposes a project to build a new stadium to replace 11,000 seat Coughlin Alumni Stadium. The project will include the following program elements necessary for a modern, contemporary facility, with the amenities expected and required for its financial success. Features of the stadium will include: Seating capacity will be approximately 18,000 seats (mixture of 1,666 reserved seats (suite, club, loge, and alumni club seating), 3,000 compensatory seats, and 13,334 seats for general admission). Seating will be distributed on the west, south, and east sides of the field. The stadium will be designed for future expansion. The reserved seats include approximately 27 enclosed suites including 4 executive suites, 23 communal suites, 156 Loge seats, and 1,128 premium club seats on the west side of the stadium. Restrooms will be provided appropriate to the stadium seating capacity. Restroom facilities will exceed minimum building code requirements and be proportioned for sports facility use, particularly football game program requirements.
4 ATTACHMENT I 4 Concessions appropriate to the stadium seating capacity and combination of general admission seating, reserved seating, and suites. The number of points of sale for concessions will change dramatically. The basis for planning the stadium indicates that one point of sale for approximately 0 general seating spectators and one point for approximately 0 reserved seating spectators should be provided. The points of sale will include fixed and portable concession location points and multiple locations adjacent to or within enclosed suites. The concessions and suites will be supported by kitchen, food distribution, and loading/unloading facilities at the ground level of the stadium. Press and media areas will be required. These include radio and television broadcast spaces, writing press space, coaching observation spaces, telecommunications support, and camera support. Game day support facilities will include first aid space, administrative office areas, ticketing offices, official s locker room, and visiting team locker facilities. Two other program areas will be planned for the stadium. One will be a retail store featuring University spirit goods. Approximately 1,0 sf of space is being allocated within the program for this function. The second will be the University Safety and Security office, including the University Police Department (UPD), which will be relocated from their current location in the Alvilda Maye Sorenson Building to the new stadium. UPD plans to seek accreditation through the International Association of Campus Law Enforcement Administrators (IACLEA). The facilities will be designed to meet evidence holding, interview rooms, office space, squad rooms, and Department of Justice storage requirements appropriate to the accrediting agency. The estimate is for approximately 5,700 sf of space for UPD. The grass football field will be replaced with an artificial turf field with an under-turf drainage field. The existing scoreboard will be relocated to the south, outside the footprint of the south grandstand seating. The existing scoreboard will be relocated south of its current location. General support facilities required for the stadium will include loading dock, general storage, mechanical rooms, electrical & computer rooms, and a circulation concourse. B. GROSS SQUARE FOOTAGE: The facility will include open air concrete grandstand seating of approximately 5,000 sf. Enclosed seating areas, suites, and related club areas will total approximately 62,000 sf. Restroom, concession, press box, retail, support, and locker facilities will total 1,000 sf. The overall facility will cover or enclose approximately 277,000 sf of space. C. SITE ANALYSIS: The new stadium will be constructed on the site of Coughlin Alumni Stadium. The project will require phasing so the existing stadium remains operational during construction of the new facilities. Two potential timetables of the project are possible. A standard approach to phasing the project is estimated to result in completion in a little less than 36 months. The first phase would begin at the end of the 14 football season and would include the construction of the east and south side seating and the west infrastructure for press box and suites. A portion of the west section of the stadium (press box, suites, concourse, and concessions) lies outside the footprint of the existing stadium, so
5 ATTACHMENT I 5 can be constructed immediately, while the existing facility is occupied. The second phase would commence after the conclusion of the 15 football season. The second phase would construct the west side stadia and install the artificial turf field. Under this approach construction would be entirely completed for the opening game of the 16 football season. An accelerated approach would be to initiate the phase one construction (east seating and press box and suites on west side) as early as possible in the spring of 14, with completion of seating on the east side of the stadium prior to the 14 football season. The second phase would begin immediately upon completion of the 14 season and complete the south stands, press box, suites, west stadium, and the new turf field by the beginning of the 15 football season. The footprint of the new stadium will be larger than the current footprint. North Campus Drive, a primary street serving the campus will not require relocation due to the project. The west side of the stadium will encroach on the existing parking lot. The east side of the stadium will encroach on the football practice field east of the current stadium. Utilities serving the existing stadium will be upgraded as needed. A sanitary sewer main crosses the middle of the football field under the stadium. SDSU will examine possible relocation of this sewer main outside of the footprint of the stadium. The water service main serving the Dykhouse Student Athlete Center and the Sanford- Jackrabbit Athletic Complex will be used to serve the fire protection and water service requirements of the New Stadium. The high voltage electrical loop immediately north of the Sanford-Jackrabbit Athletic Complex will be tapped to serve the new stadium. Storm drainage will be managed through direction of building runoff, field surface drainage, and general surface drainage to underground storm sewers west of the existing stadium. Available parking space within a 15 minute walk of the stadium has been analyzed. Adequate parking is available for game day use. The project construction activities are likely to disturb all parking west and northwest of the stadium. Parking for approximately 6 vehicles will be replaced as a component of the scope of the project. As the campus continues to develop, other parking areas will be developed that will also conveniently support stadium use. Geotechnical reports have been completed. The stadia construction will be precast concrete supported by concrete columns and beams or structural steel. The construction manager at risk will assist in conducting a value engineering analysis of seating construction and structural options re: precast concrete stadia vs. steel & aluminum stadia. The concentrated loads from the structure will be supported by concrete spread footings of increased size and thickness. Further analysis of potential building deflection and uniform control of potential building settlement will determine specific sizes and any requirements for soil stabilization. D. DESCRIPTION OF KEY BUILDING FEATURES: The new stadium will be constructed in the same location as Coughlin Alumni Stadium. Existing steel scaffolding type seating on the east side, aluminum bleachers in the south end zone, and precast
6 ATTACHMENT I 6 concrete seating on the west side will be replaced. In the preliminary design phase value engineering of the types of seating will be undertaken to choose the appropriate seating for each side of the facility. The design is a modified bowl of seating with seating on three sides, and an open section in the southwest corner near the primary entrance to the Stadium. Entrances to the stadium will be provided on the southwest, southeast, and northwest corners. The stadium bowl will concentrate club, loge, and enclosed suite seating on the west side of the facility. Reserved seats will be available on both the east and west sides of the stadium. The design includes a grade level enclosed concourse to direct pedestrian traffic to seating, concessions, restrooms, and upper levels. The concourse will be connected to the seating bowl via grade level corridors. The west concourse will provide access to concessions, restrooms, game day support facilities, food service support, a retail store, the University Police Department, ticketing, and game day administrative support spaces. The west concourse will also provide vertical access to club seating, suites, press box facilities, loge access, and upper level access to reserved seating. The east and south concourse will be an exterior concourse providing access to concessions, restrooms, and visiting team locker facilities. The construction of the stadia will be structural steel or concrete columns and framing, and either steel & aluminum or precast concrete stadia. Weather protected framing will be structural steel with bar joists and structural steel decking. Most exterior and interior walls will be constructed of concrete block, with limited use of brick and prefinished metal paneling. Fully enclosed concession, restroom, and support facilities will be insulated, heated, and air conditioned. Club facilities and concessions will be provided at an elevated second story level. Suites will be provided at the third story level. Press facilities and some suite functions will be provided at the fourth story level. Suite are likely to provide outside seating that will also provide weather protection from rain and wind for loge seating. Seating between the yard lines will be chair backed self-rising fixed seats. Bench seating will be provided outside of the yard lines and in the south end zone. The design and rake of the seating stadia will provide unobstructed sight lines throughout with full view of the field from sideline to sideline and full end zone visibility for all seating. ADA and companion seating will be provided at all different types of seating locations (general admission, reserved, loge, and suite). Food preparation facilities will include receiving and storage areas, recycling area, dry storage, walk in freezers & coolers, food service staging, kitchen, dish washing, locker & uniform areas, and chair/table/kiosk storage. Food preparation and storage areas shall have separate vertical service to club and suite level food service venues. Food preparation facilities will be designed for food assembly, plating, and staging. Food preparation, cooking, and cook to serve for concessions and club level will take place off site. Food services to suites may include cook to serve equipment and facilities. Retail facilities will include a team store, portable novelty stands, and general retail storage. Press box and media facilities shall include television broadcast booth, home radio booth, visitor radio booth, internet/web based broadcast booth, public address/score keeper/statistician booth, home &
7 ATTACHMENT I 7 visiting coaches booths, press lounge, press interview space, video production space, electrical service area, and restroom facilities. Media and service access shall be independent of public access. Locker rooms will be provided for visiting teams and officials. Ticketing windows and box office facilities shall be provided for support staff. Administrative support offices will be provided for game day activities. Various spaces will be required for operational support, including custodial, telecommunications, mechanical, electrical, food services, sound system, and stadium lighting. E. ILLUSTRATIVE FLOOR PLANS: The following attachments are included to illustrate the schematic design: o Site Plan o Main Concourse Plan o Club Level Plan o Suite Level Plan o Press Level Plan o Perspective Images F. INITIAL COST ESTIMATES: The schematic cost estimate of the project is in the range of $60 to $65 million. The estimated costs are total project costs and include: o all construction costs, demolition costs, and costs for fixed seating, signage, electronic audio, video, telecommunications, computer systems, sports lighting, parking and utilities; and o soft costs including the professional design and consultant service fees, soil borings and site development, project administration and management, food service equipment, point of sales systems, furnishings and signage. Estimated costs of primary categories of costs that include all items shown above are as follows: o Building Construction - $51,000,000 to $53,000,000 o Parking/Site development - $ 1,0,000 o Furnishings & Equipment - $ 2,000,000 to $ 2,0,000 o Professional Consultants - $ 3,0,000 to $ 4,000,000 o Project Administration - $ 1,0,000 to $ 1,0,000 o Project Contingency - $ 2,000,000 to $ 2,800,000 o Total Project Costs - $61,0,000 to $64,700,000 G. IMPACT TO M&R: The Financial Plan of the stadium will have two distinct but overlapping components; a plan to finance the total project construction (hard and soft costs) of the stadium and a plan to fund operating
8 ATTACHMENT I 8 and maintenance costs. The overarching principles of the plan are to build only what is affordable and to build only what can be operated. At the current market cost of capital, annual operating costs for interest and principle can be reduced approximately $75,000 for each reduction of $1 million in bond sales because of private donations and/or sponsorship revenue. This creates the overlap between the Construction Financial Plan and the Operating Financial Plan. Based on CH Johnson study and report, the annual funding for maintenance and repair/capital renewal funding is estimate to be $2,000. SDSU HEFF M&R allocation is not affected. H. BUDGET FOR ONGOING OPERATIONAL COSTS: Operations and maintenance: For management, custodial, grounds care, and routine maintenance, a minimum of $453,000 should be allocated each year. Utilities: The additional utility expenses are estimated at $160,000. This represents only utility consumption and does not include the costs of utility connections. I. PROPOSED FUNDING SOURCES FOR COSTS OF: 1. CONSTRUCTION Funds for construction will be private donations and sponsorship revenues, and proceeds from revenue bonds. The amount of bonds sold will be a function of final cost estimates with a goal to be as close to $60 million as feasible for total project costs. Private donations and sponsorship revenues plus limited institutional funds will be included for the funding of the construction of the nonstadium space. Sponsorship revenues can be applied against the total construction costs or against the operating costs. Assuming success in achieving a verified cost estimate towards the lower end of the cost estimate range and progress to date in securing donor commitments, revenue bond sales of $ million or less are the target of the plan. Fund raising is in progress, with a check point of mid-november to validate the financial proforma and target for bond sales. Fund raising will continue through approval, design, and stadium construction. The intent is to minimize bond sales by maximizing donations and appropriate sponsorship revenues. 2. ONGOING OPERATIONS & 3. MAINTENANCE AND REPAIR Revenue streams from amenity seat agreements, season tickets sales, sponsorships, concessions, and facility use fees will support ongoing operations, maintenance, and repair costs.
9 ATTACHMENT I 9 Market scope and scale assessment and capacity analysis to forecast annual revenues and the estimated operating pro forma, which includes principle and interest payments, completed to date by financial consultant CH Johnson provides positive indications on the ability to support the O&M and M&R costs of the stadium. Financial consultant CH Johnson is completing analysis of the ability to provide revenue streams from amenity seat agreements, season tickets sales, sponsorships, concessions, facility use fees, etc. Preliminary discussions with prospects for amenity seats have been gone well. Market tests and presales are underway and will be pursued very aggressively through September and October to the beginning of the third week of November. There are target pre-sale commitments by type of inventory (suites, loge seating, club seats and ticket sales) that will guide sales efforts to determine the validity of the market assessment and capacity analysis and associated forecast revenues. This success of these activities will validate the plans and strengthen the operating pro forma and the feasibility of successfully operating the stadium once constructed. In addition to revenues from these sources, the operating pro forma includes revenues from concessions and catering, facility use fee revenues for special events, and advertising revenues. Financial consultant CH Johnson will continue their due diligence providing their rigorous assessment on the operating pro forma during the market test period.
10 SITE PLAN S E ATTACHMENT II T UP E STADIUM SD REVISIONS & B.O.R. PREP August 13 N 6
11 35 CONCOURSE EAST 12,7 SF CONCESSION 1,0 SF 43'-4" 1,0 SF 37 STORAGE 1,4 SF 1,4 SF CONCESSION 1,4 SF GAME DAY SECURITY / FIRE COMMAND 360 SF '-0" 79'-5" 49' 33 ENTRY PLAZA 35'-0" 28 PLAYER & OFFICIALS 0 SF 1,4 SF VISITING TEAM LOCKER 4,800 SF CORRIDOR 160 SF 43'-4" M 1,4 SF LOADING DOCK 3,1 SF 79'-5" 2 21 " 8'-0" 8 SF / CONCESSION 1,4 SF 1,3 SF 59'3 1,2 SF 43'-4" STORAGE 1,690 SF CONCESSION79'-5" 900 SF 79'-5" 0" 1,690 SF CONCESSION 1,0 SF 35'-6 5/8" 1,690 SF 1,3 SF ' STORAGE 1,4 SF B 43'-4" MAIN ENTRY C 1,3 SF D TEAM STORE / HALL OF FAME 1,260 SF 27 R UP TICKETS 1,0 SF 26' ANCILLARY FIRST AID 290 SF 79'-5" Q E 8 SF F G 55' LEGEND 43 '-0" O 27'-0" ADMIN 1,3 SF 59'3 TICKETS? 280 SF 79'-5" ,4 SF CONCESSION 1,4 SF 49' BACK-OF-HOUSE 35'-0" CIRCULATION SF 1,690 SF 35'-0 1/8" 55'-8 1/4" STORAGE 1,690 SF 55'-8 1/4" CONCESSION 900 SF 79 ' / 2" '-6 5/8" SPECTATOR FACILITIES " '-0 CONCOURSE SOUTH 7,490 SF 1,690 SF 76 1,2 SF " '-5 ENTRY PLAZA TENANT SPACE " '-0 41 WEST FACE OFFICES, LOCKERS, BACK-O HOUSE*: 35,980 SQ. FT. *INCL. VISITOR'S LOCKER '-0" 79'-5" P A 77 ATTACHMENT II A ADMIN 2,000 SF 35 CONCOURSE CONCESSION EAST 1,0 SF 12,7 SF 1,4 SF 79 " '-0 S 2" ANCILLARY LOCKER 4,0 SF 54 V CONCOURSE SOUTH 7,490 SF 1/ 27'-0" " '-0 1,0 SF 24 55'-8 1/4" 34 '-0" 55'-8 1/4" 2,0 SF 76 35'-0 1/8" GAME DAY TICKETS? 280 SF UNIVERSITY POLICE 4,790 SF N " '-5 OFFICIALS' TUNNEL 2,0 SF O 27'-0" 79 OFFICIALS LOCKER 890 SF G 1,3 SF MAIN CONCOURSE 19,2 SF B.O.H. CORRIDOR 1,5 SF ENTRY PLAZA '-0" 29 STORAGE 1,0 SF 22 ANCILLARY FIRST AID 290 SF 79'-5" 79'-5" KITCHEN & BACK-OF-HOUSE,4 SF F 27'-0" '-0" 1,000 SF E 55' 39 FIRST AID 4 SF 32' ' MAIN CONCOURSE PLAN HPF FUTURE EXPANSION STADIUM & : 23,0 SQ. FT. SD REVISIONS & B.O.R. PREP WEST TOWER (CLUB August 13& ABOV 77,951 SQ. FT. 7
12 CLUB LEVEL NORTH LOUNGE 2,3 SF FAMILY RR 1 SF CLUB LEVEL CIRCULATION 7,4 SF STOR. 1,3 SF P R 21 M S 48 A.0 V CLUB LOUNGE 15,3 SF A CLUB B.O.H. 1,280 SF GREEN ROOF BELOW B 1,1 SF 58 RESTROOMS 1,1 SF BAR 1,290 SF RESTROOMS 1,1 SF 1,1 SF STOR. 6 SF C CONCIERGE & COATS 8 SF UP 46 CLUB LEVEL SOUTH LOUNGE 2,3 SF 71 D Q LOWER BOWL SEATS - EAST & SOUTH SIDES 59,090 SF E F G LEGEND BACK-OF-HOUSE CIRCULATION CLUB LEVEL CLUB SEATS LOWER BOWL SEATING SPECTATOR FACILITIES CLUB LEVEL PLAN 42 O STADIUM SD REVISIONS & B.O.R. PREP August LOWER B SEATS - EA SOUTH SI 59,090 S 8 ATTACHMENT II 12
13 PARTY SUITE 1 1,2 SF 37 COM. SUITE 1 3 SF 25 COM. SUITE 2 3 SF COM. SUITE 3 3 SF COM. SUITE 5 3 SF COM. SUITE 4 0 SF E F G EXEC. SUITE SF COM. SUITE 11 3 SF COM. SUITE 12 3 SF 24 COM. SUITE 13 3 SF 74 COM. SUITE 14 3 SF S O COM. SUITE 17 0 SF 19 B C COM. SUITE 18 3 SF 41 ATTACHMENT II A COM. SUITE 16 3 SF COM. SUITE 15 3 SF 76 A V 23 EXEC. SUITE SF EXEC. SUITE SF LOGE BOXES 3,590 SF 33 SUITE LOUNGE,970 SF EXEC. SUITE SF 22 COM. SUITE 3 SF COM. SUITE 9 3 SF M COM. SUITE 8 3 SF SUITE LEVEL PLAN COM. SUITE 7 3 SF SUITE LEVEL B.O.H. 900 SF COM. SUITE 6 3 SF 21 D COM. SUITE 19 3 SF COM. SUITE 3 SF 27 P R Q PARTY SUITE 1,0 SF 43 LEGEND BACK-OF-HOUSE 18 LOGE BOXES 13 SUITES STADIUM SD REVISIONS & B.O.R. PREP 76 August 13 75
14 GREEN ROOF BELOW COACH 270 SF AUDIX/FIELD COMMUNICATIONS 280 SF RADIO 270 SF 24 CAMERA 490 SF S B 27 P R 48 C 41 ATTACHMENT II A A.0 77 PRESIDENT SUITE 3,460 SF MEN'S 58 1 SF WOMEN'S 1 SF 54 V 42 WEB 270 SF STORAGE / PANTRY 3 SF O 23 TV 7 SF MAIN SERVER ROOM 470 SF COACH 270 SF 22 RADIO 270 SF PATCH 170 SF G COPY 170 SF STATS & SCOREBOARD 270 SF OFFICIALS 270 SF F RR 1 SF RR 1 SF M E PRESS CORRIDOR CAMERA 0 SF 3,7 SF PRESS LOBBY & LOUNGE 770 SF PRESS WORK RM 1,980 SF PRESS LEVEL PLAN 2 VIDEO PRODUCTION / EDITING / MAIN CONTROL RM 1,1 SF D UP 47 46GREEN Q ROOF BELOW 43 LEGEND BACK-OF-HOUSE 18 35'-0" CIRCULATION 35'-0" 14 PRESS LEVEL SUITES STADIUM SD REVISIONS & B.O.R. PREP 76 August
15 INTERIOR VIEW: CLUB ROOM STADIUM SD REVISIONS & B.O.R. PREP August ATTACHMENT II 15
16 EXTERIOR: SOUTHEAST PERSPECTIVE STADIUM SD REVISIONS & B.O.R. PREP August ATTACHMENT II 16
SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************
SOUTH DAKOTA BOARD OF REGENTS Budget and Finance REVISED AGENDA ITEM: 6 F DATE: December 4-6, 2018 ****************************************************************************** SUBJECT NSU Regional Sports
More informationAgenda Item No. 3.4 AGENDA ITEM BRIEFING
Agenda Item No. 3.4 AGENDA ITEM BRIEFING Submitted by: Billy Hamilton, Executive Vice Chancellor and Chief Financial Officer The Texas A&M University System Subject: Approval to Amend the FY 2016-FY 2020
More informationTHE MISSION. A PUBLIC PROCESS FROM BEGINNING TO END.
THE MISSION. A PUBLIC PROCESS FROM BEGINNING TO END. URBAN DESIGN PRINCIPLES. QUALCOMM STADIUM SITE. I-5 805 15 I-8 DEVELOPMENT PATTERNS. I-5 805 I-I5 I-8 EMBRACE THE RIVER AND PARK SYSTEM. FROM THE MOUNTAINS
More informationAloha Stadium Conceptual Redevelopment Report. April 5, 2017
Aloha Stadium Conceptual Redevelopment Report April 5, 2017 THE HISTORY OF ALOHA STADIUM A Hawaii landmark since 1975 Aloha Stadium has stood for over 40 years and effectively achieved its mission as a
More informationPORT OF SEATTLE MEMORANDUM. COMMISSION AGENDA Item No. 6a ACTION ITEM Date of Meeting August 23, 2016
PORT OF SEATTLE MEMORANDUM COMMISSION AGENDA Item No. 6a ACTION ITEM Date of Meeting August 23, 2016 DATE: TO: FROM: Michael Ehl, Director, Airport Operations Wayne Grotheer, Director, Aviation Project
More informationRoom Finishing s Built-In Counter Consisting of: Cabinets (3), Small Drawers (4) and Sink Metal Lockers (2) Mirror Television (1) Private Restroom
G R E E N R O O M 1 GREEN ROOM #1 rtheast F430-1A 315 Square Feet Carpet Built-In Counter Consisting of: Cabinets (3), Small Drawers (4) and Sink Metal Lockers (2) Mirror Television (1) (4) 20AMP Services
More informationUNLV Campus Improvement Authority Board Review of Stadium Tours, Estimated Building Costs and Proposed Calendar of Events.
UNLV Campus Improvement Authority Board Review of Stadium Tours, Estimated Building Costs and Proposed Calendar of Events April 24, 2014 table of contents 1) TOURS OF TEXAS STADIUMS... 3 2) GENSLER SUN
More informationUNLV Campus Improvement Authority Board Estimated Event Utilization and Financial Projections. May 22, 2014
UNLV Campus Improvement Authority Board Estimated Event Utilization and Financial Projections May 22, 2014 1 CIAB WORK SESSION 2 CIAB WORK SESSION RECAP KEY TAKE-AWAYS: There is a need in the market for
More informationNOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019
NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019 The City of Atlanta is providing an opportunity for public comment until April 25, 2019 related to the
More informationCLIVE ELEMENTARY SCHOOL
CLIVE ELEMENTARY SCHOOL This narrative, in conjunction with the revised cost estimate attached, represents the opinion of the Superintendency and recommendation to the Board of Education for consideration.
More informationCAIRNS RECTANGULAR PITCH STADIUM NEEDS STUDY PART 1 CAIRNS REGIONAL COUNCIL DRAFT REPORT SEPTEMBER 2011
CAIRNS RECTANGULAR PITCH STADIUM NEEDS STUDY PART 1 CAIRNS REGIONAL COUNCIL DRAFT REPORT SEPTEMBER 2011 CAIRNS RECTANGULAR PITCH STADIUM NEEDS STUDY PART 1 Cairns Regional Council September 2011 Coffey
More informationTHE FIRST-EVER SPORTS & ENTERTAINMENT SMART CITY
THE FIRST-EVER SPORTS & ENTERTAINMENT SMART CITY A SMART CITY FOR AMERICA S FAVORITE SPORT + The most inspiring place on earth + A global innovative showroom of next generation: - Products - Services -
More informationCity of Redding Airports
City of Redding Airports Benton Airpark Redding Municipal Airport DEVELOPMENT AND USE GUIDELINES FOR GENERAL AVIATION HANGARS April 7, 2009 PREFACE The City of Redding, as owner of federally obligated
More informationHARP AUTHORITY GATEWAY CENTER BOATHOUSE & CHANNEL EXTENSION TO SANTA FE AVENUE. Pueblo City Council Presentation September 17, 2018
HARP AUTHORITY GATEWAY CENTER BOATHOUSE & CHANNEL EXTENSION TO SANTA FE AVENUE Pueblo City Council Presentation September 17, 2018 PROJECT: 1A HARP Expansion FUNDING 1A Ballot Issue Pueblo County : $3,000,000
More informationBRYAN REGIONAL PARK. Presented by: Burditt Consultants November 13, 2018
BRYAN REGIONAL PARK Presented by: Burditt Consultants November 13, 2018 AGENDA 1. Project Purpose & Mission 2. Project Vision & Goals 3. Stakeholder Feedback 4. Program Overview 5. Phase A Plan Overview
More information9' - 0" Locker Bay 237 SF. Elementary Reception 741 SF. Receptionist 82 SF. Work room 105 SF. In School Suspension 89 SF. Conference room 349 SF
Bu i l d i n g Co mmi t t e e T u e s d a y Au g u s t 1 3, 2 0 1 3 9' - 0" Remove Windows Fire Wall Remove Windows 1 First Floor Plan 1/8" = 1'-0" Locker Bay 237 SF Lobby 393 SF Main Vestibule 227 SF
More informationNEW STADIUM LUXURY SUITES
NEW STADIUM LUXURY SUITES BE A PART OF SAN FRANCISCO 49ERS HISTORY IMAGINE THE REACTION FROM YOUR CLIENTS AND PROSPECTS when you host them in your luxury suite in the most spectacular stadium in the world.
More informationTORONTO TRANSIT COMMISSION REPORT NO.
Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: October 29, 2009 SUBJECT: TORONTO-YORK SPADINA SUBWAY EXTENSION PROJECT STEELES WEST STATION APPROVAL OF CONCEPTUAL DESIGN
More informationCEDAR BAYOU WATER PARK and AQUATIC CENTER Feasibility Study Executive Summary November 15, 2016
CEDAR BAYOU WATER PARK and AQUATIC CENTER Feasibility Study Executive Summary November 15, 2016 INTRODUCTION The Cedar Bayou Parks, LLC project is unique in the US. The combination of the large water park
More informationPioneer Events Center
Planning Workshop for the Concept Design of the Pioneer Events Center Filer, Idaho May 3, 2014 With The Twin Falls County Fair Board and Staff By: Populous Architects / Planners David Forkner ASLA Principal
More informationAlternative Highest & Best Use Analysis Boutique Hotel
Alternative Highest & Best Use Analysis In response to numerous comments received from the public, as well as issues raised by the CCC in the Appeal Staff Report Substantial Issue Determination, the following
More informationThese recommended actions come to the board with the recommendation of Interim President Cauce.
F 11 VII. STANDING COMMITTEES B. Finance and Asset Management Committee Alaska Airlines Signature Partnership RECOMMENDED ACTION These recommended actions come to the board with the recommendation of Interim
More informationEVENT CENTRE / ARENA COMPLEX
EVENT CENTRE / ARENA COMPLEX BUSINESS CASE ANALYSIS PRESENTATION TO COUNCIL JANUARY 14, 2019 PART A: PROJECT RECAP PART B: DETAILED ASSESSMENT OF THE FACILITY OPTIONS PART C: COMPARING THE OPTIONS PART
More informationGALEN CENTER OVERVIEW
OVERVIEW OVERVIEW Galen Center opened its doors on October 21, 2006, realizing a 126-year dream of the USC founders: to strengthen the bond between the University of Southern California and its neighboring
More informationMEDIUM SIZE STADIUM STRATEGY
MEDIUM SIZE STADIUM STRATEGY Approved by City Council on March 12, 2014 This plan is available online at www.edmonton.ca I. Executive Summary... 4 II. Medium Size Stadium Strategy... 5 1. Background...
More informationOVERVIEW ROY H. MURPHY COMMUNITY CENTER AND POOL. May 2016 NEW CENTER PARK NEW POOL
CITY OF FIRCREST FIRCREST COMMUNITY CENTER ADDITION CONCEPT MARCH 17 2016 CENTER PARK EVENTS LAWN TRON WAY PARKING LOT 34 REGULAR STALLS 2 ADA STALLS COMMUNITY CENTER ROY H. MURPHY COMMUNITY CENTER AND
More informationPark Board Chair and Commissioners
TO: FROM: Park Board Chair and Commissioners November 23, 2016 General Manager Vancouver Board of Parks and Recreation SUBJECT: Stanley Park Brewing at the Fish House Proposed Design and Lease Agreement
More informationNOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PROPOSED PASSENGER FACILITY CHARGE APPLICATION NOVEMBER 9 TH, 2018
NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PROPOSED PASSENGER FACILITY CHARGE APPLICATION NOVEMBER 9 TH, 2018 LAWTON-FORT SILL REGIONAL AIRPORT LAWTON, OKLAHOMA PASSENGER FACILITY CHARGE PROPOSED
More informationLethbridge Exhibition Park. Presentation to Finance Committee Development Plan
Lethbridge Exhibition Park Presentation to Finance Committee Development Plan How We Got Here Review Joint Committee City of Lethbridge & Lethbridge & District Exhibition (2009-2012) Financial Review Facility
More informationTORONTO TRANSIT COMMISSION REPORT NO.
Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: March 26, 2014 SUBJECT: KENNEDY INTERCHANGE STATION: METROLINX EGLINTON CROSSTOWN LIGHT RAIL TRANSIT PROJECT - PRELIMINARY CONCEPT
More information2017 Appropriation Budget Table of Contents Board Approved August 19, 2016
INDIANAPOLIS AIRPORT AUTHORITY 2017 APPROPRIATION BUDGET ORDINANCE NO. 2-2016 BOARD APPROVED AUGUST 19, 2016 2017 Appropriation Budget Table of Contents Board Approved August 19, 2016 1 Appropriation Summary
More informationSan Francisco International Terminal 3 /Boarding Area E San Francisco International Airport Civic Design Review Informational Package.
San Francisco International Terminal 3 /Boarding Area E San Francisco International Airport Civic Design Review Informational Package Terminal 1 March, 2012 Civic Design Review_Schematic Design June 10,
More informationFINEST STAGE NEW ORLEANS NEW ORLEANS
FINEST STAGE L ocated on the threshold of one of America s most exciting cities, the Smoothie King Center has taken its place as the number one entertainment and sports venue in the region. Adjacent to
More informationLove Field Modernization Program Update: Master Planning Recommendations
Love Field Modernization Program Update: Master Planning Recommendations Briefing to the Council Transportation and Environment Committee April 28, 2008 1 1 Briefing Objective Discuss the background and
More informationKlarman Hall & G2 Pavilion
Klarman Hall & G2 Pavilion Harvard Business School September 15, 2015 Maximize Convening Power of HBS Burden Hall Replacement 2 PROJECT INTRODUCTION The IMP included the HBS Burden Hall Replacement project,
More informationTORONTO TRANSIT COMMISSION REPORT NO.
Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: November 18, 2013 SUBJECT: YONGE-EGLINTON AND EGLINTON WEST INTERCHANGE STATIONS METROLINX EGLINTON CROSSTOWN LIGHT RAIL TRANSIT PROJECT
More informationCentral Beach Entertainment District. Public Engagement Workshop March 15, 2018
Central Beach Entertainment District Public Engagement Workshop March 15, 2018 Resolution Adopted by City Council 2/20/18 hold a public input session in the coming weeks at the Convention Center, similar
More informationREAL ESTATE TRANSACTION ADVISORY SERVICES
REAL ESTATE TRANSACTION ADVISORY SERVICES Improving Performance and Value of Amtrak-owned Assets AMTRAK STATION DEVELOPMENT 1 New York Penn Station Moynihan Train Hall Philadelphia 30 th Street Station
More informationtt1ll rati;a Ocala International Airport General Aviation Charrette TECHNICAL MEMORANDUM February 28, 2017 Submitted to: Ocala International Airport
TECHNICAL MEMORANDUM Ocala International Airport General Aviation Charrette February 28, 2017 Submitted to: Ocala International Airport Submitted by: Michael Baker International Quest Corporation of America,
More informationSALISBURY NHS FOUNDATION TRUST
SALISBURY NHS FOUNDATION TRUST PAPER SFT 1868 TITLE CAPITAL DEVELOPMENT REPORT TO THE TRUST BOARD FOR THE PERIOD FEBRUARY 2008 MAY 2008 PURPOSE OF PAPER The purpose of this paper is to up-date the Board
More informationImplications of Construction Cost Escalation
Implications of Construction Cost Escalation 2007 ACI-NA Economics and Finance Conference James Gill, CPA Deputy Airport Director Finance, Business & Administration Raleigh-Durham Airport Authority Presentation
More informationRANCHO CIENEGA SPORTS COMPLEX
OCTOBER 21, 2015 VOLUNTEER NEIGHBORHOOD OVERSITE COMMITTEE DESIGN DATE SCHEMATIC DESIGN PHASE TICKET OFFICE CUSTODIAL SHOWER (W) TOILETS (M/W) STORAGE STAIRS STAIR TOILET (W) OFFICE GYM ADMIN BLEACHERS
More informationFinancing Infrastructure: Working with your Users. Julie Garg Manager Airport & ATC Charges
Financing Infrastructure: Working with your Users Julie Garg Manager Airport & ATC Charges International Air Transport Association, who are we? Our VISION : To be the provider of global leadership and
More informationCapital Projects Funds
Capital Projects Funds Adopted Adopted Actuals Budget Actuals Budget REVENUES 2016-2017 2017-2018 2017-2018 2018-2019 State sources CO&DS distributed to district $ 590,527 $ 494,812 $ 586,059 $ 494,812
More informationDirector, Community Planning, Toronto and East York District
STAFF REPORT October 25, 2005 To: From: : Subject: Toronto and East York Community Council Director, Community Planning, Toronto and East York District Status Report OPA & Rezoning Application 05 117524
More informationKANSAS CITY INTERNATIONAL AIRPORT NEW TERMINAL DESIGN UPDATE 24 JANUARY 2019 MICHELLE AND ASSOCIATES 3T DESIGN & DEVELOPMENT
KANSAS CITY INTERNATIONAL AIRPORT NEW TERMINAL MICHELLE AND ASSOCIATES DESIGN UPDATE 24 JANUARY 2019 3T DESIGN & DEVELOPMENT AMENITIES DESIGN GOALS 1 CONCESSIONS Providing convenient and varied food &
More informationCambridge Avenue. Cleveland Avenue. Chicago Avenue. Chicago Avenue. Curbed planters with groundcover,
THE HUDSON 1'-8" 1'-8" 4'-0"4'-3 4'-0"4'-3 1/2" 1/2" Street Street trees trees in in tree tree grates grates along along Kingsbury Kingsbury Street Street - - 3" 3" caliper caliper shade shade trees trees
More informationFIRE Equipment Fire Training Equipment 105, , Total of Equipment 105, ,
FIRE Equipment Fire Training Equipment 105,000-105,000 - - - - - - - - - - Total of Equipment 105,000-105,000 - - - - - - - - - - Fire Apparatus Aerial Ladder Replacement 5,320,000 1,120,000 - - 1,400,000
More informationChina Creek North Park Upgrades and Glen Pump Station. Park Board Committee Meeting Monday, July 10, 2017
China Creek North Park Upgrades and Glen Pump Station Park Board Committee Meeting Monday, July 10, 2017 Purpose The purpose of this presentation is to: Share the results of the public engagement processes;
More informationAlpharetta Conference Center The Hotel at Avalon City Council Project Update November 7, 2016 AGENDA
Alpharetta Conference Center The Hotel at Avalon City Council Project Update November 7, 2016 AGENDA A. Project Update: 1. Status Update: 1. Project Costs to Date 10/31/2016 2. Complete Plans & Specs Issued
More informationBRUNSWICK'S BOWLING 350 MCHENRY ROAD, BUFFALO GROVE, IL
EXHIBIT C 7 6 4 2 7 5 8 1 5 7 6 4 2 8 9 1 1 CULTURED STONE COLUMN BASE 4 NEW PORCELAIN TILE FINISH 7 NEW METAL SIDING 2 EXISTING PAINTED METAL STANDING SEAM ROOF 5 NEW LIGHT FIXTURES 8 NEW TRELLIS WITH
More informationRNO Master Plan Approved Alternatives, Financial Analysis, and Facilities Implementation Plan
RNO Master Plan Approved Alternatives, Financial Analysis, and Facilities Implementation Plan Project Schedule Today Slide 40 Project Vision To provide an achievable, flexible, fiscally, and environmentally
More informationTampa International Airport Master Plan Update. December 12, 2012
Tampa International Airport Master Plan Update December 12, 2012 1 Prior Presentation Consolidated rental car and people mover Decongest curbsides and roadways Enable rental car growth Gain long term parking
More informationOFFICIAL GUIDE LAS VEGAS CASHMAN CENTER. VegasMeansBusiness.com
OFFICIAL GUIDE LAS VEGAS CASHMAN CENTER VegasMeansBusiness.com PRESENTING CASHMAN CENTER We d like to introduce you to the affordable and flexible alternative for your next meeting or event: Cashman Center,
More informationCapital Five-Year Fiscal Forecast
Capital Five-Year Fiscal Forecast Budget Forecast Forecast Forecast Forecast REVENUES 2016-2017 2017-2018 2018-2019 2019-2020 2020-2021 State sources: CO&DS distributed to district $ 310,000 $ 310,000
More informationWyoming Valley Airport Proposed Improvements. Presented June 26, 2012 By The WBW Airport Advisory Board & FBO
Wyoming Valley Airport Proposed Improvements Presented June 26, 2012 By The WBW Airport Advisory Board & FBO Contents Purpose of meeting Airport overview Background of proposed improvements SWOT analysis
More informationINFORMATION PAPER TO THE STRATEGIC DEVELOPMENT COMMITTEE
INFORMATION PAPER TO THE STRATEGIC DEVELOPMENT COMMITTEE BRIEFING ON RONALD REAGAN WASHINGTON NATIONAL AND WASHINGTON DULLES INTERNATIONAL AIRPORTS CAPITAL CONSTRUCTION PROGRAM APRIL 2015 2015 Use & Lease
More informationLink Union Station (LINK US)
Link Union Station (LINK US) Presentation for LAUS Master Commercial Developer Industry Forum October 13 th 2017 Jeanet Owens, PE Senior Executive Officer Program Management / Regional Rail Project Overview
More informationa new urban landscape class a office & retail district murfreesboro, tennessee
a new urban landscape class a office & retail district murfreesboro, tennessee Fountains at Gateway Is Open For Business Fountains at Gateway is a new 31-acre Class A multitenant office and retail development
More information395 Express Lanes Project Update
395 Express Lanes Project Update Key Dates Milestone Date Limited Notice to Proceed February 2017 Early Works March-June 2017 Full Notice to Proceed July 2017 Preparatory Work Summer 2017 Draft Noise Abatement
More informationEXHIBIT K TERMINAL PROJECT PROCEDURES PHASE I - DEVELOPMENT OF TERMINAL PROGRAM & ALTERNATIVES
EXHIBIT K TERMINAL PROJECT PROCEDURES PHASE I - DEVELOPMENT OF TERMINAL PROGRAM & ALTERNATIVES Over the term of the Master Amendment to the Airline Use and Lease Agreement, the Kansas City Aviation Department
More informationExecutive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport
Executive Summary MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport As a general aviation and commercial service airport, Fort Collins- Loveland Municipal Airport serves as an important niche
More informationAppendix F International Terminal Building Main Terminal Departures Level and Boarding Areas A and G Alternatives Analysis
Appendix F International Terminal Building Main Terminal Departures Level and Boarding Areas A and G Alternatives Analysis ITB MAIN TERMINAL DEPARTURES LEVEL & BOARDING AREAS A & G ALTERNATIVES ANALYSIS
More informationPurpose of Presentation. Outline of Presentation. Preliminary Design Presentation HIGHTSTOWN MUNICIPAL BUILDING Hightstown, NJ
Preliminary Design Presentation HIGHTSTOWN BUILDING Hightstown, NJ September 16, 2013 Eli Goldstein, AIA, PP, LEED Managing Partner, Architects 1 Purpose of Presentation The primary purpose of this Presentation
More informationEnergy from Waste and Recycling Facility Trident Park, Cardiff. Planning History. January 2010 SLR Ref: B
Energy from Waste and Recycling Facility Trident Park, Cardiff Planning History January 2010 Ref: 402-0036-0306B Viridor Ltd. i 402/0036/00306B CONTENTS 1.0 INTRODUCTION... 1 2.0 GENERAL HISTORY... 3
More informationStakeholders Meeting
Stakeholders Meeting for the Expansion of Runway 9R-27L, Terminal 4 Gate Relocation and Land Acquisition for Runway 9R-27L September 22, 2011 Stakeholders Meeting AGENDA Introduction FLL Airport Improvements
More informationPublic Assembly Facilities Tacoma Dome Greater Tacoma Convention & Trade Center Cheney Stadium Pantages Rialto Theater on the Square
Public Assembly Facilities Tacoma Dome Greater Tacoma Convention & Trade Center Cheney Stadium Pantages Rialto Theater on the Square Mike Combs Director March 30, 2010 1 PAF Budget in Brief 2009/2010 Revenue
More informationCommunity Park Capital Project. February 6, 2017
Community Park Capital Project February 6, 2017 Construction Budget Estimate Bid Recommended $10,318,690 $7,725,000 Staff Recommended +$1.1M $8,850,000 +$2.6M -$1.47M Pre-Bid Estimate 11/22/2016
More informationTRUCKEE TAHOE AIRPORT DISTRICT BOARD OF DIRECTOR STAFF REPORT
AGENDA ITEM: 11 TRUCKEE TAHOE AIRPORT DISTRICT BOARD OF DIRECTOR STAFF REPORT AGENDA TITLE: MEETING DATE: January 24, 2018 PREPARED BY: NTPUD Agency Partnership Opportunity, Multi-Use Trailhead Access
More informationTREASURE ISLAND FERRY SHELTER & BUS SHELTERS. Arts Commission Civic Design Review APRIL 18, 2016
TREASURE ISLAND FERRY SHELTER & BUS SHELTERS PHASE 3 - CD Arts Commission Civic Design Review APRIL 18, 2016 PHASE 2 COMMENTS/INFORMAL SESSION FOLLOW UP 1. Lighten up the concrete base of the Ferry Shelter
More informationSAN DIEGO CONVENTION CENTER
SAN DIEGO CONVENTION CENTER F L O O R P L A N S VISITSANDIEGO.COM 120517 FLOOR PLANS FRONT STREET FIRST AVENUE GASLAMP QUARTER FIFTH AVENUE WEST HARBOR DRIVE UPPER LEVEL MEETING ROOMS/BALLROOMS/SAILS PAVILION
More informationSalt Lake City International Airport April 23, 2013 Budget Briefing. Page 1
Budget Briefing Fiscal Year 2014 Budget Honorable Members of the City Council April 23, 2013 Page 1 FY 2014 Budget Goals and Objectives Develop and implement a plan of execution for the terminal redevelopment
More informationMunicipal and Regional District Tax Imposition Bylaw No and Metro Vancouver Letter of Support
To: From: Re: City of Richmond General Purposes Committee Andrew Nazareth General Manager, Finance and Corporate Services Report to Committee Date: October 11, 2016 File: 08-4150-03-01/2016- Vol01 Municipal
More informationRecreation and Park Commission, Capital Committee. Through: Philip A. Ginsburg, General Manager Dawn Kamalanathan, Capital and Planning Manager
Date: May 29, 2013 To: Recreation and Park Commission, Capital Committee Through: Philip A. Ginsburg, General Manager Dawn Kamalanathan, Capital and Planning Manager From: Subject: Mary Hobson, Project
More informationSTAFF REPORT ACTION REQUIRED
STAFF REPORT ACTION REQUIRED Proposed Area-Specific Amendment to Chapter 694, Signs, General, with Respect to Ricoh Coliseum and BMO Field and a Portion of Exhibition Place Date: July 23, 2014 To: From:
More informationFacility Information Sheet
Facility Information Sheet Western Financial Place is the premiere recreation and entertainment complex in the East and West Kootenay. The facility hosts a variety of special events throughout the year,
More information15150 Memorial Drive 155,100 RSF OF OFFICE SPACE AVAILABLE
15150 Memorial Drive 155,100 RSF OF SPACE AVAILABLE 15150 Memorial Drive is a Class A office building located in the Houston Energy Corridor in Houston, Texas only 3.2 miles east of Beltway 8 with immediate
More informationPublic Notice of Opportunity to Comment on Los Angeles World Airports Passenger Facility Charge Application at Los Angeles International Airport
Re: Public Notice of Opportunity to Comment on Los Angeles World Airports Passenger Facility Charge Application at Los Angeles International Airport Los Angeles World Airports (LAWA) intends to submit
More informationSport Capital Improvement Plan. Paul Borci Manager, Campus Planning Property & Campus Services
Sport Capital Improvement Plan Paul Borci Manager, Campus Planning Property & Campus Services What is SCIP? Property and Campus Services (PCS) in collaboration with Melbourne University Sport (MU Sport)
More information9 TECHNOLOGY DRIVE, WESTBOROUGH SUBLEASE
9 TECHNOLOGY DRIVE, WESTBOROUGH SUBLEASE A UNIQUE OPPORTUNITY RIGHT IN THE HEART OF THE SUBURBS 250,000 SF & SUBDIVIDABLE UP TO 25,000 AVAILABLE Q1 2017 1 2 PAGE 02 04 05 06 08 10 12 14 BUILDING HIGHLIGHTS
More informationPier Enhancements April 6, 2017
Pier Enhancements April 6, 2017 Pier Enhancement Categories Pier Plaza Improvements Contingency Play Elements Destination Differentiators Water Recreation Zone Furniture, Fixtures & Equipment Transportation
More informationSLC Airport Project Adds New Scope; Teams Scramble to Stay on Schedule
SLC Airport Project Adds New Scope; Teams Scramble to Stay on Schedule Two sky bridges will connect the parking garage to the second level of the terminal, while an elevated roadway for depa will access
More information2014 Evergreen State Fairground Report to Council
2014 Evergreen State Fairground Report to Council The Fairgrounds, home to equestrian events, youth education, swap meets, car races, guns shows and many community activities was visited by 604,884 people
More informationThe 14-Gate Replacement Terminal Project and Protections for Burbank
The 14-Gate Replacement Terminal Project and Protections for Burbank UNITED AIRPORT 1934 The Airport Needs A Safer, Modern, and More Convenient Replacement Terminal Why the Airport Needs a Replacement
More informationMELBOURNE AIRPORT AUTHORITY B R I E F REGULAR MEETING of April 27, :30 AM MELBOURNE INTERNATIONAL AIRPORT BOARD ROOM
MELBOURNE AIRPORT AUTHORITY B R I E F REGULAR MEETING of April 27, 2011 8:30 AM MELBOURNE INTERNATIONAL AIRPORT BOARD ROOM Pledge of Allegiance ACTION ITEMS APPROVAL OF MINUTES of the Regular Meeting of
More informationCommittee. Presentation Outline
CW-33-15 11/9/2015 Community and Corporate Services Committee November 10, 2015 1 Presentation Outline Background Vision and Objectives Study Process and Timeline Public and Stakeholder Engagement Organization
More informationVI. ALTERNATIVES TO THE MASTER PLAN C. RENOVATED EAST BUILDING ALTERNATIVE
VI. ALTERNATIVES TO THE MASTER PLAN C. RENOVATED EAST BUILDING ALTERNATIVE INTRODUCTION The Renovated East Building Alternative would include the continued use of the renovated West Building and the renovation
More informationCity of Redding. Redding Police Facility. Enough study! Just do it!
City of Redding Redding Police Facility City of Redding, 777 Cypress Ave. Redding, CA. 96001 (530) 339-7220 Enough study! Just do it! Background Since 1978 Redding Police Department (RPD) has occupied
More informationMILFORD EVSD. Milford Junior High / High School BOE Worksession
MILFORD EVSD Milford Junior High / High School BOE Worksession 1.28.16 AGENDA Milford JHS/HS Campus Masterplan / Completion of OSFC Program: 1. Junior High School 2. High School 3. Locally Funded Initiatives
More information554 sq ft AFTERSALES STAFF PARKING - 21 CARS NO
NEW ACCESS ROAD PRE-OWNED DISPLAY - 16 CARS PRE-OWNED DISPLAY - 2 CARS SITE ANALYSIS: 1,-1,99 N.V.R. APPROX. AREA OF SITE: 182,1 ft². ( 16,97.7 m²).19 acres ( 1.69 ha) MER BLEUE ROAD NEW DISPLAY - 28 CARS
More informationRAPID CITY REGIONAL AIRPORT
RAPID CITY REGIONAL AIRPORT Budget: $16,232,274 Full time Employees: 24 Mission Statement It is the mission of the Rapid City Regional Airport Board to provide safe, efficient, environmentally sensitive,
More informationRESIDENT ENGINEERING, CONSTRUCTION MANAGEMENT & QA/QC SERVICES (CONTINUOUS CONTRACTS FROM
The Robert B. Balter Company (Balter) has an extensive and continuously active involvement with the expansion of Washington Dulles International Airport (IAD) and Ronald Reagan Washington National Airport
More informationSTAFF REPORT FOR ACTION
Insert TTC logo here STAFF REPORT FOR ACTION Hillcrest Complex Property Study Date: November 30, 2016 To: From: TTC Board Chief Executive Officer Summary This report outlines a plan for staff to proceed
More informationElevating the Upstate
Greenville-Spartanburg Int l Airport Elevating the Upstate SC Economic Developers Association October 12, 2012 Introduction/Presentation Outline Introductions Airport Overview Air Service Terminal Improvement
More informationChapter 8.0 Implementation Plan
Chapter 8.0 Implementation Plan 8.1 Introduction This chapter is the culmination of the analytical work accomplished in the previous chapters. The result is a prioritized list of the essential projects.
More informationMedia facilities, including press rooms, radio and television booths; Security facilities, including a security command center;
Major League Soccer Stadium The proposed project would involve the construction of an approximately 25,000-seat outdoor stadium. The stadium would be initially built with seating for 19,621 attendees,
More informationItem # 28. Chief Capital Management Officer Report. November 20, 2008
Item # 28 Chief Capital Management Officer Report November 20, 2008 1 Metro Gold Line Eastside Extension Project Update November 2008 6 Mile Alignment 1.7 Miles of Tunnel 8 Stations (6 At-grade & 2 Underground)
More informationExecutive Summary This document contains the Master Plan for T. F. Green Airport. The goal of a master plan is to provide a framework of potential future airport development in a financially feasible manner,
More informationSpadina Avenue Built Form Study Preliminary Report
STAFF REPORT ACTION REQUIRED Spadina Avenue Built Form Study Preliminary Report Date: July 9, 2014 To: From: Wards: Reference Number: Toronto and East York Community Council Director, Community Planning,
More informationDEVELOPMENT OF TOE MIDFIELD TERMINAL IROJECT CAPACITY ENHANCEMENT REPORT DEPARTMENT OF AVIATION TOM FOERSTER CHAIRMAN BARBARA HAFER COMMISSIONER
PETE FLAHERTY COMMISSIONER TOM FOERSTER CHAIRMAN DEPARTMENT OF AVIATION BARBARA HAFER COMMISSIONER STEPHEN A. GEORGE DIRECTOR ROOM M 134, TERMINAL BUILDING GREATER PITTSBURGH INTERNATIONAL AIRPORT PITTSBURGH,
More information