CO 2 Storage Capacity Evaluation in Deep Saline Aquifers for an Industrial Pilot Selection. Methodology and Results of the France Nord Project

Size: px
Start display at page:

Download "CO 2 Storage Capacity Evaluation in Deep Saline Aquifers for an Industrial Pilot Selection. Methodology and Results of the France Nord Project"

Transcription

1 CO 2 Storage Capacity Evaluation in Deep Saline Aquifers for an Industrial Pilot Selection. Methodology and Results of the France Nord Project CLAR CO 2-14 Janvier 2015

2 France Nord Project > Joint Industry Project Funded by ADEME (French Environment and Energy Management Agency) 4 public research institutes 7 industrial partners > Main goals Feasibility of CCS in the Northern part of Paris Basin (France) This presentation is reviewing the main findings concerning the CO 2 storage evaluations. Qualify, on the basis of available data a site to store at least 200Mt of CO 2 in the deep saline aquifers of the Paris Basin.

3 Aquifer selection > In the Paris Basin Geographical extension and petrophysical properties for storing large volumes of CO 2 Deeper than 1000 meters Aquifer has to be undrinkable and unsuitable for agricultural use (salinity > 10 g/l) No conflict with other (potential) activity 3 stratigraphics targets : Buntsandstein sandstones Keuper fm. (Donnemarie, Chaunoy, Boissy) Dogger limestones (Bathonian + Callovian)

4 Regional modeling (basin scale) > Objectives : Select one or more sites with at least 200Mt CO 2 storage capacity. > 3 regional models Buntsandstein (BRGM) Keuper (IFP-EN) Dogger (BRGM) - with a common structural scheme, - from available data, - petrophysical filling at basin scale - definition of the boundary conditions of aquifers - selection of suitable injection sites During this phase of the project, 5 sites with a 200 Mt CO2 potential storage capacity were identified. 3 site were subject to a more detailed modeling (Storengy)

5 Buntsandstein Regional modeling > Static modeling model size : 200 km x 200 km 3 zones / 10 layers cells size : 2000 x 2000 m cells 4 properties : Porosity Permeability Temperature Salinity

6 Mt de CO2 Buntsandstein Regional modeling > Injection simulations 4 wells distance between wells : 30km 202 Mt injected in 50 years mainly in the upper zone (Grès à Voltzia) CO 2 injecte par Faciès GVZ CPCI GVG Années

7 Buntsandstein Regional modeling > Post injection - overpressure 15 years 30 years 150 years 300 years

8 Buntsandstein Regional modeling > Post injection - gas saturation 300 years 1500 years after 1500 years, lateral migration of CO2 : 65km in the freshwater area along Seycheprey fault.

9 Buntsandstein Site modeling > Optimisation of the gridding arround injection wells along the Secheprey fault > Review of the petrophysics permeability capillary pressure (Pc) > Optimisation of the wells location Storage potential reassessed to 133Mt Confirmation of CO 2 migration in the freshwater area

10 Buntsandstein Site modeling > Alternative case Injection west of the Marne fault Water injection east of the fault 23 wells (5 CO 2 injectors, 10 brine producers and 8 brine injectors) Storage potential : 87.5 Mt Necessity to produce brine to keep reasonnable pressure in the reservoir.

11 Keuper Regional modeling > Static modeling model size : 400km x 520 km 8 zones cells size : 4000 x 4000 m cells Rhétien marin Boissy sup. & Inf. Chalain Argiles inférieur intermédiaire Donnemarie s Chaunoy Buntsandstein

12 Keuper Regional modeling > Static modeling 3 properties : Porosity Permeability Effective thickness Chaunoy Chaunoy Chaunoy

13 Keuper Regional modeling > Injection simulations 2 area of interest : Keuper Nord Keuper Sud Keuper Nord : 6 wells necessary to inject 200 Mt of CO 2 in 50 years. Keuper Sud: SW of the area, 1 well can be sufficient to inject 200 Mt of CO 2 in 50 years.

14 Keuper Regional modeling > Post injection, Example of Keuper Sud with 4 wells 1050 years overpressure

15 Keuper Regional modeling > Post injection, Example of Keuper Sud with 4 wells 50 years gas saturation 1050 years

16 Keuper Sud Site modeling > Refinement of the model 3,98 Boissy sup. Vertical layering from 8 to 28 layers, 2,07 New constraints on the structural scheme, Petrophysical analysis 38,76 from cores, logs and production test. Modèle IFP Modèle IFP STORENGY STORENGY Hu moyen Hu moyen Unités v #1 Layering Unités proposé v #1 Layering proposé modèle local Hu moyen modèle local 0 Rhétien marin 0 argiles Rhétien supérieurs marin argiles argiles supérieurs supérieurs (couverture) argiles supérieurs (couvertu 0 Boissy sup / Chalain Sup Chalain Boissy Supérieur sup / Chalain (Argiles Sup et chenaux Chalain mal Supérieur connectés) (Argiles et 0,34 chenaux m 3,98 Boissy sup. Boissy Inf / Chalain Moy Chalain Boissy Moyen Inf / Chalain sup (Argiles Moy et chenaux Chalain Moyen mal connectés) sup (Argiles et 2,69 chenaux Boissy inf. Boissy inf. 2,07 Chalain Moyen inf (Argiles ) Chalain Moyen inf 0(Argile Chalain Inf Chalain Chalain Inférieur Inf (Argiles et chenaux Chalain mal Inférieur connectés) (Argiles et chenaux 2,74 m 0 Chalain inf. 0 Chalain Chalain Couv. inf. Chalain Couv. Chalain Couv. Chalain Couv. 0 Dolomie Dolomie Dolomie (réservoir) Dolomie (réservoir) 4,82 Couverture CCS ou absence couverture Couverture CCS ou absence 0 cou Chaunoy Marnes IS Chailly Chaunoy chaunoy Marnes Sup IS Chailly chaunoy Chailly chaunoy Sup Sup (réservoir) Chailly chaunoy Sup 4,28 (réserv Couverture CCM Couverture CCM Couverture CCM Couverture 0CCM 38,76 Chailly chaunoy Moy. Chailly Chailly chaunoy chaunoy Moy. moyen sup (réservoir) Chailly chaunoy moyen 3,02 sup (rés CCMCI CCM inf CCMCI 0 CCM inf 2,2 Couverture CCI Couverture CCI Couverture CCI Couverture 0CCI Chailly chaunoy Inf. Chailly chaunoy Chailly chaunoy Inf. inf. (réservoir) Chailly chaunoy inf. 0,27 (réserv Arg. Interm. Sup. Arg. Interm. Sup. Arg. Interm. Sup. Arg. Interm. 0Sup. Argiles et Grès Argiles AI R1 et Grès AI R1 AI R1 (argiles et grés) intermédiaires intermédiaires AI R1 (argiles 3,06 et grés) 2,68 2,68 AI R2 AI R2 AI R2 (argiles et grés) AI R2 (argiles 2,44 et grés) Arg. Interm. Inf Arg. Interm. Inf Arg. Interm. Inf Arg. Interm. 0Inf Reduction of the net thickness estimation for all layers 40,44 (~2.5 factor) 40,44 0,29 Donnemarie Sommital Donnemarie Donnemarie Sommital Sommital (reservoir) Donnemarie Sommital 7,5 (reser Donnemarie Couv. Donnemarie Sup. Couv. Sup. Couv. Sup. Couv. Sup. 0 Donnemarie Sup. Donnemarie Donnemarie Sup. Sup. (réservoir) Donnemarie Sup. 0,62 (réservo Couv. Moy. Couv. Moy. Couv. Moy. Couv. Moy. 0 Donnemarie Moy. Donnemarie Donnemarie Moy. Moy. (réservoir) Donnemarie Moy. 4,08 (réservo Couv. Inf. Couv. Inf. Couv. Inf. Couv. Inf. 0 Donnemarie Inf. Donnemarie Donnemarie Inf. Inf. (reservoir) Donnemarie Inf. 4,71 (reservo Couv. Couv. Couv. Couv. 0 Buntsandstein (réservoir) Buntsandstein (réservoir Bunt 0,29 Bunt Bunt 7,12 Socle Socle

17 Keuper Sud Site modeling > Injection simulation with the new petrophysical models 1 model with K/Phi laws computed by layers but no facies modeling Storage potential : 140 Mt with 15 wells 1 model with facies integration. K/Phi relationships computed for each facies in each layer. Storage potential : 54 Mt with 15 wells chalain Chailly- Chaunoy Grès Intermédiaires Donnemarie

18 Keuper Nord Site modeling > Refinement of the model Net thickness revisited No advanced geological studies > Injection simulations Storage potential : 40 Mt with 20 wells

19 Dogger Regional modeling > Static modeling model size : 500km x 700 km 7 zones cells size : 5000 x 5000 m cells facies modeling

20 Dogger Regional modeling > 3 K-Phi relationship were investigated > Due to a complex diagenesis history of the Dogger limestones, dual porosity / permeability system occurs (presence of pathways of very high permeability) > As there is no predictive localization of these drains, we are not able to control the evolution of the CO 2 plume and its migration. > Moreover, there is a risk that injection of 200 Mt of CO 2 in the Dogger would impact the geothermal activity. Because of these uncertainties on the Dogger geological properties and the possibility of an interaction with geothermal energy development within this level, this stratigraphic target was discarded.

21 Storage capacity identified Site Potential of injection # of wells Comments Keuper Nord 40 Mt 20 wells Keuper Sud 140 Mt 15 wells Keuper Sud 54 Mt 15 wells Without facies modeling (optimistic case) With facies modeling (pessimistic case) Injection east of the Faille de la Marne. Buntsandstein 157 Mt 21 wells Buntsandstein 87 Mt 23 wells Risk of CO 2 migration towards the drinkable part of the aquifer was considered as too important. Injection west of the Faille de la Marne Aquifer properties significantly degraded compared to the previous case All these result are largely under the objectives of the France Nord project > 21

22 Comparison with previous estimations JOULE II (1996) Projets GESTCO (2003) et EU GEOCAPACITY (2009) France Nord ( ) Traps Traps Total Conservative Flow models Dogger 189 Mt (E=0.18%) 9 Mt (E=0.01%) 4320 Mt (E=6%) 1440 Mt (E=2%) Potential Conflict with geothermal resources Keuper 529 Mt (E=0.18%) 130 Mt (E=0.18%) 4331 Mt (E=6%) 72 Mt (E=0.1%) Mt Buntsandstein Conflict with fresh water 529 Mt (E=0.18%) Mt (E=6%) 5880 Mt (E=2%) ~ 90 Mt Other fm. 91 Mt Mt 530 Mt - TOTAL 809 Mt 668 Mt Mt 7922 Mt Mt > 22

23 Conclusions > The assessment phase of the project has shown that it was not possible to identify a single site to store 200 Mt CO 2. The best identified site is the Keuper Sud site. Its storage capacity ranges between 54 and 140 Mt, with the necessity to drill about 15 injection wells over a large area (about 3000 km 2 ). > The constraint of the acceptable overpressure is the main obstacle to a massive injection of CO 2 in saline aquifers. > Do not take into account this phenomenon leads to an overestimation of storage capacity as shown in comparison with previous capacity estimates. > 23

24 Thank you for your attention Acknowledgements This work has been done within the France Nord project funded by ADEME (French Environment and Energy Management Agency) and industrial partners. The authors also thank all the technical contributors that have enabled to perform this work, namely: T. Fargetton, D. Dequidt, K. Djaouti, F. Delsante, P. Egermann and R. Nabil from Storengy; J.-P. Gely, and R. de Lannoy from GDF SUEZ; S. Gabalda, C. Kervevan C. Chiaberge and M. Gastine from BRGM; J.C. Lecomte, P. Houel, J.M. Daniel, A. Fornel and F. Roggero from IFPEN; D. Pourtoy, L. de Marliave and G. Moutet from Total. The full version of the article is available online at:

Blocking Sea Intrusion in Brackish Karstic Springs

Blocking Sea Intrusion in Brackish Karstic Springs European Water 1/2: 17-23, 3. 3 E.W. Publications Blocking Sea Intrusion in Brackish Karstic Springs The Case of Almiros Spring at Heraklion Crete, Greece A. Maramathas, Z. Maroulis, D. Marinos-Kouris

More information

NORTH CASCADE SLACIER CLIMATE PROJECT Director: Dr. Mauri S. Pelto Department of Environmental Science Nichols College, Dudley MA 01571

NORTH CASCADE SLACIER CLIMATE PROJECT Director: Dr. Mauri S. Pelto Department of Environmental Science Nichols College, Dudley MA 01571 NORTH CASCADE SLACIER CLIMATE PROJECT Director: Dr. Mauri S. Pelto Department of Environmental Science Nichols College, Dudley MA 01571 INTRODUCTION The North Cascade Glacier-Climate Project was founded

More information

EL PASO S DESALINATION EFFORTS

EL PASO S DESALINATION EFFORTS El Paso s Desalination Efforts WATER DESALINATION AND REUSE STRATEGIES FOR NEW MEXICO SEPTEMBER NEW MEXICO WATER RESOURCES RESEARCH INSTITUTE 2004 Bill Hutchison has more than 20 years of experience as

More information

3.0 OVERVIEW OF HUECO BOLSON

3.0 OVERVIEW OF HUECO BOLSON 3.0 OVERVIEW OF HUECO BOLSON The Hueco Bolson covers about 2,500 square miles, or 1.6 million acres in New Mexico, Texas, and Chihuahua (Figure 3-1). In Texas, the Hueco overlies portions of El Paso and

More information

Project Fiche MASTER PLAN FOR DEVELOPMENT OF THE NAUTICAL TOURISM IN THE SAVA RIVER BASIN

Project Fiche MASTER PLAN FOR DEVELOPMENT OF THE NAUTICAL TOURISM IN THE SAVA RIVER BASIN Project Fiche MASTER PLAN FOR DEVELOPMENT OF THE NAUTICAL TOURISM IN THE SAVA RIVER BASIN 1. Basic information 1.1 Title: Master plan 1.2 Location: Sava River Basin which covers Bosnia and Herzegovina,

More information

GEOTHERMAL ENERGY SECTOR IN THE REPUBLIC OF DJIBOUTI

GEOTHERMAL ENERGY SECTOR IN THE REPUBLIC OF DJIBOUTI Republic of Djibouti GEOTHERMAL ENERGY SECTOR IN THE REPUBLIC OF DJIBOUTI General Director of Djiboutian Agency for Geothermal Energy Development ODDEG Mr. Abdou MOHAMED HOUMED Coordination Meeting with

More information

SOME NEW STUDIES IN BINH CHAU GEOTHERMAL AREA, SOUTH VIETNAM

SOME NEW STUDIES IN BINH CHAU GEOTHERMAL AREA, SOUTH VIETNAM SOME NEW STUDIES IN BINH CHAU GEOTHERMAL AREA, SOUTH VIETNAM Nguyen Hong BANG and Nguyen Thac CUONG Division for Water Resources Planning and Investigation for the South of Vietnam 59 Street 2, Binh An

More information

Update on FLOODS in Nigeria

Update on FLOODS in Nigeria EUROPEAN COMMISSION JOINT RESEARCH CENTRE Update on FLOODS in Nigeria JRC Emergency Report #021 Nigeria, 19th of September 2018 Executive Summary The National Emergency Management Agency (NEMA) informs

More information

Flight Testing the Wake Encounter Avoidance and Advisory system: First results

Flight Testing the Wake Encounter Avoidance and Advisory system: First results Flight Testing the Wake Encounter Avoidance and Advisory system: First results Dr. Fethi Abdelmoula, Tobias Bauer DLR Institute of Flight Systems Paris, May 15 th & 16 th, 2013 WakeNet-Europe Workshop

More information

Hydrological study for the operation of Aposelemis reservoir Extended abstract

Hydrological study for the operation of Aposelemis reservoir Extended abstract Hydrological study for the operation of Aposelemis Extended abstract Scope and contents of the study The scope of the study was the analytic and systematic approach of the Aposelemis operation, based on

More information

Platte West Well Field A Protective Modeling Approach

Platte West Well Field A Protective Modeling Approach Platte West Well Field A Protective Modeling Approach Presented to: 2007 Eastern South Dakota Water Conference / 52 nd Annual Midwest Ground Water Conference June 25, 2007 Presented by: Luca DeAngelis,

More information

Performance Criteria for Assessing Airport Expansion Alternatives for the London Region

Performance Criteria for Assessing Airport Expansion Alternatives for the London Region Performance Criteria for Assessing Airport Expansion Alternatives for the London Region Jagoda Egeland International Transport Forum at the OECD TRB Annual Meeting 836 - Measuring Aviation System Performance:

More information

Multi Profile Training Areas. Col Azmi Al Abaddi Royal Jordanian Air Force

Multi Profile Training Areas. Col Azmi Al Abaddi Royal Jordanian Air Force Multi Profile Training Areas Col Azmi Al Abaddi Royal Jordanian Air Force Multi Profile Training Area (MPTA) Col. Azmi Royal Jordanian Air Force Introduction RJAF released (4) military training areas for

More information

Trajectory Based Operations (TBO)

Trajectory Based Operations (TBO) Trajectory Based Operations (TBO) David Batchelor Head of International Affairs, SESAR Joint Undertaking Emerging Technologies Workshop ATC Global, Beijing, 12 September 2016 SESAR SINGLE EUROPEAN SKY

More information

One World Lithium Inc. (OWL) is a lithium exploration company that is a compelling investment opportunity with its Salar del Diablo lithium property:

One World Lithium Inc. (OWL) is a lithium exploration company that is a compelling investment opportunity with its Salar del Diablo lithium property: One World Lithium Inc. (OWL) is a lithium exploration company that is a compelling investment opportunity with its Salar del Diablo lithium property: The Salar del Diablo is a 75,000 hectare lithium property

More information

Flight management during Concordiasi campaign

Flight management during Concordiasi campaign Flight management during Concordiasi campaign By: Sergio SOSA SESMA, Andre VARGAS, Gérard LETRENNE, Arnaud DERAMECOURT and Martin SPEL (from R-Tech) Acknowledgments: the authors are very grateful to CNRS

More information

3. BOREHOLES. Franko GEOTHERMAL ENERGY EXPLORATION IN SLOVAKIA. Ondrej Franko. Institute of Geology, Bratislava

3. BOREHOLES. Franko GEOTHERMAL ENERGY EXPLORATION IN SLOVAKIA. Ondrej Franko. Institute of Geology, Bratislava GEOTHERMAL ENERGY EXPLORATION IN SLOVAKIA Ondrej Dionyz Institute of Geology, Bratislava Key words: geothermal boreholes, debit, temperature, T.D.S., heat power Abstract. Distribution of boreholes after

More information

WEATHER-PROOFING THE NETWORK, A COLLABORATIVE APPROACH

WEATHER-PROOFING THE NETWORK, A COLLABORATIVE APPROACH WEATHER-PROOFING THE NETWORK, A COLLABORATIVE APPROACH Weather assessment in Air France operations Raphael EYROLLE OCC ATM Desk Manager Loic ANDRO OCC Meteorology referent AIR FRANCE OPERATION CONTROL

More information

IMPROVING ATM CAPACITY WITH "DUAL AIRSPACE": A PROOF OF CONCEPT STUDY FOR ASSESSING CONTROLLERS' ACCEPTABILITY

IMPROVING ATM CAPACITY WITH DUAL AIRSPACE: A PROOF OF CONCEPT STUDY FOR ASSESSING CONTROLLERS' ACCEPTABILITY IMPROVING ATM CAPACITY WITH "DUAL AIRSPACE": A PROOF OF CONCEPT STUDY FOR ASSESSING CONTROLLERS' ACCEPTABILITY Jean-Yves GRAU - SynRjy Didier DOHY - NeoSys Laurent GUICHARD EUROCONTROL Sandrine GUIBERT

More information

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis Appendix B ULTIMATE AIRPORT CAPACITY & DELAY SIMULATION MODELING ANALYSIS B TABLE OF CONTENTS EXHIBITS TABLES B.1 Introduction... 1 B.2 Simulation Modeling Assumption and Methodology... 4 B.2.1 Runway

More information

easyjet response to CAA consultation on Gatwick airport market power

easyjet response to CAA consultation on Gatwick airport market power easyjet response to CAA consultation on Gatwick airport market power Introduction easyjet welcomes the work that the CAA has put in to analysing Gatwick s market power. The CAA has made significant progress

More information

Flight Dynamics Analysis of a Medium Range Box Wing Aircraft

Flight Dynamics Analysis of a Medium Range Box Wing Aircraft AERO AIRCRAFT DESIGN AND SYSTEMS GROUP Flight Dynamics Analysis of a Medium Range Box Wing Aircraft Supervisor: Prof. Dieter Scholz Tutor: Daniel Schiktanz Warsaw University of Technology Hamburg University

More information

Swallow House, 10 Swallow Street, Birmingham, B1 1BD

Swallow House, 10 Swallow Street, Birmingham, B1 1BD Committee Date: 20/02/2014 Application Number: 2013/08477/PA Accepted: 29/11/2013 Application Type: Full Planning Target Date: 28/02/2014 Ward: Ladywood Swallow House, 10 Swallow Street, Birmingham, B1

More information

FROM 40 HOURS TO 15 MINUTES, 15 YEARS OF EXPERIENCE WITH CFD

FROM 40 HOURS TO 15 MINUTES, 15 YEARS OF EXPERIENCE WITH CFD FROM 40 HOURS TO 15 MINUTES, 15 YEARS OF EXPERIENCE WITH CFD NORBERT BULTEN WARTSILA PROPULSION THE NETHERLANDS 1 / 15 Wärtsilä 23 March 2011 Doc.ID: Revision: Status: Topics Introduction Wärtsilä Propulsion

More information

EU Report. Europe OCTOBER 2016

EU Report. Europe OCTOBER 2016 H EU Report Europe OCTOR 2016 ANALYSIS OF HOTEL RULTS OCTOR 2016 Slight drop in hotel performances; disparities subsist hoteliers posted a slight drop in results this month. However, disparities remain;

More information

The Past, Present, and Future of Nortek and Glider Measurements

The Past, Present, and Future of Nortek and Glider Measurements The Past, Present, and Future of Nortek and Glider Measurements Peter J. Rusello Scientist Nortek Since 2005, Nortek has collaborated with leading researchers to develop specialized acoustic Doppler current

More information

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub Report to: Greater Cambridge Partnership Joint Assembly 18 January 2018 Lead officer: Chris Tunstall GCP Director of Transport A10 Foxton level crossing bypass and travel hub 1. Purpose 1.1 The list of

More information

THE NETHERLANDS ANTILLES: TRADE AND INTEGRATION WITH CARICOM (REVISITED)

THE NETHERLANDS ANTILLES: TRADE AND INTEGRATION WITH CARICOM (REVISITED) GENERAL LC/CAR/G.763 2 December 2003 ORIGINAL: ENGLISH THE NETHERLANDS ANTILLES: TRADE AND INTEGRATION WITH CARICOM (REVISITED) T a b le o f contents Introduction... 1 Trends in the Netherlands Antilles

More information

THE SAN JUAN RIVER BASIN PROJECT

THE SAN JUAN RIVER BASIN PROJECT Formulation of a Strategic Actions Program for the Integrated Management of the Hydrological Resources and Sustainable Development of the San Juan River Basin and its Coastal zone PROCUENCA SAN JUAN THE

More information

J.M. Marques a, C. Matos b, P.M. Carreira c and M.O. Neves a

J.M. Marques a, C. Matos b, P.M. Carreira c and M.O. Neves a GEOCHEMICAL AND ISOTOPIC TOOLS TO ASSESS CALDAS DA RAINHA THERMOMINERAL WATER SYSTEM ASCRIBED TO A KARST/FISSURED-POROUS ENVIRONMENT (PORTUGAL): A REVIEW J.M. Marques a, C. Matos b, P.M. Carreira c and

More information

Simulation of disturbances and modelling of expected train passenger delays

Simulation of disturbances and modelling of expected train passenger delays Computers in Railways X 521 Simulation of disturbances and modelling of expected train passenger delays A. Landex & O. A. Nielsen Centre for Traffic and Transport, Technical University of Denmark, Denmark

More information

Auckland Port and the Unitary Plan Dr Douglas Fairgray

Auckland Port and the Unitary Plan Dr Douglas Fairgray Auckland Port and the Unitary Plan Dr Douglas Fairgray Source: Auckland 1886 - Sir George Grey Special Collections, Auckland Libraries, NZ Map 374 Scope The interface between the Unitary Plan and the Port

More information

Geothermal cascade use at Geinberg, Austria

Geothermal cascade use at Geinberg, Austria Bulletin d'hydrogt5ologie No 17 (1999) Centre d'hydrogiologie, Universiti de Neuchritel EDITIONS PETER LANG Geothermal cascade use at Geinberg, Austria by *Johann Goldbrunnerl, Robert Bauerl, Andrea Kolb'

More information

OÜ Skamet Reg. Nr Savi 9, Pärnu, Estonia

OÜ Skamet Reg. Nr Savi 9, Pärnu, Estonia OÜ Skamet Reg. Nr 11135000 Savi 9, Pärnu, Estonia +372 440 1000 info@skamet.ee www.skamet.ee ABOUT US Our enterprise OÜ Skamet was established in January 2006, when we bought a former metal manufacturer

More information

Quality Assurance. Introduction Need for quality assurance Answer to the need of quality assurance Details on quality assurance Conclusion A B C D E

Quality Assurance. Introduction Need for quality assurance Answer to the need of quality assurance Details on quality assurance Conclusion A B C D E Quality Assurance 1 A B C D E Introduction Need for quality assurance Answer to the need of quality assurance Details on quality assurance Conclusion 2 1 Introduction 3 Introduction The implementation

More information

DIDYMO SURVEY, LOWER FRYINGPAN RIVER, BASALT, COLORADO 2015

DIDYMO SURVEY, LOWER FRYINGPAN RIVER, BASALT, COLORADO 2015 DIDYMO SURVEY, LOWER FRYINGPAN RIVER, BASALT, COLORADO 2015 Second Annual Report PREPARED FOR: ROARING FORK CONSERVANCY PREPARED BY: COLORADO MOUNTAIN COLLEGE NATURAL RESOURCE MANAGEMENT PROGRAM TIMBERLINE

More information

REMOTELY PILOTED AIRCRAFT SYSTEMS SYMPOSIUM March Detect and Avoid. DI Gerhard LIPPITSCH. ICAO RPAS Panel Detect & Avoid Rapporteur

REMOTELY PILOTED AIRCRAFT SYSTEMS SYMPOSIUM March Detect and Avoid. DI Gerhard LIPPITSCH. ICAO RPAS Panel Detect & Avoid Rapporteur REMOTELY PILOTED AIRCRAFT SYSTEMS SYMPOSIUM 23-25 March 2015 Detect and Avoid DI Gerhard LIPPITSCH ICAO RPAS Panel Detect & Avoid Rapporteur Remotely Piloted Aircraft Systems (RPAS) Symposium, 23 25 March

More information

Thermal efficiency improvement and technology transfer of chimney stove for producing stove; Amphoe Bo Kluea, Nan Province

Thermal efficiency improvement and technology transfer of chimney stove for producing stove; Amphoe Bo Kluea, Nan Province Available online at www.sciencedirect.com Energy Procedia 9 (2011 ) 238 244 9 th Eco-Energy and Materials Science and Engineering Symposium Thermal efficiency improvement and technology transfer of chimney

More information

Sensitivity Analysis for the Integrated Safety Assessment Model (ISAM) John Shortle George Mason University May 28, 2015

Sensitivity Analysis for the Integrated Safety Assessment Model (ISAM) John Shortle George Mason University May 28, 2015 Sensitivity Analysis for the Integrated Safety Assessment Model (ISAM) John Shortle George Mason University May 28, 2015 Acknowledgments Sherry Borener, FAA Alan Durston, Brian Hjelle, Saab Sensis Seungwon

More information

Origin and Extraction of Andean Salars

Origin and Extraction of Andean Salars Think Simulation! Adventures in Electrolytes Origin and Extraction of Andean Salars Lithium and Boron Recovery from Salt brines and Salt flats in Chile and Bolivia http://tunari.tripod.com/landscapes.html

More information

June11, 2012 París, France

June11, 2012 París, France June11, 2012 París, France Content 1 Objectives 2 INEGI and SNIEG 3 Georeferenced indicators Cases Other applications Indicators 2 1. Objective To present the use of applications of territorial indicators

More information

ERASMUS. Strategic deconfliction to benefit SESAR. Rosa Weber & Fabrice Drogoul

ERASMUS. Strategic deconfliction to benefit SESAR. Rosa Weber & Fabrice Drogoul ERASMUS Strategic deconfliction to benefit SESAR Rosa Weber & Fabrice Drogoul Concept presentation ERASMUS: En Route Air Traffic Soft Management Ultimate System TP in Strategic deconfliction Future 4D

More information

PBN AIRSPACE CONCEPT WORKSHOP. SIDs/STARs/HOLDS. Continuous Descent Operations (CDO) ICAO Doc 9931

PBN AIRSPACE CONCEPT WORKSHOP. SIDs/STARs/HOLDS. Continuous Descent Operations (CDO) ICAO Doc 9931 International Civil Aviation Organization PBN AIRSPACE CONCEPT WORKSHOP SIDs/STARs/HOLDS Continuous Descent Operations (CDO) ICAO Doc 9931 Design in context Methodology STEPS TFC Where does the traffic

More information

TACTICAL CRISIS MANAGEMENT SYSTEM CRISISBOX

TACTICAL CRISIS MANAGEMENT SYSTEM CRISISBOX TACTICAL CRISIS MANAGEMENT SYSTEM CRISISBOX We are seeing an increase of the following phenomena : - Meteorological - Technological - Seismic - Contentious In order to help the authorities and regions

More information

Tsunami Survey Results in the NPS and Reproduction Analysis Using Tsunami Inversion

Tsunami Survey Results in the NPS and Reproduction Analysis Using Tsunami Inversion Technical Workshop on the Accident of TEPCO s Fukushima Dai-ichi NPS Tsunami Survey Results in the NPS and Reproduction Analysis Using Tsunami Inversion July 24, 2012 Tomoyuki Tani Agenda 1. Overview of

More information

Falkland Oil and Gas Limited ( FOGL or the Company ) Preliminary Results for the year ended 31 December 2007

Falkland Oil and Gas Limited ( FOGL or the Company ) Preliminary Results for the year ended 31 December 2007 Wednesday 12 March 2008 Falkland Oil and Gas Limited ( FOGL or the Company ) Preliminary Results for the year ended 31 December 2007 FOGL, the oil and gas exploration company focused on its extensive licence

More information

EUROCONTROL and the Airport Package

EUROCONTROL and the Airport Package European Economic and Social Committee Public Hearing Brussels, 20 February 2012 EUROCONTROL and the Airport Package François HUET EUROCONTROL Directorate Single Sky, Performance Review Unit The European

More information

STX France. STX France uses Siemens PLM solutions to enhance passenger comfort by predicting external aerodynamics

STX France. STX France uses Siemens PLM solutions to enhance passenger comfort by predicting external aerodynamics Marine STX France Product Simcenter Fresh air on the high seas: predicting exhaust plume dispersion on cruise ships Business challenges Analyzing turbulent exhaust dispersion over complex ship geometries

More information

Federal Aviation Administration Portfolio for Safety Research and Development. Seminar Paul Krois October, 2008

Federal Aviation Administration Portfolio for Safety Research and Development. Seminar Paul Krois October, 2008 Portfolio for Safety Research and Development Presented to: By: Date: EUROCONTROL Safety R&D Seminar Paul Krois October, 2008 Introduction The FAA National Aviation Research Plan (NARP) integrates and

More information

Wintershall in Argentina

Wintershall in Argentina Wintershall in Argentina March 2018 Annual production in Argentina at approx. 26 million barrels of oil equivalent Participating in 15 fields in Tierra del Fuego, Neuquén and Mendoza Operator of Vaca Muerta

More information

Policy PL Date Issued February 10, 2014

Policy PL Date Issued February 10, 2014 Subject RENEWABLE ENERGY ON CROWN LAND Compiled by Renewable Energy Program, Biodiversity Branch Replaces Policy Directives Waterpower Site Release Crown Land Onshore Windpower Development - Crown Land

More information

Growth in first-half earnings

Growth in first-half earnings Paris, 25 May 2016 Growth in first-half earnings Current operating result up 14.5% 1, driven by a significant improvement in the contribution from tourism activities (+20%), Net result up 14.5% Sharp decline

More information

Evaluation of Pushback Decision-Support Tool Concept for Charlotte Douglas International Airport Ramp Operations

Evaluation of Pushback Decision-Support Tool Concept for Charlotte Douglas International Airport Ramp Operations Evaluation of Pushback Decision-Support Tool Concept for Charlotte Douglas International Airport Ramp Operations Miwa Hayashi, Ty Hoang, Yoon Jung NASA Ames Research Center Waqar Malik, Hanbong Lee Univ.

More information

Case No COMP/M GENERAL ELECTRIC / THOMSON CSF / JV. REGULATION (EEC) No 4064/89 MERGER PROCEDURE

Case No COMP/M GENERAL ELECTRIC / THOMSON CSF / JV. REGULATION (EEC) No 4064/89 MERGER PROCEDURE EN Case No COMP/M.1786 - GENERAL ELECTRIC / THOMSON CSF / JV Only the English text is available and authentic. REGULATION (EEC) No 4064/89 MERGER PROCEDURE Article 6(1)(b) NON-OPPOSITION Date: 02/02/2000

More information

ACAS Safety Study Safety Benefit of ACAS II Phase 1 and Phase 2 in the New European Airspace Environment ACAS PROGRAMME

ACAS Safety Study Safety Benefit of ACAS II Phase 1 and Phase 2 in the New European Airspace Environment ACAS PROGRAMME ACAS PROGRAMME ACAS Safety Study Safety Benefit of ACAS II Phase 1 and Phase 2 in the New European Airspace Environment ACAS/02-022 Edition : 1 Edition Date : May 2002 Status : Released Issue Class : EATMP

More information

POLLUTION MONITORING OF SHIP EMISSIONS: AN INTEGRATED APPROACH FOR HARBOURS OF THE ADRIATIC BASIN (POSEIDON)

POLLUTION MONITORING OF SHIP EMISSIONS: AN INTEGRATED APPROACH FOR HARBOURS OF THE ADRIATIC BASIN (POSEIDON) POLLUTION MONITORING OF SHIP EMISSIONS: AN INTEGRATED APPROACH FOR HARBOURS OF THE ADRIATIC BASIN (POSEIDON) Implementation between 01/06/2014 and 31/05/2015 http://www.medmaritimeprojects.eu/section/poseidon

More information

Atlantic Interoperability Initiative to Reduce Emissions AIRE

Atlantic Interoperability Initiative to Reduce Emissions AIRE ICAO Colloquium on Aviation and Climate Change ICAO ICAO Colloquium Colloquium on Aviation Aviation and and Climate Climate Change Change Atlantic Interoperability Initiative to Reduce Emissions AIRE Célia

More information

Performance Evaluation of Individual Aircraft Based Advisory Concept for Surface Management

Performance Evaluation of Individual Aircraft Based Advisory Concept for Surface Management Performance Evaluation of Individual Aircraft Based Advisory Concept for Surface Management Gautam Gupta, Waqar Malik, Leonard Tobias, Yoon Jung, Ty Hoang, Miwa Hayashi Tenth USA/Europe Air Traffic Management

More information

Air Traffic Control Agents: Landing and Collision Avoidance

Air Traffic Control Agents: Landing and Collision Avoidance Air Traffic Control Agents: Landing and Collision Avoidance Henry Hexmoor and Tim Heng University of North Dakota Grand Forks, North Dakota, 58202 {hexmoor,heng}@cs.und.edu Abstract. This paper presents

More information

EXHIBIT K TERMINAL PROJECT PROCEDURES PHASE I - DEVELOPMENT OF TERMINAL PROGRAM & ALTERNATIVES

EXHIBIT K TERMINAL PROJECT PROCEDURES PHASE I - DEVELOPMENT OF TERMINAL PROGRAM & ALTERNATIVES EXHIBIT K TERMINAL PROJECT PROCEDURES PHASE I - DEVELOPMENT OF TERMINAL PROGRAM & ALTERNATIVES Over the term of the Master Amendment to the Airline Use and Lease Agreement, the Kansas City Aviation Department

More information

Objective of the 2nd Activity Report. To propose a First draft proposal. criteria for camp site service, to

Objective of the 2nd Activity Report. To propose a First draft proposal. criteria for camp site service, to Objective of the 2nd Activity Report To propose a First draft proposal criteria for camp site service, to be discussed today Methodology of the 2nd Activity Report The methodological approach for the development

More information

Airspace Complexity Measurement: An Air Traffic Control Simulation Analysis

Airspace Complexity Measurement: An Air Traffic Control Simulation Analysis Airspace Complexity Measurement: An Air Traffic Control Simulation Analysis Parimal Kopardekar NASA Ames Research Center Albert Schwartz, Sherri Magyarits, and Jessica Rhodes FAA William J. Hughes Technical

More information

Alpine Strategy for Adaptation to Climate Change in the Field of Natural Hazards

Alpine Strategy for Adaptation to Climate Change in the Field of Natural Hazards Nationale Plattform Naturgefahren PLANAT Plate-forme nationale Dangers naturels Plattaforma nazionale Pericoli naturali National Platform of Natural Hazards Alpine Strategy for Adaptation to Climate Change

More information

Paradigm SHIFT. Eurocontrol Experimental Centre Innovative Research June, Laurent GUICHARD (Project Leader, ATM) Sandrine GUIBERT (ATC)

Paradigm SHIFT. Eurocontrol Experimental Centre Innovative Research June, Laurent GUICHARD (Project Leader, ATM) Sandrine GUIBERT (ATC) 1 Paradigm SHIFT Eurocontrol Experimental Centre Innovative Research June, 2005 Laurent GUICHARD (Project Leader, ATM) Sandrine GUIBERT (ATC) Khaled BELAHCENE (Math Mod., Airspace) Didier DOHY (ATM, System)

More information

SESAR Active ECAC INF07 REG ASP MIL APO USE INT IND NM

SESAR Active ECAC INF07 REG ASP MIL APO USE INT IND NM SESAR Active ECAC INF07 REG ASP MIL APO USE INT IND NM Subject matter and scope * The extension of the applicability area to non-eu ECAC States that have not signed an aviation agreement with EU, as well

More information

U.S. Activities in Puerto Rico, U.S. Virgin Islands and the Wider Caribbean. NOAA and the US Coral Reef Task Force

U.S. Activities in Puerto Rico, U.S. Virgin Islands and the Wider Caribbean. NOAA and the US Coral Reef Task Force U.S. Activities in Puerto Rico, U.S. Virgin Islands and the Wider Caribbean NOAA and the US Coral Reef Task Force U.S. Coral Reef Task Force Co-Chairs: National Oceanic and Atmospheric Administration (NOAA)

More information

Workshop. SESAR 2020 Concept. A Brief View of the Business Trajectory

Workshop. SESAR 2020 Concept. A Brief View of the Business Trajectory SESAR 2020 Concept A Brief View of the Business Trajectory 1 The Presentation SESAR Concept: Capability Levels Key Themes: Paradigm change Business Trajectory Issues Conclusion 2 ATM Capability Levels

More information

along a transportation corridor in

along a transportation corridor in Rockfall hazard and risk assessment along a transportation corridor in the Nera Valley, Central Italy Presentation on the paper authored by F. Guzzetti and P. Reichenbach, 2004 Harikrishna Narasimhan Eidgenössische

More information

USE OF MICROENCAPSULATED PCM IN BUILDINGS AND THE EFFECT OF ADDING AWNINGS

USE OF MICROENCAPSULATED PCM IN BUILDINGS AND THE EFFECT OF ADDING AWNINGS USE OF MICROENCAPSULATED PCM IN BUILDINGS AND THE EFFECT OF ADDING AWNINGS ABSTRACT C. Castellón, M. Nogués, G. Pérez, M. Medrano, L.F. Cabeza Centre GREA Innovació Concurrent Edifici CREA, Universitat

More information

Xaman-Ha city, an answer to the poor growth and spread population

Xaman-Ha city, an answer to the poor growth and spread population Xaman-Ha city, an answer to the poor growth and spread population Global aspect In The Mexican Republic we can found three zones with an important tourist movement; the metropolitan area of Mexico City,

More information

French overseas territories :

French overseas territories : 1 Addressing the socio-economic and environmental pressures faced by Island Communities : Indian ocean (Mozambic channel) French overseas territories : Lagoon brief examples : how does planning integrate

More information

EUROCONTROL. Centralised Services concept. Joe Sultana Director Network Manager 1 July 2013

EUROCONTROL. Centralised Services concept. Joe Sultana Director Network Manager 1 July 2013 EUROCONTROL Centralised Services concept Joe Sultana Director Network Manager 1 July 2013 EUROCONTROL Centralised Services 2 Why do we need Centralised Services? Europe needs to be competitive again! a

More information

Geothermal Space Heating in North China to Mitigate Air pollution: A Success story

Geothermal Space Heating in North China to Mitigate Air pollution: A Success story Geothermal Space Heating in North China to Mitigate Air pollution: A Success story Prof Dr. PANG Zhonghe Institute of Geology and Geophysics, Chinese Academy of Sciences, Beijing, China Contact : z.pang@mail.iggcas.ac.cn

More information

PBN Performance. Based Navigation. Days 1, 2 & 3. ICAO PBN Seminar Seminar Case Studies Days 1,2,3. Seminar Case Studies

PBN Performance. Based Navigation. Days 1, 2 & 3. ICAO PBN Seminar Seminar Case Studies Days 1,2,3. Seminar Case Studies PBN Performance Based Navigation Seminar Case Studies Days 1, 2 & 3 1 Overview 2 Case Study - Day 1 Case Study - Day 2 Case Study - Day 3 3 Case Study - Day 1 Learning Objectives Identify navigation performance

More information

Enabling Civilian Low-Altitude Airspace and Unmanned Aerial System (UAS) Operations. Unmanned Aerial System Traffic Management (UTM)

Enabling Civilian Low-Altitude Airspace and Unmanned Aerial System (UAS) Operations. Unmanned Aerial System Traffic Management (UTM) Enabling Civilian Low-Altitude Airspace and Unmanned Aerial System (UAS) Operations By Unmanned Aerial System Traffic Management (UTM) Parimal Kopardekar, Ph.D. UTM Principal Investigator and Manager,

More information

Concept Document towards the Dead Sea Basin Biosphere Reserve and World Heritage Listing. This report has been presented to the public and to

Concept Document towards the Dead Sea Basin Biosphere Reserve and World Heritage Listing. This report has been presented to the public and to Concept Document towards the Dead Sea Basin Biosphere Reserve and World Heritage Listing. This report has been presented to the public and to political decision makers both regionally and internationally

More information

ARCTIC/ICE OPERATIONS SESSION. DYPIC A Multinational R&D Project of DP Technology in Ice

ARCTIC/ICE OPERATIONS SESSION. DYPIC A Multinational R&D Project of DP Technology in Ice Return to Session Menu DYNAMIC POSITIONING CONFERENCE October 9-10, 2012 ARCTIC/ICE OPERATIONS SESSION DYPIC A Multinational R&D Project of DP Technology in Ice Peter Jochmann DYPIC Coordinator Hamburg

More information

DETECTION OF WATER LEAKS IN FOUM EL-GHERZA DAM (ALGERIA)

DETECTION OF WATER LEAKS IN FOUM EL-GHERZA DAM (ALGERIA) Ninth International Water Technology Conference, IWTC9 2005, Sharm El-Sheikh, Egypt 581 DETECTION OF WATER LEAKS IN FOUM EL-GHERZA DAM (ALGERIA) N. Hocini and A.S. Moulla Applied Hydrology and Sedimentology

More information

December 2017 Quarterly Activities Report

December 2017 Quarterly Activities Report 31 January 2018 December 2017 Quarterly Activities Report Mira 6 horizontal well successfully drilled through nearly 1 km of coal Mira field work completed below budget Mira 6 / 2 horizontal-vertical well

More information

MARINA BOLADO PENAGOS A METHODOLOGY TO ASSESS THE ROLE OF THE RIVER DISCHARGES TO THE GULF OF CADIZ ON THE NUTRIENT SUPPLY TO THE ALBORAN SEA

MARINA BOLADO PENAGOS A METHODOLOGY TO ASSESS THE ROLE OF THE RIVER DISCHARGES TO THE GULF OF CADIZ ON THE NUTRIENT SUPPLY TO THE ALBORAN SEA MARINA BOLADO PENAGOS A METHODOLOGY TO ASSESS THE ROLE OF THE RIVER DISCHARGES TO THE GULF OF CADIZ ON THE NUTRIENT SUPPLY TO THE ALBORAN SEA INTRODUCTION General MEGAN Project Case Study Guadalquivir

More information

Mapping the Snout. Subjects. Skills. Materials

Mapping the Snout. Subjects. Skills. Materials Subjects Mapping the Snout science math physical education Skills measuring cooperative action inferring map reading data interpretation questioning Materials - rulers - Mapping the Snout outline map and

More information

Pr oject Summar y. Impact of ground beef packaging systems and temperature abuse on the safety of ground beef

Pr oject Summar y. Impact of ground beef packaging systems and temperature abuse on the safety of ground beef Pr oject Summar y Impact of ground beef packaging systems and temperature abuse on the safety of ground beef Principal Investigators: J Chance Brooks, Mindy M. Brashears, Mark F. Miller, and Adam Tittor

More information

SOURDINE II EU- 5FW project on Noise Abatement Procedures. Overall view. Ruud den Boer / Collin Beers Department: ATM & Airports

SOURDINE II EU- 5FW project on Noise Abatement Procedures. Overall view. Ruud den Boer / Collin Beers Department: ATM & Airports SOURDINE II EU- 5FW project on Noise Abatement Procedures Overall view Ruud den Boer / Collin Beers Department: ATM & Airports Study of key elements weighed key elements 4th Framework Programme Definition

More information

January / February 2006

January / February 2006 1 Dear Valued Customer, January / February 2006 The Petrel Team is proud to continue this Newsletter specific to Petrel Asia/Pacific. Petrel 2005 is out! You will receive CD for the updates soon, please

More information

EU Report. Europe AUGUST 2017

EU Report. Europe AUGUST 2017 H EU Report Europe AUGUST 2017 ANALYSIS OF HOTEL RULTS AUGUST 2017 hospitality is soaring After a vibrant month of July, August has confirmed that the hospitality sector is sailing on particularly strong

More information

Predicting a Dramatic Contraction in the 10-Year Passenger Demand

Predicting a Dramatic Contraction in the 10-Year Passenger Demand Predicting a Dramatic Contraction in the 10-Year Passenger Demand Daniel Y. Suh Megan S. Ryerson University of Pennsylvania 6/29/2018 8 th International Conference on Research in Air Transportation Outline

More information

HIGH-LEVEL GROUP ON INTERNATIONAL AVIATION AND CLIMATE CHANGE (HGCC)

HIGH-LEVEL GROUP ON INTERNATIONAL AVIATION AND CLIMATE CHANGE (HGCC) International Civil Aviation Organization WORKING PAPER HGCC/3-WP/7 15/03/13 English only HIGH-LEVEL GROUP ON INTERNATIONAL AVIATION AND CLIMATE CHANGE (HGCC) THIRD MEETING Montréal, 25 to 27 March 2013

More information

ALAN GOLDING ANALYTIKA HOLDINGS (PTY) LTD. Exploration Management, BOTSWANA

ALAN GOLDING ANALYTIKA HOLDINGS (PTY) LTD. Exploration Management, BOTSWANA ALAN GOLDING ANALYTIKA OLDINGS (PTY) LTD Exploration Management, BOTSWANA World Coal July 2014 The challenges in the development of Botswana s coal resources. Where is Botswana? Gabon Congo Dem Rep of

More information

Future Automation Scenarios

Future Automation Scenarios Future Automation Scenarios Francesca Lucchi University of Bologna Madrid, 05 th March 2018 AUTOPACE Project Close-Out Meeting. 27th of March, 2018, Brussels 1 Future Automation Scenarios: Introduction

More information

ICAO ATFM SEMINAR. Dubai, UAE, 14 December 2016

ICAO ATFM SEMINAR. Dubai, UAE, 14 December 2016 ICAO ATFM SEMINAR Dubai, UAE, 14 December 2016 ICAO ATFM Seminar Session 2.2: ATFM Sub-regional and Regional Solutions Brian Flynn EUROCONTROL Network Manager Directorate 12 th December 2016 Central Flow

More information

Sustainable development: 'Lanzarote and the Biosphere strategy'. LIFE97 ENV/E/000286

Sustainable development: 'Lanzarote and the Biosphere strategy'. LIFE97 ENV/E/000286 Sustainable development: 'Lanzarote and the Biosphere strategy'. LIFE97 ENV/E/000286 Project description Environmental issues Beneficiaries Administrative data Read more Contact details: Project Manager:

More information

Runway Incursion Preventive measures at aircraft level

Runway Incursion Preventive measures at aircraft level Runway Incursion Preventive measures at aircraft level EAPPRI v3.0 Runway Safety Seminar Lisbon, 18 October 2018 Daniel Lopez Fernandez Product Safety Enhancement Manager Introduction Currently available

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization AN-Conf/12-WP/6 7/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Agenda Item 2: Aerodrome operations improving airport performance 2.2: Performance-based

More information

Approach Specifications

Approach Specifications Approach Specifications RNP Approach (RNP APCH) and Baro-VNAV Approach Specifications RNP APCH and Baro-VNAV 1 Overview Learning Objectives: At the end of this presentation, you should: Understand the

More information

E&P in Brief. A Wintershall Fact Sheet. Wintershall in Argentina

E&P in Brief. A Wintershall Fact Sheet. Wintershall in Argentina Page 1 E&P in Brief A Wintershall Fact Sheet Wintershall in Argentina Annual production in Argentina approx. 25 million barrels of oil equivalent Field development in Tierra del Fuego and Neuquén Center

More information

Effect of Support Conditions on Static Behavior of 1400m main span and 700m side span Cable-stayed Bridge

Effect of Support Conditions on Static Behavior of 1400m main span and 700m side span Cable-stayed Bridge Effect of Support Conditions on Static Behavior of 1400m main span and 700m side span Cable-stayed Bridge Prof. G. M. Savaliya Department of Civil Engineering Government Engineering College, Surat, Gujarat,

More information

Establishing a Risk-Based Separation Standard for Unmanned Aircraft Self Separation

Establishing a Risk-Based Separation Standard for Unmanned Aircraft Self Separation Establishing a Risk-Based Separation Standard for Unmanned Aircraft Self Separation Roland E. Weibel, Matthew W.M. Edwards, and Caroline S. Fernandes MIT Lincoln laboratory Surveillance Systems Group Ninth

More information

Preferred Recreation Recommendations Stemilt-Squilchuck Recreation Plan March 2018

Preferred Recreation Recommendations Stemilt-Squilchuck Recreation Plan March 2018 Preferred Recreation Recommendations Stemilt-Squilchuck Recreation Plan March 2018 Below are the recommended recreation ideas and strategies that package together the various recreation concepts compiled

More information

THE GREAT MAN-MADE RIVER PROJECT

THE GREAT MAN-MADE RIVER PROJECT WATER RESOURCES IN LIBYA Only 5% of the entire area of Libya exceeds 100 mm GROUND WATER 95.6% (4 in) annually. Evaporation rates are also high ranging SURFACE from WATER 700 mm (28 in) 2.3% in the north

More information

Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures. Controller Pilot Symposium 24 October 2018

Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures. Controller Pilot Symposium 24 October 2018 Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures Controller Pilot Symposium 24 October 2018 Our airspace Flight Information Regions London & Scottish FIRs: 1m km 2 11% of Europe s

More information