FinnMETKO 2018 Stand prices and descriptions

Size: px
Start display at page:

Download "FinnMETKO 2018 Stand prices and descriptions"

Transcription

1 The translations into English are provided to facilitate understanding of the contract and its annexes. They are not legally binding documents and are provided as is. The legally binding documents are the original Finnish documents. FinnMETKO 2018 Stand prices and descriptions The stand prices are given as VAT exempt prices. Currently valid VAT will be added to the prices. If a stand has an additional exhibitor that has been registered and accepted by the organizers, the exhibitor will be charged 25 % of the stand price as a fair charge, however no more than until 31 May 2018, and as from 1 June The locations of the stands can be seen in the separate exhibition area map. The map scale deviates slightly from the actual measures and distances for the part of stand sizes etc, which means that the stand sizes are not directly comparable with each other. The outdoor stands are rented out based on a stand map. The stand shapes and sizes that deviate from the basic map grid must be agreed separately with the organizer. Combining adjacent stands is possible. Site safety Finnmetko Oy requires that the people working in the exhibition area and constructing stands wear official construction site ID cards. This requirement does not apply to voluntary workers. Contracted tent suppliers Finnmetko s contracted tent suppliers are Stopteltat Oy, Orimattila. Finnmetko charges other suppliers a guidance/safety fee of per tent. Exhibitors service traffic and parking: Service traffic to the stands will be allowed outside opening hours. Be prepared to show your exhibitor pass. There will be no separate service traffic passes available. The exhibitors will also have marked parking areas in the main exhibition area near the main gate (see the map) and next to the demonstration sites (see the map). Service traffic will be allowed in the morning from 6.30 to 8.00 and in the evening from to All vehicles must leave the exhibition area by 8.00 in the morning. No service traffic will be allowed during the opening hours To ensure visitor safety, all vehicle traffic (including mopeds and ATVs) during the opening hours will be absolutely forbidden.

2 FinnMETKO Exhibition Hall (Stands ) The indoor stands will be located in the FinnMETKO Exhibition Hall. The stand prices include basic wall structures, i.e. 2.5 metre high wall, crossbeam with texts and necessary support structures. The indoor stands will be constructed by KOKO Lahti Oy / Lahden Messut. Lahden Messut also offers exhibitors occupying indoor stands other construction services and rental of additional structures and fittings, as well as services and structures for stands in the whole exhibition area. An order form is available at and a copy will also be mailed to the exhibitors that have booked a stand in the FinnMETKO Hall. The basic structural plans of the indoor stands can be seen on the map. FinnMETKO Exhibition Hall Stand size m2 Stand shape m x m Stand price 8 4 x x x Outdoor stands: Gravel field (Stands ) The gravel field is surfaced with ballast sand. Boreal forest (Stands ) The boreal forest is a dry forest area from where the tree stand and stumps have been removed. Digging will not be allowed in the area. The stand sizes are shown on the map. Ball field (Stands ) The ball field is a hard, even field with macadam surface. The size of the area is 90 m x 60 m. It is a suitable area for stands presenting commercial vehicles, cars, trailers, tyres, oil products, etc. The surface of the area must not be damaged. The stand sizes are shown on the map. Forest park (Stands and ) Forest like park area, large trees, no demonstrations allowed. Fairly even boreal forest type terrain with large pine trees. Please ensure beforehand that your tent / the tent you hire will fit in the stand site. The average distance between trees is 4 5 m. The stand sizes are shown on the map. 2

3 Asphalt fields 1 and 2 and car port (Stands ) Even asphalt field. The stands are suitable for the presentation of building maintenance machines and equipment, oil products, etc. On one side of the field, there will be a car port, in which the depth of the stand will be 4 m, width 8 m (distance between poles) and height 2.5 m. Drilling holes in the asphalt field will be absolutely forbidden. One area of the field has been used for storing forest machinery. There are oil patches in the area and it is slightly sloping. Gravel field Ball field Boreal forest Asphalt fields 1 and 2 Forest park 9 20 m m m m m m m m m m m m m m m m m Stand m m m x5m, 17,5 m2 (three corner) x7m, 49 m x8m, 80 m x10m,100 m x12m,120 m x15m,165 m x15m,225 m m m m m m x25m,1000 m m m m m m m m m m m m m m m m m

4 Works demonstration site (Stands ) The earthworks demonstration site will be a 7.5 ha gravel pit located 500 metres from the asphalt fields in the main exhibition area. It is suitable for demonstrating all earthworks machinery and equipment from excavators and dumpers to crushing machinery. The basic fair services will be available in the site. There will also be a separate entrance gate to the site and parking areas. If necessary, the stands can be combined. The stand sizes are shown on the map. Stand Area Stand number Area number m2 m m m m m m m m m m m m m m m m m m m m m m Stands along the passageway 1000 m m m2 70 m m m Forest demos 1600 m m ,5 ha by agreement 2250 m ,5 ha by agreement 3000 m ,5 ha by agreement 4

5 Wood harvesting demonstration site (Stands 821,854,860 and )) The wood harvesting demonstration (thinning, energy wood harvesting) site will be located near the main exhibition area. The thinning and energy wood harvesting sites will have separate entrance gates, parking places and restaurant services. Part of the thinning sites may be fenced to ensure visitor safety. In the wood harvesting sites, the exhibitors will be responsible for the safety of the visitors. Finnmetko Oy will be responsible for safety on the passageways. Stand number Harvesting method Area ha Estimated harvested volume, m3/ha 821 thinning about 1,5 ha thinning about 1,5 ha thinning about 1,5 ha first thinning about 2,0 ha first thinning about 2,0 ha first thinning about 2,0 ha first thinning about 2,0 ha

6 Main gate triangle (Stands 20 80) The exhibition area in the main gate triangle will be located in the immediate vicinity of the main gate. Fairly even boreal forest terrain, thin pine forest and stumps in part of the area. Stand number Dimensions Area m x 12 m 264 m m x 12 m 264 m m x 12 m 264 m m x 12 m 264 m m x 12 m 264 m m x 12 m 264 m m x 12 m 288 m m x 12 m 288 m m m m x 24 m 528 m m x 24 m 528 m m x 24 m 528 m m x 24 m 528 m m x 24 m 528 m m x 24 m 576 m m x 24 m 576 m m x 24 m 576 m m x 24 m 576 m m x 24 m 576 m m x 24 m 576 m m x 24 m 576 m m m m x 30 m 720 m m x 30 m 750 m m m m m m x 24 m 1080 m m x 24 m 1080 m m x 24 m 1080 m m m m m x 70 m 1600 m m m Log loading competition 6

7 Business Park area (Stands 10 19) Stand number Dimensions Area m2 400 m m2 400 m m2 400 m m2 400 m m2 400 m m2 400 m m2 400 m m x m2 VW cars x m x m m m x m x m x m x m x m x Business Park area (Stands ) Stand number Dimensions Area x 8 32 m x 8 32 m x 8 32 m x 8 32 m x 8 32 m x 8 32 m x 8 32 m x 8 32 m x 8 32 m x 8 32 m

20th Korea Machinery Fair

20th Korea Machinery Fair 20th Korea Machinery Fair 28-31 October, 2015 Goyang / Seoul, South Korea KINTEX Korea International Exhibition Center MEREBO Messe Marketing Phone +49-40-3999905-0 www.komaf.merebo.com KOMAF 2015 Seoul,

More information

HARBOUR DUES. The Port of Helsingborg

HARBOUR DUES. The Port of Helsingborg HARBOUR DUES The Port of Helsingborg Valid 1 January -- 31 December, 2018 1 Contents 1 Ships dues 2 Environmental discounts 3 Waste and environmental charge 4 Pumping charge 5 Harbour dues 6 Advance notification

More information

Handy Superabile ASSOCIAZIONE ONLUS

Handy Superabile ASSOCIAZIONE ONLUS TOSCANA BAGNO COSTA AZZURRA Via Litoranea,36 Marina di Pisa - Telefono 05036619 TESTED FOR YOU TO: With the goal of putting at your disposal all relevant information to a conscious choice Consult the following

More information

AERODROME LICENCE APPLICATION PROCESS

AERODROME LICENCE APPLICATION PROCESS 0000180111 Page 2 Why is a Licence Required? An aerodrome licence is required for a site if it is intended to facilitate operations by commercial transport aircraft, other aerial work other than rotorcraft,

More information

The Whitefish Trail

The Whitefish Trail The Trail - 2017 Trail Construction Specifications & Scope of Services The Lower Haskill section of Trail construction will take place on two different land ownerships: City of and Iron Horse. This section

More information

Handy Superabile ASSOCIAZIONE ONLUS

Handy Superabile ASSOCIAZIONE ONLUS TOSCANA BAGNO LIDO Viale del Tirreno, 2 Tirrenia (Pi) Telefono 050 384715 TESTED FOR YOU TO: With the goal of putting at your disposal all relevant information to a conscious choice Consult the following

More information

GROUP VISIT RISK ASSESSMENT

GROUP VISIT RISK ASSESSMENT ! GROUP VISIT RISK ASSESSMENT At Willows Activity Farm the Health and Safety of our visitors is our number one priority. We work with local and national experts as well as the local authority to constantly

More information

Access Statement for Tom's Field Campsite and Shop

Access Statement for Tom's Field Campsite and Shop This access statement does not contain personal opinions as to our suitability for those with access needs, but aims to be as describe the facilities and services that we offer to our visitors. Access

More information

A BINDING APPLICATION FOR PARTICIPATION

A BINDING APPLICATION FOR PARTICIPATION LESNÍ LOM 12th INTERNATIONAL DEMONSTRATION FAIR OF MACHINES AND EQUIPMENT FOR THE MINING, PROCESSING AND BUILDING INDUSTRIES 19. 21. 6. 2018 Organizer: TĚŽEBNÍ UNIE s.r.o. Phone: +420 545 553 411 Slavíčkova

More information

Handy Superabile ASSOCIAZIONE ONLUS

Handy Superabile ASSOCIAZIONE ONLUS TOSCANA BAGNO LA PACE Viale del Tirreno 4 Tirrenia (Pi) Telefono 050 37385 TESTED FOR YOU TO: With the goal of putting at your disposal all relevant information to a conscious choice Consult the following

More information

b. Minimum Site Area. Recreational vehicle parks shall be located on a parcel of land not less than 3 acres in area.

b. Minimum Site Area. Recreational vehicle parks shall be located on a parcel of land not less than 3 acres in area. 6450 RECREATIONAL VEHICLE PARK REGULATIONS 6450 TITLE AND PURPOSE. The provisions of Section 6450 through 6499, inclusive, shall be known as the Recreational Vehicle Park Regulations. The purpose of these

More information

roma.eldersrealestate.com.au

roma.eldersrealestate.com.au Ups N Downs, ROMA, QLD 4455 Tourism - Lifestyle - Heavy Machinery Depot - Change in Circumstances, Must Be Sold 79.59 hectares, 196.67 acres OFFERS CONSIDERED PRIOR TO AUCTION - FOR GENUINE SALE 79.59

More information

ATVANS Trail Assessment for Five Bridge Lakes Wilderness Area Report and Recommendation. December 28, Prepared by.

ATVANS Trail Assessment for Five Bridge Lakes Wilderness Area Report and Recommendation. December 28, Prepared by. ATVANS Trail Assessment for Five Bridge Lakes Wilderness Area Report and Recommendation December 28, 2011 Prepared by Peter Bush Background This report documents the results and recommendations of an all-terrain

More information

AVALANCHE SKILLS TRAINING 1 MOUNT CAIN

AVALANCHE SKILLS TRAINING 1 MOUNT CAIN Thank you for choosing Island Alpine Guides for your Avalanche Skills Training. This package contains some background information to help you prepare, including meeting times and places, and a complete

More information

Handy Superabile ASSOCIAZIONE ONLUS

Handy Superabile ASSOCIAZIONE ONLUS TOSCANA BAGNO CROCE ROSSA Via litoranea 68 Marina di Pisa (Pi) telefono 050 36304 cell. 3346424640 TESTED FOR YOU TO: With the goal of putting at your disposal all relevant information to a conscious choice

More information

FILE: /PERM EFFECTIVE DATE: May 16, 2014 AMENDMENT:

FILE: /PERM EFFECTIVE DATE: May 16, 2014 AMENDMENT: APPROVED AMENDMENTS: Effective Date Briefing Note /Approval Summary of Changes: FILE: 11000-00/PERM EFFECTIVE DATE: May 16, 2014 AMENDMENT: Table of Contents 1. POLICY APPLICATION... 1 2. PRINCIPLES AND

More information

28-30 November, 2013

28-30 November, 2013 11 th China International Wine & Spirits Exhibition Guangzhou, China 28-30 November, 2013 Interwine China 2013 Guangzhou,China 28-30 November, 2013 Interwine China 2013 11 th China International Wine &

More information

Central Oregon Airshow, Inc.

Central Oregon Airshow, Inc. Central Oregon Airshow, Inc. Friday and Saturday August 24 & 25, 2018 Commercial Food Vendor Application CascadeAirShow@gmail.com or 541-475-0155 Business or Vendor Name: Contact Person Name: Phone Number:

More information

Bid for organising a World Gliding Championships 2010 in 15m, 18m and Open Class In Räyskälä, Finland

Bid for organising a World Gliding Championships 2010 in 15m, 18m and Open Class In Räyskälä, Finland Bid for organising a World Gliding Championships 2010 in 15m, 18m and Open Class In Räyskälä, Finland Applicant: Name: The Finnish Aeronautical Association, Helsinki-Malmi airport FIN-00700 Helsinki Finland

More information

Installing a Drainage Chimney. Written by Nevin Sunday, 28 May :35 - Last Updated Tuesday, 18 July :52

Installing a Drainage Chimney. Written by Nevin Sunday, 28 May :35 - Last Updated Tuesday, 18 July :52 Many, many years ago when we put the first tanks on the back of the garage, the council inspector had said that I needed to put in a rubble drain to take the stormwater from the roof of the garage. This

More information

Group similar facilities together separate dissimilar facilities.

Group similar facilities together separate dissimilar facilities. Park design Principle #1 Group similar facilities together separate dissimilar facilities. Why do we do this? Safety Differences in admission fees Differences in seasonal use Reduce user conflicts Principle

More information

HILLBILLY DAYS 2015 APPLICATION

HILLBILLY DAYS 2015 APPLICATION HILLBILLY DAYS 2015 APPLICATION Hillbilly Days 2015 April 16-18, 2015 Southeast Kentucky Chamber of Commerce Application 178 College Street Email: info@sekchamber.com Pikeville, KY 41501 Phone: 606-432-5504

More information

Cirque du Soleil. Feedback on a proposed 10 year agreement. The Adelaide City Council invites engagement from the community about.

Cirque du Soleil. Feedback on a proposed 10 year agreement. The Adelaide City Council invites engagement from the community about. The Adelaide City Council invites engagement from the community about Cirque du Soleil Feedback on a proposed Project Summary Adelaide City Council is currently planning for the development of a portion

More information

Budemeadows Touring Park Widemouth Bay, Bude, Cornwall. EX23 0NA

Budemeadows Touring Park Widemouth Bay, Bude, Cornwall. EX23 0NA Budemeadows Touring Park Widemouth Bay, Bude, Cornwall. EX23 0NA 01288 361646 08707 064825 holiday@budemeadows.com www.budemeadows.com Access Statement for Budemeadows Touring Park Nov 2013 Introduction

More information

Enclosed you find the Finnish bid to organize the 6 th FAI Junior World Gliding Championships 2009

Enclosed you find the Finnish bid to organize the 6 th FAI Junior World Gliding Championships 2009 Helsinki, 27.9.2005 To IGC bureau members 6 th FAI JUNIOR WORLD GLIDING CHAMPIONSHIPS 2009 Enclosed you find the Finnish bid to organize the 6 th FAI Junior World Gliding Championships 2009 We feel confident

More information

Access Statement for Birling Gap

Access Statement for Birling Gap This access statement does not contain personal opinions as to our suitability for those with access needs, but aims to accurately describe the facilities and services that we offer all our guests/visitors.

More information

Prior to contacting the Whitecourt Trailblazers Snowmobile Club, applicants must:

Prior to contacting the Whitecourt Trailblazers Snowmobile Club, applicants must: WHITECOURT TRAILBLAZERS Box 607 Whitecourt, AB T7S 1N7 www.whitecourttrailblazers.ca CNT AMENDMENT Restriction Code 710: See Comments Comments All applicants are required to contact: Whitecourt Trailblazers

More information

EVENT SCHEDULE:* For more information visit

EVENT SCHEDULE:* For more information visit TUESDAY, SEPT. 19, 2017 7:30 am Registration Opens 8:00 am noon Class 1 8:00 am noon Class 2 8:00 am noon Class 3 8:00 am noon Class 4 Golf Tournament: Noon 1:00 pm Lunch 1:00 pm 5:00 pm Shotgun Start

More information

Ministry of Social Affairs and Health, Finland N.B. Unofficial translation. Legally valid only in Finnish and Swedish

Ministry of Social Affairs and Health, Finland N.B. Unofficial translation. Legally valid only in Finnish and Swedish Ministry of Social Affairs and Health, Finland N.B. Unofficial translation. Legally valid only in Finnish and Swedish No. 395/2012 Adopted in Helsinki on 15 June 2012 Act on the Working and Living Environment

More information

BOAT SALES & SERVICE Firewood HAINES MARINE SERVICE A & A FIREWOOD ABSOLUTE TRUCKING & FIREWOOD

BOAT SALES & SERVICE Firewood HAINES MARINE SERVICE A & A FIREWOOD ABSOLUTE TRUCKING & FIREWOOD CONTRACTORS LIST 2018 The appearance of a contractor's name on this list indicates only that the company demonstrated proof of liabil insurance and was issued entrance passes for 2018. Entries marked (*

More information

4.1 Landforms. Note: dimensions are specified in mm at the scale of 1: All drawings are at 1:7 500 for clarity only.

4.1 Landforms. Note: dimensions are specified in mm at the scale of 1: All drawings are at 1:7 500 for clarity only. 4.1 Landforms Note: dimensions are specified in mm at the scale of 1:15 000. All drawings are at 1:7 500 for clarity only. OM = Outside measure IM = Inside measure CC = Centre to centre 0.2 0.4 OM 0.4

More information

PROGRAMME (Changes could be without notice) 22 th European Jeepers Jamboree 6-10 June 2019 Douzy - France 3 days of magnificent routes over 400km

PROGRAMME (Changes could be without notice) 22 th European Jeepers Jamboree 6-10 June 2019 Douzy - France 3 days of magnificent routes over 400km 22 th European Jeepers Jamboree 6-10 June 2019 Douzy - France 3 days of magnificent routes over 400km The European Jeepers Jamboree is a fun-filled event created exclusively for Jeep and Willys vehicles.

More information

Minimum Impact Suppression Tactics Implementation Guidelines

Minimum Impact Suppression Tactics Implementation Guidelines Minimum Impact Suppression Tactics Implementation Guidelines Establishing and Setting Up Camp Whenever possible, avoid establishing spike or coyote camps in Wilderness. If Wilderness camps are unavoidable,

More information

REQUEST FOR INFORMATION FOR PROCUREMENT OF MULTI SPECTRAL PERSONNEL CAMOUFLAGE EQUIPMENT (MSPCE) BY MINISTRY OF DEFENCE, INDIA

REQUEST FOR INFORMATION FOR PROCUREMENT OF MULTI SPECTRAL PERSONNEL CAMOUFLAGE EQUIPMENT (MSPCE) BY MINISTRY OF DEFENCE, INDIA REQUEST FOR INFORMATION FOR PROCUREMENT OF MULTI SPECTRAL PERSONNEL CAMOUFLAGE EQUIPMENT (MSPCE) BY MINISTRY OF DEFENCE, INDIA 1. Ministry of Defence (MoD), India is interested in procurement of MSPCE

More information

Dear Exhibitors, Thank you for your co-operations

Dear Exhibitors, Thank you for your co-operations Dear Exhibitors, On behalf of the Organizing Committee, we welcome you to the Asia Cold Chain Show (ACCS) 2017. This exhibitor s manual is provided with the purpose to assist your company in preparing

More information

MODEL AERONAUTICAL ASSOCIATION OF AUSTRALIA

MODEL AERONAUTICAL ASSOCIATION OF AUSTRALIA MODEL AERONAUTICAL DISPLAY PROCEDURE MOP019 APPROVED: MAAA PRESIDENT Date: 18/09/2013 Table of Contents 1. INTRODUCTION... 1 2. PURPOSE... 1 3. SCOPE... 1 4. REFERENCES... 1 5. DEFINITIONS... 2 6. POLICY...

More information

Terms, conditions and prices Trondheim Port Authority Valid from 1 January 2018

Terms, conditions and prices Trondheim Port Authority Valid from 1 January 2018 Terms, conditions and prices 2018 Trondheim Port Authority Valid from 1 January 2018 Cruise quays QUAY LENGTH DRAFT AIRDRAFT BEAM HEIGHT QUAYSIDE Quay 68 96m 13m Unlimited Unlimited 4m Quay 30 280m 8m

More information

5 MAP SPECIFICATION FOR SKI-ORIENTEERING

5 MAP SPECIFICATION FOR SKI-ORIENTEERING 5 MAP SPECIFICATION FOR SKI-ORIENTEERING 5.1 General Maps for ski orienteering are based on the specifications for foot-orienteering maps. However in order to meet the specific requirements put on the

More information

Cedar Rail Family Campground

Cedar Rail Family Campground Cedar Rail Family Campground RULES & REGULATIONS 2018 It is your responsibility as the occupant to read all of the camp rules and regulations and abide by them. Camp rules shall be reviewed from time to

More information

Bid for organising the 6 th Women s World Gliding Championships in the Standard Class, 15m Class and Club Class

Bid for organising the 6 th Women s World Gliding Championships in the Standard Class, 15m Class and Club Class Bid for organising the 6 th Women s World Gliding Championships in the Standard Class, 15m Class and Club Class All the information sought in this bid document must complete prior to the Bid being submitted.

More information

RECREATIONAL VEHICLE EXAMPLES

RECREATIONAL VEHICLE EXAMPLES RV Ordinance 21.03.010 (I). Recreational Vehicles. 1. Purpose. The purpose of the recreational vehicle (RV) code is to clearly define what is considered a recreational vehicle and to identify locations

More information

Flying Banners. Shape & Size. Material & Pole Sleeve. Mounting Accessories PROJECTING SIGNS & FLAGS

Flying Banners. Shape & Size. Material & Pole Sleeve. Mounting Accessories PROJECTING SIGNS & FLAGS Flying Banners View our comprehensive range of poles, flags and accessories. Over the next few pages you will find the full range of options - with detailed descriptions on banner shapes and size specifications

More information

2017 Concessions Info Pack & Application

2017 Concessions Info Pack & Application 2017 Concessions Info Pack & Application Contents: Page 2... Requirements for 2017 Concession Rental Pages 3 & 4.. 2017 Vendor Application & Information Sheet Page 5... 2017 Tent Rental Pricing Page 6...

More information

GREATER GEELONG PLANNING SCHEME PROPOSED AMENDMENT FOR THE PROTECTION OF EMERGENCY MEDICAL SERVICE HELICOPTER FLIGHTPATHS SERVING GEELONG HOSPITAL

GREATER GEELONG PLANNING SCHEME PROPOSED AMENDMENT FOR THE PROTECTION OF EMERGENCY MEDICAL SERVICE HELICOPTER FLIGHTPATHS SERVING GEELONG HOSPITAL GREATER GEELONG PLANNING SCHEME PROPOSED AMENDMENT FOR THE PROTECTION OF EMERGENCY MEDICAL SERVICE HELICOPTER FLIGHTPATHS SERVING GEELONG HOSPITAL APRIL 2014 Report Prepared for The Minister for Health

More information

STONETECH th China International Stone Processing Machinery, Equipment & Products Exhibition 6-9 April, 2010 Shanghai

STONETECH th China International Stone Processing Machinery, Equipment & Products Exhibition 6-9 April, 2010 Shanghai STONETECH 2010 17th China International Stone Processing Machinery, Equipment & Products Exhibition 6-9 April, 2010 Shanghai MEREBO Messe Marketing Phone +49-40-3999905-0 www.stonetech.merebo.com STONETECH

More information

GEREU 2010 Where Europe meets Africa - How Europe Can Supply the Demand for Africa s Energy, Infrastructure and Housing Challenges.

GEREU 2010 Where Europe meets Africa - How Europe Can Supply the Demand for Africa s Energy, Infrastructure and Housing Challenges. Dear Sir/Madam, The Ghanaian-German Economic Association is pleased to announce the third German European Business in Ghana Trade Fair (GEREU). GEREU 2010 Where Europe meets Africa - How Europe Can Supply

More information

DRAFT. Dorabelle Campground Rehabilitation

DRAFT. Dorabelle Campground Rehabilitation DRAFT Dorabelle Campground Rehabilitation September 2012 1.1 REGIONAL SETTING AND PROJECT LOCATION The Dorabelle Campground is located on the western shore of Shaver Lake in Fresno County, California (Section

More information

TRAIL DATABASE SCHEMA (8/26/2014)

TRAIL DATABASE SCHEMA (8/26/2014) Trail Data Model for LINES Source Data Source Agency dataagency Agency or entity that created the dataset where the original line was sourced from. Source Date of Last Data Used to Update sourcedate Publication

More information

APPENDIX E LYONS PARK ESTATES DETAILED COMMUNITY ASSESSMENT RESULTS

APPENDIX E LYONS PARK ESTATES DETAILED COMMUNITY ASSESSMENT RESULTS # Houses: 65 APPENDIX E LYONS PARK ESTATES DETAILED COMMUNITY ASSESSMENT RESULTS Overall Risk Assessment: High Description: Lyons Park Estates is located on the foothills south of the town of Lyons on

More information

Region of Waterloo International Airport 2019 Fees and Charges

Region of Waterloo International Airport 2019 Fees and Charges Region of Waterloo International Airport 2019 Fees and Charges Any questions or comments regarding these fees and charges may be directed to: Jeff Caswell, Supervisor Regulatory Affairs & Administration

More information

PORTABLE LIGHT SIGNALS

PORTABLE LIGHT SIGNALS ROADS AUTHORITIES & UTILITIES COMMITTEE (SCOTLAND) ADVICE NOTE 8 PORTABLE LIGHT SIGNALS Version 1.20 December 2006 VERSION HISTORY Version Date Notes PORTABLE LIGHT SIGNALS 1.00 Mar 05 Approved by RAUC(S)

More information

Handy Superabile ASSOCIAZIONE ONLUS

Handy Superabile ASSOCIAZIONE ONLUS TOSCANA BAGNO LA PERLA Viale del Tirreno, Tirrenia (Pi) Telefono 050 37571 TESTED FOR YOU TO: With the goal of putting at your disposal all relevant information to a conscious choice Consult the following

More information

Camping Stomio RULES AND REGULATIONS OF THE CAMPSITE

Camping Stomio RULES AND REGULATIONS OF THE CAMPSITE Camping Stomio RULES AND REGULATIONS OF THE CAMPSITE The Purpose of rules and regulations is the convenience of campers setting the conditions for the proper functioning of the campsite. Entry and stay

More information

The National Path Demonstration Site

The National Path Demonstration Site The National Path Demonstration Site at Battleby an introductory guide Good paths are essential if people are to enjoy the outdoors. Thoughtful path design really opens up access but there s more to building

More information

RESPONSIBLE EXPLORATION CHECK LISTS

RESPONSIBLE EXPLORATION CHECK LISTS 15.0 Check Lists The following check lists are intended to serve as templates that can be customized for corporate purposes, for specific jurisdictions and for specific geographical areas. We stress that

More information

Chapleau Mining Readiness and Growth Strategy Addendum Number 1 February 27 th, 2017

Chapleau Mining Readiness and Growth Strategy Addendum Number 1 February 27 th, 2017 kpmg Chapleau Mining Readiness and Growth Strategy Addendum Number 1 February 27 th, 2017 Prepared for: The Chapleau Economic Development Corporation Corporation of the Township of Chapleau 1 Chapleau

More information

LAKE SANDS DISTRICT FALL 2012 CAMPOREE BE PREPARED TO LEAD FALL CAMPOREE 2012 BE PREPARED TO LEAD

LAKE SANDS DISTRICT FALL 2012 CAMPOREE BE PREPARED TO LEAD FALL CAMPOREE 2012 BE PREPARED TO LEAD LAKE SANDS DISTRICT FALL 2012 CAMPOREE BE PREPARED TO LEAD FALL CAMPOREE 2012 BE PREPARED TO LEAD Location Wausau, Florida OCT 12-14, 2012 Be Prepared To Lead Important Notes: 1.) Scoutmasters please review

More information

Lake Wissota Access Locations within the LaFayette Township. By Chad Martin

Lake Wissota Access Locations within the LaFayette Township. By Chad Martin Lake Wissota Access Locations within the LaFayette Township By Chad Martin Anson/ Wissota Access Point # 1 Road: 195 th St. Associated Fire Numbers: 13294 Defining Characteristics: Forested from road

More information

AERODROME DATA KESHOD AIRPORT, KESHOD (VAKS)

AERODROME DATA KESHOD AIRPORT, KESHOD (VAKS) TEL: 91-11-24632950 Extn: 2219/2233 AFS: VIDDYXAX FAX: 91-11-24615508 Email: gmais@aai.aero INDIA AERONAUTICAL INFORMATION SERVICE AIRPORTS AUTHORITY OF INDIA RAJIV GANDHI BHAVAN SAFDARJUNG AIRPORT NEW

More information

Fire and Emergency New Zealand Southern District Fire Season Burning Conditions Zone A

Fire and Emergency New Zealand Southern District Fire Season Burning Conditions Zone A Fire and Emergency New Zealand Southern District Fire Season Burning Conditions Zone A Fire Type Hangi, umu, barbeques (solid fuel) Traditional Maori, Pacific Island or Pakeha form of cooking food outdoors.

More information

INVESTMENT PROJECT Preparation and management for professional automatic greenhouses

INVESTMENT PROJECT Preparation and management for professional automatic greenhouses INVESTMENT PROJECT Preparation and management for 10-100 professional automatic greenhouses Ministry of Economy of the Central Bosnia Canton Travnik, 2015. Ministry of Economy of the Central Bosnia Canton

More information

LINUS. Vineyard Poles. LINUS Vineyard Poles quality wins. voestalpine Präzisionsprofil GmbH

LINUS. Vineyard Poles. LINUS Vineyard Poles quality wins. voestalpine Präzisionsprofil GmbH LINUS Vineyard Poles LINUS Vineyard Poles quality wins voestalpine Präzisionsprofil GmbH www.vineyardpoles.com Precisely planted rows are not just a sign of a well managed vineyard; they also present an

More information

FOUNDATIONS OF ARCHAEOLOGY A WALK IN VERNDITCH CHASE

FOUNDATIONS OF ARCHAEOLOGY A WALK IN VERNDITCH CHASE FOUNDATIONS OF ARCHAEOLOGY A WALK IN VERNDITCH CHASE 1. A Tale of two Long Barrows Long barrows were constructed as earthen or drystone mounds with flanking ditches and acted as funerary monuments during

More information

Cabin Near Boone - Hot Tub - WiFi - FP - Fishing - Hiking - Specials

Cabin Near Boone - Hot Tub - WiFi - FP - Fishing - Hiking - Specials Cabin Near Boone - Hot Tub - WiFi - FP - Fishing - Hiking - Specials Summary Mountain Laurel offers a natural wooded setting with a view of the creek from the covered porch. Located on a unique 78 acres

More information

Rocky Ridge YMCA Frequently Asked Questions

Rocky Ridge YMCA Frequently Asked Questions Rocky Ridge YMCA Frequently Asked Questions When will the facility open? The facility is scheduled to open Feb. 1 st, 2018 What are your hours of operation? Rocky Ridge YMCA Health, Fitness and Aquatics

More information

Enhanced Emergency Shelter Kit (EESK)

Enhanced Emergency Shelter Kit (EESK) Finalized on 9 th of August 2017 Enhanced Emergency Shelter Kit (EESK) Introduction The enhanced emergency shelter kit was designed to cover the surface area of 15 m 2 with volume of 37.5 m 3. The size

More information

Land off Birdie Way, Rush Green, Hertford, Hertfordshire

Land off Birdie Way, Rush Green, Hertford, Hertfordshire Land off Birdie Way, Rush Green, Hertford, Hertfordshire An Archaeological Evaluation for Bride Hall Development Limited by Sarah Coles Thames Valley Archaeological Services Site Code RGH00/ 01 January

More information

What is END of TRAIL?

What is END of TRAIL? E ND of TR A IL 2018 E xhi b i to r I nf o r ma t i o n What is END of TRAIL? 2018 marks the 37th Annual END of TRAIL The of Cowboy Action Shooting. END of TRAIL is an event hosted by the held at Founders

More information

Specification for Grip blocking using Peat Dams

Specification for Grip blocking using Peat Dams Technical Guidance Note 1 Specification for Grip blocking using Peat Dams 1. Introduction Moorland drains (grips) have been dug across much of the Yorkshire upland peatlands. Many of these grips have become

More information

2018 Extended Stay Camping RESERVATION REQUEST

2018 Extended Stay Camping RESERVATION REQUEST 2018 Extended Stay Camping RESERVATION REQUEST LOT # Confirm your reservation request by completing this form and returning it with a deposit in the amount of $600.00 ($250.00 lot deposit and $350.00 hydro

More information

Private Cabin - Boone 15 min - Hot Tub - WiFi - Hiking - Specials

Private Cabin - Boone 15 min - Hot Tub - WiFi - Hiking - Specials Private Cabin - Boone 15 min - Hot Tub - WiFi - Hiking - Specials Summary Deer Run offers a very secluded natural wooded setting. Located on a unique 78 acres with hiking trails, trout stream and waterfalls.

More information

EXPLORE KLARÄLVSDELTAT BY BIKE

EXPLORE KLARÄLVSDELTAT BY BIKE EXPLORE KLARÄLVSDELTAT BY BIKE EXPLORE NATURE BY BIKE THE BIKE TRAIL 1. Stadsträdgården (City garden) park was laid out in 1861 and there was a restaurant here from 1870 to 1959. In the northwest corner

More information

USE OF REMOTELY PILOTED AIRCRAFT AND MODEL AIRCRAFT IN AVIATION

USE OF REMOTELY PILOTED AIRCRAFT AND MODEL AIRCRAFT IN AVIATION luo Regulation 1 (10) OPS M1-32 Issued: 4 December 2018 Enters into force: 7 December 2018 Validity: indefinitely Legal basis: Aviation Act (864/2014), Sections 5, 9 and 57 Act on Transport Services (320/2017),

More information

SHELTER DESIGN: IGLOO SNOW SHELTER

SHELTER DESIGN: IGLOO SNOW SHELTER CONSTRUCTION: CHALLENGING 2 to 3 hours for two people. EQUIPMENT: Sawing instrument SEASON: Winter The Igloo shelter is not a shelter that should be built in an emergency situation as they are hard to

More information

2015 TAMWORTH COUNTRY MUSIC FESTIVAL January 2015 SUPPLY AND OPERATION OF AMUSEMENTS AND RIDES

2015 TAMWORTH COUNTRY MUSIC FESTIVAL January 2015 SUPPLY AND OPERATION OF AMUSEMENTS AND RIDES 2015 TAMWORTH COUNTRY MUSIC FESTIVAL 16-25 January 2015 SUPPLY AND OPERATION OF AMUSEMENTS AND RIDES EOI NO: E081/2014 EXPRESSION OF INTEREST CLOSE: 11am Thursday 19 June 2014 1. Introduction Tamworth

More information

SUMMER VILLAGE OF SILVER SANDS. Municipal Development Plan

SUMMER VILLAGE OF SILVER SANDS. Municipal Development Plan SUMMER VILLAGE OF SILVER SANDS Municipal Development Plan Bylaw 253-2014 Adopted August 22, 2014 Summer Village of Silver Sands Municipal Development Plan Bylaw No. 253-2014 Page 2 1 INTRODUCTION 1.1 SETTING

More information

2019 Charlottenburgh Park Seasonal Camping Application

2019 Charlottenburgh Park Seasonal Camping Application LOT # 2019 Charlottenburgh Park Seasonal Camping Application APPLICATION This application is for a permit to camp on a seasonal basis in 2019 on campgrounds operated by the Raisin Region Conservation Authority

More information

5-9 April 2018 Palacio de Congresos, Ferias y Exposiciones Marbella, Spain. Application 2018 EXHIBITORS.

5-9 April 2018 Palacio de Congresos, Ferias y Exposiciones Marbella, Spain. Application 2018 EXHIBITORS. 5-9 April 2018 Palacio de Congresos, Ferias y Exposiciones Marbella, Spain Application 2018 EXHIBITORS www.marbelladesignfair.com REQUIRED INFORMATION (Please print or type) Exhibitor Name (as it will

More information

BAXTER LAKE RECREATION AREA ASSOCIATION

BAXTER LAKE RECREATION AREA ASSOCIATION Baxter Lake Recreation Area Association SITE CONTROL COMMITTEE RULES TABLE OF CONTENTS Notes 2 Introduction 2 Campsites 2 Common Grounds 2 Green Areas 2 Cutting Trees 3 Application for Site Alteration

More information

Wheatlands House, Fleet Hill, Finchampstead, Berkshire

Wheatlands House, Fleet Hill, Finchampstead, Berkshire Wheatlands House, Fleet Hill, Finchampstead, Berkshire An Archaeological Watching Brief For JCA International by James McNicoll-Norbury Thames Valley Archaeological Services Ltd Site Code WFF 08/26 August

More information

Delegations will find attached document D057036/02.

Delegations will find attached document D057036/02. Council of the European Union Brussels, 25 July 2018 (OR. en) 11286/18 ENV 530 COVER NOTE From: European Commission date of receipt: 18 July 2018 To: No. Cion doc.: D057036/02 Subject: General Secretariat

More information

Adoption and Maintenance of Sustainable Drainage Systems in South Cambridgeshire. Council Policy. Published by South Cambridgeshire District Council

Adoption and Maintenance of Sustainable Drainage Systems in South Cambridgeshire. Council Policy. Published by South Cambridgeshire District Council Adoption and Maintenance of Sustainable Drainage Systems in South Cambridgeshire Council Policy Published by South Cambridgeshire District Council November 2016 Adoption and Maintenance of Sustainable

More information

Head Pond Connector Trail Final Report Project Area: From Head Pond in Berlin to Rt. 110B in Milan

Head Pond Connector Trail Final Report Project Area: From Head Pond in Berlin to Rt. 110B in Milan Milan Trail Huggers ATV Club P.O. Box 42 Milan, NH 03588 Maintaining Trails in Milan, Stark and Dummer Head Pond Connector Trail Final Report Project Area: From Head Pond in Berlin to Rt. 110B in Milan

More information

TRB 2014 Project Delivery Committee Meeting AFH15 Presentation (January 14, 2014)

TRB 2014 Project Delivery Committee Meeting AFH15 Presentation (January 14, 2014) TRB 2014 Project Delivery Committee Meeting AFH15 Presentation (January 14, 2014) Finnish Transport Agency Presented by Pekka Pakkala (Ramboll Finland Oy) 14.1.2014 Main Road Route 4 Järvenpää Lahti PPP

More information

Welcome to the Pacific Spas family!

Welcome to the Pacific Spas family! Welcome to the Pacific Spas family! Your Pacific Spa has been engineered and built to the highest standards. Enjoy it regularly and experience the serenity and satisfaction that you ve wanted. The information

More information

APPLICATION FOR SITE DEVELOPMENT PLAN LETTER OF INTENT Amended

APPLICATION FOR SITE DEVELOPMENT PLAN LETTER OF INTENT Amended Est. 1982 Est. 1982 Urban Planning Community Design Landscape Architecture 731 North Weber Street, Suite 10, Colorado Springs, CO 80903, 719 633-9700 http://www.gumanltd.com/ Members American society of

More information

Temporary Structure/Use Checklist

Temporary Structure/Use Checklist Temporary Structure/Use Application Checklist Temporary Structure/Use Checklist Please complete all requirements of the application, including this checklist. Ensure all information is clear, legible and

More information

Cedars RV Resort Owners Handbook. Phases 1,2,3

Cedars RV Resort Owners Handbook. Phases 1,2,3 Cedars RV Resort Owners Handbook Phases 1,2,3 NOTICE TO READER This document can and will evolve over time. Every effort has been made to provide simple clarity to common topics requiring definition. Should

More information

Appendix A: San Francisco River Photos Gila National Forest

Appendix A: San Francisco River Photos Gila National Forest Appendix A: San Francisco River Photos Gila National Forest These photos accompany our request for closure to demonstrate both the the outstanding ecological values associated with this area, as well as

More information

EDGEWILD TRAIL Non Motorized Trail PROPOSED DEVELOPMENT PROJECT

EDGEWILD TRAIL Non Motorized Trail PROPOSED DEVELOPMENT PROJECT EDGEWILD TRAIL Non Motorized Trail PROPOSED DEVELOPMENT PROJECT SESW, SWSE Section 15, NWNE, NENW, SWNE, SENE Section 22, Township 138, Range 27 (City of Fifty Lakes) Crow Wing County Land Services Department

More information

Important contacts Euroanaesthesia 2018

Important contacts Euroanaesthesia 2018 Important contacts Euroanaesthesia 2018 Exhibition Organiser ESA Susan de Bièvre Strategic Marketing Manager susan.debievre@esahq.org +32-2-210 9416 Congress Venue Bella Center Copenhagen Center Boulevard

More information

SWAN CREEK VILLAGE HOMEOWNERS ASSOCIATION. P.O. Box Bountiful, UT

SWAN CREEK VILLAGE HOMEOWNERS ASSOCIATION. P.O. Box Bountiful, UT RV PARK REQUIREMENTS SWAN CREEK VILLAGE HOMEOWNERS ASSOCIATION P.O. Box 1188 Bountiful, UT 84011-118 The following RV Park requirements were voted on and approved by the Swan Creek Village HOA Board of

More information

Corporate Social Responsibility. Partnerships in Inclusive Development Community Participation and Engagement

Corporate Social Responsibility. Partnerships in Inclusive Development Community Participation and Engagement Corporate Social Responsibility Partnerships in Inclusive Development Community Participation and Engagement Project Location 110 km northeast of Chiclayo and 700 km northeast of Lima Cañariaco Region:

More information

Trail Management Objectives (TMO s)

Trail Management Objectives (TMO s) Trail Management Objectives (TMO s) TMO s are the foundation for solid, consistent trail planning, survey & design, construction, maintenance, periodic condition assessment & prescriptions, and on-going

More information

ABSTRACT. KEYWORDS Drainage, analysis, urban area, pavement, life time, laser scanner

ABSTRACT. KEYWORDS Drainage, analysis, urban area, pavement, life time, laser scanner Rasmus Lind Jensen ROADEX DRAINAGE DEMONSTRATIONS IN NUUK, GREENLAND A report on drainage demonstrations in Greenland, carried out by the Center for Arktisk Teknologi, DTU Byg, August 2011 ABSTRACT Drainage

More information

DD FORM 3009, FEB 2016 REPLACES DA FORM 1247, WHICH IS OBSOLETE. Page 1 of 6 Pages Adobe Professional X

DD FORM 3009, FEB 2016 REPLACES DA FORM 1247, WHICH IS OBSOLETE. Page 1 of 6 Pages Adobe Professional X ROUTE CLASSIFICATION For use of this form, see ATP 3-34.81/MCWP 3-17.4; the proponent agency is TRADOC. SECTION I 1. SERIAL NUMBER 2. TO 3. FOR INFORMATION 4. DATE/TIME GROUP 5. NUMBER OF SHEETS OR ENCLOSURES

More information

EXHIBITION OPPORTUNITIES UK CREDIT & COLLECTIONS CONFERENCE & 10 SEPTEMBER 2015 HILTON LONDON WEMBLEY

EXHIBITION OPPORTUNITIES UK CREDIT & COLLECTIONS CONFERENCE & 10 SEPTEMBER 2015 HILTON LONDON WEMBLEY EXHIBITION OPPORTUNITIES UK CREDIT & COLLECTIONS CONFERENCE 2015 9 & 10 SEPTEMBER 2015 HILTON LONDON WEMBLEY WHY ATTEND? The UKCCC provides a platform for leading specialist suppliers to showcase their

More information

E D I T I O N

E D I T I O N 2 0 1 8 E D I T I O N The Cambridge Tent Company have been providing tipi s for weddings, events and parties since 2015 and they are still our most requested and popular structure for people looking for

More information

PORT CHARGES AND FEES

PORT CHARGES AND FEES PORT CHARGES AND FEES Valid from 29.03.2018 CONTENTS 1 GENERAL PROVISIONS 3 2 TERMS 4 3 PORT CHARGES AND FEES 5 3.1 General provisions 5 3.2 Tonnage charge 6 3.3 Waste fee 7 3.4 Mooring charge 8 3.5 Passenger

More information

SUPPLY AND OPERATE AMUSEMENTS AND RIDES IN THE FAMILY ZONE PRECINCT TAMWORTH COUNTRY MUSIC FESTIVAL. Friday, 20 January Sunday, 29 January 2017

SUPPLY AND OPERATE AMUSEMENTS AND RIDES IN THE FAMILY ZONE PRECINCT TAMWORTH COUNTRY MUSIC FESTIVAL. Friday, 20 January Sunday, 29 January 2017 SUPPLY AND OPERATE AMUSEMENTS AND RIDES IN THE FAMILY ZONE PRECINCT TAMWORTH COUNTRY MUSIC FESTIVAL Friday, 20 January Sunday, 29 January 2017 QUOTATIONS CLOSE: 11:00am on Thursday, 25 August 2016 Reference:

More information