Head Pond Connector Trail Final Report Project Area: From Head Pond in Berlin to Rt. 110B in Milan

Size: px
Start display at page:

Download "Head Pond Connector Trail Final Report Project Area: From Head Pond in Berlin to Rt. 110B in Milan"

Transcription

1 Milan Trail Huggers ATV Club P.O. Box 42 Milan, NH Maintaining Trails in Milan, Stark and Dummer Head Pond Connector Trail Final Report Project Area: From Head Pond in Berlin to Rt. 110B in Milan By Larry Gomes, Trail Master Phone: December 6, 2017 Area 1 Head Pond Road in Berlin to log yard in Milan (3.67 miles) This section of trail follows an existing logging road that has fallen into disrepair over the years. Along most of the road, the ditch lines were overgrown, large potholes were present, culverts were coming out of the ground and in one spot there was a failed culvert. The following work was completed for Area 1: 1) Cut pine trees at end of Head Pond Road that are too big for the brush hog (chainsaw). 2) Brush-hogged both sides of the logging road to allow excavator access to the ditches for a distance of 3.1 miles. 3) Reset several culverts that have been pushed up by the frost. 4) Installed one new culvert past the second bridge to replace a failed culvert. 5) Trucked in 6-inch minus rock on 50 long section of the road past the second bridge that was low and had poor road base. This brought the road up and stabilized that section of road. 6) Installed three culverts in water bars on northern end of the logging road. 7) Cleaned out ditches along over 3 miles of road. 8) Trucked in new gravel to fill large potholes. 9) Removed rocks from the road that have been pushed up by the frost. 10) Graded and crowned the entire road (3.6 miles) using large road grader. 11) Rock raked the entire road (3.6 miles). 12) Installed trail sign posts and trail signs. Milan Trail Huggers Head Pond Connector Project Report Page 1 of 16

2 Area 1 Pictures: Brush hogging on northern end of Head Pond Road. Brush hogging on southern end of Head Pond Road. Milan Trail Huggers Head Pond Connector Project Report Page 2 of 16

3 Signage and completed road surface on upper end of Head Pond Road. Milan Trail Huggers Head Pond Connector Project Report Page 3 of 16

4 Area 2 Skidder trail from log yard to Copperville log road in Milan (.72 miles) This section of trail follows an old skidder trail that goes along the side of a small hill. The trail is rough, with rocks and stumps along the entire route but the route is dry with only cross-trail runoff needing to be addressed. The following work was completed for Area 2: 1) Cut back trees along edges of the skidder trail to 20 width and cut overhanging branches along entire length of trail (chainsaw). 2) Removed rocks and stumps from the trail and widened to fifteen feet. 3) Added new ditching on the uphill side of this trail where needed. 4) Installed a total of 10 culverts to route runoff from the up-hill side ditching across the trail. 5) Crowned trail for proper water runoff. 6) Installed a gate with ATV pass-thru to keep 4-wheel drive vehicles from entering this section of trail. 7) Install trail sign posts and trail signs. Cutting back trees along edges of skidder trail at the start of the project in March. Milan Trail Huggers Head Pond Connector Project Report Page 4 of 16

5 Dragging in culverts along newly built section of trail. Note ditching on uphill side. Milan Trail Huggers Head Pond Connector Project Report Page 5 of 16

6 Installation of gate and ATV pass-thru to protect new trail. Milan Trail Huggers Head Pond Connector Project Report Page 6 of 16

7 Area 3 Copperville logging road in Milan (.25 miles) This section of trail follows one of the old logging roads established in the Copperville area of Milan. The road has some overhanging branches and some deep water bars, but other than those minor issues, the road is in very good shape. The following work was completed for Area 3: 1) Cut back overhanging branches along length of trail (chainsaw work). 2) Restored ditch line where needed. 3) Installed culverts in 3 existing water bars. 4) Graded and crowned the road. 5) Installed trail sign posts and trail signs. Section of old logging road just before overhanging trees were cut back. Sorry - No pictures available after work was done. Milan Trail Huggers Head Pond Connector Project Report Page 7 of 16

8 Area 4 Copperville logging road to log yard on Town of Milan land (1.23 miles) This section of trail follows some old skidder roads for.75 miles before going through some sparsely populated wood lands for.25 miles and then following an existing skidder trail into Town of Milan land for.23 miles. The following work was completed for Area 4: 1) Cut back overhanging branches and widened trail to 15 wide along path of old skidder roads. 2) Cut a new trail through sparsely populated woods. 3) Remove rocks and stumps from the new trail. 4) Added ditching where needed. 5) Installed a total of ten 15 culverts to route runoff from the up-hill side ditching across the new trail. 6) Installed a 36 culvert to drain runoff from small valley. 7) Built a new 20 long wood-beam bridge over an existing brook. 8) Built a new 33 long steel-beam bridge over an existing brook. 9) Crowned trail for proper water runoff. 10) Installed trail sign posts and trail signs. Section old skidder road before widening. Milan Trail Huggers Head Pond Connector Project Report Page 8 of 16

9 Cutting back the trees along the old skidder road. Cutting through the sparse woods section. Milan Trail Huggers Head Pond Connector Project Report Page 9 of 16

10 Completed section of trail along fairly flat ground. Milan Trail Huggers Head Pond Connector Project Report Page 10 of 16

11 Installing V-shaped rubber diverters on steep section of trail. Milan Trail Huggers Head Pond Connector Project Report Page 11 of 16

12 Installing the donated beams for the 20 bridge. Donated decking and runners are installed on the 20 bridge. Milan Trail Huggers Head Pond Connector Project Report Page 12 of 16

13 33 steel bridge I-beams being installed by the excavator. Installing the stringers and decking on the 33 bridge. Milan Trail Huggers Head Pond Connector Project Report Page 13 of 16

14 Decking and runners are installed on the 33 bridge. Milan Trail Huggers Head Pond Connector Project Report Page 14 of 16

15 Area 5 Logging Road to Rt. 110B (1.8 miles) This section of trail follows an existing logging road that was rebuilt in the fall of The road was in good condition except for ruts that were left over from the logging operation. The following work was completed for Area 5: 1) Inspected all culverts along road and cleaned out debris where needed. 2) Graded and crowned the entire road using large road grader. 3) Rock raked the entire road. 4) Added gravel to the road where needed. 5) Install steel gate and OHRV pass-thru at the northern end of the logging road. 6) Installed trail sign posts and trail signs. New steel gate installed at the end of graded and rock raked logging road. Milan Trail Huggers Head Pond Connector Project Report Page 15 of 16

16 Summary Work on this project was started in March of 2017 and completed in October of In addition to the Federal RTP grant and State of New Hampshire GIA grant, the club also received a donation of $850 from the New Hampshire ATV Club to cover the cost of an oversize culvert that was not included in the original project plan. The club also received a donation of 4 wood bridge beams for a 20 bridge from the United Trail Volunteers of Maine which is a coalition of over 20 motorized and nonmotorized clubs. A club member donated all of the decking needed for that same bridge. These two donations saved the club over $1, which was used to purchase additional culverts that were needed for the project. Finally a total of 20 volunteers donated over 500 hours of labor as an RTP match. All of these resources were necessary to complete this project which will have a major impact on the area. The new trail will reduce the distance between two of the most popular ATV trails system from 38 miles (by trail) or 21 miles (by road) to only 9 miles. As a result, we expect this new trail to be one of the most heavily used trails in the Ridethe-Wilds trail system. We sincerely thank the Federal RTP administrators and the New Hampshire Bureau of Trails for providing the funding for this project. Milan Trail Huggers Head Pond Connector Project Report Page 16 of 16

KENNESAW MOUNTAIN TRAIL CLUB WORKDAY

KENNESAW MOUNTAIN TRAIL CLUB WORKDAY WORKDAY 2-10-18 1 Trail ambassadors or others see next page. 1 work sites TOOLS 15 1 3 1 2 SCHEDULE: 7:15 Start load tools; Send registration stuff out 8:00 Send tools to grassy area near trail head. 8:15

More information

Lake Wissota Access Locations within the LaFayette Township. By Chad Martin

Lake Wissota Access Locations within the LaFayette Township. By Chad Martin Lake Wissota Access Locations within the LaFayette Township By Chad Martin Anson/ Wissota Access Point # 1 Road: 195 th St. Associated Fire Numbers: 13294 Defining Characteristics: Forested from road

More information

Great Pond Mountain Conservation Trust Request for Bids Wildlands Hillside Trail Relocation and Restoration Project

Great Pond Mountain Conservation Trust Request for Bids Wildlands Hillside Trail Relocation and Restoration Project Great Pond Mountain Conservation Trust Request for Bids Wildlands Hillside Trail Relocation and Restoration Project Project Description: Great Pond Mountain Conservation Trust (GPMCT), a nonprofit land

More information

SWAN CREEK VILLAGE HOMEOWNERS ASSOCIATION. P.O. Box Bountiful, UT

SWAN CREEK VILLAGE HOMEOWNERS ASSOCIATION. P.O. Box Bountiful, UT RV PARK REQUIREMENTS SWAN CREEK VILLAGE HOMEOWNERS ASSOCIATION P.O. Box 1188 Bountiful, UT 84011-118 The following RV Park requirements were voted on and approved by the Swan Creek Village HOA Board of

More information

Property access tracks

Property access tracks Property access tracks Planning, location, construction and maintenance The need for farm roads and tracks The efficient running of a property depends on, among other things, ready access to various locations

More information

KENNESAW MOUNTAIN TRAIL CLUB WORKDAY

KENNESAW MOUNTAIN TRAIL CLUB WORKDAY WORKDAY 4-14-18 1 Trail ambassadors or others see next page. 1 TOOLS HERE 2 1 7 20 Work for 4-14-18 will again be on the lower portion of the Mountain Trail below the fire road. Due to safety considerations,

More information

UMASS CROSS-COUNTRY Trails

UMASS CROSS-COUNTRY Trails UMASS CROSS-COUNTRY Trails 1) EGG (43 min) (A) From Cage proceed to North Pleasant street (by campus pond). Make left and head toward LGRT and pass School of Education. Pass Puffton Apt complex (on left)

More information

APPENDIX D: SUSTAINABLE TRAIL DESIGN. APPENDICES Town of Chili Parks and Recreation Master Plan Update

APPENDIX D: SUSTAINABLE TRAIL DESIGN. APPENDICES Town of Chili Parks and Recreation Master Plan Update APPENDIX D: SUSTAINABLE TRAIL DESIGN APPENDICES Town of Chili Parks and Recreation Master Plan Update Sustainable Trail Construction Sustainable trails are defined by the US Forest Service as trails having

More information

GILBERT & WEST TOWN INTERCOUNTY DRAIN Windsor Township, Eaton County and City of Lansing, Delhi Township, Ingham County, Michigan

GILBERT & WEST TOWN INTERCOUNTY DRAIN Windsor Township, Eaton County and City of Lansing, Delhi Township, Ingham County, Michigan GILBERT & WEST TOWN INTERCOUNTY DRAIN Windsor Township, Eaton County and City of Lansing, Delhi Township, Ingham County, Michigan PRELIMINARY ENGINEERING REPORT Abigail Eaton, Chair Intercounty Drains

More information

Project Report Volunteer Trip Torres del Paine National Park, Patagonia, Chile December 3-15, Executive Summary

Project Report Volunteer Trip Torres del Paine National Park, Patagonia, Chile December 3-15, Executive Summary Conservation Volunteers International Program 120 Village Square #9, Orinda, California 94563 USA www.conservationvip.org info@conservationvip.org Tel: (925) 228-5946 A Non-Profit 501c3 Tax Exempt Organization

More information

TRAIL MAINTENANCE AND CONSTRUCTION MANUAL

TRAIL MAINTENANCE AND CONSTRUCTION MANUAL TRAIL MAINTENANCE AND CONSTRUCTION MANUAL MAINTAINING THE TRAIL CORRIDOR GENERAL MAINTENANCE Debris and Obstacles Remove dangerous obstacles that riders may fall on - logs and branches one-half inch in

More information

Androscoggin River Trail Access Sites. North Woods. 168 miles from its source at Lake Umbagog to Merrymeeting Bay

Androscoggin River Trail Access Sites. North Woods. 168 miles from its source at Lake Umbagog to Merrymeeting Bay Androscoggin River Trail Access Sites North Woods 168 miles from its source at Lake Umbagog to Merrymeeting Bay Trail Under Construction More than 40 Public Access Sites Available Androscoggin River Watershed

More information

APPENDIX 5: JUNEAU NORDIC SKI CLUB MEMO

APPENDIX 5: JUNEAU NORDIC SKI CLUB MEMO APPENDIX 5: JUNEAU NORDIC SKI CLUB MEMO To all participants in the McDowell Eaglecrest nordic long-range planning meeting: It was good to meet with all of you last month and talk about our vision for the

More information

ATVANS Trail Assessment for Five Bridge Lakes Wilderness Area Report and Recommendation. December 28, Prepared by.

ATVANS Trail Assessment for Five Bridge Lakes Wilderness Area Report and Recommendation. December 28, Prepared by. ATVANS Trail Assessment for Five Bridge Lakes Wilderness Area Report and Recommendation December 28, 2011 Prepared by Peter Bush Background This report documents the results and recommendations of an all-terrain

More information

Acting Commissioner Basil Seggos NYS Department of Environmental Conservation 625 Broadway, 14th Floor Albany, NY 12233

Acting Commissioner Basil Seggos NYS Department of Environmental Conservation 625 Broadway, 14th Floor Albany, NY 12233 Board of Directors Charles Clusen Chair Sidney Harring Dale Jeffers Michael Wilson Vice-Chairs James Long Secretary David Quinn Treasurer Joshua Axelrod Nancy Bernstein John Caffry Dean Cook Marilyn DuBois

More information

Non-motorized Trail Plan & Proposal. August 8, 2014

Non-motorized Trail Plan & Proposal. August 8, 2014 Town of Star Valley Ranch, Wyoming and the Star Valley Ranch Association in partnership with the USDA Forest Service, Bridger-Teton National Forest, Greys River Ranger District Non-motorized Trail Plan

More information

INTRODUCTION. Mailing address: Burke County Community Development Attn: Tim Johnson P. O. Box 219 Morganton, NC

INTRODUCTION. Mailing address: Burke County Community Development Attn: Tim Johnson P. O. Box 219 Morganton, NC REQUEST FOR QUALIFICATIONS: PROFESSIONAL, EXPERIENCED TRAIL BUILDERS FOR THE CONSTRUCTION OF THE FONTA FLORA STATE TRAIL LAKE JAMES SECTION BURKE COUNTY COMMUNITY DEVELOPMENT INTRODUCTION Burke County

More information

CONSERVATION VOLUNTEERS INTERNATIONAL PROGRAM VOLUNTEER TRIP TO TORRES DEL PAINE NATIONAL PARK, PATAGONIA, CHILE DECEMBER 2010

CONSERVATION VOLUNTEERS INTERNATIONAL PROGRAM VOLUNTEER TRIP TO TORRES DEL PAINE NATIONAL PARK, PATAGONIA, CHILE DECEMBER 2010 CONSERVATION VOLUNTEERS INTERNATIONAL PROGRAM VOLUNTEER TRIP TO TORRES DEL PAINE NATIONAL PARK, PATAGONIA, CHILE DECEMBER 2010 We, Richard and Chris Braunlich, co-leaders of the volunteer trip, met the

More information

Off Highway Vehicle Infrastructure Fund Fiscal year Summary Report

Off Highway Vehicle Infrastructure Fund Fiscal year Summary Report Off Highway Vehicle Infrastructure Fund Fiscal year 2014 Summary Report June 2015 Introduction The Off-highway Vehicle Infrastructure Fund (the Fund) was established as a result of recommendations of the

More information

Kennesaw Mountain Trail Club. Trail Skills Workshop ~ Dips and Drains. Presented by: Jay M Dement

Kennesaw Mountain Trail Club. Trail Skills Workshop ~ Dips and Drains. Presented by: Jay M Dement Kennesaw Mountain Trail Club Trail Skills Workshop ~ Dips and Drains Presented by: Jay M Dement KEY CONCEPTS: Control Erosion and Users Where Do Trails Come From, and How Do They Work: Concept of trail

More information

Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012

Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012 Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012 Purpose of Feasibility Study Purpose Evaluate the feasibility of constructing a multiuse

More information

EDGEWILD TRAIL Non Motorized Trail PROPOSED DEVELOPMENT PROJECT

EDGEWILD TRAIL Non Motorized Trail PROPOSED DEVELOPMENT PROJECT EDGEWILD TRAIL Non Motorized Trail PROPOSED DEVELOPMENT PROJECT SESW, SWSE Section 15, NWNE, NENW, SWNE, SENE Section 22, Township 138, Range 27 (City of Fifty Lakes) Crow Wing County Land Services Department

More information

Bradley Brook Relocation Project. Scoping Notice. Saco Ranger District. United States Department of Agriculture Forest Service

Bradley Brook Relocation Project. Scoping Notice. Saco Ranger District. United States Department of Agriculture Forest Service Bradley Brook Relocation Project United States Department of Agriculture Forest Service Scoping Notice White Mountain National Forest February 2011 For Information Contact: Jenny Burnett White Mountain

More information

Northern Rail Extension, Phase One

Northern Rail Extension, Phase One General Project and Funding 1. Where does Phase One start? The rail line for Phase One begins roughly at the northern boundary of the former Bradbury property, but also includes work along Tom Bear Trail

More information

BEST MANAGEMENT PRACTICES

BEST MANAGEMENT PRACTICES Building Trails Correctly the First Time; Will Reduce Maintenance Needs in The Future (not eliminate them) BEST MANAGEMENT PRACTICES For Erosion Control During Trail Maintenance and Construction NH Trail

More information

Appendix A. Tenderfoot Mountain Motorcycle Trail System. Maintenance and Construction Plan (6/13/13)

Appendix A. Tenderfoot Mountain Motorcycle Trail System. Maintenance and Construction Plan (6/13/13) Appendix A Tenderfoot Mountain Motorcycle Trail System Maintenance and Construction Plan (6/13/13) If the decision to implement the project as approved, grant funding would be pursued to fund construction

More information

Presented by Dave Hiatt to attendees at the 11/6/2016 WOHVA Annual Meeting. (Mention the picture above is of the front number plate on my dirt bike)

Presented by Dave Hiatt to attendees at the 11/6/2016 WOHVA Annual Meeting. (Mention the picture above is of the front number plate on my dirt bike) Presented by Dave Hiatt to attendees at the 11/6/2016 WOHVA Annual Meeting. (Mention the picture above is of the front number plate on my dirt bike) I have been looking for it ever since Ron Loomis and

More information

PennDOT Interstate Work next week March 30-April 3:

PennDOT Interstate Work next week March 30-April 3: PennDOT Interstate Work next week March 30-April 3: Interstate 80 Interstate 81 DELAYS THIS WEEK: Exit 256 to the Schuylkill County line. Eastbound & Westbound. Bridge cleaning Monday (3/30), Tuesday (3/31)

More information

Volunteer Project Trip Report Yosemite National Park May 16-20, 2012

Volunteer Project Trip Report Yosemite National Park May 16-20, 2012 Conservation Volunteers International Program 120 Village Square #9 Orinda, California 94563 USA www.conservationvip.org A Non-Profit 501c3 Tax Exempt Organization CST 2089890-40 Volunteer Project Trip

More information

Prior to contacting the Whitecourt Trailblazers Snowmobile Club, applicants must:

Prior to contacting the Whitecourt Trailblazers Snowmobile Club, applicants must: WHITECOURT TRAILBLAZERS Box 607 Whitecourt, AB T7S 1N7 www.whitecourttrailblazers.ca CNT AMENDMENT Restriction Code 710: See Comments Comments All applicants are required to contact: Whitecourt Trailblazers

More information

Bear Creek Habitat Improvement Project

Bear Creek Habitat Improvement Project 06/10/10 Bear Creek Habitat Improvement Project El Paso County, Colorado Pike National Forest and Colorado Springs Utilities Owned Land Report prepared by: Eric Billmeyer Executive Director Rocky Mountain

More information

are greasable that the units *Positive indexing for raising roll down the track on and

are greasable that the units *Positive indexing for raising roll down the track on and We at the Thomas family have deep roots in the Maine tradition of craftsmanship and innovation. Dale Thomas began working with steel in 1959 and for almost five decades gained extensive experience in steel

More information

PROPOSED NEW RICHMOND FOLK FESTIVAL MAIN STAGE VENUE AT TREDEGAR GREEN VENTURE RICHMOND JUNE 2013

PROPOSED NEW RICHMOND FOLK FESTIVAL MAIN STAGE VENUE AT TREDEGAR GREEN VENTURE RICHMOND JUNE 2013 PROPOSED NEW RICHMOND FOLK FESTIVAL MAIN STAGE VENUE AT TREDEGAR GREEN VENTURE RICHMOND JUNE 2013 Venture Richmond proposes to develop a new main stage venue for the Richmond Folk Festival on property

More information

Proposed Project 1: Kimble Loop East Horse Trail Reroute (1). Horse Trail Reroute: March 14, 2012

Proposed Project 1: Kimble Loop East Horse Trail Reroute (1). Horse Trail Reroute: March 14, 2012 Proposed Project 1: Kimble Loop East Horse Trail Reroute The Ironton District Ranger requests your comments on proposed trail project on National Forest System lands. (1). Horse Trail Reroute: The proposed

More information

4. Improvement Plan Elements

4. Improvement Plan Elements 4. Improvement Plan Elements Detailed description of all elements Leigh Creekside Park Improvement Plan Preliminary Conceptual Time Zone Layout Caveat: in the following plans and descriptions, specific

More information

Adopt a Trail Blue Ridge Parkway

Adopt a Trail Blue Ridge Parkway Adopt a Trail Blue Ridge Parkway THANK YOU Thank You for volunteering to maintain a trail with the Adopt-A-Trail program! You are helping to keep these trails open for public use and enjoyment. We couldn

More information

Section CHAPTER 1 LEGAL STATUS OF WATER COURSES NOVA SCOTIA DEPARTMENT OF NATURAL RESOURCES REGIONAL OFFICES

Section CHAPTER 1 LEGAL STATUS OF WATER COURSES NOVA SCOTIA DEPARTMENT OF NATURAL RESOURCES REGIONAL OFFICES Section 17 17.1.1. CHAPTER 1 LEGAL STATUS OF WATER COURSES Environment and Labour The Province of Nova Scotia has possession of all water courses, and the law requires that you obtain approval prior to

More information

JERICHO MOUNTAIN STATE PARK Riding Area Master Trail Development Plan December 1, 2006

JERICHO MOUNTAIN STATE PARK Riding Area Master Trail Development Plan December 1, 2006 JERICHO MOUNTAIN STATE PARK Riding Area Master Trail Development Plan December 1, 2006 Prepared For: NH Division of Parks and Recreation Bureau of Trails 172 Pembroke Road Concord, NH 03302 Prepared By:

More information

Ditch flows slowly to the north

Ditch flows slowly to the north Ditch flows slowly to the north Photo 1. Wetland DE: Looking west across Wetland DE from upslope. Ponded water, mucky mineral soils, and patches of emergent vegetation observed. Wetland DE appears to be

More information

Understanding user expectations And planning for long term sustainability 1

Understanding user expectations And planning for long term sustainability 1 Understanding user expectations And planning for long term sustainability 1 What is a natural surface trail? It can be as simple has a mineral soil, mulched or graveled pathway, or as developed as elevated

More information

Ridge to Rivers MINUTES. November 13, 2013

Ridge to Rivers MINUTES. November 13, 2013 Ridge to Rivers 1 st Quarter Partnership Meeting MINUTES Partners present: Doug Holloway and Julia Grant, Boise Parks and Recreation, Larry Ridenhour and Terry Humphrey, Bureau of Land Management (BLM),

More information

Snowmobile GUIDELINES FOR TRAIL SIGNING

Snowmobile GUIDELINES FOR TRAIL SIGNING STATE OF NEW HAMPSHIRE BUREAU OF TRAILS Snowmobile GUIDELINES FOR TRAIL SIGNING TRAIL FUNDED BY REGISTRATION FEES Table of Contents Introduction... Some Things to Take Into Consideration... BOT Provided

More information

MUNICIPALITY OF MURRYSVILLE Policy # 20-05

MUNICIPALITY OF MURRYSVILLE Policy # 20-05 MUNICIPALITY OF MURRYSVILLE Policy # 20-05 04/11/05 SPECIFICATIONS FOR CONSTRUCTION AND MAINTENANCE MANUAL FOR HIKING, BICYCLING AND CROSS-COUNTRY SKIING TRAILS 1. INTRODUCTION This document provides guidelines

More information

Bridging Belmont. By ROGER AMSDEN, LACONIA DAILY SUN

Bridging Belmont. By ROGER AMSDEN, LACONIA DAILY SUN Bridging Belmont This covered bridge was bought for $1 in 2013 from Dover, and broken into three sections. One section was installed two years ago, and the second and third sections were combined for a

More information

State Route 8 Corridor. Northern Summit County s Path to Success

State Route 8 Corridor. Northern Summit County s Path to Success State Route 8 Corridor Northern Summit County s Path to Success Construction Guide: 2008-2009 State Route 8 corridor work description State Route 8 Corridor 10 projects $262 million With its close proximity

More information

DRAFT. Dorabelle Campground Rehabilitation

DRAFT. Dorabelle Campground Rehabilitation DRAFT Dorabelle Campground Rehabilitation September 2012 1.1 REGIONAL SETTING AND PROJECT LOCATION The Dorabelle Campground is located on the western shore of Shaver Lake in Fresno County, California (Section

More information

C E N T R A L C A T S K I L L S

C E N T R A L C A T S K I L L S 120 C E N T R A L C A T S K I L L S Central Catskills Once out of the southern parts of the Catskills, the Long Path enters the more well traveled and civilized regions. The trail joins the Devil s Path,

More information

Multi-Use Trail Surface Study

Multi-Use Trail Surface Study Multi-Use Trail Surface Study Multi-Use Trail Surface Study This study was conducted by the Connecticut Equine Advisory Council. Research was completed in 2013 and this document was completed in 2014.

More information

DATE: 23 March, 2011 TO: Communities FROM: BlazeSports America. RE: Accessible Trails Checklist 1

DATE: 23 March, 2011 TO: Communities FROM: BlazeSports America. RE: Accessible Trails Checklist 1 M E M O R A N D U M DATE: 23 March, 2011 TO: Communities FROM: BlazeSports America RE: Accessible Trails Checklist 1 The purpose of the Accessible Trails Checklist (below) is to help the community review

More information

Best Practices for The Development of Snowmobile Trails

Best Practices for The Development of Snowmobile Trails Best Practices for The Development of Snowmobile Trails The Vermont Association of Snow Travelers, Inc Revised 7/2017 Overview Construction and maintenance of snowmobile trails is ongoing. Trails must

More information

The Remains of the Ontario and Western Railway Fifty Years after Abandonment

The Remains of the Ontario and Western Railway Fifty Years after Abandonment The Remains of the Ontario and Western Railway Fifty Years after Abandonment Oswego to Cadosia Drew James New York Ontario and Western Railway Oswego to Cadosia Oswego Fulton Pennellville Central Square

More information

SECTION 1: MARYLAND TO PA nd CROSSING MASON DIXON LINE TO RAINSBURG GAP BUCHANAN STATE FOREST, PRIVATE LAND, SGL 97

SECTION 1: MARYLAND TO PA nd CROSSING MASON DIXON LINE TO RAINSBURG GAP BUCHANAN STATE FOREST, PRIVATE LAND, SGL 97 SECTION 1: MARYLAND TO PA 326 2 nd CROSSING MASON DIXON LINE TO RAINSBURG GAP BUCHANAN STATE FOREST, PRIVATE LAND, SGL 97 Web Update, August 2010 http://www.hike mst.org Section 1 follows Tussey Mountain

More information

Section 13. Job Safety Analysis

Section 13. Job Safety Analysis Section 13 Job Safety Analysis Table of Contents Operating an ATV... 001 Chainsaw Operations... 002 Operating Jack Hammer... 003 Planting IP s... 004 Planting Lathe/Hubs... 005 Working On Or Around Roadways...

More information

e-news TRACK REGENERATION WORK AT DINGO DELL, WEST OF SYDNEY.

e-news TRACK REGENERATION WORK AT DINGO DELL, WEST OF SYDNEY. e-news TRACK REGENERATION WORK AT DINGO DELL, WEST OF SYDNEY. By the project coordinator, Matt Barnes, Public Relations Officer for the Land Rover Owners Club of Australia (Sydney Branch) Inc One of the

More information

Emily to Blind Lake Trail PROPOSED TRAIL DEVELOPMENT APPLICATION SUMMARY

Emily to Blind Lake Trail PROPOSED TRAIL DEVELOPMENT APPLICATION SUMMARY Emily to Blind Lake Trail PROPOSED TRAIL DEVELOPMENT APPLICATION SUMMARY Township 137 Range 26 (Fairfield Township) sections 2 & 3 Township 138 Range 26 (City of Emily) sections 27, 34, 35, & 36 Township

More information

Project Planning, Compliance, and Funding

Project Planning, Compliance, and Funding Project Planning, Compliance, and Funding The plans above offer high level guidance to ensure that the A.T. is managed effectively as a whole unit in a decentralized management structure. Cooperative management

More information

1. PROJECT BACKGROUND. June 25, Alberta Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8

1. PROJECT BACKGROUND. June 25, Alberta Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8 Alberta Transportation Central Region #401, 4902 51 Street Red Deer, Alberta T4N 6K8 June 25, 2001 Mr. Melvin Mayfield, P.Eng. Construction Services Coordinator Dear Mr. Mayfield: Central Region Landslide

More information

American Conservation Experience

American Conservation Experience ACE Project Report For Tonto National Forest, Arizona Trail Association and Arizona State Parks Title of Project: 4 Peaks Trail Maintenance Award Contract Number: ASP NM11021 Project Partner: Paul Burghard

More information

If the drought index rises over 500 (this is found on Florida Forestry website

If the drought index rises over 500 (this is found on Florida Forestry website FLORIDA CRACKER RANCH, INC. Handbook and General Rules Obey ALL posted speed limit and directional signs. ALL trails or roads NOT POSTED with speed limit sign are to be assumed 15 mph. Do not run equipment

More information

2017 Amendment - Public Access and Recreation Management Plan And Road Management Plan CLHCC Review Draft

2017 Amendment - Public Access and Recreation Management Plan And Road Management Plan CLHCC Review Draft Introduction The Connecticut Lakes Headwaters Working Forest Recreation Program, managed by the Division of Parks and Recreation, works closely with local organizations and businesses and the private landowner,

More information

PacifiCorp North Umpqua Hydroelectric Project FERC Project No VOLUME 1 EXHIBITS

PacifiCorp North Umpqua Hydroelectric Project FERC Project No VOLUME 1 EXHIBITS PacifiCorp North Umpqua Hydroelectric Project FERC Project No. 1927 A VOLUME 1 EXHIBITS TMP and SA Implementation Summary B Settlement Agreement (Section 15) C D E F G H I J K L M N O P Q R S T U Rolling

More information

Axes. The information below will assist the Scout in obtaining their Forester badge.

Axes. The information below will assist the Scout in obtaining their Forester badge. Axes The information below will assist the Scout in obtaining their Forester badge. Axes can come in different shapes and sizes, the two axes that are of most relevance to any Scout Troop will be the HANDAXE

More information

Meeting of the Washington Board of Selectmen September 22, 2014

Meeting of the Washington Board of Selectmen September 22, 2014 Meeting of the Washington Board of Selectmen September 22, 2014 1. J. Huebner called the meeting to order 7:03 PM. Attending for the Board were J. Huebner, S. Lennon and M. Case. 2. After leading the assembly

More information

Trail Assessment Report

Trail Assessment Report Trail Assessment Report Trail Options for the Bear Creek Canyon located in Pikes Peak Ranger District, Pike National Forest and on Colorado Springs Utility Lands Due to the presence of a unique species

More information

Salmo Ski Hill 2015 Operating Season SVTS Annual Work Plan

Salmo Ski Hill 2015 Operating Season SVTS Annual Work Plan Salmo Ski Hill 2015 Operating Season SVTS Annual Work Plan 2014 Review Our goal for 2014 had been to complete construction of a 2.5km loop trail (Figure 1) with scouting and possibly layout for the remainder

More information

TRAIL MANAGEMENT GUIDELINES

TRAIL MANAGEMENT GUIDELINES TRAIL MANAGEMENT GUIDELINES Frenchman Bay Conservancy Trail Management Guidelines CONTENTS Safety Message..2 Trail Design..2 Trail Alignment.3 Trail Construction.3 Trail bridges.. 5 Re-vegetation.5 Trail

More information

SKID STEER ATTACHMENT

SKID STEER ATTACHMENT www.erskineattachments.com EXTREME HEAVY-DUTY BRUSH MOWER SKID STEER ATTACHMENT THE ULTIMATE MOWING MACHINE... Extreme jobs call for the Extreme Heavy-Duty Brush Mower. This mower is armored to withstand

More information

Appendix E: Railroad Route Evaluation, Maps and Tables

Appendix E: Railroad Route Evaluation, Maps and Tables Appendix E: Railroad Route Evaluation, Maps and Tables LandPeople E-1 Table of Contents 1.0 Railroad Operations...3 2.0 Rails-with-Trails...3 3.0 Methodology...3 4.0 Trail Design Assumptions...4 5.0 Typical

More information

DOOR - Single Leaf, Premium Duty, Quick-Acting Model 1430 Features 1

DOOR - Single Leaf, Premium Duty, Quick-Acting Model 1430 Features 1 DOOR - Single Leaf, Premium Duty, Quick-Acting Model Features 1 FREEMAN MARINE Quick-Acting doors feature patented chain-drive, single actuation dogging. This design feature allows for quick-acting doors

More information

GARFIELD BRIDGE. Building A Bridge to No-Where

GARFIELD BRIDGE. Building A Bridge to No-Where GARFIELD BRIDGE Building A Bridge to No-Where OCEANA COUNTY LOCATION Garfield Road leads to Stony Lake Outlet, a Benona Township park and popular Lake Michigan access GARFIELD BRIDGE OVER STONY CREEK

More information

MORGAN CREEK GREENWAY Final Report APPENDICES

MORGAN CREEK GREENWAY Final Report APPENDICES APPENDICES MORGAN CREEK GREENWAY Appendix A Photos of Existing Conditions in Trail Corridor Photos of existing conditions Main trail corridor - February 2009 Photos of existing conditions south bank Morgan

More information

FMC SPORTSMAN'S CLUB CAMPING RULES REVISED 10/11/2018

FMC SPORTSMAN'S CLUB CAMPING RULES REVISED 10/11/2018 FMC SPORTSMAN'S CLUB CAMPING RULES REVISED 10/11/2018 The club facilities are the result of many years of labor and sacrifice on the part of many past and present members. The Camping Committee Chairperson(s),

More information

Statement of Work Medicine Bow-Routt National Forests, Hahns Peak/Bears Ears Ranger District Lay-down fence in California Park.

Statement of Work Medicine Bow-Routt National Forests, Hahns Peak/Bears Ears Ranger District Lay-down fence in California Park. Statement of Work Medicine Bow-Routt National Forests, Hahns Peak/Bears Ears Ranger District Lay-down fence in California Park January 18, 2013 Location Work will take place in California Park, approximately

More information

Skiing and Snowshoes on Un-groomed Fernan Saddle Terrain

Skiing and Snowshoes on Un-groomed Fernan Saddle Terrain Skiing and Snowshoes on Un-groomed Fernan Saddle Terrain Three ski or snowshoe routes are available from the Fernan Saddle Parking Lot which either do not cover routes ordinarily groomed for snow machine

More information

Alaska Volunteer Trip May 2018 Trip Report Page 2

Alaska Volunteer Trip May 2018 Trip Report Page 2 PROJECT REPORT Alaska Volunteer Trip Juneau Ranger District, Tongass National Forest and Klondike Gold Rush National Historical Park May 28 - June 8, 2018 Executive Summary Eleven Conservation Volunteers

More information

MAINTENANCE TOOLS? LANDSCAPE & MAINTENANCE TOOLS BROCHURE Q: LOOKING FOR A LARGE SELECTION OF LANDSCAPE &

MAINTENANCE TOOLS? LANDSCAPE & MAINTENANCE TOOLS BROCHURE Q: LOOKING FOR A LARGE SELECTION OF LANDSCAPE & MAINTENANCE? Q: LOOKING FOR A LARGE SELECTION OF LANDSCAPE & A: LOOK NO FURTHER THAN MESA EQUIPMENT & SUPPLY. www.mesaequipment.com LANDSCAPE & MAINTENANCE BROCHURE PEOPLE PRODUCT PERFORMANCE AIR COMPRESSORS

More information

Lincoln North Woodstock, New Hampshire Area Quick Guide

Lincoln North Woodstock, New Hampshire Area Quick Guide Lincoln North Woodstock, New Hampshire Area Quick Guide Lincoln-Woodstock 2 towns in the heart of the White Mountain National Forest. Located at Exit 32 on I-93. 100 Miles from the Mass-NH Border. Supermarket

More information

BRR Leg 1 (3.9 miles, Easy)

BRR Leg 1 (3.9 miles, Easy) BRR Leg 1 (3.9 miles, Easy) Min 3901 Max 4919 Ascent +21 Descent -1031 0.0 Start (Grayson Highlands State Park Visitor Center) 3.9 Grayson Highlands State Park Office & Gate, on R (EZ 1) Leg Notes: Minimal

More information

Lincoln Woodstock. Riverfront Park and Trail System. Project Description

Lincoln Woodstock. Riverfront Park and Trail System. Project Description Lincoln Woodstock Riverfront Park and Trail System Project Description Rev: 6 Dated: May 16, 2008 Table of Contents I. Executive Summary Page 3 II. The Riverfront Park Page 4 III. The Trail System Page

More information

2. STAKEHOLDER FEEDBACK // What We Heard

2. STAKEHOLDER FEEDBACK // What We Heard 1. QUARRY ROAD TRAIL // Welcome to the Information Session PROJECT DESCRIPTION WHY WE ARE HERE Quarry Road Trail is a popular commuter trail and recreational area for Calgarians. 1. To report citizen feedback

More information

KP Lasnaya 1 River

KP Lasnaya 1 River KP 370.2 Lasnaya 1 River The Lasnaya 1 River crossing is protected by Reno mattings and a gabion wall on the north bank (Photo 1). The south bank consists of natural river gravel deposits on top of Reno

More information

BC Sno Riders Snowmobile Club. Belden Hill Golf Course October 13, 2008

BC Sno Riders Snowmobile Club. Belden Hill Golf Course October 13, 2008 BC Sno Riders Snowmobile Club Belden Hill Golf Course October 13, 2008 B.C. Sno-Riders 2008-2009 Officers President Sandy Chapin Vice President Dave Norton Secretary Suzanne Gates Treasurer & Membership

More information

Mt. Tabby Improvement Group Inc. Annual Meeting Agenda

Mt. Tabby Improvement Group Inc. Annual Meeting Agenda Mt. Tabby Improvement Group Inc. Annual Meeting Agenda 6/21/2014 10:00 A.M. I. Call To Order --- Pat Foard Pat called the meeting to order at 10:05 a.m. II. Welcome members and introduce new members (owners)

More information

Group similar facilities together separate dissimilar facilities.

Group similar facilities together separate dissimilar facilities. Park design Principle #1 Group similar facilities together separate dissimilar facilities. Why do we do this? Safety Differences in admission fees Differences in seasonal use Reduce user conflicts Principle

More information

Appendix C. Tenderfoot Mountain Trail System. Road and Trail Rehabilitation Plan

Appendix C. Tenderfoot Mountain Trail System. Road and Trail Rehabilitation Plan Appendix C Tenderfoot Mountain Trail System Road and Trail Rehabilitation Plan All rehabilitation work would be under the direction of the District Fisheries Biologist, the Forest Hydrologist, and/or the

More information

2016 Trails Maintenance and Operating Costs

2016 Trails Maintenance and Operating Costs 2016 Trails Maintenance and Operating Costs Motorized Trails Maintenance for motorized trails comes from vehicle registration fees and a portion of the federal Recreation Trails Program (RTP) funds. The

More information

Twin Mountains Snowmobile Club P.O. BOX 519, BOBCAYGEON, ONTARIO, CANADA, K0M 1A0

Twin Mountains Snowmobile Club P.O. BOX 519, BOBCAYGEON, ONTARIO, CANADA, K0M 1A0 Twin Mountains Snowmobile Club P.O. BOX 519, BOBCAYGEON, ONTARIO, CANADA, K0M 1A0 www.twinmountainssc.ca Fall Newsletter 2015 President s Report Twin Mountains Snowmobile Club is the proud recipient of

More information

Hiking Las Vegas.com

Hiking Las Vegas.com Hike: Mt. Wilson via First Creek Canyon route Trailhead: First Creek marked Distance: 10 miles up and back Elevation gain: 3,400 feet Elevation of Peak: 7,070 feet Time: 7 to 9 hours (up and back) Difficulty:

More information

CENTER PIVOT TRACK MANAGEMENT OPTIONS

CENTER PIVOT TRACK MANAGEMENT OPTIONS Proceedings of the 28th Annual Central Plains Irrigation Conference, Kearney, Nebraska, February 23-24, 2016 Available from CPIA, 760 N. Thompson, Colby, Kansas CENTER PIVOT TRACK MANAGEMENT OPTIONS Steven

More information

WEEKLY PROVINCIAL HIGHWAY CONSTRUCTION UPDATE FOR THURSDAY, OCTOBER 6, 2016 The law is black and white. Slow to 60 km/hr in Work Zones.

WEEKLY PROVINCIAL HIGHWAY CONSTRUCTION UPDATE FOR THURSDAY, OCTOBER 6, 2016 The law is black and white. Slow to 60 km/hr in Work Zones. NEW WORK PROJECT/WORK: Highway 354 near Dilke ESTIMATED COST: $3.4M START OF THIS YEAR'S CONSTRUCTION: October 1, 2016 DESCRIPTION: About 17 km of surfacing on Highway 354 from the junction with Highway

More information

November 15, 2010 Minutes of Meeting

November 15, 2010 Minutes of Meeting Minutes of Meeting Present Bill B. (President), Lars A. (Vice President), Steve G. (Park Supervisor), Pam J. (Secretary), Tyler E. (VP for Trails), Sandy C. (Membership), Carl C. (FOW), Wayne S. (FOW),

More information

COUNTY OF SAN MATEO Parks Department

COUNTY OF SAN MATEO Parks Department COUNTY OF SAN MATEO Parks Department DATE: September 23, 2014 COMMISSION MEETING DATE: October 2, 2014 TO: FROM: SUBJECT: Parks and Recreation Commission Scott Lombardi, Park Superintendent Superintendent

More information

Conway Snowmobile Club. Grooming Procedures, Policies, and Training

Conway Snowmobile Club. Grooming Procedures, Policies, and Training Conway Snowmobile Club Grooming Procedures, Policies, and Training Created: October 7, 2009 CRW Approved: October 8, 2009 Conway Grooming Committee Revised: Page 1 of 12 Table of Contents Table of Contents...2

More information

Marilla Reservoir to Chestnut Ridge via Marilla Trails and Bullis Hollow Trail east to west

Marilla Reservoir to Chestnut Ridge via Marilla Trails and Bullis Hollow Trail east to west USGS topographic maps useful to this hike are the Bradford and Stickney 7.5 minute sectionals. These notes are designed to assist in identifying distance and location using geophysical and man-made characteristics

More information

2017 Project Report: Priority 1 Trail Repairs - Boulder Ranger District Boulder Mountainbike Alliance

2017 Project Report: Priority 1 Trail Repairs - Boulder Ranger District Boulder Mountainbike Alliance 2017 Project Report: Priority 1 Trail Repairs - Boulder Ranger District Boulder Mountainbike Alliance BMA partnered with the USFS Boulder Ranger District (USFS), to repair two flood-damaged trails (Sourdough

More information

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015 EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015 1 SEGMENT 1 2 THE WISHBONE Connects the TEXpress Managed Toll System to the 35Express Managed Toll System Limits: Crown Road (near Royal Lane) to Valley

More information

Gatwick Stream Riverside Garden Park, Horley

Gatwick Stream Riverside Garden Park, Horley Gatwick Stream Riverside Garden Park, Horley An Advisory Visit by the Wild Trout Trust January 2014 1 1. Introduction This report is the output of a Wild Trout Trust visit to the Gatwick Stream in Horley,

More information

The Rains at Kennesaw Mountain - Its Daily Impact

The Rains at Kennesaw Mountain - Its Daily Impact The Rains at Kennesaw Mountain - Its Daily Impact Sherman wrote that, prior to arriving at Kennesaw Mountain in June 1864, it had rained for 19 straight days. One of his soldiers said 21 days of rain.

More information

MANAGEMENT FACTORS TO CONSIDER REGARDING CONCURRENT TRACKED OHV USE ON GROOMED SNOWMOBILE TRAILS

MANAGEMENT FACTORS TO CONSIDER REGARDING CONCURRENT TRACKED OHV USE ON GROOMED SNOWMOBILE TRAILS MANAGEMENT FACTORS TO CONSIDER REGARDING CONCURRENT TRACKED OHV USE ON GROOMED SNOWMOBILE TRAILS By Trails Work Consulting For the American Council of Snowmobile Associations June 2015 MANAGEMENT FACTORS

More information

1. Progress of road construction of Via Limon (Limon Metal Corral)

1. Progress of road construction of Via Limon (Limon Metal Corral) Progress Report for Site visit to Panamaes for the period 2008-03-12 through 2008-03-27 Peter Schiess Main focus of site visit was 1. Progress of road construction of Via Limon (Limon Metal Corral 2. Progress

More information