1 Salmo Ski Hill 2015 Operating Season SVTS Annual Work Plan 2014 Review Our goal for 2014 had been to complete construction of a 2.5km loop trail (Figure 1) with scouting and possibly layout for the remainder of a trail to the top of the ski hill if time permitted. Figure 1. Original 2014 proposed layout for the Sunset Loop trail. Our actual achievements included (Figure 2): Layout of 2km of Sunset Loop. During layout process it was determined that the descending portion of the trail on the east side would be extremely challenging to locate within the Controlled Recreation Area (CRA) because of slope, unnamed creek and ski run. The remaining portion of the loop will be located on the Crown land to the east of East Run Clearing, construction, finishing and signage of first 500m of the 2km. Clearing of additional 300m of the 2km immediately beyond the completed section Receipt of our Water Act notification for construction of bridge over Sunset Creek.
2 2015 Objectives Our objectives and proposed timelines for 2015 are: Complete maintenance of existing trail (May) Complete construction of Sunset Loop (May/June/July until fire season) Complete construction of the Summit trail (September/October/November) Layout intermediate trail (April/May) Construction of intermediate trail (May- November) Maintenance Maintenance of the existing 500m of trail will be completed immediately upon approval of the annual work plan. Maintenance activities will consist of: Ensuring signage is secure and in place Clearing blow down and brush from winter Repairing drainage features Sunset Loop and Summit Trail The Sunset Loop departs from the bottom of the West Run and climbs through the forest between West Run and Sunset Creek (Figure 2). It will come out onto the run where Sunset Creek is culverted. It will cross the run and creek at the culvert and then enter back into the forest mirroring the west access road. The trail crosses the West Run using the existing road and gets onto an old road in the forest between the West Run and No Guts No Glory. A creek crossing will be required. The trail again uses existing roadbed to cross over to East Run. The route will then leave the CRA, re- entering at the bottom of the East Run and connecting back to the parking lot. The Summit trail will leave Sunset Loop at 1.5km, follow up the trees east of the West Run and then cross the West Run at a flat bench. The trail then climbs through the trees immediately west of the West Run, coming out at the top of the West Run (Figure 2). Randy Boardman has completed the majority of trail layout for these trails with follow- up support from Lisa Tedesco, Jillian Russell and Elliot Russell. Trail layout has avoided mature trees wherever feasible however to make trail construction and layout easier in this steeper ground we do anticipate needing to remove mature trees. These are primarily cedar and hemlock with diameters of 20-25cm on areas of steeper ground where switchbacks are required. A tree- cutting permit has been prepared and is attached as an appendix. For Sunset Loop and the Summit trail, a public tender process will be undertaken through the end of April with the target date for selection of the successful bidder of early May. As with 2014, a small machine such as the Kubota U17- HGS will be used for construction. Based on contractor input, minor adjustments may be required during construction. Trail clearing will be completed by the contractor, however volunteers may provide support if necessary to manage costs or there is particular interest from volunteers.
3 Small trees and shrubs will be cut flush at the base. Larger stems (7cm to 17cm diameter at breast height) will be cut at a height of approximately 1m to allow for the small machine to grasp onto them and remove them. Trees larger than 17cm will be marked for retention. Only certified operators with required personal protective equipment will be permitted to operate chainsaws. The small machines will be used to remove stumps and root wads and rough in the trail bed. Volunteers will finish the trail bed using basic tools such as MacLeods, picks, shovels, pulaskis and rakes. Figure 2. Map of existing trail (red) and trail at layout stage (green and yellow) ready for machine construction. Green trees indicate potential areas of tree cutting.
4 Intermediate Trail The purpose of the intermediate trail is to provide a more challenging option for hikers and mountain bikes. An intermediate trail will also reduce the amount of descending mountain bike traffic on the green rated summit trail. SVTS volunteers will complete trail layout of the intermediate trail. Elliot Russell and Tristan Ray are the trail construction managers. Trail construction managers are responsible for: Initial trail layout and design Completing any required layout adjustments based on SVTS Board of Director or SSC feedback Maintaining SVTS owned trail building tools, equipment and supplies Tracking number of volunteers and hours participated Phase 1 of the intermediate trail has been laid out and is ready for approval (Figure 3). The first section is approximately 370m. Figure 3. First phase of the intermediate trail (blue).
5 Trail construction will be hand construction. SVTS volunteers will clear brush and trees from the designated trail route using chainsaws and brushsaws. Brush and trees will be painted (similar to a mark to cut system) to ensure volunteers know what must be removed versus cannot be removed and at what height to cut the material at. Small trees and shrubs will be cut flush at the base. Larger stems (7cm to 17cm diameter at breast height) will be cut at a height of approximately 1m to allow for the small machine to grasp onto them and remove them. Trees larger than 17cm will be marked for retention. Only certified operators with required personal protective equipment will be permitted to operate chainsaws and brushsaws. SVTS volunteers will clear, construct and finish the trail bed using basic tools such as McLeods, picks, shovels, pulaskis and rakes. Community volunteer build days will be held weekly on a night to be determined based on member feedback. Weekend community volunteer build days will be held once or twice a month. At least two individuals listed as managers and assistants or on the Board of Directors will be present at any volunteer build event. These individuals will be responsible for ensuring that required signage is in place prior to work starting. Signage Signage consists of under construction safety signage, difficulty and directional signage on completed trails and trailhead signage. Prior to clearing and construction starting on a section of trail a trail closed sign will be installed at each access point. Safety and directional signage will be installed once a section of trail is completed and before being opened to the public. This will consist of a difficulty sign (e.g. green circle, blue square) and informational sign indicating allowable uses. Where there are trail junctions signs will be installed with name of trail and arrow indicating direction to go to follow that trail. If trail junction is multi- directional cautionary signage such as Caution Trails Merge will be installed. In the fall a kiosk will be installed in the parking area at a location to be determined with the SSC. The kiosk will include a large map of the area trails, allowable uses information, trail user guidelines (e.g. pack in what you pack out), and SVTS contact information. SVTS will continue to obtain signs from Inter- Mtn Enterprises Ltd. in Kelowna. Permits The loop trail crosses Sunset Creek at a historic roadbed crossing. The required Ministry of Forests, Lands and Natural Resource Operations, Water Act Section 9 notification has been received (attached).
6 A License to Cut permit has been prepared and is submitted as an appendix to this plan. The License to Cut needs to be submitted and held by the SSC as the tenure holder but the SVTS has completed the paper work. Events The SVTS would like to hold a grand opening event upon completion of the trail. A BBQ and guided tour or perhaps tag team race where pedestrians and cyclists tag off for alternate laps could be organized. Group rides and hikes may also be organized to encourage community use. Approval Dated at Salmo, BC on this day of April, The Salmo Ski Club by its authorized Signatory: The Salmo Valley Trail Society by its authorized signatory:
Route #1) Mt. of the Holy Cross - North Ridge
Climbing 14ers can be very dangerous, please read the Mountaineering Safety Page and make sure you have a map+compass and can use them effectively, without the help of electronic devices. Route #1) Mt.
Piestewa Peak/Dreamy Draw Trail Guide
Piestewa Peak/Dreamy Draw Trail Guide Trail #1A - Perl Charles Memorial Trail Length: 4.8 miles Elevation: 2,200 ft. - 1,340 ft. Difficulty: Moderate to difficult The Perl Charles trailhead is located
Kitimat. Pacific Inland Coast. Hiking Guide Kitimat, British Columbia, Canada
Kitimat Pacific Inland Coast Hiking Guide Kitimat, British Columbia, Canada 2010-2011 Sites and Trails Emergency Call 911 Police - Fire - Medical 2 Welcome to Kitimat This information was produced to assist
Barbour Rock Recreation Trails Plan Columbia Valley Greenways Trails Alliance and Columbia Valley Cycling Society
7/9/2016 Barbour Rock Recreation Trails Plan Columbia Valley Greenways Trails Alliance and Columbia Valley Cycling Society Kootenay Planning Consultants 1 Columbia Valley Greenways Trail Alliance P.O.
Example of the layout of a Fieldwork Atlas
Example of the layout of a Fieldwork Atlas Example of a Worksite with multiple facilities and work goals in one area: Map Center 49 3 46 N 117 3 11 W Noname Area with typical travel route marked. Avalanche
Design Considerations For Accessible Parks & Trails
Design Considerations For Accessible Parks & Trails Measuring Up: Campbell River 2008 Dave Calver Consulting City of Campbell River Legacies Now: Measuring Up Design Guidelines Design Considerations for
PASSPORT. Discovering the Trails of Webster, NY
PASSPORT to family wellness Discovering the Trails of Webster, NY Join the Friends of Webster Trails, Webster Health and Education Network, The Town of Webster and Wegmans to get moving more and enjoy
ADOPT-A-TRAIL MANUAL C. Bailey-May
ADOPT-A-TRAIL MANUAL C. Bailey-May 2011 1 ADOPT-A-TRAIL VOLUNTEER DUTIES Welcome to the White Mountain National Forest s Adopt-A-Trail (AAT) program and thank you for volunteering with us! This volunteer
(west) onto Charleston Boulevard. Drive 16 miles on Charleston and turn right into Red Rock
Hike: North Peak and Ice Box Overlook up and back Trailhead: 2.5 miles up the Rocky Gap Road not mark Distance: 5 miles round trip Elevation gain: 2,694 feet Elevation Peak: 7,094 feet Time: 3 to 5 hours
The Whitefish Trail
The Trail - 2017 Trail Construction Specifications & Scope of Services The Lower Haskill section of Trail construction will take place on two different land ownerships: City of and Iron Horse. This section
HIKING/BIKING IN MERRITT AREA
HIKING/BIKING IN MERRITT AREA Coquihalla Lakes: Just inside the southern boundary of BC Park's Coquihalla Summit Park, a nice little twin lakes paddle with a private campground & lodge is the Coquihalla
NCAP Application Section E: Continuous Camp Improvement Plan
Council name: (One per camp) Camp property name: Camp name: (If camp occurs off council property, use off property for camp property name.) Camp type: Cub Scout resident Boy Scout resident Venturing resident
Volunteer Project Report for May 14-20, 2017 Yosemite National Park Volunteer Trip. Executive Summary
120 Village Square #9, Orinda, California 94563 www.conservationvip.org info@conservationvip.org Tel: (925) 228-5946 A Non-Profit 501c3 Tax Exempt Organization Volunteer Project Report for May 14-20, 2017
Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012
Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012 Purpose of Feasibility Study Purpose Evaluate the feasibility of constructing a multiuse
A Publication of Friends of Sleeping Bear Dunes
A Publication of Friends of Sleeping Bear Dunes 2014, Friends of Sleeping Bear Dunes, P.O. Box 545, Empire, MI 49630 www.friendsofsleepingbear.org info@friendsofsleepingbear.org Learn more about the Friends
211: BASIC TRAIL MAINTENANCE For The Florida Trail A How To Guide For New Trail Maintainers
211: BASIC TRAIL MAINTENANCE For The Florida Trail A How To Guide For New Trail Maintainers April 2016 Second Edition July 2015 Introduction Volunteers of The Florida Trail Association (FTA) are responsible
Skiing and Snowshoes on Un-groomed Fernan Saddle Terrain
Skiing and Snowshoes on Un-groomed Fernan Saddle Terrain Three ski or snowshoe routes are available from the Fernan Saddle Parking Lot which either do not cover routes ordinarily groomed for snow machine
Meshach Browning Trail System at the Deep Creek Lake Lion s Club Park on Bumble Bee Rd.
Meshach Browning Trail System at the Deep Creek Lake Lion s Club Park on Bumble Bee Rd. The Meshach Browning trail system will be a public, non-motorized, multi-use (running, dog-walking, cross country
TRAILS INTERSECTION SIGNS
TRAILS INTERSECTION SIGNS Intersection signs shall be placed at all trail intersections and located a minimum of 3 from the edge of trail. The top of the post shall pitch away from the sign and trail.
RECREATION TRAILS MASTER PLAN
RECREATION TRAILS MASTER PLAN Prepared by: and The Kimberley Advisory Trail Planning Committee April 2003 Table of Contents 1.0 Project Description 4 2.0 Goals 4 3.0 Planning Principles 4 4.0 Master Planning
FINCH HYDRO CORRIDOR TRAIL PROJECT
FINCH HYDRO CORRIDOR TRAIL PROJECT Pharmacy Avenue to Birchmount Road January 29 th, 2018 L Amoreaux Community Centre (2000 McNicoll Avenue) 1 Purpose of Drop In Event The purpose of today s drop-in event
General Design Guidelines & Schedule of Design Elements For the Haw River Trail
General Design Guidelines & Schedule of Design Elements For the Haw River Trail Conceptual Greenway Master Plan From the Indian Valley Golf Course to Glencoe Mill Village August 2007 Prepared for The City
MORGAN CREEK GREENWAY Final Report APPENDICES
APPENDICES MORGAN CREEK GREENWAY Appendix A Photos of Existing Conditions in Trail Corridor Photos of existing conditions Main trail corridor - February 2009 Photos of existing conditions south bank Morgan
Pocahontas Area Map Jasper INFORMATION CENTRES Lake Louise Field Golden Banff
Pocahontas Miette Hot Springs Area Map Jasper Maligne JASPER Columbia Icefield Saskatchewan River Crossing INFORMATION CENTRES Banff National Park Louise Kootenay Park Lodge Yoho National Park Columbia
BRIAN HEAD AREA TRAILS MASTER PLAN. January 2015
BRIAN HEAD AREA TRAILS MASTER PLAN January 2015.............. ACKNOWLEDGEMENTS & SIGNATURES Thanks to Brian Head Town s Trails Master Plan Development Committee who includes the key partners within the
FILE: /PERM EFFECTIVE DATE: May 16, 2014 AMENDMENT:
APPROVED AMENDMENTS: Effective Date Briefing Note /Approval Summary of Changes: FILE: 11000-00/PERM EFFECTIVE DATE: May 16, 2014 AMENDMENT: Table of Contents 1. POLICY APPLICATION... 1 2. PRINCIPLES AND
TOURISM & PUBLIC SERVICES RURAL SIGNAGE POLICY
Policy and Procedures Subject Title: Tourism and Public Services Rural Signage Policy Corporate Policy (Approved by Council): X Policy Ref. No.: ROADS-01-07 Administrative Policy (Approved by CAO): By-Law
Lava Mountain Trail Distance: Elevation Range: Trail Type: Difficulty: Season: Driving Distance: Driving Time: USGS Maps: Pros Cons
Lava Mountain Trail Distance: 13.4 miles (including the side trip to North Star Lake) Elevation Range: 5900'-8330' Trail Type: singletrack Difficulty: moderate Season: late June-October Driving Distance:
Outdoor Developed Areas
The United States Access Board is an independent federal agency that promotes equality for people with disabilities through leadership in accessible design and the development of accessibility guidelines
Trails Design and Management Handbook
Trails Design and Management Handbook OPEN SPACE PITKIN AND TRAILS COUNTY Open Space and Tr ails Progr am Pitkin County, Color ado Pitkin County Open Space and Trails Program Trails Design and Management
Trail Notes Palouse Region Hikes
Trail Notes Palouse Region Hikes Campus Recreation 875 Perimeter Drive MS 1230 Moscow, Idaho 83844-1230 Ph: 208.885.6810 Rentals: 208.885.6170 Fax: 208.885.6879 uidaho.edu/outdoorprogram 0 PALOUSE REGION
San Luis Obispo. Bishop Peak Felsman Loop Eagle Rock Maino Open Space Poly Canyon Poly P Other Areas
San Luis Obispo Bishop Peak Felsman Loop Eagle Rock Maino Open Space Poly Canyon Poly P Other Areas 1 JCT. ELEV. 72 400 00 0 FELSMAN LOOP GATE LOOP RIDGE 600 FENCE JCT. ELEV. 860 1000 1200 BISHOP PEAK
Proposed Arthurs Point Special Housing Area. Housing Accords and Special Housing Areas Act Expression of Interest
Proposed Arthurs Point Special Housing Area Housing Accords and Special Housing Areas Act 2013 Expression of Interest 1.0 APPLICANT The applicant for the proposed Arthurs Point Special Housing Area is
TRAILS WHERE TO FIND TRAILS IN NOVA SCOTIA
TRAILs SIGNAGE Know the Signs............................ 44 WHERE YOU CAN RIDE Roads and Highways........................ 46 Designated Trails........................... 47 Established Trails...........................
Policy. Huts, Cabins and Lodges in BC Provincial Parks
Policy Huts, Cabins and Lodges in BC Provincial Parks Federation of Mountain Clubs of BC Version 1.3 Published August 2, 2015 INTRODUCTION The Federation of Mountain Clubs of BC (FMCBC) promotes self-propelled
ETOBICOKE CREEK NORTH TRAIL PROJECT. May 18, 2017 at Michael Power High School 105 Eringate Drive, Etobicoke ON M9C 3Z7
ETOBICOKE CREEK NORTH TRAIL PROJECT May 18, 2017 at Michael Power High School 105 Eringate Drive, Etobicoke ON M9C 3Z7 1 Purpose of Open House The purpose of today s open house is to present the design
Avalanches and the Mount Whitney Basin
Avalanches and the Mount Whitney Basin 10 April 2006 by Bob Rockwell Prelude Avalanches are a fact of life in high mountains in winter, and we take courses to find out about them. We learn how to assess
Hiking Las Vegas.com
Hike: Mt. Wilson via First Creek Canyon route Trailhead: First Creek marked Distance: 10 miles up and back Elevation gain: 3,400 feet Elevation of Peak: 7,070 feet Time: 7 to 9 hours (up and back) Difficulty:
Proposed At-grade Crossings of Officially Recognized Trails Port MacKenzie Rail Extension Project
Proposed At-grade Crossings of Officially Recognized Trails Port MacKenzie Rail Extension Project 1.0 Introduction On November 21, 2011 the Surface Transportation Board (STB) issued a final decision (Docket
The methodology and sample surveys have been developed through a partnership of: DCNR and the Secretary's Greenways Program Advisory Committee
Trail User Survey Workbook How to conduct a survey and win support for your trail Sample Surveys and Methods 2005 Rails-to-Trails Conservancy Northeast Regional Field Office 2133 Market St, #222 Camp Hill,
Stephens Rd. Nature Preserve
Stephens Rd. Nature Preserve History Stephens Road Nature Preserve (SRNP) is a 350-acre nature preserve in Huntersville that comprises nine properties purchased between 1994 and 2008. Parcels included
Finn Creek Park. Management Direction Statement Amendment
Finn Creek Park Management Direction Statement Amendment November 2013 Management Direction Statement Amendment Approved by: Jeff Leahy Regional Director, Thompson Cariboo BC Parks November 12, 2013 Date
MAYORAL ORDER No Relating to safety in Puy-Saint-Vincent's Cross-Country/Nordic Skiing Area
MAYORAL ORDER No. 2017.31 Relating to safety in Puy-Saint-Vincent's Cross-Country/Nordic Skiing Area This Mayoral Order has been issued by the Mayor of Puy-Saint-Vincent District, in accordance with and
CAMELBACK MOUNTAIN: CHOLLA TRAIL
CITY OF PHOENIX :: Camelback Mountain: Cholla T rail 21 CAMELBACK MOUNTAIN: CHOLLA TRAIL IN BRIEF Camelback Mountain is the tallest point in the city of Phoenix. From the 2,704-foot summit of Camelback,
How to Build Shelters Along the Appalachian National Scenic Trail to Meet Accessibility Guidelines
ATC LMPG-Appendix I How to Build Shelters Along the Appalachian National Scenic Trail to Meet Accessibility Guidelines Simple shelter designs are very easy to make accessible it only takes a little extra
Site Location and Setting
Memorandum Date: To: From: Subject: Kristy Le, Gary Black Steve Orem Santa Teresa County Park Historic Area Traffic and Parking Study Hexagon Transportation Consultants, Inc. has completed a traffic and
Section II. Planning & Public Process Planning for the Baker/Carver Regional Trail began in 2010 as a City of Minnetrista initiative.
Section II Planning & Public Process Planning for the began in 2010 as a City of initiative. city staff began discussions with the Park District on the possibility of a north/south regional trail connection
Decision Memo Ice Age Trail Improvement (CRAC 37)
Decision Memo Ice Age Trail Improvement (CRAC 37) U.S. Forest Service Chequamegon-Nicolet National Forest, Medford-Park Falls Ranger District Taylor County, Wisconsin T32N, R2W, Town of Grover, Section
Skyline Drive Hogback Canon City
Skyline Drive Hogback Canon City Direction to trailhead: From US 50, turn north onto 15th Street. At the traffic circle, continue north on 15th Street until it dead ends at Washington Street (about 1.5
Casque Isles Hiking Trail Upgrade Project
Casque Isles Hiking Trail Upgrade Project Request for Proposals Release Date: May 1st, 2016 Deadline for Questions: Closing: June 3 rd, 2016 @ 2:00pm June 9 th, 2016 @ 2:00pm Please include this cover
CAMPSITE 411. Girl Scouts of Greater Atlanta, Inc.
CAMPSITE 411 Girl Scouts of Greater Atlanta, Inc. What is provided for us at each campsite/cabin? Although each living unit (tents or cabins) is unique, you can expect to find certain unit equipment in
CMC Member Guide to the CMC Website
CMC Member Guide to the CMC Website HOW TO: Sign Up or Cancel a Trip/Event/Class Change Your Personal Information PLUS HOW TO FIND: Renew Your Membership Trip classification information Denver Group Classification
TAHOE GETAWAY. Monday, October 1 through October 4, 2012
TAHOE GETAWAY Monday, October 1 through October 4, 2012 COORDINATORS Sue Geisler --- Hiking Dennis Ratay --- Lodging Lodging is now filled. Waiting List: Anyone else interested in participating in the
Barton on Sea. Owned by: New Forest District Council Wind Direction SW SE (135 to 225 ) Best: S (180 )
OS Grid Ref: SZ 242 929 (Map 195) GPS: N50:44.113 W1:39.507 Owned by: New Forest District Council Wind Direction SW SE (135 to 225 ) Best: S (180 ) Nearest Phone: Casualty Units: Junction of Marine drive
Alpine Trails Mountain Community Development Lands Fernie, British Columbia Winter 2018
FOR SALE Residential Development Land 228 ± Acres Size: Zoning: Price: 228 +/- Acres R1B and R3 $7,700,000 CAD ($33,772.00 /Acre) $6,055,000 USD ($26,557.00 /Acre) Alpine s Mountain Community Development
Bayview Escarpment. Interim Management Statement
Bayview Escarpment Interim Management Statement Bayview Escarpment Provincial Nature Reserve Interim Management Statement January 15, 1995 REGIONAL DIRECTOR'S APPROVAL STATEMENT This Interim Management
PARK HOST RESPONSIBILITIES
PARK HOST RESPONSIBILITIES Cedar Point Recreation Area, Gloster Recreation Area, Grelle Recreation Area, Jessica Hollis Park, Muleshoe Bend Recreation Area, Shaffer Bend Recreation Area and Turkey Bend
Beaver Island Airport Terminal Building Project Q & A Prepared by Mead & Hunt
Beaver Island Airport Terminal Building Project Q & A Prepared by Mead & Hunt About the Consultant Q What services do you (Mead & Hunt) provide as the Island s airport consultant? A Mead & Hunt provides
Æÿ U Æ% Sauk Point @ Segment Merrimac. Æÿ DL. Devil's Lake. State Park. Gibraltar.
MARQUETTE Æ% 23 French Creek Wildlife Area Dells Æ% 127 Æÿ H Æÿ F (/ 51 Lake Delton Æÿ Æ% 16 90 Mirror Lake State ark Western Bifurcation Æ% 23 ortage ortage Canal 94 ine Island Wildlife Area Eastern Bifurcation
The original needs analysis carried out in 2001 identified three options for acquiring or leasing land for the crèche:
5. REDCLIFFS/SUMNER COMMUNITY CRÈCHE RELOCATION Officer responsible Author Property Manager Kevin Mara, DDI 941 6401 The purpose of this report is to update the Council on the status of this project, in
crrv OF DALLAS Memorandum Trinity River Corridor Project Update On Recreation
Memorandum OATE December 8, 2011 crrv OF DALLAS TO Trinity River Corridor Project Committee Members: Vonciel Jones Hill (Chair) Linda Koop (Vice Chair), Monica Alonzo, Scott Griggs, Angela Hunt, Delia
Procedure for the Use of Power-Driven Mobility Devices on Mass Audubon Sanctuaries 1 September 17, 2012
Procedure for the Use of Power-Driven Mobility Devices on Mass Audubon Sanctuaries 1 September 17, 2012 Background As part of Mass Audubon s mission to preserve the nature of Massachusetts for people and
Business Item No
Metropolitan Parks and Open Space Commission Meeting date: February 6, 2018 For the Community Development Committee meeting of February 20, 2018 For the Metropolitan Council meeting of February 28, 2018
Management Standards for Recreational Trails
Management Standards for Recreational Trails First edition October 2008 The National Trails Office The National Trails Office (NTO) is a programme run by the Irish Sports Council building on the work of
Below is an example of a well laid-out template of a route card used by the Sionnach Team which is a good format to begin with.
Route Card A route card is used as a navigational aid to hill walkers by setting out a step by step plan for an intended hike. It is good practice to make out a route card before every hike you or your
Glacial Lakes State Trail Master Plan Amendment Trail Extension into Downtown Willmar
Glacial Lakes State Trail Master Plan Amendment Trail Extension into Downtown Willmar Minnesota Department of Natural Resources Division of Parks and Trails July 2012 Glacial Lakes State Trail Master Plan
Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program,
Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program, updates on construction to be held in this area, and how
HIKING TRAILS IN THE DAHLONEGA AREA
HIKING TRAILS IN THE DAHLONEGA AREA 22 Trails in the North Georgia Mountains within 32 miles of Dahlonega Provided by the Dahlonega- Lumpkin County Visitors Center Information compiled and produced by
Area Organization Project Name Project Description Funding Amount Castlegar Castlegar Nordic Ski Club
BACKGROUNDER RECREATION INFRASTRUCTURE GRANTS 2018 INTAKE: LIST OF PROJECTS APPROVED FOR FUNDING Area Organization Project Name Project Description Funding Amount Castlegar Castlegar Nordic Ski $12,000
THE RESERVE III AT SUGAR MOUNTAIN, NORTH CAROLINA
THE RESERVE III AT SUGAR MOUNTAIN, NORTH CAROLINA Information Memorandum AUGUST 2015 THE RESERVE III Contents I. THE PROPERTY... 3 OVERVIEW... 3 READY TO BUILD... 4 INEXPENSIVE CONSTRUCTION... 5 ADDITIONAL
Seasonal Interpretive Ranger
Position Description Department of Education and Natural Resources Seasonal Interpretive Ranger Early March-end of October position Objective: Seasonal Interpretive Rangers work directly with the Chief
Looking back across Emerald Lake at Wapta Mountain (on the left) and Mount Burgess (on the right):
YOHO LAKE FROM EMERALD LAKE, YOHO NATIONAL PARK, BRITISH COLUMBIA, CANADA We decided to hike to Yoho Lake from Emerald Lake even though the distance is longer than the trail from Takakkaw Falls (about
ALPINE Parque Nacional de Ordesa y Monte Perdido / Spain, 2014
Parque Nacional de Ordesa y Monte Perdido / Spain, 204 VARI 2 Strong alpine backpack ideal for use on climbing trails. The slender front loader Vari 2 has the padded and flexible Vent Comfort system to
TART Trails, Inc. (231)
TART Trail System TART Trails, Inc. www.traversetrails.org (231) 941-4300 Leelanau Trail Stretching 15 miles along a former railroad corridor, the TART-owned Leelanau Trail connects Traverse City and Suttons
M.J. Milne & Associates Ltd.
M.J. Milne & Associates Ltd. March, 29 Tolko Industries Ltd. 6 Yellowhead Highway RR#, Site, C Kamloops, BC V2C K Attention: Mr. Michael Bragg, R.P.F. Dear Sir: Re: Risk Rating Evaluation Non-status Roads
COUNTY OF SAN MATEO Parks Department
COUNTY OF SAN MATEO Parks Department DATE: September 23, 2014 COMMISSION MEETING DATE: October 2, 2014 TO: FROM: SUBJECT: Parks and Recreation Commission Scott Lombardi, Park Superintendent Superintendent
BANFF NATIONAL PARK, ALBERTA, CANADA LYC ADVENTURE TRIP ITINERARY 2016
BANFF NATIONAL PARK, ALBERTA, CANADA LYC ADVENTURE TRIP ITINERARY 2016 Tuesday, July 5, 2016 Anytime prior to 5:00pm Staff & Camper Arrival (Airport pick-up Calgary International Airport Calgary, Alberta,
Tour Leader Official Guidelines
Bicycle Touring Club of North Jersey Tour Leader Official Guidelines GENERAL All tour participants must be members of BTCNJ. This is not an attempt to increase membership, but rather it is an insurance
With the first portion of this process complete, we anticipate the general timeline for the remainder of the process to be:
THE CITY OF FIRE RESCUE E D M O N T O N FIRE RESCUE SERVICES 10351 96 Street Edmonton, Alberta T5H 2H5 April 19, 2013 Dear Rossdale residents: As many of you know, Fire Rescue Services is currently in
Route Combo) Mt. Bierstadt - Bierstadt, Sawtooth, Evans
Climbing 14ers can be very dangerous, please read the Mountaineering Safety Page and make sure you have a map+compass and can use them effectively, without the help of electronic devices. Route Combo)
Lena Beach Recreation Area Renovation. Dear National Forest User:
United States Department of Agriculture Forest Service Alaska Region Tongass National Forest Juneau Ranger District 8510 Mendenhall Loop Juneau, AK 99801 Phone: (907) 586-8800 Fax: (907) 586-8808 File
Columbia, Maryland - Village of Owen Brown
Columbia, Maryland - Village of Owen Brown From the Village of Owen Brown, good trails stretch to other neighboring Columbia villages. Mostly following stream valleys, the trails go to and from schools
Trails. Lois Jensen Nature Preserve is a 30 acre parcel on the north end of the city. It provides unspoiled wooded paths.
Trails Lois Jensen Nature Preserve is a 30 acre parcel on the north end of the city. It provides unspoiled wooded paths. TRAIL S, PATHS, ROUTES AND CONNECTORS Citizen input pointed to trails, paths, bike
LVS BASE VEST OPERATOR S MANUAL
LVS BASE VEST OPERATOR S MANUAL CONTENTS 02 INTRO 04 FITTING 06 ADJUSTING SIDE-STRAPS 10 STORAGE 14 CARE 16 OPTIONAL SIDE ARMOR 20 COVERS AND ACCESSORIES This manual must be carefully read by all persons
Estimating Tourism Expenditures for the Burlington Waterfront Path and the Island Line Trail
A report by the University of Vermont Transportation Research Center Estimating Tourism Expenditures for the Burlington Waterfront Path and the Island Line Trail Report # 10-003 February 2010 Estimating
Memo. Orange City Trail Plan Becky Mendez, AICP Jamie Krzeminski, PE, PTOE Matt Wiesenfeld, PE, AICP. Development of the Existing and Proposed Network
Memo Date: Friday, December 22, 2017 Project: To: From: Subject: Trail Plan Becky Mendez, AICP Jamie Krzeminski, PE, PTOE Matt Wiesenfeld, PE, AICP Development of the Existing and Proposed Network HDR
Seek the Board s approval for the Donald Place kerb and channel renewal to progress to final design, tender and construction; and
3. DONALD PLACE - KERB AND CHANNEL RENEWAL General Manager responsible: General Manager City Environment Officer responsible: Transport and City Streets Manager Author: Michelle Flanagan, Streets Capital
State Route 8 Corridor. Northern Summit County s Path to Success
State Route 8 Corridor Northern Summit County s Path to Success Construction Guide: 2008-2009 State Route 8 corridor work description State Route 8 Corridor 10 projects $262 million With its close proximity
Our Focus: Your Future AWARD OF TENDER FOR ROAD RESURFACING HOT MIX ASPHALT CONTRACT IS.07RSRF (H)
Town of Fort Erie Infrastructure Services Our Focus: Your Future Prepared for Council-in-Committee Report No. IS-25-07 Agenda Date May 22, 2007 File No. 230803-126 Subject AWARD OF TENDER FOR ROAD RESURFACING
A30 Chiverton to Carland Cross Improvement Scheme Preferred route announcement
A30 Chiverton to Carland Cross Improvement Scheme Preferred route announcement Introduction The Government s Road Investment Strategy, published in 2014, sets out the vision for the strategic road network
BRYCE CANYON COUNTRY Boulder Mountain Scenic backways itinerary
BRYCE CANYON COUNTRY Boulder Mountain Scenic backways itinerary Boulder Mountain Area The high plateaus of the Aquarius Plateau (Boulder Mountain), are heavily forested and covered in countless winding
Appendix A Appendix A (Project Specifications) Auk Auk / Black Diamond (Trail 44) Reroute
Appendix A (Project Specifications) Auk Auk / Black Diamond (Trail 44) Reroute I. Proposed Action: This project proposes to reroute approximately 1,800 feet of a 50 inch wide trail, off of private property
Eagle Rock Loop Ouachita National Forest Page 1 of 8
EAGLE ROCK LOOP Eagle Rock Loop Ouachita National Forest Page 1 of 8 Hiking: Biking: Equestrian: Trail Highlights: This trail offers the longest loop trail in Arkansas. A combination of the Little Missouri,
Fossil Creek Wild & Scenic River Comprehensive River Management Plan Forest Service Proposed Action - details March 28, 2011
Fossil Creek Wild & Scenic River Comprehensive River Management Plan Forest Service Proposed Action - details March 28, 2011 Primary Goals of the Proposed Action 1. Maintain or enhance ORVs primarily by
Blackburn Road Blackburn Level Crossing Removal. Frequently Asked Questions August 2014 GENERAL
Frequently Asked Questions August 2014 Blackburn Road Blackburn Level Crossing Removal GENERAL What is the project? The Victorian Government has committed to eliminating a number of the busiest level crossings
MASTER PLAN MASTER PLAN
LAKE JAMES LOOP TRAIL MASTER PLAN MASTER PLAN Lake James Loop Trail Work Group: Scott Black Burke Co. GIS Paul Braun Save Lake James Scott Carpenter Deputy Co. Manager Johnnie Carswell Burke Co. Commissioner
Park Board Chair and Commissioners
TO: FROM: Park Board Chair and Commissioners November 23, 2016 General Manager Vancouver Board of Parks and Recreation SUBJECT: Stanley Park Brewing at the Fish House Proposed Design and Lease Agreement
Coastal Management: Treasure Island - Long Key Nourishment
Coastal Management: Treasure Island - Long Key Nourishment Project Completed - October 20, 2010 The nourishment of Treasure Island and Long Key (TI/LK) beaches began in late July of 2010. The previous
WARNING Due to Extensive Beetle Kill Trees, Trails are Subject to Closure or Rerouting. Please be Advised and Pay attention to On Ground Signage.
WARNING Due to Extensive Beetle Kill Trees, Trails are Subject to Closure or Rerouting. Please be Advised and Pay attention to On Ground Signage. WYOMING RANGE WESTERN WYOMING The Wyoming Range trail system
Offers Over 299,000 (Freehold) The Old Fire Station Tea Room, 37 Main Street, Tomintoul, AB37 9EX
Offers Over 299,000 (Freehold) The Old Fire Station Tea Room, 37 Main Street, Tomintoul, AB37 9EX Outstanding café business opportunity situated in the everpopular tourist destination of Tomintoul within