1 Obstruction Evaluation 2015 GDOT PowerPoint GAA Title Spring Page Conference What are all these surfaces? February 19, 2016 Sub Titles Presented By Alan Hood, Airport Safety Body Text Data Program Manager Georgia DOT

2 Approach Surfaces and Obstruction Removal Categories of approach surfaces for GA Airports. State Licensing FAA Part 77 FAA TERPs Visual Surface (20:1)

3 GDOT Airport Licensing Approach Standards State Licensing 3 configurations - based on runway length < 4,000 4,000 4,999 5,000 + Meets visual approach criteria from design guide Surface starts at threshold Surface needs to be clear to meet the minimum state licensing criteria Generally least restrictive of the three surfaces Airports inspected biennially

4 GDOT Airport Licensing Approach Standards 20:1 15:1 20:1 700 To 5000 To 10,000 To < >5000

5 GDOT Airport Licensing Approach Standards Obstruction Removal obstructions should be removed immediately or removal efforts should be initiated as soon as possible with written plan provided to GDOT by specified date in letter. if removal is not possible, displace threshold Documentation of obstructions: biennial inspection letter Notification Alan Hood, Airport Safety Data Program Manager and GDOT Project Manager

6 FAA Part 77 Approach Standards Generally most restrictive, used as screening criteria 9 configurations: Based on runway category and type of approach <12,500lb - visual = A(V) <12,500lb - visual - opposite A(NP) = A(V) op A(NP) <12,500lb - non-precision = A(NP) >12,500lb - visual = B(V) >12,500lb - visual - opposite D/PIR = B(V) op D/PIR >12,500lb - > ¾ mi visibility = C >12,500lb - > ¾ mi visibility - opposite D/PIR = C op D/PIR >12,500lb - < ¾ mi visibility = D >12,500lb - precision = PIR Surface starts 200 from the end of the runway Surface should be clear to meet FAA 5010 Safety Data Inspection Program criteria Airports inspected biennially

7 FAA Part 77 Approach Standards 10,000 40,000 50:1 34:1 34:1 5,000 20:1 20:1 20: A(V) 32 B(V) 32 A(NP) 32 C 32 D 32 PIR

8 FAA Part 77 Approach Standards Obstruction Removal Obstructions should be removed or provide schedule for removal Documentation of obstructions: biennial inspection letter FAA 5010 report Notification Required Provide sketch and coordinates of cleared area Alan Hood, Airport Safety Data Program Manager and GDOT Project Manager GDOT will coordinate with FAA to remove from FAA database

9 Who is Responsible? Ultimately the Sponsor -State Licensing and Part 77 Inspections: When obstructions are identified in an inspection, they become a liability. -State Licensing surface obstructions could lead to denial of license.

10 FAA TERPs Visual Surface Standards (20:1) Surface starts 200 from threshold 20:1 Approach Slope Obstructions should be mitigated to maintain night minimums When are procedures reviewed? Any request for change in approach, name change, LOC-ID change, runway numeral change, etc FAA performs review of airport s terminal procedures every 2 years

11 FAA TERPs Visual Surface Standards (20:1) 20:1 Surface for Categories 20:1 A D are all same size 34:1 now 20: A(NP) 32 C

12 FAA TERPs Visual Surface Standards (20:1) Obstruction Removal mitigate obstructions by: removal lighting PAPI waiver requires FAA Flight Standards approval obstructions should be mitigated to maintain nighttime procedures. Obstruction removal previous to 20:1 letter from Flight Procedures. Sketch and coordinates of cleared area Alan Hood, Airport Safety Data Program Manager and GDOT Project Manager GDOT notifies FAA to update database

13 FAA TERPs Visual Surface Standards (20:1)

14 Who is Responsible? Ultimately the Sponsor -Sponsors are also responsible for ensuring the TERPs Visual Surface is clear. Flight Procedures uses the FAA surveyed obstruction database to review procedures. -Obstructions do not automatically disappear from database with a new survey. -Must submit sketch with coordinates and boundaries of cleared areas to get obstructions removed from database. ***If you have been notified you have obstructions by Flight Procedures then you validate the obstructions in writing. No survey or coordinates and boundaries required unless you are topping obstructions.

15 Graphic Representation 3 Surfaces Using Google Earth 5000 Runway with GPS Approach State Licensing Approach FAA Part 77 Category C TERPS 20:1

16 State Licensing :1 400 Inner Width at Runway End

17 FAA Part 77 Category C 34:1 500 Inner Width 200 from Runway End

18 TERPS 20:1 400 Inner Width 200 from Runway End

19 State Licensing/ FAA Part 77/ TERPs 20:1

20 Graphic Representation 3 Surfaces Using Google Earth 3700 Runway with GPS Approach State Licensing Approach FAA Part 77 Category A(NP) TERPS 20:1

21 State Licensing :1 120 Inner Width at Runway End

22 FAA Part 77 Category A(NP) 20:1 500 Inner Width 200 from Runway End

23 TERPS 20:1 400 Inner Width 200 from Runway End

24 State Licensing/ FAA Part 77/ TERPs 20:1

25 Threshold Citing Table AC A

26 Questions?

Airport 20 to 1 Approach Surface

Airport 20 to 1 Approach Surface Airport 20 to 1 Approach Surface 2014 South Carolina Aviation Association Annual Conference Jon Walker Eastern Flight Procedures Team Feb 13, 2014 20 to 1 Surface Area Criteria 14 CFR Part 77; AC 150/5300-13A;

More information

Airport Obstruction Standards

Airport Obstruction Standards Airport Obstruction Standards Dr. Antonio Trani Department of Civil and Environmental Engineering Virginia Tech Outline of this Presentation Obstructions to navigation around airports Discussion of Federal

More information

Appendix C AIRPORT LAYOUT PLANS

Appendix C AIRPORT LAYOUT PLANS Appendix C AIRPORT LAYOUT PLANS Appendix C AIRPORT LAYOUT PLANS Airport Master Plan Santa Barbara Airport As part of this Airport Master Plan, the Federal Aviation Administration (FAA) requires the development

More information

Chapter Six ALP Drawings. Tacoma Narrows Airport. Master Plan Update

Chapter Six ALP Drawings. Tacoma Narrows Airport. Master Plan Update Chapter Six ALP Drawings Master Plan Update The master planning process for the (Airport) has evolved through efforts in the previous chapters to analyze future aviation demand, establish airside and landside

More information

DRAFT MASTER PLAN UPDATE

DRAFT MASTER PLAN UPDATE DRAFT MASTER PLAN UPDATE CHAPTER VI: AIRPORT LAYOUT PLAN NARRATIVE DRAFT REPORT APRIL 2017 PREPARED BY: Table of Contents WESTCHESTER COUNTY AIRPORT 6 AIRPORT LAYOUT PLAN NARRATIVE REPORT... 6-1 6.1 AGIS

More information

DATE OF AERIAL PHOTOGRAPHY:

DATE OF AERIAL PHOTOGRAPHY: DESCRIPTION RUNWAY SAFETY AREA RUNWAY PROTECTION ZONE TAXIWAY OBJECT FREE AREA DATE OF AERIAL PHOTOGRAPHY: 6-17-01 RUNWAY SAFETY AREA FOR PORTION OF RUNWAY 16L-34R SOUTH OF RUNWAY BRIDGE HAS A FAA WAIVER

More information

SITE ELEVATION AMSL...Ground Elevation in feet AMSL STRUCTURE HEIGHT...Height Above Ground Level OVERALL HEIGHT AMSL...Total Overall Height AMSL

SITE ELEVATION AMSL...Ground Elevation in feet AMSL STRUCTURE HEIGHT...Height Above Ground Level OVERALL HEIGHT AMSL...Total Overall Height AMSL ******************************************** * Federal Airways & Airspace * * Summary Report * ******************************************** File: User Assigned File Name Latitude: NAD83 Coordinate Longitude:

More information

2015 GDOT PowerPoint Title Page

2015 GDOT PowerPoint Title Page Georgia Department of Transportation 2015 GDOT PowerPoint Title Page Aviation Program Update Georgia Airports Association February Sub Titles 17, 2016 Body Text Presented By Steven V. Brian, Manager Aviation

More information

** DETERMINATION OF NO HAZARD TO AIR NAVIGATION **

** DETERMINATION OF NO HAZARD TO AIR NAVIGATION ** Mail Processing Center Federal Aviation Administration Southwest Regional Office Obstruction Evaluation Group 2601 Meacham Boulevard Fort Worth, TX 76137 Issued Date: 05/16/2011 Aeronautical Study No.

More information

ORDINANCE NO. _2013-

ORDINANCE NO. _2013- ORDINANCE NO. _2013- AN ORDINANCE OF THE TOWNSHIP OF CONEWAGO, DAUPHIN COUNTY, PENNSYLVANIA, PROVIDING FOR AIRPORT ZONING REGULATIONS WITHIN THE AIRPORT ZONING OVERLAY DISTRICT CREATED BY THIS ORDINANCE

More information

GDOT AND FAA ADO UPDATES

GDOT AND FAA ADO UPDATES GDOT AND FAA ADO UPDATES Building on the Past Soaring Into the Future Aviation Program Update 2015 GDOT PowerPoint October 27, 2016 Title Page Georgia Airports Association Presented By Steven V. Brian,

More information

Consideration will be given to other methods of compliance which may be presented to the Authority.

Consideration will be given to other methods of compliance which may be presented to the Authority. Advisory Circular AC 139-10 Revision 1 Control of Obstacles 27 April 2007 General Civil Aviation Authority advisory circulars (AC) contain information about standards, practices and procedures that the

More information

(a) it has been licensed for the purpose, and save in accordance with the conditions prescribed in such licence; or

(a) it has been licensed for the purpose, and save in accordance with the conditions prescribed in such licence; or PART - XI Aerodromes 78. Licensing of Aerodromes (1) No aerodrome shall be used as a regular place of landing and departure by a scheduled air transport service or for a series of landings and departures

More information

TECHNICAL REPORT #7 Palm Beach International Airport Airport Layout Plan

TECHNICAL REPORT #7 Palm Beach International Airport Airport Layout Plan TECHNICAL REPORT #7 Palm Beach International Airport Airport Layout Plan Technical Report #7 Palm Beach International Airport Layout Plan Palm Beach International Airport Prepared for Palm Beach County

More information

CHAPTER 3 ALTERNATIVES CONSIDERED

CHAPTER 3 ALTERNATIVES CONSIDERED CHAPTER 3 ALTERNATIVES CONSIDERED 3.0 ALTERNATIVES The 2010 Stevensville Airport Master Plan contained five (5) airside development options designed to meet projected demands. Each of the options from

More information

March 2016 Safety Meeting

March 2016 Safety Meeting March 2016 Safety Meeting AC 61 98C Subject: Currency Requirements and Guidance for the Flight Review and Instrument Proficiency Check Date: 11/20/15 AC No: 61-98C Initiated by: AFS-800 Supercedes: AC

More information

Source: Chippewa Valley Regional Airport ASOS, Period of Record

Source: Chippewa Valley Regional Airport ASOS, Period of Record Chapter 1 Inventory Runway wind coverage is the percentage of time a runway can be used without exceeding allowable crosswind velocities. Allowable crosswind velocities vary depending on aircraft size

More information

ADVISORY CIRCULAR ON CALCULATION OF DECLARED DISTANCES

ADVISORY CIRCULAR ON CALCULATION OF DECLARED DISTANCES Page 1 of 6 1. PURPOSE This Advisory circular (AC) provides guidance to operators to calculated declared distances at aerodrome for safe use of runway and promulgation of aeronautical data to the aeronautical

More information

CATCODE ] CATCODE

CATCODE ] CATCODE Runways. FAC: 1111 CATCODE: 111111 OPR: AFCEC/COS OCR: AF/A3O-A 1.1. Description. The runway is the paved surface provided for normal aircraft landings and take offs. Runways are classified as either Class

More information

The following criteria shall be applied within the boundaries of the AO District:

The following criteria shall be applied within the boundaries of the AO District: Sec. 419 (a) Purpose AIRPORT OVERLAY DISTRICT (AO) The purpose of the Airport Overlay District is to regulate and restrict the height of structures, objects, or natural growth, regulate the locations of

More information

According to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the elements that affect airfield capacity include:

According to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the elements that affect airfield capacity include: 4.1 INTRODUCTION The previous chapters have described the existing facilities and provided planning guidelines as well as a forecast of demand for aviation activity at North Perry Airport. The demand/capacity

More information

AVIATION PLANNING AND DEVELOPMENT Oakland International Airport 530 Water Street Oakland, CA 94607

AVIATION PLANNING AND DEVELOPMENT Oakland International Airport 530 Water Street Oakland, CA 94607 AVIATION PLANNING AND DEVELOPMENT Oakland International Airport 530 Water Street When Do I Need to File an FAA Form 7460-1? Objects Affecting Navigable Airspace (14CFR77) June 2013 Background The Federal

More information

FACILITY REQUIREMENTS SUMMARY OF KEY ISSUES OVERVIEW

FACILITY REQUIREMENTS SUMMARY OF KEY ISSUES OVERVIEW FACILITY REQUIREMENTS SUMMARY OF KEY ISSUES OVERVIEW This summary is intended to provide a brief overview of the key issues associated with conformance to FAA standards at Methow Valley State Airport.

More information

Learning More About: Protecting and Evaluating Airspace for Airports

Learning More About: Protecting and Evaluating Airspace for Airports Learning More About: Protecting and Evaluating Airspace for Airports Introduction Tall structures, smoke, and Tall Structures rising terrain are just a few conditions that can create hazardous conditions

More information

AERODROME LIGHTING SYSTEM

AERODROME LIGHTING SYSTEM AERODROME LIGHTING SYSTEM 1. Introduction This chapter will show the wide variety of approach lighting systems before the runway threshold and systems present on runways. 2. Runway approach ramps 2.1.

More information

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis Saint Petersburg-Clearwater International Airport Airspace & Instrument Approach Analysis February 23, 2005 Jeppesen Boeing Jeppesen Government / Military Services Group Airspace Services Division AIRSPACE

More information

AERONAUTICAL SURVEYS & INSTRUMENT FLIGHT PROCEDURES

AERONAUTICAL SURVEYS & INSTRUMENT FLIGHT PROCEDURES AERONAUTICAL SURVEYS & INSTRUMENT FLIGHT PROCEDURES Current as of November 2012 ALASKA AVIATION SYSTEM PLAN UPDATE Prepared for: State of Alaska Department of Transportation & Public Facilities Division

More information

CHAPTER 1 BACKGROUND AND PROPOSED ACTION

CHAPTER 1 BACKGROUND AND PROPOSED ACTION CHAPTER 1 BACKGROUND AND PROPOSED ACTION 1.0 INTRODUCTION An Environmental Assessment (EA) evaluates the effects of a proposed Federal action on the surrounding environment and is prepared in compliance

More information

Initiated By: AFS-400

Initiated By: AFS-400 U.S. Department of Transportation Federal Aviation Administration Advisory Circular Subject: Development and Submission of Special Date: 04/14/2015 AC No: 90-112A Instrument Procedures to the FAA Initiated

More information

AERODROME OPERATING MINIMA

AERODROME OPERATING MINIMA Title: Determination of Aerodrome Operating Minima Page 1 of 8 AERODROME OPERATING MINIMA 1. PURPOSE 1.1 The purpose of this Advisory Circular is to provide methods to be adopted by operators in determining

More information

AIRPORT LAYOUT PLAN FOR FRIEDMAN MEMORIAL REPLACEMENT AIRPORT - SITE 12 FRIEDMAN MEMORIAL AIRPORT AUTHORITY INDEX OF SHEETS SHEET TITLE

AIRPORT LAYOUT PLAN FOR FRIEDMAN MEMORIAL REPLACEMENT AIRPORT - SITE 12 FRIEDMAN MEMORIAL AIRPORT AUTHORITY INDEX OF SHEETS SHEET TITLE GOODING MUNICIPAL SOURCE: JeppView 3.6.3.1 (Printed May 19, 2010) MAGIC VALLEY REGIONAL BURLEY MUNICIPAL LOCATION MAP NTS - SITE 12 AIRPORT LAYOUT PLAN FOR FRIEDMAN MEMORIAL REPLACEMENT AIRPORT - SITE

More information

COMMERCIAL OPERATIONS

COMMERCIAL OPERATIONS Cornell University UAV Guidelines Office of Risk Management and Insurance Purpose: The Office of Risk Management and Insurance has published guidelines as a resource for members of the University community

More information

USE OF 3D GIS IN ANALYSIS OF AIRSPACE OBSTRUCTIONS

USE OF 3D GIS IN ANALYSIS OF AIRSPACE OBSTRUCTIONS USE OF 3D GIS IN ANALYSIS OF AIRSPACE OBSTRUCTIONS A project by by Samuka D. W. F19/1461/2010 Supervisor; Dr D. N. Siriba 1 Background and Problem Statement The Airports in Kenya are the main link between

More information

Aerodrome Inspectors Workshop

Aerodrome Inspectors Workshop Aerodrome Inspectors Workshop Obstructions, Public Protection & Fencing Location: Trinidad & Tobago, 9-13 JUN 2014 Presenter: Herman Smith, FAA ACSI Date Presentation Title 1 Obstructions and Public Protection

More information

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis Appendix B ULTIMATE AIRPORT CAPACITY & DELAY SIMULATION MODELING ANALYSIS B TABLE OF CONTENTS EXHIBITS TABLES B.1 Introduction... 1 B.2 Simulation Modeling Assumption and Methodology... 4 B.2.1 Runway

More information

1.1.3 Taxiways. Figure 1-15: Taxiway Data. DRAFT Inventory TYPICAL PAVEMENT CROSS-SECTION LIGHTING TYPE LENGTH (FEET) WIDTH (FEET) LIGHTING CONDITION

1.1.3 Taxiways. Figure 1-15: Taxiway Data. DRAFT Inventory TYPICAL PAVEMENT CROSS-SECTION LIGHTING TYPE LENGTH (FEET) WIDTH (FEET) LIGHTING CONDITION 1.1.3 Taxiways EWN has an extensive network of taxiways and taxilanes connecting the terminal, air cargo, and general aviation areas with the runways as listed in Figure 1-15. A 50-foot wide parallel taxiway

More information

CHAPTER 1 INTRODUCTION AND BACKGROUND

CHAPTER 1 INTRODUCTION AND BACKGROUND CHAPTER 1 INTRODUCTION AND BACKGROUND An Environmental Assessment (EA) evaluates the effects of a proposed Federal action on the surrounding environment and is prepared in compliance with the National

More information

Challenges in Complex Procedure Design Validation

Challenges in Complex Procedure Design Validation Challenges in Complex Procedure Design Validation Frank Musmann, Aerodata AG ICAO Workshop Seminar Aug. 2016 Aerodata AG 1 Procedure Validation Any new or modified Instrument Flight Procedure is required

More information

Ref. AIM Para AOPA Air Safety Foundation Supported by the FAA Ref. AIM Para Supported by the FAA

Ref. AIM Para AOPA Air Safety Foundation   Supported by the FAA   Ref. AIM Para Supported by the FAA ILS Critical Area Holding Position Sign: ATC may hold you at this sign, on a taxiway, when the instrument landing system is being used at the airport. Aircraft taxiing beyond this point may interfere with

More information

INTRODUCTION TO THE SAFE PROGRAM

INTRODUCTION TO THE SAFE PROGRAM January 2016 Page 1 INTRODUCTION TO THE SAFE PROGRAM Los Angeles World Airports (LAWA) is committed to providing the airport community with a safe and secure workplace. This document describes the purpose

More information

FAI Sporting Code. Section 11 Humanpowered Aircraft CLASS I Edition Approved by the FAI Air Sport General Commission (CASI) on October 13, 2011

FAI Sporting Code. Section 11 Humanpowered Aircraft CLASS I Edition Approved by the FAI Air Sport General Commission (CASI) on October 13, 2011 FAI Sporting Code Section 11 Humanpowered Aircraft CLASS I 2011 Edition Approved by the FAI Air Sport General Commission (CASI) on October 13, 2011 NOTE: Section 11 and General Section combined make up

More information

ICAO Standards. Airfield Information Signs. ICAO Annex 14, 4th Edition Aerodrome Design and Operations

ICAO Standards. Airfield Information Signs. ICAO Annex 14, 4th Edition Aerodrome Design and Operations ICAO Standards Airfield Information Signs ICAO Annex 14, 4th Edition Aerodrome Design and Operations Federal Aviation Administration U.S. Department of Transportation February 2004 ICAO Standards This

More information

Aerodrome Manual. ICAO/FAA Comprehensive Aerodrome Certification Inspector Workshop. Presented To: Caribbean States By: FAA Office of Airports

Aerodrome Manual. ICAO/FAA Comprehensive Aerodrome Certification Inspector Workshop. Presented To: Caribbean States By: FAA Office of Airports ICAO/FAA Comprehensive Aerodrome Certification Inspector Workshop Presented To: Caribbean States By: FAA Office of Airports OBJECTIVE Development of an Aerodrome Manual (AM). 2 ICAO ANNEX 14 - SECTION

More information

Thursday, May 2 nd, 2013 South St. Paul Municipal Airport Meeting Room 4:00 p.m. 5:30 p.m. MEETING NOTES

Thursday, May 2 nd, 2013 South St. Paul Municipal Airport Meeting Room 4:00 p.m. 5:30 p.m. MEETING NOTES SOUTH ST. PAUL MUNICIPAL AIRPORT FLEMING FIELD MASTER PLAN ADVISORY GROUP MEETING #2 Thursday, May 2 nd, 2013 South St. Paul Municipal Airport Meeting Room 4:00 p.m. 5:30 p.m. MEETING NOTES The purpose

More information

AMENDMENT No. 8 TO THE INTERNATIONAL STANDARDS AND RECOMMENDED PRACTICES AERODROMES ANNEX 14 TO THE CONVENTION ON INTERNATIONAL CIVIL AVIATION

AMENDMENT No. 8 TO THE INTERNATIONAL STANDARDS AND RECOMMENDED PRACTICES AERODROMES ANNEX 14 TO THE CONVENTION ON INTERNATIONAL CIVIL AVIATION AMENDMENT No. 8 TO THE INTERNATIONAL STANDARDS AERODROMES ANNEX 14 TO THE CONVENTION ON INTERNATIONAL CIVIL AVIATION VOLUME I AERODROME DESIGN AND OPERATIONS The amendment to Annex 14, Volume I contained

More information

Ronald Reagan Washington National Airport. April 18, 2012

Ronald Reagan Washington National Airport. April 18, 2012 ONE ENGINE INOPERATIVE SURFACE DEVELOPMENT CASE STUDY Ronald Reagan Washington National Airport April 18, 2012 Mike Hines, C.M. Metropolitan Washington Airports Authority N Ronald Reagan Washington National

More information

Yellowstone Regional Airport Operational Capability Assessment

Yellowstone Regional Airport Operational Capability Assessment Yellowstone Regional Airport Operational Capability Assessment Agenda Introductions Project Review Geographic & Operational Challenges Current Approach Baseline & Test Flight Procedures Safety and Operational

More information

Frequently Asked Questions and Answers Bowman Field Airport Area Safety Program

Frequently Asked Questions and Answers Bowman Field Airport Area Safety Program Frequently Asked Questions and Answers Bowman Field Airport Area Safety Program 1. What is the proposed Bowman Field Airport Area Safety Program? The proposed Bowman Field Airport Area Safety Program has

More information

Chapter 1. Draw Standard Departure Procedure

Chapter 1. Draw Standard Departure Procedure Chapter 1. Draw Standard Departure Procedure 1. Prior to drawing departure area consult the US Terminal Procedures book to determine if there are published take off special Take Off Minimums and (Obstacle)

More information

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35 Runway 17-35 Airport Master Plan Runway 12-30 Brookings Regional Airport Table of Contents Table of Contents Chapter 1: Master Plan Goals... 1-1 1.1. Introduction... 1 1.2. Objective 1 Identify improvements

More information

AIRPORT COMPLIANCE th Texas Aviation Conference. 3/29/2018 Date. Footer Text

AIRPORT COMPLIANCE th Texas Aviation Conference. 3/29/2018 Date. Footer Text AIRPORT COMPLIANCE 2018 36 th Texas Aviation Conference 3/29/2018 AWOS FCC LICENSE RENEWAL Needs renewal every 10 years (renew 90 days before expiration). Needs update if there is name change, coordinate

More information

[Docket No. FAA ; Directorate Identifier 2004-NM-252-AD; Amendment ; AD ]

[Docket No. FAA ; Directorate Identifier 2004-NM-252-AD; Amendment ; AD ] [Federal Register: October 5, 2005 (Volume 70, Number 192)] [Rules and Regulations] [Page 58002-58005] From the Federal Register Online via GPO Access [wais.access.gpo.gov] [DOCID:fr05oc05-6] DEPARTMENT

More information

14 CFR Aeronautics and Space CHAPTER I FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED)

14 CFR Aeronautics and Space CHAPTER I FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) THIS DATA CURRENT AS OF THE FEDERAL REGISTER DATED JANUARY 15, 2004 14 CFR Aeronautics and Space CHAPTER I FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) SUBCHAPTER F -- AIR

More information

Chapter 9 - AIRPORT SYSTEM DESIGN

Chapter 9 - AIRPORT SYSTEM DESIGN Chapter 9 - AIRPORT SYSTEM DESIGN 9.01 GENERAL This chapter discusses the development program for Dutchess County Airport to the year 2020. This airport system design is based upon the airport's existing

More information

AIR NAVIGATION ORDER

AIR NAVIGATION ORDER CLEARANCE AREAS AND OBSTACLE LIMITATION SURFACES AT AIR NAVIGATION ORDER VERSION : 2.0 DATE OF IMPLEMENTATION : 15-02-2013 OFFICE OF PRIME INTEREST : AERODROME STANDARDS BRANCH. (Directorate of Airspace

More information

Advisory Circular CT

Advisory Circular CT (CAA logo, name of the country, etc.) Advisory Circular CT-42-009 SUBJECT: Airport Movement Area and Related Facilities Maintenance DATE: MM/YYYY ASSOCIATED RULES According with (name of the country) Civil

More information

Pierre Regional Airport Airport Master Plan. Kickoff Meeting April 7, 2017

Pierre Regional Airport Airport Master Plan. Kickoff Meeting April 7, 2017 Pierre Regional Airport Airport Master Plan Kickoff Meeting April 7, 2017 Agenda Introductions Airport Master Planning Planning Considerations Master Plan Elements Schedule Public Involvement Basics about

More information

Interim Policy, FAA Review of Solar Energy System Projects on Federally Obligated Airports

Interim Policy, FAA Review of Solar Energy System Projects on Federally Obligated Airports This document is scheduled to be published in the Federal Register on 10/23/2013 and available online at http://federalregister.gov/a/2013-24729, and on FDsys.gov [4910-13] DEPARTMENT OF TRANSPORTATION

More information

CE 563 Airport Design

CE 563 Airport Design CE 563 Airport Design Prevent aircraft collisions Prevent aircraft collisions with obstructions Expedite and maintain an orderly flow of air traffic Air traffic control system command center Herndon, VA

More information

RULES OF TENNESSEE DEPARTMENT OF TRANSPORTATION AERONAUTICS DIVISION CHAPTER LICENSING AND REGISTRATION OF AIRPORTS TABLE OF CONTENTS

RULES OF TENNESSEE DEPARTMENT OF TRANSPORTATION AERONAUTICS DIVISION CHAPTER LICENSING AND REGISTRATION OF AIRPORTS TABLE OF CONTENTS RULES OF TENNESSEE DEPARTMENT OF TRANSPORTATION AERONAUTICS DIVISION CHAPTER 1680-1-2 LICENSING AND REGISTRATION OF AIRPORTS TABLE OF CONTENTS 1680-1-2-.01 Purpose 1680-1-2-.06 Repealed 1680-1-2-.02 Definitions

More information

Procedures for Air Navigation Services Aerodromes (PANS-AGA) ICAO Doc. 9981

Procedures for Air Navigation Services Aerodromes (PANS-AGA) ICAO Doc. 9981 Procedures for Air Navigation Services Aerodromes (PANS-AGA) ICAO Doc. 9981 Introduction The First Edition of Doc. 9981 was approved by the President of the Council on 20 October 2014 The document becomes

More information

ARTICLE 34 AIRPORT HEIGHT COMBINING ZONE (AH) (Amended by Ordinance #295 Effective June 26, 2009)

ARTICLE 34 AIRPORT HEIGHT COMBINING ZONE (AH) (Amended by Ordinance #295 Effective June 26, 2009) ARTICLE 34 AIRPORT HEIGHT COMBINING ZONE (AH) (Amended by Ordinance #295 Effective June 26, 2009) Section 34.10 - Purpose and Intent The purpose of the Airport Height Combining Zone (AH) is to protect

More information

Part 139, Amendment 11. Aerodromes Certification, Operation and Use. Docket 14/CAR/3

Part 139, Amendment 11. Aerodromes Certification, Operation and Use. Docket 14/CAR/3 Docket 14/CAR/3 Content Rule objective... 3 Extent of consultation... 3 Summary of submissions... 3 Insertion of Amendments... 3 Effective date of rule... 3 Availability of rules... 4 139.11 Duration of

More information

Standard Instrument Approach Procedures, and Takeoff Minimums. and Obstacle Departure Procedures; Miscellaneous Amendments

Standard Instrument Approach Procedures, and Takeoff Minimums. and Obstacle Departure Procedures; Miscellaneous Amendments This document is scheduled to be published in the Federal Register on 04/22/2016 and available online at http://federalregister.gov/a/2016-08751, and on FDsys.gov [4910-13] DEPARTMENT OF TRANSPORTATION

More information

AIRSPACE PROTECTION. Guidance and considerations for development in the vicinity of Ohio s airports and heliports

AIRSPACE PROTECTION. Guidance and considerations for development in the vicinity of Ohio s airports and heliports AIRSPACE PROTECTION Guidance and considerations for development in the vicinity of Ohio s airports and heliports UPDATED SPRING 2018 AIRSPACE PROTECTION When construction is proposed near public use airports

More information

Chippewa-Eau Claire Metropolitan Planning Area Long Range Transportation Plan

Chippewa-Eau Claire Metropolitan Planning Area Long Range Transportation Plan 1.2.7 2010 Eau Claire County Comprehensive Plan According to Eau Claire County s most recent comprehensive plan, the County will limit land use development adjacent to EAU in order to preserve the ability

More information

APPENDIX D FEDERAL AVIATION REGULATIONS, PART 77

APPENDIX D FEDERAL AVIATION REGULATIONS, PART 77 APPENDIX D FEDERAL AVIATION REGULATIONS, PART 77 Subparts A through C PART 77 - OBJECTS AFFECTING NAVIGABLE AIRSPACE Subpart A General 77.1 Scope. 77.2 Definition of terms. 77.3 Standards. 77.5 Kinds of

More information

GULFSTREAM AEROSPACE CORPORATION

GULFSTREAM AEROSPACE CORPORATION Page 1 2011-24-02 GULFSTREAM AEROSPACE CORPORATION Amendment 39-16866 Docket No. FAA-20110572; Directorate Identifier 2011-NM-009-AD. PREAMBLE (a) Effective Date This AD is effective January 3, 2012. (b)

More information

[Docket No. FAA ; Directorate Identifier 2015-NM-101-AD] Airworthiness Directives; The Boeing Company Airplanes

[Docket No. FAA ; Directorate Identifier 2015-NM-101-AD] Airworthiness Directives; The Boeing Company Airplanes This document is scheduled to be published in the Federal Register on 12/31/2015 and available online at http://federalregister.gov/a/2015-32850, and on FDsys.gov [4910-13-P] DEPARTMENT OF TRANSPORTATION

More information

II.J. 14 CFR and Publications

II.J. 14 CFR and Publications References: 14 CFR Parts 1, 61, 91; NTSB Part 830; AC 00-2; FAA-H-8083-25; POH/AFM; AIM Objectives Key Elements Elements Schedule Equipment IP s Actions SP s Actions Completion Standards The student should

More information

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 3 - Refinement of the Ultimate Airfield Concept Using the Base Concept identified in Section 2, IDOT re-examined

More information

50 Ways to Improve Your Airport: Engaging Airport Management on Key Issues

50 Ways to Improve Your Airport: Engaging Airport Management on Key Issues 50 Ways to Improve Your Airport: Engaging Airport Management on Key Issues Tuesday, November 17, 2015 1:00 p.m. 2:00 p.m. PRESENTED BY: Charles D. Lamb, P.E. Airfield Lighting Image Source: Delta Airport

More information

Amendment Docket No. FAA ; Directorate Identifier 2010-NM-122-AD

Amendment Docket No. FAA ; Directorate Identifier 2010-NM-122-AD Page 1 2011-14-06 AIRBUS Amendment 39-16741 Docket No. FAA-2011-0257; Directorate Identifier 2010-NM-122-AD PREAMBLE Effective Date (a) This airworthiness directive (AD) becomes effective August 22, 2011.

More information

BAE SYSTEMS (OPERATIONS) LIMITED

BAE SYSTEMS (OPERATIONS) LIMITED Page 1 2010-10-22 BAE SYSTEMS (OPERATIONS) LIMITED Amendment 39-16301 Docket No. FAA-2008-0909; Directorate Identifier 2007-NM-363-AD PREAMBLE Effective Date (a) This AD becomes effective June 25, 2010.

More information

SUBCHAPTER E AIRSPACE

SUBCHAPTER E AIRSPACE PART 71 DESIGNATION OF CLASS A, B, C, D, AND E AIRSPACE AREAS; AIR TRAFFIC SERVICE ROUTES; AND REPORTING POINTS Sec. SPECIAL FEDERAL AVIATION REGULATION NO. 97 [NOTE] 71.1 Applicability. 71.3 [Reserved]

More information

U.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION. National Policy

U.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION. National Policy NOTICE U.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION National Policy N 8900.318 Effective Date: 8/13/15 Cancellation Date: 8/13/16 SUBJ: Optional Letter of Authorization (LOA) for Straight-In

More information

AIRPORT LAND USE COMPATILIBILTY AIRPORT LAND USE COMPATIBILIITY

AIRPORT LAND USE COMPATILIBILTY AIRPORT LAND USE COMPATIBILIITY CHAPTER 7 AIRPORT LAND USE COMPATILIBILTY CHAPTER 7 AIRPORT LAND USE COMPATIBILIITY 7.0 INTRODUCTION On airport aviation related development is typically compatible with aircraft operations. On airport

More information

TERMINAL PROCEDURES PUBLICATION SYMBOLS

TERMINAL PROCEDURES PUBLICATION SYMBOLS TERMINAL PROCEDURES PUBLICATION SYMBOLS 54 AERONAUTICAL INFORMATION STANDARD TERMINAL ARRIVAL (STAR) CHARTS................. 55 DEPARTURE PROCEDURE (DP) CHARTS....................... 55 APPROACH LIGHTING

More information

VATUSA PHOENIX TRACON and VATUSA PHOENIX ATCT LETTER OF AGREEMENT. SUBJECT: Interfacility Coordination Procedures

VATUSA PHOENIX TRACON and VATUSA PHOENIX ATCT LETTER OF AGREEMENT. SUBJECT: Interfacility Coordination Procedures VATUSA PHOENIX TRACON and VATUSA PHOENIX ATCT LETTER OF AGREEMENT EFFECTIVE: 01/08/08 SUBJECT: Interfacility Coordination Procedures 1. PURPOSE. This Letter of Agreement establishes procedures for coordinating

More information

RNP AR APCH Approvals: An Operator s Perspective

RNP AR APCH Approvals: An Operator s Perspective RNP AR APCH Approvals: An Operator s Perspective Presented to: ICAO Introduction to Performance Based Navigation Seminar The statements contained herein are based on good faith assumptions and provided

More information

2015 PURDUE ROAD SCHOOL March 11, 2015

2015 PURDUE ROAD SCHOOL March 11, 2015 2015 PURDUE ROAD SCHOOL March 11, 2015 Runway Protection Zone (RPZ) Definition It is a trapezoidal shape formed off the end of a runway and its geometry it a function of the airport s aircraft approach

More information

Unmanned Aircraft Systems (UAS) 101

Unmanned Aircraft Systems (UAS) 101 Unmanned Aircraft Systems (UAS) 101 Presented to: The American Association of State Highway and Transportation Officials Presented by: Dave May, FAA UAS Integration Office Date: What is a UAS? A UAS is

More information

Sample Regulations for Water Aerodromes

Sample Regulations for Water Aerodromes Sample Regulations for Water Aerodromes First Edition (unedited version) March 2015 Notice to users: This document is an unedited version which is made available to the public for convenience. Its content

More information

Standard Instrument Approach Procedures, and Takeoff Minimums. and Obstacle Departure Procedures; Miscellaneous Amendments

Standard Instrument Approach Procedures, and Takeoff Minimums. and Obstacle Departure Procedures; Miscellaneous Amendments This document is scheduled to be published in the Federal Register on 02/03/2016 and available online at http://federalregister.gov/a/2016-01858, and on FDsys.gov [4910-13] DEPARTMENT OF TRANSPORTATION

More information

[Docket No. FAA ; Product Identifier 2018-NM-068-AD; Amendment ; AD ]

[Docket No. FAA ; Product Identifier 2018-NM-068-AD; Amendment ; AD ] [Federal Register Volume 83, Number 236 (Monday, December 10, 2018)] [Rules and Regulations] [Pages 63392-63394] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR

More information

Noise Abatement Arrival Procedures at Louisville International Airport. Prof. John-Paul Clarke Georgia Institute of Technology

Noise Abatement Arrival Procedures at Louisville International Airport. Prof. John-Paul Clarke Georgia Institute of Technology Noise Abatement Arrival Procedures at Louisville International Airport Prof. John-Paul Clarke Georgia Institute of Technology The Team Noise Abatement Procedures Working Group (NAPWG) has the following

More information

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 1 - Introduction This report describes the development and analysis of concept alternatives that would accommodate

More information

APPENDIX K LAND USE. Charles M. Schulz - Sonoma County Airport Draft Environmental Impact Report July 2011 K-1

APPENDIX K LAND USE. Charles M. Schulz - Sonoma County Airport Draft Environmental Impact Report July 2011 K-1 APPENDIX K LAND USE Charles M. Schulz - Sonoma County Airport Draft Environmental Impact Report July 2011 K-1 Appendix K Land Use THIS PAGE INTENTIONALLY LEFT BLANK Charles M. Schulz - Sonoma County Airport

More information

KSFO RNAV TO GLS DEMONSTRATION

KSFO RNAV TO GLS DEMONSTRATION Delta Air Lines - Noah Flood GLS GLS DTT 1.9 DTT 1.9 GLS1 GLS1 KSFO RNAV TO GLS DEMONSTRATION Key Components Three Key Components 1. Global Navigation Satellite System A. GPS/Galileo/GLONASS 2. Ground

More information

EGSL ANDREWSFIELD EGSL AD 2.1 AERODROME LOCATION INDICATOR AND NAME EGSL AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA

EGSL ANDREWSFIELD EGSL AD 2.1 AERODROME LOCATION INDICATOR AND NAME EGSL AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA UNITED KINGDOM AIP AD 2.EGSL-1 26 May 2016 EGSL ANDREWSFIELD EGSL AD 2.1 AERODROME LOCATION INDICATOR AND NAME EGSL ANDREWSFIELD EGSL AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 1 ARP coordinates

More information

APA Idaho 2018 Annual Conference Presentation on October 11 th, Rick Patton Aviation Planner

APA Idaho 2018 Annual Conference Presentation on October 11 th, Rick Patton Aviation Planner The New West Passionate Planning for People and Places APA Idaho 2018 Annual Conference Presentation on October 11 th, 2018 AIRPORT TOOLS FOR THE CITY/COUNTY PLANNER Rick Patton Aviation Planner This presentation

More information

FACILITY REQUIREMENTS 5.1 Introduction

FACILITY REQUIREMENTS 5.1 Introduction Chapter 5 FACILITY REQUIREMENTS 5.1 Introduction The facility requirements section of this study defines the physical facilities needed to safely and efficiently accommodate the current and future aviation

More information

REIMS AVIATION S.A.

REIMS AVIATION S.A. Page 1 2011-07-03 REIMS AVIATION S.A. Amendment 39-16640 Docket No. FAA-2011-0058; Directorate Identifier 2010-CE-071-AD PREAMBLE Effective Date (a) This airworthiness directive (AD) becomes effective

More information

MASTER PLAN CONCEPT 1 DRAFT

MASTER PLAN CONCEPT 1 DRAFT The Airport Master Plan Update for Dallas Executive Airport has included the development of aviation demand forecasts, an assessment of future facility needs, and the evaluation of airport development

More information

Flight Evaluation Schedule For GPS IFR Approval Primary Means Enroute, Terminal and Non-Precision Approach

Flight Evaluation Schedule For GPS IFR Approval Primary Means Enroute, Terminal and Non-Precision Approach Flight Evaluation Schedule For GPS IFR Approval Primary Means Enroute, Terminal and Non-Precision Approach Aircraft Description: Model ZK- Operator GPS Description: Manufacturer Model Serial Number TSO-C129

More information

Windmills & Airspace Can We Work Together?

Windmills & Airspace Can We Work Together? May 29, 2008 Windmills & Airspace Can We Work Together? J. Randolph Babbitt C O N F I D E N T I A L www.oliverwyman.com Windmills & Airspace Overview of Airspace Issues For Wind Turbine Sites The FAA s

More information

Municipal Drone Operations Ben Roper City of College Station

Municipal Drone Operations Ben Roper City of College Station Municipal Drone Operations Ben Roper City of College Station Unmanned Aerial System (UAS) aka Drone You are establishing an aviation unit for your entity What could possible go wrong? https://youtu.be/aolm1aqkews

More information

Municipal Drone Operations Ben Roper City of College Station

Municipal Drone Operations Ben Roper City of College Station Municipal Drone Operations Ben Roper City of College Station Unmanned Aerial System (UAS) aka Drone You are establishing an aviation unit for your entity What could possible go wrong? What is Needed Register

More information

University of Missouri MU Unmanned Aircraft Systems (UAS) Request Form/Process

University of Missouri MU Unmanned Aircraft Systems (UAS) Request Form/Process University of Missouri This UAS Request Form is for the use on the contiguous MU Campus Only and must be completed and submitted to ehs@missouri.edu for review and permit approval prior to any UAS operations

More information

15 Precision Approach Path Indicator 33 None RSA 150 feet wide by 300 feet long 150 feet wide by 300 feet long

15 Precision Approach Path Indicator 33 None RSA 150 feet wide by 300 feet long 150 feet wide by 300 feet long The first (AMP) was completed in 1984 and updated in 2000. The current FAA approved Airport Layout Plan (ALP) is dated November 9, 2001. The FAA suggests updating the AMP every five year in accordance

More information