2015 GDOT PowerPoint
|
|
- Baldric Carson
- 6 years ago
- Views:
Transcription
1 Obstruction Evaluation 2015 GDOT PowerPoint GAA Title Spring Page Conference What are all these surfaces? February 19, 2016 Sub Titles Presented By Alan Hood, Airport Safety Body Text Data Program Manager Georgia DOT
2 Approach Surfaces and Obstruction Removal Categories of approach surfaces for GA Airports. State Licensing FAA Part 77 FAA TERPs Visual Surface (20:1)
3 GDOT Airport Licensing Approach Standards State Licensing 3 configurations - based on runway length < 4,000 4,000 4,999 5,000 + Meets visual approach criteria from design guide Surface starts at threshold Surface needs to be clear to meet the minimum state licensing criteria Generally least restrictive of the three surfaces Airports inspected biennially
4 GDOT Airport Licensing Approach Standards 20:1 15:1 20:1 700 To 5000 To 10,000 To < >5000
5 GDOT Airport Licensing Approach Standards Obstruction Removal obstructions should be removed immediately or removal efforts should be initiated as soon as possible with written plan provided to GDOT by specified date in letter. if removal is not possible, displace threshold Documentation of obstructions: biennial inspection letter Notification Alan Hood, Airport Safety Data Program Manager and GDOT Project Manager
6 FAA Part 77 Approach Standards Generally most restrictive, used as screening criteria 9 configurations: Based on runway category and type of approach <12,500lb - visual = A(V) <12,500lb - visual - opposite A(NP) = A(V) op A(NP) <12,500lb - non-precision = A(NP) >12,500lb - visual = B(V) >12,500lb - visual - opposite D/PIR = B(V) op D/PIR >12,500lb - > ¾ mi visibility = C >12,500lb - > ¾ mi visibility - opposite D/PIR = C op D/PIR >12,500lb - < ¾ mi visibility = D >12,500lb - precision = PIR Surface starts 200 from the end of the runway Surface should be clear to meet FAA 5010 Safety Data Inspection Program criteria Airports inspected biennially
7 FAA Part 77 Approach Standards 10,000 40,000 50:1 34:1 34:1 5,000 20:1 20:1 20: A(V) 32 B(V) 32 A(NP) 32 C 32 D 32 PIR
8 FAA Part 77 Approach Standards Obstruction Removal Obstructions should be removed or provide schedule for removal Documentation of obstructions: biennial inspection letter FAA 5010 report Notification Required Provide sketch and coordinates of cleared area Alan Hood, Airport Safety Data Program Manager and GDOT Project Manager GDOT will coordinate with FAA to remove from FAA database
9 Who is Responsible? Ultimately the Sponsor -State Licensing and Part 77 Inspections: When obstructions are identified in an inspection, they become a liability. -State Licensing surface obstructions could lead to denial of license.
10 FAA TERPs Visual Surface Standards (20:1) Surface starts 200 from threshold 20:1 Approach Slope Obstructions should be mitigated to maintain night minimums When are procedures reviewed? Any request for change in approach, name change, LOC-ID change, runway numeral change, etc FAA performs review of airport s terminal procedures every 2 years
11 FAA TERPs Visual Surface Standards (20:1) 20:1 Surface for Categories 20:1 A D are all same size 34:1 now 20: A(NP) 32 C
12 FAA TERPs Visual Surface Standards (20:1) Obstruction Removal mitigate obstructions by: removal lighting PAPI waiver requires FAA Flight Standards approval obstructions should be mitigated to maintain nighttime procedures. Obstruction removal previous to 20:1 letter from Flight Procedures. Sketch and coordinates of cleared area Alan Hood, Airport Safety Data Program Manager and GDOT Project Manager GDOT notifies FAA to update database
13 FAA TERPs Visual Surface Standards (20:1)
14 Who is Responsible? Ultimately the Sponsor -Sponsors are also responsible for ensuring the TERPs Visual Surface is clear. Flight Procedures uses the FAA surveyed obstruction database to review procedures. -Obstructions do not automatically disappear from database with a new survey. -Must submit sketch with coordinates and boundaries of cleared areas to get obstructions removed from database. ***If you have been notified you have obstructions by Flight Procedures then you validate the obstructions in writing. No survey or coordinates and boundaries required unless you are topping obstructions.
15 Graphic Representation 3 Surfaces Using Google Earth 5000 Runway with GPS Approach State Licensing Approach FAA Part 77 Category C TERPS 20:1
16 State Licensing :1 400 Inner Width at Runway End
17 FAA Part 77 Category C 34:1 500 Inner Width 200 from Runway End
18 TERPS 20:1 400 Inner Width 200 from Runway End
19 State Licensing/ FAA Part 77/ TERPs 20:1
20 Graphic Representation 3 Surfaces Using Google Earth 3700 Runway with GPS Approach State Licensing Approach FAA Part 77 Category A(NP) TERPS 20:1
21 State Licensing :1 120 Inner Width at Runway End
22 FAA Part 77 Category A(NP) 20:1 500 Inner Width 200 from Runway End
23 TERPS 20:1 400 Inner Width 200 from Runway End
24 State Licensing/ FAA Part 77/ TERPs 20:1
25 Threshold Citing Table AC A
26 Questions?
Airport 20 to 1 Approach Surface
Airport 20 to 1 Approach Surface 2014 South Carolina Aviation Association Annual Conference Jon Walker Eastern Flight Procedures Team Feb 13, 2014 20 to 1 Surface Area Criteria 14 CFR Part 77; AC 150/5300-13A;
More informationAirport Obstruction Standards
Airport Obstruction Standards Dr. Antonio Trani Department of Civil and Environmental Engineering Virginia Tech Outline of this Presentation Obstructions to navigation around airports Discussion of Federal
More informationAppendix C AIRPORT LAYOUT PLANS
Appendix C AIRPORT LAYOUT PLANS Appendix C AIRPORT LAYOUT PLANS Airport Master Plan Santa Barbara Airport As part of this Airport Master Plan, the Federal Aviation Administration (FAA) requires the development
More informationChapter Six ALP Drawings. Tacoma Narrows Airport. Master Plan Update
Chapter Six ALP Drawings Master Plan Update The master planning process for the (Airport) has evolved through efforts in the previous chapters to analyze future aviation demand, establish airside and landside
More informationDRAFT MASTER PLAN UPDATE
DRAFT MASTER PLAN UPDATE CHAPTER VI: AIRPORT LAYOUT PLAN NARRATIVE DRAFT REPORT APRIL 2017 PREPARED BY: Table of Contents WESTCHESTER COUNTY AIRPORT 6 AIRPORT LAYOUT PLAN NARRATIVE REPORT... 6-1 6.1 AGIS
More informationDATE OF AERIAL PHOTOGRAPHY:
DESCRIPTION RUNWAY SAFETY AREA RUNWAY PROTECTION ZONE TAXIWAY OBJECT FREE AREA DATE OF AERIAL PHOTOGRAPHY: 6-17-01 RUNWAY SAFETY AREA FOR PORTION OF RUNWAY 16L-34R SOUTH OF RUNWAY BRIDGE HAS A FAA WAIVER
More informationSITE ELEVATION AMSL...Ground Elevation in feet AMSL STRUCTURE HEIGHT...Height Above Ground Level OVERALL HEIGHT AMSL...Total Overall Height AMSL
******************************************** * Federal Airways & Airspace * * Summary Report * ******************************************** File: User Assigned File Name Latitude: NAD83 Coordinate Longitude:
More information2015 GDOT PowerPoint Title Page
Georgia Department of Transportation 2015 GDOT PowerPoint Title Page Aviation Program Update Georgia Airports Association February Sub Titles 17, 2016 Body Text Presented By Steven V. Brian, Manager Aviation
More information** DETERMINATION OF NO HAZARD TO AIR NAVIGATION **
Mail Processing Center Federal Aviation Administration Southwest Regional Office Obstruction Evaluation Group 2601 Meacham Boulevard Fort Worth, TX 76137 Issued Date: 05/16/2011 Aeronautical Study No.
More informationORDINANCE NO. _2013-
ORDINANCE NO. _2013- AN ORDINANCE OF THE TOWNSHIP OF CONEWAGO, DAUPHIN COUNTY, PENNSYLVANIA, PROVIDING FOR AIRPORT ZONING REGULATIONS WITHIN THE AIRPORT ZONING OVERLAY DISTRICT CREATED BY THIS ORDINANCE
More informationGDOT AND FAA ADO UPDATES
GDOT AND FAA ADO UPDATES Building on the Past Soaring Into the Future Aviation Program Update 2015 GDOT PowerPoint October 27, 2016 Title Page Georgia Airports Association Presented By Steven V. Brian,
More informationConsideration will be given to other methods of compliance which may be presented to the Authority.
Advisory Circular AC 139-10 Revision 1 Control of Obstacles 27 April 2007 General Civil Aviation Authority advisory circulars (AC) contain information about standards, practices and procedures that the
More information(a) it has been licensed for the purpose, and save in accordance with the conditions prescribed in such licence; or
PART - XI Aerodromes 78. Licensing of Aerodromes (1) No aerodrome shall be used as a regular place of landing and departure by a scheduled air transport service or for a series of landings and departures
More informationTECHNICAL REPORT #7 Palm Beach International Airport Airport Layout Plan
TECHNICAL REPORT #7 Palm Beach International Airport Airport Layout Plan Technical Report #7 Palm Beach International Airport Layout Plan Palm Beach International Airport Prepared for Palm Beach County
More informationCHAPTER 3 ALTERNATIVES CONSIDERED
CHAPTER 3 ALTERNATIVES CONSIDERED 3.0 ALTERNATIVES The 2010 Stevensville Airport Master Plan contained five (5) airside development options designed to meet projected demands. Each of the options from
More informationMarch 2016 Safety Meeting
March 2016 Safety Meeting AC 61 98C Subject: Currency Requirements and Guidance for the Flight Review and Instrument Proficiency Check Date: 11/20/15 AC No: 61-98C Initiated by: AFS-800 Supercedes: AC
More informationSource: Chippewa Valley Regional Airport ASOS, Period of Record
Chapter 1 Inventory Runway wind coverage is the percentage of time a runway can be used without exceeding allowable crosswind velocities. Allowable crosswind velocities vary depending on aircraft size
More informationADVISORY CIRCULAR ON CALCULATION OF DECLARED DISTANCES
Page 1 of 6 1. PURPOSE This Advisory circular (AC) provides guidance to operators to calculated declared distances at aerodrome for safe use of runway and promulgation of aeronautical data to the aeronautical
More informationCATCODE ] CATCODE
Runways. FAC: 1111 CATCODE: 111111 OPR: AFCEC/COS OCR: AF/A3O-A 1.1. Description. The runway is the paved surface provided for normal aircraft landings and take offs. Runways are classified as either Class
More informationThe following criteria shall be applied within the boundaries of the AO District:
Sec. 419 (a) Purpose AIRPORT OVERLAY DISTRICT (AO) The purpose of the Airport Overlay District is to regulate and restrict the height of structures, objects, or natural growth, regulate the locations of
More informationAccording to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the elements that affect airfield capacity include:
4.1 INTRODUCTION The previous chapters have described the existing facilities and provided planning guidelines as well as a forecast of demand for aviation activity at North Perry Airport. The demand/capacity
More informationAVIATION PLANNING AND DEVELOPMENT Oakland International Airport 530 Water Street Oakland, CA 94607
AVIATION PLANNING AND DEVELOPMENT Oakland International Airport 530 Water Street When Do I Need to File an FAA Form 7460-1? Objects Affecting Navigable Airspace (14CFR77) June 2013 Background The Federal
More informationFACILITY REQUIREMENTS SUMMARY OF KEY ISSUES OVERVIEW
FACILITY REQUIREMENTS SUMMARY OF KEY ISSUES OVERVIEW This summary is intended to provide a brief overview of the key issues associated with conformance to FAA standards at Methow Valley State Airport.
More informationLearning More About: Protecting and Evaluating Airspace for Airports
Learning More About: Protecting and Evaluating Airspace for Airports Introduction Tall structures, smoke, and Tall Structures rising terrain are just a few conditions that can create hazardous conditions
More informationAERODROME LIGHTING SYSTEM
AERODROME LIGHTING SYSTEM 1. Introduction This chapter will show the wide variety of approach lighting systems before the runway threshold and systems present on runways. 2. Runway approach ramps 2.1.
More informationSaint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis
Saint Petersburg-Clearwater International Airport Airspace & Instrument Approach Analysis February 23, 2005 Jeppesen Boeing Jeppesen Government / Military Services Group Airspace Services Division AIRSPACE
More informationAERONAUTICAL SURVEYS & INSTRUMENT FLIGHT PROCEDURES
AERONAUTICAL SURVEYS & INSTRUMENT FLIGHT PROCEDURES Current as of November 2012 ALASKA AVIATION SYSTEM PLAN UPDATE Prepared for: State of Alaska Department of Transportation & Public Facilities Division
More informationCHAPTER 1 BACKGROUND AND PROPOSED ACTION
CHAPTER 1 BACKGROUND AND PROPOSED ACTION 1.0 INTRODUCTION An Environmental Assessment (EA) evaluates the effects of a proposed Federal action on the surrounding environment and is prepared in compliance
More informationInitiated By: AFS-400
U.S. Department of Transportation Federal Aviation Administration Advisory Circular Subject: Development and Submission of Special Date: 04/14/2015 AC No: 90-112A Instrument Procedures to the FAA Initiated
More informationAERODROME OPERATING MINIMA
Title: Determination of Aerodrome Operating Minima Page 1 of 8 AERODROME OPERATING MINIMA 1. PURPOSE 1.1 The purpose of this Advisory Circular is to provide methods to be adopted by operators in determining
More informationAIRPORT LAYOUT PLAN FOR FRIEDMAN MEMORIAL REPLACEMENT AIRPORT - SITE 12 FRIEDMAN MEMORIAL AIRPORT AUTHORITY INDEX OF SHEETS SHEET TITLE
GOODING MUNICIPAL SOURCE: JeppView 3.6.3.1 (Printed May 19, 2010) MAGIC VALLEY REGIONAL BURLEY MUNICIPAL LOCATION MAP NTS - SITE 12 AIRPORT LAYOUT PLAN FOR FRIEDMAN MEMORIAL REPLACEMENT AIRPORT - SITE
More informationCOMMERCIAL OPERATIONS
Cornell University UAV Guidelines Office of Risk Management and Insurance Purpose: The Office of Risk Management and Insurance has published guidelines as a resource for members of the University community
More informationUSE OF 3D GIS IN ANALYSIS OF AIRSPACE OBSTRUCTIONS
USE OF 3D GIS IN ANALYSIS OF AIRSPACE OBSTRUCTIONS A project by by Samuka D. W. F19/1461/2010 Supervisor; Dr D. N. Siriba 1 Background and Problem Statement The Airports in Kenya are the main link between
More informationAerodrome Inspectors Workshop
Aerodrome Inspectors Workshop Obstructions, Public Protection & Fencing Location: Trinidad & Tobago, 9-13 JUN 2014 Presenter: Herman Smith, FAA ACSI Date Presentation Title 1 Obstructions and Public Protection
More informationAppendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis
Appendix B ULTIMATE AIRPORT CAPACITY & DELAY SIMULATION MODELING ANALYSIS B TABLE OF CONTENTS EXHIBITS TABLES B.1 Introduction... 1 B.2 Simulation Modeling Assumption and Methodology... 4 B.2.1 Runway
More information1.1.3 Taxiways. Figure 1-15: Taxiway Data. DRAFT Inventory TYPICAL PAVEMENT CROSS-SECTION LIGHTING TYPE LENGTH (FEET) WIDTH (FEET) LIGHTING CONDITION
1.1.3 Taxiways EWN has an extensive network of taxiways and taxilanes connecting the terminal, air cargo, and general aviation areas with the runways as listed in Figure 1-15. A 50-foot wide parallel taxiway
More informationCHAPTER 1 INTRODUCTION AND BACKGROUND
CHAPTER 1 INTRODUCTION AND BACKGROUND An Environmental Assessment (EA) evaluates the effects of a proposed Federal action on the surrounding environment and is prepared in compliance with the National
More informationChallenges in Complex Procedure Design Validation
Challenges in Complex Procedure Design Validation Frank Musmann, Aerodata AG ICAO Workshop Seminar Aug. 2016 Aerodata AG 1 Procedure Validation Any new or modified Instrument Flight Procedure is required
More informationRef. AIM Para AOPA Air Safety Foundation Supported by the FAA Ref. AIM Para Supported by the FAA
ILS Critical Area Holding Position Sign: ATC may hold you at this sign, on a taxiway, when the instrument landing system is being used at the airport. Aircraft taxiing beyond this point may interfere with
More informationINTRODUCTION TO THE SAFE PROGRAM
January 2016 Page 1 INTRODUCTION TO THE SAFE PROGRAM Los Angeles World Airports (LAWA) is committed to providing the airport community with a safe and secure workplace. This document describes the purpose
More informationFAI Sporting Code. Section 11 Humanpowered Aircraft CLASS I Edition Approved by the FAI Air Sport General Commission (CASI) on October 13, 2011
FAI Sporting Code Section 11 Humanpowered Aircraft CLASS I 2011 Edition Approved by the FAI Air Sport General Commission (CASI) on October 13, 2011 NOTE: Section 11 and General Section combined make up
More informationICAO Standards. Airfield Information Signs. ICAO Annex 14, 4th Edition Aerodrome Design and Operations
ICAO Standards Airfield Information Signs ICAO Annex 14, 4th Edition Aerodrome Design and Operations Federal Aviation Administration U.S. Department of Transportation February 2004 ICAO Standards This
More informationAerodrome Manual. ICAO/FAA Comprehensive Aerodrome Certification Inspector Workshop. Presented To: Caribbean States By: FAA Office of Airports
ICAO/FAA Comprehensive Aerodrome Certification Inspector Workshop Presented To: Caribbean States By: FAA Office of Airports OBJECTIVE Development of an Aerodrome Manual (AM). 2 ICAO ANNEX 14 - SECTION
More informationThursday, May 2 nd, 2013 South St. Paul Municipal Airport Meeting Room 4:00 p.m. 5:30 p.m. MEETING NOTES
SOUTH ST. PAUL MUNICIPAL AIRPORT FLEMING FIELD MASTER PLAN ADVISORY GROUP MEETING #2 Thursday, May 2 nd, 2013 South St. Paul Municipal Airport Meeting Room 4:00 p.m. 5:30 p.m. MEETING NOTES The purpose
More informationAMENDMENT No. 8 TO THE INTERNATIONAL STANDARDS AND RECOMMENDED PRACTICES AERODROMES ANNEX 14 TO THE CONVENTION ON INTERNATIONAL CIVIL AVIATION
AMENDMENT No. 8 TO THE INTERNATIONAL STANDARDS AERODROMES ANNEX 14 TO THE CONVENTION ON INTERNATIONAL CIVIL AVIATION VOLUME I AERODROME DESIGN AND OPERATIONS The amendment to Annex 14, Volume I contained
More informationRonald Reagan Washington National Airport. April 18, 2012
ONE ENGINE INOPERATIVE SURFACE DEVELOPMENT CASE STUDY Ronald Reagan Washington National Airport April 18, 2012 Mike Hines, C.M. Metropolitan Washington Airports Authority N Ronald Reagan Washington National
More informationYellowstone Regional Airport Operational Capability Assessment
Yellowstone Regional Airport Operational Capability Assessment Agenda Introductions Project Review Geographic & Operational Challenges Current Approach Baseline & Test Flight Procedures Safety and Operational
More informationFrequently Asked Questions and Answers Bowman Field Airport Area Safety Program
Frequently Asked Questions and Answers Bowman Field Airport Area Safety Program 1. What is the proposed Bowman Field Airport Area Safety Program? The proposed Bowman Field Airport Area Safety Program has
More informationChapter 1. Draw Standard Departure Procedure
Chapter 1. Draw Standard Departure Procedure 1. Prior to drawing departure area consult the US Terminal Procedures book to determine if there are published take off special Take Off Minimums and (Obstacle)
More informationAirport Master Plan. Brookings Regional Airport. Runway Runway 17-35
Runway 17-35 Airport Master Plan Runway 12-30 Brookings Regional Airport Table of Contents Table of Contents Chapter 1: Master Plan Goals... 1-1 1.1. Introduction... 1 1.2. Objective 1 Identify improvements
More informationAIRPORT COMPLIANCE th Texas Aviation Conference. 3/29/2018 Date. Footer Text
AIRPORT COMPLIANCE 2018 36 th Texas Aviation Conference 3/29/2018 AWOS FCC LICENSE RENEWAL Needs renewal every 10 years (renew 90 days before expiration). Needs update if there is name change, coordinate
More information[Docket No. FAA ; Directorate Identifier 2004-NM-252-AD; Amendment ; AD ]
[Federal Register: October 5, 2005 (Volume 70, Number 192)] [Rules and Regulations] [Page 58002-58005] From the Federal Register Online via GPO Access [wais.access.gpo.gov] [DOCID:fr05oc05-6] DEPARTMENT
More information14 CFR Aeronautics and Space CHAPTER I FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED)
THIS DATA CURRENT AS OF THE FEDERAL REGISTER DATED JANUARY 15, 2004 14 CFR Aeronautics and Space CHAPTER I FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) SUBCHAPTER F -- AIR
More informationChapter 9 - AIRPORT SYSTEM DESIGN
Chapter 9 - AIRPORT SYSTEM DESIGN 9.01 GENERAL This chapter discusses the development program for Dutchess County Airport to the year 2020. This airport system design is based upon the airport's existing
More informationAIR NAVIGATION ORDER
CLEARANCE AREAS AND OBSTACLE LIMITATION SURFACES AT AIR NAVIGATION ORDER VERSION : 2.0 DATE OF IMPLEMENTATION : 15-02-2013 OFFICE OF PRIME INTEREST : AERODROME STANDARDS BRANCH. (Directorate of Airspace
More informationAdvisory Circular CT
(CAA logo, name of the country, etc.) Advisory Circular CT-42-009 SUBJECT: Airport Movement Area and Related Facilities Maintenance DATE: MM/YYYY ASSOCIATED RULES According with (name of the country) Civil
More informationPierre Regional Airport Airport Master Plan. Kickoff Meeting April 7, 2017
Pierre Regional Airport Airport Master Plan Kickoff Meeting April 7, 2017 Agenda Introductions Airport Master Planning Planning Considerations Master Plan Elements Schedule Public Involvement Basics about
More informationInterim Policy, FAA Review of Solar Energy System Projects on Federally Obligated Airports
This document is scheduled to be published in the Federal Register on 10/23/2013 and available online at http://federalregister.gov/a/2013-24729, and on FDsys.gov [4910-13] DEPARTMENT OF TRANSPORTATION
More informationCE 563 Airport Design
CE 563 Airport Design Prevent aircraft collisions Prevent aircraft collisions with obstructions Expedite and maintain an orderly flow of air traffic Air traffic control system command center Herndon, VA
More informationRULES OF TENNESSEE DEPARTMENT OF TRANSPORTATION AERONAUTICS DIVISION CHAPTER LICENSING AND REGISTRATION OF AIRPORTS TABLE OF CONTENTS
RULES OF TENNESSEE DEPARTMENT OF TRANSPORTATION AERONAUTICS DIVISION CHAPTER 1680-1-2 LICENSING AND REGISTRATION OF AIRPORTS TABLE OF CONTENTS 1680-1-2-.01 Purpose 1680-1-2-.06 Repealed 1680-1-2-.02 Definitions
More informationProcedures for Air Navigation Services Aerodromes (PANS-AGA) ICAO Doc. 9981
Procedures for Air Navigation Services Aerodromes (PANS-AGA) ICAO Doc. 9981 Introduction The First Edition of Doc. 9981 was approved by the President of the Council on 20 October 2014 The document becomes
More informationARTICLE 34 AIRPORT HEIGHT COMBINING ZONE (AH) (Amended by Ordinance #295 Effective June 26, 2009)
ARTICLE 34 AIRPORT HEIGHT COMBINING ZONE (AH) (Amended by Ordinance #295 Effective June 26, 2009) Section 34.10 - Purpose and Intent The purpose of the Airport Height Combining Zone (AH) is to protect
More informationPart 139, Amendment 11. Aerodromes Certification, Operation and Use. Docket 14/CAR/3
Docket 14/CAR/3 Content Rule objective... 3 Extent of consultation... 3 Summary of submissions... 3 Insertion of Amendments... 3 Effective date of rule... 3 Availability of rules... 4 139.11 Duration of
More informationStandard Instrument Approach Procedures, and Takeoff Minimums. and Obstacle Departure Procedures; Miscellaneous Amendments
This document is scheduled to be published in the Federal Register on 04/22/2016 and available online at http://federalregister.gov/a/2016-08751, and on FDsys.gov [4910-13] DEPARTMENT OF TRANSPORTATION
More informationAIRSPACE PROTECTION. Guidance and considerations for development in the vicinity of Ohio s airports and heliports
AIRSPACE PROTECTION Guidance and considerations for development in the vicinity of Ohio s airports and heliports UPDATED SPRING 2018 AIRSPACE PROTECTION When construction is proposed near public use airports
More informationChippewa-Eau Claire Metropolitan Planning Area Long Range Transportation Plan
1.2.7 2010 Eau Claire County Comprehensive Plan According to Eau Claire County s most recent comprehensive plan, the County will limit land use development adjacent to EAU in order to preserve the ability
More informationAPPENDIX D FEDERAL AVIATION REGULATIONS, PART 77
APPENDIX D FEDERAL AVIATION REGULATIONS, PART 77 Subparts A through C PART 77 - OBJECTS AFFECTING NAVIGABLE AIRSPACE Subpart A General 77.1 Scope. 77.2 Definition of terms. 77.3 Standards. 77.5 Kinds of
More informationGULFSTREAM AEROSPACE CORPORATION
Page 1 2011-24-02 GULFSTREAM AEROSPACE CORPORATION Amendment 39-16866 Docket No. FAA-20110572; Directorate Identifier 2011-NM-009-AD. PREAMBLE (a) Effective Date This AD is effective January 3, 2012. (b)
More information[Docket No. FAA ; Directorate Identifier 2015-NM-101-AD] Airworthiness Directives; The Boeing Company Airplanes
This document is scheduled to be published in the Federal Register on 12/31/2015 and available online at http://federalregister.gov/a/2015-32850, and on FDsys.gov [4910-13-P] DEPARTMENT OF TRANSPORTATION
More informationII.J. 14 CFR and Publications
References: 14 CFR Parts 1, 61, 91; NTSB Part 830; AC 00-2; FAA-H-8083-25; POH/AFM; AIM Objectives Key Elements Elements Schedule Equipment IP s Actions SP s Actions Completion Standards The student should
More informationDraft Concept Alternatives Analysis for the Inaugural Airport Program September 2005
Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 3 - Refinement of the Ultimate Airfield Concept Using the Base Concept identified in Section 2, IDOT re-examined
More information50 Ways to Improve Your Airport: Engaging Airport Management on Key Issues
50 Ways to Improve Your Airport: Engaging Airport Management on Key Issues Tuesday, November 17, 2015 1:00 p.m. 2:00 p.m. PRESENTED BY: Charles D. Lamb, P.E. Airfield Lighting Image Source: Delta Airport
More informationAmendment Docket No. FAA ; Directorate Identifier 2010-NM-122-AD
Page 1 2011-14-06 AIRBUS Amendment 39-16741 Docket No. FAA-2011-0257; Directorate Identifier 2010-NM-122-AD PREAMBLE Effective Date (a) This airworthiness directive (AD) becomes effective August 22, 2011.
More informationBAE SYSTEMS (OPERATIONS) LIMITED
Page 1 2010-10-22 BAE SYSTEMS (OPERATIONS) LIMITED Amendment 39-16301 Docket No. FAA-2008-0909; Directorate Identifier 2007-NM-363-AD PREAMBLE Effective Date (a) This AD becomes effective June 25, 2010.
More informationSUBCHAPTER E AIRSPACE
PART 71 DESIGNATION OF CLASS A, B, C, D, AND E AIRSPACE AREAS; AIR TRAFFIC SERVICE ROUTES; AND REPORTING POINTS Sec. SPECIAL FEDERAL AVIATION REGULATION NO. 97 [NOTE] 71.1 Applicability. 71.3 [Reserved]
More informationU.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION. National Policy
NOTICE U.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION National Policy N 8900.318 Effective Date: 8/13/15 Cancellation Date: 8/13/16 SUBJ: Optional Letter of Authorization (LOA) for Straight-In
More informationAIRPORT LAND USE COMPATILIBILTY AIRPORT LAND USE COMPATIBILIITY
CHAPTER 7 AIRPORT LAND USE COMPATILIBILTY CHAPTER 7 AIRPORT LAND USE COMPATIBILIITY 7.0 INTRODUCTION On airport aviation related development is typically compatible with aircraft operations. On airport
More informationTERMINAL PROCEDURES PUBLICATION SYMBOLS
TERMINAL PROCEDURES PUBLICATION SYMBOLS 54 AERONAUTICAL INFORMATION STANDARD TERMINAL ARRIVAL (STAR) CHARTS................. 55 DEPARTURE PROCEDURE (DP) CHARTS....................... 55 APPROACH LIGHTING
More informationVATUSA PHOENIX TRACON and VATUSA PHOENIX ATCT LETTER OF AGREEMENT. SUBJECT: Interfacility Coordination Procedures
VATUSA PHOENIX TRACON and VATUSA PHOENIX ATCT LETTER OF AGREEMENT EFFECTIVE: 01/08/08 SUBJECT: Interfacility Coordination Procedures 1. PURPOSE. This Letter of Agreement establishes procedures for coordinating
More informationRNP AR APCH Approvals: An Operator s Perspective
RNP AR APCH Approvals: An Operator s Perspective Presented to: ICAO Introduction to Performance Based Navigation Seminar The statements contained herein are based on good faith assumptions and provided
More information2015 PURDUE ROAD SCHOOL March 11, 2015
2015 PURDUE ROAD SCHOOL March 11, 2015 Runway Protection Zone (RPZ) Definition It is a trapezoidal shape formed off the end of a runway and its geometry it a function of the airport s aircraft approach
More informationUnmanned Aircraft Systems (UAS) 101
Unmanned Aircraft Systems (UAS) 101 Presented to: The American Association of State Highway and Transportation Officials Presented by: Dave May, FAA UAS Integration Office Date: What is a UAS? A UAS is
More informationSample Regulations for Water Aerodromes
Sample Regulations for Water Aerodromes First Edition (unedited version) March 2015 Notice to users: This document is an unedited version which is made available to the public for convenience. Its content
More informationStandard Instrument Approach Procedures, and Takeoff Minimums. and Obstacle Departure Procedures; Miscellaneous Amendments
This document is scheduled to be published in the Federal Register on 02/03/2016 and available online at http://federalregister.gov/a/2016-01858, and on FDsys.gov [4910-13] DEPARTMENT OF TRANSPORTATION
More information[Docket No. FAA ; Product Identifier 2018-NM-068-AD; Amendment ; AD ]
[Federal Register Volume 83, Number 236 (Monday, December 10, 2018)] [Rules and Regulations] [Pages 63392-63394] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR
More informationNoise Abatement Arrival Procedures at Louisville International Airport. Prof. John-Paul Clarke Georgia Institute of Technology
Noise Abatement Arrival Procedures at Louisville International Airport Prof. John-Paul Clarke Georgia Institute of Technology The Team Noise Abatement Procedures Working Group (NAPWG) has the following
More informationDraft Concept Alternatives Analysis for the Inaugural Airport Program September 2005
Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 1 - Introduction This report describes the development and analysis of concept alternatives that would accommodate
More informationAPPENDIX K LAND USE. Charles M. Schulz - Sonoma County Airport Draft Environmental Impact Report July 2011 K-1
APPENDIX K LAND USE Charles M. Schulz - Sonoma County Airport Draft Environmental Impact Report July 2011 K-1 Appendix K Land Use THIS PAGE INTENTIONALLY LEFT BLANK Charles M. Schulz - Sonoma County Airport
More informationKSFO RNAV TO GLS DEMONSTRATION
Delta Air Lines - Noah Flood GLS GLS DTT 1.9 DTT 1.9 GLS1 GLS1 KSFO RNAV TO GLS DEMONSTRATION Key Components Three Key Components 1. Global Navigation Satellite System A. GPS/Galileo/GLONASS 2. Ground
More informationEGSL ANDREWSFIELD EGSL AD 2.1 AERODROME LOCATION INDICATOR AND NAME EGSL AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA
UNITED KINGDOM AIP AD 2.EGSL-1 26 May 2016 EGSL ANDREWSFIELD EGSL AD 2.1 AERODROME LOCATION INDICATOR AND NAME EGSL ANDREWSFIELD EGSL AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 1 ARP coordinates
More informationAPA Idaho 2018 Annual Conference Presentation on October 11 th, Rick Patton Aviation Planner
The New West Passionate Planning for People and Places APA Idaho 2018 Annual Conference Presentation on October 11 th, 2018 AIRPORT TOOLS FOR THE CITY/COUNTY PLANNER Rick Patton Aviation Planner This presentation
More informationFACILITY REQUIREMENTS 5.1 Introduction
Chapter 5 FACILITY REQUIREMENTS 5.1 Introduction The facility requirements section of this study defines the physical facilities needed to safely and efficiently accommodate the current and future aviation
More informationREIMS AVIATION S.A.
Page 1 2011-07-03 REIMS AVIATION S.A. Amendment 39-16640 Docket No. FAA-2011-0058; Directorate Identifier 2010-CE-071-AD PREAMBLE Effective Date (a) This airworthiness directive (AD) becomes effective
More informationMASTER PLAN CONCEPT 1 DRAFT
The Airport Master Plan Update for Dallas Executive Airport has included the development of aviation demand forecasts, an assessment of future facility needs, and the evaluation of airport development
More informationFlight Evaluation Schedule For GPS IFR Approval Primary Means Enroute, Terminal and Non-Precision Approach
Flight Evaluation Schedule For GPS IFR Approval Primary Means Enroute, Terminal and Non-Precision Approach Aircraft Description: Model ZK- Operator GPS Description: Manufacturer Model Serial Number TSO-C129
More informationWindmills & Airspace Can We Work Together?
May 29, 2008 Windmills & Airspace Can We Work Together? J. Randolph Babbitt C O N F I D E N T I A L www.oliverwyman.com Windmills & Airspace Overview of Airspace Issues For Wind Turbine Sites The FAA s
More informationMunicipal Drone Operations Ben Roper City of College Station
Municipal Drone Operations Ben Roper City of College Station Unmanned Aerial System (UAS) aka Drone You are establishing an aviation unit for your entity What could possible go wrong? https://youtu.be/aolm1aqkews
More informationMunicipal Drone Operations Ben Roper City of College Station
Municipal Drone Operations Ben Roper City of College Station Unmanned Aerial System (UAS) aka Drone You are establishing an aviation unit for your entity What could possible go wrong? What is Needed Register
More informationUniversity of Missouri MU Unmanned Aircraft Systems (UAS) Request Form/Process
University of Missouri This UAS Request Form is for the use on the contiguous MU Campus Only and must be completed and submitted to ehs@missouri.edu for review and permit approval prior to any UAS operations
More information15 Precision Approach Path Indicator 33 None RSA 150 feet wide by 300 feet long 150 feet wide by 300 feet long
The first (AMP) was completed in 1984 and updated in 2000. The current FAA approved Airport Layout Plan (ALP) is dated November 9, 2001. The FAA suggests updating the AMP every five year in accordance
More information