TriMet Core Capacity Concepts. TriMet Board January 25, 2017
|
|
- Rosamond York
- 5 years ago
- Views:
Transcription
1 1 TriMet Core Capacity Concepts TriMet Board January 25,
2 2 Regional Growth 400,000 more people and 260,000 more jobs in less than 20 years Concentrated in Regional Centers, Town Centers, Station Areas, and Main Streets $13.1 billion worth of development in station areas since decision to build 5% of the area (MAX station areas) had 39% of all the housing units developed on it since the decision to build each line 2
3 3 (18.3 M) Population 12,000,000 10,000,000 8,000,000 6,000,000 4,000,000 #24 2,000,000 0 Source: NTD
4 4 Boardings per Capita # Source: NTD
5 5 Boardings (4.2 B) 700,000, ,000, ,000, ,000, ,000, ,000,000 #11 100,000,000 0 Source: NTD
6 More than 3 VMT saved for every 1 mile ridden on Westside MAX 6 6
7 Transit and Development - Westside 7 Intel Orenco MAX 7
8 Busy Trains 8 8
9 9 Reliability and Capacity When uneven headways occur, some trips are extra busy Original MAX system design started about 35 years ago. Growth forces systems to mature and adapt. We re doing our part on the operations side, but we can seek help with trackwork, switches, signals, junctions, stations and other infrastructure 9
10 Blue Line Westbound is At Capacity within 5 years according to FTA Core Capacity Criteria 10 Expo Center Airport PM Peak Blue Line 5.6 sq ft/ psgr Union Station Rose Quarter Gateway Hillsboro Pioneer Square Gresham PSU Beaverton Clackamas Town Center Park Ave FTA Threshold: 5.7 sq ft/psgr or less = at capacity within 5 years 5.6 sq ft/psgr = medium rating for project need 10
11 11 Two Different Markets 1. Less busy Red Line trains serve as far as Beaverton TC (3 stations on westside) 2. Heavily loaded Blue Line trains serve Silicon Forest and Hillsboro (14 additional stations beyond Beaverton TC) Expo Center Airport Union Station Rose Quarter Gateway Hillsboro Pioneer Square Gresham PSU Beaverton Clackamas Town Center Park Ave 11
12 12 Key locations in a growing system Expo Center Airport Union Station Rose Quarter Gateway Hillsboro Pioneer Square Gresham PSU Beaverton Clackamas Town Center Park Ave 12
13 13 Gateway Junction Single-track section 498 trains per day in all directions Single track conflicts: -IB Red w/ OB Red -OB Red w/ IB Red Merge point Merge point & Conflicts: -IB Red w/ OB Blue -IB Red w/ OB Green -OB Blue w/ IB Red -OB Green w/ IB Red Merge point & Conflicts: -OB Blue w/ IB Green -IB Green w/ OB Blue 13
14 Departure from Ruby Junction Departure from Clackamas Town Center Gateway Transit Center Departure from PDX Arrival at Gateway 5:00 PM 4:42 PM 5:01 PM 5:01 PM 5:02 PM 4:46 PM 5:03 PM 5:03 PM 5:04 PM 5:05 PM 4:48 PM 5:06 PM 5:06 PM Window needs to stay open to leave gap for Yellow Line merge at Steel Bridge 5:07 PM 5:08 PM 5:09 PM 5:10 PM 5:11 PM 4:57 PM 5:12 PM 5:12 PM 5:13 PM 5:14 PM 4:57 PM 5:15 PM 5:15 PM 5:16 PM 5:17 PM 5:01 PM 5:18 PM 5:18 PM 5:19 PM 5:20 PM 5:02 PM 5:21 PM 5:21 PM Window needs to stay open to leave gap for Yellow Line merge at Steel Bridge 5:22 PM 5:23 PM 5:24 PM 5:25 PM 5:26 PM 5:12 PM 5:27 PM 5:27 PM 5:28 PM 5:29 PM 5:11 PM 5:30 PM 5:30 PM Currently 2+ minute buffer required between trains Only 2 obvious windows between 5-5:30 PM without additional capacity improvements Hillsboro Beaverton Union Station PSU Expo Center Pioneer Square Rose Quarter Park Ave Gateway Airport Clackamas Town Center 14 14
15 15 Gateway Double-Track & Station Concept Add second track New double-track New station platform with walkway to Blue/Green station and bus transfers Removes conflicts in both directions 15
16 16 Another Gateway Option for Discussion New 2nd-track Removes conflicts in both directions 16
17 17 Airport Single Track Expo Center Airport Rose Quarter Union Station Gateway Conflicts: -IB Red w/ OB Red -OB Red w/ IB Red Hillsboro Beaverton PSU Pioneer Square Clackamas Town Center Park Ave Conflicts: -IB Red w/ OB Red -OB Red w/ IB Red Single-track section causes conflicts between IB Red and OB Red 17
18 18 Airport Double Track Conflicts: -IB Red w/ OB Red -OB Red w/ IB Red Conflicts: -IB Red w/ OB Red -OB Red w/ IB Red Add second track 18
19 19 Gateway and Airport Interact Airport animation Gateway animation 19
20 Cleveland MAX Station Layover & Recovery Expo Center Airport 20 Rose Quarter Union Station Gateway Pioneer Square Gresham PSU Clackamas Town Center Park Ave No Crossover behind station limits number of trains that can dwell and therefore limits: Headways Ability to recover from late arrivals 20
21 21 Rose Quarter/Steel Bridge Merge point & Conflicts: -OB Green w/ IB Red -OB Green w/ IB Blue -OB Yellow w/ IB Red -OB Yellow w/ IB Blue -IB Red w/ OB Yellow -IB Red w/ OB Green -IB Blue w/ OB Yellow -IB Blue w/ OB Green Merge point & Conflicts: -Traffic (car and pedestrian) signal clearance timing impacts all movements -OB Yellow w/ib Blue -OB Yellow w/ib Red -OB Yellow w/ib Green -IB Blue w/ OB Yellow -IB Red w/ OB Yellow -IB Green w/ OB Yellow 21
22 5:08 PM 5:09 PM Schedule Overlap Limits Resiliency Gateway Rose Quarter 5:10 PM Yellow 5:25 PM 5:26 PM 5:11 PM Steel Bridge Providence Park Beaverton TC 5:12 PM 5:12 PM Red 5:27 PM 5:28 PM 5:42 PM 6:00 PM 5:13 PM 5:14 PM Hillsboro/ Hatfield 5:15 PM 5:15 PM Blue 5:30 PM 5:31 PM 5:45 PM 6:03 PM 6:33 PM 5:16 PM 5:17 PM 5:18 PM 5:18 PM Green 5:33 PM 5:34 PM 5:19 PM 5:20 PM 5:21 PM 5:21 PM Blue 5:36 PM 5:37 PM 5:51 PM 6:09 PM 6:38 PM 5:22 PM 5:23 PM 5:24 PM 5:25 PM Yellow 5:40 PM 5:41 PM 5:26 PM 5:27 PM 5:27 PM Red 5:42 PM 5:43 PM 5:57 PM 6:15 PM 5:28 PM 5:29 PM 5:30 PM 5:30 PM Blue 5:45 PM 5:46 PM 6:00 PM 6:18 PM 6:47 PM 5:31 PM 5:32 PM 5:33 PM 5:33 PM Green 5:48 PM 5:49 PM 5:34 PM 5:35 PM 5:36 PM 5:36 PM Blue 5:51 PM 5:52 PM 6:06 PM 6:24 PM 6:53 PM 606 trains/day in all directions through Rose Quarter/Steel Bridge on average weekday Hillsboro Window for another train less resilient to delay without further capacity and reliability improvements Beaverton Union Station PSU Expo Center Pioneer Square Rose Quarter Park Ave Gateway 22 Airport Clackamas Town Center 22
23 23 Rose Quarter/Steel Bridge Process Multiple options Long-term conceptual analysis underway 23
24 24 Idealized Concept for Rose Quarter/Steel Bridge Separate the lines minimize conflicts and maximize the capacity Yellow completely separate from Blue/Red Consider reconfiguring RQ station to allow Green Line to separate before RQ station 24
25 Current Steel Bridge/RQ 25 Gateway Rose Quarter Steel Bridge Providence Park Beaverton TC Hillsboro 5:08 PM 5:09 PM 5:10 PM Yellow 5:25 PM 5:26 PM 5:11 PM 5:12 PM 5:12 PM Red 5:27 PM 5:28 PM 5:42 PM 6:00 PM 5:13 PM 5:14 PM 5:15 PM 5:15 PM Blue 5:30 PM 5:31 PM 5:45 PM 6:03 PM 6:33 PM 5:16 PM 5:17 PM 5:18 PM 5:18 PM Green 5:33 PM 5:34 PM 5:19 PM 5:20 PM 5:21 PM 5:21 PM Blue 5:36 PM 5:37 PM 5:51 PM 6:09 PM 6:38 PM 5:22 PM Window for another train less resilient to delay without further capacity and reliability improvements 5:23 PM 5:24 PM 5:25 PM Yellow 5:40 PM 5:41 PM Expo Center Airport 5:26 PM 5:27 PM 5:27 PM Red 5:42 PM 5:43 PM 5:57 PM 6:15 PM 5:28 PM Union Station Rose Quarter 5:29 PM 5:30 PM 5:30 PM Blue 5:45 PM 5:46 PM 6:00 PM 6:18 PM 6:47 PM Hillsboro Pioneer Square Gateway 5:31 PM 5:32 PM 5:33 PM 5:33 PM Green 5:48 PM 5:49 PM 5:34 PM Beaverton PSU Clackamas Town Center 5:35 PM 5:36 PM 5:36 PM Blue 5:51 PM 5:52 PM 6:06 PM 6:24 PM 6:53 PM Park Ave 25
26 With Steel Bridge/RQ Fix 26 5:08 PM 5:09 PM 5:10 PM 5:11 PM Gateway Rose Quarter 4-track Bridge Providence Park Beaverton TC 5:12 PM 5:12 PM Red 5:27 PM 5:28 PM 5:42 PM 6:00 PM 5:13 PM 5:14 PM Hillsboro 5:15 PM 5:15 PM Blue 5:30 PM 5:31 PM 5:45 PM 6:03 PM 6:33 PM 5:16 PM 5:17 PM add'l westside 5:18 PM 5:18 PM Green 5:33 PM only capacity 5:19 PM 5:20 PM 5:21 PM 5:21 PM Blue 5:36 PM 5:37 PM 5:51 PM 6:09 PM 6:38 PM 5:22 PM 5:23 PM 5:24 PM 5:25 PM 5:26 PM 5:27 PM 5:27 PM Red 5:42 PM 5:43 PM 5:57 PM 6:15 PM 5:28 PM 5:29 PM 5:30 PM 5:30 PM Blue 5:45 PM 5:46 PM 6:00 PM 6:18 PM 6:47 PM 5:31 PM 5:32 PM add'l westside 5:33 PM 5:33 PM Green 5:48 PM only capacity 5:34 PM 5:35 PM Many new possible windows for more trains open up 5:36 PM 5:36 PM Blue 5:51 PM 5:52 PM 6:06 PM 6:24 PM 6:53 PM Separating lines allows more capacity. Separated tracks at Steel Bridge/RQ would mean more capacity for Westside Blue Line and other lines (e.g., Yellow would no longer have any impact on Blue Line and Green Line impact would be reduced) Expo Ctr Rose Quarter 4-track Bridge PSU 5:06 PM Yellow 5:25 PM 5:26 PM 5:41 PM Green 5:33 PM 5:34 PM 5:21 PM Yellow 5:40 PM 5:41 PM Many new possible windows for more trains open up Green 5:48 PM 5:49 PM 26
27 27 More vehicles & Storage track LRVs for more MAX service Ruby Junction expansion to store them 27
28 We re making the Operational Improvements but can seek FTA help with Capital Improvements 28 28
29 29 Potential Grant Sources 5309 Capital Investment Grant opportunities 29
Wedding Events And MAX Transit Stations
Wedding Events And MAX Transit Stations Pre-Wedding BBQ Take YELLOW line towards Expo Center (eastbound) and get off at Rosa Parks stop on N. Interstate. Further Directions on Page 2 and 3 MAX lines: SW
More informationSCOPING INFORMATION PACKET
SCOPING INFORMATION PACKET Project Description The proposed project would provide a direct link connecting several light rail lines in operation or in construction, including the Metro Gold Line to Pasadena,
More informationLessons Learned from Rebuilding the Muni Subway Schedule Leslie Bienenfeld
Lessons Learned from Rebuilding the Muni Subway Schedule Leslie Bienenfeld Manager of Fixed Guideway Scheduling San Francisco Municipal Transportation Agency San Francisco, California SFMTA & the Municipal
More informationDecember 2018 Monthly Performance Report
Date: January 16, 2019 To: From: Subject: General Manager Board of Directors Timothy Kea Budget & Grants Department December 2018 Monthly Performance Report The monthly systemwide ridership decreased 1.4%
More informationJanuary 2019 Monthly Performance Report
Date: February 19, 2019 To: From: Subject: General Manager Board of Directors Timothy Kea Budget & Grants Department January 2019 Monthly Performance Report The monthly systemwide ridership decreased 0.5%
More informationRegional Planning for Tri-Rail Coastal Link
2013 APTA Rail Conference Regional Planning for Tri-Rail Coastal Link William L. Cross, P.E. South Florida Regional Transportation Authority Director of Planning and Capital Development Pompano Beach,
More informationSilver Line Operating Plan
Customer Service and Operations Committee Information Item IV-A December 6, 2012 Silver Line Operating Plan Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information
More informationVolume 16 Issue 3 Summer Railfans on a Portland Rail Excursion
Oregon Electric Railway Historical Society Volume 16 Issue 3 Summer 2010 Reminder to members: Please be sure your dues are up to date. 2010 dues were due Jan 1, 2010. Railfans on a Portland Rail Excursion
More informationUnion Station Rail Corridor East
Union Station Rail Corridor East Community Advisory Committee CAC Meeting #2: Overview of Track Expansion Plans March 6, 2018 PURPOSE OF CAC MEETING #2 Future service requirements Infrastructure needed
More informationCreating Connections in Niagara Region
Creating Connections in Niagara Region GERRY CHAPUT, CHIEF CAPITAL OFFICER - METROLINX ERIN MOROZ, DIRECTOR OF COMMUNICATIONS AND COMMUNITY RELATIONS - METROLINX METROLINX PRESENTATION TO NIAGARA REGION
More informationUnion Station Rail Corridor East Enhancements Project
Union Station Rail Corridor East Enhancements Project Transit Project Assessment Process Public Meeting #1 Presentation Wednesday June 28, 2017 GRIDLOCK COSTS OUR ECONONY REGIONAL TRANSFORMATION GO EXPANSION
More informationMercer SCOOT Adaptive Signal Control. Karl Typolt, Transpo Group PSRC RTOC July 6th, 2017
Mercer SCOOT Adaptive Signal Control Karl Typolt, Transpo Group PSRC RTOC July 6th, 2017 Our mission, vision, and core values Mission: deliver a high-quality transportation system for Seattle Vision: connected
More informationThe focus is the Central Broward County area. September 10,
OUNTY OMMISSION WORKSHOP www.centralbrowardtransit.com ENTRAL BROWARD EAST-WEST TRANSIT STUDY 1 The Study Area The focus is the entral Broward ounty area Broward ounty 2 The Study Area The cities include:
More informationTransAction Overview. Introduction. Vision. NVTA Jurisdictions
Introduction Vision NVTA Jurisdictions In the 21 st century, Northern Virginia will develop and sustain a multimodal transportation system that enhances quality of life and supports economic growth. Investments
More informationMetro Green Line to LAX. January, 2012
Metro Green Line to LAX 2 Agenda Context Airport Connection Types Project Process Questions and Discussion Los Angeles Lacks a Strong Airport Transit Connection 3 Airports in the U.S. with current or planned
More informationRestoration of Historic Streetcar Services in Downtown Los Angeles
Restoration of Historic Streetcar Services in Downtown Los Angeles Alternatives Analysis Community Update Meeting November 3, 2011 Introduction Local lead agency: Metro Federal lead agency: Federal Transit
More informationAuthors. Courtney Slavin Graduate Research Assistant Civil and Environmental Engineering Portland State University
An Evaluation of the Impacts of an Adaptive Coordinated Traffic Signal System on Transit Performance: a case study on Powell Boulevard (Portland, Oregon) Authors Courtney Slavin Graduate Research Assistant
More informationWorkshop on Advances in Public Transport Control and Operations, Stockholm, June 2017
ADAPT-IT Analysis and Development of Attractive Public Transport through Information Technology Real-time Holding Control Strategies for Single and Multiple Public Transport Lines G. Laskaris, PhD Candidate,
More informationTransit Vehicle Scheduling: Problem Description
Transit Vehicle Scheduling: Problem Description Outline Problem Characteristics Service Planning Hierarchy (revisited) Vehicle Scheduling /24/03.224J/ESD.204J Problem Characteristics Consolidated Operations
More informationHere is one more (a big one) for tomorrow s hearing. Thanks and let me know if you have questions! Aaron C. Deas Office of Government Affairs
From: To: Subject: Date: Attachments: Deas, Aaron JWMCC Exhibits HB 5530 Testimony - TriMet Thursday, May 18, 2017 1:54:09 PM 2017-05-18-SWCLightRail SupportFULL.pdf Here is one more (a big one) for tomorrow
More informationTitle VI Service Equity Analysis
Pierce Transit Title VI Service Equity Analysis Pursuant to FTA Circular 4702.1B NE Tacoma Service May 2016 Pierce Transit Transit Development Dept. PIERCE TRANSIT TITLE VI SERVICE EQUITY ANALYSIS TABLE
More informationPREFACE. Service frequency; Hours of service; Service coverage; Passenger loading; Reliability, and Transit vs. auto travel time.
PREFACE The Florida Department of Transportation (FDOT) has embarked upon a statewide evaluation of transit system performance. The outcome of this evaluation is a benchmark of transit performance that
More informationORANGE COUNTY TRANSPORTATION AUTHORITY. Go Local Fixed-Guideway Program History and Project Update. PowerPoint 3
ORANGE COUNTY TRANSPORTATION AUTHORITY Go Local Fixed-Guideway Program History and Project Update PowerPoint 3 Santa Ana-Garden Grove Fixed Guideway Project OCTA Board of Directors September 26, 2011 Project
More information5.1 Traffic and Transportation
5.1 When it opens in 2009, the Bellevue Nickel Improvement Project will increase the number of vehicles able to travel through the study area, improve travel speeds, and improve safety by reducing the
More informationTERMINAL DEVELOPMENT PLAN
5.0 TERMINAL DEVELOPMENT PLAN 5.0 TERMINAL DEVELOPMENT PLAN Key points The development plan in the Master Plan includes the expansion of terminal infrastructure, creating integrated terminals for international,
More informationLA Metro Rapid - Considerations in Identifying BRT Corridors. Martha Butler LACMTA, Transportation Planning Manager Los Angeles, California
LA Metro Rapid - Considerations in Identifying BRT Corridors Martha Butler LACMTA, Transportation Planning Manager Los Angeles, California LA Metro Transportation planner/coordinator, designer, builder
More informationDate: 11/6/15. Total Passengers
Total San Diego Metropolitan Transit System POLICY 42 PERFORMANCE MONITORING REPORT Page 1 of 6 OBJECTIVE Develop a Customer-Focused and Competitive System The following measures of productivity and service
More informationBUSH INTERCONTINENTAL AIRPORT
JULY 2014 BUSH INTERCONTINENTAL AIRPORT Project 500N-Terminal D, Phase III-Gate D9 A380 Conversion Project Manager: Randy Williams Everything is Bigger Terminal D at IAH The saying everything is bigger
More informationDefining Capacity of Airport Passenger Buildings. Defining Capacity of Airport Passenger Buildings
Defining Capacity of Airport Passenger Buildings Dr. Richard de Neufville Professor of Systems Engineering and Civil and Environmental Engineering Massachusetts Institute of Technology Defining Capacity
More informationUNLOCKING THE BRIGHTON MAINLINE
UNLOCKING THE BRIGHTON MAINLINE The highly successful Coast to Capital region, which runs from South London to Brighton and across the coast to Chichester, needs significant long-term rail investment to
More informationSpace Based ADS-B. ICAO SAT meeting - June 2016 AIREON LLC PROPRIETARY INFORMATION
Space Based ADS-B ICAO SAT meeting - June 2016 1 Options to Detect an Aircraft Position Position Accuracy / Update Interval Voice Position Reporting ADS-C Position Reporting Radar Surveillance / MLAT Space
More informationCURRENT SHORT-RANGE TRANSIT PLANNING PRACTICE. 1. SRTP -- Definition & Introduction 2. Measures and Standards
CURRENT SHORT-RANGE TRANSIT PLANNING PRACTICE Outline 1. SRTP -- Definition & Introduction 2. Measures and Standards 3. Current Practice in SRTP & Critique 1 Public Transport Planning A. Long Range (>
More informationAPPENDIX H MILESTONE 2 TRAFFIC OPERATIONS ANALYSIS OF THE AT-GRADE CROSSINGS
Draft Environmental Impact Statement/Environment Impact Report Appendix H Milestone 2 Traffic Operations Analysis of the At-Grade Crossings APPENDIX H MILESTONE 2 TRAFFIC OPERATIONS ANALYSIS OF THE AT-GRADE
More informationProject Advisory Group. May 23, 2013
Project Advisory Group May 23, 2013 1 Introductions and Review Review the three recommended Alternatives for detailed evaluation Next Steps Schedule and upcoming meetings Other discussion 2 Delay the Open
More informationPedestrian Safety Review Spadina Avenue
STAFF REPORT ACTION REQUIRED Pedestrian Safety Review Spadina Avenue Date: October 13, 2015 To: Toronto and East York Community Council From: Director, Transportation Services, Toronto and East York District
More informationEVALUATION OF TRANSIT SIGNAL PRIORITY EFFECTIVENESS USING AUTOMATIC VEHICLE LOCATION DATA
EVALUATION OF TRANSIT SIGNAL PRIORITY EFFECTIVENESS USING AUTOMATIC VEHICLE LOCATION DATA A Thesis Presented to The Academic Faculty by Carl Andrew Sundstrom In Partial Fulfillment of the Requirements
More informationMobile Farebox Repair Program: Setting Standards & Maximizing Regained Revenue
Mobile Farebox Repair Program: Setting Standards & Maximizing Regained Revenue Michael J. Walk, Chief Performance Officer Larry Jackson, Directory of Treasury Maryland Transit Administration March 2012
More informationTORONTO TRANSIT COMMISSION REPORT NO.
Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: March 26, 2014 SUBJECT: KENNEDY INTERCHANGE STATION: METROLINX EGLINTON CROSSTOWN LIGHT RAIL TRANSIT PROJECT - PRELIMINARY CONCEPT
More informationUnion Station Queens Quay Transit Link Study
Welcome Union Station in 1899. Image: City of Toronto Archives Union Station today. Image: Camil Rosiak Activity along Queens Quay. Image: Waterfront Toronto For more information or to comment, visit toronto.ca/waterfronttransit
More informationAstoria Boulevard ADA and Station Renewal Track Improvements. January 30, 2019
Astoria Boulevard ADA and Station Renewal Track Improvements January 30, 2019 Major Scope of Work Replace Street and Platform Stairs Work Description Install Two Street-to-Mezzanine Elevators Install Two
More informationAtt. A, AI 46, 11/9/17
Total s San Diego Metropolitan Transit System POLICY 42 PERFORMANCE MONITORING REPORT Page 1 of 6 Date: 11/8/17 OBJECTIVE Develop a Customer-Focused and Competitive System The following measures of productivity
More informationTitle VI Service Equity Analysis
Pierce Transit Title VI Service Equity Analysis Pursuant to FTA Circular 4702.1B September 2013 Service Change February 2013 Page intentionally left blank PIERCE TRANSIT TITLE VI SERVICE EQUITY ANALYSIS
More informationWest Santa Ana Branch Transit Corridor. Community Meetings March 12, 13, 17 & 19, 2018
West Santa Ana Branch Transit Corridor Community Meetings March 12, 13, 17 & 19, 2018 Purpose of this Meeting > Update on Public Scoping comments received > Why Metro is revisiting the Northern Alignments
More informationVasona Light Rail Signal Design Challenges. Hugh D. MacGillivray, Hatch Mott MacDonald Dennis Mellon, Santa Clara County Transportation Authority
Vasona Light Rail Signal Design Challenges Hugh D. MacGillivray, Hatch Mott MacDonald Dennis Mellon, Santa Clara County Transportation Authority Abstract The Vasona line is the most recent extension of
More informationBoston Redevelopment Authority 2/26/ Chestnut Hill Avenue Boston/Brookline, MA
Boston Redevelopment Authority 2/26/2014 Cassidy Playground Waterworks Design revisions made since the DPIR submission March 2013 Massing - Reduced project 16,030 SF, for a total project area of 218,520
More informationClaremont Project Background and Update Community Meeting September 11, 2017
Claremont Project Background and Update Community Meeting September 11, 2017 Topics Project Background Claremont Segment Information Project Timeline Upcoming Discussion Items Upcoming Meetings Questions
More informationDEMOGRAPHICS AND EXISTING SERVICE
EXECUTIVE SUMMARY The Central Corridor light-rail transit (LRT) project will open in 2014 and operate between downtown Minneapolis and downtown St. Paul, serving the University of Minnesota and University
More informationPERFORMANCE MEASURE INFORMATION SHEET #16
PERFORMANCE MEASURE INFORMATION SHEET #16 ARROW LAKES RESERVOIR: RECREATION Objective / Location Recreation/Arrow Lakes Reservoir Performance Measure Access Days Units Description MSIC 1) # Access Days
More informationCity of Austin Department of Aviation Austin Bergstrom International Airport 2040 Master Plan. Public Workshop #2 April 19, 2018
City of Austin Department of Aviation Austin Bergstrom International Airport 2040 Master Plan Public Workshop #2 April 19, 2018 DISCUSSION TOPICS Introduction About the Master Plan Public Workshop #1 Recap
More informationMajor Scheme Business Case Summary Report for Programme Entry
Paper A Heart of South West Local Transport Board Major Scheme Business Case Summary Report for Programme Entry M5 Junction 25, Taunton July 2016 1 SCHEME SUMMARY Scheme Name M5 Junction 25, Taunton Date
More informationEAKINS OVAL / 25 TH & PENNSYLVANIA AREA PROJECT SUMMARY 1
EAKINS OVAL / 25 TH & PENNSYLVANIA AREA PROJECT SUMMARY The Parkway Council Foundation is studying potential road and sidewalk reconfigurations of two areas at the western edge of the Benjamin Franklin
More informationAirport Capacity, Airport Delay, and Airline Service Supply: The Case of DFW
Airport Capacity, Airport Delay, and Airline Service Supply: The Case of DFW Faculty and Staff: D. Gillen, M. Hansen, A. Kanafani, J. Tsao Visiting Scholar: G. Nero and Students: S. A. Huang and W. Wei
More informationTransportation Improvement District (TID) Exercise New Castle County Unified Development Code
Transportation Improvement District (TID) Exercise New Castle County Unified Development Code Churchmans Crossing TID How should New Castle County deploy Transportation Improvement Districts (TIDs)? Site
More informationPUBLIC TRANSIT IN KENOSHA, RACINE, AND MILWAUKEE COUNTIES
PUBLIC TRANSIT IN KENOSHA, RACINE, AND MILWAUKEE COUNTIES #118404v1 Regional Transit Authority June 19, 2006 1 Presentation Overview Existing Public Transit Transit System Peer Comparison Recent Transit
More informationCREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS PUBLIC MEETING DECEMBER 6, 2017
CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS PUBLIC MEETING DECEMBER 6, 2017 CONGESTION COSTS OUR ECONOMY The average commute in Ontario is already over 45 minutes, and that figure jumps to more than
More informationPBN and RNAV concepts
PBN and RNAV concepts Rabat, 16/27-03-2015 Target: Learn basic concept on PBN and RNAV. NOT FOR COMMERCIAL PURPOSES 2 Concepts Part 1: PBN concept Part 2: RNAV, RNP Part 3: FTE (Flight Technical Error)
More informationOutline. 1. Timetable Development 2. Fleet Size. Nigel H.M. Wilson. 3. Vehicle Scheduling J/11.543J/ESD.226J Spring 2010, Lecture 18
Vehicle Scheduling Outline 1. Timetable Development 2. Fleet Size 3. Vehicle Scheduling 1 Timetable Development Can translate frequency into timetable by specifying headways as: equal -- appropriate if
More informationTRI-COUNTY TRANSPORTATION FOR SENIORS AND/OR PERSONS WITH DISABILITIES MONTHLY PERFORMANCE REPORTS
DATE: MAY 216 SUBJECT: TRI-COUNTY TRANSPORTATION FOR SENIORS AND/OR PERSONS WITH DISABILITIES MONTHLY PERFORMANCE REPORTS RIDE CONNECTION 1. Ride Connection E&D services (all funding sources). As of May,
More informationPROPOSED FOR IMPLEMENTATION
PROPOSED FOR IMPLEMENTATION Capital Transit Schedule & Route Revision Objective: Update the current Capital Transit schedules and routes to provide a higher level of reliability, add service to Riverside
More informationAPPENDIX B. Arlington Transit Peer Review Technical Memorandum
APPENDIX B Arlington Transit Peer Review Technical Memorandum Arlington County Appendix B December 2010 Table of Contents 1.0 OVERVIEW OF PEER ANALYSIS PROCESS... 2 1.1 National Transit Database...2 1.2
More informationApproval of August 2019 Service Changes
Approval of August 2019 Service Changes Operations, Safety & Security Committee April 9, 2019 Rob Smith AVP Service Planning and Scheduling 1 Today s Consideration Approve proposed August 2019 service
More informationCREATING CONNECTIONS IN CLARINGTON
CREATING CONNECTIONS IN CLARINGTON ANDRE MAROIS Director, RER Corridor Infrastructure Lakeshore East CHRIS BURKE Director, Service Planning, Planning & Development CLARINGTON GENERAL GOVERNANCE COMMITTEE
More informationTampa International Airport Master Plan Update. December 12, 2012
Tampa International Airport Master Plan Update December 12, 2012 1 Prior Presentation Consolidated rental car and people mover Decongest curbsides and roadways Enable rental car growth Gain long term parking
More informationSydney CBD - Partnering with the coach industry for solutions
Sydney CBD - Partnering with the coach industry for solutions Steve Issa Executive Director Operations and Planning Transport for NSW 16 June 2017 Tomorrow s Sydney Responding to growth: Sydney s population
More information3660 MARKET STREET, ST. LOUIS, MO armorydistrict.com
3660 MARKET STREET, 1 REGIONAL CONTEXT PROPERTY INFORMATION One-of-a-kind creative/tech office redevelopment Over 160,000 SF of creative office space Mixed-use historic building High ceilings Next to the
More informationCreating Sustainable Communities Through Public Transportation
Creating Sustainable Communities Through Public Transportation 21 st Transportation Committee January 16, 2008 Keith T. Parker Chief Executive Officer Charlotte Area Transit System (CATS) Charlotte Mecklenburg
More informationSanta Cruz Wharf Improvement Project. Briefing Paper. Prepared by City of Santa Cruz. for
Santa Cruz Wharf Improvement Project Briefing Paper Prepared by City of Santa Cruz for U.S. Army Corps of Engineers Interagency Meeting 12 November 2014 Santa Cruz Wharf Improvement Project Constructed
More informationAppendix 9. Impacts on Great Western Main Line. Prepared by Christopher Stokes
Appendix 9 Impacts on Great Western Main Line Prepared by Christopher Stokes 9 IMPACTS ON GREAT WESTERN MAIN LINE Prepared by Christopher Stokes Introduction 9.1 This appendix evaluates the impact of
More informationBirmingham City Centre Vision for Movement
Birmingham City Centre Vision for Movement Wes Sedman - Centro Commissioning Team Laying the foundations for a vibrant and liveable global city Birmingham Big City Plan - A City Centre Masterplan A vision
More informationSharing the Way with Sustainable Transport Options
Sharing the Way with Sustainable Transport Options Planning Institute Australia Professional Development Seminar Adelaide, SA Thursday 1 st May 2008 John Devney Sustainable Transport What is Sustainable
More informationAppendix F International Terminal Building Main Terminal Departures Level and Boarding Areas A and G Alternatives Analysis
Appendix F International Terminal Building Main Terminal Departures Level and Boarding Areas A and G Alternatives Analysis ITB MAIN TERMINAL DEPARTURES LEVEL & BOARDING AREAS A & G ALTERNATIVES ANALYSIS
More informationChapter 3. Burke & Company
Chapter 3 Burke & Company 3. WRTA RIDERSHIP AND RIDERSHIP TRENDS 3.1 Service Overview The Worcester Regional Transit Authority (WRTA) provides transit service to over half a million people. The service
More informationClydebank Healthcentre. Design Delivery Group Session Six- 19/04/2016
Clydebank Healthcentre Design Delivery Group Session Six- 19/04/2016 HALL ST Town Hall DUMBARTON RD KILBOWIE RD BRUCE ST Care Home HUME S MAIN AVENUE WEST TITAN BOULEVARD Queen s Quay Basin RIVER CLYDE
More informationLongmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT
Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT December 2018 Project Summary Boulder County, Colorado, in partnership with the City of Boulder, is evaluating options for multi-use
More informationPresentation to the Clackamas County Board of County Commissioners September 22, 2015
Presentation to the Clackamas County Board of County Commissioners September 22, 2015 Schedule Westside: Completed in 2014 Southwest: Completed in 2015 Eastside: Completion in 2016 Southeast: Completion
More informationTrigger Point Justification Note 30 th August 2013
1. Introduction Trigger Point Justification Note 30 th August 2013 DCC constructed a highway assignment model of Tiverton and the surrounding area and this suggested that in pure capacity terms, up to
More informationCrosswind dependent separations and update on TBS concept (transitional step)
Crosswind dependent separations and update on TBS concept (transitional step) 28-29 June 2010 WAKENET 3 EUROPE 2 nd workshop Airbus, Toulouse Peter CHOROBA, EUROCONTROL peter.choroba@eurocontrol.int The
More informationPEARL RIVER DELTA DEVELOPMENT OPPORTUNITIES AND CHALLENGESFOR HONG KONG AVIATION
PEARL RIVER DELTA DEVELOPMENT OPPORTUNITIES AND CHALLENGESFOR HONG KONG AVIATION Cathay Pacific recognises the increasing importance of the Pearl River Delta (PRD) region to Hong Kong s long-term prosperity.
More informationSunshine Coast Airport Master Plan September 2007
Sunshine Coast Airport Master Plan September 2007 Contents CONTENTS... I ACKNOWLEDGEMENT... II DISCLAIMER... III 1 EXECUTIVE SUMMARY...IV 1 INTRODUCTION... 1 2 AVIATION DEMAND FORECAST... 5 3 AIRCRAFT
More informationUpdate on the Thameslink programme
A picture of the National Audit Office logo Report by the Comptroller and Auditor General Department for Transport Update on the Thameslink programme HC 413 SESSION 2017 2019 23 NOVEMBER 2017 4 Key facts
More informationPRESENTATION TO THE RICHMOND REGIONAL TRANSPORTATION PLANNING ORGANIZATION: JUNE 2, 2016 BRT CONNECTIVITY AND LAND USE ANALYSIS PLAN JOSH MALLOW
Richmond Regional Planning District Commission 1969 PRESENTATION TO THE RICHMOND REGIONAL TRANSPORTATION PLANNING ORGANIZATION: JUNE 2, 2016 BRT CONNECTIVITY AND LAND USE ANALYSIS PLAN JOSH MALLOW PROJECT
More informationDRAFT Service Implementation Plan
2017 Service Implementation Plan October 2016 SECTION NAME 2017 Service Implementation Plan October 2016 2017 SERVICE IMPLEMENTATION PLAN TABLE OF CONTENTS Table of Contents... I List of Tables... III
More informationMIT ICAT. Robust Scheduling. Yana Ageeva John-Paul Clarke Massachusetts Institute of Technology International Center for Air Transportation
Robust Scheduling Yana Ageeva John-Paul Clarke Massachusetts Institute of Technology International Center for Air Transportation Philosophy If you like to drive fast, it doesn t make sense getting a Porsche
More informationFUTURE PASSENGER PROCESSING. ACRP New Concepts for Airport Terminal Landside Facilities
FUTURE PASSENGER PROCESSING ACRP 07-01 New Concepts for Airport Terminal Landside Facilities In association with: Ricondo & Associates, TransSolutions, TranSecure RESEARCH Background Research Objective
More information4. Safety Concerns Potential Short and Medium-Term Improvements
NH Route 104 Access Management Study Page 19 4. Safety Concerns Potential Short and Medium-Term Improvements Potential safety improvement strategies are listed by priority based on field observations by
More informationAirport analyses informing new mobility shifts: Opportunities to adapt energyefficient mobility services and infrastructure
Airport analyses informing new mobility shifts: Opportunities to adapt energyefficient mobility services and infrastructure Alejandro Henao, Josh Sperling, Venu Garikapati, Yi Hou, Stan Young National
More informationJAL Group Announces its FY Medium-Term Business Plan
JAL Group Announces its FY2006-2010 Medium-Term Business Plan -Mobilize the Group s Strengths to Regain Trust - Tokyo, Thursday March 2, 2006: The JAL Group today announced its medium-term business plan
More informationFiscal Management and Control Board. Fare Policy October 16, Draft for Discussion & Policy Purposes Only
Fiscal Management and Control Board Fare Policy October 16, 2015 1 Components of Fares Fare Level Different types of pricing by: By mode By time of day By distance By rider type (reduced fare) Subscription
More informationMONTHLY OPERATIONS REPORT DECEMBER 2015
MONTHLY OPERATIONS REPORT DECEMBER 215 Table of Contents DECEMBER 215 Section Page December Highlights... 3 Strategic Goals Progress Update... 4 Ridership... 6 Revenue... 9 Expenses... 1 System Summary...
More informationSouth of England north-south connectivity
South of England north-south connectivity An outline economic case for the inclusion of north-south connectivity improvements to form part of the government s road investment strategy (RIS2) Weston-super-Mare
More informationTRI-COUNTY TRANSPORTATION FOR SENIORS AND/OR PERSONS WITH DISABILITIES MONTHLY PERFORMANCE REPORTS
DATE: JUNE 216 SUBJECT: TRI-COUNTY TRANSPORTATION FOR SENIORS AND/OR PERSONS WITH DISABILITIES MONTHLY PERFORMANCE REPORTS RIDE CONNECTION 1. Ride Connection E&D services (all funding sources). As of June,
More informationHome of Southbank Partners. Riverfront Commons. Southbank Partners. Covington Newport Bellevue Ft. Thomas Dayton Ludlow
Home of Southbank Partners Riverfront Commons Southbank Partners Covington Newport Bellevue Ft. Thomas Dayton Ludlow Riverfront Commons Fostering a vision of Northern Kentucky s Future Riverfront Commons
More informationCREATING CONNECTIONS IN THE CITY OF ST. CATHARINES
CREATING CONNECTIONS IN THE CITY OF ST. CATHARINES LEON STAMBOLICH, DIRECTOR, CORRIDOR INFRASTRUCTURE BRIAN GALLAUGHER, DIRECTOR, PROJECT PLANNING RER ST. CATHARINES CITY COUNCIL NOVEMBER 13, 2017 A REGION
More informationKING STREET PILOT STUDY PUBLIC MEETING
KING STREET PILOT STUDY PUBLIC MEETING 2017.02.13 PUBLIC WORK with GEHL STUDIO / NEW YORK SWERHUN ASSOCIATES SAM SCHWARTZ CONSULTING LLC STARTING POINTS 17 1 - TRANSIT FIRST! Transit service is beyond
More informationRW Bruhn Bridge and Approaches Project
RW Bruhn Bridge and Approaches Project The Trans-Canada Highway 1 RW Bruhn Bridge and Approaches Project involves four-laning approximately 1.9 km of Highway 1 in Sicamous, including replacement of the
More informationB. Congestion Trends. Congestion Trends
B. Congestion Trends Congestion Trends There are two types of congestion that impact mobility: recurring and non-recurring congestion. Recurring congestion is related to segments of roadway that are over
More informationCentral Oregon Intergovernmental Council
Central Oregon Intergovernmental Council Regional Transit Master Plan (RTMP) Technical Advisory Committee March 8, 2013 Agenda Introductions (5 min) Project Update (5 min) Updated Demand Estimates (5 min)
More informationSeptember 2014 Prepared by the Department of Finance & Performance Management Sub-Regional Report PERFORMANCE MEASURES
September 2014 Prepared by the Department of Finance & Performance Management 2013 Sub-Regional Report PERFORMANCE MEASURES REGIONAL PERFORMANCE MEASURES RTA staff has undertaken the development of a performance
More information2017 Proposed Service Changes. For Public Meetings January 2017
2017 Proposed Service Changes For Public Meetings January 2017 Peninsula Corridor Electrification Project (PCEP) Schedule First Train Set Env. Clearance (Jan.) Delivered LNTP Award (Sept.) NTP (March)
More informationSAMTRANS SERVICE PLAN
Agenda Overview Part I: Key Findings Market Assessment Service Evaluation Part II: Service Development Framework Metrics Criteria Part III: Next Steps SAMTRANS SERVICE PLAN Preliminary Analysis and Criteria
More information