Birmingham City Centre Vision for Movement

Size: px
Start display at page:

Download "Birmingham City Centre Vision for Movement"

Transcription

1 Birmingham City Centre Vision for Movement Wes Sedman - Centro Commissioning Team Laying the foundations for a vibrant and liveable global city

2 Birmingham Big City Plan - A City Centre Masterplan A vision and framework for transforming the city centre over the next 20 years: Growing the City Core Raise liveability Improve connections Strengthen authentic character Diversify the culture and retail offer Developed by Birmingham City Council Centro a major stakeholder CITY CENTRE MASTERPLAN Sept 2010

3 The Big City Plan seeks to deliver: 1,500,000 sq.m. of new office, retail, leisure and cultural floorspace A 2.1 billion growth in the local economy/annum 50,000 new jobs 65,000 sq.m. of new or improved public spaces 28,000m of enhanced walking and cycling routes 5,000 new homes

4 Previously plans only considered city core (red) City Core has grown in the last 20 years (yellow) Current masterplan focuses on wider area (approx. 800ha) City centre made up quarters Each quarter reflects character and land use Character areas help the city to define direction

5 Areas of Transformation Westside New Street Station Snow Hill District Eastside Southern Gateway

6 Westside Library of Birmingham

7 New Street Station Gateway

8 Eastside Park

9 Snow Hill District

10 Southern Gateway - HS2

11 The Vision for Movement - supports delivery of the Big City Plan 3 Key Priorities: A Well Connected City Delivering a world class, easy to use integrated public transport system Key Objective: provide additional capacity for growth and regeneration in the city centre An Efficient City Making best use of the existing highway network with an appropriate hierarchy of priorities Key Objective: reduce dependence on the private car A Walkable City Creating and outstanding pedestrian environment Key Objective: put the needs of pedestrians at the heart of the strategy Birmingham City Centre Vision for Movement Laying the foundations for a vibrant and liveable global city November 2010

12 A Well Connected City To support the growth and regeneration, focus will be on improving the quality, legibility and choice of sustainable transport modes Rapid Transit Routes (Birmingham Sprint) Extension of the Metro system Heavy rail capacity High Speed Two Cycle routes/parking Improved pedestrian linkages

13 Concept Rapid Transit Network

14 Rapid Transit Walsall to Five Ways Phase 1 Key Elements: Builds upon the existing X51 Connects Moor Street with New Street High levels of existing priority Low infrastructure requirements Rapid Transit/Bus Gate needed on Broad Street Changes to traffic signal operations Terminates at Sheepcote Street Cost = 11.5M

15 An Efficient City Priority access for public transport, pedestrians and cyclists at congested locations. Improvements to key road junctions Improve the efficiency of parking within the city centre. Improve servicing in the city centre and access for emergency vehicles. Promote sustainable travel options through existing business and residential communities.

16 A Connected Walkable City

17 A Connected Walkable City

18 Birmingham City Centre Interchange (BCCI) JEWELLERY QUARTER RF EASTSIDE Stop key Primary stops Secondary stops TC TL SF SE SA SD SB SC RH Alighting only stops Primary, secondary and alighting only stops for the city loop (16+24) TJ Snow Hill/Colmore Row Interchange 17% of total services BH BG PN PP RA RB RC RG FD FE Primary, secondary and alighting only stops for Megabus, Park & Ride and Expressess JH TG TH TB TA TD TF TK TE AF AE AD AC AB AA DB DC DA DE PM PA PL PB PK PJ Bull Street/Priory Queensway Interchange 47% of total services DD PC PD PH MK MJ MH MG PE MN MO ML MM FB FA Total coverage from Interhanges 100% of total services JF JG JE JA JB JC Paradise Circus Interchange 22% of total services CITY CORE DH DH DI DJ DK MD MC ME MF MQ MP Moor Street Interchange 23% of total services FC JD NG NH HA MB MA New Street Gateway Interchange 24% of total services VC VB VE VA VF LB EE EA DIGBETH GA GB GC LC UH EB EC ED KC KA LA LF LE LD GD UD UC UB UA UF UG UE KD GF GE WESTSIDE

19 Whole Journey Experience

20 Whole Journey Experience

21 BCCI Information Configuration

22 BCCI Information Configuration

23 BCCI On Street Product Range

24 BCCI On Street Product Range

25 BCCI On Street Product Range

26 BCCI Modular Product Types

27 BCCI Modular Product Types

28 Thank you

Specification Details: Coded Dash Number M28803/1 -MC PART LISTINGS MANUFACTURER'S DESIGNATION OR TYPE NUMBER TEST OR QUALIFICATION REFERENCE

Specification Details: Coded Dash Number M28803/1 -MC PART LISTINGS MANUFACTURER'S DESIGNATION OR TYPE NUMBER TEST OR QUALIFICATION REFERENCE Specification Details: DLA Land and Maritime - VQ Date: 2/4/2015 Specification: MIL-DTL-28803 Title: Display, Optoelectronic, Readouts, Backlighted Segmented Federal Supply Class (FSC): 5980 Conventional:

More information

Make Model Number(s) STC No: Description System Covered SA449GL

Make Model Number(s) STC No: Description System Covered SA449GL Make Model Number(s) STC No: Description Covered 200, 200C, 200CT, 200T, A200, A200CT, B200, B200C, B200CT, B200T, B300, B300C SA00754CH ADC-2000 Fuel/Airdata ARMY ADC S35, V35, V35A, V35B, 35-C33A, E33A,

More information

HEAT TRANSFER PRODUCTS INC.

HEAT TRANSFER PRODUCTS INC. AERO-CLASSICS 1677 Curtiss Ct. La Verne CA 91750 USA Tel: 909-596-1630 Fax: 909-596-1753 www.aero-classics.com HEAT TRANSFER PRODUCTS INC. Aero-Classics Aviation Oil Coolers with FAA/PMA 8000074 9 row

More information

FEDERAL AVIATION ADMINISTRATION (FAA) APPROVED MODEL LIST (AML) SA02430SE FOR

FEDERAL AVIATION ADMINISTRATION (FAA) APPROVED MODEL LIST (AML) SA02430SE FOR MODEL BASIS 1. Aerostar PA-60-600 (Aerostar 600), PA-60-601 (Aerostar 601), PA-60-601 P (Aerostar 601P), PA-60-602P (Aerostar 602P), PA-60-700P (Aerostar 700P) A17WE FAR 23 FMS-5048 Revision IR, Revision

More information

FOR REFERENCE ONLY. FAA Approved Model List (AML) STC Number SA01899WI. Description. AML Amendment Log. 3/15/2019 Original

FOR REFERENCE ONLY. FAA Approved Model List (AML) STC Number SA01899WI. Description. AML Amendment Log. 3/15/2019 Original FAA Approved Model List () S SA01899WI Amendment Log 3/15/2019 Original Description Issued: March 15, 2019 Page 2 of 8 Aermacchi S.p.A (Aermacchi S.p.A) [Siai Marchetti] Aermacchi S.p.A (Aermacchi S.p.A)

More information

Delivering and Investing in Future Infrastructure Projects

Delivering and Investing in Future Infrastructure Projects Delivering and Investing in Future Infrastructure Projects Inside Government 29 th March Ian MacLeod Assistant Director Planning and Regeneration Birmingham City Council Scale of Growth Housing 150,000

More information

2015 June Non-Ad Valorem Recap 5/27/2015

2015 June Non-Ad Valorem Recap 5/27/2015 BL BELMONT LAKES CDD $ 4,200.00 42 42 $ 176,400.00 - - 42 42 1 BROWARD COUNTY GARBAGE $ 270.00 183 192 $ 51,840.00 - - 183 192 4 BROWARD COUNTY GARBAGE $ 270.00 665 869 $ 234,630.00 2-667 869 5 BROWARD

More information

Cessna Aircraft Company: Amendment ; Docket No. FAA ; Directorate Identifier 2008-CE-066-AD.

Cessna Aircraft Company: Amendment ; Docket No. FAA ; Directorate Identifier 2008-CE-066-AD. 2008-26-10 Cessna Aircraft Company: Amendment 39-15776; Docket No. FAA-2008-1328; Directorate Identifier 2008-CE-066-AD. Effective. Date (a) This AD becomes effective on January 5, 2009. Affected ADs (b)

More information

2015 Proposed Non-Ad Valorem Recap 08/05/15

2015 Proposed Non-Ad Valorem Recap 08/05/15 BL BELMONT LAKES CDD $ 4,200.00 42 42 $ 176,400.00 - - 42 42 1 BROWARD COUNTY GARBAGE $ 270.00 184 193 $ 52,110.00 - - 184 193 4 BROWARD COUNTY GARBAGE $ 270.00 665 871 $ 235,170.00 2-667 871 5 BROWARD

More information

Number SA01800SE. Seaton Engineering Corp. 217 West Garden Court Spokane, WA 99208

Number SA01800SE. Seaton Engineering Corp. 217 West Garden Court Spokane, WA 99208 United States of America Department of Transportation Federal Aviation Administration Supplemental This certificate, issued to: SA01800SE Seaton Engineering Corp. 217 West Garden Court Spokane, WA 99208

More information

Vision Planning for Metropolitan Areas. Ian Macleod Head of Development (East) and Planning Strategy Birmingham City Council

Vision Planning for Metropolitan Areas. Ian Macleod Head of Development (East) and Planning Strategy Birmingham City Council Vision Planning for Metropolitan Areas Ian Macleod Head of Development (East) and Planning Strategy Birmingham City Council The Regeneration Story Past and present 1950-1960: Motor City Planning for the

More information

J.P. INSTRUMENTS FAA APPROVED MODEL LIST (AML) NUMBER SA00954SE FOR INSTALLATION OF THE EDM 711 SERIES PRIMARY INSTRUMENTS (CHT, TIT, OIL

J.P. INSTRUMENTS FAA APPROVED MODEL LIST (AML) NUMBER SA00954SE FOR INSTALLATION OF THE EDM 711 SERIES PRIMARY INSTRUMENTS (CHT, TIT, OIL FAA APPROVED MODEL LIST () SA00954SE ITEM AIRCRAFT MAKE AIRCRAFT MODEL Rev A Page 1 of 5 FAA APPROVED MODEL LIST () SA00954SE 1. American General Aircraft Holdings, AA-5, AA-5A, AA-5B A16EA FAR 23 8/10/2001

More information

NU N SPRINGS DRAIN-3A NU , , NZ N SPRINGS DRAIN-3B NZ , , NE N SPRINGS

NU N SPRINGS DRAIN-3A NU , , NZ N SPRINGS DRAIN-3B NZ , , NE N SPRINGS 10/13/09 DRAINAGE / CID RECAP RATE # OF TAX BASE TAXES # OF EX EX BASE TOTAL TOT L1 LAUDERDALE ISLES 15.00 553 553 8,295.00 553 L2 LAUDERDALE ISLES 2 145 145 145 TL TWIN LAKES 40.00 217 217 8,680.00 217

More information

Out-of-District Placement December Extraordinary Services ESY

Out-of-District Placement December Extraordinary Services ESY Initials Classification Placement Cost ESY Cost School Year DD Bridgewater Raritan (350555005) $ 14,427.00 Extraordinary Services ESY Extraordinary Services School Year Related Services Cost COMMENTS AJ

More information

CESSNA AIRCRAFT COMPANY

CESSNA AIRCRAFT COMPANY Page 1 2008-26-10 CESSNA AIRCRAFT COMPANY Amendment 39-15776 Docket No. FAA-2008-1328; Directorate Identifier 2008-CE-066-AD PREAMBLE Effective Date (a) This AD becomes effective on January 5, 2009. Affected

More information

SERVICE BULLETIN FLIGHT CONTROLS - FLIGHT CONTROL (GUST) LOCK INSPECTION / REPLACEMENT SYNOPSIS OF CHANGE

SERVICE BULLETIN FLIGHT CONTROLS - FLIGHT CONTROL (GUST) LOCK INSPECTION / REPLACEMENT SYNOPSIS OF CHANGE SERVICE BULLETIN TITLE: FLIGHT CONTROLS - FLIGHT CONTROL (GUST) LOCK INSPECTION / REPLACEMENT SYNOPSIS OF CHANGE This Service Bulletin has been revised to add ending serial effectivity. The first paragraph

More information

Birmingham Connected Briefing October Joe Green Transportation Behaviour Change Manager, Economy, Birmingham City Council

Birmingham Connected Briefing October Joe Green Transportation Behaviour Change Manager, Economy, Birmingham City Council Birmingham Connected Briefing October 2018 Joe Green Transportation Behaviour Change Manager, Economy, Birmingham City Council A period of transformational change for the city centre and beyond Creating

More information

West Midlands Sustainable Urban

West Midlands Sustainable Urban West Midlands Sustainable Urban Transport Strategy and its Delivery: Movement for Growth Liveable City Conference Transport and Connectivity Seminar - 30/11/2017 Adam Harrison, Strategy & Intelligence

More information

HISTORY IN THE MAKING. The UK s most important city centre development outside London. Being delivered by:

HISTORY IN THE MAKING. The UK s most important city centre development outside London. Being delivered by: UPDATE JANUARY 2016 HISTORY IN THE MAKING The UK s most important city centre development outside London. Being delivered by: THE HEART OF THE CITY St Philip s Square Birmingham Museum & Art Gallery A

More information

Figure 3: Global Sydney. Draft Metropolitan Strategy for Sydney. North Sydney CBD. Second Harbour Crossing. Walsh Bay Arts Precinct.

Figure 3: Global Sydney. Draft Metropolitan Strategy for Sydney. North Sydney CBD. Second Harbour Crossing. Walsh Bay Arts Precinct. Newtown Glebe Macdonaldtown Pyrmont Ultimo Sydney International Convention, Exhibition & Entertainment Precinct Sydney Education & Health Erskineville Figure 3: Global Sydney Waterloo Second Harbour Crossing

More information

H1: BIRMINGHAM CURZON STREET STATION

H1: BIRMINGHAM CURZON STREET STATION HIGH SPEED TWO INFORMATION PAPER H1: BIRMINGHAM CURZON STREET STATION This paper outlines the proposals for Curzon Street Station. It will be of particular interest to those potentially affected by the

More information

CONSTRUCTION Straights and shapes are manufactured from CA360, CA345 or CA377 brass

CONSTRUCTION Straights and shapes are manufactured from CA360, CA345 or CA377 brass CONSTRUCTION Straights and shapes are manufactured from CA360, CA345 or CA377 brass ADVANTAGES Large range of styles and sizes Some shapes are offered in either extruded or forged patterns APPLICATIONS

More information

Enterprise and Business Scrutiny Panel

Enterprise and Business Scrutiny Panel Enterprise and Business Scrutiny Panel Keren Jones, Service Director, City Economy Marie Bintley, Head of City Development 03 February 2015 Citywide Economic Context Business and enterprise: 8,065 Businesses

More information

AUCKLAND $1.2 BILLION $1.9 BILLION $149 MILLION 15% SPEND $5.7 BILLION

AUCKLAND $1.2 BILLION $1.9 BILLION $149 MILLION 15% SPEND $5.7 BILLION AUCKLAND AUCKLAND $5.7 BILLION FORECAST TOTAL AUCKLAND INVESTMENT The next 10 years are expected to underline Auckland s performance as the fastest growing major city in Australasia. The city is expected

More information

Bolton Council Invest in Bolton. Welcome INVEST IN

Bolton Council Invest in Bolton. Welcome INVEST IN Welcome INVEST IN Partnerships for Growth Building a brighter future through partnership Vision Invest in Logistics North Bolton When it comes to the economic regeneration of Greater Manchester, Bolton

More information

East Sussex Strategic Partnership Transport Update 2 March Jon Wheeler Team Manager Strategic Economic Infrastructure

East Sussex Strategic Partnership Transport Update 2 March Jon Wheeler Team Manager Strategic Economic Infrastructure East Sussex Strategic Partnership Transport Update 2 March 2016 Jon Wheeler Team Manager Strategic Economic Infrastructure Summary Transport and Economic Growth Strategic Transport Bexhill Hastings Link

More information

Preft j Lt-Modification Class or Type Manufacturer Model Prefix: X - Experimental (Army or Navy) Y - Service Test Or Limited Procurement (Army only)

Preft j Lt-Modification Class or Type Manufacturer Model Prefix: X - Experimental (Army or Navy) Y - Service Test Or Limited Procurement (Army only) 46-9 AIRCRAFT IDENTIFICATION STANDARDS US MILITARY AIRPLANE MODEL DESIGNATION Example: X PB 4 U -I Navy Y P -2 - A Army Preft j Lt-Modification Class or Type Manufacturer Model Prefix: X - Experimental

More information

P\'1A NO. PQ2101CE-D PRODUCTION APPROVAL LISTING - SlTPPLEMENT NO. 70 DATED: June 23, 2003 AD 1INISTRATION - PARTS MANUFACTURER APPROVAL

P\'1A NO. PQ2101CE-D PRODUCTION APPROVAL LISTING - SlTPPLEMENT NO. 70 DATED: June 23, 2003 AD 1INISTRATION - PARTS MANUFACTURER APPROVAL P\'1A NO. PQ2101CE-D PRODUCTION APPROVAL LISTING - SlTPPLEMENT NO. 70 FEDERAL AVIATIO AD 1INISTRATION - PARTS MANUFACTURER APPROVAL Rapco, Inc. 445 Cardinal Lane Hartland, WI 53029 (262)367-2292 Page 1

More information

Urban Design Meets Economic Regeneration. Weston Civic Pride Initiative. Weston Civic Pride Initiative. Weston Civic Pride Initiative

Urban Design Meets Economic Regeneration. Weston Civic Pride Initiative. Weston Civic Pride Initiative. Weston Civic Pride Initiative Art & Lighting The contribution to economic regeneration in Weston-super-Mare : Urban Design Meets Economic Regeneration Presentation by Mark Luck Leicester 5 July 2007 Project Overview introduction Project

More information

Infrastructure for Growth

Infrastructure for Growth A passion to deliver a prosperous future Connecting North Cambridgeshire Infrastructure for Growth Infrastructure for growth Wisbech is the largest settlement in Fenland. The town and its hinterland has

More information

Masterplanning Study Contents

Masterplanning Study Contents / Ascot Road, Watford Masterplanning Study May 016 / Ascot Road, Watford Masterplanning Study Contents Existing Uses and Road etwork Potential Developmet s Masterplanning Strategy Masterplan Vision Proposed

More information

!!!! "#$%&'($)(*! +!,-.'/-&!-$0!1'2-$!134.#/5!#%!.6(! 7'#&'2$(!839(/!:-.(/46(0!!

!!!! #$%&'($)(*! +!,-.'/-&!-$0!1'2-$!134.#/5!#%!.6(! 7'#&'2$(!839(/!:-.(/46(0!! !!!! "#$%&'($)(! +!,-.'/-&!-$0!1'2-$!134.#/5!#%!.6(! 7'#&'2$(!839(/!:-.(/46(0!!! ;

More information

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content Gold Coast Rapid Transit Chapter twelve Social impact Chapter content Social impact assessment process...235 Existing community profile...237 Consultation...238 Social impacts and mitigation strategies...239

More information

A TRANSPORT SYSTEM CONNECTING PEOPLE TO PLACES

A TRANSPORT SYSTEM CONNECTING PEOPLE TO PLACES THE MAYOR'S VISION FOR TRANSPORT A TRANSPORT SYSTEM CONNECTING PEOPLE TO PLACES VISION We will build a transport system that works for everyone, connecting people to the places they want to go within the

More information

2019 may september alaska cruises & cruisetours

2019 may september alaska cruises & cruisetours 2019 may september alaska cruises & cruisetours Whether this is your first cruise to Alaska or a return to the Great Land, the opportunity to study new beauty awaits. The 2019 season marks Princess 50

More information

NOTICE TO MEMBERS No February 5, 2003

NOTICE TO MEMBERS No February 5, 2003 NOTICE TO MEMBERS No. 2003-008 February 5, 2003 NEW EQUITY OPTION CLASSES Bourse de Montréal Inc.(The Bourse) and (CDCC) hereby inform you that at the opening of trading on Monday, February 10, 2003 the

More information

Wallasey public bank holiday pharmacy opening hours Easter August 2014

Wallasey public bank holiday pharmacy opening hours Easter August 2014 Wallasey public bank holiday pharmacy opening hours Easter August 2014 Alliance Manor Health Centre Liscard Village Wallasey Wirral CH45 4JG Tel:0151 638-5617 Asda Seaview Road Liscard Wallasey Wirral

More information

Draft City Centre Transport Proposals

Draft City Centre Transport Proposals Draft City Centre Transport Proposals Introduction This draft position paper provides an overview of the current City Centre transport issues, including concepts of the possible future City Centre transport

More information

Our Future City. Tuesday 5 th July, 4pm-6pm Suite 1, Jurys Inn Brighton

Our Future City. Tuesday 5 th July, 4pm-6pm Suite 1, Jurys Inn Brighton Our Future City Tuesday 5 th July, 4pm-6pm Suite 1, Jurys Inn Brighton Brighton & Hove the connected city. Creative, dynamic, inclusive and caring. A fantastic place to live, work and visit Objective To

More information

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge Public Consultation Centre (PCC) No. 3 Please Sign-in Cambridge City Hall November 21, 2017 2:00 to 8:00pm Preston Memorial Auditorium

More information

International standard flanges acc.to SAE, ISO, DIN, GOST

International standard flanges acc.to SAE, ISO, DIN, GOST Gear Pump High Performance Version GP up to 31 cm 3 (1.89 inch 3 ) p max 3 bar ( PSI) Speed from to RPM Technical Features Operating pressure 8 bar, Peak pressure 3 bar High-strength quality aluminum alloys

More information

Growth and Connectivity Conference. 12 th September, Birmingham CONFERENCE SUMMARY

Growth and Connectivity Conference. 12 th September, Birmingham CONFERENCE SUMMARY Growth and Connectivity Conference 12 th September, Birmingham Lord Deighton s HS2 Growth Task Force's report "High Speed 2: Get Ready" highlighted that "Creating connections, bringing people and businesses

More information

2015 Leaf Trinity Football Final Checklist Set Subset Name Checklist

2015 Leaf Trinity Football Final Checklist Set Subset Name Checklist Set Subset Name Checklist 2015 Leaf Trinity Football Pure Auto Alvin Dupree PA-AD1 2015 Leaf Trinity Football Pure Auto Amari Cooper PA-AC1 2015 Leaf Trinity Football Pure Auto Ameer Abdullah PA-AA1 2015

More information

AIRCRAFT RESALE - VALUE ADDED COMPARISON AIRCRAFT BLUEBOOK PRICE DIGEST ~ SUMMER 2017 Vol 17-2

AIRCRAFT RESALE - VALUE ADDED COMPARISON AIRCRAFT BLUEBOOK PRICE DIGEST ~ SUMMER 2017 Vol 17-2 Price List Current as of 3/1/17 AVIATION SERVICE, INC. INSTALLED INSTALLED INSTALLED PARTIAL LISTING OF SELECTED AIRCRAFT VALUATIONS FOR BLUEBOOK ENGINE VALUE ADDED CLICK HERE V VII AEROSTAR 1981 601P

More information

304 King Street DOWNTOWN CHARLESTON, SC FOR SALE OR LEASE APPROXIMATELY ± 6,866 SF

304 King Street DOWNTOWN CHARLESTON, SC FOR SALE OR LEASE APPROXIMATELY ± 6,866 SF 304 King Street DOWNTOWN CHARLESTON, SC 29401 FOR SALE OR LEASE APPROXIMATELY ± 6,866 SF Iconic Building Well Suited For Restaurant Bar Concept Retail Office C O N TA C T: Reid Davis, CCIM, SIOR (843)

More information

Creating a High Quality Business District

Creating a High Quality Business District Date Month Date Month Friday 7 November 2014 Nine Elms on the South Bank A Bilfinger Real Estate company Creating a High Quality Business District New London Architecture Introduction Nine Elms Vauxhall

More information

A Response to: Belfast On The Move Transport Masterplan for Belfast City Centre, Sustainable Transport Enabling Measures

A Response to: Belfast On The Move Transport Masterplan for Belfast City Centre, Sustainable Transport Enabling Measures West Belfast Partnership 218-226 Falls Road Belfast BT12 6AH T: 02890809202 A Response to: Belfast On The Move Transport Masterplan for Belfast City Centre, Sustainable Transport Enabling Measures Issued

More information

WELCOME. Members of the development team are on hand to answer questions and feedback forms are available for your comments.

WELCOME. Members of the development team are on hand to answer questions and feedback forms are available for your comments. WELCOME Thank you for attending our public consultation in respect of TJX Europe s proposed new landmark office building opposite Watford Junction Station. The purpose of the consultation is to present

More information

Swallow House, 10 Swallow Street, Birmingham, B1 1BD

Swallow House, 10 Swallow Street, Birmingham, B1 1BD Committee Date: 20/02/2014 Application Number: 2013/08477/PA Accepted: 29/11/2013 Application Type: Full Planning Target Date: 28/02/2014 Ward: Ladywood Swallow House, 10 Swallow Street, Birmingham, B1

More information

THE FUTURE S HERE. Page 1

THE FUTURE S HERE. Page 1 THE FUTURE S HERE Page 1 Page 2 THE FUTURE FOR BIRMINGHAM IS EASTSIDE LOCKS, FORMING PART OF EASTSIDE, BIRMINGHAM S MAJOR REGENERATION PROJECT. THIS VIBRANT NEW QUARTER FOR THE CITY WILL CREATE A MIXED

More information

Part 005 Implementation Strategy _

Part 005 Implementation Strategy _ Part 0 Implementation Strategy www. landlab.co.nz Queenstown Town Centre Masterplan Version 7 14 June 28 Section 0 Page 4 5.1 Implementation Plan The projects and initiatives contained within the Queenstown

More information

ASHTON GATE SPORTS & CONVENTION CENTRE. A New Home For Bristol Flyers

ASHTON GATE SPORTS & CONVENTION CENTRE. A New Home For Bristol Flyers ASHTON GATE SPORTS & CONVENTION CENTRE A New Home For Bristol Flyers THE VISION I n 2016 Ashton Gate/ Bristol Sport delivered the 45m redevelopment of the home of Bristol City FC and Bristol Bears Rugby.

More information

RAPCO INC. FUEL PUMP APPLICATION GUIDE For Electric Fuel Pumps

RAPCO INC. FUEL PUMP APPLICATION GUIDE For Electric Fuel Pumps RAPCO INC. FUEL PUMP APPLICATION GUIDE For Electric Fuel Pumps Overhauled - FAA Approved Fuel Pumps with Warranty and FAA Form 8130-3 New - FAA-PMA Approved Fuel Pumps with Warranty This Application Guide

More information

Birmingham Hotel Market Overview

Birmingham Hotel Market Overview Birmingham Hotel Market Overview January 2014 1 1. Birmingham hotel market performance headlines for December 2013 While the occupancy rate dropped slightly between November and December detailed analysis

More information

Draft Greater Sydney Region Plan

Draft Greater Sydney Region Plan Powered by TCPDF (www.tcpdf.org) Draft Greater Sydney Region Plan Submission_id: 31382 Date of Lodgment: 14 Dec 2017 Origin of Submission: Online Organisation name: Greenfields Development Company & Ingham

More information

HARBOUR EDGE STITCH. Uniting the Waterfront with the City Centre

HARBOUR EDGE STITCH. Uniting the Waterfront with the City Centre 78 AC_BEU_CCMP_2_TM1_4 _FD.indd 78 20/07/12 12:04 PM 01 HARBOUR EDGE STITCH Uniting the Waterfront with the City Centre 01 VISION OUR 2032 VISION IS: Quay Street as a high-quality Harbour Edge space that

More information

Pushbutton Switch A22. Ordering Information. Install in 22-dia. or 25-dia. Panel Cutout. Construction

Pushbutton Switch A22. Ordering Information. Install in 22-dia. or 25-dia. Panel Cutout. Construction Pushbutton Switch Install in 22-dia. or 25-dia. Panel Cutout Easy mounting and removal of Switch Unit. Increase wiring efficiency with three-row mounting of Switch Unit. Finger protection mechanism on

More information

Hotel and Hospitality Services. Capita Real Estate

Hotel and Hospitality Services. Capita Real Estate Hotel and Hospitality Services Capita Real Estate About Us At GL Hearn we are seeing continuous growth in the hotel investment and development markets. We act for investors, developers and occupiers across

More information

PART VIII APPLICATION FOR REVISED SOUTH SIDE TRAFFIC MANAGEMENT WORKS TO FACILITATE LUAS BXD PLANNING REPORT ROADS & TRAFFIC DEPARTMENT

PART VIII APPLICATION FOR REVISED SOUTH SIDE TRAFFIC MANAGEMENT WORKS TO FACILITATE LUAS BXD PLANNING REPORT ROADS & TRAFFIC DEPARTMENT PART VIII APPLICATION FOR REVISED SOUTH SIDE TRAFFIC MANAGEMENT WORKS TO FACILITATE LUAS BXD PLANNING REPORT ROADS & TRAFFIC DEPARTMENT NOVEMBER 2012 1.0 INTRODUCTION This report has been prepared in support

More information

2008 Manchester Flats Cancelling Machine

2008 Manchester Flats Cancelling Machine 2008 Manchester Flats Cancelling Machine A NEC (Nippon Electric Company) Flats Cancelling Machine was introduced at Manchester Mail Centre in late November 2008. Its purpose was to cancel all Flat items

More information

FAA Approved Model List (AML) STC SA01818WI

FAA Approved Model List (AML) STC SA01818WI FAA Approved Model List () STC SA01818WI Aermacchi S.p.A (Aermacchi S.p.A) [Siai Marchetti] Aermacchi S.p.A (Aermacchi S.p.A) [Siai Marchetti] Aero Commander (Dynac Aerospace Corp) [Volaire] F.260, F.260B,

More information

GRAND CENTRAL BIRMINGHAM

GRAND CENTRAL BIRMINGHAM FACT FILE JANUARY 2014 GRAND CENTRAL BIRMINGHAM Anchored by a full line John Lewis Store, Grand Central Birmingham will bring over 40 new premium and high quality stores and more than 20 new concept cafes

More information

Llandudno Junction. Regeneration Proposals for the Future. December 2009

Llandudno Junction. Regeneration Proposals for the Future. December 2009 Llandudno Junction Regeneration Proposals for the Future December 2009 Llandudno Junction - Vision Statement 1 Purpose 1.1 The purpose of this document is to describe key priorities to support the regeneration

More information

PERMITS ISSUED DURING THE PERIOD 05/01/15 through 05/31/15 PAGE 1. THIS REPORT WAS PRINTED ON Monday, June 01, City of Starkville

PERMITS ISSUED DURING THE PERIOD 05/01/15 through 05/31/15 PAGE 1. THIS REPORT WAS PRINTED ON Monday, June 01, City of Starkville PAGE 1 CA COMMERCIAL ADDITION / ALTERATION 1500181 CA 05/04/15 15 CZ I 100 WOOD ST STARKVILLE HOUSING 437 274,000.00 1,158.00 1,158.00 1500156 CA 05/08/15 15 CD I 603 YELLOW JACKET S RENAISSANCE RETAIL

More information

Chapter. CPT only copyright 2007 American Medical Association. All rights reserved. 9Ambulance

Chapter. CPT only copyright 2007 American Medical Association. All rights reserved. 9Ambulance Chapter 9Ambulance 9 9.1 Enrollment........................................................ 9-2 9.2 Reimbursement.................................................... 9-2 9.2.1 Emergency Ground Ambulance

More information

Business Case Approved. Under Construction. Business Case Approved. Under Construction

Business Case Approved. Under Construction. Business Case Approved. Under Construction Item 6 Appendix A: LGF Project Summary for South Essex Update September Project and A127 Network Resilience (Essex) Basildon Integrated Transport Package (Essex) Range of improvements at key locations

More information

RAPCO, I~C. 445 Cardinal Lane Hartland, WI (262)

RAPCO, I~C. 445 Cardinal Lane Hartland, WI (262) Pl\IA NO. PQ2101CE-D PRODUCn01\ APPROVAL LISTING - SUPPLD1E~T NO. 73 DATED: August 29. 2003 FEDERAL AVIATI01\ AD\IINISTRAnON - PARTS MANuFACTURER APPROVAL RAPCO, I~C. 445 Cardinal Lane Hartland, WI 53029

More information

9.1 INTRODUCTION 9.2 EXISTING DEVELOPMENT. Southern Cross University

9.1 INTRODUCTION 9.2 EXISTING DEVELOPMENT. Southern Cross University Property Strategy The property strategy delivers improved legibility, responds to the locational attributes of the site, and facilitates essential operational efficiencies. 9.1 INTRODUCTION Non-aviation

More information

JOINT CORE STRATEGY FOR BROADLAND, NORWICH AND SOUTH NORFOLK EXAMINATION MATTER 3C EASTON/COSTESSEY

JOINT CORE STRATEGY FOR BROADLAND, NORWICH AND SOUTH NORFOLK EXAMINATION MATTER 3C EASTON/COSTESSEY Matter 3C Easton/Costessey Representor No. 8826 JOINT CORE STRATEGY FOR BROADLAND, NORWICH AND SOUTH NORFOLK EXAMINATION MATTER 3C EASTON/COSTESSEY SUBMISSION ON BEHALF OF TAYLOR WIMPEY DEVELOPMENTS AND

More information

3 Burner ASSEMBLY MANUAL

3 Burner ASSEMBLY MANUAL REVOLUTIONTM 3 Burner ASSEMBLY MANUAL 85-3118-2 (G53201) Propane 85-3119-0 (G53202) Natural Gas Limited 5-Year Warranty Read and save manual for future reference. Assemble your grill immediately. Missing

More information

North West London CCG Phamacy Name Address Postcode Tel. No. Christmas Day 28th Dec 1st Jan

North West London CCG Phamacy Name Address Postcode Tel. No. Christmas Day 28th Dec 1st Jan North West London CCG Phamacy Name Address Postcode Tel. No. Christmas Day 28th Dec 1st Jan Honeypot Pharmacy 189 Streatfield Road, Kenton,, HA3 9DA 020 8204 4542 10:00-13.00 Closed Closed Tanna Chemist

More information

oncourse TRAINING COURSE INFORMATION HIGHFIELD AWARDING BODY FOR COMPLIANCE FOOD SAFETY LEVEL

oncourse TRAINING COURSE INFORMATION HIGHFIELD AWARDING BODY FOR COMPLIANCE FOOD SAFETY LEVEL oncourse TRAINING COURSE INFORMATION HIGHFIELD 4 AWARDING BODY FOR COMPLIANCE FOOD SAFETY LEVEL welcome Centre number 10697 Thank you for enquiring about the HABC Level 4 Award in Food Safety in Catering

More information

SOBJ SSOBJ TITLE CA 00 MGMT/ORGANIZ SERVICE CB 00 LEGAL SERVICES CF 00 TECHNICAL RESEARCH CG 00 MARKETING SERVICES CH 00 COMMUNICATION SERVIC CJ 00

SOBJ SSOBJ TITLE CA 00 MGMT/ORGANIZ SERVICE CB 00 LEGAL SERVICES CF 00 TECHNICAL RESEARCH CG 00 MARKETING SERVICES CH 00 COMMUNICATION SERVIC CJ 00 SOBJ SSOBJ TITLE CA 00 MGMT/ORGANIZ SERVICE CB 00 LEGAL SERVICES CF 00 TECHNICAL RESEARCH CG 00 MARKETING SERVICES CH 00 COMMUNICATION SERVIC CJ 00 EMPLOYEE TRAINING CZ 00 PERSONAL SERV CNTRCT EA 00 SUPPLIES

More information

PERTH CITY SWAN PERTH AIRPORT CURTIN UNIVERSITY WESTFIELD CAROUSEL TANGNEY CITY OF CANNING JANDAKOT AIRPORT SWAN TANGNEY

PERTH CITY SWAN PERTH AIRPORT CURTIN UNIVERSITY WESTFIELD CAROUSEL TANGNEY CITY OF CANNING JANDAKOT AIRPORT SWAN TANGNEY THE CITY OF CANNING CITY OF CANNING PERTH CITY SWAN PERTH AIRPORT CURTIN UNIVERSITY WESTFIELD CAROUSEL TANGNEY CITY OF CANNING JANDAKOT AIRPORT SWAN TANGNEY UNTAPPED POTENTIAL The Canning City Centre,

More information

Tourism Development Framework for Scotland. Executive Summary- Development Framework to 2020 for the Visitor Economy (Refresh 2016)

Tourism Development Framework for Scotland. Executive Summary- Development Framework to 2020 for the Visitor Economy (Refresh 2016) Tourism Development Framework for Scotland Executive Summary- Development Framework to 2020 for the Visitor Economy (Refresh 2016) Introduction The Tourism Development Framework for Scotland refresh 2016:

More information

UNION PACIFIC RAILROAD ROSTER DATE Brotherhood Maintenance Of Way Employees RUN DATE ROSTER TITLE CODE DATA DATE

UNION PACIFIC RAILROAD ROSTER DATE Brotherhood Maintenance Of Way Employees RUN DATE ROSTER TITLE CODE DATA DATE ROSTER - 9090 TITLE CODE - 310 DATA DATE 01-01-2017 SENIORITY DIVISION - BMWE A&S R R Track Sub Department - A&S Track Inspector (A) 0001 Pratt J.W. 0208373 09-11-78 07-19-93 NON-AGMT 0002 Elliott K.T.

More information

Brighton & Hove CCG. Sussex community pharmacy bank holiday opening times, by CCG area - Monday 27 th August Summer BH Monday 27th August 2018

Brighton & Hove CCG. Sussex community pharmacy bank holiday opening times, by CCG area - Monday 27 th August Summer BH Monday 27th August 2018 community pharmacy bank holiday opening times, by CCG area - Monday 27 th Further information is available from NHS 111 (dial 111) or on the NHS choices website www.nhs.uk NHS 111 is available 24 hours

More information

4 Burner ASSEMBLY MANUAL

4 Burner ASSEMBLY MANUAL REVOLUTIONTM 4 Burner ASSEMBLY MANUAL 85-3120-4 (G53203) Propane 85-3121-2 (G53204) Natural Gas Limited 5-Year Warranty Read and save manual for future reference. Assemble your grill immediately. Missing

More information

West of England. Priority Places Requiring Public Investment

West of England. Priority Places Requiring Public Investment West of England Priority Places Requiring Public Investment Development Urban Regeneration & Suburban Intensification Bristol Central Area Bristol Central Area; Stokes Croft, Temple Meads & St Philips

More information

chairs & stools-plastic V14b_Layout 1 11/07/ :05 Page 1 CHAIRS AND STOOLS - PLASTIC SHELL Primo Limited

chairs & stools-plastic V14b_Layout 1 11/07/ :05 Page 1 CHAIRS AND STOOLS - PLASTIC SHELL Primo Limited chairs & stools-plastic V14b_Layout 1 11/07/2018 10:05 Page 1 CHAIRS AND STOOLS - PLASTIC SHELL Primo Limited chairs & stools-plastic V14b_Layout 1 11/07/2018 10:05 Page 2 new P1918S 520mm 520mm 850mm

More information

Strategic Transport Forum

Strategic Transport Forum Strategic Transport Forum Friday 16 th March 2018 www.englandseconomicheartland.com Item 3: Innovation www.englandseconomicheartland.com Innovation work stream - EEH 1. Policy modelling 2. MaaS 3. EEH

More information

Roundhouse Way Transport Interchange (Part of NATS City Centre Package)

Roundhouse Way Transport Interchange (Part of NATS City Centre Package) Roundhouse Way Transport Interchange (Part of NATS City Centre Package) 15/16 16/17 17/18 18/19 19/20 Total TOTAL COST Roundhouse Way Transport Interchange 0.5m 0.5m FUNDING CIL 0.05m 0.05m Growth Deal

More information

FUTURE TRANSPORT STRATEGY AND GREATER SYDNEY SERVICES AND INFRASTRUCTURE PLAN. Western Parkland City

FUTURE TRANSPORT STRATEGY AND GREATER SYDNEY SERVICES AND INFRASTRUCTURE PLAN. Western Parkland City FUTURE TRANSPORT STRATEGY AND GREATER SYDNEY SERVICES AND INFRASTRUCTURE PLAN Western Parkland City 2 Transport for NSW Future Transport Strategy and Greater Sydney Services and Infrastructure Plan Western

More information

FAA Approved Model List (AML) STC Number SA01818WI

FAA Approved Model List (AML) STC Number SA01818WI FAA Approved Model List () STC SA01818WI Revision Log Date Description July 22, 2016 Original Aug 22, 2016 Add models under the following TCDS: 1A2, 1A4, 1A6, A34CE, A-767 Add models under the following

More information

CENTRAL CONSOLIDATED SCHOOL DISTRICT #22 CREDIT CARD CHECK LISTING

CENTRAL CONSOLIDATED SCHOOL DISTRICT #22 CREDIT CARD CHECK LISTING CENTRAL CONSOLIDATED SCHOOL DISTRICT #22 CREDIT CARD CHECK LISTING FOR THE MONTH ENDING DECEMBER 31, 2006 PAGE 1 115831 12/19/06 49,077.30 FNB AP60 CITY MARKET 24101.1000.56118.1010. AD 103106 404.92 CITY

More information

Team London Bridge Response to the Department for Transport Consultation on the combined Thameslink, Southern and Great Northern franchise

Team London Bridge Response to the Department for Transport Consultation on the combined Thameslink, Southern and Great Northern franchise Team London Bridge Response to the Department for Transport Consultation on the combined Thameslink, Southern and Great Northern franchise 23 August 2012 Table of Contents 1. Executive Summary 2. Introduction

More information

4. Proposed Transit Improvements

4. Proposed Transit Improvements 4. Proposed Transit Improvements The following proposed transit improvements have been assembled based on input received from the community meetings and from review and coordination with the TAC as well

More information

EXPENDITURE IN THE WEST MIDLANDS

EXPENDITURE IN THE WEST MIDLANDS EXPENDITURE IN THE WEST MIDLANDS 2018-19 If you would like this leaflet in a format more suited to your needs, please call 0345 3036760 or e-mail customerservices@tfwm.org.uk For more information please

More information

BRT in Developed Countries The Brisbane Experience

BRT in Developed Countries The Brisbane Experience Symposium on Public Transportation in Indian Cities with Special focus on Bus Rapid Transit (BRT) System New Delhi 20-21 Jan 2010 BRT in Developed Countries The Brisbane Experience Brian Bothwell Network

More information

S420 Barbecue Assembly Manual

S420 Barbecue Assembly Manual TM MC S420 Barbecue Assembly Manual 85-3062-2 (G45123) Propane 85-3063-0 (G45124) Natural Gas 1 YEAR LIMITED WARRANTY READ AND SAVE MANUAL FOR FUTURE REFERENCE. Assemble your grill immediately. Missing

More information

4 Transport projects underway in Western Sydney

4 Transport projects underway in Western Sydney 4 Transport projects underway in Western Sydney About this chapter This chapter provides an overview of the Australian and NSW government s significant investments in road, bus and rail infrastructure

More information

Draft Greater Sydney Region Plan

Draft Greater Sydney Region Plan Draft Greater Sydney Region Plan Submission_id: 31392 Date of Lodgment: 14 Dec 2017 Origin of Submission: Online Organisation name: Greenfields Development Company No. 2 Pty Limited Organisation type:

More information

Plugging the greater Midlands region into global wealth

Plugging the greater Midlands region into global wealth Plugging the greater Midlands region into global wealth A great airport for a great city Birmingham Airport will be at the centre of a network of great airports delivering aviation capacity and connectivity

More information

Capital Metro is the first stage of a light rail network that will have a transformative effect on Canberra. capitalmetro.act.gov.

Capital Metro is the first stage of a light rail network that will have a transformative effect on Canberra. capitalmetro.act.gov. Artist impression Nullabor Avenue Harrison Business Case overview Capital Metro is the first stage of a light rail network that will have a transformative effect on Canberra. capitalmetro.act.gov.au Why

More information

FAA Approval Information

FAA Approval Information Corporation 2009 San Bernardino Road West Covina, CA 91790 Phone or (626) 813-1234 Fax (800) 237-4209 or (626) 813-1235 http://www.concordebattery.com An ISO 9001:2000 + AS9100B Certified Company Eligibility

More information

Gold Coast. Rapid Transit. Chapter content. Chapter four Route selection and staging

Gold Coast. Rapid Transit. Chapter content. Chapter four Route selection and staging Chapter four Route selection and staging Gold Coast Rapid Transit Chapter four Route selection and staging Chapter content Route selection...73 Section one: Helensvale to Griffith University...74 Section

More information

N4 Carrick-on-Shannon to Dromod Road Project. 2.1 Introduction

N4 Carrick-on-Shannon to Dromod Road Project. 2.1 Introduction Chapter 2 Need for the Scheme 2.1 Introduction The National Primary Route N4, Dublin to Sligo is a strategic corridor from Dublin to the northwest and border counties (See RCSR 101 in Volume 2). The National

More information

141305BP Whistlers Bar Menu 2017_Layout 1 16/05/ :11 Page 1 FOOD

141305BP Whistlers Bar Menu 2017_Layout 1 16/05/ :11 Page 1 FOOD 141305BP Wh B Mu 2017_Lu 1 16/05/2017 16:11 Pg 1 12.30 m C FOOD 141305BP Wh B Mu 2017_Lu 1 16/05/2017 16:11 Pg 2 S STARTERS Su Su f f h h D D 4.95 (50-100 C) 4.95 Fh O Su 5.15 Fh P M Su Rh bf fvu mmé wh

More information

Overview of Ford Land Projects PTY Limited aspirations

Overview of Ford Land Projects PTY Limited aspirations Overview of Ford Land Projects PTY Limited aspirations B U I L D I N G A S Y C O M M N U T I 1 Utilise the best available urban design and architecture techniques to create a harmonious relationship between

More information

LEASING OPPORTUNITIES

LEASING OPPORTUNITIES LEASING OPPORTUNITIES ROB CHASMAR Personal Real Estate Corporation 1 604 661 0822 rob.chasmar@colliers.com JASON TEAHEN Personal Real Estate Corporation 1 604 661 0847 jason.teahen@colliers.com HIGHLIGHTS

More information