1 March 4, 2014 VIA College of Lake County West Washington Street Grayslake, Illinois Re: Master Plan Projects Architect s Project umber: Schematic Design Meeting #8 Minutes Summary of the Schematic Design Meeting #8 held at 8:30 am on March 4, 2015 at College of Lake County-Grayslake Campus, Room A261. These notes record our understanding of items discussed and decisions made at this meeting. Please notify us within seven (5) calendar days of any necessary additions or corrections. PERSOS I ATTEDECE David Agazzi, College of Lake County Drew Miller, Project Manager, Cotter Consulting Ted Johnson, College of Lake County Greg Evans, College of Lake County Pat Argoudelis, Manager, College of Lake County Christine Klippert, Operations, College of Lake County Michele Reynolds, College of Lake County Michael Lundeen, Project Manager, Legat Architects ITEMS DISCUSSED 1. The group met as a follow-up to meeting 7 to discuss revised options A and B. These were sent prior to the meeting for staff review. 2. Both options had saw-tooth bay windows facing the central corridor to better allow the offices to function and bay windows allow better display. Dave recommended that the saw-tooth be deleted and a straight curtain wall be incorporated. 3. Option A was preferred. The Web pick-up was moved west adjacent to the elevator with likely less SF. The secure storage closet to south was deleted/moved into other storage. The text book area was enlarged. The kitchen/break-room was removed, simplified, and moved to the office area. Customer service will be a movable desk/counter in lieu of an enclosed area with walls. The front display areas / general merchandize area should be opened up by moving the cashier north and consolidating the offices. 4. The exiting was discussed 5. The lower level was discussed. The east service corridor will be removed. The group reviewed the elevator location, exiting, and access for deliveries. 6. ext steps a. Legat is continuing to develop infrastructure and interiors surrounding the bookstore. b. Legat will update and refine options A and B.3 and forward to CLC for review prior to the next meeting. 7. Meeting adjourned.
2 College of Lake County - Master Plan Projects SD Meeting Minutes March 4, 2014, Page 2 of 2 Thank you. Sincerely, Legat Architects, Inc. Michael Lundeen, AIA ML/ML ATTACHMETS Agenda CC File: CLC Cafe St Act AB core: B3 Dorothy McCarty, Cotter Consulting Jeffrey Sronkoski, Legat Architects Steven Brubaker, Brubaker Ryan Horsman, Legat Architects Jaclyn Rutter, Legat Architects FILEAME MI Mar SD MTG8.docx
3 Meeting Agenda ORGAIZATIO College of Lake County RE PROJECT TITLE Master Plan Projects PROJECT O LOCATIO CLC-Grayslake Campus, Room T326 DATE, TIME March 4, 2014, 8:30 am 1. Goals of the Meeting (5min) Confirm Elevator, Stair, Dock Access Receive approval of SD Layout Option A or B Confirm locations of Offices, Cashiers, window display, etc. 2. Lower Level and Dock Access (5min) Review Loading Dock access, Exiting of Basement, Workroom, Storage, Receiving 3. Main Floor (45min) February 18 th meeting summary Review Option A.1 and B ext step (5min) SD Document Completion for estimating by CM Approval of SD, Start Design Development CC File: CLC FILEAME
4 College of Lake County STUDET ACTIVITIES Enter address here DISPLAY WIDOWS PROPOSED EW ETRACE DISPLAY WIDOWS CLEAR SOTRY ABOVE QUEUE LIE CLOTHIG STUDET STREET CASHIER'S WORKSTATIO 100 SF 12+ LF CADY SACKS BAG GEERAL MERCHADISE 2,234 SF REQUESTED: 2,392 DAYLIGHTIG OPERATIOS CLERK'S AD ACCOUTS PAYABLE OFFICE 177 SF RUSH PERIOD CASHIER'S STATIO CLOTHIG GIFTS SCHOOL SPLIES 112 LF SCHOOL SPLIES 72 LFT ELECTROIC'S DISPLAY COUTER WITH SHELVES 2 HIGH PASS THROUGH WIDOW GM & TB BUYER'S OFFICES 388 SF MAAGER OFFICE 131 SF CUSTOMER SERVICE 141 SF CORECE AREA 118 SF RELOCATE DOOR EXISTIG MECHAICAL TO REMAI BACK GM 270 SF EXISTIG MECHAICAL CHASE TO REMAI COVERTED TO CHASE PART OF EXISTIG MECHAICAL CHASE TO REMAI TEXTBOOK STACKS 1,330 SF REQUESTED: 2,000 SF 1,450 LF REQUESTED: 2,403 LF Legat Architects 651 W Washington Blvd. Suite One Chicago, IL P F ART AD PHOTO CULIARY, URSIG, BACKPACK CARDS EW ELEV. 100 SF BREAK 85 SF SECURE 68 SF WEB PICK- 213 SF 1/16" = 1'-0" PASS THROUGH WIDOW QUEUE LIE Option A 1 First Floor Option A 1/16" = 1'-0" B-COURT /10/2014 A200 A PROJECT UMBER DATE OF ISSUE
5 College of Lake County STUDET ACTIVITIES DAYLIGHTIG MAAGER OFFICE 120 SF Enter address here STUDET STREET Legat Architects PROPOSED EW ETRACE DISPLAY WIDOWS RUSH PERIOD CASHIER'S STATIO 6 LF CLOTHIG QUEUE LIE DISPLAY WIDOWS ART AD PHOTO SCHOOL SPLIES 112 LF SCHOOL SPLIES - GEERAL MERCHADISE 2,520 SF REQUESTED: 2,392 CARDS GIFTS BAG STACKED 5 SHELVES 12+ LF CADY SACKS 72 LFT ELECTROIC'S DISPLAY COUTER WITH SHELVES 2 HIGH CULIARY, URSIG, BACKPACK GIFTS PASS THROUGH WIDOW TRADE BOOKS 2 SHELVES GM & TB BUYER'S OFFICES 342 SF CUSTOMER SERVICE 141 SF CORECE AREA 106 SF 2' - 0" 4' - 21/2" 1' - 3" RELOCATE DOOR EXISTIG MECHAICAL TO REMAI BACK GM 270 SF EXISTIG MECHAICAL CHASE TO REMAI COVERTED TO CHASE PART OF EXISTIG MECHAICAL CHASE TO REMAI TEXTBOOK STACKS 1,339 SF REQUESTED: 2,000 SF 1,450 LF REQUESTED: 2,403 LF 651 W Washington Blvd. Suite One Chicago, IL P F EW CATERIA CASHIER'S STATIO 400 SF CASHIER'S WORKSTATIO 100 SF OPERATIOS CLERK'S AD ACCOUTS PAYABLE OFFICE 160 SF EW ELEV. 100 SF BREAK 85 SF SECURE 73 SF WEB PICK- 228 SF PASS THROUGH WIDOW QUEUE LIE 1/16" = 1'-0" Option B.3 1 First Floor-Option B.3 1/16" = 1'-0" B-COURT /10/2014 A200 B.3 PROJECT UMBER DATE OF ISSUE
6 College of Lake County REMOVE STAIR RELOCATE EW Enter address here RECEIVIG DESK RECEIVIG DESK ABOVE & BELOW S/ WEB ORDER DESK PROPOSED EW SERVICE CORRIDOR STACKED 5 HIGH 60 LF 6 RUSH PERIOD PALLETS PALLET PALLET PALLET PALLET PALLET PALLET RECEIVIG SPLIES PALLET PALLET PALLET PALLET PALLET PALLET PALLET PALLET PALLET PALLET PALLET PALLET PALLET PALLET PALLET PALLET Legat Architects 651 W Washington Blvd. Suite One Chicago, IL P F OVERHEAD TRASH RECYCLE ABOVE & BELOW RECEIVIG WORK DESK STACKED 5-6 HIGH TOTAL ALL BOOK SHELVES: 300 LF DOUBLE SIDED BOOK SHELVES WORK/ / RECEIVIG AREA 1,464 SF BACK REQUESTED: 815 SF EW PROPOSED / WORK REQUESTED: 400 SF 34 PALLETS ACCOMMODATED PROCESSIG 20 SF SHRIK WRAP MACHIE STACKED 5-6 HIGH BOOK SHELVES PALLET PALLET PALLET PALLET PALLET PALLET PALLET PALLET PALLET PALLET PALLET PALLET PALLET PALLET PALLET PALLET PALLET PALLET OVERHEAD TO EW CATERIA 3/32" = 1'-0" Lower Level 1 Lower Level - Option 3/32" = 1'-0" /10/2014 A200 LL PROJECT UMBER DATE OF ISSUE
7 10 13 CHAIRS-PERMAET WATER HEATER S-002 ELEV. EQUIP. S-001 CORRIDOR S-004 S-003 MECHAICAL S-005 CLOSETS E-1 R CHILLER CHILLER CHP CHP HRP BOILER BOILER FD 10,000 GAL. TAK SEE MECH. AIJ 10,000 GAL. TAK SEE MECH. SIM. OPE TO ABOVE V.T. S.C. LIFT COTROLS OPE TO PIT BELOW AD THEATRE ABOVE PIT Stair #4 T001D Janitor T007A Closet T006A Elevator Machine Room T030 T002 Air Compressor T028B Stair #5 T001E Water Service Room T029 T027 T028 Refrigeration Room M002A Edu Affairs Space Holder M002 Student Dev Space Holder STAIRS PASSAGE P102 M003 Rigging P001 P002 M001 Mechanical P003Room Elevator Service Room L012 HOLDIG -AV DEPT. L011 MULTI-PURPOSE STUDIO Orchestra Lift Pit P004 RAMP B008 rage S T O R A G E L035-1 Ceramics L035 Lab L038 L039 L034B PDC Office L034 Office L034A PDC Classroom L032 Faculty Lounge 15 Storage SERV. AV Service Desk L002 SET L LO03 DARK- L001 L004 L015 L005 L007 L006 PDC L014 Photo Lab L008 L010 RECORDIG STUDIO L009 VIDEO/ TAPE ew Stair From Above Elevator to Kitchen ew Exit Further B010 Kitchen and Storage Extend Culinary B012 B011 B004 B009 Tele. Room B006A B006 Student Lounge B007 Cooler B005 Lancers B003 ew Elevator to P005 Shaft P010 Rigging P007 Machine Room P006 Storage / Textbook Buy Back Storage B013 Text Book Buyer Office B014 B001 Willow Room / Kitchen B002 FIRE WALL STOVE PREP TABLE Dry Food Storage CoolerFreezer Men's LEVEL 6 5 ROWS OF 14 CHAIRS(EA. ROW)-PERMAET 13 CHAIRS-PERMAET LEVEL 1 Auditorium C005 C005 AUDITORIUM Women's Men's StorageStorage Maintenance Storage C009 Conference Room Storage Storage Crib C010 C011 C009A Storage Crib STAGE 5 C8-1 3 Women's Foyer C002-1 Prep Room Delivery Through Service C-Wing Atrium/Lounge Willow Room C001 C003 C002 Reconfigure Conference Room Storage Service Science Core 0' 40' 80' KEY 1. Renovations at existing space: c. Related above ceiling HVAC work. 2. Renovations at existing Lancers food service and student lounge: a. Remove existing walls. Maintenance Department C013 C025 C015 Break Room / Storage Conference Room C021 Facilities C014 C016 C020 d. Related above ceiling HVAC work. 3. Renovate for new Storage/Receiving/Overstock Room: a. Remove existing walls. Pump Pit C018 Mail Room Loading Dock c. Related HVAC work. 4. ew elevator to Level 1 as part of the Food Service Addition. 5. Install new monumental open stair to access Level 1; excavate to provide new stair opening. 6. HVAC above ceiling work: a. Existing systems replacement. b. Tie-in with new geothermal loop. c. ew ceilings and lighting. d. ew technology Cabling Cooling Tower Biology Storage C3-1 6 C2-1 6 f. Protection of existing space (below ceiling) not being remodeled. COLLEGE OF LAKE COUTY Cafeteria Lower Level Plan College of Lake County Core A/B + Cafeteria Basement Long Term 1 March ' 40' 80' 160' 240'
8 10 13 CHAIRS-PERMAET WATER HEATER S-002 ELEV. EQUIP. S-001 CORRIDOR S-004 S-003 MECHAICAL S-005 CLOSETS E-1 R CHILLER CHILLER CHP CHP HRP BOILER BOILER FD 10,000 GAL. TAK SEE MECH. AIJ 10,000 GAL. TAK SEE MECH. SIM. OPE TO ABOVE V.T. S.C. LIFT COTROLS OPE TO PIT BELOW AD THEATRE ABOVE PIT Stair #4 T001D Janitor T007A Closet T006A Elevator Machine Room T030 T002 Air Compressor T028B Stair #5 T001E Water Service Room T029 T027 T028 Refrigeration Room M002A Edu Affairs Space Holder M002 Student Dev Space Holder STAIRS PASSAGE P102 M003 Rigging P001 P002 M001 Mechanical P003Room Elevator Service Room L012 HOLDIG -AV DEPT. L011 MULTI-PURPOSE STUDIO Orchestra Lift Pit P004 RAMP B008 rage S T O R A G E L035-1 Ceramics L035 Lab L038 L039 L034B PDC Office L034 Office L034A PDC Classroom L032 Faculty Lounge 15 Storage SERV. AV Service Desk L002 SET L LO03 DARK- L001 L004 L015 L005 L007 L006 PDC L014 Photo Lab L008 L010 RECORDIG STUDIO L009 VIDEO/ TAPE ew Stair From Above Elevator to Kitchen B009 Tele. Room B006A B006 Student Lounge B007 Cooler B005 ew Elevator to P005 Shaft P010 Rigging P007 Machine Room P006 ew Exit B010 Kitchen and Storage B004 Lancers B003 B012 B011 Storage / Textbook Buy Back Storage B013 Text Book Buyer Office B014 B001 Willow Room / Kitchen B002 FIRE WALL STOVE PREP TABLE Dry Food Storage CoolerFreezer Men's 5 C8-1 Foyer 3 Women's C002-1 Prep Room C-Wing Atrium/Lounge Willow Room C001 LEVEL 6 5 ROWS OF 14 CHAIRS(EA. ROW)-PERMAET Auditorium C005 C002 C005 AUDITORIUM 13 CHAIRS-PERMAET LEVEL 1 STAGE Women's C003 Storage Men's StorageStorage Maintenance Storage C009 Storage Crib Conference Room Storage Storage Crib C010 C011 C009A 0' 40' 80' KEY 1. Renovations at existing space: c. Related above ceiling HVAC work. 2. Renovations at existing Lancers food service and student lounge: a. Remove existing walls. Maintenance Department C013 C025 C015 Break Room / Storage Conference Room C021 Facilities C014 C016 C020 d. Related above ceiling HVAC work. 3. Renovate for new Storage/Receiving/Overstock Room: a. Remove existing walls. Pump Pit C018 Mail Room Loading Dock c. Related HVAC work. 4. ew elevator to Level 1 as part of the Food Service Addition. 5. Install new monumental open stair to access Level 1; excavate to provide new stair opening. 6. HVAC above ceiling work: a. Existing systems replacement. b. Tie-in with new geothermal loop. c. ew ceilings and lighting. d. ew technology Cabling Cooling Tower Biology Storage C3-1 6 C2-1 6 f. Protection of existing space (below ceiling) not being remodeled. COLLEGE OF LAKE COUTY Cafeteria Lower Level Plan College of Lake County Core A/B + Cafeteria Basement Short Term 1 March ' 40' 80' 160' 240'
Capitol Hill Prime Retail Space For Lease
Capitol Hill Prime Retail Space For Lease,36-4,874 SF Billy Dean Poll, Altaras, CCIM CCIM + 45 + 45 586 586 5604 563 bpoll@nai-psp.com daltaras@nai-psp.com Billy Dean Poll, Altaras, CCIM CCIM + 45 + 586
More informationFLOOR PLANS. Georgia World Congress Center Centennial Olympic Park
FLOOR PLANS Georgia World Congress Center Centennial Olympic Park How can we accommodate you? Whether it s the right size room to excite your sales force about a new innovation or the perfect area to generate
More informationFOR LEASE 7707 Gateway Boulevard, Newark CA
FOR LEASE 7707 Gateway Boulevard, Newark CA NAPA PETALUMA FAIRFIELD 80 Grizzly Bay NOVATO San Pablo Bay 780 80 CONCORD RICHMOND WALNUT CREEK FEATURES Class A Office / Lab Building ±28,600 SF Newly Improved
More informationCapital Five-Year Fiscal Forecast
Capital Five-Year Fiscal Forecast Budget Forecast Forecast Forecast Forecast REVENUES 2016-2017 2017-2018 2018-2019 2019-2020 2020-2021 State sources: CO&DS distributed to district $ 310,000 $ 310,000
More informationReston EastPointe Sunset Hills Road Reston, VA 20190
Reston EastPointe 1191 Sunset Hills Road Reston, VA 219 Floor Date Available 8 th 2,376 R May 219 Building Highlights: Direct Dulles Toll Road visibility and access Fitness center with showers and lockers
More informationFOR LEASE 7999 Gateway Boulevard, Newark CA
FOR LEASE 7999 Gateway Boulevard, Newark CA I N N O V A T I O N S T A R T S H E R E FEATURES Class A Office / R&D / Lab Building ±117,206 SF Warm Shell with Generous T.I. Allowance Newly Improved Lobby
More informationUP TO 56,119 SF AVAILABLE
UP TO 56,119 SF AVAILABLE BUILDING FEATURES Private Metro Center Station entrance located within building atrium. Easy access to Blue, Orange, Silver and Red lines. New fitness center delivering April
More informationYAS Events Centre Photographer s Room
CENTRE YAS Events Centre Photographer s Room 18m PANTRY PHOTOGRAPHER S LOCKER 21m RECEPTION STORAGE YAS EVENTS CENTRE M 2 BANQUET 10 COCKTAIL CLASS THEATRE U-SHAPE CABARET PRESS CONFERENCE 378 210 189
More informationCapital Projects Funds
Capital Projects Funds Adopted Adopted Actuals Budget Actuals Budget REVENUES 2016-2017 2017-2018 2017-2018 2018-2019 State sources CO&DS distributed to district $ 590,527 $ 494,812 $ 586,059 $ 494,812
More informationNetball Auckland Waitakere
Netball Auckland Waitakere ASB STADIUM Region: Venue: Address: Auckland Waitakere ASB Stadium Kohimarama Road St Heliers Auckland Phone: 09 521 0009 Fax: 09 521 0043 Website: www.asbstadium.co.nz Multi-purpose
More informationMAJOR EXTERIOR & INTERIOR RENOVATION
MAJOR EXTERIOR & INTERIOR RENOVATION Rob Shannon, SIOR, CCIM Exeutive Vice President Lic. 00857593 +1 408 453 7486 rob.shannon@cbre.com Christian Marent Executive Vice President Lic. 00932744 +1 408 453
More informationCLIVE ELEMENTARY SCHOOL
CLIVE ELEMENTARY SCHOOL This narrative, in conjunction with the revised cost estimate attached, represents the opinion of the Superintendency and recommendation to the Board of Education for consideration.
More information9 TECHNOLOGY DRIVE, WESTBOROUGH SUBLEASE
9 TECHNOLOGY DRIVE, WESTBOROUGH SUBLEASE A UNIQUE OPPORTUNITY RIGHT IN THE HEART OF THE SUBURBS 250,000 SF & SUBDIVIDABLE UP TO 25,000 AVAILABLE Q1 2017 1 2 PAGE 02 04 05 06 08 10 12 14 BUILDING HIGHLIGHTS
More informationCAMS Capitol Accessibility, Maintenance and Safety
CAMS Capitol Accessibility, Maintenance and Safety January 2018 Budget and Schedule Changes Cost Scheduled Completion July 2016: Project Start $ 50,000,000 June 30, 2019 July 2017: Add of Governor s Staff
More informationST. PAUL'S RESIDENCE ADDITION WATERLOO, ONTARIO
STAIRS NEW WASHROOMS REPURPOSE EXISTING WASHROOM LIGHT WELLS LIGHT WELL 36' - " 5' - 6" 6' - 6" 4' - " NEW CO-ED WASHROOMS 43.40 ft² 2.58 ft² 8' - 8" 3' - 4" 40' - 0" 2.58 ft² Gross Floor - Basement EAST
More informationSECTION IV B PROJECT STATUS REPORT FISCAL
SECTION IV B PROJECT STATUS REPORT FISCAL 2009 2015 Seven Historical Summary: New Jersey Institute of Technology Rowan University Rutgers, The State University Kean University New Jersey City University
More informationWissahickon School District
Year of Original Construction Current Yr 2017-18 Wissahickon School District Capital Project Fund Plan 2018-19 2019-20 2020-21 2021-22 2022-23 TOTAL High School 1961 199,971 780,000 5,923,000 - - 520,000
More informationBoivin. OIT Room Inventory (click here for campus map) Room Number & Photo. Seats. Ceiling Projector. Additional Photographs. Building.
OIT Room Inventory (click here for campus map) Building Room Number & Photo Seats Available Updated last by Burt Clark on Oct 12, 2007. The number of available seats is accurate for this date. Comments
More information3317 EXPO- SITION PL LOS ANGELES
FOR LEASE CREATIVE OFFICE 24,913 TOTAL SF 3317 EXPO- SITION PL LOS ANGELES INDUSTRYPARTNERS.COM 310 395 5151 CA BRE No. 01900833 RICH MALOOF rm@industrypartners.com CA BRE No. 01435225 JIM JACOBSEN jj@industrypartners.com
More informationROCKWORTH S INNOVATIVE DEVELOPMENT HITS DOWNTOWN! FOR LEASE 275 East 200 South Salt Lake City, Utah 84111
ROCKWORTH S INNOVATIVE DEVELOPMENT HITS DOWNTOWN! RENOVATIONS UNDERWAY, ESTIMATED COMPLETION SEPTEMBER 2018! FOR LEASE 275 East 200 South Salt Lake City, Utah 84111 Another quality development by the Rockworth
More informationFOR LEASE 7707 Gateway Boulevard, Newark CA
FOR LEASE 7707 Gateway Boulevard, Newark CA NAPA PETALUMA FAIRFIELD 80 Grizzly Bay NOVATO San Pablo Bay 780 80 CONCORD RICHMOND WALNUT CREEK FEATURES Class A Office / Lab Building ±9,362 Available SF on
More information1933 SOUTH BROADWAY LOS ANGELES, CALIFORNIA. A turn key Los Angeles building with immediate lease up possibilities
1933 SOUTH BROADWAY LOS ANGELES, CALIFORNIA A turn key Los Angeles building with immediate lease up possibilities ED MATEVOSIAN Lic. 01358783 +1 818 502 6744 edward.matevosian@cbre.com TAYLOR WATSON Lic.
More informationSCHEMATIC PACKAGE SHEET INDEX
SCHEMATIC PACKAGE SHEET INDEX GENERAL PLANS 0 COVER 0 DEMO PLANS 0 PHASING PLANS 04 PROPOSED FLOOR PLANS 05 PROPOSED ENLARGED ST FLOOR PLAN 06 PROPOSED ENLARGED ST FLOOR PLAN 07 PROPOSED ENLARGED ND FLOOR
More informationThe latest Multi-Tenant Research Park in the Bay Area accommodating users from 10,000 SF to 600,000 SF
PACIFIC RESEARCH CENTER I N N O V A T I O N S T A R T S H E R E The latest Multi-Tenant Research Park in the Bay Area accommodating users from 10,000 SF to 600,000 SF Building SF 1 7333 Gateway Blvd Fully
More informationBluefield State College Research and Development Center
Bluefield State College Research and Development Center For Further Information Contact Jim Spencer Community & Economic Development Director City of Bluefield 200 Rogers Street, Bluefield, WV 24701 Phone:
More informationTHE FIRST-EVER SPORTS & ENTERTAINMENT SMART CITY
THE FIRST-EVER SPORTS & ENTERTAINMENT SMART CITY A SMART CITY FOR AMERICA S FAVORITE SPORT + The most inspiring place on earth + A global innovative showroom of next generation: - Products - Services -
More information10641 Scripps Summit Court San Diego, CA 92131
10641 Scripps Summit Court San Diego, CA 92131 EXPERIENCE SUMMIT POINTE Central location with Visibility & access A distinctive opportunity Summit Pointe is a unique tenant focused offi ce renovation in
More informationDigital Signage & Advertising Opportunities
Digital Signage & Advertising Opportunities Welcome Reach your audience with your message! Digital advertising display units are positioned in high-traffic areas within and surrounding the Metro Toronto
More informationCENTER POINT AT LAKEWOOD RANCH Lakewood Ranch, Florida
MASTER SITE PLAN 50 acres OPENING DELIVERY End of 2019, 1st Q 2020 LOCATION SEC of University Parkway and Lakewood Ranch Blvd., Sarasota, FL LEASING CONTACTS Massimo Rastrelli 941.552.4336 OFFICE MRastrelli@castoinfo.com
More informationriverlinksvenues.com.au
Venue Information Pack (includes information on Riverlinks Eastbank, Function Rooms, Meeting Rooms, Riverlinks WestSide, Riverlinks Box Office, Technical Services and Catering) 70 Welsford Street, Shepparton
More informationMoraine Park Technical College
Moraine Park Technical College Table of Contents Section 1 Executive Summary 1 Section 2 Existing Facilities Owned Facilities 3 Facility Room Inventory 4 Leased Facilities 5 Floor Plans Beaver Dam Campus
More informationPROJECT: Gold House 819 Cerrito Street
PROJECT: Gold House 819 Cerrito Street PROJECT DESCRIPTIO THIS PROJECT PROPOSES THE COVERSIO OF A EXISTIG 2-CAR ITO A SIGLE CAR AD ADJACET ETRY TO THE HOME APPLICAT/ARCHITECT DEVI DUTTA-CHOUDHURY, AIA
More information15150 Memorial Drive 155,100 RSF OF OFFICE SPACE AVAILABLE
15150 Memorial Drive 155,100 RSF OF SPACE AVAILABLE 15150 Memorial Drive is a Class A office building located in the Houston Energy Corridor in Houston, Texas only 3.2 miles east of Beltway 8 with immediate
More informationPRE-TRAINING PACKET THANK YOU FOR REGISTERING FOR TRAINING!
THANK YOU FOR REGISTERING FOR TRAINING! Please read through the following packet for information regarding your upcoming training. IF YOU HAVE ANY QUESTIONS PLEASE CALL: TRAINING COORDINATOR Jamie Hammer:
More informationMonmouth University Public Telephones (Sorted by Location)
Page 1 of 8 600 Building Courtyard 4051 600 Building Hall 4132 600 Building Lab - 2nd floor 4194 600 Building Lab - 2nd floor 4195 600 Building Classroom - AW2 4090 600 Building Room 601 2136 600 Building
More informationFACILITY MASTER PLAN educating for the future: forging a path for tomorrow s innovative, global thinkers. Outreach Meeting #4 December 17, 2013
FACILITY MASTER PLAN educating for the future: forging a path for tomorrow s innovative, global thinkers. Outreach Meeting #4 December 17, 2013 outreach process / overview outreach meeting 1 process overview
More informationDaily Crime Log Lake Worth
& Time 14-0006 01/04/14 1/4/2014 11:15AM YMCA - Boynton Beach Petty Theft to Security that his car was broken into off campus. The Employee's college keys were taken. There are no witnesses or suspects
More informationDescription & Accommodation Cathal Brugha Street - Lot 1
Opportunity In advance of the programmed relocation of the Schools of Hospitality Management and Tourism; Culinary Arts and Food Technology; and Environmental Health and Food Science to the new Dublin
More informationDepartmental & Service Listings
Switchboards Kelowna 4200 762-5445 Penticton 3200 492-4305 Oliver 498-6264 Revelstoke 837-4235 Salmon Arm 8200 832-2126 Summerland 494-1300 Vernon 2200 545-7291 Toll Free Numbers Financial Awards 1-800-767-5492
More informationMAKE THE SMART CONNECTION
MAKE THE SMART CONNECTION Owned By 1765 & 1775 GREENSBORO STATION PLACE, TYSONS CORNER OVERVIEW Boro Station is master-planned Dulles Toll Road Westpark Drive Greensboro Drive to serve the modern professional.
More informationMEETING MINUTES Date Time Purpose Location 1) Issues second week tenth week
MEETING MINUTES Helms Elementary School Construction Progress Meeting # 33 Date Time Purpose Location December 5, 2012 1:00 PM Weekly Update Helms ES T Building Prepared By Tim Beally See sign in sheet
More information6640 & 6550 CAROTHERS PARKWAY
6640 & 6550 CAROTHERS PARKWAY PROPERTY OVERVIEW 6640 and 6550 Carothers Parkway is a two-building, Class A workplace community located in Franklin s Cool Springs executive growth corridor. Home to more
More informationARCHULETA SCHOOL DISTRICT 50 Jt. PAGOSA SPRINGS, CO
ARCHULETA SCHOOL DISTRICT 50 Jt. PAGOSA SPRINGS, CO CAPITAL RESERVE CAPITAL PROJECTS 2017-18 PLAN and BUDGET Archuleta School District 50 Jt. P.O. Box 1498 The Archuleta School District 50 Jt. (the District
More informationThis is the entrance to the ticket office.
Visual Story This is the entrance to the ticket office. To get inside you go through a revolving door, but you can use the side door if you prefer. If the exhibition is busy you may need to queue outside
More informationFloorplans & Specs. Index. West Building 100 Level West Building 200 Level West Building 300 Level
Floorplans & Specs Index Page West Building Level... 2-3 West Building 200 Level... 5-6 West Building 300 Level... 7-8 North Building Level... 9-10 North Building 200 Level... 11-12 North Building 300
More informationAVAILABLE FOR SALE ENTITLED 53,228 SF BUILDING FOR SALE Washington Dr., Fontana. Property Features:
Property Features: Free - Standing; Entitled 53,8 SF;,311 SF Office (3) Dock High Loading Rare, New Planned Wholesale Warehouse Corner Location (Live Oak Ave. & Washington Dr.) 1 Block South Of Valley
More informationRANCHO CIENEGA SPORTS COMPLEX
OCTOBER 21, 2015 VOLUNTEER NEIGHBORHOOD OVERSITE COMMITTEE DESIGN DATE SCHEMATIC DESIGN PHASE TICKET OFFICE CUSTODIAL SHOWER (W) TOILETS (M/W) STORAGE STAIRS STAIR TOILET (W) OFFICE GYM ADMIN BLEACHERS
More informationProposal Quote/Bid. Permit Required. Oversight AITE. Doors
Doors AITE 1. Repair front doors BOE No 2 Materials ordered 2. Smoke E-Vac system BOE Yes/Vendor 4 Review pending Cloonan 3. Refinish auditorium stage floor BOE State Bid No 2 Walkthrough scheduled 4.
More information24/7 Retail. C.W. Vasile, MD Owner Office: Fax:
Airport Plaza Properties 1117 W. Manchester Blvd. Inglewood, CA 90301 1100 W. Florence Ave. Inglewood CA 90301 1120 W. Florence Ave. Inglewood CA 90301 C.W. Vasile, MD Owner Office: 310.216.7100 Fax: 310.216.0594
More informationFACILITY USE HANDBOOK
Exhibit A FACILITY USE HANDBOOK Sly Park Environmental Education Center 5600 Sly Park Road Pollock Pines, CA 95726 916-228-2485 www.slyparkcenter.org Sacramento County Office of Education PO Box 269003
More informationRENOVATIONS UNDERWAY. CITIGROUP CENTER New Name! New Look! New Building! BY WORLD RENOWNED ARCHITECT RICHARD MEIER 2017 COMPLETION
RENOVATIONS UNDERWAY BY WORLD RENOWNED ARCHITECT RICHARD MEIER 2017 COMPLETION SPACE FOR LEASE CITIGROUP CENTER New Name! New Look! New Building! $20 MILLION DOLLAR MAIN LOBBY & EXTERIOR BUILDING RENOVATIONS
More informationCROWN IS NOW OFFERING THE BIGGEST AVAILABLE CAMPUS IN THE GTA
CROWN IS NOW OFFERING THE BIGGEST AVAILABLE CAMPUS IN THE GTA 242,000 SF AVAILABLE MAY 2019 MISSISSAUGA HERE S YOUR CHANCE FOR THE BIGGEST AVAILABLE CAMPUS IN THE GTA AVAILABLE MAY 2019 EVERYTHING IS INCLUDED
More informationFOOD TRUCKS PULLING IN 4 Rotating Trucks Rain or Shine! Every Wednesday from 11:00AM - 2:00PM
Over ±1,000,000 SF of Modern Tech Space! Bayshore Technology Park is the San Francisco Peninsula s Premier and Largest Multi-Tenant Tech Office and Life Science Campus! FOOD TRUCKS PULLING IN 4 Rotating
More informationFOOD TRUCKS PULLING IN 4 Rotating Trucks Rain or Shine! Every Wednesday from 11:00AM - 2:00PM
Over ±1,000,000 SF of Modern Tech Space! Bayshore Technology Park is the San Francisco Peninsula s Premier and Largest Multi-Tenant Tech Office and Life Science Campus! FOOD TRUCKS PULLING IN 4 Rotating
More informationSample MDF Rack Elevation
SAMPLE Ports 1-24 4 8 12 16 20 24 Ports 25-48 28 32 36 40 44 48 ASYNC 1 ASYNC 2 A1 A2 CONSOLE Power Status Console 10/100 BASE-TX Tx Rx VG 248 100 Link STAT RPS SYST DU PLEX SPEED POE MODE STAT RPS SYST
More informationGlenview - Chicago North Shore REAL ESTATE DEVELOPMENT OPPORTUNITY Waukegan Rd. Glenview, IL Waukegan Rd. Glenview, IL 60025
Glenview Chicago North Shore REAL ESTATE DEVELOPMENT OPPORTUNITY 1148 Waukegan Rd. Glenview, IL 60025 Demographics Population 2015 Male Population 2015 Female Population 2015 Total Population 2015 Total
More informationACC Vision Statement. ACC Mission. Community Environment Leadership. ACC Core Values
T H E I S S I O N / V I S I O N S T A T E E N T ACC Vision Statement Audubon Country Club will be a unique, gated community that is friendly, relevant and innovative for current and future members. We
More informationYOUR SPACE AWAITS th Street SW Calgary, AB
YOUR SPACE AWAITS 1122 4 th Street SW Calgary, AB 1122 4 th Street SW is a 14-storey office tower that offers 125,533 square feet of office and retail space. 1122 4 th Street SW is centrally located in
More informationENERGY STAR Received LEED Platinum for Core & Shell by the U.S. Green Building Council
PROPERTY MANAGEMENT Hines ENERGY STAR Received LEED Platinum for Core & Shell by the U.S. Green Building Council TYPICAL FLOOR 31,380 SF PARKING 1 : 1,500 SF HVAC SYSTEM Chilled water/variable air volume
More informationPOINTS. Ideal Location. Rare Opportunity. OFFICE / MEDICAL SUITES FOR LEASE
POINTS Ideal Location. OFFICE / MEDICAL SUITES FOR LEASE Rare Opportunity. NY VILLA RD LOCATION CHESAPEAKE DR Highlights Common area improvements now complete: exterior upgrades and spec suite improvements
More informationmove up Centre Calgary Trail, Edmonton, AB
move up Centre 104 Centre 104 is located between Calgary Trail and Gateway Blvd, with excellent visibility and signage opportunities. This property provides a number of space options with flexible layouts
More information201 E LAS OLAS BLVD DOWNTOWN FORT LAUDERDALE S NEWEST LUXURY OFFICE TOWER
201 E LAS OLAS BLVD DOWNTOWN FORT LAUDERDALE S NEWEST LUXURY OFFICE TOWER www.201elasolas.com This image is subject to errors, omissions or withdrawal without notice. rendering. FACT SHEET DISCOVER THE
More informationPlanning the Future. Campus and Community Forum August 18, 2011 South Dakota State University
Planning the Future Campus and Community Forum August 18, 2011 South Dakota State University City Gateways Medary Avenue Medary Avenue Medary Avenue August 2011 View: South from Highway 14 Bypass Medary
More informationEDMONTON S SKYLINE HAS A NEW STANDARD. NOW LEASING HISTORY IN THE MAKING.
82% LEASED KELLY RAMSEY TOWER NOW LEASING EDMONTON S SKYLINE HAS A NEW STANDARD. NOW LEASING HISTORY IN THE MAKING. The Kelly Ramsey Tower is Edmonton s first Financial District tower in 25 years. To grow
More informationFORTIS AT THE MUSEUMS
18 Freestanding, 4-Story Townhomes From the $400 s FORTIS AT THE MUSEUMS 1613 WHEELER AVENUE HOUSTON, TX 77004 Large Open Concept Living Area with 11Foot Ceilings Expansive Rooftop Terrace with Downtown
More informationAccess Statement 9 October 2015
Access Statement 9 October 2015 350 Sauchiehall Street Glasgow, G2 3JD Tel: 0141 352 4900 Email: gen@cca-glasgow.com Website: www.cca-glasgow.com Mon-Thu: 10am-12midnight / Fri-Sat: 10am-1am / Sun: 12noon-12midnight
More informationCOLLEGE GREEN EXECUTIVE PLAZA 8785 & 8795 FOLSOM BOULEVARD, SACRAMENTO, CA
FOR LEASE UNDER NEW OWNERSHIP! COLLEGE GREEN CONTACT US TONY WHITTAKER First Vice President +1 916 492 6914 tony.whittaker@cbre.com Lic. 01780828 CASEY HORVATH Associate +1 916 492 6954 casey.horvath@cbre.com
More informationFOR LEASE Gateway Boulevard, Newark FEATURES PACIFIC RESEARCH CENTER. Freestanding Office / Lab / R&D Building. ± 126,721 SF Available
PACIFIC RESEARC CENTER FOR LEASE 7500 ateway Boulevard, Newark I N N O V A T I O N S T A R T S E R E NAPA PETALUMA FAIRFIELD 80 rizzly Bay NOVATO San Pablo Bay 780 80 CONCORD RICMOND WALNUT CREEK FEATURES
More informationWelcome to the Catholic Churches of
Welcome to the Catholic Churches of SACRED HEART CHURCH 210 East Third Street Monticello, Iowa 52310-1535 Facebook.com/Sacred Heart & St. Luke Churches ST. LUKE CHURCH 206 First St S.E. Hopkinton, IA 52237
More informationKINGSTON CITY HALL SELF-GUIDED TOUR
KINGSTON CITY HALL SELF-GUIDED TOUR Welcome to KINGSTON CITY HALL Welcome to City Hall National Historic Site. City Hall is located on the traditional territory of the Anishinaabe and Haudenosaunee. This
More informationAlpharetta Conference Center The Hotel at Avalon City Council Project Update November 7, 2016 AGENDA
Alpharetta Conference Center The Hotel at Avalon City Council Project Update November 7, 2016 AGENDA A. Project Update: 1. Status Update: 1. Project Costs to Date 10/31/2016 2. Complete Plans & Specs Issued
More informationGreenville-Spartanburg International Airport RFP - Janitorial Services Contract Space Exhibits 8/22/17
Greenville-Spartanburg International Airport RFP - Janitorial Services Contract Space Exhibits 8/22/17 1 Airline/Airport Use & Lease Agreement Greenville-Spartanburg International Airport Cost Center Boundaries
More informationALL THE RIGHT ANGLES
ALL THE RIGHT ANGLES 3 BUILDING OVERVIEW 5 AMENITIES 7 BUILDING SPECS 8 FLOOR PLANS 14 L O C AT I O N 16 OWNERSHIP 17 CONTACT INDEX Hailed by the American Institute of Architects as one of the five most
More informationNORMAN OKLAHOMA NATIONALS JUNE 10-15, 2001
NORMAN OKLAHOMA LOCATIONS Fairfield Inn CB, TV, LC, P, IB, WS, $65 / $75 + 11.5% tax (405) 447-1661 (2.5 miles to OU) IP, IA Guest Inn R, CM, TV, LC, P, LF, OP $37 to $55 + 11.5% tax (405) 360-1234 Hampton
More informationCROSSINGS CORPORATE CENTRE 6005 HIDDEN VALLEY ROAD, CARLSBAD, CA
WWW.CROSSINGSCORPORATE.COM WWW.CROSSINGSCORPORATE.COM FEATURES: 71,563 SF Class A Office building with an outstanding location just 1-mile off the Interstate-5 at the signalized intersection of Palomar
More informationPRESENTS FOR SALE DOS LAGOS RANCH. Located in Brazos County, Texas Priced at $1,595,000.00
Craig Browne Broker Accredited Land Consultant PRESENTS FOR SALE DOS LAGOS RANCH Located in Brazos County, Texas Priced at $1,595,000.00 2801 Earl Rudder Freeway South College Station, Tx FOR VIDEO AND
More informationSPRINGHILL SUITES. GEN 4.5 Proto-Model Design ARCHITECTURE AND CONSTRUCTION
SPRINGHILL SUITES GEN 4.5 Proto-Model Design ARCHITECTURE AND CONSTRUCTION Front Elevation SITE Summary Building Length 298 feet Building Depth 65 feet Land 2.18 acres Parking 128 spaces Site Plan Ground
More informationCLUB SPORTS 006 OFFICE COORDINATOR 003B STORAGE 003C VESTIBULE V002 OFFICE STORAGE 003D 006A STUDENT LEADERSHIP ADVISOR 003E INSURGENT 005 ASUO
CLUB SPORTS 006 VETERANS 015 OUTDOOR PROG.& 007 COORDINATOR 003B 007BA 003C V002 JANITOR 017 RENTAL 007A 015A FIRE / WATER 016 007B 003D 006A OP 007BB ASST. COORD. 006C 006B STOR 015AA G.I. 018 SECURED
More informationSEATING CAPACITY Capacity (total fixed seats) 1,579 seats Orchestra (31 rows) 1,043 seats Loge (3 rows) 134 seats Balcony (10 rows) 402 seats
TECHNICAL INFORMATION SEATING CAPACITY Capacity (total fixed seats) 1,579 seats Orchestra (31 rows) 1,043 seats Loge (3 rows) 134 seats Balcony (10 rows) 402 seats ADA SEATS 12 accessible positions in
More informationIREDALE GROUP A R C H I T E C T U R E
3 0 Oct, 2007 Development Permit 2 0 Sep, 2007 Design Panel RAMP TO LEVEL 5 LEVEL 4 PARKING (34 COVERED STALLS) RAMP TO LEVEL 2 Falls Hotel Level 8 Plan 8 viewport /6" = '-0" 3 AH0B Ramp to Level 24 2
More information7. Heat pumps are installed. B & P will schedule a Site Visit for the week of November 20, 2011.
ARCHITECT S FIELD REPORT VAN H. GILBERT ARCHITECT PC 2428 Baylor Drive SE Albuquerque, NM 87106 Project: East Grand Plains Elementary School Renovation Report No: 8 Date: November 9, 2011 Time: 10:00 a.m.
More informationA A A A MEN'S ROOM EQUIPMENT 117 EXISTING HOTEL TOWER WOMEN'S ROOM 115 EXISTING HOTEL TOWER AREA APPROX 23 STORIES
A-03. A-02. A-0. A-00. A-03. A-02. A-0. A-00. 020 Atlantic Avenue Atlantic City, NJ 0840 45 West 57th Street New York, NY 009 T: 22.246.2770 F: 22.246.277 9 02 Mark Petrella - NJ License # 2AI0260300 R
More informationCHOOSE THE HIGH GROUND
CHOOSE THE HIGH GROUND 6201 America Center Drive, San Jose, CA Class A Multi-tenant Office Building Scott Dever Senior Director +1 408 615 3457 scott.dever@cushwake.com Lic. #01890552 Jeff Cushman Executive
More information[section 40(2) FOIA], [section 40(2) FOIA], [section 40(2) FOIA], [section 40(2) FOIA]
Nursery Initial Fit Out Meeting 31.3.10 [section 40(2) FOIA], [section 40(2) FOIA], [section 40(2) FOIA], [section 40(2) FOIA] Context: Child initiated place! Free Flow in doors and outdoors, 6 main areas
More informationcaribbean corporate center
1325 Chesapeake Terrace ±28,629 1315 Chesapeake Terrace ±54,317 ±28,629 SF - ±82,946 SF Office/ R&D For Lease www.caribbeancorporatecenter.com 1310-1314, 1315, 1325 Chesapeake Terrace, SUNNYVALE, CA CAMPUS
More informationThe car is very unique in that it has a traditional business car floor plan but instead of the normal open platform it was equipped with a solarium ty
o The " Indiana " ~: o The Indiana was built around 1910 as a heavyweight compartment/section sleeper by the Pullman Co. for the Chicago, Milwaukee, St. Paul & Pacific Railroad (Milwaukee Road). The car
More informationAttendees: Rich Davis, Mark Kormondy, Robyn Herring, Jeanne Rynne, David McAvity, Anthony Tindill, Bob Leverich, Mark Lacina
CLUC Minutes 10/20/2014 Attendees: Rich Davis, Mark Kormondy, Robyn Herring, Jeanne Rynne, David McAvity, Anthony Tindill, Bob Leverich, Mark Lacina Guests: Erin Genia, John Paul Jones, Colleen Thorpe,
More informationAccess Statement For The Clarendon Hotel Montpelier Row, Blackheath Village SE3 0RW
Montpelier Row, Blackheath Village SE3 0RW Contents: Page 1 Introduction to hotel 1 - Directions from Blackheath Station 1 - Taxi and buses information 2 Arrival and Car Parking information 3 Main entrance
More information7425 Knightdale Blvd Knightdale, NC 27545
INVESTMENT SALE > FREE STANDING RESTAURANT 7425 Knightdale Blvd Knightdale, NC 27545 PROPERTY DETAILS > > Asking Price: $995,000 > > Cap Rate: 89% RHAM Falls DURHAM CO WAKE CO FRANKLIN CO WAKE CO Wake
More informationMOVE IN INFO A move in checklist is available on page 14. Additional move-in info is available on our website.
Residence Hall 1 BUILDING INFO Residence Hall 1 (RH1) houses students on four floors, with males and females on separate wings. Study lounges are located on each floor. A community kitchen and a laundry
More informationDECATUR S CHOICE OFFICE ENVIRONMENT
DECATUR S CHOICE ENVIRONMENT RECENTLY RENOVATED LOBBY INTERIOR EVOKES STRONG CORPORATE PRESENCE PROMINENTLY LOCATED. PREMIER FINISHES. DECATUR S CHOICE ENVIRONMENT. Well-recognized corner office building
More information2001 S STATE STREET & 2000 S WABASH AVE CHICAGO, IL
2001 S STATE STREET & 2000 S WABASH AVE CHICAGO, IL PRICING & FINANCIAL ANALYSIS DUAL OFFERING IN THE SOUTH LOOP 22 APARTMENTS & 20,000 SF OF COMMERCIAL PROPERTY PROPERTY OVERVIEW: This dual offering is
More informationCONFERENCES & EVENTS
CONFERENCES & EVENTS LOADING DOCKS/ FREIGHT ELEVEARS Four-bay loading dock on Wabash Avenue. All cars support a maximum capacity of 20,000 lbs. BAY 1: Serviced by Car #28. Access from Wabash Avenue. Dimensions
More informationbusiness performs Where th Avenue SW Calgary, AB
Where business performs 550 6 th Avenue SW 550 6 th Avenue SW is ideally situated at the northeast corner of 5 th Street and 6 th Avenue SW, in the heart of Calgary s business and financial district. This
More informationMerriam Parks and Recreation Recreation Facilities Master Plan Advisory Committee Meeting Sept. 22, 2016
Merriam Parks and Recreation Recreation Facilities Master Plan Advisory Committee Meeting Sept. 22, 2016 Welcome Process Recap Survey Findings Preliminary Programming Conceptual Site Diagrams Discussion
More informationThe latest Multi-Tenant Research Park in the Bay Area accommodating users from 10,000 SF to 600,000 SF
I N N O V A T I O N S T A R T S H E R E The latest Multi-Tenant Research Park in the Bay Area accommodating users from 10,000 SF to 600,000 SF Building SF 1 7333 Gateway Blvd Fully Leased 2 7555 Gateway
More informationDaily Crime Log Boca Raton
17-0029 2/21/2017 1/26/17- Unkown AD107 - Game Room Petty Theft On 2/21/17, Two students reported that a black lighting fan and a trophy left inside AD107 Game Room on 1/26/17, were taken. The value of
More informationRIVERSIDE INVERCLYDE PROPERTY HOLDINGS
TO LET OFFICE SUITES FROM 289 SQ FT - 6,227 SQ FT CUSTOM HOUSE RIVERSIDE INVERCLYDE PROPERTY HOLDINGS A Grade A listed building in the heart of Greenock, Custom House has been transformed into high quality
More informationCONSTRUCTION ACTIVITY
CONSTRUCTION ACTIVITY Significant Projects Summer 2018 NORTH CAMPUS N1 North Eagleville Road Infrastructure Repairs & Upgrades N2 Northwest Science Quad Infrastructure Phase I N3 Gant Science Complex Renovations
More informationProject Description. 1 of 7
#1 Repairs and Modernization Buildings - mod, new flooring campuswide 251,488.33 - - 251,488.33 Bldg - Sched Maint rep/repl doors 07-08 75,991.21 - - 75,991.21 Bldgs - Sched Maint rep/ren site lighting
More information