APPENDIX 1 - ABBREVIATIONS
|
|
- Jessie Collins
- 5 years ago
- Views:
Transcription
1 APPENDIX 1 - ABBREVIATIONS
2 AAAE AAD AAGR AC ACAIS ACI ADA ADG AF AFS AFSS AGL AIP ALP ALS ALSF-1 ALSF-2 AMASS AMP ANG ARC ARFF ARP ARSA ARTCC ARTS ASM ASOS ASR ATA ATC ATCT ATIS ATS AWOS American Association of Airport Executives Average Annual Delay Average Annual Growth Rate Advisory Circular Air Carrier Activity Information System Airports Council International Americans with Disabilities Act or Air Defense Area Airplane Design Group Airway Facilities Airway Facilities Sector Automated Flight Service Station Above Ground Level Airport Improvement Plan Airport Layout Plan Approach Lighting System ALS with Sequenced Flashers I ALS with Sequenced Flashers II Airport Movement Area Safety System Airport Master Plan Air National Guard Airport Reference Code Airport Rescue and Firefighting Airport Reference Point Airport Radar Service Area Air Route Traffic Control Center Automated Radar Terminal System Available Seat Mile Automated Surface Observation System Airport Surveillance Radar Air Transport Association of America Air Traffic Control Airport Traffic Control Tower Automated Terminal Information Service Air Traffic Service Automated Weather Observation System A BCA BCR BEA BMP BRL CAT CEQ Benefit/Cost Analysis Benefit/Cost Ratio Bureau of Economic Analysis Best Management Practices Building Restriction Line Category or Clear Air Turbulence Council on Environmental Quality B C PAGE A1-I
3 CFC CFCS CIP CM CTA CTAF Central Flow Control Central Flow Control Service Capital Improvement Plan Commercial Service Airport Central Terminal Area Common Traffic Advisory Frequency C DBMS DEA DEIS DEP DGPS DH DME DME/P DOI DOT EFIS EIS EPA FAA F&E FAC FAF FAP FAR FBO FCC FEIS FL FMS FOMO FSDO FSS GA GADO GAMA GCA GDP Data Base Management System Drug Enforcement Agency Draft Environmental Impact Statement Departure Differential Global Positioning Satellite (System) Decision Height Distance Measuring Equipment Precision Distance Measuring Equipment Department of Interior Department of Transportation Electronic Flight Information Systems Environmental Impact Statement Environmental Protection Agency Federal Aviation Administration Facilities and Equipment Facility Final Approach Fix Final Approach Point Federal Aviation Regulation Fixed Base Operator Federal Communications Commission Final Environmental Impact Statement Flight Level Flight Management System Fixed or Movable Object Flight Standards District Office Flight Service Station D E F G General Aviation General Aviation District Office General Aviation Manufacturers Association Ground Control Approach Gross Domestic Product PAGE A1-II
4 GIS GNSS gpm GPS GSI GSA GSE Geographic Information System Global Navigation Satellite System Gallons Per Minute Global Positioning System Glide Slope Indicator General Services Administration Ground Support Equipment G HAA HAT HIRL HITL HOV HUD Height Above Airport Height Above Touchdown High Intensity Runway Lighting High Intensity Taxiway Lighting High Occupancy Vehicle Housing and Urban Development H IAP IATA ICAO IFR ILS IM ISTEA Instrument Approach Procedures International Air Transport Association International Civil Aviation Organization Instrument Flight Rules Instrument Landing System Inner Marker Intermodal Surface Transportation Efficiency Act I JNU Juneau J K LAA LDA LDIN LOC LOCID LOI MALS MALSF MALSR MAP MDA MEA Local Airport Advisory Localizer Directional Aid or Landing Directional Aid Lead-in Lights Localizer Location Identifier Letter of Intent L M Medium Intensity Approach Lighting System MALS with Sequenced Flashers MALS with Runway Alignment Indicator Lights Million Annual Passengers Minimum Descent Altitude Minimum En Route Altitude PAGE A1-III
5 MGTOW Maximum Gross Takeoff Weight MIRL Medium Intensity Runway Lighting MITL Medium Intensity Taxiway Lighting MSL Mean Sea Level MM Middle Marker MOU Memorandum of Understanding MOS Modification of Standards MP Master Plan MSA Minimum Safe Altitude MSL Mean Sea Level NAS NASA NASP NAVAID NBAA NDB NEPA NM NOAA NOTAM NPDES NPIAS NTSB NWS O&D OAG ODAL OFA OFZ OM OMB N National Airspace System or Naval Air Station National Aeronautics and Space Administration National Airspace System Plan Navigation Aid National Business Aircraft Association Non-Directional Radio Homing Beacon National Environmental Policy Act Nautical Mile National Oceanic and Atmospheric Administration Notice to Airmen National Pollutant Discharge Elimination System National Plan of Integrated Airport Systems National Transportation Safety Board National Weather Service O Origination and Destination Official Airline Guide Omni-directional Approach Lighting System Object Free Area Obstacle Free Zone Outer Marker Office of Management and Budget PAPI PAR PCI PFC PR RAIL Precision Approach Path Indicator Precision Approach Radar Pavement Condition Index Passenger Facility Charge Primary Commercial Service Airport Runway Alignment Indicator Lights P Q R PAGE A1-IV
6 RAPCON Radar Approach Control (FAA) REIL Runway End Identification Lights RF Radio Frequency RL General Aviation Reliever Airport RNAV Area Navigation RNP Required Navigation Performance ROD Record of Decision RPZ Runway Protection Zone RSA Runway Safety Area RT Remote Transmitter RTR Remote Transmitter/Receiver RVR Runway Visual Range RW Runway SATCOM Satellite Communications SEL Single Event Level/Sound Exposure Level SHPO State Historic Preservation Officer SID Standard Instrument Departure SIGMET Significant Meteorological Information SIMMOD Airport and Airspace Simulation Model SM Statute Mile STD Standard TACAN Tactical Aircraft Control and Navigation TAF Terminal Area Forecast TCA Traffic Control Area or Terminal Control Area TCAS Traffic Alert And Collision Avoidance System TEA-21 Transportation Equity Act for the 21st Century TERPS Terminal Instrument Procedures TH Threshold TL Taxilane TODA Takeoff Distance Available TORA Take-off Run Available TRACON Terminal Radar Approach Control Facility TSA Transportation Security Administration or Taxiway Safety Area TVOR Terminal VHF Omni-directional Range TW Taxiway S T UHF USAF VASI VFR VHF Ultra High Frequency United States Air Force Visual Approach Slope Indicator Visual Flight Rules Very High Frequency U V PAGE A1-V
7 VLF Very Low Frequency VMC Visual Meteorological Conditions VOR VHF Omni-directional Range VOR/DME VHF Omni-directional Range with Distance Measuring Equipment VORTAC VOR collocated with TACAN WAAS WX Wide Area Augmentation System Weather W X Y Z PAGE A1-VI
SUMMARY OF QUANTITES NO. ITEM DESCRIPTION UNIT QUANTITY DRAWING NUMBER TITLE GENERAL ELECTRICAL
SRQ-D-FOTS-G000 DRAWING NUMBER TITLE GENERAL 1 SRQ-D-FOTS-G000 COVER SHEET 2 SRQ-D-FOTS-G001 DRAWING INDEX AND SUMMARY OF QUANTITIES 3 SRQ-D-FOTS-G002 LEGEND AND ABBREVIATIONS 4 SRQ-D-FOTS-G101 OVERALL
More informationGLOSSARY A.1 ABBREVIATIONS/ACRONYMS
Appendices Glossary A A GLOSSARY A.1 ABBREVIATIONS/ACRONYMS AC ADF ADPM AGL AIP ALP ALS ALSF-1 ARC ARFF ARP ARTCC ASDA ASO ASR ASV ATC ATCT AVGAS BLI CBP CIP - Advisory Circular - Automatic Direction
More informationBELLINGHAM INTERNATIONAL AIRPORT. Appendix A. Glossary. Prepared by: Leibowitz & Horton AMC JUB Engineers, Inc.
BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN UPDATE Appendix A Glossary Prepared by: Leibowitz & Horton AMC JUB Engineers, Inc. A APPENDIX A: GLOSSARY A.1 ABBREVIATIONS AC - Advisory Circular ADF - Automatic
More informationSource: Chippewa Valley Regional Airport ASOS, Period of Record
Chapter 1 Inventory Runway wind coverage is the percentage of time a runway can be used without exceeding allowable crosswind velocities. Allowable crosswind velocities vary depending on aircraft size
More informationPart 1 DEFINITIONS AND ABBREVIATIONS. CONSOL or CONSOLAN means a kind of low or medium frequency long range navigational aid.
Federal Aviation Regulation Sec. 1.2 Part 1 DEFINITIONS AND ABBREVIATIONS Sec. 1.2 Abbreviations and symbols. In Subchapters A through K of this chapter: AGL means above ground level. ALS means approach
More informationAPPENDIX C AIRSPACE PROCEDURES
APPENDIX C AIRSPACE PROCEDURES This appendix is designed to provide the reader with an introduction to how aircraft operate in and around Cincinnati/Northern Kentucky International Airport (CVG), the facilities
More informationAppendix A GLOSSARY OF TERMS AND ACRONYMS
Appendix A GLOSSARY OF TERMS AND ACRONYMS Airport Layout Plan Update Illinois Valley Airport DEFINITIONS ACCELERATE STOP DISTANCE AVAILABLE (ASDA). See declared distances. AIR CARRIER. An operator, which:
More informationGlossary of Terms Used In Airport Master Planning
Appendix B Glossary of Terms Used In Airport Master Planning PREFACE Many technical terms and expressions are used in airport master planning and noise management programs. This glossary has been prepared
More information50 Ways to Improve Your Airport: Engaging Airport Management on Key Issues
50 Ways to Improve Your Airport: Engaging Airport Management on Key Issues Tuesday, November 17, 2015 1:00 p.m. 2:00 p.m. PRESENTED BY: Charles D. Lamb, P.E. Airfield Lighting Image Source: Delta Airport
More informationAPPENDIX A GLOSSARY. A series of external FAA publications consisting of all non-regulatory material of a policy, guidance, and informational nature.
GLOSSARY APPENDIX A GLOSSARY Above Ground Level (AGL) Advisory Circular (AC) Aircraft Aircraft Operation Aircraft Owners and Pilots Association (AOPA) Aircraft Rescue and Fire Fighting (ARFF) Airport Advisory
More informationActual Runway Length: The length of full-width, usable runway from end to end or full strength pavement where those runways are paved
Actual Runway Length: The length of full-width, usable runway from end to end or full strength pavement where those runways are paved ADF: Automatic Direction Finder Advisory Circular (AC): A series of
More information1.1.3 Taxiways. Figure 1-15: Taxiway Data. DRAFT Inventory TYPICAL PAVEMENT CROSS-SECTION LIGHTING TYPE LENGTH (FEET) WIDTH (FEET) LIGHTING CONDITION
1.1.3 Taxiways EWN has an extensive network of taxiways and taxilanes connecting the terminal, air cargo, and general aviation areas with the runways as listed in Figure 1-15. A 50-foot wide parallel taxiway
More informationABOVE GROUND LEVEL. The elevation of a point or surface above the ground. ACCELERATE STOP DISTANCE AVAILABLE (ASDA). See declared distances
Appendix A Glossary of Terms Master Plan Update DEFINITIONS ABOVE GROUND LEVEL. The elevation of a point or surface above the ground. ACCELERATE STOP DISTANCE AVAILABLE (ASDA). See declared distances ADVISORY
More informationCE 563 Airport Design
CE 563 Airport Design Prevent aircraft collisions Prevent aircraft collisions with obstructions Expedite and maintain an orderly flow of air traffic Air traffic control system command center Herndon, VA
More informationCHAPTER 1 INTRODUCTION AND BACKGROUND
CHAPTER 1 INTRODUCTION AND BACKGROUND An Environmental Assessment (EA) evaluates the effects of a proposed Federal action on the surrounding environment and is prepared in compliance with the National
More informationAcronyms. Airport Layout Plan Report Appendix A A-1
Appendix A Acronyms AC... Advisory Circular ADG... Airplane Design Group ADO... Airport District Office AGL... Above Ground Level AIM... Aeronautical Information Manual AIP... Airport Improvement Program
More informationDRAFT MASTER PLAN UPDATE
DRAFT MASTER PLAN UPDATE CHAPTER VI: AIRPORT LAYOUT PLAN NARRATIVE DRAFT REPORT APRIL 2017 PREPARED BY: Table of Contents WESTCHESTER COUNTY AIRPORT 6 AIRPORT LAYOUT PLAN NARRATIVE REPORT... 6-1 6.1 AGIS
More informationTERMINAL PROCEDURES PUBLICATION SYMBOLS
TERMINAL PROCEDURES PUBLICATION SYMBOLS 54 AERONAUTICAL INFORMATION STANDARD TERMINAL ARRIVAL (STAR) CHARTS................. 55 DEPARTURE PROCEDURE (DP) CHARTS....................... 55 APPROACH LIGHTING
More informationWHAT FARS ARE IMPORTANT FOR YOUR AERONAUTICAL KNOWLEDGE TEST
WHAT FARS ARE IMPORTANT FOR YOUR AERONAUTICAL KNOWLEDGE TEST FAR PAR 1.1 General Definitions 1. Light-Sport Aircraft (LSA) means an aircraft, other than a helicopter or powered-lift that, since its original
More informationRunway Safety Summit. Acronyms. December 1-3, 2009 Omni Shoreham Hotel Washington, D.C. Taxiing Toward Tomorrow
FAA International Runway Safety Summit December 1-3, 2009 Omni Shoreham Hotel Washington, D.C. Acronyms Taxiing Toward Tomorrow A AAAE AAS AAS AC ACARS ACO AD ADS-B AERA AFP AFS AGC AGL AIAA AID AIR ALPA
More informationMetroAir Virtual Airlines
MetroAir Virtual Airlines NAVIGATION BASICS V 1.0 NOT FOR REAL WORLD AVIATION GETTING STARTED 2 P a g e Having a good understanding of navigation is critical when you fly online the VATSIM network. ATC
More informationTed Stevens Anchorage International Airport FAR Part 150 Study Update Glossary of Common Acoustic and Air Traffic Control Terms
Ted Stevens Anchorage International Airport FAR Part 150 Study Update Glossary of Common Acoustic and Air Traffic Control Terms ADOT&PF (Alaska Department of Transportation and Public Facilities): The
More informationCHAPTER 5 - FACILITY REQUIREMENTS
CHAPTER 5 - FACILITY REQUIREMENTS This chapter identifies the requirements for airfield and landside facilities to accommodate the forecast demand level. Facility requirements have been developed for the
More informationNavigation at the. Federal Aviation Administration Crossroads
Navigation at the Crossroads To: Stanford 2010 PNT Symposium By: Leo Eldredge GNSS Program Manager Date: Peak Aircraft Traffic Over The US 5000 aircraft 689 M passengers 36 B pounds cargo 2 If We Do Nothing
More informationDECEMBER Gensler Unison Consulting Trillion Aviation Arora Engineers, Inc. MSA Engineering Consultants KPS3. in association with
DECEMBER 2018 DECEMBER 2018 in association with Gensler Unison Consulting Trillion Aviation Arora Engineers, Inc. MSA Engineering Consultants KPS3 Webber Air Cargo ECORP Traffic Works Q&D Construction
More informationFINAL APPENDIX A GLOSSARY
APPENDIX A GLOSSARY Advanced Navigation (ANAV) Any method of flight navigation that utilizes the best available technology, currently satellite-based, to allow more precise and efficient routes of flight.
More informationAppendix A - Glossary
Appendix A - Glossary The terms and definitions here are relevant to airport design standards and retrieved from AC 150/5300-13A, Airport Design. A Accelerate-Stop Distance Available (ASDA). See Declared
More informationFINAL GLOSSARY OF TERMS
GLOSSARY OF TERMS The following list of terms and definitions are intended to assist the reader in understanding the various technical discussions presented in the following chapters. A-Weighted Sound
More informationTallahassee International Airport Master Plan. Technical Advisory Committee Meeting #2 October 19, 2016
Tallahassee International Airport Master Plan Technical Advisory Committee Meeting #2 October 19, 2016 Agenda Welcome / Introductions Master Plan Process and Project Status Forecast of Aviation Demand
More informationIFR 91.157 Must be instrument rated to fly special VFR at Night (civil twilight to civil twilight, sun 6 degrees below horizon) 91.159 Unless in a holding pattern of 2 minutes or less, VFR cruising altitude
More informationFlight Inspection Services
Flight Inspection Services Overview Copyright 2013 Serbia and Montenegro Air Traffic Services (SMATSA), LLC About us SMATSA is the provider of air navigation services in the airspace of the Republic of
More informationTECHNICAL REPORT #7 Palm Beach International Airport Airport Layout Plan
TECHNICAL REPORT #7 Palm Beach International Airport Airport Layout Plan Technical Report #7 Palm Beach International Airport Layout Plan Palm Beach International Airport Prepared for Palm Beach County
More informationT. F. Green Airport Master Plan Update
Acronyms List Acronym AAAE AADT ADS ADT AGL AIP AIR-21 ALB ALP ALSF-II AOA APHIS APM ARC ARFF ARTCC ASDE-X ASM ATA ATC ATCT ATIS AUS BDL bhp BOS CAT CERCLIS Definition American Association of Airport Executives
More informationYellowstone Regional Airport Operational Capability Assessment
Yellowstone Regional Airport Operational Capability Assessment Agenda Introductions Project Review Geographic & Operational Challenges Current Approach Baseline & Test Flight Procedures Safety and Operational
More informationFederal Aviation Administration. Air Traffic 101. By: Michael Valencia & Dianna Johnston Date: Feb. 26, 2017
Presented to: UC Davis Aviation Symposium By: Michael Valencia & Dianna Johnston Date: Overview Part 1 Air Traffic Controllers History Safety and Navigation Terminology Air Traffic Facility Types Equipment
More informationRunway and Taxiway Marking
Lecture-38 10CV63 TE-II Runway and Taxiway Marking In order to aid pilots in guiding the aircraft on runways and taxiways, pavements are marked with lines and numbers. These markings are of benefit primarily
More informationTECHNICAL REPORT #3 Palm Beach International Airport Demand/Capacity and Facility Requirements
TECHNICAL REPORT #3 Palm Beach International Airport Demand/Capacity and Facility Requirements Technical Report #3 Palm Beach International Airport Demand/Capacity and Facility Requirements Palm Beach
More informationThe aim of any instrument approach is to allow the aircraft to safely descend to a low altitude in order to become visual.
INSTRUMENT APPROACH CHARTS "An instrument approach is just a series of straight lines joined by rate one turns" Ron Magrath The aim of any instrument approach is to allow the aircraft to safely descend
More informationAPPENDIX A. Glossary of Terms
APPENDIX A APPENDIX A A ABOVE GROUND LEVEL: The elevation of a point or surface above the ground. ACCELERATE-STOP DISTANCE AVAILABLE (ASDA): See declared distances. ADVISORY CIRCULAR: External publications
More informationDemand Capacity and Facility Requirements
Chapter 2 Demand Capacity and Facility Requirements Missoula International Airport Master Plan Update Prepared for Missoula County Airport Authority August 2008 Contents Section Page 2 Demand Capacity
More informationGLOSSARY OF AVIATION TERMS
APPENDIX A: GLOSSARY OF AVIATION TERMS ABOVE GROUND LEVEL (AGL). An altitude that is measured with respect to the underlying ground. ACCELERATED-STOP DISTANCE AVAILABLE (ASDA). See Declared Distances.
More informationState of the National Airspace Infrastructure
State of the National Airspace Infrastructure National Airspace System Performance Workshop Asilomar Conference Center Pacific Grove, CA March 14-17, 2006 Jasenka Rakas NEXTOR University of California,
More informationCATCODE ] CATCODE
Runways. FAC: 1111 CATCODE: 111111 OPR: AFCEC/COS OCR: AF/A3O-A 1.1. Description. The runway is the paved surface provided for normal aircraft landings and take offs. Runways are classified as either Class
More informationGlossary. Part I Acronyms/Data Terminology. AIFSS -- Automated International Flight Service Station.
Glossary Part I Acronyms/Data Terminology AC -- Air Carrier. AFSS -- Automated Flight Service Station. AIFSS -- Automated International Flight Service Station. ARTCC -- Air Route Traffic Control Center.
More informationOLD AIRPORT (PFN) RW 05/23 RW 14/32. 4,884-FEET X 150-FEET MIRL 4-BOX VASIs (5 & 23 APPROACHES) REILS
FAITH ADAMS AGENDA AIRPORT RELOCATION CHALLENGES AIRFIELD LIGHTING & SIGNAGE NAVAIDS AIRFIELD LIGHTING VAULT L-890 ALCMS AIR TRAFFIC CONTROL TOWER (ATCT) CONCLUSION AIRPORT RELOCATION OLD AIRPORT (PFN)
More informationCHAPTER 1. INTRODUCTION
CHAPTER 1. INTRODUCTION An Airport Master Plan Update serves as an opportunity for airport sponsors, airport users, and other stakeholders to discuss the existing challenges and uncertain futures surrounding
More informationChapter 9 - AIRPORT SYSTEM DESIGN
Chapter 9 - AIRPORT SYSTEM DESIGN 9.01 GENERAL This chapter discusses the development program for Dutchess County Airport to the year 2020. This airport system design is based upon the airport's existing
More information2007 Instrument Procedures Handbook; Chapter 5 Approach
2007 Instrument Procedures Handbook; Chapter 5 Approach Authors: US Department of Transportation, Federal Aviation Administration (Flight Procedures Standards Branch) From: www.faa.gov/library/manuals/aviation/instrument_procedures_handbook/media/web%20ch%2005.pdf
More informationInstrument Rating Airplane Ground Training Rev. 07/93 Copyright 1989, 1993 Thomas W. Gorski Instrument Rating Ground School Schedule
Instrument Rating Airplane Ground Training Rev. 07/93 Copyright 1989, 1993 Thomas W. Gorski Instrument Rating Ground School Schedule Class 3 Nights Per week, 3 hours per class Total Class Time - 48 Hours
More informationAD 2. AERODROMES VAKS AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA
AD 2-1 AD 2. AERODROMES AD 2.1 AERODROME LOCATION INDICATOR AND NAME - KESHOD / DOMESTIC AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 1 Aerodrome reference point coordinates and its site 2 Direction
More informationPlan prepared for: The Wyoming Department of Transportation, Aeronautics Division and the Federal Aviation Administration
Plan prepared for: The Wyoming Department of Transportation, Aeronautics Division and the Federal Aviation Administration Plan prepared by: Short Elliott Hendrickson Inc. KRAMER aerotek, inc. November
More informationPrepared By: Mead & Hunt, Inc Port Lansing Road Lansing, MI 48906
Master Plan The preparation of this document was financed in part through a planning grant from the Federal Aviation Administration (FAA) as provided under Section 505 of the Airport and Airway Improvement
More informationSection 3: Demand/Capacity Analysis and Facility Requirements
3.0 INTRODUCTION In the previous section, aviation demand forecasts were presented for FDK through the year 2025. These forecasts included projections of aircraft operations, based aircraft, aircraft fleet
More informationUSE OF RADAR IN THE APPROACH CONTROL SERVICE
USE OF RADAR IN THE APPROACH CONTROL SERVICE 1. Introduction The indications presented on the ATS surveillance system named radar may be used to perform the aerodrome, approach and en-route control service:
More informationAirport 101 O Hare Noise Compatibility Commission July 19, 2018
Airport 101 O Hare Noise Compatibility Commission July 19, 2018 24 HOUR VIEW OF AIR TRAFFIC WHAT IS AN AIRPORT? Rural airstrip Private airport Military airport Community airport Regional airport Major
More informationGleim Private Pilot Syllabus Fifth Edition, 3rd Printing Updates March 2016
Page of Gleim Private Pilot Syllabus Fifth Edition, rd Printing Updates March 0 NOTE: Text that should be deleted is displayed with a line through it. New text is shown with a blue background. If you see
More informationAirplane Design Group (ADG). A grouping of airplanes based on wingspan. The groups are as follows:
GLOSSARY Glossary I Aircraft Approach Category. A grouping of aircraft based on 1.3 times their stall speed in their landing configuration at their maximum certificated landing weight. The categories are
More informationFINAL GLOSSARY OF TERMS
GLOSSARY OF TERMS Airport planning and the Environmental Impact Statement (EIS) process require the use of many technical terms. Some of the most important are defined in this section. Terms in italics
More informationAVIA 3133 INSTRUMENT PROCEDURES UNIVERSITY OF OKLAHOMA
AVIA 3133 INSTRUMENT PROCEDURES UNIVERSITY OF OKLAHOMA, 20 I,, have acquired and have in my possession a copy of the training course outline, training syllabus, and safety procedures and practices for
More informationDRAFT Rock Springs Sweetwater Country Airport Master Plan
DRAFT Rock Springs Sweetwater Country Airport Master Plan September 24, 2012 As required by Paragraph 425.B(4) of FAA Order 5100.38C, Airport Improvement Program (AIP) Handbook: The preparation of this
More informationFriedman Memorial Airport Authority. Regular Meeting April 09, 2013
Friedman Memorial Airport Authority Regular Meeting April 09, 2013 Approve Friedman Memorial Airport Authority Meeting Minutes March 12, 2013 Regular Meeting Minutes March 21, 2013 Special Meeting March
More informationLONG BEACH, CALIFORNIA
LONG BEACH, CALIFORNIA 1 LONG BEACH, CALIFORNIA Airport Capacity Session Kent Duffy Senior Airport Planner Federal Aviation Administration kent.duffy@faa.gov 2 Agenda FAA Airport Capacity Guidance Airport
More informationa. Aeronautical charts DID THIS IN LESSON 2
AIRMAN CERTIFICATION STANDARDS: REMOTE PILOT SMALL: You will know and be able to explain in writing or oral form the below tasks regarding AIRPORT OPERATIONS Task References Objective Task B. Airport Operations
More informationCHAPTER FOUR. Airport Facility Requirements. Introduction Page 4-2. Airfield Capacity Analysis Page 4-2. Skylark Field Airport Airport Master Plan
Skylark Field Airport Airport Master Plan CHAPTER FOUR Airport Facility Requirements Introduction Page 4-2 Airfield Capacity Analysis Page 4-2 Skylark Field Airport Airport Master Plan Skylark Field Airport
More informationAVIATION GLOSSARY OF TERMS
APPENDIX A AVIATION GLOSSARY OF TERMS Above Ground Level (AGL). An altitude that is measured with respect to the underlying ground. Accelerate-stop distance available (ASDA). The runway plus stopway length
More informationAIRSPACE STRUCTURE. In aeronautics, airspaces are the portion of the atmosphere controlled by a country above its territory.
AIRSPACE STRUCTURE 1. Introduction In aeronautics, s are the portion of the atmosphere controlled by a country above its territory. There are two kinds of : Controlled is of defined dimensions within which
More informationDATE OF AERIAL PHOTOGRAPHY:
DESCRIPTION RUNWAY SAFETY AREA RUNWAY PROTECTION ZONE TAXIWAY OBJECT FREE AREA DATE OF AERIAL PHOTOGRAPHY: 6-17-01 RUNWAY SAFETY AREA FOR PORTION OF RUNWAY 16L-34R SOUTH OF RUNWAY BRIDGE HAS A FAA WAIVER
More informationMAP SYMBOLS APPENDIX F BASEMAP AIRPORT TIS AND TAS TRAFFIC NAVAIDS Rev. A Garmin G1000 Pilot s Guide for Cessna Nav III
MAP SYMBOLS AIRPORT Unknown Airport Non-towered, Non-serviced Airport BASEMAP Interstate Highway State Highway Towered, Non-serviced Airport US Highway National Highway Non-towered, Serviced Airport Towered,
More informationU.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION. National Policy
NOTICE U.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION National Policy N 8900.318 Effective Date: 8/13/15 Cancellation Date: 8/13/16 SUBJ: Optional Letter of Authorization (LOA) for Straight-In
More informationAD 2. AERODROMES VOAT AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA
AD 2-1 AD 2. AERODROMES AD 2.1 AERODROME LOCATION INDICATOR AND NAME - AGATTI / DOMESTIC AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 1 Aerodrome reference point coordinates and its site 2 Direction
More informationSingle Engine Instrument Training Record I PREFLIGHT PREPARATION WEATHER INFORMATION weather reports and forecasts. pilot and radar reports.
Single Engine Instrument Training Record I PREFLIGHT PREPARATION WEATHER INFORMATION weather reports and forecasts. pilot and radar reports. surface analysis charts. radar summary charts. significant weather
More informationAirports and UAS: Integrating UAS into Airport Infrastructure and Planning
ACRP Problem Statement 17-03-09 Recommended Allocation: $500,000 Airports and UAS: Integrating UAS into Airport Infrastructure and Planning ACRP Staff Comments This is one of four UAS-themed problem statements
More informationRNAV - RNP. July 2010
RNAV - RNP July 2010 July 2010 Issue 1 Page 1 of 6 1 Who Issues approval to fly in P-RNAV Airspace? a) National Authority b) Euro Control c) JAA d) ICAO 2 A Fixed Published Route is? a) Alternative / Reserve
More informationAppendix D List of Acronyms & Glossary of Terms
Appendix D List of Acronyms & Glossary of Terms Acronyms A AAD ACCRI ACEC AEE AGL ALP APE ARTCC ASR ATADS ATC ATCT ATO Average Annual Day Aviation Climate Change Research Initiative Area of Critical Environmental
More informationInstrument Oral Exam Guide Ryan Roberts CFI/CFII/MEI 2004 Halozone.Com Revision 1.0
Instrument Oral Exam Guide Ryan Roberts CFI/CFII/MEI 2004 Halozone.Com Revision 1.0 1. What are the instrument currency requirements? (FAR 61.57) Within the preceding 6 calendar months at least: (has to
More informationAD 2. AERODROMES. For the ICAO location indicators used for Canadian aerodromes, refer to the following publications:
AIP CANADA (ICAO) PART 3 AERODROMES (AD) AD 2. AERODROMES AD 2.1 Aerodrome Location Indicator and Name For the ICAO location indicators used for Canadian aerodromes, refer to the following publications:
More informationGLOSSARY. Above Ground Level (AGL). An altitude that is. Glider. A heavier-than-air aircraft that is. Accelerate-stop distance available (ASDA).
APPENDIX A GLOSSARY GLOSSARY Above Ground Level (AGL). An altitude that is measured with respect to the underlying ground. Accelerate-stop distance available (ASDA). The runway plus stopway length declared
More informationInventory. Introduction
Inventory Introduction General Mitchell International Airport (MKE) is an integral component of the transportation infrastructure serving the Milwaukee Metropolitan Area and southeast Wisconsin. Because
More informationMaster Plan Update Working Paper Two
Master Plan Update Working Paper Two Master Plan Update Working Paper Two September 2015 The preparation of this document may have been supported, in part, with financial assistance from the Federal Aviation
More informationNavigation - Runways. Chap 2, Nolan
Navigation - Runways Chap 2, Nolan 1 Runways Runways numbered to correspond to magnetic bearing Runway 27 has magnetic bearing 270 degrees Active Runway selected for headwind greater than 5 knots When
More informationFederal Aviation Administration Flight Plan Presented at the Canadian Aviation Safety Seminar April 20, 2004
Federal Aviation Administration Flight Plan 2004-2008 Presented at the Canadian Aviation Safety Seminar April 20, 2004 Challenges Reducing an Already Low Commercial Accident Rate Building an Air Traffic
More informationEXPLANATION OF TPP TERMS AND SYMBOLS
U.S. TERMINAL PROCEDURES PUBLICATION 52 EXPLANATION OF TPP TERMS AND SYMBOLS The discussions and examples in this section will be based primarily on the IFR (Instrument Flight Rule) Terminal Procedures
More informationLAFAYETTE REGIONAL AIRPORT AIRPORT MASTER PLAN JUNE 2015 (REVISED NOVEMBER 2015)
LAFAYETTE REGIONAL AIRPORT AIRPORT MASTER PLAN JUNE 2015 (REVISED NOVEMBER 2015) LAFAYETTE REGIONAL AIRPORT AIRPORT MASTER PLAN Version 2.0 June, 2015 Rev. November, 2015 Lafayette, LA RS&H No.: 212-3039-000
More informationAPPENDIX A GLOSSARY OF TERMS
APPENDICES DRAFT APPENDIX A GLOSSARY OF TERMS Appendix A: August 2016 DRAFT APPENDIX A: GLOSSARY OF TERMS This glossary includes definitions of terms and acronyms used in the Plan. It is intended to serve
More informationSaint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis
Saint Petersburg-Clearwater International Airport Airspace & Instrument Approach Analysis February 23, 2005 Jeppesen Boeing Jeppesen Government / Military Services Group Airspace Services Division AIRSPACE
More informationAIRPORT FACILITY REQUIREMENTS
4.1 INTRODUCTION Chapter 4 AIRPORT FACILITY REQUIREMENTS The major elements of the Airport, which were described in Chapter 3, Existing Airport Facilities must be analyzed individually and balanced in
More informationDRAFT FINAL REPORT AIRPORT MASTER PLAN. Rifle Garfield County Airport Revised May 15, 2014
DRAFT FINAL REPORT AIRPORT MASTER PLAN Rifle Garfield County Airport Revised May 15, 2014 As required by Paragraph 425.B(4) of FAA Order 5100.38C, Airport Improvement Program (AIP) Handbook: The preparation
More informationR FAA
Chapter Four Section 01 - Introduction Section 02 - Criteria for Determination of Facility Requirement Recommendations Section 03 - FAA Design Standards & Non-Standard Conditions Section 04 - Airfield
More information3 INTRODUCTION. Chapter Three Facility Requirements. Facility Requirements PEAKING CHARACTERISTICS
Chapter Three Facility Requirements 3 INTRODUCTION This chapter identifies the long-range airfield and terminal area facilities needed to satisfy the 20-year forecast of aviation demand at Monett Municipal
More informationInstrument Proficiency Check Flight Record
Instrument Proficiency Check Flight Record Date: Flight Time: Sim. Inst. Time: Pilot Name: Aircraft Type: Aircraft Tail Number: Act. Inst. Time: Instructor Name: Holding Procedures Task Notes N/A Satisfactory
More informationAD 2-OERY-1 7 JAN 16 OERY AD 2.1 AERODROME LOCATION INDICATOR AND NAME. OERY - RIYADH/ King Salman Air Base
AD 2-OERY-1 OERY AD 2.1 AERODROME LOCATION INDICATOR AND NAME OERY - RIYADH/ King Salman Air Base OERY AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 1 ARP coordinates and site at AD 244319N 0464329E/
More informationI3202 WORKSHEET / DD-175 / JET LOG
I3202 WORKSHEET / DD-175 / JET LOG Planned Route: Takeoff: KHBG (Hattiesburg MUNI), RWY 13 Altitude: 8,000 Airspeed TAS as filed Destination: New Orleans INTL via LBY2.LBY LBY.RYTHM4 Approach: KMSY RVFAC
More informationFrom: Commanding Officer, Naval Air Station Pensacola. Subj: NAVAL AIR STATION PENSACOLA CLOSED CONTROL TOWER AIRFIELD OPERATIONS
DEPARTMENT OF THE NAVY COMMANDING OFFICER NAS PENSACOLA 150 HASE ROAD STE-A PENSACOLA, FLORIDA 32508-1051 NAVAL AIR STATION PENSACOLA INSTRUCTION 3710.1 NASPCOLAINST 3710.1 N32 From: Commanding Officer,
More informationChapter 4 Airport Facility Requirements
Chapter 4 Airport Facility Requirements Introduction CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-1 Organization of Materials CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-2 RPZ - ROAD RPZ - NON-AIRPORT
More informationOverview of Satellite Navigation Transition. CAASD Industry Day with Users May 7, 2002
Overview of Satellite Navigation Transition CAASD Industry Day with Users May 7, 2002 Safety First and Foremost Navigation The Separation Safety Triad Communications Surveillance Three Legs of the Safety
More informationInventory of Existing Conditions.
A Inventory of Existing Conditions. Fort Collins-Loveland Municipal Airport, jointly owned and operated by the Cities of Fort Collins and Loveland, is located in the heart of a region with a thriving economy,
More informationAERODROME OPERATING MINIMA
Title: Determination of Aerodrome Operating Minima Page 1 of 8 AERODROME OPERATING MINIMA 1. PURPOSE 1.1 The purpose of this Advisory Circular is to provide methods to be adopted by operators in determining
More informationTHANKS TO OUR SPONSORS
THANKS TO OUR SPONSORS Presented to: By: Catherine M. Lang, FAA, Deputy Associate Administrator for Airports Date: Best Practices in Airport Safety Presented to: By: Catherine M. Lang, FAA, Deputy Associate
More informationIntroduction. Appendix D: Airspace Protection
Preliminary PreliminaryDraft DraftMaster MasterPlan Plan Bankstown Airport Introduction : Airspace Protection D Preliminary Master Plan Draft Master Plan Airspace protection D1 OVERVIEW The protection
More information6.1 INTRODUCTION 6.2 AIRSIDE ALTERNATIVES NORTH PERRY AIRPORT MASTER PLAN UPDATE RUNWAY LENGTH REQUIREMENTS SECTION 6: ALTERNATIVES ANALYSIS
6.1 INTRODUCTION In the previous chapter, facility needs for the 20-year planning horizon were identified. The next step in the planning process is to identify and evaluate the various ways certain facilities
More information