1 Method of Working Plan: YMML 2018/2 Date of Issue: January 2018 Method of Working Plan Melbourne Airport Slab Rectification Works 2018/2 Important Dates: Date of Approval January 2018 Date Works 27 th January 2018 Commence Date Works Complete August 2019 MOWP Expires 31 st January 2019 Contents: 1. WORK INFORMATION 2 2. OPERATIONAL AND AIRCRAFT RESTRICTIONS 3 3. RESTRICTIONS TO CONTRACTOR 6 4. ADMINISTRATION AUTHORITY PLANS DISTRIBUTION 22 Date of Issue: January 2018 Uncontrolled when printed Page 1 of 25

2 1. WORK INFORMATION 1.1 Conditions of this MOWP No changes to the conditions outlined in this Method of Working Plan can be made without the approval of the MOWP Safety Coordinator. 1.2 Project Scope and commencement This MOWP has been produced to allow planned works to be undertaken as part of Southern Apron Slab Rectification Works. The planned works will include the removal and replacement of various slabs within the various stages as defined in the attached MOWP staging plans. Stage 1 of the works will commence on 27 th January 2018 and will take approximately 6 weeks to complete. Stages 2 and 3 will be completed at a date not yet fixed; The actual date and time of commencement of the work will be notified by a Local Works Plan and/or an Operations Advice and associated NOTAM which will be issued before the commencement of each Stage of works. A Local Works Plan will be issued at least 48 hours prior to the commencement of each MOWP Stage. 1.3 Location of the work site Stage 1 Stage 2 Stage 3 Bay Hotel 2 and Bay Hotel 2A Bay Hotel 3 and Bay Hotel 3A Intersections of Taxiway Sierra and Taxiway Juliet 1.4 Staging of the works All Stages of works may include pavement maintenance, electrical works, drainage works, survey or geological investigation. The works will be undertaken in Three (3) separate stages. Some MOWP stages may be combined with another Stage to expedite or minimise impact to aircraft operations. If an additional MOWP Stage is required an amendment to this MOWP will be issued detailing the new MOWP Stage and followed up with a Local Works Plan, a Notice to Airmen (NOTAM) and/or Operations Advice as required. 1.5 Weather Conditions Works will not be permitted on the manoeuvring area or in areas where the Senior Airside Safety Officer (Car 2) believes is unsafe: 1. Low Visibility Conditions or 2. Weather conditions that the Senior Airside Safety Officer (Car 2) in conjunction with Air Traffic Control believes are unsafe or may affect airport operations. Low Visibility Conditions/Operations is defined when the cloud base is 200 ft or less or Visibility is 800m or less and the Senior ASO has reported that the aerodrome is secure (Critical and Sensitive Area are protected). ATC will then declare Low Date of Issue: January 2018 Uncontrolled when printed Page 2 of 25

3 Visibility Procedures in Force on the Computer Automated Terminal Information Service (CATIS). As per the CASA endorsed Letter of Agreement between Melbourne Airport and Airservices Australia (ATS LOA 532), once a NOTAM has been issued and there is unfavourable weather conditions and the NOTAM is required to be cancelled or amended, a new NOTAM may be issued at short notice to activate another stage of the MOWP to minimise impact to aircraft operations. Melbourne Airport will give at least two hours notice to Air Traffic Control and the major airline operators affected by the late change in the new NOTAM action. Once a Stage of works has been cancelled due to weather and a new Stage enacted there will be no further changes implemented within a 12 hour period. 1.6 Hours of Work The works will be undertaken in: Stage 1, 2 and 3 will be between the hours of 06:00 local time and 18:00 local time, Monday until Sunday inclusive or such other hours as agreed by Melbourne Airport. Some stages of these works may remain closed over a twenty-four hour period to allow the pavement repair to cure or will be conducted during evening hours to minimise the impact on aircraft operations. The actual times of works be notified by a Local Works Plan and/or an Operations Advice and associated NOTAM which will be issued before the commencement of each Stage of works. A Local Works Plan will be issued at least 48 hours prior to the commencement of each MOWP Stage 2. OPERATIONAL AND AIRCRAFT RESTRICTIONS 2.1 Operational Restrictions Stage 1 During Stage 1 Bay Hotel 2 and Bay Hotel 2A will not be available for aircraft operations. Bays impacted : Hotel 2 & 2A Tow Bar Disconnect Point Nil Impact Note: During this stage of works the Taxilane Juliet centreline will be relocated 13.7m north to facilitate these works. Taxilane centreline lighting will not be available. Stage 2 During Stage 2 Bay Hotel 3 and Hotel 3A will not be available for aircraft operations. Bays impacted: Hotel 3 & 3A Tow Bar Disconnect Point Nil Impact Note: During this stage of works the Taxilane Juliet centreline will be relocated 13.7m north to facilitate these works. Taxilane centreline lighting will not be available Date of Issue: January 2018 Uncontrolled when printed Page 3 of 25

4 Stage 3 During Stage 3 The intersection of Taxiway Sierra and Taxiway Juliet is not available resulting in: Taxiway Sierra between Taxiway Juliet and Taxiway Whiskey not available Taxiway Juliet between Taxiway Alpha and Taxiway Sierra not available Bays impacted: NIL 2.2 Critical Obstacles Tow Bar Disconnect Points S13, S12, J1, J2, will not be available Critical obstacles if any will be accessed as part of the proposed works. No vehicle or other item of plant over 4 metres high may be used at the works site without authority from the Airfield Operations & Works Coordinator. Please refer to section NOTAM A NOTAM will be issued for each stage of the work at least 48 hours before works commence. The NOTAM will be worded as follows: Stage 1 (A) MELBOURNE (B) (START DATE) (C) (FINISH DATE) (E) MOWP YMML 2018/ 2 STAGE 1 TAXILANE J CL REALIGNED 13.7M TO THE NORTH TAXILANE J CL LGT NOT AVBL Stage 2 (A) MELBOURNE (B) (START DATE) (C) (FINISH DATE) (E) MOWP YMML 2018/ 2 STAGE 2 TAXILANE J CL REALIGNED 13.7M TO THE NORTH TAXILANE J CL LGT NOT AVBL Stage 3 (A) MELBOURNE (B) (START DATE) (C) (FINISH DATE) (E) MOWP YMML 2018/ 2 STAGE 3 TWY S BTN TWY W AND TWY J NOT AVBL TWY J BTN TWY A AND TWY S NOT AVBL DUE TO WIP 2.4 MARKING THE UNSERVICABLE AREA Melbourne Airport shall mark the unserviceable operational area and install unserviceability markers and markings during the works as detailed below and as per the attached plans. MAG signs leading into the works area will be turned off or obscured when a taxiway is closed or unserviceable. MAG signs within the closed area will remain unchanged / energised to aid with contractor/worker situation awareness. When stated below, Limit of Works markers orange witches hats and yellow lights (if required) will be placed immediately adjacent to, or around the works area. Date of Issue: January 2018 Uncontrolled when printed Page 4 of 25

5 Also refer to Para 3.8 for contractor Site Restricted Area markers and markings. Stage 1 Marking the Unserviceable Operational Area US cones and lights at 3m centres across Taxiway lighting obscured or deenergized on Contractor restricted area Stage 2 Marking the Unserviceable Operational Area US cones and lights at 3m centres across Taxiway lighting obscured or deenergized on Contractor restricted area Stage 3 Marking the Unserviceable Operational Area US cones and lights at 3m centres across Taxiway lighting obscured or deenergized on Movement Area Guidance Signs (MAG Signs) located on Taxiways obscured or de-energized At a point 24m north of the parking clearance line abeam Bay Hotel 2 which will be surveyed in and marked as per the Stage 1 staging plan. Juliet Taxilane Taxiway Sierra east into Taxilane Juliet from north & south To be placed at approx. 27m west of the Bay Hotel 1 lead in line. To be surveyed and marked. To be placed at approx. 24m east of the Bay Hotel 3 lead in line. To be surveyed and marked. All other areas to be surveyed and marked as per the attached plan At a point 24m north of the parking clearance line abeam Bay Hotel 3 which will be surveyed in and marked as per the Stage 1 staging plan. Juliet Taxilane Taxiway Sierra east into Taxilane Juliet from north & south To be placed at approx. 30m northeast of the Bay Hotel 3B lead in line. To be surveyed and marked. To be placed at approx. 45m east of the Bay Hotel 2 lead in line. To be surveyed and marked. All other areas to be surveyed and marked as per the attached plan At a point 54m parallel to the Bay Hotel 3 lead in line (west side) to be surveyed and marked. Taxiway Sierra, 30m south of the Taxiway intersection marking north of Taxiway Whiskey and perpendicular to the Taxiway centreline both Taxiways east and west into Taxiway Whiskey Taxiway Juliet on the Taxiway intersection marking west of Taxiway Sierra. Taxiway Alpha east into Taxiway Juliet from the north & south Taxiway Whiskey north into Twy Sierra from the east & west Taxiway Sierra west into Taxiway Juliet Taxiway Sierra from the Taxiway Juliet northern intersection marking to the southern intersection marking All other lighting within the closed area Taxiway Alpha x 2 east into Taxiway Juliet from the north & south Taxiway Whiskey x 2 north into Twy Sierra from the east & west Office use only Car 2 Verified Office check Office use only Car 2 Verified Office check Office use only Car 2 Verified Office check Date of Issue: January 2018 Uncontrolled when printed Page 5 of 25

6 Contractor restricted area Taxiway Sierra x 1 into Twy Juliet west At a point 54m parallel to the Bay Hotel 3 lead in line (west side) to be surveyed and marked. Taxiway Juliet on the Taxiway intersection marking west of Taxiway Sierra. Taxiway Sierra on the intersection marking south of Taxiway Juliet 3. RESTRICTIONS TO CONTRACTOR 3.1 Working Hours on Site In Stage 1, Stage 2 and Stage 3 works will be between the hours of 06:00 local time and 18:00 local time Monday until Sunday inclusive or such other hours as agreed by Melbourne Airport. 3.2 Works Permit This Method of Working Plan is not an approval to commence works. Before any works may commence the Contractor must obtain a Permit to Commence Works (PERCOW) from the Melbourne Airport Buildings Approvals Officer (Phone ). Please contact Building.Approval@melair.com.au should you require any further information. 3.3 Electrical Services and Control Cables The contractor, before the commencement of any works, will confirm the location of all underground services. This check is usually done in conjunction with the issuing of a Permit to Commence Works and prevents damage to any airport services. 3.4 Excavations An excavation permit must be obtained from Melbourne Airport Airfield Lighting by ing airsidepermits@melair.com.au 7 days prior to any excavation works that penetrate the ground surface 3.5 Airport Security Aviation Security Identification Cards (ASIC) must be obtained for all personnel associated with airside works. Melbourne Airport will issue an ASIC on application by the contractor. Applications must be made at least 6 working weeks in advance. Once issued, the ASIC must be worn and displayed at all times on the outside of their clothing, waist height or above, at the front or side of the person s body and with the front face of the card clearly visible by all staff whilst working on the airside of the airport. Where contractors have submitted an application and the ASIC check is not complete, Visitor Passes may be used. Escort Drivers and Works Safety Officers will act as the escort. Visitor Passes are restricted to 28 days from the date of issue. Delivery personnel, with legitimate business on airside, may operate with a Visitor Pass under escort/watch at all times of an ASIC holder. 3.6 Airport Emergencies Date of Issue: January 2018 Uncontrolled when printed Page 6 of 25

7 Under certain emergency situations, access to the airside of the airport including the work site will not be allowed. Because of the unpredictable nature of emergency situations it is not possible to give advance warning of these occurrences. Local Standby situations do not require the works party to vacate the airside. 3.7 Poor Visibility Under certain weather conditions (low visibility), access to the airside of the airport, including the work site, will not be allowed. Because of the unpredictable nature of the weather it is not possible to give advance warning of these occurrences. Low visibility conditions are defined in paragraph Site Restricted Area Melbourne Airport may request the contractor to define the Site Restricted area. The Site Restricted area is to be defined by either: 900mm or 300mm red and white half-filled water barriers, a continuous line of rope with flagging attached, A continuous line of orange witches hats and yellow warning lights or as approved by the Airfield Operations & Works Coordinator. Red obstruction lights may also be requested to be placed around hazards within the work area. The works party, including all works vehicles that are not appropriately lit or approved under the Melbourne Airport Standard Blanket Clearance (Letter of Agreement LOA - 163), are not permitted to move outside the works area without the approval of the Works Safety Officer. 3.9 Access to the Works Site Access to the works site for all contractor vehicles and deliveries will be via the access gates as shown on the attached plans. No vehicle will be allowed access or egress through any other gate except as approved by the MOWP Safety Coordinator. Unlicensed airside drivers of vehicles and plant moving between the access gate and the works site must follow the route specified on the attached plan under the escort of an Escort Vehicle. Unlicensed vehicles moving to and from the airside works site will be issued with a temporary pass at the access gate. The pass is to be returned at the completion of the delivery. Vehicles that frequently gain access to Airside must apply for a permanent Airside Vehicle pass Traffic Management Plan Melbourne Airport may request a Traffic Management Plan (TMP) be submitted to the MOWP Safety Coordinator in the event any works which may have an impact on the Airside Roads or the Apron Service Roads Marking and Lighting of Vehicles Date of Issue: January 2018 Uncontrolled when printed Page 7 of 25

8 Vehicles accessing the site will be required to have signs that clearly identify the vehicle as belonging to that company (an A4 size sign should be taken as a guide) and be issued with an airside vehicle permit. Additionally, all vehicles, while operating airside, will be required to have and display an amber beacon which is visible 360 degrees of the vehicle and must been visible up to 200 meters from the vehicle in normal daylight conditions. Please refer to the Airside Vehicle Control Handbook for more information. Access from the access gate to the work site for all contractors who do not have an Authority to Drive Airside (ADA) will be by escort only Site Sheds locations Site shed locations that have any impact on the airlines Staging or Storage Area will not be approved Pavement and Site Cleanliness The contractor is to ensure that aircraft pavements used or crossed during the works are kept clean and free of debris. A sweeper (no steel brushes), approved by the MOWP Safety Coordinator, is to be kept on call at all times whilst works are in progress. Areas within the works site must also be free of Foreign Object Debris (FOD) Vehicle/Equipment Height Limit No vehicle or other item of plant over 4 metres high may be used at the works site without authority from the Airfield Operations & Works Coordinator Operation of Cranes A permit must be obtained prior to the erection of any crane on the airport. Applications for approval must be sent to cranepermits@melair.com.au. Minimum of 72 hours notification is required for a crane permit. For cranes that are likely to penetrate Melbourne Airport Airspace, 12 weeks notification is required Filling of Trenches No trench within the runway or taxiway strip may be left open, unattended or unprotected at the completion of each day/night work without prior approval of the MOWP Safety Coordinator. Any approved open excavations within the works area must be covered with heavy duty steel plates and defined by 900mm or 300mm red and white half-filled water barriers and red obstruction lights Oxy-Cutting, Welding and Grinding Melbourne Airport may issue a Hot works permit for Airside subject to the following conditions: The area is free from any smoke detecting device that may cause a false alarm due to smoke A staff member to be in attendance at all times whilst the Hot Works is in operation Date of Issue: January 2018 Uncontrolled when printed Page 8 of 25

9 Hot works permit required & conditions of permit are met (contact Car 2 who can assist with permit). The process for Airside Operations staff issuing Hot Works Permits is as follows: Ensure that the area is clean and tidy Ensure there are no combustible materials around Ensure if welding that there is a welding screen around the site Ensure there is a serviceable fire extinguisher on hand Ensure there is a fire blanket on site Ensure a spotter is in attendance for the duration of the hot works Ensure there are no refuelling aircraft or aircraft fuel vents in the vicinity of at least 50 metres for the duration of the permit. When satisfied that all of these conditions are being adhered to, a permit will be issued. The permit is for that job, in that location specified and if the works move to another location, then a new permit is required The permit is valid for a period of time only, maximum one day, and if work is to resume the next day, a new permit is required The original permit will be issued to the applicant and a copy of the permit will be kept by the issuing Melbourne Airport officer Note: No permits will be issued during days of total fire bans Please contact Car for the permit Area returned to existing condition Explosives No explosives or explosive power tools may be used on the airport without prior approval of the MOWP Safety Coordinator Speed Limits Maximum speed limits apply as follows: 60km/h applies on the Perimeter Road, 40 km/h on the runway and taxiway areas, 10 km/h within the works site, 25km/h on the haul road and 15 km/h on the Aprons. Breaches of the speed limit will result in a Penalty Infringement Notice (PIN) being issued or refusal of access to the driver and vehicle involved Parking of Private Vehicles Only vehicles and plant actually engaged in the works will be permitted airside at the works site. All other vehicles must be parked at a landside site pre-arranged with the Project Manager. All vehicles must be returned to the nominated landside compound at the completion of each day/night works Waste Disposal and Environment Protection Any putrescible waste generated at the site is to be placed in secure, covered rubbish bins and removed from the airport. The contractor must ensure that all other waste is contained within the site and not free to blow around the airport. Builders waste must be removed well clear of movement area to a site directed by the Works Safety Officer and the Melbourne Airport Corporate Environment Manager. The contractor must comply with all environmental controls as specified in the Construction Environment Management Plan provided by the contractor and endorsed by the Melbourne Airport Environment Manager (phone ). Date of Issue: January 2018 Uncontrolled when printed Page 9 of 25

10 Please note that the consumption of any food whilst Airside should be contained within a vehicle or an approved site shed (at no stage should food be consumed in the open) Control of Works Personnel All personnel associated with the work will at all times be bound by the directions of the Works Safety Officer with respect to operational safety matters Personal Protective Equipment (PPE) for the Airside Environment The following PPE must be worn by all personnel, airside Dust Hearing Protection as per Melbourne Airport Airside Operations Safety Policy. High Visibility clothing or fluorescent yellow vests that meet Australian Standards and/or the Melbourne Airport Airside Operations Safety Policy Eye and Skin protection is to be worn in reference to the prevailing weather conditions Safety shoes must be worn on the works site Dust must be kept to a minimum and excavated areas must be constantly watered in windy conditions Dumping of Fill Fill must be transported from the site to the landside and dumped in an area approved by the Melbourne Airport Corporate Environment Manager and the MOWP Safety Coordinator. Fill must not be dumped or stored Airside without the express approval of the MOWP Safety Coordinator Bird and Animal Hazards The contractor is to monitor the works site and fill dumping area for increased bird or animal activity. In the event that birds and animals are attracted to the area, Melbourne Airport in consultation with the Airport Ornithologist, will instruct the contractor to implement suitable measures to reduce the wildlife hazard Food Consumption Due to bird attraction, the consumption of any food whilst Airside should be contained within a vehicle or an approved site shed (at no stage should food be consumed outside in open areas) Lime and Cement Spreading If lime and cement spreading is to take place in winds greater than 5 knots, or if the wind is blowing towards the terminal or critical operational areas such as an active apron, taxiway or runway system, the contractor will employ additional measures to minimise the escape of dust from the site. It is preferable that contractors undertake the spreading of lime and cement dust at Date of Issue: January 2018 Uncontrolled when printed Page 10 of 25

11 early morning/dusk hours to minimize impacts on airfield operations. A permit must be obtained prior to any spreading from the Senior Works Safety Officer (Car 2 Phone ) Completion of works On completion of each stage of the works, the contractor is to clean up the area, to the satisfaction of the MOWP Safety Coordinator and the Senior Works Safety Officer, make good any pavement damage to the satisfaction of the Airfield Maintenance Leader and remove all building rubbish, excess materials and construction plant from the site. A joint inspection involving the Airfield Operations team including but not limited to; Airfield Lighting Leader, Airfield Maintenance Leader, the Airfield Operations & Works Coordinator and the Airfield Operations & CASA Manager will be conducted before the particular works area is deemed to be completed Melbourne Airport is required by Part 99 of the Civil Aviation Safety Regulations 1998, (CASR 99), to develop and implement a Drug and Alcohol Management Plan (DAMP) that covers persons who perform, or are available to perform, a Safety- Sensitive Aviation Activity (SSAA refer to definition below). Under CASR 99, the Melbourne Airport DAMP applies to all Melbourne Airport personnel that perform, or are available to perform, a SSAA in an aerodrome testing area (refer to definition below These personnel are: All Airside Drivers employed or engaged by Melbourne Airport Persons employed directly by Melbourne Airport; Contractors engaged by Melbourne Airport; Subcontractors engaged by contractors of Melbourne Airport; and Persons employed by those contractors and subcontractors. CASR 99 requires Melbourne Airport contractors (including their sub-contractors) that undertake a SSAA to comply with Melbourne Airport s DAMP. In this program these personnel are all referred to as SSAA employees even though they may not be directly employed by Melbourne Airport. Your organisation has been identified as an organisation that has been engaged by Melbourne Airport to perform a SSAA. Melbourne Airport requires your organisation to comply with CASR 99 and Melbourne Airport s DAMP by undertaking the following actions: Ensure all SSAA employees are aware of the DAMP Ensure all SSAA employees have access to the DAMP Ensure all SSAA employees are educated in the DAMP (attached PPT) Ensure all SSAA employees have undertaken pre-employment drug and alcohol (D & A) testing prior to commencing a SSAA (persons that have had continued access to the airside prior to 2009 do not need to undertake pre deployment D&A testing) 1. Ensure your organisation maintains records of : a. Name of all SSAA employees b. Date SSAA employee was given access to the Melbourne Airport DAMP c. Date SSAA employee educated Date of Issue: January 2018 Uncontrolled when printed Page 11 of 25

12 d. Duties undertaken by the SSAA employees e. Commencement date of employee undertaken a SSAA f. Date of Pre-employment D & A test g. Type of test undertaken (0ral/Urine/Blood/Breath) h. The standard that the D & A complied with (AS3547, NMI R 126, AS/NZS 4308, AS 4760) i. Termination date The requirement for various organisations, including Melbourne Airport, to develop, educate and implement a program has been introduced into the CASRs in order to enhance safety benefits and other outcomes for the aviation sector. The purpose of the DAMP is to provide: A communique of Melbourne Airport s policy and procedures 1. A reference document to all Melbourne Airport s SSAA employees 2. Education and training on Melbourne Airport s Drug and Alcohol Management Plan. 3. Information regarding Melbourne Airport s drug and alcohol support and assistance services This communique is provided for the effective enforcement of the zero drug and alcohol policy, thereby contributing to compliance with appropriate legislation and the provision of a safe and healthy airside environment. It is designed to send a clear message that illegal drug use and the misuse of legal drugs or alcohol are inconsistent with airside safety policies and will encourage SSAA employees who may have a drug and/or alcohol problem to seek appropriate treatment and counselling. All Melbourne Airport SSAA employees are expected to recognise their legal obligations and comply with the requirements of this DAMP. Any breach of the policies, including the refusal to consent to the testing process, may result in disciplinary action and/or the imposition of penalties under the Airside Driver Penalty Points System. Drug and alcohol management procedures outlined in Melbourne Airport s DAMP are to be followed in conjunction with each individual organisations procedures and requirements as it may be the case that an employee contracting to Melbourne Airport is to subject to the requirements of the Melbourne Airport s DAMP and their Organisations DAMP. Melbourne Airport s DAMP policy is available at the below web link. Melbourne Airport DAMP link Current Regulation Part 99 can be found in volume 3 of the Civil Aviation Safety Regulations Drug and alcohol management plans Date of Issue: January 2018 Uncontrolled when printed Page 12 of 25

13 CASR Part 99 - Drug and alcohol management plans and testing CASA Training: Managing The Risk & DAMP Supervisor Link Medical Review Officer Link Definitions: Civil Aviation Safety Regulations 1998 defines SSAA employees Safety Sensitive Aviation Activities (SSAA) are: any actions taken by a person in an aerodrome testing area (which includes persons presence in the area) other than as a passenger any of the following activities, wherever they occur: driving or operating equipment or vehicles including stationary plant equipment airside calculation of the position of freight, baggage, passengers and fuel on aircraft the maintenance, certification of maintenance or manufacture of aircraft, aeronautical products, ground based navigation aids or radar the fuelling and maintenance of vehicles that will be used to fuel aircraft on aerodrome testing areas activities undertaken by an airport security guard or screening person in the course of their duties as a guard or person activities undertaken by a member of the operating crew of an aircraft in the course of that person s duties as a crew member the loading and unloading of trolleys containing baggage, cargo or mail for loading onto aircraft or unloading from aircraft and the driving of such trolleys activities undertaken by an air traffic controller in the course of the controller's duties as a controller, or the supervisor of such a person providing flight information and search and rescue alert services: to a pilot or operator of an aircraft immediately before the flight of the aircraft; or to a pilot or operator of an aircraft, during the flight of the aircraft; or as an intermediary for communications between a pilot or operator of the aircraft and an air traffic controller the provision of aviation firefighting services. Aerodrome testing area means: (a) any surface in a certified aerodrome or a registered aerodrome over which an aircraft is able to be moved while in contact with the surface of the aerodrome, including any parking areas; and (b) any part of the surface of a certified aerodrome or registered aerodrome Date of Issue: January 2018 Uncontrolled when printed Page 13 of 25

14 (i) that is not covered by paragraph (a); and (ii) that does not have a building on it; and (iii) from which access to a surface mentioned in paragraph (a) may be had; and (c) a building located on a certified aerodrome or registered aerodrome that is used: for maintenance of an aircraft or an aeronautical product; or for the manufacture of aircraft or aeronautical products or by an air traffic service provider to control air traffic or by the holder of an AOC for flying training; and(d) any part of an aircraft, aerobridge or other moveable structure in a certified aerodrome or a registered aerodrome. Regular SSAA employee means a SSAA employee who is reasonably likely to perform an applicable SSAA at least 2 or more times every 90 days. 4. ADMINISTRATION 4.1 Contractor The work is being carried out by the Melbourne Airport Staff and contractors employed by Melbourne Airport. 4.2 Project Manager The Project Manager for stage s 1, 2 and 3 will be Wen Li & Ben Shrever from DCWC. All questions relating to the technical aspect of this project should be directed to the Project Manager. 4.3 Works Organiser The Works Organiser for all stages will be Keen Lim from Fulton Hogan. All questions relating to the practical aspect of this project should be directed to the appropriate works organiser. Note: The Works Organisers may change throughout these stages of works; changes will be advised within the Local Works Plan 4.4 MOWP Safety Co-ordinator The MOWP Safety Co-ordinator will be Leanne Carroll Melbourne Airport Airfield Operations & Works Coordinator (phone (03) ) and Ashley Bevan Airfield Operations & Works Coordinator ( ). Any queries about the conditions contained in this Method of Working Plan or the effect of the works on aircraft operations should be directed to the MOWP Safety Coordinator. 4.5 Works Safety Officer The Senior Airside Safety Officer (Car 2) will be the nominated Senior Works Safety Officer. The Senior Works Safety Officer will be responsible for the operational safety of the work. Date of Issue: January 2018 Uncontrolled when printed Page 14 of 25

15 The Senior Works Safety Officer performs the following responsibilities as specified in the CASA Manual of Standards Part 139 and pertaining to these works: (a) Ensure the safety of aircraft operations in accordance with the standards for aerodrome works and this MOWP (b) Ensure that, where applicable, the aerodrome works are notified by issue of a NOTAM and that the text of each NOTAM is as set out in this MOWP (c) Supply the air-traffic controller, with whatever information is necessary to ensure the safety of aircraft operations on a daily basis. (d) Discuss with the works organisation, on a daily basis, any matters necessary to ensure the safety of aircraft operations (e) Ensure that unserviceable portions of the movement area, temporary obstructions, and the limits of the works area are correctly marked and lit in accordance with this MOWP (f) Ensure that the vehicles, plant and equipment carrying out aerodrome works are properly marked and lit or are under an escort (g) Ensure that all other requirements of the directions and MOWP relating to vehicles, plant, equipment and materials are complied with (h) Ensure that access routes to work areas are in accordance with this MOWP are clearly identified and that access is restricted to these routes.ensure that excavation is carried out in accordance with this MOWP and, in particular, so as to avoid damage or loss of calibration to any underground power or control cable associated with a precision approach and landing system or any other navigational aid (i) Report immediately to air traffic control any incident, or damage to facilities, likely to affect air-traffic control services or the safety of aircraft (j) Remain on duty at the works area while work is in progress and the aerodrome is open to aircraft operations (k) Ensure that air traffic control is kept informed, of the radio call signs of the vehicles used by the works safety officer (l) Require the immediate removal of vehicles, plant and personnel from the movement area where necessary to ensure the safety of aircraft operations (m) Ensure that the movement area is safe for normal aircraft operations following removal of vehicles, plant, equipment and personnel from the works area (n) Ensure that floodlighting or any other lighting required for carrying out aerodrome works is shielded so as not to represent a hazard to aircraft operations 4.6 MOWP Author This MOWP has been written by Leanne Carroll & Ashley Bevan Airfield Operations & Works Coordinator s Melbourne Airport 5. AUTHORITY 5.1 Conduct of Works All works must be carried out in accordance with the standards set down in the Civil Aviation Safety Authority publication entitled Manual of Standards Part 139 for Aerodromes and the specific conditions laid down in this Method of Working Plan. 5.2 Expiry Date of Issue: January 2018 Uncontrolled when printed Page 15 of 25

16 This Method of Working Plan will expire on 31 st January 2019 unless otherwise amended or extended. 5.3 Variation Approval The approval of the MOWP Safety Coordinator must be obtained before any variation is made to this Method of Working Plan or associated NOTAM. Verbal approvals are to be confirmed in writing at the earliest opportunity. This Method of Working Plan has been checked and concurred with by Airservices Australia, Major Airline Operators and internally within Melbourne Airport. The Method of Working Plan is issued by Melbourne Airport in accordance with the Manual of Standards Part 139 Aerodromes, Chapter 10, Section 10 Aerodrome Works Safety issued by the Civil Aviation Safety Authority. Luc Ramalinga Airfield Manager Date of Issue: January 2018 Uncontrolled when printed Page 16 of 25

17 6. PLANS Date of Issue: January 2018 Uncontrolled when printed Page 17 of 25

18 Date of Issue: January 2018 Uncontrolled when printed Page 18 of 25

19 Date of Issue: January 2018 Uncontrolled when printed Page 19 of 25

20 Date of Issue: January 2018 Uncontrolled when printed Page 20 of 25

21 7. DISTRIBUTION 7.1 MOWP Distribution List Company Title Name Air China General Manager VIC/SA Mr. Jiang Zhi Feng & TAS Air China Customer Service Mr. Jeff Li Supervisor Air New Zealand Airport Manager Ben Limisella Air New Zealand Flight Planning Services Markus Kraettli AirAsia X Duty Executive Edwards, Mathew AirAsia X Operations Manager David Stephens AirAsia X Air Asia X BHD loweechng AirAsia X Air Asia X BHD AirAsia X Station Manager Mr Steven McQueen Airservices Australia Senior Advisor Airport Generic Relations Airservices Australia Analyst, Service Delivery Ms. Tiffany Klease Support Airservices Australia Surveillance Engineering Mr. Keith Snape Airservices Australia Melbourne Tower Airservices Australia Melbourne TAC Airservices Australia Melbourne System Supervisor Airservices Australia Robert Crompton Airservices Australia Managers, Melbourne Operations Airservices Australia TOC Director Frank Bosnich Airservices Australia Melbourne and Canberra Simon Godsmark TCU and Towers Airservices Australia Safety and Licensing ML Bill. Hambly-Clark TWR Airservices Australia Investigators Airservices Australia Technical Manager Mr. James Asciak Airservices Australia ATC Systems Supervisor Mr Chris Kumar Airservices Australia TOC CNS Airservices Australia TOC MLATM Airservices Australia Service Desk Airways Airservices Australia ARFF Supervisors Airservices Australia Administration and Mr Glenn Cox Training Airwork Flight Operations Airwork Flight Operations David Vandreike Airwork Flight Operations Flight Dispatch AMSA Mr. Gerard Gillespie Atlas Air Manager Dispatch Mr. Jordan Frohlinger Avitec Pty Ltd Mr. Frank Lenarcic BAE Systems Australia Mr. Bob McBain Bejing Capital Airlines Operation Manager Mr Chad CAO Cathay Pacific Airways Cargo Manager - Cathay Frank Calderone Limited Pacific Cathay Pacific Airways Limited Airport Service Manager Victoria & SA Mr. Cameron Ritchie Date of Issue: January 2018 Uncontrolled when printed Page 21 of 25

22 China Eastern Airlines Coordinator Andree Deliyannis China Eastern Airlines Station Manager Melbourne China Eastern Airlines China Eastern Airlines Station Manager Mr. Gary Gu China Southern Airlines Station Manager Mr George Wang Melbourne Civil Aviation Safety District Aerodrome Mr. Joe Hain Authority Inspector Cootes Transport Group Group Aviation Manager Geoff Pinner Department of Defence 34 Squadron Defence Mr. Eric Sellers establishment Dnata Managers, Duty Dnata Airport Services Ramp Services Manager Mr. Benn Page Dnata Airport Services Terminal Services Mr. Ian Gillon Manager-Cargo Emirates Airport Services Manager Mr. Matthew Loughnan Emirates Manager Flight Operations Mr. Paolo Guidotti Technical Emirates Manager Development & Mr. Mohan Sharma Optimisation - Flight Operations Etihad Airways Etihad duty flight dispatch Etihad Airways Airport Manager Mr. Steve Fisher Etihad Navigation Etihad Navigation Express Freighters Head of Flying Operations Captain James Boland Australia & Chief Pilot Fiji Airways Airport Manager Ms. Elizabeth Senico Fiji Airways Manager Flight Planning Mr. Mike Truman Garuda Indonesia Station Supervisor Ms. Olga Brunton Hainan Airlines Station Manager Mr Johnny LU Iss Security WSO Coordinator Harry Singh Iss Security Airfield Manager - Aviation Rob Morin & Transport Japan Airlines General Manager, Shinsaku Yasumitsu Victoria, South Australia and Tasmania, Japan Airlines Jepperson Australia Pty Navigation Information Mr. Troy Smith Ltd Analyst Jepperson Australia Pty Technical Sales Mr. David Hopkins Ltd Representative JetCity Pty Ltd Managing Director Mr. Lorne Cole Jetstar Airways Pty Aircraft Performance Limited Engineer Jetstar Airways Pty Jetstar Operations and Limited Dispatch Jetstar Airways Pty Dispatch Limited Jetstar Airways Pty Data Integrity Analyst Limited Jetstar Airways Pty Limited Manager Aircraft Performance Engineering Date of Issue: January 2018 Uncontrolled when printed Page 22 of 25

23 Jetstar Airways Pty Manager Aerodromes and Steve Marion Limited Airways Jetstar Airways Pty Melbourne Airport Mr. Paul O Brien Limited Manager Lufthansa Systems Lufthansa Systems Flight Murat Serengil FlightNav Inc Nav Inc Malaysia Airlines Assistant Station Head Ms Asha D'Monte Malaysia Airlines Station Manager Mr. Kumar Brang Melbourne Airport All Duty Managers Melbourne Airport Airport Manager Melbourne Airport Passenger Facilitation Melbourne Airport Airfield Lighting Melbourne Airport Head Of Aviation Ms Katie Cooper Melbourne Airport All Airside Safety Officers Melbourne Airport Airfield Manager Mr. Luc Ramalinga Melbourne Airport Airfield Maintenance Mr. Mark Cachia Leader Melbourne Airport Airfield Lighting Leader Mr Michael Mahlstedt Melbourne Airport All Airfield Maintenance Group Melbourne Airport Capital Program David Burns Department Melbourne Airport Airfield Design Mr Alan Darvill Coordinator Melbourne Airport Clerk of Works Mr. Craig Butler Melbourne Airport Operations Trainer Mr. Julio Slayo Melbourne Airport Senior Airside Safety Mr. Richard Forbes Officer Melbourne Airport Senior Airside Safety Mr. Rodney Kent Officer Melbourne Airport Senior Airside Safety Mr. Danny Turnley Officer Melbourne Airport Senior Airside Safety Mr. Leigh Aggett Officer Melbourne Airport Airside Safety Officer Mr. George Spiliotacopoulos Melbourne Airport Airside Safety Officer Mr Kevin Bogert Melbourne Airport Airport Safety Officer Mr. Ruslan Verbini Melbourne Airport Airside Safety Officer Mr. Tom Weaver Melbourne Airport Airside Safety Officer Mr. Bill Bailey Melbourne Airport Airside Safety Officer Mr. Bevin Buchanan Melbourne Airport Airside Safety Officer Mr Martin Bamford Melbourne Airport Airside Safety Officer Mr. Shane Murphy Melbourne Airport Airside Safety Officer Mr Graeme Woodall Melbourne Airport Airside Safety Officer Mr Stephanos Eleftheriadis Melbourne Airport Airside Safety Officer Mr Jared Baillie Melbourne Airport Airside Safety Officer Mr. Theo Diamantopoulos Melbourne Airport Airfield Maintenance Mr. Colin Schang Officer Melbourne Airport Airside Safety Officer Mr. Neil Power Melbourne Airport Airside Safety Officer Mr. Ray Ramadan Melbourne Airport Environment Officer Amelia Donato Date of Issue: January 2018 Uncontrolled when printed Page 23 of 25

24 Melbourne Airport Airfield Operations Peter Gaukrodger Interface Manager Melbourne Airport AOCC Supervisor Tim Pedder Melbourne Airport Communications Officers Melbourne Airport Supervisor Airport SACC Coordination Centre Melbourne Airport Airfield Operations & Mr. Marc Storti CASA Manager Melbourne Airport Airfield Operations & Mr. Ashley Bevan Works Coordinator Melbourne Airport Airfield Operations & Ms. Leanne Carroll Works Coordinator Melbourne Airport Airfield Safety Coordinator Ms Fiona Fernandes Menzies Aviation Group Operations Manager Mr. Clayton Williams (Australia) Pty Ltd Menzies Aviation Group Customer Services Ms Vicki Whitehead (Australia) Pty Ltd Manager Menzies Aviation Group Ramp Operations Mr. Shaun Roberton (Australia) Pty Ltd Manager Pel-Air Aviation Pel-Air Aviation Chief Operations Officer Mr Eugene Lee Pel-Air Aviation Operations Manager - Edwards, Melinda Essendon Pel-Air Aviation Flight Operations Manager Trent Edmonds Philippine Airlines Station Manager Mr. James Gaspersz Qantas Airway Limited Airport Duty Manager Mr. Shane Dickson Qantas Airways Limited Flight Despatch Planning Mr. Glenn Hillman Qantas Airways Limited Mr. Peter Millsom Qantas Airways Limited Mr Tony Ferraaro Qantas Airways Limited OH&S Facilitator Mr. Peter Wilson (Melbourne Line Maintenance) Qantas Airways Limited State Operations Manager Mr. Mark Canavan Qantas Airways Limited Safety Adviser VIC, SA, Mr Jason Lim TAS Qatar Airways Senior Aeronautical Ricardo Alonso Martin Information Specialist Qatar Airways Flight Dispatch Qatar Airways Airport Services Duty Mr Carlton Tucker Officer Qatar Airways Airport Services Manager Mr. Patrick Devinport Regional Express Flight Operations Regional Express Manager Flight Operations Mr Andrew Messer Engineering Regional Express Assitant Airport Manager Ms Joanne Fletcher Royal Brunei Airlines Alan Bradley Singapore Airlines Station Manager Singapore Airlines Mr John May Singapore Airlines Victoria Cargo Manager Greg Muir Singapore Airlines Station Manager Mr Fan Ping En Singapore Airlines Cargo Mr.Trevor.Kairns SriLankan Airlines Mr Dave De Visser SriLankan Airlines Mr.Dilshan Jamel Date of Issue: January 2018 Uncontrolled when printed Page 24 of 25

25 SriLankan Airlines Ltd SriLankan Airlines Ltd SriLankan Airlines Ltd SriLankan Airlines Ltd Airport Services & Cargo Contracts Manager Lakmali Kahawatte Skytraders Mr. Reg Farrar Skywest Airlines Skywest Duty Pilots Skywest Airlines Skywest Central Op Tasman Cargo Chief Pilot Mr. Andrew Sturrock Thai Airways International Service Manager Ms. Petcharin Sittitoon Thai Airways International Cargo Sales and Ms. Deb Towan Operations Controller Tiger Airways Tiger Ops Support Tiger Airways Tiger Ops Control Centre Tiger Airways Tiger Performance Tiger Airways Mr. Stewart Webster Tiger Airways Mr. John Loughnan Tiger Airways Flight Operations Mr. Tim Gardyne Tiger Airways Head of Safety Ms.Victoria Collins Tiger Airways Ground Service Manager Mr Jacob Velonias Tiger Airways Regional Ground Services Mr. Alan Grant Manager TOLL Air Services Manager Domestic Mr. Alan Williams Freighters TOLL Air Services Manager Domestic Mr. Ron Demir Freighters TOLL Aviation Services General Manager Mr. Murray Collings TOLL Priority Frieght Supervisor/ Uff Budak Manager United Airlines Station Operations Ms Leone Addison-Baker Manager Victorian Police Airwing Operations Manager/ Chief Pilot Vietnam Airlines Duty Manager Virgin Australia Virgin Office, AMCO Virgin Australia Melbourne Line Mr. Dale Fisher Maintenance Supervisor Virgin Australia Safety and Quality Mr. Christopher Bibes Virgin Australia Airside Operations Leader Mr. Jason Davey Virgin Australia Virgin Australia Manager Mr. Greg Brennan Virgin Australia. Maintenance Manager Mr Derek Paynter Virgin Australia. FOE Virgin Australia. VARA Flight Technical Virgin Australia. Movement Control Ms. Heidi Mandouit Manager Virgin Blue Operations Controller Viva Energy Airport Manager Mr Mario Nicolosi Xiamen Airlines Date of Issue: January 2018 Uncontrolled when printed Page 25 of 25

Dates: Date of Approval Date Works

Dates: Date of Approval Date Works Method of Working Plan: YMML 2017/4 Date of Issue: November 2017 Method of Working Plan Melbourne Airport Foxtrot Apron Works Dates: Important Date of Approval Date Works 15 th January 2018 Commence Date

More information

OPERATIONAL AND AIRCRAFT RESTRICTIONS

OPERATIONAL AND AIRCRAFT RESTRICTIONS Method of Working Plan: YMML 2017/4 Date of Issue: January 2017 Method of Working Plan Melbourne Airport Foxtrot Apron Works Amendment No.2 Dates: Important Date of Approval 9 th January 2018 Date Works

More information

OPERATIONAL AND AIRCRAFT RESTRICTIONS

OPERATIONAL AND AIRCRAFT RESTRICTIONS Method of Working Plan: YMML 2017/3 Date of Issue: November 2017 Method of Working Plan Melbourne Airport Alpha Slab Rectification Works 2017/3 Dates: Important Date of Approval November 2017 Date Works

More information

TITLE PAGE. Method of Working Plan Melbourne Airport. Runway Maintenance to Runway 16/34 and Runway 09/27. Method of Working Plan: YMML 2018/4

TITLE PAGE. Method of Working Plan Melbourne Airport. Runway Maintenance to Runway 16/34 and Runway 09/27. Method of Working Plan: YMML 2018/4 TITLE PAGE Method of Working Plan: YMML 2018/4 Date of issue: March 2018 Method of Working Plan Melbourne Airport Runway Maintenance to Runway 16/34 and Runway 09/27 Important Dates: Date of Approval April

More information

OPERATIONAL AND AIRCRAFT RESTRICTIONS

OPERATIONAL AND AIRCRAFT RESTRICTIONS Method of Working Plan: YMML 2018/3 Date of Issue: March 2018 Method of Working Plan Melbourne Airport Bravo Slab Replacement Works Draft Amendment 2 Dates: Important Date of Approval March 2018 Date Works

More information

Method of Working Plan Melbourne Airport. Runway 27 High Intensity Approach Lighting Replacement Project. Method of Working Plan: YMML 2016/2

Method of Working Plan Melbourne Airport. Runway 27 High Intensity Approach Lighting Replacement Project. Method of Working Plan: YMML 2016/2 Method of Working Plan: YMML 2016/2 Date of Issue: 1 st February 2017 Amendment No.1 Method of Working Plan Runway 27 High Intensity Approach Lighting Replacement Project Important Dates: Date of Approval

More information

ORANGE AIRPORT METHOD OF WORKING PLAN. Orange Airport

ORANGE AIRPORT METHOD OF WORKING PLAN. Orange Airport METHOD OF WORKING PLAN MOWP: ISSUE NO: DATE OF ISSUE: AMENDMENT NO. YORG 14/01 Version 1 9 February 2015 21 AERODROME: Orange Airport PROJECT DESCRIPTION: Runway 11/29 Extension, Runway 04/22 Extension,

More information

Vancouver Airport Authority. Contractor Safety Management Program [CSMP] Airside Contractor & Construction Safety

Vancouver Airport Authority. Contractor Safety Management Program [CSMP] Airside Contractor & Construction Safety Vancouver Airport Authority Contractor Safety Management Program [CSMP] Airside Contractor & Construction Safety - 2017 CSMP Contractor Expectations - 2017 i Contents Contents Contents Introduction ii

More information

PERTH AIRPORT TERMINAL 4 APRON TAXIWAY REALIGNMENT AND TAXIWAYS DELTA, BRAVO AND WHISKEY CATEGORY III UPGRADE DRAFT METHOD OF WORKING PLAN

PERTH AIRPORT TERMINAL 4 APRON TAXIWAY REALIGNMENT AND TAXIWAYS DELTA, BRAVO AND WHISKEY CATEGORY III UPGRADE DRAFT METHOD OF WORKING PLAN Reference Number YPPH 007-17 Date of DRAFT Issue 12 th May2017 Amendment Number Date of Amendment CONTENTS: PERTH AIRPORT TERMINAL 4 APRON TAXIWAY REALIGNMENT AND TAXIWAYS DELTA, BRAVO AND WHISKEY CATEGORY

More information

Low Visibility Operations

Low Visibility Operations Airside Operational Instruction 21 Uncontrolled when printed Page 0 of 7 1 LOW VISIBILITY OPERATIONS Policy East Midlands Airport (EMA) is committed to providing facilities and procedures to enable aircraft

More information

PART H SECTION 3 GENERAL REQUIREMENTS AND PROCEDURES GOVERNING THE EXECUTION OF WORKS ON OR ADJACENT TO AIRSIDE OPERATIONAL AREAS

PART H SECTION 3 GENERAL REQUIREMENTS AND PROCEDURES GOVERNING THE EXECUTION OF WORKS ON OR ADJACENT TO AIRSIDE OPERATIONAL AREAS H-3-1 PART H SECTION 3 GENERAL REQUIREMENTS AND PROCEDURES GOVERNING THE EXECUTION OF WORKS ON OR ADJACENT TO AIRSIDE OPERATIONAL AREAS 1. Regulations 1.1 These requirements are intended to ensure that

More information

Airport Operating Standard. Transfer of Explosive Cargo

Airport Operating Standard. Transfer of Explosive Cargo Airport Operating Standard Transfer of Explosive Cargo June 2018 Contents Introduction 2 Responsibilities 3 Approvals 4 Safe distances 6 Preferred aircraft parking position 7 Handling agent vehicular

More information

AIRSIDE VEHICLE CONTROL HANDBOOK

AIRSIDE VEHICLE CONTROL HANDBOOK AIRSIDE VEHICLE CONTROL HANDBOOK BANKSTOWN AND CAMDEN AIRPORTS Revised September 2016 CONTENTS Contents... 2 INTRODUCTION... 3 DEFINITIONS... 4 ADA REQUIREMENTS... 6 1. AUTHORITY TO DRIVE AIRSIDE AND THE

More information

OPERATIONAL SAFETY POLICY TRANSFER OF EXPLOSIVE CARGO MARCH This document is uncontrolled when printed

OPERATIONAL SAFETY POLICY TRANSFER OF EXPLOSIVE CARGO MARCH This document is uncontrolled when printed OPERATIONAL SAFETY POLICY TRANSFER OF EXPLOSIVE CARGO MARCH 2015 Produced by Melbourne Airport in the interest of Airport Safety and Security Table of Contents SECTION ONE INTRODUCTION 1.1 Introduction...4

More information

OPERATIONAL SAFETY POLICY GROUND RUNNING OF AIRCRAFT MARCH This document is uncontrolled when printed

OPERATIONAL SAFETY POLICY GROUND RUNNING OF AIRCRAFT MARCH This document is uncontrolled when printed OPERATIONAL SAFETY POLICY GROUND RUNNING OF AIRCRAFT MARCH 2015 Produced by Melbourne Airport in the interest of Airport Safety and Security Printed on Maine Recycled Digital Paper Table of Contents SECTION

More information

Sample Regulations for Water Aerodromes

Sample Regulations for Water Aerodromes Sample Regulations for Water Aerodromes First Edition (unedited version) March 2015 Notice to users: This document is an unedited version which is made available to the public for convenience. Its content

More information

Form No. OPS-20 Issue No. 01 Airport Safety Induction Revision No. 01

Form No. OPS-20 Issue No. 01 Airport Safety Induction Revision No. 01 Form No. OPS-20 Issue No. 01 Airport Safety Induction Revision No. 01 As the Airport operator, Archerfield Airport Corporation Pty Ltd ( AAC ) has a responsibility to provide a safe work environment for

More information

PART F SECTION 2 RESPONSIBILITIES AND ACTIONS

PART F SECTION 2 RESPONSIBILITIES AND ACTIONS F-2-1 AIRPORT OPERATIONS MANUAL AIRFIELD OPERATIONS 31 January 2011 PART F SECTION 2 RESPONSIBILITIES AND ACTIONS 1. Overview 1.1 This section outlines the responsibilities and actions of the airport organizations

More information

Effective: PERTH AIRPORT AIRSIDE SURFACE MONITORING FOR FORRESTFIELD AIRPORT LINK TUNNELLING

Effective: PERTH AIRPORT AIRSIDE SURFACE MONITORING FOR FORRESTFIELD AIRPORT LINK TUNNELLING AUSTRALIA AERONAUTICAL INFORMATION SERVICE AIRSERVICES AUSTRALIA GPO BOX 367, CANBERRA ACT 2601 Phone: 02 6268 4874 Email: aim.editorial@airservicesaustralia.com Effective: AERONAUTICAL INFORMATION CIRCULAR

More information

(a) it has been licensed for the purpose, and save in accordance with the conditions prescribed in such licence; or

(a) it has been licensed for the purpose, and save in accordance with the conditions prescribed in such licence; or PART - XI Aerodromes 78. Licensing of Aerodromes (1) No aerodrome shall be used as a regular place of landing and departure by a scheduled air transport service or for a series of landings and departures

More information

AIRFIELD OPERATIONAL INSTRUCTION 26 GENERAL AVIATION OPERATIONS

AIRFIELD OPERATIONAL INSTRUCTION 26 GENERAL AVIATION OPERATIONS AIRFIELD OPERATIONAL INSTRUCTION 26 GENERAL AVIATION OPERATIONS Return to Contents Page Liverpool John Lennon Airport 0 20161012LJAAOI26V6.0pdf AIRFIELD OPERATIONAL INSTRUCTION 26 GENERAL AVIATION OPERATIONS

More information

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) Part 171 AERONAUTICAL TELECOMMUNICATION SERVICES Published by Air Safety Support International Ltd Air Safety Support International Limited 2005 First

More information

STATUTORY INSTRUMENTS. S.I. No. 855 of 2004 IRISH AVIATION AUTHORITY (AIR TRAFFIC SERVICE SYSTEMS) ORDER, 2004

STATUTORY INSTRUMENTS. S.I. No. 855 of 2004 IRISH AVIATION AUTHORITY (AIR TRAFFIC SERVICE SYSTEMS) ORDER, 2004 STATUTORY INSTRUMENTS S.I. No. 855 of 2004 IRISH AVIATION AUTHORITY (AIR TRAFFIC SERVICE SYSTEMS) ORDER, 2004 PUBLISHED BY THE STATIONERY OFFICE DUBLIN To be purchased directly from the GOVERNMENT PUBLICATIONS

More information

AOP 11 Low Visibility Procedures (LVP s) (Aerodrome Operating Procedure)

AOP 11 Low Visibility Procedures (LVP s) (Aerodrome Operating Procedure) AOP 11 Low Visibility Procedures (LVP s) (Aerodrome Operating Procedure) Produced by Airfield Services Document Author Operations Support Manager Contents 1 SECTION 1 - LOW VISIBILITY PROCEDURES (LVP S)...

More information

East Midlands Airport 2018 Aerodrome Manual

East Midlands Airport 2018 Aerodrome Manual East Midlands Airport 2018 Aerodrome Manual Version 1.0 Not Valid after 31 st December 2018 Department Operations Document Owner Operations Director (Accountable Manager) Document Administrator Ops Development

More information

International Civil Aviation Organization REVIEW OF STATE CONTINGENCY PLANNING REQUIREMENTS. (Presented by the Secretariat) SUMMARY

International Civil Aviation Organization REVIEW OF STATE CONTINGENCY PLANNING REQUIREMENTS. (Presented by the Secretariat) SUMMARY BBACG/16 WP/4 31/01/05 International Civil Aviation Organization The Special Coordination Meeting for the Bay of Bengal area (SCM/BOB) and The Sixteenth Meeting of the Bay of Bengal ATS Coordination Group

More information

GRANDE PRAIRIE AIRPORT. Reduced Visibility Operations Plan

GRANDE PRAIRIE AIRPORT. Reduced Visibility Operations Plan GRANDE PRAIRIE AIRPORT Reduced Visibility Operations Plan Amended November 8, 2017 Distribution List: (Updates to the Reduced Visibility Operations Plan will be circulated to this list.) Name and Title

More information

SAFETY NOTICE OPERATIONAL AND SAFETY PLAN FOR THE CONSTRUCTION OF NEW GENERAL AVIATION HANGAR FACILITY BRIEFING NOTES DURATION 6 MONTHS

SAFETY NOTICE OPERATIONAL AND SAFETY PLAN FOR THE CONSTRUCTION OF NEW GENERAL AVIATION HANGAR FACILITY BRIEFING NOTES DURATION 6 MONTHS SAFETY NOTICE OPERATIONAL AND SAFETY PLAN FOR THE CONSTRUCTION OF NEW GENERAL AVIATION HANGAR FACILITY BRIEFING NOTES START DATE 20 th April 2015 END DATE 11 TH September 2015 DURATION 6 MONTHS Issue 1

More information

Control of Cranes and Other Temporary Obstacles

Control of Cranes and Other Temporary Obstacles United Kingdom Overseas Territories Aviation Circular OTAC 139-27 140-11 171-8 172-11 178-10 Control of Cranes and Other Temporary Obstacles Issue 1 1 June 2018 Effective on issue GENERAL Overseas Territories

More information

Runway Crossings at Brisbane International Airport

Runway Crossings at Brisbane International Airport Runway Crossings at Brisbane International Airport All instructions to cross runways will be issued by Ground on 121.7 MHz All runway crossings require a specific CROSSING clearance. Runway Crossing Requirements

More information

STANDARD OPERATING PROCEDURES TACTICAL OPERATIONS b AIRCRAFT INCIDENTS AND ACCIDENTS EFFECTIVE: OCTOBER 2007

STANDARD OPERATING PROCEDURES TACTICAL OPERATIONS b AIRCRAFT INCIDENTS AND ACCIDENTS EFFECTIVE: OCTOBER 2007 STANDARD OPERATING PROCEDURES TACTICAL OPERATIONS 202.15b AIRCRAFT INCIDENTS AND ACCIDENTS EFFECTIVE: OCTOBER 2007 AIRCRAFT INCIDENTS AND ACCIDENTS Goals 1. To familiarize with Airport Index 2. To familiarize

More information

Airside Driving Policy

Airside Driving Policy Owner: Eibhlin McGrath Creation Date: May 2011 Last Updated: 14-09-2015 Version: 2.2 Document Number AMUVP-03 September 2015 Document No.: AMUVP-03 1 CONTENTS Document Control... 3 Airside Driving Policy...

More information

MANAGING THE RISK TO AVIATION SAFETY OF WIND TURBINE INSTALLATIONS (WIND FARMS)/WIND MONITORING TOWERS.

MANAGING THE RISK TO AVIATION SAFETY OF WIND TURBINE INSTALLATIONS (WIND FARMS)/WIND MONITORING TOWERS. NATIONAL AIRPORTS SAFEGUARDING FRAMEWORK GUIDELINE D MANAGING THE RISK TO AVIATION SAFETY OF WIND TURBINE INSTALLATIONS (WIND FARMS)/WIND MONITORING TOWERS. REVISION DATE VERSION NUMBER CHANGES MADE APPROVED

More information

COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management

COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management L 80/10 Official Journal of the European Union 26.3.2010 COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management (Text with EEA relevance) THE EUROPEAN

More information

Airside Vehicle Control Manual

Airside Vehicle Control Manual Reference No: 9004MKY Version 4 27 September 2017 MACKAY AIRPORT PTY LTD ACN 132 228 534 9004_MKY_MAPLAirsideVehicleControlManualV4_EffectiveDate_27/09/2017_ReviewDate_27/09/2018 Foreword The Mackay Airport

More information

SURFACE MOVEMENT GUIDANCE AND CONTROL SYSTEM PLAN. Los Angeles International Airport

SURFACE MOVEMENT GUIDANCE AND CONTROL SYSTEM PLAN. Los Angeles International Airport SURFACE MOVEMENT GUIDANCE AND CONTROL SYSTEM PLAN Los Angeles International Airport Surface Movement Guidance and Control System (SMGCS) Plan The SMGCS Plan for Los Angeles International Airport (LAX)

More information

NZQA registered unit standard version 4 Page 1 of 5. Maintain safety standards on the apron area of an airport. Aviation > Airport Operations

NZQA registered unit standard version 4 Page 1 of 5. Maintain safety standards on the apron area of an airport. Aviation > Airport Operations Page 1 of 5 Title Maintain safety standards on the apron area of an airport Level 4 Credits 4 Purpose People credited with this unit standard are able to, on the apron area of an airport: identify and

More information

ICAO Aerodrome s Manual. AERODROME S INSPECTOR WORKSHOP St. Maarten, MAHO June 2012

ICAO Aerodrome s Manual. AERODROME S INSPECTOR WORKSHOP St. Maarten, MAHO June 2012 ICAO Aerodrome s Manual AERODROME S INSPECTOR WORKSHOP St. Maarten, MAHO 11-15 June 2012 Objectives - Identify the requirements listed in Annex 14 regarding the development and maintenance of an aerodrome

More information

TUCSON INTERNATIONAL AIRPORT (TUS) DISABLED AIRCRAFT RECOVERY PLAN Section TABLE OF CONTENTS Page

TUCSON INTERNATIONAL AIRPORT (TUS) DISABLED AIRCRAFT RECOVERY PLAN Section TABLE OF CONTENTS Page TUCSON INTERNATIONAL AIRPORT (TUS) DISABLED AIRCRAFT RECOVERY PLAN Section TABLE OF CONTENTS Page 1.0 Disabled Aircraft Recovery Plan Overview 4 1.1 Overview 4 2.0 Aircraft Incident/Accidents 6 3.0 TAA

More information

OPERATING DIRECTIVE Number: D Aviation Authority Revised: 03/26/13

OPERATING DIRECTIVE Number: D Aviation Authority Revised: 03/26/13 OPERATING DIRECTIVE Number: D343.00.06 Effective: 10/01/88 Aviation Authority Revised: 03/26/13 Page: 1 of 11 Subject: Vehicles and Personnel Access to Movement and Safety Areas PURPOSE: To establish procedures

More information

CIVIL AVIATION AUTHORITY, PAKISTAN OPERATIONAL CONTROL SYSTEMS CONTENTS

CIVIL AVIATION AUTHORITY, PAKISTAN OPERATIONAL CONTROL SYSTEMS CONTENTS CIVIL AVIATION AUTHORITY, PAKISTAN Air Navigation Order No. : 91-0004 Date : 7 th April, 2010 Issue : Two OPERATIONAL CONTROL SYSTEMS CONTENTS SECTIONS 1. Authority 2. Purpose 3. Scope 4. Operational Control

More information

Advisory Circular CT

Advisory Circular CT (CAA logo, name of the country, etc.) Advisory Circular CT-42-009 SUBJECT: Airport Movement Area and Related Facilities Maintenance DATE: MM/YYYY ASSOCIATED RULES According with (name of the country) Civil

More information

USE OF REMOTELY PILOTED AIRCRAFT AND MODEL AIRCRAFT IN AVIATION

USE OF REMOTELY PILOTED AIRCRAFT AND MODEL AIRCRAFT IN AVIATION luo Regulation 1 (10) OPS M1-32 Issued: 4 December 2018 Enters into force: 7 December 2018 Validity: indefinitely Legal basis: Aviation Act (864/2014), Sections 5, 9 and 57 Act on Transport Services (320/2017),

More information

Air Operator Certification

Air Operator Certification Civil Aviation Rules Part 119, Amendment 15 Docket 8/CAR/1 Contents Rule objective... 4 Extent of consultation Safety Management project... 4 Summary of submissions... 5 Extent of consultation Maintenance

More information

Airside Driving Policy

Airside Driving Policy Owner: Creation Date: Eibhlin McGrath Last Updated: 19/02/2015 Version: 2.0 Document Number AMUVP-03 March 2015 Document No.: AMUVP-03 1 CONTENTS Document Control... 3 Airside Driving Policy... 4 Introduction...

More information

Effective: AUSTRALIAN INTERNATIONAL AIRSHOW AVALON 2019, AVALON AIRPORT 19 FEBRUARY - 5 MARCH 2019, IFR OPERATIONS AVALON AIRPORT

Effective: AUSTRALIAN INTERNATIONAL AIRSHOW AVALON 2019, AVALON AIRPORT 19 FEBRUARY - 5 MARCH 2019, IFR OPERATIONS AVALON AIRPORT AUSTRALIA AERONAUTICAL INFORMATION SERVICE AIRSERVICES AUSTRALIA GPO BOX 367, CANBERRA ACT 2601 Phone: 02 6268 4874 Email: aim.editorial@airservicesaustralia.com Effective: AIP SUPPLEMENT (SUP) H 02/19

More information

Section 32 TABLE OF CONTENTS Airfield and Aircraft Operations. 32.A General B Aircraft

Section 32 TABLE OF CONTENTS Airfield and Aircraft Operations. 32.A General B Aircraft Section 32 TABLE OF CONTENTS Airfield and Aircraft Operations Section: Page 32.A General... 32-1 32.B Aircraft... 32-4 32-i THIS PAGE INTENTIONALLY LEFT BLANK 32-i SECTION 32 Airfield and Aircraft Operations

More information

Contents. Subpart A General 91.1 Purpose... 7

Contents. Subpart A General 91.1 Purpose... 7 Contents Rule objective... 3 Extent of consultation... 3 Summary of comments... 4 Examination of comments... 6 Insertion of Amendments... 6 Effective date of rule... 6 Availability of rules... 6 Part 91

More information

Driving Training Class. Presented by: Lancaster Airport Authority

Driving Training Class. Presented by: Lancaster Airport Authority Driving Training Class Presented by: Lancaster Airport Authority Driving is a Privilege Driving on the airport, airport apron and ramps is a privilege and can be revoked at anytime for any reason. Violations

More information

GUYANA CIVIL AVIATION REGULATION PART X- FOREIGN OPERATORS.

GUYANA CIVIL AVIATION REGULATION PART X- FOREIGN OPERATORS. Civil Aviation 1 GUYANA CIVIL AVIATION REGULATION PART X- FOREIGN OPERATORS. REGULATIONS ARRANGEMENT OF REGULATIONS 1. Citation. 2. Interpretation. 3. Applicability of Regulations. PART A GENERAL REQUIREMENTS

More information

INTERNATIONAL FIRE TRAINING CENTRE

INTERNATIONAL FIRE TRAINING CENTRE INTERNATIONAL FIRE TRAINING CENTRE RFFS SUPERVISOR INITIAL LICENSING OF AERODROMES CHAPTER 8 THE MINIMUM REQUIREMENTS TO BE MET IN THE PROVISION OF RESCUE AND FIRE FIGHTING SERVICES AT UK LICENSED AERODROMES

More information

SECTION TRAINING HELO. Date: 01/08/16 Page: 1 of Table of Contents Training, Helicopter

SECTION TRAINING HELO. Date: 01/08/16 Page: 1 of Table of Contents Training, Helicopter Date: 01/08/16 Page: 1 of 10 1. Table of Contents Training, Helicopter 1. TABLE OF CONTENTS TRAINING, HELICOPTER... 1 2. HELICOPTER POLICY... 2 1. SCOPE... 2 2. ORGANISATION & STRUCTURE... 2 3. RESPONSIBLE

More information

Consideration will be given to other methods of compliance which may be presented to the Authority.

Consideration will be given to other methods of compliance which may be presented to the Authority. Advisory Circular AC 139-10 Revision 1 Control of Obstacles 27 April 2007 General Civil Aviation Authority advisory circulars (AC) contain information about standards, practices and procedures that the

More information

CONTENTS SECTION CONTENTS FOREWORD RESPONSIBILITIES OF VEHICLE OPERATORS AUTHORITY TO USE AIRSIDE AUTHORITY TO DRIVE AIRSIDE

CONTENTS SECTION CONTENTS FOREWORD RESPONSIBILITIES OF VEHICLE OPERATORS AUTHORITY TO USE AIRSIDE AUTHORITY TO DRIVE AIRSIDE March 2015 2012 CONTENTS SECTION CONTENTS FOREWORD PART 1 PART 2 PART 3 PART 4 PART 5 PART 6 PART 7 ANNEX A ANNEX B ANNEX C ANNEX D ANNEX E ANNEX F ANNEX G ANNEX H ANNEX I RESPONSIBILITIES OF VEHICLE

More information

Part 105. Parachuting - Operating Rules. CAA Consolidation. 15 December Published by the Civil Aviation Authority of New Zealand

Part 105. Parachuting - Operating Rules. CAA Consolidation. 15 December Published by the Civil Aviation Authority of New Zealand Part 105 CAA Consolidation 15 December 2012 Parachuting - Operating Rules Published by the Civil Aviation Authority of New Zealand DESCRIPTION Part 105 prescribes rules relating to parachute operations,

More information

Blackbushe Airport Terms & Conditions

Blackbushe Airport Terms & Conditions EGLKT&C v2 2018.02.01 Page 1 of 5 Blackbushe Airport Terms & Conditions 1. DEFINITIONS "Airport" means all that area comprising Blackbushe Airport at Camberley, Surrey which is operated by or under the

More information

Presentation Title: Aerodromes Licensing Requirements

Presentation Title: Aerodromes Licensing Requirements Presentation Title: Aerodromes Licensing Requirements Presenter s name: Ms Mary-Ann Joubert Manager: Aerodrome Operations Date: 29 March 2017 Content Establishment of ICAO Chicago Convention Members Status

More information

AIRPORT SECURITY BULLETIN

AIRPORT SECURITY BULLETIN AIRPORT SECURITY BULLETIN 17-11 Temporary Badge Program Background: Safety and Security is the Airport s first priority. In order to tighten security, the Airport has eliminated the Visitor V and Construction

More information

WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY. Ermenando Silva APEX, in Safety Manager ACI, World

WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY. Ermenando Silva APEX, in Safety Manager ACI, World WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY Ermenando Silva APEX, in Safety Manager ACI, World Aerodrome Manual The aim and objectives of the aerodrome manual and how it is to be used by operating

More information

Aerodrome Manual. ICAO/FAA Comprehensive Aerodrome Certification Inspector Workshop. Presented To: Caribbean States By: FAA Office of Airports

Aerodrome Manual. ICAO/FAA Comprehensive Aerodrome Certification Inspector Workshop. Presented To: Caribbean States By: FAA Office of Airports ICAO/FAA Comprehensive Aerodrome Certification Inspector Workshop Presented To: Caribbean States By: FAA Office of Airports OBJECTIVE Development of an Aerodrome Manual (AM). 2 ICAO ANNEX 14 - SECTION

More information

PERTH AIRPORT OPERATING PROTOCOL

PERTH AIRPORT OPERATING PROTOCOL PERTH AIRPORT OPERATING PROTOCOL AUTHORITY TABLE Authorised By Executive General Manager - Operations & Customer Experience Policy Manager Manager Business Systems Development Responsible Officer Senior

More information

REGULATIONS (10) FOREIGN AIR OPERATORS

REGULATIONS (10) FOREIGN AIR OPERATORS Republic of Iraq Ministry of Transport Iraq Civil Aviation Authority REGULATIONS (10) FOREIGN AIR OPERATORS Legal Notice No. REPUBLIC OF IRAQ THE CIVIL AVIATION ACT, NO.148 REGULATIONS THE CIVIL AVIATION

More information

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) Part 173 FLIGHT CHECKING ORGANISATION APPROVAL Published by Air Safety Support International Ltd Air Safety Support International Limited 2005 ISBN 0-11790-410-4

More information

CONTENTS FOREWORD...1 PART ONE...2 RESPONSIBILITIES OF VEHICLE OPERATORS...2 PART TWO...4 AUTHORITY FOR USE AIRSIDE...4

CONTENTS FOREWORD...1 PART ONE...2 RESPONSIBILITIES OF VEHICLE OPERATORS...2 PART TWO...4 AUTHORITY FOR USE AIRSIDE...4 CONTENTS FOREWORD...1 PART ONE...2 RESPONSIBILITIES OF VEHICLE OPERATORS...2 PART TWO...4 AUTHORITY FOR USE AIRSIDE...4 PART THREE...6 AUTHORITY TO DRIVE AIRSIDE...6 PART FOUR...9 APPROVED ISSUING AUTHORITIES...9

More information

Part 171. Aeronautical Telecommunication Services - Operation and Certification. CAA Consolidation. 10 March 2017

Part 171. Aeronautical Telecommunication Services - Operation and Certification. CAA Consolidation. 10 March 2017 Part 171 CAA Consolidation 10 March 2017 Aeronautical Telecommunication Services - Operation and Certification Published by the Civil Aviation Authority of New Zealand DESCRIPTION Part 171 provides the

More information

2 Definitions Ardmore Airport Limited. Ardmore Airport Limited, as owner and operator. Airside Driving Permit.

2 Definitions Ardmore Airport Limited. Ardmore Airport Limited, as owner and operator. Airside Driving Permit. 1 Background Ardmore Airport Limited is required under the Civil Aviation Act 1990 and Civil Aviation Authority rule part 139 to establish and implement procedures for limiting and controlling access of

More information

SECTION 32. Airfield and Aircraft Operations

SECTION 32. Airfield and Aircraft Operations SECTION 32 Airfield and Aircraft Operations 32.A Airfields General. 32.A.01 The following safety requirements shall be in addition to the airfield's safety requirements. When an airfield has safety requirements

More information

USE OF RADAR IN THE APPROACH CONTROL SERVICE

USE OF RADAR IN THE APPROACH CONTROL SERVICE USE OF RADAR IN THE APPROACH CONTROL SERVICE 1. Introduction The indications presented on the ATS surveillance system named radar may be used to perform the aerodrome, approach and en-route control service:

More information

San Bernardino International Airport Authority Building 795

San Bernardino International Airport Authority Building 795 San Bernardino International Airport Authority Building 795 Construction Safety and Phasing Plan 1601 E. Third St. San Bernardino, California 92408 As an authorized representative of, (Company) I (Name

More information

Access to and security of the airport

Access to and security of the airport 1(8) Access to and security of the airport Table of contents 1. General... 2 2. Traffic... 2 3. Safety... 2 4. Security... 2 4.1 Access to authorisation areas... 2 4.2 Authorisation documents... 3 4.2.1

More information

Cork Airport Airside Driving Policy

Cork Airport Airside Driving Policy Owner: Eibhlin McGrath Creation Date: May 2011 Last Updated: 17/12/2015 Version: 2.3 Document Number AMUVP-03 CONTENTS Document Control... 3 Airside Driving Policy... 4 Introduction... 4 Cork Airport Managing

More information

Guideline: Rules and appropriate practices for disabled aircraft removal

Guideline: Rules and appropriate practices for disabled aircraft removal Guideline for the Airport Community Guideline: Rules and appropriate practices for disabled aircraft removal Date of issue: May 2018 GUIDELINE-OCD001-R0 TABLE OF CONTENTS 1. Purpose and Scope... 3 2. Definitions

More information

made under regulations and of the Civil Aviation Safety Regulations 1998.

made under regulations and of the Civil Aviation Safety Regulations 1998. Part 145 Manual of Standards (MOS) (as amended) made under regulations 145.005 and 145.015 of the Civil Aviation Safety Regulations 1998. This compilation was prepared on 4 July 2012 taking into account

More information

Striving for Excellence in Aviation Ground Safety

Striving for Excellence in Aviation Ground Safety AAGSC RECOMMENDED INDUSTRY PRACTICE PASSENGER SAFETY ON THE APRON AAGSC : RIP No. 7 Issue 3 Issued : 12 May 2006 Review Date : May 2008 Background There are few standards that provide guidance to airport

More information

It is essential that planning take full account of air safety and efficiency of operations.

It is essential that planning take full account of air safety and efficiency of operations. Airspace Protection Airspace Protection It is essential that planning take full account of air safety and efficiency of operations. 7.1 INTRODUCTION Obstacles near an airport, whether they are natural

More information

TERRACE-KITIMAT AIRPORT SOCIETY APRON MANAGMENT PLAN

TERRACE-KITIMAT AIRPORT SOCIETY APRON MANAGMENT PLAN TERRACE-KITIMAT AIRPORT SOCIETY 2018-19 APRON MANAGMENT PLAN Table of Contents List of Effective Pages... 3 Manual Distribution and Amendment Procedures... 5 Record of Amendments... 5 Apron Management

More information

AIR LAW AND ATC PROCEDURES

AIR LAW AND ATC PROCEDURES 1 The International Civil Aviation Organisation (ICAO) establishes: A standards and recommended international practices for contracting member states. B aeronautical standards adopted by all states. C

More information

8 Aviation Support. 8.1 Aerodrome Rescue and Fire Fighting Services. 8.2 Aircraft Refuelling. 8.3 Air Cargo

8 Aviation Support. 8.1 Aerodrome Rescue and Fire Fighting Services. 8.2 Aircraft Refuelling. 8.3 Air Cargo 8 Aviation Support 8.1 Aerodrome Rescue and Fire Fighting Services CASA mandates that a permanent Aerodrome Rescue and Fire Fighting Service (ARFFS) is established for domestic aerodromes when more than

More information

REQUIRED DOCUMENTATION FOR THE ISSUE OF AIRPORT IDENTIFICATION CARDS, VEHICLE PASSES, AIRSIDE ACCESS, AUTHORISATIONS TO DRIVE

REQUIRED DOCUMENTATION FOR THE ISSUE OF AIRPORT IDENTIFICATION CARDS, VEHICLE PASSES, AIRSIDE ACCESS, AUTHORISATIONS TO DRIVE REQUIRED DOCUMENTATION FOR THE ISSUE OF AIRPORT IDENTIFICATION CARDS, VEHICLE PASSES, AIRSIDE ACCESS, AUTHORISATIONS TO DRIVE Introduction This document aims at summarising the rules of access at the airport

More information

Guidelines for NOTAM Workflow and Allocation of Responsibilities

Guidelines for NOTAM Workflow and Allocation of Responsibilities Guidelines for NOTAM Workflow and Allocation of Responsibilities May 19 2011 INDEX 1- MAIN OBJECTIVES 1 2- ORIGINATION OF NOTAM 1 3- VALUE OF A NOTAM 3 4- DURATION OF NOTAM 4 5- THE AERONAUTICAL DATA CHAIN

More information

Appendix A COMMUNICATION BEST PRACTICES

Appendix A COMMUNICATION BEST PRACTICES Appendix A COMMUNICATION BEST PRACTICES 1. GENERAL 1.1 It is apparent from investigation reports and surveys regarding runway safety occurrences that communication issues are frequently a causal or contributory

More information

Telephone No. 2:4622495 Telegraphic Address: Commercial : AIRCIVIL NEW DELHI Aeronautical : VIDDYAYX E Mail: dri@dgca.nic.in Fax : 01124629221 GOVERNMENT OF INDIA AERONAUTICAL INFORMATION SERVICES DIRECTOR

More information

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) Part 66 AIRCRAFT MAINTENANCE PERSONNEL LICENSING AND AUTHORISATION Published by Air Safety Support International Ltd Air Safety Support International

More information

CIVIL AVIATION REGULATIONS SURINAME PART 17 - AERONAUTICAL TELECOMMUNICATIONS VERSION 5.0

CIVIL AVIATION REGULATIONS SURINAME PART 17 - AERONAUTICAL TELECOMMUNICATIONS VERSION 5.0 CIVIL AVIATION REGULATIONS SURINAME PART 17 - AERONAUTICAL TELECOMMUNICATIONS VERSION 5.0 January 2018 AMENDMENTS Location Date Amended by Description CONTENTS 17.1 GENERAL... 4 17.1.1 Applicability...

More information

Part 101 Gyrogliders and Parasails, Unmanned Aircraft (Including Balloons), Kites, and Rockets Operating Rules

Part 101 Gyrogliders and Parasails, Unmanned Aircraft (Including Balloons), Kites, and Rockets Operating Rules Part 101 Compliance Matrix (To be used with Part 102 matrix when making application for a certificate under Part 102) The Rule references in this compliance matrix have been extracted from the Civil Aviation

More information

AMENDMENT No. 8 TO THE INTERNATIONAL STANDARDS AND RECOMMENDED PRACTICES AERODROMES ANNEX 14 TO THE CONVENTION ON INTERNATIONAL CIVIL AVIATION

AMENDMENT No. 8 TO THE INTERNATIONAL STANDARDS AND RECOMMENDED PRACTICES AERODROMES ANNEX 14 TO THE CONVENTION ON INTERNATIONAL CIVIL AVIATION AMENDMENT No. 8 TO THE INTERNATIONAL STANDARDS AERODROMES ANNEX 14 TO THE CONVENTION ON INTERNATIONAL CIVIL AVIATION VOLUME I AERODROME DESIGN AND OPERATIONS The amendment to Annex 14, Volume I contained

More information

Training and licensing of flight information service officers

Training and licensing of flight information service officers 1 (12) Issued: 16 August 2013 Enters into force: 1 September 2013 Validity: Indefinitely Legal basis: This Aviation Regulation has been issued by virtue of Section 45, 46, 119 and 120 of the Aviation Act

More information

AERODROME LICENCE APPLICATION PROCESS

AERODROME LICENCE APPLICATION PROCESS 0000180111 Page 2 Why is a Licence Required? An aerodrome licence is required for a site if it is intended to facilitate operations by commercial transport aircraft, other aerial work other than rotorcraft,

More information

Ground Movement Handling of Large Passenger and Cargo Carrying Aircraft

Ground Movement Handling of Large Passenger and Cargo Carrying Aircraft Airside Operational Instruction TBA Ground Movement Handling of Large Passenger and Cargo Carrying Aircraft Ground Movement Handling of Large Passenger and Cargo Carrying Aircraft Airside Operation Instruction

More information

MCAS CHERRY POINT. Basic Airfield Vehicle Operator Course (AVOC)

MCAS CHERRY POINT. Basic Airfield Vehicle Operator Course (AVOC) MCAS CHERRY POINT Basic Airfield Vehicle Operator Course (AVOC) REFERENCES 1) FAA Handbook 7110.65 (ATC) 2) NAVAIR 00-80T-114 (ATC NATOPS) 3) MCO 1500.19 (Safety Program) 4) AirStaO P 3710.5 (AOM) 5) ATCFacO

More information

Appendix D AIRSIDE VEHICLE DRIVING BEST PRACTICES

Appendix D AIRSIDE VEHICLE DRIVING BEST PRACTICES Appendix D AIRSIDE VEHICLE DRIVING BEST PRACTICES Note. This guidance is a compilation of material drawn from many sources including ICAO, IATA, ACI and a number of aerodromes that already operate vehicle

More information

CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257

CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257 Form PDES 8 THE CITY OF LOS ANGELES CIVIL SERVICE COMMISSION CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257 Summary of Duties: A Senior Airport Engineer performs the more difficult and

More information

Official Journal of the European Union L 59/1. (Non-legislative acts) REGULATIONS

Official Journal of the European Union L 59/1. (Non-legislative acts) REGULATIONS 1.3.2012 Official Journal of the European Union L 59/1 II (Non-legislative acts) REGULATIONS COMMISSION IMPLEMENTING REGULATION (EU) No 173/2012 of 29 February 2012 amending Regulation (EU) No 185/2010

More information

Subject: Automatic Dependent Surveillance-Broadcast (ADS-B) Operations and Operational Authorization

Subject: Automatic Dependent Surveillance-Broadcast (ADS-B) Operations and Operational Authorization OC NO 17 OF 2014 Date: 14 th October 2014 File No AV 22024/30/2014-FSD GOVERNMENT OF INDIA CIVIL AVIATION DEPARTMENT DIRECTOR GENERAL OF CIVIL AVIATION OPERATIONS CIRCULAR Subject: Automatic Dependent

More information

PROTECTED AIRSPACE ASSESSMENT TOOL (PAAT) USER MANUAL

PROTECTED AIRSPACE ASSESSMENT TOOL (PAAT) USER MANUAL PROTECTED AIRSPACE ASSESSMENT TOOL (PAAT) USER MANUAL March 2016 TABLE OF CONTENTS 1.0 INTRODUCTION 1 2.0 STATUTORY APPROVALS PROCESS 2 2.1 PRESCRIBED AIRSPACE 2 2.2 PERTH AIRPORT ASSESSMENT PROCESS 3

More information

Civil Instrument Flight Rules at Military Aerodromes or in Military Controlled Airspace

Civil Instrument Flight Rules at Military Aerodromes or in Military Controlled Airspace Federal Departement of the Environment, Transport, Energy and Communications DETEC Federal Office of Civil Aviation FOCA Safety Division - Flight Operations FOCA GM/INFO Guidance Material / Information

More information

7/1/2014. Class II Driver s License Information and Study Guide

7/1/2014. Class II Driver s License Information and Study Guide 7/1/2014 Class II Driver s License Information and Study Guide TABLE OF CONTENTS I. INTRODUCTION Purpose... 1 General Requirements... 1 Policy Statement... 1 Authority... 2 Procedures For Obtaining an

More information

AERODROME MANUAL. (name) AIRPORT

AERODROME MANUAL. (name) AIRPORT AERODROME MANUAL (name) AIRPORT (MM/YYYY) () (FIRST PUBLISHED IN 1999) Airport Certificate The airport certificate will be found on the next page. Amendment date: 06/2008 (Airport Operator Name) Page 2

More information

Steve Parry has left for pastures new and you can contact Richie Gallagher on Steve s old mobile number

Steve Parry has left for pastures new and you can contact Richie Gallagher on Steve s old mobile number Issue 11 Volume 1 / Issue 9 October 2017 Welcome to the latest edition of Aerodrome Safety Central. The newsletter is published on a quarterly basis and includes articles on Airfield news, Work in Progress

More information

CIVIL AVIATION REGULATIONS PART 10 COMMERCIAL AIR TRANSPORT BY FOREIGN AIR OPERATORS WITHIN FEDERATED STATES OF MICRONESIA

CIVIL AVIATION REGULATIONS PART 10 COMMERCIAL AIR TRANSPORT BY FOREIGN AIR OPERATORS WITHIN FEDERATED STATES OF MICRONESIA CIVIL AVIATION REGULATIONS PART 10 COMMERCIAL AIR TRANSPORT BY FOREIGN AIR OPERATORS WITHIN FEDERATED STATES OF MICRONESIA FEDERATED STATES OF MICRONESIA 2001 [THIS PAGE INTENTIONALLY LEFT BLANK] 10-ii

More information