Aircraft movements and parking stands

Size: px
Start display at page:

Download "Aircraft movements and parking stands"

Transcription

1 1(19) Aircraft movements and parking stands Table of contents 1 General Foreword Aircraft parking stands Planning Airport CDM Push-back De-icing Compass calibration Billing of aircraft parking charge Training requirements Turn-around process Traffic Communication between pilot and ground handling staff Signalling Radio communication Parking stand before aircraft arrival Marshalling Docking guidance systems Push-back Push-back procedures Push and Hold procedure Parking stand after aircraft departure Arrivals Aprons H, J, K, L, M and S De-icing Engine test run station Engine test runs at sites other than the test run station Safety Safety distances Wingtip markings Chocks Foreign object debris (FOD) Snow removal/anti-skid treatment at parking stand Avoidance of jet blasts at Apron F Engine test run Compass calibration Security Environment Idle power Use of APUs De-icing of aircraft at Stockholm Arlanda Airport Sites approved for de-icing Map of sites approved for de-icing Sites for remote de-icing Monitoring and compliance References For further information Reference documentation...19

2 Appendix A Tables aircraft parking stands and push-back procedures Appendix A Danger zones around aircraft A (19)

3 3(19) 1 General 1.1 Foreword This Airport Regulations contains the local regulations in force in the parking, de-icing, engine test runs and compass calibration of aircraft. The regulations are based on rules in the European Aviation Safety Agency (EASA) s statutes with local additions and adjustments for Stockholm Arlanda Airport. These regulations must be followed in operations in conjunction with the parking of aircraft. In cases where the regulations below describe flight deck crew procedures, this is for informational purposes. The regulations for flight deck crew at the airport are mainly controlled through AIP and NOTAM. 1.2 Aircraft parking stands Information about the designation and size of parking stands is described in Appendix A and serves as documentation for the planning of aircraft parking and the allotment of parking stands. Restrictions are indicated in the notes for the stand. 1.3 Planning Swedavia Stockholm Arlanda, Stand & Traffic Planning is the unit responsible for planning aircraft parking at Stockholm Arlanda Airport. The parking stands are allotted by Traffic Planning via air traffic control. The telephone number to Traffic Planning for: Arlanda North, tel Arlanda South, tel The allotment of aircraft stands requires that Traffic Planning has an up-to-date picture of traffic at all times. The company/representative is therefore responsible for contacting Traffic Planning whenever delays are expected or when aircraft are towed from the stand. Notification shall be made to Traffic Planning in close connection with the start of every towing or technical taxiing. Notification shall be made by calling Arlanda Apron at VHF radio MHz, SA Traffic Plan on Airport Radio, Intercom (snabbtelefon) number or telephone Notification shall include the aircraft registration and between what stands/areas the towing/technical taxiing is being carried out. If a parking stand is being used, for instance, temporarily for equipment or for maintenance, the request shall first be submitted to Traffic Planning, which gives approval. Aircraft parked at the terminal for turnaround longer than two hours will be towed away unless otherwise requested, including aircraft parked on the other parking areas shall, upon request of traffic planning towed away within two hours. Contact Traffic Planning for an alternative parking stand. Traffic Planning works using the following timeframes: Code C aircraft: the stand should be prepared no later than 45 minutes before estimated departure time and it should be possible, upon request, to tow the aircraft away 30 minutes after arrival time. Code D aircraft: the stand should be prepared no later than 60 minutes before estimated departure time and it should be possible, upon request, to tow the aircraft away 60 minutes after arrival time. Code E aircraft: the stand should be prepared no later than 90 minutes before estimated departure time and it should be possible, upon request, to tow the aircraft away 60 minutes after arrival time.

4 4(19) Ground handling companies should be informed if the stand cannot be prepared for the aircraft as above. The operator may then for its own production choose a shorter preparation time at the terminal, or choose to handle departure from a remote stand. In case of technical problems after push-back is completed, the aircraft is not normally given priority back to the original parking stand. 1.4 Airport CDM Airport Collaborative Decision Making (A-CDM) facilitates an optimal handling of turnaround processes at the airport in order to increase the efficiency of European airspace (Single European Sky). The following instructions/information apply: Ground handling company and air operator must heed any CDM warnings Ground handling company and air operator are responsible for correct TOBT (aircraft ready) The flight crew must ensure that engine start-up and push-back can be requested within TSAT -/+ 5 min. If the flight is not ready for start-up and push-back within the specified time window, this must be reported to ground handling company responsible for updating TOBT - Note that the EOBT/TOBT may not differ by more than -10/+15 minutes. If the difference is greater, the flight will not be allocated a TSAT. In that case, the A-CDM process slows down and there is a risk in cases where there is a CTOT that the flight will get a new CTOT for push-back as well. The de-icing sequence will be based on the TSAT, and if there is no TSAT there is a risk of lower priority for de-icing. - An upgrade of the visual docking guidance system (VDGS) is in progress, and after the update the system will display three rows: local time, TOBT and TSAT. The row for TOBT will switch between the text TOBT and the time for TOBT. The row for TSAT will switch between the text TSAT and the time for TSAT. The TSAT time will be displayed as soon as it is available, normally about 30 minutes before TOBT. The aim is to have all parking stands equipped with a VDGS. If the flight crew requests start-up after TSAT +5, then ATS must - Notify the flight crew that the TSAT window is closed - Notify the flight crew that they must ask their ground handling company to register new TOBT to get a new TSAT Air operators performing self-handling are responsible for reporting TOBT or changes in TOBT. Contact Stand & Traffic Planning, tel For other A-CDM-related matter, contact cdm@swedavia.se

5 1.5 Push-back A (19) Push-back procedures are presented for the purpose of maintaining an orderly flow of traffic on terminal aprons. These procedures show the direction of the aircraft and where push-back should end. The end position of a push-back is also indicated in order to create the best conditions in terms of workplace health and safety with regard to jet blasts. For these reasons, the procedures shall be respected as far as possible, while taking into account aviation safety. 1.6 De-icing As the airport operator, Swedavia is obliged to ensure that the companies providing air traffic services at the airport are given the opportunity to de-ice their aircraft before take-off if necessary. Methods and procedures must be carried out in compliance with the regulations in force, such as the European Aviation Safety Agency (EASA) s statutes, Airport Regulations and applicable environmental considerations for the use and removal of de-icing fluid. Personnel who perform de-icing or related operations must possess approved, current and valid authorisation. Regardless of what de-icing site is used, the de-icing co-ordinator must be familiar with the site and have knowledge of its features and limitations. The co-ordinator shall also make sure that all personnel who perform de-icing meet the competency requirements that have been established. 1.7 Compass calibration There is currently no dedicated site for compass calibration at the airport. 1.8 Billing of aircraft parking charge When an aircraft parks in a space it is guided to by one of the marshals, Swedavia reserves the right to bill the parking charge directly to the company that towed the aircraft to the space. If the towing is performed at the request of a company other than the one that performed the towing, the company ordering the towing will be billed directly. If this involves technical maintenance, the airport may bill the company that performed the technical maintenance. In that case, direct billing will be on a weekly basis in advance. 1.9 Training requirements, turn-around process All operators who operate passenger bridges (jetties), docking guidance systems and passenger flows must be trained and approved for the tasks. The training process involves the ground handling company in question appointing one or more people that Swedavia trains as superusers. Such people then have authorisation

6 to train operators in their own organisation. Swedavia s training material must be used in the training of the superuser/operator. A (19) 2 Traffic 2.1 Communication between pilot and ground handling staff Communication between pilot and ground handling staff (does not apply to Air Traffic Management) can take place through signalling or radio communication Signalling All signalling between ground handling staff and pilot shall take place in accordance with the Standardised European Rules of the Air (SERA) EU no 923/2012. Daylight-fluorescent wands, marshalling bats or gloves must be used by all ground handling staff for signalling during the daytime. Illuminated wands must be used in darkness or low visibility Radio communication Communication between ground handling staff (for start-up and pushback) and pilot must take place in accordance with TSFS 2013:46 chap 5.

7 7(19) 2.2 Parking stand before aircraft arrival Information about the allotted stand will be given to the pilot via TWR and to ground handling companies via NDS. Before the arrival of the aircraft at the parking stand and before the docking guidance system is activated, the jetty operator in charge of the aircraft is responsible for: ensuring that the parking stand is free of vehicles and equipment ensuring that the parking stand is free of foreign object debris (FOD) checking that no equipment may be damaged or may damage the jetty while the jetty is being manoeuvred. For stands that do not have a jetty, someone is delegated by the apron manager or trained marshall to ensure the above. 2.3 Marshalling With some exceptions, most aircraft parking stands at Stockholm Arlanda Airport are equipped with precision fixed parking aids (docking guidance systems). At stands where aircraft are not approved for docking guidance system use, where such aids are not present or are out of order, manual marshalling or towing will be performed. For assistance with manual marshalling, contact the Apron Tower. In case of manual marshalling, the marshall is responsible for ensuring that: before marshalling begins, the parking stand is free of objects or equipment that may damage the aircraft. marshalling is performed only by authorised personnel (a person approved by Swedavia). marshalling is performed in accordance with the marshalling signals specified in EU no. 923/2012 (SERA) and TSFS 2014:71. unless otherwise stated, the parking aid is not activated vehicles or personnel do not remain or pass between marshalling personnel and aircraft while marshalling is underway 2.4 Docking guidance systems Activation of fixed parking aids is not only a form of guidance to the pilot but also an acknowledgement that the parking stand is free from objects, equipment or personnel that may damage/suffer damage or injury from the aircraft. When a stand is equipped with a fixed parking aid, the ground handling company for each aircraft is responsible for ensuring that: the parking aid is operated only by qualified personnel the parking aid is operated according to Swedavia s training material before the arrival of the aircraft, the parking aid is activated to accommodate the right aircraft type and, as appropriate, the right version before activation of the fixed parking aid, the parking stand has been inspected and found free of equipment, objects or personnel that may damage/suffer damage or injury from the aircraft while the aircraft is taxiing in, the parking aid is checked to verify that its function will follow expected behaviour throughout the docking procedure

8 in case of irregularities in the docking procedure, or system error, the emergency stop button is activated any error or irregularity noted in the system is reported to the Arlanda Service Center tel A (19) no vehicles or personnel remain or pass between the aircraft and the docking system during the docking procedure. 2.5 Push-back Push-back in conjunction with towing shall be preceded by contact with TWR. The tables for aircraft parking stands provide where push-back is to be carried out, and the push-back procedures show how this is to be carried out. For push-back procedures where push-back is to be carried out, see Appendix A Tables aircraft parking stands and push-back procedures. Reversing of aircraft engines as an alternative to push-back is not allowed. Aircraft may not taxi or be towed between a building and another aircraft that is undergoing or has completed push-back, without conveying information about this to the pilots and the push-back supervisors by the aircraft or once pushback is completed. When push-back is being performed simultaneously from two adjacent or opposing stands and the push-back supervisors and pilots have not mutually agreed otherwise in advance, the pushback from the stand with the lower number is entitled to go first Push-back procedures Ground handling companies must ensure in their procedures for carrying out push-back and training that the operator of the TBL vehicle completely avoids operating on or over centreline lighting when driving with the cradle in the lowered position. This procedure shall ensure that the lights are not damaged. 2.6 Push and Hold procedure In order to increase availability of parking stands, when flights have received or expect a delayed off-block time, the Push and Hold procedure is available. Push and Hold applies to departing aircraft after a request from Traffic Planning. Depending on availability, both the apron and taxiways can be used for parking. Availability will depend on the traffic situation at the time. Traffic Planning takes the decision in cooperation with TWR and in dialogue with the relevant airline/handling agent. The airport can accommodate 4 aircraft for Push and Hold simultaneously. Air traffic control can reduce the number of waiting aircraft in order to avoid blocking the taxiway system. Push and Hold allows for punctual off-block times, for delays up to 90 minutes. For delays in excess of 90 minutes the flight will be given the option to park in a position suitable to the extended delay. 2.7 Parking stand after aircraft departure After the aircraft s departure, the start-up leader is responsible for ensuring that:

9 the parking stand is free from vehicles and materials. the parking stand is free from FOD. cables and hoses are rolled and hung up. wheel chocks and cones are properly rolled and hung up. A (19) After the aircraft s departure, the jetty operator is responsible for ensuring that: the jetty has been moved to parking position and that no equipment has been left below or adjacent to the jetty that may be damaged or damage the jetty while it is being manoeuvred. the fixed parking aid has been de-activated or turned off. 2.8 Arrivals Aprons H, J, K, L, M and S Companies that conduct operations at Aprons H, J, L and M as well as in the hangar areas at Aprons K and S are responsible for meeting and receiving aircraft that will park there. These companies are responsible for reporting to Traffic Planning that this will take place. This in turn ensures that the aircraft is cleared straight to the intended apron. The following procedure shall be adhered to: Prior to landing, companies shall report to Traffic Planning that a given flight will be going to Apron H, J, K, L, M or S. A representative of the company shall ensure that the relevant requirements according to sections 2.1, 2.2, 2.3, 3.1 and 3.4 below are met. Prior to taxiing to the apron, a representative of the company shall be on the spot to signal stop at the marked position so that taxiing can be carried out without the aircraft being forced to stop so that taxiways or vehicle routes are blocked. 2.9 De-icing Aircraft movements, i.e. taxiing, towing and movements to and/or from the de-icing site, are controlled by directions in AIP/NOTAM and by instructions from the air traffic control tower (TWR). For aircraft using Runway 01L/19R, 01R/19L and 08/26 for take-off, de-icing takes place where approved at the aircraft parking stand, or at another assigned site approved for de-icing, according to sections and below. For aircraft that use Runway 01R/19L for take-off, it is no longer a requirement that de-icing must take place on Apron M. Given that it is no longer required that de-icing must take place on Apron M for aircraft taking off on Runway 01R/19L, Traffic Planning will no longer send out text messages (SMS) when there is a change in runways. On those occasions when there is taxiing towards Apron M so that an aircraft can be de-iced on Apron M, the pilot is assigned a de-icing pad on Apron M by calling the Arlanda Apron at VHF frequency MHz. If de-icing is to be carried out on Apron M for aircraft taxiing in with the intention of de-icing on Apron M, the de-icing company is responsible for ensuring that the check is carried out according to section 3.4 below and then informing Traffic Planning that it is clear for aircraft to taxi in by calling the Arlanda Apron.

10 At any time the weather situation makes only single-runway operations (take-off from Runway 01L) possible, the airport may decide through TTF (the Tactical Traffic Forum) to perform remote de-icing at Apron S and/or R (see section below). A (19) 2.10 Engine test run station Booking of the engine test run station (motorkörningsplatsen) is handled by Traffic Planning, Planning Position Arlanda North (Nord). Errors, deficiencies or damage at an engine test run station must be reported without delay to Traffic Planning Arlanda North. In addition to regulations in force in the European Aviation Safety Agency (EASA) s statutes concerning test runs of aircraft engines in connection with maintenance measures, the following applies: Aircraft engine tune-up and test runs must occur at the engine test run station located at Apron H, unless otherwise stated below. If an aircraft engine is to be test run with an output of up to 70 per cent, the aircraft must be parked with its main landing gear within the marked area inside the engine test run station. If an aircraft engine is to be test run with an output of 70 per cent or more, the aircraft must be parked with its main landing gear within the marked area located about 17 m in front of the outer gate rail. Taxiing into the engine test run station using the aircraft s own engine is not allowed. Wheel chocks must be used on the aircraft during an engine test run. The following aircraft types must use a site other than the engine test run station: Aircraft with a wingspan greater than 55m. Code D and larger aircraft with a tail engine.

11 11(19) 2.11 Engine test runs at sites other than the test run station In case of test runs for aircraft types that are not approved or cannot be operated at the above engine test run station, the aircraft shall be referring to alternative sites. The following alternative sites have been approved 1) At 450m, beginning of Runway 26 2) At 450m, beginning of Runway 19L 3) At 450m, beginning of Runway 19R The choice of site shall be based on the following prioritisation 1. Noise 2. Traffic situation 3. Wind direction The following procedure must be applied: The person responsible for the engine testing contacts Traffic Planning, Planning Position Arlanda North (Nord) about the request at least one hour before the scheduled time. Traffic Planning submits an assignment related to the engine test run request to the Airport Technical & Operative Supervisor (ATOS). ATOS is responsible for coordinating the assignment together with TWR and the Operator. Traffic Planning keeps a logbook of the number of engine test runs that take place at alternative sites between p.m. and 6.00 a.m. local time. This is in order to comply with the Swedish Environmental Protection Agency s general advice about national aviation noise levels. 3. Safety 3.1 Safety distances Commanding officers on board aircraft are responsible for avoiding any collision between aircraft and objects or vehicles. If the stand allocated is not suitable for practical reasons, the commanding officer shall inform Air Traffic Control Tower (TWR) that another parking stand is desired. After this, Stand & Traffic Planning makes a decision regarding the possibility of allowing a change in the parking stand allocation. Ground handling companies are responsible for ensuring that safety distances are maintained at the parking stand and that the stand is free of loose objects, both upon the arrival of the aircraft and after its departure. If safety distances cannot be maintained, the ground handling company is responsible for interrupting the procedure and correct, also inform and making the flight deck crew and ATOS aware of this. The safety area represents the area within the red painted safety line at the stand. The safety area also includes surface areas below and within the manoeuvring area of the jetty. An area marked by barriers indicates that equipment may never be placed here.

12 12(19) Push-back supervisors are responsible for ensuring that no collision occurs with vehicles or objects during push-back. When there is a risk of collision, interrupt the procedure and inform the commanding officer. See also Appendix A Danger zones around aircraft. 3.2 Wingtip markings When aircraft are parked at Stockholm Arlanda Airport, their wingtips must be marked with cones. The purpose is to increase awareness of the aircraft s dimensions in order to avoid a collision. Swedavia is responsible for supplying the cones. The responsibility for setting out and removing the cones rests with the ground handling company serving the aircraft in question. The cones are placed in accordance with the airline s regulations and procedures. If there are no such airline regulations, the IATA standards for the placement of cones are to be used. The cones shall be in contrast to the surroundings and furnished with reflective material so that they are also visible in low visibility conditions. For aircraft departure, the cones must be removed in a coordinated manner. The cones must be kept in their designated space when they are not in use. 3.3 Chocks At Stockholm Arlanda, wheel chocks are used for aircraft parking to ensure that the aircraft cannot start moving when the aircraft s brakes have been released or when the aircraft has been released from the tow or pushback tractor. The responsibility for placing and removing chocks lies with the ground handling company involved. In the placing of chocks, the ground company involved is responsible for keeping the surface free of snow, ice, sand or other material that can cause friction between the chocks and the surface to deteriorate when the chocks are being put in place. The chocks are placed as specified in the airline s rules and procedures, although the minimum requirement is that two pairs of chocks must always be used for Code C aircraft or larger. The chocks must be placed under the landing gear s two main wheels or else one must be placed under one of the main wheel and the other under the nose wheel. If chocks under the nose wheel are removed before the tow or pushback tractor is connected, chocks must be placed under both main wheels. 3.4 Foreign object debris (FOD) Everyone who is in the airside area of the airport has a responsibility and a duty to remove foreign object debris (FOD) that may cause damage to aircraft. The ground handling company at a parking stand is responsible for performing an FOD check before aircraft arrival and after aircraft departure. This check also includes inspecting for, securing and removing equipment or objects that may damage aircraft or

13 jetties. This responsibility also includes reporting FOD to the airport personnel in charge on those occasions when it is not immediately possible to remove the object personally. A (19) At remote de-icing sites, de-icing companies are responsible for performing an FOD check. The check also includes a check for, securing and removal of equipment or objects that could damage aircraft. This responsibility also includes reporting to the airport personnel in charge on occasions when someone cannot immediately remove an object.

14 14(19) When strong winds are expected in the airport area, ground handling companies must ensure that all equipment and other objects cannot be blown away and cause injury or damage to aircraft or to the property of the ground handling company or others. The procedure for this shall be clearly specified in the ground handling company s procedures. 3.5 Snow removal/anti-skid treatment at parking stand Snow removal and anti-skid treatment is normally performed by the Swedavia field service at the airport in accordance with a prioritised procedure. However, the operator/ground handling company is responsible for checking before the arrival/departure of an aircraft that passenger/employees can move safely at all times, and for performing anti-skid treatment as needed, for example on the apron, stairs and passageways used by passengers, using the equipment that has been provided. For co-ordination of large-scale anti-skid treatment, the snow coordinator must be contacted, telephone Avoidance of jet blasts at Apron F To avoid jet blasts affecting parked aircraft at Apron F, the following procedure applies: Aircraft that have parked aircraft behind them at any time during taxiing in or out shall not use higher power than idle thrust. To avoid any use of break-away thrust, aircraft that have been stopped for any reason under these conditions must request assistance to be pulled into their final parking position or to a position where the use of break-away power no longer constitutes any hazard. 3.7 Engine test run Before any engine test run, the person responsible for the test run must ensure that an inspection of the engine test run site has been conducted with regard to persons that may be injured or equipment that may be damaged. During any engine test run, the person responsible for the test run must ensure that no person is injured or property is damaged or, if this is the case, must interrupt the procedure. 3.8 Compass calibration With this document, the rules and regulations in effect for the compass calibration base have been complied with, and any risks to aviation safety are thus mitigated. 4. Security The Swedavia Arlanda Security Department ARNMS is responsible in consultation with the Arlanda Police or the airline in question for any security arrangements for aircraft parked on the aprons.

15 15(19) Environment 5.1 Idle power Idle power is allowed for a limited period a maximum of 5 minutes when a brief technical inspection is needed. The procedure shall occur under the responsibility of the start-up manager. 5.2 Use of APUs Auxiliary power units (APUs) PU may be started/used no earlier than 5 minutes before the estimated time of push-back or taxiing and no more than 5 minutes after the aircraft is on block. If an APU needs to be used for a longer period, this may only occur following an agreement with the ground handling company in question. Use of APU in technical positions and in connection with the technical inspection shall be for environmental reasons minimized. 5.3 De-icing of aircraft at Stockholm Arlanda Airport All de-icing fluid spilled on the ground during de-icing of aircraft must be recovered. In addition, the following applies: The right to perform de-icing is granted only on the condition that the contractor ensures that de-icing fluid found on the ground after de-icing has been performed is immediately suctioned from the ground surface. De-icing of aircraft may only occur at the sites listed under section and below. Before de-icing begins, the de-icing company must be notified. This company must ensure that a suction vehicle for recovery of de-icing fluid is manned and in operation. However, during the period September 16-May 15, de-icing staff are on continuous stand-by. If de-icing is carried out between May 15 and September 16, the Arlanda Service Center shall be notified immediately when the de-icing order has been submitted. This is so that operations staff can switch the glycol valves to their winter position. Telephone Arlanda Service Center De-icing fluid may only be applied just before an aircraft s departure. If de-icing fluid must be applied at a time other than directly before departure, the aircraft must immediately be moved away, once the deicing fluid has been applied, to permit recovery of de-icing fluid. Suction recovery of de-icing fluid must begin immediately after an aircraft has left its parking stand. An aircraft may not be moved to a stand where de-icing has been performed before the de-icing fluid has been recovered. Aircraft that have carried out the preventive de-icing procedure at T2 may taxi out to Runway 01R or 19L for take-off. Suctioned glycol may only be emptied at the A-glycol tip facility located southwest of the end of Runway 01L.

16 16(19) Sites approved for de-icing At Stockholm Arlanda, the day markings for de-icing areas are marked with a double unbroken white line, within which de-icing must occur. Site Parking stand Remarks Terminal , Terminal Stop bar W may be used as needed when completing full body de-icing on A320. Stop bar W can be found at the following stands: 31, 32, 33, 34, 35, 37, 38, 39, 40, 41och 43. Terminal , 60A Terminal De-icing occurs after push-back is completed. However, the preventive deicing procedure is permitted at the parking stand Terminal 2 remote 69, 69L and 69R Terminal F F28 F44 Apron D Apron E Apron G Apron G remote G149 Contact Traffic Planning before taxiing to G149 for de-icing, if the aircraft has not been parked there. This is to ensure that taxiing in is possible given the use of neighbouring parking stands and the wingspan limit of m. Apron M M5 M9 Apron R R3 R10, R9C R10A Apron R remote Marked site between the taxiing lines R5 and R6 The de-icing site is limited to aircraft with a maximum wingspan of m Apron S remote Marked de-icing site north of SC The de-icing site is limited to aircraft with a maximum wingspan of m

17 5.3.2 Map of sites approved for de-icing A (19)

18 5.3.3 Sites for remote de-icing A (19)

19 19(19) 6. Monitoring and compliance - 7. References 7.1 For further information Questions concerning stand availability Swedavia Stand & Traffic Planning ARNOAT Questions concerning engine test run sites Swedavia Stand & Traffic Planning ARNOAT Questions concerning CDM cdm@swedavia.se Questions concerning compass calibration Swedavia Stand & Traffic Planning ARNOAT Other questions Stand & Traffic Planning ARNOAT Ground Operations Manager ARNOAx Reference documentation Appendix A Tables aircraft parking stands and push-back procedures. Appendix A Danger zones around aircraft

FRA CDM. Airport Collaborative Decision Making (A-CDM) Flight Crew Briefing FRANKFURT AIRPORT. German Harmonisation

FRA CDM. Airport Collaborative Decision Making (A-CDM) Flight Crew Briefing FRANKFURT AIRPORT. German Harmonisation Airport Collaborative Decision Making (A-CDM) CDM Airport @ FRA Flight Crew FRANKFURT AIRPORT Table of contents: 1. General... 3 2. Target Off Block Time (TOBT)... 4 2.1 Automatically generated TOBT...

More information

7/24/2013. Ramp Service Operations. Definition. Apron

7/24/2013. Ramp Service Operations. Definition. Apron Ramp Service Operations IAV200 Week 6 1 Definition The airport apron or Ramp is the area of an airport where aircrafts are parked, unloaded or loaded, refueled, or boarded. 2 Apron 3 1 Taxi way & Runway

More information

TANZANIA CIVIL AVIATION AUTHORITY SAFETY REGULATION CHECKLIST FOR INSPECTION OF SURFACE MOVEMENT GUIDANCE CONTROL SYSTEM (SMGCS)

TANZANIA CIVIL AVIATION AUTHORITY SAFETY REGULATION CHECKLIST FOR INSPECTION OF SURFACE MOVEMENT GUIDANCE CONTROL SYSTEM (SMGCS) Page 1 of 11 AERODROME NAME: ICAO REFERENCE CODE: TRAFFIC DENSITY CLASS: (see Note 3) VISIBILITY CONDITION: (see Note 3) AERODROME INSPECTOR: DATE: S/N ICAO A SURFACE MOVEMENT GUIDANCE CONTROL SYSTEM 1

More information

Access to and security of the airport

Access to and security of the airport 1(8) Access to and security of the airport Table of contents 1. General... 2 2. Traffic... 2 3. Safety... 2 4. Security... 2 4.1 Access to authorisation areas... 2 4.2 Authorisation documents... 3 4.2.1

More information

AIRFIELD OPERATIONAL INSTRUCTION 26 GENERAL AVIATION OPERATIONS

AIRFIELD OPERATIONAL INSTRUCTION 26 GENERAL AVIATION OPERATIONS AIRFIELD OPERATIONAL INSTRUCTION 26 GENERAL AVIATION OPERATIONS Return to Contents Page Liverpool John Lennon Airport 0 20161012LJAAOI26V6.0pdf AIRFIELD OPERATIONAL INSTRUCTION 26 GENERAL AVIATION OPERATIONS

More information

London City Airport. 43 years

London City Airport. 43 years ACCIDENT Aircraft Type and Registration: No & Type of Engines: Dassault Falcon 7X, VQ-BSO 3 Pratt & Whitney Canada PW307A engines Year of Manufacture: 2009 (Serial no: 64) Date & Time (UTC): Location:

More information

LFPG / Paris-Charles de Gaulle / CDG

LFPG / Paris-Charles de Gaulle / CDG This page is intended to draw commercial and private pilots attention to the aeronautical context and main threats related to an aerodrome. They have been identified in a collaborative way by the main

More information

Basic assignment of responsibilities

Basic assignment of responsibilities 1(7) Basic assignment of responsibilities 1. General... 1 2. The airport s general permit to operate the airport... 1 2.1 Aviation safety requirements... 1 2.2 Environmental requirements... 2 2.3 Requirements

More information

WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY. Ermenando Silva APEX, in Safety Manager ACI, World

WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY. Ermenando Silva APEX, in Safety Manager ACI, World WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY Ermenando Silva APEX, in Safety Manager ACI, World Aerodrome Manual The aim and objectives of the aerodrome manual and how it is to be used by operating

More information

OPERATIONAL SAFETY POLICY GROUND RUNNING OF AIRCRAFT MARCH This document is uncontrolled when printed

OPERATIONAL SAFETY POLICY GROUND RUNNING OF AIRCRAFT MARCH This document is uncontrolled when printed OPERATIONAL SAFETY POLICY GROUND RUNNING OF AIRCRAFT MARCH 2015 Produced by Melbourne Airport in the interest of Airport Safety and Security Printed on Maine Recycled Digital Paper Table of Contents SECTION

More information

CAUTION! JET BLAST ON APRON

CAUTION! JET BLAST ON APRON CAUTION! JET BLAST ON APRON 23.-24.5.2017 2 Prague Airport video Prague Airport facts and figures Prague Airport Václav Havel Main Gateway to the Czech Republic LKPR / PRG 11 km distance from the downtown

More information

REPUBLIC OF SINGAPORE AERONAUTICAL INFORMATION SERVICES CIVIL AVIATION AUTHORITY OF SINGAPORE SINGAPORE CHANGI AIRPORT P.O. BOX 1, SINGAPORE

REPUBLIC OF SINGAPORE AERONAUTICAL INFORMATION SERVICES CIVIL AVIATION AUTHORITY OF SINGAPORE SINGAPORE CHANGI AIRPORT P.O. BOX 1, SINGAPORE Telephone: (65) 6595 6051 AFS: WSSSYNYX Facsimile: (65) 6441 0221 caas_singaporeais@caas.gov.sg www.caas.gov.sg REPUBLIC OF SINGAPORE AERONAUTICAL INFORMATION SERVICES CIVIL AVIATION AUTHORITY OF SINGAPORE

More information

GENERAL 1. What is Airport CDM? 2. What is the aim of A-CDM? 3. Why has A-CDM been implemented at Amsterdam Airport Schiphol?

GENERAL 1. What is Airport CDM? 2. What is the aim of A-CDM? 3. Why has A-CDM been implemented at Amsterdam Airport Schiphol? GENERAL 1. What is Airport CDM? A-CDM stands for Airport Collaborative Decision Making and means that joint decisions are made by all operational partners the airport, air traffic control, the airlines,

More information

TERRACE-KITIMAT AIRPORT SOCIETY APRON MANAGMENT PLAN

TERRACE-KITIMAT AIRPORT SOCIETY APRON MANAGMENT PLAN TERRACE-KITIMAT AIRPORT SOCIETY 2018-19 APRON MANAGMENT PLAN Table of Contents List of Effective Pages... 3 Manual Distribution and Amendment Procedures... 5 Record of Amendments... 5 Apron Management

More information

INTRODUCTION OF AIRPORT COLLABORATIVE DECISION MAKING (A-CDM) AT SINGAPORE CHANGI AIRPORT

INTRODUCTION OF AIRPORT COLLABORATIVE DECISION MAKING (A-CDM) AT SINGAPORE CHANGI AIRPORT Telephone: (65) 6595 6051 AFS: WSSSYNYX Facsimile: (65) 6441 0221 caas_singaporeais@caas.gov.sg www.caas.gov.sg REPUBLIC OF SINGAPORE AERONAUTICAL INFORMATION SERVICES CIVIL AVIATION AUTHORITY OF SINGAPORE

More information

East Midlands Airport 2018 Aerodrome Manual

East Midlands Airport 2018 Aerodrome Manual East Midlands Airport 2018 Aerodrome Manual Version 1.0 Not Valid after 31 st December 2018 Department Operations Document Owner Operations Director (Accountable Manager) Document Administrator Ops Development

More information

Advisory Circular CT

Advisory Circular CT (CAA logo, name of the country, etc.) Advisory Circular CT-42-009 SUBJECT: Airport Movement Area and Related Facilities Maintenance DATE: MM/YYYY ASSOCIATED RULES According with (name of the country) Civil

More information

THE CIVIL AVIATION AUTHORITY OF THAILAND. Aeronautical Information Service Department AIP SUPPLEMENT

THE CIVIL AVIATION AUTHORITY OF THAILAND. Aeronautical Information Service Department AIP SUPPLEMENT THE CIVIL AVIATION AUTHORITY OF THAILAND AIRAC Phone: 66 02 568 8831 Fax: 66 02 576 1903 Aeronautical Information Service Department AIP SUPPLEMENT AFTN: VTBAYOYX E-mail: aisthai@caat.or.th 333/105 Lak

More information

CIVIL AVIATION AUTHORITY, PAKISTAN OPERATIONAL CONTROL SYSTEMS CONTENTS

CIVIL AVIATION AUTHORITY, PAKISTAN OPERATIONAL CONTROL SYSTEMS CONTENTS CIVIL AVIATION AUTHORITY, PAKISTAN Air Navigation Order No. : 91-0004 Date : 7 th April, 2010 Issue : Two OPERATIONAL CONTROL SYSTEMS CONTENTS SECTIONS 1. Authority 2. Purpose 3. Scope 4. Operational Control

More information

USE OF RADAR IN THE APPROACH CONTROL SERVICE

USE OF RADAR IN THE APPROACH CONTROL SERVICE USE OF RADAR IN THE APPROACH CONTROL SERVICE 1. Introduction The indications presented on the ATS surveillance system named radar may be used to perform the aerodrome, approach and en-route control service:

More information

MANCHESTER AIRPORT AIRCRAFT PUSHBACK PROCEDURES. Effective from 27th November :01 hrs local.

MANCHESTER AIRPORT AIRCRAFT PUSHBACK PROCEDURES. Effective from 27th November :01 hrs local. MANCHESTER AIRPORT AIRCRAFT PUSHBACK PROCEDURES Effective from 27th November 2018. 00:01 hrs local. Operational changes from previous revision; TRPs 216 and NA permanently withdrawn from use. Choice of

More information

Executive Summary Introduction

Executive Summary Introduction Executive Summary This interim voluntary Code of Practice has been compiled by a group representing airlines, airports, air traffic control, the Civil Aviation Authority (CAA) and A D S (formerly the Society

More information

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) Part 173 FLIGHT CHECKING ORGANISATION APPROVAL Published by Air Safety Support International Ltd Air Safety Support International Limited 2005 ISBN 0-11790-410-4

More information

REPORT IN-011/2012 DATA SUMMARY

REPORT IN-011/2012 DATA SUMMARY REPORT IN-011/2012 DATA SUMMARY LOCATION Date and time Site Saturday, 13 April 2012; 20:17 UTC Seville Airport (LEZL) (Spain) AIRCRAFT Registration EI-EBA EI-EVC Type and model BOEING 737-8AS BOEING 737-8AS

More information

Chapter 6. Airports Authority of India Manual of Air Traffic Services Part 1

Chapter 6. Airports Authority of India Manual of Air Traffic Services Part 1 Chapter 6 6.1 ESSENTIAL LOCAL TRAFFIC 6.1.1 Information on essential local traffic known to the controller shall be transmitted without delay to departing and arriving aircraft concerned. Note 1. Essential

More information

ATM REGIONAL CONTINGENCY PLAN FOR.. CTA/UTA/FIR

ATM REGIONAL CONTINGENCY PLAN FOR.. CTA/UTA/FIR ATM REGIONAL CONTINGENCY PLAN FOR.. CTA/UTA/FIR OBJECTIVE: This ATS Contingency plan s objective is to ensure the continued safety and supplies of air navigation services in the event of partially or total

More information

ICAO Aerodrome s Manual. AERODROME S INSPECTOR WORKSHOP St. Maarten, MAHO June 2012

ICAO Aerodrome s Manual. AERODROME S INSPECTOR WORKSHOP St. Maarten, MAHO June 2012 ICAO Aerodrome s Manual AERODROME S INSPECTOR WORKSHOP St. Maarten, MAHO 11-15 June 2012 Objectives - Identify the requirements listed in Annex 14 regarding the development and maintenance of an aerodrome

More information

Target Off-Block Time (TOBT)

Target Off-Block Time (TOBT) Target Off-Block Time (TOBT) What is TOBT? TOBT Definition (EUROCONTROL, A-CDM Manual version 4): The time that an Aircraft Operator (AO) or Ground Handler (GH) estimates that an aircraft will be ready,

More information

Ground Movement Handling of Large Passenger and Cargo Carrying Aircraft

Ground Movement Handling of Large Passenger and Cargo Carrying Aircraft Airside Operational Instruction TBA Ground Movement Handling of Large Passenger and Cargo Carrying Aircraft Ground Movement Handling of Large Passenger and Cargo Carrying Aircraft Airside Operation Instruction

More information

Vancouver Airport Authority. Contractor Safety Management Program [CSMP] Airside Contractor & Construction Safety

Vancouver Airport Authority. Contractor Safety Management Program [CSMP] Airside Contractor & Construction Safety Vancouver Airport Authority Contractor Safety Management Program [CSMP] Airside Contractor & Construction Safety - 2017 CSMP Contractor Expectations - 2017 i Contents Contents Contents Introduction ii

More information

An advisory circular may also include technical information that is relevant to the rule standards or requirements.

An advisory circular may also include technical information that is relevant to the rule standards or requirements. Advisory Circular AC61-19 Pilot Licences and Ratings Flight Examiner Ratings Revision 13 02 July 2018 General Civil Aviation Authority advisory circulars contain guidance and information about standards,

More information

B.C. MINISTRY OF TRANSPORTATION. SA17 Local Area Specification #2 SMALL AIRPORT WINTER MAINTENANCE

B.C. MINISTRY OF TRANSPORTATION. SA17 Local Area Specification #2 SMALL AIRPORT WINTER MAINTENANCE 1. OBJECTIVE B.C. MINISTRY OF TRANSPORTATION SA17 SMALL AIRPORT WINTER MAINTENANCE To ensure the Anahim Lake airport is kept open and safe for small airport users. 2. GENERAL PERFORMANCE SPECIFICATIONS

More information

Effective: AUSTRALIAN INTERNATIONAL AIRSHOW AVALON 2019, AVALON AIRPORT 19 FEBRUARY - 5 MARCH 2019, IFR OPERATIONS AVALON AIRPORT

Effective: AUSTRALIAN INTERNATIONAL AIRSHOW AVALON 2019, AVALON AIRPORT 19 FEBRUARY - 5 MARCH 2019, IFR OPERATIONS AVALON AIRPORT AUSTRALIA AERONAUTICAL INFORMATION SERVICE AIRSERVICES AUSTRALIA GPO BOX 367, CANBERRA ACT 2601 Phone: 02 6268 4874 Email: aim.editorial@airservicesaustralia.com Effective: AIP SUPPLEMENT (SUP) H 02/19

More information

AERONAUTICAL INFORMATION CIRCULAR 1/19

AERONAUTICAL INFORMATION CIRCULAR 1/19 NAV CANADA 31 JAN 19 AERONAUTICAL INFORMATION CIRCULAR 1/19 NOTICE OF MANDATE TO APPLY AIRPORT COLLABORATIVE DECISION MAKING (A-CDM) PROCEDURES AT TORONTO/LESTER B. PEARSON INTERNATIONAL AIRPORT 1.0 Date

More information

Intentionally left blank

Intentionally left blank Intentionally left blank Contents 1. Introduction... 3 2. What is Airport Collaborative Decision Making?... 3 3. Operating concept at Changi... 3 a) Target off Block Time (TOBT)... 3 Who is responsible

More information

Description of Airport Charges. Swedavia AB Appendix 3 to Conditions of Services, Swedavia AB

Description of Airport Charges. Swedavia AB Appendix 3 to Conditions of Services, Swedavia AB Description of Airport Charges Swedavia AB 2016 Appendix 3 to Conditions of Services, Swedavia AB Contents 1 Swedavias Charges... 3 2 Aircraft Related Charges... 4 2.1 Take-Off Charge... 4 2.2 Emission

More information

PART D SECTION 2 STAND ALLOCATION

PART D SECTION 2 STAND ALLOCATION D-2-1 AIRPORT OPERATIONS MANUAL AIRFIELD OPERATIONS 7 March 2014 PART D SECTION 2 STAND ALLOCATION 1. Overview To optimize the overall utilization of aircraft parking facilities, aircraft stands for passenger

More information

Changi Airport A-CDM Handbook

Changi Airport A-CDM Handbook Changi Airport A-CDM Handbook Intentionally left blank Contents 1. Introduction... 3 2. What is Airport Collaborative Decision Making?... 3 3. Operating concept at Changi... 3 a) Target off Block Time

More information

TUCSON INTERNATIONAL AIRPORT (TUS) DISABLED AIRCRAFT RECOVERY PLAN Section TABLE OF CONTENTS Page

TUCSON INTERNATIONAL AIRPORT (TUS) DISABLED AIRCRAFT RECOVERY PLAN Section TABLE OF CONTENTS Page TUCSON INTERNATIONAL AIRPORT (TUS) DISABLED AIRCRAFT RECOVERY PLAN Section TABLE OF CONTENTS Page 1.0 Disabled Aircraft Recovery Plan Overview 4 1.1 Overview 4 2.0 Aircraft Incident/Accidents 6 3.0 TAA

More information

Airport Rules and Regulations

Airport Rules and Regulations Airport Rules and Regulations 10/10/2017 Contents 1 General information... 3 2 Users information... 3 2.1 Accessibility... 3 2.2 Emergency numbers... 3 2.3 Safety Department... 4 2.4 Security Control Centre...

More information

Appendix D AIRSIDE VEHICLE DRIVING BEST PRACTICES

Appendix D AIRSIDE VEHICLE DRIVING BEST PRACTICES Appendix D AIRSIDE VEHICLE DRIVING BEST PRACTICES Note. This guidance is a compilation of material drawn from many sources including ICAO, IATA, ACI and a number of aerodromes that already operate vehicle

More information

COMMISSIONING OF ADDITIONAL AIRCRAFT STANDS KEMPEGOWDA INTERNATIONAL AIRPORT BENGALURU (VOBL)

COMMISSIONING OF ADDITIONAL AIRCRAFT STANDS KEMPEGOWDA INTERNATIONAL AIRPORT BENGALURU (VOBL) TEL: 91-11-24632950 Extn: 2219/2233 AFS: VIDDYXAX FAX: 91-11-24615508 Email: gmais@aai.aero AIRAC AIP SUPPLEMENT File No. AAI/ATM/AIS/09-09/2018 Following supplement is issued for information, guidance

More information

Aircraft Staging & Parking Plan

Aircraft Staging & Parking Plan Aircraft Staging & Parking Plan Aviation Services Creation Date: 14 September 2015 Version: 3.3 Document Control Version History Version Date Changes 3.0 1 July 2014 Updated to current style. LDS Section

More information

AIRPORT PROCEDURE AIR 002

AIRPORT PROCEDURE AIR 002 INDEX 1. Objective and Scope of Application...2 2. References...2 3. DEFINITIONS...2 4. GENERAL PROVISIONS...3 5. GENERAL AVIATION SLOT MANAGEMENT - G.A.S.M...3 6. AIRCRAFT APRONS AND STANDS...3 7. PPR

More information

Los Angeles International Airport Rules and Regulations SECTION 04 AIRCRAFT OPERATIONS

Los Angeles International Airport Rules and Regulations SECTION 04 AIRCRAFT OPERATIONS 4.1 Operation of Aircraft 4.1.1 All persons who navigate, land, service, maintain, or repair aircraft shall do so in conformity with Federal Aviation Administration (FAA), Transportation Security Administration

More information

COMMISSION IMPLEMENTING REGULATION (EU)

COMMISSION IMPLEMENTING REGULATION (EU) 18.10.2011 Official Journal of the European Union L 271/15 COMMISSION IMPLEMENTING REGULATION (EU) No 1034/2011 of 17 October 2011 on safety oversight in air traffic management and air navigation services

More information

APRON MANAGEMENT SERVICES

APRON MANAGEMENT SERVICES AC-AD-029 APRON MANAGEMENT SERVICES GENERAL The Ghana Civil Aviation Authority (GCAA) Advisory Circulars from Aerodrome Safety and Standards (ASAS) contain information about standards, practices and procedures

More information

1.0 PURPOSE. a) Ensure safe movement with the objective of preventing collisions between aircraft, and between aircraft and obstacles;

1.0 PURPOSE. a) Ensure safe movement with the objective of preventing collisions between aircraft, and between aircraft and obstacles; 1.0 PURPOSE Page 1 of 5 The purpose of this Advisory Circular (AC) is to provide guidance to the aerodrome operators in adopting operational procedures and principles for apron management. The aerodrome

More information

STANDARD OPERATING PROCEDURES TACTICAL OPERATIONS b AIRCRAFT INCIDENTS AND ACCIDENTS EFFECTIVE: OCTOBER 2007

STANDARD OPERATING PROCEDURES TACTICAL OPERATIONS b AIRCRAFT INCIDENTS AND ACCIDENTS EFFECTIVE: OCTOBER 2007 STANDARD OPERATING PROCEDURES TACTICAL OPERATIONS 202.15b AIRCRAFT INCIDENTS AND ACCIDENTS EFFECTIVE: OCTOBER 2007 AIRCRAFT INCIDENTS AND ACCIDENTS Goals 1. To familiarize with Airport Index 2. To familiarize

More information

HEMET RYAN AIRPORT Revision 1 08/01/2011 NON-POWERED SAILPLANE/GLIDER AIRPORT OPERATIONS MANUAL (AOM)

HEMET RYAN AIRPORT Revision 1 08/01/2011 NON-POWERED SAILPLANE/GLIDER AIRPORT OPERATIONS MANUAL (AOM) HEMET RYAN AIRPORT Revision 1 08/01/2011 NON-POWERED SAILPLANE/GLIDER AIRPORT OPERATIONS MANUAL (AOM) AIRPORT MANAGER S OFFICE Riverside County Economic Development Agency Aviation Division 3403 10 th

More information

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDURJUNG AIRPORT, NEW DELHI

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDURJUNG AIRPORT, NEW DELHI GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDURJUNG AIRPORT, NEW DELHI ENVIRONMENT CIRCULAR 2 OF 2010 File No. 04-01/2010-AED Dated: July 1, 2010 Subject:

More information

GUYANA CIVIL AVIATION REGULATION PART X- FOREIGN OPERATORS.

GUYANA CIVIL AVIATION REGULATION PART X- FOREIGN OPERATORS. Civil Aviation 1 GUYANA CIVIL AVIATION REGULATION PART X- FOREIGN OPERATORS. REGULATIONS ARRANGEMENT OF REGULATIONS 1. Citation. 2. Interpretation. 3. Applicability of Regulations. PART A GENERAL REQUIREMENTS

More information

TABLE OF CONTENTS 1.0 INTRODUCTION...

TABLE OF CONTENTS 1.0 INTRODUCTION... Advisory Circular Subject: Publication of the Level of Service with Respect to Departure Below RVR 2600 (½ Statute Mile) Issuing Office: Civil Aviation, Standards Document No.: AC 302-001 File Classification

More information

Runway Crossings at Brisbane International Airport

Runway Crossings at Brisbane International Airport Runway Crossings at Brisbane International Airport All instructions to cross runways will be issued by Ground on 121.7 MHz All runway crossings require a specific CROSSING clearance. Runway Crossing Requirements

More information

HIGHLANDS AND ISLANDS AIRPORTS LIMITED

HIGHLANDS AND ISLANDS AIRPORTS LIMITED HIGHLANDS AND ISLANDS AIRPORTS LIMITED ARRANGEMENTS FOR FLIGHTS OUTSIDE OFFICIAL OPENING HOURS The term Company or HIAL Group applies to Highlands and Islands Airport Limited (HIAL) and any subsidiary

More information

NZQA registered unit standard version 4 Page 1 of 5. Maintain safety standards on the apron area of an airport. Aviation > Airport Operations

NZQA registered unit standard version 4 Page 1 of 5. Maintain safety standards on the apron area of an airport. Aviation > Airport Operations Page 1 of 5 Title Maintain safety standards on the apron area of an airport Level 4 Credits 4 Purpose People credited with this unit standard are able to, on the apron area of an airport: identify and

More information

PERTH AIRPORT OPERATING PROTOCOL

PERTH AIRPORT OPERATING PROTOCOL PERTH AIRPORT OPERATING PROTOCOL AUTHORITY TABLE Authorised By Executive General Manager - Operations & Customer Experience Policy Manager Manager Business Systems Development Responsible Officer Senior

More information

Apron Management. Airside Operational Instruction 05. Content

Apron Management. Airside Operational Instruction 05. Content Airside Operational Instruction 05 Content 1. Aircraft Pushback Procedures 2. Aircraft Parking and Safety Practices 3. Marshalling Licenses 4. Aircraft Chocking & use of Traffic Cones 5. Aircraft Engine

More information

Airside Driving Policy

Airside Driving Policy Owner: Creation Date: Eibhlin McGrath Last Updated: 19/02/2015 Version: 2.0 Document Number AMUVP-03 March 2015 Document No.: AMUVP-03 1 CONTENTS Document Control... 3 Airside Driving Policy... 4 Introduction...

More information

LIGHT AIRCRAFT ASSOCIATION

LIGHT AIRCRAFT ASSOCIATION LIGHT AIRCRAFT ASSOCIATION STRUT SAFETY GUIDELINES These notes provide general guidelines to Strut Safety Officers in respect of safety enhancement at Strut events Struts should create their own specific

More information

ORANGE AIRPORT METHOD OF WORKING PLAN. Orange Airport

ORANGE AIRPORT METHOD OF WORKING PLAN. Orange Airport METHOD OF WORKING PLAN MOWP: ISSUE NO: DATE OF ISSUE: AMENDMENT NO. YORG 14/01 Version 1 9 February 2015 21 AERODROME: Orange Airport PROJECT DESCRIPTION: Runway 11/29 Extension, Runway 04/22 Extension,

More information

DEPARTMENT OF CIVIL AVIATION ANNEX 1 REPUBLIC OF MAURITIUS

DEPARTMENT OF CIVIL AVIATION ANNEX 1 REPUBLIC OF MAURITIUS DEPARTMENT OF CIVIL AVIATION ANNEX 1 REPUBLIC OF MAURITIUS APPLICATION FOR REMOTELY PILOTED AIRCRAFT OPERATING PERMISSION OPERATIONS MANUAL TEMPLATE The following table provides an outline of the sort

More information

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010 COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, XXX Draft COMMISSION REGULATION (EU) No /2010 of [ ] on safety oversight in air traffic management and air navigation services (Text with EEA relevance)

More information

From: Commanding Officer, Naval Air Station Pensacola. Subj: NAVAL AIR STATION PENSACOLA CLOSED CONTROL TOWER AIRFIELD OPERATIONS

From: Commanding Officer, Naval Air Station Pensacola. Subj: NAVAL AIR STATION PENSACOLA CLOSED CONTROL TOWER AIRFIELD OPERATIONS DEPARTMENT OF THE NAVY COMMANDING OFFICER NAS PENSACOLA 150 HASE ROAD STE-A PENSACOLA, FLORIDA 32508-1051 NAVAL AIR STATION PENSACOLA INSTRUCTION 3710.1 NASPCOLAINST 3710.1 N32 From: Commanding Officer,

More information

SECTION 4 - APPROACH CONTROL PROCEDURES

SECTION 4 - APPROACH CONTROL PROCEDURES SECTION 4 - APPROACH CONTROL PROCEDURES CHAPTER 1 - PROVISION OF SERVICES 1.1 An approach control unit shall provide:- a) Approach control service. b) Flight Information service. c) Alerting service. RESPONSIBILITIES

More information

Black Start Ancillary Service Schedule

Black Start Ancillary Service Schedule 1. Glossary and Interpretation 1.1 Glossary: In this Ancillary Service Schedule, unless the context otherwise requires, the following definitions apply: Availability Fee means the monthly availability

More information

CLEARANCE INSTRUCTION READ BACK

CLEARANCE INSTRUCTION READ BACK CLEARANCE INSTRUCTION READ BACK 1. Introduction An ATC clearance or an instruction constitutes authority for an aircraft to proceed only in so far as known air traffic is concerned and is based solely

More information

Andres Lainoja Eesti Lennuakadeemia

Andres Lainoja Eesti Lennuakadeemia Andres Lainoja Eesti Lennuakadeemia In the beginning was the Word... Convention on International Civil Aviation (Doc 7300) was signed on 7 December 1944 International Civil Aviation Organization began

More information

GRANDE PRAIRIE AIRPORT. Reduced Visibility Operations Plan

GRANDE PRAIRIE AIRPORT. Reduced Visibility Operations Plan GRANDE PRAIRIE AIRPORT Reduced Visibility Operations Plan Amended November 8, 2017 Distribution List: (Updates to the Reduced Visibility Operations Plan will be circulated to this list.) Name and Title

More information

Appendix 6.1: Hazard Worksheet

Appendix 6.1: Hazard Worksheet Appendix 6.1: Appendix 6.1: Ref. Condition, real or potential; that can cause injury, illness, etc. This is a prerequisite for an Airfield Hazards 1. Taxiway Geometry Direct access to runway from ramp

More information

PERTH AIRPORT OPERATING PROTOCOL

PERTH AIRPORT OPERATING PROTOCOL PERTH AIRPORT OPERATING PROTOCOL AUTHORITY TABLE Authorised By Chief Operating Officer Policy Manager Manager Business Systems Development Responsible Officer Manager Terminal and Landside Operations Commencement

More information

STATUTORY INSTRUMENTS. S.I. No. 855 of 2004 IRISH AVIATION AUTHORITY (AIR TRAFFIC SERVICE SYSTEMS) ORDER, 2004

STATUTORY INSTRUMENTS. S.I. No. 855 of 2004 IRISH AVIATION AUTHORITY (AIR TRAFFIC SERVICE SYSTEMS) ORDER, 2004 STATUTORY INSTRUMENTS S.I. No. 855 of 2004 IRISH AVIATION AUTHORITY (AIR TRAFFIC SERVICE SYSTEMS) ORDER, 2004 PUBLISHED BY THE STATIONERY OFFICE DUBLIN To be purchased directly from the GOVERNMENT PUBLICATIONS

More information

Aerodrome Manual. ICAO/FAA Comprehensive Aerodrome Certification Inspector Workshop. Presented To: Caribbean States By: FAA Office of Airports

Aerodrome Manual. ICAO/FAA Comprehensive Aerodrome Certification Inspector Workshop. Presented To: Caribbean States By: FAA Office of Airports ICAO/FAA Comprehensive Aerodrome Certification Inspector Workshop Presented To: Caribbean States By: FAA Office of Airports OBJECTIVE Development of an Aerodrome Manual (AM). 2 ICAO ANNEX 14 - SECTION

More information

Airside Driving Policy

Airside Driving Policy Owner: Eibhlin McGrath Creation Date: May 2011 Last Updated: 14-09-2015 Version: 2.2 Document Number AMUVP-03 September 2015 Document No.: AMUVP-03 1 CONTENTS Document Control... 3 Airside Driving Policy...

More information

Flight Director Regulation for AIR SHOW in Mlada Boleslav, 16 June 2016

Flight Director Regulation for AIR SHOW in Mlada Boleslav, 16 June 2016 In Mlada Boleslav, 11 th June 2016 6 Flight Director Regulation for AIR SHOW in Mlada Boleslav, 16 June 2016 (Flight Director Information and obligatory instructions leading to performance of the 11th

More information

AIRPORT COLLABORATIVE DECISION MAKING

AIRPORT COLLABORATIVE DECISION MAKING Airport CDM Flight Crew Briefing Deutsche Harmonisierung AIRPORT COLLABORATIVE DECISION MAKING AIRPORT CDM at Hamburg Airport (HAM) Flight Crew Briefing English Version: 0.1 Author: Airport CDM Team HAM

More information

Procedures for Air Navigation Services Aerodromes (PANS-AGA) ICAO Doc. 9981

Procedures for Air Navigation Services Aerodromes (PANS-AGA) ICAO Doc. 9981 Procedures for Air Navigation Services Aerodromes (PANS-AGA) ICAO Doc. 9981 Introduction The First Edition of Doc. 9981 was approved by the President of the Council on 20 October 2014 The document becomes

More information

1.2 An Approach Control Unit Shall Provide the following services: c) Alerting Service and assistance to organizations involved in SAR Actions;

1.2 An Approach Control Unit Shall Provide the following services: c) Alerting Service and assistance to organizations involved in SAR Actions; Section 4 Chapter 1 Approach Control Services Approach Control Note: This section should be read in conjunction with Section 2 (General ATS), Section 6 (Separation Methods and Minima) and Section 7 (ATS

More information

LAPL(A)/PPL(A) question bank FCL.215, FCL.120 Rev OPERATIONAL PROCEDURES 070

LAPL(A)/PPL(A) question bank FCL.215, FCL.120 Rev OPERATIONAL PROCEDURES 070 OPERATIONAL PROCEDURES 070 1 1 Which one of the following statements is false? An accident must be reported if, between the time that anyone boards an aircraft to go flying and until everyone has left

More information

Guideline: Rules and appropriate practices for disabled aircraft removal

Guideline: Rules and appropriate practices for disabled aircraft removal Guideline for the Airport Community Guideline: Rules and appropriate practices for disabled aircraft removal Date of issue: May 2018 GUIDELINE-OCD001-R0 TABLE OF CONTENTS 1. Purpose and Scope... 3 2. Definitions

More information

Subject Aircraft Deicing Central Deicing Facility (CDF) Specific Procedures. Date of Issue: Effective Date:

Subject Aircraft Deicing Central Deicing Facility (CDF) Specific Procedures. Date of Issue: Effective Date: Directive Supersedes: #2013-D-010 Directive # 2016-D-005 Subject From: Aviation Services Contact: Ken Eastman, ken.eastman@gtaa.com, (416) 776-3453 Date of Issue: Effective Date: Expected Action: Compliance

More information

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) Part 171 AERONAUTICAL TELECOMMUNICATION SERVICES Published by Air Safety Support International Ltd Air Safety Support International Limited 2005 First

More information

PART F SECTION 2 RESPONSIBILITIES AND ACTIONS

PART F SECTION 2 RESPONSIBILITIES AND ACTIONS F-2-1 AIRPORT OPERATIONS MANUAL AIRFIELD OPERATIONS 31 January 2011 PART F SECTION 2 RESPONSIBILITIES AND ACTIONS 1. Overview 1.1 This section outlines the responsibilities and actions of the airport organizations

More information

AOP 11 Low Visibility Procedures (LVP s) (Aerodrome Operating Procedure)

AOP 11 Low Visibility Procedures (LVP s) (Aerodrome Operating Procedure) AOP 11 Low Visibility Procedures (LVP s) (Aerodrome Operating Procedure) Produced by Airfield Services Document Author Operations Support Manager Contents 1 SECTION 1 - LOW VISIBILITY PROCEDURES (LVP S)...

More information

Gliding Federation of Australia

Gliding Federation of Australia Gliding Federation of Australia 37 th Club and Sports Class Championship 2017 Local rules Version 1.1 1 Part A Competition 1. Location Goondiwindi Aerodrome, Goondiwindi, Queensland 2. Dates Official practice

More information

CIVIL AVIATION REGULATIONS PART 10 COMMERCIAL AIR TRANSPORT BY FOREIGN AIR OPERATORS WITHIN FEDERATED STATES OF MICRONESIA

CIVIL AVIATION REGULATIONS PART 10 COMMERCIAL AIR TRANSPORT BY FOREIGN AIR OPERATORS WITHIN FEDERATED STATES OF MICRONESIA CIVIL AVIATION REGULATIONS PART 10 COMMERCIAL AIR TRANSPORT BY FOREIGN AIR OPERATORS WITHIN FEDERATED STATES OF MICRONESIA FEDERATED STATES OF MICRONESIA 2001 [THIS PAGE INTENTIONALLY LEFT BLANK] 10-ii

More information

COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management

COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management L 80/10 Official Journal of the European Union 26.3.2010 COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management (Text with EEA relevance) THE EUROPEAN

More information

REGULATIONS (10) FOREIGN AIR OPERATORS

REGULATIONS (10) FOREIGN AIR OPERATORS Republic of Iraq Ministry of Transport Iraq Civil Aviation Authority REGULATIONS (10) FOREIGN AIR OPERATORS Legal Notice No. REPUBLIC OF IRAQ THE CIVIL AVIATION ACT, NO.148 REGULATIONS THE CIVIL AVIATION

More information

GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION

GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION ANSS AC NO. 1 of 2017 31.07. 2017 Air Space and Air Navigation Services Standard ADVISORY CIRCULAR Subject: Procedures to follow in case

More information

AERODROME OPERATIONS 1 INTRODUCTION

AERODROME OPERATIONS 1 INTRODUCTION AIP New Zealand AD 1.5-1 AD 1.5 AERODROME OPERATIONS 1 INTRODUCTION 1.1 General 1.1.1 This section details procedures for operations on and in the vicinity of aerodromes. 1.1.2 The layout of the circuit

More information

L 342/20 Official Journal of the European Union

L 342/20 Official Journal of the European Union L 342/20 Official Journal of the European Union 24.12.2005 COMMISSION REGULATION (EC) No 2150/2005 of 23 December 2005 laying down common rules for the flexible use of airspace (Text with EEA relevance)

More information

ES Aircraft Deicing Document Identification Number Date: March 15, ) Activity Description:

ES Aircraft Deicing Document Identification Number Date: March 15, ) Activity Description: ES-301-1.06 Aircraft Deicing Document Identification Number ES-301-1.06 Date: March 15, 2018 Document Owner: Keith Pass 1) Activity Description: Aircraft deicing is the application of aircraft deicing

More information

1. GENERALLY. date of entry and signature

1. GENERALLY. date of entry and signature 1.1 Amendments and Corrigendum: 1. GENERALLY number / page number Amendments applicability date date of entry and signature number Corrigendum applicability date date of entry and signature 1.2 List of

More information

MAST 16 th December 2009

MAST 16 th December 2009 MAST 16 th December 2009 Items for Discussion A380 meeting feedback Safety Performance Driver Van Run feedback AIP Review of AIP text re push-backs Review of AIP text re conditional line ups - unclear

More information

Section 32 TABLE OF CONTENTS Airfield and Aircraft Operations. 32.A General B Aircraft

Section 32 TABLE OF CONTENTS Airfield and Aircraft Operations. 32.A General B Aircraft Section 32 TABLE OF CONTENTS Airfield and Aircraft Operations Section: Page 32.A General... 32-1 32.B Aircraft... 32-4 32-i THIS PAGE INTENTIONALLY LEFT BLANK 32-i SECTION 32 Airfield and Aircraft Operations

More information

JMA Flying Event Safety Rules

JMA Flying Event Safety Rules JMA Flying Event Safety Rules Changes to Third edition are denoted by text in red. Approved by the JMA committee March 2006. Foreword These Safety Rules are to apply to any event, open to the JMA general

More information

Guidelines for NOTAM Workflow and Allocation of Responsibilities

Guidelines for NOTAM Workflow and Allocation of Responsibilities Guidelines for NOTAM Workflow and Allocation of Responsibilities May 19 2011 INDEX 1- MAIN OBJECTIVES 1 2- ORIGINATION OF NOTAM 1 3- VALUE OF A NOTAM 3 4- DURATION OF NOTAM 4 5- THE AERONAUTICAL DATA CHAIN

More information

REPUBLIC OF SEYCHELLES CIVIL AVIATION AUTHORITY AERONAUTICAL INFORMATION SERVICE P.O.BOX 181, VICTORIA SEYCHELLES

REPUBLIC OF SEYCHELLES CIVIL AVIATION AUTHORITY AERONAUTICAL INFORMATION SERVICE P.O.BOX 181, VICTORIA SEYCHELLES Phone: 248-384000 AFS: FSIAYNYX FAX: 248-384030 Email: sezais@scaa.sc REPUBLIC OF SEYCHELLES CIVIL AVIATION AUTHORITY AERONAUTICAL INFORMATION SERVICE P.O.BOX 181, VICTORIA SEYCHELLES AIP SUPPLEMENT S02/09

More information

Cork Airport Airside Driving Policy

Cork Airport Airside Driving Policy Owner: Eibhlin McGrath Creation Date: May 2011 Last Updated: 17/12/2015 Version: 2.3 Document Number AMUVP-03 CONTENTS Document Control... 3 Airside Driving Policy... 4 Introduction... 4 Cork Airport Managing

More information

Striving for Excellence in Aviation Ground Safety

Striving for Excellence in Aviation Ground Safety AAGSC RECOMMENDED INDUSTRY PRACTICE PASSENGER SAFETY ON THE APRON AAGSC : RIP No. 7 Issue 3 Issued : 12 May 2006 Review Date : May 2008 Background There are few standards that provide guidance to airport

More information