1 D-2-1 AIRPORT OPERATIONS MANUAL AIRFIELD OPERATIONS 7 March 2014 PART D SECTION 2 STAND ALLOCATION 1. Overview To optimize the overall utilization of aircraft parking facilities, aircraft stands for passenger and cargo flights are allocated by Apron Control Centre, in compliance with a set of criteria laid out in this Section. Airlines/airport operators are apprised of these criteria governing the aircraft stand allocation at the Passenger Aprons, Cargo Aprons, Maintenance Apron and Long Term Parking Apron. 2. General Criteria for Parking Stand Allocation 2.1 Scheduled Flights Scheduled flights endorsed and coordinated by the Hong Kong Schedule Co-ordination Office of the Civil Aviation Department (CAD) will be accorded priority in the planning of the Stand Allocation Schedule. 2.2 Non-Scheduled Flights Subject to Para.2.4, stand allocation for non-scheduled flights, such as extra sector, charter, non-revenue and ad-hoc flights will be notified to the airline/handling agent on the day the flights are operated. 2.3 Stand Allocation Priority Aircraft will be allocated the frontal parking stands on a first-come-firstserved basis, subject to the specific stand allocation slots as set out in Para.3. Wide-bodied aircraft and long-haul flights will normally be assigned with priority in the allocation of frontal stands. 2.4 Business Aviation designated parking stand allocation Due to strong demand for business aviation designated parking stands, apart from a charter permit and approved runway slots provided by CAD, all relevant stand allocation requests are required to be endorsed by Airfield Department (AD) of the Airport Authority prior to commencing operations to/from (HKIA). AD will handle the request based on the actual parking stand availability at HKIA and on a first-come-first-served basis. If the requested times/dates are not available due to apron congestion, AAHK will offer the closet alternative(s) or, in some cases, a quick turnaround of 6 hours or less in order to maximize the efficient use of parking stands. Application guidelines are available at the following website:

2 D-2-2 AIRPORT OPERATIONS MANUAL AIRFIELD OPERATIONS 31 January Stand Allocation Slots The time slots for which a parking stand is available for allocation to a flight on the Passenger Apron, Cargo Apron, Maintenance and Long Term Parking Apron are as follows: 3.1 Turnaround Passenger Flight From 12.5 minutes before the scheduled time of arrival (STA) until 12.5 minutes after the scheduled time of departure (STD). 3.2 Originating Passenger Flight From 1 hour 15 minutes before STD until 12.5 minutes after STD. 3.3 Terminating Passenger Flight From 12.5 minutes before STA until 45 minutes after STA. 3.4 Turnaround Cargo Flight From 12.5 minutes before the STA until 12.5 minutes after STD. 3.5 Originating Cargo Flight From 2 hours before the STD until 12.5 minutes after STD. 3.6 Terminating Cargo Flight From 12.5 minutes before STA until 1 hour and 30 minutes after STA. 3.7 Combi Flight Combi Flight is regarded as passenger flight in slot allocation. 3.8 Off-scheduled Flight Aircraft with arrival time exceeding 12.5 minutes before STA or departure time exceeding 12.5 minutes after STD may be allocated to another parking stand in order to avoid consequential disruption to succeeding arriving flights. 3.9 Overnight Parking Aircraft may remain overnight in parking stands at the Passenger Apron and Cargo Apron only when such parking will not adversely affect the overall stand allocation for scheduled flights in the following morning.

3 D-2-3 AIRPORT OPERATIONS MANUAL AIRFIELD OPERATIONS 31 October Criteria for Aircraft Parking 4.1 Passenger Aprons Parking stands in the Passenger Apron will be allocated to aircraft operating passenger and combi services. Combi aircraft allocated to frontal stands must comply with the precautionary measures as stipulated in Para.3.2 (e) of Part E, Section 2, regarding the safe operation of airbridge The following guidelines of parking stand allocation will be considered at high priority: Maximize the number of passengers served by airbridges; Strengthen HKIA as the leading international aviation hub by transfer passenger facilitation; Minimize aircraft towing; Facilitate passenger movements between the aircraft the airlines lounges if it is not at the expense of the overall parking stand optimization Aircraft operating terminating flights or long-turnaround flights with ground time exceeding 5 hours will normally be parked at remote stands at the Passenger Apron, and at the Long Term Parking Apron or Temporary Parking Area when the ground time exceeds 8 hours. To facilitate passenger disembarkation and baggage off-loading, the aircraft may, subject to availability upon arrival, be allocated to a frontal stand at the Passenger Apron for a duration not exceeding 45 minutes. 4.2 Cargo Aprons Scheduled cargo aircraft will have priority over non-scheduled cargo aircraft in the allocation of cargo parking stands. Aircraft which consistently operate off schedule may be excluded from the Stand Allocation Planning Schedule Aircraft operating terminating flights or long-turnaround flights with ground time exceeding 8 hours will normally be parked on the Long Term Parking Apron or the Temporary Parking Stands. 4.3 Maintenance and Long Term Parking Apron Stands on the Maintenance and Long Term Parking Apron will normally be allocated for aircraft operating scheduled passenger service with turnaround times exceeding 8 hours. All maintenance stands are suitable for aircraft types up to Code E aircraft except M5 and M31 are designed up to Code F, M6 to M10 are designed up to B747-8 aircraft and M35 for Code C aircraft only.

4 D-2-4 AIRPORT OPERATIONS MANUAL AIRFIELD OPERATIONS 31 August Routine line servicing to facilitate aircraft departure on schedule can be carried out on a parking stand during turnaround. Other engineering activities including those which will immobilize aircraft for long duration must be carried out on the Maintenance and Long Term Parking Apron or aircraft hangars unless permission to carry out such maintenance work on the Temporary Parking Stands or the Passenger Aprons has been given by the Apron Control Centre. Apron Control Centre would normally approve such request if the maintenance operator can tow away the aircraft from the stand within 1 hour upon request and ascertain no contamination be made to the pavement. 4.4 Temporary Parking Stands The available temporary parking stands and their corresponding condition of use are as follows: Stand No. No. of Stands Condition of Use TW1 1 Tow-in/Tow-out Up to wing span of 26m (only for CRJ700 and ERJ170) TW2 1 Tow-in/Tow-out Accommodate Code C aircraft TC1 1 Tow-in/Tow-out For parking of 1 Code D; or 2 Code C aircraft, one is up to A320 only No night time operation L411-L416 L421-L Tow-in/Tow-out Accommodate up to Code E except A No ground servicing of aircraft M1A 1 Tow-in/Tow-out Accommodate Code C aircraft NB21- NB40 20 Tow-in/Tow-out Accommodate up to Gulfstream 650 No ground servicing of aircraft No night time operation D301, D302 & D304 3 Tow-in/Tow-out Accommodate up to Code F (Stand D301) Accommodate up to Code F except A and B747-8 (Stand D302) Accommodate up to Code E (Stand D304) No ground servicing of aircraft

5 D-2-5 AIRPORT OPERATIONS MANUAL AIRFIELD OPERATIONS 31 July Objective of the Mitigation Parking Sudden surge in demand for active parking stands may arise when adverse weather, prolonged Red lightning warning or industrial actions affecting airline operation. To increase the aircraft parking capacity by providing temporary parking positions on the apron for non-active aircraft and release full operational stands for active aircraft whilst maintaining safe and efficient airfield operation. Those parking positions are not equipped with aircraft ground servicing facilities Mitigation Parking Procedures Parking order Location No. of aircraft able to be accommodated 1 Taxilane M (MT1) 1 2 Taxilane P (PT1-PT3) 3 3 Taxilane G (GT1 GT4) 4 4 Taxilane L7 (LT1 LT2) 2 Total IAC-ACC will seek permission from Air Traffic Control (ATC) 2 hours prior to activation with the general aircraft stand occupancy, expected amounts and types of aircrafts involved, expected overall duration All line maintenance operators will be well informed of the parking locations Towing of the aircraft on Mitigation Parking positions must be closely monitored by Airfield staff to ensure parking position on taxilane is correct When Taxilane G is to be used, IAC-ACC will inform AFC on the arrangement. 4.6 Objective of Multiple Parking Occasionally Business Aviation Centre (BAC) aircraft parking capacity is fully utilized and small business jets are required to overflow to other aprons. In this connection, Airport Authority has earmarked a number of parking stands to serve this purpose. Designed and certified to serve Code E aircraft parking stands below are earmarked for multiple parking namely L415, L416, L424, L425, L426, M25, M26, M27, TW1 and TC1R. A single aircraft parking stand listed above will be used to park more than 1 Code C or below sized business jet. Detail operation procedures are disseminated to ATC and LMOs.

6 D-2-6 AIRPORT OPERATIONS MANUAL AIRFIELD OPERATIONS 31 July Temporary Holding Arrival Aircraft (active aircraft) on Operational Taxiway (e.g. TWY B) due to Apron Full Arriving aircraft will be held on active taxiways (e.g. TWY B) and waiting for first available parking stand when full apron happens. In order to minimize disruption and to maintain operations in orderly manner, the stand allocation criteria, subject to real-time situation, will be as the followings: 5.1. Continue to adopt the first-come-first-serve principle. 5.2 Avoid last minute assignment of parking stands so that operators have time for resource management. 5.3 Avoid parking stand resource mismatched (e.g. Code C aircraft assigned to Code E stand, result in Code E aircraft with no suitable stand). 6. Relocation of Aircraft During airport emergency or any unforeseen circumstances, the Apron Control Centre may require urgent relocation of an aircraft from a parking stand to safeguard its safety or to minimize interruption to airport operations. It is thus an essential operational requirement that airlines or their ramp handling agents make provision for their aircraft to be moved with short notice, at most within 30 minutes from the time when an instruction is given by Apron Control Centre. Such provisions should include arrangement for access to the flight deck to release parking brakes, and availability of suitable tow bars, aircraft tractor and towing crew. 7. Bi-Monthly Stand Allocation Schedule A Stand Allocation Schedule will be issued on a bi-monthly basis for the Airport Authority internal assessment on stand adequacy. The Stand Allocation Schedule is subject to amendments in response to changes of flight movement schedules, operational requirements, stands outages, weather disruptions, and other variables. 8. Displaying Real-time Stand Allocation Information Real-time stand allocation information is initiated by Apron Control Centre and displayed on the Flight Information Display System (FIDS). In the event of lastminute change in stand assignment for arrival flights, Apron Control Centre will inform Air Traffic Control, ground operator franchisees, airlines and Airport Operation Control Centre by telephone/trunk Mobile Radio in addition to display on the FIDS.

Aircraft Staging & Parking Plan

Aircraft Staging & Parking Plan Aircraft Staging & Parking Plan Aviation Services Creation Date: 14 September 2015 Version: 3.3 Document Control Version History Version Date Changes 3.0 1 July 2014 Updated to current style. LDS Section

More information

PART F SECTION 2 RESPONSIBILITIES AND ACTIONS

PART F SECTION 2 RESPONSIBILITIES AND ACTIONS F-2-1 AIRPORT OPERATIONS MANUAL AIRFIELD OPERATIONS 31 January 2011 PART F SECTION 2 RESPONSIBILITIES AND ACTIONS 1. Overview 1.1 This section outlines the responsibilities and actions of the airport organizations

More information

PART E SECTION 5 AVIATION FUEL SUPPLY SYSTEM

PART E SECTION 5 AVIATION FUEL SUPPLY SYSTEM E-5-1 AIRPORT OPERATIONS MANUAL AIRFIELD OPERATIONS 31 MARCH 2016 1. Overview PART E SECTION 5 AVIATION FUEL SUPPLY SYSTEM 1.1 The supply of aviation fuel at the (HKIA) is operated by the Aviation Fuel

More information

Flight Regularity Administrative Regulations

Flight Regularity Administrative Regulations Flight Regularity Administrative Regulations (Ministry of Transport 2016 #56) As of March 24, 2016, the Flight Regularity Administrative Regulations has been approved on the 6 th ministerial meeting. It

More information

Pre-Coordination Runway Scheduling Limits Winter 2014

Pre-Coordination Runway Scheduling Limits Winter 2014 Appendices 1 Runway Scheduling Limits 2 Additional Runway Scheduling Constraints 3 Terminal Scheduling Limits 4 Load Factors - to be used for terminal scheduling calculations 5 Stand Limits 6 Additional

More information

COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management

COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management L 80/10 Official Journal of the European Union 26.3.2010 COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management (Text with EEA relevance) THE EUROPEAN

More information

Runway Scheduling Limits Summer 2015

Runway Scheduling Limits Summer 2015 Appendix 1 Runway Scheduling Limits Summer 2015 Arrivals Hour (UTC) 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 Average Total Summer 2014 38 39 37 40 40 41 40 43 43 41 41 44 44 43 38 44 20 39.8

More information

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDURJUNG AIRPORT, NEW DELHI

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDURJUNG AIRPORT, NEW DELHI GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDURJUNG AIRPORT, NEW DELHI ENVIRONMENT CIRCULAR 2 OF 2010 File No. 04-01/2010-AED Dated: July 1, 2010 Subject:

More information

MANCHESTER AIRPORT AIRCRAFT PUSHBACK PROCEDURES. Effective from 27th November :01 hrs local.

MANCHESTER AIRPORT AIRCRAFT PUSHBACK PROCEDURES. Effective from 27th November :01 hrs local. MANCHESTER AIRPORT AIRCRAFT PUSHBACK PROCEDURES Effective from 27th November 2018. 00:01 hrs local. Operational changes from previous revision; TRPs 216 and NA permanently withdrawn from use. Choice of

More information

Classification: Public

Classification: Public Appendices 1 Runway Scheduling Limits 2 Additional Runway Scheduling Constraints 3 Terminal Scheduling Limits 4 Load Factors - to be used for terminal scheduling calculations 5 Stand Limits 6 Additional

More information

Runway Crossings at Brisbane International Airport

Runway Crossings at Brisbane International Airport Runway Crossings at Brisbane International Airport All instructions to cross runways will be issued by Ground on 121.7 MHz All runway crossings require a specific CROSSING clearance. Runway Crossing Requirements

More information

General Aviation/Business Aviation Parking Stand Booking Guidelines

General Aviation/Business Aviation Parking Stand Booking Guidelines General Aviation/Business Aviation Parking Stand Booking Guidelines 1. Definitions and Abbreviations AA BAPS GA/BA GA/BA Guidelines HKBAC CAD HKIA HKSCO HMRF OCS Operators SC Guidelines UID Users Airport

More information

CIVIL AVIATION REQUIREMENTS SECTION 4 AERODROME STANDARDS & LICENSING SERIES 'B' PART VI 22 ND MARCH 2012 EFFECTIVE: FORTHWITH

CIVIL AVIATION REQUIREMENTS SECTION 4 AERODROME STANDARDS & LICENSING SERIES 'B' PART VI 22 ND MARCH 2012 EFFECTIVE: FORTHWITH GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP SAFDARJANG AIRPORT, NEW DELHI CIVIL AVIATION REQUIREMENTS SECTION 4 AERODROME STANDARDS & LICENSING SERIES 'B' PART

More information

PERTH AIRPORT OPERATING PROTOCOL

PERTH AIRPORT OPERATING PROTOCOL PERTH AIRPORT OPERATING PROTOCOL AUTHORITY TABLE Authorised By Chief Operating Officer Policy Manager Manager Business Systems Development Responsible Officer Manager Terminal and Landside Operations Commencement

More information

Airport Operating Standard. Transfer of Explosive Cargo

Airport Operating Standard. Transfer of Explosive Cargo Airport Operating Standard Transfer of Explosive Cargo June 2018 Contents Introduction 2 Responsibilities 3 Approvals 4 Safe distances 6 Preferred aircraft parking position 7 Handling agent vehicular

More information

PERTH AIRPORT OPERATING PROTOCOL

PERTH AIRPORT OPERATING PROTOCOL PERTH AIRPORT OPERATING PROTOCOL AUTHORITY TABLE Authorised By Executive General Manager - Operations & Customer Experience Policy Manager Manager Business Systems Development Responsible Officer Senior

More information

1.2 An Approach Control Unit Shall Provide the following services: c) Alerting Service and assistance to organizations involved in SAR Actions;

1.2 An Approach Control Unit Shall Provide the following services: c) Alerting Service and assistance to organizations involved in SAR Actions; Section 4 Chapter 1 Approach Control Services Approach Control Note: This section should be read in conjunction with Section 2 (General ATS), Section 6 (Separation Methods and Minima) and Section 7 (ATS

More information

General Aviation/Business Aviation Parking Stand Booking Guidelines

General Aviation/Business Aviation Parking Stand Booking Guidelines General Aviation/Business Aviation Parking Stand Booking Guidelines 1. Definitions and Abbreviations AA BAPS GA/BA GA/BA Guidelines HKBAC CAD HKIA HKSCO HMRF OCS Operators SC Guidelines UID Users Airport

More information

HKIA : OPERATIONS AND CAPACITY

HKIA : OPERATIONS AND CAPACITY CHAPTER 3 HKIA : OPERATIONS AND CAPACITY Internal and External Transportation Links 3.1 Hong Kong International Airport (HKIA) is located right at the heart of passenger and cargo conveyance between Hong

More information

AIRPORT IRREGULAR OPERATIONS (IROPS) PLAN. South Bend International Airport (SBN) St. Joseph County Airport Authority

AIRPORT IRREGULAR OPERATIONS (IROPS) PLAN. South Bend International Airport (SBN) St. Joseph County Airport Authority AIRPORT IRREGULAR OPERATIONS (IROPS) PLAN (SBN) St. Joseph County Airport Authority TABLE OF CONTENTS TABLE OF CONTENTS... 2 INTRODUCTION... 3 AIRPORT INFORMATION... 3 CONTACT INFORMATION... 4 PASSENGER

More information

SECTION 4 - APPROACH CONTROL PROCEDURES

SECTION 4 - APPROACH CONTROL PROCEDURES SECTION 4 - APPROACH CONTROL PROCEDURES CHAPTER 1 - PROVISION OF SERVICES 1.1 An approach control unit shall provide:- a) Approach control service. b) Flight Information service. c) Alerting service. RESPONSIBILITIES

More information

PPR REGULATIONS FOR BUSINESS AND GENERAL AVIATION AT EINDHOVEN AIRPORT

PPR REGULATIONS FOR BUSINESS AND GENERAL AVIATION AT EINDHOVEN AIRPORT PPR REGULATIONS FOR BUSINESS AND GENERAL AVIATION AT EINDHOVEN AIRPORT Eindhoven, September 2017 Contents Scope of application p. 3 Definitions p. 3 Capacity p. 3 Distribution of PPRs p. 4 PPR applications

More information

Dallas/Fort Worth International Airport Winter Weather Season Kick-Off Meeting

Dallas/Fort Worth International Airport Winter Weather Season Kick-Off Meeting Dallas/Fort Worth International Airport Winter Weather Season Kick-Off Meeting 10.27.16 Dallas/Fort Worth International Airport Winter Weather Season Kick-Off Meeting Agenda Welcome / Introductions DFW

More information

GUIDELINES FOR THE ADMINISTRATION OF SANCTIONS AGAINST SLOT MISUSE IN IRELAND

GUIDELINES FOR THE ADMINISTRATION OF SANCTIONS AGAINST SLOT MISUSE IN IRELAND GUIDELINES FOR THE ADMINISTRATION OF SANCTIONS AGAINST SLOT MISUSE IN IRELAND October 2017 Version 2 1. BACKGROUND 1.1 Article 14.5 of Council Regulation (EEC) No 95/93, as amended by Regulation (EC) No

More information

PART H SECTION 3 GENERAL REQUIREMENTS AND PROCEDURES GOVERNING THE EXECUTION OF WORKS ON OR ADJACENT TO AIRSIDE OPERATIONAL AREAS

PART H SECTION 3 GENERAL REQUIREMENTS AND PROCEDURES GOVERNING THE EXECUTION OF WORKS ON OR ADJACENT TO AIRSIDE OPERATIONAL AREAS H-3-1 PART H SECTION 3 GENERAL REQUIREMENTS AND PROCEDURES GOVERNING THE EXECUTION OF WORKS ON OR ADJACENT TO AIRSIDE OPERATIONAL AREAS 1. Regulations 1.1 These requirements are intended to ensure that

More information

From Planning to Operations Dr. Peter Belobaba

From Planning to Operations Dr. Peter Belobaba From Planning to Operations Dr. Peter Belobaba Istanbul Technical University Air Transportation Management M.Sc. Program Network, Fleet and Schedule Strategic Planning Module 16 : 13 March 2014 Lecture

More information

AIRFIELD OPERATIONAL INSTRUCTION 26 GENERAL AVIATION OPERATIONS

AIRFIELD OPERATIONAL INSTRUCTION 26 GENERAL AVIATION OPERATIONS AIRFIELD OPERATIONAL INSTRUCTION 26 GENERAL AVIATION OPERATIONS Return to Contents Page Liverpool John Lennon Airport 0 20161012LJAAOI26V6.0pdf AIRFIELD OPERATIONAL INSTRUCTION 26 GENERAL AVIATION OPERATIONS

More information

REPORT IN-011/2012 DATA SUMMARY

REPORT IN-011/2012 DATA SUMMARY REPORT IN-011/2012 DATA SUMMARY LOCATION Date and time Site Saturday, 13 April 2012; 20:17 UTC Seville Airport (LEZL) (Spain) AIRCRAFT Registration EI-EBA EI-EVC Type and model BOEING 737-8AS BOEING 737-8AS

More information

SPRINGFIELD-BRANSON NATIONAL AIRPORT. Irregular Operations (IROPS) Contingency Plan STANDARD OPERATING PROCEDURES

SPRINGFIELD-BRANSON NATIONAL AIRPORT. Irregular Operations (IROPS) Contingency Plan STANDARD OPERATING PROCEDURES SPRINGFIELD-BRANSON NATIONAL AIRPORT Irregular Operations (IROPS) Contingency Plan STANDARD OPERATING PROCEDURES ASSISTANCE TO AIRCRAFT OPERATORS DURING IRREGULAR OPERATIONS 1 Irregular Operations (IROPS)

More information

TANZANIA CIVIL AVIATION AUTHORITY SAFETY REGULATION CHECKLIST FOR INSPECTION OF SURFACE MOVEMENT GUIDANCE CONTROL SYSTEM (SMGCS)

TANZANIA CIVIL AVIATION AUTHORITY SAFETY REGULATION CHECKLIST FOR INSPECTION OF SURFACE MOVEMENT GUIDANCE CONTROL SYSTEM (SMGCS) Page 1 of 11 AERODROME NAME: ICAO REFERENCE CODE: TRAFFIC DENSITY CLASS: (see Note 3) VISIBILITY CONDITION: (see Note 3) AERODROME INSPECTOR: DATE: S/N ICAO A SURFACE MOVEMENT GUIDANCE CONTROL SYSTEM 1

More information

Grow Transfer Incentive Scheme

Grow Transfer Incentive Scheme Grow Transfer Incentive Scheme Grow Transfer Incentive Scheme offers a retrospective rebate of the Transfer Passenger Service Charge for incremental traffic above the level of the corresponding season

More information

REPUBLIC OF SINGAPORE AERONAUTICAL INFORMATION SERVICES CIVIL AVIATION AUTHORITY OF SINGAPORE SINGAPORE CHANGI AIRPORT P.O. BOX 1, SINGAPORE

REPUBLIC OF SINGAPORE AERONAUTICAL INFORMATION SERVICES CIVIL AVIATION AUTHORITY OF SINGAPORE SINGAPORE CHANGI AIRPORT P.O. BOX 1, SINGAPORE Telephone: (65) 6595 6051 AFS: WSSSYNYX Facsimile: (65) 6441 0221 caas_singaporeais@caas.gov.sg www.caas.gov.sg REPUBLIC OF SINGAPORE AERONAUTICAL INFORMATION SERVICES CIVIL AVIATION AUTHORITY OF SINGAPORE

More information

THE CIVIL AVIATION AUTHORITY OF THAILAND. Aeronautical Information Service Department AIP SUPPLEMENT

THE CIVIL AVIATION AUTHORITY OF THAILAND. Aeronautical Information Service Department AIP SUPPLEMENT THE CIVIL AVIATION AUTHORITY OF THAILAND AIRAC Phone: 66 02 568 8831 Fax: 66 02 576 1903 Aeronautical Information Service Department AIP SUPPLEMENT AFTN: VTBAYOYX E-mail: aisthai@caat.or.th 333/105 Lak

More information

To be in effect from 1 September 2017 to 31 August 2019 CONTENTS

To be in effect from 1 September 2017 to 31 August 2019 CONTENTS VILNIUS AIRPORT INCENTIVE SCHEME To be in effect from 1 September 2017 to 31 August 2019 CONTENTS 1. PREAMBLE... 2 2. DEFINITIONS... 2 3. INCENTIVE SCHEME... 3 3.1 New route incentive... 3 3.1.1 Level

More information

Keflavik International Airport Airport Charges

Keflavik International Airport Airport Charges Keflavik International Airport Airport Charges Valid from July 1 st 2017 Contents 1. Introduction... 3 2. Definitions... 4 3. Airport charges... 5 3.1 Landing Charges... 5 3.2 Departure Charges... 5 3.3

More information

The Coordinator s Activity Report

The Coordinator s Activity Report The Coordinator s Activity Report Season : S15 Period : 29 th March 2015 24 th October 2015 Performed by: Slot Coordination Czech Republic Slot Coordination Czech Republic - 1 - Table of contents: 1. Introduction

More information

Changi Airport A-CDM Handbook

Changi Airport A-CDM Handbook Changi Airport A-CDM Handbook Intentionally left blank Contents 1. Introduction... 3 2. What is Airport Collaborative Decision Making?... 3 3. Operating concept at Changi... 3 a) Target off Block Time

More information

USE OF RADAR IN THE APPROACH CONTROL SERVICE

USE OF RADAR IN THE APPROACH CONTROL SERVICE USE OF RADAR IN THE APPROACH CONTROL SERVICE 1. Introduction The indications presented on the ATS surveillance system named radar may be used to perform the aerodrome, approach and en-route control service:

More information

VANCOUVER AIRPORT AUTHORITY TARIFF OF FEES AND CHARGES Effective January 1, 2019 Subject to Change PAYMENT TERMS AND CONDITIONS

VANCOUVER AIRPORT AUTHORITY TARIFF OF FEES AND CHARGES Effective January 1, 2019 Subject to Change PAYMENT TERMS AND CONDITIONS PAYMENT TERMS AND CONDITIONS All fees and charges payable by an air carrier under the Tariff will be invoiced by the Airport Authority and invoiced amounts will be payable by the air carrier on the following

More information

AIRPORT PROCEDURE AIR 002

AIRPORT PROCEDURE AIR 002 INDEX 1. Objective and Scope of Application...2 2. References...2 3. DEFINITIONS...2 4. GENERAL PROVISIONS...3 5. GENERAL AVIATION SLOT MANAGEMENT - G.A.S.M...3 6. AIRCRAFT APRONS AND STANDS...3 7. PPR

More information

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL This chapter delineates the recommended 2005 2024 Sussex County Airport Capital Improvement Program (CIP). It further identifies probable construction

More information

The Coordinator s Activity Report

The Coordinator s Activity Report The Coordinator s Activity Report Season : W17 Period : 29 th October 2017 24 th March 2018 Performed by: Slot Coordination Czech Republic Slot Coordination Czech Republic - 1 - Table of contents: 1. Introduction

More information

Intentionally left blank

Intentionally left blank Intentionally left blank Contents 1. Introduction... 3 2. What is Airport Collaborative Decision Making?... 3 3. Operating concept at Changi... 3 a) Target off Block Time (TOBT)... 3 Who is responsible

More information

Grow Transfer Incentive Scheme ( GTIS ) ( the Scheme )

Grow Transfer Incentive Scheme ( GTIS ) ( the Scheme ) Grow Transfer Incentive Scheme ( GTIS ) ( the Scheme ) 1. Scheme Outline The GTIS offers a retrospective rebate of the Transfer Passenger Service Charge 1 for incremental traffic above the level of the

More information

Aeronautical Prices and Terms and Conditions

Aeronautical Prices and Terms and Conditions Aeronautical Prices and Terms and Conditions 1 July 2017 Terms and Conditions Christchurch International Airport Limited ( CIAL ) is registered as a limited liability company under the Companies Act in

More information

HIGHLANDS AND ISLANDS AIRPORTS LIMITED

HIGHLANDS AND ISLANDS AIRPORTS LIMITED HIGHLANDS AND ISLANDS AIRPORTS LIMITED ARRANGEMENTS FOR FLIGHTS OUTSIDE OFFICIAL OPENING HOURS The term Company or HIAL Group applies to Highlands and Islands Airport Limited (HIAL) and any subsidiary

More information

Short-Haul Operations Route Support Scheme (RSS)

Short-Haul Operations Route Support Scheme (RSS) Short-Haul Operations Route Support Scheme (RSS) Valid from January 1 st, 2018 1: Introduction: The Shannon Airport Authority is committed to encouraging airlines to operate new routes to/from Shannon

More information

CIVIL AVIATION REQUIREMENT SECTION 3 AIR TRANSPORT SERIES C PART I ISSUE IV, 24 th March 2017 EFFECTIVE: FORTHWITH

CIVIL AVIATION REQUIREMENT SECTION 3 AIR TRANSPORT SERIES C PART I ISSUE IV, 24 th March 2017 EFFECTIVE: FORTHWITH GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPPOSITE SAFDARJUNG AIRPORT, NEW DELHI CIVIL AVIATION REQUIREMENT SERIES C PART I ISSUE IV, 24 th March 2017 EFFECTIVE:

More information

OPERATING DIRECTIVE Number: D Aviation Authority Revised: 03/25/15

OPERATING DIRECTIVE Number: D Aviation Authority Revised: 03/25/15 Page: 1 of 7 PURPOSE: To establish procedures for airlines and airline service companies to request and utilize the Authority s controlled aircraft gates, hardstands, ticket counter and related facilities

More information

Airside Driving Policy

Airside Driving Policy Owner: Creation Date: Eibhlin McGrath Last Updated: 19/02/2015 Version: 2.0 Document Number AMUVP-03 March 2015 Document No.: AMUVP-03 1 CONTENTS Document Control... 3 Airside Driving Policy... 4 Introduction...

More information

EASA FTL 2016: Examples of ORO.FTL.110 Operator Responsibilities. 04-Dec-2015

EASA FTL 2016: Examples of ORO.FTL.110 Operator Responsibilities. 04-Dec-2015 EASA FTL 2016: Examples of ORO.FTL.110 Operator 04-Dec-2015 The following aid has been developed to provide some suggestions for meeting Operator responsibilities. Not all examples have been presented,

More information

Operation of the UK Traffic Distribution Rules in relation to all-cargo services at London Gatwick Airport. Consultation paper by BAA Gatwick

Operation of the UK Traffic Distribution Rules in relation to all-cargo services at London Gatwick Airport. Consultation paper by BAA Gatwick Operation of the UK Traffic Distribution Rules in relation to all-cargo services at London Gatwick Airport Consultation paper by BAA Gatwick Introduction 1. This paper seeks the views of interested parties

More information

Low Visibility Operations

Low Visibility Operations Airside Operational Instruction 21 Uncontrolled when printed Page 0 of 7 1 LOW VISIBILITY OPERATIONS Policy East Midlands Airport (EMA) is committed to providing facilities and procedures to enable aircraft

More information

Proposed amendments to the Air Navigation (Essendon Airport) Regulations 2001

Proposed amendments to the Air Navigation (Essendon Airport) Regulations 2001 Proposed amendments to the Air Navigation (Essendon Airport) Regulations 2001 Public Consultation Paper September 2017 Summary Purpose The purpose of this paper is to seek comments through public consultation

More information

OPERATING DIRECTIVE Number: D Aviation Authority Revised: 05/26/16

OPERATING DIRECTIVE Number: D Aviation Authority Revised: 05/26/16 Page: 1 of 7 PURPOSE: To establish procedures for airlines and airline service companies to request and utilize the Authority s controlled aircraft gates, hardstands, ticket counter and related facilities

More information

AVIATION RULES OF THE KYRGYZ REPUBLIC APKR-6 "OPERATION OF AIRCRAFT" Annex 6 Flight time limitations and flight duty time 01-Sep-2016

AVIATION RULES OF THE KYRGYZ REPUBLIC APKR-6 OPERATION OF AIRCRAFT Annex 6 Flight time limitations and flight duty time 01-Sep-2016 AVIATION RULES OF THE KYRGYZ REPUBLIC APKR-6 "OPERATION OF AIRCRAFT" Annex 6 Flight time limitations and flight duty time 01-Sep-2016 Contents Contents... 2 1 Definitions... 3 2 Purpose and scope... 3

More information

The pilot and airline operator s perspective on runway incursion hazards and mitigation options. Session 2 Presentation 2

The pilot and airline operator s perspective on runway incursion hazards and mitigation options. Session 2 Presentation 2 The pilot and airline operator s perspective on runway incursion hazards and mitigation options Session 2 Presentation 2 Operational Hazards Workload issues during taxi that can result in a loss of situational

More information

Airline Schedule Development Overview Dr. Peter Belobaba

Airline Schedule Development Overview Dr. Peter Belobaba Airline Schedule Development Overview Dr. Peter Belobaba Istanbul Technical University Air Transportation Management M.Sc. Program Network, Fleet and Schedule Strategic Planning Module 18 : 1 April 2016

More information

Azerbaijan AAR-OPS-1 SUBPART Q. 21-Nov-2014

Azerbaijan AAR-OPS-1 SUBPART Q. 21-Nov-2014 Azerbaijan AAR-OPS-1 SUBPART Q FLIGHT AND DUTY TIME LIMITATIONS AND REST REQUIREMENTS Contents Contents... 2 AAR-OPS 1.1075 GENERAL... 3 AAR-OPS 1.1080 Terminology... 4 AAR-OPS 1.1085 Limitations Flight

More information

CHAPTER 1 EXECUTIVE SUMMARY

CHAPTER 1 EXECUTIVE SUMMARY CHAPTER 1 EXECUTIVE SUMMARY 1 1 EXECUTIVE SUMMARY INTRODUCTION William R. Fairchild International Airport (CLM) is located approximately three miles west of the city of Port Angeles, Washington. The airport

More information

Irregular Operations (IROPS)

Irregular Operations (IROPS) Irregular Operations (IROPS) Introduction The Passenger Bill of Rights prohibits domestic flights from remaining on the tarmac for more than three hours. International flights may remain on the tarmac

More information

AOP 11 Low Visibility Procedures (LVP s) (Aerodrome Operating Procedure)

AOP 11 Low Visibility Procedures (LVP s) (Aerodrome Operating Procedure) AOP 11 Low Visibility Procedures (LVP s) (Aerodrome Operating Procedure) Produced by Airfield Services Document Author Operations Support Manager Contents 1 SECTION 1 - LOW VISIBILITY PROCEDURES (LVP S)...

More information

Inauguration 2017 Dulles Tower

Inauguration 2017 Dulles Tower Inauguration 2017 Dulles Tower Presented to: IAD Users By: IAD Staff, Management and NATCA Date:1/3/2017 General Information Inauguration takes place Friday, January 20, 2017 at 1200 (noon) local. The

More information

1. Purpose and scope. a) the necessity to limit flight duty periods with the aim of preventing both kinds of fatigue;

1. Purpose and scope. a) the necessity to limit flight duty periods with the aim of preventing both kinds of fatigue; ATTACHMENT A. GUIDANCE MATERIAL FOR DEVELOPMENT OF PRESCRIPTIVE FATIGUE MANAGEMENT REGULATIONS Supplementary to Chapter 4, 4.2.10.2, Chapter 9, 9.6 and Chapter 12, 12.5 1. Purpose and scope 1.1 Flight

More information

SECURITY OVERSIGHT AGENCY May 2017 EXTENDED DIVERSION TIME OPERATIONS (EDTO)

SECURITY OVERSIGHT AGENCY May 2017 EXTENDED DIVERSION TIME OPERATIONS (EDTO) ADVISORY CIRCULAR CIVIL AVIATION SAFETY AND CAA-AC-OPS031A SECURITY OVERSIGHT AGENCY May 2017 1.0 PURPOSE EXTENDED DIVERSION TIME OPERATIONS (EDTO) 1.1 This advisory circular (AC) provides guidance to

More information

CASE STUDY The New Guayaquil International Airport

CASE STUDY The New Guayaquil International Airport www.jacobs.com worldwide CASE STUDY The New Guayaquil International Airport Prepared for ICAO Airport Planning Seminar for the SAM Region Lima, Peru 10-14 Sep. 2018 September 11, 2018 Outline Existing

More information

MINISTERIAL STATEMENT ON GIBRALTAR AIRPORT

MINISTERIAL STATEMENT ON GIBRALTAR AIRPORT Annex II 18/09/06 MINISTERIAL STATEMENT ON GIBRALTAR AIRPORT The Minister of Foreign Affairs and Cooperation of the Kingdom of Spain, Mr. Miguel Angel Moratinos, the Minister for Europe of the United Kingdom

More information

ACI-NA Winter and Irregular Operations Management April 23, Rose Agnew

ACI-NA Winter and Irregular Operations Management April 23, Rose Agnew ACI-NA Winter and Irregular Operations Management April 23, 2014 Rose Agnew Agenda IROPS Causes & Effects Overview Actions HUB Airports ACRP Reports Regional Coordination GTAA Expert Panel (Peer Review)

More information

RED ATLAS PRODUCT BROCHURE. From Nevalee Business Solutions

RED ATLAS PRODUCT BROCHURE. From Nevalee Business Solutions RED ATLAS PRODUCT BROCHURE From Nevalee Business Solutions CONTENTS OVERVIEW... 3 FUNCTIONS... 3 BACKGROUND... 3 ATC... 4 OPERATIONS... 5 ACCOUNTS... 6 REPORTING... 7 CONSULTING... 8 2 OVERVIEW Red Atlas

More information

Appendix. Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Gatwick Airport Limited

Appendix. Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Gatwick Airport Limited Gatwick Airport Limited Response to Airports Commission Consultation Appendix 37 Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Further information

More information

GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION

GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION ANSS AC NO. 1 of 2017 31.07. 2017 Air Space and Air Navigation Services Standard ADVISORY CIRCULAR Subject: Procedures to follow in case

More information

WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY. Ermenando Silva APEX, in Safety Manager ACI, World

WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY. Ermenando Silva APEX, in Safety Manager ACI, World WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY Ermenando Silva APEX, in Safety Manager ACI, World Aerodrome Manual The aim and objectives of the aerodrome manual and how it is to be used by operating

More information

JOB DESCRIPTION FBO Manager

JOB DESCRIPTION FBO Manager JOB DESCRIPTION FBO Manager RESPONSIBLE TO: LOCATION: Managing Director London Biggin Hill Airport Ltd WHAT IS THE JOB LIKE? The role holder will have an oversight of operational issues and teams to ensure

More information

TERRACE-KITIMAT AIRPORT SOCIETY APRON MANAGMENT PLAN

TERRACE-KITIMAT AIRPORT SOCIETY APRON MANAGMENT PLAN TERRACE-KITIMAT AIRPORT SOCIETY 2018-19 APRON MANAGMENT PLAN Table of Contents List of Effective Pages... 3 Manual Distribution and Amendment Procedures... 5 Record of Amendments... 5 Apron Management

More information

AERONAUTICAL INFORMATION CIRCULAR 1/19

AERONAUTICAL INFORMATION CIRCULAR 1/19 NAV CANADA 31 JAN 19 AERONAUTICAL INFORMATION CIRCULAR 1/19 NOTICE OF MANDATE TO APPLY AIRPORT COLLABORATIVE DECISION MAKING (A-CDM) PROCEDURES AT TORONTO/LESTER B. PEARSON INTERNATIONAL AIRPORT 1.0 Date

More information

GENERAL 1. What is Airport CDM? 2. What is the aim of A-CDM? 3. Why has A-CDM been implemented at Amsterdam Airport Schiphol?

GENERAL 1. What is Airport CDM? 2. What is the aim of A-CDM? 3. Why has A-CDM been implemented at Amsterdam Airport Schiphol? GENERAL 1. What is Airport CDM? A-CDM stands for Airport Collaborative Decision Making and means that joint decisions are made by all operational partners the airport, air traffic control, the airlines,

More information

East Midlands Airport 2018 Aerodrome Manual

East Midlands Airport 2018 Aerodrome Manual East Midlands Airport 2018 Aerodrome Manual Version 1.0 Not Valid after 31 st December 2018 Department Operations Document Owner Operations Director (Accountable Manager) Document Administrator Ops Development

More information

GOVERNMENT OF INDIA OFFICEOFDIRECTORGENERALOFCIVILAVIATION TECHNICAL CENTRE, OPP SAFDARJANG AIRPORT, NEW DELHI

GOVERNMENT OF INDIA OFFICEOFDIRECTORGENERALOFCIVILAVIATION TECHNICAL CENTRE, OPP SAFDARJANG AIRPORT, NEW DELHI GOVERNMENT OF INDIA OFFICEOFDIRECTORGENERALOFCIVILAVIATION TECHNICAL CENTRE, OPP SAFDARJANG AIRPORT, NEW DELHI CIVIL AVIATION REQUIREMENTS SECTION 9 AIRSPACE AND AIR NAVIGATION SERVICES STANDARDS SERIES

More information

Route Support Cork Airport Route Support Scheme ( RSS ) Short-Haul Operations Valid from 1st January Introduction

Route Support Cork Airport Route Support Scheme ( RSS ) Short-Haul Operations Valid from 1st January Introduction Route Support Cork Airport Route Support Scheme ( RSS ) Short-Haul Operations Valid from 1st January 2016 1. Introduction Cork Airport is committed to encouraging airlines to operate new routes to/from

More information

CHRISTCHURCH INTERNATIONAL AIRPORT NOISE MANAGEMENT PLAN. 28 March 2014 V10

CHRISTCHURCH INTERNATIONAL AIRPORT NOISE MANAGEMENT PLAN. 28 March 2014 V10 CHRISTCHURCH INTERNATIONAL AIRPORT NOISE MANAGEMENT PLAN 28 March 2014 V10 419879.1ws34.tmp Page 1 TABLE OF CONTENTS 1.0 Introduction... 3 2.0 Aircraft Noise - Operations... 5 2.1 City Plan Requirements...

More information

IFR SEPARATION USING RADAR

IFR SEPARATION USING RADAR IFR SEPARATION USING RADAR 1. Introduction When flying IFR inside controlled airspace, air traffic controllers either providing a service to an aircraft under their control or to another controller s traffic,

More information

Aerodrome Safety. H.V. SUDARSHAN International Civil Aviation Organization

Aerodrome Safety. H.V. SUDARSHAN International Civil Aviation Organization NPF/SIP/2010-WP/19 Aerodrome Safety H.V. SUDARSHAN International Civil Aviation Organization Workshop on the development of National Performance Framework for Air Navigation Systems (Nairobi, 6-10 December

More information

SECTION 6 - SEPARATION STANDARDS

SECTION 6 - SEPARATION STANDARDS SECTION 6 - SEPARATION STANDARDS CHAPTER 1 - PROVISION OF STANDARD SEPARATION 1.1 Standard vertical or horizontal separation shall be provided between: a) All flights in Class A airspace. b) IFR flights

More information

BOARD OF AIRPORT COMMISSIONERS

BOARD OF AIRPORT COMMISSIONERS 1 8/17/2018 8/21/2018 8/16/2018 i ElY MY Y I : JH MT BY...01,, III1*.ji,"1.111Los Angeles World Airports REPORT TO THE BOARD OF AIRPORT COMMISSIONERS Meeting Date: la Approved by: e1. "ampbell, Chief Airports

More information

FRA CDM. Airport Collaborative Decision Making (A-CDM) Flight Crew Briefing FRANKFURT AIRPORT. German Harmonisation

FRA CDM. Airport Collaborative Decision Making (A-CDM) Flight Crew Briefing FRANKFURT AIRPORT. German Harmonisation Airport Collaborative Decision Making (A-CDM) CDM Airport @ FRA Flight Crew FRANKFURT AIRPORT Table of contents: 1. General... 3 2. Target Off Block Time (TOBT)... 4 2.1 Automatically generated TOBT...

More information

CAAC China. CCAR 121 Subpart P Crew members Flight and Duty time Limits, and Rest Requirements Revision Oct-2017

CAAC China. CCAR 121 Subpart P Crew members Flight and Duty time Limits, and Rest Requirements Revision Oct-2017 CAAC China CCAR 121 Subpart P Crew members Flight and Duty time Limits, and Rest Requirements Revision 5 10-Oct-2017 Contents Contents... 2 CCAR 121.481 General... 3 CCAR 121.483 Flight crew flight time

More information

The pilot and airline operator s perspective on runway incursion hazards and mitigation options. Session 3 Presentation 1

The pilot and airline operator s perspective on runway incursion hazards and mitigation options. Session 3 Presentation 1 The pilot and airline operator s perspective on runway incursion hazards and mitigation options Session 3 Presentation 1 Operational Hazards Workload issues during taxiing that can result in a loss of

More information

SLOTS AND BUSINESS AVIATION - THE LEGAL POSITION

SLOTS AND BUSINESS AVIATION - THE LEGAL POSITION SLOTS AND BUSINESS AVIATION - THE LEGAL POSITION John Balfour Clyde & Co EUACA SEMINAR ON BUSINESS AVIATION 30 September 2009, Amsterdam THE SLOT REGULATION - SCOPE The Regulation is basically concerned

More information

8.4.9 Fatigue Management. Republic of Korea

8.4.9 Fatigue Management. Republic of Korea 8.4.9 Fatigue Management Flight Safety Regulations for Aeroplanes (FSRA) Implementation 2017.6.12 Ministry of Land Transport and Maritime Affairs (Air Navigation Division), 044-201-4264 Republic of Korea

More information

INCENTIVE PROGRAM

INCENTIVE PROGRAM LIMAK KOSOVO INT L AIRPORT J.S.C. PRISTINA INTERNATIONAL AIRPORT "ADEM JASHARI" INCENTIVE PROGRAM 2018 2020 (25 March 2018 28 March 2020) 1 ARTICLE 1: OBJECTIVE The objective of the Incentive Program is

More information

BOARD OF AIRPORT COMMISSIONERS

BOARD OF AIRPORT COMMISSIONERS 6/30/2017 Approval NY ElY D 1 RW 1 AE.011, Or?" 0.1014 Los Angeles World Airports REPORT TO THE BOARD OF AIRPORT COMMISSIONERS Approved by: (-F---01LA)------ Robert Falcon, Chief Airports Engineer 4/11.1"

More information

JUNEAU RUNWAY INCURSION MITIGATION (RIM) PROGRAM JANUARY 25, 2017

JUNEAU RUNWAY INCURSION MITIGATION (RIM) PROGRAM JANUARY 25, 2017 JUNEAU RUNWAY INCURSION MITIGATION (RIM) PROGRAM JANUARY 25, 2017 1 Agenda Program Description Runway Incursions Design and Geometry Deficiencies Runway 8/26 Operations Potential Mitigation Next Steps

More information

LFPG / Paris-Charles de Gaulle / CDG

LFPG / Paris-Charles de Gaulle / CDG This page is intended to draw commercial and private pilots attention to the aeronautical context and main threats related to an aerodrome. They have been identified in a collaborative way by the main

More information

Aircraft movements and parking stands

Aircraft movements and parking stands 1(19) Aircraft movements and parking stands Table of contents 1 General... 3 1.1 Foreword... 3 1.2 Aircraft parking stands... 3 1.3 Planning... 3 1.4 Airport CDM... 4 1.5 Push-back... 5 1.6 De-icing...

More information

Aer Rianta Submission to the Commission for Aviation Regulation On The Consideration of the Full Coordination of Dublin Airport.

Aer Rianta Submission to the Commission for Aviation Regulation On The Consideration of the Full Coordination of Dublin Airport. AR/CAR/03: Aer Rianta Submission to the Commission for Aviation Regulation On The Consideration of the Full Coordination of Dublin Airport. (CP3/2001) 5th June 2001 TABLE OF CONTENTS 1 INTRODUCTION & BACKGROUND

More information

Schedule of Airport Charges

Schedule of Airport Charges Schedule of Airport s IMPORTANT NOTE: This schedule of charges must be read in conjunction with Leeds Bradford Airport Limited s current standard conditions of use by airlines & aircraft operators ( Standard

More information

Effective: AUSTRALIAN INTERNATIONAL AIRSHOW AVALON 2019, AVALON AIRPORT 19 FEBRUARY - 5 MARCH 2019, IFR OPERATIONS AVALON AIRPORT

Effective: AUSTRALIAN INTERNATIONAL AIRSHOW AVALON 2019, AVALON AIRPORT 19 FEBRUARY - 5 MARCH 2019, IFR OPERATIONS AVALON AIRPORT AUSTRALIA AERONAUTICAL INFORMATION SERVICE AIRSERVICES AUSTRALIA GPO BOX 367, CANBERRA ACT 2601 Phone: 02 6268 4874 Email: aim.editorial@airservicesaustralia.com Effective: AIP SUPPLEMENT (SUP) H 02/19

More information

INTRODUCTION OF AIRPORT COLLABORATIVE DECISION MAKING (A-CDM) AT SINGAPORE CHANGI AIRPORT

INTRODUCTION OF AIRPORT COLLABORATIVE DECISION MAKING (A-CDM) AT SINGAPORE CHANGI AIRPORT Telephone: (65) 6595 6051 AFS: WSSSYNYX Facsimile: (65) 6441 0221 caas_singaporeais@caas.gov.sg www.caas.gov.sg REPUBLIC OF SINGAPORE AERONAUTICAL INFORMATION SERVICES CIVIL AVIATION AUTHORITY OF SINGAPORE

More information

MALDIVIAN CIVIL AVIATION REGULATIONS MCAR-OPS 1. Amendment July 2010 SUBPART Q REQUIREMENTS

MALDIVIAN CIVIL AVIATION REGULATIONS MCAR-OPS 1. Amendment July 2010 SUBPART Q REQUIREMENTS CIVIL AVIATION DEPARTMENT Republic of Maldives MALDIVIAN CIVIL AVIATION REGULATIONS MCAR-OPS 1 Commercial Air Transportation (Aeroplanes) Amendment 2 01 July 2010 SUBPART Q FLIGHT AND DUTY TIME LIMITATIONS

More information

TUCSON INTERNATIONAL AIRPORT (TUS) DISABLED AIRCRAFT RECOVERY PLAN Section TABLE OF CONTENTS Page

TUCSON INTERNATIONAL AIRPORT (TUS) DISABLED AIRCRAFT RECOVERY PLAN Section TABLE OF CONTENTS Page TUCSON INTERNATIONAL AIRPORT (TUS) DISABLED AIRCRAFT RECOVERY PLAN Section TABLE OF CONTENTS Page 1.0 Disabled Aircraft Recovery Plan Overview 4 1.1 Overview 4 2.0 Aircraft Incident/Accidents 6 3.0 TAA

More information