/ I SAV I A. Keflavik International Airport
|
|
- Brianna Martin
- 5 years ago
- Views:
Transcription
1 / I SAV I A Keflavik International Airport
2 ABOUT ISAVIA
3 ABOUT ISAVIA / Operates all airports in Iceland Connecting different regions Connecting Iceland to Europe and USA / Air Navigation services One of the largest ATC areas in the world Connects three continents / 1200 employees
4 AVIATION IT S IN OUR NATURE ROLE / Isavia is a service oriented operator of airports and air navigation and serves as a foundation in Icelandic air transport VISION / Our vision is for Iceland to serve as the center for aviation in the North Atlantic VALUES / Our values are safety, cooperation and service
5 CONNECTING CONTINENTS IT S IN OUR NATURE / Keflavik airport: 25 airlines and 80 destinations
6 EXISTING OPERATIONS
7 TERMINAL LAYOUT Check-In Security Baggage Area Borders Non-Schengen Departures
8 TRAFFIC & FUTURE FORECASTING
9 AIRLINES SUMMER 2016
10 PASSENGER DEVELOPMENT AT KEF % / Huge increase between years / +222% between 2010 and % 20% 12% 16% 20% 26% / Increased ratio of transfer passengers % % / Nationality forecast % in foreign travelers +10% in Icelandic travelers forecast To/from Transfer
11 INTRA-DAY PASSENGERS JULY AVERAGE Arrivals Departures
12 LONG TERM PASSENGER FORECAST To/from Transfer
13 FUTURE DEVELOPMENT
14
15
16 TERMINAL AREA
17 PHASED TERMINAL DEVELOPMENT ,5 million passengers 10,6 million passengers movements movements 22 contact stands 26 contact stands 7 remote stands 8 remote stands 5 baggage claim belts 7 baggage claim belts 13,8 million passengers movements 30 contact stands 10 remote stands 9 baggage claim belts Possible expansions beyond 13.8 million passengers
18 PROJECT IDEAS
19 DE-ICING STAND / Environmental / Chemistry / Maximize recycling of glycol with minimal energy usage (geothermal) / Recycling options / Financial / Construction and Business models
20 MAXIMUM AIRPORT CAPACITY / Operational Research / Finding the maximum capacity through the smallest denominator that syncs the capacity of the landside, checkin, baggage, security, border control, gates, stands and runways to maximies the possible capacity before the construction of 3rd runway.
21 RISK ANALYSIS / Financial / Asses the risk portfolio of the construction projects planned in relation to the MasterPlan of the airport until 2040 with as key milestones. Source: mbl.is
22 / AIR NAVIGATION SERVICES Ásbjörn Hagalín Pétursson
23 THE AREA ICELAND CONTROLS / Total size is square km Iceland is square km / Air Traffic Controllers Maintain horizontal and vertical separation / Complex flow Green, Red, Blue: N-Europe to US White: Scandinavia and Russia to US West coast and Canada Purple: Scandinavia and Russia to US East coast Yellow: Central to south America to far east
24
25 MACHINE LEARNING - AIR TRAFFIC FORECAST / Possible features: Prior days Flight Plans ahead of time Minimum Time Track based on weather forecast / Optimize Air Traffic Controllers on duty
26 FIND THE OPTIMAL HIGHWAY THROUGH THE SKY EVERY DAY
27 DISPLAY SURVEILLANCE DATA IN BROWSER / Live stream of surveillance data / Similar to Flightradar24.com and flightaware.com
28 UNMANNED AERIAL VEHICLES / Flight inspection of Precision Approach Path Indicator (PAPI) approach lights. Computer vision / Automatic inspection of airport fences Computer vision Object recognition
29 / THE I C ELANDI C R EG I O NAL AI R PO R TS How can we operate airports in such a small community? Jón Karl Ólafsson Director Regional Airports Iceland
30 DOMESTIC FLIGHT ROUTES Part of the public transport system in Iceland We do not have train system Many small towns and villages depending on flights Many complain about the cost of flying Passenger numbers have been declining however growth again in 2016
31 AIRPORTS WITH SCHEDULED FLIGHTS IN ICELAND / International airports Akureyri* Egilsstaðir* Keflavík Reykjavík* *Also domestic airport / Domestic airports Bíldudalur Gjögur Grímsey Húsavík Höfn í Hornafirði Ísafjörður Vestmannaeyjar Vopnafjörður Þingeyri Þórshöfn
32 PASSENGERS REGIONAL AIRPORTS
33 CARGO AND MAIL REGIONAL AIRPORTS
34 SEPARATE FINANCING METHOD / Keflavík International Airport Cost based scheme of charges Users ( airlines and passengers ) pay for the whole operation of the airport, and all it s facilities Huge investment plans for the future, as passenger numbers have been growing very fast Profitable operation / Domestic/Regional airports Financed with a service contract with the state Users pay only around 20% of actual cost of operation Very productive operation of airports however incentives are low for owner and operators lack of future goals and objectives
35 IDEAS
36 MACRO ECONOMICS FLIGHTS AS PUBLIC TRANSPORT / We have not seen growth in passenger numbers despite the huge growth in tourism. / Transportation of people mainly on roads privet cars and buses. / Only faster transportation possible with flights. / Huge growth in tourism in the past and future not using flights as public transportation within the country. / Calculating the macro effects of regional flights would become more common way of transportation: Subsidize flights as other transportation is that a viable option? Savings time road maintenance better distribution?
37 MACRO ECONOMICS FLIGHTS FOR REGIONAL CARGO / Cargo and mail with flights declining fast the last years. / Cargo mainly on roads very heavy and big trucks on narrow roads. / Smaller cargo aircraft available not in use in Iceland / Might this be and option cargo aircraft 5-8 tons for bulky cargo straight to the bigger international hubs ( Keflavik ). / Possible to subsidize would that be more feasible than building bigger roads more suitable for heavy cargo? / Transportation of fish other?
38 / THANK YO U
City of Austin Department of Aviation Austin Bergstrom International Airport 2040 Master Plan. Public Workshop #2 April 19, 2018
City of Austin Department of Aviation Austin Bergstrom International Airport 2040 Master Plan Public Workshop #2 April 19, 2018 DISCUSSION TOPICS Introduction About the Master Plan Public Workshop #1 Recap
More informationTERMINAL DEVELOPMENT PLAN
5.0 TERMINAL DEVELOPMENT PLAN 5.0 TERMINAL DEVELOPMENT PLAN Key points The development plan in the Master Plan includes the expansion of terminal infrastructure, creating integrated terminals for international,
More informationDescription of Airport Charges. Swedavia AB Appendix 3 to Conditions of Services, Swedavia AB
Description of Airport Charges Swedavia AB 2016 Appendix 3 to Conditions of Services, Swedavia AB Contents 1 Swedavias Charges... 3 2 Aircraft Related Charges... 4 2.1 Take-Off Charge... 4 2.2 Emission
More informationKeflavik International Airport Airport Charges
Keflavik International Airport Airport Charges Valid from July 1 st 2017 Contents 1. Introduction... 3 2. Definitions... 4 3. Airport charges... 5 3.1 Landing Charges... 5 3.2 Departure Charges... 5 3.3
More informationAirport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal
Airport Master Plan Rapid City Regional Airport October 2015 FAA Submittal Rapid City Regional Airport Master Plan Update Table of Contents Executive Summary... i Scope & Timeline... i Forecasts... i Preferred
More informationSouthwestFloridaInternational Airport
SouthwestFloridaInternational Airport SouthwestFloridaInternationalAirportislocatedinLee CountyalongtheGulfCoastofSouthFlorida,tenmiles southeastofthefortmyerscentralbusinessdistrict. Theprimaryhighwayaccesstotheairportfrom
More informationSaint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis
Saint Petersburg-Clearwater International Airport Airspace & Instrument Approach Analysis February 23, 2005 Jeppesen Boeing Jeppesen Government / Military Services Group Airspace Services Division AIRSPACE
More informationAirport s Perspective of Traffic Growth and Demand Management CANSO APAC Conference 5-7 May 2014, Colombo, Sri Lanka
Airport s Perspective of Traffic Growth and Demand Management CANSO APAC Conference 5-7 May 2014, Colombo, Sri Lanka SL Wong Senior Manager - Technical & Industry Affairs The Question I Try to Answer How
More informationCHAPTER 1 EXECUTIVE SUMMARY
CHAPTER 1 EXECUTIVE SUMMARY 1 1 EXECUTIVE SUMMARY INTRODUCTION William R. Fairchild International Airport (CLM) is located approximately three miles west of the city of Port Angeles, Washington. The airport
More informationENVISIONING AUSTIN s Airport of the Future
ENVISIONING AUSTIN s Airport of the Future ABIA 2040 Master Plan Public Workshop #1 October 12, 2017 WHAT IS THE PURPOSE OF TODAY S WORKSHOP? Educate & Inform Solicit Input Answer Questions 2 WHAT IS A
More informationAirport Access The challenge for Business Aviation in the 21st century. Vlad Olteanu, Policy Manager
Airport Access The challenge for Business Aviation in the 21st century Vlad Olteanu, Policy Manager EUACA Seminar, Amsterdam, 30 September 2009 THE VOICE OF EUROPE S AIRPORTS More than 400 AIRPORTS / 46
More informationIcelandair Group Financial Results for the first half and Q2 2007
Icelandair Group Financial Results for the first half and Q2 2007 Total revenue for H1 2007 was ISK 28.1 billion compared to ISK 24.1 billion for H1 2006, an increase of 17%. Total revenue for Q2 2007
More informationANA HOLDINGS Financial Results for the Year ended March 31, 2016
ANA HOLDINGS NEWS ANA HOLDINGS Financial Results for the Year ended March 31, 2016 TOKYO, April 28, 2016 ANA HOLDINGS (hereafter ANA HD ) today reports its consolidated financial results for fiscal year
More informationSPADE-2 - Supporting Platform for Airport Decision-making and Efficiency Analysis Phase 2
- Supporting Platform for Airport Decision-making and Efficiency Analysis Phase 2 2 nd User Group Meeting Overview of the Platform List of Use Cases UC1: Airport Capacity Management UC2: Match Capacity
More informationANA HOLDINGS Announces Mid-Term Corporate Strategy for FY ~Strengthening the foundations of the business and looking into the future~
ANA HOLDINGS NEWS ANA HOLDINGS Announces Mid-Term Corporate Strategy for FY2018-2022 ~Strengthening the foundations of the business and looking into the future~ TOKYO, February 1, 2018 ANA HOLDINGS (hereinafter
More informationQ: How many flights arrived and departed in 2017? A: In 2017 the airport saw 39,300 air transport movements.
Southampton Airport Masterplan FAQ 4 October 2018 Background Southampton Airport Today Q: How many passengers currently use Southampton Airport and how has this changed over the last 5 years? A: Over the
More informationH1 RESULTS 2007 Jón Karl Ólafsson, CEO
H1 RESULTS 2007 Jón Karl Ólafsson, CEO Agenda 01 Highlights 02 Financial results 03 Outlook 04 New organizational chart 05 Q & A H1 Highlights Aggressive fleet growth characterizes H1 results 12 aircraft
More informationSchiphol Group. Annual Report
Schiphol Group Annual Report 2013 Business model Business model Schiphol Group distinguishes four core activities: Aviation, Consumer Products and Services, Real Estate, and Alliances and Participations.
More informationFORECASTING FUTURE ACTIVITY
EXECUTIVE SUMMARY The Eagle County Regional Airport (EGE) is known as a gateway into the heart of the Colorado Rocky Mountains, providing access to some of the nation s top ski resort towns (Vail, Beaver
More informationThe Government s Aviation Strategy Transport for the North (TfN) response
The Government s Aviation Strategy Transport for the North (TfN) response Transport for the North Background Good transport links are a crucial part of a strong economy supporting labour markets and delivering
More informationRegional Jets ,360 A319/ , , , ,780
Excel Tab Name: Seats (18 MAP) PASSENGER AIRLINE FLIGHT SCHEDULE CALCULATION RECORD Summary 17.2 MAP flight schedule* (with Southwest Airlines B737-800s changed to B737-700s) Number of Total Seats Avg.
More information2006 ANNUAL GENERAL MEETING
2006 ANNUAL GENERAL MEETING Address by Garth F. Atkinson President and Chief Executive Officer April 19, 2006 Thank you Peter and good morning ladies and gentlemen and invited guests. Before proceeding
More informationAppendix. Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Gatwick Airport Limited
Gatwick Airport Limited Response to Airports Commission Consultation Appendix 37 Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Further information
More informationThe CLE Master Plan Includes:
The CLE Master Plan Includes: An inventory of existing conditions Forecasting future demand and analyzing future needs Evaluating alternative development scenarios Preparing the Airport Layout Plan Preparing
More informationApplewood Heights Community Open House
Applewood Heights Community Open House Agenda TORONTO PEARSON BACKGROUND Toronto Pearson: For you. The World. Our goal: To become North America s premier gateway airport. Our job is to get you better connected
More informationTWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22)
INTERNATIONAL CIVIL AVIATION ORGANIZATION TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22) Bangkok, Thailand, 5-9 September 2011 Agenda
More informationINNOVATION IN AVIATION. Geert Boosten d.d. June 19, 2018 IPIC 2018
INNOVATION IN AVIATION Geert Boosten d.d. June 19, 2018 IPIC 2018 INCREDIBLE INDUSTRY ACHIEVEMENTS IN 100 YEARS City in the Sky: Over 1 million passengers Live in this city Entrance via airports worldwide
More informationAirport Master Plan for. Brown Field Municipal Airport PAC Meeting #3
Airport Master Plan for Brown Field Municipal Airport PAC Meeting #3 Public Meeting #1 > 8/24/17 from 5:30 to 8:00 pm > 41 attendees signed-in > Comments: > EAA area > Environmental constraints > Focus
More informationDESIGN CONTEST NO: MASTERPLAN KEFLAVIK INTERNATIONAL AIRPORT ID: 89046
DESIGN CONTEST NO: 15738 MASTERPLAN KEFLAVIK INTERNATIONAL AIRPORT ID: 89046 2 89046 TABLE OF CONTENT - MASTERPLAN - LAND-USE PLAN - TERMINAL PLAN - ENVIROMENTAL PLAN - MASTERPLAN PROCESS AND METHODOLOGY
More informationBNA Master Plan Update Community Advisory Committee Meeting No. 5
A Six Sigma Organization BNA Master Plan Update Community Advisory Committee Meeting No. 5 September 19, 2012 Introductions MNAA Staff RW Armstrong Team Albersman & Armstrong, Ltd. Atkins North America,
More informationThe challenges of growth, the growth of challenges Airports Canada 2013 April 11, JAMES C. CHERRY CEO Aéroports de Montréal
The challenges of growth, the growth of challenges Airports Canada 2013 April 11, 2013 JAMES C. CHERRY CEO Aéroports de Montréal AGENDA THE CHALLENGES OF GROWTH, THE GROWTH OF CHALLENGES Trafic growth
More informationDraft Concept Alternatives Analysis for the Inaugural Airport Program September 2005
Section 10 Preferred Inaugural Airport Concept 10.0 Introduction The Preferred Inaugural Airport Concept for SSA was developed by adding the preferred support/ancillary facilities selected in Section 9
More informationFederal Budget Submission. Prepared for the House of Commons Standing Committee on Finance. Greater Toronto Airports Authority
2018-2019 Federal Budget Submission Prepared for the House of Commons Standing Committee on Finance Greater Toronto Airports Authority - August 2017 - Contact: Lorrie McKee Director, Public Affairs and
More informationChapter The All-new, World-class Denver International Airport Identify Describe Know Describe Describe
Chapter 10 The aerospace subject is very large and diverse. As seen in previous chapters, there are many subject areas. So far you have learned about history, weather, space and aerodynamics. Now you will
More informationDRAFT. Master Plan RESPONSIBLY GROWING to support our region. Summary
Master Plan GROWING 2017-2037 RESPONSIBLY to support our region Summary DRAFT 2 1 Introduction Over the next three decades, Southern Ontario is set to experience significant growth its population will
More informationFLIGHT PATH FOR THE FUTURE OF MOBILITY
FLIGHT PATH FOR THE FUTURE OF MOBILITY Building the flight path for the future of mobility takes more than imagination. Success relies on the proven ability to transform vision into reality for the betterment
More informationMetroAir Virtual Airlines
MetroAir Virtual Airlines NAVIGATION BASICS V 1.0 NOT FOR REAL WORLD AVIATION GETTING STARTED 2 P a g e Having a good understanding of navigation is critical when you fly online the VATSIM network. ATC
More informationRonan Delaney. DELANEY_RONAN_AVIATION_JUN_2018.DOCX
Ronan Delaney Profession Structural Engineer Current Position Associate Principal Global Aviation Skills Leader Joined Arup 1988 Years of Experience 25+ Nationality Irish Qualifications Bsc (Eng), Dip
More informationCOMMERCIAL AND GENERAL AVIATION
Existing Facilities Melbourne International Airport is served by three runways and a number of airside and landside facilities. The runways include Runway 4/22 (3,001 feet long by 75 feet wide), Runway
More informationCIVIL AVIATION AUTHORITY
CIVIL AVIATION AUTHORITY INFRASTUCTRE DEVELOPMENT: BOTTLENECKS AND SOLUTIONS IN AVIATION SECTOR by the Presentation to the ICPAU 5 th Economic Director Finance, Civil Aviation Authority, U 20 July Overview
More information2018 Airport Master Plan Overview of Development Concepts. Greg Ballentine (WSP)
2018 Airport Master Plan Overview of Development Concepts Greg Ballentine (WSP) Thank You Stakeholder and community consultation has included discussions with over 40 stakeholder groups including airport
More informationANA HOLDINGS Financial Results for the Three Months ended June 30, 2015
ANA HOLDINGS NEWS ANA HOLDINGS Financial Results for the Three Months ended June 30, 2015 TOKYO, July 29, 2015 ANA HOLDINGS (hereinafter ANA HD ) today reports its financial results for the three months
More informationSky Express identity. 1 ATR72 (70Y), 4 ATR42 (48Y) & 1 Bae Jet Stream 41 (30Y) >95% aircraft reliability. Since 2005 in Heraklion, Crete, Greece
Profile Sky Express is a member of ERA and operates to 29 destinations within Greece, connecting the most popular Greek Islands with mainland. Its fleet is consisted mainly of new technology ATR aircrafts.
More informationBadgery s Creek Airport Presention. Revised from NAN 2015 AGM
Badgery s Creek Airport Presention Revised from NAN 2015 AGM Contents History Badgery s Creek Objectives Why is another airport required? Badgery s Creek Airport key facts, approval process and timeline
More informationIntegrated Applications Programme (IAP) & Space for UAS UAS for Applications
ESA s Integrated Applications Programme (IAP) & Space for UAS UAS for Applications M. Vaissiere ESA Director of Telecommunications and Integrated Applications Programme European High Level UAS Conference
More informationGSP TERMINAL IMPROVEMENT PROGRAM PRESS KIT
About GSP MISSION STATEMENT At Greenville-Spartanburg International Airport (GSP), we begin each day fully committed to finding new ways to achieve our mission to provide the citizens of Upstate South
More informationCurrent and Forecast Demand
Existing Facilities Jacksonville International Airport (JIA) is served by a number of airside and landside facilities. There are two runways that serve the airport in an open V configuration. The Annual
More informationToronto Pearson Master Plan Greater Toronto Airports Authority October 4, 2017
Toronto Pearson Master Plan 2017-2037 Greater Toronto Airports Authority October 4, 2017 Stakeholder engagement The GTAA has been proactively engaging stakeholders to outline how it is preparing to meet
More informationMacao's aviation strategy and partnership approach
Macao's aviation strategy and partnership approach Lam Hin San, Kevin Macao SAR, China 31 March 2008 Macao SAR, China Total Area: 28.6 km 2 Macao Peninsula: 9.3 km2 Taipa Island: 6.5 km2 CoTai Area: 5.2
More informationMeeting Presentation. Sacramento International Airport Master Plan Update October 30, 2012
Meeting Presentation Master Plan Update October 30, 2012 Agenda We encourage open discussion during today s meeting Team Goals Background (Airport Master Plans) Areas of Emphasis Schedule Special Concerns
More informationFederal Aviation. Administration. FAA Overview. Federal Aviation. Administration
Presented to: AFCEA International Los Angeles By: William C. Withycombe Regional Administrator, Western-Pacific Region Date: Overview! Major Safety Initiatives! Organizational Structure! Destination 2025!
More informationDFS Aviation Services GmbH. A brand of experience. Aviation Services
DFS Aviation Services GmbH A brand of experience Aviation Services Who we are Company profile DFS Aviation Services GmbH offers a wide range of products and services related to air navigation services
More information1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan
TABLE OF CONTENTS CHAPTER 1 INTRODUCTION 10 Project Background 1-1 11 Mission Statement and Goals 1-1 12 Objectives of this Sustainable Master Plan 1-2 CHAPTER 2 INVENTORY 20 Airport Background 2-1 201
More informationCOMOX VALLEY AIRPORT. Strategic Plan Summary. October 2010
COMOX VALLEY AIRPORT Strategic Plan 2011-2015 Summary October 2010 COMOX VALLEY AIRPORT Introduction History The Comox Airport was constructed by the Department of National Defence in 1942. The Comox Airport
More informationAn Integrated Investment Incentives and Cargo Hub Airports to Stimulate Air Cargo Demand. June,2017
An Integrated Investment Incentives and Cargo Hub Airports to Stimulate Air Cargo Demand June,2017 I. Introduction Africa has huge opportunity for air transport countries need proactively exploit. 1 billion
More informationAIRPORT OF THE FUTURE
AIRPORT OF THE FUTURE Airport of the Future Which airport is ready for the future? IATA has launched a new activity, working with industry partners, to help define the way of the future for airports. There
More informationAlternatives Analysis EXECUTIVE SUMMARY
Alternatives Analysis EXECUTIVE SUMMARY Alternative development plans were created as part of the Master Plan for Harrisburg International Airport. The aim is to provide sufficient capacity for projected
More informationICAO Big Data Project ADS-B Data as a source for analytical solutions for traffic behaviour in airspace
ICAO Big Data Project ADS-B Data as a source for analytical solutions for traffic behaviour in airspace ICAO/IATA/CANSO PBN/2 San Jose December 8, 2016 Big Data process Quantitative Quantitative / Qualitative
More informationChapter 1 EXECUTIVE SUMMARY
Chapter 1 EXECUTIVE SUMMARY Contents Page Aviation Growth Scenarios................................................ 3 Airport Capacity Alternatives.............................................. 4 Air Traffic
More information1. Introduction. 2.2 Surface Movement Radar Data. 2.3 Determining Spot from Radar Data. 2. Data Sources and Processing. 2.1 SMAP and ODAP Data
1. Introduction The Electronic Navigation Research Institute (ENRI) is analysing surface movements at Tokyo International (Haneda) airport to create a simulation model that will be used to explore ways
More informationFLL Master Plan Update Technical Advisory Committee (TAC) Briefing #1. September 28, 2016
FLL Master Plan Update Technical Advisory Committee (TAC) Briefing #1 September 28, 2016 TAC Committee Role: Internal Stakeholders To provide input on the master planning analysis from the technical and
More informationLake Tahoe Airport Master Plan Public Meeting March 16, 2015
Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development plans
More informationKey Statistical Indicator For The International Airports Operator In PPP/BOT/Project Finance Environment
Key Statistical Indicator For The International Airports Operator In PPP/BOT/Project Finance Environment Introduction Taken over airports in emerging markets and in immature environments (but not always
More informationPromote Iceland is a public-private partnership and the goals of Promote Iceland are: - to grow Iceland s good image and reputation, - to support the
DESTINATION ICELAND Promote Iceland is a public-private partnership and the goals of Promote Iceland are: - to grow Iceland s good image and reputation, - to support the competitive standing of Icelandic
More informationKeflavik International Airport Air Navigation Charge
Keflavik International Airport Air Navigation Charge Valid from May 1 st 2016 Contents 1. Introduction... 3 2. Definitions... 4 3. Terminal Navigation Charge (TNC)... 5 3.1 Terminal Navigation Charge (TNC)...
More informationDocument prepared by MnDOT Office of Aeronautics and HNTB Corporation. MINNESOTA GO STATE AVIATION SYSTEM PLAN
LAST UPDATE JULY 2013 Acknowledgements The preparation of this document was financed in part by a grant from the Federal Aviation Administration (Project No: 3-27-0000-07-10), with the financial support
More informationATR-600 SERIES THE LEADING TURBOPROP
ATR-600 SERIES THE LEADING TURBOPROP ATR, regional market leader THE STRONGEST TRACK RECORD IN REGIONAL AVIATION 75% of turboprop orders in 2010-2016 The regional aviation market has evolved rapidly over
More informationFinancing Infrastructure: Working with your Users. Julie Garg Manager Airport & ATC Charges
Financing Infrastructure: Working with your Users Julie Garg Manager Airport & ATC Charges International Air Transport Association, who are we? Our VISION : To be the provider of global leadership and
More informationOPTIMIZING AIRPORT OPERATING EXPENSES
OPTIMIZING AIRPORT OPERATING EXPENSES Business of Airports Conference April 20-22, 2015 Dafang Wu, CFA, CMA Agenda Benchmark airport expenses Historical cost saving practice Alternative approach 1 of 17
More informationPort of Seattle Sea-Tac Airport Master Plan An Economic Engine for Washington State. Kurt Beckett Deputy Chief Executive Officer
Port of Seattle Sea-Tac Airport Master Plan An Economic Engine for Washington State Kurt Beckett Deputy Chief Executive Officer WA Ports A Unique Public Agency Mission: Create Jobs through Travel, Trade
More informationTed Stevens Anchorage International Airport
Ted Stevens Anchorage International Airport 2014 MASTER PLAN UPDATE Executive Summary IN ASSOCIATION WITH: HDR DOWL HKM RIM Architects ATAC Ted Stevens Anchorage International Airport is planning for the
More informationAirport Master Planning Process & Update
Airport Master Planning Process & Update David Stewart ICAO Airport Master Planning Task Force Subgroup Leader ICAO Airport Planning Seminar for the SAM Region Lima, Peru 10-14 Sep. 2018 1 Speaker: David
More informationAirport Safety Initiative Networking Session Initiated by the Airport Safety Cluster. Helsinki, IST Event /11/ 2006,16:00-17:30
Airport Safety Initiative Networking Session Initiated by the Airport Safety Cluster Helsinki, IST Event 2006 22/11/ 2006,16:00-17:30 Agenda 16:00 Welcome (Andrea Kurz, Airport Safety Cluster) 16:05 Setting
More informationKeflavik International Airport Passenger forecast 2018
Keflavik International Airport Passenger forecast 2018 2 Keflavik International Airport Passenger forecast Keflavik International Airport 2018 3 Passenger Forecast 2018 Forecast 2018 6,409,312 3,971,969
More informationATR THE SHORTCUT TO YOUR DESTINATION
ATR 42-600 THE SHORTCUT TO YOUR DESTINATION THE STRON IN REGIONA 75% of turboprop orders in 2010-2017 ATR, regional market leader GEST TRACK RECORD L AVIATION The regional aviation market has evolved rapidly
More informationClassification: Public
Appendices 1 Runway Scheduling Limits 2 Additional Runway Scheduling Constraints 3 Terminal Scheduling Limits 4 Load Factors - to be used for terminal scheduling calculations 5 Stand Limits 6 Additional
More informationANA HOLDINGS Financial Results for FY2014
ANA HOLDINGS NEWS ANA HOLDINGS Financial Results for FY2014 TOKYO, April 30, 2015 ANA HOLDINGS (hereafter ANA HD ) today reports its consolidated financial results for fiscal year 2014 (April-March). Highlights
More informationIcelandair Group A Brief Introduction. Magnús Þorlákur Lúðvíksson, Business Development March 2017
Icelandair Group A Brief Introduction Magnús Þorlákur Lúðvíksson, Business Development March 2017 1 Today s agenda A brief introduction to Icelandair Group Our partnership with Reykjavik University Q&A
More informationVisual Fact Book Full Year 2008
Visual Fact Book Full Year 2008 Content Slide Title Page 3 Disclaimer................................... 2 4 Fraport at a Glance/FRA at a Glance.......... 2 5 History of Fraport AG..........................
More informationThank you for participating in the financial results for fiscal 2014.
Thank you for participating in the financial results for fiscal 2014. ANA HOLDINGS strongly believes that safety is the most important principle of our air transportation business. The expansion of slots
More informationFinancing of the Icelandic Airports based on the Norwegian System
Financing of the Icelandic Airports based on the Norwegian System Sigríður Alma Gunnsteinsdóttir Thesis of 30 ECTS credits Master of Science (M.Sc.) in Engineering Management June 2016 Financing of the
More informationEvaluation of Quality of Service in airport Terminals
Evaluation of Quality of Service in airport Terminals Sofia Kalakou AIRDEV Seminar Lisbon, Instituto Superior Tecnico 20th of October 2011 1 Outline Motivation Objectives Components of airport passenger
More informationOUTLINE OF JAL GROUP MEDIUM RANGE CORPORATE PLAN FOR THE YEARS 2004 THROUGH 2006
OUTLINE OF JAL GROUP MEDIUM RANGE CORPORATE PLAN FOR THE YEARS 2004 THROUGH 2006 Tokyo March 10, 2004: FY2003 business has been badly affected in terms of demand and on revenue by the negative impact of
More informationAirport Systems: Planning, Design, and Management
Airport Systems: Planning, Design, and Management Richard de Neufville AmedeoR. Odoni McGraw-Hill New York Chicago San Francisco Lisbon London Madrid Mexico City Milan New Delhi San Juan Seoul Singapore
More informationThe path of Rome Fiumicino Airport to operational excellence. EURO Aviation IT Summit Budapest September 28, 2018
The path of Rome Fiumicino Airport to operational excellence EURO Aviation IT Summit Budapest September 28, 2018 2017 - ROME FIUMICINO (FCO) IN NUMBERS >200 DESTINATIONS 41Mln 100 55 6 +9% 5 8 25% PASSENGERS
More informationWORLD METEOROLOGICAL ORGANIZATION AFRICAN CONFERENCE ON METEOROLOGY FOR AVIATION (ACMA -2018)
Hello Bonjour WORLD METEOROLOGICAL ORGANIZATION AFRICAN CONFERENCE ON METEOROLOGY FOR AVIATION (ACMA -2018) 28 to 30 November 2018 Dakar, Senegal Update on On-going Deliberations on The Single African
More informationIntroduction DRAFT March 9, 2017
Chapter Overview The City of Redmond (City) initiated an update to the Airport Master Plan ( Plan ) to assess the facility and service needs of the Redmond Municipal Airport ( the Airport ) throughout
More informationSEAMLESS SKY IN EUROPE. Carlo Maria Borghini Director Administration and Finance Muscat, OMAN October 2009
SEAMLESS SKY IN EUROPE Carlo Maria Borghini Director Administration and Finance Muscat, OMAN October 2009 EUROPE AND ASIA-PACIFIC FACING SIMILAR SITUATION EUROPE ASIA-PACIFIC Traffic growth (travel 4.1%,
More informationCasper/Natrona County International Airport Master Plan Update Technical Advisory Committee Meeting Two - October 14th, :30 PM
Casper/Natrona County International Airport Master Plan Update Technical Advisory Committee Meeting Two - October 14th, 2014 1:30 PM Casper/Natrona County International Airport Master Plan Update Policy
More informationForecast and Overview
Forecast and Overview DENVER INTERNATIONAL AIRPORT Overall goals of the (MPR): Work with DEN to refine the preferred airport development plan to guide the development over an approximate 25-year planning
More informationAero Expo 2016 Civil Aviation Convention & Exhibition Enhancing Regional & Remote Connectivity. November 18 th, 2016.
KNOWLEDGE PARTNER Aero Expo 2016 Civil Aviation Convention & Exhibition Enhancing Regional & Remote Connectivity November 18 th, 2016 Presented To: Shri Ashok Gajapathi Raju Pusapati Hon ble Minister of
More informationTABLE OF CONTENTS. Airport Master Plan Update Manchester-Boston Regional Airport. W:\ _Manchester\MPU\Final\Executive Summary.
TABLE OF CONTENTS Section Page Section Page 1.0 INTRODUCTION... 1 1.1 Purpose of an... 1 1.2 Goals and Objectives... 1 1.3 Mission Statement... 2 1.4 Stakeholder/Public Involvement... 2 1.5 Major Deliverables...
More informationTABLE OF CONTENTS. Washington Aviation System Plan Update July 2017 i
TABLE OF CONTENTS Chapter 1 Overview... 1-1 1.1 Background... 1-1 1.2 Overview of 2015 WASP... 1-1 1.2.1 Aviation System Performance... 1-2 1.3 Prior WSDOT Aviation Planning Studies... 1-3 1.3.1 2009 Long-Term
More informationTotal Airport Management Solution DELIVERING THE NEXT GENERATION AIRPORT
Total Airport Management Solution DELIVERING THE NEXT GENERATION AIRPORT Benefits of Total Airport Management Greater end-to-end visibility across landside and airside operations More accurate passenger
More information5 th MEXICO CITY Airport Consultative Committee (ACC) Consolidated Meeting Notes (Meeting date: June 15, 2017)
5 th MEXICO CITY Airport Consultative Committee (ACC) Consolidated Meeting Notes (Meeting date: June 15, 2017) 1. Airlines Only Session During the pre-meeting session the airlines community expressed their
More informationEast Midlands Airport - Past, Present and Future Introduction The History of East Midlands Airport (EMA) Fig. 1 - RAF Castle Donnington Layout -1945
East Midlands Airport - Past, Present and Future by John Froggatt, Cargo & Commercial Bid Director, East Midlands Airport 1. Introduction John has been employed at East Midlands Airport for the last 29
More informationAtlantic Interoperability Initiative to Reduce Emissions AIRE
ICAO Colloquium on Aviation and Climate Change ICAO ICAO Colloquium Colloquium on Aviation Aviation and and Climate Climate Change Change Atlantic Interoperability Initiative to Reduce Emissions AIRE Célia
More informationCHAPTER 4: ALTERNATIVES
MSP Long Term Comprehensive Plan Update Metropolitan Airports Commission 4.1 INTRODUCTION CHAPTER 4: ALTERNATIVES Several alternatives were developed and evaluated based on their capability to meet the
More informationLake Tahoe Airport Master Plan
Lake Tahoe Airport Master Plan City Council Briefing October 20, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development
More informationAn Overview of GMR Megawide Consortium s Unsolicited Proposal. March 2018
s An Overview of GMR Megawide Consortium s Unsolicited Proposal March 2018 1 Metro Manila requires a multi-airport system and NAIA shall continue to play an anchor role in this system. Multi-Airport system
More information