1 The challenges of growth, the growth of challenges Airports Canada 2013 April 11, 2013 JAMES C. CHERRY CEO Aéroports de Montréal

2 AGENDA THE CHALLENGES OF GROWTH, THE GROWTH OF CHALLENGES Trafic growth at Montréal-Trudeau Montréal-Trudeau expansion and modernization Technology Access roads and rail transport Financing challenges Environment and noise 2

3 MONTRÉAL TRUDEAU World-class terminal, recently expanded and modernized 2 parallel runways; 1 intersecting runway More than 200,000 movements/year Sufficient capacity for at least 50 years 3

4 PASSENGER TRAFFIC GROWTH In 2012, some 13.8 million passengers transited through Montréal Trudeau airport, a new all-time record -3 rd largest in Canada International traffic has enjoyed strong and sustained growth since 2003 its share has increased from 32 % to 38 % Average projected growth between 2% - 3% per year 4 4

5 PASSENGERS TRAFFIC p 5

6 MONTRÉAL TRUDEAU EXPANSION AND MODERNIZATION : About $750 million. Completed on budget and on schedule. Main components: transborder jetty, international jetty, international arrivals complex and international arrivals public hall. Significantly increased capacity and service level : Modernization and expansion of the domestic sector (jetty, aeroquay, arrivals). New transborder (U.S.) departures sector, including indoor parking and envelope of the future rail shuttle station. Multitude of smaller projects, for a total of about $750 million. 6

7 7 7

8 BEFORE 8

9 AFTER 9

10 BEFORE 10

11 AFTER 11

12 BEFORE 12

13 AFTER 13

14 BEFORE 14

15 AFTER 15

16 HOTEL AND TRANSBORDER(U.S.) DEPARTURES SECTOR 16

17 MAJOR PROJECTS UNDERWAY AND UPCOMING Expansion of the international jetty Redevelopment of the domestic/international departures area Expansion of international arrivals + a host of smaller maintenance and enhancement projects About $800 Million by

18 EXPANSION OF THE INTERNATIONAL JETTY MAIN FEATURES 6 new gates 2 new PTV stands Tarmac expansion and remote parking stands 8 boarding lounges Restaurants, stores + VIP room 4-storey building Timeline: 2011 to

19 EXPANSION OF THE INTERNATIONAL JETTY 19

20 EXPANSION OF THE INTERNATIONAL JETTY PHASING PLAN BUILDINGS D1098 AND D4032 D1098 January July 2016 D4032 September December

21 REDEVELOPMENT OF THE DOMESTIC AND INTERNATIONAL DEPARTURES AREA MAIN FEATURES Improvement of passenger flow. Addition of 2 check-in islands with 54 positions each and installation of 40 kiosks per island to encourage electronic check-in. Consolidation of domestic and international screening checkpoints for greater flexibility, including 23 processing positions. Relocation of part of the commercial area in the new departures area. Timeline: 2009 to

22 REDEVELOPMENT OF THE DOMESTIC AND INTERNATIONAL DEPARTURES AREAS 22

23 EXPANSION OF INTERNATIONAL ARRIVALS Secondary Canadian Customs Additional carrousels New outbound baggage sorting room Connecting facilities Timeline: 2011 to

24 TECHNOLOGY 100 % common-use CUSSKS Self-tagging Self-service bagage drops Automated border control Other developments in planning Smoother passenger flow with a smaller terminal footprint 24

25 ACCESS ROADS AND RAIL TRANSPORT Redevelopment of ADM's road network in front of Montréal-Trudeau: Completed on time and budget MTQ's redevelopment of Dorval interchange : Links with H 520: 2013 Links with H 20 (east): 2015 Links with H 20 (west): 2019 Rail shuttle/urban transport system Need for fast, reliable access Light rail system for both airport and west island communities Decision on an optimal solution in

26 REDEVELOPMENT OF THE ROAD NETWORK 26 26

27 PROPOSED RAIL LINK 27

28 FINANCIAL CHALLENGES Self-financing, no government subsidies Long-term debt: $1.6 B Key ratios: Debt/passenger Debt coverage EBITDA/Revenues AIF's and rates subject to competitive pressures Need to augment non-aeronautical revenues and be imaginative 28

29 ENVIRONMENT AND NOISE Aviation industry commitment to control and reduce GHG emissions Airports must do their share ADM leading the way (efficient thermal plant, automatic blinds, insulated buildings, energy-efficient vehicles, etc) Noise is the most important issue Quieter aircraft Commitment to best practices especially for night flights 29

Aéroports de Montréal

Aéroports de Montréal PRESENTATION 2013 ADM Services A division of ADM Capital, a wholly-owned subsidiary of Aéroports de Montréal (ADM) Offers ADM s expertise in airport management, operation and development to other airports,

More information

Pierre Elliott Trudeau (formerly Dorval) and Mirabel airports have been serving the Montréal community since 1941 and 1975 respectively.

Pierre Elliott Trudeau (formerly Dorval) and Mirabel airports have been serving the Montréal community since 1941 and 1975 respectively. Pierre Elliott Trudeau (formerly Dorval) and Mirabel airports have been serving the Montréal community since 1941 and 1975 respectively. Their infrastructures have undergone major changes over the years

More information

TERMINAL DEVELOPMENT PLAN

TERMINAL DEVELOPMENT PLAN 5.0 TERMINAL DEVELOPMENT PLAN 5.0 TERMINAL DEVELOPMENT PLAN Key points The development plan in the Master Plan includes the expansion of terminal infrastructure, creating integrated terminals for international,

More information

AIRPORT TERMINAL BUILDING EXPANSION FAQs

AIRPORT TERMINAL BUILDING EXPANSION FAQs AIRPORT TERMINAL BUILDING EXPANSION FAQs Q1: What s involved in the Airport Terminal Building Expansion? A1: The expansion of the Airport Terminal Building will be conducted in two phases: First phase:

More information

Remarks by Mr. Philippe Rainville. President and Chief Executive Officer. Aéroports de Montréal (ADM)

Remarks by Mr. Philippe Rainville. President and Chief Executive Officer. Aéroports de Montréal (ADM) Remarks by Mr. Philippe Rainville President and Chief Executive Officer Aéroports de Montréal (ADM) Global Aviation Security Symposium (AVSEC2017) OACI/ICAO Montréal, September 12, 2017 1 Ladies and gentlemen,

More information

Birmingham Airport 2033

Birmingham Airport 2033 Over the next 15 years, we will expand and improve the Airport to maximise our potential as a single runway airport by investing 500 million in new development. Our plans take account of our forecasted

More information

Aeroterm adds high-profile projects to its on-airport properties portfolio. By Kat Zeman, Senior Editor at Knighthouse Media

Aeroterm adds high-profile projects to its on-airport properties portfolio. By Kat Zeman, Senior Editor at Knighthouse Media Construction Today article http://www.construction-today.com/sections/commercial/3399-aeroterm Kat Zeman 08 June 2018 Aeroterm Aeroterm adds high-profile projects to its on-airport properties portfolio.

More information

SouthwestFloridaInternational Airport

SouthwestFloridaInternational Airport SouthwestFloridaInternational Airport SouthwestFloridaInternationalAirportislocatedinLee CountyalongtheGulfCoastofSouthFlorida,tenmiles southeastofthefortmyerscentralbusinessdistrict. Theprimaryhighwayaccesstotheairportfrom

More information

AÉROPORTS DE MONTRÉAL TO CALL FOR TENDERS TO DISMANTLE THE FORMER MIRABEL TERMINAL BUILDING WITH A VIEW TO REDEVELOPING THE UNDERLYING LAND

AÉROPORTS DE MONTRÉAL TO CALL FOR TENDERS TO DISMANTLE THE FORMER MIRABEL TERMINAL BUILDING WITH A VIEW TO REDEVELOPING THE UNDERLYING LAND PRESS RELEASE For immediate release AÉROPORTS DE MONTRÉAL TO CALL FOR TENDERS TO DISMANTLE THE FORMER MIRABEL TERMINAL BUILDING WITH A VIEW TO REDEVELOPING THE UNDERLYING LAND Montréal, May 1, 2014 During

More information

Notes for a speech. by James C. Cherry. Chief Executive Officer of. Aéroports de Montréal. at a luncheon meeting of the

Notes for a speech. by James C. Cherry. Chief Executive Officer of. Aéroports de Montréal. at a luncheon meeting of the Notes for a speech by James C. Cherry Chief Executive Officer of Aéroports de Montréal at a luncheon meeting of the Association québécoise du transport et des routes on November 11, 2010 in Montréal Ladies

More information

Canada s Airports: Enabling Connectivity, Growth and Productivity for Canada

Canada s Airports: Enabling Connectivity, Growth and Productivity for Canada Canada s Airports: Enabling Connectivity, Growth and Productivity for Canada 2018 Federal Budget Submission House of Commons Standing Committee on Finance Introduction The Canadian Airports Council is

More information

Annual General Meeting. April 15, 2010

Annual General Meeting. April 15, 2010 Annual General Meeting April 15, 2010 AGENDA 2009 In Review Activity Levels Financial Overview Performance Measures Key Activities Moving Forward Activity Levels Passenger Activity (2009) Total Passengers

More information

The mandate and composition of the Committee were changed following:

The mandate and composition of the Committee were changed following: PREAMBLE In accordance with its statutes and its contractual agreements with the Government of Canada, Aéroports de Montréal (ADM) must, among other things, operate and maintain Montréal Pierre Elliott

More information

Aéroports de Montréal s Contribution to the Economic Development of Montréal

Aéroports de Montréal s Contribution to the Economic Development of Montréal Aéroports de Montréal s Contribution to the Economic Development of Montréal Notes for a speech by James Cherry President and CEO Aéroports de Montréal Delivered at a breakfast meeting of the Board of

More information

Public Notice of Opportunity to Comment on Los Angeles World Airports Passenger Facility Charge Application at Los Angeles International Airport

Public Notice of Opportunity to Comment on Los Angeles World Airports Passenger Facility Charge Application at Los Angeles International Airport Re: Public Notice of Opportunity to Comment on Los Angeles World Airports Passenger Facility Charge Application at Los Angeles International Airport Los Angeles World Airports (LAWA) intends to submit

More information

2006 ANNUAL GENERAL MEETING

2006 ANNUAL GENERAL MEETING 2006 ANNUAL GENERAL MEETING Address by Garth F. Atkinson President and Chief Executive Officer April 19, 2006 Thank you Peter and good morning ladies and gentlemen and invited guests. Before proceeding

More information

Tampa International Airport Master Plan Update. December 12, 2012

Tampa International Airport Master Plan Update. December 12, 2012 Tampa International Airport Master Plan Update December 12, 2012 1 Prior Presentation Consolidated rental car and people mover Decongest curbsides and roadways Enable rental car growth Gain long term parking

More information

Edmonton International Airport Master Plan Open House Display Boards April 16, 2011

Edmonton International Airport Master Plan Open House Display Boards April 16, 2011 Edmonton International Airport Master Plan Open House Display Boards April 16, 2011 Welcome to the EIA Master Plan Open House We invite your feedback about our plans for the next 25 years. Please sign

More information

GENEVA, ROME, VENICE AND FORT-DE-FRANCE AMONG NEW DESTINATIONS AVAILABLE FROM MONTRÉAL TRUDEAU THIS SUMMER

GENEVA, ROME, VENICE AND FORT-DE-FRANCE AMONG NEW DESTINATIONS AVAILABLE FROM MONTRÉAL TRUDEAU THIS SUMMER PRESS RELEASE For immediate release GENEVA, ROME, VENICE AND FORT-DE-FRANCE AMONG NEW DESTINATIONS AVAILABLE FROM MONTRÉAL TRUDEAU THIS SUMMER Montréal, February 24, 2009 Aéroports de Montréal is pleased

More information

2017 AERONAUTICAL FEES

2017 AERONAUTICAL FEES 2017 AERONAUTICAL FEES at Montréal-Pierre Elliott Trudeau International Airport (Montréal-Trudeau) and Montréal-Mirabel International Airport (Montréal-Mirabel) TABLE OF CONTENTS 1. 2017 Aeronautical fees...

More information

ANNUAL GENERAL MEETING

ANNUAL GENERAL MEETING ANNUAL GENERAL MEETING April 19, 2012 April 19, 2012 AGENDA 1. CORPORATE INTRODUCTION 2. BUSINESS METRICS 3. AIRPORT DEVELOPMENT PROGRAM UPDATE 4. OTHER YYC ACTIVITY IN 2011 5. SPRINGBANK AIRPORT 6. LOOKING

More information

Taking our world class passenger experience even higher

Taking our world class passenger experience even higher Taking our world class passenger experience even higher PREMIUM RETAIL Adelaide Airport: Expanding to meet growing needs Since the existing terminal was opened in 2005, overall passenger numbers have increased

More information

Operational implementation of new ATM automated systems and integration of the existing systems ADS-B IMPLEMENTATION IN GUYANA. (Presented by Guyana)

Operational implementation of new ATM automated systems and integration of the existing systems ADS-B IMPLEMENTATION IN GUYANA. (Presented by Guyana) International Civil Aviation Organization SAM/IG/22-IP/19 South American Regional Office 12/11/2018 Twenty Second Workshop/Meeting of the SAM Implementation Group (SAM/IG/22) - Regional Project RLA/06/901

More information

LAX Specific Plan Amendment Study (SPAS) Update. December 3, 2012

LAX Specific Plan Amendment Study (SPAS) Update. December 3, 2012 LAX Specific Plan Amendment Study (SPAS) Update December 3, 2012 Response to the Draft Environmental Impact Report Draft EIR Release and Public Comment Official Comment Period was July 27, 2012 through

More information

Page 1 of 1. Press Release. Enhanced intercity bus service between Québec, Sherbrooke and Montréal's airports

Page 1 of 1. Press Release. Enhanced intercity bus service between Québec, Sherbrooke and Montréal's airports Page 1 of 1 Enhanced intercity bus service between Québec, Sherbrooke and Montréal's airports Montréal, December 17, 2001 - Aéroports de Montréal today announced the awarding of a contract to Autocars

More information

Greater Orlando Aviation Authority

Greater Orlando Aviation Authority Greater Orlando Aviation Authority Orlando International Airport & Orlando Executive Airport Budgets Fiscal Year 2017-2018 Greater Orlando Aviation Authority Orlando, Florida Greater Orlando Aviation Authority

More information

CHAPTER 4: ALTERNATIVES

CHAPTER 4: ALTERNATIVES MSP Long Term Comprehensive Plan Update Metropolitan Airports Commission 4.1 INTRODUCTION CHAPTER 4: ALTERNATIVES Several alternatives were developed and evaluated based on their capability to meet the

More information

2005 ANNUAL GENERAL MEETING

2005 ANNUAL GENERAL MEETING 2005 ANNUAL GENERAL MEETING Address by Garth F. Atkinson President and Chief Executive Officer April 20, 2005 Before proceeding with my formal remarks, it is my great pleasure to introduce the other members

More information

Airports of the Future Taking the Terminal to the Traveler

Airports of the Future Taking the Terminal to the Traveler Passenger Terminal World Expo 2011 Copenhagen, Denmark Airports of the Future Taking the Terminal to the Traveler Steven B. Cornell Assoc. Vice President Summary Aviation Timeline First Controlled Airplane

More information

Schiphol Group. Annual Report

Schiphol Group. Annual Report Schiphol Group Annual Report 2013 Business model Business model Schiphol Group distinguishes four core activities: Aviation, Consumer Products and Services, Real Estate, and Alliances and Participations.

More information

The name of Montréal-Mirabel International Airport (Montréal-Mirabel, YMX) remains unchanged.

The name of Montréal-Mirabel International Airport (Montréal-Mirabel, YMX) remains unchanged. Montréal-Dorval Becomes Montréal-Trudeau Montréal, December 30, 2003 - Aéroports de Montréal reminds the public that Montréal-Dorval International Airport's name will officially change to Montréal Pierre

More information

AIRPORT MASTER PLAN UPDATE

AIRPORT MASTER PLAN UPDATE AIRPORT MASTER PLAN UPDATE PENSACOLA INTERNATIONAL AIRPORT Technical Advisory Committee Meeting #2 June 20, 2017 Agenda» Introduction» Facility Requirements Airside Terminal Landside General Aviation Cargo

More information

BNA Master Plan Update Community Advisory Committee Meeting No. 5

BNA Master Plan Update Community Advisory Committee Meeting No. 5 A Six Sigma Organization BNA Master Plan Update Community Advisory Committee Meeting No. 5 September 19, 2012 Introductions MNAA Staff RW Armstrong Team Albersman & Armstrong, Ltd. Atkins North America,

More information

GSP TERMINAL IMPROVEMENT PROGRAM PRESS KIT

GSP TERMINAL IMPROVEMENT PROGRAM PRESS KIT About GSP MISSION STATEMENT At Greenville-Spartanburg International Airport (GSP), we begin each day fully committed to finding new ways to achieve our mission to provide the citizens of Upstate South

More information

Appendix F International Terminal Building Main Terminal Departures Level and Boarding Areas A and G Alternatives Analysis

Appendix F International Terminal Building Main Terminal Departures Level and Boarding Areas A and G Alternatives Analysis Appendix F International Terminal Building Main Terminal Departures Level and Boarding Areas A and G Alternatives Analysis ITB MAIN TERMINAL DEPARTURES LEVEL & BOARDING AREAS A & G ALTERNATIVES ANALYSIS

More information

Agenda. Introduction YYC. Looking Ahead in 2014

Agenda. Introduction YYC. Looking Ahead in 2014 Agenda Introduction 2013 @ YYC Looking Ahead in 2014 Introduction The Airport Transfer Process in Canada From coast to coast: A Canadian success story $20 billion infrastructure investment Canadian airports

More information

14 C.F.R. Part 158. Passenger Facility Charge Program Logan International Airport. Public Notice

14 C.F.R. Part 158. Passenger Facility Charge Program Logan International Airport. Public Notice 14 C.F.R. Part 158 Passenger Facility Charge Program Logan International Airport Public Notice Summary of Proposed 2018 PFC Application PFC Project Descriptions and Justifications PFC Financial Plan Class

More information

ACI-NA Conference NextGen at NAV CANADA. John Crichton President and Chief Executive Officer October 11, 2009

ACI-NA Conference NextGen at NAV CANADA. John Crichton President and Chief Executive Officer October 11, 2009 ACI-NA Conference NextGen at NAV CANADA John Crichton President and Chief Executive Officer October 11, 2009 IATA Roadmap Functions Current Planned Not Planned Automated ATC Coordination CAATS Early Issue

More information

Existing Conditions AIRPORT PROFILE Passenger Terminal Complex 57 air carrier gates 11,500 structured parking stalls Airfield Operations Area 9,000 North Runway 9L-27R 6,905 Crosswind Runway 13-31 5,276

More information

Innovation. passenger flow annual report

Innovation. passenger flow annual report Innovation improving passenger flow 2012 annual report table of contents 1 corporate profile 2 message from management 6 2012 highlights 8 review of activities 19 environmental and social responsibility

More information

TABLE OF CONTENTS. Airport Master Plan Update Manchester-Boston Regional Airport. W:\ _Manchester\MPU\Final\Executive Summary.

TABLE OF CONTENTS. Airport Master Plan Update Manchester-Boston Regional Airport. W:\ _Manchester\MPU\Final\Executive Summary. TABLE OF CONTENTS Section Page Section Page 1.0 INTRODUCTION... 1 1.1 Purpose of an... 1 1.2 Goals and Objectives... 1 1.3 Mission Statement... 2 1.4 Stakeholder/Public Involvement... 2 1.5 Major Deliverables...

More information

The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands.

The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands. The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands. Connecting People Building Opportunities 198 Brisbane Airport Corporation CHAPTER 10

More information

Airport IT Are you ready for the future

Airport IT Are you ready for the future Airport IT Are you ready for the future Life was simple Trends Affecting Airports in the next 20 years It s all about me! I can travel the world (virtually) I am the new (middle class) passenger Shifting

More information

Westshore Development Forum Presented by: Alice J. Price, AICP, Senior Project Director

Westshore Development Forum Presented by: Alice J. Price, AICP, Senior Project Director Presented by: Alice J. Price, AICP, Senior Project Director Back In Time: 1946 Drew Field 1952 Main Terminal 1963 Study Terminal Design Goals: Human Values Airline economics Airport financial considerations

More information

Cabling solutions at the core of complex Airport projects

Cabling solutions at the core of complex Airport projects Cabling solutions at the core of complex Airport projects JetBlue Terminal installation at New York JFK Airport Opening in Sept 2008 of a new 640.000 sq foot terminal The terminal will double the number

More information

INTRODUCTION YYC LOOKING AHEAD

INTRODUCTION YYC LOOKING AHEAD APRIL 21, 2016 INTRODUCTION 2015 @ YYC LOOKING AHEAD Introduction Across Canada Airports Drive the Economy 150,000 on-airport jobs 135 million passengers per year $25 billion infrastructure investment

More information

2018 Airport Master Plan Overview of Development Concepts. Greg Ballentine (WSP)

2018 Airport Master Plan Overview of Development Concepts. Greg Ballentine (WSP) 2018 Airport Master Plan Overview of Development Concepts Greg Ballentine (WSP) Thank You Stakeholder and community consultation has included discussions with over 40 stakeholder groups including airport

More information

IAH Terminal Redevelopment Project. Memorandum of Agreement with United Airlines

IAH Terminal Redevelopment Project. Memorandum of Agreement with United Airlines IAH Terminal Redevelopment Project Memorandum of Agreement with United Airlines May 29, 2014 On April 24, HAS presented plans for a new Mickey Leland International Terminal (MLIT) Sufficient capacity for

More information

New Orleans Aviation Board unveils $826 million overhaul of Louis Armstrong Airport

New Orleans Aviation Board unveils $826 million overhaul of Louis Armstrong Airport New Orleans Aviation Board unveils $826 million overhaul of Louis Armstrong Airport http://www.nola.com/politics/index.ssf/2013/04/new_orle ans_aviation_board_unv.html Richard Rainey, NOLA.com The Times-Picayune

More information

FACILITATION PANEL (FALP)

FACILITATION PANEL (FALP) International Civil Aviation Organization WORKING PAPER 23/3/16 English only FACILITATION PANEL (FALP) NINTH MEETING Montréal, 4-7 April 2016 Agenda Item 3: Amendments to Annex 9 AIRPORT TRAFFIC FLOW ARRANGEMENTS

More information

Commission parlementaire des Transports et de l Environnement

Commission parlementaire des Transports et de l Environnement Commission parlementaire des Transports et de l Environnement Audition sur le projet de Chemin de fer TransQuébec Express 23 septembre 2010 Représentation De la Société MAKIVIK «L accès au territoire du

More information

Planning, Development and Environment Committee

Planning, Development and Environment Committee Page 1 of 7 MEMORANDUM TO: Planning, Development and Environment Committee FROM: Neil Ralston, Airport Planner Airport Development (726-8129) SUBJECT: 2035 MSP LONG TERM COMPREHENSIVE PLAN FORECAST, FACILITY

More information

(in thousands of dollars) EBITDA 232, , , , ,978 1

(in thousands of dollars) EBITDA 232, , , , ,978 1 Annual Report Financial highlights FINANCIAL RETROSPECTIVE (in thousands of dollars) 2014 2013 2012 2011 Revenues $ 488,770 $ 463,888 $ 446,501 $ 435,375 $ 426,844 Excess (deficiency) of revenues over

More information

Description of Airport Charges. Swedavia AB Appendix 3 to Conditions of Services, Swedavia AB

Description of Airport Charges. Swedavia AB Appendix 3 to Conditions of Services, Swedavia AB Description of Airport Charges Swedavia AB 2016 Appendix 3 to Conditions of Services, Swedavia AB Contents 1 Swedavias Charges... 3 2 Aircraft Related Charges... 4 2.1 Take-Off Charge... 4 2.2 Emission

More information

Alternatives Analysis EXECUTIVE SUMMARY

Alternatives Analysis EXECUTIVE SUMMARY Alternatives Analysis EXECUTIVE SUMMARY Alternative development plans were created as part of the Master Plan for Harrisburg International Airport. The aim is to provide sufficient capacity for projected

More information

Lake Tahoe Airport Master Plan

Lake Tahoe Airport Master Plan Lake Tahoe Airport Master Plan City Council Briefing October 20, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development

More information

BNA Master Plan Update Public Meeting No. 2

BNA Master Plan Update Public Meeting No. 2 A Six Sigma Organization BNA Master Plan Update Public Meeting No. 2 September 18, 2012 Agenda BNA Master Plan Update Consultants Status of the BNA Master Plan Update Workstation Boards Forecasts of Aviation

More information

TRBUSINESS. It was also driven by an increase of long-haul destinations, and expanded short haul networks.

TRBUSINESS. It was also driven by an increase of long-haul destinations, and expanded short haul networks. Manchester Airports Group (MAG) which owns Manchester, London Stansted, and East Midlands airports and manages Escape Lounges in the US under its MAG USA arm, says that passenger growth drove an 11.2%

More information

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development plans

More information

Executive Summary This document contains the Master Plan for T. F. Green Airport. The goal of a master plan is to provide a framework of potential future airport development in a financially feasible manner,

More information

Charles H. Ada II Executive Manager A.B. Won Pat International Airport Guam

Charles H. Ada II Executive Manager A.B. Won Pat International Airport Guam Charles H. Ada II Executive Manager A.B. Won Pat International Airport Guam ABOUT THE GUAM AIRPORT Autonomous instrumentality of the Government of Guam; created in 1975 by P.L. 13-57; only commercial

More information

msp macnoise.com MSP Noise Oversight Committee (NOC) November 17, 2010

msp macnoise.com MSP Noise Oversight Committee (NOC) November 17, 2010 MSP Noise Oversight Committee (NOC) November 17, 2010 Operations Update Technical Advisor s Report Summary MSP Complaints September October 2010 3,025 3,567 2009 6,350 6,001 Total Operations September

More information

September 14, Dear Mr. Goyette:

September 14, Dear Mr. Goyette: September 14, 2004 Mr. Jacques Goyette Chairman of the Board Développement de l Aéroport Saint-Hubert de Longueuil 5700 Route de l Aéroport Saint-Hubert, Quebec J3Y 8Y9 Dear Mr. Goyette: On behalf of the

More information

CHAPTER 1 EXECUTIVE SUMMARY

CHAPTER 1 EXECUTIVE SUMMARY CHAPTER 1 EXECUTIVE SUMMARY 1 1 EXECUTIVE SUMMARY INTRODUCTION William R. Fairchild International Airport (CLM) is located approximately three miles west of the city of Port Angeles, Washington. The airport

More information

Port of Seattle Sea-Tac Airport Master Plan An Economic Engine for Washington State. Kurt Beckett Deputy Chief Executive Officer

Port of Seattle Sea-Tac Airport Master Plan An Economic Engine for Washington State. Kurt Beckett Deputy Chief Executive Officer Port of Seattle Sea-Tac Airport Master Plan An Economic Engine for Washington State Kurt Beckett Deputy Chief Executive Officer WA Ports A Unique Public Agency Mission: Create Jobs through Travel, Trade

More information

TERMINAL 3. tour guide booklet. April 2012

TERMINAL 3. tour guide booklet. April 2012 TERMINAL 3 tour guide booklet April 2012 T3 PRE-TOUR PARKING / RESTROOMS All attendees should park on the north side of the Department of Aviation s Administration Building, located at 1845 E. Russell

More information

DRAFT. Master Plan RESPONSIBLY GROWING to support our region. Summary

DRAFT. Master Plan RESPONSIBLY GROWING to support our region. Summary Master Plan GROWING 2017-2037 RESPONSIBLY to support our region Summary DRAFT 2 1 Introduction Over the next three decades, Southern Ontario is set to experience significant growth its population will

More information

Master Plan Update Community Advisory Committee Kick-off Meeting

Master Plan Update Community Advisory Committee Kick-off Meeting Nashville International Airport Master Plan Update Community Advisory Committee Kick-off Meeting September 13, 2018 Agenda Welcome and Introductions Master Plan Objectives Master Plan Process BNA Vision

More information

Norfolk International Airport

Norfolk International Airport Norfolk International Airport Master Plan Update Technical Advisory Committee Meeting #1 Community Advisory Committee Meeting #1 January 24, 2018 Agenda Project Background Introductions Overview of Airport

More information

SOUNDSCAPE ADVISORY COMMITTEE MONTRÉAL PIERRE ELLIOTT TRUDEAU INTERNATIONAL AIRPORT SUMMARY. Meeting of December 11 th, 2015

SOUNDSCAPE ADVISORY COMMITTEE MONTRÉAL PIERRE ELLIOTT TRUDEAU INTERNATIONAL AIRPORT SUMMARY. Meeting of December 11 th, 2015 SOUNDSCAPE ADVISORY COMMITTEE MONTRÉAL PIERRE ELLIOTT TRUDEAU INTERNATIONAL AIRPORT SUMMARY Meeting of December 11 th, 2015 Page 1 Following is a summary of the meeting of the Soundscape Advisory Committee

More information

Love Field Modernization Program Update: Master Planning Recommendations

Love Field Modernization Program Update: Master Planning Recommendations Love Field Modernization Program Update: Master Planning Recommendations Briefing to the Council Transportation and Environment Committee April 28, 2008 1 1 Briefing Objective Discuss the background and

More information

KERRIE MATHER MANAGING DIRECTOR AND CHIEF EXECUTIVE OFFICER. Macquarie Conference 4 MAY 2016

KERRIE MATHER MANAGING DIRECTOR AND CHIEF EXECUTIVE OFFICER. Macquarie Conference 4 MAY 2016 KERRIE MATHER MANAGING DIRECTOR AND CHIEF EXECUTIVE OFFICER Macquarie Conference 4 MAY 2016 Disclaimer General securities warning This presentation has been prepared by Sydney Airport Limited (ACN 165

More information

REGION OF WATERLOO INTERNATIONAL AIRPORT AIRPORT MASTER PLAN EXECUTIVE SUMMARY MARCH 2017

REGION OF WATERLOO INTERNATIONAL AIRPORT AIRPORT MASTER PLAN EXECUTIVE SUMMARY MARCH 2017 REGION OF WATERLOO INTERNATIONAL AIRPORT AIRPORT MASTER PLAN EXECUTIVE SUMMARY MARCH 2017 Contact: Chris Wood, Airport General Manager cwood@regionofwaterloo.ca (519) 648-2256 ext. 8502 Airport Master

More information

Baggage Screening System Recap Projects Panel

Baggage Screening System Recap Projects Panel Baggage Screening System Recap Projects Panel ACI NA Operations & Technical Affairs Conference Tuesday, March 24, 2015 Michael Healy, P.Eng. Vice-President, Infrastructure & Commercial Development Halifax

More information

Frankfurt Airport Preparing for the Future!

Frankfurt Airport Preparing for the Future! SESSION 3. Aviation Demand & Capacity Expansion Frankfurt Airport Preparing for the Future! Pierre Dominique PRUEMM Senior Executive Vice President, Incheon, September 6, 2017 Frankfurt Airport Preparing

More information

INTRODUCTION YYC LOOKING AHEAD

INTRODUCTION YYC LOOKING AHEAD APRIL 21, 2016 INTRODUCTION 2015 @ YYC LOOKING AHEAD Introduction Across Canada Airports Drive the Economy 150,000 on-airport jobs 135 million passengers per year $25 billion infrastructure investment

More information

Aviation Operating Administration/Executive

Aviation Operating Administration/Executive Administration/Executive To provide the executive and administrative support necessary to the Divisions within the Aviation Department to ensure continued efficiencies, effectiveness, and compliance with

More information

BURLINGTON INTERNATIONAL AIRPORT

BURLINGTON INTERNATIONAL AIRPORT BURLINGTON INTERNATIONAL AIRPORT VISION 2030 AIRPORT MASTER PLAN UPDATE Summary Presentation AIRPORT STAFF AND STUDY TEAM Robert McEwing, Director of Planning & Development Brad Worthen, Community Facilitator

More information

JUNE 2016 GLOBAL SUMMARY

JUNE 2016 GLOBAL SUMMARY JUNE 2016 GLOBAL SUMMARY FAST FACTS The world of air transport, 2014 All figures are for 2014, unless otherwise stated, to give a single set of data for one year. Where available, the latest figures are

More information

NARITA INTERNATIONAL AIRPORT OVERSEAS

NARITA INTERNATIONAL AIRPORT OVERSEAS NARITA INTERNATIONAL AIRPORT OVERSEAS BUSINESS About Narita Airport Narita International Airport Corporation(NAA) owns the airport land, runways, terminals and other facilities at Narita Airport. We manage

More information

These fee changes have been established in order to establish base fee recoveries for expanding infrastructure and ongoing annual maintenance.

These fee changes have been established in order to establish base fee recoveries for expanding infrastructure and ongoing annual maintenance. November 1, 2016 Attention: Airport Operators/Tenants/Stakeholders RE: Final Rates and Fees Changes Effective January 1, 2017 We have now concluded the consultation process with the Airline Consultative

More information

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PROPOSED PASSENGER FACILITY CHARGE APPLICATION NOVEMBER 9 TH, 2018

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PROPOSED PASSENGER FACILITY CHARGE APPLICATION NOVEMBER 9 TH, 2018 NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PROPOSED PASSENGER FACILITY CHARGE APPLICATION NOVEMBER 9 TH, 2018 LAWTON-FORT SILL REGIONAL AIRPORT LAWTON, OKLAHOMA PASSENGER FACILITY CHARGE PROPOSED

More information

IMPLEMENTATION OF ADS-B BY NAV CANADA

IMPLEMENTATION OF ADS-B BY NAV CANADA IMPLEMENTATION OF ADS-B BY NAV CANADA Carole Stewart-Green Manager, ATS Regulatory Coordination ABOUT NAV CANADA Private, non-share capital company Second largest ANSP in the world 12 million aircraft

More information

COMOX VALLEY AIRPORT. Strategic Plan Summary. October 2010

COMOX VALLEY AIRPORT. Strategic Plan Summary. October 2010 COMOX VALLEY AIRPORT Strategic Plan 2011-2015 Summary October 2010 COMOX VALLEY AIRPORT Introduction History The Comox Airport was constructed by the Department of National Defence in 1942. The Comox Airport

More information

A Multi-Agent Microsimulation Model of Toronto Pearson International Airport

A Multi-Agent Microsimulation Model of Toronto Pearson International Airport A Multi-Agent Microsimulation Model of Toronto Pearson International Airport Gregory Hoy 1 1 MASc Student, Department of Civil Engineering, University of Toronto 35 St. George Street, Toronto, Ontario

More information

BAG LOG FUTURE-PROOFING CALGARY AIRPORT A DOUBLE FIRST AT SAN FRANCISCO IATA RESOLUTION 753: THE GOOD NEWS KEFLAVIK THE NEW NORTH ATLANTIC HUB

BAG LOG FUTURE-PROOFING CALGARY AIRPORT A DOUBLE FIRST AT SAN FRANCISCO IATA RESOLUTION 753: THE GOOD NEWS KEFLAVIK THE NEW NORTH ATLANTIC HUB BAG LOG Issue 12 March 2017 A DOUBLE FIRST AT SAN FRANCISCO Page 3 IATA RESOLUTION 753: THE GOOD NEWS Page 4 KEFLAVIK THE NEW NORTH ATLANTIC HUB Page 6 MANUAL ENCODING CUT BY 50% AT COPENHAGEN Page 7 CHECK-IN

More information

AMERICAN EXPRESS BUSINESS TRAVEL. April 20, 2011

AMERICAN EXPRESS BUSINESS TRAVEL. April 20, 2011 AMERICAN EXPRESS BUSINESS TRAVEL April 20, 2011 Agenda 1 An intro to American Express 2 The Managed Travel Program 3 4 Business Travel Trends Fares and Volumes 5 Demand for Service 6 Importance of Technology

More information

Master Plan Phase 2 Workshop

Master Plan Phase 2 Workshop Master Plan Phase 2 Workshop Tampa Airport: A Legacy of Innovation and Convenience Tampa Airport: A legacy of Innovation and Convenience The world s first airport people mover Tampa Airport: A legacy of

More information

TO: Planning Advisory Committee (PAC) Members RE: Pangborn Airport Master Plan PAC Meeting #4 Presentation Material DATE: July 18, 2017

TO: Planning Advisory Committee (PAC) Members RE: Pangborn Airport Master Plan PAC Meeting #4 Presentation Material DATE: July 18, 2017 TO: Planning Advisory Committee (PAC) Members RE: Pangborn Airport Master Plan PAC Meeting #4 Presentation Material DATE: July 18, 2017 Please find attached for your review prior to the PAC Meeting #4,

More information

Regular Board Meeting August 4, 2015

Regular Board Meeting August 4, 2015 Regular Board Meeting August 4, 2015 1616 Airport Circle Hailey, ID 83333 208.788.4956 PUBLIC COMMENT FY 16 Rates & Charges FY 16 Budget Approval Rates & Charges will provide the Board the ability to operate

More information

Los Angeles International Airport (LAX) Airside $907M

Los Angeles International Airport (LAX) Airside $907M Los Angeles International Airport (LAX) $3,948M Airside $907M Airfield Electrical Systems Rehabilitation Bradley West Core Renovation, East Ramp and Concourse Demolition Imperial Terminal Aircraft Parking

More information

PASSENGER JOURNEY. Our vision: a seamless, secure and efficient walking pace journey that is highly personalized throughout.

PASSENGER JOURNEY. Our vision: a seamless, secure and efficient walking pace journey that is highly personalized throughout. NEXTT JOURNEY Our vision: a seamless, secure and efficient walking pace journey that is highly personalized throughout. 00 THROUGHOUT THE JOURNEY IDENTITY MANAGEMENT Biometrics are used to confirm identity

More information

Hartsfield Jackson Update prepared for:

Hartsfield Jackson Update prepared for: Hartsfield Jackson Update prepared for: September 6, 2013 Presented by: Shelley Lamar, Planning Manager Agenda ATL Overview Economic Impact Preparing for the Future Your Questions Airport overview Airport

More information

Fort Wayne International Airport Master Plan Study. Executive Summary

Fort Wayne International Airport Master Plan Study. Executive Summary Fort Wayne International Airport Master Plan Study Executive Summary March 2012 Introduction Airport Background Forecast of Aviation Activity Development Plans Recommended Airfield & Access Development

More information

AVIATION. MichiganReportCard.com 5

AVIATION. MichiganReportCard.com 5 MichiganReportCard.com 5 GRADE C AVIATION OVERVIEW Michigan s 200+ airports bring $4.3 billion into the economy each year. The state s Tier 1 and Tier 2 airports were evaluated based on six key infrastructure

More information

DEVELOPMENT OF TOE MIDFIELD TERMINAL IROJECT CAPACITY ENHANCEMENT REPORT DEPARTMENT OF AVIATION TOM FOERSTER CHAIRMAN BARBARA HAFER COMMISSIONER

DEVELOPMENT OF TOE MIDFIELD TERMINAL IROJECT CAPACITY ENHANCEMENT REPORT DEPARTMENT OF AVIATION TOM FOERSTER CHAIRMAN BARBARA HAFER COMMISSIONER PETE FLAHERTY COMMISSIONER TOM FOERSTER CHAIRMAN DEPARTMENT OF AVIATION BARBARA HAFER COMMISSIONER STEPHEN A. GEORGE DIRECTOR ROOM M 134, TERMINAL BUILDING GREATER PITTSBURGH INTERNATIONAL AIRPORT PITTSBURGH,

More information

MASTER PLAN UPDATE Toronto Pearson International Airport. City of Toronto Planning and Growth Management Committee September 5, 2007

MASTER PLAN UPDATE Toronto Pearson International Airport. City of Toronto Planning and Growth Management Committee September 5, 2007 MASTER PLAN UPDATE Toronto Pearson International Airport City of Toronto Planning and Growth Management Committee September 5, 2007 Connecting Toronto 59 non-stop International destinations 8.5 million

More information

FUTURE PASSENGER PROCESSING. ACRP New Concepts for Airport Terminal Landside Facilities

FUTURE PASSENGER PROCESSING. ACRP New Concepts for Airport Terminal Landside Facilities FUTURE PASSENGER PROCESSING ACRP 07-01 New Concepts for Airport Terminal Landside Facilities In association with: Ricondo & Associates, TransSolutions, TranSecure RESEARCH Background Research Objective

More information

FORECASTING FUTURE ACTIVITY

FORECASTING FUTURE ACTIVITY EXECUTIVE SUMMARY The Eagle County Regional Airport (EGE) is known as a gateway into the heart of the Colorado Rocky Mountains, providing access to some of the nation s top ski resort towns (Vail, Beaver

More information

MASTER PLAN UPDATE. Planning Advisory Committee (PAC) FRESNO YOSEMITE INTERNATIONAL AIRPORT. Meeting #4

MASTER PLAN UPDATE. Planning Advisory Committee (PAC) FRESNO YOSEMITE INTERNATIONAL AIRPORT. Meeting #4 MASTER PLAN UPDATE Planning Advisory Committee (PAC) FRESNO YOSEMITE INTERNATIONAL AIRPORT Meeting #4 December 14, 2017 Today s Agenda o Welcome o Introductions o Progress update o Alternatives analysis

More information