1 Pre-Feasibility Report (As Per The Provision Of EIA Notification 2006) Proposed Up-gradation of Chhatrapati Shivaji International Airport(CSIA) Mumbai for By Mumbai International Airport Limited (MIAL) Submitted To Ministry Of Environment, Forests And Climate Change New Delhi February, 2016

2 Contents 1.0 Executive Summary Introduction to Project Background Identification of Project and Project Proponent: Project Proponent Identification of Project Need for the Project and its Importance to the Country Air Traffic at CSIA Economic Impact of CSIA and Employment Generation Project Description Type of Project Location Alternate Sites Considered Modernization of CSIA Present Status Upgradation Program Proposed Project Justification for the Projects (Completion of Projects Approved in EC 2007) Terminal T2 SE & NW Piers Cargo Terminals Aprons Taxiway development Airport Facilities...37 Page 2 of 52

3 3.7 Justification for Projects : New/Fresh Projects Vehicle under Pass under Runway 14/ Extension of Taxiway M New ATC Tower at Kalina Site Analysis Connectivity to CSIA Land Form, Land Use and Land Ownership Topography Existing Land Use Pattern Existing Infrastructure and Amenities Soil Classification Climatic Data and Secondary Sources Social Infrastructure Available Planning Proposed Utility Infrastructure Rehabilitation and Resettlement (R&R) Project Schedule and Cost Estimate Analysis of Proposal Page 3 of 52

4 List of Tables Table Existing and projected passenger traffic pax (x1,000,000) at the airport Table Existing And Projected Aircraft Movement Table Existing and projected cargo...15 Table Details of proposed upgradation...32 Table Taxiway works as per moef clearance 2006 (sqm)... Table Soil analysis results Table Distribution of population...45 Table Ultimate water demand at CSIA Table Sewage Generation Table STP details Table Power requirement Table Emergency power requirement Table Project schedule and cost estimate List of Figures Figure 2.6 Location of CSIA...19 Figure km radius study area of CSIA...20 Figure Terminal T2, CSIA...22 Figure Completed Projects & Existing facilities of CSIA...24 Figure General Aviation apron located South of Main Runway...26 Figure Existing Roadway layout and proposed Metro Line 3 Stations at CSIA...29 Figure NW Pier Development...31 Figure NW & SE Pier Development...31 Figure Proposed Upgradation Projects, CSIA...33 Figure Existing International Cargo Complex, Sahar, CSIA...35 Figure Proposed integrated Cargo Development, Sahar, CSIA...35 Figure Existing Route between T2 to T1 Apron...40 Figure Proposed vehicular Under Pass Plan...40 Figure Proposed Vehicular Under Pass Detail Plan...41 Figure Proposed Taxiway Extension & Bridge Plan...42 Figure Soil analysis results...44 Figure Water balance chart...47 Figure Slum Areas at CSIA...50 Page 4 of 52

5 1.0 Executive Summary Mumbai International Airports Limited (MIAL), a Company under Indian Companies Act, was entrusted to develop and operate CSIA under a Public Private Partnership (PPP) mode for a period of 30 years, extendable for another 30 years. Mumbai International Airport Limited, a subsidiary of GVK Airport Holdings Private Limited is a joint venture between Airports Authority of India (AAI) and GVK led Consortium comprising of GVK Airport Holdings Private Limited (GVKAHPL), ACSA Global Limited (ACSA) and Bid Services Division (Mauritius) Limited ( GVK Consortium ). MIAL entered into Operation, Management and Development Agreement (OMDA) with the Airports Authority of India (AAI) on April 4, 2006 for operating, maintaining, developing, designing, constructing, upgrading, modernizing, financing and managing the Mumbai International Airport. MIAL took over operations and management of the Airport with effect from May 3, MIAL prepared the Master Plan for CSIA, designed to expand, upgrade and modernize airport infrastructure to cater to 40 million passengers, and one million metric tonnes of cargo annually. Since 2007, MIAL has been implementing the projects as per the Master Plan to enhance the efficiency, capacity and safety of airport operations at CSIA. The expansion and up-gradation of CSIA has been undertaken ensuring that the ongoing airport operations are not affected during the course of project implementation. CSIA witnessed rapid passenger growth of 41.6 % between and , and cargo tonnage increased by about 30.1% in the same period. CSIA handled traffic of 36.6 million passengers and 694,261 tonnes of cargo in With commissioning of the new common user integrated Terminal 2, new domestic terminal T1C, upgraded runway and taxiway system, and a new ATC Tower, CSIA is now being equipped to handle over 52 million passengers and one million metric tonnes of cargo annually. In recent times through joint efforts of AAI and MIAL significant progress has been made in improvements to ATC and airfield operations at CSIA leading to increase in Air Traffic Movements (ATMs) per hour. Also the load factor has been increasing for most of the airlines, leading to increased throughput per ATM. Due to this, and the improvements in airfield, navigation and operations, the passenger handling capacity at CSIA is set to increase well beyond earlier target of 40 mppa. This shall lead to savings in power, fuel and consumption of other resources. Accordingly, although CSIA s planned target was 40 mppa, the passenger handling capacity of CSIA (combined terminals and airfield capacity) is estimated to be 52 mppa, post completion of the works included in this application/pfr. 1.1 Airport Modernization Project On April 3, 2007, CSIA received Environment Clearance from MoEF for airport expansion and modernization works. The projects approved as part of Phase 1 for CSIA modernization and expansion were taken up between , for 16,39,759 sqm of area, while Phase 2 works were taken up between for 8,02,145 sqm of area. The total site area of CSIA is Ha which includes Ha of airside area and Ha of landside area, while balance 125 Ha of land is under encroachment. In 2007 MIAL started modernization and redevelopment of Page 5 of 52

6 the airport to cater to the growing needs of domestic and international air travellers, and all other airport users including airlines, ground handlers, employees, etc. as per guidelines of regulatory agencies such as AAI, DGCA etc. Major activities of modernization of airport included in EC of 2007 are: Redevelopment/Renovation of existing domestic passenger terminals; Construction of 2 new passenger terminals; T1C and new common user integrated Terminal-2; Terminal forecourt improvements, multi-level car park for 5500 cars; Dedicated airport approach road to new Terminal at Sahar; Construction of new Air Traffic Control Tower; Expansion of additional apron areas and parking bays; Expansion and upgradation of taxiways and rapid exit taxi ways; Construction of new Sewage Treatment Plants ; Expansion of new utilities including multiple Constant Current Regulatory (CCR s) Building and Distribution Sub-Stations(DSS s); Upgradation of airside storm water drainage system with 5 new oil water separators; Upgradation of overall airport including runway, taxiway, apron etc. to serve the largest commercial service aircraft; Construction of airline support facilities such as aircraft run up bays, maintenance hangars and ground support equipment storage; Upgradation of runways; Other upgrades, expansions and construction of facilities including Yellow Fever Hospital, and police stations, etc.; Re-development of Residential Colonies. 1.2 Airport Upgradation Proposal MIAL has completed most of the projects/ works approved in the Environment Clearance of Some parts of the projects / works approved in 2007 are currently in progress and need additional time for completion. Also few of the approved projects/ works which could not be initiated due to existing constraints, shall be taken up in the next five to seven years. MIAL is therefore submitting this application for extension of time for ongoing balance work of projects/ works approved in 2007, to get the requisite additional time for their completion. The upgradation works included in this application are in two categories: A. Completion of balance works approved in EC of Completion of balance work of passenger terminals; 2. Completion of balance work of cargo terminals; 3. Completion of balance work of apron expansion; 4. Completion of balance work of Taxiway extension; 5. Completion of balance work of airport facilities Page 6 of 52

7 Page 7 of 52

8 B. New/Fresh Projects Proposed Up-gradation of Chhatrapati Shivaji International Airport (CSIA) - Project Feasibility Report (PFR) i) Vehicle Underpass for Runway 14: In order to ensure better utilization of available aircraft parking stands at terminal/apron, to increase operational efficiency, reduction in consumption of fuel, higher environmental sustainability, and enhanced safety of operations, MIAL is proposing to construct a vehicle underpass below Runway 14/32 to connect the aprons of Terminal T2 in Sahar and Domestic Terminal T1 in Santa Cruz, for expeditious transfer of passengers and baggage/ cargo between the two Terminals. Detail description of this project is given in Section ii) Construction of Taxiway M: In order to reduce departure queuing times on Runway 27, which is the airport s main runway, MIAL is proposing to construct an access taxiway to runway 27end. The project involves construction of extension to existing Taxiway M, with bridge over Mithi River. This project will increase runway capacity during departure peak times. In addition to this, Taxiway M will improve aircraft circulation from/to Terminal T2 apron from the Runway 27. Detail description of this project is given in Section iii) Construction New ATC Tower in Kalina: Relocation of existing ATC Tower at Santacruz may be required in future due to security reasons. Construction of new Air Traffic Control Tower is therefore proposed in Kalina, as this location is further from the main public and passenger access areas, and is more appropriate from security point of view. Also, this location provides unobstructed views of all runway ends and taxiways. Detail description of this project is given in Section It may be noted that an incidental increase in airport s passenger handling capacity and completion of the pending projects/works are well within the resource demand as approved in the Environmental Clearance of 2007, and no additional demand for water, or power, or sewerage, etc. is envisaged for completion of the balance work or for the new projects. All Projects included in this application are approved in the Environmental Clearance of 2007, except the three fresh projects mentioned in Section 1.2 (B), and land acquisition is not involved for any project/work. All projects are within airport site area, and are required to enhance efficiency, safety and security of operations at CSIA. Some of these projects shall need slum rehabilitation for a small part, i.e acres, of the acres of slums located on airport land, in accordance with Slum Rehabilitation policy of Govt. of Maharashtra for CSIA. It may be noted that Chhatrapati Shivaji International Airport (CSIA) has acres under slums and as per Interim Development Plan of CSIA, approved by Government of Maharashtra (GoM) 104 acres of this 309 acres shall be required in future for expansion of aeronautical area of CSIA. MIAL shall separately approach MoEF in future, for Environmental Clearance for this proposed aeronautical area expansion and associated slum rehabilitation. It may be noted that presently, for the urgent and critical airport upgradation works included in this project application only acres of the total acres of slum area is required. The details of the proposed slum rehabilitation for this limited slum area of acres required for the urgent and critical airport development works, is described in Section 7 of this report. Enabling works may be required for each project, and the project areas mentioned in this report are indicative. These may be modified within the approved area during the detailed design and implementation stage. Mitigation measures shall be developed to prevent, minimize, rectify and/or compensate impacts during construction and operations of the Page 8 of 52

9 proposed projects. The demand for water, power and waste treatment shall be within the limits of Environment Clearance (EC) granted earlier. 1.3 Air Traffic at CSIA The passenger traffic at CSIA has increased rapidly, with 41.6% growth from mppa in , to mppa in , with average annual growth rate of 5.2%. Similarly the annual cargo tonnage has increased in corresponding years by 30.1% from 533,494 MT in to 694,261 MT in Traffic forecast indicates passenger traffic demand to reach over 50 mppa by CSIA handled traffic of 36.6 million passengers in , with annual growth of 13.7%. 1.4 Impact of CSIA Development CSIA has made major contribution to local and regional economic development (direct and indirect), and the same is detailed in report of National Council of Applied Economic Research (NCAER), New Delhi, titled Economic Impact Study of Chhatrapati Shivaji International Airport, Mumbai. As per the report, In , around Rs billion or 0.44 per cent was contributed by CISA s operational activities to India s GDP. Its contribution relative to the regional economy (Maharashtra) was 3.35 per cent of the state s GSDP. The total impact comprises : Rs.39.9 billion that was directly contributed through value added mode (air transport and airport services). Rs.74.6 billion that was contributed indirectly through supply chain (multiplier impact). Rs billion in induced impact (through tourism and investment) 1.5 Need for proposed Upgradation Project Modernization and expansion of CSIA was undertaken to increase airport capacity and provide required facilities and level of service to the passengers. The Modernization Program of CSIA, granted EC in 2007 included development of airside /airfield, Terminals, Cargo, landside and airport facilities. As some project/works could not be completed, they shall be implemented in next five to seven years along with new projects identified for upgradation. The projects approved in EC 2007 need to be completed to ensure planned operational requirements of CSIA, and the new/fresh other proposals are essential for enhancing CSIA s capacity, efficiency to serve the passenger and cargo traffic of Mumbai region. In view of continued rapid growth in passenger traffic (13.7% in ) CSIA s operational infrastructure needs to be further upgraded to serve the estimated demand of over 50 mppa by 2020 to ensure economic growth of Mumbai City, the financial Capital of India,. This is particularly important as CSIA shall be required to serve entire demand of Mumbai till the commencement of operations at proposed Navi Mumbai airport. 1.6 Strategic Importance and Urgency of proposed upgradation works for CSIA. As mentioned, the passenger traffic at CSIA has been rapidly increasing with 13.7% growth in This rapid increase in passenger traffic is expected to continue in future with national GDP growth reaching targeted 9%. In view of this, CSIA shall be required to handle considerably more traffic than earlier estimated 40 mppa, and therefore it is essential that airport s infrastructure is urgently upgraded to increase its capacity and efficiency to handle Mumbai s increasing air traffic demand. Page 9 of 52

10 In view of the delay in the implementation of Navi Mumbai Airport there will be increased pressure on CSIA to serve the entire air traffic demand of Mumbai and surrounding region. Therefore, in order to augment the existing capacity of CSIA, it is essential that the projects identified in this regard are approved and implemented immediately to avoid a crisis. Any delay in implementation of the identified three critical projects may lead to undesirable situation wherein the city of Mumbai shall not have airport with adequate capacity to serve the financial and business capital of the country. Public Accounts Committee (PAC), GoI & CAG in their respective reports on CSIA development have made strong observations regarding urgent need for capacity augmentation of CSIA in order to meet the rapidly increasing demand of Mumbai, and have suggested that urgent steps to be taken to create adequate capacity at CSIA to serve the city of Mumbai, particularly in view of delay in implementation of Navi Mumbai Airport project. In view of the urgency to expedite implementation of proposed works, it is essential that MoEF approval is granted at the earliest, as these works shall take 24 to 36 months for completion. Mumbai airport may face serious capacity constraints if these projects are delayed. Considering the importance of the upgradation works, and as there is no land acquisition involved and as most of the projects in this proposal have already been approved in EC of 2007, MIAL requests that Public Consultation/Public Hearing be exempted for this proposal. MIAL requests MoEF to consider the proposed upgradation of CSIA under sub section (i)(f) of Stage (3) of Public Consultation wherein all projects or activities concerning national defense and security or involving other strategic considerations as determined by the Central Government are exempted from Public Consultation. The proposed upgradation proposal for CSIA comes within the above definition as :- 1) Aviation facilities of Indian Air Force and Indian Navy are located at CSIA. 2) The proposed upgradation works shall increase security and safety of the airport and its operations. Security agencies (I.B., BCAS, CISF, State Police, etc.) have repeatedly raised security concerns due to presence of slums in close proximity of operational area of CSIA. Recently, Parliamentary Standing Committee on Transport, Tourism and Culture in its Report on Security at Airport in India has highlighted security threat to CSIA due to presence of slums at airport. 3) CSIA is the second busiest airport in India and serves not only Mumbai but also large part of Western India. Augmentation of CSIA s infrastructure is strategic to the economic development and growth of business in Mumbai and surrounding region. The proposed upgradation works are of strategic importance, as Mumbai, the financial capital of the country, may face serious growth constraints due to limitation of airport capacity in view of rapidly increasing domestic and international passenger and cargo demand, and delay in implementation of Navi Mumbai Airport. For continued growth of Mumbai and surrounding region of Western India, it is imperative that capacity and efficiency of operations at CSIA is urgently augmented to ensure continued growth of economy and business. In view of the above, MIAL requests MoEF that the proposal for upgradation of CSIA be considered for exemption under the said provisions. Page 10 of 52

11 2.0 Introduction to Project 2.1 Background Chhatrapati Shivaji International Airport (CSIA) is the second busiest airport in India, serving as a gateway to international passengers and domestic passengers. Presently, 42 international airlines and 5 domestic airlines connect CSIA to 43 international destinations and 47 domestic destinations. In addition, 4 international airlines and 1 domestic airline operate exclusive freighter flights from CSIA. In , Mumbai airport handled 36.6 million passengers, with annual growth of 13.7%, along with tonnes of cargo, and currently handles up to air traffic movements per hour. Based on the Environment Clearance granted by MoEF in 2007, MIAL started modernization and redevelopment of the airport to cater to the growing needs of domestic and international air travellers, and other airport users including Airlines, Ground Handlers, etc. as per guidelines of regulatory agencies such as AAI, DGCA etc. The modernization projects that are completed by MIAL include: Refurbishment of domestic passenger terminal, T-1B & T-1A; 2 new passenger terminals, new common user integrated Terminal-T2 at Sahar and Terminal T1C with Hotel at Santa Cruz Sahar Terminal forecourt improvements, construction of multi-level car park for 5500 cars; Elevated 6 lane airport approach road to New Terminal -2; Construction and relocation of Air Traffic Control tower (to Santacruz); Expansion of additional apron areas and parking bays on the airside; Expansion, upgradation and construction of new taxiways and rapid exit taxi ways ; Construction of new Sewage Treatment Plants for CSIA; Expansion of new utilities including multiple Constant Current Regulator building (CCR s) and Distribution Sub Stations(DSS); Upgradation of airside storm water drainage system with 5 oil water separators; Relocation of navigational aid facilities; Upgradation of airport s airside infrastructure to serve the largest commercial service aircraft; New airline support facilities such as aircraft run up bays, maintenance hangars, and ground support equipment storage; Upgradation of existing runways; Other upgrades / expansions / construction of new facilities including Yellow Fever Hospital, and Police Station, etc.; Statutory Environmental Clearances received for CSIA development MIAL has received following Environmental Clearances and approvals for CSIA development : Environment Clearance from MoEF vide approval letter No. 10-5/2007-IA-III dated Consent to Establish for Phase I from MPCB vide Consent No. BO/RO/(P&P)/CC-145 dated Page 11 of 52

12 Consent to Establish for Phase II from MPCB vide Consent No BO/RO(HQ)/CE/CAC-217 dated Consent to Establish for Aviation Fuel Storage & Handling facility from MPCB vide Consent No.BO/RO(HQ)/CE/CAC-539 dated and amendment vide Consent No.BO/RO(HQ)/CE/CAC-712 dated Consent to Operate from MPCB vide Consent No. BO/RO(HQ)/CO/CAC-468 dated Consent to Operate from MPCB vide Consent No. Format 1.0/BO/CAC-cell/RO-MU/EIC- MU /O (part)/cac 9304 dated Consent to Operate (Part) to Terminal T1C Hotel Extension of Domestic Terminal 1A from MPCB vide Consent No. Format 1.0/BO/CAC-cell/EIC-MU /O (part)/cac-690 dated Amalgamated Consent to Operate for Airport vide Consent No. Format 1.0/BO/CAC- Cell/EIC-MU /CR/CAC dated Identification of Project and Project Proponent: Project Proponent Mumbai International Airports Limited (MIAL) is a Public Private Partnership (PPP) and joint venture between AAI and GVK led Consortium comprising of GVK Airport Holdings Private Limited (GVKAHPL), ACSA Global Limited (ACSA) and Bid Services Division (Mauritius) Limited. MIAL was incorporated to take over the management of CSIA and on April 4, 2006 MIAL entered into Operation, Management and Development Agreement (OMDA) with AAI for operating, maintaining, developing, modernizing, financing & managing the Airport for a primary period of thirty years, extendable by another thirty years. MIAL took over operations and management of the Airport with effect from May 3, Identification of Project Chhatrapati Shivaji International Airport is a Brownfield airport, located in center of a land constrained city of Mumbai, the financial capital of India. CSIA is located at 19 05' 27" North 72 52' 00" East, at an average field elevation of eight meters above sea level. CSIA is situated near the suburbs of Santa Cruz, Vile Parle, Sahar and Andheri. The total area of CSIA is Ha of this Ha is planned for airside/ aeronautical development, and Ha for landside/non-aeronautical development, while balance 125 Ha of land is currently under encroachments. The airport upgradation/development works that MIAL has completed as per the Environmental Clearance of 2007 from MOEF are within the 24, 41,904 square meters approved in the EC (16, 39,759sqm under Phase I and 8, 02,145 sqm under Phase II). The modernization and expansion activities initiated in 2007 have transformed CSIA into a major international aviation hub, and have enhanced passenger facilities as well as created value. Due to the ongoing improvements, the airport's passenger service ratings, given by Airports Council International, have improved considerably in recent years. Its Airport Service Quality (ASQ) rating has gone up from 3.25 in 2006 to 4.96 (maximum of 5.0) in May Mumbai continues to experience rapid growth in passenger volumes, and shall realize significant growth in the coming years. The current annual passenger growth during was 21.1%, for domestic passengers and 4.1% for international passengers. Mumbai city is expected to have traffic demand of approximately 50mppa by 2020, and therefore It is Page 12 of 52

13 essential that further upgradation of the airport is planned and implemented to augment its current capacity to serve the air passenger demand of Mumbai, particularly in view of new airport at Navi Mumbai being operational post In view of this, MIAL now intends to take up implementation of critical aeronautical infrastructure in order to enhance airport s operational efficiency and capacity. No additional land acquisition is involved as all the proposed upgradation projects are planned, and shall be implemented within the CSIA site area. Few projects shall require a part of land currently under encroachments. However such land requirement is very limited. All Projects included in this application are approved in the Environmental Clearance of 2007, except the three fresh projects mentioned in Section 1.2 (B), and land acquisition is not involved for any project/work. All projects are within airport site area, and are required to enhance efficiency, safety and security of operations at CSIA. Some of these projects shall need slum rehabilitation for a small part, i.e acres, of the acres of slums located on airport land, in accordance with Slum Rehabilitation policy of Govt. of Maharashtra for CSIA. It may be noted that Chhatrapati Shivaji International Airport (CSIA) has acres under slums and as per Interim Development Plan of CSIA, approved by Government of Maharashtra (GoM) 104 acres of this 309 acres shall be required in future for expansion of aeronautical area of CSIA. MIAL shall separately approach MoEF in future, for Environmental Clearance for this proposed aeronautical area expansion and associated slum rehabilitation. It may be noted that presently, for the urgent and critical airport upgradation works included in this project application only acres of the total acres of slum area is required. The details of the proposed slum rehabilitation for this limited slum area of acres required for the urgent and critical airport development works, is described in Section 7 of this report. The upgradation works included in this application are in two categories: 1. Completion of balance works approved in EC of 2007 : I. Completion of balance work of passenger terminals II. Completion of balance work of cargo terminals III. Completion of balance work of apron expansion IV. Completion of balance work of Taxiway extension V. Completion of balance work of airport facilities 2. New/Fresh Projects : I. Construction of Vehicle Underpass under Runway 14/32, connecting existing aircraft parking area/ aprons at Terminal T2 in Sahar and Terminal T1 in Santa Cruz. II. Construction of Extension of Taxiway M III. Construction of New ATC Tower, at Kalina 2.3 Need for the Project and its Importance to the Country The passenger traffic at CSIA has increased by 41.6% from mppa in , to mppa in , with average annual growth rate of 5.2%. The annual cargo tonnage has increased in corresponding years by 30.1% from 533,494 MT in to 694,261 MT in Similarly, the Air Traffic Movements (ATM s) increased by 15.9% in last 8 years from 232,509 in to 269,451 in , at an average annual growth rate of 2.0%. CSIA was planned to handle annual passenger capacity of 40 million passenger per year and one million tonnage of cargo, with provision with scope for internal operational efficiencies. Due to improvements and efficiencies in airfield, navigation and terminal operations, the Page 13 of 52

14 capacity at CSIA in future shall continue to increase. In view of this, the reassessed capacity of CSIA (the terminal and airfield capacity), is 52 mppa. These operational efficiencies shall lead to savings in energy, fuel, consumption of other resources, and shall increase sustainability of airport operations at CSIA. In view of rapid growth in passenger traffic, of over 13.7% in , CSIA s operational infrastructure needs to be upgraded to serve the estimated demand of over 50 mppa by The projects approved in EC 2007 need to be completed to ensure planned operational requirements of CSIA, and the new/fresh other proposals are essential for enhancing CSIA s capacity to serve the passengers and cargo traffic of Mumbai region. Adequate capacity of Mumbai airport is essential for economic growth of Mumbai City, the financial Capital of India. 2.4 Air Traffic at CSIA The existing and projected passenger traffic at CSIA is as under ; Year Domestic International Total ,80,924 79,83, ,64, ,16,813 81,18, ,35, ,72,231 82,34, ,06, ,95,453 90,76, ,71, ,43,608 97,04, ,47, ,76,951 99,30, ,07, ,80, ,40, ,21, ,05, ,29, ,34, ,08, ,21, ,30, ,16, ,35, ,52, ,42, ,42, ,84, ,37, ,65, ,03, ,01, ,74, ,76, ,88, ,89, ,77, ,33, ,08, ,41, ,67, ,63, ,30,711 Table Existing and projected passenger traffic pax at the airport The existing and projected aircraft movements at CSIA are as under : Year Domestic International Total ATMs ,70,851 61,658 2,32, ,61,940 65,574 2,27, ,64,632 65,167 2,29, ,73,982 68,677 2,42, ,79,305 72,207 2,51, ,73,252 71,247 2,44, ,88,306 72,360 2,60, ,95,370 74,086 2,69, ,11,059 74,936 2,85, ,15,892 80,080 2,95, ,29,778 86,666 3,16, ,34,524 89,446 3,23, ,34,217 90,404 3,24, ,33,925 91,409 3,25, ,31,716 88,711 3,20, ,27,168 87,608 3,14,776 Table 2.2 Existing and projected aircraft movement Page 14 of 52

15 The existing and projected Cargo traffic at CSIA is as under : Year International Domestic Total ,73,770 1,59,724 5,33, ,78,610 1,51,328 5,29, ,08,452 1,74,184 5,82, ,70,402 1,99,831 6,70, ,67,182 1,90,288 6,57, ,52,742 1,82,463 6,35, ,67,642 1,81,102 6,48, ,86,541 2,07,720 6,94, ,95,666 2,06,403 7,02, ,38,319 2,14,221 7,52, ,91,968 2,31,307 8,23, ,26,069 2,41,994 8,68, ,50,914 2,49,370 9,00, ,77,600 2,57,222 9,34, ,03,606 2,31,225 8,34, ,34,399 1,99,517 7,33,915 Table Existing and projected cargo traffic The passenger traffic at CSIA has increased rapidly, with 41.6% growth from mppa in , to mppa in , with average annual growth rate of 5.2%. Similarly the annual cargo tonnage has increased in corresponding years by 30.1% from 533,494 MT in to 694,261 MT in Traffic forecast indicates passenger traffic demand to reach over 50 mppa by CSIA handled traffic of 36.6 million passengers in , with annual growth of 13.7%. 2.5 Economic Impact of CSIA and Employment Generation CSIA has made major contribution in local and regional economic development (direct and indirect), and the same is detailed in 2014 report by National Council of Applied Economic Research (NCAER), New Delhi, titled Economic Impact Study of Chhatrapati Shivaji International Airport, Mumbai. Based on the said report, CSIA s contribution to economy, and in generation of employment, is summarized as under : Income contribution In , around Rs billion or 0.44 per cent was contributed by CISA s operational activities to India s GDP. Its contribution relative to the regional economy (Maharashtra) was 3.35 per cent of the state s GSDP. The total impact comprises : Rs.39.9 billion that was directly contributed through value added mode (air transport and airport services). Rs.74.6 billion that was contributed indirectly through supply chain (multiplier impact). Rs billion in induced impact (through tourism and investment). Total Impact (Direct plus Indirect plus Induced) Estimates of the total impact of CSIA s operations are given in Table A. The main findings of NCEAR report are: The total economic contribution of CSIA operations is Rs billion, which is 0.44 per cent of the national GDP and relatively 3.35 per cent to Maharashtra s GSDP in Page 15 of 52

16 10. In terms of employment, the total contribution of CSIA s operations is 1,403,000 jobs, which is 0.30 per cent of national employment and relatively 2.86 per cent to Maharashtra s employment in It is important to note here that the results of the multiplier impact in terms of income and employment may not necessarily imply the current contribution of CSIA to the national and regional economies because many of the goods and services are generally procured globally and, hence, are not produced in the domestic economy. Table A : Total Impact of CSIA's Operations in Types Gross output (Rs.billion) Value added (Rs. Billion) Employment ('000) Direct and indirect impact Induced impact Total Impact Employment Contribution In terms of employment contribution, CSIA s operations sector has contributed about 1,425 thousand jobs (0.31 percent of the national employment) in and as a ratio to Maharashtra s employment it contributed 2.90 per cent. The total comprises: In terms of direct contribution, around 49 thousand jobs were added. Indirect contribution to jobs was 418 thousand through supply chains (multiplier impact). With the help of tourism and investment, the induced impact added up to 958 thousand jobs. CSIA s contribution to National and Regional Economy is indicated in Table B below :- Table B : Contribution of CSIA's Operations to National and Regional Economy in Types Contribution to National Economy Contribution to Maharashtra Economy Direct and Indirect Impact % of GDP % of Employment % of GDP % of Employment Induced Impact Total Impact Contribution of CSIA s Construction to the National and Regional Economy In the case of construction activities, the impact is one-time and belongs to the entire construction phase ( to ). The economic contribution of CSIA s construction in terms of value added and employment to the national and regional economy is estimated as: Page 16 of 52

17 Direct contribution of Rs.75.5 billion in income and 20,000 jobs to the national economy during the construction period. Indirect (multiplier impact) contribution of Rs billion in income and 1,078,000 jobs to the national economy The other important findings from the study are: Total passenger traffic at CSIA will reach 49 million by By , CSIA would make an annual direct contribution to Maharashtra s economy in terms of income, which would turn out to be 0.56 per cent of GDP. CSIA s direct plus indirect (multiplier) annual income contribution to Maharashtra s economy annually will be 1.61 per cent of GSDP by Thus, CSIA s total income impact (direct plus indirect plus induced) to Maharashtra s economy will be 4.02 per cent of GSDP by Contribution of tax revenue to the Government s Exchequer Development of an airport, not only contributes income and employment to the economy, but also adds tax revenue to the government s exchequer. The growing economic activities of CSIA have helped MIAL to generate a substantial amount of revenue and in return, MIAL has paid a chunk of its revenue to the government s exchequer in the form of various taxes. MIAL s tax revenue contribution to the government s exchequer in the form of various taxes is Rs.3490 million in , which is 23.6 per cent of the total revenue of MIAL. Page 17 of 52

18 3.0 Project Description 3.1 Type of Project The said project is an upgradation project, and most of the works included herein, are part of Environment Clearance granted in 2007 for modernization and expansion of CSIA. Some part of the works approved in 2007 are nearing completion, and MIAL needs additional time for their completion. As few of the approved works were not initiated due to operational constraints, these shall be taken up in the next five to seven years. MIAL is therefore submitting this application for extension to cover the works approved in 2007, to get the requisite additional time for their completion. All the projects/ works mentioned in the current PFR have been approved earlier, except three new projects, which have been identified for fresh approval. The upgradation works included in this application are in two categories: 1. Completion of balance works approved in EC of 2007 : I. Completion of passenger terminals; II. Completion of balance work of cargo terminals; III. Completion of balance work of Aircraft parking; IV. Completion of balance work of Taxiway extension; V. Completion of balance work of Airport facilities (such Re-development of Residential Colonies, Radar Building, ROFF, CISF barracks, etc) 2. New/Fresh Projects : I. Construction of Vehicle Underpass under Runway 14-32, connecting existing aprons at Terminal T2 in Sahar and Terminal T1 in Santacruz II. Construction Extension of Taxiway M III. Construction of New ATC Tower, at Kalina 3.2 Location Chhatrapati Shivaji International Airport is a Brownfield airport, located at 19 05' 27" North 72 52' 00" East, at an average field elevation of eight meters above sea level. The location map and 10 km radius study area map are given in Figure-2.6 and Figure-2.7 respectively. 3.3 Alternate Sites Considered Since the proposed project is upgradation project, alternate sites have not been considered. 3.4 Modernization of CSIA: Present Status Modernization and expansion of CSIA was undertaken to increase airport capacity and provide sufficient and high quality facilities to the passengers. The Modernization Program of CSIA, granted EC in 2007 included development of airside /airfield, Terminals, Cargo, landside and airport facilities. Airside /airfield development included reconstruction and rehabilitation of both runways, construction/reconstruction of parallel taxiways, construction of RETs (Rapid Exit Taxiways) expansion of aircraft parking aprons for both passenger terminals, Post completion of these works, CSIA is now certified to operate Code F flights on a scheduled basis, facilitating the Page 18 of 52

19 Figure- 2.6 Location of CSIA Page 19 of 52

20 Figure km radius study area of CSIA Page 20 of 52

21 largest commercial service aircraft in operation. A careful phasing of projects was developed by MIAL, ensuring uninterrupted airport operations throughout implementation process. CSIA now has an upgraded cross runway system with parallel taxiways and rapid exit taxiways, two passenger terminals, Terminal T1 (Domestic Terminal) at Santa Cruz and new integrated terminal T2 at Sahar. T2 has a dedicated elevated expressway connecting passengers to Western Express Highway. CSIA has two runways, Runway and Runway Primary Runway is 3,448 meters in length and serves the majority of airport operations. It is oriented to the predominant wind direction, east and west. Secondary Runway is 2,871 meters in length and intersects the primary runway midway, and is oriented in a northwest to southeast direction. Other major components of the airport include cargo facilities, airline support, airline and airport maintenance, general aviation, Utility plants, residential etc. The status of projects/works completed by MIAL since 2007 is described in the following sections and location of the projects are shown in Figure Passenger Terminals Passenger terminals of CSIA are located at Sahar and Santa Cruz. Terminal-1 comprising of the Terminal 1A, 1B and the newly built 1C, is located in Santacruz. These Terminals currently handle most of the domestic operations. Terminal - T2 is a common user Terminal, located at Sahar, and handles both domestic and international operations. As part of extension and development of passenger terminals, refurbishment of Terminal 1B and Terminal 1A has been completed, along with construction of new Terminal 1C (with a Terminal Hotel) and new Terminal T2, with MLCP. Modern passenger amenities like lounges, restaurants, hotels, food courts, retail and duty free shops, etc. have been set up at T1 and T2 in addition to the stateof-art operational facilities for Check-in, Security Screening, baggage handling, etc. As part of Terminal 1 development at Santacruz, a 280 room hotel has been constructed, while at Terminal T2 at Sahar, a day hotel with required facilities has been built to serve the passengers, crew, etc. Terminal hotel at T1 is also equipped with business centre and conference rooms, etc. The concept of the new integrated Terminal 2 is based on the principle of a One roof common user terminal accommodating all passengers services related to international as well as domestic flights. After completion of SE and NW piers of T2, it shall provide capacity of at least 45 million passengers per annum (mppa). T2 is planned for total 188 check-in counters plus 19 recheck-in counters, 60 departure immigration counters and 80 arrival immigration counters, 65 security check lanes, 14 baggage carousels, 29 fixed link bridges, 62 passenger boarding bridges, 48 travellators, 63 escalators, 92 elevators and a 6-lane elevated expressway with dedicated passenger connectivity leading to the Terminal-2. The estimated capacity of T1 complex is approx 20 million passengers per annum (mppa), and it has 11 contact aircraft stands with passenger boarding bridges to serve narrow body aircrafts. The Sahar and Santa Cruz terminal areas are separated by Runway and taxiways. Aircraft parking aprons are provided for domestic and common user integrated terminal, cargo terminals, general aviation as well as for aircraft maintenance purposes, and remain overnight (RON) aircraft parking. Page 21 of 52

22 Figure 2.8 Terminal T2, CSIA Page 22 of 52

23 3.4.2 Cargo Terminals The international cargo facility of CSIA is located at Sahar, near Terminal T2, and consists of cargo facilities of both cargo operators at CSIA, i.e. MIAL & Air India. The existing Sahar cargo complex has been in operation since 1970s and is in need of upgradation. The total cargo handled at CSIA has increased considerably with 694,261 tonnes handled in against 533,494 tonnes in MIAL intends to achieve over 1 million metric tonnes of cargo handling capacity. The existing total area for storage and processing for cargo is approx sqm. As part of airport upgradation, a new Facility for Perishable Cargo has been constructed, exclusively for export of perishable and pharma cargo which includes cold storage chambers in the Exports Zone for pharmaceuticals and vaccines, along with cold storage chambers in the Imports Zone. A separate storage facility for dangerous goods in both the exports and Imports Zone is provided in CSIA International Cargo Complex, with separate storage facility for radioactive material. The domestic cargo handling facility has been constructed west of Terminal 1, along Western Express Highway, on area of 9,715 sqm, and is nearing completion. MIAL has planned additional Cargo Warehouse facility in Santacruz, along with dedicated Courier Terminals in Santacruz and Kalina. In past three years MIAL has constructed Central Store and Utility Building, 1.0 MLD, STP and Power Sub Station for CSIA s cargo development at International Cargo Complex at Sahar. As part of balance works for proposed up gradation program of CSIA (approved in EC of 2007), MIAL shall complete the construction / expansion of proposed Cargo facilities for MIAL and Air India, located in Sahar along with required landside infrastructure. The existing and proposed Cargo facilities are indicated in Figure no. 3.5 and 3.6 respectively General Aviation General Aviation (GA) terminal of CSIA is located south of Runway near Gate No.8. GA Terminal is used by private and non-scheduled flight operators, including government aircrafts. Facilities are provided for passengers who depart and arrive on business jets / private aircrafts. This terminal has two conference halls, two exclusive lounges, two crew rest rooms and a cafe bar for processing passengers entering via non-scheduled aircraft. General Aviation (GA) Traffic has increased from 10,923 ATMs in to 12,400 ATMs in To cater to the increased GA Traffic the facilities at GA Terminal have been expanded in past few years Runways CSIA has two operational runways, Runway (primary), which is oriented in an east-west direction, with length of 3,448 meters and width of 60 meters. Runway (secondary) is oriented in northwest southwest direction, and has been upgraded to 45 meters width, and length of 2,871 m. Both runways have asphalt surfaces and are connected to the terminals by taxiways and aprons. Being the primary Runway, handles 95% of the air traffic, while Runway is used in case of emergency and when primary runway is under scheduled maintenance. Both runways are important for maintaining airport operations as per the current fleet mix, wind conditions. Since 2007, MIAL has undertaken reconstruction of both Runways and their runway upgradation work was completed in Page 23 of 52

24 Figure 2.9 Completed Projects & Existing facilities at CSIA Page 24 of 52

25 3.4.5 Taxiways Before in 2006, the taxiway network of CSIA did not fully service all runway ends, resulting in long runway occupancy time as each aircraft used the runway, instead of taxiway to reach at the end of the runway for take-off. Now with the provision of additional parallel taxiways constructed as part of airport up gradation approved in EC of 2007 along with connector taxiways and rapid exit taxiways (RET), aircraft circulation and flexibility of the airfield has improved considerably and leading to increase in runway system s operational capacity which has increased airport s capacity to 52 mppa. Since 2007 MIAL has constructed/ reconstructed 6 rapid exit taxiways (RETs) to improve runway efficiency; one RET serves Runway 09 and three other RETs service Runway 27 optimizing runway utilization. Additionally, one RET serves Runway 14 on the east side and one services Runway 32. CSIA now has 39 taxiways and taxi lanes. With the use of newly commissioned RETs for primary Runway 27, the runway occupancy time of arriving flights has been reduced to less than 49 seconds. Reduction in runway occupancy time has improved the operational efficiency allowing increased number of landings and takeoffs at the airport to increase runway capacity to at least 48 aircraft movements per hour. In 2007, before improvements were made, the airport was operating only 36 air traffic movements per hour. In next five years MIAL shall under take construction of some of the taxiways which are pending or partially constructed due to existing encumbrances, or encroachments or enabling works requiring relocation. Construction of these taxiways (approved in EC of 2007) are included as part of this application, as MIAL needs additional time for their completion Aprons Aprons are pavement areas to park aircraft. Some aprons are adjacent to the terminals, while others may be at a distance, for remote parking. Since 2007 as part of airport upgradation program, apron areas at CSIA have been expanded in order to accommodate the required aircraft stand as per the traffic forecast. Sizing of aircraft parking positions has been based on peak monthly average day demand, as well as aircraft manoeuvring capabilities, mandatory clearance requirements, parking configuration and ground services requirements. The new aircraft stands at CSIA have been designed in a compact manner, optimizing space and allowing flexibility and minimizing taxiing distances where possible. There are now four main apron areas at CSIA. i) Terminal T2 apron ( at Sahar) servicing Integrated T2 Terminal, and International Cargo Terminal ii) Terminal T1 apron ( at Santacruz) servicing Domestic Terminals. iii) Kalina apron servicing General Aviation and maintenance apron iv) Apron West of main Runway servicing Remain overnight (RON) apron Terminal 1 and Terminal 2 aprons are located in Santa Cruz and Sahar, respectively. The Cargo apron is located in the Sahar, adjacent to cargo complex. Aprons have been planned at CSIA within the available land area to achieve maximum stand capacity and utilization. The Terminal 2 apron is designed for Code E and F aircrafts, and the apron provides contact stands connected to the terminal building as well as remote stands. The domestic apron in Santa Cruz is planned to accommodate Code C aircrafts. Finally, a Remain Overnight (RON) parking Page 25 of 52

26 apron for single aisle aircraft has also been constructed south of Runway 14/32, with ten parking bays. The General Aviation apron is located south of main Runway and provides parking for 20 general aviation, non-scheduled aircrafts, along with Air Force and Navy Hangars. Each hangar has its aircraft parking area in front of the hangar. The GA apron requires relocation to allow realignment/reconstruction of the taxiway to 190 m from the Runway 09 centreline. In next five years MIAL shall undertake construction of proposed additional GA apron area, currently pending due to existing encumbrances and enabling works requiring relocations of existing airport structures. Construction of these aprons (approved in EC of 2007) is included in this application, as MIAL needs additional time for their completion. Figure General aviation apron located south of main runway Figure General aviation apron located south of main runway Communications, Navigation, and Surveillance (CNS) Communication, navigation, and surveillance systems (CNS) are the foundation of airport s air traffic management. Navigational aids (NAVAIDs) of airport guide aircrafts safely into and out of the runway environment Visual Aids Visual navigational aids are the facilities that aid pilots via a visual means. Multiple visual aids have been upgraded at CSIA, including approach lights, runway centreline lights, taxiway edge lights, signages. In addition, two new CCRs with redundant circuits on the airfield for full time back up use have also been installed Air Traffic Control Tower An Air Traffic Control Tower (ATCT) is critical aeronautical facility for management and operation of the airport s air traffic, and is operated by Airport Authorities of India (AAI). The air traffic controllers direct air traffic to ensure safe and efficient air traffic in airspace. The controllers give pilots taxing and takeoff instructions, air traffic clearances, and advice based on their observations and information received from enroute centres, flight service stations and other sources. The location, height and orientation of the ATCT is defined by the need of clear sightlines to the runway ends and unobstructed views of the aircraft manoeuvring areas. The old ATC Tower in Sahar area was penetrating the Obstacle Limitation Surface (OLS) of Runway Page 26 of 52

27 14-32 and therefore required relocation. Proposed Up-gradation of Chhatrapati Shivaji International Airport (CSIA) - Project Feasibility Report (PFR) As part of airport up gradation & modernization program, an ATC Tower was constructed near the domestic terminal area in Santa Cruz in 2013, and is now operational. MIAL has proposed construction of a new ATC Tower at Kalina, in view of security concerns as the current ATC Tower at Santa Cruz is located directly on the airport s approach road from Western Expressway. The proposed location of new ATC Tower is in Kalina, away from Western Expressway traffic and close to existing Defence compound. This project shall be taken up as per the requirements of airport security T2 Multi Level Car Park (T2 MLCP) The T2 Multi-Level Car Park is part of Terminal T2, and was commissioned in 2014 along with the Common User Terminal, T2. T2 MLCP serves airport passengers parking for the duration of their trip, drivers picking up or dropping off passengers, meters and greeters vehicles picking up passengers and employees. T2 MLCP is integrated with Terminal 2 at arrival and departure levels, thus enabling very convenient connection to and from the Terminal. T2 multi-level car park is 10 level facility and accommodates 5,500 car parking spaces and is provided with 72 nos. of toilets, 8 large size elevators and 8 escalators for easy access to different levels. The roof of the MLCP is designed to serve as a large green garden providing a visual delight, and sitting area for travellers, meters and greeters. T2 MLCP has been provided with car parking management system that maximizes the efficiency of its operations, and has been designed as an energy efficient, fully automatic and easy to maintain facility provided with ventilation and exhaust systems, internal electrical and emergency power, fire detection and alarm system, fire fighting system, IT/CCTV and security measures such as automated Under Vehicle Scanning System (UVSS), registration plate picture, driver picture, explosive detection system and manual search Fuel Systems Earlier Fuel storage facilities at CSIA was located on 3 independent land plots across the airport complex and operated by 3 separate companies IOCL, HPCL and BPCL. The separate fuel facilities resulted in inefficiencies in the transport of fuel between aircraft stands and tank farms. In addition, the fuel is transported by truck requiring additional trips on congested airfield roads. To optimize land use and reduce vehicle movements, a consolidated tankage at a single location is being developed by the Joint Venture Company, Mumbai Aviation Fuel Farm Facility Private Limited (MAFFFL), in which three PSU Oil Companies and MIAL each hold 25% of the share. The existing facilities of the oil companies is being merged into this a common user tank farm facility consisting of 47,500 KL on-site storage tanks, at Santa Cruz. The new plot measures 3.7 Ha and consolidation of the fuel companies into the plot reduces the footprint of the fuel farm and vehicle travel. The said development of Integrated fuel facility is part of EC of 2007, and the ongoing work is expected to be completed in next three years. MIAL requires extension of EC for this project, and has therefore been included in this application. Page 27 of 52

28 Roadways & Parking A. Road ways at CSIA Western Expressway (WEH) located on western edge of CSIA provides primary access to CSIA from South and Central Mumbai, while Andheri-Ghatkopar Link Road provides airport connectivity from north, Andheri-Kurla Road from east and Santacruz- Kalina-Kurla Road serves airport traffic from east and southern part of CSIA. The two terminals of CSIA, Terminal 1 and Integrated Terminal 2, were earlier connected to each other from landside via WEH & Sahar Road. In 2014, MIAL with MMRDA completed construction of dedicated 6 lane Elevated road from Western Expressway to new Terminal - T2, providing much required direct connectivity to airport. The traffic from south Mumbai and suburban areas comes to CSIA from the ten lane Western Express Highway (WEH), and enter Terminal 1 area at Santacruz. Traffic from south Mumbai and northern suburban reaches T2 directly from WEH, via six lane Sahar Elevated Road (SER). Construction of Sahar Elevated Road has reduced the travel time to T2 (from WEH) by almost 20 minutes during peak hours and has also lead to reduction in noise pollution and fuel consumption. B. Road network at Sahar Terminal T2 International Airport The primary access roadway system to Sahar International airport (T2) is through six lane road Sahar Elevated Road (SER) and existing at grade road International Airport road and Sahar road leading to T2 arrival kerb side. Sahar Elevated Road (SER) spans from the WEH upto T2 Departure Kerb at Sahar. There are four ramps (two up ramps and two down ramps) provided additionally at the Terminal 2 forecourt area on SER to facilitate various traffic movement to Arrival and Departure kerb and return. Both SER and At grade 3 lane Airport Arrival road at T2 area (from junction in front of Ambassador Flight kitchen) follows a unidirectional traffic movement, moving only in clockwise direction (west to east) to reach terminal kerbs and return back. Further, there is an additional three lane service road adjacent to At grade (3 lane) Arrival road at the eastern end section of At grade road system to facilitate heavy vehicles, airport vehicles and VIP vehicle movement. Apart from the above, there is additional three lane road (with unidirectional traffic flow) inside the T2 forecourt which facilitates the public bus and auto rickshaw movement at T2. C. Road network at Santacruz Terminal T1 Domestic Airport The main internal road network at Terminal T1 Airport includes at grade three lane Airport road from WEH at Vile Parle junction with unidirectional traffic movement (clockwise movement) upto T1 kerbs and looping back to WEH. There is an additional two lane service road extending from Main Airport road up to Airport Gate 1 for airport vehicles. Further, two 3 lane Arrival roads spurs from Airport Road loop to Terminal 1B and 1A Arrival area to serve the arriving and departing passenger traffic. D. Parking at Sahar Terminal T2 International Airport As part of Terminal T2 development, MIAL has constructed a new Multi Level Car Park (T2 MLCP) with capacity 5500 car parks, which caters to all airport users. This MLCP is located in Page 28 of 52

29 front of Terminal T2 and is accessible from Sahar Elevated road as well as at grade road of T2. Additionally two surface parking lots of capacity (750 and 150) for airport taxi staging. These taxi staging have been constructed in close proximity to T2. E. Parking at Santacruz Terminal T1 Domestic Airport The present car parking for Terminal T1 is located in front of Terminals T1A and T1B and around 300 taxi staging slots (surface parking) at T1. As part of T1 development, MIAL has constructed a multi level car parking (MLCP) with 895 car parking slots. F. Public Transport Connectivity to CSIA Currently, there is no dedicated rail link connecting CSIA to rest of Mumbai. The nearest railway stations on the suburban railway network (Western Suburban line) is Vile Parle (East) located close to Terminal 1, whereas Andheri is the closest railway station to Terminal 2. The Mumbai Metro Line 1, runs on the northern periphery of CSIA development near Terminal T2 at Sahar, and most of northern landside areas of CSIA is accessible from Metro Line 1 stations such as Chakala Station, Airport Road Station and Marol Naka Station. Figure 3.1: Existing Roadway Layout and Proposed Metro Line 3 Stations at CSIA Page 29 of 52

30 As part of CSIA development, Metro Line 3 project by MMRCL is being implemented to provide high speed connectivity to CSIA with three stations within airport, and these shall be operational by The three metro stations at T1, T2 and one at Sahar road shall augment connectivity to CSIA. The BEST city bus service operates from CSIA to various destinations in Mumbai. Pre-paid taxis, metered taxis and auto rickshaws are also available at both the Terminals of airport. 3.5 Upgradation Program Proposed Project The projects in this application are in two categories. First category is the projects approved in the 2007 EC, which shall be completed in next five years. MIAL requires extension of EC for such projects/works, and these are therefore included in this application. As the earlier Environment Clearance is up to 2015, MIAL is applying for extension for such projects, which were previously approved. These are indicated in part A of Table-3.1. The second category includes new/fresh projects. The three new projects identified for implementation in next 5 years were not part of previous the application and are therefore included in this application. The new projects are important to increase environmental sustainability, reduction in the carbon emissions higher operational efficiency at CSIA, and increased security. No land acquisition is required for any of the projects. All the Projects are to be located on the airport site, and are focused to enhance airport s efficiency, safety, capacity and security. The three new projects are: Construction of Vehicle Underpass Connecting Existing Sahar and Santa Cruz Aprons Construction of Taxiway M Extension with Bridge Construction of New ATC Tower, at Kalina 3.6 Justification for the Projects: Completion of Projects approved in EC of 2007 The completion of proposed upgradation works is essential for efficient Terminal & airport operations for CSIA, and the projection in Category A in above table have already been approved in EC of The completion of construction work is included in this PFR, for extension of time Completion of Terminal 2 - South East and North West Pier MIAL has completed major part of Terminal T2 development work (as per EC of 2007), except North West pier and ongoing South East pier. Terminal T2 was commissioned in February,2014 for international traffic. Construction of North West pier shall be taken up in the next few years. Completion of Terminal T2 piers is essential to provide required Terminal Capacity and efficient operation of both domestic and international operation from T2. It will reduce the need for passenger transfer, and improve efficiency in operation by bringing together all the airlines operating international and most of domestic under a single terminal, as well as achieving better utilization of space and facilities. This application proposes construction that includes Northwest and Southeast Piers, on approximately 28,000 sqm area. Page 30 of 52

31 Figure 3.2 : NW Pier Development Figure 3.3 : NW & SE Pier Development Page 31 of 52

32 Table Details of Proposed Upgradation Projects for CSIA Page 32 of 52

33 Figure 3.4 Proposed Upgration Projects, CSIA. Page 33 of 52

34 3.6.2 Completion of Cargo Terminals Proposed Up-gradation of Chhatrapati Shivaji International Airport (CSIA) - Project Feasibility Report (PFR) Cargo complex upgradation and expansion is needed to provide required cargo handling capacity, increase efficiency, and safety in cargo operations. The total cargo handled at CSIA has increased considerably with 698,250 tonnes handled in 2015 against 533,494 tonnes in MIAL has planned to achieve cargo handling capacity of over 1 million metric tonnes. Expansion, restructuring of existing cargo facilities and construction of new cargo facilities is required for addressing the growth, higher efficiency and safety of cargo operations. MIAL has completed construction of Perishable Cargo Facility, Cold Storage Import Facility, Domestic Cargo Terminal and construction of Heavy Cargo facility is near completion. As part of airport upgradation program, MIAL shall complete the construction of proposed Cargo Terminal works approved in EC of Proposed Cargo Development includes : A) Construction / completion of MIAL s international, domestic and courier cargo facilities B) Construction of Air India s international & domestic cargo facilities. A) Completion of MIAL s international, domestic and courier cargo facilities, on total area of 62,977 sqms. The proposed MIAL cargo facilities include: a) MIAL s Import Warehouse : This is currently an operational warehouse of 3 Modules comprising MIAL and Air India Export Area, and APEDA and MIAL Import area. MIAL needs to undertake modifications/redevelopment to this facility to increase its capacity and efficiency, on an area of 14,627 sqm. b) MIAL s Heavy Import Warehouse : The existing current MIAL Heavy Import Warehouse is to be demolished for construction of Taxiway construction, therefore a new MIAL Heavy Import Warehouse shall be constructed at the current location. c) MIAL s Import Warehouse-2 (Automated Storage & Retrieval Import Facility) : This is an Import Cargo facility with Automated Sorting and Retrieval System (ASRS) to be developed on an area of 2921 sqm, for storing import cargo with bin storage positions. Ground floor is planned to be used for de-stuffing and release of import, document checking and general storage with truck docking area. This building is planned to be connected to MIAL Import Warehouse-1. d) MIAL s Export Warehouse-1: This facility is a multi-level export processing warehouse shall be developed on an area of 9285 sqm with BUA of 18,813 sqm with automated storage and retrieval positions, with Transfer Vehicle system, lift and run system for airside transfer and truck dock positions are provided. This building is planned to be connected to the proposed Export Warehouse in the North, this facility is under construction and nearing completion. e) MIAL s Export Warehouse: This building is planned on an area of 6873 sqm with BUA of 45,713 sqm as a multi-level export processing area with ULD storage positions and Transfer Vehicle system, connected to MIAL s Export Facility for airside transfer along with an independent airside loading & unloading area, landside docks and with a large basement for parking and unloading of goods. Page 34 of 52

35 f) Courier Terminals : An integrated courier terminal complex shall be developed in Santa Cruz area on the west side of Runway 14, located on airside near Gate 1 of 5250 sqm. The terminal shall have airside and landside accessibility. A second integrated courier terminal shall be developed near Apron Lima, south of Runway 09, with required landside and airside access, on an area of 20,030 sqm with BUA of 18,863 sqm. Similarly, MIAL shall construct Domestic Cargo Facility at Santacruz, near Old Power House plot, on area of 1651 sqms. Figure 3.5 Existing International Cargo Complex, Sahar CSIA. Figure 3.6 Proposed Integrated Cargo Development, Sahar, CSIA. Page 35 of 52

36 (B) Completion of Air India s Cargo Facilities MIAL and Air India shall take up construction of new Cargo facilities for Air India, by redeveloping their current facilities on Air India s existing cargo International Cargo site area at Sahar. As part of this work, Air India s Import Facility/Warehouse, Export Warehouse and Domestic Cargo Facility shall be constructed on an area of 16,501 sqm. with BUA of 30,646 sqm. The aforesaid Cargo Terminal Development works are part of the Cargo development approved in EC of 2007, and construction of the above works shall be completed in next five years Completion of Aircraft Parking Apron The balance works of expansion of aircraft parking areas, approved in EC of 2007, which are necessary for achieving the planned airport capacity are included in this application, for extension of time. In 2007, EC was granted for the expansion of domestic and international apron expansion and also for additional domestic and RON remote parking bays over an area of 38.6 Ha. Aprons are used for the manoeuvring, parking and servicing of aircraft at airports. Aprons support passenger, cargo and general aviation aircraft operations. To cater for projected traffic and peak stand demand CSIA requires completion of construction of the balance apron works. a) Integrated Terminal-2 Apron expansion The apron area for aircraft operations of integrated Terminal 2 in Sahar needs to be completed to provide required aircraft parking stands for the Northwest and Southeast pier of Terminal T2. This apron is in addition to the apron on eastern side of the integrated T2. The balance works of international apron extension, are already approved in EC of 2007, and are included in this application, for extension of time. The apron of integrated T2 will provide 29 Code E/F equivalent positions served by passenger boarding bridges including 17 Multi Aircraft Ramp Systems (MARS) stands to meet the projected passenger demand at CSIA. This apron expansion will provide additional three aircraft stands for T2 which will enhance efficiency of airlines and airport operations A small part of this is currently encroached land. The balance apron area to be constructed is sqm. out of this a small part is on currently encroached land (2.62 Acres / approx.10,522 sqm). This small part of overall apron work shall be taken up after rehabilitation of existing hutment dwellers. The details of proposed rehabilitation process are outlined in Section 7 of this PFR. b) Aprons South of Runway General aviation (GA) facilities located in southern part of the airport and south of Runway need to be relocated as they are within the footprint of southern parallel taxiway to Runway As construction of the parallel taxi way is necessary for ensuring the enhanced capacity for the airport, as well as enhancing airside efficiency and safety, the GA aircraft apron needs to be constructed at a new location. The relocation of the GA apron is proposed south of Runway 09/27 within airport land. The construction of this apron requires relocation of existing general aviation aircraft facilities to approx Hectares (2.09 Acres) of CSIA land currently under encroachments. This apron covers an area of approximately 7.50 Ha. The area of 0.84 Hectares (2.09 Acres) under encroachments shall be taken up for development after slum rehabilitation. The details of proposed Rehabilitation process for hutment dweller are outlined in Section 7. Page 36 of 52

37 Completion of Taxiway Development 2007 EC approval was granted for all the taxiways developments required for efficient operations of CSIA, on area of 7,94,030 sqm. Some part of these proposed taxiways, are not yet completed and these are to be developed in next five years to enhance movement of aircrafts to increase airside efficiency and safety. The balance taxiway construction of approx. 4,23, 474 sqm shall be taken up to complete the CSIA taxiway system Completion of Airport Facilities Construction of various airport facilities has been approved in EC of 2007, and MIAL has completed construction of some of these facilities while construction of few facilities shall be taken up in next 5 years. Construction of Airport facilities mentioned below needs to be completed, as these are critical for airport operations, hence these are included in this application for additional time for their completion. These include: (1) GSD and Centralized Kitchen, Sahar : Air India Ground Service Department (GSD) storage, maintenance, refuelling, and office facilities currently located west of new integrated Terminal T2 at Sahar need to be relocated to a new site to enable the construction of Terminal T2 s North West Pier, and associated aircraft apron. The proposed GSD development comprises transport hangar, equipment washing, and water treatment facility for potable water to aircraft, workshops, Car Bays, Stores, Administrative Offices, and Centralized Kitchen. The proposed new GSD with Centralised Kitchen for Air India shall be developed on area of 47,431 sqm. with BUA of 38,156 sqm on site are within CSIA airside, along Cargo/Sahar Road. (2) Indian Airlines / Air India Hangar (1 no.) South of Runway : MIAL is to construct a new Code C hangar with associated apron for Air India. This hangar shall be built within the airside of CSIA, on area of 4976 sqm and shall include a new apron. (3) Air India aeronautical facilities South of Main Runway : Existing Air India facilities located south of Runway are in the footprint of proposed Code F parallel taxiway planned west of Runway The taxiway is needed to reduce number of aircraft crossings on the active Runway, and reduce taxing distance to terminal facilities. The affected Air India facilities including aircraft maintenance, administrative offices shall be relocated and constructed on an area of 33,564 sqm. with BUA of 37,601 sqm on a site south of Runway 09. (4) Hangars South of Main Runway : Two GA hangar shall be built on the South of Runway These GA Hangars shall have offices, passenger/vip areas and other facilities, as well as aircraft parking and taxiway access to the hangar. The approximate area of proposed hangars with apron and office space is 3,060 sqms. (5) Redevelopment of Residential Colonies : In line with the requirement of releasing land for airport development, the existing old residential colonies on airport land are to be restructured, redeveloped and densified at their respective locations in AAI-NAD Colony in Sahar, Air India- Indian Airlines Colony at Kalina to release land for airport development. In this regard construction work is completed for the CPWD residential quarters at Sahar, and MIAL has received approval from local authorities for the proposed redevelopment of AAI NAD Colony. The same shall commence by March The densification of colonies is planned entirely Page 37 of 52

38 within the airport land and will not require land acquisition or any slum rehabilitation. The utilities and the associated facilities shall be enhanced appropriately. Redevelopment of residential colonies on 296,070 sqm of area has been approved in EC of The balance area for residential development (as CPWD Quarters has been completed) shall be within the approved area of EC Redevelopment of residential colonies is critical for airport development and upgradation. Total residential area proposed for re-densification purpose in this application, is 2,81,778 sqm., with BUA of 224,779sqm. (6) Meteorological Farm: The Indian Meteorological Department s observatory and related offices are to be relocated from their current location, as their current site is required for airside development and, new IMD facilities shall be constructed on site in NAD Colony with an area of 8,088 sqm. (7) CISF Chakala: The project involves the construction of 20 new residential family quarters at CISF in Chakala, Andheri for Senior CISF officials posted at CSIA. The project area is 943 sqm. (8) Vile Parle Police Station, Santacruz: The existing Vile Parle Police Station located within CSIA site area near Terminal T1 is an old ground floor building without required modern facilities and necessary infrastructure. MIAL shall construct a new Police Station on area of 2,270 sqm. (9) Expansion of Common User Fuel Storage Facilities: In the EC of 2007, approval was granted for the expansion of Common User Fuel Storage Facilities with area of 74,000 sqm. The existing Fuel Farm at CSIA located at Santacruz is to be expanded, with increased storage capacity, on the existing site located near north of Runway 09 end,into a common user fuel storage facility to be used by all oil companies operating at CSIA. The capacity of consolidated fuel farm shall be 48 ML with area of 37,925 sqm., and BUA of 10,910 sqm. Majority of aircraft parking stands shall be served by hydrant fuelling systems originating from this Common Use Fuel Farm. The said development of Integrated fuel facility is part of EC of 2007, and the ongoing expansion work shall be completed in next 3 three years. MIAL requires extension of EC for this project, and is therefore included in this application. (10) DoP Sorting Office: A new sorting office for Department of Post (DoP) is to be constructed by MIAL in NAD Colony within CSIA site area. The existing DoP sorting office is coming in the way of construction of new western taxiway to Runway 14. The expansion of taxiway will facilitate efficient and safe movement of aircraft. The Sorting Office shall be constructed on area of 11,351 sqm. and BUA of 29,147 sqm., in NAD Colony. (11) Extension to existing CISF staff quarters at, Kalina and Sahar : Additional accommodation is required for increased strength of CISF personnel for airport security. These shall be constructed on the existing CISF buildings at Kalina (1468 sqm) and Sahar (1432 sqm) on total area of 2900 sqm. MIAL has completed expansion of existing CISF Kalina campus providing new bachelor accommodation for 1600 personnel. The balance CISF accommodation facilities shall be constructed in next two years. Page 38 of 52

39 (12) AI Cabin Catering / In-flight / Chef Air Kitchen: Air India cabin catering facilities need to be relocated and developed at more suitable location at NAD colony, on an area of 12,288 sqm. with BUA of 28,676 sqm. (13) Airport Management Building: In EC of 2007 Airport Management Facilities of 5,000 Sqm of area was approved. However, as this project could not be completed, it has been included in this application for extension of time. MIAL shall construct Airport Management Building on area of 9755 sqm. with BUA of 51,516 sqm. This building will accommodate essential offices of airport operator and various agencies/departments and airport related offices. (14) GSE Maintenance Facilities with Bridge Access: A large number of existing Ground Support Equipment (GSE) maintenance facilities operated by various airlines and ground handlers have to be relocated as they are coming in the apron expansion work. It is therefore proposed to construct new GSE maintenance area for Terminal-2. The site is located east of integrated Terminal 2, across Mithi River on an area of 30,055 sqms. This new GSE area will be connected to integrated T2 apron by a bridge, on Mithi River. MIAL has received approval from Municipal Corporation of Greater Mumbai (MCGM) and Mithi River Development Planning Authority (MRDPA) for the proposed bridge construction. (15) Airport Maintenance Compound : In EC of 2007 area of 13,450 Sqm was approved for the Airport Maintenance Compound. The construction of a Maintenance Compound enables relocation of existing vehicle maintenance facilities / workshops near domestic apron, which need to be relocated as they come within the foot print of proposed western taxiway to Runway 14. The new airport maintenance compound shall be located on the south of main Runway 09/27 on an area of 4063 sqms. (16) Main Rescue and Fire Fighting Building: In EC of 2007 approval was granted for the construction of the New Main Rescue and Fire Fighting Building and this application is for an extension of the timeline for completion of the said work, on an area of 6197 sqm. (17) Radar Buildings : The existing approach radar is located north of the intersection of the runways. In view of ongoing airport development the radar needs to be relocated from its existing location. The current radar is being relocated near CCR Building near Terminal T2, and a third radar required for CSIA, shall be constructed on a site near eastern airport boundary. The area of each of the radar structure shall be 767 sqm. (18) MIAL Essential Staff Residential Quarters and Guest House : As part of the approved work of Redevelopment of Residential Colonies, MIAL shall construct residential quarters and Guest House on a site area of 3735 sqm. with BUA of 8600 sqm., in Kalina area of CSIA, near CISF Quarters. (19) Other Incidental Construction: This item includes any additional construction work required to support the developments described above, with area of approx. 20,000 sqm. Page 39 of 52

40 3.7 Justification for the Projects : New/Fresh Projects Vehicle Underpass under Runway It may be noted that, although Terminal-2 is designed to serve passenger demand of over 45 mppa and beyond, the available aircraft parking stands associated with T2 do not fully accommodate all the remain overnight (RON) Operations during international peak hours. Therefore both the aprons, Terminal 2 apron and also the Terminal 1 apron need to be used together to serve the aircraft parking demand during peak hours. It is therefore essential to connect the two aprons to enable transfer of passengers from Terminal 2 to Terminal 1 apron (remote stands). This project comprises construction of a 15.1 m wide vehicular underpass under secondary cross Runway to connect the aircraft parking aprons of Terminal T2 at Sahar and Terminal T1 at Santa Cruz shown in Figure-3.8 and 3.9. Passenger transfers between the aprons is currently on the existing perimeter airside road inside the operational area of the CSIA. A shorter link between the two aprons is required to minimize the travel time for passengers, baggage and to reduce noise and fuel consumption. Currently vehicle traffic takes a 4.0 km long route around the Runway 14 end. The existing route traversed around Runway 14/32 for passenger and cargo movement between T1 & T2 is shown in Figure-3.7. With an average speed of km/hour mandatory on perimeter airside roads, the travel time between aprons is minutes unimpeded. For passenger coaches, an additional 5-10 minutes are required considering enplaning and deplaning of passengers at each end of the bus movement bringing the total time take to minutes thereby lowering passenger level of service. The existing road is highly congested and traffic is slow. A more direct transfer between the aprons is therefore required. In view of this, MIAL has proposed construction of a road connecting the two aprons with vehicular underpass under Runway 14/32, which will reduce travel distance and time for passengers ground support vehicles, resulting in operational and cost efficiency and reduction in fuel consumption and noise. The total length of proposed underpass is m, width is 15.1 m, while the length of up and down ramps is 225 m., and proposed area is 29,820 sqms. The underpass includes ramps at both ends for connecting to existing airside roads, all mechanical and electrical works such as fire-fighting, fire protection, ventilation, lighting, control systems, communication systems, SWD and its pumping room, etc. Figure 3.7 Existing route between T2 to T1 Aprons Figure 3.8 Proposed Vehicular Under Pass Plan Page 40 of 52

41 3.7.2 Extension of Taxiway M Extension with Bridge Figure 3.9 Proposed Vehicular Under Pass Detail Plan Construction of extension to existing Taxiway M, with associated/bridge is a new project of airport upgradation to enhance airport s capacity and operational / airside efficiency. The project comprises of Taxiway M extension to connect existing Terminal-2 aircraft parking apron to Runway 27 beginning. Connecting the apron with the runway end requires extension of the existing Taxiway M over Mithi River, in the form of a bridge. The project Taxiway M Extension with a bridge shall provide much required holding area for the aircrafts ready to take off from Runway 27. The proposed length of Taxiway M Extension shall be 242 m, width shall be 62 m wide, out of this 242 m of Taxiway, the length of taxiway bridge over Mithi river shall be 117 m and width shall range between 41m (north side) to 57 m (south side) is shown in Figure MIAL has received approval from Municipal Corporation of Greater Mumbai (MCGM) and Mithi River Development Authority (MRDPA) for the proposed Taxiway M Bridge, based on reports of I.I.T (Bombay) and CWPRS (Pune) submitted by MIAL. Taxiway M development will take place entirely within the airport site area and will not require land acquisition. Approx. 2.5 Hectares (6.00 acres) of airport s site area currently under encroachments shall be required for this work. The taxiway construction work in the existing encroached areas shall be taken up after rehabilitation of existing hutment dwellers in next two years. The construction of taxiway in the encroached area shall be taken up after rehabilitation of hutment dwellers, while the construction of bridge shall be taken up earlier. The details of proposed rehabilitation process are outlined in Section 7 of this PFR. Page 41 of 52

42 Figure 3.10 Proposed Taxiway Extension & Bridge Plan New ATC Tower at Kalina Air Traffic Control Tower (ATCT) is critical aeronautical facility for operation of airport s air traffic, and in India it is operated by Airport Authorities of India (AAI). Air traffic controllers direct air traffic in airport s airspace to ensure safe and efficient flow, movement of aircrafts. The controllers give pilots taxiing and takeoff instructions, air traffic clearances, based on their observations and information received from air route traffic control enroute centers, flight service stations and other sources. The location, height and orientation of the ATC Tower is defined by the need of clear sightlines to the runway ends and unobstructed views of the aircraft manoeuvring areas along with other factors such as security, operations, constructability and safety. The relocation of the existing ATCT towards the south of the airport is required to ensure increased security of this critical operational installation. The current ATC Tower is located in highly accessible area, and in view of threat perceptions of security agencies, MIAL is considering relocation of this facility to a more secure location, or an area of 3800 sqm close to existing defence compound of Indian Navy, in southern part of CSIA. This location provides required security and an unobstructed view to all runway ends. Construction of new ATC Tower is included as a new/fresh project in this application, for approval. The proposed area shall be 3,778 sqm, and height of the Tower is expected to be approximately 75 m AMSL, however height of the tower will be finalized in consultation with the Airports Authority of India (AAI). Page 42 of 52

43 4.0 Site Analysis 4.1 Connectivity to CSIA CSIA is well connected by main arterial roads of Mumbai, like Western Expressway to East, AGKL on north, Kalina Pond on south and Andheri-Kurla Road on East. In future, from 2020 onwards CSIA shall have Metro Line 3 connectivity with these metro station located within CSIA site area. MIAL has constructed Sahar Elevated Access Road (SER), a dedicated 6 lane elevated express road that connects the Western Express Highway with Terminal T2. Suburban rail connectivity for employees at CSIA is through Ville Parle (East) railway station on the Western suburban rail line close to domestic terminal at Santacruz. Andheri (East) is another suburb railway station on the Western line close to CSIA. Mumbai Metro Line 1 runs along the northern edge of CSIA, approximately 1km from Terminal T2. Airport Road Station and Marol Station of Metro line 1 are closest to CSIA The proposed Line 3 of the Mumbai Metro that shall run underground from Colaba to SEEPZ & serving CSIA via three stations one each at the Santa Cruz and Sahar terminals and one at Sahar road. Metro Line 3 shall reduce the commute time for airport users between Colaba and the airport to 40 minutes. 4.2 Land Form, Land Use and Land Ownership The Landuse of entire airport land area is earmarked / designated as Special Airport Development. Land is owned by AAI, and leased to MIAL in 2006 for a period of 30 years, extendable by another 30 years. 4.3 Topography No major change in the topography is envisaged as the additional features will be developed within the existing airport site area. 4.4 Existing Land Use Pattern Entire project site is already developed and is categorized for airport use Existing Infrastructure and Amenities The following infrastructure exists - All weather metal top road connectivity to the elevated road/metro nearest NH-8; - Well connected internal roads and internal electrical lines; - Electrical substation and guest house facility; - Hospital; - Drinking water facility; and - Post office, bus station, railway station, banks, shopping complex, community halls, senior secondary schools, worship places etc., exist near airport. 4.6 Soil Classification The texture of soil is mostly clayey gravel in the study area. The ph of the soil was 7.1 indicating that the soil is usually alkaline in nature. Soil analysis results are given in Table-4.1. Page 43 of 52

44 Parameters Units Values ph Conductivity µs Physical Parameters Bulk density gm/cc 1.05 Water retaining Capacity % Sulphates mg/kg Chlorides mg/kg Potassium mg/kg Copper mg/kg Manganese mg/kg Zinc mg/kg Iron mg/kg 3.2 Table Soil analysis results 4.7 Climatic Data and Secondary Sources Based on Historical data recorded at Santa Cruz and Colaba observatory, collected from the IMD, the maximum temperature during summer varies between 32 0 c c and minimum temperature during winter varies from C C. The relative humidity of the area rangers between 57% to 87% with winter recording ranging between 57%-72% and monsoon from 61% to 87%. The study area receives extensive rainfall from the southwest monsoon and northeast monsoon. The average annual rainfall based on last 30 years data is 2457 mm. 4.8 Social Infrastructure Available The existing social infrastructure in the area includes the following and will further be strengthened (as required): Hospital with ambulance; Banks; Post office; Railway stations; Bus station; Fire stations; Secondary school; Police stations; Shopping complex; Sports infrastructure (Stadium & Camps etc.); Self help groups; Community halls; Cinema halls; and Primary health care centres. Page 44 of 52

45 5.0 Planning 5.1 Concept & Objective The modernization and expansion activities initiated in 2007 have transformed CSIA into a major aviation hub and have increased airport s capacity, enhanced passenger facilities.due to the ongoing improvements, the airport's passenger convenience ratings, given by Airports Council International (ACI), have improved considerably in recent years. Its Airport Service Quality (ASQ) rating has gone up from 3.25 in 2006 to 4.96 in May Mumbai continues to experience rapid growth in passenger traffic, with CSIA registering 21% growth in CSIA is expected to realize significant growth in the coming years, reaching 50 mppa by It is essential that further upgradation of airport s infrastructure is implemented urgently to serve the air passenger demand of Mumbai City, particularly in view of delay in implementation of Navi Mumbai airport. In view of this MIAL now intends to take up required upgradation of critical aeronautical and infrastructural works at CSIA in order to enhance airport s capacity to be able to serve the rapidly increasing demand of Mumbai City. No additional land acquisition is involved for the upgradation works as all the proposed upgradation projects shall be implemented within the CSIA site area 5.2 Population Projection The region wise distribution of population of Mumbai is given in Table-5.1. Areas Population Decadal population variation Absolute Percentage Thane District ,281, ,351, , ,249,126 1,897, ,131,849 2,882, ,060, Navi Mumbai (M Corp.) , , ,120, Mumbai (Suburban) district ,900, ,958,365 2,058, ,751,002 1,792, ,640,419 1,889, ,356, Mumbai District ,070, ,285, , ,174, , ,338, , ,085,411-2,52, Table Distribution of population 5.3 Land Use Planning The proposed land use plan reflects the best uses of land based on a careful balancing of operational, environmental and commercial requirements. Page 45 of 52

46 6.0 Proposed Utility Iinfrastructure This section summarizes the existing & estimated demand of the basic utilities for the projects identified in the preceding section. 6.1 Water Supply MIAL received EC in 2007 with water demand estimated at MLD at the end of Phase II of airport expansion. The total water consumption at CSIA is well within the earlier estimated demand. Further, MIAL has taken a number of water conservation measures in the passenger terminals and other airside/landside facilities including recycling of treated water for HVAC, gardening and flushing purposes, elimination of water leakages etc. Future water demand estimations are based on projected passenger traffic and considering an average consumption of 70 litres per passenger per day (as per NBC norms). The ultimate stage CSIA water demand is estimated at a maximum of MLD, in this fresh water requirement is 8.00 MLD & recycled water requirement is MLD. The said requirement is well within the earlier projected water requirement; hence no extra provision of fresh water from Municipal corporation of Greater Mumbai (MCGM) is required. The projected ultimate water demand is given in Table-6.1. Sr. No Details Fresh water Demand(MLD) Recycled water Demand(MLD) Total water Demand(MLD) 1 Passenger Terminals( Mppa) 2 Cargo Terminals Aircraft Parking Taxiway Extension Airport Facilities Other minor facilities New projects Total Demand Table 6.1 Ultimate stage water demand at CSIA 6.2 Sewerage Generation Sewage generation at CSIA is from Passenger Terminals, Cargo Terminals & other airport facilities at CSIA. The total estimated sewage generation is given in Table-6.2 Sr. No Details Sewage Generation (MLD) 1 Passenger Terminals(52 Mppa) Cargo Terminals Aircraft Parking Taxiway Extension Airport Facilities Other minor facilities New projects 1.00 Total Table 6.2 Ultimate stage sewage generation Page 46 of 52

47 MIAL has constructed and commissioned three state-of-art SBR technology STPs for treating the waste water generated at CSIA. This includes a 10 MLD (5+5) STP near Terminal 2 for Sahar area of CSIA, 4 MLD (2+2) STP near airside facilities for Santacruz and Kalian area, and 1 MLD STP for Cargo area. These have been constructed for the ultimate stage capacity of the airport at 52 Mppa and shall cater to the demand from the proposed projects in this application. Therefore no additional STPs are required for the projects covered under this application. Details of sewage treatment plants at CSIA are given in Table-6.3. Sewage Treatment Existing Installed Ultimate stage Sewage Extra capacity Needed (MLD) Capacity (MLD) Generation (MLD) STP T2,Sahar 10(5+5) 6.80 Nil STP Cargo, Sahar Nil STP T1,Santacruz 4 (2+2) 2.31 Nil Table STP details Fig 6.1-Water balance chart 6.3 Power Supply The power requirement for the NW and SE pier, Hangars and taxiway lighting is provided through the existing substations constructed by TATA (DSS I, DSS II and DSS III). A new substation near proposed R&FF Building near T1 apron is planned to cater to proposed vehicular underpass load requirement viz., lighting, fire and storm water pumps, ventilation system etc. This new substation will be connected to DSS III through two 11kV feeders. Two redundant source of H.T power supply shall be drawn from DSS 3 source at GSD sub-station to provide alternative power connection to Vehicular Under Pass. In order to meet the essential load required, two standby LMVA DG sets are proposed. Installed and proposed power requirement at CSIA details are given in Table-6.4. Page 47 of 52

48 Installed Capacity (MVA) 6.4 Emergency Power Proposed Up-gradation of Chhatrapati Shivaji International Airport (CSIA) - Project Feasibility Report (PFR) Existing Operational (MVA) Required for new projects (MVA) Extra capacity needed MVA NIL Table Power requirement Emergency power supply is estimated and provided on the basis of ultimate total load requirement of airport facilities. Uninterrupted power supply for the same shall be met by appropriate capacity DG sets. Two numbers of DG sets (415V), one working and one standby of required rating shall be provided to cater to the total power requirement of the Vehicular Under Pass such as lighting, fire pumps etc & also cater to the need of proposed projects. Hence no additional DG sets are required. Emergency power requirement is given in Table Solid Waste Installed capacity Required for new Extra capacity (MVA) projects (MVA) needed (MVA) NIL Table Emergency power requirement The current total waste generation at CSIA is about 10 tonnes per day including 9.5 tonnes of non-hazardous waste and 0.5 tonnes of hazardous waste. The solid waste generated during construction and operation of the new facilities is about 7 tonnes. Hazardous wastes including used oil, chemical/paint/bitumen drums, discarded oil filters, runway rubber/paint deposits etc. It is disposed to MPCB/CPCB authorized disposal agencies in accordance with the Hazardous Waste (Management, Handling & Trans-boundary Movement) Rules The non-hazardous wastes which mainly includes food waste, PET bottles, glass and wooden wastes, other plastic wastes, stationery & paper wastes etc, are disposed in environmentally sustainable manner through MCGM approved contractor agency which collects, segregates, transports and disposes the waste as per environmental regulations. MIAL is also taking steps to set up Organic Waste Converter to treat the food waste generated from food outlets operating in airport premises, and convert the same into manure. The manure shall be used for horticultural & landscape development at airport. The construction work for Organic Waste Convertor is nearing completion and it shall be commissioned by Feb Based on the above details it is clear that the utility demand from pending works/projects and new/fresh projects is well within the demand approved in EC report and also within the currently installed utility infrastructure at CSIA. Page 48 of 52

49 7.0 Rehabilitation and Resettlement (R&R) Proposed Up-gradation of Chhatrapati Shivaji International Airport (CSIA) - Project Feasibility Report (PFR) CSIA site area of Ha ( acres) has encroachment on 125 hectares ( acres). Out of these 125 hectares a small part of encroached land (8.057 Ha) is proposed to be utilized for some of the projects included in this application, and shall need slum rehabilitation for a small part, i.e acres(8.057 Ha), of the acres of slums located on airport land, in accordance with Slum Rehabilitation policy of Govt. of Maharashtra for CSIA. It may be noted that CSIA has acres under slums and as per Interim Development Plan of CSIA, approved by Government of Maharashtra (GoM) 104 acres (42.10ha) of this acres shall be required in future for expansion of aeronautical area of CSIA. MIAL shall separately approach MoEF in future, for Environmental Clearance for this proposed aeronautical area expansion and associated slum rehabilitation. The rehabilitation of hutment dwellers from the said 104 acres (42.10ha) of encroached airport land area required for aeronautical development of CSIA shall be taken up in phases in future, as per requirement of airport development, in accordance with Slum Rehabilitation Policy of GoM, for CSIA. In this up-gradation proposal submitted by MIAL for Environment Approval, only hectares (19.90 acres) of slum area located on CSIA land is required for proposed works. This includes 2.42 hectares (6 acres) for Extension of Taxiway M, 3.66 Hectares (9.04 Acres) for taxiways South of Runway 09, 0.84 Hectares (2.09 Acres) for development of general aviation aircraft parking stands, 1.06 Hectares (2.62 Acres) for development of North West Pier of Terminal T2, and Ha (0.19 acres) for 3 rd Radar. The total slum area required for the projects included in this PFR is therefore only Ha (19.90 Acres). The estimated total number of hutments in the said area, with existing hutment density of approx 617 tenements/ha (250 hutments/acre) is Mumbai Metropolitan Region Development Authority (MMRDA) has been appointed as the co-ordinating agency for Slum Rehabilitation at CSIA by Government of Maharashtra. Government of Maharashtra has directed MMRDA and Additional Collectors (Encroachment) to initiate survey of hutment dwellers in the priority slum pockets required for airport s aeronautical area development, which includes aforesaid Ha of encroached area required for projects/works mentioned in this PFR. The slum dwellers located on the said Ha of slum area within CSIA shall be rehabilitated in the newly constructed rehabilitation tenements at Kurla. Additional Collectors (Encroachment) Eastern & Western Suburbs have initiated the process of survey of existing hutment dwellers in these priority slum pockets as per the Slum Rehabilitation process of Government of Maharashtra (GoM). The rehabilitation of hutment dwellers from CSIA site area to the constructed SRA tenements at Kurla is expected to be completed within next two years, in accordance with Slum Rehab Scheme of GoM for CSIA. On completion of rehabilitation of existing hutment dwellers residing in slum pockets (8.057 Ha) required for identified airport development works, MIAL shall initiate implementation of the above mentioned projects for up-gradation of CSIA. The balance part of these projects unaffected by encroachments shall be commenced earlier. The cost of rehabilitation of hutment dwellers residing on airport land required for above works is included in the project cost (approx. Rs.18 crores/acre) of the respective works. Page 49 of 52

50 Figure Slum Areas at CSIA Page 50 of 52

51 8.0 Project Schedule and Cost Estimate Proposed Up-gradation of Chhatrapati Shivaji International Airport (CSIA) - Project Feasibility Report (PFR) Project schedule and cost estimate for the proposed upgradation program of CSIA is given in Table 8.1 Table-8.1. Project Schedule and Cost Estimate Page 51 of 52

Appendix. Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Gatwick Airport Limited

Appendix. Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Gatwick Airport Limited Gatwick Airport Limited Response to Airports Commission Consultation Appendix 37 Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Further information

More information

TERMINAL DEVELOPMENT PLAN

TERMINAL DEVELOPMENT PLAN 5.0 TERMINAL DEVELOPMENT PLAN 5.0 TERMINAL DEVELOPMENT PLAN Key points The development plan in the Master Plan includes the expansion of terminal infrastructure, creating integrated terminals for international,

More information

An Overview of GMR Megawide Consortium s Unsolicited Proposal. March 2018

An Overview of GMR Megawide Consortium s Unsolicited Proposal. March 2018 s An Overview of GMR Megawide Consortium s Unsolicited Proposal March 2018 1 Metro Manila requires a multi-airport system and NAIA shall continue to play an anchor role in this system. Multi-Airport system

More information

Birmingham Airport 2033

Birmingham Airport 2033 Over the next 15 years, we will expand and improve the Airport to maximise our potential as a single runway airport by investing 500 million in new development. Our plans take account of our forecasted

More information

CASE STUDY The New Guayaquil International Airport

CASE STUDY The New Guayaquil International Airport www.jacobs.com worldwide CASE STUDY The New Guayaquil International Airport Prepared for ICAO Airport Planning Seminar for the SAM Region Lima, Peru 10-14 Sep. 2018 September 11, 2018 Outline Existing

More information

Westover Metropolitan Airport Master Plan Update

Westover Metropolitan Airport Master Plan Update Westover Metropolitan Airport Master Plan Update June 2008 INTRODUCTION Westover Metropolitan Airport (CEF) comprises the civilian portion of a joint-use facility located in Chicopee, Massachusetts. The

More information

TABLE OF CONTENTS. Washington Aviation System Plan Update July 2017 i

TABLE OF CONTENTS. Washington Aviation System Plan Update July 2017 i TABLE OF CONTENTS Chapter 1 Overview... 1-1 1.1 Background... 1-1 1.2 Overview of 2015 WASP... 1-1 1.2.1 Aviation System Performance... 1-2 1.3 Prior WSDOT Aviation Planning Studies... 1-3 1.3.1 2009 Long-Term

More information

FORECASTING FUTURE ACTIVITY

FORECASTING FUTURE ACTIVITY EXECUTIVE SUMMARY The Eagle County Regional Airport (EGE) is known as a gateway into the heart of the Colorado Rocky Mountains, providing access to some of the nation s top ski resort towns (Vail, Beaver

More information

AIRPORT MASTER PLAN UPDATE

AIRPORT MASTER PLAN UPDATE AIRPORT MASTER PLAN UPDATE PENSACOLA INTERNATIONAL AIRPORT Technical Advisory Committee Meeting #2 June 20, 2017 Agenda» Introduction» Facility Requirements Airside Terminal Landside General Aviation Cargo

More information

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan TABLE OF CONTENTS CHAPTER 1 INTRODUCTION 10 Project Background 1-1 11 Mission Statement and Goals 1-1 12 Objectives of this Sustainable Master Plan 1-2 CHAPTER 2 INVENTORY 20 Airport Background 2-1 201

More information

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport Executive Summary MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport As a general aviation and commercial service airport, Fort Collins- Loveland Municipal Airport serves as an important niche

More information

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35 Runway 17-35 Airport Master Plan Runway 12-30 Brookings Regional Airport Table of Contents Table of Contents Chapter 1: Master Plan Goals... 1-1 1.1. Introduction... 1 1.2. Objective 1 Identify improvements

More information

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES INTRODUCTION An Airport Master Plan provides an evalua on of the airport s avia on demand and an overview of the systema c airport development that will best meet those demands. The Master Plan establishes

More information

The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands.

The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands. The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands. Connecting People Building Opportunities 198 Brisbane Airport Corporation CHAPTER 10

More information

CIVIL AVIATION AUTHORITY

CIVIL AVIATION AUTHORITY CIVIL AVIATION AUTHORITY INFRASTUCTRE DEVELOPMENT: BOTTLENECKS AND SOLUTIONS IN AVIATION SECTOR by the Presentation to the ICPAU 5 th Economic Director Finance, Civil Aviation Authority, U 20 July Overview

More information

IGI Airport : The Journey so far and the future.

IGI Airport : The Journey so far and the future. IGI Airport : The Journey so far and the future. 21 st October 2010 Presented by: Peter W. Noyce Chief Operating Officer 0 1 Agenda 1 Introduction GMR / DIAL 2 Challenges during journey 3 DIAL Contribution

More information

Table of Contents. Overview Objectives Key Issues Process...1-3

Table of Contents. Overview Objectives Key Issues Process...1-3 Table of Contents Chapter One Introduction Overview...1-1 Objectives...1-1 Key Issues...1-2 Process...1-3 Chapter Two Inventory of Existing Conditions Airport Setting...2-1 Locale...2-1 Airport Surroundings...2-5

More information

DRAFT. Master Plan RESPONSIBLY GROWING to support our region. Summary

DRAFT. Master Plan RESPONSIBLY GROWING to support our region. Summary Master Plan GROWING 2017-2037 RESPONSIBLY to support our region Summary DRAFT 2 1 Introduction Over the next three decades, Southern Ontario is set to experience significant growth its population will

More information

AIRPORT MODERNISATION IN INDIA By K Roy Paul Secretary, Ministry of Civil Aviation, India and Chairman, Air-India Limited

AIRPORT MODERNISATION IN INDIA By K Roy Paul Secretary, Ministry of Civil Aviation, India and Chairman, Air-India Limited - 1 - AIRPORT MODERNISATION IN INDIA By K Roy Paul Secretary, Ministry of Civil Aviation, India and Chairman, Air-India Limited With phenomenal growth in air traffic, the importance of air transport in

More information

AIRPORTS AUTHORITY OF INDIA S AIRPORT COLLABORATIVE DECISION MAKING SYSTEM. (Presented by Airports Authority of India) SUMMARY

AIRPORTS AUTHORITY OF INDIA S AIRPORT COLLABORATIVE DECISION MAKING SYSTEM. (Presented by Airports Authority of India) SUMMARY 12 th Meeting of Arabian Sea-Indian Ocean ATS Coordination Group ASIOACG/12) & 8 th Meeting of Indian Ocean Strategic Partnership to Reduce Emissions (INSPIRE/8) New Delhi, India, 20-21 September 2017

More information

Current and Forecast Demand

Current and Forecast Demand Existing Facilities Jacksonville International Airport (JIA) is served by a number of airside and landside facilities. There are two runways that serve the airport in an open V configuration. The Annual

More information

Airport Master Plan Update

Airport Master Plan Update Duttchessss Countty Airrporrtt Masstterr Plan Updatte Airport Master Plan Update Final Report Dutchess County Airport Town of Wappingers, New York C&S Engineers, Inc. 499 Col. Eileen Collins Blvd. Syracuse,

More information

Sunshine Coast Airport Master Plan September 2007

Sunshine Coast Airport Master Plan September 2007 Sunshine Coast Airport Master Plan September 2007 Contents CONTENTS... I ACKNOWLEDGEMENT... II DISCLAIMER... III 1 EXECUTIVE SUMMARY...IV 1 INTRODUCTION... 1 2 AVIATION DEMAND FORECAST... 5 3 AIRCRAFT

More information

Press Release March 1, Refer to: Anna Salgado

Press Release March 1, Refer to: Anna Salgado Press Release March 1, 2018 Refer to: Anna Salgado 63 917 5637629 asalgado@megawide.com.ph MEGAWIDE GMR offers an alternative solution to NAIA congestion Aligned with the government strategy to develop

More information

STUDY WORK GROUP MEETING No. 3. November 29, 2016

STUDY WORK GROUP MEETING No. 3. November 29, 2016 STUDY WORK GROUP MEETING No. 3 November 29, 2016 Agenda Welcome and introductions Update project schedule Brief overview of previous SWG meeting Update on aviation forecasts Introduction to airfield demand/capacity

More information

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019 NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019 The City of Atlanta is providing an opportunity for public comment until April 25, 2019 related to the

More information

CHAPTER 4: ALTERNATIVES

CHAPTER 4: ALTERNATIVES MSP Long Term Comprehensive Plan Update Metropolitan Airports Commission 4.1 INTRODUCTION CHAPTER 4: ALTERNATIVES Several alternatives were developed and evaluated based on their capability to meet the

More information

2006 ANNUAL GENERAL MEETING

2006 ANNUAL GENERAL MEETING 2006 ANNUAL GENERAL MEETING Address by Garth F. Atkinson President and Chief Executive Officer April 19, 2006 Thank you Peter and good morning ladies and gentlemen and invited guests. Before proceeding

More information

Sam Imperati Facilitator

Sam Imperati Facilitator Sam Imperati Facilitator 1 Introductions 1) Facilitator Introduction a) Name b) Occupation c) Role 2) Chair and Member Introductions: a) Name b) Affiliations c) Occupation 3) Project Team Introductions:

More information

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 1 - Introduction This report describes the development and analysis of concept alternatives that would accommodate

More information

Airport Planning and Terminal Design

Airport Planning and Terminal Design Airport Planning and Terminal Design Major Terminal Design Considerations Passenger Terminal Configuration Passenger Terminal Concepts Major Design Considerations 1 Terminal Configuration Centralised processing

More information

Addendum - Airport Development Alternatives (Chapter 6)

Addendum - Airport Development Alternatives (Chapter 6) Bowers Field Addendum - Airport Development Alternatives (Chapter 6) This addendum to the Airport Development Alternatives chapter includes the preferred airside development alternative and the preliminary

More information

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 3 - Refinement of the Ultimate Airfield Concept Using the Base Concept identified in Section 2, IDOT re-examined

More information

DEVELOPMENT OF TOE MIDFIELD TERMINAL IROJECT CAPACITY ENHANCEMENT REPORT DEPARTMENT OF AVIATION TOM FOERSTER CHAIRMAN BARBARA HAFER COMMISSIONER

DEVELOPMENT OF TOE MIDFIELD TERMINAL IROJECT CAPACITY ENHANCEMENT REPORT DEPARTMENT OF AVIATION TOM FOERSTER CHAIRMAN BARBARA HAFER COMMISSIONER PETE FLAHERTY COMMISSIONER TOM FOERSTER CHAIRMAN DEPARTMENT OF AVIATION BARBARA HAFER COMMISSIONER STEPHEN A. GEORGE DIRECTOR ROOM M 134, TERMINAL BUILDING GREATER PITTSBURGH INTERNATIONAL AIRPORT PITTSBURGH,

More information

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL This chapter delineates the recommended 2005 2024 Sussex County Airport Capital Improvement Program (CIP). It further identifies probable construction

More information

Global Aviation Market. Connie Muller Mumbai International Airport Limited (MIAL)

Global Aviation Market. Connie Muller Mumbai International Airport Limited (MIAL) Global Aviation Market an Indian Focus Connie Muller Mumbai International Airport Limited (MIAL) 1 Born and grew up in South Africa (the greatest place on earth). Studied as an accountant. (Found that

More information

CHAPTER 1: INTRODUCTION

CHAPTER 1: INTRODUCTION CHAPTER 1: INTRODUCTION Purpose and Scope The information presented in this report represents the study findings for the 2016 Ronan Airport Master Plan prepared for the City of Ronan and Lake County, the

More information

IAA Submission on the Commission for Aviation Regulation s Draft 2014 Determination of Maximum Level of Charges at Dublin Airport

IAA Submission on the Commission for Aviation Regulation s Draft 2014 Determination of Maximum Level of Charges at Dublin Airport IAA Submission on the Commission for Aviation Regulation s Draft 2014 Determination of Maximum Level of Charges at Dublin Airport In its draft 2014 determination of the maximum level of charges at Dublin

More information

STUDY WORK GROUP MEETING No. 4. July 12, 2017

STUDY WORK GROUP MEETING No. 4. July 12, 2017 STUDY WORK GROUP MEETING No. 4 July 12, 2017 Agenda Welcome and introductions Update of project schedule Brief overview of previous SWG meeting Introduction to airport development alternatives Comments,

More information

Fort Wayne International Airport Master Plan Study. Executive Summary

Fort Wayne International Airport Master Plan Study. Executive Summary Fort Wayne International Airport Master Plan Study Executive Summary March 2012 Introduction Airport Background Forecast of Aviation Activity Development Plans Recommended Airfield & Access Development

More information

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved TABLE OF CONTENTS Description Page Number LIST OF ACRONYMS... a CHAPTER ONE INTRODUCTION General... 1-1 Study Objectives... 1-1 Public Involvement... 1-2 Issues to Be Resolved... 1-2 CHAPTER TWO EXISTING

More information

The CLE Master Plan Includes:

The CLE Master Plan Includes: The CLE Master Plan Includes: An inventory of existing conditions Forecasting future demand and analyzing future needs Evaluating alternative development scenarios Preparing the Airport Layout Plan Preparing

More information

Punta Gorda Airport Master Plan Update

Punta Gorda Airport Master Plan Update Punta Gorda Airport Master Plan Update Draft Executive Summary Prepared for: The Charlotte County Airport Authority January 2018 Charlotte County Airport Authority James Herston, Chair Robert D. Hancik,

More information

Milton. PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton.

Milton. PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton. Milton GeneralAviationAirport PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton. Existing Facilities Peter Prince Airport is served by one runway, Runway 18/36, 3,700 feet

More information

PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project

PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project GENERAL AIRPORT INFORMATION AIRPORT USERS Airport ownership: Public, owned by the Pullman-Moscow Regional Airport Board Year opened: February

More information

2009 Muskoka Airport Economic Impact Study

2009 Muskoka Airport Economic Impact Study 2009 Muskoka Airport Economic Impact Study November 4, 2009 Prepared by The District of Muskoka Planning and Economic Development Department BACKGROUND The Muskoka Airport is situated at the north end

More information

Appendix D Project Newsletters. Tacoma Narrows Airport. Master Plan Update

Appendix D Project Newsletters. Tacoma Narrows Airport. Master Plan Update Appendix D Project Newsletters Tacoma Narrows Airport Master Plan Update This appendix contains the newsletters distributed throughout the project. These newsletters provided updates and information on

More information

Regular Board Meeting August 4, 2015

Regular Board Meeting August 4, 2015 Regular Board Meeting August 4, 2015 1616 Airport Circle Hailey, ID 83333 208.788.4956 PUBLIC COMMENT FY 16 Rates & Charges FY 16 Budget Approval Rates & Charges will provide the Board the ability to operate

More information

ERIE INTERNATIONAL AIRPORT MASTER PLAN TABLE OF CONTENTS

ERIE INTERNATIONAL AIRPORT MASTER PLAN TABLE OF CONTENTS EXECUTIVE SUMMARY ERIE INTERNATIONAL AIRPORT MASTER PLAN TABLE OF CONTENTS PAGE NO. CHAPTER 1-INTRODUCTION... 1-1 1.01 General...1-1 1.02 Purpose and Scope of Study...1-1 1.03 The Planning Process...1-2

More information

CHAPTER 1 EXECUTIVE SUMMARY

CHAPTER 1 EXECUTIVE SUMMARY CHAPTER 1 EXECUTIVE SUMMARY 1 1 EXECUTIVE SUMMARY INTRODUCTION William R. Fairchild International Airport (CLM) is located approximately three miles west of the city of Port Angeles, Washington. The airport

More information

Manchester Airports Group

Manchester Airports Group Manchester Airports Group WHO ARE WE? MAG is a leading UK based airport company, which owns and operates Manchester, London Stansted and East Midlands airports. MAG is privately managed on behalf of its

More information

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development plans

More information

BNA Master Plan Update Public Meeting No. 2

BNA Master Plan Update Public Meeting No. 2 A Six Sigma Organization BNA Master Plan Update Public Meeting No. 2 September 18, 2012 Agenda BNA Master Plan Update Consultants Status of the BNA Master Plan Update Workstation Boards Forecasts of Aviation

More information

Aviation Data and Analysis Seminar February Economics of Airports and Air Navigation Services Providers

Aviation Data and Analysis Seminar February Economics of Airports and Air Navigation Services Providers Aviation Data and Analysis Seminar 20-23 February 2017 Economics of Airports and Air Navigation Services Providers 250 7000 6000 200 5000 150 4000 Growth of air transport World recession SARS Freight Tonne

More information

BNA Master Plan Update Community Advisory Committee Meeting No. 5

BNA Master Plan Update Community Advisory Committee Meeting No. 5 A Six Sigma Organization BNA Master Plan Update Community Advisory Committee Meeting No. 5 September 19, 2012 Introductions MNAA Staff RW Armstrong Team Albersman & Armstrong, Ltd. Atkins North America,

More information

KANNUR INTERNATIONAL AIRPORT LIMITED (KIAL) Status Report as on 5 May Total land planned for the project acres

KANNUR INTERNATIONAL AIRPORT LIMITED (KIAL) Status Report as on 5 May Total land planned for the project acres KANNUR INTERNATIONAL AIRPORT LIMITED (KIAL) Status Report as on 5 May 2017 Total land planned for the project - 2061 acres Already acquired & available with KIAL - 1277.93 acres Balance land under acquisition

More information

Schiphol Group. Annual Report

Schiphol Group. Annual Report Schiphol Group Annual Report 2013 Business model Business model Schiphol Group distinguishes four core activities: Aviation, Consumer Products and Services, Real Estate, and Alliances and Participations.

More information

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal Airport Master Plan Rapid City Regional Airport October 2015 FAA Submittal Rapid City Regional Airport Master Plan Update Table of Contents Executive Summary... i Scope & Timeline... i Forecasts... i Preferred

More information

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012 1. Introduction The Federal Aviation Administration (FAA) recommends that airport master plans be updated every 5 years or as necessary to keep them current. The Master Plan for Joslin Field, Magic Valley

More information

Greater Orlando Aviation Authority

Greater Orlando Aviation Authority Greater Orlando Aviation Authority Orlando International Airport & Orlando Executive Airport Budgets Fiscal Year 2017-2018 Greater Orlando Aviation Authority Orlando, Florida Greater Orlando Aviation Authority

More information

Wyoming Valley Airport Proposed Improvements. Presented June 26, 2012 By The WBW Airport Advisory Board & FBO

Wyoming Valley Airport Proposed Improvements. Presented June 26, 2012 By The WBW Airport Advisory Board & FBO Wyoming Valley Airport Proposed Improvements Presented June 26, 2012 By The WBW Airport Advisory Board & FBO Contents Purpose of meeting Airport overview Background of proposed improvements SWOT analysis

More information

PUBLIC NOTICE. Table 1 Projects Proposed by Amendment

PUBLIC NOTICE. Table 1 Projects Proposed by Amendment PUBLIC NOTICE The Dallas Department of Aviation (the Department) intends to file an amendment application to increase the PFC amount of one previously approved project at Dallas Love Field Airport (the

More information

Master Plan Update Technical Advisory Committee Meeting

Master Plan Update Technical Advisory Committee Meeting Nashville International Airport Master Plan Update Technical Advisory Committee Meeting February 14, 2019 Agenda Welcome and Introductions Aviation Activity Forecast Facility Requirements Alternatives

More information

SPADE-2 - Supporting Platform for Airport Decision-making and Efficiency Analysis Phase 2

SPADE-2 - Supporting Platform for Airport Decision-making and Efficiency Analysis Phase 2 - Supporting Platform for Airport Decision-making and Efficiency Analysis Phase 2 2 nd User Group Meeting Overview of the Platform List of Use Cases UC1: Airport Capacity Management UC2: Match Capacity

More information

B GEORGIA INFRASTRUCTURE REPORT CARD AVIATION RECOMMENDATIONS DEFINITION OF THE ISSUE. Plan and Fund for the Future:

B GEORGIA INFRASTRUCTURE REPORT CARD AVIATION RECOMMENDATIONS DEFINITION OF THE ISSUE. Plan and Fund for the Future: 2014 GEORGIA INFRASTRUCTURE REPORT CARD B + RECOMMENDATIONS Plan and Fund for the Future: While the system continues to enjoy excess capacity and increased accessibility it still needs continued focus

More information

Sustain Aviation Growth Under Air Transport Economic Regulations

Sustain Aviation Growth Under Air Transport Economic Regulations Sustain Aviation Growth Under Air Transport Economic Regulations Ebtesam Al Shamlan Air Transport Director Ministry of Transport and Telecommunications 2nd AIRPORTS ARABIA CONFERENCE 10-11 OCTOBER 2017

More information

The Civil Aviation Sector as a Driver for Economic Growth in Egypt

The Civil Aviation Sector as a Driver for Economic Growth in Egypt The Civil Aviation Sector as a Driver for Economic Growth in Egypt EDSCA Conference Cairo, November 10, 2013 Agenda 1. Facts and figures 2. Socio-economic impact of the civil aviation sector 3. Options

More information

SECTION 5 ALTERNATIVE DEVELOPMENT CONCEPT ANALYSES

SECTION 5 ALTERNATIVE DEVELOPMENT CONCEPT ANALYSES SECTION 5 ALTERNATIVE DEVELOPMENT CONCEPT ANALYSES 5.1 INTRODUCTION This section investigates Airfield Development Alternatives, generalized Land Use Alternatives, and more detailed General Aviation Alternatives.

More information

These fee changes have been established in order to establish base fee recoveries for expanding infrastructure and ongoing annual maintenance.

These fee changes have been established in order to establish base fee recoveries for expanding infrastructure and ongoing annual maintenance. November 1, 2016 Attention: Airport Operators/Tenants/Stakeholders RE: Final Rates and Fees Changes Effective January 1, 2017 We have now concluded the consultation process with the Airline Consultative

More information

Aviation Development

Aviation Development Aviation Development Gold Coast Airport has efficient and cost effective passenger processing and aircraft turn-around times that is underpinned by a strong focus on safety. 6.1 INTRODUCTION This focus

More information

An Overview of Airport Infrastructure in India. By V.P.Agrawal, Chairman, Airports Authority of India

An Overview of Airport Infrastructure in India. By V.P.Agrawal, Chairman, Airports Authority of India An Overview of Airport Infrastructure in India By V.P.Agrawal, Chairman, Airports Authority of India Global Economic Scenario Global economies now seeing recovery. Asia Pacific economies GDP levels to

More information

Building A Vibrant Air Cargo Hub at Singapore Changi Airport

Building A Vibrant Air Cargo Hub at Singapore Changi Airport Building A Vibrant Air Cargo Hub at Singapore Changi Airport 30 October 2012 Presented By: James Fong Assistant Vice President Cargo and Logistics Development Contents Quick intro & Brief History of Changi

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: The People s Republic of Bangladesh Project: Hazrat Shahjalal International Airport Expansion Project (I) Loan Agreement: June

More information

Existing Conditions AIRPORT PROFILE Passenger Terminal Complex 57 air carrier gates 11,500 structured parking stalls Airfield Operations Area 9,000 North Runway 9L-27R 6,905 Crosswind Runway 13-31 5,276

More information

New PFC Application #13

New PFC Application #13 PUBLIC CONSULTATION New PFC Application #13 Buffalo, NY December 16, 2015 Agenda PFC Program at Notice to Carriers and Consultation Meeting Class of Carrier Not Required to Collect PFC Air Carrier Requirements

More information

South Africa Airside Capacity Enhancement Study for Air Traffic Navigation Services. Task 7 Report: Development Impacts

South Africa Airside Capacity Enhancement Study for Air Traffic Navigation Services. Task 7 Report: Development Impacts P U B L I C V E R S I O N South Africa Airside Capacity Enhancement Study for Air Traffic Navigation Services Task 7 Report: Development Impacts Metron Aviation, Inc. 45300 Catalina Court, Suite 101 Dulles,

More information

HILLSBORO AIRPORT MASTER PLAN UPDATE Planning Advisory Committee Meeting 1

HILLSBORO AIRPORT MASTER PLAN UPDATE Planning Advisory Committee Meeting 1 HILLSBORO AIRPORT MASTER PLAN UPDATE Planning Advisory Committee Meeting 1 Feb. 27, 2017 HILLSBORO AIRPORT MASTER PLAN UPDATE Planning Advisory Committee Welcome Curtis Robinhold, Port of Portland 1 HILLSBORO

More information

THE AIRTRAIN AIRPORT ACCESS SYSTEM JOHN F. KENNEDY INTERNATIONAL AIRPORT AIRPORT ACCESS SERVICE

THE AIRTRAIN AIRPORT ACCESS SYSTEM JOHN F. KENNEDY INTERNATIONAL AIRPORT AIRPORT ACCESS SERVICE THE AIRTRAIN AIRPORT ACCESS SYSTEM JOHN F. KENNEDY INTERNATIONAL AIRPORT AIRPORT ACCESS SERVICE The JFK AirTrain airport access system interfaces with two existing regional transit systems; the Long Island

More information

MASTER PLAN UPDATE. Planning Advisory Committee (PAC) FRESNO YOSEMITE INTERNATIONAL AIRPORT. Meeting #4

MASTER PLAN UPDATE. Planning Advisory Committee (PAC) FRESNO YOSEMITE INTERNATIONAL AIRPORT. Meeting #4 MASTER PLAN UPDATE Planning Advisory Committee (PAC) FRESNO YOSEMITE INTERNATIONAL AIRPORT Meeting #4 December 14, 2017 Today s Agenda o Welcome o Introductions o Progress update o Alternatives analysis

More information

FACILITATION PANEL (FALP)

FACILITATION PANEL (FALP) International Civil Aviation Organization WORKING PAPER FALP/10-WP/19 Revised 29/8/18 FACILITATION PANEL (FALP) TENTH MEETING Montréal, 10-13 September 2018 Agenda Item 6: Other matters FACILITATION FOR

More information

Financing Infrastructure: Working with your Users. Julie Garg Manager Airport & ATC Charges

Financing Infrastructure: Working with your Users. Julie Garg Manager Airport & ATC Charges Financing Infrastructure: Working with your Users Julie Garg Manager Airport & ATC Charges International Air Transport Association, who are we? Our VISION : To be the provider of global leadership and

More information

Australian Airport Association Stakeholder Dinner. 31 May 2018 Sydney, Australia. Speech by Angela Gittens

Australian Airport Association Stakeholder Dinner. 31 May 2018 Sydney, Australia. Speech by Angela Gittens Australian Airport Association Stakeholder Dinner 31 May 2018 Sydney, Australia Speech by Angela Gittens Good evening ladies and gentlemen. It is a pleasure to be with you tonight and thank you again Caroline

More information

K.I.A where it all starts! Ghana Airports Company Ltd

K.I.A where it all starts! Ghana Airports Company Ltd K.I.A where it all starts! Ghana Airports Company Ltd Presentation at the Aviation Suppliers and Stakeholders Convention Topic: Integrated Airport Development: Airport Cities and Commercial Opportunities

More information

CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257

CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257 Form PDES 8 THE CITY OF LOS ANGELES CIVIL SERVICE COMMISSION CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257 Summary of Duties: A Senior Airport Engineer performs the more difficult and

More information

2018 Airport Master Plan Overview of Development Concepts. Greg Ballentine (WSP)

2018 Airport Master Plan Overview of Development Concepts. Greg Ballentine (WSP) 2018 Airport Master Plan Overview of Development Concepts Greg Ballentine (WSP) Thank You Stakeholder and community consultation has included discussions with over 40 stakeholder groups including airport

More information

JUNE 2016 GLOBAL SUMMARY

JUNE 2016 GLOBAL SUMMARY JUNE 2016 GLOBAL SUMMARY FAST FACTS The world of air transport, 2014 All figures are for 2014, unless otherwise stated, to give a single set of data for one year. Where available, the latest figures are

More information

Airport Master Plan Update June 15, 2017

Airport Master Plan Update June 15, 2017 Airport Master Plan Update June 15, 2017 www.harveyfield.com The Master Plan is a 20-year plan to understand the needs of current and future users of the Airport. This is important to ensure that safe

More information

Airport Master Plan Update June 15, 2017

Airport Master Plan Update June 15, 2017 Airport Master Plan Update June 15, 2017 www.harveyfield.com The Master Plan is a 20-year plan to understand the needs of current and future users of the Airport. This is important to ensure that safe

More information

Strategic Airport Management Programme April Airport Economics. presented by. Eileen Poh Assistant Director (ICAO Affairs)

Strategic Airport Management Programme April Airport Economics. presented by. Eileen Poh Assistant Director (ICAO Affairs) Airport Economics presented by Eileen Poh Assistant Director (ICAO Affairs) 1 Outline Regulated and non-regulated Revenues Price Cap-Regulation: Single or Dual Till Financial State of Airports Airports

More information

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 10 Preferred Inaugural Airport Concept 10.0 Introduction The Preferred Inaugural Airport Concept for SSA was developed by adding the preferred support/ancillary facilities selected in Section 9

More information

Financial Proposal for Gwinnett County Airport Briscoe Field

Financial Proposal for Gwinnett County Airport Briscoe Field Financial Proposal for Gwinnett County Airport Briscoe Field Financial Proposal For the Lease, Operation and Improvement RP039-11 of GWINNETT COUNTY AIRPORT BRISCOE FIELD Presented To Gwinnett County Board

More information

Preferred Alternative Summary

Preferred Alternative Summary Tacoma Narrows Airport Master Plan Update Preferred Alternative Summary The Preferred Alternative represents Pierce County s vision for the long-term development of the Tacoma Narrows Airport. This Alternative

More information

Whangarei Airport. Prepared by Carine Andries 10/20173

Whangarei Airport. Prepared by Carine Andries 10/20173 Whangarei Airport Prepared by Carine Andries 10/20173 March 2010 TABLE OF CONTENTS 1 2 3 INTRODUCTION... 3 AIRPORT ROLE AND FUNCTION... 3 AIRPORT FEATURES AND CAPACITY... 3 3.1 3.2 3.3 3.4 3.5 3.5.1 3.5.2

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB4960 Project Name. MIDDLE EAST AND NORTH AFRICA Sector Aviation (100%) Project ID

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB4960 Project Name. MIDDLE EAST AND NORTH AFRICA Sector Aviation (100%) Project ID Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB4960 Project Name EG-Second

More information

Airport Master Planning Process & Update

Airport Master Planning Process & Update Airport Master Planning Process & Update David Stewart ICAO Airport Master Planning Task Force Subgroup Leader ICAO Airport Planning Seminar for the SAM Region Lima, Peru 10-14 Sep. 2018 1 Speaker: David

More information

Ronan Delaney. DELANEY_RONAN_AVIATION_JUN_2018.DOCX

Ronan Delaney.   DELANEY_RONAN_AVIATION_JUN_2018.DOCX Ronan Delaney Profession Structural Engineer Current Position Associate Principal Global Aviation Skills Leader Joined Arup 1988 Years of Experience 25+ Nationality Irish Qualifications Bsc (Eng), Dip

More information

Alternatives Analysis EXECUTIVE SUMMARY

Alternatives Analysis EXECUTIVE SUMMARY Alternatives Analysis EXECUTIVE SUMMARY Alternative development plans were created as part of the Master Plan for Harrisburg International Airport. The aim is to provide sufficient capacity for projected

More information

14 C.F.R. Part 158. Passenger Facility Charge Program Logan International Airport. Public Notice

14 C.F.R. Part 158. Passenger Facility Charge Program Logan International Airport. Public Notice 14 C.F.R. Part 158 Passenger Facility Charge Program Logan International Airport Public Notice Summary of Proposed 2018 PFC Application PFC Project Descriptions and Justifications PFC Financial Plan Class

More information

Table of Contents. Master Plan March 2014 TOC i Spokane International Airport

Table of Contents. Master Plan March 2014 TOC i Spokane International Airport Table of Contents Page Chapter 1 Inventory 1. Introduction... 1 1 1.1 Community Profile... 1 2 1.1.1 Location and Setting... 1 1 1.1.2 Climate... 1 2 1.1.3 Socioeconomic Conditions... 1 5 1.1.4 Area Land

More information

Presentation to the British Irish Airport s EXPO John Heffernan Chief Development Officer, Dublin Airport

Presentation to the British Irish Airport s EXPO John Heffernan Chief Development Officer, Dublin Airport Presentation to the British Irish Airport s EXPO John Heffernan Chief Development Officer, Dublin Airport 1 DUBLIN-LONDON 28.4 No.1 +2,200 MILLION PASSENGERS BUSIEST ROUTE IN EUROPE &No. 2 IN THE WORLD

More information