Welcome to the SH 46 Public Meeting

Size: px
Start display at page:

Download "Welcome to the SH 46 Public Meeting"

Transcription

1 Welcome to the SH 46 Public Meeting Kendall SPRING BRANCH 311 BEGIN PROJECT 3159 Bulverde UV 46 SMITHSON VALLEY 281 BULVERDE RD END PROJECT SMITHSON VALLEY RD Bexar Scan this QR Code for more information or visit the TxDOT website and search for SH 46: SH 46 From Bulverde Rd to FM 3159

2 Project Information Bicycle and Pedestrian Federal funding could be used for construction of this project; therefore, federal guidelines for bike and pedestrian accommodations must be followed. For the length of this project a designated striped bicycle lane and a separate sidewalk will be provided. This improvement would increase safety for both cyclists and pedestrians, provide for alternative modes of travel, and provide ADA accessibility as required throughout. Drainage A major component of this project is mitigating drainage and storm water runoff. Engineers evaluate water flow direction and volumes to determine the best drainage solutions. There are two different types of drainage designs for this project. In some areas, drainage will be accommodated with grass lined ditches and culverts. In some areas curb and gutter with storm drains and underground storm sewer lines will be used. Hazardous Materials SH 46 is currently not a hazardous materials route and there is no intent to designate this as a hazardous materials route. This project is being designed to accommodate local growth and enhance safety and mobility. Grass Lined Open Ditch Curb and Gutter Sewer

3 Project Information Sight Considerations Due to the combination of the rolling terrain and sharp curves along SH 46, additional right of way will need to be acquired to improve sight distance. The improved sight distance will provide a safer roadway for vechicles traveling along this corridor. Retaining Walls Along some steeply sloped areas of this project, retaining walls will be used in an effort to minimize the purchase of new right-of-way and grading, while still providing improved sight visibility for traffic. Example of Curve Smoothing Medians The use of medians improves safety along roadways with large volumes of traffic by reducing conflicts of turning and crossing vehicles. Medians also allow for protected left turns without impeding traffic flow. Research has shown that raised medians, where implemented, have reduced severe (injury/fatal) crashes along urban/suburban roadways by 25-31%. Source: AASHTO Highway Safety Manual, 2010.

4 Why 6 s? Short Term Needs/Long Term Design This project is being designed to address immediate safety and traffic operational needs and accommodate traffic for the next 20 years. In a project of this scope and size, it is not cost effective to design, plan, and construct a 4 lane road, knowing 6 lanes are currently needed. Traffic Volumes Below are projected traffic volumes along with a ranking of how they would operate. The Level of Service (LOS) is evaluated and ranked A (best) through F (worst). Growth According to the Alamo Area Metropolitan Planning Organization, the population in County is projected to increase from approximately 108,000 in 2010 to approximately 260,000 by 2040, a 140% increase. This project is being designed to accommodate current needs and future growth.

5 Why 6 s? Reducing Delay at Traffic Signals The use of 6 lanes will allow more vehicles to pass through traffic signals more efficiently. The additional lane of traffic cuts down the queueing of cars and reduces delays at intersections along SH 46 versus a 4 lane intersection. Safety Improvements In the 6 lane configuration, the outside lane provides safer driveway access allowing for better deceleration and acceleration in and out of driveways. This still allows the inside 2 lanes to continue moving uninterrupted by the vehicles turning in and out of driveways. U-Turn Accessibility The additional lane allows for safe and efficient U-turns to be made. U-Turn Accessibility

6 Typical Sections Curb and Gutter Section Curb and Gutter Section Requires less right-of-way purchase Smaller footprint Higher construction cost Includes underground storm sewer 1 Raised Median Sewer Sewer Grass Lined Open Ditch Section Requires more right-of-way purchase Larger footprint Construction of open ditches costs less than buried storm sewer Grass-lined ditches improve water quality by filtering pollutants in stormwater Grass Lined Open Ditch Section 1 Raised Median Intersection of SH 46 and US 281 Provides 3 lanes of through traffic on each side with a turn lane, in addition to US 281 turnarounds Provides a bike lane through the intersection All improvements can be made without additional upgrades to US 281 or the existing overpass Intersection of SH 46 and US Turnaround Turn Turn 20 Turnaround

7 Livingston Pickwick Greig Cornwall Creekwood in Fore st Mount a Shado w Glen Winston Fire Candle Hill Wellington Walk Whispering Victoria Glen Mountaintop Mountainside Mitchell Rainbow Wentworth Windstone Grey Mist Pebble Wood t Mount Joy Copper Rim Oak Limit [ ^_ ^_? ^_?? 281 UV46 ^_?? 3159 Limit? Crescent Old Boerne Peak St Dripping Springs Creek r Smithson Windmill dge Palomino Harness Temerity Rustling Catalina Retama Tom Creek ³ 1, ,400 Feet Cres H av en Creek Sidney Creek Ri reek C Miller Creek Kenilworth Valley Cheyenne Tres Lomas Western Brykerwood Long Branch Night Sky Hanz Creek Colinas L os Misty Creek Frontier Brook Long Meadow Cedar Pine Meadow Coral Anderson Champions River Ri dge Player Dry Sawgrass Auburn Ri dge Vie w Sun Valley Kemper Bentwood Dural Crest Eagle Crest Shadow Lost Creek Ledge Juniper Crest G rove Shady El m Rim ill Oak Indigo Kudu Grey Bluff Verde Alvins Elk Palo Verde Claire Canyon Stony Crest Mayer Stoney Lewis Creek Fallbrook High Manor Temple Canyon Highland Breeze Arroyo Luis Stahl Cibolo Creek Ahern Creek Glen View G reen View Swine Creek Short Circuit York Castle Windmill Breeze Meadowbrook Grassland Crown Caliche Wiste Wood Hillside Oaks Indian Ridg e way Rosenberry Spring Branch Quail Hill Dove Tree Freshwater Chest nut Springs Indian Creek Cactus Legend [ Cemetery ^_ Church? Water Wells Project Limits River and Streams Bulverde City Limits 100 Year Floodplain SH 46: From Bulverde Road to FM 3159; County; CSJ & Bulverde

8 Rodeo Ashford Livingston Greig Glen Wentworth Windstone Grey Mist Pebble Wood UV 46 ^_? 3159 Limit? Canterbu Smithson Valley Middle Pickwick Miller Creek Tom Creek Cornwall Winston Wellington Walk Victori a Smithson Valley High t Haven Cres Creek Sidney Creek Dripping Springs Creek Kenilworth Eagles View Creekwood in Forest Mounta Shado w Glen Fire Candle Anderson Mountaintop Mountainside Mitchell Heritage Baptist Church Sun Valley Oak Verde Palo Verde Morning Light Brykerwood Colinas Los Misty Brook Champions Whispering Sawgrass Bentwood Copper Rim Lost Creek Crescent G rove Shady Indigo Alvins Elk Ramrod Long Branch Night Sky Creek Frontier Long Meadow Pine Meadow Coral River Ri dge Player Dry Auburn Kemper Dural Crest Eagle Crest Shadow Ledge Juniper Legend [ Cemetery ^_ Church Peak? Water Wells ³ Feet Crest River and Streams Bulverde City Limits Rim Parcels NWI Kudu 100 Year Floodplain Lewis Creek Developed Open Space Developed Low Itensity Developed Medium Intensity Developed High Intensity SH 46: From Bulverde Road to FM 3159; County; CSJ &

9 Hill Rainbow W P W Mount Joy Limit [? ^_? ^_ 281 UV 46?? Old Boerne C Cedar Ri dge View St ill El m Letsch Cemetery Spring Branch Midddle Arlon Seay Elementary ³ Feet Hanz Creek River Side Community Church Hill County Christian Church Bill Brown Elemetary Bracken Christian Lewis Creek Swine Creek Ahern Creek Meadowbrook Grassland Crown Caliche Short Circuit York Castle Grey Bluff r Wiste Wood Windmill Breeze Hillside Oaks Indian Chest n ut Spring s Spring Branch Quail Hill Dove Tree Freshwater Bulverde Cactus Oak Indian Creek Legend [ Cemetery ^_ Church? Water Wells Water Quality Pond River and Streams Bulverde City Limits Parcels NWI 100 Year Floodplain Developed Open Space Developed Low Itensity Developed Medium Intensity Developed High Intensity SH 46: From Bulverde Road to FM 3159; County; CSJ &

10 Environmental Considerations The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by TxDOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated December 16, 2014, and executed by FHWA and TxDOT. La revisión ambiental, consultas y otras acciones requeridas por las leyes ambientales federales aplicables para este proyecto están siendo o han sido, llevado a cabo por TxDOT - en virtud de 23 USC 327 y un Memorando de Entendimiento fechado el 16 de diciembre del 2014, y ejecutado por la FHWA y el TxDOT. Footer SH Text 46 Public Meeting March 3, Date 2016

Appendix A NEWSPAPER NOTICES

Appendix A NEWSPAPER NOTICES Appendix A NEWSPAPER NOTICES Appendix B MAILING LIST AND NOTICE Balous & Julie Miller P.O. Box 839925 San Antonio, TX 78283-3925 S B Enterprises LTD P.O. Box 448 Boerne, TX 78006-0448 M2G Principal

More information

WELCOME TO THE OPEN HOUSE

WELCOME TO THE OPEN HOUSE WELCOME TO THE OPEN HOUSE US 281 North Loop 1604 to Borgfeld Drive CSJ: 0253-04-146 & 0253-04-138 May 12, 2016 Please sign in Explore the exhibits Submit a comment form Ask questions We want to know your

More information

WELCOME US 83 Public Meeting

WELCOME US 83 Public Meeting WELCOME US 83 Public Meeting From north of the Starr/Zapata County Line to Loma Blanca Road Thursday, June 8, 2017 Roma Middle School Lecture Hall Open House: 5 6 p.m. Presentation and Public Comment:

More information

US 83 FROM NORTH OF THE STARR/ZAPATA COUNTY LINE TO LOMA BLANCA ROAD

US 83 FROM NORTH OF THE STARR/ZAPATA COUNTY LINE TO LOMA BLANCA ROAD US 83 FROM NORTH OF THE STARR/ZAPATA COUNTY LINE TO LOMA BLANCA ROAD PUBLIC MEETING JUNE 8, 2017 Talk Text Crash 2 AGENDA TECHNICAL PRESENTATION (Roma Area Engineer Eduardo Gracia, P.E.) PROJECT SCHEDULE

More information

PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40

PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40 PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40 Project Description The primary purpose of this project is to improve the major

More information

Wichita Falls MPO - MTP Project List 1 of 6

Wichita Falls MPO - MTP Project List 1 of 6 Wichita Falls MPO - MTP Project List 1 of 6 FUNDING SCHEDULE FOR WICHITA FALLS MPO 2015-2040 M TxDOT Ten-Year Plan 2016-2026 TxDOT STATE, PROJECTS (TABLE I) ESTIMATED STATUS HIGHWAY CSJ PROJECT LIMITS

More information

US 380 FEASIBILITY STUDY

US 380 FEASIBILITY STUDY US 380 FEASIBILITY STUDY Denton County CSJ(s): 0135-10-061, 0135-10-062 Public Meeting(s): January 15 & 22, 2019 WELCOME US 380 Denton County Feasibility Study DALLAS DISTRICT PUBLIC MEETING January 15

More information

Segment 2: La Crescent to Miller s Corner

Segment 2: La Crescent to Miller s Corner goal of the USFWS refuges is to conserve, protect and enhance fish, wildlife and plants and their habitats for the continuing benefit of the American people. Refuge lands are used largely for fishing,

More information

MORGAN CREEK GREENWAY Final Report APPENDICES

MORGAN CREEK GREENWAY Final Report APPENDICES APPENDICES MORGAN CREEK GREENWAY Appendix A Photos of Existing Conditions in Trail Corridor Photos of existing conditions Main trail corridor - February 2009 Photos of existing conditions south bank Morgan

More information

Interoffice Memorandum

Interoffice Memorandum Supplemental Information Agenda Item No. 5.1 May 1, 2014 Interoffice Memorandum May 1, 2014... Date Honorable Planning Commission... To Rick Carter, PE... From Agenda Item 5.1-2014-2019 Capital Improvement

More information

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015 From: Kathleen Dempsey To: Kathleen Dempsey Subject: FDOT Treasure Coast Traffic Report 10 09 15 through 10 16 15 Date: Friday, October 09, 2015 2:10:36 PM Attachments: image003.png CR 714_Median Construction

More information

Community Advisory Panel Meeting #

Community Advisory Panel Meeting # Community Advisory Panel Meeting # 6 02.13.19.. Agenda Welcome and Introductions Community Conversations City Council Meeting Debrief Review Citywide Tunnel Video (North Portal Only) Churchill Pedestrian

More information

COMMENT PERIOD INTRODUCTION

COMMENT PERIOD INTRODUCTION To: Interested Persons From: Tom Buford File: Del Rio Trail Project Date: June 8, 2018 Community Development Department Reference: NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT FOR THE DEL RIO

More information

FEASIBILITY CRITERIA

FEASIBILITY CRITERIA This chapter describes the methodology and criteria used to evaluate the feasibility of developing trails throughout the study areas. Land availability, habitat sensitivity, roadway crossings and on-street

More information

MEMORANDUM VILLAGE OF NORTHBROOK

MEMORANDUM VILLAGE OF NORTHBROOK MEMORANDUM VILLAGE OF NORTHBROOK TO: Staff COPY: Village President & Board of Trustees Department Heads FROM: Richard Nahrstadt, Village Manager DATE: April 29, 2016 SUBJECT: STAFF BRIEFING WEEK OF April

More information

CONFIRMED BENCHMARKS UPDATED JUNE 26, 1991

CONFIRMED BENCHMARKS UPDATED JUNE 26, 1991 CONFIRMED BENCHMARKS UPDATED JUNE 26, 1991 1. Chiseled square on southwest side of street light base, in median of Gus Thomasson Rd., 40' northeast of centerline of Jamaica Way. Elevation: 536.49 2. Chiseled

More information

MEMORANDUM. Honorable Mayor and City Councilmembers William S. Joynes, Sr., City Administrator

MEMORANDUM. Honorable Mayor and City Councilmembers William S. Joynes, Sr., City Administrator AGENDA ITEM 1A MEMORANDUM DATE: January 17, 2017 TO: FROM: SUBJECT: Honorable Mayor and City Councilmembers William S. Joynes, Sr., City Administrator Sue Polka, Interim Asst. Public Works Director/City

More information

Memorandum. To: From: cc: Date: November 7, Re: 1.0 Purpose and Organization of this Addendum. 2.0 Project Description

Memorandum. To: From: cc: Date: November 7, Re: 1.0 Purpose and Organization of this Addendum. 2.0 Project Description Memorandum To: From: cc: Laura Prickett, Horizon Water and Environment Analette Ochoa and Wana Chiu, WRECO Parag Mehta, Kimley Horn Date: November 7, 2017 Re: Santa Cruz Route 1 Tier I and Tier II HOV

More information

Transportation TRANSPORTATION PROJECTS

Transportation TRANSPORTATION PROJECTS Transportation TRANSPORTATION PROJECTS Balls Ford Road Interchange Total Project Cost $142.9M This project includes the construction of a new diverging diamond interchange at Route 234 Bypass (Prince William

More information

US 19 Sunset Point Rd to Countryside Blvd.

US 19 Sunset Point Rd to Countryside Blvd. Frontage Lanes Alternative Six-Lane Roadway Two-Lane, One-Way Frontage Lanes Close All Median Openings w/ Concrete Median Barrier Construct Within Existing Right-of-Way Status Update Construction started

More information

COMMUNITY MEETING NOVEMBER 1, Wheaton Regional Park Pine Lake Trail

COMMUNITY MEETING NOVEMBER 1, Wheaton Regional Park Pine Lake Trail COMMUNITY MEETING NOVEMBER 1, 2012 MEETING AGENDA I. Introduction of Project Team II. Trail Renovation Process III. Wheaton Regional Park IV. Pine Lake Trail Renovation Project V. Comments and Questions

More information

The Baker/Carver Regional Trail is intended to

The Baker/Carver Regional Trail is intended to Section V Design Guidance The Baker/Carver Regional Trail is intended to safely accommodate 183,000 annual visits, an array of non-motorized uses, a variety of skill levels, and persons with special needs.

More information

CHAPTER III: TRAIL DESIGN STANDARDS, SPECIFICATIONS & PERMITS

CHAPTER III: TRAIL DESIGN STANDARDS, SPECIFICATIONS & PERMITS CHAPTER III Trail Design Standards, Specifications & Permits This chapter discusses trail standards, preferred surface types for different activities, permits, and other requirements one must consider

More information

Hospital Link Project Project Update Winter 2018

Hospital Link Project Project Update Winter 2018 Hospital Link Project Project Update Winter 2018 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction of the Hospital Link facility is open

More information

Blue River Trail Master Plan JSA to Town Hall June 2004

Blue River Trail Master Plan JSA to Town Hall June 2004 Blue River Trail Master Plan JSA to Town Hall June 2004 Prepared for: Silverthorne Town Council Silverthorne SPORT Committee Department of Recreation and Culture Silverthorne Public Works Silverthorne

More information

Alternatives Analysis City of Newport Beach Sunset Ridge Park Project December 14, 2011

Alternatives Analysis City of Newport Beach Sunset Ridge Park Project December 14, 2011 Alternatives Analysis City of Newport Beach Sunset Ridge Park Project December 14, 2011 Alternatives Analysis for Vehicular Access: This report supplements the project s certified EIR s Alternatives Analysis.

More information

FORT WORTH DISTRICT. Springtown Area Projects. Loyl C. Bussell, P.E. Acting District Engineer. Thursday, February 8, 2018 Date.

FORT WORTH DISTRICT. Springtown Area Projects. Loyl C. Bussell, P.E. Acting District Engineer. Thursday, February 8, 2018 Date. FORT WORTH DISTRICT Springtown Area Projects Loyl C. Bussell, P.E. Acting District Engineer Photo by Liam Frederick Footer Text Thursday, February 8, 2018 Date Maintaining a Safe System TxDOT is responsible

More information

FDOT Treasure Coast Traffic Report through

FDOT Treasure Coast Traffic Report through FDOT Treasure Coast Traffic Report 02 26 16 through 03 04 16 Kathleen Dempsey Fri 2/26/2016 2:56 PM To:Kathleen Dempsey ; 1 attachment 355 KB CR 714_Median Access Modifications.pdf;

More information

NCDOT STIP Project No. R Project Overview

NCDOT STIP Project No. R Project Overview 6/2/2010 NCDOT STIP Project No. R-2603 Wilkes County Project Overview The North Carolina Department of Transportation (NCDOT) proposes to widen NC (Elkin Highway) in Wilkes County from its existing multi-lane

More information

1.0 Purpose and Organization of the Community Impact Assessment Addendum

1.0 Purpose and Organization of the Community Impact Assessment Addendum Memorandum To: From: cc: Laura Prickett, Horizon Water and Environment Carie Montero, Senior Project Manager/Environmental Lead, Parsons Transportation Group Parag Mehta, Kimley Horn Date: September 24,

More information

RW Bruhn Bridge and Approaches Project

RW Bruhn Bridge and Approaches Project RW Bruhn Bridge and Approaches Project The Trans-Canada Highway 1 RW Bruhn Bridge and Approaches Project involves four-laning approximately 1.9 km of Highway 1 in Sicamous, including replacement of the

More information

Section 3-04 Cross Sectional Elements TABLE OF CONTENTS. INTRODUCTION...3 General...3 Exhibit 1-Cross-Sectional Elements...3

Section 3-04 Cross Sectional Elements TABLE OF CONTENTS. INTRODUCTION...3 General...3 Exhibit 1-Cross-Sectional Elements...3 Section 3-04 Cross Sectional Elements TABLE OF CONTENTS INTRODUCTION...3 General...3 Exhibit 1-Cross-Sectional Elements...3 CROSS-SECTIONAL ELEMENTS...3 Traveled Way...3 Shoulder...3 Surfacing Taper...3

More information

A Montessori-Inspired Faith-based School

A Montessori-Inspired Faith-based School Serving families of Lake Helen since 1990 A Montessori-Inspired Faith-based School & Ministry of Blake Memorial Baptist Church Department of Education #5976 Certified & Nationally Accredited by International

More information

City of Madison, Buckeye Road Monona Drive to Stoughton Road County AB Dane County Public Involvement Meeting

City of Madison, Buckeye Road Monona Drive to Stoughton Road County AB Dane County Public Involvement Meeting City of Madison, Buckeye Road Monona Drive to Stoughton Road County AB Dane County Public Involvement Meeting Wednesday, May 31, 2017 6:30 to 8 P.M. Frank Allis Elementary School 4201 Buckeye Road Madison,

More information

Thornton Water Project. Larimer County Route Study and Project Update September 12, 2017

Thornton Water Project. Larimer County Route Study and Project Update September 12, 2017 Thornton Water Project Larimer County Route Study and Project Update September 12, 2017 Purpose of Meeting Provide information on the Thornton Water Project Present the results of the pipeline routing

More information

Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd

Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd Project ID SOA07003 Department State of Alaska Project Type Improvement Start Date December 2017 Location Assembly: Section 4, Seats F & G, Assembly:

More information

FINAL. Bicycle/Pedestrian Feasibility Study City of DeBary Dirksen Drive Trail. Prepared For: Volusia County MPO

FINAL. Bicycle/Pedestrian Feasibility Study City of DeBary Dirksen Drive Trail. Prepared For: Volusia County MPO City of DeBary Dirksen Drive Trail FINAL Prepared By: Reynolds, Smith and Hills, Inc. Prepared For: Volusia County MPO September 2007 Table of Contents INTRODUCTION...1 PROJECT PURPOSE AND SCOPE...2 PHYSICAL

More information

Hancock. Hancock. Hancock County Population 54,558. Land Area (sq mi) 1,587 Bridges 120 Highway Corridor Priority Miles HCP 1 81 HCP 2 34

Hancock. Hancock. Hancock County Population 54,558. Land Area (sq mi) 1,587 Bridges 120 Highway Corridor Priority Miles HCP 1 81 HCP 2 34 Hancock Hancock County Population 54,558 T3 ND Oqiton Twp Land Area (sq mi) 1,587 Bridges 120 Highway Corridor Priority Miles T41 MD 81 HCP 2 34 T39 MD T40 MD 141 HCP 4 62 215 Total -5 533 T32 MD Great

More information

FHWA P/N Guidelines. Corridor Relationship. Highway 22 Segment 1 - US 169 to CSAH 2 Relevance / Documentation of Need

FHWA P/N Guidelines. Corridor Relationship. Highway 22 Segment 1 - US 169 to CSAH 2 Relevance / Documentation of Need Highway 22 Segment 1 - US 169 to CSAH 2 Vehicle Mobility Congestion Intersection Congestion Existing Conditions - Based on Highway Capacity Manual methodology, corridor level of service is currently LOS

More information

June 2013: Capital Improvements Update. through $ 126,196,202 Available Funding through 2018 $ 149,783,656. Staff s Recommendation

June 2013: Capital Improvements Update. through $ 126,196,202 Available Funding through 2018 $ 149,783,656. Staff s Recommendation Capital Improvements Update June 2013: Pl dp j t Planned Projects through 2018 - $ 126,196,202 Available Funding through 2018 $ 149,783,656 pp p,, Un-appropriated - $ 23,587,454 Staff s Recommendation

More information

SCOPING INFORMATION PACKET

SCOPING INFORMATION PACKET SCOPING INFORMATION PACKET Project Description The proposed project would provide a direct link connecting several light rail lines in operation or in construction, including the Metro Gold Line to Pasadena,

More information

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT December 2018 Project Summary Boulder County, Colorado, in partnership with the City of Boulder, is evaluating options for multi-use

More information

FY Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars

FY Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars FY2016-2020 Regional Transportation Improvement Program Basic Project List () All costs in current dollars Project Name Key # Year Project Cost 10th Avenue Bridge, Caldwell 13055 2018 $1,367 10th Avenue

More information

FY Transportation Improvement Program Basic Project List (in Thousands)

FY Transportation Improvement Program Basic Project List (in Thousands) FY2010-2014 Transportation Improvement Program Basic Project List (in Thousands) Project Name Key # Year Project Cost 16th Avenue North, 7th Street North to Garrity Boulevard GU09308 2011 $592 21st Avenue

More information

1.2 Corridor History and Current Characteristics

1.2 Corridor History and Current Characteristics SECTION 1 Description and Background of Study Area 1.1 Introduction This preliminary engineering report was prepared for the Alaska Department of Transportation and Public Facilities (ADOT&PF). It is part

More information

North San Luis Obispo County Coastal Trail Master Plan

North San Luis Obispo County Coastal Trail Master Plan North San Luis Obispo County Coastal Trail Master Plan Draft Opportunities & Constraints Report November 11, 2011 Prepared by: Alta Planning + Design Table of Contents 1. Introduction... 1 SEGMENT 1:

More information

Palm Beach County Traffic Report August 24 through August 31, 2012

Palm Beach County Traffic Report August 24 through August 31, 2012 For Immediate Release August 24, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report August 24 through August 31, 2012 Palm Beach County Palm Beach County traffic will

More information

Annual Listing of Federally Obligated Projects in Santa Barbara County Federal Fiscal Year (October 1, 2014 to September 30, 2015)

Annual Listing of Federally Obligated Projects in Santa Barbara County Federal Fiscal Year (October 1, 2014 to September 30, 2015) Annual Listing of Federally Obligated Projects in County Federal Fiscal Year 2015 (October 1, 2014 to September 30, 2015) Annual List of Projects with Federal Funding for Federal Fiscal Year 2015 Federal

More information

BONITA BEACH ROAD. May 18, Ian Lockwood, PE Cindy Zerger, AICP, ASLA Ken Ray, RLA. Greg Diserio, RLA. Tara Salmieri, AICP

BONITA BEACH ROAD. May 18, Ian Lockwood, PE Cindy Zerger, AICP, ASLA Ken Ray, RLA. Greg Diserio, RLA. Tara Salmieri, AICP BONITA BEACH ROAD May 18, 2016 Ian Lockwood, PE Cindy Zerger, AICP, ASLA Ken Ray, RLA Greg Diserio, RLA Tara Salmieri, AICP Toole Design Group Engineers Planners Landscape Architects Authors BONITA BEACH

More information

Memorandum / Letter of Intent

Memorandum / Letter of Intent VERONA WAUKESHA KENOSHA APPLETON WESTON Memorandum / Letter of Intent To: Adam Sayre, Director of Planning & Development, City of Verona From: Kevin Yeska, JSD Professional Services, Inc. www.jsdinc.com

More information

Site Location and Setting

Site Location and Setting Memorandum Date: To: From: Subject: Kristy Le, Gary Black Steve Orem Santa Teresa County Park Historic Area Traffic and Parking Study Hexagon Transportation Consultants, Inc. has completed a traffic and

More information

FY Transportation Improvement Program Basic Project List (in Thousands) - Application Not Funded

FY Transportation Improvement Program Basic Project List (in Thousands) - Application Not Funded FY2011-2015 Transportation Improvement Program Basic Project List (in Thousands) - Application Not Funded Requesting Agency: ACHD Project Name Key # Year Project Cost ACHD Thin Lift Overlay Projects 11922

More information

Town of Danvers Planning Board

Town of Danvers Planning Board Town of Danvers Planning Board Danvers Town Hall One Sylvan Street Danvers, MA 01923 www.danvers.govoffice.com Margaret Zilinsky, Chair Kristine Cheetham William Prentiss Aaron Henry James Sears John Farmer,

More information

ANCLOTE COASTAL TRAIL ALTERNATIVES ANALYSIS STUDY

ANCLOTE COASTAL TRAIL ALTERNATIVES ANALYSIS STUDY ANCLOTE COASTAL TRAIL ALTERNATIVES ANALYSIS STUDY PASCO COUNTY MPO JULY 2015 PROJECT OVERVIEW... INTRODUCTION EXECUTIVE SUMMARY CONTEXT... TAMPA BAY AREA, PINELLAS, & PASCO COUNTY S MULTI-USE TRAIL PLANS

More information

Construction Update. Local Officials Briefing March 2016

Construction Update. Local Officials Briefing March 2016 Construction Update Local Officials Briefing March 2016 1 History: Chicago-St. Louis Corridor Since 1980 s IDOT has been looking at this corridor for high-speed service 1992 Designated a HSR Corridor EIS

More information

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016 March 25, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016 TREASURE COAST Construction and maintenance-related

More information

Construction Projects Report

Construction Projects Report Construction Projects Report Week of Mar 26-Apr 01, 2018 Street/Intersection From To CURRENT PROJECTS Proposed Date of Construction Auburn Dr. Georgetown Bowling Green 2/19/18 4/13/18 Proposed Date of

More information

Lake Apopka Trail Loop Design Guidelines

Lake Apopka Trail Loop Design Guidelines November 2002 Prepared for 14908 Tilden Road Winter Garden, FL 34787 Prepared by 140 North Orlando Avenue Suite 295 Winter Park, FL 32789 November, 2002 I. INTRODUCTION...1 II. DESIGN GUIDELINES FOR TRAILS...3

More information

US 83 Relief Route. City of La Joya City of Peñitas Hidalgo County. November 15, 2012

US 83 Relief Route. City of La Joya City of Peñitas Hidalgo County. November 15, 2012 US 83 Relief Route City of La Joya City of Peñitas Hidalgo County November 15, 2012 TxDOT Mission: Work with others to provide safe and reliable transportation solutions for Texas. Public Meeting Agenda

More information

4. Safety Concerns Potential Short and Medium-Term Improvements

4. Safety Concerns Potential Short and Medium-Term Improvements NH Route 104 Access Management Study Page 19 4. Safety Concerns Potential Short and Medium-Term Improvements Potential safety improvement strategies are listed by priority based on field observations by

More information

Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering

Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering Aldridge Transportation Consultants, LLC Advanced Transportation Planning and Traffic Engineering John M.W. Aldridge, PE, PTOE, AICP 182 Chimney Rock Road Colorado Registered Professional Engineer Highlands

More information

CONSTRUCTION PROJECTS IN CUYAHOGA COUNTY CLEVELAND EUCLID 3/9/18 RICHMOND MAYFIELD HIGHLAND HEIGHTS HEIGHTS SOUTH EAST MAYFIELD EUCLID CLEVELAND

CONSTRUCTION PROJECTS IN CUYAHOGA COUNTY CLEVELAND EUCLID 3/9/18 RICHMOND MAYFIELD HIGHLAND HEIGHTS HEIGHTS SOUTH EAST MAYFIELD EUCLID CLEVELAND BAY VILLAGE WESTLAKE OLMSTED NORTH TOWNSHIP OLMSTED FALLS OLMSTED BEREA STRONGSVILLE ROYALTON NORTH BROOK PARK PARMA PARMA BROADVIEW BRECKSVILLE HILLS SEVEN INDEPENDENCE BROOKLYN RIVER ROCKY LAKEWOOD PARK

More information

ROUTE 2 BUS #29 WHITE BUS

ROUTE 2 BUS #29 WHITE BUS MAYER UNIFIED SCHOOL DISTRICT #43 2018-2019 PM BUS ROUTES PM TAKE HOME - ESTIMATED DROP OFF TIMES ROUTE 2 BUS #29 WHITE BUS BLACK CANYON CITY: HIGH SCHOOL PICK UP DROP OFF 2:35 PM BUMBLE BEE EXIT OFF 1-17

More information

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts Macleod Trail Corridor Study Welcome Macleod Trail Corridor Study Open House Presentation of Proposed Design Concepts Study Purpose Develop a corridor plan for Macleod Trail that aligns with The City s:

More information

VI. ALTERNATIVES TO THE MASTER PLAN C. RENOVATED EAST BUILDING ALTERNATIVE

VI. ALTERNATIVES TO THE MASTER PLAN C. RENOVATED EAST BUILDING ALTERNATIVE VI. ALTERNATIVES TO THE MASTER PLAN C. RENOVATED EAST BUILDING ALTERNATIVE INTRODUCTION The Renovated East Building Alternative would include the continued use of the renovated West Building and the renovation

More information

Palm Beach County Traffic Report July 13 through July 20, 2012

Palm Beach County Traffic Report July 13 through July 20, 2012 For Immediate Release July 13, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report July 13 through July 20, 2012 Palm Beach County Palm Beach County traffic will be

More information

Lake Erie Commerce Center Traffic Analysis

Lake Erie Commerce Center Traffic Analysis LOCATION: East of NYS Route 5 at Bayview Road Town of Hamburg Erie County, New York PREPARED BY: Wendel Companies 140 John James Audubon Parkway Suite 200 Amherst, New York 14228 January 2012 i ii Table

More information

THE BIG PICTURE. Week of March 11, City of Buda Accepting Applications For Boards and Commissions

THE BIG PICTURE. Week of March 11, City of Buda Accepting Applications For Boards and Commissions City of Buda Accepting Applications For Boards and Commissions The deadline is approaching to submit applications for the City of Buda's various boards and commissions. Deadline to submit a completed application

More information

IOWA ORNITHOLOGISTS' UNION - Birding Sites in Linn County

IOWA ORNITHOLOGISTS' UNION - Birding Sites in Linn County IOWA ORNITHOLOGISTS' UNION - Birding Sites in Linn County Printed on 6/15/2018 Bever Park (ebird Hotspot) GPS Coordinates: 41.9851219,-91.6269125 Restrooms Parking Trails ADA Accessible Trails Boyson Trail

More information

Thousand Oaks -agoura Hills - calabas

Thousand Oaks -agoura Hills - calabas 161 bus time schedule & line map 161 Thousand Oaks -agoura Hills - calabas View In Website Mode The 161 bus line (Thousand Oaks -agoura Hills -calabas) has 3 routes. For regular weekdays, their operation

More information

SAN RAFAEL City Council January 20, 2015

SAN RAFAEL City Council January 20, 2015 SONOMA MARIN AREA RAIL TRANSIT SMART CENTRAL SAN RAFAEL STATUS UPDATE SAN RAFAEL City Council January 20, 2015 CENTRAL SAN RAFAEL SMART SOUTH OF PUERTO SUELLO TUNNEL 1. Active Construction 2. Construction

More information

St. Dennis Drive Conversion of Traffic Lanes to On- Street Parking and Bicycle Lanes

St. Dennis Drive Conversion of Traffic Lanes to On- Street Parking and Bicycle Lanes STAFF REPORT ACTION REQUIRED St. Dennis Drive Conversion of Traffic s to On- Street Parking and Bicycle s Date: April 22, 2014 To: From: Wards: Reference Number: Public Works and Infrastructure Committee

More information

Chapter 2: Entire US287 Corridor

Chapter 2: Entire US287 Corridor Chapter 2: Entire US287 Corridor The US287 Study Area spans four incorporated jurisdictions and two counties. Due to the length and density of infrastructure along the US287 Study Area, corridor-wide maps

More information

Town of Frisco. Trails Master Plan. Legend. Planning Area 1. i l. 9 Campground. Lake Hill Development. Giberson Property. Frisco Transit Center

Town of Frisco. Trails Master Plan. Legend. Planning Area 1. i l. 9 Campground. Lake Hill Development. Giberson Property. Frisco Transit Center SO-UV I-70 UPPER SALT LICK TOO-PWECH SUNRISE 1 Town of Frisco Planning Area 1 NAH-OON-KARA I-70 Lake Hill Development Legend Existing Trails Existing USFS System Trails 2 A Existing Non-System Trails Bike

More information

LUDWIG RD. SUBDIVISION PROJECT TRAFFIC IMPACT ANALYSIS

LUDWIG RD. SUBDIVISION PROJECT TRAFFIC IMPACT ANALYSIS LUDWIG RD. SUBDIVISION PROJECT TRAFFIC IMPACT ANALYSIS Prepared for Skip Coddington GSC Development, Inc PO Box 1623 Woodinville WA 9872 Prepared by 1141 NE 124 th St., #59 Kirkland, WA 9834 425.522.4118

More information

Appendix H1 Traffic Study Hill St Obispo Ave Obispo Ave Student Drop-off & Pick-up Area Parking Lot Plaza Level Hill St Fire Lane Access Service Lane Access Redondo Ave Redondo Ave Parking Lot N No

More information

A303. Sparkford to Ilchester Dualling Scheme. Public consultation. Welcome. Highways England -- creative MCR18_0016

A303. Sparkford to Ilchester Dualling Scheme. Public consultation. Welcome. Highways England -- creative MCR18_0016 Sparkford to Ilchester Dualling Scheme Public consultation Welcome Background The /A358 corridor provides vital east-west connectivity between the south west and London and the south east for people, communities

More information

Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012

Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012 Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012 Purpose of Feasibility Study Purpose Evaluate the feasibility of constructing a multiuse

More information

ONONDAGA CREEKWALK PHASE II. Public Information Meeting Series 1

ONONDAGA CREEKWALK PHASE II. Public Information Meeting Series 1 ONONDAGA CREEKWALK PHASE II Public Information Meeting Series 1 Andrew Maxwell Director, Syracuse-Onondaga County Planning Agency Owen Kerney Assistant Director for City Planning Russell Houck, PE City

More information

SAHARA RANCHO CORPORATE CENTER SOUTH RANCHO DRIVE, LAS VEGAS, NV 89102

SAHARA RANCHO CORPORATE CENTER SOUTH RANCHO DRIVE, LAS VEGAS, NV 89102 SAHARA O 2200-2250 SOUTH O DRIVE,, NV 89102 HIGH END PROFESSIONAL OFFICE BUILDING FOR LEASE 3960 Howard Hughes Parkway, Suite 0 FORT APACHE ROAD N DURANGO DRIVE S RAINBOW BLVD N JONES BLVD N DECATUR BLVD

More information

San Luis Obispo. Bishop Peak Felsman Loop Eagle Rock Maino Open Space Poly Canyon Poly P Other Areas

San Luis Obispo. Bishop Peak Felsman Loop Eagle Rock Maino Open Space Poly Canyon Poly P Other Areas San Luis Obispo Bishop Peak Felsman Loop Eagle Rock Maino Open Space Poly Canyon Poly P Other Areas 1 JCT. ELEV. 72 400 00 0 FELSMAN LOOP GATE LOOP RIDGE 600 FENCE JCT. ELEV. 860 1000 1200 BISHOP PEAK

More information

Fairfax County Parkway Widening Fairfax County

Fairfax County Parkway Widening Fairfax County Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.

More information

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 June 19, 2015 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 TREASURE COAST Construction and maintenance-related lane

More information

November 21, 2012 Barbara Kelleher, (954)

November 21, 2012 Barbara Kelleher, (954) November 21, 2012 Barbara Kelleher, (954) 777-4090 barbara.kelleher@dot.state.fl.us BROWARD COUNTY TRAFFIC IMPACT REPORT November 26 to November 30, 2012 FORT LAUDERDALE -- Construction and maintenance-related

More information

Damen Elston Fullerton Reconstruction, Intersection Improvements CDOT Project B-1-501

Damen Elston Fullerton Reconstruction, Intersection Improvements CDOT Project B-1-501 Damen Elston Fullerton Reconstruction, Intersection Improvements CDOT Project B-1-501 Bird s Eye View of Existing INTRODUCTION This project is part of the City s Building a New Chicago initiative in conjunction

More information

3. COLTA / HUGA CONNECTIONS - PRELIMINARY

3. COLTA / HUGA CONNECTIONS - PRELIMINARY 9 3. COLTA / HUGA CONNECTIONS - PRELIMINARY 3.1 COLTA The Chain of Lakes Trail Association (COLTA) trail, formerly identified as the Chester Spur Line, was completed and opened for use in June 2011. The

More information

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013 FREDERICK COUNTY STATE HIGHWAY ADMINISTRATION -- Frederick County -- Line 1 PROJECT: I-7, Baltimore National Pike INTERSTATE CONSTRUCTION PROGRAM DESCRIPTION: Widen I-7 east of MD 355 to east of MD 144

More information

AGENCY NAME TRANSPORTATION

AGENCY NAME TRANSPORTATION TRANSPORTATION TRANSPORTATION AGENCY NAME Prince William County FY 2015 BUDGET CIP-TRANSPORTATION 561 Fuller Road/Fuller Heights Road Improvements Total Project Cost - $4.4 M This project will widen Fuller

More information

Welcome KROSNO CREEK DIVERSION PROJECT CLASS ENVIRONMENTAL ASSESSMENT

Welcome KROSNO CREEK DIVERSION PROJECT CLASS ENVIRONMENTAL ASSESSMENT Welcome KROSNO CREEK DIVERSION PROJECT PUBLIC INFORMATION CENTRE # 1 Tonight s Presentation Study Overview Background Existing Conditions Alternative Solutions Preliminary Preferred Solution Next Steps

More information

Becker County Trail Routing Feasibility Study

Becker County Trail Routing Feasibility Study 2016 Becker County Trail Routing Feasibility Study CONNECTING DETROIT MOUNTAIN AND MOUNTAIN VIEW RECREATIONAL AREA TO THE HEARTLAND TRAIL BECKER COUNTY ULTEIG ENGINEERS Contents Acknowledgements...2 INTRODUCTION...3

More information

Transportation Improvement District (TID) Exercise New Castle County Unified Development Code

Transportation Improvement District (TID) Exercise New Castle County Unified Development Code Transportation Improvement District (TID) Exercise New Castle County Unified Development Code Churchmans Crossing TID How should New Castle County deploy Transportation Improvement Districts (TIDs)? Site

More information

Launceston City Council. Kings Meadows Traffic Management Report for Public Consultation

Launceston City Council. Kings Meadows Traffic Management Report for Public Consultation Launceston City Council Kings Meadows Traffic Management Report for Public Consultation November 2013 This report: has been prepared by GHD for Launceston City Council and may only be used and relied on

More information

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015 EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015 1 SEGMENT 1 2 THE WISHBONE Connects the TEXpress Managed Toll System to the 35Express Managed Toll System Limits: Crown Road (near Royal Lane) to Valley

More information

Caliber Charter School VALLEJO, CA

Caliber Charter School VALLEJO, CA Traffic Impact Study Final Report Caliber Charter School VALLEJO, CA 21 June 2016 Prepared for: Prepared by: Traffic Engineering & Transportation Planning This report has been prepared and certified by

More information

DRAFT TH AVE NE URBAN DESIGN MERIT PRESENTATION DPD# NOVEMBER 2017

DRAFT TH AVE NE URBAN DESIGN MERIT PRESENTATION DPD# NOVEMBER 2017 DRAFT 11.08.17 4801 24TH AVE NE URBAN DESIGN MERIT PRESENTATION 17-002 DPD#3027312 16 NOVEMBER 2017 PROJECT BACKGROUND URBAN DESIGN ANALYSIS VACATION / NO-VACATION COMPARISON URBAN DESIGN MERIT INTRODUCTION

More information

±3,200 SF RETAIL SPACE AVAILABLE 280 EAST FLAMINGO ROAD, LAS VEGAS, NEVADA 89109

±3,200 SF RETAIL SPACE AVAILABLE 280 EAST FLAMINGO ROAD, LAS VEGAS, NEVADA 89109 FOR LEASE :: RESORT CORRIDOR ±3,200 SF RETAIL SPACE AVAILABLE 280 EAST,, NEVADA 89109 KOVAL LANE HOWARD HUGHES PARKWAY HUALAPAI WAY FORT APACHE ROAD S RAINBOW BLVD N JONES BLVD N DECATUR BLVD S DECATUR

More information

MAYER UNIFIED SCHOOL DISTRICT # PM BUS ROUTES PM TAKE HOME - ESTIMATED DROP OFF TIMES

MAYER UNIFIED SCHOOL DISTRICT # PM BUS ROUTES PM TAKE HOME - ESTIMATED DROP OFF TIMES MAYER UNIFIED SCHOOL DISTRICT #43 2017-2018 PM BUS ROUTES PM TAKE HOME - ESTIMATED DROP OFF TIMES ROUTE 2 BUS #45 WHITE BUS PICK UP DROP OFF BLACK CANYON CITY: HIGH SCHOOL DEPART MAYER HIGH SCHOOL 2:35

More information

Trans Canada Highway Corridor Management Plan. Final Draft Report. Drinkwater Road to Cowichan Bay Road. Prepared for:

Trans Canada Highway Corridor Management Plan. Final Draft Report. Drinkwater Road to Cowichan Bay Road. Prepared for: Trans Canada Highway Corridor Management Plan inal Draft Report Prepared for: City of Duncan Cowichan Tribes Council District of North Cowichan Cowichan Valley Regional District South Coast Region of the

More information

Southern Oregon Transportation Engineering, LLC

Southern Oregon Transportation Engineering, LLC Southern Oregon Transportation Engineering, LLC 112 Monterey Drive - Medford, Or. 97504 Office 541.608.9923 Cell 541.941.4148 Email: Kwkp1@Q.com August 12, 2013 Mike Faught, Public Works Department City

More information

LOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE. CALABASAS CITY COUNCIL April 26, 2017

LOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE. CALABASAS CITY COUNCIL April 26, 2017 LOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE CALABASAS CITY COUNCIL LOST HILLS ROAD INTERCHANGE PROJECT UPDATES Construction of CIDH piles for the soundwall foundation commenced on March 20

More information