1 Supplemental Information Agenda Item No. 5.1 May 1, 2014 Interoffice Memorandum May 1, Date Honorable Planning Commission... To Rick Carter, PE... From Agenda Item Capital Improvement Program (CIP) General Plan Conformance... Subject Please find attached an updated copy of Attachment 2, CIP Projects and Related General Plan Policies). The table has been updated for improved consistency with the Rural Roads Improvements Standards by clarifying some of the project descriptions.

2 Capital Improvement Program Projects and Project Description TBD001 Bilby Rd Improvements - Bruceville Rd and Promenade Pkwy Construct road for center two lanes, landscaped median, storm drain system, box culvert at Shed "C", one traffic signal (collectors), signal interconnect and street lights. Location: Bilby Road, from Bruceville Road to Promenade Parkway TBD002 Bond Rd Median between E. Stockton Blvd and Elk Grove-Florin Rd Construct a landscaped median and signal interconnect on Bond Road, between E. Stockton Boulevard and Elk Grove- Florin Road. Location: Bond Road, between E. Stockton Boulevard and Elk Grove-Florin Road. TBD003 Bond Rd Improvements from Bradshaw Rd to Grant Line Rd Consistent with Rural Roads Policy, widen road for landscaped bike lanes and medians, storm drain system, two traffic signals (collectors), street lighting, signal interconnect, asphalt pedestrian path, rural landscaping, and right of way acquisition for frontage improvements. Location: Bond Road, between Bradshaw Road and Grant Line Road TBD004 Bradshaw Rd Improvements - Grant Line Rd to Calvine Rd Consistent with the Rural Roads Policy, widen road for four lanes, including landscaped bike lane and medians, storm drain system, nine traffic signals (including collectors), street lighting, signal interconnect, sidewalk in urban areas, asphalt path in rural areas, landscaping, and right of 1 of 50

3 way acquisition. Location: Bradshaw Road, from Grant Line Road to Calvine Road. TBD005 Bruceville Rd Improvements - Laguna Blvd to Kammerer Rd Widen road to six four lanes, including landscaped medians, storm drain system, box culverts, two traffic signals (collectors), street lighting, signal interconnect, sidewalk, curb and gutter, landscaping, right of way acquisition, utility relocations, and environmental mitigation. Location: Bruceville Road, from Sheldon Road to Kammerer Road TBD006 Calvine Rd Improvements - Cliffcrest Dr to Vineyard Rd Consistent with the Rural Roads Policy, construct frontage improvements, including the construction of outside lanes, bike lanes, street lighting, sidewalk in urban areas, asphalt path in rural areas, landscaping, traffic signal, and an atgrade railroad crossing right of way acquisition. Location: Calvine Road, from 900 feet of Cliffcrest Drive to Vineyard Road TBD007 Calvine Rd Improvements - Vineyard Rd to Grant Line Rd Consistent with the Rural Roads Policy, widen road for four lanes, including landscapedbike lanes and medians, storm drain system, street lighting, two traffic signals (collectors), signal interconnect, sidewalk in urban areas, asphalt path in rural areas, landscaping, and right of way acquisition. Location: Calvine Road, from Vineyard Road to Grant Line Road TBD008 Elk Grove Blvd Landscaping RailRoad to Franklin Blvd 2 of 50

4 Provides landscaping and fencing along the south side of Elk Grove Boulevard, between the railroad and Franklin Boulevard. Location: Elk Grove Boulevard, from Railroad to Franklin Boulevard, on the south side TBD009 Elk Grove Blvd Median Construct a landscaped median on Elk Grove Boulevard between East Stockton Boulevard and Elk Grove-Florin Road. Location: Elk Grove Boulevard, between East Stockton Boulevard and Elk Grove-Florin Road TBD010 Elk Grove Blvd Improvements - Waterman Rd to Bradshaw Rd Widen road for center two four lanes, landscaped median, storm drain system and one traffic signal (collectors). Location: Elk Grove Boulevard, from Waterman Road to Bradshaw Road TBD011 Elk Grove Blvd Improvements - Bradshaw Rd to Grant Line Rd Widen road for center two lanesmedian and bike lanes, landscaped median, storm drain system, two traffic signal (collectors), signal interconnect, street lights, sidewalk, curb and gutter, landscaping, and right of way acquisition for frontage improvements. Location: Elk Grove Boulevard, from Bradshaw Road to Grant Line Road TBD012 Elk Grove-Florin Rd Signals E. Stockton Rd and Elk Grove Blvd Construction of two traffic signals (collectors) on Elk Grove-Florin Road, between E. Stockton Road and Elk Grove Boulevard Location: Elk Grove-Florin Road, between E. Stockton Road and Elk Grove Boulevard 3 of 50

5 TBD013 Elk Grove-Florin Blvd Median between Elk Grove Blvd and Bond Rd Construct a landscaped median, signal interconnect and storm drain repair on Elk Grove-Florin Boulevard, between Elk Grove Boulevard and Bond Road. Location: Elk Grove-Florin Boulevard, between Elk Grove Boulevard and Bond Road TBD014 Elk Grove-Florin Rd Improvements - Bond Rd to Calvine Rd Widen road for improvements, including landscaped medians, storm drain system repair, three traffic signals (collectors), street lighting, signal interconnect, sidewalk, curb and gutter, landscaping, an at-grade railroad crossing, Whitehouse Creek culvert extension and right of way acquisition for frontage improvements. Location: Elk Grove-Florin Road, from Bond Road to Calvine Road TBD015 Excelsior Rd Improvements - Sheldon Rd to Calvine Rd Consistent with the Rural Roads Policy, construct two lane road including, landscaped bike lane and median, storm drain system, culvert extension, signal interconnect, street lights, asphalt path, landscaping, and right of way acquisition. Location: Excelsior Road, from Sheldon Road to Calvine Road TBD016 Franklin Blvd Frontage Improvements - City Limits to Laguna Blvd 4 of 50

6 Widen road to provide frontage improvements, including storm drain system, street lights, sidewalk, curb and gutter, and landscaping. Location: Franklin Boulevard, from City Limits to Laguna Boulevard TBD017 Franklin Blvd Median - Elk Grove Blvd to Whitelock Pkwy Construct landscaped median. Location: Franklin Boulevard, from Elk Grove Boulevard to Whitelock Parkway TBD018 Grant Line Rd Improvements - Waterman Rd to Bradshaw Rd Widen road to six lanes, including landscaped medians, storm drain system, box culverts, one traffic signals (collectors), street lighting, signal interconnect, sidewalk, curb and gutter, landscaping and right of way acquisition. Location: Grant Line Road, from Waterman Road to Bradshaw Road TBD019 Grant Line Rd Improvements - Bradshaw Rd to Calvine Rd Widen road to four lanes, including landscaped medians, storm drain system, box culverts, four traffic signals (collectors), street lighting, signal interconnect, sidewalk, curb and gutter, landscaping, at-grade railroad crossing and right of way acquisition. Location: Grant Line Road, from Bradshaw Road to Calvine Road TBD020 Grant Line Rd Two-Way Left Turn Lane Widen Grant Line Road, between Bond Road and Calvine Road, to provide a two-way left turn lane. Location: Grant Line Road, between Bond Road and Calvine Road 5 of 50

7 TBD021 Lotz Pkwy Improvements - Laguna Springs Dr to Kammerer Rd Widen road and construct new road for center two lanes, landscaped median, storm drain system, box culvert, four traffic signal (collectors), signal interconnect, street lights, sidewalk, curb and gutter, landscaping and right of way acquisition. Location: Lotz Parkway, Laguna Springs Drive to Kammerer Road TBD022 Willard Pkwy Improvements - Bilby Rd (south) to Kammerer Rd Widen road and construct new road for center two lanes, landscaped median and storm drain system. Location: Willard Parkway, Bilby Road (south) to Kammerer Road TBD023 Whitelock Pkwy Improvements - Bruceville Rd to Poppy Ridge Rd Widen road and construct new road for center two lanes, landscaped median, two traffic signal (collectors), signal interconnect and street lights. Location: Whitelock Parkway, Bruceville Road to Poppy Ridge Road TBD024 Sheldon Rd Improvements - Elk Grove-Florin Rd to Grant Line Rd Consistent with the Rural Roads Policy, widen road for bike lanes and center two lanesmedian, storm drain system, 6 of 50

8 box culvert, three traffic signal (collectors), signal interconnect, street lights, asphalt path, landscaping, pedestrian crossing (at Laguna Creek Trail), bridge widening, at-grade railroad crossing and right of way acquisition. Location: Sheldon Road, Elk Grove-Florin Road to Grant Line Road TBD025 Waterman Rd Improvements - Grant Line Rd to Bond Rd Widen road for center two lanes, storm drain system, box culvert, five traffic signal (collectors), signal interconnect, street lights, sidewalk, curb and gutter, landscaping, pedestrian crossing (at Laguna Creek Trail), wall (north of Elk Grove Boulevard) and right of way acquisition. Location: Waterman Road, Grant Line Road to Bond Road TBD026 Waterman Rd Improvements - Bond Rd to Sheldon Rd Consistent with the Rural Roads Policy, widen road for to center twofour lanes, storm drain system, two traffic signal (collectors), signal interconnect, street lights, sidewalk in urban areas, asphalt path in rural areas, landscaping and right of way acquisition. Location: Waterman Road, Bond Road to Sheldon Road TBD027 Waterman Rd Improvements - Sheldon Rd to Calvine Rd Consistent with the Rural Roads Policy, widen road for bike lanes and center mediantwo lanes, storm drain system, two traffic signal (collectors), signal interconnect, street lights, asphalt path, landscaping and right of way acquisition. Location: Waterman Road, Sheldon Road to Calvine Road TBD028 Wilton Rd Improvements - Grant Line Rd to City 7 of 50

9 Limits Widen road for center two lanesmedian, storm drain system, two traffic signal (collectors), signal interconnect, street lights, asphalt path, landscaping, bridge/culvert and right of way acquisition. Location: Wilton Road,- Grant Line Road to City Limits TBD029 West Stockton Blvd Improvements - Poppy Ridge to Machado Widen road for center two lanes, landscaped median, storm drain system, two traffic signals (collectors), signal interconnect and street lights. Location: West Stockton Boulevard Improvements - Poppy Ridge to Machado TBD030 Wyland Dr Bridge Construct 48' wide by 100' long bridge over Elk Grove Creek on Wyland Drive. Location: Wyland Drive, at Elk Grove Creek TBD031 Elk Grove Blvd and Ginther Dr Traffic Signal Modify/Signalize the intersection. Location: Elk Grove Boulevard and Ginther Drive Intersection TBD032 Laguna Blvd and Laguna Springs Traffic Signal Modification Modify intersection and traffic signal. Location: Laguna Boulevard and Laguna Springs Road intersection TBD033 Whitelock Pkwy and W Stockton Blvd Traffic Signal 8 of 50

10 Construction of interim traffic signal. Location: Whitelock Parkway and West Stockton Boulevard intersection TBD034 Whitelock Pkwy and Cosumnes High School Intersection Modifications Intersection modifications. Location: Whitelock Parkway and Cosumnes High School Intersection TBD035 Elk Grove Boulevard/I-5 Southbound Off-Ramp Modify the southbound off-ramp from I-5 to Elk Grove Boulevard to a two-lane exit. Location: Elk Grove Boulevard at I-5, Southbound Off- Ramp TBD036 Elk Grove Boulevard/SR-99 Northbound Auxiliary Lane Construct a northbound auxiliary lane on SR-99 from Elk Grove Boulevard to Laguna Boulevard/Bond Road. Location: SR-99 from Elk Grove Boulevard to Laguna Boulevard/Bond Road. TBD037 Elk Grove Boulevard/SR-99 Eastbound Right Turn Lane Construct eastbound right turn lane on Elk Grove Boulevard to southbound SR-99. Location: Elk Grove Boulevard at SR-99 TBD038 Laguna Boulevard/SR-99 Southbound Off-Ramp Construct free right turn lane from SR-99 southbound offramp to westbound Laguna Boulevard. Location: Laguna Boulevard at SR-99 Southbound Off- Ramp TBD039 Laguna Boulevard/SR-99 Southbound Auxiliary 9 of 50

11 Lane Construct a southbound auxiliary lane on SR-99 from Laguna Boulevard to Elk Grove Boulevard. Location: SR-99, from Laguna Boulevard to Elk Grove Boulevard WAC006 East Stockton Blvd Sidewalk Extension to Elk Grove Park The proposed project will improve pedestrian access and safety along East Stockton Boulevard with construction of frontage (curb, gutter and sidewalk) and drainage improvements along the eastern side of the roadway from the newly constructed soundwall to Elk Grove Regional Park's northern driveway. The project will also provide a walkway to the adjacent Historical Society's Museum parking lot. Location: Along the eastern side of East Stockton Boulevard, approximately 500-feet south of Teresa Way, to Elk Grove Regional Park's northern driveway. WAC008 Southside Avenue Sidewalk The proposed Project will construct improvements to create an accessible path of travel along the south side of Southside Avenue from Elk Grove-Florin Road to Jessie Baker Elementary School. Location: Along the south side of Southside Avenue, between Elk Grove-Florin Road and Jessie Baker Elementary School. WAC009 Elk Grove-Florin Rd at West Camden Sidewalk 10 of 50

12 Infill The proposed project will improve pedestrian access and safety along Elk Grove-Florin Road with construction of approximately 170-feet frontage (curb, gutter and sidewalk) and drainage improvements along the western side of the roadway from West Camden Drive to the existing improvements along the Save Mart Shopping Center. Location: Along the western side of Elk Grove-Florin Road, just south of West Camden Drive. WAC010 Citywide Curb Ramps 2015 This project will remove accessibility barriers to persons using wheelchairs or other personal assistance devices by reconstructing approximately 25 curb ramps to meet current ADA accessibility requirements. Location: This is a city-wide project. WAC011 Citywide Curb Ramps 2016 This project will remove accessibility barriers to persons using wheelchairs or other personal assistance devices by reconstructing approximately 25 curb ramps to meet current ADA accessibility requirements. Location: This is a city-wide project. WAC012 Citywide Curb Ramps 2017 This project will remove accessibility barriers to persons using wheelchairs or other personal assistance devices by reconstructing approximately 25 curb ramps to meet current ADA accessibility requirements. Location: This is a city-wide project. WAC013 Citywide Curb Ramps 2018 This project will remove accessibility barriers to persons using wheelchairs or other personal assistance devices by reconstructing approximately 25 curb ramps to meet 11 of 50

13 current ADA accessibility requirements. Location: This is a city-wide project. WAC014 Citywide Curb Ramps 2019 This project will remove accessibility barriers to persons using wheelchairs or other personal assistance devices by reconstructing approximately 25 curb ramps to meet current ADA accessibility requirements. Location: This is a city-wide project. WAC015 Citywide Curb Ramps This project will remove accessibility barriers to persons using wheelchairs or other personal assistance devices by reconstructing approximately 25 curb ramps to meet current ADA accessibility requirements. Location: This is a city-wide project. WAC016 Sidewalk Infill Elk Grove Florin Rd at Elk Grove Creek The project will construct 125 feet of curb, gutter, and sidewalk south of Strawberry Creek connecting to the existing sidewalk terminus. It will also include 135 feet of AC path on the north side of Strawberry Creek connecting to another adjacent sidewalk terminus Location: East side of Elk Grove Florin Road at Elk Grove Creek crossing WBR001 Bridge Preventative Maintenance Project 2014 The project will provide preventative maintenance of four bridges including joint seal replacement, deck treatment and erosion repair, as well as slope repair in Laguna Creek at Bruceville Road bridge. Location: Four locations at: 1) Bruceville Road bridge over Laguna Creek (south of 12 of 50

14 Sheldon Road); 2) Laguna Boulevard over the Union Pacific Railroad tracks (west of Franklin Boulevard); 3) Elk Grove Boulevard over the Union Pacific Railroad tracks (west of Franklin Blvd); and 4) Sheldon Road over Laguna Creek (east of Waterman Road). WCC002 Civic Center - Aquatics Center This project will consist of construction of a competition aquatics center and attached adventure park. The aquatic center will include an olympic size pool, a ten-meter dive tower and associated seating, meeting rooms, locker rooms, parkings, etc. The adventure park amenities will be determined via a design-build competition between operators and selected by the Council. Location: South of Civic Center Drive and East of Big Horn Blvd. ED-6 Promote policies, programs and services that support a diverse local economy providing a range of goods and services, support existing local businesses, and that encourage new, independent business ventures. LU-1 The City of Elk Grove recognizes the value of using the City s land use authority to regulate the use of land within the city, the uses which can take place upon lands in Elk Grove, the arrangement of public and private buildings, and the design of public and private development in order to create an attractive, vibrant community which fulfills the goals expressed in this General Plan. LU-28 Land uses in the Laguna Ridge Policy Area shall conform with the general layout of land uses shown in Figure LU-5. PTO-1 The City of Elk Grove supports the development, maintenance, and enhancement of parks and trails serving a variety of needs at the neighborhood, area, and citywide level. The City may seek to accomplish the provision of parks and trails in cooperation with the Elk Grove Community Services District. PTO-4 New residential developments may be required to, at a minimum, provide parks consistent with the Quimby Act (CA Govt. Code Section 66477), through land dedication, fees in lieu, or on-site improvements at a standard of five (5) acres of land for parks per 1,000 residents. Land dedication and/or payment of in-lieu fees shall be required consistent with state law. Land dedi cationdedication and/or fees may be required pursuant to other policies in this Element with or without the use of the authority provided in the Quimby Act, or in combination with the Quimby Act and other legal authority. 13 of 50

15 WCC004 Civic Center - Performing Arts Center 36,000 Square Feet building to support Performance Venues of various sizes and types. Location: Civic Center Site - South of Elk Grove Blvd. and East of Big Horn Blvd. ED-6 Promote policies, programs and services that support a diverse local economy providing a range of goods and services, support existing local businesses, and that encourage new, independent business ventures. LU-28 Land uses in the Laguna Ridge Policy Area shall conform with the general layout of land uses shown in Figure LU-5. WCC005 Civic Center - General On-Site Infrastructure General Infrastructure includes: Open Space, Civic Plaza, Common Areas, Bike Lanes, Walking Paths, and on grade Surface Parking. Location: Civic Center Site - South of Elk Grove Blvd. and East of Big Horn Blvd. ED-6 Promote policies, programs and services that support a diverse local economy providing a range of goods and services, support existing local businesses, and that encourage new, independent business ventures. LU-28 Land uses in the Laguna Ridge Policy Area shall conform with the general layout of land uses shown in Figure LU-5. PTO-15 The City views open space lands of all types as important resource which should be preserved in the region, and supports the establishment of multipurpose open space areas to address a variety of needs, including, but not limited to: Maintenance of agricultural uses; Wildlife habitat Recreational open space Aesthetic benefits To the extent possible, lands protected in accordance with this policy should be in proximity to Elk Grove, to facilitate use of these areas by Elk Grove residents, assist in mitigation of habitat loss within the city, and provide an open space resource close to the urbanized areas of Elk Grove Flood control. PTO-4 New residential developments may be required to, at a minimum, provide parks consistent with the Quimby Act (CA Govt. Code Section 66477), through land dedication, fees in lieu, or on-site improvements at a standard of five (5) acres of land for parks per 1,000 residents. Land dedication and/or payment of in-lieu fees shall be required consistent with state law. Land dedication and/or fees may be 14 of 50

16 required pursuant to other policies in this Element with or without the use of the authority provided in the Quimby Act, or in combination with the Quimby Act and other legal authority. WCC006 Civic Center - Athletic Fields and Courts Areas of site left undeveloped by other projects can be utilized for park like fields and courts. Location: Civic Center Site - South of Elk Grove Blvd. and East of Big Horn Blvd. WCC007 Civic Center - Community - Cultural and Art Center 35,000 Square Feet building to support Community events focused on organized cultural and artistic activities of various sizes and types. Location: Civic Center Site - South of Elk Grove Blvd. and East of Big Horn Blvd. WCC008 Civic Center - Discovery Children's Museum 25,000 Square Feet building to provide children with information and learning experiences in a hands-on visually and physically stimulating environment. Location: Civic Center Site - South of Elk Grove Blvd. and East of Big Horn Blvd. Goal 1-2 Outdoor recreation opportunities for all residents. PTO-4 New residential developments may be required to, at a minimum, provide parks consistent with the Quimby Act (CA Govt. Code Section 66477), through land dedication, fees in lieu, or on-site improvements at a standard of five (5) acres of land for parks per 1,000 residents. Land dedication and/or payment of in-lieu fees shall be required consistent with state law. Land dedication and/or fees may be required pursuant to other policies in this Element with or without the use of the authority provided in the Quimby Act, or in combination with the Quimby Act and other legal authority. ED-6 Promote policies, programs and services that support a diverse local economy providing a range of goods and services, support existing local businesses, and that encourage new, independent business ventures. PF-1 Except when prohibited by state law, the City shall require that sufficient capacity in all public services and facilities will be available on time to maintain desired service levels and avoid capacity shortages, traffic congestion, or other negative effects on safety and quality of life. ED-6 Promote policies, programs and services that support a diverse local economy providing a range of goods and services, support existing local businesses, and that encourage new, independent business ventures. LU-28 Land uses in the Laguna Ridge Policy Area shall conform with the general layout of land uses shown in Figure LU of 50

17 WCC009 Civic Center - Public Library 50,000 Square Feet building to provide multi-age related resources for learning using traditional and emerging technologies for knowledge exchange combined with a pleasant environment for study and youth programs. Location: Civic Center Site - South of Elk Grove Blvd. and East of Big Horn Blvd. ED-6 Promote policies, programs and services that support a diverse local economy providing a range of goods and services, support existing local businesses, and that encourage new, independent business ventures. PF-1 Except when prohibited by state law, the City shall require that sufficient capacity in all public services and facilities will be available on time to maintain desired service levels and avoid capacity shortages, traffic congestion, or other negative effects on safety and quality of life. WCC010 Civic Center - Senior Center + Parking 5,000 Square Feet building with on-site parking to provide the second senior venue for offering activities, programs, and opportunities for interactions with other senior community members. Location: Civic Center Site - South of Civic Center Drive and East of Big Horn Blvd. WCC011 Civic Center - Veteran's Hall + Parking 3000 Square Feet building + on-site parking to provide activity programs for Veterans Location: Civic Center Site - South of Civic Center Drive and East of Big Horn Blvd. WCC012 Civic Center - Nature Center 2500 Square Feet building to support environmental education centered on local species, climate, plants, animals, and conditions within the Civic Center site. Location: Civic Center Site - South of Elk Grove Blvd. and East of Big Horn Blvd. ED-6 Promote policies, programs and services that support a diverse local economy providing a range of goods and services, support existing local businesses, and that encourage new, independent business ventures. LU-28 Land uses in the Laguna Ridge Policy Area shall conform with the general layout of land uses shown in Figure LU-5. ED-6 Promote policies, programs and services that support a diverse local economy providing a range of goods and services, support existing local businesses, and that encourage new, independent business ventures. LU-28 Land uses in the Laguna Ridge Policy Area shall conform with the general layout of land uses shown in Figure LU-5. ED-6 Promote policies, programs and services that support a diverse local economy providing a range of goods and services, support existing local businesses, and that encourage new, independent business ventures. LU-28 Land uses in the Laguna Ridge Policy Area shall conform with the general layout of land uses shown in Figure LU-5. PTO-4 New residential developments may be required to, at a minimum, provide parks consistent with the Quimby Act (CA Govt. Code Section 66477), through land dedication, fees in lieu, or on-site improvements at a standard of five (5) acres of land for parks per 1,000 residents. Land dedication and/or payment of in-lieu fees shall be required consistent with state law. Land dedi cationdedication and/or 16 of 50

18 fees may be required pursuant to other policies in this Element with or without the use of the authority provided in the Quimby Act, or in combination with the Quimby Act and other legal authority. WCC013 Civic Center - Playgrounds and Play Equipment Develop play areas within the park areas specifically configured for play equipment and youth activities. Location: Civic Center Site - South of Elk Grove Blvd. and East of Big Horn Blvd. WCC014 Civic Center - Parking Structure 175,000 Square Feet parking structure building to support various projects on the Civic Center site by consolidating parking into a small area and encouraging pedestrian circulation to activities. Location: Civic Center Site - South of Elk Grove Blvd. and East of Big Horn Blvd. WCC016 Civic Center - Hotel & Conference Center ED-6 Promote policies, programs and services that support a diverse local economy providing a range of goods and services, support existing local businesses, and that encourage new, independent business ventures. LU-28 Land uses in the Laguna Ridge Policy Area shall conform with the general layout of land uses shown in Figure LU-5. PTO-4 New residential developments may be required to, at a minimum, provide parks consistent with the Quimby Act (CA Govt. Code Section 66477), through land dedication, fees in lieu, or on-site improvements at a standard of five (5) acres of land for parks per 1,000 residents. Land dedication and/or payment of in-lieu fees shall be required consistent with state law. Land dedi cationdedication and/or fees may be required pursuant to other policies in this Element with or without the use of the authority provided in the Quimby Act, or in combination with the Quimby Act and other legal authority. ED-6 Promote policies, programs and services that support a diverse local economy providing a range of goods and services, support existing local businesses, and that encourage new, independent business ventures. LU-28 Land uses in the Laguna Ridge Policy Area shall conform with the general layout of land uses shown in Figure LU-5. ED-6 Promote policies, programs and services that support a diverse local 17 of 50

19 136,000 Square Feet building to provide overnight accomodationsaccommodations, venue for large events, and general support for other activities planned at the Civic Center Location: Civic Center Site - South of Elk Grove Blvd. and East of Big Horn Blvd. WCC017 Civic Center - Office Building (Private/Public Offices) 50,000 Square Feet building to provide office work environments. Location: Civic Center Site - South of Elk Grove Blvd. and East of Big Horn Blvd. WCE007 Madeira East - East Park The project will construct the Madeira East (east) neighborhood park, which is approximately five acres. Location: North of Whitelock Parkway and west of Lotz Parkway on an unnamed street. WCE008 Oasis Park Phase 1 The project will construct the first phase of Oasis Park, which is approximately 10 acres and includes the initial sports fields, park and plsprayground and parking areas. Location: South of Whitelock Parkway between Brucevillle Rd. and Big Horn Blvd. WCE009 Oasis Park Phase 2 The project will construct the second phase of Oasis Park, which is approximately 10 acres and includes the remaining sports fields, additional parking areas, and main community center. Location: South of Whitelock Parkway between Brucevillle Rd. and Big Horn Blvd. WCE010 Madeira East - Central Park The project will construct the Madeira East Central neighborhood park. economy providing a range of goods and services, support existing local businesses, and that encourage new, independent business ventures. LU-28 Land uses in the Laguna Ridge Policy Area shall conform with the general layout of land uses shown in Figure LU-5. ED-6 Promote policies, programs and services that support a diverse local economy providing a range of goods and services, support existing local businesses, and that encourage new, independent business ventures. LU-28 Land uses in the Laguna Ridge Policy Area shall conform with the general layout of land uses shown in Figure LU-5. PTO-1 The City of Elk Grove supports the development, maintenance, and enhancement of parks and trails serving a variety of needs at the neighborhood, area, and citywide level. The City may seek to accomplish the provision of parks and trails in cooperation with the Elk Grove Community Services District. PTO-1 The City of Elk Grove supports the development, maintenance, and enhancement of parks and trails serving a variety of needs at the neighborhood, area, and citywide level. The City may seek to accomplish the provision of parks and trails in cooperation with the Elk Grove Community Services District. PTO-1 The City of Elk Grove supports the development, maintenance, and enhancement of parks and trails serving a variety of needs at the neighborhood, area, and citywide level. The City may seek to accomplish the provision of parks and trails in cooperation with the Elk Grove Community Services District. PTO-1 The City of Elk Grove supports the development, maintenance, and enhancement of parks and trails serving a variety of needs at the neighborhood, area, and citywide level. The City may seek to accomplish the provision of parks 18 of 50

20 Location: Just south of the intersection of 3 unnamed roads in the center of the Madeira East development area. WCE011 Poppy West Park The project will construct the Poppy West neighborhood park. Location: South of Poppy Ridge Rd. between Bruceville Rd. and Big Horn Blvd. WCE012 Sun Grove Park The project will construct the Sun Grove neighborhood park. Location: East of Big Horn Blvd. between Whitelock Pkwy. and Poppy Ridge Rd. WCE013 Madeira East - Senior Park The project will construct the Senior Madeira neighborhood park. Location: West of Lotz Pkwy. between Whitelock Pkwy. and Poppy Ridge Rd. WDR011 Elk Grove-Florin Rd Culvert Improvements The project involves replacing the existing roadside ditch on the west side of Elk Grove-Florin Road, 750-feet south of Sheldon Road to Whitehouse Creek, with a drainage pipe and replacing the outfall at Whitehouse Creek. Location: Elk Grove-Florin Road, approximately 750-feet south of Sheldon Road to Whitehouse Creek, along the west side. and trails in cooperation with the Elk Grove Community Services District. PTO-1 The City of Elk Grove supports the development, maintenance, and enhancement of parks and trails serving a variety of needs at the neighborhood, area, and citywide level. The City may seek to accomplish the provision of parks and trails in cooperation with the Elk Grove Community Services District. PTO-1 The City of Elk Grove supports the development, maintenance, and enhancement of parks and trails serving a variety of needs at the neighborhood, area, and citywide level. The City may seek to accomplish the provision of parks and trails in cooperation with the Elk Grove Community Services District. PTO-1 The City of Elk Grove supports the development, maintenance, and enhancement of parks and trails serving a variety of needs at the neighborhood, area, and citywide level. The City may seek to accomplish the provision of parks and trails in cooperation with the Elk Grove Community Services District. SA-17 Vehicular access to the buildable area of all parcels must be at or above the 10-year flood elevation. SA-24 Drainage facilities should be properly maintained to ensure their proper operation during storms. 19 of 50

21 WDR013 Sleepy Hollow Detention Basin Retrofit Project The Sleepy Hollow Detention Basin is a 6.3-acres existing detention basin used for flood control. The project would transform this basin into a multi-purpose facility providing flood storage, increasing water quality benefits, enhancing aquatic and upland habitat and recharging the underlying groundwater basin. Location: The detention basin will be retrofitted with this project is located 800 feet south of the intersection of Calvine Road and Vineyard Road. It is bounded on the south by the Laguna Creek tributary and on the west by railroad tracks, which are no longer in service. CAQ-17 The City recognizes the value of naturally vegetated stream corridors, commensurate with flood control and public acceptance, to assist in removal of pollutants, provide native and endangered species habitat and provide community amenities. CAQ-19 Encourage the retention of natural stream corridors, and the creation of natural stream channels where improvements to drainage capacity are required. CAQ-22 Stream crossings shall be minimized and be aesthetically compatible with the natural appearance of the stream channel. The use of bridges and other stream crossings with natural (unpaved) bottoms shall be encouraged to minimize impacts to natural habitat. CAQ-23 Uses in the stream corridors shall be limited to recreation and agricultural uses compatible with resource protection and flood control measures. Roads, parking, and associated fill slopes shall be located outside of the stream corridor, except at stream crossings. CAQ-24 Open space lands within a stream corridor shall be required to be retained as open space as a condition of development approval for projects that include a stream corridor. Unencumbered maintenance access to the stream shall be provided. PTO-15 The City views open space lands of all types as important resource which should be preserved in the region, and supports the establishment of multipurpose open space areas to address a variety of needs, including, but not limited 20 of 50

22 to: Maintenance of agricultural uses; Wildlife habitat Recreational open space Aesthetic benefits To the extent possible, lands protected in accordance with this policy should be in proximity to Elk Grove, to facilitate use of these areas by Elk Grove residents, assist in mitigation of habitat loss within the city, and provide an open space resource close to the urbanized areas of Elk Grove Flood control. WDR017 Strawberry Creek Detention Basin Retrofit Project This project will modify an existing 9.3 acre flood detention basin using low impact development techniques such as the development of perennial channels to treat summer irrigation flows, seasonal wetland areas to treat large storm flows and winter runoff, and habitat creation of riparian clusters. The basin will also be used to increase groundwater recharge from stormwater runoff and provide recreational/aesthetic opportunities to the area. Location: South of Calvine Road and west of Mountain Bell Court, near Edward Harris Middle School. CAQ-17 The City recognizes the value of naturally vegetated stream corridors, commensurate with flood control and public acceptance, to assist in removal of pollutants, provide native and endangered species habitat and provide community amenities. CAQ-19 Encourage the retention of natural stream corridors, and the creation of natural stream channels where improvements to drainage capacity are required. CAQ-22 Stream crossings shall be minimized and be aesthetically compatible with the natural appearance of the stream channel. The use of bridges and other stream crossings with natural (unpaved) bottoms shall be encouraged to minimize impacts to natural habitat. CAQ-23 Uses in the stream corridors shall be limited to recreation and agricultural uses compatible with resource protection and flood control measures. Roads, parking, and associated fill slopes shall be located outside of the stream corridor, except at stream crossings. CAQ-24 Open space lands within a stream corridor shall be required to be retained as open space as a condition of development approval for projects that include a stream corridor. Unencumbered maintenance access to the stream shall be provided. PTO-15 The City views open space lands of all types as important resource which should be preserved in the region, and supports the establishment of multipurpose open space areas to address a variety of needs, including, but not limited 21 of 50

23 to: Maintenance of agricultural uses; Wildlife habitat Recreational open space Aesthetic benefits To the extent possible, lands protected in accordance with this policy should be in proximity to Elk Grove, to facilitate use of these areas by Elk Grove residents, assist in mitigation of habitat loss within the city, and provide an open space resource close to the urbanized areas of Elk Grove Flood control. WDR018 Laguna Crk & Whitehouse Crk Multi-Functional Corridor Project This project will preserve, rehabilitate and enhance Laguna and Whitehouse Creeks and adjacent wetlands while at the same time improving flood storage capacity; and develop and link a disconnected section of the Laguna Creek trail system. The location of the project is a 2.2 mile reach along the confluence of the Laguna and Whitehouse Creeks. The project area would cover a portion of an 90- acre undeveloped area, currently owned by East Lawn Cemetery, which is east of State Route 99 and a section along the Laguna Creek and the bypass channel northwest of State Route 99 to the City's boundary. CAQ-17 The City recognizes the value of naturally vegetated stream corridors, commensurate with flood control and public acceptance, to assist in removal of pollutants, provide native and endangered species habitat and provide community amenities. CAQ-19 Encourage the retention of natural stream corridors, and the creation of natural stream channels where improvements to drainage capacity are required. CAQ-22 Stream crossings shall be minimized and be aesthetically compatible with the natural appearance of the stream channel. The use of bridges and other stream crossings with natural (unpaved) bottoms shall be encouraged to minimize impacts to natural habitat. CAQ-23 Uses in the stream corridors shall be limited to recreation and agricultural uses compatible with resource protection and flood control measures. Roads, parking, and associated fill slopes shall be located outside of the stream corridor, except at stream crossings. CAQ-24 Open space lands within a stream corridor shall be required to be retained as open space as a condition of development approval for projects that include a stream corridor. Unencumbered maintenance access to the stream shall be provided. PTO-15 The City views open space lands of all types as important resource which should be preserved in the region, and supports the establishment of multipurpose open space areas to address a variety of needs, including, but not limited 22 of 50

24 to: Maintenance of agricultural uses; Wildlife habitat Recreational open space Aesthetic benefits To the extent possible, lands protected in accordance with this policy should be in proximity to Elk Grove, to facilitate use of these areas by Elk Grove residents, assist in mitigation of habitat loss within the city, and provide an open space resource close to the urbanized areas of Elk Grove Flood control. WDR021 Elk Grove Creek Multi-Functional Creek Improvements The project will provide additional flood storage capacity to alleviate high flows in Elk Grove Creek during heavy storm events. In addition, the design will incorporate riparian planting to enhance habitat for native species. The City plans to incorporate various design strategies to improve water quality at this site. Location: East of SR-99 and north of East Stockton Boulevard adjacent to Elk Grove Creek. CAQ-17 The City recognizes the value of naturally vegetated stream corridors, commensurate with flood control and public acceptance, to assist in removal of pollutants, provide native and endangered species habitat and provide community amenities. CAQ-19 Encourage the retention of natural stream corridors, and the creation of natural stream channels where improvements to drainage capacity are required. CAQ-22 Stream crossings shall be minimized and be aesthetically compatible with the natural appearance of the stream channel. The use of bridges and other stream crossings with natural (unpaved) bottoms shall be encouraged to minimize impacts to natural habitat. CAQ-23 Uses in the stream corridors shall be limited to recreation and agricultural uses compatible with resource protection and flood control measures. Roads, parking, and associated fill slopes shall be located outside of the stream corridor, except at stream crossings. CAQ-24 Open space lands within a stream corridor shall be required to be retained as open space as a condition of development approval for projects that include a stream corridor. Unencumbered maintenance access to the stream shall be provided. PTO-15 The City views open space lands of all types as important resource which should be preserved in the region, and supports the establishment of multipurpose open space areas to address a variety of needs, including, but not limited 23 of 50

25 to: Maintenance of agricultural uses; Wildlife habitat Recreational open space Aesthetic benefits To the extent possible, lands protected in accordance with this policy should be in proximity to Elk Grove, to facilitate use of these areas by Elk Grove residents, assist in mitigation of habitat loss within the city, and provide an open space resource close to the urbanized areas of Elk Grove Flood control. WDR023 North Camden Dr Storm Drain Improvements This project will upsize approximately 750 feet of existing storm drain pipe. Location: North Camden Drive and Springhurst Drive from Hollybrook Court to the outfall at Whitehouse Creek. WDR024 Emerald Vista Dr Storm Drain Improvements This project upsizes the existing storm drain pipe to reduce the risk of potential flooding. Location: Emerald Vista Drive from Tipton Court to the outfall at Elk Grove Creek SA-17 Vehicular access to the buildable area of all parcels must be at or above the 10-year flood elevation. SA-24 Drainage facilities should be properly maintained to ensure their proper operation during storms. SA-17 Vehicular access to the buildable area of all parcels must be at or above the 10-year flood elevation. SA-24 Drainage facilities should be properly maintained to ensure their proper operation during storms. 24 of 50

26 WDR026 Sheldon Rd Ditch Improvements This project provides improvements to the existing ditch system. This project also includes the installation of a multi-use trail system along the existing frontage over the existing ditch. Location: Along Sheldon Road, from Waterman Road to Grant Line Road CAQ-17 The City recognizes the value of naturally vegetated stream corridors, commensurate with flood control and public acceptance, to assist in removal of pollutants, provide native and endangered species habitat and provide community amenities. CAQ-19 Encourage the retention of natural stream corridors, and the creation of natural stream channels where improvements to drainage capacity are required. CAQ-22 Stream crossings shall be minimized and be aesthetically compatible with the natural appearance of the stream channel. The use of bridges and other stream crossings with natural (unpaved) bottoms shall be encouraged to minimize impacts to natural habitat. CAQ-23 Uses in the stream corridors shall be limited to recreation and agricultural uses compatible with resource protection and flood control measures. Roads, parking, and associated fill slopes shall be located outside of the stream corridor, except at stream crossings. CAQ-24 Open space lands within a stream corridor shall be required to be retained as open space as a condition of development approval for projects that include a stream corridor. Unencumbered maintenance access to the stream shall be provided. PTO-15 The City views open space lands of all types as important resource which should be preserved in the region, and supports the establishment of multipurpose open space areas to address a variety of needs, including, but not limited 25 of 50

27 to: Maintenance of agricultural uses; Wildlife habitat Recreational open space Aesthetic benefits To the extent possible, lands protected in accordance with this policy should be in proximity to Elk Grove, to facilitate use of these areas by Elk Grove residents, assist in mitigation of habitat loss within the city, and provide an open space resource close to the urbanized areas of Elk Grove Flood control. WDR027 Shed C Multi-Functional Corridor Improvements This project is to perform various technical studies only. The studies will recommend design strategies to replace the existing channel with a multi-functional storm drainage and flood control corridor that will provide a number of benefits including flood control, wildlife habitat, wetlands, recreation, and stormwater quality treatment. Location: Along Shed C through the Southeast Planning Area, from Lotz Parkway to Bruceville Road. CAQ-17 The City recognizes the value of naturally vegetated stream corridors, commensurate with flood control and public acceptance, to assist in removal of pollutants, provide native and endangered species habitat and provide community amenities. CAQ-19 Encourage the retention of natural stream corridors, and the creation of natural stream channels where improvements to drainage capacity are required. CAQ-22 Stream crossings shall be minimized and be aesthetically compatible with the natural appearance of the stream channel. The use of bridges and other stream crossings with natural (unpaved) bottoms shall be encouraged to minimize impacts to natural habitat. CAQ-23 Uses in the stream corridors shall be limited to recreation and agricultural uses compatible with resource protection and flood control measures. Roads, parking, and associated fill slopes shall be located outside of the stream corridor, except at stream crossings. CAQ-24 Open space lands within a stream corridor shall be required to be retained as open space as a condition of development approval for projects that include a stream corridor. Unencumbered maintenance access to the stream shall be provided. PTO-15 The City views open space lands of all types as important resource which should be preserved in the region, and supports the establishment of multipurpose open space areas to address a variety of needs, including, but not limited 26 of 50

28 to: Maintenance of agricultural uses; Wildlife habitat Recreational open space Aesthetic benefits To the extent possible, lands protected in accordance with this policy should be in proximity to Elk Grove, to facilitate use of these areas by Elk Grove residents, assist in mitigation of habitat loss within the city, and provide an open space resource close to the urbanized areas of Elk Grove Flood control. WDR028 PUMP STATION IMPROVEMENTS - A EvaluteEvaluate the condition and life cycle of various systems used to control and communicate the condition of pump station equipment. Determine when replacement is needed and implement replace of control equipment. Location: All six City Pump Stations WDR029 PUMP STATION IMPROVEMENTS - B This project will provide a master plan for upgrades of existing storm drain pump station sites and construct building(s), operational site improvements, security and improvements. Location: All 6 pump stations. WFC005 Multi Modal Station Construct a new 600' long passenger loading platform adjacent to UPRR, a parking lot for about 100 vehicles, drop off/loading zones for passengers and buses, a new signal at intersection of Elk Grove Florin Road entrance, a new bicycle and pedestrian trail with a new railroad undercrossing adjacent to White House Creek. Location: In the triangle of land bounded by Elk Grove Florin Road on the east, Union Pacific Railroad tracks on SA-24 Drainage facilities should be properly maintained to ensure their proper operation during storms. SA-24 Drainage facilities should be properly maintained to ensure their proper operation during storms. CAQ-26 It is the policy of the City of Elk Grove to minimize air pollutant emissions from all City facilities and operations to the extent feasible and consistent with the City s need to provide a high level of public service. PTO-7 The trails system in Elk Grove should provide for connectivity, so that all trails are linked to the extent possible for greater use as recreational and travel 27 of 50

Memorandum. To: From: cc: Date: November 7, Re: 1.0 Purpose and Organization of this Addendum. 2.0 Project Description

Memorandum. To: From: cc: Date: November 7, Re: 1.0 Purpose and Organization of this Addendum. 2.0 Project Description Memorandum To: From: cc: Laura Prickett, Horizon Water and Environment Analette Ochoa and Wana Chiu, WRECO Parag Mehta, Kimley Horn Date: November 7, 2017 Re: Santa Cruz Route 1 Tier I and Tier II HOV

More information

CITY OF PALMDALE. REPORT to the Mayor and Members of the City Council from the City Manager

CITY OF PALMDALE. REPORT to the Mayor and Members of the City Council from the City Manager .. CITY OF PALMDALE REPORT to the Mayor and Members of the City Council from the City Manager DATE: SUBJECT: June 1, 2016 Approval of City of Palmdale's 2016 Ten-Year Capital Improvement Plan ISSUING DEPARTMENT:

More information

1.0 Purpose and Organization of the Community Impact Assessment Addendum

1.0 Purpose and Organization of the Community Impact Assessment Addendum Memorandum To: From: cc: Laura Prickett, Horizon Water and Environment Carie Montero, Senior Project Manager/Environmental Lead, Parsons Transportation Group Parag Mehta, Kimley Horn Date: September 24,

More information

Capital Improvement Program Fiscal Year

Capital Improvement Program Fiscal Year Capital Improvement Program Fiscal Year 2013-2014 Tustin City Council Mayor Al Murray Mayor Pro Tem Charles E. Chuck Puckett Council Members John Nielsen Rebecca Beckie Gomez Allan Bernstein CITY OF TUSTIN

More information

November 21, 2012 Barbara Kelleher, (954)

November 21, 2012 Barbara Kelleher, (954) November 21, 2012 Barbara Kelleher, (954) 777-4090 barbara.kelleher@dot.state.fl.us BROWARD COUNTY TRAFFIC IMPACT REPORT November 26 to November 30, 2012 FORT LAUDERDALE -- Construction and maintenance-related

More information

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY March 19, 2018 AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY TYPE OF ITEM: Action STATEMENT OF ISSUE The Wakulla Environmental Institute (WEI) Trail is one of several trails

More information

CITY OF PALMDALE. REPORT to the Mayor and Members of the City Council from the City Manager

CITY OF PALMDALE. REPORT to the Mayor and Members of the City Council from the City Manager CITY OF PALMDALE REPORT to the Mayor and Members of the City Council from the City Manager DATE: SUBJECT: June 4, 2014 Approval of City of Palmdale's 2014 Ten-Year Capital Improvement Plan ISSUING DEPARTMENT:

More information

THREE MILE PLAN TOWN OF SUPERIOR COLORADO

THREE MILE PLAN TOWN OF SUPERIOR COLORADO THREE MILE PLAN TOWN OF SUPERIOR COLORADO February 23, 2015 INTRODUCTION This document has been prepared by the Town of Superior, Colorado, to address the existing and proposed land uses within an approximate

More information

Palm Beach County Traffic Report July 13 through July 20, 2012

Palm Beach County Traffic Report July 13 through July 20, 2012 For Immediate Release July 13, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report July 13 through July 20, 2012 Palm Beach County Palm Beach County traffic will be

More information

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015 From: Kathleen Dempsey To: Kathleen Dempsey Subject: FDOT Treasure Coast Traffic Report 10 09 15 through 10 16 15 Date: Friday, October 09, 2015 2:10:36 PM Attachments: image003.png CR 714_Median Construction

More information

APPENDIX F List of Commitments

APPENDIX F List of Commitments APPENDIX F List of Commitments s Table F.1 Standard Mitigation Measures Mitigation Measure MnDOT Specification Number Status Update Description Status Update Utilities Provide early notice to utility operators

More information

SOUTH INTERCHANGE AREA

SOUTH INTERCHANGE AREA Santaquin City General Plan 1 Location and Characteristics The South Interchange Area of Santaquin is located west of Interstate 15 and south of 500 South (Figure 1). It includes properties already annexed

More information

FDOT Treasure Coast Traffic Report through

FDOT Treasure Coast Traffic Report through FDOT Treasure Coast Traffic Report 02 26 16 through 03 04 16 Kathleen Dempsey Fri 2/26/2016 2:56 PM To:Kathleen Dempsey ; 1 attachment 355 KB CR 714_Median Access Modifications.pdf;

More information

A. CONCLUSIONS OF THE FGEIS

A. CONCLUSIONS OF THE FGEIS Chapter 11: Traffic and Parking A. CONCLUSIONS OF THE FGEIS The FGEIS found that the Approved Plan will generate a substantial volume of vehicular and pedestrian activity, including an estimated 1,300

More information

Clackamas County Development Agency

Clackamas County Development Agency Clackamas County Development Agency Development Services Building, 150 Beavercreek Rd., Oregon City, OR 97045 www.clackamas.us/transportation/renewal 503-742-4323 The Clackamas County Board of Commissioners

More information

Blue River Trail Master Plan JSA to Town Hall June 2004

Blue River Trail Master Plan JSA to Town Hall June 2004 Blue River Trail Master Plan JSA to Town Hall June 2004 Prepared for: Silverthorne Town Council Silverthorne SPORT Committee Department of Recreation and Culture Silverthorne Public Works Silverthorne

More information

Gardner: overview. Santa Fe, Oregon, and California National Historic Trails UNINCORPORATED JOHNSON COUNTY OLATHE UNINCORPORATED JOHNSON COUNTY

Gardner: overview. Santa Fe, Oregon, and California National Historic Trails UNINCORPORATED JOHNSON COUNTY OLATHE UNINCORPORATED JOHNSON COUNTY Santa Fe, Oregon, and California ational Historic Trails : overview 99: p.134 100: p.135 GARDER JUCTIO 102: p.137 56: p.126 EDGERTO Burlington orthern Intermodal and Logistics 98: p.133 101: p.136 S Waverly

More information

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016 March 25, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016 TREASURE COAST Construction and maintenance-related

More information

Rule Governing the Designation and Establishment of All-Terrain Vehicle Use Trails on State Land

Rule Governing the Designation and Establishment of All-Terrain Vehicle Use Trails on State Land Rule Governing the Designation and Establishment of All-Terrain Vehicle Use Trails on State Land 1.0 Authority 1.1 This rule is promulgated pursuant to 23 V.S.A. 3506. Section 3506 (b)(4) states that an

More information

COMMENT PERIOD INTRODUCTION

COMMENT PERIOD INTRODUCTION To: Interested Persons From: Tom Buford File: Del Rio Trail Project Date: June 8, 2018 Community Development Department Reference: NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT FOR THE DEL RIO

More information

SUMMER VILLAGE OF SILVER SANDS. Municipal Development Plan

SUMMER VILLAGE OF SILVER SANDS. Municipal Development Plan SUMMER VILLAGE OF SILVER SANDS Municipal Development Plan Bylaw 253-2014 Adopted August 22, 2014 Summer Village of Silver Sands Municipal Development Plan Bylaw No. 253-2014 Page 2 1 INTRODUCTION 1.1 SETTING

More information

Non-Motorized Transportation

Non-Motorized Transportation Non-Motorized Transportation Non-motorized facilities are important components to the transportation system. They provide an environmentally-friendly, low-cost mode of travel. Some of the facilities can

More information

Appendix 4.1 L. No-Build Project Descriptions

Appendix 4.1 L. No-Build Project Descriptions Appendix 4.1 L No-Build Project Descriptions No-Build Projects New Bedford A new traffic signal system was installed and activated in early 2009 at the intersection of King s Highway and Mount Pleasant

More information

FY Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars

FY Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars FY2016-2020 Regional Transportation Improvement Program Basic Project List () All costs in current dollars Project Name Key # Year Project Cost 10th Avenue Bridge, Caldwell 13055 2018 $1,367 10th Avenue

More information

CHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS

CHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS CHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS NORTH CENTRAL CAC AREA LITTLE VALLEY ROAD TO JUG HANDLE CREEK PLANNING AREA This planning area includes Cleone, Noyo,

More information

EAST DON TRAIL ENVIRONMENTAL ASSESSMENT. Community Liaison Committee Meeting #3 July 15, :30 to 8:30 pm Flemingdon Park Library

EAST DON TRAIL ENVIRONMENTAL ASSESSMENT. Community Liaison Committee Meeting #3 July 15, :30 to 8:30 pm Flemingdon Park Library EAST DON TRAIL ENVIRONMENTAL ASSESSMENT Community Liaison Committee Meeting #3 July 15, 2013 6:30 to 8:30 pm Flemingdon Park Library Agenda 1. Welcome 2. Housekeeping and Updates a) Housekeeping b) CLC

More information

A. From I-68 in Monongalia County, West Virginia to SR 6119 in Fayette County, Pennsylvania 1

A. From I-68 in Monongalia County, West Virginia to SR 6119 in Fayette County, Pennsylvania 1 Mon-Fayette Transportation Project A. From I-68 in Monongalia County, West Virginia to SR 6119 in Fayette County, Pennsylvania 1 The Mon/Fayette Transportation Project (MFTP) from I-68 in West Virginia

More information

Transportation TRANSPORTATION PROJECTS

Transportation TRANSPORTATION PROJECTS Transportation TRANSPORTATION PROJECTS Balls Ford Road Interchange Total Project Cost $142.9M This project includes the construction of a new diverging diamond interchange at Route 234 Bypass (Prince William

More information

SAN RAFAEL City Council January 20, 2015

SAN RAFAEL City Council January 20, 2015 SONOMA MARIN AREA RAIL TRANSIT SMART CENTRAL SAN RAFAEL STATUS UPDATE SAN RAFAEL City Council January 20, 2015 CENTRAL SAN RAFAEL SMART SOUTH OF PUERTO SUELLO TUNNEL 1. Active Construction 2. Construction

More information

EXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015

EXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015 EXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015 35EXPRESS PROJECT OVERVIEW 2 SEGMENT 1 3 SOUTH OF I-635 May Shift northbound mainlane traffic east in the southeast quadrant Miscellaneous frontage

More information

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MCPB Item No. Date: 6/23/2016 Lucy V. Barnsley Elementary School Addition, Mandatory Referral MR2016027

More information

Blueways: Rivers, lakes, or streams with public access for recreation that includes fishing, nature observation, and opportunities for boating.

Blueways: Rivers, lakes, or streams with public access for recreation that includes fishing, nature observation, and opportunities for boating. Parks, Open Space and Trails PRINCE WILLIAM COUNTY 2008 COMPREHENSIVE PLAN TRAILS PLAN CONTENTS The components of the trails plan are: Intent Definitions Goals, Policies, and Action Strategies Trails Map

More information

Palm Beach County Traffic Report August 24 through August 31, 2012

Palm Beach County Traffic Report August 24 through August 31, 2012 For Immediate Release August 24, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report August 24 through August 31, 2012 Palm Beach County Palm Beach County traffic will

More information

SR 934 Project Development And Environment (PD&E) Study

SR 934 Project Development And Environment (PD&E) Study SR 934 Project Development And Environment (PD&E) Study Project Advisory Group Meeting March 1, 2018 State Road 934/NE/NW 79th Street from west of I-95 (NW 13th CT) to N. Bayshore Drive PD&E STUDY SR 934/NE/NW

More information

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014 April 4, 2014 Chuck McGinness, 954-777-4090 Chuck.McGinness@dot.state.fl.us FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014 TREASURE COAST Construction and maintenance-related lane closures

More information

Northeast Quadrant Distinctive Features

Northeast Quadrant Distinctive Features NORTHEAST QUADRANT Northeast Quadrant Distinctive Features LAND USE The Northeast Quadrant includes all the area within the planning area that is east of Interstate 5 and to the north of State Route 44.

More information

Concord Road Interchange. Standard hours of work

Concord Road Interchange. Standard hours of work Artist impression of the Concord Road interchange, Concord - concept only WestConnex s M4 East will extend the M4 Motorway with two new 5.5 kilometre tunnels from Homebush to Haberfield, providing a bypass

More information

Basic Project Information

Basic Project Information FY 2015-16 PROJECT DESCRIPTION FORM (2C) Submitting Agency: Loudoun County Basic Project Information Project Title: Loudoun County Parkway (VA Route 607) U.S. 50 to Creighton Rd. (2C) Project Type (check

More information

EXECUTIVE SUMMARY FALL Introduction. Findings

EXECUTIVE SUMMARY FALL Introduction. Findings EXECUTIVE SUMMARY FALL 2004 Introduction Trails are one of the most popular and highly desirable recreational resources in communities of all sizes throughout the country. In addition to providing a safe

More information

Chuckanut Ridge Fairhaven Highlands EIS Scoping Concerns

Chuckanut Ridge Fairhaven Highlands EIS Scoping Concerns Chuckanut Ridge Fairhaven Highlands EIS Scoping Concerns Coalition of Southside Neighborhoods CSN Comments for Fairhaven Highlands EIS Scope Hearing, Jan 16, 2008 1 Chuckanut Ridge Hilly Terrain: Potential

More information

Fair Park Comprehensive Development Plan Update. City Council Briefing November 5, 2007

Fair Park Comprehensive Development Plan Update. City Council Briefing November 5, 2007 1 Fair Park Comprehensive Development Plan Update City Council Briefing November 5, 2007 Introduction Park and Recreation Department Renaissance Plan focused on eight Big Moves: Upgrade current parks Provide

More information

AGENCY NAME TRANSPORTATION

AGENCY NAME TRANSPORTATION TRANSPORTATION TRANSPORTATION AGENCY NAME Prince William County FY 2015 BUDGET CIP-TRANSPORTATION 561 Fuller Road/Fuller Heights Road Improvements Total Project Cost - $4.4 M This project will widen Fuller

More information

University Region Non-Motorized Plan 2015

University Region Non-Motorized Plan 2015 Non-Motorized Transportation Non-motorized facilities are important components to the transportation system. They provide an environmentally-friendly, low-cost mode of travel. Some of the facilities can

More information

Header i

Header i Header i 048285014.10 Header Sub Title Body Text here. Body text here. Body text here. Section 1... 1 Executive Summary... 1 Opportunities and Constraints... 3 Overall Opportunities and Constraints Map

More information

State Route 8 Corridor. Northern Summit County s Path to Success

State Route 8 Corridor. Northern Summit County s Path to Success State Route 8 Corridor Northern Summit County s Path to Success Construction Guide: 2008-2009 State Route 8 corridor work description State Route 8 Corridor 10 projects $262 million With its close proximity

More information

Route 29 Solutions Projects

Route 29 Solutions Projects Your guide to the Route 29 Solutions Projects For full details & continued engagement please visit www.route29solutions.org The Route 29 Solutions Package is a $230 million investment into the improvement

More information

The Baker/Carver Regional Trail is intended to

The Baker/Carver Regional Trail is intended to Section V Design Guidance The Baker/Carver Regional Trail is intended to safely accommodate 183,000 annual visits, an array of non-motorized uses, a variety of skill levels, and persons with special needs.

More information

Springettsbury Township. Road Improvement Projects

Springettsbury Township. Road Improvement Projects Springettsbury Township Road Improvement Projects 2009 2016 2016 Township Road Improvement Projects Springettsbury Township is divided into the following 4 Sectors: Northwest Sector Sherman Street Route

More information

APPENDIX OFFICIAL MAP ORDINANCE OF HAMILTONBAN TOWNSHIP OFFICIAL MAP NARRATIVE

APPENDIX OFFICIAL MAP ORDINANCE OF HAMILTONBAN TOWNSHIP OFFICIAL MAP NARRATIVE APPENDIX A OFFICIAL MAP ORDINANCE OF HAMILTONBAN TOWNSHIP OFFICIAL MAP NARRATIVE INTRODUCTION: The Official Map of Hamiltonban Township has been prepared to identify those lands and features that Hamiltonban

More information

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No.

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No. Georgetown-Lewes Rail/Trail Study Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No. 47) August 22, 2011 Presentation Outline Background Benefits Statewide

More information

COMMUNITY MEETING NOVEMBER 1, Wheaton Regional Park Pine Lake Trail

COMMUNITY MEETING NOVEMBER 1, Wheaton Regional Park Pine Lake Trail COMMUNITY MEETING NOVEMBER 1, 2012 MEETING AGENDA I. Introduction of Project Team II. Trail Renovation Process III. Wheaton Regional Park IV. Pine Lake Trail Renovation Project V. Comments and Questions

More information

Ditch flows slowly to the north

Ditch flows slowly to the north Ditch flows slowly to the north Photo 1. Wetland DE: Looking west across Wetland DE from upslope. Ponded water, mucky mineral soils, and patches of emergent vegetation observed. Wetland DE appears to be

More information

Site Location and Setting

Site Location and Setting Memorandum Date: To: From: Subject: Kristy Le, Gary Black Steve Orem Santa Teresa County Park Historic Area Traffic and Parking Study Hexagon Transportation Consultants, Inc. has completed a traffic and

More information

Agenda Report. Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer

Agenda Report. Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer Agenda Report Subject: Prepared By: Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer Steven M. Saunders, Director of Public Works/Village Engineer Date: August 12, 2012 On March 8, 2012

More information

RIO VISTA MUNICIPAL AIRPORT

RIO VISTA MUNICIPAL AIRPORT DRAINAGE TECHNICAL MEMORANDUM RIO VISTA MUNICIPAL AIRPORT RIO VISTA, CALIFORNIA Prepared for: City of Rio Vista 1 Main Street Rio Vista, CA 94571 (707) 374-5337 Prepared by: August 2012 Copyright 2012

More information

Bear Creek Habitat Improvement Project

Bear Creek Habitat Improvement Project 06/10/10 Bear Creek Habitat Improvement Project El Paso County, Colorado Pike National Forest and Colorado Springs Utilities Owned Land Report prepared by: Eric Billmeyer Executive Director Rocky Mountain

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report July 7, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report July 7 through July 14, 2017 TREASURE COAST Construction and maintenance related lane

More information

Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd

Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd Project ID SOA07003 Department State of Alaska Project Type Improvement Start Date December 2017 Location Assembly: Section 4, Seats F & G, Assembly:

More information

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street STAFF REPORT ACTION REQUIRED Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street Date: March 12, 2007 To: From: Toronto and East York Community Council Director, Transportation Infrastructure

More information

MEMORANDUM. Honorable Mayor and City Councilmembers William S. Joynes, Sr., City Administrator

MEMORANDUM. Honorable Mayor and City Councilmembers William S. Joynes, Sr., City Administrator AGENDA ITEM 1A MEMORANDUM DATE: January 17, 2017 TO: FROM: SUBJECT: Honorable Mayor and City Councilmembers William S. Joynes, Sr., City Administrator Sue Polka, Interim Asst. Public Works Director/City

More information

Hospital Link Project Project Update Winter 2018

Hospital Link Project Project Update Winter 2018 Hospital Link Project Project Update Winter 2018 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction of the Hospital Link facility is open

More information

Construction Update. ODOT District Two Construction Update. For Immediate Release Thursday, October 18, Lucas County

Construction Update. ODOT District Two Construction Update. For Immediate Release Thursday, October 18, Lucas County Construction Update Contact: The District Two Public Information Office at (419) 373-4428 or email D02.PIO@dot.ohio.gov For Immediate Release Thursday, October 18, 2018 ODOT District Two Construction Update

More information

Welcome KROSNO CREEK DIVERSION PROJECT CLASS ENVIRONMENTAL ASSESSMENT

Welcome KROSNO CREEK DIVERSION PROJECT CLASS ENVIRONMENTAL ASSESSMENT Welcome KROSNO CREEK DIVERSION PROJECT PUBLIC INFORMATION CENTRE # 1 Tonight s Presentation Study Overview Background Existing Conditions Alternative Solutions Preliminary Preferred Solution Next Steps

More information

May 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015

May 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015 May 1, 2015 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report May 1 through May 8, 2015 Palm Beach County Palm Beach County traffic will be affected this week by ongoing

More information

5.1 Traffic and Transportation

5.1 Traffic and Transportation 5.1 When it opens in 2009, the Bellevue Nickel Improvement Project will increase the number of vehicles able to travel through the study area, improve travel speeds, and improve safety by reducing the

More information

Progress Report for Projects of Regional Significance

Progress Report for Projects of Regional Significance Rosedale Highway facing west January 2017 What s Inside? Kern Council of Governments Progress Report for Projects of Regional Significance EDITION Status Information on: Safety & Maintenance...this section

More information

Part Three : COMMUNITY PLAN AREAS AND SPECIAL STUDY AREAS SACRAMENTO 2030 GENERAL PLAN. Introduction

Part Three : COMMUNITY PLAN AREAS AND SPECIAL STUDY AREAS SACRAMENTO 2030 GENERAL PLAN. Introduction Special study Areas Part Three : COMMUNITY PLAN AREAS AND SPECIAL STUDY AREAS SACRAMENTO 2030 GENERAL PLAN Introduction Beyond the boundaries of the 2030 General Plan, the City has defined Special Study

More information

City of Haslett. City of East Lansing. City of East Lansing

City of Haslett. City of East Lansing. City of East Lansing Central Park North (Nancy L. Moore Park) Lake Park North Expansion White Park Expansion #2 White Park Expansion #1 County East East Haslett East East TF87-212 Acquisition $90,000.00 Park. TF08-138 Acquisition

More information

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 June 19, 2015 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 TREASURE COAST Construction and maintenance-related lane

More information

CHAPTER 9. PARKS, RECREATION, TRAILS AND NATURAL AREA RESOURCES

CHAPTER 9. PARKS, RECREATION, TRAILS AND NATURAL AREA RESOURCES CHAPTER 9. PARKS, RECREATION, TRAILS AND NATURAL AREA RESOURCES The forms of recreation chosen by residents and visitors in the CBJ are as diverse as the population. Many people choose to recreate in developed

More information

Procedure for the Use of Power-Driven Mobility Devices on Mass Audubon Sanctuaries 1 September 17, 2012

Procedure for the Use of Power-Driven Mobility Devices on Mass Audubon Sanctuaries 1 September 17, 2012 Procedure for the Use of Power-Driven Mobility Devices on Mass Audubon Sanctuaries 1 September 17, 2012 Background As part of Mass Audubon s mission to preserve the nature of Massachusetts for people and

More information

Cell: (408) Release MA June 25, 2012

Cell: (408) Release MA June 25, 2012 VTA NEWS CONTACT: Bernice Alaniz FOR IMMEDIATE RELEASE Cell: (408) 888-9983 Release MA 12 06 08 Bernice.Alaniz@vta.org June 25, 2012 Construction Activities Underway For BART Silicon Valley The Santa Clara

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report July 22, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report July 22 through July 29, 2016 TREASURE COAST Construction and maintenance-related lane

More information

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) TDD (651)

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) TDD (651) METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN 55101 Phone (651) 602 1000 TDD (651) 291 0904 DATE: June 19, 2007 TO: Metropolitan Parks and Open Space Commission FROM: Jan Youngquist, Senior

More information

Southwest Quadrant Distinctive Features

Southwest Quadrant Distinctive Features SOUTHWEST QUADRANT Southwest Quadrant Distinctive Features LAND USE The 31.17 square mile Southwest Quadrant includes all the area within the planning area west of I-5 and south of the Sacramento River.

More information

A VISION FOR EL MIRAGE

A VISION FOR EL MIRAGE el mirage A VISION FOR EL MIRAGE OASIS, ARIZONA A thriving desert jewel destination with a strong arts district, high-wage employment parks system joined together by cohesive, multi-use accessible trails

More information

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT December 2018 Project Summary Boulder County, Colorado, in partnership with the City of Boulder, is evaluating options for multi-use

More information

SOUTHEAST BOULEVARD Planning Study Washington, DC. Progress Drawings October 6, 2014

SOUTHEAST BOULEVARD Planning Study Washington, DC. Progress Drawings October 6, 2014 Existing Conditions Site Plan CONGRESSIONAL CEMETERY SOUTHEAST BOULEVARD Planning Study Concept A (formerly A-1) Site Plan Concept A (formerly A-1) Concept A proposes an expansion of the Capitol Hill neighborhood

More information

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015 EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015 1 SEGMENT 1 2 THE WISHBONE Connects the TEXpress Managed Toll System to the 35Express Managed Toll System Limits: Crown Road (near Royal Lane) to Valley

More information

LYNDHURST NEW URBAN DEVELOPMENT AREA STRUCTURE PLAN. Lyndhurst New Urban Development Area Structure Plan OUTCOMES AND PERFORMANCE STANDARDS

LYNDHURST NEW URBAN DEVELOPMENT AREA STRUCTURE PLAN. Lyndhurst New Urban Development Area Structure Plan OUTCOMES AND PERFORMANCE STANDARDS APPENDIX 15.1-3 LYNDHURST NEW URBAN DEVELOPMENT AREA STRUCTURE PLAN Purpose of the Structure Plan Lyndhurst New Urban Development Area Structure Plan OUTCOMES AND PERFORMANCE STANDARDS LSP-P1 The District

More information

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT 5.8 FUNDING TRAILS DEVELOPMENT The City has been successful in establishing dedicated local funding sources as well as applying for grants to develop the City s trail system, having received nearly $2.4

More information

3. COLTA / HUGA CONNECTIONS - PRELIMINARY

3. COLTA / HUGA CONNECTIONS - PRELIMINARY 9 3. COLTA / HUGA CONNECTIONS - PRELIMINARY 3.1 COLTA The Chain of Lakes Trail Association (COLTA) trail, formerly identified as the Chester Spur Line, was completed and opened for use in June 2011. The

More information

Airport Planning Area

Airport Planning Area PLANNING AREA POLICIES l AIRPORT Airport Planning Area LOCATION AND CONTEXT The Airport Planning Area ( Airport area ) is a key part of Boise s economy and transportation network; it features a multi-purpose

More information

URBAN DESIGN REPORT. Proposed Residential Development, Old Church Road, Caledon East

URBAN DESIGN REPORT. Proposed Residential Development, Old Church Road, Caledon East Proposed Residential Development, Old Church Road, Caledon East TABLE CONTENTS: 1.0 DEVELOPMENT 1.1 Introduction-Analysis of Guiding Principles and Documents 1.2 Community Design and Architectural Design

More information

LONG TERM (OPERATION) IMPACTS AND POTENTIAL MITIGATION

LONG TERM (OPERATION) IMPACTS AND POTENTIAL MITIGATION 3.6 This chapter provides a project-level analysis of potential impacts to recreation sites in the study area including parks, natural areas, open spaces, trails, and playfields, as well as amenities such

More information

RESORT AREA STRATEGIC ACTION PLAN (RASAP) STEERING COMMITTEE MEETING - APRIL 3, 2019

RESORT AREA STRATEGIC ACTION PLAN (RASAP) STEERING COMMITTEE MEETING - APRIL 3, 2019 RESORT AREA STRATEGIC ACTION PLAN (RASAP) STEERING COMMITTEE MEETING - APRIL 3, 2019 Welcome & Introductions - Deb Zywna AGENDA FY 20 Resort CIP Proposed Projects - Kathy Warren ORDFBC Design Guidelines

More information

5.7 Local road upgrades

5.7 Local road upgrades 5.7 Local road upgrades Local roads around the St Peters interchange and the intersection of Campbell Road and Euston Road would be upgraded to ensure safe and efficient connections with the New M5, and

More information

CITY COUNCIL AGENDA MEMORANDUM

CITY COUNCIL AGENDA MEMORANDUM To: Mayor and City Council From: Charles Ozaki, City and County Manager Prepared By: Kevin Standbridge, Deputy City and County Manager Katie Allen, City and County Engineer David Shinneman, Community Development

More information

4. Safety Concerns Potential Short and Medium-Term Improvements

4. Safety Concerns Potential Short and Medium-Term Improvements NH Route 104 Access Management Study Page 19 4. Safety Concerns Potential Short and Medium-Term Improvements Potential safety improvement strategies are listed by priority based on field observations by

More information

Town of Danvers Planning Board

Town of Danvers Planning Board Town of Danvers Planning Board Danvers Town Hall One Sylvan Street Danvers, MA 01923 www.danvers.govoffice.com Margaret Zilinsky, Chair Kristine Cheetham William Prentiss Aaron Henry James Sears John Farmer,

More information

Classifications, Inventory and Level of Service

Classifications, Inventory and Level of Service Classifications, Inventory and Level of Service Section 3 Kenmore Park, Recreation and Open Space Plan 1 P a g e Classifications and Inventory Park Classifications Kenmore classifies its parks based upon

More information

Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012

Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012 Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012 Purpose of Feasibility Study Purpose Evaluate the feasibility of constructing a multiuse

More information

- Countywide - Roadway Cone Zone / Lane Closure / Sidewalk Repair Schedule

- Countywide - Roadway Cone Zone / Lane Closure / Sidewalk Repair Schedule Report for Monday, September 10, 2018 through Monday, September 17, 2018 S. Perry Park Rd. (DC105) and Red Rocks Dr. Intersection Improvements Safety improvements on the S. Perry Park Road (DC 105) and

More information

Vista Field Airport. Master Plan Update. February, Prepared for: Port of Kennewick One Clover Island Kennewick, Washington

Vista Field Airport. Master Plan Update. February, Prepared for: Port of Kennewick One Clover Island Kennewick, Washington Vista Field Airport February, 2006 Prepared for: Port of Kennewick One Clover Island Kennewick, Washington 99336 Prepared by: J-U-B ENGINEERS, Inc. 2810 W. Clearwater Avenue, Suite 201 Kennewick, Washington

More information

As the Toronto Transit Commission (TTC) operates a transit service on Bay Street, City Council approval of this report is required.

As the Toronto Transit Commission (TTC) operates a transit service on Bay Street, City Council approval of this report is required. REPORT FOR ACTION Construction Staging Area - 81 Bay Street Date: December 11, 2017 To: Toronto and East York, Community Council From: Acting Director, Transportation Services Toronto and East York District

More information

FHWA P/N Guidelines. Corridor Relationship. Highway 22 Segment 1 - US 169 to CSAH 2 Relevance / Documentation of Need

FHWA P/N Guidelines. Corridor Relationship. Highway 22 Segment 1 - US 169 to CSAH 2 Relevance / Documentation of Need Highway 22 Segment 1 - US 169 to CSAH 2 Vehicle Mobility Congestion Intersection Congestion Existing Conditions - Based on Highway Capacity Manual methodology, corridor level of service is currently LOS

More information

Community Development Committee

Community Development Committee C Community Development Committee For the Metropolitan Council meeting of October 31, 2012 Committee Report Item:2012-316 ADVISORY INFORMATION October 16, 2012 Date Prepared: Subject: Intercity Regional

More information

Welcome to Dayton Parkway Interchange Open House. November 26, 2018

Welcome to Dayton Parkway Interchange Open House. November 26, 2018 Welcome to Dayton Parkway Interchange Open House November 26, 2018 Project Partners Minnesota DOT Hennepin County City of Rogers Dayton Project History NW Hennepin County I94 Study 2007/08 Interchange

More information

Memorandum / Letter of Intent

Memorandum / Letter of Intent VERONA WAUKESHA KENOSHA APPLETON WESTON Memorandum / Letter of Intent To: Adam Sayre, Director of Planning & Development, City of Verona From: Kevin Yeska, JSD Professional Services, Inc. www.jsdinc.com