Wentworth Avenue Reconstruction Project Delaware Avenue to Humboldt Avenue
|
|
- Clementine Bailey
- 5 years ago
- Views:
Transcription
1 entworth Avenue Reconstruction Project Project Purpose & Need This project will improve safety, operations, and pavement quality. Existin rural roadway Proposed urban roadway Existin Issues: Poor pavement condition Lackin pedestrian/bike facilities Poor drainae Proposed Improvements: Curb and utter Adequate shoulder width Continuous trail or sidewalk system Drainae and utility improvements entworth Avenue provides: An important east-west roadway in northern Dakota County Connections between Robert Street, Mendota Heihts, and South St. Paul Access to residential and commercial properties, City Hall, and the Sports Dome CSAH 8 (entworth Avenue) Project Considerations Map Dakota County March, 2017 BELLOS ST ENTORTH AVE ENTORTH AVE E ENTORTH AVE LA Fitness SMITH AVE S T AS NE MI MARTHALER PARK LIVINSTON AVE OLIVIA T DODE NATURE CENTER MINEA ST Sports Dome S O LL ST Project Area etland Lakes/Ponds Park Existin Sidewalks/Trails Municipal Boundary eststpaul Municipal, Police&Fire Buildin BE É Leend Cedarwood The est est Apartments Apartments ALLEN CT ALLEN CT City of est St. Paul Cityof MendotaHeihts ALL-AY ROBERT ST S CHARLTON ST entworthcenter Manaement entworth Apartments 35 FOOOD LN AVE St. Stephen s Lutheran Church illwerscheidfuneral Home CRAFORD DR DT CARMEL AVE Marathon Fuel Station ENTORTH AVE E M O TH ESCHCKE PARK CROLEY CIR N O PS E AV BOL RUNE LN Somerset CountryClub THOMPSON HILL HUM ALVIN AVE É BETTY LN ALLEN AVE ALLEN AVE BETTY LN ú S THOMPSON AVE CHARLTON ST DELAARE AVE THOMPSON AVE KRAFT RD KRAFT RD LOTHENBACH AVE ARLOUH PARK Dakota County IS KRAFT RD E Dakota County IS
2 entworth Avenue Reconstruction Project Alternative A - Base Desin P R O 100 Benefits: 8-foot shoulder accommodates parked/stalled vehicles 8-foot boulevard separates traffic from trail users and provides snow storae 10-foot trails on each side provides a continuous connection throuhout the corridor Potential turn lanes at key intersections Impacts: reatest amount of permanent riht-of-way acquisition reatest impact to wetlands and trees reatest impact to residential driveways Hihest Cost Option Existin E R O A 60 (V ) 0 - Elements: Existin 60-foot riht-of-way 12-foot drive lanes 2-foot shoulders 8-foot trail (Bellows to Charlton) 12-foot boulevard (at trail) Lackin continuous pedestrian/bike facilities
3 entworth Avenue Reconstruction Project Alternative B - Suburban Desin P R O 74 Benefits: 8-foot shoulder accommodates parked/stalled vehicles 5-foot boulevard separates traffic from trail/sidewalk users but provides less snow storae 8-foot trail provides a continuous connection throuhout the corridor 6-foot sidewalk (Humboldt to Charlton) on the south side of the corridor provides a connection to key destinations on the south side of the corridor Potential turn lanes at key intersections 0-6 Impacts: Reduced permanent riht-of-way acquisition Increased temporary impact to private property Reduced impact to wetlands and trees Requires retainin wall construction Reduced impact to residential driveways Reduced cost option Existin E R O A 60 (V ) 0 - Elements: Existin 60-foot riht-of-way 12-foot drive lanes 2-foot shoulders 8-foot trail (Bellows to Charlton) 12-foot boulevard (at trail) Lackin continuous pedestrian/bike facilities
4 entworth Avenue Reconstruction Project Alternative C - Urban Desin P R O 60 B L Benefits: 6-foot shoulder is a safety uprade from existin conditions 5-foot boulevard separates traffic from trail users but provides less snow storae 8-foot trail provides a continuous connection throuhout the corridor Potential turn lanes at key intersections 6 6 Impacts: No pedestrian accommodations on south side of the road Least permanent riht-of-way acquisition reatest temporary impact to private property Reduced impact to wetlands and trees Requires retainin wall construction Reduced impact to residential driveways Lowest cost option Existin E R O A 60 (V ) 0 - Elements: Existin 60-foot riht-of-way 12-foot drive lanes 2-foot shoulders 8-foot trail (Bellows to Charlton) 12-foot boulevard (at trail) Lackin continuous pedestrian/bike facilities
5 entworth Avenue Reconstruction Project Project Schedule & Fundin 2018 Final Desin & City of est St. Paul 45% Federal Fundin Local Fundin Street Assessments Sanitary Assessments Column1 Project Construction Dakota County 55% Riht-of-ay Acquisition Construction Cost Federal Fundin Local Fundin Assessment Notifications Assessment Public Hearin May - Nov 2019 Tentative Open House # N D J F M A M J J A S O N D J F M A M J J A S O N D Project Desin Construction Jacob Rezac Dakota County Jacob.Rezac@co.dakota.mn.us Project Contacts Ross Beckwith City of est St. Paul RBeckwith@wspmn.ov Aaron arford Bolton & Menk aaronwa@bolton-menk.com Project ebsite: (search County Road 8)
6 entworth Avenue Reconstruction Project Sanitary Sewer Improvements
City of Madison, Buckeye Road Monona Drive to Stoughton Road County AB Dane County Public Involvement Meeting
City of Madison, Buckeye Road Monona Drive to Stoughton Road County AB Dane County Public Involvement Meeting Wednesday, May 31, 2017 6:30 to 8 P.M. Frank Allis Elementary School 4201 Buckeye Road Madison,
More informationTHREE MILE PLAN TOWN OF SUPERIOR COLORADO
THREE MILE PLAN TOWN OF SUPERIOR COLORADO February 23, 2015 INTRODUCTION This document has been prepared by the Town of Superior, Colorado, to address the existing and proposed land uses within an approximate
More informationPalm Beach County Traffic Report July 13 through July 20, 2012
For Immediate Release July 13, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report July 13 through July 20, 2012 Palm Beach County Palm Beach County traffic will be
More information2009 Regional Solicitation Selected Projects*
2009 Regional Solicitation Selected Projects* Special Federal Allocation from the MPO Mn/DOT I-494/TH169 Interchange Reconstruction $34,000,000 Surface Transportation Program - Urban Guarantee AR-09-10
More informationMacleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts
Macleod Trail Corridor Study Welcome Macleod Trail Corridor Study Open House Presentation of Proposed Design Concepts Study Purpose Develop a corridor plan for Macleod Trail that aligns with The City s:
More informationConstruction Staging Adelaide Street West
REPORT FOR ACTION Construction Staging Adelaide Street West Date: October 6, 2016 To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto and East York District
More information26 APPLICATION FOR APPROVAL TO EXPROPRIATE WIDENING AND RECONSTRUCTION OF ST. JOHN'S SIDEROAD PROJECT 97100, TOWN OF AURORA
Clause No. 26 in Report No. 12 of the was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting held on June 26, 2014. 26 APPLICATION FOR APPROVAL TO EXPROPRIATE
More informationAbbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd
Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd Project ID SOA07003 Department State of Alaska Project Type Improvement Start Date December 2017 Location Assembly: Section 4, Seats F & G, Assembly:
More informationPalm Beach County Traffic Report August 24 through August 31, 2012
For Immediate Release August 24, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report August 24 through August 31, 2012 Palm Beach County Palm Beach County traffic will
More informationCity of Durango 5.8 FUNDING TRAILS DEVELOPMENT
5.8 FUNDING TRAILS DEVELOPMENT The City has been successful in establishing dedicated local funding sources as well as applying for grants to develop the City s trail system, having received nearly $2.4
More informationBasic Project Information
FY 2015-16 PROJECT DESCRIPTION FORM (2C) Submitting Agency: Loudoun County Basic Project Information Project Title: Loudoun County Parkway (VA Route 607) U.S. 50 to Creighton Rd. (2C) Project Type (check
More informationAs the Toronto Transit Commission (TTC) operates a transit service on Bay Street, City Council approval of this report is required.
REPORT FOR ACTION Construction Staging Area - 81 Bay Street Date: December 11, 2017 To: Toronto and East York, Community Council From: Acting Director, Transportation Services Toronto and East York District
More informationNovember 21, 2012 Barbara Kelleher, (954)
November 21, 2012 Barbara Kelleher, (954) 777-4090 barbara.kelleher@dot.state.fl.us BROWARD COUNTY TRAFFIC IMPACT REPORT November 26 to November 30, 2012 FORT LAUDERDALE -- Construction and maintenance-related
More informationCommunity Development Committee
C Community Development Committee For the Metropolitan Council meeting of October 31, 2012 Committee Report Item:2012-316 ADVISORY INFORMATION October 16, 2012 Date Prepared: Subject: Intercity Regional
More informationDamen Elston Fullerton Reconstruction, Intersection Improvements CDOT Project B-1-501
Damen Elston Fullerton Reconstruction, Intersection Improvements CDOT Project B-1-501 Bird s Eye View of Existing INTRODUCTION This project is part of the City s Building a New Chicago initiative in conjunction
More informationLESLIE BARNS & CONNECTION TRACK. Project Update Construction and Traffic Management Consultation
LESLIE BARNS & CONNECTION TRACK Project Update Construction and Traffic Management Consultation PRESENTATION SUMMARY Part 1 Brief Project Update (New Streetcars & Streetscape Improvements) Part 2 Construction
More informationConstruction Staging Area 700 Bay Street - Elizabeth Street and Walton Street
REPORT FOR ACTION Construction Staging Area 700 Bay Street - Elizabeth Street and Walton Street Date: March 7, 2017 To: Toronto and East York Community Council From: Acting Director, Transportation Services,
More informationPublic Information Center August 12, 2010
Route 52 Causeway Bridge Replacement & Somers Point Circle Elimination Project Somers Point Atlantic County Public Information Center August 12, 2010 Ocean City Cape May County Presentation Overview General
More information1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET
Report No. 3 of the Regional Council Meeting of March 28, 2013 1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET The recommends: 1. Receipt
More informationLincoln Village Pedestrian Bicycle Bridge Community Meeting September 13th, 2016
Lincoln Village Pedestrian Bicycle Bridge Community Meeting September 13th, 2016 Purpose of the Meeting Introduce the project and the proposed improvements Review existing conditions Discuss the needs
More informationFuller/Fuller Heights Road Improvements
Fuller/Fuller Heights Road Improvements Total Project Cost - $4.4M Project Description This project will construct a mini-roundabout at the intersection of Fuller Heights Road and Old Triangle Road to
More informationThornton Water Project. Larimer County Route Study and Project Update September 12, 2017
Thornton Water Project Larimer County Route Study and Project Update September 12, 2017 Purpose of Meeting Provide information on the Thornton Water Project Present the results of the pipeline routing
More informationTRAFALGAR PARK. 78: p.140 W 99th St FLAT ROCK CREEK PARK. W 103rd St OVERLAND PARK. Quivira Rd. College Blvd. Shared use path. Mountain bike trail
Lenexa: overview TRAFALGAR PARK 78: p.140 As the Westport Route crosses over Lenexa's boundaries with Olathe and Overland Park several times, approximately 2.75 or 3 miles of the historic route of the
More informationForest Hill Blvd. at Kirk Road Widening Project FM#:
Seat Belts Save Lives. Buckle Up Everyone Every Time! Forest Hill Blvd. at Kirk Road Widening Project FM#: 435122-1-52-01 Project Scope This 0.298-mile project began Nov. 17, 2016 and is expected to be
More informationState Route 8 Corridor. Northern Summit County s Path to Success
State Route 8 Corridor Northern Summit County s Path to Success Construction Guide: 2008-2009 State Route 8 corridor work description State Route 8 Corridor 10 projects $262 million With its close proximity
More informationLong water shutdown scheduled for Tuesday, September 18
Thank you for your interest in the Center City Connector Streetcar. In this weekly update, you ll find information about ongoing construction for the 1st phase of utility work in Pioneer Square. Utility
More informationDRAFT TH AVE NE URBAN DESIGN MERIT PRESENTATION DPD# NOVEMBER 2017
DRAFT 11.08.17 4801 24TH AVE NE URBAN DESIGN MERIT PRESENTATION 17-002 DPD#3027312 16 NOVEMBER 2017 PROJECT BACKGROUND URBAN DESIGN ANALYSIS VACATION / NO-VACATION COMPARISON URBAN DESIGN MERIT INTRODUCTION
More informationSR 934 Project Development And Environment (PD&E) Study
SR 934 Project Development And Environment (PD&E) Study Project Advisory Group Meeting March 1, 2018 State Road 934/NE/NW 79th Street from west of I-95 (NW 13th CT) to N. Bayshore Drive PD&E STUDY SR 934/NE/NW
More informationFORT WORTH DISTRICT. Springtown Area Projects. Loyl C. Bussell, P.E. Acting District Engineer. Thursday, February 8, 2018 Date.
FORT WORTH DISTRICT Springtown Area Projects Loyl C. Bussell, P.E. Acting District Engineer Photo by Liam Frederick Footer Text Thursday, February 8, 2018 Date Maintaining a Safe System TxDOT is responsible
More informationOhio Department of Transportation Traffic Advisory. District 4 Allen C. Biehl, P.E., Deputy Director S. Arlington Road.
Ohio Department of Transportation Traffic Advisory District 4 Allen C. Biehl, P.E., Deputy Director 2088 S. Arlington Road. Akron, Ohio 44306 www.transportation.ohio.gov/dist4 Friday, September 18, 2015
More informationConstruction Staging Area Blue Jays Way (357 King Street West)
REPORT FOR ACTION Construction Staging Area Blue Jays Way (357 King Street West) Date: June 8, 2018. To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto
More informationState Project Reconstruction I-84
State Project 151-273 Reconstruction I-84 Waterbury, Connecticut FROM WASHINGTON STREET TO PIERPONT ROAD I-84 Constructors J.V. Robert Turner Area Engineer Ken Fargnoli District Engineer John Dunham Assistant
More informationNon-Motorized Transportation
Non-Motorized Transportation Non-motorized facilities are important components to the transportation system. They provide an environmentally-friendly, low-cost mode of travel. Some of the facilities can
More informationConstruction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013
FREDERICK COUNTY STATE HIGHWAY ADMINISTRATION -- Frederick County -- Line 1 PROJECT: I-7, Baltimore National Pike INTERSTATE CONSTRUCTION PROGRAM DESCRIPTION: Widen I-7 east of MD 355 to east of MD 144
More informationSTAGE 2 & 3 Pavement reconstruction within viaduct footprint, pavement widening and resurfacing N/S of viaduct footprint, sidewalk
STAGE 1 Viaduct removal, deck replacement on the River Bridge, and approach of the Chicago River Bridge north to Roscoe) Maintain local access roadways - 1 lane in each direction A signed alternate route
More informationBusiness Item No
Metropolitan Parks and Open Space Commission Meeting date: February 6, 2018 For the Community Development Committee meeting of February 20, 2018 For the Metropolitan Council meeting of February 28, 2018
More information1.2 Corridor History and Current Characteristics
SECTION 1 Description and Background of Study Area 1.1 Introduction This preliminary engineering report was prepared for the Alaska Department of Transportation and Public Facilities (ADOT&PF). It is part
More information3529 Souris River Flood Plan (Phase MI-1)
Date: September 28, 2018 To: Derek Hackett, Public Information Officer From: Grant Goldader, Civil Engineering Specialist Re: Traffic Control Report for the week of 10/01/2018 3529 Souris River Flood Plan
More information2. Goals and Policies. The following are the adopted Parks and Trails Goals for Stillwater Township:
D. PARKS AND TRAILS 1. Introduction Stillwater Township s population is relatively low, with most residents living on rural residences on large lots. The need for active park space has been minimal in
More informationFINCH HYDRO CORRIDOR TRAIL PROJECT
FINCH HYDRO CORRIDOR TRAIL PROJECT Pharmacy Avenue to Birchmount Road January 29 th, 2018 L Amoreaux Community Centre (2000 McNicoll Avenue) 1 Purpose of Drop In Event The purpose of today s drop-in event
More informationC O M M U N I T Y E V E N T W O R K O R D E R ROAD USE NOTIFICATION
Corporate Services Commission REQUEST RECEIVED: March 10, 2015 EVENT CODE: 2015-005 C O M M U N I T Y E V E N T W O R K O R D E R ROAD USE NOTIFICATION EVENT NAME: Canada Day EVENT ORGANIZER CONTACT ORGANIZATION
More informationAppendix 4.1 L. No-Build Project Descriptions
Appendix 4.1 L No-Build Project Descriptions No-Build Projects New Bedford A new traffic signal system was installed and activated in early 2009 at the intersection of King s Highway and Mount Pleasant
More informationParticipant Responses April 19, 2017 Open House Meeting
Hugo 2040 Comprehensive Plan Update Participant Responses April 19, 2017 Open House Meeting Thank you for participating in Hugo s Comprehensive Plan Update. The Comprehensive Plan is the document that
More informationDesign Meeting Presentation
Contract No. 17ECS-TI-05SP April November 2017 Design Meeting Presentation November 2015 Agenda Items: Introduction (5 min) Overview (10 min) Scope of work (60 min): Schedule and Traffic Staging / Closures
More informationRoute 29 Solutions Projects
Your guide to the Route 29 Solutions Projects For full details & continued engagement please visit www.route29solutions.org The Route 29 Solutions Package is a $230 million investment into the improvement
More informationMemorandum / Letter of Intent
VERONA WAUKESHA KENOSHA APPLETON WESTON Memorandum / Letter of Intent To: Adam Sayre, Director of Planning & Development, City of Verona From: Kevin Yeska, JSD Professional Services, Inc. www.jsdinc.com
More information- Countywide - Roadway Cone Zone / Lane Closure / Sidewalk Repair Schedule
Report for Monday, September 10, 2018 through Monday, September 17, 2018 S. Perry Park Rd. (DC105) and Red Rocks Dr. Intersection Improvements Safety improvements on the S. Perry Park Road (DC 105) and
More informationRunway Safety Margin Enhancement Project. Ann Arbor Municipal Airport Matt Kulhanek Director-Facilities Management
Runway Safety Margin Enhancement Project Ann Arbor Municipal Airport Matt Kulhanek Director-Facilities Management 1 Agenda Background Safety Issues being Addressed Environmental Assessment Study Airport
More information66th Street. Portland Ave
APPENDIX A: FIGURES dd re Mi ld es le Av e D r Grand or Lynd a sh Little Bobs on e rs E m La E 64th St Blaisdell E 65th St 4-LANE DIVIDED 4-LANE UNDIVIDED; NO LEFT/RIGHT TURN LANES Bloomington 15th 14th
More informationClackamas County Development Agency
Clackamas County Development Agency Development Services Building, 150 Beavercreek Rd., Oregon City, OR 97045 www.clackamas.us/transportation/renewal 503-742-4323 The Clackamas County Board of Commissioners
More informationA Message from the Director
Lee s Summit Public Works Department Director Chuck Owsley Deputy Director & City Engineer Dena Mezger Deputy Director Administration & Operations Bob Hartnett Airport Manager John Ohrazda City Traffic
More informationFINAL. Bicycle/Pedestrian Feasibility Study City of DeBary Dirksen Drive Trail. Prepared For: Volusia County MPO
City of DeBary Dirksen Drive Trail FINAL Prepared By: Reynolds, Smith and Hills, Inc. Prepared For: Volusia County MPO September 2007 Table of Contents INTRODUCTION...1 PROJECT PURPOSE AND SCOPE...2 PHYSICAL
More informationFDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016
March 25, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016 TREASURE COAST Construction and maintenance-related
More informationUniversity Region Non-Motorized Plan 2015
Non-Motorized Transportation Non-motorized facilities are important components to the transportation system. They provide an environmentally-friendly, low-cost mode of travel. Some of the facilities can
More informationGrove Field Airport Environmental Assessment
Grove Field Airport Environmental Assessment Advisory Committee Meeting #2 December 9, 2008 Port of Camas-Washougal Conference Room 6:00 7:30 PM Agenda: Welcome and Overview Dave Ripp, Director, Port of
More informationCounty of Elgin Tourism Signage Policy Addendum A
1.0 INTRODUCTION County of Elgin Tourism Signage Policy Addendum A 1.1 PURPOSE OF ELGIN TOURISM SIGNAGE POLICY To define the eligibility, use, design and authority for tourism oriented directional signage
More informationMORGAN CREEK GREENWAY Final Report APPENDICES
APPENDICES MORGAN CREEK GREENWAY Appendix A Photos of Existing Conditions in Trail Corridor Photos of existing conditions Main trail corridor - February 2009 Photos of existing conditions south bank Morgan
More informationMajor Projects Overview
Major Projects Overview Miami-Dade Expressway Authority February 2018 About MDX MDX operates 5 roads in Miami Dade County SR 924, SR 112, SR 836, SR 874 and SR 878 MDX Primary Source of Revenue: User Fees-Tolls
More informationORDINANCE NO. JACKSON TOWNSHIP, CAMBRIA COUNTY
ORDINANCE NO. JACKSON TOWNSHIP, CAMBRIA COUNTY AN ORDINANCE OF THE TOWNSHIP OF JACKSON AMENDING SECTIONS OF THE JACKSON TOWNSHIP ZONING ORDINANCE AS FOLLOWS: PROVIDING NEW DEFINITIONS OF CAMPGROUNDS, CAMPSITE,
More informationANCLOTE COASTAL TRAIL ALTERNATIVES ANALYSIS STUDY
ANCLOTE COASTAL TRAIL ALTERNATIVES ANALYSIS STUDY PASCO COUNTY MPO JULY 2015 PROJECT OVERVIEW... INTRODUCTION EXECUTIVE SUMMARY CONTEXT... TAMPA BAY AREA, PINELLAS, & PASCO COUNTY S MULTI-USE TRAIL PLANS
More informationELECTION SIGN GUIDELINES
ELECTION SIGN GUIDELINES GUIDELINES FOR THE PLACEMENT OF FREE STANDING ELECTION SIGNS ON CITY OF LETHBRIDGE ROAD RIGHT OF WAY Definition An election sign is a temporary sign announcing or supporting political
More informationEXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015
EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015 1 SEGMENT 1 2 THE WISHBONE Connects the TEXpress Managed Toll System to the 35Express Managed Toll System Limits: Crown Road (near Royal Lane) to Valley
More informationSite Location and Setting
Memorandum Date: To: From: Subject: Kristy Le, Gary Black Steve Orem Santa Teresa County Park Historic Area Traffic and Parking Study Hexagon Transportation Consultants, Inc. has completed a traffic and
More informationC O M M U N I T Y E V E N T W O R K O R D E R ROAD USE NOTIFICATION
REQUEST RECEIVED: January 28, 2014 EVENT CODE 2014-005 C O M M U N I T Y E V E N T W O R K O R D E R ROAD USE NOTIFICATION EVENT NAME: Canada Day EVENT ORGANIZER CONTACT ORGANIZATION INFORMATION Name:
More informationNortheast Corridor Transportation Update
Northeast Corridor Transportation Update Presented by: Stuart Basham Division 10 Planning Engineer North Carolina Department of Transportation October 2, 2014 Today s presentation includes: I-485 Outer
More informationUS 83 FROM NORTH OF THE STARR/ZAPATA COUNTY LINE TO LOMA BLANCA ROAD
US 83 FROM NORTH OF THE STARR/ZAPATA COUNTY LINE TO LOMA BLANCA ROAD PUBLIC MEETING JUNE 8, 2017 Talk Text Crash 2 AGENDA TECHNICAL PRESENTATION (Roma Area Engineer Eduardo Gracia, P.E.) PROJECT SCHEDULE
More informationFDOT Treasure Coast Traffic Impact Report
July 22, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report July 22 through July 29, 2016 TREASURE COAST Construction and maintenance-related lane
More informationNew Jersey Department of Transportation
Administration, Organization, Records Management & Information Requests 16:1A-4.4(a) Copying fees - Records Page 1 10: $0.75 per page Page 11 20: $0.50 per page Over 20 pages - $0.25 per page 16:1A-4.5(c)
More informationExecutive Summary. Need for the Study FINAL REPORT
FINL REPORT Executive Summary The transportation system of Dakota County, Minnesota, is built around a framework of Principal rterial P highways, which are well established to the north for example, the
More informationCITY COUNCIL AGENDA MEMORANDUM
To: Mayor and City Council From: Charles Ozaki, City and County Manager Prepared By: Kevin Standbridge, Deputy City and County Manager Katie Allen, City and County Engineer David Shinneman, Community Development
More informationParking Amendments - Bay Street, between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal)
REPORT FOR ACTION between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal) Date: October 26, 2017 To: Toronto and East York Community Council From: Acting Director,
More informationLafourche Parish Government REQUEST FOR QUALIFICATIONS. Landscape Architectural Services
Lafourche Parish Government REQUEST FOR QUALIFICATIONS Landscape Architectural Services Bayou Lafourche Parish Multi-Use Path Feasibility Study Phase 1 And Bayou Lafourche Parish Multi-Use Path Feasibility
More informationCity of Madera Engineering Division. Citizen s Oversight Committee February 13, 2019
City of Madera Engineering Division Citizen s Oversight Committee February 13, 2019 INTRODUCTION The City of Madera uses Measure T funds to support various programs as outlined in the Annual Expenditure
More informationRESORT AREA STRATEGIC ACTION PLAN (RASAP) STEERING COMMITTEE MEETING - APRIL 3, 2019
RESORT AREA STRATEGIC ACTION PLAN (RASAP) STEERING COMMITTEE MEETING - APRIL 3, 2019 Welcome & Introductions - Deb Zywna AGENDA FY 20 Resort CIP Proposed Projects - Kathy Warren ORDFBC Design Guidelines
More informationMay 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015
May 1, 2015 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report May 1 through May 8, 2015 Palm Beach County Palm Beach County traffic will be affected this week by ongoing
More information4 VIVA PHASE 2 YONGE STREET - Y2, AND HIGHWAY 7 - H3 CORRIDORS PRELIMINARY ENGINEERING UPDATE
4 VIVA PHASE 2 YONGE STREET - Y2, AND HIGHWAY 7 - H3 CORRIDORS PRELIMINARY ENGINEERING UPDATE The Rapid Transit Public/Private Partnership Steering Committee recommends the following: 1. The presentation
More informationQuiet Zone along FEC Corridor. Paul Calvaresi Regional Transportation Planner
Quiet Zone along FEC Corridor Paul Calvaresi Regional Transportation Planner Calvaresip@browardmpo.org About the Quiet Zone Throughout all of Broward County on the FEC Tracks Deerfield Beach Pompano Beach
More informationRELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers (office) STA (cell)
RELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers 540-332-9201 (office) STA12-130 540-292-2500 (cell) Sandy.Myers@VDOT.Virginia.gov Marshall Barnhill 540-332-9264 (office) 540-414-5670 (cell)
More informationFDOT Treasure Coast Traffic Report through
FDOT Treasure Coast Traffic Report 02 26 16 through 03 04 16 Kathleen Dempsey Fri 2/26/2016 2:56 PM To:Kathleen Dempsey ; 1 attachment 355 KB CR 714_Median Access Modifications.pdf;
More informationSAFETY IMPROVEMENT OF A DANGEROUS FOUR-LEG, STOP CONTROLLED INTERSECTION IN AFRAGOLA, ITALY
SAFETY IMPROVEMENT OF A DANGEROUS FOUR-LEG, STOP CONTROLLED INTERSECTION IN AFRAGOLA, ITALY Authors: Giuseppe Silvestro giuseppesilvestro0391@gmail.com Vincenzo Viro vincenzo.viro@gmail.com Supervisor:
More informationFarmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP)
F100090 Fed ID: F100090 Farmington MPO Rec Num: 4 Lead Agency: City of Aztec Proj East Arterial Route Phase 1B Fr: US 550 To: Legion Rd Project Desc.: Construct new road Category: Capacity Proj NMDOT Dist.:
More informationNOTICE OF PUBLIC HEARING.
NOTICE OF PUBLIC HEARING. In accordance with Tennessee Code Annotated Section 13-7- 105, the Board of County Commissioners of Blount County, Tennessee, will convene in a called meeting and hold public
More informationCONSTRUCTION PROJECTS IN CUYAHOGA COUNTY CLEVELAND EUCLID 3/9/18 RICHMOND MAYFIELD HIGHLAND HEIGHTS HEIGHTS SOUTH EAST MAYFIELD EUCLID CLEVELAND
BAY VILLAGE WESTLAKE OLMSTED NORTH TOWNSHIP OLMSTED FALLS OLMSTED BEREA STRONGSVILLE ROYALTON NORTH BROOK PARK PARMA PARMA BROADVIEW BRECKSVILLE HILLS SEVEN INDEPENDENCE BROOKLYN RIVER ROCKY LAKEWOOD PARK
More informationConstruction Staging Area 197 Redpath Avenue
REPORT FOR ACTION Construction Staging Area 197 Redpath Avenue Date: January 31, 2017 To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto and East York District
More informationProject Start Date: Project Completion Date: July 1, Contractor: Mattson Construction Contact Information: Nate Lillemon
Date: 06-24-16 To: Derek Hackett, Public Information Officer From: Sunil Jeboo, Traffic Engineer Re: Road Closure for the Week of 06-27-16 (3236.1) 6 th Pump Station Western Ave. and 6 th SW Western Ave.
More informationWelcome to the Cross County Trail Public Input Session!
Welcome to the Cross County Trail Public Input Session! Please sign in on the table below! What are we doing here? Camden County has proposed a bicycle and pedestrian trail spanning across the entire county.
More informationProvincial Railway Technical Standards
GENERAL: INDEX: The standards and requirements listed in this document are intended for use on provincially regulated railway public grade crossings. These standards are considered the minimum requirements
More informationOctober 31, 2014 Chuck McGinness, (954)
From: McGinness, Charles To: McGinness, Charles Subject: FDOT Broward County Traffic Impact Report 10 31 14 through 11 07 14 Date: Friday, October 31, 2014 2:59:04 PM Attachments: image002.png October
More informationCOMMENT PERIOD INTRODUCTION
To: Interested Persons From: Tom Buford File: Del Rio Trail Project Date: June 8, 2018 Community Development Department Reference: NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT FOR THE DEL RIO
More informationThe 20 mile WMRRT is planned through the Hennepin County
DESIGN GUIDANCE DEVELOPMENT CONCEPT The 20 mile WMRRT is planned through the Hennepin County cities of Dayton, Champlin, Brooklyn Park and Brooklyn Center. The regional trail will fill a critical gap in
More informationSpringettsbury Township. Road Improvement Projects
Springettsbury Township Road Improvement Projects 2009 2016 2016 Township Road Improvement Projects Springettsbury Township is divided into the following 4 Sectors: Northwest Sector Sherman Street Route
More informationPURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40
PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40 Project Description The primary purpose of this project is to improve the major
More informationMetrolinx Projects: Temporary Delegation for Long- Term Road Closures
PW29.1 REPORT FOR ACTION Metrolinx Projects: Temporary Delegation for Long- Term Road Closures Date: April 24th, 2018 To: Public Works and Infrastructure Committee From: General Manager, Transportation
More informationUS 19 Sunset Point Rd to Countryside Blvd.
Frontage Lanes Alternative Six-Lane Roadway Two-Lane, One-Way Frontage Lanes Close All Median Openings w/ Concrete Median Barrier Construct Within Existing Right-of-Way Status Update Construction started
More informationSteven Bauer, Policy Advisory Committee Chairperson, Presiding
MINUTES BAY-LAKE REGIONAL PLANNING COMMISSION SHEBOYGAN METROPOLITAN AREA TECHNICAL AND POLICY ADVISORY COMMITTEES October 26, 2017 Sheboygan County Administration Building (Room 119), Sheboygan MEMBERS
More informationAPPENDIX F List of Commitments
APPENDIX F List of Commitments s Table F.1 Standard Mitigation Measures Mitigation Measure MnDOT Specification Number Status Update Description Status Update Utilities Provide early notice to utility operators
More informationConstruction Staging Area 19 Western Battery Road
REPORT FOR ACTION Construction Staging Area 19 Western Battery Road Date: December 6, 2017 To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto and East York
More informationNEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release
NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Jennifer Wright (915) 790-4340 Jennifer.Wright3@txdot.gov Major Operation: 36 massive beams will be placed at Sunland & I 10. Operation
More information2016 Development Cost Charges (DCC) UPDATE
2016 Development Cost Charges (DCC) UPDATE City of Richmond Public Meeting November 3, 2016 Outline Development Cost Charges (DCC) Overview DCC Rate Calculation DCC Recoverable Costs (DCC Programs) Estimated
More informationRESIDENT AND BUSINESS NOTIFICATION TEMPORARY CHANGED TRAFFIC CONDITIONS FINANCIAL REVIEW CORPORATE CYCLING CHALLENGE SUNDAY 04 DECEMBER 2011
RESIDENT AND BUSINESS NOTIFICATION TEMPORARY CHANGED TRAFFIC CONDITIONS FINANCIAL REVIEW CORPORATE CYCLING CHALLENGE 2011 Dear Resident and Business, The City of Greater Geelong wishes to advise you of
More information