December 20,2016. George T. Webb, P.E. County Engineer. Tanya N. McConnell, P. Deputy County Engineer
|
|
- Lizbeth Baldwin
- 5 years ago
- Views:
Transcription
1 Department of Engineering and Public Works P.O Box \Vesr Palm Beach. FL (561) FAX. (561) com Palm Beach County Board of County Commissioners Paulen e Burdick. Mayor Melissa \!ckinlay, Vice t\layor Hal R \'aleche DATE: TO: THRU: FROM: RE: INTEROFFICE MEMORANDUM December 20,2016 George T. Webb, P.E. County Engineer Tanya N. McConnell, P. Deputy County Engineer Omelio A. Fernandez, P.E., Director Roadway Production Division(i)~ ROADWAY PRODUCTION DIVISION FY2016 ANNUAL REPORT Dave Kernr-r Sreven L. Abrams Mary Lou Berger t\!ack Bernard County Administrator Verden1a C. Baker This report addresses 160 projects which are presently under Design, Right-of-Way Acquisition, or Construction (see Exhibit G). The Construction Status report (see Exhibit A) addresses a total of35 projects. Construction projects include intersection improvements, bridges, slope protection, pathways, seawall repair, drainage improvements, safety improvements, milling and resurfacing, and miscellaneous roadway work in approximately road miles, resulting in 19 new lane miles. \n Lqua/ Opporrwuc; A},(11 mauve Acrion Employer PAGE 1 OF3 FY ANNUAL ROADWAY PRODUCTION pnncecj on recycled paper
2 A total of 12 construction projects were awarded, 10 county funded and 2 federally funded projects. The county funded projects resulted in the following Office of Small Business Assistance (OSBA) commitments (see Exhibit E, Page lof 1). Goal Commitment County Funded Projects 15.0% 25.94% A total of 6 projects were finaled, 3 were federally funded and 3 were county funded. The county funded projects resulted in the following OSBA achievements (see Exhibit F, Page 1 of 1 ). Commitment Achievement Overall 25.39% 33.34% The following attached Exhibits provide a summary of Roadway Production Thoroughfare Road activity. Exhibit A Exhibit B Exhibit C Exhibit D Exhibit E Exhibit F Exhibit G Exhibit H Construction Status Annual Bidding Schedule Actual Awards Consultant Competitive Negotiations Goals Set By OSBA & Contractor Commitment Contractor Achievement of OSBA Goals Active Project Status Thoroughfare Roads Construction Historical Record PAGE 2 OF3 FY ANNUAL ROADWAY PRODUCTION REPORT
3 cc: AI-Turk, Motasem, P.E., Manager Traffic Engineering Operations Bengston, Carl, Manager, Streetscape Brown, Sherry, Director OFMB Carrier, Steven P.E., Assistant County Engineer Corry, Laura, Director, SFWMD, PBC Service Center Dawson, Daryl, Director, Road & Bridge Harris, Amy, P.E., Special Projects Engineer, Traffic Division Hering, Ross, Director, PREM Jacobowitz, Irwin, Director, Contract Development & Control Jeedigunta, Giridhar, P.E., Manager Traffic Signal Systems Johnson, Tonya D., Director, OSBA Keller, Joanne, P.E., Director, Land Development Kissner, Linda, Engineering FDOT Martz, Mike, Fiscal Director, Fire Rescue Mohyuddin, Khurshid, PBC Planning Division Mugavero, Philip, Senior Assistant County Attorney Palumbo, Duane, PBC Water Utilities Robbins Rob, Director, DERM Thomson, Bruce, Planner II, PBC Planning Division Tomlinson, Mark, Director, Construction Coordination Division Uhren, Nick, P.E., Executive Director, MPO Willhite, Alexis, Director, Administrative Services Division Wilson John, Director, Budget Division ec: Roadway Production Division Staff: Rose, Morton, P.E., Assistant Director Young, David, P.E., Special Projects Section Manager Farrell, Kathleen, P.E., Thoroughfare Roads Section Manager Frazeii-Smith, Kristine, P.E., Local Roads Section Manager Knight, Holly, P.E., Contracts Section Manager Mark, Glenn, P.L.S., Survey Section Manager Cioci, Tripp, Right-of-Way Section Manager Lewis, Donna, Technical Assistant III PAGE3 OF 3 FY2016- ANNUAL ROADWAY PRODUCTION REPORT F:\ROADW A YIEXCEL\SEMI ANNUAL & ANNUAL120 16\ANNUAL_ 16.Doc
4 ROADWAY PRODUCTION DIVISION CONSTRUCTION STATUS Project Project Name, Limits Description Contract Amount Road Lane Number Mil. $ Miles Miles Projects Under Construction Start - Finish (1) Australian Ave., W. 10th St. to 330' N. ofw 13th St. Intersection Improvements NTP Pending Canal Point Pedestrian Bridge Bridge NTP Pending CR880 Twenty Mile Bend Slope Protection Phase II Slope Protection /16-10/ Garden Rd., S. of FOOT Canal to S. of B lue Heron Blvd. 0.3 mi, 3 L NTP Pending (2) Haverhill Rd., Lantana Rd. to South of the LWDD L-14Canal 4LD NTP Pending (2) Haverhill Rd., South of the LWDD L-14 Canal to Lake Worth Road Widen 2L to 5L A Lyons Rd.; Lantana Rd ton. of LWDD L-14 Canal Widen 2L to 4LO /16. 05/ Old Dixie Hwy., 45th Street to Park Avenue Milling and Resurfacing /16. 01/ Old Dixie Hwy., Park Ave. to Northlake Blvd. 0.9 mi, 3 L NTP Pending Penny Ln., Melaleuca Ln., to Dead End MSTU /16 03/ Point Chosen Swing Bridge over Rim Canal Fender System Replacement Fender System Toney Penna Dr. and Old Dixie Hwy. Intersection Improvements NTP Pending 12 Projects Notes: (1) Start date is notice to proceed date. Finish date Is the scheduled contract completion date at the time of this report. (2) Projects # and # combined and let as one contract. Projects Substantially Complete ( semi-final inspections are complete ) Sub. Complete C 60th St. N. from 120th Ave. N. to East of Royal Palm Beach Blvd. 0.5 mi, 3 L / Bluegill Trail from Grassy Waters Preserve/Northlake Blvd. ton. of PGA Blvd Pathway / Bums Road & Military Trail Intersection Improvements Intersection Improvements County Road 880 Twenty Mile Bend Slope Protection Slope Protection / A (3) Seminole Pratt Whitney Rd., S.R. 80 to S. of Okeechobee Blvd. 1.4mi, 4L / B (3) Seminole Pratt Whitney Rd., S. of Okeechobee Blvd. to N. of Sycamore Dr. 2.8 mi,4 L C1 (3) Seminole Pratt Whitney Rd., Sycamore Dr. ton. of Sycamore Dr. 0.1 ml,4 L Projects (3) A, , C1 combined and let as one contract. Projects substantially complete and on hold since April 2014.!Projects Finaled ( accepted by contract review committee ) Flnaled th St. from 1-95 to Old Dixie Highway/Greenwood Avenue Safety Improvements & Resurfacing / Belvedere Road from Club House Dr. to Australian Avenue Safety Improvements & Resurfacing / Clint Moore Rd. & Military Trail Intersection Drainage Improvements Drainage Improvements / Historic Jupiter-Indiantown Rlverbend Park to Cypress Creek Natural Pathway / Intracoastal Road Seawall Repair Seawall Repair / Palmetto Park Road Bridge over the L.W.D.D. E-1 Canal Sidewalk & Barrier Modifications /16 6 Projects ROADWAY PRODUCTION DIVISION ANNUAL REPORT FY 2016 EXHIBIT "A", PAGE 1 OF 2
5 ROADWAY PRODUCTION DIVISION CONSTRUCTION STATUS Project Number Project Name, Limits Description Contract Amount Road Lane Mil. $ Miles Miles!Projects Under Construction (Annual Contract) Start- Finish A Haverhill Rd.; N. of Caribbean Blvd. to Oyer Park N Island Way and Limestone Creek Road Jog Rd., S. of Hypoluxo Rd. to 10th Ave. N Jog Rd., S. of Clint Moore Rd. to Linton Blvd Okeechobee Blvd. & Ponce de Leon Sl Intersection Improvements PGA Blvd. & Ellison Wilson Rd. Intersection Improvements Tradewlnd Rd. and Winding Creek Lane Pathway Intersection Improvements Safety Improvements & Resurfacing Safety Improvements & Resurfacing Safety Improvements & Resurfacing Intersection Improvements Intersection Improvements NTP Pending / /16-06/ /16-01/ / /16-11/ NTP Pending 7 Projects I Projects Finaled (Annual Contract) Flnaled Oyer Blvd. & Military Tr RCA Blvd & All A1A SR 80 and Kirk Rd. Intersection Improvements Intersection Improvements Intersection Improvements Intersection Improvements / / /16-11/16 3 Projects P.B.C. Construction Project Totals - 35 Projects ROADWAY PRODUCTION DIVISION ANNUAL REPORT FY 2016 EXHIBIT ''A", PAGE 2 OF 2
6 ROADWAY PRODUCTION DIVISION FY 2017 BIDDING SCHEDULE Proposed Bid Date Project Number Project Name, Limits Description Rd. Miles AddL Ln. Miles 'Bid-Est $(X 1000) PM/PE Consultant Aug Palmwood Road- 750' N. of Don<~ld Ross Rd. to Susan Ave. Slope Stabilization $1,100 DY-FM Wantman Oct Connector Rd., Lyons Rd. to Acme Dairy Rd. 0.5ml, 2/3L $600 DY-FM Civil Design Oct Gun Club Rd. over LWDD E-3 Canal Bridge lf11jrovements $470 KF-EF Wantman Nov Annual Trame Loops $815 HK ln House Nov Summit Blvd. over LWDD E-3 Canal Bridge I111Jrovements 0.0 0,0 $260 DY-WC Behar Dec Annual Traf!ic Signal $4,700 HK In-House Dec Annual Guardrail $670 HK Jn.House Dec Drexel Rd., Fair Green Rd. to 15th Ln. N. 0.1 ml 3L, Bridge Replacement-Culvert $810 KFS-MCD Behar Dec SW 18th & Military Trail Intersection Improvements $1,150 DY-FM HSQ Feb A Center St., Thelma Ave. to Woodland Estates Dr. 0.3 mi, 3 L $1,100 KFS-MCD Civil Design Feb B CR880 West of 20 mile bend Slope Stabilization - Phase Ill Slope Stabilization $1,300 SC-HK Wantman Feb Kirk Rd. S. over LWDD L-7 Canal to Pot '0 Gold St. 0.1 mi 3 L, Bridge Replacement-Culvert $1,300 KFS-MCD Gerwig Feb Purdy Lane, Forest Hill Elementary to E. of Major Dr. 0.2 mi, 3 L, Bridge Replacement $2,300 KF-EF Wantman Mar Northlake Blvd. & Military Trail Intersection Improvements $1,380 DY-MA Area dis Mar Wallis Rd., LWDD E-3 Canal to Haverhill Rd. Pathway $900 KFS-MCD Schorah Apr Coral Ridge Dr. - S. County Regina! Park N. Entrance to 750' N. 0.1 ml, 2L $1,130 DY-MA Area dis May Camino Real Rd.IBoca Club over Intracoastal Waterway Bridge Rehabilitation Bridge Rehatilitation $9,000 KFS SMO Wantman May Flavor Pict Rd., SR7 to Lyons Rd. 1.0 mi, 2L $3,800 KF-AK Stantec May Indiantown Rd. & Jupiter Farms Rd. lntersecl on Improvements $1,100 DY-WC K-F Group May Kirk Rd. over LWDD L-5 Canal Bridge Replacerrent-Culvert $500 KFS-MCD Gerwig May PGA Blvd. & Central Blvd. Intersection Improvements $400 DY-FM Area dis RO.ADWAYPROOUCTION DMSION ANNUAL REPORT - FY2016 EXHIBIT.. 8 ~, PAGE 1 OF 3
7 ROADWAY PRODUCTION DIVISION FY 2017 BIDDING SCHEDULE Proposed Bid Da11e Project Number Project Name, Umits Deocriptlon Rd. Miles Addl. Ln. Miles "Bid-Est $(X 1000) PMIPE Consultant Jun Australian Ave. and Palm Beach Lakes Bhd. Intersection Improvements $1,200 KF-EF Wantman Jun A Boynton Beach Blvd and Acme Dairy Rd. Intersection Improvements $200 DY-MA Klmley-Hom Jun-17 (1) (1) Hood Rd.- E. of Florida's Tumplke tow. of Central Blvd. Hood Rd. and Central Blvd. 1.2 ml, 4L Includes new Bridge over 1-95 lnterseclon Improvements $14,200 DY-MA KF-SJ Stanley Arcadls Jun Lyons Rd., Hillsboro Canal to SW 18th Street ,6 L $2,000 KF-AMD LDI Jun Lyons Rd., Oint Moore Rd. to Atlantic Ave. 3.0 ml, 4 L $8,600 KF-ABK HSQ Jun Okeechobee Blvd. & Skees Rd. lnterseclon Improvements $450 DY-WC HSQ Jun-17 (2) A (2) B Roebuck Rd. - Jog Road to Haverhill Rd. Jog Rd./Roebuck Rd. 1.0 ml, 5 L lnterseclon Improvements $6,000 KF-SJ Mock Roos Jun-17 (3) (3) Sandalfoot BlvdJSR 7 over LWDD E-1 Canal S.W. 3rd. Sl/SR 7 over LWDD E-1 Canal Bridge Replacement and Intersection Improvement $3,000 KF ABK AGA Jun Sherwood Forest Blvd. over LWDO L-8 Canol Bridge Improvements $550 KFS-MCD Wantman (1) and wu be combined and let as one contract (2) Aand B,..II be combined and let as one contract (3) and Yill be combined and let as one contract FY 2017 TOTAL 33 PROJECTS $70,985 ROADWAY PRODUCTION OMSION ANNUAL REPo:tT FY2016 E.XHI81T e. PAGE 2 OF 3
8 11t8J2017 ROADWAY PRODUCTION DIVISION FY 2017 BIDDING SCHEDULE Project Number Project Name, Limits Description Rd. Miles Addl. Ln. Miles "Estimate $(X 1000) PMIPE Consultant ANNUAL CONTRACT PROJECTS th Street South and SR 7 lntersecton Improvements $25 KF-SJ In-House Fairgrounds Rd. and Weisman Way lnterseclon Improvements $250 KFS-MCD In-House Glades Rd. & Sandpiper Shores Elementary School lnterseclon Improvements $150 OY-WC Area dis A Indiantown Rd. & Sierra Square lnterseclon Improvements $80 OY-WC K-f Group Island Way and limestone Creek Road Intersection Improvements $40 KF-SJ In-House Jog Road and LWOD L-16 Canal Intersection Improvements $35 KF-SJ In-House Lantana Rd. and Brentwood Rd. lnterseclon Improvements $25 KF-SJ In-House Lantana Rd. and Willowood Lane Intersection Improvements $20 KF-SJ In-House Loxahatchee RJver Rd. and Via Rio Intersection Improvements $25 KF-SJ In-House Lyons Road from PBCHS Entrance to LWDD L-7 Canal lnterseclon Improvements $35 KF-SJ In-House Northlake Blvd., SR 710 to Military Trail Milling and Resurfacing $1,075 DY-WC In-House Woolbright Rd. -Military Trail to lawrence Rd. Milling, Resurfacing and Drahage Improvements $990 DY-WC In-House FY 2017 ANNUAL CONTRAClOR 12 PROJECTS $2,750 ROADWAY PRODUCTION DMSION ANNUAL REPORT - FY201 6 EXHIBIT "B", PAGE 3 OF 3
9 ROADWAY PRODUCTION DIVISION CONSTRUCTION CONTRACT AWARDS FY 2016 Project Number Project Name, Limits Description Miles Bid ($X 1000) Rd. Ln. Est. Act. Award Date Mgr. / Act. Eng. FY 2016 Project Contracts Australian Ave., W. 10th St. to 330' N. of W 13th St. Intersection Improvements $450 $700 Sep-16 DY-MA Canal Point Pedestrian Bridge Bridge $700 $812 Aug-16 HK CR880 Canal Bank Stobllizatlon Project Bank Stabilization $1,400 $884 Apr-16 HK-SC Garden Rd., S. of FOOT Canal to S. of Blue Heron Blvd. 0.3 ml, 3 L $1,090 $908 Sep-16 KFS-MCD (1) Haverhill Rd., Lantana Rd. to South of the LWOO L~14 Canal (1) Haverhill Rd., South of the LWOD L 1 4 Canal to Lake Worth Road 4LD Widen 2L to SL $8,900 $7,445 Sep-16 KF-SJ Lyons Rd.: Lantana Rd ton. of LWDD L-14 Canal Widen 2L to 4LD $5,100 $4,307 Mar-16 KF-ABK Old Dixie Hwy., 45th Street to Park Avenue Milling and Resurfacing $1,200 $1,048 Jul-16 HK Old Dixie Hwy., Park Ave. to Northlake Blvd. 0.9 mi, 3 L $3,500 $3,084 Sep-16 DY-MA Palmetto Park Rd. Bridge over LWOD E-1 Canal Sidewalk & Banner Modifications $120 $119 Feb-16 KF-EF Penny Ln., Melaleuca Ln. to dead end MSTU $300 $455 Aug-16 KFS-SMO Toney Penna Or. and Old Oixie Hwy. Intersection Improvements $1,600 $2,079 Sep-16 DY MA (1) Projects and combined and let as one contract FY 2016 TOTAL 12 Projects ,360 21,8-41 Annual Contracts Annual Roadway Landscaping $1,250 $1,404 Feb-16 HK Annual Annual Asphalt Milling and Resurfacing Asphalt Milling and Resurfacing 0.0 o.o $5,600 $5,632 $5,688 Feb-16 HK Annual Annual Annual Pathway and Minor Construction Pathway and Minor Construction Federalized} Traffic Signal ss.soo $4, $2,800 $3, $9,800 $5,152 Feb-16 Mor-16 May-16 HK HK HK Annual Annual Pavement Mart(lng Pavement Mart(ing $3,500 $2,030 $2,203 Jun-16 HK Annuli Guardrail $625 $556 Jul-16 HK Annual Traffic Loops $815 $916 Sep-16 HK FY 2016 TOTAL 10 Projects ,890 31,762 PROJECTS BUILT BY ANNUAL CONTRACTORS rovements $ $ $1, $440 FY 2016 TOTAL 4 Projects $3,470 ROADWAY PRODUCTION DIVISION ANNUAL REPORT FY 2016 EXHIBIT "C", PAGE 1 OF 1
10 CONSULTANT COMPETITIVE NEGOTIATIONS ROADWAY PRODUCTION CONSULTANT CONTRACT DOLLAR AWARDS Project Number Project Name, Limits Amount Florida Mango Road: 1Oth to Edgewater Drive $653, th Ave. over Lake Osborne $281, Benoist Farms Road: SR 80 to Belvedere Road FY2016- TOTAL $490, $1,425, I Annual Agreements Issued Renewed Intersection Improvements Street Lighting Design Services Traffic Signal Design Services Construction Materials Testing, Geotechnical Engineering & Inspections Structural Engineering Services Surveying & Mapping Services Civil Engineering Services I FY2016 ANNUAL AGREEMENT- TOTALS Miscellaneous Consultants Certified Consultants Re-Certified New Tasks to Annuals Supplements to Selected Projects Supplements to Annual Tasks MISCELLANEOUS TOTALS ROADWAY PRODUCTION DIVISION ANNUAL REPORT FY EXHIBIT "D", PAGE 1 of 1
11 ROADWAY PRODUCTION DIVISION SBE GOAL & CONTRACTOR COMMITMENT FOR PROJECTS AWARDED Project Number Project Name Award Amount Award/Minus Contingent Items Contractor "/o SBEGoal $$ Contractor Commitment % $$ FY 2016 County Funded Projects Australian Ave., W. 10th St. to 330' N. of W 13th St. $699, $658, R & D Paving, LLC 15.00% $98, % $340, CR880 Canal Bank Stabilization Project $883, $883, Dickerson Florida, Inc % $132, % $136, Garden Rd., S. of FOOT Canal to S. of Blue Heron Blvd. $907, $882, Community Asphalt Corp % $1 32, % $131, Haverhill Rd., Lantana Rd. to South of the LWDD L-14 (1) Canal Haverhill Rd., South of the LWDD L-14 Canal to Lake Worth (1) Road A Lyons Rd.; Lantana Rd ton. of LWDD L-14 Canal $7,444, $4,307, $7,366, $4,262, J.W. Cheatham, LLC Rosso Site Development, Inc % $1,104, % $639, % $1,174, % $2,471, Old Dixie Hwy., Park Ave. to Northlake Blvd. $3,084, $2,998, Community Asphalt Corp % $449, % $467, Palmetto Park Rd. Bridge over LWDD E-1 Canal $118, $118, West Construction 15.00% $17, % $1 8, Penny Ln., Melaleuca Ln. to dead end $454, $348, R & D Paving, LLC 15.00% $52, % $95, Toney Penna Dr. and Old Dixie Hwy. $2,079, $2,040, Community Asphalt Corp % $306, % $236, (1) Projects # and # combined and let as one contract FY 2016 TOTAL 10 PROJECTS $19,979, $19,559, % $2,933, % $5,073, FY 2016 Federally Funded Projects Canal Point Pedestrian Bridge Award Amount $811, Contractor West Construction Old Dixie Hwy., 45th Street to Park Avenue $1,048, Ranger Construction, Industries, Inc. FY 2016 TOTAL 2 PROJECTS s1,859,8o2.oo I Project was federally funded, and the responsive bidder could not be ranked for SBE compliance due to federal funding restrictions. Notes: Award amounts include Utility Company Participation. Percentage figures are not rounded. ROADWAY PRODUCTION DIVISION ANNUAL REPORT- FY 2016 EXHIBIT "E", PAGE 1 OF 1
12 ROADWAY PRODUCTION DIVISION SBE GOAL & CONTRACTOR ACHIEVEMENT FOR PROJECT FINALED Project Number Project Name Initial Amount Final Amount % +I Contractor Initial Amount Less Less Contingency Contractor Commitment ss % Final Contract Amount Less Final Contingency ss Contractor Achiev em ent,4 FY2016 County Funded Projects Clint Moore Road and Military Trail Drainage Improvements $339, $263, '!. Foster M1rine Contr~c:totS, Inc. $33., S56,7 o.so 16.96% $261, $57, % Intracoastal Road SeawaU Repair $125,995." $133,151." 6.24% Coston M1rine Services, Inc. $125, $11, % SU3,15U n2,uu 69.36% 201"10 PahTH!ftO Pi"' Road Bridge over the LW.O.O. E-1 Canal $111, $121,U % West Construction, Inc. $111, S11,U % S1Z1,U...50 $22,10' '.4 FY 2016 TOTAL 3 PROJECTS $513,752." $519, % $57!, FY 2016 Federaltv Funded Pro!ects Selveoere Road from Club "ouse Ortve to Australian Avenue th Slreet from 1-95 to Old OilCie Highway/Greenwood Avenue $7 67, $1,2n,S06.25 $611, % $1,352,U % Ranger Construction. In<. J.W. Cheathlm, LLC 2013&18 Historic Jupiter Indiantown Trail Riverbend Par1t to Cypress Creek Natural Area $098, $099, % Rosso Site Development, Inc. Notes: Initial and Final Award Amounts include Util ~y Company Par1 1cipatlon. Percentage f.gures are not rounded ROADWAY PROOUCTlON DNISION ANNUAL REPORT FY 2015 EXHIBIT " F", PAGE 1 OF 1
13 ROADWAY PRODUCTION -ACTIVE PROJECT STATUS PROJECT NAME, LIMITS PROJ. NO. DESCRIPTION PHASE START COMPLETE STATUS PM PE CONSULTANT SCHED. ACTUAL SCHED. ACTUAL 10th Ave. North and Boutwell Rd Intersection s S2013 Complete KOF SJ Mock Roos D Master Plan R Awaiting Design c Awaiting Design 45th Street and Military Trail Intersection Improvement Intersection D S N.T.P Issued DY MA HSQ Group, Inc. R Awaiting Design c Awaiting Design 45th St. from 1-95 to Old Dixie Highway/Greenwood Milling & Resurfacing c S2015 2S2016 Finaled HK In-House Avenue 6th Avenue South over Lake Osborne Drive Bridge Replacement D Study NTP Issued DY FM Stantec R Awaiting RIW c Awaiting Design 60th St. N., W. of Royal Palm Beach Blvd. to E. of C 0.5 mi, 3 L D S % Complete KOF KOF K-F Group Royal Palm Beach Blvd. R S S2014 Complete c S S2017 Substantially Complete Atlantic Ave. and Florida's Turnpike Intersection s S S2015 Complete DY MA Kim ley-horn D S % Complete c Awaiting Design Roadway Production Division- Annual Report FY S - First Semester / 2S- Seco11d Semester Exhibit G Page 1 of24
14 PROJECT NAME. LIMITS PROJ. NO. DESCRIPTION PHASE START COMPLETE STATUS PM PE CONSULTANT SCIIED. ACTUAL SC/IED. ACTUAL Australian Ave. and Palm Beach Lakes Blvd mi, 5/6 L D S % Complete KOF EF Wantman c Awaiting Design Australian Ave Over Carver Canal Bridge s S S2016 Complete OY MA RJ Behar Australian Ave., W. 10th St. to 330' N. Of W.13th St Intersection S S2015 Complete DY MA Kimley-Horn R S S2016 Complete c S Under Construction Belvedere Road & Sansbury's Way Safety S/D Scope and Fee DY MA Arcadis c Awaiting Design Belvedere Road from Club House Dr. to Australian Milling & Resurfacing c S2015 2S2016 Finaled HK In-House Avenue Benoist Farms Rd., SR 80 to Belvedere Rd mi. 3L S Master Plan Submitted KOF AMO Scalar R Awaiting Design c Awaiting Design Bishoff Rd., Dead End to Jog Rd MSTU Paving & Scope & Fee Pending KFS SMO COl Drainage c Awaiting Design Blue Heron Blvd. and Congress Ave Intersection S S2015 Complete OY MA Arcadis R S R/W Acquisition c Awaiting R/W Roadway Production Division -Annual Report FY 2016 IS- First Semester / 2S- Seco11d Semester Exhibit G Page 2 of24
15 PROJECT NAME, LlMITS PROJ. NO. DESCRIPTION PHASE START COMPLETE STATUS PM PE CONSULTANT SCHED. ACTUAL SC/fED. ACTUAL Blue Heron Blvd. and Australian Ave Intersection D S % Complete DY MA Kim ley-hom R S FOOT Review c Awaiting Design Bluegill Trail from Grassy Waters Preserve/Northlake Pathway c S S2016 Substantially Complete HK HK Blvd. ton. of PGA Blvd. Boca Del Mar Dr.. Montoya Cir. N. to Palmetto Park Pathway D S Permit Pending KFS SMO In-House Rd. c Awaiting Design Boca Del Mar Or.. Montoya Cir. S. to Power1ine Pathway S % Complete KFS SMO In-House c Awaiting Design Boynton Beach Blvd. and Southbound Entrance to S Study s $ Work Stopped- FOOT KOF KOF Kimley-Hom Florida's Turnpike Boynton Beach Blvd. and Acme Dairy Rd A Intersection D % OY MA Kim ley-horn R RIW Acquisition in Process c Awaiting RIW Burns Rd. and Military Tr Intersection D Complete DY MA Arcadis/ Abacoa R S2014 Complete c S S2016 Substantially Complete Cabana Colony Missing Links Pathway S S2016 Complete KFS SMO In-House c Under Construction Roadway Production Division- Amrua/ Report FY 2016 IS- First Semester!2S- Seco11d Semester Exhibit G Page3 o/24
16 PROJECT NAME, LIMITS PROJ. NO. DESCRIPTION PHASE START COMPLETE STATUS SCHED. ACTUAL SCHED. ACTUAL PM PE CONSULTANT Camino Real Rd./Boca Club Bridge over Intracoastal Bridge Rehab. D Waterway S % Review KFS SMO WGI/BDA R NIA NIA NIA c Awaiting Design Camino Real Rd.IMilitary to 7th Safety Improvements D & Resurfacing % Complete DY we In-House R c NIA NIA NIA Awaiting Design Canal Point Pedestrian Bridge over L-10 Canal Improvements D S Complete HK HK AGA R c NIA NIA NIA NIA NI A Under Construction Center St.. Thelma Ln. to Woodland Estates Dr A 0.3 m i. 3L D S % Review Pending KFS MCD CDI R c S RIWI Acquisition in Process Awaiting Design Central Blvd.IUniversity Blvd Roundabout s S S2015 Complete KOF ABK HSQ Church St., Limestone Creek Rd. to W. of Central Blvd mi. 3 L D S % Revision pending KFS SMO Simmons & White R c Awaiting Design Awaiting Design Clint Moore Rd. and Military Tr Drainage D c S S2015 Complete S2015 1S2016 1S2016 Finaled DY HK Civil Design Roadway Production Division- Ammo/ Report FY 2016 JS- First Semester / 2S- Second Semester Exhibit G Page4of24
17 PROJECT NAME, LIMITS PROJ. NO. DESCRIPTION PHASE START COMPLETE STATUS PM PE CONSULTANT SCI/ED. ACTUAL SCHED. ACTUAL Clint Moore Rd. E of Congress Ave. to E. of LWDD E Bridge Replacement D Cancelled KOF AMD WGI 4 Canal c Cancelled Congress Ave over WPB 'F' Canal, N of Okeechobee Bridge Replacement D S % plan complete KOF AMD HSQ Blvd to Ware Dr. c Awaiting Design Congress Avenue & Palm Beach Lakes Blvd Intersection D S % Review DY MA Arcadis R Awaiting Design c Awaiting Design Congress Ave., N. of Northlake Blvd. to Alt. A-1-A mi, 2 L & 3 L s S S2016 Study Complete KOF AK Kimley-Horn D S N.T.P. Issued R Awaiting Design c Awaiting Design Connector Rd., Lyons Rd. to Acme Dairy Road mi. 213 L D S S2016 Complete DY FM Civil Design c Bid Process Coral Ridge Drive Park Road to 750' N Miles D S % Complete DY MA Arcadis c Awaiting Design Roadway Production Division -Annual Report FY 2016 JS- First Semester I 2S- Seco11d Semester Exhibit G PageS of24
18 PROJECT NAME, LIMITS PROJ. NO. DESCRIPTION PHASE START COMPLETE STATUS SCHED. ACTUAL SCHED. ACTUAL PM PE CONSULTANT C.R. 880 Twenty Mile Bend Slope Protection Slope Protection D S S2014 Complete DY HK BOA R N/A N/A N/A c S S2015 Substantially Complete CR 880 Twenty Mile Bend Slope Protection - Phase II Slope Protection c S2016 Under Construction HK HK Wantman Group CR 880 Bridge over C-51 Canal Bridge Replacement D S Master plan complete KOF EF AGA R c Awaiting Design F Davis Rd. Bridge over LWDD L-6 Canal Bridge Replacement D S % submittal pending KFS MCD AGA R c N/A N/A N/A Awaiting Design Dr. Martin Luther King Jr. Blvd. from Rosenwald Elem Canst. Inspection JPA c School to US Under Construction HK In-House Drexel Rd. Bridge over LWDD L-2 Canal, S of Fair Bridge Replacement D Green to 15th Ln S % Review Pending KFS MCD RJ Behar R S S2016 Complete c Awaiting Design Dyer Blvd. and Military Tr Intersection D S S2015 Complete KOF SJ In-House R N/A N/A N/A c S S2016 Finaled Fairgrounds Rd., North of Southern Blvd. to Detention Pathway D Center S % Complete KFS SMO In-House R c S R/W Acquisition in Process Awaiting Design Roadway Production Division -Annual Report FY 2016 IS- First Semester / 2S- Second Semester Exhibit G Page6of24
19 PROJECT NAME, LIMITS PROJ. NO. DESCRIPTION PHASE START COMPLETE STATUS PM PE CONSULTANT SCflED. ACTUAL SCHED. ACTUAL Fairgrounds Rd. and Weisman Way Intersection D S g6% Design Complete KFS MCD In-House c Awaiting Design Flavor Pict Rd.. S.R. 7 to Lyons Rd mi, 2 L D S % Review KOF AK Stantec R N/A N/A c Awaiting Design Florida Mango Road Widening from 10th Ave North to mi. 3 L D S N.T.P. Issued KOF AMD Stanley Edgewater Dr. R Awaiting Design c Awaiting Design Florida Mango Rd., Edgewater Dr. to Barbados Rd mi, 3L D S % Submittal KOF AMD AGA R Awaiting Design c Awaiting Design Florida Mango Rd. Bridge, N. of Myrica Rd to Summit mi, 3 L D S % Submittal KFS SMO AGA Blvd. R Awaiting Design c Awaiting Design Florida Mango Rd. over LWDD L-5 Canal Bridge Replacement D S Design Change KFS SMO AGA R Awaiting Design c Awaiting Design Florida Mango Rd. over PBC L-2 Canal Bridge Replacement D Scope & Fee Pending KFS MCD RJ Behar c Awaiting Design Roadway Production Division- Annual Report FY 2016 IS- First Semester 12S- Seco11d Semester Exhibit G Page 7 o/24
20 PROJECT NAME, LIMITS PROJ. NO. DESCRIPTION PHASE START COMPLETE STATUS PM PE CONSULTANT SCHED. ACTUAL SCHED. ACTUAL Forest Hill Blvd. and Military Tr S Study s S Study Complete KOF SJ Kim ley-horn Garden Rd.. S. of FOOT Canal to S. of Blue Heron mi, 3 L D S S2016 Complete KFS MCD LDI Blvd. c S Under Construction Gateway Blvd. and Military Tr Intersection D S % Complete DY FM Kimley-Horn R S Appraisals c Awaiting Design Gateway Blvd. I High Ridge Rd Intersection D S % Complete DY we HSQ R N/A c Awaiting Design Glades Road & Sandpiper Shores Elementary School Intersection D S % Review DY we Arcadis Improvements c Awaiting Design Glades Rd. and Florida's Turnpike Intersection D S S2016 Complete by FOOT KOF AMD Turnpike c S NTP Pending Glades Rd. and Butts Rd Intersection D S % Complete DY FM Kim ley-horn/boca R Awaiting Design c Awaiting Design Roadway Production Division - Allllual Report FY S - First Semester I 2S - Seco11d Semester Exhibit G Page 8of24
21 PROJECT NAME, LIMITS PROJ. NO. DESCRIPTION PHASE START COMPLETE STATUS PM PE CONSULTANT SCHED. ACTUAL SCHED. ACTUAL Gun Club Rd. over LWDD E-3 Canal Bridge Improvement s S S2014 Complete KOF EF WGI D S S2016 Complete c S S2017 Bid Process Haverhill Rd. Lantana Rd. to S. of LWDD L-14 Canal mi, 4 L D S S2016 Complete KOF SJ In-House c S NTP Pending Haverhill Rd, S. of LWDD L-14 Canal to Lake Worth mi, 4 L & 5 L D S S2016 Complete KOF SJ Arcadis Rd. R S S2016 Complete c S NTP Pending Haverhill Rd. from Summit Blvd. to Belvedere Rd Milling & Resurfacing c Awaiting Design HK In-House Haverhill Rd., N. of Caribbean to Bee Line Hwy mi, 5 L D S % Review Pending KOF EF R.J. Behar R S Awaiting Design c Awaiting Design Haverhill Rd.; N. of Caribbean Blvd. to Dyer Park N A Pathway D S Complete KOF EF RJ Behar Entrance c S NTP Pending Historic Jupiter Indiantown Trail: Pathway from Pathway c S S2015 Finaled DY HK S&WIERM Riverbend Park to Martin County line Roadway Production Divisioll- Annual Report FY 2016 JS- First Semester I 2S- Second Semester Exhibit G Page 9 of24
22 PROJECT NAME, LIMITS PROJ. NO. DESCRIPTION PHASE START COMPLETE STATUS PM PE CONSULTANT SCHED. ACTUAL SCf/ED. ACTUAL Hood Rd., E. of Florida's Turnpike tow. of Central mi, 4 L D S % Complete DY MA Stanley Blvd. R S R!W Acquisition in Process c Awaiting Design Hood Rd. and Central Blvd Intersection D S % Complete KOF SJ Arcadis c Awaiting Design Indiantown Rd. and Jupiter Farms Intersection D S % Complete DY we K-F Group R Awaiting Design c Awaiting Design Indiantown Road at Sierra Square A Intersection D S S2016 Complete DY we K-F Group c NTP Pending Intracoastal Seawall Repair Seawall Repair c S S2016 Finaled DY DY BDNWGI Island Way and Limestone Creek Rd Intersection D S2016 2S2016 Complete KOF SJ In-House R N/A N/A NJA c S2016 Awaiting Design Island Way/Casa Circle - Church Street Study s S Draft Study DY MA HSQ Jog Rd., S. of Clint Moore Rd. to Linton Blvd Safety Improvement & D 2015 Resurface 1S S2016 Complete DY we ln-house(aga) c S Under Construction Roadway Production Division -Annual Report FY 2016 IS- First Semester I 2S- Second Semester Exltibit G Page 10 o/24
23 PRO.JECT NAME, LIMITS PROJ. NO. DESCRIPTION PHASE START COMPLETE STATUS PM PE CONSULT ANT SCHED. ACTUAL SCHED. ACTUAL Jog Rd., S. of Hypoluxo Rd. to 10th Ave. N Safety Improvements D Complete DY DY In-House & Resurface c S Under Construction Jog Rd. Bridge over Florida's Turnpike Slope Stabilization D S % Complete DY FM RJ Behar c Awaiting Design Jupiter Farms Rd., 167th Place N. to ERM Property Pathway D S S2016 Complete KF5 SMO In-House c S Under Construction Kirk Rd. BridgeS. of LWDD l-7 Canal ton. of Pot 0 ' Bridge Replacement D S % Complete KFS MCD AGA GoldSt c Awaiting Design Kirk Rd., 80' N. of l-7 Canal to Summit Blvd Pathway D S2016 Design Complete KFS SMO In-House R N/A N/A NIA c Awaiting Bridge construction Kirk Rd from Summit Blvd to Gun Club Rd Pathway D S Design complete KFS SMO In-House R NIA N/A NIA c Awaiting Bridge construction Roadway Production Division- Annual Report FY S - First Semester I 2S- Second Semester Exhibit G Page 11 of24
24 PROJECT NAME, LIMITS PROJ. N O. DESCRIPTION PHASE START COMPLETE STATUS PM PE CONSULTANT SCIJED. ACTUAL SCHED. ACTUAL Kirk Rd. over LWDD L-5 Canal Bridge Replacement D % Review KFS MCD AGA c Awaiting Design Kudza Rd. over LWDD L-8 Canal Bridge Replacement D Scope & Fee Pending KFS SMO WGI c Awaiting Design Lake Worth Rd. and Jog Rd Intersection D S Scope Revised KOF AK Arcadis R S Awaiting Design c Awaiting Design Lantana Rd. & Brentwood Blvd Intersection D S % Complete KOF SJ In-House c Awaiting Design Lantana Rd. and Edgecliff Rd Intersection D S % Complete KOF AK In-House R R/W Acquisition in Process c Awaiting R/IN Lantana Rd & Willowood Lane Intersection D S % Complete KOF SJ In-House c Awaiting Design Lantana Rd. and Lawrence Rd Intersection D S % Complete KOF AMD Arcadis R Awaiting Design c Awaiting Design Roadway Production Division- Annual Report FY 2016 IS- First Semester 1 2S- Seco11d Semester Exhibit G Page 12 of24
25 PROJECT NAME, LIMITS PROJ. NO. DESCRIPTION PHASE START COMPLETE STATUS PM PE CONSULTANT SCHED.ACTUAL SCI/ED. ACTUAL Linton Blvd. and Military Tr Intersection S Revised 65% Complete KOF SJ Arcadis R Legals & Sketches Review c Awaiting R/W Linton Blvd and Federal Hwy Intersection S S % Complete DY MA HSQ c Awaiting Design Lyons Rd., Hillsboro Canal to S.W. 18th St mi. 6 L D S % Submittal Review KOF AMD LDI R RIW Acquisition in Process c Awaiting Design Lyons Rd., Clint Moore Rd. tow. Atlantic Ave mi, 4L D % plans complete KOF AK HSQ c Awaiting Design Lyons Rd., L-38 Canal to N. of L-37 Canal mi, 4 L D S S2014 Complete KOF AK LDI/Developer c S2014 Finaled Lyons Rd. and Atlantic Ave Intersection S S2016 Complete KOF AK LDI/Developer c S Under Construction Lyons Rd., Lantana Rd. ton. of L.W.D.D. L-14 Canal A 1.0 mi. 4 L S S2016 Complete KOF AK HSQ c S Under Construction Roadway Production Division- Annual Report FY 2016 IS- First Semester I 2S- Seco11d Semester Exhibit G Page 13 of24
26 PROJECT NAME, LIMITS PROJ. NO. DESCRIPTION PHASE START COMPLETE STATUS PM PE CONSULTANT SCHED. ACTUAL SCHED. ACTUAL Lyons Rd.. N. of LWDD L-14 Canal to Lake Worth Rd mi,4L S % Submittal Pending KOF AK HSQ R Awaiting design c Awaiting Design Lyons Rd.. Lake Worth Rd. to S. of L.W.O.O. L A 0.2 mi, 2/3 L S % Resubmittal KOF AK HSQ Canal Pending R Awaiting design c Awaiting Design Lyons Rd., S. of LWDD L-11 Canal ton. of LWDD L mi, 2/3 L S On Hold KOF AK HSQ 10 Canal R On Hold c F F On Hold Lyons Rd., S. of S.R Right Turn Lane S S2015 Complete DY MA In-House c S S2015 Complete Lyons Road -Norte Lago to Pine Springs Drive Safety Reconstruction DY FOOT Muck City Rd Pathway S % Complete KFS SMO In-House c Awaiting Design Myrtle Or. and 47th Way MSTU S S2016 Complete KFS SMO LDI c Bids Rejected Roadway Production Division- Annual Report FY 2016 IS - First Semester I 2S- Scco11d Semester Exhibit G Page 14 o/24
27 PROJECT NAME, LIMITS PROJ. NO. DESCRIPTION PHASE START COMPLETE STATUS PM PE CONSULTANT SCHED. ACTUAL SCHED. ACTUAL Northlake Blvd.. Osprey Isles Blvd. to Ibis Blvd Pathway D S Survey Pending KFS SMO In-House c Awaiting Design Northlake Blvd., E. of Seminole Pratt Whitney Rd. to A 1.0 mi, 4 L D S % Submittal KOF EF Metric E. of Hall Blvd. R S Legals & Sketches c Awaiting RIW Northlake Blvd., E. of Hall Blvd. to Coconut Blvd B 2.4 mi, 4 L D S On Hold KOF EF Metric R S Legals & Sketches c Awaiting Design Northlake Blvd., SR 710 to Military Trail Safety Improvements D S Under design DY we In-House & Resurface c Awaiting Design Northlake Blvd. and Military Tr Intersection D S S2016 Complete DY MA Arcadis R S RIW Acquisition in Process c Awaiting RIW Northlake Blvd., Alt. A1A & Prosperity Farms Road Study s S Draft Study DY we A rca dis Oakwood Lakes Dr from Boynton Bch Blvd to Old Pathway D S S2016 Complete KFS SMO In-House Boynton Rd R N/A NIA N/A c Awaiting Design Roadway Production Division- Annual Report FY 2016 IS- First Semester I 2S- Seco11d Semester Exhibit G Page 15 of24
28 PROJECT NAME, LIMITS PROJ. NO. DESCRIPTION PHASE START COMPLETE STATUS PM PE CONSULTANT SCH 0. ACTUAL SCH 0. ACTUAL Okeechobee Blvd., Cheetham Hill Rd. to 168th Tr. N Pathway D S Permits Pending KFS SMO In-House c Awaiting Design Okeechobee Blvd. and Ponce de Leon St WB Turn Lane D S S2015 Complete KOF SJ In-House R S S2016 Complete c S S2017 Under Construction Okeechobee Blvd. and Skees Road Intersection D S % Complete DY we HSQ Group, Inc. R N/A N/A c Awaiting Design Okeechobee Blvd. & Jog Road NB Lefts, Study s S Draft Study DY MA HSQ Okeechobee Blvd. and Church St Intersection D S S % Review KOF SJ Arcadls R Awaiting Design c Awaiting Design Old Dixie Hwy., Yamato Rd., Linton Blvd mi. 3 L D S % Complete DY MA American R Awaiting Design c Awaiting Design Old Dixie Hwy., 45th St. to Park Ave Milling & Resurfacing c Under Construction HK HK In-House Old Dixie Hwy., Park Ave. to Northlake Blvd mi. 3 L D S S2016 Complete DY MA American R S S2016 Complete c S N.T.P. Pending Roadway Pmduction Division- Annual Report FY 2016 IS- First Semester I 2S- Second Semester Exhibit G Page 16 of24
29 PROJECT NAME, LIMITS PROJ. NO. DESCRIPTION PHASE START COMPLETE STATUS PM PE CONSULTANT SCHED. ACTUAL SCHED. ACTUAL Orange Blvd., Seminole Pratt Whitney Rd. to 120th Pathway s S S2014 Complete KFS SMO In-House Ave. D S % Complete c Awaiting Design Palm Beach Lakes Blvd. Bridge over FEC Railroad Study s S S2015 Complete KOF EF R.J. Behar Palm Beach Lakes Blvd. & N. Robbins Drive Intersection D S Awaiting NTP KOF SJ HSQ R Awaiting Design c Awaiting Design Palmetto Park Rd. Bridge over LWDD E-1 Canal Bridge Replacement D S S2015 Complete KOF EF WGI c S2016 Finaled Palmetto Park Road & Boca Rio Road Intersection D S Master plan review DY FM HSQ c Awaiting Design Palmetto Park Road, E. of Military to Intersection D Consultant Selection KOF EF TBD Improvement R Awaiting Design c Awaiting Design Palmetto Park Rd., SW 7th Ave. to SW 5th Ave mi, 4/6 L D S % Complete KOF EF WGI R Awaiting design c Awaiting Design Roadway Production Division -Annual Report FY 2016 IS- First Semester I 2S- Seco11d Semester Exhibit G Page 17 of24
30 PROJECT NAME, LIMITS PROJ. NO. DESCRIPTION PHASE START COMPLETE STATUS PM PE CONSULTANT SCf/ED. ACTUAL SCHED. ACTUAL Palmetto Park Rd. Bridge over Intracoastal Waterway Rehab/Painting D S S2015 Complete DY DY BDAIWGI c Awaiting Design Palmwood Rd. Slope Stabilization Slope Stabilization D S S2016 Finaled DY FM BDA!WGI c Award Pending Penny Ln., Melaleuca Ln. to dead end MSTU D S S2016 Complete KFS SMO S&W R S S2015 Complete c S Under Construction P.G.A. Blvd. and Central Blvd Intersection D S S2016 Complete DY FM Arcadis R RIW Acquisition in Process c Awaiting RIW P.G.A. Blvd. and Military Tr Intersection D S % Review KOF AMD Civil Design R Legals & Sketches c Awaiting RIW P.G.A. Blvd. and Ellison Wilson Rd Intersection D S S2016 Complete DY FM HSQ c S Under Construction Point Chosen Swing Bridge over Rim Canal Fender System c S Under Construction DY DY BDA!WGI Polo Road - LWDD L-13 Canal to Lake Worth Road L, 0.5 mi D 2S2016 Developer 65% DY FM Schnars/Pulte complete c F Roadway Production Division- Annual Report FY 2016 IS- First Semester / 1S- Second Semester Exhibit G Page 18 of24
31 PROJECT NAME, LIMITS PROJ. NO. DESCRIPTION PHASE START COMPLETE STATUS PM PE CONSULTANT SCHED. ACTUAL SCHED. ACTUAL Prairie Road over LWDD L-8 Canal Bridge Replacement D 1S201 1S2018 Scope & Fee Pending KFS MCD WGI R N/A N/A NIA c Awaiting Design Purdy Ln., Forest Hill Elem. to E. of Major Dr mi, 3 L D S % Review Complete KOF EF WGI R S RIW Acquisition in Process c Awaiting Design R.C.A. Blvd. and Alt. A-1 -A Right turn lane D S S2016 Complete DY MA Arcadis R S S2014 Complete c S S2016 Finaled Redding Rd and Sunup Tr Drainage Study s S S2016 Complete DY FM Civil Roebuck Rd. and Jog Rd A Intersection D S2013 1S2016 Complete KOF SJ Mock Roos N/A c Awaiting Design Roebuck Rd., Jog Rd. to Haverhill Rd mi, 5 L D S % Complete KOF SJ Mock, Roos R S RIW Acquisition in Process c Awaiting Design Roebuck Rd.. Little Oaks to Loxahatchee Pines Pathway D S % Complete KFS SMO In-House R S Awaiting Design c Awaiting Design Roadway Production Division -Annual Report FY 2016 IS- First Semester I 2S- Seco11d Semester Exhibit G Page 19 of24
32 PROJECT NAME, LIMITS PRO.!. NO. DESCRIPTION PHASE START COMPLETE STATUS PM PE CONSULTANT SCHED. ACTUAL SCHED. ACTUAL Roebuck Rd., Loxahatchee Pines Dr. to Loxahatchee Pathway D S Permits Pending KFS SMO In-House River Rd. R S Acquisition Pending c Awaiting Design Royal Palm Beach Blvd., M-Canal to S. of Orange mi. 315 L D S % Complete KOF AMD K-F Group Blvd. R Awaiting Design c Awaiting Design Sandalfoot Blvd., S.R. 7 to E. of S.R Bridge D S % Complete KOF AK AGA c Awaiting Design SE 23rd Ave./Federal Highway Intersection s S N.T.P. Issued DY FM Arcadis Seminole Pratt Whitney Rd., S.R. 80 to S. of A 1.4mi,4L D S S2010 Complete KOF ws Crossroads Okeechobee Blvd. R S S2009 Complete c S Substantially Complete Seminole Pratt Whitney Rd., S. of Okeechobee Blvd B 2.8 mi. 4 L D S S2010 Complete KOF ws CH2MHILL to N. of Sycamore Dr. R S S2009 Complete c S Substantially Complete Seminole Pratt Whitney Rd., Sycamore Dr. to N. of C1 0.1 mi. 4 L c S Substantially Complete KOF WS Metric Sycamore Dr. Roadway Production Division- Allnual Report FY 2016 IS- First Semester I 2S- Second Semester Exhibit G Page 20of24
33 PROJECT NAME, LIMITS PROJ. NO. DESCRIPTION PHASE START COMPLETE STATUS PM PE CONSULTANT SCHED. ACTUAL SCHED. ACTUAL Seminole Pratt Whitney Rd.. Seminole Ridge HS to M mi, 4L D 2S2014 2S2016 Developer Complete DY FM Minto/Farner Canal c 1S2017 Developer-Under Construction Seminole Pratt Whitney Rd.. Orange Blvd. to S. of D 1.8 mi, 4/6 L D S % Pending KOF EF AECom Northlake Blvd. R S Legals & Sketches review c Awaiting R/W Seminole Pratt Whitney Rd. and Northlake Blvd A3 Intersection D S % Complete KOF EF Arcadis R S Legals & Sketches c Awaiting R/W Sherwood Forest Blvd., S. of L-9 Canal to S. of L Pathway D S S2017 Complete KFS SMO In-House Canal c Awaiting Bridge construction Sherwood Forest Blvd., over L.W.D.D. L-8 Canal Bridge Widening D S % Complete KFS MCD BDA/WGI c Awaiting Design Silver Beach Rd., E. of Congress Ave. to Old Dixie mi, 2 & 3 L D S % Review KOF AK Metric Hwy. R S R/W Acquisition in Process c Awaiting Design Roadway Production Division -Annual Report FY S- First Semester I 2S - Seco11d Semester Exhibit G Page 21 of24
34 PROJECT NAME, LIMITS PRO.!. NO. DESCRIPTION PHASE START COMPLETE STATUS PM PE CONSULTANT SCHED. ACTUAL SCIIED. ACTUAL Smith Sundry Rd. over LWDD L-33 Canal Bridge Replacement D Scope & Fee Pending KFS SMO WGI c Awaiting Design Southern Blvd. (SR 80) & Kirk Rd Intersection D S S2015 DY MA Arcadis c S Finaled MA SR 80 & Lyons Rd./Sansbury's Way Intersection D FOOT DY FM FOOT c FOOT Summit Blvd. Bridge over LWDD E-3 Canal Canal Bank Erosion D S Complete DY we RJ Behar c Bid Process Summit Blvd. Bridge over SFWMD C-51 Canal S Study s S Complete DY FM AGA S.W. 3rd. St.. S.R. 7 to E. of S.R Bridge D S % Complete KOF AK AGA c Awaiting Design S.W. 18th St. and Military Tr Intersection D S S2016 Complete DY FM HSQ c Bid Process Toney Penna Dr. and Old Dixie Hwy Intersection D S S2014 Complete DY MA Arcadis R S S2013 Complete c NTP Pending Roadway Production Divisiou- Aunua/ Report FY 2016 IS- First Semester / 2S- Second Semester Exhibit G Page 22 of24
February 15, Honorable Melissa McKinlay, Mayor and Members of the Board of County Commissioners. FayeW:~~~ Assistal}f' LOUT}'~drnlnistrator
Department of Engineering and Public Works P.O. Box 21229 INTEROFFICE MEMORANDUM West Palm Beach, FL 33416-1229 (561) 684-4 FAX: (561) 684-45 w ww.pbcgov.com Palm Beach County Board of County Commissioners
More informationIST FUNDING THROUGH CURRENT FISCAL YEAR ONLY
IST FUNDING THROUGH CURRENT FISCAL YEAR ONLY Data Date: 1/17/2019 Expended Engineering B04 - Bridge Modifications Smith Sundy Rd. over LWDD Lat. 33 Canal (PB934411) 600,000 600,000 $162,437 $75,944 Palm
More informationLand Use Context Definitions
Land Use Context Definitions Note: The colors to the right of the land use context names refer to the mapset. Land Use Context Type Description Building Placement and Parking Land Uses Data Source Higher
More informationOcean Way at U.S. #1 (Town of Jupiter) Installation of a new traffic signal.
PALM BEACH COUNTY TRAFFIC DIVISION UPDATE OF ROAD AND BRIDGE CONSTRUCTION LIST DATE OF ISSUE: FEBRUARY 13, 2013 STATUS FOR FEBRUARY 18, 2013 THROUGH FEBRUARY 24, 2013 *** CONSTRUCTION WORK ZONES ADDED
More informationPalm Beach County Infrastructure Sales Tax Program Project Tracking. FY 2017 Projects
FY 2017 Projects Engineering Lake Osborne Dr. over Lake Bass Canal Palm Beach Lakes Blvd over FEC R/R Smith Sundy Rd. over LWDD Lat. 33 Canal Kudza Rd. over LWDD Lat. 8 Canal Prairie Rd. over LWDD Lat.
More informationRoad widening from 2 lanes to 4 lanes. Bridge removal and piping of the canal. Lane closures are not expected.
PALM BEACH COUNTY TRAFFIC DIVISION UPDATE OF ROAD AND BRIDGE CONSTRUCTION LIST DATE OF ISSUE: SEPTEMBER 12, 2012 STATUS FOR SEPTEMBER 17, 2012 THROUGH SEPTEMBER 23, 2012 *** CONSTRUCTION WORK ZONES ADDED
More informationPALM BEACH COUNTY INFRASTRUCTURE SURTAX REVENUES As of November 30, 2017
PALM BEACH COUNTY INFRASTRUCTURE SURTAX REVENUES As of November 30, 2017 Interest Sales Tax TOTAL BUDGET Overage/(Shortfall) FY 2017 $ 185,642.45 $ 50,430,391.92 $ 57,708,049.23 $ 50,398,384.00 $ 7,309,665.23
More informationDraft Year 2040 Cost Feasible Plan
Year 2040 Plan Ranking of Desires Plan Projects And Matching of Available Revenues Palm Beach Metropolitan Planning Organization (MPO) Technical Advisory Committee (TAC) Citizens Advisory Committee (CAC)
More informationDCD:Z.ty Ea.~~ /{/Kile(
Department of Engineering and Public Works P.O. Box 21229 Wesr Palm Beach. FL 33416-1229 (56 1) 684-4000 FAX (561) 684-4050 www.pbcgov.com Palm Beach County Board of County Commissioners Mary Lou Berger.
More informationMay 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015
May 1, 2015 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report May 1 through May 8, 2015 Palm Beach County Palm Beach County traffic will be affected this week by ongoing
More informationPalm Beach County Traffic Report July 13 through July 20, 2012
For Immediate Release July 13, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report July 13 through July 20, 2012 Palm Beach County Palm Beach County traffic will be
More information1 6:52 AM BUS YARD 4:38 PM 2 7:12 AM N SEACREST BLVD & NE 16TH AVE 4:18 PM
8th 9th Grade Routes SouthTech Academy Transportation Routes STEC Trip 01 1 6:34 AM OKEECHOBEE BLVD & ROYAL PALM BEACH BLVD 5:00pm 2 6:52 AM GOODWILL @N MILITARY TRL & OKEECHOBEE BLVD 4:42pm 3 7:00 AM
More informationPalm Beach County Traffic Report. Aug. 25 through Sept. 1, 2017
August 25, 2017 Meredith Cruz, (561) 641 6440 mcruz@corradino.com Palm Beach County Traffic Report Aug. 25 through Sept. 1, 2017 Palm Beach County Palm Beach County traffic will be affected this week by
More informationPalm Beach County Traffic Report August 24 through August 31, 2012
For Immediate Release August 24, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report August 24 through August 31, 2012 Palm Beach County Palm Beach County traffic will
More informationGovernment in Palm Beach County
Government in Palm Beach County 2018 STAY CONNECTED Are you getting the latest updates and information from county government? If not, we invite you to visit our Stay Connected page at pbcgov.com/stayconnected.
More informationFALL Construction Project Status Report PROJECT HIGHLIGHT CURRENT PROJECTS. NORTH COUNTY DISTRICT PARK New Construction PROJECT SCOPE
FALL 2018 Construction Project Status Report PROJECT HIGHLIGHT 1 NORTH COUNTY DISTRICT PARK PROJECT SCOPE Palm Beach County has leased 82 acres to the City of Palm Beach Gardens for the construction of
More informationPALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY I. EXECUTIVE BRIEF
PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY Agenda Item: Meeting Date: July 11, 2017 Department: Submitted By: Office of Financial Management and Budget Submitted For: County Administration
More informationInfrastructure Sales Tax Capital Projects April 4, 2017
Engineering & Public Works Bridge Replacements Prosperity Farms Rd. over SFWMD C-17 Canal (934116) 1 6th Ave. So. over Lake Osborne (LWDD E-4 Canal)(S Br/ East bound) (934307) Corkscrew Blvd. over SFWMD
More informationFuture Land Use Amendments History Report
Amendments History Report Round 6 C 6 C 6 C 2 LGA 206 024 Feurring Commercial Southeast corner of Atlantic Ave & Adopted 206 035 4.90 Lyons Rd 2 LGA 206 025 2 LGA 205 00 6 B 2 LGA 206 007 West Boynton
More informationTRANDERSOL SAMPLING OF CENTRAL STATIONS BEGINNING IN FLORIDA CURRENT PROJECTS FLORIDA TRANDERSOL - EDERP MIAMI GRAND CENTRAL LONG EXPRESS EXPRESS
CURRENT PROJECTS FLORIDA NTSN MODULAR OUTLINE TRAIN SCHEDULE STOPS 75 10 10 95 27 95 75 75 75 75 4 4 27 75 595 75 MIRAMAR CENTRAL MIAMI KENDAL CENTRAL MIAMI TAMIAMI CENTRAL 95 595 MIAMI LAKES CENTRAL 95
More informationSUMMER Construction Project Status Report PROJECT HIGHLIGHT CURRENT PROJECTS. BRIDGEMAN DRIVE PARK New Construction PROJECT SCOPE
R/W EXISTING 6' WOOD FENCE NEW BENCH DUMOR 10-60PL S-1 EMBEDMENT (2) FM NEW BIKE RACK DUMOR 125-20 S-2 ENGINEERED PLAYGROUND MULCH (12"D, COMPACTED) M.H. M.H. EXISTING 6' WOOD FENCE E.B. 5' CONCRETE WALK
More informationFDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015
From: Kathleen Dempsey To: Kathleen Dempsey Subject: FDOT Treasure Coast Traffic Report 10 09 15 through 10 16 15 Date: Friday, October 09, 2015 2:10:36 PM Attachments: image003.png CR 714_Median Construction
More informationPALM BEACH MPO. May 3, Valerie Neilson, AICP Multimodal Manager Palm Beach MPO
PALM BEACH MPO May 3, 2017 Valerie Neilson, AICP Multimodal Manager Palm Beach MPO VNeilson@PalmBeachMPO.org US-1 MULTIMODAL CORRIDOR STUDY 1. Project Overview 2. Goals 3. Timeline 4. Next Steps PROJECT
More informationWhat is Shovel Ready Palm Beach? What is a Shovel Ready Site?
What is Shovel Ready Palm Beach? Shovel Ready Palm Beach is one of the first programs of its kind in Florida. Under the program, the BDB identifies vacant commercial and industrial property that is Shovel
More informationAPPENDIX A: Planning Consistency Checklist
APPENDIXA: PlanningConsistencyChecklist Planning Requirements for Environmental Document Approvals with Segmented Implementation Document Information: Date: 1/20/2015 Document Type: EA Document Status:
More informationFDOT Treasure Coast Traffic Report through
FDOT Treasure Coast Traffic Report 02 26 16 through 03 04 16 Kathleen Dempsey Fri 2/26/2016 2:56 PM To:Kathleen Dempsey ; 1 attachment 355 KB CR 714_Median Access Modifications.pdf;
More informationTREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 9
TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M To: Council Members AGENDA ITEM 9 From: Date: Subject: Staff October 21, 2016 Council Meeting South Dixie Highway Corridor Improvement Plan
More informationFDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015
June 19, 2015 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 TREASURE COAST Construction and maintenance-related lane
More informationApril 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014
April 4, 2014 Chuck McGinness, 954-777-4090 Chuck.McGinness@dot.state.fl.us FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014 TREASURE COAST Construction and maintenance-related lane closures
More informationFDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016
March 25, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016 TREASURE COAST Construction and maintenance-related
More informationDistrict Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director
District 8 2014 Construction Progr am Preble Greene Butler Warren Clinton Lebanon Hamilton Clermont Serving Butler, Clermont, Clinton, Greene, Hamilton, Preble and Warren Counties. John R. Kasich, Ohio
More informationEast Coast Greenway (ECG) Southeast Region Miami-Dade/Broward/Palm Beach/Martin/St. Lucie/Indian River
East Coast Greenway (ECG) Southeast Region Miami-Dade/Broward/Palm Beach/Martin/St. Lucie/Indian River What is the ECG/SE Region? Connects Key West to Maine 220 miles Indian River to Miami-Dade County
More informationForest Hill Blvd. at Kirk Road Widening Project FM#:
Seat Belts Save Lives. Buckle Up Everyone Every Time! Forest Hill Blvd. at Kirk Road Widening Project FM#: 435122-1-52-01 Project Scope This 0.298-mile project began Nov. 17, 2016 and is expected to be
More informationPALM BEACH MPO TRANSPORTATION IMPROVEMENT ADOPTED JUNE 15, Amended 7/20/17
PALM BEACH MPO TRANSPORTATION IMPROVEMENT PROGRAM FY 2018-2022 ADOPTED JUNE 15, 2017 WWW.PALMBEACHMPO.ORG/TIP Amended 7/20/17 2300 North Jog Road - 4th Floor - West Palm Beach FL, 33411-561.684-4170 Public
More informationState Highway System Key Sheet Broward County ²
Broward County ² GOVT RD/SNAKE RD 3 0 3 Indian River St. Lucie Martin Palm Beach Broward I-75 " On System Roads #" 10 3293 Map Preparation Date: 5/2/2016 3:53:29 PM 86075000 #" 75 US 27 Inset - 3 Inset
More informationFPL FiberNet Locations List CLLI ADDRESS MARKET SITE TYPE MIANFLHF W DIXIE HWY (Arcos) MIAMI CABLE LANDING STATION MIAMFLEL 1 NE 1ST ST MIAMI
FPL FiberNet Locations List CLLI ADDRESS MARKET SITE TYPE MIANFLHF 15950 W DIXIE HWY (Arcos) MIAMI CABLE LANDING STATION MIAMFLEL 1 NE 1ST ST MIAMI CARRIER CONDO MIAMFL98 100 N BISCAYNE BLVD MIAMI CARRIER
More informationFacility Renewal Project Budget Report July 01, 2018
Facility Renewal Project Report Referendum Project List August 31, 2018 ISSOC Meeting May 11, 2018 ISSOC Meeting Facility Renewal Projects Acreage Pines ES 7,001,890 7,001,890 7,001,890 - - Alexander W
More informationCompletion: August 2011 LS #321 Design LS #8
1 CIPNumber c350406 2 c350302 3 c350902 LEGEND PERMITTING/ BIDDING CHARLOTTE COUNTY UTILITIES Burnt Store Water Reclamation Facility (Expansion to 0.75 MGD) East Port Expansion Water Reclamation Facility
More information2016 FTBA ANNUAL CONFERENCE FDOT WORK PROGRAM OVERVIEW THE RITZ CARLTON ORLANDO, GRANDE LAKES August 4-7, 2016
Florida Department of TRANSPORTATION 2016 FTBA ANNUAL CONFERENCE FDOT WORK PROGRAM OVERVIEW THE RITZ CARLTON ORLANDO, GRANDE LAKES August 4-7, 2016 Jim Boxold, Secretary SECRETARY S CHALLENGE 2 2016 GENERAL
More information068D 420B 068C 421E SEMINOLE PRATT WHITNEY RD 420A SOUTHERN BLVD 500J 500Q 500B
068D PIERCE HAMMOCK 068H 069A 068J 068K 068A 448 420H FRONTIER 420B 068C ACREAGE PINES ORANGE BLVD 068E 068G 069B 420C 420G 420D 420E SEMINOLE PRATT WHITNEY RD 420A 421E 421A GOLDEN GROVE 421H 421C 421J
More informationAGENDA ITEM I. EXECUTIVE BRIEF PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY
Attachments: Lists identifying contracts: 1) Purchasing - Consent $ 3,762,333.28 2) TDC Contracts $ 16,500.00 3) Risk Management $ 721500.00 TOTAL $ 3,851,333.28 Recommended by: 7_,,_,/7 I I. Weiss, Director
More informationFDOT Treasure Coast Traffic Impact Report
July 7, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report July 7 through July 14, 2017 TREASURE COAST Construction and maintenance related lane
More informationFarmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP)
F100090 Fed ID: F100090 Farmington MPO Rec Num: 4 Lead Agency: City of Aztec Proj East Arterial Route Phase 1B Fr: US 550 To: Legion Rd Project Desc.: Construct new road Category: Capacity Proj NMDOT Dist.:
More informationBCC Meeting Schedule for 10/1/2014 To 10/31/2014
Meetings are subject to cancellation. Time and Location is also subject to change. Persons desiring to appeal any decisions made as a result of these meetings or hearings will need to ensure that a verbatim
More informationSL~~ ===============================;;=~ Ill~, IIB\~t1,~l~,y]!~:; d' i Meeting Date: March 14, 2017 [] i1 D1:1 " l(t\\,: 1 t. I. Executive Brief [ ]
2. nfrastructure Surtax Project Plan - FY 2017 3. Changes from March 22, 2016 Surtax Plan 4. Budget Amendment in Fund 3950 Recommended by -~-+---«,l! ;_...;:....,.a;. -=------1--'----f---- Department D"te
More informationCity of Grand Island Tuesday, December 12, 2017 Council Session
City of Grand Island Tuesday, December 12, 2017 Council Session Item E-3 Public Hearing on One & Six Year Street Improvement Plan Council action will take place under Resolution item I-1. Staff Contact:
More informationBOND 2012 PROPOSITION 1
Horne Rd (Ayers St to Port Avenue) $2,261 $1,418 Hanson Aug15 JFK Causeway Area Imps McArdle Rd (Whitaker Dr to Ennis Joslin Rd) S Staples St (Morgan Ave to IH 37) Navigation Blvd (Up River Rd to Leopard
More informationFDOT Treasure Coast Traffic Impact Report
July 22, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report July 22 through July 29, 2016 TREASURE COAST Construction and maintenance-related lane
More informationFORT WORTH DISTRICT. Springtown Area Projects. Loyl C. Bussell, P.E. Acting District Engineer. Thursday, February 8, 2018 Date.
FORT WORTH DISTRICT Springtown Area Projects Loyl C. Bussell, P.E. Acting District Engineer Photo by Liam Frederick Footer Text Thursday, February 8, 2018 Date Maintaining a Safe System TxDOT is responsible
More informationPalm Beach County School District Eligibility Survey - Free/Reduced Count of Students Aged 5-17 as of 4/14/2019
0664 Academy For Positive Learning - 0664 - EM 128 103 6 19 109 85.16 % 2141 Acreage Pines Elementary - 2141 - E 490 213 42 235 255 52.04 % 1451 Addison Mizner Elementary - 1451 - E 849 194 59 596 253
More informationWhittier Bridge Project
Amesbury / Newburyport / Salisbury Whittier Bridge / I-95 Improvement Project Original Whittier Bridge Proposed Whittier Bridges 10/21/2016 Whittier Bridge Project 1 Project Description The project limits
More informationOctober 31, 2014 Chuck McGinness, (954)
From: McGinness, Charles To: McGinness, Charles Subject: FDOT Broward County Traffic Impact Report 10 31 14 through 11 07 14 Date: Friday, October 31, 2014 2:59:04 PM Attachments: image002.png October
More informationJanuary 2018 Air Traffic Activity Summary
January 2018 Air Traffic Activity Summary Jan-2018 Jan-2017 CY-2018 CY-2017 Passengers 528,947 505,421 4.7% 528,947 505,421 4.7% Passengers 537,332 515,787 4.2% 537,332 515,787 4.2% Passengers 1,066,279
More informationHighways: Interstate. Highways: State Highways. Highways: Local Roads. Highways: Off State Hwy Sys/Off Fed Sys. Fixed Capital Outlay: Facilities
FLORIDA DEPARTMENT OF TRANSPORTATION 5 - YEAR TRANSPORTATION PLAN ($ IN THOUSANDS) TENTATIVE FY 2019-2023 (10/01/2017 20:15:01) COLUMBIA COUNTY Highways: Interstate 4424121 I-10 COLUMBIA COUNTY REST AREA
More informationTri-Rail Coastal Link Project Update
Exhibit 3 Tri-Rail Coastal Link Project Update Presented to: FTA Region IV December 16, 2013 Agenda Review of Project Activities Next Steps Discussion 2 Review of Project Activities Rebranded project to
More informationCapital Program Delivery
Capital Program Delivery Transportation & Public Works Department City Council FY 2013 Budget Workshop August 23, 2012 1 TPW Capital Programs 2013 Building Facilities Storm Water Management Roadway & Bridge
More informationCulpeper District. Albemarle County Monthly Report December 2011
Culpeper District Albemarle County Monthly Report Special Issues Construction Significant Accomplishments (as of 11/15/11) Georgetown Road completed on November 8. I-64 Eastbound Shadwell Exit completed
More informationCulpeper District. Albemarle County Monthly Report. September 2012
Culpeper District Albemarle County Monthly Report September 2012 Special Issues Bridges on Route 745, Arrowhead Valley Road The road will be closed at the Rail Road Bridge on the southern end of the road
More informationBROWARD COUNTY TRAFFIC IMPACT REPORT March 13 through March 20, March 13, 2015 Chuck McGinness,
From: McGinness, Charles To: McGinness, Charles Subject: FDOT Broward County Traffic Impact Report 03 13 15 through 03 20 15 Date: Friday, March 13, 2015 2:43:29 PM Attachments: image001.png BROWARD COUNTY
More informationFY Candidate Sidewalk Projects. Sidewalk Advisory Committee
FY 18-19 Candidate Sidewalk Projects Sidewalk Advisory Committee Sidewalk Advisory Committee December 2017 FY 18-19 Candidate Sidewalk Projects Old Berkley Road C. Fred Jones Blvd. (CR 559A) to Gapway
More informationNovember 21, 2012 Barbara Kelleher, (954)
November 21, 2012 Barbara Kelleher, (954) 777-4090 barbara.kelleher@dot.state.fl.us BROWARD COUNTY TRAFFIC IMPACT REPORT November 26 to November 30, 2012 FORT LAUDERDALE -- Construction and maintenance-related
More information2018 Investment in Infrastructure Expo February 27, 2018 Jason Jonas, P.E. Public Works Director
2018 Investment in Infrastructure Expo February 27, 2018 Jason Jonas, P.E. Public Works Director 1 Jefferson County, Missouri Road and Bridge Sales Tax: Jefferson County has a one-half cent sales tax that
More informationToll Rates for Florida Turnpike System and Florida Department of Transportation (FDOT) Toll Facilities. South Florida
Toll Rates for Florida Turnpike System and Florida Department of Transportation (FDOT) Toll Facilities South Florida Effective: October 29, 207 S.R. 82 (HEFT) Miami-Dade and Broward Counties S.R. 82 (HEFT)
More informationFY TIP Fiscal Constraint 2017 Total Commitments. agencies (the Michigan Department of programmed in the Kalamazoo Area
KALAMAZOO AREA TRANSPORTATION STUDY FY 2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM MARCH 2019 AMENDMENTS The program is developed using the continuing, What is the TIP? cooperative, and comprehensive
More informationHighways: State Highways
FLORIDA DEPARTMENT OF TRANSPORTATION 5 - YEAR TRANSPORTATION PLAN ($ IN THOUSANDS) TENTATIVE FY 2019-2023 (10/01/2017 20:15:01) CLAY COUNTY Highways: State Highways 4135301 D2 CLAY COUNTY TRAFFIC SIGNAL
More informationProject Update to Treasure Coast Regional Planning Council
S o u t h F l o r i d a E a s t C o a s t C o r r i d o r ( S F E C C ) S t u d y Project Update to Treasure Coast Regional Planning Council December 14, 2012 M I A M I - D A D E, B R O W A R D, A N D
More informationFOR IMMEDIATE RELEASE Fiorella Teodista January 5, 2018 SOUTH FLORIDA AND TREASURE COAST WEEKLY LANE CLOSURES AND WORK ZONE ADVISORY
TRAFFIC ADVISORY FOR IMMEDIATE RELEASE Fiorella Teodista 954-934-1130 January 5, 2018 SOUTH FLORIDA AND TREASURE COAST WEEKLY LANE CLOSURES AND WORK ZONE ADVISORY FORT LAUDERDALE Florida s Turnpike announces
More informationGlades Target Area Projects Summary
Municipality Belle Glade Unincorporated Belle Glade Unincorporated Belle Glade Unincorporated Belle Glade Implementation of Projects Consistent with Glades Region Master Plan Recommendations from 2015
More informationMay 1, 2015 Chuck McGinness, BROWARD COUNTY TRAFFIC IMPACT REPORT May 1 through May 8, 2015
From: McGinness, Charles To: McGinness, Charles Subject: FDOT Broward County Traffic Impact Report 05 01 15 through 05 08 15 Date: Friday, May 01, 2015 3:10:15 PM Attachments: image001.png May 1, 2015
More informationHighways: Interstate. Highways: State Highways
FLORIDA DEPARTMENT OF TRANSPORTATION 5 - YEAR TRANSPORTATION PLAN ($ IN THOUSANDS) TENTATIVE FY 2019-2023 (10/01/2017 20:15:01) ST. JOHNS COUNTY Highways: Interstate 4392931 I-95 SB(SR9) DURBIN CREEK BRIDGE
More informationDelaware County Engineer
2018 Project Presentation Delaware County Engineer 2018 ASHE LUNCHEON JANUARY 30, 2018 What s New at DCEO? New County Logos and Website Redesign GIS Upgrades Drone Program Planning for the Future ROADS,
More informationMajor Projects Overview
Major Projects Overview Miami-Dade Expressway Authority February 2018 About MDX MDX operates 5 roads in Miami Dade County SR 924, SR 112, SR 836, SR 874 and SR 878 MDX Primary Source of Revenue: User Fees-Tolls
More informationCampus Construction Program Report WLAC Monthly Facilities Committee Meeting November 16, 2015
Campus Construction Program Report WLAC Monthly Facilities Committee Meeting November 16, 2015 1. Cost Update 2. Schedule Update 3. Pre Design Update 4. Design Update 5. Contractor Procurement Update November
More informationONONDAGA CREEKWALK PHASE II. Public Information Meeting Series 1
ONONDAGA CREEKWALK PHASE II Public Information Meeting Series 1 Andrew Maxwell Director, Syracuse-Onondaga County Planning Agency Owen Kerney Assistant Director for City Planning Russell Houck, PE City
More informationlakeside centre Page 3
A diverse retail mix activates and enlivens the center by day and night, whether on weekdays or weekends. Retailers will reflect the surrounding community and the broader area, delivering on daily needs
More informationAGENDA. Call to Order ~ Roll Call. Public Comments (Non Agenda Items). Commissioners and Manager Comments.
Lea County Board of County Commissioners Regular Meeting Thursday, February 7, 2019 9:00 A.M. Lea County Courthouse - Commission Chambers 100 North Main Avenue, Lovington, New Mexico Notice of this Meeting
More informationAGENDA. WEDNESDAY, SEPTEMBER 23, :00 PM or immediately after the ICTC meeting
AGENDA WEDNESDAY, SEPTEMBER 23, 2015 6:00 PM or immediately after the ICTC meeting County Administration Building, 2 nd Floor Board of Supervisors Chambers 940 W. Main St. El Centro, CA 92243 CHAIRPERSON:
More informationCONSTRUCTION PROJECTS IN CUYAHOGA COUNTY CLEVELAND EUCLID 3/9/18 RICHMOND MAYFIELD HIGHLAND HEIGHTS HEIGHTS SOUTH EAST MAYFIELD EUCLID CLEVELAND
BAY VILLAGE WESTLAKE OLMSTED NORTH TOWNSHIP OLMSTED FALLS OLMSTED BEREA STRONGSVILLE ROYALTON NORTH BROOK PARK PARMA PARMA BROADVIEW BRECKSVILLE HILLS SEVEN INDEPENDENCE BROOKLYN RIVER ROCKY LAKEWOOD PARK
More informationBOND 2012 PROPOSITION 1
BOND 2012 PROPOSITION 1 Horne Rd (Ayers St to Port Avenue) $2,261 $1,418 Hanson Aug15 JFK Causeway Area Imps Navigation Blvd (Up River Rd to Leopard St) $684 $4,909 $2,900 Jan16 Apr16 Apr16 S Staples St
More informationMost people notice when ODOT builds something
ODOT District 8 2016 Construction Program Taking Care of What We Have Most people notice when ODOT builds something new. However, we actually spend 93 percent of our time and resources taking care of what
More informationTENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS
Florida Department of TRANSPORTATION - DISTRICT ONE TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS 2017-2021 DISTRICT ONE HEADQUARTERS (BARTOW) SOUTHWEST AREA OFFICE (FORT MYERS) MISSION STATEMENT The Department
More informationProjected Advertisement Date
2013 Planned s CY 2013 and CY 2014 Richmond District Schedule Preliminary Engineering Task Order Contracts SR 288/SR 145 Survey, 288 90349 Chesterfield Ramp and Signal Design 2/27/2013 $ 0.19 I-64 Over
More informationLIHTC Properties in Florida's 20th District LIHTC (1997 to. (Alcee Hastings - D) Through ) Source: HUD LIHTC
LIHTC Properties in Florida's 20th District LIHTC (1997 to (Alcee Hastings - D) 2016) Source: HUD LIHTC Through 2016 nprofit Placed DIXIE COURT 950 NW FOURTH FT FL 33311 t 121 t NORTHWE GARDENS II 1204
More informationWELCOME. Glades Plaza is a 182,704 SF retail center in the. heart of Boca Raton, Florida and sits at the
BOCA RATON, FLORIDA WELCOME Glades Plaza is a 82,704 SF retail center in the heart of Boca Raton, Florida and sits at the intersection of Glades Road and Butts Road, which boasts over 83,000 cars per
More informationAGENDA REQUEST. AGENDA ITEM NO: XII.A.2. BY Financial Administration John Lege Financial Administration Deputy Director Strickland
AGENDA HEADING: Legislative Public Hearings AGENDA REQUEST COMMISSION MEETING DATE: September 8, 2015 AGENDA ITEM NO: XII.A.2. BY Financial Administration John Lege Financial Administration Deputy Director
More informationBROWARD DEANERY 1 ALL SAINTS (954) 467-6496 333 Tarpon Dr. Ft. Lauderdale, FL 33301 4 INTERCESSION (954) 763-5986 501 N.W. 17 St. Ft. Lauderdale, FL 33311 I-95 to Broward Blvd. exit. Go east on Broward
More informationALTON TOWN CENTER PALM BEACH GARDENS, FLORIDA
ALTON TOWN CENTER PALM BEACH GARDENS, FLORIDA ALTON TOWN CENTER PALM BEACH GARDENS, FLORIDA CONTENTS OVERVIEW 1 ARTISTS CONCEPTS 3 SITE AERIAL 11 DONALD ROSS CORRIDOR AERIAL 13 TRACT PLAN 15 DRIVING ROUTE
More informationFAMILY LAW CHILDREN'S ISSUES (FL994)
FAMILY LAW CHILDREN'S ISSUES (FL994) 551104 Ms. Sheena Alta Benjamin-Wise, Co-Chair (2018) 2335 E. Atlantic Blvd., Ste. 406 Pompano Beach, FL 33062-5244 (954)783-9737 Fax: (954)366-5605 Email: sbwise@wiselawoffice.com
More informationDISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, FloridaExpressLanes.com
DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, 2017 FloridaExpressLanes.com This page intentionally left blank. TABLE OF CONTENTS List of Figures... ii List of Tables.... ii
More informationAPPENDIX K RURAL ENVIRONMENTAL CLEARANCE PROJECTS
APPENDIX K RURAL ENVIRONMENTAL CLEARANCE PROJECTS Appendix K contains a list of projects that are not planned for construction within the four-year time frame of the Rural TIP, but are referenced in the
More informationFASTRAK PROGRESS REPORT
FASTRAK PROGRESS REPORT OCTOBER DECEMBER 212 The FasTrak Progress Report is prepared on a quarterly basis and is regularly distributed with the FasTrak Project Management Team (PMT) agenda and notice.
More informationCity of Grand Island Tuesday, February 28, 2017 Council Session
City of Grand Island Tuesday, February 28, 2017 Council Session Item G-8 #2017-52 - Approving Bid Award for the 2017 Asphalt Resurfacing Project No. 2017-AC-1 Staff Contact: John Collins, P.E. - Public
More informationHomes Sold in Boca Raton 2/17/15 to 2/22/15
Homes Sold in Boca Raton 2/17/15 to 2/22/15 90 Properties 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Price / Status / MLS # Subdivision Sold Date $985,000 1500 S Ocean Boulevard 704 Closed / RX-10063652
More informationPenny for Pasco Renewal. FY2014/15 thru FY2024/25
Penny for Pasco Renewal FY2014/15 thru FY2024/25 1 Background Pasco Citizens Committee (PAC) Citizens Survey Results Coordination Activities Project Schedule Category Allocations Revenue Estimates Distribution
More informationINTER-OFFICE MEMORANDUM
INTER-OFFICE MEMORANDUM TO: FROM: Development Review Committee John G. Thomson, AICP./(' Land Development Manager,... j \ DATE: February 10, 2014 SUBJECT: DRC Meeting Date: February 18, 2014 Request for
More informationWith the completion of this project, we would like to follow-up on the projections as well as highlight a few other items:
TO: FROM: Mayor and Council Interim City Manager Rebecca Underhill, Director of Finance DATE: February 28, 2014 SUBJECT: Water Meter Project Analysis On March 28, 2012, Acting City Manager Mike Loftin
More informationPalm Beach County Redevelopment Sites State Road 7, Delray Beach, FL 33446
14095 State Road 7, Delray Beach, FL 33446 Business Development Board of Palm Beach County, Inc. BDB.org 561.835.1008 1 2400 Metro Center Blvd - West Palm Beach - Lincoln College Business Development Board
More informationState Route 8 Corridor. Northern Summit County s Path to Success
State Route 8 Corridor Northern Summit County s Path to Success Construction Guide: 2008-2009 State Route 8 corridor work description State Route 8 Corridor 10 projects $262 million With its close proximity
More informationMUNICIPAL COMMISSION/COUNCIL TERMS, TERM LIMITS, SALARIES AND BENEFITS SURVEY
City of Atlantis 2 years ne Mayor - $12,800 ne Council - $10,800 City of Belle Glade 3 years ne Mayor - $11,712 Vice-Mayor - $11,036 $10,360; Mayor also has an assigned vehicle City of Boca Raton 3 years
More informationCustomer Service:
Customer Service: 1-877-905-0500 MIAMI - DADE COUNTY Medical Doctors House Calls 1-855-668-8798 8:00am - 5:00pm 1770 NE Miami Gardens Dr. Unit #1 North Miami Beach, FL 33179 (305) 949-4141 12555-C Biscayne
More information