PALM BEACH MPO TRANSPORTATION IMPROVEMENT ADOPTED JUNE 15, Amended 7/20/17

Size: px
Start display at page:

Download "PALM BEACH MPO TRANSPORTATION IMPROVEMENT ADOPTED JUNE 15, Amended 7/20/17"

Transcription

1 PALM BEACH MPO TRANSPORTATION IMPROVEMENT PROGRAM FY ADOPTED JUNE 15, Amended 7/20/ North Jog Road - 4th Floor - West Palm Beach FL, Public participation is solicited without regard to race, color, national origin, age, sex, religion, disability or family status. Persons who require special accommodations under the American with Disabilities Act or translation services for a meeting, free of charge, or for complaints, questions or concerns about civil rights, please contact: Malissa Booth at or MBooth@PalmBeachMPO.org. Hearing impaired individuals are requested to telephone the Florida Relay System at #711.

2 TRANSPORTATION IMPROVEMENT PROGRAM FY This Transportation Improvement Program was developed consistent with federal and state requirements. State and federally funded projects were approved by the Palm Beach MPO on June 15, Mayor Susan Haynie MPO Chair The preparation of this report was financed in part through grants from the Federal Highway Administration and Federal Transit Administration, U.S. Department of Transportation; the Florida Department of Transportation; and participating local governments. The contents of this report do not necessarily reflect the official views or policy of the U. S. Department of Transportation North Jog Road 4 th Floor West Palm Beach, FL

3 FY TRANSPORTATION IMPROVEMENT PROGRAM PALM BEACH TABLE OF CONTENTS Executive Summary...4 ing Summary...20 Map of Major Projects Project Listing by Type SIS Capacity...28 Major MPO Projects...42 Local Initiative Program...47 Transportation Alternative Program...59 SUN Trail Projects...65 Other FDOT & Local Projects...67 Major Maintenance O&M - Roadways O&M - Transit Airports Railroads Seaports Glossary... Appendix A MPO Priority Projects List for FY Appendix B Annual Listing of Obligated Projects for FY Appendix C (to be created in Dec 2017) TIP Amendments & Modifications... Appendix D Eastern Federal Lands Highway Division FY TIP... Appendix E Public Meetings and Comments... Appendix F 3

4 EXECUTIVE SUMMARY The Transportation Improvement Program (TIP) is a staged program encompassing a five-year period consisting of all regionally significant transportation improvements to all modes of travel in Palm Beach County. The TIP is developed through a continuous, cooperative and comprehensive effort involving the Florida Department of Transportation (FDOT), the Board of County Commissioners, the Port of Palm Beach, South Florida Regional Transportation Authority and municipalities within the County. Consultation is also carried out with the Miami-Dade TPO and Broward MPO during the TIP process. The document complies with the requirements set forth in Section 134 of Title 23, USC and 23 CFR The TIP identifies transportation improvements funded by Federal, State and local sources in order to assist local governments within the Palm Beach MPO area with their transportation planning efforts. The TIP is based on the FDOT s FY Work Program for Palm Beach County, and generally moves forward the projects in the time frame from previous TIPs. Please note that the identified projects may experience unforeseen changes and that the DOT work program and the TIP may be amended throughout the year to accommodate this. To provide for continuity and ease of use, the projects contained in the TIP have been aggregated by type and listed in sections. The TIP provides funding for the following project types: PROJECT TYPE SIS Capacity Major MPO Projects Local Initiatives Program Transportation Alternatives Program SUN Trail Projects Other FDOT & Local Projects Major Maintenance O&M - Roadways O&M - Transit Airports Railroads Seaport TOTAL TIP FY $ $ $ $ $ $ $ $ $ $ $ $ $ 4 FUNDING 976,030, ,631,832 89,829,932 17,477,907 1,430, ,830, ,007, ,901, ,056,348 78,294,758 58,240,384 10,000,000 3,059,731,783 % OF TOTAL 31.9% 4.7% 2.9% 0.6% <.1% 7.4% 10.7% 19.9% 17.1% 2.6% 1.9% 0.3% 100%

5 Time Frame This document includes a five-year implementation schedule for Fiscal Year 2018 through Fiscal Year 2022 following the federal fiscal calendar which begins on October 1st and ends on September 30th (i.e. Fiscal Year 2018 addresses the dates of October 1, 2017 to September 30, 2018). However, projects utilizing state funds are based on a fiscal year beginning July 1st and ending June 30th. Certification Review The Palm Beach MPO undergoes a certification review process annually with FDOT and a quadrennial review with Federal Highway Administration (FHWA) and Federal Transit Administration (FTA). The certification review process ensures the MPO is carrying out the metropolitan planning process in adherence with federal and state regulations. The last joint FHWA and FTA Certification Review was completed on October 30, The last Joint State/MPO Certification Review was completed on July 7, Prioritization of Projects In order to be included in the TIP, a project must be consistent with the MPO adopted long-range transportation plan (LRTP). The adopted LRTP was prepared using estimates of available revenues and project and program costs and is presumed to be cost feasible. The LRTP is referenced in local comprehensive plans and seeks consistency with these plans to the maximum extent feasible. The MPO adopted a list of Priority Projects from the LRTP in September and transmitted them to FDOT for use in preparing the tentative Work Program these are included in Appendix C and highlighted in the summary of projects section. FDOT then developed the Draft Tentative Work Program and provided the schedule of projects for creation of the TIP. Major projects are screened through the State s Efficient Transportation Decision Making (ETDM) review process. This review provides for an early examination of the projects, allowing for timely and effective decision making and early National Environmental Policy Act (NEPA) reviews and approvals. Congestion Management Process and Evaluation Projects and system-wide effectiveness for all modes of transportation are evaluated through the Congestion Management Process (CMP). A CMP is a systematic and regionally-accepted approach for managing congestion that provides accurate, up-todate information on transportation system performance and assesses alternative strategies for congestion management that meet MPO needs. Transportation Disadvantaged Transportation Disadvantaged (TD) services are provided for people who, because of physical or mental disability, income status or age, are unable to transport themselves or to purchase transportation and are, therefore, dependent upon others for transportation as defined in Florida Statutes The Transportation Disadvantaged Service Plan (TDSP) serves as a comprehensive operational guidebook outlining the services and service parameters that govern public transportation in Palm Beach County, Florida. The MPO works closely with Palm Tran to update the Transportation Disadvantaged Service Plan (TDSP) when new or enhanced policies, rules and procedures are adopted. A copy of the TDSP can be found on the MPO website at: 5

6 Project Sections in the TIP The projects in this document are presented in major categories that are explained in greater detail below. SIS Capacity Strategic Intermodal System projects are prioritized by FDOT to support regional mobility. Major MPO Projects The MPO Board annually prioritizes major highway, transit and freight projects from the Cost Feasible Plan based on the Goals, Objectives and Values in the LRTP and the Congestion Management Process (CMP). Local Initiative Program Lower cost, non-regionally significant projects submitted to the MPO annually by local agencies and prioritized using a project scoring system based on the Goals, Objectives and Values in the LRTP. Transportation Alternatives Program Active transportation projects submitted to the MPO annually by local agencies and prioritized through the Bicycle Trailways Pedestrian Advisory Committee (BTPAC). Shared-Use Nonmotorized (SUN) Trail Network Local governments may submit projects annually to the MPO for prioritization to seek state funding for project implementation. Projects must be paved non-motorized trails on the priority network established by the Florida Office of Greenways and Trails (OGT). Other FDOT and Local Projects These projects are advanced by agencies other than the MPO with outside discretionary funding sources (e.g. local gas taxes, local impact fees, county incentive grant funds, highway safety program funds, etc.). Major Maintenance Projects proposed by the maintaining agencies based on the condition of the transportation infrastructure. These are larger projects representing an opportunity to enhance existing facilities through scope modifications or additions. O&M - Roadways Operations and maintenance projects proposed by the maintaining agencies based on the condition of the transportation infrastructure and the need to operate it efficiently. O&M Transit Projects proposed by the transit agencies to continue to operate existing services. Airports, Railroads and Seaport Projects identified by facility owner/operators consistent with their respective master plans. 6

7 GLOSSARY OF PROJECT PHASES PHASE CODE CAP CST DSB ENV INC MNT MSC OPS PDE PE PLN ROW RRU NAME Capital Construction Scheduled Design Build Environmental Contract Incentives Maintenance Miscellaneous Construction Scheduled Operations Project Development and Environmental Preliminary Engineering Scheduled Planning Scheduled Right of Way Acquisition Scheduled Railroad & Utilities DEFINITIONS AND ACRONYMS For a full list of definitions and acronyms, see Appendix A. ing code descriptions are available in the funding summary table. 7

8 Summary of Projects The following tables highlight the status of MPO Priority Projects, projects scheduled for construction in FY 2018, and some of the more significant changes between the adopted FY TIP and the FY TIP. A typical project includes a Project Development and Environment (PD&E) phase, a Design (PE) phase, a Right of Way (ROW) phase and a Construction (CST) phase. Table 1: Major MPO Projects Rank Proj. No Project SR 7 Location Improvement 60th St Construct new 4 lane to Northlake Blvd. road Okeechobee Blvd SR 7 to 60th St Southern L-8 Canal to W of Blvd / SR 80 Forest Hill a Widen from 2 to 4 lanes Widen from 4 to 6 lanes Construct buffered bike lanes, shared use Broward Co Line pathways, transit to Glades Rd shelters and turn lane improvements Total Cost $54,493 < FY 18 $49,612 ROW $19,875 $19,875 $52,948 $7,854 $11,701 $11,701 Add 3rd N/S left at SR 7, Increase NB off ramp storage at I-95, Convert NB thru to NBL and SB Thru/Right to Excl. Right at NW 13th/University, Add 2nd NB left at NW 4th $8,200 $8,198 Broward Co Line Install Safety/Quiet FEC Railroad to 15th St in West Zone infrastructure on Crossings Palm Beach FEC corridor $6,987 $6,987 15th St in West Install Safety/Quiet Palm Beach to Zone infrastructure on Martin County FEC corridor Line $2,239 SR 7 Glades Rd FEC Railroad 6b Crossings Various Intersections FY 18 $44 FY 19 ROW ing in TIP ($1,000s) FY 20 $516 ROW $44 ENV $2,861 FY 21 ROW $371 FY 22 Notes/ Needs CST April 2018 CST October 2017 CST $43,488 ROW $516 ROW $2,077 CST August 2017 RRU $2 CST September 2017 CST Underway CAP $2,239 8 Construct w/ Brightline phase 2

9 Table 1: Major MPO Projects (Continued) Rank Proj. No Project Location Improvement Construct new facility to Tri Rail Support Northern Layover enhance O&M for existing Facility Facility system and support Jupiter extension Extend commuter rail service onto the FEC corridor via the Tri Rail - New West Palm Beach to Northwood Crossover and Service Jupiter construct 3 new stations Extension 45th Street, PGA Blvd, and Toney Penna Dr. Palm Tran Delray Beach: Expand existing maintenance Support Facility Congress Ave facilities Construct second Tri Rail East side of Military Tri Rail station in Boca Raton on Tr S of Glades Rd CSX/SFR corridor & Atlantic Ave SR 7 to W of Lyons US 1 Camino Real to Indiantown Rd Lake Worth Road to Boutwell Road 10th Ave North Atlantic Ave Reserve ing W of Lyons to Jog Rd Total Cost < FY 18 $36,150 $17,116 FY 18 CAP FY 19 $15,500 CAP ing in TIP ($1,000s) FY 20 FY 21 FY 22 Notes/Needs Design-Build in Oct 2017 $3,534 $75,000 $1,365 $73,843,000 Need FDOT to restart PD&E $12,292 $12,292 CST in 2018 $18,500 $1,500 CAP $17,000 Widen from 2 to 4 lanes $30,919 $1,571 ROW $10,486 New express bus service with associated multimodal corridor improvements $54,505 $2 Widen from 2 to 3 lanes $3,000 Widen from 4 to 6 lanes $74,258 Reserve funding for future projects Cost Summary PLN $775 PDE $10 ROW PE RRU $200 $5,172 ENV $5 CST $13,486 $505 PE $52,480 $1,510 CST PDE $510 PDE $3,000 $2,500 $71,248 $17,056 $461,010 $138,073 9 $62,058 $32,562 $13,159 $15,572 $20,056 $197,571

10 Table 2: Local Initiatives Program Rank Lead Agency Proj. No. Project Location 13-1 FDOT Southern Blvd. At Sansbury's Way Intersection 13-2 FDOT SE Avenue G Main St. to SE 9th St/ Gove Elementary School 13-3 FDOT W of Australian Ave to SR 710 Dixie Hwy Beautification 13-4 FDOT Palmetto Park Rd SR 7 to NW 2nd Ave PGA Blvd Mirasol/Ave of Champions to US FDOT 13-6 Palm Tran 14-1 FDOT 14-2 FDOT 14-3 FDOT 14-4 FDOT 14-5 FDOT 14-6 FDOT Construct sidewalk on the S side of SE Ave G Install median irrigation and landscaping Construct 10-ft+ multiuse pathway on the south side of roadway Install Adaptive Traffic Control System Implement Easy Card interface, Mobile ticketing Install Adaptive Traffic W Indiantown Florida Turnpike to US Control System and 1 Road patterned pavement Install pedestrian 11th Street to 27th scale lighting on east US Street side of corridor Install pedestrian 1st Street to Blue Australian Ave. scale lighting Heron Blvd. Install pedestrian Columbia Medical Congress Ave scale lighting Plaza to Blue Heron Replace bridges; Seminole Dr (L-16) introduce bike/ped Sandalfoot (E-1-E) Bridge facilities, maximize Replacement New England Bl (E-1) vertical clearance for El Clair Ranch (L-30) waterway Southern Blvd at CR 880 Intersection Install street lighting (SR 80) Palm Tran Systemwide Fare Collection ing in TIP ($1000's) FY 21 FY 20 FY 19 FY 18 Total Cost < FY 18 Improvement Add EB right, second $7,850 $1,422 CST $6,427 WB left and widen C51 canal bridge $739 $739 $1,366 $155 $3,826 $636 FY 22 Notes/ Needs CST April 2017 CST $1,211 RRU $2 CST $3,188 $2,568 $2,568 $1,320 $1,320 $6,599 $612 CST April 2017 CST $5,964 RRU PE $1,195 $360 PE $3,507 $2,182 $5,796 $60 10 ENV RRU $15 $10 $2,162 ENV $40 CST $60 $474 $360 $22 $360 CST $835 ENV $15 CST $1,683 CST $3,594 CST $3,132

11 Table 2: Local Initiatives Program (Continued) Rank 14-7 Lead Agency Delray Beach Proj. No. Project Lowson Blvd/ SW 10th St 14-8 FDOT Fiber Optic Cable Installation 14-9 FDOT Hamlin Blvd FDOT Video Camera Detection FDOT Clint Moore Road Swinton Ave ing in TIP ($1000's) FY 19 FY 20 FY 21 Location Improvement Total Cost < FY 18 FY 18 Install bike lanes and Military Trail to SE 6th sidewalks. Includes $4,792 PE $5 Ave standalone pedestrian bridges. Seminole Pratt - SR 80 to Northlake Blvd, Lyons Rd - Lantana Rd Install fiber optic to Boynton Beach Blvd, communication cable Lawrence Rd to connect additional Hypoluxo Rd to traffic signals to ITS Boynton Beach, network Military Trail - Linton Blvd to Glades/Butts Rd 190th St to 180th Ave N 27 mast arm traffic signals with loop detection Congress Ave to NW 2nd Ave. S 10th St to NE 4th St CST $4,787 $2,902 PE $310 $898 PE $260 ENV $40 $1,815 PE $60 PE $ $1,197 PE $310 ENV $30 CST Widen to provide two 10-ft travel lanes, 4-ft bike lanes and 6-ft sidewalks. Add street lighting, drainage, landscaping. $3,197 PE $510 ENV $20 CST $2,667 Construct a 6-ft pathway Replace inductive loops with video camera detection Construct 10-ft shared use pathway on the south side of the corridor CST $2, FDOT West Palm Beach Tri-Rail Station to Two New WPB northern and southern Trolley Routes WPB Purchase seven (7) vehicles to support new trolley service $1, Palm Tran Palm Tran Bus Various locations along Shelters existing bus routes Construct 30 transit shelters $ West Palm Beach WPB Trolley Shelters Various locations along existing trolley lines Construct seven (7) trolley shelters $571 CAP $ FDOT Homewood Blvd Old Germantown Rd to Install bike lanes and Lowson Blvd sidewalks $1,393 PE $ CST $598 CST $1,755 $857 CAP $1,505 CAP $600 ENV $20 CST $1,013 FY 22 Notes/ Needs

12 Table 2: Local Initiatives Program (Continued) Rank 15-5 Lead Agency FDOT 15-6 Boca Raton Proj. No. Project George Bush Blvd New Boca Raton Trolley 15-7 Delray Beach Existing Delray Beach Trolley 15-8 FDOT NE 5th Ave 16-1 Delray Beach FDOT FDOT Improvement Total Cost < FY 18 Widen to provide two 10-ft travel lanes, 5-ft NE 2nd Ave to A1A bike lanes and 5-6 ft (excluding Intracoastal sidewalks. Add street Waterway bridge) lighting, drainage, landscaping. Tri-Rail Station to Downtown and Downtown Circulator Tri-Rail Station to Atlantic Ave/A1A Purchase seven (7) vehicles to support new trolley service Replace four (4) vehicles 16-5 FDOT FDOT Lake Worth Road Reserve Box $3,733 PE $510 Boca Raton Road to NW Construct 6-ft 20th St sidewalk on west side Pedestrian Erie Street to A Street enhancements/ traffic circle reconfiguration Reserve funding for Local Initiative Projects Cost Summary 12 ENV $20 CAP $860 ENV $10 Notes/ Needs CST $3,203 $734 PE $260 $5,113 PE $5 $6,379 PE $759 ENV $309 CST $5,311 $2,346 PE $573 ENV $100 CST $1,673 $693 PE $5 $1,127 PE $245 $943 $21,131 $100,440 $10,449 FY 22 CAP $1,505 $860 Convert 6L to 4L and C-15 Canal to Atlantic install protected bike Ave in Delray Beach lanes Convert 4L to 3L and Albemarle Rd to US 1 associated Okeechobee Blvd in (Dixie Highway) multimodal West Palm Beach improvements Bridge replacement Bridge over C-15 Canal Brant Bridge and inclusion of in Delray Beach shared use path Add bike lanes, bike Wellington Trace to lane relocation at Big Blue Trace South Shore Blvd intersection; crosswalk striping Traffic Calming Install speed tables, in Indian Trail Various midblock midblock islands, Improvement locations raised medians District ing in TIP ($1000's) FY 19 FY 20 FY 21 FY 18 $1,505 Congress Ave Wellington -- Location $14,873 $12,912 CST $464 CST $5,108 CST $688 ENV $53 CST $829 PE $454 ENV $105 $383,549 Needed $450 $3,776 $16,904 $19,976 $25,302 $16,904 $384

13 Table 3: Transportation Alternatives Program Lead Project Proj. No. Agency Everglades/E PBC Office of 12-1 Community Main St to Canal Street Revitalization 13-1 Lake Worth 13-2 Delray Beach 13-3 West Palm Beach 13-4 Delray Beach 14-1 Palm Beach County 14-2 West Palm Beach Total Cost < FY 18 FY 18 FY 19 ing in TIP ($1000's) FY 21 FY 20 FY 22 Notes/ Needs Location Improvement L-10 canal Construct a pedestrian bridge $760 $760 CST Nov 2017 South A Street to South F Street in Lake Worth Improve city right-of-way to construct shared-use path, benches, landscaping and decorative crosswalks $1,164 $1,164 CST Aug 2017 Construct sidewalks, add George Bush Blvd to designated bike lanes, NE 13th St in Delray reduce vehicle travel lane Beach widths, install landscaping $733 $733 CST Aug 2017 Construct sidewalk on Banyan Blvd to Palm west side of corridor, Tamarind Ave Beach Lakes Blvd in install pedestrian lighting West Palm Beach and landscaping $959 $959 CST Sep 2017 $1,636 $5 CST $1,631 $482 $5 CST $477 $573 $5 CST $568 Rank 5th Avenue NE 2nd Ave NE 2nd Ave NE 13th St to NE 22nd St in Delray Beach Construct sidewalks, add designated bike lanes, reduce vehicle travel lane widths, install landscaping Australian Ave - 9th St to 13th St Kirk Road - Forest Install overhead school Safe Routes to Hill Blvd to Pot O zone flashers Gold St. Schools Military Trail Dolphin Dr to Old Military Tr Residential Streets Construct ADA compliant North Shore bounded by 45th St, ramps and sidewalks, Neighborhood Congress Ave, enhanced crosswalks, and in West Palm Australian Ave and signage Beach Lake Mangonia 13

14 Table 3: Transportation Alternatives Program (Continued) Rank 14-3 Lead Agency Royal Palm Beach Proj. No. Project Okeechobee Blvd Location Folsom Rd to SR 7 and Partridge Lane south of Okeechobee Blvd Delray Beach Seacrest Blvd NE 22nd Street to Gulfstream Blvd 15-1 FDOT US 1 Beach Rd to Martin County Line 15-2 Wellington Binks Pointe Pathway Binks Forest Dr. to Flying Cow Road 15-3 Royal Palm Beach ADA Update Various Royal Palm Beach neighborhoods 15-4 FDOT West Palm Beach 16-1 Wellington West Palm Beach West Palm Beach 16-4 Delray Beach Various Belle Glade Sidewalk neighborhoods Improvements Various West Palm Beach ADA Update neighborhoods Bicycle Improvements Aero Club Drive in Wellington Total Cost < FY 18 Improvement Install pedestrian and roadway lighting Add green bike lanes,wider sidewalks, brick crosswalks and school zone lighting Add buffered bike lanes, street trees and signage. Construct Multi-use pathway to connect to Wellington Environmental Preserve Upgrade existing sidewalks to ADA standards in residential neighborhoods Construct missing sidewalks near schools Upgrade existing sidewalks to ADA standards near schools Construct 4.2 mile long bike lane Construct pedestrian bridge west of existing bridge Install ADA ramp Roosevelt Estates improvements and ADA/Crosswalk Neighborhood in textured pavement in Improvements West Palm Beach crosswalks Various locations in Pave alleyways and install Alley Project landscaping Delray Beach Cost Summary Pedestrian Bridge North Shore Bridge in West Palm Beach 14 FY 18 FY 19 ing in TIP ($1000's) FY 21 FY 20 $5 $1,704 $5 $4,548 $696 $549 $7 CST $542 $839 $5 CST $834 $1,166 $368 CST $798 $879 $5 CST $874 CST $1,699 CST $3,852 $766 PE $5 CST $761 $1,015 PE $5 CST $1,010 $910 PE $5 CST $905 $2,572 PE $5 CST $2,567 $4,722 Notes/ Needs CST $1,537 $1,542 $22,796 FY 22 $8,086 $4,746 $5,242 $0 $0 $0

15 Table 4: SUN Trail Program ing in TIP ($1000's) Rank Applicant Proj. No. Project Location Improvement Total Cost Convert 4-lane roadway to 2West Palm & US 1 25th St to 42nd lane divided roadway with 16-1 $6,024 Beach 2 (Broadway Ave) St Shared-Use Nonmotorized trail in median. Cost Summary $6, < FY 18 FY 18 PE FY 19 FY 20 FY 21 FY 22 Notes/Needs $1,410 $4,744 ENV $20 $1,430 $4,744

16 Project Number Table 5: Other FY 2018 Construction/Implementation Projects Location Southern Blvd (SR-80) from FEC R/R to CR-880 Resurfacing Improvement Construction ing FY 2018 $4,721,231 Federal $15,776,212 State Turnpike from N of Boynton Beach Blvd to Lake Worth Rd Widen from four to six lanes $165,089,788 Toll/Turnpike I-95 from the L30 Canal near Lake Ida to N. of Gateway $15,895,483 Federal Resurfacing Blvd $127,025 State Military Trail (SR-809) at Northlake Blvd Intersection Improvements $185,815 State $185,815 Local West Palm Beach Operations Center Roof System Replacement $120,000 State PGA Blvd Interchange Lighting $757,123 State Atlantic Ave (SR-806) Interchange Reconstruct I-95 Interchange (add lanes) at Atlantic Ave to add $5,368,999 Federal capacity $184,473 State Northwood Connection from CSX Mainline to FEC Mainline in West Palm Beach New railroad connection $12,476,012 State Turnpike at Glades Rd NB Exit Ramp Ramp Improvements - Thermoplastic $5,576 Toll/Turnpike Southern Blvd (SR-80) from Pike Road to E of NB Turnpike Ramps Add westbound right turn lanes. $1,609,611 State Turnpike: MP (Beeline Hwy) to MP (N of Hood Rd) Resurfacing $9,781,015 Toll/Turnpike Turnpike: MP (Beeline Hwy) to MP (N of Hood Rd) Install Guardrail $1,358,498 Toll/Turnpike Blue Heron (SR-708): Military Trail to Congress Avenue Intersection Lighting Improvements $212,589 Federal $12,070 State Military Trail (SR-809): Shiloh Drive to Burns Road Intersection Lighting Improvements $781,704 Federal City of Belle Glade Roadways - Various Locations Resurfacing $928,368 State McClure Rd: Lake Ave to Rim Canal Rd Small County Outreach Program project - resurfacing $3,427,543 State South Central Florida Express Railway near Pahokee Port of Palm Beach Southeast Rail Extension Upland Cargo Improvements $5,000,000 $2,000,000 State State $1,666,667 $2,000,000 Local Local 16

17 Table 6: Significant Changes from FY TIP Project Number Location Improvement Gateway Blvd Interchange Improvement Boynton Beach Blvd Interchange Improvement Glades Road PGA/Central Blvd 45th St Northlake Blvd Interchange Improvement New Interchange Interchange Improvement Interchange Improvement Construct 3rd WB to SB left turn lane, Southern Blvd (SR-80) at Forest Hill Blvd Channelized NB to EB right turn lane Widen from 6 to 8 lanes Turnpike: Glades Rd to Atlantic Ave Turnpike: Broward County line to Glades Widen from 6 to 8 lanes Rd Turnpike: Atlantic Ave to Boynton Beach Widen from 6 to 8 lanes Blvd Beeline Hwy (SR-710): Northlake Blvd to Widen from 4 to 6 lanes Blue Heron Blvd Atlantic Ave/SR-806: SR-7/US-441 to W Widen from 2 to 4 lanes of Lyons Rd 17 Significant Change Advanced PE from FY 20 to FY 18 Added $12M ROW in FY 20 Added $39M CST in FY 22 Advanced PE from FY 21 to FY 18 Added $17M ROW in FY 20 Added $54M CST in > FY 22 Added $24M CST in FY 19 - to be built with I95 express (S of Glades Rd to Linton Blvd) Advanced $8.8M ROW to FY 19 Added CST $83M in > FY 22 Added $14.9M ROW to FY 2022 Advanced $5.1M PE from FY 21 to FY 18 Added $58.5M ROW in FY Added $15M CST in FY 22 Advanced $4.6M CST from FY 20 to FY 19 Delayed $244M CST from FY 20 to FY 22 Delayed $241M CST from FY 21 to > FY 22 Delayed $299M CST from FY 20 to > FY 22 Delayed $90.5M CST from FY 20 to FY 22 Added $16M ROW in FY Added $13.5 CST in FY 21

18 Table 6: Significant Changes from FY TIP (Continued) Location Project Number , , US-27: Broward County line to South , Bay , US-27: CR827 & Okeelanta Rd Intersections I-95 at Indiantown Road Improvement Resurfacing, widen shoulders, replace guardrail Add acceleration lanes Reconstruct/Signalize NB Off Ramp Add EB auxiliary lane between I-95 NB and Island Way I-95 at Belvedere Road Add Second NB to EB Right Turn Lane Add EB to SB Right Turn lane Northbound Noise Wall Extension to North & South of Diane Dr Runway 13/31 Expansion I-95 at Okeechobee Blvd I-95 NB along Diane Drive in Boynton Beach North Palm Beach County Airport Military Trail from Southern Blvd to Cumberland Drive SR-7 At Stribling Way I-95 from Gateway Blvd to Lantana Road Resurfacing US-1 N of Linton Blvd SR-15 from S of Morgan Rd to S of Shirley Dr Boynton Beach Blvd. from Lyons Road to E of Turnpike Intersection Lighting Improvements Add 2nd NB and SB Left Turn Lane Resurfacing Resurfacing Resurfacing 18 Significant Change Added $1.4M PE in FY 18 Added $2.57M PE in FY 19 Added $26.5M CST in FY 20 Added $20.8M CST in FY 21 Added $412K PE in FY 19 Added $1.84M CST in FY 21 Added $505K PE in FY 20 Added $3.8M CST in FY 22 Added $209K PE in FY 20 Added $1.0M CST in FY 22 Added $132K PE in FY 20 Added $880K CST in FY 22 Added $283K PE in FY 18 Added $1.5M CST in FY 20 Added $10M CST in FY 20 Added $185K PE in FY 18 Added $665K CST in FY 19 Added $600K PE in FY 21 Added $1.6M PE in FY 18 Added $6.5M CST in FY 20 Added $275K PE in FY 18 Added $1.3M CST in FY 20 Added $445K PE in FY 18 Added $2.8M CST in FY 20 Added $395K PE in FY 18 Added $2.5M CST in FY 20

19 Public Participation Process The Draft FY TIP was presented as an information item to the MPO Board on May 18, The Palm Beach MPO adopted the FY TIP at a public meeting of the MPO Board on June 15, The following opportunities for public review and comment were offered for more than 30 days prior to the public meeting: Website - The Draft FY TIP document in PDF form, Notice of the Public Meeting and an online public comment are posted to The website also provides information on all of the ways to review the draft TIP and offer public comments. Newspaper advertising Provides notice of the Public Meeting and information of the various opportunities for viewing the Draft TIP, asking questions and offering public comment. Palm Beach Post Display ads published in the main section on 5/14/17. Spanish language ads were published in the free weekly editions of el Latino Semanal on 5/19/17. MPO Office, 18 Palm Beach County libraries & 11 Municipal Libraries Distribute a printed notice with instructions to access the online Draft FY TIP document for public review and comment. MPO Committees - The Draft TIP is reviewed for approval by the MPO s Technical Advisory Committee (TAC), Citizens Advisory Committee (CAC) and Bicycle Trailways Pedestrian Advisory Committee (BTPAC). The TAC is comprised of planning and engineering staff from municipal, county and state agencies and organizations to provide input on the technical aspects of the program. The CAC is comprised of representatives from the community with interests in transportation and planning in accordance with the requirements of TEA-21 and Chapter , F.S., to provide a citizen viewpoint on transportation projects and impacts. The BTPAC is comprised of representatives from the community with interests in active transportation. MPO Board meeting Public comments were heard at the publicly noticed MPO Board meetings during the initial information draft on May 18, 2017 and the final adoption on June 15, ing A typical project includes a Project Development and Environment (PD&E) phase, a Design (PE) phase, a Right of Way (ROW) phase and a Construction (CST) phase. Costs on the TIP pages will have historical costs, five years of the current TIP and projected future costs to complete the project consistent with the LRTP Cost Feasible Plan. For some ongoing programs, such as resurfacing, safety or operational projects, there may not be a total cost provided but rather additional details on that program. The TIP is financially constrained for each year. Federally funded projects identified in the TIP can be implemented using current proposed revenue sources based on the FDOT Tentative Work Program and locally dedicated transportation revenues. All Projects funded by FDOT with federal or non-federal dollars are included in a balanced 36-month forecast of cash and expenditures and a five-year finance plan supporting the FDOT Work Program. All local government projects (non-federally funded) that are included in the TIP are part of member local government s capital improvement programs. The following table provides a summary of federal, state and local funding codes as well as the dollar amounts allocated to projects within each funding code by fiscal year. Note that all project costs are shown in year of expenditure dollars, meaning the costs reflect the adjusted value of the work at the time the funds will be expended on the project. 19

20 ing Codes Code / Name Federal 5307 FEDERAL TRANSIT URBAN AREA FORMULA FUNDS 5311 FEDERAL TRANSIT RURAL AREA FORMULA FUNDS 5339 FEDERAL TRANSIT ADMINISTRATION AC.. ADVANCED CONSTRUCTION (REIMBURSED BY FED) ACBR AC FED BRIDGE FUNDS ACNP AC NATIONAL HWY FUNDS ACSA AC STATEWIDE STP (SA) FUNDS ACSU AC PALM BEACH MPO (SU) FUNDS ACTA AC STATEWIDE TRANSPORTATION ALT (TALT) CM CONGESTION MITIGATION FOR AIR QUALITY FAA FEDERAL AVIATION ADMIN HSP HIGHWAY SAFETY PROGRAM NHRE NAT HWY PERFORM - RESURFACING RHH RAIL HIGHWAY X-INGS - HAZARD SA STP, ANY AREA STATEWIDE SU STP, PALM BEACH MPO TALT TRANSPORTATION ALTS- ANY AREA STATEWIDE TALU TRANSPORTATION ALTS PALM BEACH MPO Federal Subtotal State BNBR AMENDMENT 4 BONDS (BRIDGES) BNIR INTRASTATE R/W & BRIDGE BONDS BRRP STATE BRIDGE REPAIR & REHAB CIGP COUNTY INCENTIVE GRANT PROGRAM D UNRESTRICTED STATE PRIMARY DDR DISTRICT DEDICATED REVENUE DI ST. - S/W INTER/INTRASTATE HWY DIH STATE IN-HOUSE PRODUCT SUPPORT DIS STRATEGIC INTERMODAL SYSTEM DITS STATEWIDE ITS - STATE 100%. DPTO STATE - PTO DS STATE PRIMARY HIGHWAYS & PTO Total 15,476, ,878 1,551,881 3,500,000 48,149,770 6,247,493 1,799, ,927 1,674, ,000 5,651, ,620 11,607,840 18,730,921 1,133,111 1,601, ,671,995 15,975, ,878 1,600,000 61,787, ,000 1,646,764 9,808,089 19,100,610 1,582,680 1,608, ,572,426 15,975, ,878 1,600,000 30,167,080 9,450,000 4,416,516 2,678,330 4,496,725 19,896,687 1,078,388 1,606,762 91,678,366 15,975, ,878 1,600,000 51,403, ,364 19,904,455 90,019,702 15,975, , ,474,171 1,761,455 4,762,197 19,904, ,190,156 79,376,218 1,564,390 6,351,881 3,500, ,981,721 6,247,493 1,799, ,927 3,436,274 9,900,000 12,539,148 2,678, ,620 30,674,851 97,537,128 3,794,179 4,816, ,132, ,619 3,175,815 15,884,030 49,169, ,000 1,328,481 1,398,203 18,332,954 13,167,814 1,806,737 8,707,427 10,042,789 2,852,481 16,183,414 28,084,982 76,752,062 1,611,990 3,000,000 1,433,157 14,049,172 33,740,329 3,086,401 1,797,184 16,909,981 39,276,829 27,938,860 1,363,229 8,500,000 1,468,986 13,125,177 11,851,134 99,344,464 2,282,933 16,581,415 57,811,361 10,520,000 1,366,606 1,505,711 5,025,177 8,107,075 16,470,445 8,249,567 82,337, ,871 1,543,354 5,025,177 17,455, ,151,201 8,707,427 13,932,809 10,108,413 82,029, ,591, ,212,150 6,392,177 11,500,000 7,349,411 55,557,657 84,322,313 20

21 Code / Name State (continued) FCO PRIMARY/FIXED CAPITAL OUTLAY GMR GROWTH MANAGEMENT FOR SIS PKBD TURNPIKE MASTER BOND FUND PKYI TURNPIKE IMPROVEMENT PKYO TURNPIKE TOLL COLLECTION/OPER. PKYR TURNPIKE RENEWAL & REPLACEMENT PORT SEAPORTS SCRC SCOP FOR RURAL COMMUNITIES SED STATE ECONOMIC DEVELOPMENT SIWR 2015 SB2514A-STRATEGIC INT SYS TCOR TRANSIT CORRIDOR TDTF TRANS DISADV - TRUST FUND TLWR 2015 SB2514A-TRAIL NETWORK TMBD I-95 EXPRESS LANES TRIP TRANS REGIONAL INCENTIVE PROGM TRWR 2015 SB2514A-TRAN REG INCT PRG State Subtotal Local ADR ADVERTISING REVENUE ADV AD-VALOREM BOCA BOCA RATON CENW CENTURY WEST DL LOCAL FUNDS - PTO - BUDGETED DOSS DIVISION OF SENIOR SERVICES FBR FAREBOX REVENUE GT LOCAL OPTION GAS TAX IF IMPACT FEE IST INFRASTRUCTURE SURTAX LF LOCAL FUNDS LFP LOCAL FUNDS FOR PARTICIPATING RTA SFRTA Local Total Grand Total Total 120,000 8,620, ,855,767 47,453,151 13,460,046 2,000,000 4,355, , ,000 2,942, , ,456 17,325, , ,886,719 1,195,997 8,270,922 45,271,474 26,058,051 23,846, ,000 2,942,000 1,183,147 8,500, ,947,635 3,469,998 46,497, ,000 2,942,000 1,276, ,506 1,304, ,358,235 2,070,000 48,059,169 40, ,000 2,942,000 1,276, , ,719, ,355,174 17,112,526 48,639, ,000 2,942,000 1,276, ,545, ,000 9,816, ,355, ,779, ,920,850 39,558,239 2,000,000 4,355, ,000 23,846,504 2,075,000 14,710, ,000 5,512,288 26,331,527 1,621,647 1,588,457, ,000 49,612, , , , ,000 11,244,100 64,849,500 77,552,500 12,600,000 45,618, , ,671, ,229, ,000 53,963, , , ,000 11,420,580 60,300,000 31,783,481 14,800,000 40,729, , , ,077, ,597, ,000 50,959, , , ,000 11,600,692 54,357,000 25,532,005 12,600,000 31,831, , ,360, ,396, ,000 32,614, , , ,000 11,784,405 50,801,000 17,071,933 28,000, , , ,642, ,381, ,000 33,781, , ,000 11,971,794 33,045,000 11,500, ,000 92,390, ,126,308 3,625, ,930,560 1,512,000 1,875, ,590 1,679,000 58,021, ,352, ,939,919 79,500, ,071, ,499 3,330, ,142,012 3,059,731,783 21

22 Understanding the TIP The following informational guide has been developed to assist the reader in understanding the layout and content of the TIP report Project Name. 2. Project Limits or Description. 3. FDOT Financial Management Number. 4. Length of the project in miles. 5. Identifies whether the project is part of the Strategic Intermodal System. 6. Identifies whether the project is a Regionally Significant Project. 7. Shows the Type of Work accomplished by the project. 8. Lead agency for the project. 9. The number of existing lanes, the number of lanes to be improved and the number of lanes to be added by the project. 10. Identifies how the project is referenced in the Long Range Transportation Plan (LRTP). 11. Provides any explanatory description or notes for the project. 12. of the project. 13. ing source. See Summary for descriptions. 14. Programmed cost estimates for each fiscal year. 15. s already encumbered/expended for the project in previous years. 16. s expected to be necessary for the project in future years beyond the five-year period addressed in the TIP. 17. Total project cost including prior years, the current TIP and future years. 22 6

23 FEC 120 AVE S LYONS RD JOG RD SE 6 AVE FY 2018 SOUTH BAY US RESURFACING CONNERS HWY CR 880 SR-80 SEE GLADES INSET RESURFACING BACOM POINT RD SW 16ST PAHOKEE FEC CR 827A BELLE TRANSIT SHELTER A3 INTERSECTION IMPROV RESURFACING SEM PRATT WHITNEY RD FLYING COW RD RESURFACING WIDEN TO 6L BELLE RESURFACING GLADE GATOR BLVD CR 880 FEC GLADE RD FEC Legend SIS Capacity Major MPO Projects Local Initiatives Program Transportation Alternatives Program SUN Trail Other FDOT & Local Projects Maintenance Projects Airports; Railroads; Seaport GLADES INSET MUCK CITY RD DUDA RD FEC FEC FEC AVIATION SAFETY PROJECT TRANSPORTATION IMPROVEMENT PROGRAM CONSTRUCTION PROJECTS HATTON HWY FEC RESURFACING SR NEW RAIL EXTENSION CONNERS HWY RESURFACING BROWNS FARM RD RAIL SAFETY HALL BLVD CSXT TEMPLE BLVD ORANGE BLVD LOXAHATCHEE GROVES AERO A WIDEN 4L CLUBDR PADDOCK FOLSOM RD WELLINGTON GREENBRIAR BLVD DR BIG BLUE TRACE SOUTH BEELINE HWY COCONUT BLVD WIDEN TO 5L WELLINGTON BLVD CRESTWOOD WELLINGTONTRACE SHORE ROYAL PALM BEACH BLV INDIANTOWN RD RESURFACING NEW ROAD CONSTRUCTION ROYAL PALM BEACH BLVD SR 7 EXTENSION SR 7/US 441 CSXT LIGHTING SOUTHERN BLVD BLVD CAIN NORTHLAKE BLVD OKEECHOBEE BLVD STRIBLIN G BELVEDERE RD WEST PALM BEACH LAKE WORTH RD PALMETTO PARK RD PGA BLVD FOREST HILL BLVD WAY LANTANA RD TURNPIKE BOYNTON BCH BLVD CLINT MOORE RD YAMATO RD HAGEN RANCH RD GLADES RD BOCA RIO RD SW 18 ST ISLAND JUPITER PALM BEACH GARDENS 45 ST HAVERHILL TEQUESTA ATLANTIS GOLF JUPITER INLET COLONY RIVIERA BEACH MANGONIA PARK BOYNTON BEACH JUNO BEACH CLOUD LAKE GLEN RIDGE PALM SPRINGS SCHOOL FLASHERS GREENACRES POWERLINE RD W AY 57 AV E HYPOLUXO RD EL CLAIR RANCH RD ST ANDREWS BLVD DELRAY BEACH BOCA RATON CSXT CSXT GUN CLUB RD SUMMIT BLVD MILITARY TR S PENNOCK LN BLVD CENTRAL ADD TURN LANE(S) RB2018XX STORMWATER AND DRAINAGE INTERSECTION IMPROVEMENT INTERSECTION IMPROVEMENT INTERSECTION IMPROV WIDEN TO 3L B WIDEN TO 3L WIDEN 4L WIDEN TO 6L INTERSECTIONS IMPROV 2017R504 INTERSECTION IMPROV BRIDGE REPLACE BRIDGE REPLACE WIDEN 3L RESURFACING & GUARDRAIL RESURFACING RESURFACING RESURFACING LIGHTING TRI-RAIL LAYOVER FACILITY TRANSIT SHELTER TRANSIT SHELTER TRANSIT SHELTER ATLANTIC AVE FEC FEC DONALD ROSS RD SR809/MILITARY TRAIL OVERHEAD SCHOOL FLASHERS 2017R502 INTERSECTION IMPROVEMENT GATEWAY BLVD LAKE IDA RD LINTON BLVD NW 12 AVE AIRPORT RD ALT A1A VIL LAGE B L V D RESURFACING RESURFACING NORTH PALM BEACH LAKE PARK FLORIDA MANGO RD BLUE WOOLBRIGHT CONGRESS AVE DIXIE HWY BEACH RD RD RESURFACING FEDERAL HWY/US1/SR5 LAKE CLARKE SHORES SW 10TH AVE PROSPERITY FARMS LIGHTING LIGHTING AVIATION OPERATIONAL RESURFACING RESURFACING TRANSIT SHELTER INTERSECTION IMPROVEMENT SHARED USE PATHWAY TRANSIT SHELTER TRANSIT SHELTER RESURFACING INTERSECTION IMPROV INTERSECTION IMPROV Updated as of 8/18/2017 File: MPO Common > TIP > TIP FY > Draft TIP > Maps Based on FY Adopted TIP HIGH RIDGE RD CSXT NE 2 AVE I-95 ELLISON WILSON RD NEW RAIL CONNECTION COMPLETE STREET FEC PALM BEACH SOUTH PALM BEACH LANTANA MANALAPAN HYPOLUXO RD SEACREST SW 4 AVE OCEAN DR INTERSECTION IMPROVEMENT 2017R101 INTERSECTION IMPROVEMENT HERON BLVD OCEAN RIDGE BRINY BREEZES HIGHLAND BEACH PALM BEACH SHORES PALM BEACH LAKE WORTH BLVD FEC FEC FEC GEORGIA AVE SR805/DIXIE HWY FEDERAL HWY S FLAGLER DR GULF STREAM OCEAN BLVD N OCEAN BLVD WIDEN 2L/3L TRANSIT SHELTER TRANSIT SHELTER 2017R403 BRIDGE REPLACEMENT RESURFACING TRANSIT SHELTER RESURFACING BIKE LANE/SIDEWALK INTERCHANGE IMPROVEMENT LANDSCAPING AIRPORT PAVEMENT REHAB OVERHEAD SCHOOL FLASHERS UPLAND CARGO IMPROVEMENTS TRANSIT SHELTER NEW TROLLEY SERVICE BRIDGE REPLACEMENT NEW TROLLEY SERVICE BRIDGE REPLACEMENT 2017R507 INTERSECTION IMPROVEMENT AIRPORT TAXIWAY WIDENINGS AIRFIELD PAVEMENT REJUVENTATOR BRIDGE REPLACEMENT 2017R902 RESURFACING INTERSECTION IMPROV INTERSECTION IMPROV RAIL SAFETY RAIL SAFETY RAIL SAFETY ADD EXPRESS LANES RAIL SAFETY FY 2018

24 FEC 120 AVE S LYONS RD JOG RD SE 6 AVE FY 2019 Legend SIS Capacity Major MPO Projects Local Initiatives Program TRANSPORTATION IMPROVEMENT PROGRAM CONSTRUCTION PROJECTS RESURFACING INDIANTOWN RD ISLAND W AY ATMS TEQUESTA JUPITER INLET COLONY S PENNOCK LN JUPITER ALT A1A FEC Based on FY Adopted TIP BEACH RD RESURFACING FEDERAL HWY/US1/SR5 OCEAN DR SOUTH BAY US-27 CONNERS HWY CR 880 BACOM POINT RD SIDEWALK Transportation Alternatives Program SUN Trail Other FDOT & Local Projects Maintenance Projects Airports; Railroads; Seaport SR-80 SEE GLADES INSET GLADES INSET BRIDGE REPLACEMENT PAHOKEE MUCK CITY RD FEC GLADE RD BELLE BELLE GLADE GATOR BLVD CR 827A TABIT RD DUDA RD FEC HATTON HWY AIRPORT HANGARS FEC SEM PRATT WHITNEY RD CONNERS HWY SR-80 BROWNS FARM RD FLYING COW RD HALL BLVD CSXT TEMPLE BLVD ORANGE BLVD LOXAHATCHEE GROVES PEDESTRIAN BRIDGE AERO CLUBDR PADDOCK FOLSOM RD WELLINGTON GREENBRIAR BLVD DR BIG BLUE TRACE SOUTH BEELINE HWY B WIDEN FROM 2L TO 4L BRIDGE REPLACEMENT CR 880 WELLINGTON COCONUT BLVD BLVD CRESTWOOD WELLINGTONTRACE SHORE ROYAL PALM BEACH BLV ROYAL PALM BEACH BLVD SR 7 EXTENSION SR 7/US 441 CSXT SOUTHERN BLVD BLVD CAIN NORTHLAKE BLVD OKEECHOBEE BLVD STRIBLIN G BELVEDERE RD WEST PALM BEACH LAKE WORTH RD PALMETTO PARK RD PGA BLVD 2017R302 INTERSECTION IMPROVEMENT ADD TURN LANE(S) FOREST HILL BLVD WAY LANTANA RD RESURFACING RESURFACING TURNPIKE BOYNTON BCH BLVD CLINT MOORE RD YAMATO RD HAGEN RANCH RD GLADES RD BOCA RIO RD PALM BEACH GARDENS 45 ST HAVERHILL RIVIERA BEACH ATLANTIS GOLF MANGONIA PARK BOYNTON BEACH JUNO BEACH CLOUD LAKE GLEN RIDGE DELRAY BEACH BOCA RATON NORTH PALM BEACH LAKE PARK 2017R913 LAKE BRIDGE REHABILITATION CLARKE SHORES 2017R LAKE BRIDGE PALM REPLACEMENT SPRINGS WORTH GREENACRES SW 18 ST RESURFACING TRAFFIC SIGNALS POWERLINE RD 57 AV E HYPOLUXO RD RESURFACING EL CLAIR RANCH RD ST ANDREWS BLVD CSXT CSXT GUN CLUB RD SUMMIT BLVD MILITARY TR BLVD CENTRAL TRAFFIC SIGNALS AIRPORT MAINT FACILITY RESURFACING 2017R914 BRIDGE REPLACEMENT INTERCHANGE IMPROVEMENT NEW TRI-RAIL STATION LIGHTING LIGHTING ATLANTIC AVE LINTON BLVD DONALD ROSS RD SR809/MILITARY TRAIL RESURFACING RESURFACING FEC LIGHTING GATEWAY BLVD LAKE IDA RD NW 12 AVE AIRPORT RD VIL LAGE B L V D FLORIDA MANGO RD BLUE WOOLBRIGHT CONGRESS AVE DIXIE HWY RD SW 10TH AVE PROSPERITY FARMS HIGH RIDGE RD BIKE LANE/SIDEWALK INTERCHANGE IMPROVEMENT ADD EXPRESS LANES NEW TROLLEY SERVICE AIRPORT STORM DRAINAGE Updated as of 8/18/2017 File: MPO Common > TIP > TIP FY > Draft TIP > Maps CSXT NE 2 AVE I-95 ELLISON WILSON RD INTERSECTION IMPROVEMENT RESURFACING FEC PALM BEACH SOUTH PALM BEACH LANTANA MANALAPAN HYPOLUXO RD SEACREST SW 4 AVE HERON BLVD FEC FEC OCEAN RIDGE BRINY BREEZES BLVD GULF STREAM HIGHLAND BEACH FEC OCEAN BLVD GEORGIA AVE SR805/DIXIE HWY FEDERAL HWY N OCEAN BLVD RB2019XX STORMWATER AND DRAINAGE PALM BEACH SHORES S FLAGLER NEW TROLLEY SERVICE DR SEAPORT EXPANSION SIDEWALK PALM BEACH BRIDGE PAINTING 2017R909 BRIDGE REPLACEMENT SIDEWALK BRIDGE REPLACEMENT RESURFACING SIDEWALK TRANSIT SHELTER INTERSECTION IMPROVEMENT RESURFACING ADD LANES & RECONSTRUCT BRIDGE REHABILITATION NEW TROLLEY SERVICE BRIDGE REHABILITATION FY 2019

25 FEC 120 AVE S LYONS RD JOG RD SE 6 AVE FY 2020 Legend SIS Capacity Major MPO Projects Local Initiatives Program TRANSPORTATION IMPROVEMENT PROGRAM CONSTRUCTION PROJECTS INDIANTOWN RD ISLAND WAY RESURFACING SAFETY PROJECT TEQUESTA S PENNOCKLN JUPITER ALT A1A FEC Based on FY Adopted TIP JUPITER INLET COLONY FEDERAL HWY/US1/SR5 OCEAN DR Transportation Alternatives Program SUN Trail Other FDOT & Local Projects Maintenance Projects Airports; Railroads; Seaport SIDEWALK BEELINE HWY AVIATION PRESERVATION PROJECT CSXT CSXT CONSTRUCT HANGARS PGA BLVD NORTHLAKE BLVD PALM BEACH GARDENS RYDER CUP B LVD BRIDGE - PAINTING BLVD CENTRAL DONALD ROSS RD MILITARY TRAIL FEC RESURFACING L to 3L RD PROSPERITY FARMS JUNO BEACH ELLISON WILSON RD NORTH PALM BEACH N OCEAN BLVD SOUTH BAY US-27 CONNERS HWY SR-80 CR 880 SEE GLADES INSET GLADES INSET PAHOKEE MUCK CITY RD SW 16ST FEC CR 827A TABIT RD BELLE GLADE DUDA RD FEC ARTERIAL TRAFFIC MGMT SYSTEMS RESURFACING AVIATION EXPAND APRON HATTON HWY GATOR BLVD FEC SEM PRATT WHITNEY RD BIKE PATH/TRAIL CONNERS HWY SR-80 BROWNS FARM RD FLYING COW RD CR 880 HALL BLVD TEMPLE BLVD ORANGE BLVD LOXAHATCHEE GROVES AERO CLUB DR PADDOCK FOLSOM RD WELLINGTON GREEN BRIARBLVD DR COCONUT BLVD BLVD ROYAL PALM BEACH CRESTWOOD SOUTHERN BLVD WELLINGTON TRACE SOUTH SHORE ROYAL PALM BEACH BLV RESURFACING BLVD SR 7 EXTENSION BLVD CAIN STRIBLIN G ATMS SR 7/US 441 LAKE WORTH RD WEST PALM BEACH OKEECHOBEE BLVD L to 3L WAY LANTANA RD RESURFACING RESURFACING BELVEDERE RD TURNPIKE HYPOLUXO RD BOYNTON BCH BLVD CLINT MOORE RD GLADES RD YAMATO RD HAGEN RANCH RD HAVERHILL ATLANTIS RIVIERA BEACH MANGONIA PARK CLOUD LAKE GLEN RIDGE BOYNTON BEACH DELRAY BEACH BOCA RATON LAKE PARK LAKE CLARKE SHORES LAKE PALM SPRINGS WORTH GREENACRES BRIDGE REPLACEMENT FOREST HILL BLVD ADD LEFT TURN LANE(S) BRIDGE REPLACEMENT BOCA RIO RD SW 18 ST WOOLBRIGHT POWERLINE RD EL CLAIR RANCH RD RD GUN CLUB RD SUMMIT BLVD MILITARY TR ATLANTIC AVE PALMETTO PARK RD KIRK RD GATEWAY LAKE IDA RD CSXT CSXT ADD LANES & RECONSTRUCT RESURFACING PEDESTRIAN BRIDGE ATMS BIKE LANE/SIDEWALK BIKE PATH/TRAIL & TAXIWAY CONSTRUCTION LINTON BLVD NW 12 AVE BRIDGE REPLACEMENT AVIATION RUNWAY REHAB BRIDGE REPLACEMENT NW 4 AVE SW 4 AVE CONGRESS AVE NOISE GOLFWALLS ATMS B LVD SW 10TH AVE NW 8 ST I-95 SEACREST BLVD 45 ST PALM BEACH SOUTH PALM RESURFACING BEACH LANTANA MANALAPAN HYPOLUXO OCEAN RIDGE BRINY BREEZES HIGHLAND BEACH 2 AVE NW LIGHTING HIGH RIDGE RD CSXT SW 8 ST NE 2 AVE DIXIE HWY BRIDGE - PAINTING FEC PALM BEACH SHORES PALM BEACH GEORGIA AVE FEDERAL HWY SR805/DIXIE HWY S GULF STREAM OCEAN BLVD FEC FEC FEC FLAGLER DR BRIDGE REPLACEMENT RESURFACING RESURFACING S INTERSECTION IMPROVEMENT BRIDGE REPLACEMENT Updated as of 8/18/2017 File: MPO Common > TIP > TIP FY > Draft TIP > Maps AVIATION CONCOURSE EXPANSION DRAINAGE IMPROVEMENT RESURFACING REPLACE TROLLEYS BIKE PATH/TRAIL BIKE LANE/SIDEWALK RESURFACING BIKE LANE/SIDEWALK FY 2020

26 SW 5 ST FEC 120 AVE S LYONS RD 10TH AVE SE 6 AVE FY 2021 Legend SIS Capacity Major MPO Projects Local Initiatives Program TRANSPORTATION IMPROVEMENT PROGRAM CONSTRUCTION PROJECTS INDIANTOWN RD ISLAND WAY TEQUESTA JUPITER INLET COLONY S PENNOCKLN JUPITER ALT A1A FEC Based on FY Adopted TIP BEACH RD BRIDGE REPLACEMENT FEDERAL HWY/US1/SR5 OCEAN DR CONNERS HWY SR-80 CR 880 GLADES INSET SOUTH BAY FEC US-27 BACOM POINT RD Transportation Alternatives Program SUN Trail Other FDOT & Local Projects Maintenance Projects Airports; Railroads; Seaport SEE GLADES INSET PAHOKEE MUCK CITY RD SW 16 ST GLADE RD BELLE FEC BELLE GLADE RESURFACING SAFETY IMPROVEMENTS ADD SPECIAL USE LANE SAFETY IMPROVEMENTS GATOR BLVD SIGNING/PAVEMENT MARKINGS SAFETY IMPROVEMENTS HATTON HWY FEC BIKE LANE/SIDEWALK SEM PRATT WHITNEY RD CONNERS HWY SR RESURFACING BROWNS FARM RD FLYING COW RD CR 880 BEELINE HWY TEMPLE BLVD LOXAHATCHEE GROVES AERO CLUB DR WELLINGTON GREEN BRIARBLVD RESURFACING PADDOCK DR ORANGE BLVD FOLSOM RD COCONUT BLVD WELLINGTONTRACE SOUTH WELLINGTON CSXT BLVD ROYAL PALM BEACH CRESTWOOD SHORE ROYAL PALM BEACH BLV BLVD CSXT SR 7 EXTENSION RESURFACING SOUTHERN BLVD BIKE LANE/SIDEWALK BLVD CAIN SR 7/US 441 NORTHLAKE BLVD WEST PALM BEACH OKEECHOBEE BLVD FOREST HILL BLVD STRIBLIN G WAY LAKE WORTH RD PALMETTO PARK RD TURNPIKE YAMATO RD HAGEN RANCH RD GLADES RD BOCA RIO RD SW 18 ST PINEHURST DR PALM BEACH GARDENS RYDER CUP ADD LEFT TURN LANE(S) WIDEN FROM 2L TO 4L WIDEN TO 5&6L RESURFACING WIDEN FROM 4L to 6L HAVERHILL SUMMIT BLVD GREENACRES HYPOLUXO RD ST ANDREWS BLVD GUN CLUB RD ATLANTIS GOLF BOYNTON BEACH JUNO BEACH RIVIERA BEACH PALM LIGHTING BEACH SHORES MANGONIA PARK CLOUD LAKE GLEN RIDGE LAKE CLARKE SHORES LAKE PALM SPRINGS WORTH WOOLBRIGHT ATLANTIC AVE LINTON BLVD DONALD ROSS RD 45 ST 10 AVE N KIRK RD MELALEUCA LN LANTANA RD BOYNTON BCH BLVD POWERLINE RD B LVD JOG RD 57 AVE EL CLAIR RANCH RD S 57TH AVE MILITARY TR BLVD CENTRAL INTERSECTION IMPROVEMENT RESURFACING RESURFACING INTERSECTION IMPROVEMENT HAVERHILL RD GATEWAY BLVD LAKE IDA RD CLINT MOORE RD PGA DELRAY BEACH BOCA RATON SW 12 AVE SR809/MILITARY TRAIL LAWRENCE RD NW 12 AVE AIRPORT RD FAU BLVD BLVD NORTH PALM BEACH LAKE PARK BLUE HERON BLVD BLVD VILLAGE NW 5 AVE NW 4 AVE SW 4 AVE CONGRESS AVE OLD BOYNTON RD CSXT FEC RESURFACING CSXT RESURFACING RESURFACING WIDEN TO 3L BIKE LANE/SIDEWALK RD SW DIXIE HWY 2 AVE NW RD HIGH RIDGE RD NW 8 ST PROSPERITY FARMS RESURFACING CSXT SW 8 ST AUS T RALIAN AVE SEACREST BLVD ELLISON WILSON RD PALM BEACH SOUTH PALM BEACH LANTANA I-95 S A ST MANALAPAN HYPOLUXO OCEAN RIDGE BRINY BREEZES HIGHLAND BEACH PALM BEACH PARKER AVE FEDERAL HWY N FLAGLER DR S OLIVE AVE GEORGIA AVE SR805/DIXIE HWY N OCEAN FLAGLER DR BRADLEY PL S GULF STREAM OCEAN BLVD CSXT RESURFACING FEC FEC FEC BIKE LANE/SIDEWALK L to 3L Updated as of 8/18/2017 File: MPO Common > TIP > TIP FY > Draft TIP > Maps RESURFACING FEC FLAGLER DR BLVD RESURFACING BIKE LANE/SIDEWALK BIKE LANE/SIDEWALK BIKE PATH/TRAIL 2017R912 BRIDGE REPLACEMENT INTERSECTION IMPROVEMENT BRIDGE REPLACEMENT BIKE LANE/SIDEWALK FY 2021

Land Use Context Definitions

Land Use Context Definitions Land Use Context Definitions Note: The colors to the right of the land use context names refer to the mapset. Land Use Context Type Description Building Placement and Parking Land Uses Data Source Higher

More information

Draft Year 2040 Cost Feasible Plan

Draft Year 2040 Cost Feasible Plan Year 2040 Plan Ranking of Desires Plan Projects And Matching of Available Revenues Palm Beach Metropolitan Planning Organization (MPO) Technical Advisory Committee (TAC) Citizens Advisory Committee (CAC)

More information

APPENDIX A: Planning Consistency Checklist

APPENDIX A: Planning Consistency Checklist APPENDIXA: PlanningConsistencyChecklist Planning Requirements for Environmental Document Approvals with Segmented Implementation Document Information: Date: 1/20/2015 Document Type: EA Document Status:

More information

IST FUNDING THROUGH CURRENT FISCAL YEAR ONLY

IST FUNDING THROUGH CURRENT FISCAL YEAR ONLY IST FUNDING THROUGH CURRENT FISCAL YEAR ONLY Data Date: 1/17/2019 Expended Engineering B04 - Bridge Modifications Smith Sundy Rd. over LWDD Lat. 33 Canal (PB934411) 600,000 600,000 $162,437 $75,944 Palm

More information

TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS

TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS Florida Department of TRANSPORTATION - DISTRICT ONE TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS 2017-2021 DISTRICT ONE HEADQUARTERS (BARTOW) SOUTHWEST AREA OFFICE (FORT MYERS) MISSION STATEMENT The Department

More information

Road widening from 2 lanes to 4 lanes. Bridge removal and piping of the canal. Lane closures are not expected.

Road widening from 2 lanes to 4 lanes. Bridge removal and piping of the canal. Lane closures are not expected. PALM BEACH COUNTY TRAFFIC DIVISION UPDATE OF ROAD AND BRIDGE CONSTRUCTION LIST DATE OF ISSUE: SEPTEMBER 12, 2012 STATUS FOR SEPTEMBER 17, 2012 THROUGH SEPTEMBER 23, 2012 *** CONSTRUCTION WORK ZONES ADDED

More information

TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS

TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS Florida Department of TRANSPORTATION - DISTRICT ONE TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS 2017-2021 DISTRICT ONE HEADQUARTERS (BARTOW) SOUTHWEST AREA OFFICE (FORT MYERS) MISSION STATEMENT The Department

More information

Palm Beach County Traffic Report July 13 through July 20, 2012

Palm Beach County Traffic Report July 13 through July 20, 2012 For Immediate Release July 13, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report July 13 through July 20, 2012 Palm Beach County Palm Beach County traffic will be

More information

Palm Beach County Infrastructure Sales Tax Program Project Tracking. FY 2017 Projects

Palm Beach County Infrastructure Sales Tax Program Project Tracking. FY 2017 Projects FY 2017 Projects Engineering Lake Osborne Dr. over Lake Bass Canal Palm Beach Lakes Blvd over FEC R/R Smith Sundy Rd. over LWDD Lat. 33 Canal Kudza Rd. over LWDD Lat. 8 Canal Prairie Rd. over LWDD Lat.

More information

Ocean Way at U.S. #1 (Town of Jupiter) Installation of a new traffic signal.

Ocean Way at U.S. #1 (Town of Jupiter) Installation of a new traffic signal. PALM BEACH COUNTY TRAFFIC DIVISION UPDATE OF ROAD AND BRIDGE CONSTRUCTION LIST DATE OF ISSUE: FEBRUARY 13, 2013 STATUS FOR FEBRUARY 18, 2013 THROUGH FEBRUARY 24, 2013 *** CONSTRUCTION WORK ZONES ADDED

More information

May 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015

May 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015 May 1, 2015 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report May 1 through May 8, 2015 Palm Beach County Palm Beach County traffic will be affected this week by ongoing

More information

PALM BEACH COUNTY INFRASTRUCTURE SURTAX REVENUES As of November 30, 2017

PALM BEACH COUNTY INFRASTRUCTURE SURTAX REVENUES As of November 30, 2017 PALM BEACH COUNTY INFRASTRUCTURE SURTAX REVENUES As of November 30, 2017 Interest Sales Tax TOTAL BUDGET Overage/(Shortfall) FY 2017 $ 185,642.45 $ 50,430,391.92 $ 57,708,049.23 $ 50,398,384.00 $ 7,309,665.23

More information

MUNICIPAL COMMISSION/COUNCIL TERMS, TERM LIMITS, SALARIES AND BENEFITS SURVEY

MUNICIPAL COMMISSION/COUNCIL TERMS, TERM LIMITS, SALARIES AND BENEFITS SURVEY City of Atlantis 2 years ne Mayor - $12,800 ne Council - $10,800 City of Belle Glade 3 years ne Mayor - $11,712 Vice-Mayor - $11,036 $10,360; Mayor also has an assigned vehicle City of Boca Raton 3 years

More information

Palm Beach County Traffic Report August 24 through August 31, 2012

Palm Beach County Traffic Report August 24 through August 31, 2012 For Immediate Release August 24, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report August 24 through August 31, 2012 Palm Beach County Palm Beach County traffic will

More information

TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS

TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS Florida Department of TRANSPORTATION - DISTRICT ONE TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS 2017-2021 DISTRICT ONE HEADQUARTERS (BARTOW) SOUTHWEST AREA OFFICE (FORT MYERS) MISSION STATEMENT The Department

More information

Regional Planning for Tri-Rail Coastal Link

Regional Planning for Tri-Rail Coastal Link 2013 APTA Rail Conference Regional Planning for Tri-Rail Coastal Link William L. Cross, P.E. South Florida Regional Transportation Authority Director of Planning and Capital Development Pompano Beach,

More information

Highways: Interstate. Highways: State Highways

Highways: Interstate. Highways: State Highways FLORIDA DEPARTMENT OF TRANSPORTATION 5 - YEAR TRANSPORTATION PLAN ($ IN THOUSANDS) TENTATIVE FY 2019-2023 (10/01/2017 20:15:01) ALACHUA COUNTY Highways: Interstate 4230716 I-75(SR121)WILLISTON RD SR222(NW

More information

Palm Beach County Traffic Report. Aug. 25 through Sept. 1, 2017

Palm Beach County Traffic Report. Aug. 25 through Sept. 1, 2017 August 25, 2017 Meredith Cruz, (561) 641 6440 mcruz@corradino.com Palm Beach County Traffic Report Aug. 25 through Sept. 1, 2017 Palm Beach County Palm Beach County traffic will be affected this week by

More information

Highways: Interstate. Highways: State Highways. Highways: Local Roads. Highways: Off State Hwy Sys/Off Fed Sys. Fixed Capital Outlay: Facilities

Highways: Interstate. Highways: State Highways. Highways: Local Roads. Highways: Off State Hwy Sys/Off Fed Sys. Fixed Capital Outlay: Facilities FLORIDA DEPARTMENT OF TRANSPORTATION 5 - YEAR TRANSPORTATION PLAN ($ IN THOUSANDS) TENTATIVE FY 2019-2023 (10/01/2017 20:15:01) COLUMBIA COUNTY Highways: Interstate 4424121 I-10 COLUMBIA COUNTY REST AREA

More information

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 9

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 9 TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M To: Council Members AGENDA ITEM 9 From: Date: Subject: Staff October 21, 2016 Council Meeting South Dixie Highway Corridor Improvement Plan

More information

Government in Palm Beach County

Government in Palm Beach County Government in Palm Beach County 2018 STAY CONNECTED Are you getting the latest updates and information from county government? If not, we invite you to visit our Stay Connected page at pbcgov.com/stayconnected.

More information

50 Largest U.S. Metropolitan Areas

50 Largest U.S. Metropolitan Areas America s Racially : Opportunities and Challenges 50 Largest U.S. Metropolitan Areas Community types in the 50 largest metropolitan areas 39,333,003 % 14,533,3 16,983,337 9% 10% 47,406,687 49,199,197 30,180,578

More information

FLORIDA DEPARTMENT OF TRANSPORTATION Bay County Citizen s Plan Tentative Work Program Fiscal Years

FLORIDA DEPARTMENT OF TRANSPORTATION Bay County Citizen s Plan Tentative Work Program Fiscal Years Bay County Citizen s Plan Tentative Work Program Fiscal Years 2019-2023 The Florida Department of Transportation Complies with Various Non-Discrimination Laws and Regulations, including Title VI of the

More information

Tri-Rail Coastal Link Project Update

Tri-Rail Coastal Link Project Update Exhibit 3 Tri-Rail Coastal Link Project Update Presented to: FTA Region IV December 16, 2013 Agenda Review of Project Activities Next Steps Discussion 2 Review of Project Activities Rebranded project to

More information

Highways: Interstate. Highways: State Highways

Highways: Interstate. Highways: State Highways FLORIDA DEPARTMENT OF TRANSPORTATION 5 - YEAR TRANSPORTATION PLAN ($ IN THOUSANDS) TENTATIVE FY 2019-2023 (10/01/2017 20:15:01) ST. JOHNS COUNTY Highways: Interstate 4392931 I-95 SB(SR9) DURBIN CREEK BRIDGE

More information

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT July 1, 2014 Through June 30, 2019

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT July 1, 2014 Through June 30, 2019 Tentative Work Program Fiscal Years 2015-2019 Page: 1 MISSION STATEMENT The Department will provide a safe, interconnected statewide transportation system for Florida's citizens and visitors that ensures

More information

Highways: State Highways

Highways: State Highways FLORIDA DEPARTMENT OF TRANSPORTATION 5 - YEAR TRANSPORTATION PLAN ($ IN THOUSANDS) TENTATIVE FY 2019-2023 (10/01/2017 20:15:01) CLAY COUNTY Highways: State Highways 4135301 D2 CLAY COUNTY TRAFFIC SIGNAL

More information

Update on Palm Beach MPO Funded Projects

Update on Palm Beach MPO Funded Projects Update on Palm Beach MPO Funded Projects Presented February 3, 2016: Palm Beach Technical Advisory Committee (TAC) Citizens Advisory Committees (CAC) Tri-Rail Milestones Service began Jan 9, 1989 Double-tracking

More information

PALM BEACH MPO. May 3, Valerie Neilson, AICP Multimodal Manager Palm Beach MPO

PALM BEACH MPO. May 3, Valerie Neilson, AICP Multimodal Manager Palm Beach MPO PALM BEACH MPO May 3, 2017 Valerie Neilson, AICP Multimodal Manager Palm Beach MPO VNeilson@PalmBeachMPO.org US-1 MULTIMODAL CORRIDOR STUDY 1. Project Overview 2. Goals 3. Timeline 4. Next Steps PROJECT

More information

November 21, 2012 Barbara Kelleher, (954)

November 21, 2012 Barbara Kelleher, (954) November 21, 2012 Barbara Kelleher, (954) 777-4090 barbara.kelleher@dot.state.fl.us BROWARD COUNTY TRAFFIC IMPACT REPORT November 26 to November 30, 2012 FORT LAUDERDALE -- Construction and maintenance-related

More information

Update of MDX Open Road Tolling

Update of MDX Open Road Tolling Update of MDX Open Road Tolling Citizens Transportation Advisory Committee September 11, 2013 About MDX MDX is an agency of the state created by the State Legislature and the County Commission to assure

More information

Project Update to Treasure Coast Regional Planning Council

Project Update to Treasure Coast Regional Planning Council S o u t h F l o r i d a E a s t C o a s t C o r r i d o r ( S F E C C ) S t u d y Project Update to Treasure Coast Regional Planning Council December 14, 2012 M I A M I - D A D E, B R O W A R D, A N D

More information

CityStats Southeast Florida Trends

CityStats Southeast Florida Trends CityStats Southeast Florida Trends 2017 Research Analyst Liane Schrader, CAE Center for Municipal Research & Innovation Florida League of Cities CityStats Southeast Florida Regional Trend Analysis 100%

More information

Major Projects Overview

Major Projects Overview Major Projects Overview Miami-Dade Expressway Authority February 2018 About MDX MDX operates 5 roads in Miami Dade County SR 924, SR 112, SR 836, SR 874 and SR 878 MDX Primary Source of Revenue: User Fees-Tolls

More information

CityStats Southeast Florida Trends

CityStats Southeast Florida Trends CityStats Florida Trends 2018 Research Analyst Liane Giroux, CAE Center for Municipal Research & Innovation Florida League of Cities CityStats Florida Regional Trend Analysis Municipal Revenue Sources

More information

2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016

2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016 2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016 Project numbers do not signify ranking they are for mapping identification purposes only. 1. 15th Street East The

More information

SR 934 Project Development And Environment (PD&E) Study

SR 934 Project Development And Environment (PD&E) Study SR 934 Project Development And Environment (PD&E) Study Project Advisory Group Meeting March 1, 2018 State Road 934/NE/NW 79th Street from west of I-95 (NW 13th CT) to N. Bayshore Drive PD&E STUDY SR 934/NE/NW

More information

East Coast Greenway (ECG) Southeast Region Miami-Dade/Broward/Palm Beach/Martin/St. Lucie/Indian River

East Coast Greenway (ECG) Southeast Region Miami-Dade/Broward/Palm Beach/Martin/St. Lucie/Indian River East Coast Greenway (ECG) Southeast Region Miami-Dade/Broward/Palm Beach/Martin/St. Lucie/Indian River What is the ECG/SE Region? Connects Key West to Maine 220 miles Indian River to Miami-Dade County

More information

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 June 19, 2015 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 TREASURE COAST Construction and maintenance-related lane

More information

The Joint Charlotte County - Punta Gorda and Lee MPO Meeting has changed from 10:00 a.m. to 9:30 a.m.

The Joint Charlotte County - Punta Gorda and Lee MPO Meeting has changed from 10:00 a.m. to 9:30 a.m. The Joint Charlotte County - Punta Gorda and Lee MPO Meeting has changed from 10:00 a.m. to 9:30 a.m. JOINT MEETING OF THE CHARLOTTE COUNTY-PUNTA GORDA METROPOLITAN PLANNING ORGANIZATION BOARD AND LEE

More information

What is Shovel Ready Palm Beach? What is a Shovel Ready Site?

What is Shovel Ready Palm Beach? What is a Shovel Ready Site? What is Shovel Ready Palm Beach? Shovel Ready Palm Beach is one of the first programs of its kind in Florida. Under the program, the BDB identifies vacant commercial and industrial property that is Shovel

More information

BROWARD COUNTY TRAFFIC IMPACT REPORT March 13 through March 20, March 13, 2015 Chuck McGinness,

BROWARD COUNTY TRAFFIC IMPACT REPORT March 13 through March 20, March 13, 2015 Chuck McGinness, From: McGinness, Charles To: McGinness, Charles Subject: FDOT Broward County Traffic Impact Report 03 13 15 through 03 20 15 Date: Friday, March 13, 2015 2:43:29 PM Attachments: image001.png BROWARD COUNTY

More information

May 1, 2015 Chuck McGinness, BROWARD COUNTY TRAFFIC IMPACT REPORT May 1 through May 8, 2015

May 1, 2015 Chuck McGinness, BROWARD COUNTY TRAFFIC IMPACT REPORT May 1 through May 8, 2015 From: McGinness, Charles To: McGinness, Charles Subject: FDOT Broward County Traffic Impact Report 05 01 15 through 05 08 15 Date: Friday, May 01, 2015 3:10:15 PM Attachments: image001.png May 1, 2015

More information

October 31, 2014 Chuck McGinness, (954)

October 31, 2014 Chuck McGinness, (954) From: McGinness, Charles To: McGinness, Charles Subject: FDOT Broward County Traffic Impact Report 10 31 14 through 11 07 14 Date: Friday, October 31, 2014 2:59:04 PM Attachments: image002.png October

More information

FOR IMMEDIATE RELEASE Fiorella Teodista January 5, 2018 SOUTH FLORIDA AND TREASURE COAST WEEKLY LANE CLOSURES AND WORK ZONE ADVISORY

FOR IMMEDIATE RELEASE Fiorella Teodista January 5, 2018 SOUTH FLORIDA AND TREASURE COAST WEEKLY LANE CLOSURES AND WORK ZONE ADVISORY TRAFFIC ADVISORY FOR IMMEDIATE RELEASE Fiorella Teodista 954-934-1130 January 5, 2018 SOUTH FLORIDA AND TREASURE COAST WEEKLY LANE CLOSURES AND WORK ZONE ADVISORY FORT LAUDERDALE Florida s Turnpike announces

More information

Mainline Description

Mainline Description Mainline Description The Mainline component of Florida s Turnpike extends for 320 miles and consists of five distinct sections as shown in the figure above. These sections are the SR 821 (HEFT), Southern

More information

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015 From: Kathleen Dempsey To: Kathleen Dempsey Subject: FDOT Treasure Coast Traffic Report 10 09 15 through 10 16 15 Date: Friday, October 09, 2015 2:10:36 PM Attachments: image003.png CR 714_Median Construction

More information

LMS Project Prioritized List

LMS Project Prioritized List PALM BEACH COUNTY UNIFIED LOCAL MITIGATION STRATEGY LMS Project Prioritized List July 30, 2017 2017 20 S O U T H M I L I T A R Y T R A I L, W E S T P A L M B E A C H, FL 33415 1 92 7 Greenacres Original

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report July 7, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report July 7 through July 14, 2017 TREASURE COAST Construction and maintenance related lane

More information

May 16, 2014 Chuck McGinness, (954) BROWARD COUNTY TRAFFIC IMPACT REPORT May 16 through May 23, 2014

May 16, 2014 Chuck McGinness, (954) BROWARD COUNTY TRAFFIC IMPACT REPORT May 16 through May 23, 2014 May 16, 2014 Chuck McGinness, (954) 777-4090 chuck.mcginness@dot.state.fl.us BROWARD COUNTY TRAFFIC IMPACT REPORT May 16 through May 23, 2014 FORT LAUDERDALE -- Construction and maintenance-related lane

More information

Non-Motorized Transportation

Non-Motorized Transportation Non-Motorized Transportation Non-motorized facilities are important components to the transportation system. They provide an environmentally-friendly, low-cost mode of travel. Some of the facilities can

More information

Tri-Rail Coastal Link and Downtown Miami Link. Miami-Dade County Black Affairs Advisory Board February 3, 2016

Tri-Rail Coastal Link and Downtown Miami Link. Miami-Dade County Black Affairs Advisory Board February 3, 2016 Tri-Rail Coastal Link and Downtown Miami Link Miami-Dade County Black Affairs Advisory Board February 3, 2016 Current Tri-Rail Service Miami Int l Airport 72 mile system Now 18 stations 50 trains per weekday

More information

LMS Project Prioritized List

LMS Project Prioritized List PALM BEACH COUNTY UNIFIED LOCAL MITIGATION STRATEGY LMS Project Prioritized List December 14, 2016 2016 20 S O U T H M I L I T A R Y T R A I L, W E S T P A L M B E A C H, FL 33415 1 92 7 Greenacres Original

More information

FDOT Treasure Coast Traffic Report through

FDOT Treasure Coast Traffic Report through FDOT Treasure Coast Traffic Report 02 26 16 through 03 04 16 Kathleen Dempsey Fri 2/26/2016 2:56 PM To:Kathleen Dempsey ; 1 attachment 355 KB CR 714_Median Access Modifications.pdf;

More information

Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP)

Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP) F100090 Fed ID: F100090 Farmington MPO Rec Num: 4 Lead Agency: City of Aztec Proj East Arterial Route Phase 1B Fr: US 550 To: Legion Rd Project Desc.: Construct new road Category: Capacity Proj NMDOT Dist.:

More information

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014 April 4, 2014 Chuck McGinness, 954-777-4090 Chuck.McGinness@dot.state.fl.us FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014 TREASURE COAST Construction and maintenance-related lane closures

More information

University Region Non-Motorized Plan 2015

University Region Non-Motorized Plan 2015 Non-Motorized Transportation Non-motorized facilities are important components to the transportation system. They provide an environmentally-friendly, low-cost mode of travel. Some of the facilities can

More information

PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY I. EXECUTIVE BRIEF

PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY I. EXECUTIVE BRIEF PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY Agenda Item: Meeting Date: July 11, 2017 Department: Submitted By: Office of Financial Management and Budget Submitted For: County Administration

More information

Toll Rates for Florida Turnpike System and Florida Department of Transportation (FDOT) Toll Facilities. South Florida

Toll Rates for Florida Turnpike System and Florida Department of Transportation (FDOT) Toll Facilities. South Florida Toll Rates for Florida Turnpike System and Florida Department of Transportation (FDOT) Toll Facilities South Florida Effective: October 29, 207 S.R. 82 (HEFT) Miami-Dade and Broward Counties S.R. 82 (HEFT)

More information

Route 29 Solutions Projects

Route 29 Solutions Projects Your guide to the Route 29 Solutions Projects For full details & continued engagement please visit www.route29solutions.org The Route 29 Solutions Package is a $230 million investment into the improvement

More information

Glades Target Area Projects Summary

Glades Target Area Projects Summary Municipality Belle Glade Unincorporated Belle Glade Unincorporated Belle Glade Unincorporated Belle Glade Implementation of Projects Consistent with Glades Region Master Plan Recommendations from 2015

More information

Northern Virginia District State of the District. Helen L. Cuervo, P.E. District Engineer October 18, 2017

Northern Virginia District State of the District. Helen L. Cuervo, P.E. District Engineer October 18, 2017 Northern Virginia District State of the District Helen L. Cuervo, P.E. District Engineer October 18, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation American Society

More information

1 6:52 AM BUS YARD 4:38 PM 2 7:12 AM N SEACREST BLVD & NE 16TH AVE 4:18 PM

1 6:52 AM BUS YARD 4:38 PM 2 7:12 AM N SEACREST BLVD & NE 16TH AVE 4:18 PM 8th 9th Grade Routes SouthTech Academy Transportation Routes STEC Trip 01 1 6:34 AM OKEECHOBEE BLVD & ROYAL PALM BEACH BLVD 5:00pm 2 6:52 AM GOODWILL @N MILITARY TRL & OKEECHOBEE BLVD 4:42pm 3 7:00 AM

More information

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016 March 25, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016 TREASURE COAST Construction and maintenance-related

More information

The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP).

The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP). The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP). A 7-day public comment period regarding the amendment begins January

More information

Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd

Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd Project ID SOA07003 Department State of Alaska Project Type Improvement Start Date December 2017 Location Assembly: Section 4, Seats F & G, Assembly:

More information

CITY OF BROOKFIELD Capital Improvement Fund Budget

CITY OF BROOKFIELD Capital Improvement Fund Budget CITY OF BROOKFIELD Capital Improvement Fund Budget The City adopts an annual capital improvement budget, based on a five-year capital improvement program (CIP). The annual budget and CIP are prepared by

More information

Infrastructure Sales Tax Capital Projects April 4, 2017

Infrastructure Sales Tax Capital Projects April 4, 2017 Engineering & Public Works Bridge Replacements Prosperity Farms Rd. over SFWMD C-17 Canal (934116) 1 6th Ave. So. over Lake Osborne (LWDD E-4 Canal)(S Br/ East bound) (934307) Corkscrew Blvd. over SFWMD

More information

DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, FloridaExpressLanes.com

DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, FloridaExpressLanes.com DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, 2017 FloridaExpressLanes.com This page intentionally left blank. TABLE OF CONTENTS List of Figures... ii List of Tables.... ii

More information

Citizen's Report. Draft Tentative Work Program Fiscal Year Palm Beach County

Citizen's Report. Draft Tentative Work Program Fiscal Year Palm Beach County Citizen's Report Draft Tentative Work Program Fiscal Year 2020-2024 Palm Beach County Prepared by FDOT - District 4 Program Management Office - 11/14/2018 Data County: Palm Beach ( 93 ) TRANSPORTATION

More information

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No.

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No. Georgetown-Lewes Rail/Trail Study Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No. 47) August 22, 2011 Presentation Outline Background Benefits Statewide

More information

FALL Construction Project Status Report PROJECT HIGHLIGHT CURRENT PROJECTS. NORTH COUNTY DISTRICT PARK New Construction PROJECT SCOPE

FALL Construction Project Status Report PROJECT HIGHLIGHT CURRENT PROJECTS. NORTH COUNTY DISTRICT PARK New Construction PROJECT SCOPE FALL 2018 Construction Project Status Report PROJECT HIGHLIGHT 1 NORTH COUNTY DISTRICT PARK PROJECT SCOPE Palm Beach County has leased 82 acres to the City of Palm Beach Gardens for the construction of

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report July 22, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report July 22 through July 29, 2016 TREASURE COAST Construction and maintenance-related lane

More information

TRANDERSOL SAMPLING OF CENTRAL STATIONS BEGINNING IN FLORIDA CURRENT PROJECTS FLORIDA TRANDERSOL - EDERP MIAMI GRAND CENTRAL LONG EXPRESS EXPRESS

TRANDERSOL SAMPLING OF CENTRAL STATIONS BEGINNING IN FLORIDA CURRENT PROJECTS FLORIDA TRANDERSOL - EDERP MIAMI GRAND CENTRAL LONG EXPRESS EXPRESS CURRENT PROJECTS FLORIDA NTSN MODULAR OUTLINE TRAIN SCHEDULE STOPS 75 10 10 95 27 95 75 75 75 75 4 4 27 75 595 75 MIRAMAR CENTRAL MIAMI KENDAL CENTRAL MIAMI TAMIAMI CENTRAL 95 595 MIAMI LAKES CENTRAL 95

More information

Frequently Asked Questions on the Route 29 Solutions Improvements Projects

Frequently Asked Questions on the Route 29 Solutions Improvements Projects Frequently Asked Questions on the Route 29 Solutions Improvements Projects Background What are the Route 29 Solutions improvement projects? These projects include the Route 29/250 Interchange ( Best Buy

More information

FLL Master Plan Update Technical Advisory Committee (TAC) Briefing #1. September 28, 2016

FLL Master Plan Update Technical Advisory Committee (TAC) Briefing #1. September 28, 2016 FLL Master Plan Update Technical Advisory Committee (TAC) Briefing #1 September 28, 2016 TAC Committee Role: Internal Stakeholders To provide input on the master planning analysis from the technical and

More information

FDOT FY16-20 ADOPTED WORK PROGRAM

FDOT FY16-20 ADOPTED WORK PROGRAM FDOT FY16-20 ADOPTED WORK PROGRAM as of 07/01/15 Excludes Department Building & Grounds Projects, as well as Debt Service / Includes Budgeted & Non-Budgeted Items BD County Item Description Item Work Mix

More information

Schedule ROUTE. All Week. Broward County Transit

Schedule ROUTE. All Week. Broward County Transit For more details on our fares please visit our web site at Broward.org/BCT or call customer service: 954.357.8400. Reading A Timetable - It s Easy 1. The map shows the exact bus route. 2. Major route intersections

More information

Route 141 and I-44 Design-Build Project Community Involvement Group. March 21, 2016

Route 141 and I-44 Design-Build Project Community Involvement Group. March 21, 2016 Route 141 and I-44 Design-Build Project Community Involvement Group March 21, 2016 Purpose of CIG 1. Share information with major stakeholders 2. Keep stakeholders informed of the process 3. Reduce uncertainty

More information

TBARTA: 2015 Master Plan and Tampa Bay Express Project

TBARTA: 2015 Master Plan and Tampa Bay Express Project TBARTA: 2015 Master Plan and Tampa Bay Express Project The Real Story Who: Tampa Bay Area Regional Transportation Authority What: Develop and implement a Regional Transportation Master Plan for the seven-county

More information

Penny for Pasco Renewal. FY2014/15 thru FY2024/25

Penny for Pasco Renewal. FY2014/15 thru FY2024/25 Penny for Pasco Renewal FY2014/15 thru FY2024/25 1 Background Pasco Citizens Committee (PAC) Citizens Survey Results Coordination Activities Project Schedule Category Allocations Revenue Estimates Distribution

More information

FY TIP Fiscal Constraint 2017 Total Commitments. agencies (the Michigan Department of programmed in the Kalamazoo Area

FY TIP Fiscal Constraint 2017 Total Commitments. agencies (the Michigan Department of programmed in the Kalamazoo Area KALAMAZOO AREA TRANSPORTATION STUDY FY 2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM MARCH 2019 AMENDMENTS The program is developed using the continuing, What is the TIP? cooperative, and comprehensive

More information

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications Individual HIGHWAYS Bridge - On State System SR46598 P-4 Region 4 Bridge - On System Pool CDOT Region 4 Bridge Federal National Highway Performance Program - - 956 483 719 719 2,877 State State Highway

More information

Additional Economic Development Strategy submissions- Klickitat County

Additional Economic Development Strategy submissions- Klickitat County Klickitat County Transportation Improvement Projects 1 White Salmon to Hood River Bridge Final EIS, design, bridge replacement 2 Klickitat County Rural Arterials Reconstruct to all-weather roads Part of

More information

RETREAT AGENDA ITEM FISCAL YEAR (FY) 2019 FY 2023 DRAFT TENTATIVE WORK PROGRAM

RETREAT AGENDA ITEM FISCAL YEAR (FY) 2019 FY 2023 DRAFT TENTATIVE WORK PROGRAM October 17, 2017 RETREAT AGENDA ITEM FISCAL YEAR (FY) 2019 FY 2023 DRAFT TENTATIVE WORK PROGRAM STATEMENT OF ISSUE The Draft FY 2019 FY 2023 Work Program will be presented by the Florida Department of

More information

Chapter 1: Introduction Draft

Chapter 1: Introduction Draft Chapter 1: Draft TABLE OF CONTENTS 1... 4 1.6.1 Stakeholder Engagement Plan... 10 Chapter 1 Page 2 TABLE OF EXHIBITS Exhibit 1.1-1 ABIA Annual Growth Since 1993... 5 Exhibit 1.4-1: ABIA Location Map...

More information

Welcome to the Downtown Fort Lauderdale Neighborhood Working Group Meeting. First meeting june 17, 2010

Welcome to the Downtown Fort Lauderdale Neighborhood Working Group Meeting. First meeting june 17, 2010 Welcome to the Downtown Fort Lauderdale Neighborhood Working Group Meeting First meeting june 17, 2010 State of the Project Draft Environmental Impact Statement Study Phase This study is NOT the final

More information

Summary of Transportation Development Credits (TDCs) Dallas-Fort Worth Metropolitan Planning Organization (MPO) (As of September 30, 2016)

Summary of Transportation Development Credits (TDCs) Dallas-Fort Worth Metropolitan Planning Organization (MPO) (As of September 30, 2016) ATTACHMENT 1 Summary of Transportation Development Credits (s) (MPO) Original Allocation of s to Dallas/Fort Worth MPO: 465,846,222 Award Type Amount Current Allocation in 2013 in 2014 in 2015 in 2016

More information

SUMMER Construction Project Status Report PROJECT HIGHLIGHT CURRENT PROJECTS. BRIDGEMAN DRIVE PARK New Construction PROJECT SCOPE

SUMMER Construction Project Status Report PROJECT HIGHLIGHT CURRENT PROJECTS. BRIDGEMAN DRIVE PARK New Construction PROJECT SCOPE R/W EXISTING 6' WOOD FENCE NEW BENCH DUMOR 10-60PL S-1 EMBEDMENT (2) FM NEW BIKE RACK DUMOR 125-20 S-2 ENGINEERED PLAYGROUND MULCH (12"D, COMPACTED) M.H. M.H. EXISTING 6' WOOD FENCE E.B. 5' CONCRETE WALK

More information

2017 FTBA CONSTRUCTION CONFERENCE February 2-3, 2017 Hyatt Regency, Orlando FDOT WORK PROGRAM OVERVIEW

2017 FTBA CONSTRUCTION CONFERENCE February 2-3, 2017 Hyatt Regency, Orlando FDOT WORK PROGRAM OVERVIEW Florida Department of TRANSPORTATION 2017 FTBA CONSTRUCTION CONFERENCE February 2-3, 2017 Hyatt Regency, Orlando FDOT WORK PROGRAM OVERVIEW Presenter: Jim Boxold, Secretary 1 Florida s Continued Growth

More information

Memo. Orange City Trail Plan Becky Mendez, AICP Jamie Krzeminski, PE, PTOE Matt Wiesenfeld, PE, AICP. Development of the Existing and Proposed Network

Memo. Orange City Trail Plan Becky Mendez, AICP Jamie Krzeminski, PE, PTOE Matt Wiesenfeld, PE, AICP. Development of the Existing and Proposed Network Memo Date: Friday, December 22, 2017 Project: To: From: Subject: Trail Plan Becky Mendez, AICP Jamie Krzeminski, PE, PTOE Matt Wiesenfeld, PE, AICP Development of the Existing and Proposed Network HDR

More information

Moving Forward: SFRTA Projects & Initiatives. ULI Southeast Florida/Caribbean Infrastructure Committee July 27, 2011

Moving Forward: SFRTA Projects & Initiatives. ULI Southeast Florida/Caribbean Infrastructure Committee July 27, 2011 Moving Forward: SFRTA Projects & Initiatives ULI Southeast Florida/Caribbean Infrastructure Committee July 27, 2011 What is SFRTA? A body politic and agency of the state. Created on July 1, 2003, by an

More information

Vista Field Airport. Master Plan Update. February, Prepared for: Port of Kennewick One Clover Island Kennewick, Washington

Vista Field Airport. Master Plan Update. February, Prepared for: Port of Kennewick One Clover Island Kennewick, Washington Vista Field Airport February, 2006 Prepared for: Port of Kennewick One Clover Island Kennewick, Washington 99336 Prepared by: J-U-B ENGINEERS, Inc. 2810 W. Clearwater Avenue, Suite 201 Kennewick, Washington

More information

ONONDAGA CREEKWALK PHASE II. Public Information Meeting Series 1

ONONDAGA CREEKWALK PHASE II. Public Information Meeting Series 1 ONONDAGA CREEKWALK PHASE II Public Information Meeting Series 1 Andrew Maxwell Director, Syracuse-Onondaga County Planning Agency Owen Kerney Assistant Director for City Planning Russell Houck, PE City

More information

List of Priority Projects

List of Priority Projects 2012 List of Priority Projects Adopted August 9, 2012 TABLE OF CONTENTS LE OF CONTENTS Overview...2 List of Priority Projects Process.3 State Highway Capacity Projects...4 Mass Transit Projects Jacksonville

More information

Fort Lauderdale City Commission Transit Presentation. July 21, 2009 CAR

Fort Lauderdale City Commission Transit Presentation. July 21, 2009 CAR Fort Lauderdale City Commission Transit Presentation July 21, 2009 CAR 109 0932 Agenda Overview City Transit Vision Commission Direction 2035 LRTP Long Range Transportation Plan THOR Transit/Housing Oriented

More information

Chapter 1: Introduction

Chapter 1: Introduction Chapter 1: TABLE OF CONTENTS 1... 4 1.1 Master Plan Study Content... 4 1.2 Purpose and Scope of Master Plan Study... 4 1.3 Airport History and Role... 6 1.4 Airport Location and Service Area... 6 1.5 ABIA

More information

State Highway System Key Sheet Broward County ²

State Highway System Key Sheet Broward County ² Broward County ² GOVT RD/SNAKE RD 3 0 3 Indian River St. Lucie Martin Palm Beach Broward I-75 " On System Roads #" 10 3293 Map Preparation Date: 5/2/2016 3:53:29 PM 86075000 #" 75 US 27 Inset - 3 Inset

More information

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT 5.8 FUNDING TRAILS DEVELOPMENT The City has been successful in establishing dedicated local funding sources as well as applying for grants to develop the City s trail system, having received nearly $2.4

More information

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT December 2018 Project Summary Boulder County, Colorado, in partnership with the City of Boulder, is evaluating options for multi-use

More information