1 Romanian railways infrastructure projects Cristina Trifon, 9 th of April 2013, Advantage Austria, Bucharest
2 Content: 1. About 2. The reforming process of Romanian Railways milestones 3. Romanian railway network - facts & figures 4. Heavy rail infrastructure - projects 5. Tram infrastructure 6. Metro infrastructure
3 1. About Railway and multimodal transport business consultancy services Railway Business Club networking business-matchmaking Institutional & governmental Lobby cross-media communication
4 1. About Objective: The development of strong, competitive, integrated regional and Eurasian RAILWAY BUSINESS ENVIRONMENT
5
6 2. The reforming process - milestones Vertical separation First railway passenger operator entered the market IMF agreement structural reforms involved Privatisation of some production units Reorganisation of the economy First private rail freight entered the market Romania joins EU AFER (Romanian Railway Authority grouping Romanian Railway Notified Body - ONFR; Romanian Railway Investigating Body - OIFR; Romanian Railway Licensing Body - OLFR Romanian Railway Safety Authority - ASFR ) Privatisation of CFR Marfa?
7 3. Romanian railway infrastructure network facts & figures Length of railway network: 10,818 km of which electrified line 4,002 km non-electrified line 6,816 km double track line 2,909 km single track line 7,771 km
8 3. Romanian railway infrastructure network facts & figures Tunnels & bridges 17,945 bridges and culverts (of which 4,216 bridges) total length of 142,33 km. 179 tunnels total length 69 km
9 3. Romanian railway infrastructure network facts & figures Level crossings 5,119 railway level crossings 1,082 of which with automatic barriers
10 3. Romanian railway infrastructure network facts & figures Stations Total number of stations: 969
11 3. Romanian Railway Infrastructure facts & figures Interoperable and non-interoperable railway infrastructure length of interoperable railway network: 7,007 km length of non-interoperable railway network: 3,268 km (92 traffic sections), of which: 1,262 km (on-going tender) still managed by CFR 1,977 km (45 sections), leased by private infrastructure managers
12 *
13
14 4. Heavy rail projects rehabilitation of Corridor IV Modernised sections Bucharest Câmpina ( ) Bucharest - Constanţa ( ) Câmpina Predeal ( ).
15 4. Heavy rail projects rehabilitation of Corridor IV On-going rehabilitation works Border Curtici Km. 614 EUR M Simeria Coşlariu EUR M Coşlariu Sighişoara EUR 1.1 Bn
16 4. Heavy rail projects rehabilitation of Corridor IV Signalling ERTMS projects Operational Pilot Project for installation of ETCS/ERTMS level 2 (Chitila-Crivina) Contract value : EUR 36 M Signalling installations, ERTMS, GSM-R, interlocking and Simeria Operational Control Centre Simeria Sighisoara, Contract value: EUR 117 M
17 4. Heavy rail projects rehabilitation of Corridor IV
18 4. Heavy rail infrastructure projects rehabilitation of Corridor IV
19 4.1 Other projects Tunnels and bridges (railway regional subsidiary ) Total value EUR M Timișoara EUR 10.8 M București EUR 21.3 M Constanța EUR 2.8 M Brașov EUR 12.6 M Iași EUR 11.7 M Cluj EUR 31.7 M Craiova EUR 22 M Galați EUR 36 M Modernisation of railway stations (on-going projects in 16 projects) Total value EUR M Slatina, Râmnicu Vâlcea, Reșița Sud, Bistrița, Zalău, Giurgiu Oraș, Slobozia Veche, Călărași Sud, Sfântu Gheorghe, Târgu Mureş, Piteşti, Piatra Neamț, Botoșani, Vaslui, Brăila, Alexandria Other 112 level crossings Detection system for overheated axles and tight brakes (21 locations) modernisation of electromechanical interlocking systems: Siculeni Adjud, Ilia Lugoj
20 4.2. Financing Non-reimbursable European funds, through the Sectoral Operational Programme Transport (SOP-T) Next SOP-T ( ) is in preparation Other financings possibilities: CEF, TEN-T Programme PPP, EBRD, EIB
21 5. Tramway infrastructure
22 5. Tramway infrastructure recent projects City Modernisation Projects Status Cluj 16 km s.t. Works on going Brăila 6.2 km d.t. Finalised Galați 6 km d.t. Works on going Iaşi 25.5 km Projects approved for financings + proposed for financings Craiova Modernization of the network Tenders on going Arad Arad-Ghioroc, 30.3 km s.t. Project proposed Timişoara 5 km c.d c.s. Projects approved for financings + proposed for financings Ploieşti Modernization of the network Tenders on going Bucureşti 2.8 km d.t km d.t. Works on going + works to start Bistriţa Project for implementation of a tram network
23 6. Bucharest underground Short and medium term plans totaling around EUR 6.5 Billion Construction of 3 new lines (5, 6 and 7) and the extension of Line 3 and Line 4.
24 6. Bucharest underground Works on-going: Line 5 Drumul Taberei Pantelimon Section 1. Drumul Taberei Universitate Estimated cost: EUR 883 Mill. Length of route: km/no. Stations: 14 Next: Section 2. Universitate Pantelimon Estimated cost: EUR 1.2 Bill Length of route: km/no. Stations: 13
25 3. Financing urban rail infrastructure The Regional Operational Program PPP, EBRD, EIB, JICA
26 Thank you! *
Romania Service Center / Updated 13/12/2016 Country Romania Romania Romania Romania
Romania Service Center / Updated 13/12/2016 Country Romania Romania Romania Romania DASP name Address (incl. post code) and Company Name Str. Fabrica de glucoza nr. 5, Novo Park, Cladirea G, sector 2,
More informationSERVICIUL DE TELECOMUNICAŢII SPECIALE SECŢIUNEA II CAIET DE SARCINI
SERVICIUL DE TELECOMUNICAŢII SPECIALE Ex. unic SECŢIUNEA II CAIET DE SARCINI CONTRACT DE FURNIZARE ECHIPAMENTE DE COMUNICAŢII PENTRU A PROIECTULUI CREŞTEREA CAPACITĂŢII DE INTERCONECTARE A SISTEMELOR INFORMATICE
More informationHow, when, what & why to access Structural Funds in Romania
How, when, what & why to access Structural Funds in Romania 1. STRUCTURAL FUNDS AND ROMANIA The European Commission adopted the Partnership Agreement" with Romania, in the context of mobilization of the
More informationCHARACTERISTICS OF UNEMPLOYMENT IN SOUTH WEST OLTENIA REGION IN Some metodological and organizatorical aspects
CHARACTERISTICS OF UNEMPLOYMENT IN SOUTH WEST OLTENIA REGION IN 2004-2011 ZAHARIA MARIAN, Ph.D., Professor, Petroleum-Gas University of Ploiesti, Romania, marianzaharia53@gmail.com BĂLĂCESCU ANIELA, Lecturer
More informationL. Issaia - Keramida Consultant to the Managing Director of ERGOSE
L. Issaia - Keramida Consultant to the Managing Director of ERGOSE THE MODERNIZATION PROJECTS OF OSE S RAILWAY NETWORK, WHICH ARE IMPLEMENTED WITH THE FINANCIAL SUPPORT OF EUROPEAN UNION FUNDS (EUROPEAN
More informationThe development of a high speed road network in Northwestern Romania in the context of the Gdansk - Budapest
OPEN DAYS 2007, NEEBOR Marinel Kovacs President Maramures County Council The development of a high speed road network in Northwestern Romania in the context of the Gdansk - Budapest Odessa - Constanta
More informationResults presentation. December 2012
Results presentation December 2012 1 Introduction A Romanian focused property investment company Distribute dividends (or return of capital & share subscription) on a semi-annual basis Focus on properties
More informationUrbanisation and the Urban Network in South Eastern Europe
Urbanisation and the Urban Network in South Eastern Europe The level of urbanisation in South Eastern Europe, particularly in the Balkan states is well below the level of urbanisation of Western Europe,
More informationRESULTS PRESENTATION 30 JUNE 2016
RESULTS PRESENTATION 30 JUNE 2016 RESULTS PRESENTATION 30 JUNE 2016 1 Company profile Leading property investment and development group in the CEE. Largest retail owner and operator in Romania. Exceptional
More informationANALYSIS OF THE ARAD COUNTY s INVESTMENT POTENTIAL Investor's Guide
ANALYSIS OF THE ARAD COUNTY s INVESTMENT POTENTIAL Investor's Guide Situated in the western part of Romania, at the border with Hungary, Arad is the sixth largest county of Romania, having an important
More informationOICE (Roma) & ANCE (Salerno) delegation in visit to Bucharest Camber of Commerce
BUCHAREST CHAMBER OF COMMERCE AND INDUSTRY 140 years at the service of the business community Business Opportunities OICE (Roma) & ANCE (Salerno) delegation in visit to Bucharest Camber of Commerce 2008,
More informationTHE EVOLUTION OF ESTABLISHMENTS OF TOURISTIC RECEPTION, IN THE CONTEXT OF REGIONAL DEVELOPMENT IN ROMANIA DURING
82 The evolution of establishments o touristic reception THE EVOLUTION OF ESTABLISHMENTS OF TOURISTIC RECEPTION, IN THE CONTEXT OF REGIONAL DEVELOPMENT IN ROMANIA DURING 2000-2014 Daniela Ruxandra Andrei,
More informationBucharest City Report Q3 2015
City Report Retail Sales Jan - Sep 2015 y-o-y GDP Growth H1 2015 Unemployment Rate August 2015 Economy / Investment Economy Inflation 3.8% Sep. 2015 / Sep. 6.8% 5.8% R O N -1.73% Exports / Imports Jan.
More informationCITY OF BELGRADE BELGRADE LAND DEVELOPMENT PUBLIC AGENCY
CITY OF BELGRADE BELGRADE URBAN TRANSPORT Conference on Transportation Infrastractures in the Balkans July 2011, Madrid BELGRADE LAND DEVELOPMENT PUBLIC BELGRADE BELGRADE Belgrade is capital of Serbia.
More informationAsociatia Sentire YOUTH EXCHANGE Horezu, ROMANIA
Asociatia Sentire YOUTH EXCHANGE 04.02.2019 12.02.2019 Horezu, ROMANIA About the organizers: The association SENTIRE is an organisation that has as purposes the development of youth, helping out those
More informationAustria Romania Bilateral Economic Relations. Rudolf Lukavsky, Consilierul Comercial September 16, 2014, Bucharest
Austria Romania Bilateral Economic Relations Rudolf Lukavsky, Consilierul Comercial September 16, 2014, Bucharest Austrian exports to / imports from Romania Exports 1,8 bn. (-7.5 %), Imports 1,1 bn. (-0.4
More informationARTC & INLAND RAIL 14 NOVEMBER 2017 SIMON THOMAS, PROGRAMME DIRECTOR ARTC INLAND RAIL
ARTC & INLAND RAIL 14 NOVEMBER 2017 SIMON THOMAS, PROGRAMME DIRECTOR ARTC INLAND RAIL 1 AUSTRALIA S LARGEST RAIL FREIGHT NETWORK OPERATOR ARTC is a company under the Corporations Act owned by the Commonwealth
More informationBulletin 1 Dear Orienteering Friends! We, orienteers from Cluj county, received the honour to be organizers of the European Youth Orienteering Championships in 2015. This will be the year, when Cluj-Napoca
More informationProject Data Sheet BASIC PROJECT DATA. Improvement of the systems for navigation and topo-hydrographic measurements on the Danube River
BASIC PROJECT DATA Full project title: Short project title: (acronym) Improvement of the systems for navigation and topo-hydrographic measurements on the Danube River Project logo: Project website: Project
More informationThe strategic importance of the Danube for a sustainable development of the region. Transnational pilot-workshop Cross-programme ETC Danube projects
The strategic importance of the Danube for a sustainable development of the region Transnational pilot-workshop Cross-programme ETC Danube projects Manfred Seitz 28 September 2009 Course of presentation
More informationTOURIST DEMAND: AN APPROCH FOR IAŞI, PIATRA NEAMŢ AND VATRA DORNEI CITIES
TOURIST DEMAND: AN APPROCH FOR IAŞI, PIATRA NEAMŢ AND VATRA DORNEI CITIES PhD. Student Roxana Valentina GÂRBEA Alexandru Ioan Cuza University, Romania Email: rocsval86@yahoo.ca Abstract: The assessment
More informationTulcea County Council - Romania Danube Strategy and Black Sea Synergy, as it is seen from the Danube Delta. Umeå - 26 th of September 2014
Tulcea County Council - Romania Danube Strategy and Black Sea Synergy, as it is seen from the Danube Delta Umeå - 26 th of September 2014 Tulcea County is situated in South-East of Romania, having on its
More informationYouth Exchange Horezu, ROMANIA
Youth Exchange 27.04.2017 05.05.2017 Horezu, ROMANIA About the organizers: The association "Centrul pentru Dezvoltarea Instrumentelor Structurale" is an organisation that has as purposes the development
More informationand Country Planning Plan Ð Section I Ð Lines
LAW on the approval of the National Town and Country Planning Plan Ð Section I Ð Lines of Communication * Art. 1. Ñ The National Town and Country Planning Plan Ñ Section I Ñ Lines of Communication shall
More informationElpida A. Epaminonda. TEN-T and CEF Coordinator Ministry of Transport, Communications and Works
Elpida A. Epaminonda TEN-T and CEF Coordinator Ministry of Transport, Communications and Works 1 The Trans-European Transport Network (TEN-T) TEN-T: Parts of national networks for all modes of transport
More informationEconomic Sustainability and expected benefits
Project Number: T.13.4 Project Title: Dakar-Bamako Rail Revitalisation and Signalling Status: S3/S4 Programme/project structuring and promotion to obtain financing Countries Region Sector Sub-Sector Project
More informationIntroduction. Keywords: hotel market, regional development, competitiveness
COMPARATIVE STUDY OF THE HOTEL MARKET FROM CLUJ-NAPOCA AND TIMISOARA, ROMANIA Cosma Smaranda Adina Cosma Smaranda Adina Cosma Negruşa, Adina Negruşa, Bota Marius Faculty of Business, Babes-Bolyai University
More informationAustria Romania Bilateral Economic Relations. Rudolf Lukavsky, Commercial Counsellor July 1, 2014
Austria Romania Bilateral Economic Relations Rudolf Lukavsky, Commercial Counsellor July 1, 2014 Austrian exports to / imports from Romania Exports 1,8 bn. (-8.3 %), Imports 1,1 bn. (-0.6 %) in 2013 3.000
More informationGovernment of Montenegro. Ministry of Transport and Maritime Affairs. Podgorica, April 2013
Government of Montenegro Ministry of Transport and Maritime Affairs Podgorica, April 2013 1 I RAIL INFRUSTRUCTURE 1. Rehabilitation of railway line Bar Vrbnica, according to the study Italferr: Technical
More informationPaper 87 - INTERNATIONAL COLLABORATION CONCERNING THE USE OF THE DANUBE RIVER IN ROMANIA
Paper 87 - INTERNATIONAL COLLABORATION CONCERNING THE USE OF THE DANUBE RIVER IN ROMANIA CIORTAN R.; DUMITRU M.; SUCIU I.; KRKLJUS D. Ph.D, Corresponding Member of the Romanian Academy of Technical Sciences,
More informationSafe, Timely & Comfortable Move for Better Future ~Japan-India Cooperation on Railway Sector ~
Safe, Timely & Comfortable Move for Better Future ~Japan-India Cooperation on Railway Sector ~ IRC (Int l Rail Conference) 2017 @Pragati Maidan, Oct. 11 th, 2017 Takema SAKAMOTO Chief Representative Japan
More informationSpecial Coordination Service for Implementation (SCOS) - ROLE
Introduction MINISTRY OF ECONOMY & DEVELOPMENT Special Coordination Service for Implementation (SCOS) - ROLE The role & responsibilities of SCOS is specified in L.2860/2000, L.3614/2007, L.4314/2014 and
More informationLegal Briefing. Serbia: Infrastructure
Legal Briefing Serbia: Infrastructure Legal Briefing Serbia: Infrastructure 01 Serbia on the Right Track THE EUROPEAN AND WORLD TRANSPORT NETWORK 02 Overview of Finalized, Ongoing, and Planned Projects
More informationAgrium s s approach towards the Water Management of the Danube River. Bucharest, November
Agrium s s approach towards the Water Management of the Danube River Bucharest, November 6 2012 What does the Danube River mean for Agrium? Agrium is one of the worlds largest suppliers for agricultural
More informationThe Danube A Stream of Energy
Danube Business Talks 2018 The Danube A Stream of Energy Hans-Peter Hasenbichler, Managing Director, viadonau 10 October 2018, Meliá Vienna viadonau stands for modern waterway management Company owner:
More informationThe Ministry of Transport of Ukraine / European Commission / OTIF International Conference on Transport Law Kyiv, October, 21 22, 2003.
The Ministry of Transport of Ukraine / European Commission / OTIF International Conference on Transport Law Kyiv, October, 21 22, 2003. The Report of the Minister of Transport of Ukraine the General Director
More informationPhase 1 opening July 2009 Phase 2 opening Summer 2010 ARAD ROMANIA
Phase 1 opening July 2009 Phase 2 opening Summer 2010 ARAD ROMANIA HIGHLIGHTS Ice Plaza will be the first shopping centre in Arad, Romania, supporting a local population of 250,000 people and a catchment
More informationAnnual Report Accident Investigation Board, Norway Railway Department
Annual Report 2010 Accident Investigation Board, Norway Railway Department Accident Investigation Board, Norway Postbox 213 N-2001 Lillestrøm Norway Phone: +47 63 89 63 00 Fax: +47 63 89 63 01 http://www.aibn.no
More informationInternational Rail Opportunities
International Rail Opportunities Jake Rudham 17 th June 2016 1 Presentation title - edit in the Master slide Some Initial Considerations There is a lot happening in rail across the world not just in the
More informationComparison of Bangkok & Kuala Lumpur
Mass Transit: Comparison of Bangkok & Kuala Lumpur Session on Yong Hee Kong PPP Resource & Research Centre, Kuala Lumpur KL: Historical Background Study by JICA 1987 Appeared in Mid-Term Review of 6th
More informationActions to Narrow the Gap Between Transport Efficiency of the Danube Region Countries
Actions to Narrow the Gap Between Transport Efficiency of the Danube Region Countries Miodrag Poledica, State Secretary and PAC Serbia Ministry of Construction, Transport and Infrastructure THE DANUBE
More informationNetwork Size and Growth
16.50 25.10 30.30 11.40 5.10 9.63 10.00 8.26 64.94 km 208.24 Overview Network Size and Growth At present, metro systems are operational in seven cities in India Bengaluru, Chennai, Delhi, Gurgaon, Jaipur,
More information1 st US - Kosovo Trade Forum New York, New York
Republic of Kosova Ministry of Economy and Finance 1 st US - Kosovo Trade Forum New York, New York Presentation By Lorik Fejzullahu Head of Public Private Partnership Unit October 27 2010 Presentation
More informationYugoslav Republic of Macedonia.
Albania the former Yugoslav Republic of Macedonia Power Interconnection (I): Grid Section in Albania Partners: Transmission System Operator in Albania (OST sh.a.) The Ministry of Energy and Industry, Albania
More informationNikolina Angelkova TRANSPORT AND ITC PRIORITIES. Minister of Transport, Information Technology and Communications. 28 August 2014 Sofia
MINISTRY OF TRANSPORT, INFORMATION TECHNOLOGY AND COMMUNICATIONS REPUBLIC OF BULGARIA TRANSPORT AND ITC PRIORITIES Nikolina Angelkova Minister of Transport, Information Technology and Communications 28
More informationWhy does Sydney need a new fast Metro to the West? A fast Metro to the west is a vital component of this Plan
Why does Sydney need a new fast Metro to the West? (as shown in 10,000 Friends of Greater Sydney Stage 1 Rail Plan) The Stage 1 Rail Plan was developed to support an integrated transport plan that would
More informationFirst draft program of CONT mission to Greece (24-25 September 2015)
First draft program of CONT mission to Greece (24-25 September 2015) Wednesday 23 September Arrival of CONT Members to Thessaloniki Thursday 24 September 8:00 Departure from hotel 8:15 Inspection of the
More informationTHE REPUBLIC OF THE UNION OF MYANMAR
THE REPUBLIC OF THE UNION OF MYANMAR MINISTRY OF TRANSPORT AND COMMUNICATIONS 5 th Meeting of the Working Group on the Trans-Asian Railway Network and Global Smart Rail Conference Current Status and Challenges
More informationProject Data Sheet BASIC PROJECT DATA. Rehabilitation and Development of Transport and Navigation on the Sava River Waterway. Full project title:
BASIC PROJECT DATA Full project title: Short project title: (acronym) Rehabilitation and Development of Transport and Navigation on the Sava River Waterway Project logo: Project website: www.savacommission.org
More informationKavala, Greece, 18 July 2013
Kavala, Greece, 18 July 2013 In 1996 1997 Odessa region established direct communications on inter-regional level with Romanian border counties of Galati and Tulcha. In June 1997, the Agreement About relationships
More informationSTATUS QUO ANALYSIS / STATE OF THE ART / GOOD PRACTICE COLLECTION. Sustainable Transport and Tourism along the Danube
Sustainable Transport and Tourism along the Danube www.transdanube.eu STATUS QUO ANALYSIS / STATE OF THE ART / GOOD PRACTICE COLLECTION WP 3 / Action3.2 and 3.3 ERDF PP9 The South-East Regional Development
More informationProducţie PRESENTATION corturi industriale The company CCSM CORTURI INDUSTRIALE SRL, was established in the year 2006, with integral Romanian capital. The company's main object of activity represents the
More informationTHE DANUBE CORRIDOR A DEVELEOPMENT GENERATOR. a company of
a company of 1 Corridor VII, the Danube A Development Generator Otto Schwetz President of PIANC Austria Counsellor of the Senate of the City of Vienna ret. Chairman of the Pan-European Transport Corridor
More informationBucharest City Report Q1 2015
City Report Retail Sales y-o-y Construction Works (first 2 months 2015 y-o-y) GDP Growth Unemployment Rate (March 2015) Economy / Investment Economy Macroeconomic Overview 4.3% Inflation (Mar. 2015 / Mar.
More informationANNEX V. List of Abbreviations
ANNEX V List of Abbreviations SEE R&D EU TEN-T GROSEE FP NUTS LAU ESPON Cohesion SMART SWOT MEGA FUA GDP PUSH PIA TRACC RO BG GR EUROSTAT BBU OTP FYROM EC FMA FOCI ECR2 South East Europe Research and Development
More informationTHE PERCEPTION OF TOURISM DEVELOPMENT IN WEST REGION OF ROMANIA
Annals of the University of Petroşani, Economics, 12(4), 2012, 235-242 235 THE PERCEPTION OF TOURISM DEVELOPMENT IN WEST REGION OF ROMANIA GABRIELA CORINA SLUSARIUC, ILIE RĂSCOLEAN * ABSTRACT: The main
More informationThe Bank Group s Response to Ports and Hinterland Connectivity in Africa
The Bank Group s Response to Ports and Hinterland Connectivity in Africa INTERNATIONAL ASSOCIATION OF PORTS AND HARBOURS (IAPH) AFRICA REGIONAL CONFERENCE AND EXHIBITION Abuja, Nigeria 17 19 September
More informationETCS implementation strategy for international Corridors. ETCS implementation strategy for international Rail corridors
ETCS implementation strategy for international Rail corridors by Dr. Peter Winter, ERTMS Programme Director at UIC Introduction The ETCS concept Actual situation in the various countries European rail
More informationInfrastructure Projects in Mumbai Metropolitan Region & Maharashtra
Infrastructure Projects in Mumbai Metropolitan Region & Maharashtra 20 th March 2013 By: SVR Srinivas (IAS), Addl Metropolitan Commissioner & MD MMRC & PRK Murthy, Chief T&C Division MMRDA & Director MMRC
More informationPiatra Neamt. Our Town
Piatra Neamt Our Town Piatra-Neamt is a city located in North- Eastern Romania. The city is the capital of Neamt county and thanks to its architectural and natural beauty it earned the nickname Perla Moldovei.
More informationProject Data Sheet BASIC PROJECT DATA
BASIC PROJECT DATA Full project title: Short project title: (acronym) Improvement of navigation in the joint Bulgarian-Romanian section of the Danube river from km 530 to km 520 Batin and from km 576 and
More informationR O M A N I A CONSILIUL CONCURENTEI
R O M A N I A CONSILIUL CONCURENTEI www.competition.ro Palatul Parlamentului Calea 13 Septembrie, nr.1, sector 5 Bucuresti? Cabinet Presedinte Tel: 021.337.36.08; Fax: 021. 337.36.43 Septembrie, nr.1,
More informationThe Tourist Accommodation Capacity in Romania and the Main Tourism Indicators Registered in 2011 and in the First Months of 2012
Economy Transdisciplinarity Cognition www.ugb.ro/etc Vol. XV, Issue 1/2012 378-387 The Tourist Accommodation Capacity in Romania and the Main Tourism Indicators Registered in 2011 and in the First Months
More informationINVESTMENT PROJECTS AND OPPORTUNITIES IN MONTENEGRO
INVESTMENT PROJECTS AND OPPORTUNITIES IN MONTENEGRO February 2017 PRIORITY SECTORS FOR INVESTMENT Transport Energy Tourism TRANSPORT PROJECTS ONGOING PROJECTS Construction of Highway Bar Boljare The highway
More informationGENERAL INFO PACK, BUCHAREST, ROMANIA. Tandem AEROdays 19.20
GENERAL INFO PACK, BUCHAREST, ROMANIA Tandem AEROdays 19.20 MEETING VENUE The Tandem AEROdays 2019 Bucharest Conference will take place at the Palace of Parliament. The building selected for the conference
More informationFREEING UP MELBOURNE'S BIGGEST BOTTLENECK
FREEING UP MELBOURNE'S BIGGEST BOTTLENECK PRESENTATION TO THE TOURISM INDUSTRY 29 AUGUST 2017 Evan Tattersall, CEO, Melbourne Metro Rail Authority MELBOURNE S CHALLENGES POPULATION GROWTH NORTHERN +450,000
More informationOutlıne of the Presentatıon
Outlıne of the Presentatıon Background and Objectives What has been achieved National Perspective Regional Perspective Estimated Financing Requirements What is Needed Chingola-Solwezi-Jimbe Railway Line
More informationPIATRA NEAMT OVERVIEW
PIATRA NEAMT OVERVIEW LOCATION The city is located 350 km north of the capital city of Bucharest, in the historical region of Moldavia. The nearest airport is Bacău, situated at 60 km south. Piatra Neamţ
More informationPROJECTION FOR ROMANIA DANUBE STRATEGY
PROJECTION FOR ROMANIA DANUBE STRATEGY Peter LANGER 1, Marin ANDREICA 2, Eugen ALBU 3 Abstract The paper highlights a few management consequences of the projection for Romania Danube Strategy, focusing
More informationEUSDR - Strategic Management Opportunity For Financing European Projects. Manuela Panaitescu 1, Mariana Trandafir 2
Vol. 5, No. 1/2015 EUSDR - Strategic Management Opportunity For Financing European Projects Manuela Panaitescu 1, Mariana Trandafir 2 Abstract: The study is based on the analysis of the funding opportunities
More informationKosovo s economic and investment potential
Kosovo s economic and investment potential Jane Armitage Country Director US-Kosovo Trade & Investment Forum New York October 27, 2010 1 Topics covered in the presentation Kosovo s economic and investment
More informationLISTA AGENTILOR DE HANDLING la 16 iulie 2018
LISTA AGENTILOR DE HANDLING la 16 iulie 018 Aeronautical Agent Name Contact details Location IATA / ICAO Auth. Certificate no. / Valability S.C. GLOBE GROUND ROMANIA SC ION TIRIAC AIR SC MENZIES AVIATION
More informationThe Role of Logistics in the Implementation of the Intermodal Transport Strategy in Romania. Strategies for the Road Infrastructure in Dobrogea Region
The Role of Logistics in the Implementation of the Intermodal Transport Strategy in Romania. Strategies for the Road Infrastructure in Dobrogea Region Iordanoaia Florin Maritime University Constanta, Romania
More informationBelgrade lies at the point where the Sava River meets the Danube. It is surrounded on three sides by riverways. Hence its appellation as the Gateway
B Belgrade lies at the point where the Sava River meets the Danube. It is surrounded on three sides by riverways. Hence its appellation as the Gateway of the Balkans, and the Doorway to the Central Europe.
More informationOpen Access Competition in Passenger Railways in Europe
Konferenz Verkehrsökonomik und -politik, Berlin 29.06.2017 Open Access Competition in Passenger Railways in Europe David Kupfer European University Institute David.Kupfer@eui.eu 1 Background: 25 Years
More informationFINAL REPORT. of civil aviation safety investigation. No. I Date: Artem Avia, Ucraine. Genex Ltd., Belarus
FINAL REPORT of civil aviation safety investigation OCCURRENCE TYPE Owner Operator Manufacturer Aircraft Registration Location Date and time Serious Incident Artem Avia, Ucraine Genex Ltd., Belarus Antonov
More informationAgenda and Travel Details
Building the foundation for future mobility in European cities Agenda and Travel Details 05-06 September 2017 Grand Hotel Continental Bucharest WWW.CREATE-MOBILITY.EU Agenda Building the foundation for
More informationRail Infrastructure Development Link
Rail Infrastructure Development Link 1 1 Thailand Malaysia at Padang Besar 1. 2. 3. 4. 5. 6. 1. Landbridge train crossing the border 2. SRT locomotive waiting to haul Langkawi Express to Hat Yai 3. CIQ
More informationWESTERN PELOPONNESE RAILWAY, PORTS AND ROADS
WESTERN PELOPONNESE RAILWAY, PORTS AND ROADS Project Key Features Short Description: Project Components: Design and/or Construction, Financing, Operation, Maintenance and Exploitation of rail lines, ports
More informationMiddle East Rail Market Report
blogs.terrapinn.com/rail Middle East Rail Market Report Discover the biggest opportunities, challenges and projects shaping the Middle East rail industry. Revolutionizing transport in the Middle East In
More informationTransport Infrastructure Development in Republic of Macedonia
Transport Infrastructure Development in Republic of Macedonia 2011-2018 M.Sc. Marjan Kopevski 18-19 September 2018, Almaty Brief description Republic of Macedonia Area 25.713km², Population: 2.022.547,
More information2017 Major Projects Pipeline Report Adrian Hart, Senior Manager Infrastructure & Mining
2017 Major Projects Pipeline Report Adrian Hart, Senior Manager Infrastructure & Mining Major Projects Pipeline Report - 2017 Presentation Outline Overview and key findings of the 2017 Pipeline Report
More informationIPA National Programme 2009 part 1 Bosnia and Herzegovina Fiche 2 - "Transport Infrastructure"
IPA National Programme 2009 part 1 Bosnia and Herzegovina Fiche 2 - "Transport Infrastructure" 1. Basic information 1.1 CRIS Number: 2009/021-333 1.2 Title: Improvement of regional transport infrastructure
More informationENERGY COMMUNITY TAPPING ON ITS ENERGY EFFICIENCY POTENTIAL. Energy Community Secretariat
ENERGY COMMUNITY TAPPING ON ITS ENERGY EFFICIENCY POTENTIAL Energy Community Secretariat 1 June 2015 ENERGY COMMUNITY TAPPING ON ITS ENERGY EFFICIENCY POTENTIAL ENERGY COMMUNITY SECRETARIAT 1 JUNE 2015
More informationIMPACT conference 2018 «Affordability of Public Transport» Enforcing attractiveness & relevance Of Public Transport Services
IMPACT conference 2018 «Affordability of Public Transport» Enforcing attractiveness & relevance Of Public Transport Services The «Ile de France» County 11 million inh. (19%) 5 million jobs (23%) 30% of
More information1) Riverbed surveying
1) Riverbed surveying The topo-hydrographic surveys include data collection, systematisation and processing for the monitoring of the evolution of the hydrolographical situation on the Danube Surveys are
More informationIntroduction Government 6
CONTENTS Introduction 5 1. Government 6 The McNulty Report 6 Rail Delivery Group 6 Scotland and Wales 7 Regulation 8 Passenger Transport Executives 10 Community Rail Partnerships 11 Rail Decentralisation
More informationCOORDINATES OF RURAL DEVELOPMENT WITH LEADER PROGRAM IN COVASNA COUNTY, UNTIL 2014
LUCRĂRI ŞTIINŢIFICE, SERIA I, VOL.XVII (2) COORDINATES OF RURAL DEVELOPMENT WITH LEADER PROGRAM IN COVASNA COUNTY, UNTIL 2014 KLÁRA - DALMA POLGÁR (DESZKE) 1, LILIANA DUGULEANĂ 2 1 Doctoral student, TRANSILVANIA
More informationGATEWAY TO EUROPE Cooperation of the ports on the western coast of the Black Sea and the ports on the River Danube
GATEWAY TO EUROPE Cooperation of the ports on the western coast of the Black Sea and the ports on the River Danube Otto SCHWETZ Chairman of the Working Group Economies, Tourism and Transport Sofia, March
More informationINLAND RAIL. Connecting Australia. 5 June 2018 National Infrastructure Summit inlandrail.com.au
INLAND RAIL Connecting Australia RICHARD WANKMULLER - CHIEF EXECUTIVE OFFICER INLAND RAIL 5 June 2018 National Infrastructure Summit 2018 inlandrail.com.au The Australian Government is delivering Inland
More informationGreece. Tourism in the economy. Tourism governance and funding
Greece Tourism in the economy Tourism is an important economic sector in Greece. Tourism directly contributed EUR 8.5 billion to the Greek economy in 2013, equivalent to 5.3% of GDP. Tourism is also an
More informationCONTENTS. Introduction Government 6. Scotland and Wales 6 Regulation 7 Passenger Transport Executives Main Line Railway Infrastructure 9
CONTENTS Introduction 5 1. Government 6 Scotland and Wales 6 Regulation 7 Passenger Transport Executives 7 2. Main Line Railway Infrastructure 9 Network Rail 9 Organisation 9 Route Utilisation Strategies
More informationEndless investment opportunities in public infrastructure and services Carlos Herrera Investors Servicing Director
Endless investment opportunities in public infrastructure and services 2014-2015 Carlos Herrera Investors Servicing Director PROINVERSION The State agency for the private investment promotion. Promotes
More informationCONNECTIVITY AGENDA Co-financing of Investment Projects in the Western Balkans 2017
CONNECTIVITY AGENDA Co-financing of Investment Projects in the Western Balkans 2017 CONNECTIVITY AGENDA Co-financing of Investment Projects in the Western Balkans in 2017 Johannes Hahn European Commissioner
More informationDevelopment of the Hellenic Parts of Priority Axes No 22 & 29: A Strategic Approach
Development of the Hellenic Parts of Priority Axes No 22 & 29: A Strategic Approach Eleni Zacharaki Intermediate Managing Authority for Transport (IMA) / Hellenic Ministry of Transport & Communications
More informationCHINGOLA-SOLWEZI-JIMBE RAILWAY LINE
From a landlocked to a land linked Zambia CHINGOLA-SOLWEZI-JIMBE RAILWAY LINE Presented by Ministry of Transport Works Supply and Communications and October 2013 Presented to PUBLIC-PRIVATE DIALOGUE FORUM
More informationDevelopment & Infrastructure projects
European Investment Bank financing Urban Development & Infrastructure projects 2 nd Serbian Property & Infrastructure Development Conference, Belgrade, 21 February 2017. Dubravka Nègre, Head of EIB Regional
More informationTHE IMAGE AND MARKET POTENTIAL OF SIBIU INTERNATIONAL AIRPORT. Market study
THE IMAGE AND MARKET POTENTIAL OF SIBIU INTERNATIONAL AIRPORT Market study 1 METHODOLOGICAL ASPECTS The aim of the present study is twofold. Firstly, we aimed at contouring the image of the Sibiu International
More informationPresentation on DIRSI Residential Complex, TBILISI. Description of Project September AS GEORGIA AS Group Investment LLC
Presentation on DIRSI Residential Complex, TBILISI Description of Project September 2014 AS GEORGIA AS Group Investment LLC Project Overview DIRSI is a multifunctional residential complex in the historical
More informationSpending round 2013: The case for investment in transport. Mayor s Office, May 2013
Spending round 2013: The case for investment in transport isabel.dedring@london.gov.uk Mayor s Office, May 2013 Key messages London is the productive heart of the UK economy, supporting jobs and growth