1 First draft program of CONT mission to Greece (24-25 September 2015) Wednesday 23 September Arrival of CONT Members to Thessaloniki Thursday 24 September 8:00 Departure from hotel 8:15 Inspection of the project "metro of Thessaloniki" 10:00 Departure from Thessaloniki by bus 12:30 Inspection of the rehabilitation of Karla Lake project + working lunch 16:00 Departure to Xiniada by bus 18:00 Inspection of the project "Central Greece (E65) motorway - part Xiniada-Trikala" 19:30 Departure to Lamia 20:00 Transfer to hotel in Lamia Night in Lamia Friday 25 September 8:00 Departure from hotel 8:30 Inspection of the project "completion of the new double high-speed railway line Tithorea-Lianokladi-Domokos" in Lianokladi 10:00 Departure from Lianokladi by bus 12:30 Arrival in Athens + working lunch 14:00 Meetings with Greek authorities and inspection of the projects: "Greek cadastre and National Register" and "e-ticket system in Attica" 17:30 Press conference 18:30 End of official program

2 EN ANNEX I Physical object of the major project Infrastructure investment 1. Title of project: Thessaloniki Metro Main Line (Project 1) - Preparatory works and initial tunnel construction works 2. Body responsible for the implementation 2.1. Name: ATTIKO METRO S.A Address: L. Mesogeion , Athens 3. Project description 3.1. General description of the physical object of the project (a) This is a "bridge" project which has been initiated during the programming period concerning the completion of the preparatory works required for the construction of the Thessaloniki Metro Main Line and also the initial part of tunnel construction. The operation of the Thessaloniki Metro Main Line aims at the upgrade of the transport infrastructure of the city of Thessaloniki, the gradual reduction of city traffic congestion through new passenger service and increased use of public transport. At reducing primary and secondary pollutants in the atmosphere, improving the quality of life in Thessaloniki and indirectly enhancing road safety. Main beneficiaries of the infrastructure are the residents and visitors of the city of Thessaloniki. The completion and operation of the Main Line is estimated to serve approximately new journeys daily during rush hour. (b) This project is part of a wider project aimed at constructing a metro system in the city of Thessaloniki, including both the construction of the Main Line and its east extension to Kalamaria. The Main Line of the Thessaloniki Metro is divided in two projects: - Project 1 "Thessaloniki Metro Main Line - Preparatory works and initial tunnel construction" which is a "bridge" project between the programming periods and Project 2 "Thessaloniki Metro Main Line" which is a project "phase" between the programming periods and , completing the Thessaloniki Metro Main Line related works. 1

3 Both projects are independent from a technical and financial standpoint based on a demarcation methodology and analysis of their financial and physical object Technical description of the infrastructure investment (a) The Thessaloniki Metro Main Line (Project 1) comprises the completion of the following works: (b) (c) - Project studies, including the relevant technical consultants and experts' studies (apart from the case studies which are an obligation of the contractor and part of construction/installation works). - Management and supervision of the works. - Ιnstallation of construction sites, protective structures prior to excavations, traffic arrangements and public utility networks relocation. - Archaeological excavations and land expropriations. - Construction of initial tunnelling from the New Railway Station up to the Syntrivani junction (track crossing). This project contributes in the indicators which will be achieved with the completion of the Main Line. The indicative key indicators to be used are the following: - Additional population with access to fixed rail Means of Transport (Metro): new passenger journeys daily. - Reduction in journey time from New Railway Station to Α. Papanastasiou from 50 to 17 minutes. - Reduction of greenhouse gas emissions: 5 thousand tons annualy. - Metro Line length: 9,6 km. - Metro Stations: 13. The ownership, management, operation and maintenance of the infrastructure are under the State Company Attiko Metro S.A. 2

4 European Commission Press release - 20 November 2014 Almost EUR 285 million of EU regional funds for the new Thessaloniki metro The European Commission has approved three major investments of million from the European Regional and Development Fund (ERDF) concerning the new Thessaloniki metro in the Greek Central Macedonia. Thessaloniki is a city with a high population density which presents intense traffic congestion and significant air pollution. The three projects aim to support the preparatory and construction works of the 9.6 km long Main Line with 13 metro stations and the preparatory works of its 4.8 km long East Extension to Kalamaria with 5 additional metro stations Greece's second biggest city will have a driverless metro system, improving attractiveness and usage of public transport and traffic and environmental conditions in the Thessaloniki Metropolitan Area and the suburbs. Moreover, the projects are expected to create 520 jobs during their implementation and 540 jobs once the metro is operational. Commenting on the decision, Commissioner for Regional Policy Corina Creţu said These projects are good examples of how EU regional funds can help get Greece back on the path of recovery in a sustainable manner. The metro in Thessaloniki will contribute to improving the mobility of the citizens of the second biggest Greek city and their quality of life, ensuring safe, sustainable and environmentally friendly travel conditions and making the region even more attractive for investors. We trust that the Greek authorities will now put all their efforts to complete timely these important projects. The first investment "Thessaloniki Metro Basic Main Line (Project 1): Preparatory works and initial parts of tunnels construction" goes along with the second investment "Thessaloniki Metro Main Line (Project 2) - Construction works - Phase A". They foresee the completion of all the preparatory works and the initial construction works in 8 platform stations of the Thessaloniki Metro Main Line, two shafts and tunnels excavation. The ERDF will finance million out of a total of million The third investment, "Thessaloniki Metro Extension to Kalamaria - Preparatory works Phase A" (Project 3), concerns the completion of all the preparatory works for the construction of the 4.8 km long east extension of the Thessaloniki metro to Kalamaria with 5 additional metro stations. It aims at improving mobility and reducing cost for passengers travelling between the Thessaloniki city centre and the east suburbs. The ERDF will finance 27 million out of a total of 41.5 million. The three investments come through the EU Regional Policy programme "Macedonia Thrace" under the priority axis "Sustainable Development and Improvement of the Quality of Life". The ERDF will finance million out of a total of 437 million. Background: These projects are major projects, i.e. a project whose total investment (VAT included) is above 50m and thus subject to a specific decision by the European Commission, whereas projects of a lower value are approved at national or regional levels. The co-financing decision for these projects falls under the programming period Greece has been allocated approximately billion in total cohesion policy funding from and billion for

5 Lake Karla welcomes new life Faced with a drying lake, this project aims to bring Lake Karla back to life by restoring the ecological balance in the area, at the same time providing better drinking resources for residents and a boost for local tourism. Sourcing water from a nearby river, hydrology works, building a museum and holding information days feature among the diverse tasks to be undertaken in the project. The rising tide of environmental protection The project looks to develop a large wetland area by constructing reservoirs and water collection systems and carrying out excavation work, with km of levies to be worked on. Other aspects of the project include cleaning leachate, bringing water into Lake Karla via the Pinios River, at a maximum rate of 14 m3/sec, undertaking works to protect the area against floods, notably on the plains, and carrying out mountain hydrology work with the aim of reducing debris over a surface area of 445 km2. Water culture Infrastructure and eco-tourism works carried out under the project will include building a natural history museum and information centre to showcase the region s natural and cultural past, with visitors expected per year. The project will also complete a study previously started in the period on managing the local water and soil ecosystem, together with studies into local archaeology in relation to the project works. In a bid to raise awareness about this natural wonderland, information days, conventions, exhibitions and marketing campaigns will also be organised. Once completed, a total of ha will have been improved, 110 ha of cultural heritage developed and 190 jobs created during the development phase, another 20 during the operational phase. The key outcomes will be the sustainable development of the water body, a reduction of 17.8 million m3 per year of underground water extracted, and lower levels of pollution, with 90% less flow from Karla tunnel into the Gulf of Pagasitikos. The level of drinking water supplied by the Volos Urban Group will also increase and eventually serve homes. Draft date 27/09/2011 Technical information Fund ERDF for the 2007 to 2013 programming period Programming period Total Investment 50,000,000 EU Investment 37,890,900

6 EUROPEAN COMMISSION DIRECTORATE-GENERAL REGIONAL POLICY Bulgaria, Cyprus, Greece, Hungary, Romania, IPA/ISPA accession negotiations Greece and Cyprus Brussels, 12 July 2011 DG REGIO I.3/MS/ed D(2011) Information note to Commissioner Hahn Major project 1. Name of the major project: Rehabilitation of Lake Karla 2010GR161PR Fund: ERDF 3. Objective: Convergence 4. Location: Greece, Thessaly 5. Programming period: Total/Decision amount: 50 M / EU contribution: Co-financing rate: 80% 9. Nature of the decision: Adoption 10. Short description of the decision: The present project aims the rehabilitation of Lake Karla by restoring the ecological balance of the region and by facilitating the water supply in the city of Volos. The works of the project, forming part of the period, include the completion of the water collection systems construction, the manufacture of pump stations, the optimization of the functioning of the lake as wetland, the infrastructure, the promotion of eco-tourism, mountainous hydronomy works, the increase of water supply of the Volos Urban Group and the expropriations. The rehabilitation of the lake will restore on the one hand the ecological balance of the region in the field of biodiversity and on the other hand the drinking water resources, given that the drying of the lake deteriorated the quality of life of the population of the region concerned. The project also presents benefits regarding the upgrading and the tourism development. 11. Financial effect: No 12. Contact: Maria SIOLIOU (81393) Rue de la Loi 200, B-1049 Bruxelles - Belgique. Téléphone: (32-2) CSM2 - Bureau: 6/22. Téléphone: ligne directe (32-2) Télécopieur: (32-2) C:\Users\kdulhauste\AppData\Local\Temp\2. Lake Karla information note_1492b1b.doc Maria.Sioliou@ec.europa.eu

7 INFORMATION NOTE TO COMMISSIONER HAHN Major project 1. Name of the major project: Completion of the road axis of Central Greece (E65): Section "Xyniada-Trikala". 2. Fund: CF 3. Objective: Convergence 4. Location: Thessalia and Sterea Ellada, Greece 5. Programming period: Total/Decision amount: EUR / EUR (decision amount includes state aid) 7. EU contribution: EUR Co-financing rate: 85% 9. Nature of the decision: adoption 10. Short description of the decision: The present bridge project concerns the E-65 motorway concession, and in particular the construction of the part Xyniada Trikala (78,5km), as well as the installation of toll stations and communication system in the Skarfeia Raches section (57 km) of the PATHE motorway. The section selected is the result of the recast of the motorway concession following the financial crisis that seriously worsened the bankability and finances of the initially perceived project. Parts which belonged to the project as initially forecasted might take place in the programming period upon the condition that certain indicators are fulfilled. The current section includes two big (>200 m) and ten small (<200 m) bridges, two tunnels, eight multi-level junctions, two motorist stations, one control and maintenance center, two frontal toll stations, two side toll stations etc. The design of the present project has taken into account the need for it to be completed within the current programming period. The project is of particular importance both as a safe and fast motorway that will rejuvenate the regions it passes through, as well as to the Greek economy overall in the present circumstance. 11. Financial effect on the EU budget (yes/no): no 12. Financial changes to the programme/project (yes/no): yes 13. a) State aid issues: DG COMP consulted: yes b) Revenue generating project: yes, tolls 14. Contacts: REGIO desk officer Antonios SARTZETAKIS (tel: 68595) 15. CCI number: 2013GR161PR006

8 INFORMATION NOTE TO COMMISSIONER HAHN Major Project 'Finalisation of the new double high speed railway line Tithorea - Lianokladi - Domokos' - CCI 2010GR161PR0011 Programme: Sectoral operational programme 'Reinforcing Accessibility' 2007GR161PO004 Objective: Convergence Location: Sterea Ellada Programming period: Total cost of the project: 922,842 million Total eligible public cost for the "bridge" project: 690,000 million Decision amount: 474,099 million EU contribution: 402,984 million Co-financing rate: 85% Nature of the project: Approval of a major "bridge" project for Community assistance from the Cohesion Fund (one other part of this project has been financed under the allocation). Short description of the decision: The decision relates to a "bridge" major project consisting of the finalisation of the new double high speed railway line Tithorea - Lianokladi - Domokos (106 km) whose cofinancing is envisaged by the Cohesion Fund of the axis PATHEP railway network and multimodal transports. This belongs to axis 22 (TEN-T) and is part of the railway axis of Athina - Thessaloniki. The project will be concluded by ERGA OSE A.E under public management. The project facilitates the population travelling by rail through Athens towards Thessaloniki in Northern Greece and vice versa. It is constructed in the mountainous region of Tithorea Domokos to substitute the existing single line and to allow for speeds of 160 km/h instead of the current 80 km/h. By its finalization the whole Thessaloniki Athens line will be double and upgraded to significantly reduce travel times to 3,3 hours. The finalization of this part alone can lead to a reduction of travelling time of approximately 50 minutes. The project includes the conclusion of the infrastructure and plant works of Tithorea Lianokladi, the finalization of tunnel constructions and the finalization of train station constructions. It also includes the remaining infrastructure, electromechanical and plant works of Lianokladi Domokos, the superstructure across the full length of the project, the construction of trackworks and the placing of the railway line on 3 stations. Finally, it foresees the construction of 2 new stations and another 2 stops, as well as the renovation of 3 stations, the rehabilitation of the road network in the area that was affected by the works, as well as the side-roads parallel to the new line, and the installation of electrification, signalisation, telecommunications, telecommanding, ETCS level 1 system for the protection of trains and GSMR wireless communication. Financial effect: NONE Contact: Christos SAPSALIS (59158), Antonios SARTZETAKIS (68595)

9 Information note to Mr Hahn Major project 1. Name of the programme/major project: "Integrated Automatic Fare Collection System" 2. Fund: ERDF 3. Objective: Convergence 4. Location: Greece, Attica 5. Programming period: Total/Decision amount: EUR 91 million / EUR 34 million 7. EU contribution: EUR 29 million 8. Co-financing rate: 85% 9. Nature of the decision: Adoption 10. Short description of the decision: This decision concerns a priority project. The entire project includes the design, financing, installation, operation support, maintenance and technical management of an Integrated Automatic Fare Collection System (AFCS). The operation proposed for co-financing concerns the design, procurement and installation of the systems and software for its full operation. This system will cover and serve all modes of public transport (thermal buses, electric buses, trolley buses, urban railways-metro, tramways - trams and the suburban railway) operating in the area of competence of the Athens Urban Transport Organisation (OASA). All paper tickets will be replaced by electronic tickets which will be validated by units to be installed in all vehicles. The AFCS will be completed with entry and exit gates in the metro system. The project will be implemented and operated through a Public-Private Partnership with a total duration of 12 years (2 years for the design, installation and 10 years for the full operation of the system). The benefits of the new AFCS derive from the users' time saving, the operational performance, the reduction of revenue losses due to fare evasion and from the reduction in the use of passenger cars. 11. Financial effect on the EU budget: No 12. Financial changes to the project: No 13. a) State aid issues: DG COMP consulted: Yes, and they gave agreement. b) Revenue generating project: No 14. Contact: Chrysoula LENTZOU (tel.: 56653) 15. CCI number: 2011GR161PR008

L. Issaia - Keramida Consultant to the Managing Director of ERGOSE

L. Issaia - Keramida Consultant to the Managing Director of ERGOSE L. Issaia - Keramida Consultant to the Managing Director of ERGOSE THE MODERNIZATION PROJECTS OF OSE S RAILWAY NETWORK, WHICH ARE IMPLEMENTED WITH THE FINANCIAL SUPPORT OF EUROPEAN UNION FUNDS (EUROPEAN

More information

Special Coordination Service for Implementation (SCOS) - ROLE

Special Coordination Service for Implementation (SCOS) - ROLE Introduction MINISTRY OF ECONOMY & DEVELOPMENT Special Coordination Service for Implementation (SCOS) - ROLE The role & responsibilities of SCOS is specified in L.2860/2000, L.3614/2007, L.4314/2014 and

More information

Development of the Hellenic Parts of Priority Axes No 22 & 29: A Strategic Approach

Development of the Hellenic Parts of Priority Axes No 22 & 29: A Strategic Approach Development of the Hellenic Parts of Priority Axes No 22 & 29: A Strategic Approach Eleni Zacharaki Intermediate Managing Authority for Transport (IMA) / Hellenic Ministry of Transport & Communications

More information

A Strategy Proposal for Road Infrastructure Development in Recession Times

A Strategy Proposal for Road Infrastructure Development in Recession Times INTERNATIONAL SEMINAR ON ROADS, BRIDGES AND TUNNELS NOVEMBER 2017, THESSALONIKI A Strategy Proposal for Road Infrastructure Development in Recession Times Sergios Lambropoulos, Professor Emeritus National

More information

ITA AITES WORLD TUNNEL CONGRESS 2009

ITA AITES WORLD TUNNEL CONGRESS 2009 ITA AITES WORLD TUNNEL CONGRESS 2009 Budapest, Hungary, May 23 29, 2009 OF SAFE AND EFFICIENT UNDERGROUND URBAN ROAD AND RAIL INFRASTRUCTURES Manuel Arnáiz Ronda PhD. Civil Engineering President of AETOS

More information

Greece: Bright opportunities for the future. December 2, 2010

Greece: Bright opportunities for the future. December 2, 2010 Greece: Long History in PPPs Bright opportunities for the future December 2, 2010 The Greek PPP market Focal point in regional PPP practice Significant history & expertise on PPP projects Clear legal framework

More information

Terms of Transport with the TRAINOSE S.A trains and buses What you need to know when traveling with us

Terms of Transport with the TRAINOSE S.A trains and buses What you need to know when traveling with us Terms of Transport with the TRAINOSE S.A trains and buses What you need to know when traveling with us November 2017 The present text may be freely modified by TRAINOSE S.A and is published in the official

More information

THE EXTENSIONS PROGRAMME

THE EXTENSIONS PROGRAMME THE EXTENSIONS PROGRAMME OF ATHENS METRO PRESENTATION AT THE ISIGE UTNA COLLOQUE ASPECTS D ATHENES: ARCHITECTURE URBANISME TRANSPORT - SOCIETE Athens, March 4 th, 2009 George Yannis, Ass.Professor NTUA

More information

1. Good Practice Example: Sustainable Urban Development (Northern Budapest, Hungary)

1. Good Practice Example: Sustainable Urban Development (Northern Budapest, Hungary) 1. Good Practice Example: Sustainable Urban Development (Northern Budapest, Hungary) List of relevant key words Brownfield Rehabilitation, Sustainable Urban Development, Green Space Development, Functional

More information

Report on the fact-finding mission of the Budgetary Control Committee to Greece 24/25 September 2015

Report on the fact-finding mission of the Budgetary Control Committee to Greece 24/25 September 2015 Directorate-General for Internal Policies of the Union Directorate for Budgetary Affairs Secretariat of the Committee on Budgetary Control Brussels, 3 December 2015 Report on the fact-finding mission of

More information

ACTION PLAN FOR THE PERIOD concerning the STRATEGY ON IMPLEMENTATION OF THE FRAMEWORK AGREEMENT ON THE SAVA RIVER BASIN

ACTION PLAN FOR THE PERIOD concerning the STRATEGY ON IMPLEMENTATION OF THE FRAMEWORK AGREEMENT ON THE SAVA RIVER BASIN Doc. 1S-26-O-11-5/1-2 ACTION PLAN FOR THE PERIOD 2011-2015 concerning the STRATEGY ON IMPLEMENTATION OF THE FRAMEWORK AGREEMENT ON THE SAVA RIVER BASIN April 2011 Table of Contents INTRODUCTION... 5 1.

More information

NATIONAL BACKGROUND REPORT ON TRANSPORT FOR KOSOVO *

NATIONAL BACKGROUND REPORT ON TRANSPORT FOR KOSOVO * NATIONAL BACKGROUND REPORT ON TRANSPORT FOR KOSOVO * Shaban Buza,, PhD, Professor Ramadan Duraku,, MSc, Lecturer KEY NOTES Introduction The Transport S&T system Overview of Transport research activities

More information

November 7 th Post Workshop Report

November 7 th Post Workshop Report Malaga Workshop November 7 th 2017 Post Workshop Report Main Conclusions and Lessons Learnt November 2017 Contents 1. Introduction... 3 2. Day 1... 5 2.1. Technical Visit to the Metropolitan Transport

More information

WESTERN PELOPONNESE RAILWAY, PORTS AND ROADS

WESTERN PELOPONNESE RAILWAY, PORTS AND ROADS WESTERN PELOPONNESE RAILWAY, PORTS AND ROADS Project Key Features Short Description: Project Components: Design and/or Construction, Financing, Operation, Maintenance and Exploitation of rail lines, ports

More information

IAT Annual Conference 'Driving Forward

IAT Annual Conference 'Driving Forward Zero to Hero Transformation of Ireland s National Road Network IAT Annual Conference 'Driving Forward Sean O Neill Topics Overview How It All came together. TII & National Road Network & History A Little

More information

ECO-TEXTILE INTRODUCTION AND PROMOTION OF THE ECO-LABEL TO THE GREEK TEXTILE INDUSTRY LIFE03 ENV/GR/ LIFE - ENVIRONMENT LAYMAN S REPORT

ECO-TEXTILE INTRODUCTION AND PROMOTION OF THE ECO-LABEL TO THE GREEK TEXTILE INDUSTRY LIFE03 ENV/GR/ LIFE - ENVIRONMENT LAYMAN S REPORT ECO-TEXTILE INTRODUCTION AND PROMOTION OF THE ECO-LABEL TO THE GREEK TEXTILE INDUSTRY LIFE03 ENV/GR/000204 LIFE - ENVIRONMENT LAYMAN S REPORT Eco-Textile Project Eco-Textile was implemented within the

More information

Porto planning for people, not cars. John Bartlett Towards Carfree Cities Conference IX York 28 June 2010

Porto planning for people, not cars. John Bartlett Towards Carfree Cities Conference IX York 28 June 2010 Porto planning for people, not cars John Bartlett Towards Carfree Cities Conference IX York 28 June 2010 Location of Porto Porto snapshot Population 1.5 million people in greater metropolitan area (814km

More information

Submission to Infrastructure Victoria s Draft 30-Year Infrastructure Strategy

Submission to Infrastructure Victoria s Draft 30-Year Infrastructure Strategy Submission to Infrastructure Victoria s Draft 30-Year Infrastructure Strategy 1. Introduction This submission is a response to Infrastructure Victoria s assessment of the need to construct a heavy rail

More information

1. To inform members of the views of the West of England Joint Scrutiny Committee (JSC) following a meeting held on Wednesday 5 th March 2014

1. To inform members of the views of the West of England Joint Scrutiny Committee (JSC) following a meeting held on Wednesday 5 th March 2014 West of England Joint Transport Executive Committee 13 th March 2014 Agenda Item 5 Views of Joint Scrutiny Committee Purpose 1. To inform members of the views of the West of England Joint Scrutiny Committee

More information

Project Data Sheet BASIC PROJECT DATA

Project Data Sheet BASIC PROJECT DATA BASIC PROJECT DATA Full project title: Short project title: (acronym) Improvement of navigation in the joint Bulgarian-Romanian section of the Danube river from km 530 to km 520 Batin and from km 576 and

More information

Economic impact of the Athens International Airport

Economic impact of the Athens International Airport FOUNDATION FOR ECONOMIC & INDUSTRIAL RESEARCH 11 T. Karatassou St, 11742 Athens, Greece, Tel: (+30) 210 9211 200-10, Fax: (+30) 210 9233 977, www.iobe.gr Economic impact of the Athens International Airport

More information

ACI EUROPE POSITION. A level playing field for European airports the need for revised guidelines on State Aid

ACI EUROPE POSITION. A level playing field for European airports the need for revised guidelines on State Aid ACI EUROPE POSITION A level playing field for European airports the need for revised guidelines on State Aid 16 June 2010 1. INTRODUCTION Airports play a vital role in the European economy. They ensure

More information

Project Fiche MASTER PLAN FOR DEVELOPMENT OF THE NAUTICAL TOURISM IN THE SAVA RIVER BASIN

Project Fiche MASTER PLAN FOR DEVELOPMENT OF THE NAUTICAL TOURISM IN THE SAVA RIVER BASIN Project Fiche MASTER PLAN FOR DEVELOPMENT OF THE NAUTICAL TOURISM IN THE SAVA RIVER BASIN 1. Basic information 1.1 Title: Master plan 1.2 Location: Sava River Basin which covers Bosnia and Herzegovina,

More information

The Bus Services Bill and Municipal Bus Companies

The Bus Services Bill and Municipal Bus Companies The Bus Services Bill and Municipal Bus Companies Summary Why we need bus services What are municipal bus operators? Network Warrington Being commercial/serving the community Bus Services Bill Value to

More information

Tunnelling Featured Projects

Tunnelling Featured Projects Tunnelling Featured Projects We have been involved in the following Major Tunnel Projects: Attico Metro S.A. (Athens metro underground network, http://www.attikometro.gr/) Egnatia Odos SA (670 Km motorway,

More information

AIR Citizen s Summary

AIR Citizen s Summary w w w.ip a- cb c- 00 7. eu C om pe tit i ve ne ss To u ris m En vi ro nm en t Programme co-funded by the EUROPEAN UNION Ms. Corina Crețu, Commissioner for Regional Policy said: "I am pleased to adopt this

More information

Project Data Sheet BASIC PROJECT DATA. Improvement of the systems for navigation and topo-hydrographic measurements on the Danube River

Project Data Sheet BASIC PROJECT DATA. Improvement of the systems for navigation and topo-hydrographic measurements on the Danube River BASIC PROJECT DATA Full project title: Short project title: (acronym) Improvement of the systems for navigation and topo-hydrographic measurements on the Danube River Project logo: Project website: Project

More information

FREEING UP MELBOURNE'S BIGGEST BOTTLENECK

FREEING UP MELBOURNE'S BIGGEST BOTTLENECK FREEING UP MELBOURNE'S BIGGEST BOTTLENECK PRESENTATION TO THE TOURISM INDUSTRY 29 AUGUST 2017 Evan Tattersall, CEO, Melbourne Metro Rail Authority MELBOURNE S CHALLENGES POPULATION GROWTH NORTHERN +450,000

More information

COMMISSION OF THE EUROPEAN COMMUNITIES COMMUNICATION FROM THE COMMISSION. Developing an EU civil aviation policy towards Brazil

COMMISSION OF THE EUROPEAN COMMUNITIES COMMUNICATION FROM THE COMMISSION. Developing an EU civil aviation policy towards Brazil COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 5.5.2010 COM(2010)210 final COMMUNICATION FROM THE COMMISSION Developing an EU civil aviation policy towards Brazil COMMUNICATION FROM THE COMMISSION Developing

More information

Scientific Support to the Danube Strategy

Scientific Support to the Danube Strategy Monday, 29 September 2014 CONCEPT PAPER Scientific Support to the Danube Strategy The of the European Commission is coordinating an initiative aiming to provide scientific support to the European Union

More information

Catchment and Lake Research

Catchment and Lake Research LARS 2007 Catchment and Lake Research Multilateral versus bilateral agreements for the establishment of river based organizations: comparison of legal, economic and social benefits in the Zambian experience.

More information

Egnatia Odos: An axis for development and co-operation

Egnatia Odos: An axis for development and co-operation Egnatia Odos: An axis for development and co-operation Egnatia Odos is one of the two Trans-European transport axes (the other being PATHE) which cross through our country and, together with the Eleftherios

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: November 18, 2013 SUBJECT: YONGE-EGLINTON AND EGLINTON WEST INTERCHANGE STATIONS METROLINX EGLINTON CROSSTOWN LIGHT RAIL TRANSIT PROJECT

More information

Capital Metro is the first stage of a light rail network that will have a transformative effect on Canberra. capitalmetro.act.gov.

Capital Metro is the first stage of a light rail network that will have a transformative effect on Canberra. capitalmetro.act.gov. Artist impression Nullabor Avenue Harrison Business Case overview Capital Metro is the first stage of a light rail network that will have a transformative effect on Canberra. capitalmetro.act.gov.au Why

More information

CITY OF BELGRADE BELGRADE LAND DEVELOPMENT PUBLIC AGENCY

CITY OF BELGRADE BELGRADE LAND DEVELOPMENT PUBLIC AGENCY CITY OF BELGRADE BELGRADE URBAN TRANSPORT Conference on Transportation Infrastractures in the Balkans July 2011, Madrid BELGRADE LAND DEVELOPMENT PUBLIC BELGRADE BELGRADE Belgrade is capital of Serbia.

More information

Climate Change and. Airport Regions

Climate Change and. Airport Regions Climate Change and Airport Regions Climate Change and Airport Regions Airport regions welcome aviation if it can be developed with a sustainable profile. With the integration of regional economies in

More information

Project Data Sheet BASIC PROJECT DATA. Rehabilitation and Development of Transport and Navigation on the Sava River Waterway. Full project title:

Project Data Sheet BASIC PROJECT DATA. Rehabilitation and Development of Transport and Navigation on the Sava River Waterway. Full project title: BASIC PROJECT DATA Full project title: Short project title: (acronym) Rehabilitation and Development of Transport and Navigation on the Sava River Waterway Project logo: Project website: www.savacommission.org

More information

Related Expertise Concession Projects - PPP

Related Expertise Concession Projects - PPP Related Expertise Concession Projects - PPP IMPETUS-ISIS for Attiki Odos ISIS and Impetus developed a traffic model for the offer that Attiki Odos, SA had provided in the bidding process and won the contract

More information

Response to the London Heathrow Airport Expansion Public Consultation

Response to the London Heathrow Airport Expansion Public Consultation Response to the London Heathrow Airport Expansion Public Consultation Summary This report sets out the response to the Heathrow Airport s consultation on airport expansion and airspace change. The consultation

More information

West Midlands Sustainable Urban

West Midlands Sustainable Urban West Midlands Sustainable Urban Transport Strategy and its Delivery: Movement for Growth Liveable City Conference Transport and Connectivity Seminar - 30/11/2017 Adam Harrison, Strategy & Intelligence

More information

Assessment of Environmental Impacts of the proposed Sectoral Operational Programme for Tourism and Spa Industry

Assessment of Environmental Impacts of the proposed Sectoral Operational Programme for Tourism and Spa Industry Unofficial translation of the original document produced in Czech language Assessment of Environmental Impacts of the proposed Sectoral Operational Programme for Tourism and Spa Industry Assessment team:

More information

New Trends & Challenges in City Tourism by Alex Galinos Managing Director Athens, October 23, 2006

New Trends & Challenges in City Tourism by Alex Galinos Managing Director Athens, October 23, 2006 New Trends & Challenges in City Tourism by Alex Galinos Managing Director Athens, October 23, 2006 In Athens was founded in May 2005 as a non-profit organization In Athens is the official tourism board

More information

CHANGES OF ROAD ADMINISTRATION IN HUNGARY

CHANGES OF ROAD ADMINISTRATION IN HUNGARY CHANGES OF ROAD ADMINISTRATION IN HUNGARY Andras Gulyas Ph.D. Hungarian Roads Management Co. PIARC Seminar 2005 Warsaw 1/25 Contents of the presentation Overview of the economic transition and its effect

More information

The economic impact of ATC strikes in Europe Key findings from our updated report for A4E

The economic impact of ATC strikes in Europe Key findings from our updated report for A4E pwc.com The economic impact of ATC strikes in Europe Key findings from our updated report for A4E Prepared for A4E Updates to our analysis since June 2016 Since releasing our Preliminary Findings in June

More information

PERTH AND KINROSS COUNCIL. Housing and Health Committee. 25 May Perth and Kinross Local Housing Strategy

PERTH AND KINROSS COUNCIL. Housing and Health Committee. 25 May Perth and Kinross Local Housing Strategy PERTH AND KINROSS COUNCIL 7 16/234 Housing and Health Committee 25 May 2016 Perth and Kinross Local Housing Strategy 2016-2021 Report by Director (Housing and Social Work) PURPOSE OF REPORT This report

More information

Ryeish Green and Grays Fruit Farm Sports Hub Projects. Shinfield South and Wokingham Without. Heather Thwaites, Director of Environment

Ryeish Green and Grays Fruit Farm Sports Hub Projects. Shinfield South and Wokingham Without. Heather Thwaites, Director of Environment TITLE Ryeish Green and Grays Fruit Farm Sports Hub Projects FOR CONSIDERATION BY The Executive on 30 July 2015 WARD DIRECTOR LEAD MEMBER Shinfield South and Wokingham Without Heather Thwaites, Director

More information

Regional Authority of Central Macedonia

Regional Authority of Central Macedonia Greece Regional Authority of Central Macedonia Urban area of Thessaloniki What we HAVE -Municipality of Thessaloniki (city centre) of 325.182 people -An Urban Area of 790.824 inhabitants and an area of

More information

MEETING DATE: February 17, 2010 SUBJECT: ACTION ITEM TORONTO TRANSIT COMMISSION REPORT NO. ACCESSIBLE TRANSIT SERVICES PLAN: 2009 STATUS REPORT

MEETING DATE: February 17, 2010 SUBJECT: ACTION ITEM TORONTO TRANSIT COMMISSION REPORT NO. ACCESSIBLE TRANSIT SERVICES PLAN: 2009 STATUS REPORT TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: February 17, 2010 SUBJECT: ACCESSIBLE TRANSIT SERVICES PLAN: 2009 STATUS REPORT ACTION ITEM RECOMMENDATION It is recommended that the Commission forward

More information

Annex 1 Revised TEE, AMCB and Public Accounts Tables Print Version

Annex 1 Revised TEE, AMCB and Public Accounts Tables Print Version Annex 1 Revised TEE, AMCB and Public Accounts Tables Print Version NB. The Excel file also includes the BAFB and Full approval cost tables. South Yorkshire BRT Northern Route Full Approval September 2013

More information

Consultation on Town Quay Mooring Redevelopment Proposals

Consultation on Town Quay Mooring Redevelopment Proposals Consultation on Town Quay Mooring Redevelopment Proposals Lymington Harbour Commissioners (LHC) would like your views on its proposals to redevelop the Town Quay area to meet the changing market requirements

More information

GENERAL PRESENTATION Corporate & Project

GENERAL PRESENTATION Corporate & Project GENERAL PRESENTATION Corporate & Project GENERAL PRESENTATION Corporate & Project Part 1 : Scope of Work and Project Organization Part 2 : Public Transport Project Objectives Part 3 : Financial Structure

More information

Measure 67: Intermodality for people First page:

Measure 67: Intermodality for people First page: Measure 67: Intermodality for people First page: Policy package: 5: Intermodal package Measure 69: Intermodality for people: the principle of subsidiarity notwithstanding, priority should be given in the

More information

Silvia Giulietti ETIS Conference Brussels An EEA reporting mechanism on tourism and environment and ETIS

Silvia Giulietti ETIS Conference Brussels An EEA reporting mechanism on tourism and environment and ETIS Silvia Giulietti ETIS Conference Brussels 28.01.2016 An EEA reporting mechanism on tourism and environment and ETIS Main content Why tourism and environment? Why a reporting mechanism on tourism and environment

More information

MODAIR. Measure and development of intermodality at AIRport

MODAIR. Measure and development of intermodality at AIRport MODAIR Measure and development of intermodality at AIRport M3SYSTEM ANA ENAC GISMEDIA Eurocontrol CARE INO II programme Airports are, by nature, interchange nodes, with connections at least to the road

More information

Section A: Scheme Summary

Section A: Scheme Summary Section A: Scheme Summary Name of Scheme: PMO Scheme Code: Lead Organisation: Senior Responsible Officer: Lead Promoter Contact: Case Officer: North East Calderdale Transformational Programme WYTF-PA4-054

More information

Terms of Reference (ToR) for a Short-Term assignment

Terms of Reference (ToR) for a Short-Term assignment Terms of Reference (ToR) for a Short-Term assignment Technical assistance requested Expert for climate change mitigation and adaptation Project Title Outline of the Climate Adaptation Strategy and basin-wide

More information

Republika e Kosovës Republika Kosova-Republic of Kosovo Qeveria - Vlada - Government New Kosovo Project

Republika e Kosovës Republika Kosova-Republic of Kosovo Qeveria - Vlada - Government New Kosovo Project Republika e Kosovës Republika Kosova-Republic of Kosovo Qeveria - Vlada - Government New Kosovo Project March 20, 2018 Bringing Kosovo s energy sector closer to Europe Content of Presentation 1. Project

More information

HAMBURG. APPLICATION FOR THE TITLE AS EUROPEAN GREEN CAPITAL.

HAMBURG. APPLICATION FOR THE TITLE AS EUROPEAN GREEN CAPITAL. HAMBURG. APPLICATION FOR THE TITLE AS EUROPEAN GREEN CAPITAL. Christian Maaß State Secretary for Urban Development and the Environment Free and Hanseatic City of Hamburg THE WORLD IS AT RISK. Europe s

More information

Performance Criteria for Assessing Airport Expansion Alternatives for the London Region

Performance Criteria for Assessing Airport Expansion Alternatives for the London Region Performance Criteria for Assessing Airport Expansion Alternatives for the London Region Jagoda Egeland International Transport Forum at the OECD TRB Annual Meeting 836 - Measuring Aviation System Performance:

More information

Recommendations on Consultation and Transparency

Recommendations on Consultation and Transparency Recommendations on Consultation and Transparency Background The goal of the Aviation Strategy is to strengthen the competitiveness and sustainability of the entire EU air transport value network. Tackling

More information

monitoring of egnatia motorways spatial impacts

monitoring of egnatia motorways spatial impacts monitoring of egnatia motorways spatial impacts MINISTRY OF ENVIRONMENT, PHYSICAL PLANNING AND PUBLIC WORKS 1 A TOOL AT THE SERVICE OF SPATIAL DEVELOPMENT The Egnatia motorway Observatory monitors, and

More information

Rehabilitation and development of navigation on the Sava river

Rehabilitation and development of navigation on the Sava river Rehabilitation and development of navigation on the Sava river 3rd Joint Statement Implementation Meeting, Vienna, April 5-6, 2011 Background of the project Recognized as a priority project in the framework

More information

Sustainable development: 'Lanzarote and the Biosphere strategy'. LIFE97 ENV/E/000286

Sustainable development: 'Lanzarote and the Biosphere strategy'. LIFE97 ENV/E/000286 Sustainable development: 'Lanzarote and the Biosphere strategy'. LIFE97 ENV/E/000286 Project description Environmental issues Beneficiaries Administrative data Read more Contact details: Project Manager:

More information

Agreement on the operation of the Kolarctic CBC Programme Branch Office in Norway

Agreement on the operation of the Kolarctic CBC Programme Branch Office in Norway Agreement on the operation of the Kolarctic CBC Programme Branch Office in Norway between Regional Council of Lapland, Hallituskatu 20, 96100 Rovaniemi, Finland acting as the Managing Authority of the

More information

Director, External Trade, CARICOM Secretariat. CARICOM Secretariat, Guyana

Director, External Trade, CARICOM Secretariat. CARICOM Secretariat, Guyana THE COMMONWEALTH SECREATARIAT SEEKS APPLICATIONS FOR THE POST OF REGIONAL TRADE ADVISER (RTA) FOR AN ASSIGNMENT WITH THE CARIBBEAN COMMUNITY (CARICOM) SECRETARIAT DATE REQUIRED: December 2014 REPORTING

More information

10 th INSULEUR FORUM Palma de Mallorca, 10-11/6/2010

10 th INSULEUR FORUM Palma de Mallorca, 10-11/6/2010 10 th INSULEUR FORUM Palma de Mallorca, 10-11/6/2010 Sustainable Development and Insularity - Planning a development policy for insular areas covering a wide typology Agatha Lagi Special Service for Strategy,

More information

visits4u Case Studies: Historical Centre of Athens Athens, Greece

visits4u Case Studies: Historical Centre of Athens Athens, Greece visits4u Case Studies: Historical Centre of Athens Athens, Greece Historical Centre of Athens Athens, Greece Title: The Historical Centre of Athens as an Accessible Destination Description Tourism in Greece

More information

DaHar Danube Inland Harbour Development

DaHar Danube Inland Harbour Development The European Union's Southeast Europe programme supporting DaHar Danube Inland Harbour Development DaHar WP 4 A4: Local Action Plan of the Port of Novi Sad Final version: 30 th of December 2013 This project

More information

2006 ANNUAL GENERAL MEETING

2006 ANNUAL GENERAL MEETING 2006 ANNUAL GENERAL MEETING Address by Garth F. Atkinson President and Chief Executive Officer April 19, 2006 Thank you Peter and good morning ladies and gentlemen and invited guests. Before proceeding

More information

Industry briefing NOVEMBER 2017

Industry briefing NOVEMBER 2017 Industry briefing NOVEMBER 2017 SYDNEY METRO AUSTRALIA S BIGGEST PUBLIC TRANSPORT PROJECT A new stand-alone railway, this 21st century network will revolutionise the way Sydney travels. Services start

More information

Blackburn Road Blackburn Level Crossing Removal. Frequently Asked Questions August 2014 GENERAL

Blackburn Road Blackburn Level Crossing Removal. Frequently Asked Questions August 2014 GENERAL Frequently Asked Questions August 2014 Blackburn Road Blackburn Level Crossing Removal GENERAL What is the project? The Victorian Government has committed to eliminating a number of the busiest level crossings

More information

Nikolina Angelkova TRANSPORT AND ITC PRIORITIES. Minister of Transport, Information Technology and Communications. 28 August 2014 Sofia

Nikolina Angelkova TRANSPORT AND ITC PRIORITIES. Minister of Transport, Information Technology and Communications. 28 August 2014 Sofia MINISTRY OF TRANSPORT, INFORMATION TECHNOLOGY AND COMMUNICATIONS REPUBLIC OF BULGARIA TRANSPORT AND ITC PRIORITIES Nikolina Angelkova Minister of Transport, Information Technology and Communications 28

More information

FEDERAL BUDGET PRIORITIES FOR THE SOUTH WEST METROPOLITAN REGION 2018 TO 2022

FEDERAL BUDGET PRIORITIES FOR THE SOUTH WEST METROPOLITAN REGION 2018 TO 2022 A Co-operative venture of the municipalities of: Cockburn, East Fremantle, Fremantle, Kwinana, Melville & Rockingham Tuesday, 5 December 2017 Enquiries: Mick McCarthy 9364 0631 Our Ref: Federal Budget

More information

SUSTAINABLE AIR TRANSPORT IN THE FUTURE TEN-T

SUSTAINABLE AIR TRANSPORT IN THE FUTURE TEN-T SUSTAINABLE AIR TRANSPORT IN THE FUTURE TEN-T This document is part of a series of technical support documents to the green paper "TEN-T : A policy review Towards a better integrated trans-european transport

More information

NR is also currently conducting two other studies, those for the Cambridgeshire Corridor and for Ely Area Capacity Enhancements.

NR is also currently conducting two other studies, those for the Cambridgeshire Corridor and for Ely Area Capacity Enhancements. Joint Response to draft East Coast Main Line Route Study 8 March 2018 For and on behalf of the Borough Council of King s Lynn & West Norfolk, Fen Line Users Association, King s Lynn BID Ltd and Norfolk

More information

How, when, what & why to access Structural Funds in Romania

How, when, what & why to access Structural Funds in Romania How, when, what & why to access Structural Funds in Romania 1. STRUCTURAL FUNDS AND ROMANIA The European Commission adopted the Partnership Agreement" with Romania, in the context of mobilization of the

More information

Working Draft: Time-share Revenue Recognition Implementation Issue. Financial Reporting Center Revenue Recognition

Working Draft: Time-share Revenue Recognition Implementation Issue. Financial Reporting Center Revenue Recognition March 1, 2017 Financial Reporting Center Revenue Recognition Working Draft: Time-share Revenue Recognition Implementation Issue Issue #16-6: Recognition of Revenue Management Fees Expected Overall Level

More information

THIS IS THE KEY LINK OF THE MEDITERRANEAN CORE NETWORK CORRIDOR (TEN-T NETWORK), WHICH WILL BE COMPLETED BY telt-sas.com 2

THIS IS THE KEY LINK OF THE MEDITERRANEAN CORE NETWORK CORRIDOR (TEN-T NETWORK), WHICH WILL BE COMPLETED BY telt-sas.com 2 telt-sas.com 1 LYON-TURIN: A EUROPEAN PROJECT telt-sas.com 2 The Lyon-Turin railway line is part of a global project which aims at connecting eastern and western Europe through a new cross-border line

More information

Former Yugoslav Republic of Macedonia (FYROM)

Former Yugoslav Republic of Macedonia (FYROM) Former Yugoslav Republic of Macedonia (FYROM) Tourism in the economy Tourism directly contributed MKD 6.4 billion or 1.3% of GDP in 2013, and accounted for 3.3% of total employment. Estimates for 2014

More information

Edinburgh Waverley capacity upgrade

Edinburgh Waverley capacity upgrade Edinburgh Waverley capacity upgrade As part of our rail upgrade plan, and in order to facilitate the introduction of longer trains and to prepare for projected future growth in demand for both track and

More information

Proposal for a COUNCIL DECISION

Proposal for a COUNCIL DECISION EUROPEAN COMMISSION Brussels, 22.9.2016 COM(2016) 621 final 2016/0301 (NLE) Proposal for a COUNCIL DECISION on the position to be taken by the European Union within the EU-ICAO Joint Committee on the Decision

More information

Aviation Taxes and Charges

Aviation Taxes and Charges Aviation Taxes and Charges A comparison of the level of the taxation, subsidies and charges for aviation and for other transport modes in Germany, France and the United Kingdom. IATA ECONOMICS BRIEFING

More information

Lake Balaton Recreational Area

Lake Balaton Recreational Area Lake Balaton Recreational Area September 28, 2018, Thessaloniki Zita Könczölné Egerszegi Environmental Director Lake Balaton Development Coordination Agency Location Central-Europe Carpathian basin Nature

More information

Order of the Minister of Environment #39, August 22, 2011 Tbilisi

Order of the Minister of Environment #39, August 22, 2011 Tbilisi Registration Code 360050000.22.023.016080 Order of the Minister of Environment #39, August 22, 2011 Tbilisi On preparatory stages and procedure of the methodology for Elaborating structure, content and

More information

EU Strategy for the Danube Region framework for development of inland navigation

EU Strategy for the Danube Region framework for development of inland navigation EU Strategy for the Danube Region framework for development of inland navigation Belgrade, 6 March 2013 International Conference Sava River A Transport corridor & tourist destination Markus Simoner, via

More information

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy Agenda Item 7 Executive Open Report on behalf of Richard Wills, Executive Director for Environment and Economy Report to: Executive Date: 02 September 2014 Subject: Lincoln East West Link Road Phase 1

More information

Economic Sustainability and expected benefits

Economic Sustainability and expected benefits Project Number: T.13.4 Project Title: Dakar-Bamako Rail Revitalisation and Signalling Status: S3/S4 Programme/project structuring and promotion to obtain financing Countries Region Sector Sub-Sector Project

More information

Agenda 11. Strathclyde Bus Alliance progress update. Date of meeting 9 December 2016 Date of report 15 November 2016

Agenda 11. Strathclyde Bus Alliance progress update. Date of meeting 9 December 2016 Date of report 15 November 2016 Agenda 11 Strathclyde Bus Alliance progress update Date of meeting 9 December 2016 Date of report 15 November 2016 Report by Assistant Chief Executive (Operations) 1. Object of report The object of this

More information

East West Rail Consortium

East West Rail Consortium East West Rail Consortium EWR Wider Economic Case: Refresh 18 th November 2015 Rupert Dyer Rail Expertise Ltd Rail Expertise Ltd. Tel: 01543 493533 Email: info@railexpertise.co.uk 1 Introduction 1.1 The

More information

Observatory of Egnatia Odos motorway, Greece

Observatory of Egnatia Odos motorway, Greece Observatory of Egnatia Odos motorway, Greece 1st Spatial Impacts Report paper presented at the Colloque scientifique sur les observatoires autoroutiers et d'infrastructures lineaires: incidences environnementales

More information

The Single European Sky and SESAR, the European ATM modernisation programme. Patrick Ky, Executive Director 26 May 2010

The Single European Sky and SESAR, the European ATM modernisation programme. Patrick Ky, Executive Director 26 May 2010 The Single European Sky and SESAR, the European ATM modernisation programme Patrick Ky, Executive Director 26 May 2010 TODAY S SITUATION IN EUROPE 4 Fragmentation of the European AIrspace THE CONTEXT Traffic

More information

WORKING PAPER In the context of the placement in the Observatory of the Egnatia Odos A.E.

WORKING PAPER In the context of the placement in the Observatory of the Egnatia Odos A.E. COMPARATIVE ANALYSIS OF POPULATION CHANGES IN THE AREAS CROSSED BY THE THREE BASIC ROAD AXES OF GREECE: THE EGNATIA MOTORWAY, THE PA.TH.E. AND THE IONIAN MOTORWAY WORKING PAPER In the context of the placement

More information

06.09 Lubelskie: SME development in Janow Lubelski

06.09 Lubelskie: SME development in Janow Lubelski 06.09 Lubelskie: SME development in Janow Lubelski 1. BASIC INFORMATION 1.1. CRIS Number: 2002/000-580-06.09 1.2. Title: SME development in Janów Lubelski 1.3. Sector: 1.4. Location: Town and Gmina of

More information

Part four. In this part you will find: The next steps to deliver the master plan

Part four. In this part you will find: The next steps to deliver the master plan Part four NEXT STEPS In this part you will find: The next steps to deliver the master plan 6. How COULD the Master Plan be delivered? There are a number of steps required to take the proposals in the master

More information

Survey of Britain s Transport Journalists A Key Influencer Tracking Study Conducted by Ipsos MORI Results

Survey of Britain s Transport Journalists A Key Influencer Tracking Study Conducted by Ipsos MORI Results Survey of Britain s Transport Journalists A Key Influencer Tracking Study Conducted by Ipsos MORI 2014 Results Methodology This report presents the findings of the 2014 study of Transport Journalists,

More information

JAKARTA TRANSPORTATION

JAKARTA TRANSPORTATION Toward A Better TRANSPORTATION AGENCY DKI JAKARTA PROVINCIAL GOVERNMENT (INDONESIA) FERDINAND GINTING JAKARTA TRANSPORTATION Jakarta a Capital City, and many more roles! Capital City of Indonesia and Centre

More information

VIP Trip to Germany, Czech Republic and Poland Regional Innovation and Competitiveness November PROGRAMME (Final Version

VIP Trip to Germany, Czech Republic and Poland Regional Innovation and Competitiveness November PROGRAMME (Final Version CETREGIO Chinese - European Training in Regional Policy Regional Policy Dialogue with China A project of the Directorate General for Regional and Urban Policy (DG REGIO) of the European Commission in the

More information

DESTIMED PROJECT CALL FOR EXPRESSION OF INTEREST FOR THE IMPLEMENTATION OF ECOTOURISM PILOT ACTIONS IN CROATIAN MPAS

DESTIMED PROJECT CALL FOR EXPRESSION OF INTEREST FOR THE IMPLEMENTATION OF ECOTOURISM PILOT ACTIONS IN CROATIAN MPAS DESTIMED PROJECT CALL FOR EXPRESSION OF INTEREST FOR THE IMPLEMENTATION OF ECOTOURISM PILOT ACTIONS IN CROATIAN MPAS Terms of Reference TABLE OF CONTENTS 1 Background... 3 2 Objectives of the call for

More information

Appendix. Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Gatwick Airport Limited

Appendix. Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Gatwick Airport Limited Gatwick Airport Limited Response to Airports Commission Consultation Appendix 37 Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Further information

More information

EVALUATING THE IMPACT OF THE ECONOMIC CRISIS ON GREEK TOURISM: PUBLIC

EVALUATING THE IMPACT OF THE ECONOMIC CRISIS ON GREEK TOURISM: PUBLIC EVALUATING THE IMPACT OF THE ECONOMIC CRISIS ON GREEK TOURISM: PUBLIC PERCEPTIONS AMONG ROMANIANS Ana Maria Tuluc Ph. D Student Academy of Economic Studies Faculty of Economics Bucharest, Romania Abstract:

More information