1 Submission to Infrastructure Victoria s Draft 30-Year Infrastructure Strategy 1. Introduction This submission is a response to Infrastructure Victoria s assessment of the need to construct a heavy rail link from the city to Doncaster, in the draft report, 30-Year Infrastructure Strategy, October The draft report concludes that a rail connection to Doncaster cannot be justified as: it provides only a low contribution to meeting the growing demand for access to economic activity in central Melbourne ; it has a prohibitively high cost ; for many people in the Doncaster area it actually provides a worse journey than they currently have with the Doncaster Area Rapid Transit (DART) buses because of the need to start interchanging between bus and rail. ; and thus it has a very poor preliminary benefit-cost result. The draft report states also that the proposal has strong community support but it was not recommended by the citizen jury. 2. Comment on the Draft Report s reasons for non-recommendation There are many reasons that proponents of the Doncaster railway have used for its construction. However, that it would make a contribution to the economic activity in central Melbourne, has never been one of them. Therefore, while its economic contribution may be considered as low, it is unreasonable to consider this as a significant reason for rejection unless this is the only or one of the main two or three criteria used for consideration of the value of infrastructure projects. The draft report suggest that the cost of the proposal would be in the order of $3 billion to $5 billion. While this is a high cost, it compares favourably with the recently abandoned East-West road link eastern section ($11 billion) and Melbourne Metro rail ($11 billion). It should be noted that the proposal also includes redirecting the South Morang line to the city via a tunnel through the inner northern suburbs. A report on the feasibility of building the Doncaster rail, Doncaster Rail: What are its prospects? by Professor Peter Newman, September 2012, provides a costing of about $850 million for the section from Doncaster to Victoria Park, and a further $300 million for an extension from Victoria Park to the Melbourne Metro at Parkville via a tunnel. While these costings are on the low side, they suggest that $3 billion is not an unreasonable estimate for the proposal. It should be noted that the route of the tunnel to Parkville in the Draft Report proposal, based on Public Transport Victoria s Network Development Plan Metropolitan Rail,

2 December 2012 differs slightly from the one in the Newman assessment, but this should not lead to a significant cost difference. The assertion that a journey from Doncaster to the city via train would be worse for many people than the existing DART bus services because of the need to transfer between modes is presented without any evidence. The use of the phrase for many people is at best meaningless. It replaces what one would normally expect, a number or proportion of existing bus commuters who would be inconvenienced by having to change from a feeder bus to the train at Doncaster station. But it is also misleading in that it implies that a significantly large number of commuters would be inconvenienced by the change of mode. There is also the issue of what is so inconvenient about a change of mode. Public transport users are used to it and accept it as part of the public transport network. One of the problems facing commuters in the outer suburbs of Melbourne using stations such as Williams Landing and Craigieburn is that there is insufficient station car parking and inadequate and overcrowded feeder bus services to and from the station. Commuters in these areas (as evidenced by reports in local papers) want more of both and are quite happy to make a mode change from either private car or bus to the train, rather than drive their cars to their workplaces. The construction of the Doncaster railway would not necessarily lead to the removal of all, or any, DART services. Any future realignment of bus services would be expected to occur following a review when the railway commenced operations. However, the introduction of feeder buses to Doncaster and other stations on the line would be expected to happen, especially at Doncaster station where car parking would be limited. The draft report states that this proposal was supported during the consultative phase, and has general community support. No evidence is shown that supporters of the project would not be concerned with a bus - train mode connection at Doncaster station. The need for changes of this nature is a common feature of a public transport network. The draft report provides a benefit cost ratio for the project (including wider economic benefits) is 0.1 to 0.2. This figure seems inordinately low, especially when compared with that given to the Eastern Freeway to CityLink connection (previously known as the East West Link, Eastern Section), ranging from , or with wider economic benefits. However the additional note in the draft report on this assessment is instructive: It should be noted that these results cannot be directly compared to other economic analyses of this option, due to a wide range of differences in the analysis.. The same can also be applied to the benefit cost analysis for the Doncaster railway. Furthermore, the submission to the draft report from Russell Crawford suggests that there is a flaw in the way that benefit cost ratios of public transport projects have been assessed by the 2

3 draft report. His methodology applied to the benefit cost ration of the Doncaster would provide a figure much greater than Additional comments on the Draft Report s Analysis This project has been assessed without reference to Melbourne s public transport network as a whole, except where comparisons have been made with current and possible future bus services between Doncaster and the city. The draft report states that the replacement of the existing DART buses (which spread out across the Doncaster region, providing four routes with direct access to central Melbourne) with feeder buses to a new rail line would require passengers who currently have access to the city without interchange to start changing services. However there is a certain inefficiency in the use of bus resources here. A rail line would allow the same number of buses operating currently between Doncaster and the city centre to operate at high frequencies on feeder routes from the greater Doncaster area to the station, and allow for the development of new routes beyond what might be considered the current catchment area. That this would be less desirable for many users is not a reason not to add public transport infrastructure, and has to be weighed against the advantages of doing so. The Newman study notes that at Murdoch station,59% of passenger boardings are from bus to train transfers. Apparently passengers in Perth are not dissuaded from public transport by having to make bus - train transfers. The draft report states that the Doncaster rail would be dependent on additional capacity between Clifton Hill and the city. However Public Transport Victoria (PTV) has already factored this into its planning and considers that a tunnel between Clifton Hill and the city may be necessary even without the Doncaster railway, because the line between Clifton Hill and the city via Jolimont will be unable to cope with the future demand on the South Morang and Hurstbridge lines. Having a second route from Clifton Hill to the city would provide sufficient capacity for the Doncaster trains to utilise the existing Jolimont route along with Hurstbridge trains, with South Morang trains travelling via the tunnel. This is the preferred PTV plan as outlined in its Network Development Plan. The draft report, quoting from the Doncaster Rail Study: Phase One Recommendations Report (February 2014), states that delivery of Doncaster heavy rail would primarily attract current public transport users (50 per cent DART users and the 48 per cent who currently travel on other rail services), with an anticipated two per cent of passengers who currently travel by private vehicle, which would equal 1,120 passengers per day in 2031, which if true would mean there would be very little impact on traffic congestion on the Eastern Freeway. The figures refer only to a railway constructed from the Doncaster Park and Ride to the city along the Eastern Freeway to Victoria Park. For a rail operating from Doncaster Hill (or beyond) this figure may well be greater. 3

4 The rail study indicates that travel time from the Doncaster Park and Ride would be 25 minutes, 10 minutes faster than the current equivalent DART bus service. A train service operating from Doncaster Hill (or beyond) would increase the time difference between the two modes. In any case a saving of 10 minutes per journey (a 30% time saving) is significant, and, coupled with traffic congestion, stress, cost of running and parking a private car may well produce a greater number of drivers switch their transfer mode to a future Doncaster rail. The Newman study provides a different view of patronage estimates based on that of the Southern Railway in Perth, a line passing through suburbs not dissimilar to those along the Doncaster corridor. The report points out that with a higher speed, the catchment area for the Southern Railway is greater than that for Melbourne trains, and the travel times (even where passengers make bus - train transfers) are much less than those for car. This suggests that if the Doncaster train could operate at a speed closer to that of Southern Railway, the potential patronage would be greater than the rail study estimate. The Newman study states that Southern Rail, after four years in operation, carries 20 million passengers per year, roughly 60,000 per typical week day, similar to the estimate of 56,000 stated in the rail study report, which provides a very low estimate of drivers forsaking their car for public transport. Also there was 25% growth in passenger boardings at that station between March 2010 and March 2010, which suggests that drivers are moving from their cars to public transport. 4. In support of Doncaster Heavy Rail One of the problems with Melbourne's public transport network is that there is a backlog of projects that should have been built 40 or more years ago. In addition, there are now, with the recent rapid expansion of suburban Melbourne, projects which should have been started 10 years ago. For example, the Doncaster and Rowville lines should have been built 50 years ago as the surrounding suburbs were becoming populated. Also the rail link to Melbourne Airport should have been completed in 1970, in time for the airport s opening. PTV recognised the backlog and has incorporated these projects into its network development, stating that."over the next 20 years, 200 kilometres of new track will be added to the existing 837 kilometres of metropolitan network. Nearly 130 kilometres of new track will be built to extend the network to bring service to some 300,000 people in areas like Doncaster and Rowville that do not currently have a rail service. (Network Development Plan p. 5). In rejecting the need for projects like the Doncaster and Rowville rail lines, does Infrastructure Victoria have insight into Melbourne needs that PTV lacks? Implicit in the PTV plan is the recognition of the importance of equity and access as an issue in provision of public transport. The Doncaster railway will provide a fast train service to residents in a fairly large catchment area (the Manningham Council municipality is the only one in Melbourne which does not have any heavy rail within its borders) to the city centre and other 4

5 destinations served by railway, trams and buses. Trains also provide access for many people with physical disabilities who have difficulty, or cannot, use trams and buses. The question of whether the Doncaster railway could attract people, city commuters in particular, to abandon their cars and take the train is open to debate, but a train journey of 35 minutes against a car commute of up to an hour along the Eastern Freeway may well encourage a sufficient number of people to do so, and in numbers sufficient to reduce the current peak hour congestion on the freeway, Hoddle Street and other arterial roads. At least the railway provides an option for car commuters, and provides a quality of journey that buses cannot. And a reduction of congestion on the Eastern Freeway, where the peak hour congestion comes mainly from the number of cars accessing the city centre rather than those crossing to the western suburbs, would reduce the pressure to build the East West Link in the future. It should be noted that the cost of building a heavy rail from Doncaster Hill to the city would be a lot less than the estimate of $9 billion for the East West Link, and not create the many problems resulting from the latter s construction. These include loss of parkland and vegetation, loss of housing, and induction of additional motor vehicle traffic with the resultant air pollution and greenhouses gases. Apart from the public support for the Doncaster rail project, recognized by Infrastructure Victoria, it is also supported by the Councils of Manningham and Yarra, the Metropolitan Transport Forum (which also supports the line to Rowville), and public interest groups such as the Public Transport Users Association. The arguments in this submission can also be applied to the Rowville Heavy Rail project. The rise in public transport patronage in Melbourne from 2006 has a number of causes resulted from population increase, road congestion, relative cost of road versus rail transport, young people rejecting car ownership in favour of public transport, and the desire of people to minimise their personal impact on greenhouse gas emissions. In cities across the world there is a movement to public transport. Many governments and transport authorities have responded by building new public transport networks and rehabilitating existing ones as a matter of priority. It is a pity that the draft report has not shown the same urgency for the construction of Doncaster and other rail projects, some of which were needed decades ago, others which are needed now or will be in the very near future. Denis Watson. 5

6 References Draft 30-Year Infrastructure Strategy, Draft Options Book, Version 2, Infrastructure Victoria October Doncaster Rail: What are its prospects?, Professor Peter Newman, September Network Development Plan Metropolitan Rail, Public Transport Victoria, December Doncaster Rail Study: Phase One Recommendations Report, February Submission to the Draft 30-Year Infrastructure Strategy, Russell Crawford, October 2016 Transport for Suburbia: Beyond the automobile age, Paul Mees, Earthscan,

5 Rail demand in Western Sydney

5 Rail demand in Western Sydney 5 Rail demand in Western Sydney About this chapter To better understand where new or enhanced rail services are needed, this chapter presents an overview of the existing and future demand on the rail network

More information

OBJECTION TO AMENDMENT TO PLANNING SCHEME AND GRANTING OF PLANNING PERMIT

OBJECTION TO AMENDMENT TO PLANNING SCHEME AND GRANTING OF PLANNING PERMIT PLANNING AND ENVIRONMENT ACT 1987 OBJECTION TO AMENDMENT TO PLANNING SCHEME AND GRANTING OF PLANNING PERMIT AMENDMENT C32 APPLICATION 0873/02 Public Transport Users Association Inc. 247-249 Flinders Lane

More information

Forest Hill Society response to the draft London and South East Route Utilisation Strategy (February 2011)

Forest Hill Society response to the draft London and South East Route Utilisation Strategy (February 2011) Forest Hill Society response to the draft London and South East Route Utilisation Strategy (February 2011) 1. The Forest Hill Society represents residents in and around the Forest Hill and Honor Oak Park

More information

Manningham Bus Improvements. Graeme Brown Regional Manager Metro East Bus and Regional Services

Manningham Bus Improvements. Graeme Brown Regional Manager Metro East Bus and Regional Services Manningham Bus Improvements Graeme Brown Regional Manager Metro East Bus and Regional Services Meeting Our Transport Challenges The Government announced its Meeting Our Transport Challenges (MOTC) blueprint

More information

Infrastructure Victoria All Things Considered Options Paper. Manningham City Council Submission

Infrastructure Victoria All Things Considered Options Paper. Manningham City Council Submission Manningham City Council Submission Infrastructure Victoria All Things Considered Options Paper Manningham City Council Submission Transport and Planning Manningham residents deserve a public transport

More information

Transport Strategy refresh

Transport Strategy refresh Transport Strategy refresh Background paper Public Transport Network March 2018 Dr John Stone (University of Melbourne) Dr Ian Woodcock (RMIT) 1 This report has been prepared by Dr John Stone (University

More information

Public Transport for Perth in 2031

Public Transport for Perth in 2031 South West Group Submission Public Transport for Perth in 2031 October 2011 South West Group Vision and Mission Local Governments in South Metropolitan Perth, through cooperation with industry, community

More information

3 The growth of Western Sydney

3 The growth of Western Sydney 3 The growth of Western Sydney About this chapter This chapter provides an overview of Western Sydney s growing population and economy, and the benefit of the proposed Western Sydney Airport. Population

More information

AUSTRALIAN TRAVEL TIME METRIC 2017 EDITION

AUSTRALIAN TRAVEL TIME METRIC 2017 EDITION AUSTRALIAN TRAVEL TIME METRIC 217 EDITION For more information please contact: Brendan Lyon Chief Executive Officer Infrastructure Partnerships Australia Suite 3.3, Level 3, 9 Pitt Street Sydney NSW 2

More information

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Executive Director / Senior Planning Policy Officer

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Executive Director / Senior Planning Policy Officer SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL REPORT TO: Leader and Cabinet 8 May 2008 AUTHOR/S: Executive Director / Senior Planning Policy Officer SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL S RESPONSE TO UTTLESFORD

More information

New free City connector bus service

New free City connector bus service The Adelaide City Council invites engagement from the community about New free City connector bus service 99C City Loop and Adelaide Connector free bus services to merge: Project Summary Adelaide City

More information

ALL ABOARD LABOR S LONG TERM PASSENGER TRANSPORT STRATEGY

ALL ABOARD LABOR S LONG TERM PASSENGER TRANSPORT STRATEGY ALL ABOARD LABOR S LONG TERM PASSENGER TRANSPORT STRATEGY Revitalising Passenger Transport Increasing traffic congestion in our cities and a lack of transport services in our regional towns is frustrating

More information

4 Transport projects underway in Western Sydney

4 Transport projects underway in Western Sydney 4 Transport projects underway in Western Sydney About this chapter This chapter provides an overview of the Australian and NSW government s significant investments in road, bus and rail infrastructure

More information

RIVERLINESTAGEONE ATASMANIANGRENS POLICYINITIATIVE. LaunchedbyNickMcKimMP March2014. AuthorisedbyNickMcKimMP,ParliamentHouse,Hobart

RIVERLINESTAGEONE ATASMANIANGRENS POLICYINITIATIVE. LaunchedbyNickMcKimMP March2014. AuthorisedbyNickMcKimMP,ParliamentHouse,Hobart RIVERLINESTAGEONE ATASMANIANGRENS POLICYINITIATIVE LaunchedbyNickMcKimMP March2014 AuthorisedbyNickMcKimMP,ParliamentHouse,Hobart ` > YOUR TEAM IN STATE PARLIAMENT > WANT MORE INFO? State Parliamentary

More information

Strategic Transport Forum 21 st September 2018

Strategic Transport Forum 21 st September 2018 Strategic Transport Forum 21 st September 2018 Agenda Item 4: Heathrow Airport Expansion: Surface Access Strategy Update Recommendation: It is recommended that the Forum consider the update provided by

More information

What is Rail Futures?

What is Rail Futures? What is Rail Futures? Rail Futures Institute is an independent nonpartisan group. It was formed to advocate cost-effective rail and intermodal solutions for public transport and freight problems based

More information

Sunshine Coast Council Locked Bag 72 Sunshine Coast Mail Centre QLD Submitted via online portal. 2 June 2017.

Sunshine Coast Council Locked Bag 72 Sunshine Coast Mail Centre QLD Submitted via online portal. 2 June 2017. Sunshine Coast Council Locked Bag 72 Sunshine Coast Mail Centre QLD 4560 Submitted via online portal 2 June 2017 Dear Sir /Madam, RE: DRAFT ENVIRONMENTAL AND LIVEABILITY STRATEGY The Green Building Council

More information

Moving Brisbane is the Newman Liberal team s blueprint for a modern and efficient transport system.

Moving Brisbane is the Newman Liberal team s blueprint for a modern and efficient transport system. Moving Brisbane Moving Brisbane is the Newman Liberal team s blueprint for a modern and efficient transport system. From roads and river crossings, to buses and bikes, Moving Brisbane addresses every component

More information

Comments on the High Speed Rail Phase-2 Report

Comments on the High Speed Rail Phase-2 Report 22 nd May 2013 Director, High Speed Rail Study Department of Infrastructure and Transport GPO Box 594 Canberra ACT 2601 Dear Director, In response to the invitation to provide comment to the High Speed

More information

FEDERAL BUDGET PRIORITIES FOR THE SOUTH WEST METROPOLITAN REGION 2018 TO 2022

FEDERAL BUDGET PRIORITIES FOR THE SOUTH WEST METROPOLITAN REGION 2018 TO 2022 A Co-operative venture of the municipalities of: Cockburn, East Fremantle, Fremantle, Kwinana, Melville & Rockingham Tuesday, 5 December 2017 Enquiries: Mick McCarthy 9364 0631 Our Ref: Federal Budget

More information

MELBOURNE METRO RAIL PROJECT EXPANDING MELBOURNE S UNDERGROUND RAIL NETWORK UPDATE FOR RESIDENTS OF THE DOMAIN PRECINCT APRIL 2016

MELBOURNE METRO RAIL PROJECT EXPANDING MELBOURNE S UNDERGROUND RAIL NETWORK UPDATE FOR RESIDENTS OF THE DOMAIN PRECINCT APRIL 2016 MELBOURNE METRO RAIL PROJECT EXPANDING MELBOURNE S UNDERGROUND RAIL NETWORK UPDATE FOR RESIDENTS OF THE DOMAIN PRECINCT APRIL 2016 MEETING THE CHALLENGE OF POPULATION GROWTH 24 14.4 12.6 MELBOURNE METRO

More information

Committee for Melbourne Briefing Note Victorian State Budget Overview of Key Announcements

Committee for Melbourne Briefing Note Victorian State Budget Overview of Key Announcements Committee for Melbourne Briefing Note 2013-14 Victorian State Budget Overview of Key Announcements Strong and secure finances In 2013-14, the Coalition Government will deliver an estimated operating surplus

More information

284,557 inhabitants + 23% 60,000 vehicles during peak periods Growing need in terms of moving people public transit Saturation of the road network

284,557 inhabitants + 23% 60,000 vehicles during peak periods Growing need in terms of moving people public transit Saturation of the road network Gatineau at a glance 284,557 inhabitants (4 th largest city in Quebec) Growing population: + 23% since the 2002 merger (53,200 more people) Part of the Gatineau-Ottawa metropolitan area (1.2 million inhabitants

More information

The Coalition s Policy to Build Melbourne s East West Link

The Coalition s Policy to Build Melbourne s East West Link 1 Our Plan Real Solutions for all Australians The direction, values and policy priorities of the next Coalition Government. The Coalition s Policy to Build Melbourne s East West Link August 2013 Our Plan

More information

PLANNING THE SUNBURY GROWTH CORRIDOR

PLANNING THE SUNBURY GROWTH CORRIDOR SUNBURY GROWTH CORRIDOR NOVEMBER 2016 PLANNING THE SUNBURY GROWTH CORRIDOR Sunbury Planning Background The Victorian Planning Authority, in consultation with Hume City Council, is undertaking a number

More information

PERTH-ADELAIDE CORRIDOR STRATEGY

PERTH-ADELAIDE CORRIDOR STRATEGY INTRODUCTION The Royal Automobile Association of SA Inc (RAA), the State s principal advocate for motorists on a broad range of motoring-related issues, represents the views of more than 560,000 South

More information

Reimagining Central Station Precinct

Reimagining Central Station Precinct Reimagining Central Station Precinct Submission by BusNSW 1. Introduction BusNSW members provide bus and coach transport services throughout NSW under various contractual and regulatory environments. This

More information

Gold Coast. Rapid Transit. Chapter content. Chapter four Route selection and staging

Gold Coast. Rapid Transit. Chapter content. Chapter four Route selection and staging Chapter four Route selection and staging Gold Coast Rapid Transit Chapter four Route selection and staging Chapter content Route selection...73 Section one: Helensvale to Griffith University...74 Section

More information

Why does Sydney need a new fast Metro to the West? A fast Metro to the west is a vital component of this Plan

Why does Sydney need a new fast Metro to the West? A fast Metro to the west is a vital component of this Plan Why does Sydney need a new fast Metro to the West? (as shown in 10,000 Friends of Greater Sydney Stage 1 Rail Plan) The Stage 1 Rail Plan was developed to support an integrated transport plan that would

More information

Kilometres. Blacktown. Penrith. Parramatta. Liverpool Bankstown. Campbelltown

Kilometres. Blacktown. Penrith. Parramatta. Liverpool Bankstown. Campbelltown 0 5 10 15 20 Kilometres Penrith Blacktown Parramatta Liverpool Bankstown Campbelltown accessibility outcomes Legend Outcomes targeted in Western Sydney are: public transport that is accessible throughout

More information

Hugo Klingenberg Senior Manager Network Development ElectraNet Adelaide, South Australia Lodged via

Hugo Klingenberg Senior Manager Network Development ElectraNet Adelaide, South Australia Lodged via Hugo Klingenberg Senior Manager Network Development ElectraNet Adelaide, South Australia 5000 Lodged via email consultation@electranet.com.au. Friday, 21 July 2017 Dear Mr Klingenberg, RE: Eyre Peninsula

More information

Response to the London Heathrow Airport Expansion Public Consultation

Response to the London Heathrow Airport Expansion Public Consultation Response to the London Heathrow Airport Expansion Public Consultation Summary This report sets out the response to the Heathrow Airport s consultation on airport expansion and airspace change. The consultation

More information

The State of Transport in Macquarie Park

The State of Transport in Macquarie Park The State of Transport in Macquarie Park 31st August 2015 Overview Macquarie Park is a major economic centre that contributes over $9billion to Australia s economy each year. Providing access to and from

More information

London Borough of Barnet Traffic & Development Design Team

London Borough of Barnet Traffic & Development Design Team London Borough of Barnet Traffic & Development Design Team AERODROME ROAD PEDESTRIAN FACILITY AND BUS STOP INTRODUCTION FEASIBILITY REPORT Job Number: 60668 Doc Ref: S106/12-13/60668 Author: Manoj Kalair

More information

WRITTEN EVIDENCE FROM SCOTTISH ASSOCIATION FOR PASSENGER TRANSPORT

WRITTEN EVIDENCE FROM SCOTTISH ASSOCIATION FOR PASSENGER TRANSPORT WRITTEN EVIDENCE FROM SCOTTISH ASSOCIATION FOR PASSENGER TRANSPORT Forth Crossing Public Transport Corridor: Introductory Notes The Scottish Association for Public Transport (SAPT) is concerned that the

More information

[REGIONAL LAND TRANSPORT PROGRAM AND REGIONAL FUEL TAX SUBMISSION ]

[REGIONAL LAND TRANSPORT PROGRAM AND REGIONAL FUEL TAX SUBMISSION ] 2018 Ben Ross Talking Southern Auckland Picture 1: Manukau Bus Station with MIT and rail station in the background [REGIONAL LAND TRANSPORT PROGRAM AND REGIONAL FUEL TAX SUBMISSION ] Submission to the

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: March 26, 2014 SUBJECT: KENNEDY INTERCHANGE STATION: METROLINX EGLINTON CROSSTOWN LIGHT RAIL TRANSIT PROJECT - PRELIMINARY CONCEPT

More information

Transport in Melbourne s Westen Suburbs: Alternatives to the Westgate Tunnel

Transport in Melbourne s Westen Suburbs: Alternatives to the Westgate Tunnel Transport in Melbourne s Westen Suburbs: Alternatives to the Westgate Tunnel The people of Melbourne s west have a huge problem with noise and poisonous exhaust from hundreds of trucks on their residential

More information

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content Gold Coast Rapid Transit Chapter twelve Social impact Chapter content Social impact assessment process...235 Existing community profile...237 Consultation...238 Social impacts and mitigation strategies...239

More information

Views of London Forum of Amenity and Civic Societies to the House of Commons Environmental Audit Committee on the Airports Commission report

Views of London Forum of Amenity and Civic Societies to the House of Commons Environmental Audit Committee on the Airports Commission report Views of London Forum of Amenity and Civic Societies to the House of Commons Environmental Audit Committee on the Airports Commission report Summary i) We strongly recommend that the Government reject

More information

Board meeting

Board meeting Board meeting 28.11.17 Secretariat memorandum Author: Vincent Stops Agenda item: 8 Ref: LTW568 Drafted: 13.11.17 Oxford Street bus changes associated with pedestrianisation 1 Purpose of report 1.1. To

More information

Appendix 4.1 J. May 17, 2010 Memorandum from CTPS to the Inter Agency Coordinating Group

Appendix 4.1 J. May 17, 2010 Memorandum from CTPS to the Inter Agency Coordinating Group Appendix 4.1 J May 17, 2010 Memorandum from CTPS to the Inter Agency Coordinating Group CTPS CENTRAL TRANSPORTATION PLANNING STAFF Staff to the Boston Region Metropolitan Planning Organization MEMORANDUM

More information

The Coalition s Policy to Build the Swan Valley Bypass and Perth Gateway

The Coalition s Policy to Build the Swan Valley Bypass and Perth Gateway 1 Our Plan Real Solutions for all Australians The direction, values and policy priorities of the next Coalition Government. The Coalition s Policy to Build the Swan Valley Bypass and Perth Gateway August

More information

Wellington $312 $49 $456 OVERVIEW WELLINGTON REGIONAL SUMMARY

Wellington $312 $49 $456 OVERVIEW WELLINGTON REGIONAL SUMMARY National Land Transport Programme 2015 18 Wellington WELLINGTON REGIONAL SUMMARY OVERVIEW The Wellington region is made up of a number of cities, urban areas and supporting rural hinterland. The city is

More information

WELLINGTON $422 MILLION $614 MILLION $83 MILLION 22% SPEND $1.9 BILLION

WELLINGTON $422 MILLION $614 MILLION $83 MILLION 22% SPEND $1.9 BILLION WELLINGTON WELLINGTON $1.9 BILLION FORECAST TOTAL WELLINGTON INVESTMENT The Wellington region s transport challenges are dominated by the region s concentration of population in the metropolitan cities,

More information

EAST WEST RAIL EASTERN SECTION. prospectus for growth

EAST WEST RAIL EASTERN SECTION. prospectus for growth EAST WEST RAIL EASTERN SECTION prospectus for growth September 2018 executive summary The East West Rail Consortium, a partnership of local authorities, rail operators and Network Rail, continues to promote

More information

We further recognise that some pain and changes are required from the entire City in order to construct and deliver the project.

We further recognise that some pain and changes are required from the entire City in order to construct and deliver the project. 70 Merivale Street PO Box 2001 South Bank QLD 4101 Ph: 07 3846 5191 Email: janinew@businesssouthbank.com.au www.businesssouthbank.com.au ABN 28 285 012 048 21 May 2018 The Right Honourable Lord Mayor Councillor

More information

Congestion. Addressing urban congestion in SEQ. How do you define congestion? South East Queensland is growing. Sustained growth in motorised travel

Congestion. Addressing urban congestion in SEQ. How do you define congestion? South East Queensland is growing. Sustained growth in motorised travel How do you define congestion? Addressing urban congestion in SEQ Engineer: traffic volume exceeds road capacity Russell Murray Director Urban Congestion Task Force Department of Transport and Main Roads

More information

Bus and Community Transport Services in Wales

Bus and Community Transport Services in Wales Bus and Community Transport Services in Wales Call for evidence The Enterprise and Business Committee of the National Assembly for Wales is carrying out an inquiry into Bus and Community Transport Services

More information

2018 Service Implementation Plan Executive Summary

2018 Service Implementation Plan Executive Summary 2018 Service Implementation Plan Executive Summary March 2018 2018 SERVICE IMPLEMENTATION PLAN Executive Summary 2018 Service Implementation Plan Each year, Sound Transit prepares a Service Implementation

More information

FALLS FLAT: COMPARING THE TTC`S FARE POLICY TO OTHER LEADING TRANSIT AGENCIES

FALLS FLAT: COMPARING THE TTC`S FARE POLICY TO OTHER LEADING TRANSIT AGENCIES FALLS FLAT: COMPARING THE TTC`S FARE POLICY TO OTHER LEADING TRANSIT AGENCIES Brady Yauch Executive Director and Economist of Consumer Policy Institute (416) 964-9223 ext 236 bradyyauch@consumerpolicyinstitute.org

More information

Memorandum of Understanding with ACT Government

Memorandum of Understanding with ACT Government MEDIA RELEASE 8 April 2015 Memorandum of Understanding with ACT Government The ACT Government and Canberra Airport today entered into a new Memorandum of Understanding (MoU) on key areas of common interest

More information

Draft Western District Plan

Draft Western District Plan Powered by TCPDF (www.tcpdf.org) Draft Western District Plan Submission_id: 31732 Date of Lodgment: 15 Dec 2017 Origin of Submission: Online Organisation name: APP Corporation Pty Ltd Organisation type:

More information

BRT in Developed Countries The Brisbane Experience

BRT in Developed Countries The Brisbane Experience Symposium on Public Transportation in Indian Cities with Special focus on Bus Rapid Transit (BRT) System New Delhi 20-21 Jan 2010 BRT in Developed Countries The Brisbane Experience Brian Bothwell Network

More information

East Lancashire Highways and Transport Masterplan East Lancashire Rail Connectivity Study Conditional Output Statement (Appendix 'A' refers)

East Lancashire Highways and Transport Masterplan East Lancashire Rail Connectivity Study Conditional Output Statement (Appendix 'A' refers) Report to the Cabinet Member for Highways and Transport Report submitted by: Director of Corporate Commissioning Date: 1 June 2015 Part I Electoral Divisions affected: All East Lancashire Highways and

More information

RailFAIR! RailFAIR! - Castle to Castle. Castle to Castle. Nottingham to Lincoln - Proposed Train Service Improvements

RailFAIR! RailFAIR! - Castle to Castle. Castle to Castle. Nottingham to Lincoln - Proposed Train Service Improvements - - Proposed Train Service Improvements TO GRIMSBY Show Your Support: www.railfair.co.uk TO SLEAFORD LINCOLN Hykeham Swinderby Collingham TO DONCASTER & THE NORTH NEWARK NORTHGATE NEWARK CASTLE TO PETERBROUGH

More information

Draft City Centre Transport Proposals

Draft City Centre Transport Proposals Draft City Centre Transport Proposals Introduction This draft position paper provides an overview of the current City Centre transport issues, including concepts of the possible future City Centre transport

More information

PLANNING AND INVESTMENT...

PLANNING AND INVESTMENT... CONTENTS 1. INTRODUCTION...2 1.1 Plan Melbourne Refresh...2 1.2 Future Challenges and Opportunities...2 2. FAST FACTS...3 3. HIGHLIGHTS...4 3.1 Construction Management Plan Guidelines and Template...5

More information

easyjet response to CAA consultation on Gatwick airport market power

easyjet response to CAA consultation on Gatwick airport market power easyjet response to CAA consultation on Gatwick airport market power Introduction easyjet welcomes the work that the CAA has put in to analysing Gatwick s market power. The CAA has made significant progress

More information

SYDNEY S GROWTH ENGINES: DRIVING SYDNEY S ROAD NETWORK NEEDS

SYDNEY S GROWTH ENGINES: DRIVING SYDNEY S ROAD NETWORK NEEDS SYDNEY S GROWTH ENGINES: DRIVING SYDNEY S ROAD NETWORK NEEDS John Brewer, General Manager Strategic Network Planning, RTA of NSW Natalie Camilleri, Manager Network and Corridor Planning, RTA of NSW ABSTRACT:

More information

JOINT CORE STRATEGY FOR BROADLAND, NORWICH AND SOUTH NORFOLK EXAMINATION MATTER 3C EASTON/COSTESSEY

JOINT CORE STRATEGY FOR BROADLAND, NORWICH AND SOUTH NORFOLK EXAMINATION MATTER 3C EASTON/COSTESSEY Matter 3C Easton/Costessey Representor No. 8826 JOINT CORE STRATEGY FOR BROADLAND, NORWICH AND SOUTH NORFOLK EXAMINATION MATTER 3C EASTON/COSTESSEY SUBMISSION ON BEHALF OF TAYLOR WIMPEY DEVELOPMENTS AND

More information

Threats to possible orbital light-rail in outer London from the current Brent Cross planning application...

Threats to possible orbital light-rail in outer London from the current Brent Cross planning application... Threats to possible orbital light-rail in outer London from the current Brent Cross planning application... (We need safeguarding in place, for better times!) Map from Transport 2025 document. Boris photo:

More information

Part four. In this part you will find: The next steps to deliver the master plan

Part four. In this part you will find: The next steps to deliver the master plan Part four NEXT STEPS In this part you will find: The next steps to deliver the master plan 6. How COULD the Master Plan be delivered? There are a number of steps required to take the proposals in the master

More information

GAMA 2020 PUBLIC TRANSPORT VISION

GAMA 2020 PUBLIC TRANSPORT VISION GAMA 2020 PUBLIC TRANSPORT VISION BACKGROUND INFORMATION THE MOBILITY CHALLENGE MANIFESTED BY CONGESTION INADEQUATE INFRASTRUCTURE INDISCIPLINE PRESCRIBED SOLUTION Road Space Usage Bus & Trotro Carry 70%

More information

CONGESTION MONITORING THE NEW ZEALAND EXPERIENCE. By Mike Curran, Manager Strategic Policy, Transit New Zealand

CONGESTION MONITORING THE NEW ZEALAND EXPERIENCE. By Mike Curran, Manager Strategic Policy, Transit New Zealand CONGESTION MONITORING THE NEW ZEALAND EXPERIENCE 26 th Australasian Transport Research Forum Wellington New Zealand 1-3 October 2003 By, Manager Strategic Policy, Transit New Zealand Abstract New Zealand

More information

7.0 Bus and light rail in Sydney

7.0 Bus and light rail in Sydney 7.0 Bus and light rail in Sydney Summary Buses and light rail provide accessible public transport on transit corridors where traffic flows do not support a heavy rail line. The principal issue facing bus

More information

A TRANSPORT SYSTEM CONNECTING PEOPLE TO PLACES

A TRANSPORT SYSTEM CONNECTING PEOPLE TO PLACES THE MAYOR'S VISION FOR TRANSPORT A TRANSPORT SYSTEM CONNECTING PEOPLE TO PLACES VISION We will build a transport system that works for everyone, connecting people to the places they want to go within the

More information

TfL Planning. 1. Question 1

TfL Planning. 1. Question 1 TfL Planning TfL response to questions from Zac Goldsmith MP, Chair of the All Party Parliamentary Group on Heathrow and the Wider Economy Heathrow airport expansion proposal - surface access February

More information

LIFE IN METROPOLITAN AREAS IN THE 21 ST CENTURY

LIFE IN METROPOLITAN AREAS IN THE 21 ST CENTURY Les Ateliers Internationaux de Maîtrise d Oeuvre Urbaine de Cergy-Pontoise 36 th International workshop of Urban Planning and Design LIFE IN METROPOLITAN AREAS IN THE 21 ST CENTURY QUESTIONS ABOUT THE

More information

Measure 67: Intermodality for people First page:

Measure 67: Intermodality for people First page: Measure 67: Intermodality for people First page: Policy package: 5: Intermodal package Measure 69: Intermodality for people: the principle of subsidiarity notwithstanding, priority should be given in the

More information

Draft Greater Sydney Region Plan

Draft Greater Sydney Region Plan Draft Greater Sydney Region Plan Submission_id: 31221 Date of Lodgment: 13 Dec 2017 Origin of Submission: Online Organisation name: Infrastructure Group Organisation type: Other First name: Jacob Ibrahim

More information

were these made available?

were these made available? (1) What publicity was undertaken across LB Brent by TfL and by Brent? No information is held by Brent Council as to what publicity TfL undertook in the London Borough of Brent. No publicity was undertaken

More information

MODAIR. Measure and development of intermodality at AIRport

MODAIR. Measure and development of intermodality at AIRport MODAIR Measure and development of intermodality at AIRport M3SYSTEM ANA ENAC GISMEDIA Eurocontrol CARE INO II programme Airports are, by nature, interchange nodes, with connections at least to the road

More information

HUME CORRIDOR INTEGRATED GROWTH AREA PLAN (HIGAP) INFRASTRUCTURE AND DELIVERY STRATEGY

HUME CORRIDOR INTEGRATED GROWTH AREA PLAN (HIGAP) INFRASTRUCTURE AND DELIVERY STRATEGY HUME CITY COUNCIL HUME CORRIDOR INTEGRATED GROWTH AREA PLAN (HIGAP) INFRASTRUCTURE AND DELIVERY STRATEGY DECEMBER 2015 www.hume.vic.gov.au PREAMBLE This Infrastructure and Delivery Strategy aims to provide

More information

Shaping the Future of the Railway

Shaping the Future of the Railway Shaping the Future of the Railway Thursday 14 September Paul O Halloran, Director Engineering Metro Trains Melbourne 50 Level Crossing Removals $5-6 billion 50 level crossings to be removed over 2 full

More information

Roundhouse Way Transport Interchange (Part of NATS City Centre Package)

Roundhouse Way Transport Interchange (Part of NATS City Centre Package) Roundhouse Way Transport Interchange (Part of NATS City Centre Package) 15/16 16/17 17/18 18/19 19/20 Total TOTAL COST Roundhouse Way Transport Interchange 0.5m 0.5m FUNDING CIL 0.05m 0.05m Growth Deal

More information

MELBOURNE METRO RAIL PROJECT SOUTH YARRA STATION OPTIONS ASSESSMENT

MELBOURNE METRO RAIL PROJECT SOUTH YARRA STATION OPTIONS ASSESSMENT MELBOURNE METRO RAIL PROJECT SOUTH YARRA STATION OPTIONS ASSESSMENT June 2015 Page 410 of 443 Table of Contents 1. Executive summary... 3 2. Introduction... 4 2.1. The Melbourne Metro Rail Project... 4

More information

Passenger Voice. Rail, bus, coach and tram. High Speed 2 freeing up capacity

Passenger Voice. Rail, bus, coach and tram. High Speed 2 freeing up capacity High Speed 2 freeing up capacity The opening of the HS2 line from London to the West Midlands will free up capacity on the existing West Coast Main Line (WCML). Some existing passengers between London

More information

PEOPLE FOCUSED PUBLIC TRANSPORT

PEOPLE FOCUSED PUBLIC TRANSPORT PEOPLE FOCUSED PUBLIC TRANSPORT A STRONG PLAN FOR REAL CHANGE 1 We re ready. Over the last four years, we ve been working hard developing our vision for the future of South Australia. Not just policies,

More information

South Australia Transport Infrastructure Summit Adelaide May 2009

South Australia Transport Infrastructure Summit Adelaide May 2009 TOWARDS 2020: RAA s vision for metropolitan adelaide Sharon Hanlon General Manager Public Affairs Royal Automobile Association (RAA) of South Australia Inc INTRODUCTION The Royal Automobile Association

More information

Greenwich Community Association Inc Submission to the NSW Department of Planning and Environment

Greenwich Community Association Inc Submission to the NSW Department of Planning and Environment Greenwich Community Association Inc Submission to the NSW Department of Planning and Environment Concept State Significant Development Application SSD 18_9579 Sydney Metro Crows Nest Over Station Development

More information

NSW PRE-BUDGET STATEMENT FUTURE ECONOMY FUTURE JOBS

NSW PRE-BUDGET STATEMENT FUTURE ECONOMY FUTURE JOBS 2017-18 NSW PRE-BUDGET STATEMENT FUTURE ECONOMY FUTURE JOBS Executive Summary The 2017-18 NSW State Budget presents an opportunity for the NSW Government to future-proof the tourism and transport sectors.

More information

Let's get moving with the affordable medium-speed alternatives to the old dream of high-speed rail

Let's get moving with the affordable medium-speed alternatives to the old dream of high-speed rail University of Wollongong Research Online Faculty of Engineering and Information Sciences - Papers: Part B Faculty of Engineering and Information Sciences 2018 Let's get moving with the affordable medium-speed

More information

Tram Passenger Survey

Tram Passenger Survey Key findings Autumn 2015 Foreword Jeff Halliwell Now in its third year, our Tram Passenger Survey has covered passengers views of their journey in six network areas in Britain. For the second time this

More information

East Melbourne Precinct HO2. March 2015

East Melbourne Precinct HO2. March 2015 East Melbourne Precinct HO2 March 2015 Local Heritage Planning Policy Review Statements of Significance Melbourne s Local Heritage Planning Policy Review project includes the preparation of statements

More information

The Belfast Manifesto

The Belfast Manifesto TheBelfast Manifesto NIIRTA The Northern Ireland Independent Retail Trade Association (NIIRTA) strongly supports The Belfast Manifesto. This should be required reading for election candidates to both Belfast

More information

2 THE MASTER PLAN 23

2 THE MASTER PLAN 23 2 THE MASTER PLAN 23 THE MASTER PLAN 2.1 Purpose of the Master Plan A Master Plan provides the airport operator, the Commonwealth, State and Local Governments, the local community, aviation industries

More information

TERMINAL DEVELOPMENT PLAN

TERMINAL DEVELOPMENT PLAN 5.0 TERMINAL DEVELOPMENT PLAN 5.0 TERMINAL DEVELOPMENT PLAN Key points The development plan in the Master Plan includes the expansion of terminal infrastructure, creating integrated terminals for international,

More information

IATA ECONOMIC BRIEFING DECEMBER 2008

IATA ECONOMIC BRIEFING DECEMBER 2008 ECONOMIC BRIEFING DECEMBER 28 THE IMPACT OF RECESSION ON AIR TRAFFIC VOLUMES Recession is now forecast for North America, Europe and Japan late this year and into 29. The last major downturn in air traffic,

More information

Memorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other:

Memorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other: Memorandum Date: March 23, 2018 To: Transportation Authority Board From: Eric Cordoba Deputy Director Capital Projects Subject: 4/10/18 Board Meeting: San Francisco Freeway Corridor Management Study Update

More information

Northern Beaches Transport Action Plan

Northern Beaches Transport Action Plan Northern Beaches Transport Action Plan The NSW Government is taking action now to deliver transport improvements for the Northern Beaches, as well as planning for the future growth of the area. $633 million

More information

2016 Regional Transportation Alternatives Program (TAP) Grant Application

2016 Regional Transportation Alternatives Program (TAP) Grant Application 2016 Regional Transportation Alternatives Program (TAP) Grant Application PROJECT TITLE: Yelm-Tenino Trail Extension Feasibility Study TRPC use only GENERAL PROJECT INFORMATION Agency or Organization City

More information

REVIEW OF GOLD COAST AIRPORT Noise Abatement Procedures

REVIEW OF GOLD COAST AIRPORT Noise Abatement Procedures REVIEW OF GOLD COAST AIRPORT Noise Abatement Procedures Introduction The purpose of this document is to present an overview of the findings of the review of the Noise Abatement Procedures (NAPs) in place

More information

Capital Metro is the first stage of a light rail network that will have a transformative effect on Canberra. capitalmetro.act.gov.

Capital Metro is the first stage of a light rail network that will have a transformative effect on Canberra. capitalmetro.act.gov. Artist impression Nullabor Avenue Harrison Business Case overview Capital Metro is the first stage of a light rail network that will have a transformative effect on Canberra. capitalmetro.act.gov.au Why

More information

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JANUARY 25, 2011

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JANUARY 25, 2011 Item 1, Report No. 1, of the Priorities and Key Initiatives Committee, which was adopted without amendment by the Council of the City of Vaughan on January 25,. 1 RAPID TRANSIT UPDATE TORONTO-YORK SPADINA

More information

Transport Delivery Committee

Transport Delivery Committee Agenda Item No. 11 Transport Delivery Committee Date 6 th March 2016 Report title Accountable Director Accountable Employee Virgin Trains Partnership Agreement Update Pete Bond, Director of Transport Services

More information

Submission by Heathrow Southern Railway Ltd.

Submission by Heathrow Southern Railway Ltd. Response to Consultation on core elements of the regulatory framework to support capacity expansion at Heathrow Submission by Heathrow Southern Railway Ltd. 22 nd September 2017 Contact; Steven Costello,

More information

Memorandum. Roger Millar, Secretary of Transportation. Date: April 5, Interstate 90 Operations and Mercer Island Mobility

Memorandum. Roger Millar, Secretary of Transportation. Date: April 5, Interstate 90 Operations and Mercer Island Mobility Memorandum To: From: The Honorable Dow Constantine, King County Executive; The Honorable Ed Murray, City of Seattle Mayor; The Honorable Bruce Bassett, City of Mercer Island Mayor; The Honorable John Stokes,

More information

TRANSPORT AFFORDABILITY INDEX

TRANSPORT AFFORDABILITY INDEX TRANSPORT AFFORDABILITY INDEX Report - December 2016 AAA 1 AAA 2 Table of contents Foreword 4 Section One Overview 6 Section Two Summary of Results 7 Section Three Detailed Results 9 Section Four City

More information

Chapter 11. Links to Heathrow. Prepared by Christopher Stokes

Chapter 11. Links to Heathrow. Prepared by Christopher Stokes Chapter 11 Links to Heathrow Prepared by Christopher Stokes 11 LINKS TO HEATHROW Prepared by Christopher Stokes 11.1 This submission relates to the following questions listed by the Committee: 2.3 Implications

More information