Implementation Status & Results Indonesia Strategic Roads Infrastructure Project (P079906)
|
|
- Roland Day
- 6 years ago
- Views:
Transcription
1 Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Strategic Roads Infrastructure Project (P079906) Operation Name: Strategic Roads Infrastructure Project (P079906) Project Stage: Implementation Seq.No: 9 Status: ARCHIVED Archive Date: 05-Mar-2014 Country: Indonesia Approval FY: 2007 Product Line: IBRD/IDA Region: EAST ASIA AND PACIFIC Lending Instrument: Specific Investment Loan Implementing Agency(ies): BPPSPAM - Ministry of Public Works Key Dates Board Approval Date 06-Jul-2006 Original Closing Date 31-Dec-2011 Planned Mid Term Review Date Last Archived ISR Date 03-Aug-2013 Effectiveness Date 01-Nov-2007 Revised Closing Date Actual Mid Term Review Date Project Development Objectives Project Development Objective (from Project Appraisal Document) The objective of the Project is to improve economic competitiveness by improving the capacity and quality of strategic national roads on the Borrower's islands of Java and Sumatra, improving road safety and increasing the efficiency, quality and transparency of works procurement and implementation in Borrower's Ministry of Public Works. Has the Project Development Objective been changed since Board Approval of the Project? Yes No Component(s) losure Authorized Public Disclosure Authorized Component Name Component Cost Improvement to Strategic National Roads Implementation Support Road Sector Institutional Development 4.00 Overall Ratings Previous Rating Current Rating Progress towards achievement of PDO Moderately Satisfactory Moderately Satisfactory Overall Implementation Progress (IP) Moderately Satisfactory Moderately Satisfactory Overall Risk Rating Implementation Status Overview Investments are now nearly completed and the project is expected to achieve its main objectives with only moderate shortcomings. The capacity and transparency of the Ministry of Public Works have been strengthened as reflected in its procurement practices, anti-corruption procedures, construction oversight, and complaints handling performance. Civil works to increase the capacity and quality of the strategic national road network have already been completed on 89 percent of the 245 km of new, upgraded, or improved roads targeted Page 1 of 6
2 under the project. Road safety audits were conducted for all the project roads and their recommendations addressed, and the road accident recording system developed under the project is now fully operational and being expanded and upgraded. Improvement of about 100 intersections has also helped increase both traffic capacity and road safety. Locations Country First Administrative Division Location Planned Actual Indonesia Not Entered Kecamatan Widang Indonesia Not Entered Tegal Not Entered Not Entered Tegal Indonesia Not Entered Tanjungkarang-Telukbetung Indonesia Not Entered Surabaya Indonesia Not Entered Propinsi Sumatera Selatan Indonesia Not Entered Semarang Indonesia Not Entered Pekalongan Indonesia Not Entered Pasuruan Indonesia Not Entered Palembang Indonesia Not Entered Propinsi Lampung Indonesia Not Entered Kartasura Indonesia Not Entered Propinsi Jawa Timur Indonesia Not Entered Propinsi Jawa Tengah Indonesia Not Entered Propinsi Jawa Barat Indonesia Not Entered Propinsi Jambi Indonesia Not Entered Daerah Khusus Ibukota Jakarta Raya Indonesia Not Entered Cirebon Indonesia Not Entered Propinsi Banten Indonesia Not Entered Kabuyutan Indonesia Not Entered Bawan Indonesia Not Entered Kecamatan Boyolali Indonesia Not Entered Kabupaten Magelang Page 2 of 6
3 Country First Administrative Division Location Planned Actual Indonesia Not Entered Keprekan Indonesia Not Entered Kecamatan Pejagoan Indonesia Not Entered Kecamatan Karangampel Indonesia Not Entered Kecamatan Ambarawa Indonesia Not Entered Kecamatan Cianjur Indonesia Not Entered Kecamatan Karawang Indonesia Not Entered Kecamatan Demak Indonesia Not Entered Kabupaten Kendal Indonesia Not Entered Kecamatan Cilegon Indonesia Not Entered Kecamatan Losari Indonesia Not Entered Kecamatan Brebes Indonesia Not Entered Kecamatan Pemalang Indonesia Not Entered Desa Pilang Indonesia Not Entered Kecamatan Ngawi Results Project Development Objective Indicators Indicator Name Core Unit of Measure Baseline Current End Target Roads in good and fair condition as a share of Percentage Value total classified roads The denominator (the size of the total classified network) is the defined national road length of the project provinces. The roads in good and fair condition increased from Baseline. Size of the total classified network Kilometers Sub Type Supplemental Value Page 3 of 6
4 Number of kilometers of new strategic national Kilometers Value road 68% completed against the restructured schedule. The shortfall is due to termination of one package (17km) due to non-performance of the contractor. Number of kilometers of strategic national road Kilometers Value with increased capacity 88% completed against the restructured schedule. The remaining length (10 km) will be achieved by the closing date. Average increase of travel speed Percentage Value New data not available yet. The necessary surveys will be carried out at EOP. Average increase of AADT on project roads Percentage Value Data not available yet. The necessary surveys will be carried out at EOP. Number of kilometers of strategic national road Kilometers Value betterment implemented (plus percentage completion of civil works) with good and orfair condition 100% completed against the Original target was 153 (prior restructured schedule. to April 2011 restructuring). Percentage of Construction contracts that Percentage Value comply with specifications All completed and currently ongoing construction contracts comply with specifications. Expected to achieve 100% when all are completed. Number of Technical Audits carried out Number Value Page 4 of 6
5 Anti-Corruption procedures and Construction Supervision carried out as the framework Fully Operational Road Accident Recording System with Trained Staff Road safety audits conducted and recommendations addressed Expected achievement as per restructured schedule. Number Value Expected achievement as per restructuring. Percentage Value IRSMS-2 TA completed its original scope and additional scope. IRSMS-1 TA canceled. Number Value Target achieved. Intermediate Results Indicators Indicator Name Core Unit of Measure Baseline Current End Target Number of meters of bridge construction (plus Meter(m) Value percentage completion of civil works) The remaining length will be achieved by the revised closing date. Percentage Disbursement of construction Percentage Value works achieved. Disbursement is behind schedule as per restructured schedule. Number of intersections improved Number Value Date 30-Jun-2006 Works are underway to complete the remaining 6 improved intersections. Data on Financial Performance (as of 16-Jan-2014) Financial Agreement(s) Key Dates Project Ln/Cr/Tf Status Approval Date Signing Date Effectiveness Date Original Closing Date Revised Closing Date P IBRD Effective 06-Jul Sep Nov Dec-2011 Page 5 of 6
6 Project Ln/Cr/Tf Status Approval Date Signing Date Effectiveness Date Original Closing Date Revised Closing Date P IBRD Effective 04-Aug Aug Aug Dec-2011 Disbursements (in Millions) Project Ln/Cr/Tf Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P IBRD Effective USD P IBRD Effective USD Disbursement Graph Key Decisions Regarding Implementation The project closing date was extended by another six months to June 30, Restructuring History Level two Approved on 17-Apr-2011, Level two Approved on 30-May-2013, Level 2 RVP Decision on 17-Dec-2013 Related Projects There are no related projects. Page 6 of 6
Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379)
Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379) Operation Name: Djibouti Power Access and
More informationImplementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379)
Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379) Operation Name: Djibouti Power Access and
More informationImplementation Status & Results Argentina AR Cordoba Road Infrastructure (P099585)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina AR Cordoba Road Infrastructure (P099585) Operation Name: AR Cordoba Road Infrastructure
More informationImplementation Status & Results Mozambique Roads and Bridges Management and Maintenance Program - Phase II (P083325)
losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Mozambique Roads and Bridges Management and Maintenance Program
More informationImplementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466) Operation Name: CO Integrated Mass Transit
More informationImplementation Status & Results Serbia Transport Rehabilitation Project (Serbia) (P075207)
Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Serbia Transport Rehabilitation Project (Serbia) (P075207) Operation Name: Transport Rehabilitation Project (Serbia)
More informationImplementation Status & Results Mexico MX Urban Transport Transformation Progr (P107159)
losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Mexico MX Urban Transport Transformation Progr (P107159) Operation
More informationImplementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466) Operation Name: CO Integrated Mass Transit
More informationImplementation Status & Results Peru Vilcanota Valley Rehabilitation and Management Project (P082625)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Peru Vilcanota Valley Rehabilitation and Management Project (P082625) Operation Name: Vilcanota
More informationImplementation Status & Results Serbia SERBIA ROAD REHABILITATION AND SAFETY PROJECT (P127876)
Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Serbia SERBIA ROAD REHABILITATION AND SAFETY PROJECT (P127876) Operation Name: SERBIA ROAD REHABILITATION AND SAFETY
More informationImplementation Status & Results Argentina National Urban Solid Waste Management Project (P089926)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina National Urban Solid Waste Management Project (P089926) Operation Name: National Urban
More informationImplementation Status & Results Argentina Norte Grande Road Infrastructure (P120198)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina Norte Grande Road Infrastructure (P120198) Operation Name: Norte Grande Road Infrastructure
More informationImplementation Status & Results Argentina AR Basic Municipal Services Project (P060484)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina AR Basic Municipal Services Project (P060484) Operation Name: AR Basic Municipal Services
More informationImplementation Status & Results Argentina AR Road Safety (P116989)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina AR Road Safety (P116989) Operation Name: AR Road Safety (P116989) Project Stage: Implementation
More informationImplementation Status & Results Argentina Essential Public Health Functions Programs II Project (P110599)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina Essential Public Health Functions Programs II Project (P110599) Operation Name: Essential
More informationImplementation Status & Results Argentina National Urban Solid Waste Management Project (P089926)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina National Urban Solid Waste Management Project (P089926) Operation Name: National Urban
More informationImplementation Status & Results Moldova NATIONAL WATER SUPPLY & SANITATION PROGRAM (P107612)
Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Moldova NATIONAL WATER SUPPLY & SANITATION PROGRAM (P107612) Operation Name: NATIONAL WATER SUPPLY & SANITATION
More informationImplementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466) Operation Name: CO Integrated Mass Transit
More informationImplementation Status & Results Egypt, Arab Republic of Railways Restructuring (P101103)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Egypt, Arab Republic of Railways Restructuring (P101103) Operation Name: Railways Restructuring
More informationImplementation Status & Results Peru Sierra Irrigation Subsector (P104760)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Peru Sierra Irrigation Subsector (P104760) Operation Name: Sierra Irrigation Subsector (P104760)
More informationImplementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Operation Name: Colombian
More informationImplementation Status & Results Peru PE Sierra Irrigation Subsector (P104760)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Peru PE Sierra Irrigation Subsector (P104760) Operation Name: PE Sierra Irrigation Subsector (P104760)
More informationImplementation Status & Results Peru Sierra Irrigation Subsector (P104760)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Peru Sierra Irrigation Subsector (P104760) Operation Name: Sierra Irrigation Subsector (P104760)
More informationNorte Grande Road Infrastructure (P120198)
Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Argentina Transport & Digital Development Global Practice IBRD/IDA Investment Project Financing FY 2011 Seq No: 15 ARCHIVED on 02-Apr-2018 ISR31768
More informationImplementation Status & Results Argentina Urban Transport in Metropolitan Areas (P095485)
losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina Urban Transport in Metropolitan Areas (P095485)
More informationImplementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Operation Name: Colombian
More informationImplementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Operation Name: Colombian
More informationImplementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Operation Name: Colombian
More informationImplementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932) Operation Name: Colombian
More informationUrban Transport in Metropolitan Areas (P095485)
Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Argentina Transport & ICT Global Practice IBRD/IDA Adaptable Program Loan FY 2010 Seq No: 12 ARCHIVED on 09-May-2016 ISR22958 Implementing Agencies:
More informationImplementation Status & Results Paraguay Road Maintenance (P082026)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Paraguay Road Maintenance (P082026) Operation Name: Road Maintenance (P082026) Project Stage: Implementation
More informationImplementation Status & Results Paraguay Road Maintenance (P082026)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Paraguay Road Maintenance (P082026) Operation Name: Road Maintenance (P082026) Project Stage: Implementation
More informationUrban Transport in Metropolitan Areas (P095485)
Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Argentina Transport & ICT Global Practice IBRD/IDA Adaptable Program Loan FY 2010 Seq No: 14 ARCHIVED on 30-Jun-2017 ISR28825 Implementing Agencies:
More informationImplementation Status & Results Paraguay Road Maintenance (P082026)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Paraguay Road Maintenance (P082026) Operation Name: Road Maintenance (P082026) Project Stage: Implementation
More informationUrban Transport in Metropolitan Areas (P095485)
Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Argentina Transport & ICT Global Practice IBRD/IDA Adaptable Program Loan FY 2010 Seq No: 11 ARCHIVED on 15-Sep-2015 ISR20616 Implementing Agencies:
More informationThe World Bank. Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized
Public Disclosure Authorized AFRICA Mozambique Water Global Practice IBRD/IDA Specific Investment Loan FY 2008 Seq No: 16 ARCHIVED on 30-Oct-2015 ISR21080 Implementing Agencies: Public Disclosure Authorized
More informationImplementation Status & Results Report Mozambique Conservation Areas for Biodiversity and Development Project (P131965)
Public Disclosure Authorized AFRICA Mozambique Environment & Natural Resources Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 8 ARCHIVED on 27-Dec-2017 ISR30661 Implementing Agencies:
More informationPublic Disclosure Copy
Public Disclosure Authorized AFRICA Ethiopia Trade & Competitiveness Global Practice IBRD/IDA Specific Investment Loan FY 2009 Seq No: 14 ARCHIVED on 21-Dec-2015 ISR20896 Implementing Agencies: Public
More informationUrban Transport in Metropolitan Areas (P095485)
Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Argentina Transport & Digital Development Global Practice IBRD/IDA Investment Project Financing FY 2010 Seq No: 15 ARCHIVED on 26-Jan-2018 ISR31117
More informationImplementation Status & Results Africa GEF-Western Indian Ocean Marine Highway Development and Coastal and Marine Contamination Prevention (P078643)
losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Africa GEF-Western Indian Ocean Marine Highway Development
More informationJanuary 2018 Air Traffic Activity Summary
January 2018 Air Traffic Activity Summary Jan-2018 Jan-2017 CY-2018 CY-2017 Passengers 528,947 505,421 4.7% 528,947 505,421 4.7% Passengers 537,332 515,787 4.2% 537,332 515,787 4.2% Passengers 1,066,279
More informationImplementation Status & Results Bosnia and Herzegovina REAL ESTATE REGISTRATION PROJECT (P128950)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Bosnia and Herzegovina REAL ESTATE REGISTRATION PROJECT (P128950) Operation Name: REAL ESTATE REGISTRATION
More informationImplementation Status & Results Bolivia BO Rural Alliances (P083051)
losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Bolivia BO Rural Alliances (P083051) Operation Name:
More informationImplementation Status & Results Africa GEF-Western Indian Ocean Marine Highway Development and Coastal and Marine Contamination Prevention (P078643)
Public Disclosure Authorized Public Disclosure Authorized losure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Africa GEF-Western Indian Ocean Marine Highway Development
More informationImplementation Status & Results Andean Countries Adaptation to the Impact of Rapid Glacier Retreat in the Tropical Andes (P098248)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Andean Countries Adaptation to the Impact of Rapid Glacier Retreat in the Tropical Andes (P098248)
More informationRoad Rehabilitation Project
Indonesia Road Rehabilitation Project Report Date: March 2001 Field Survey: September 2000 1. Project Profile and Japan s ODA Loan Location Map of Project Area Improved Road Section in Lampung Province,
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2840. Date ISDS Prepared/Updated: 03/22/2007 I. BASIC INFORMATION. A. Basic Project Data
Date ISDS Prepared/Updated: 03/22/2007 I. BASIC INFORMATION A. Basic Project Data INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2840 Country: Africa Project ID: P100785 Project Name: West
More informationFigure (1/3) RAINFALL DATA
Average Annual Rainfall = 2,449 mm Jan Feb Mar Apr May June July Aug Sep Oct Nov Dec Average Monthly Rainfall (1899 1956) Total No. of Years : 49 years Jan Feb Mar Apr May June July Aug Sep Oct Nov Dec
More informationAir China Limited Annual Results. March Under IFRS
Air China Limited 21 Annual Results Under IFRS March 211 Agenda Part 1 Highlights Part 2 Business Overview Part 3 Financial Overview Part 4 Outlook 2 Part 1 Highlights Steady Economic Growth; Asia Pacific
More informationSound Transit Operations January 2014 Service Performance Report. Ridership
Ridership Total Boardings by Mode Mode Jan-13 Jan-14 % YTD-13 YTD-14 % ST Express 1,343,290 1,426,928 6.2% 1,343,290 1,426,928 6.2% Sounder 245,135 256,775 4.7% 245,135 256,775 4.7% Tacoma Link 86,229
More informationSTRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003
STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003 Prepared by the APIRG RVSM Implementation Task Force AFI STRATEGY/ACTION
More informationWith the completion of this project, we would like to follow-up on the projections as well as highlight a few other items:
TO: FROM: Mayor and Council Interim City Manager Rebecca Underhill, Director of Finance DATE: February 28, 2014 SUBJECT: Water Meter Project Analysis On March 28, 2012, Acting City Manager Mike Loftin
More informationDTTAS Quarterly Aviation Statistics Snapshot Quarter Report
Contents DTTAS Quarterly Aviation Statistics Snapshot Quarter 3 2018 Report 1.1 Dublin Airport Key Statistics... 1 1.2 Cork Airport Key Statistics... 3 1.3 Shannon Airport Key Statistics... 5 1.4 Total
More informationDTTAS Quarterly Aviation Statistics Snapshot Quarter Report
Contents DTTAS Quarterly Aviation Statistics Snapshot Quarter 1 2018 Report 1.1 Dublin Airport Key Statistics... 1 1.2 Cork Airport Key Statistics... 3 1.3 Shannon Airport Key Statistics... 5 1.4 Total
More informationAFTA Travel Trends. June 2017
AFTA Travel Trends June 2017 AFTA Travel Trends Report 2017 Inbound and Outbound overview Introduction This snapshot provides an overview of the balance of trade between Inbound and Outbound Travel for
More informationPerformance monitoring report 2017/18
Performance monitoring report /18 Gatwick Airport Limited 1. Introduction Date of issue: 20 July 2018 This report provides an update on performance at Gatwick in the financial year /18, ending 31 March
More informationCARICOM Single ICT Space Digital Transformation is a Journey
CARICOM Single ICT Space Digital Transformation is a Journey CARICOM ICT Cluster of Agencies The Agenda Ecosystem & Characteristics Req of the Single ICT Space Caribbean Competitiveness Progress Major
More informationRecovery Now! ANZPHIC 2010 Sydney - July 8, Hotel Performance Back On Track
Recovery Now! Hotel Performance Back On Track ANZPHIC 2010 Sydney - July 8, 2010. STR Global Ltd is the exclusive owner of all rights in this presentation and its content. Reproduction of all or a portion
More informationAnalysts Briefing. 24 June Cathay Pacific Airways Limited
Analysts Briefing 24 June 2016 Cathay Pacific Airways Limited Operating performance - overview Challenging business environment. Load factor lower than expectations on weakening passenger demand. Strong
More information2007/08 Full Year Results Investor Briefing
2007/08 Full Year Results Investor Briefing Highlights of Result Profit before tax up 46% to $1,408 million Up 36% on the reported result Margin improvement $3 billion of Sustainable Future Benefits achieved
More information24-26 March 2014 Cairo, Egypt. Technology. Session #6 Presentation #2
24-26 March 2014 Cairo, Egypt Technology Session #6 Presentation #2 Queen Alia International Airport Introduction of AIG WILDLIFE FOD Queen Alia International Airport Airport International Group (AIG)
More informationTAG Farnborough Airport
TAG Farnborough Airport Farnborough Aerodrome Consultative Committee TAG Information Report - March 2012 1. Aircraft Movements 1.1 Following the acceptance of the TAG appeal on the 11 th February 2011,
More informationRotorua. newzealand.com. argentina. Market information about our Visitors and our Active Considerers
Rotorua argentina Market information about our Visitors and our Active Considerers newzealand.com PAST VISITORS HISTORIC VIEW TOTAL ARRIVALS YE MARCH 2018 AUS 1,495K 39% INDIA 63K 2% USA 340K 9% GERMAN
More informationAnalysts and Investors conference call. Q results. 15 May 2013
Analysts and Investors conference call Q1 2013 results 15 May 2013 Management summary Key messages of Q1 2013 +6% +9% +3.3%p. Q1 2013 operational KPIs are in line with 109.7 116.2 6.5 7.1 82.3 85.6 expectations,
More informationSIA ANALYST/MEDIA BRIEFING Q2 and 1H FY17/18 Results 8 November 2017
SIA ANALYST/MEDIA BRIEFING Q2 and 1H FY17/18 Results 8 November 2017 THE PARENT AIRLINE Q2 AND 1H FY17/18 RESULTS THE PARENT AIRLINE COMPANY OPERATING PERFORMANCE Q2 % 1H % FY17/18 Change FY17/18 Change
More informationI T N E T R E N R A N T A I T ON O AL A L A R A R R I R VA V L A S L S A N A D N D D E D PA
INTERNATIONAL ARRIVALS AND DEPARTURES July 2015 Government of Tonga SD18M-36 Statistical Bulletin Month of Change from Change from July 2015 Number previous month previous year All Arrivals 8,252-28.0
More informationInformation Paper 2 SUMMARY
COSCAP North Asia Cooperative Development of Operational Safety & Continuing Airworthiness Programme 14th STEERING COMMITTEE MEETING Performance Based Navigation (PBN) Update on ICAO Asia and Pacific Regional
More informationPerformance monitoring report for 2014/15
Performance monitoring report for 20/15 Date of issue: August 2015 Gatwick Airport Limited Summary Gatwick Airport is performing well for passengers and airlines, and in many aspects is ahead of the performance
More informationCampus Construction Program Report WLAC Monthly Facilities Committee Meeting November 16, 2015
Campus Construction Program Report WLAC Monthly Facilities Committee Meeting November 16, 2015 1. Cost Update 2. Schedule Update 3. Pre Design Update 4. Design Update 5. Contractor Procurement Update November
More informationDTTAS Quarterly Aviation Statistics Snapshot Quarter Report
Contents DTTAS Quarterly Aviation Statistics Snapshot Quarter 4 2015 Report 1.1 Dublin Airport Key Statistics... 1 1.2 Cork Airport Key Statistics... 3 1.3 Shannon Airport Key Statistics... 5 1.4 Total
More informationIATA FUEL EFFICIENCY CAMPAIGN
IATA FUEL EFFICIENCY CAMPAIGN Juergen Haacker Director, Operations Montreal, IATA Fuel Efficiency Campaign Jet fuel price driving airline fuel efficiency Increased 5% from 2003-2005 Industry is on track
More informationAFTA Travel Trends. July 2017
AFTA Travel Trends July 2017 AFTA Travel Trends Report 2017 Inbound and Outbound overview Introduction This snapshot provides an overview of the balance of trade between Inbound and Outbound Travel for
More informationCWC LA - Cash Balance (January 2012)
CWC LA - Cash Balance 2012-13 (January 2012) 1,200,000 Cash Balance 1,000,000 800,000 ($1,000s) 600,000 400,000 200,000 - CWC LA - Actuals/Projected CWC LA - ed (Nov) 1 1 CWC Hollywood - Financial Dashboard
More informationSound Transit Operations December 2014 Service Performance Report. Ridership
Ridership Total Boardings by Mode Mode Dec-13 Dec-14 % YTD-13 YTD-14 % ST Express 1,266,130 1,396,787 10.3% 16,605,299 17,661,976 6.4% Sounder 248,710 285,016 14.6% 3,035,735 3,361,317 10.7% Tacoma Link
More informationMETRO OPERATIONS COMMITTEE
Los Angeles County Metropolitan Transportation Authority Item 1 CHIEF OPERATIONS OFFICER S S REPORT METRO OPERATIONS COMMITTEE Lonnie Mitchell Chief Operations Officer May 19, 20 1 Employee Recognition
More informationSTATISTICAL BULLETIN ON INTERNATIONAL ARRIVALS, DEPARTURES AND MIGRATION 2011 SERIES NO. SDT: Government of Tonga
SERIES NO. SDT: 38-13 Government of Tonga STATISTICAL BULLETIN ON INTERNATIONAL ARRIVALS, DEPARTURES AND MIGRATION 2011 Statistics Department, P.O. Box 149, Nuku alofa, Kingdom of Tonga Website: www.spc.int/prism/tonga/
More informationNoise Oversight Committee
Noise Oversight Committee May 8, 2014 Audio/Video recordings are made of this meeting 1 Item 1 Review and Approve Draft Meeting Minutes Minutes from March 19, 2014 2 Item 2 Review of Operations Report
More informationJakarta, 3 May Analyst Meeting. Q1/ Corporate Performance
Jakarta, 3 May 2018 Analyst Meeting Q1/2018 - Corporate Performance Shares Information 6,750 GIAA IJ Equity - Last Price (R1) JCI Index - Last Price (L1) 294 6,188.987 600 6,500 6,189 6,250 6,000 550 500
More informationTechnical Cooperation Bureau
Technical Cooperation Bureau Hatem Oueslati Field Project Officer TCB 25 January 2018 Page 1 Scope ICAO Roles TCB Objectives TCP and projects TCB in the MID region Conclusions 25 January 2018 Page 2 ICAO
More informationToronto Pearson February 2019 Briefing. February 19, 2019
Toronto Pearson February 2019 Briefing February 19, 2019 Noise Management Forums UPDATE: The Six Ideas Runway Selection Criteria 2019 Airfield Restoration Program Noise Management Forums Review elements
More informationRIJEKA GATEWAY PROJECT CROATIA. M. Audigé Program Team Leader ECSIE
RIJEKA GATEWAY PROJECT CROATIA M. Audigé Program Team Leader ECSIE Transport Forum & Learning Week - Washington DC 2006 Transport Forum & Learning Week 2006 2 Historical Reminder Initially two separated
More informationAirworthiness Analysis
Airworthiness Analysis Question How many Approvals do Airworthiness oversee? 1000 1250 1400 Question How many Approvals do Airworthiness oversee? 1000 1250 1400 Question How many Q Pulse events did we
More informationInternational Visitation to the Northern Territory. Year ending March 2017
International Visitation to the Northern Territory Year ending March 217 The following is a summary of information relevant to the Northern Territory tourism industry including visitation results from
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Project Name Cusco Transport Improvement
More informationCranfield Safety Management and Investigation Course
Cranfield Safety Management and Investigation Course 2005 Asia-Pacific Conference on Risk Management and Safety Hong Kong, 1 December 2005 Hong Kong, 28 November 2005 Safety Management System Safety Management
More informationAnnual General Meeting. 20 April 2011
Annual General Meeting 20 April 2011 Presentation outline 1 FY2010 in review 2 Financial highlights 3 Looking ahead 2 1. FY2010 in review A strident leap forward December 2010 Recent acquisitions in Indonesia:
More informationContract (Description)
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized A1 A3 A8 Contract Reference Contract (Description) PART A: Sector Policy, Legal, Regulatory,
More information26 October 2017 Icelandair Group Interim Report NET PROFIT USD 101 MILLION IN THIRD QUARTER
NET PROFIT USD 101 MILLION IN THIRD QUARTER Total income in Q3 up by 10% between years, to USD 536.0 million Passenger revenue higher than expected EBITDA unchanged year on year, at USD 161.1 million Passenger
More informationCathay Pacific Airways Analyst & Investor Briefing June Cathay Pacific Airways Interim Results 6 August 2008
Cathay Pacific Airways 2010 Analyst & Investor Briefing June 2010 Cathay Pacific Airways 2008 Interim Results 6 August 2008 Airline Strategy Remains largely unchanged Grow our international network, expand
More informationFinancing of Aviation Development Projects by the Asian Development Bank. Asian Development Bank
Financing of Aviation Development Projects by the Asian Development Bank Presentation by Marcelo J. Minc Asian Development Bank ICAO and the World Bank Development Forum Maximizing Civil Aviation s s Contribution
More informationExchange Sunshine Coast 2014
Exchange Sunshine Coast 2014 A refresher on CSQ... What does CSQ do? We: promote careers in the building and construction industry invest in skills and training grow the number of skilled workers build
More informationPERFORMANCE REPORT JANUARY Keith A. Clinkscale Performance Manager
PERFORMANCE REPORT JANUARY 2018 Keith A. Clinkscale Performance Manager INTRODUCTION/BACKGROUND Keith A. Clinkscale Performance Manager FIXED ROUTE DASHBOARD JANUARY 2018 Safety Max Target Goal Preventable
More informationPareto s annual Oil & Offshore Conference: Presentation of Kværner ASA Jan Arve Haugan, President & CEO
Pareto s annual Oil & Offshore Conference: Presentation of Kværner ASA Jan Arve Haugan, President & CEO 1 HSE our licence to operate Our HSE mindset is a core value We: strive continuously for zero harm
More informationINVEST IN BOUNTIFUL. THE best performing stock exchange for longterm investors
INVEST IN BOUNTIFUL THE best performing stock exchange for longterm investors the indonesian archipelago: of spice islands and much more more THAN more THAN 17,000 250 ISLANDS MILLION PEOPLE INDONESIA
More informationManual vs. Automatic Operation and Operational Restrictions
Customer Services, Operations, and Safety Committee Board Information Item IV-B March 11, 2010 Manual vs. Automatic Operation and Operational Restrictions Page 81 of 91 Washington Metropolitan Area Transit
More informationSound Transit Operations August 2015 Service Performance Report. Ridership
Ridership Total Boardings by Mode Mode Aug-14 Aug-15 % YTD-14 YTD-15 % ST Express 1,534,241 1,553,492 1.3% 11,742,839 12,354,957 5.2% Sounder 275,403 326,015 18.4% 2,139,086 2,463,422 15.2% Tacoma Link
More informationGlobal Airline Trends and Impacts International Aviation Issues Seminar
Global Airline Trends and Impacts International Aviation Issues Seminar December 2017, Washington D.C. Oliver Lamb Managing Director 1 Around the world in 45 minutes Financial Performance Canada Mexico
More informationNetwork Manager Adding value to the Network 29 September 2011
Network Manager Adding value to the Network 29 September 2011 Alain FOURNIE Head of Operational Monitoring & Reporting Directorate Network Management EUROCONTROL The European Organisation for the Safety
More informationHeathrow (SP) Limited
Draft v2.0 10 Feb Heathrow (SP) Limited Results for year ended 31 December 2013 24 February 2014 Strong operational and financial performance in 2013 Passenger satisfaction at record high and over 72 million
More informationSSP progress in Latvia. Overview
SSP progress in Latvia CAA of Latvia: Ms. Ērika Neimane, Head of the ATM Section, ANS Division LGS: Mr. Jānis Lapiņš, Head of Safety, Quality, Security and Audit Management airbaltic: Mr. Lauris Miķelsons,
More information