Colombian PBN implementation: El Dorado case study
|
|
- Darcy Pitts
- 6 years ago
- Views:
Transcription
1 Colombian PBN implementation: El Dorado case study SDM WORKSHOP ON PBN XAVIER OUTTERS SME & PROJECT MANAGER NAVBLUE SAS
2 Electronic Flight Bag Dispatch Pre-flight Airport Databases - FlySmart+ - Charts+ - Mission+ - Navigation+ - Airport+ - N Flight Planning - N Tracking - N Performance - N RAIM Crew management - N Crew The picture can't be displayed. - N RAIDO - ADOC - AODB Post-flight - AIRFASE - ANALYTICS - ELISE by NAVBLUE - GNSS by NAVBLUE Airspace - DESIGN by NAVBLUE - ASSESS by NAVBLUE Avionics - ROPS+ Consulting - YourOps PILOTS DISPATCHERS FLIGHT OPS ENG. ANSP & Airports NAVBLUE is a services company, wholly owned by Airbus, dedicated to Flight Operations & Air Traffic Management Solutions.
3 03 Challenges and lessons learnt 02 KPIs, solutions, expected benefits 01 Project Overview
4 Project Overview CHAPTER 01
5 5 PAX numbers within Latin American region grew 23% from
6 6 Bogota PAX grew more than 60% in only 6 years with a 15% increase of airport operations
7 7 Project Objectives International Cooperation Agreement to Redesign the Airspace & Optimize Airside Capacity at Bogota El Dorado Airport To position Bogotá El Dorado international airport as one of the most efficient international terminals in Latin America by increasing its capacity and airspace efficiency through: Introduction of PBN Reduction of aircraft separation within the TMA Implementation of independent and simultaneous parallel runways operations Improvement of ground operations Update of regulations & operations manuals Enhancement of ATC capability with theoretical & practical On-The-Job Training (OJT)
8 8 Bogota urgently needed an airspace turnaround ATCOs vector ~100% of arriving aircrafts (high workload) Encounter/dispersed flows Inefficient use of runways Holding patterns Bottleneck at VOR Limited access to RWY 31L/R Reference Day 09/10/2015 Bogota s ATCOs constantly outperform their own limits!
9 9 TMA workload needed to be balanced Uneven sectors work balance (North Sector taking most of the load) Excessive radio comms. due the 100% vectoring of arrivals. Job dissatisfaction Increased workload due to continuous traffic increase within TMA
10 KPIs, solutions, expected benefits CHAPTER 02
11 11 Desired outcome and solution matrix (1/2) Matrix matching existing situation against a desired outcome. Identified solutions matching any combination of safety, capacity, efficiency, environment, or access factors. First two main items required GAP / Solutions to increase capacity and user RNAV to improve access and efficiency within Bogota TMA
12 12 Desired outcome and solution matrix (1/2) Further desired outcome items looked to balance ATC sector workload and reduce complexity by implementing RNAV SIDs and STARs. Simultaneous independent approaches to balance capacity. Design facilitated CCO and CDO operations, and balanced city-pair flows. Radio transmissions dropped significantly reducing both ATC and crew workload.
13 SKBO TMA - PBN Expected Benefits Increase in airspace capacity (simulation runs): o o RNW13: 92 ops per hour (29.2% increase) RNW31: 68 ops per hour (126% increase) Reduction in ATCOs workload (60% less communications per aircraft) Flexibilization of restricted military airspace Reduced workload for pilots. Expected financial efficiencies for up to US100M/year
14 14 Bogota CONOPS Runway 13 Independent trajectories with altitude separation Reduced ATCO workload due to repeatable trajectories and predicted trajectory distances. Reduces crew workload based on strategic coding of trajectories in NavDB. Reduced ATCO intervention Improved safety
15 15 Point of Merge System All aircraft sent direct AMVES (point merge). Better traffic management compared to sending aircraft to previous VOR due to specifically designed RNAV system. Non-RNAV aircraft vectored to VOR to complete conventional procedure. Appropriate management of reduced separation down to 3nm.
16 16 EDR CONOPS Runway 31 Altitude separation Reduced ATCO/ crew workload Reduced ATCO intervention Improved safety
17 17 New TMA Sectors Reduced span of control for each individual sector. Balanced workload across sectors based on inbound and outbound flow demands. Fewer conflicts to manage Reduced ATCO workload Reduced ATCO intervention
18 Challenges and lessons learnt CHAPTER 03
19 19 CONOPS Reference Day 09/10/ % Traffic
20 20 Project Challenges and Lessons Learnt Design Access to RWY 31 for both RNP and non- RNP capable aircraft = RNP AR trajectories + RNAV Visual published by Authority. Non-RNAV aircraft within the TMA = Kept selected non-rnav SID s and STARs published at lower altitudes + conventional ILS from BOG-VOR. NOTAM published that RNAV SIDs and STARs must be filed as a first requirement. Fast Track Project = KoM to Implementation in two years. Only way is for all stakeholders to be aligned with main scope and objective Jet Vs Turboprop = Trajectories designed considering faster aircraft overcoming slower aircraft. ATC Training Change a 20-year with a new way of working = Only way is with ATC to be part of the design, undergo and appropriate training, and commit to change. Knowledge transfer process (both ways) = understanding PBN benefits, allowing technology to help achieve goals, and trust that all parties (ATC, Operators, Regulators) are committed to success. Achieve change via training = tailored training program including simulations for all area and tower controllers, and On the Job Training to accompany ATC during initial implementation of operations.
21 21 Project Challenges and Lessons Learnt Stakeholders Successful public-private collaboration = Identify people that don t believe and lead them to understand and then to believe. Commitment from all stakeholders is a must for the success of such a big project. Coming up with a final design = Discuss options separately with each stakeholder, then identify and resolve as best as possible items that don t match. Solutions may not match all stakeholder wants, but an initial design can only be made better in time. Airspace needs to be shared by everyone. Military Flexible Use of Airspace (FUA) Use of Military airspace = Military forces wishing to share exclusive use of airspace when not in use for the benefit of the overall commercial aviation industry. Military Civil aviation FUA Letter of Agreement = Designed under international guidelines to ensure an appropriate agreement between both parties on how / when to use the mentioned airspace. Orderly FUA = Specific RNAV trajectories designed to be used by qualified commercial aircraft. Trajectories reduce overall arrival track miles, or allow use of airspace during adverse weather in other TMA Areas.
22 Contact XAVIER OUTTERS Mob: AIRBUS S.A.S. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT. THIS DOCUMENT AND ALL INFORMATION CONTAINED HEREIN IS THE SOLE PROPERTY OF AIRBUS. NO INTELLECTUAL PROPERTY RIGHTS ARE GRANTED BY THE DELIVERY OF THIS DOCUMENT OR THE DISCLOSURE OF ITS CONTENT. THIS DOCUMENT SHALL NOT BE REPRODUCED OR DISCLOSED TO A THIRD PARTY WITHOUT THE EXPRESS WRITTEN CONSENT OF AIRBUS S.A.S. THIS DOCUMENT AND ITS CONTENT SHALL NOT BE USED FOR ANY PURPOSE OTHER THAN THAT FOR WHICH IT IS SUPPLIED. THE STATEMENTS MADE HEREIN DO NOT CONSTITUTE AN OFFER. THEY ARE BASED ON THE MENTIONED ASSUMPTIONS AND ARE EXPRESSED IN GOOD FAITH. WHERE THE SUPPORTING GROUNDS FOR THESE STATEMENTS ARE NOT SHOWN, AIRBUS S.A.S. WILL BE PLEASED TO EXPLAIN THE BASIS THEREOF. AIRBUS, ITS LOGO, A300, A310, A318, A319, A320, A321, A330, A340, A350, A380, A400M ARE REGISTERED TRADEMARKS.
Towards the Future ATM
Presented by Paul-Franck BIJOU, CEO of Quo Vadis, the PBN company by Airbus Towards the Future ATM ATC Guild Seminar New Delhi, Oct 20-21, 2010 Every 3 seconds in the world an Airbus aircraft takes off
More informationThink the solution, experience the change
Think the solution, experience the change RNP AR Approach Design Don-Jacques OULD FERHAT, Head of Operations Think the solution, experience the change AGENDA Airbus PBN services subsidiary Implementing
More informationBeijing, 18 h of September 2014 Pierre BACHELIER Head of ATM Programme. Cockpit Initiatives. ATC Global 2014
Beijing, 18 h of September 2014 Pierre BACHELIER Head of ATM Programme Cockpit Initiatives for ATM ATC Global 2014 Page 2 Cockpit Initiatives for ATM Airbus vision on ATM transformation Airbus position
More informationNAVBLUE: Reach for the skies
1 SPECTRABY NAVBLUE NAVBLUE: Reach for the skies A 100% fully owned Airbus subsidiary 350+ Navigation and ATM experts worldwide Key locations: Toulouse London Waterloo 300+airline customers 50+ Airport/ANSP/CAA
More informationATSAW. (Airborne Traffic Situational Awareness) Presented by Laurent VIDAL - Surveillance systems manager Support to sales & programs
ATSAW (Airborne Traffic Situational Awareness) Presented by Laurent VIDAL - Surveillance systems manager Support to sales & programs CONTENTS 1 2 3 INTRODUCTION ATSAW COCKPIT INTERFACE ATSAW OPERATION
More informationPBN and airspace concept
PBN and airspace concept 07 10 April 2015 Global Concepts Global ATM Operational Concept Provides the ICAO vision of seamless, global ATM system Endorsed by AN Conf 11 Aircraft operate as close as possible
More informationTWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line.
International Civil Aviation Organization WORKING PAPER 31/10/12 English only TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 5: Efficient flight paths through trajectory-based
More informationGo-Around Procedure. Flight Instructor Seminar / Miami, May 24 th and 25 th, 2011
Flight Instructor Seminar / Miami, May 24 th and 25 th, 2011 Go-Around Procedure Presented by Capt. David Owens / Senior Director Flight Crew Training Policy Content Introduction Go-Around Preparation
More informationDon-Jacques OULD FERHAT VP Airspace and Airlines Services. Airbus. PBN Safety programs
Don-Jacques OULD FERHAT VP Airspace and Airlines Services Airbus PBN Safety programs Long term cooperation with China Complex projects in China RNP AR at Kathmandu airport Cochin : First RNP APCH in India
More informationCANSO view on A-CDM. Case study on A-CDM at HKIA. Change management & human factors
CANSO view on A-CDM Case study on A-CDM at HKIA Change management & human factors What is A-CDM? ARRIVAL TAXI IN TURN AROUND TAXI OUT DEPARTURE Lack of shared awareness and collaboration Shared Processes
More informationFLIGHT OPERATIONS PANEL (FLTOPSP)
International Civil Aviation Organization FLTOPSP/1-WP/3 7/10/14 WORKING PAPER FLIGHT OPERATIONS PANEL (FLTOPSP) FIRST MEETING Montréal, 27 to 31 October 2014 Agenda Item 4: Active work programme items
More informationInternational Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez
International Civil Aviation Organization PBN Airspace Concept Victor Hernandez Overview Learning Objective: at the end of this presentation you should Understand principles of PBN Airspace Concept 2 Gate
More informationTWELFTH AIR NAVIGATION CONFERENCE
International Civil Aviation Organization AN-Conf/12-WP/6 7/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Agenda Item 2: Aerodrome operations improving airport performance 2.2: Performance-based
More informationSOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT
PRE-PLANNING PHASE Nomination of the State Focal Point of Contact Appointment of the South Africa PBN Project Manager and Team Define the goals and objectives of Project Define the Terms of Reference for
More informationDSNA NAVIGATION STRATEGY
DSNA NAVIGATION STRATEGY PBN & GNSS Ministère de l'écologie, du Développement durable, et de l Énergie PBN IMPLEMENTATION DRIVERS IN FRANCE ICAO directions towards PBN Improve Safety and Airspace Capacity,
More informationSeychelles Civil Aviation Authority. Telecomm & Information Services Unit
Seychelles Civil Aviation Authority Telecomm & Information Services Unit 12/15/2010 SCAA 1 WORKSHOP EXERCISE Workshop on the development of National Performance Framework 6 10 Dec 2010 10/12/2010 SCAA
More informationICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES
AFCAC/ICAO Joint Workshop Walter White ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES 24 JUNE 2014 Airbus ProSky Corporate Presentation 29/06/2014 PERFORMANCE-BASED NAVIGATION The implementation of Performance-Based
More informationDesign Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation
Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7 European Airspace Concept Workshops for PBN Implementation Design in Context TFC Where does the traffic come from? And when? RWY Which
More informationNew generation aircraft in the instrument approach domain. Jean-Christophe Lair Airbus Test pilot 1 st Feb. 2017
New generation aircraft in the instrument approach domain Jean-Christophe Lair Airbus Test pilot 1 st Feb. 2017 Agenda Video A little bit of history Today s situation A350 XWB solutions for final approaches
More informationStall. Review of the Fundamentals, the Procedure and the Training. Presented by Capt. Christian Norden/ Flight Crew Development
May 2011 Stall Review of the Fundamentals, the Procedure and the Training Presented by Capt. Christian Norden/ Flight Crew Development Content Introduction Stall phenomenon Angle of Attack Control and
More informationLithium Battery as Cargo
Paul Rohrbach Lithium Battery as Cargo Airbus Position Status Million cells / year Usage of Lithium Batteries is growing year on year Particularly because of High energy for low size and weight. The usage
More informationPBN AIRSPACE CONCEPT WORKSHOP. SIDs/STARs/HOLDS. Continuous Descent Operations (CDO) ICAO Doc 9931
International Civil Aviation Organization PBN AIRSPACE CONCEPT WORKSHOP SIDs/STARs/HOLDS Continuous Descent Operations (CDO) ICAO Doc 9931 Design in context Methodology STEPS TFC Where does the traffic
More informationOperational Interruption Cost Assessment Methodology
Maintenance Economics Annika WOLF Operational Interruption Cost Assessment Methodology IATA -Airline Cost Conference 2016 Content #1 Definition & Context #2 Scope #3 Model Parameters #4 OI Cost Illustration
More informationFederal Aviation Administration. Air Traffic 101. By: Michael Valencia & Dianna Johnston Date: Feb. 26, 2017
Presented to: UC Davis Aviation Symposium By: Michael Valencia & Dianna Johnston Date: Overview Part 1 Air Traffic Controllers History Safety and Navigation Terminology Air Traffic Facility Types Equipment
More informationPBN Implementation. Phil Rakena. PBN Implementation Programme Manager
Implementation Phil Rakena Implementation Programme Manager CANSO APAC Conference - 06 th May 2017 Implementation Scope: What, Why, When? How to? o Needs / Plan o Collaborate o Educate o Regulate o Resource
More informationSaint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis
Saint Petersburg-Clearwater International Airport Airspace & Instrument Approach Analysis February 23, 2005 Jeppesen Boeing Jeppesen Government / Military Services Group Airspace Services Division AIRSPACE
More informationFly at the speed of ingenuity on your Learjet 85
rockwell collins Pro Line Fusion Avionics Fly at the speed of ingenuity on your Learjet 85 Image courtesy of Bombardier. Experience the most advanced avionics system ever offered on a mid-size jet. Achieve
More informationPBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN
PBN Performance Based Navigation - PBN & Airspace Concepts - Introduction to PBN 1 Learning Objectives PBN Concept within the context of an Airspace (Operational) Concept. Introduction to PBN 2/37 Components
More informationPBN IMPLEMENTATION IN INDONESIA
PBN IMPLEMENTATION IN INDONESIA Program For The PBN Workshop For ATC I Wayan Sudiartha Head of the Standardization and Certification Division Profile of AirNav Indonesia Establishment : o Declared by Government
More informationIntroduction to ROPS. Runway Overrun Prevention System. Presented by: Jerome JOURNADE ROPS Technical Manager
Presented by: Jerome JOURNADE ROPS Technical Manager Introduction to ROPS Runway Overrun Prevention System Agenda 1. What is ROPS? Why is it needed 2. Overview of ROPS design 3. ROPS, a performance based
More information34 th Airline/ATS Safety Forum
34 th Airline/ATS Safety Forum Colleen Kitson, Senior ATS Specialist Outline RNP1 - including Albury Future applications Workshop Background ICAO Global Air Navigation Plan specifies PBN as the highest
More informationRNP AR APCH Approvals: An Operator s Perspective
RNP AR APCH Approvals: An Operator s Perspective Presented to: ICAO Introduction to Performance Based Navigation Seminar The statements contained herein are based on good faith assumptions and provided
More informationPractical Experiences & ATM Workshop. ATM Requirements. Setting the Scene
Practical Experiences & ATM Workshop ATM Requirements Setting the Scene ATM Requirements Forum - INTRO 2 Issue Many Issues (and many solutions) This Forum s central theme MIXED MODE One of the thorniest
More informationIRISH AVIATION AUTHORITY DUBLIN POINT MERGE. Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority
IRISH AVIATION AUTHORITY DUBLIN POINT MERGE Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority 2012 Holding Holding Before Point Merge No Pilot anticipation of distance
More informationFLIGHT OPERATIONS PANEL
International Civil Aviation Organization FLTOPSP/WG/2-WP/18 10/04/15 WORKING PAPER FLIGHT OPERATIONS PANEL WORKING GROUP MEETING SECOND MEETING Rome Italy, 4 to 8 May 2015 Agenda Item 5 : New Work Programme
More informationRNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood.
RNP OPERATIONS 1. Introduction Planes were made as a means of transport. To successfully fly from a location A to a location B, pilots were first and foremost navigators. Originally relying on visual landmarks
More informationAir Navigation Bureau ICAO Headquarters, Montreal
Performance Based Navigation Introduction to PBN Air Navigation Bureau ICAO Headquarters, Montreal 1 Performance Based Navigation Aviation Challenges Navigation in Context Transition to PBN Implementation
More informationATR-600 SERIES THE LEADING TURBOPROP
ATR-600 SERIES THE LEADING TURBOPROP ATR, regional market leader THE STRONGEST TRACK RECORD IN REGIONAL AVIATION 75% of turboprop orders in 2010-2016 The regional aviation market has evolved rapidly over
More informationPBN Performance. Based Navigation. Days 1, 2 & 3. ICAO PBN Seminar Seminar Case Studies Days 1,2,3. Seminar Case Studies
PBN Performance Based Navigation Seminar Case Studies Days 1, 2 & 3 1 Overview 2 Case Study - Day 1 Case Study - Day 2 Case Study - Day 3 3 Case Study - Day 1 Learning Objectives Identify navigation performance
More informationRNP AR Experience. Phil Rakena PBN Project Manager February 2015
RNP AR Experience Phil Rakena PBN Project Manager February 2015 1 What is PBN? Area navigation, using on-board systems to provide position and confirm navigation performance. PBN represents a shift from
More informationATR THE SHORTCUT TO YOUR DESTINATION
ATR 42-600 THE SHORTCUT TO YOUR DESTINATION THE STRON IN REGIONA 75% of turboprop orders in 2010-2017 ATR, regional market leader GEST TRACK RECORD L AVIATION The regional aviation market has evolved rapidly
More informationICAO PBN GO TEAM PBN Implementation Workshop ENAC / ATM
ICAO PBN GO TEAM PBN Implementation Workshop Tunis, 24-28 February 2014 ENAC / ATM Bertrand FOUCHER 1 PERSONAL BACKGROUND ATC in Paris Charles de Gaulle ATC Supervisor in Paris Charles de Gaulle, ATC Instructor
More informationPBN Implementation inside Italian Airspace Status update Summer 2013
PBN Implementation inside Italian Airspace Status update Summer 2013 Paris, 11-13 September 2013 enav.it Contents Tasks achieved PBN implementation schedules On going activities Further aspects Conclusions
More informationPBN Airspace Concept. ATS requirements
INTERNATIONAL CIVIL AVIATION ORGANIZATION PBN Airspace Concept ATS requirements Victor Hernandez RO ATM/SAR ICAO North America, Central America and Caribbean Regional Office 1 Gate to Gate concept Phases
More informationAP/FD TCAS and TCAP. Airborne Conflict Safety Forum Harry Nelson. A reminder and update. Month 20XX
Use Tab 'Insert - Header & Footer' for Presentation Title - Siglum - Reference Month 20XX Airborne Conflict Safety Forum Harry Nelson AP/FD TCAS and TCAP A reminder and update 1 2 AP / FD TCAS Refresher
More informationNextGen Priorities: Multiple Runway Operations & RECAT
NextGen Priorities: Multiple Runway Operations & RECAT May 2018 Presented by Paul Strande & Jeffrey Tittsworth Federal Aviation Administration National Airspace System Today Air traffic services for the
More informationMeasurement of environmental benefits from the implementation of operational improvements
Measurement of environmental benefits from the implementation of operational improvements ICAO International Aviation and Environment Seminar 18 19 March 2015, Warsaw, Poland Sven Halle Overview KPA ASSEMBLY
More informationICAO International Aviation and Environment Seminar OPERATIONAL IMPROVEMENTS. Presented by ICAO APAC RSO
ICAO International Aviation and Environment Seminar OPERATIONAL IMPROVEMENTS Presented by ICAO APAC RSO Operations in the Context of Aviation Planning & Pre-Flight Post Landing Applicable Operational Improvements
More informationAvailable On-Board Technologies For Runway Excursions Prevention
ROPS et Al. - ICAO RRSS Dubai Head of ROPS Programme Fabrice VILLAUMÉ Available On-Board Technologies For Runway Excursions Prevention Safety at Landing: the First Air Transportation Safety Issue Runway
More informationLearning Objectives. By the end of this presentation you should understand:
Designing Routes 1 Learning Objectives By the end of this presentation you should understand: Benefits of RNAV Considerations when designing airspace routes The basic principles behind route spacing The
More informationNextGen Trajectory-Based Operations Status Update Environmental Working Group Operations Standing Committee
NextGen Trajectory-Based Operations Status Update Environmental Working Group Operations Standing Committee May 17, 2010 Rose Ashford Rose.Ashford@nasa.gov 1 Outline Key Technical Concepts in TBO Current
More informationUSE OF RADAR IN THE APPROACH CONTROL SERVICE
USE OF RADAR IN THE APPROACH CONTROL SERVICE 1. Introduction The indications presented on the ATS surveillance system named radar may be used to perform the aerodrome, approach and en-route control service:
More informationPractical Experiences & ATM Workshop. ATM Requirements. Setting the Scene. Many Issues (and many solutions) This Forum s central theme MIXED MODE
Practical Experiences & ATM Workshop ATM Requirements Setting the Scene Issue Many Issues (and many solutions) This Forum s central theme MIXED MODE One of the thorniest problems to solve 2 What is mixed
More informationRussian Federation ATM modernization program
Russian Federation ATM modernization program Alexander Vedernikov Deputy Director of Federal Air Transport Agency 20-21 March, 2012, Moscow Main strategic directions of Russian Air Navigation System development
More informationTítulo ponencia: Introduction to the PBN concept
Título ponencia: Introduction to the PBN concept Organizado por: Index Introduction Background PBN Concept PBN Operations Conclusions Introduction Subject This presentation addresses the Performance-Based
More informationStandards and procedures for the approval of performance-based navigation operations. (Presented by Colombia) SUMMARY
216 INTERNATIONAL CIVIL AVIATION ORGANIZATION SAM/IG/9-WP/15 South American Regional Office Regional Project RLA/06/901 12/04/12 Assistance for the implementation of a regional ATM system according to
More informationController Training Case Study Implementation of new RNP AR APCH for RWY07 (North Circuit) at HKIA
Controller Training Case Study Implementation of new RNP AR APCH for RWY07 (North Circuit) at HKIA Disclaimer This presentation is for information purposes only. It should not be relied on as the sole
More informationATM STRATEGIC PLAN VOLUME I. Optimising Safety, Capacity, Efficiency and Environment AIRPORTS AUTHORITY OF INDIA DIRECTORATE OF AIR TRAFFIC MANAGEMENT
AIRPORTS AUTHORITY OF INDIA ATM STRATEGIC PLAN VOLUME I Optimising Safety, Capacity, Efficiency and Environment DIRECTORATE OF AIR TRAFFIC MANAGEMENT Version 1 Dated April 08 Volume I Optimising Safety,
More informationImplementation of PBN in Armenian airspace
Implementation of PBN in Armenian airspace PBN implementation plan, based on the specifications of the airspace of the Republic of Armenia, has been developed in accordance with Resolution A36-23, approved
More informationAirport Compatibility
Presented by Dan COHEN-NIR Programs Director Airbus Americas Holdings Inc. www.airbusamericas.com Airport Compatibility Opportunities and Challenges Airport Challenges & Aircraft Design Challenge: Prepare
More informationCivil and military integration in the same workspace
Civil and military integration in the same workspace Presented by PLC 1 introduction Civilian and Military ATCOs work alongside each other in various countries and are employed in a number of different
More informationAsia/Pacific Air Traffic Management Perspectives
Asia/Pacific Air Traffic Management Perspectives Len Wicks Regional Officer, Air Traffic Management, International Civil Aviation Organization (ICAO) MID ATMSG/4, Amman, April 2018 Contents Asia/Pacific
More informationAthens International Airport, Marketing Workshop. The Challenges facing Air Transport. John Blanchfield Director, Technical Marketing, Airbus
Athens International Airport, Marketing Workshop The Challenges facing Air Transport John Blanchfield Director, Technical Marketing, Airbus First A380 delivery - Toulouse 15th October 2007 From today there
More informationWhat is an Airspace Concept? Module 5
What is an Airspace Concept? Module 5 European Airspace Concept Workshops for PBN Implementation Overview Learning Objectives: At the end of this presentation you should: Understand what the purpose of
More informationOptimization of Airspace and Procedures in the Metroplex
Optimization of Airspace and Procedures in the Metroplex Administration SoCal Metroplex Project Overview Brief To: By: Los Angeles World Airport Rob Henry, Manager SoCal Metroplex Jose Gonzalez, SoCal
More informationHoneywell.com PBN Concepts Krakow, Poland
PBN Concepts Krakow, Poland EPKK (KRK) Current Operational Environment Current Operational Environment : Runways: 07/25 8,366 ft (2550m) Approaches: ILS or LOC 25 RNAV (GNSS) 07, 25 VOR 07, 25 NDB 25 Departure
More informationThird Meeting of the Air Navigation System Implementation Group (ANSIG/3) Cairo, Egypt, 3 5 July Saudi Arabia
Third Meeting of the Air Navigation System Implementation Group (ANSIG/3) Cairo, Egypt, 3 5 July 2018 Saudi Arabia Outline High Level Plan Overall Progress in ASBU Implementation (Priority 1) Success Story(ies)/Initiatives
More informationAfrica, Airbus; A vision of the future
Africa, Airbus; A vision of the future Addis Ababa March 13 th, 2013 Image: DSK Source: Global Insight, United Nations, Airbus GMF Africa Real GDP Urban population Intra-regional & domestic Inter-regional
More information2012 Performance Framework AFI
2012 Performance Framework AFI Nairobi, 14-16 February 2011 Seboseso Machobane Regional Officer ATM, ESAF 1 Discussion Intro Objectives, Metrics & Outcomes ICAO Process Framework Summary 2 Global ATM Physical
More informationPerformance Based Navigation (PBN) Implementation Plan. The Gambia
Performance Based Navigation (PBN) Implementation Plan The Gambia Version 1.0 Table of contents 1. Executive summary.. 2 2. Introduction. 2 3. The need for PBN implementation 2 4. Benifit of PBN implementation
More informationAN-Conf/12-WP/162 TWELFTH THE CONFERENCE. The attached report
29/11/12 TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 REPORT OF THE COMMITTEE TO THE CONFERENCE ON AGENDA ITEM 2 The attached report has been approved by thee Committee for submission
More informationAirbus A320family FOPP Air Flow Deflector
Airbus A320family FOPP Air Flow Deflector Noise reduction on approach Presented by Current status Two tonal noise components are generated by the Fuel Over Pressure Protector (FOPP) cavities ( whistling
More informationCONNECT Events: Flight Optimization
CONNECT Events: Flight Optimization Ian Britchford Director Post Flight Solutions 5 th October 2016 Data Analysis and Root Cause Evaluation for Continuous Improvement Learn about Jeppesen s next level
More informationMRO Trends: Airbus update
MRO Americas 2011 MRO Trends: Airbus update New Standards. Together. Presented by Chris Reamy, Director, Services Solutions & Strategy Airbus update on A380 in-service maintenance experience A350XWB maintenance
More informationPerformance Based Navigation Implementation of Procedures
Performance Based Navigation Implementation of Procedures Dr. Daniel Schaad Head of Instrument Flight Procedures (ATM/IFP) Minsk, April 10th, 2015 DIESER TEXT DIENT DER NAVIGATION First of all thank you
More informationStatus of PBN implementation in France
Status of PBN implementation in France PBN TF/4 Dec 2010 Benoit ROTURIER (DSNA) 1 Context supporting DSNA navigation strategy ICAO Navigation strategy Performance Based Navigation (PBN) concept Resolutions
More informationdel Airbus en el mundo de la
Ing Ivan Ramirez Centro de ensayos de Airbus en Toulouse-Francia Automatización del Airbus en el mundo de la aviación Fly by wire aircraft Page 2 Contents Fly by wire principles Flight Handling Page 3
More informationUSE AND APPLICATION OF GNSS IN THE IMPLEMENTATION OF NAVIGATION BASED ON PERFORMANCE IN ECUADOR
BACKGROUND OF GNSS USE The guidelines for the transition to the use of the Global Navigation Satellite System GNSS in the CAR / SAM Regions were issued by ICAO at the Eleventh World Air Navigation Conference
More informationContinuous Climb Operations (CCO) Manual
Doc 9993 AN/495 Continuous Climb Operations (CCO) Manual NOTICE TO USERS This document is an unedited advance version of an ICAO publication as approved, in principle, by the Secretary General, which is
More informationI AO Chi h e i f E c E on o o n m o i m c i A na n ly l s y is i & P o P l o ilc i y y Se S ctio i n
Narjess Teyssier ICAO Chief Economic Analysis & Policy Section Montréal 29 September 2010 Content Data Trends Forecasts Impact on stakeholders Monitoring air transport development: Statistics, analysis
More informationNav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation
Nav Specs and Procedure Design Module 12 Activities 8 and 10 European Airspace Concept Workshops for PBN Implementation Learning Objectives By the end of this presentation you should understand: The different
More informationAIR TRAFFIC FLOW MANAGEMENT INDIA S PERSPECTIVE. Vineet Gulati GM(ATM-IPG), AAI
AIR TRAFFIC FLOW MANAGEMENT INDIA S PERSPECTIVE Vineet Gulati GM(ATM-IPG), AAI AIR TRAFFIC FLOW MANAGEMENT ATFM is a service provided with the objective to enhance the efficiency of the ATM system by,
More informationNAM/CAR Regional Safety/Air Navigation/Aviation Security Implementation Matters 5.2 Effectiveness of air navigation implementation mechanisms
06/09/17 Seventh Meeting of the North American, Central American and Caribbean Directors of Civil Aviation (NACC/DCA/07) Washington, D. C., United States, 19 21 September 2017 Agenda Item 5: NAM/CAR Regional
More informationICAO Big Data Project ADS-B Data as a source for analytical solutions for traffic behaviour in airspace
ICAO Big Data Project ADS-B Data as a source for analytical solutions for traffic behaviour in airspace ICAO/IATA/CANSO PBN/2 San Jose December 8, 2016 Big Data process Quantitative Quantitative / Qualitative
More informationUK Implementation of PBN
UK Implementation of PBN Geoff Burtenshaw Directorate of Airspace Policy UK Civil Aviation Authority 1 UK airspace context Presentation Overview Future Airspace Strategy (FAS) (FAS) Industry Implementation
More informationImplementation challenges for Flight Procedures
Implementation challenges for Flight Procedures A Data-house perspective for comprehensive Procedure Design solution: A need today Sorin Onitiu Manager Business Affairs, Government & Military Aviation,
More informationConsiderations for. RNP to xls. Operations. Juergen Ruppert. Regional Director Air Traffic Optimisation Services GE Aviation
Considerations for RNP to xls Operations Juergen Ruppert Regional Director Air Traffic Optimisation Services GE Aviation RNP to ILS 2 Content Why RNP to XLS What is the technology How does it work now?
More informationFuel and Flight Efficiency Services by Airbus
AACO 7 th Aviation Fuel Forum Caroline STEMART Flight Operations Consultant Fuel and Flight Efficiency Services by Airbus Page 1 Why fuel is key in your expenses? Fuel expenses represent more than 30%
More informationPHILIPPINES ATC EXPERIENCE ON PBN 6/15/ CIVIL AVIATION AUTHORITY OF THE PHILIPPINES
PHILIPPINES ATC EXPERIENCE ON PBN a Brief History Dependency to Ground Navigational Aids In June 2010, the outage of the Manila DVOR/DME and ILS system brought air traffic to a halt. The very low visibility
More informationPBN Hybrid Procedures as an Enabler for Airport Accessibility in Challenging Terrain
PBN Hybrid Procedures as an Enabler for Airport Accessibility in Challenging Terrain the example of Innsbruck/Austria Dr.-Ing. Philipp Daniel Schaad Head of Instrument Flight Procedures Austro Control
More informationImplementation of the Performance-Based Air Navigation Systems for the CAR Region ICAO Regional TC Project RLA/09/801 Agenda Item 6 WP/14
of the Performance-Based Air Navigation Systems for the CAR Region ICAO Regional TC Project RLA/09/801 Agenda Item 6 WP/14 Julio Garriga, RO/TA International Civil Aviation Organization North American,
More informationRequired Navigation Performance (RNP) in the United States
Required Navigation Performance (RNP) in the United States Overview FAA Roadmap for Performance-Based Navigation Moving to Performance-Based Navigation (RNAV and RNP) Definitions Operational attributes
More informationAirport-CDM Workshop. Stephane Durand Co-chair CANSO CDM sub-group International Affairs DSNA
Airport-CDM Workshop Stephane Durand Co-chair CANSO CDM sub-group International Affairs DSNA Jean-Baptiste Djebbari Airline Pilot International Affairs DSNA Content Introduction 1. CANSO and A-CDM 2. A-CDM
More informationTANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES
Page 1 of 8 1. PURPOSE 1.1. This Advisory Circular provides guidance to personnel involved in construction of instrument and visual flight procedures for publication in the Aeronautical Information Publication.
More informationRNP AR RWY 16 in Vienna Schwechat (LOWW) PBN based Noise Abatement
RNP AR RWY 16 in Vienna Schwechat (LOWW) PBN based Noise Abatement Dr. Philipp Daniel Schaad Head of Instrument Flight Procedures (ATM/IFP) ICANA, Frankfurt, November 2016 DIESER TEXT DIENT DER NAVIGATION
More informationORGANISER HOST LEAD SPONSOR
ORGANISER HOST LEAD SPONSOR Data Sharing and ATFM Moderator Francois Delille Director of Business and Product Strategy, ATM, Thales CANSO LATIN AMERICA AND CARIBBEAN CONFERENCE 2017 Challenges of the Air
More informationTHE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR ANS IN ERITREA Presented by Ghebreab Ghebremedhin Director ANS/AGA Division
THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR ANS IN ERITREA 2011-2015 Presented by Ghebreab Ghebremedhin Director ANS/AGA Division DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION
More informationNext Generation Airspace Developments: Key Operational Trends and Enablers
Next Generation Airspace Developments: Key Operational Trends and Enablers ICNS 2013, Day 1 Plenary Nikos Fistas EUROCONTROL Herdon, VA, 23/04/13 Agenda Key goals of future European ATM system 4D Trajectory
More informationAir Transport Forecast & Scenarios Key drivers for Scenario building. EFONET Workshop The Hague November 21st 2008
Air Transport Forecast & Scenarios Key drivers for Scenario building EFONET Workshop The Hague November 21st 2008 4 building blocks of Airbus forecast Market research Passenger Demand Forecast Aircraft
More informationPBN and RNAV concepts
PBN and RNAV concepts Rabat, 16/27-03-2015 Target: Learn basic concept on PBN and RNAV. NOT FOR COMMERCIAL PURPOSES 2 Concepts Part 1: PBN concept Part 2: RNAV, RNP Part 3: FTE (Flight Technical Error)
More information