1 International Civil Aviation Organization FLTOPSP/1-WP/3 7/10/14 WORKING PAPER FLIGHT OPERATIONS PANEL (FLTOPSP) FIRST MEETING Montréal, 27 to 31 October 2014 Agenda Item 4: Active work programme items 4.3: PBN operational implementation issues CONCEPT OF OPERATIONS VISUAL RNAV (Presented by Mario Chaves, prepared by Theo Van de Ven and Claude Godel) SUMMARY This working paper describes both the Concepts of Operation and Operational Considerations. Both must be seen as the basis information, needed to come to a manual with sufficient information available for those responsible for the design, dissemination and use of a new type of approach using the RNAV capabilities of the aircraft in visual conditions. We ask Flight Operations Panel (FLTOPSP) members to study the concept, think about possible operational issues related to the application of visual RNAV approaches that should be resolved and seeks answers to questions Instrument Flight Procedure Panel (IFPP) members identified in the operational field. Action by the FLTOPSP is in paragraph INTRODUCTION 1.1 Visual approaches are commonly used at a number of international aerodromes for shorter and more efficient routings and environmental reasons. To improve the accuracy, predictability, repeatability and safety of these operations, Operators and States are developing and publishing visual approach procedures supported by RNAV (generally published as RNAV visual ). 1.2 However, there are no existing criteria in Procedures for Air Navigation Services Aircraft Operations (PANS-OPS, Doc 8168) or any other relevant ICAO documentation to support standardization of these procedures to provide consistent application on a worldwide basis; consequently development of non-standard operational concepts, procedures and charting occurs. It becomes most important that the approach design, publication and operational use of those approaches are standardized. (14 pages) FLTOPSP 1 WP 3 Concept of Operations Visual RNAV.docx

2 FLTOPSP/1-WP/ OVERVIEW OF EXISTING VISUAL APPROACHES 2.1 Visual approaches are not new. They exist uncharted, based on ad-hoc traffic handling methods by ATC and they exist in the form of published, charted procedures. 2.2 Until recently, published visual approaches are primarily based on visual navigation. Therefore, specific landmarks are used to be able to navigate along a desired flight path. There are no requirements of lateral and vertical protection around the published nominal path. Approaches exist where supporting use is made of ground based navigation systems such as VOR radials and DME distances, to mark points to define the route more accurate in the lateral and vertical sense. 2.3 With the emerging RNAV system capability of many aircraft, these supporting instrumental navigation based on ground based systems were replaced by RNAV, providing for more flexibility in the design of the route and a higher accurate and predictable flight path. The development of visual approaches supported by the RNAV capability of the aircraft should therefore be seen as a natural evolution of an already existing use of instrumental navigation support to a visual approach. 2.4 However, ICAO did not yet pick up this development and currently a proliferation of design criteria and publications take place. Design criteria, charting, coding and use of the procedures are non-standardized. This is an undesired situation as the design, publication and database storage are not embedded in the required aviation environment. 3. IFPP INITIATIVE FOR VISUAL RNAV CRITERIA 3.1 The IFPP is in the process of developing criteria for the design and publication of visual RNAV approaches. Despite already extended use of the terminology RNAV visual it seems still worth to decide if Visual RNAV would not be the better naming. 3.2 There are two different views on the status of a visual RNAV approach: a) one stream sees a visual RNAV approach as an RNAV approach, only to be used under Visual Meteorological Conditions (VMC); and b) the other sees the visual RNAV approach primarily as a conventional visual approach, supported by an RNAV system (in this case RNAV visual would be better). 3.3 It is necessary to clarify and decide in what category approach the visual RNAV approach should be classified. This question is put forward in paragraph 6.1 of this working paper. The outcome may have an effect on some wording used in this document. 3.4 It has been decided to publish the information in the form of a manual. The advantage of a manual is the possibility to provide more supporting information in a narrative form and information of a much wider spectrum than the design criteria alone. Standardization in design, publication, development and operational use of a visual RNAV, training and system handling issues requires a broad spectrum and requires more than the separate elements only. A manual allows all these elements to be touched upon in one place. In a second stage, references and/or elements of the criteria can be published in existing ICAO documentation, when consolidated and matured.

3 - 3 - FLTOPSP/1-WP/3 3.5 The aim of the manual is to present a standard concept of operations, design criteria and charting examples for the application of published visual RNAV approaches following up on already existing procedures and criteria. This concept of operations, standardized design criteria and charting methodology can be applied for dedicated use (limited to authorized aircraft operators only) or when so desired, used for public use and thus assists in removing inconsistencies that currently exist. 4. CONCEPT OF OPERATIONS 4.1 Basic assumptions: a) they are primarily an ATM tool targeting safety, efficiency (and potentially environmental) gains; b) when cleared for a visual RNAV, the pilot will follow the coded RNAV path or inform ATC if it is no longer possible; c) they will be developed only where visual approaches are already in use by ATC for ATM reasons, or are considered by ATC and other Stakeholders as an operationally beneficial means of managing traffic in VMC; d) visual RNAV approach is an enhancement of the standard visual approach, made possible by utilising the RNAV capability of the contemporary passenger transport aircraft; e) the approaches are incorporated into the terminal area procedures and may be preceded by a STAR. They are used in lieu of instrument approach when the weather conditions are suitable for the operation; and f) traffic separation remains the responsibility of ATC throughout the operation. 4.2 Visual RNAV approach is not intended to be used in marginal weather conditions. 4.3 There is a need to have a common understanding of how visual RNAV approaches will be designed and utilized. Therefore, for visual RNAV approaches, the following concept of operations is applicable and must be part of the requirements for the publication of visual RNAV approaches: a) a visual RNAV approach can be developed where there is an identifiable operational or safety benefit and it has been requested by a stakeholder (ANSP, air operator, airport authority or ATC); b) the RNAV guidance is to be seen as a technical support to the visual navigation. The aircraft navigates through the RNAV system, but the terrain clearance is monitored by visual reference to the ground, and optionally to other preceding traffic; c) the nominal track is protected with an aircraft dependent corridor in order to provide for a Minimum Obstacle Clearance Altitude (MOCA) along the flight path and to guarantee the safe publication of procedure altitudes along the track taking the MOCA into account;

4 FLTOPSP/1-WP/3-4 - d) depending on the complexity of the procedure, prior to publication, the fly-ability of the procedure may have to be tested in a full flight simulator and if deemed necessary in actual conditions when critical environment is involved; speed and/or altitude constraints may be necessary; and e) ATC responsibilities remain the same as per published visual approaches. Pilots are responsible for accurate navigation along the coded path and shall inform ATC if this is no longer achievable. 5. OPERATIONAL CONSIDERATIONS 5.1 The following operational factors must be considered and published as deemed necessary, when conducting visual RNAV approaches: a) both ATC and the pilot are aware of their roles and responsibilities (e.g.: IR rating required) regarding a visual approach (navigation, separation, required visual meteorological conditions); b) the visual RNAV approach must be stored and retrievable from the database and the pilot must verify that the aircraft capability matches the navigation requirement(s); c) the pilot understands that although RNAV is used for navigation, aircraft position verification is primarily based on visual references; d) the pilot can request a visual RNAV approach provided the required visual meteorological conditions exist and he/she can comply with the navigation requirements; e) if ATC offers the visual RNAV approach, the navigation requirements must be met, and the aircraft must be in a position from where the approach can be initiated and expected to be flown within the envelope of a normal operation; f) the pilot understands that an offer of a visual RNAV approach by ATC can be refused at any time if unable to meet the required conditions; g) a specific waypoint (e.g at the end of a STAR, preceding the visual RNAV Approach segment) shall be clearly identified in the procedure as the visual approach commencement point from which visual approach conditions must be fulfilled or the approach must be abandoned as indicated on the chart; h) the pilot adheres to all route, speed and altitude limitations and instructions as published if visual RNAV is accepted, the aircraft must remain on the published track; i) the course of action in case of inability to complete the approach to landing need to be included with the procedure; j) the design may take aircraft category into account, where there is a need for, based on speed, altitude or usage need; and k) the pilot must be trained for visual RNAV approaches.

5 - 5 - FLTOPSP/1-WP/3 6. ACTION BY THE FLTOPSP 6.1 The FLTOPSP is invited to: a) take note of the information in this paper; b) consider appropriate follow-up actions; and c) provide answers on the following (not limited to) the following questions identified by the IFPP: 1) Is the visual approach to be seen as an RNAV approach usable under limited visibility and ceiling conditions, or to be seen as a visual approach with RNAV support? 2) Use of autopilot or flight director: is this advisable not advisable or should it be even required? 3) Use of RNP: is this advisable (if available) and if so what value to be set? 4) Is there a need for publication and storage of a missed approach at the end of a visual RNAV approach? d) In agreement with the IFPP, create a job card to undertake the above task before submitting the conclusions and recommendations to the IFPP for incorporation within their own tasks. A proposed job card is attached in Appendix B to this working paper.

6

7 APPENDIX A FLTOPSP/1-WP/3 Appendix A

8 FLTOPSP/1-WP/3 Appendix A

9 FLTOPSP/1-WP/3 Appendix A

10 FLTOPSP/1-WP/3 Appendix A

11 FLTOPSP/1-WP/3 Appendix A

12

13 APPENDIX B FLTOPSP/1-WP/3 Appendix B Working Group on Strategic Review and Planning ANWP Amendment Input Form (Job-card) PART I Category Safety Sustainability Implementation Reference: Title Proposed by Problem Statement Specific Details (including impact statements) PART II Develop operational concepts and propose high level criteria to the IFPP related to the conduct of visual approaches aided by the use of on board aircraft coded procedures IATA Ops Panel Member Since the introduction and widespread implementation of PBN, new types of procedures have emerged that seek to simplify the pilot and ATC task to improve cost effectiveness and environmental impact or to remove airport access limitations. These types of operations are based on utilizing PBN but introduce new combinations of means of navigation to, from and throughout final approach and departure. The currently named RNAV Visual or Visual RNAV approach is one such operation. It is an especially useful tool potentially giving lateral and vertical guidance to pilots when conducting an approach in visual conditions either to a challenging runway or assisting in preventing un-stabilized approaches. Being an approach coded in the aircraft s navigation database, but only flown in visual conditions, it falls into a potential no-man s land in that the pilot may mistakenly understand normal instrument criteria have been applied to the procedure and ATC may believe that when clearing a flight for the RNAV Visual or Visual RNAV approach, the crew will understand that separation from terrain and other traffic are solely the responsibility of the operating crew. Any misunderstanding by either could potentially lead to a hazardous situation developing. One particular concern is if at some point the crew should lose their visual reference they may believe their approach is protected. Furthermore, being visual, should such an approach contain a missed approach and/or missed approach instructions? Develop operating procedures, define weather conditions for issuance of such an approach and propose outline or high level design criteria for the RNAV Visual. Part of this process may require developing a more appropriate name for the approach type that clearly defines this approach type as being separate from a standard RNAV procedure, but still contains the basic requirements so that it may be coded for the FMS NDB and, where appropriate, published in a States AIP The work may also require guidelines for an alternative method to create and gain approval of such visual procedures by individual operator s or groups of operators outside the conventional method where States may not be able to, or wish to, commit to providing such approaches for universal use. All work should take into account not only the needs of the flight crew, but ATC along with some form of design criteria. There is also a need to clarify the (RNAV) track keeping accuracy and separation responsibilities expected by ATC whenever clearing an aircraft for this visual procedure. Potential impact: increased flight safety and crew awareness, repeatable flight paths with reduced ATC workload, cost effectiveness through shorter routings, reduced environmental impact and improved airport access. Rating High Medium Low Rationale for acceptance/rejection Action already in progress

14 FLTOPSP/1-WP/3 Appendix B B-2 Interdependencies/References Annex 4, Annex 6, Annex 11, PBN Manual, Doc 9905 Required Action By Whom/Resources Deliverables Timescales (for deliverable) 1 Develop provisions for application of RNAV Visual approach procedures Dedicated WP or the PBN OPS WG Proposed amendments to Doc 8168 Volumes I and II, Doc 8697 and Annex Issue Date: Date Assessed by SRP: Date Approved by ANC: Next Review Date: Completed Date: Version 2.0 (01 May 2012) END

FLIGHT OPERATIONS PANEL

FLIGHT OPERATIONS PANEL International Civil Aviation Organization FLTOPSP/WG/2-WP/18 10/04/15 WORKING PAPER FLIGHT OPERATIONS PANEL WORKING GROUP MEETING SECOND MEETING Rome Italy, 4 to 8 May 2015 Agenda Item 5 : New Work Programme

More information

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES Page 1 of 8 1. PURPOSE 1.1. This Advisory Circular provides guidance to personnel involved in construction of instrument and visual flight procedures for publication in the Aeronautical Information Publication.

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization AN-Conf/12-WP/6 7/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Agenda Item 2: Aerodrome operations improving airport performance 2.2: Performance-based

More information

Standards and procedures for the approval of performance-based navigation operations. (Presented by Colombia) SUMMARY

Standards and procedures for the approval of performance-based navigation operations. (Presented by Colombia) SUMMARY 216 INTERNATIONAL CIVIL AVIATION ORGANIZATION SAM/IG/9-WP/15 South American Regional Office Regional Project RLA/06/901 12/04/12 Assistance for the implementation of a regional ATM system according to

More information

Learning Objectives. By the end of this presentation you should understand:

Learning Objectives. By the end of this presentation you should understand: Designing Routes 1 Learning Objectives By the end of this presentation you should understand: Benefits of RNAV Considerations when designing airspace routes The basic principles behind route spacing The

More information

Quality Assurance. Introduction Need for quality assurance Answer to the need of quality assurance Details on quality assurance Conclusion A B C D E

Quality Assurance. Introduction Need for quality assurance Answer to the need of quality assurance Details on quality assurance Conclusion A B C D E Quality Assurance 1 A B C D E Introduction Need for quality assurance Answer to the need of quality assurance Details on quality assurance Conclusion 2 1 Introduction 3 Introduction The implementation

More information

2012 Performance Framework AFI

2012 Performance Framework AFI 2012 Performance Framework AFI Nairobi, 14-16 February 2011 Seboseso Machobane Regional Officer ATM, ESAF 1 Discussion Intro Objectives, Metrics & Outcomes ICAO Process Framework Summary 2 Global ATM Physical

More information

REGULATION No. 10/2011 ON APPROVAL OF FLIGHT PROCEDURES INCLUDING SID-s AND STAR-s. Article 1 Scope of Application

REGULATION No. 10/2011 ON APPROVAL OF FLIGHT PROCEDURES INCLUDING SID-s AND STAR-s. Article 1 Scope of Application Republika e Kosovës Republika Kosovo Republic of Kosovo Autoriteti i Aviacionit Civil i Kosovës Autoritet Civilnog Vazduhoplovstva Kosova Civil Aviation Authority of Kosovo Director General of Civil Aviation

More information

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES AFCAC/ICAO Joint Workshop Walter White ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES 24 JUNE 2014 Airbus ProSky Corporate Presentation 29/06/2014 PERFORMANCE-BASED NAVIGATION The implementation of Performance-Based

More information

Approach Specifications

Approach Specifications Approach Specifications RNP Approach (RNP APCH) and Baro-VNAV Approach Specifications RNP APCH and Baro-VNAV 1 Overview Learning Objectives: At the end of this presentation, you should: Understand the

More information

CONTROLLED AIRSPACE CONTAINMENT POLICY

CONTROLLED AIRSPACE CONTAINMENT POLICY Safety and Airspace Regulation Group (SARG) 17 January 2014 Policy Statement 1 Overview CONTROLLED AIRSPACE CONTAINMENT POLICY 1.1 UK airspace design policy for ATS Routes, SIDs and STARs is based upon

More information

Nav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation

Nav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation Nav Specs and Procedure Design Module 12 Activities 8 and 10 European Airspace Concept Workshops for PBN Implementation Learning Objectives By the end of this presentation you should understand: The different

More information

FLIGHT CREW LICENSING AND TRAINING PANEL (FCLTP) SECOND MEETING. Montreal, 31 January to 11 February 2005 AGENDA ITEM 5

FLIGHT CREW LICENSING AND TRAINING PANEL (FCLTP) SECOND MEETING. Montreal, 31 January to 11 February 2005 AGENDA ITEM 5 10/2/05 FLIGHT CREW LICENSING AND TRAINING PANEL (FCLTP) SECOND MEETING Montreal, 31 January to 11 February 2005 AGENDA ITEM 5 The attached constitutes the report on Agenda Item 5 and should be inserted

More information

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez International Civil Aviation Organization PBN Airspace Concept Victor Hernandez Overview Learning Objective: at the end of this presentation you should Understand principles of PBN Airspace Concept 2 Gate

More information

FLIGHT OPERATIONS PANEL

FLIGHT OPERATIONS PANEL International Civil Aviation Organization FLTOPSP/WG/2-WP/11 24/04/2015 WORKING PAPER FLIGHT OPERATIONS PANEL WORKING GROUP SECOND MEETING (FLTOPSP/WG2) Rome, Italy 4 to 8 May 2015 Agenda Item 6: Any Other

More information

FLIGHT OPERATIONS PANEL

FLIGHT OPERATIONS PANEL International Civil Aviation Organization FLTOPSP/WG/2-WP/14 27/04/2015 WORKING PAPER FLIGHT OPERATIONS PANEL WORKING GROUP SECOND MEETING (FLTOPSP/WG/2) Rome Italy, 4 to 8 May 2015 Agenda Item 4 : Active

More information

PBN ROUTE SPACING AND CNS REQUIREMENTS (Presented by Secretariat)

PBN ROUTE SPACING AND CNS REQUIREMENTS (Presented by Secretariat) International Civil Aviation Organization The First Meeting of South China Sea Major Traffic Flow Review Group (SCS-MTFRG/1) Kuala Lumpur, Malaysia, 19-20 January 2015 Agenda Item 5: Discuss strategy for

More information

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point : Gen

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point : Gen Page 1 of 8 1. INTRODUCTION 1.1. This material has been prepared to provide step-by-step guidance on the application of performance-based navigation (PBN) in developing an Airspace Change Proposal (ACP).

More information

Performance Based Navigation (PBN) Implementation Plan. The Gambia

Performance Based Navigation (PBN) Implementation Plan. The Gambia Performance Based Navigation (PBN) Implementation Plan The Gambia Version 1.0 Table of contents 1. Executive summary.. 2 2. Introduction. 2 3. The need for PBN implementation 2 4. Benifit of PBN implementation

More information

ICAO Activities. IFPP work on the Manual for Continuous Descent Operations. Federal Aviation Administration

ICAO Activities. IFPP work on the Manual for Continuous Descent Operations. Federal Aviation Administration ICAO Activities IFPP work on the Manual for Continuous Descent Operations Presented to: JPDO, EWG, Ops SC Workshop NASA Ames Facility, Moffet Field, CA By: Lynn Boniface, ISI, Supporting AFS-420 Date:

More information

Amendment 37,38 to Annex 15 Amendment 57 to Annex 4

Amendment 37,38 to Annex 15 Amendment 57 to Annex 4 International Civil Aviation Organization Amendment 37,38 to Annex 15 Amendment 57 to Annex 4 Roberta Luccioli TO/AIM Seminario de la OACI sobre la Transicion al AIM Fases1 3 Outline 1. Amendment 37 to

More information

IRISH AVIATION AUTHORITY DUBLIN POINT MERGE. Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority

IRISH AVIATION AUTHORITY DUBLIN POINT MERGE. Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority IRISH AVIATION AUTHORITY DUBLIN POINT MERGE Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority 2012 Holding Holding Before Point Merge No Pilot anticipation of distance

More information

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT DIRECTORATE E - Air Transport E.2 - Single sky & modernisation of air traffic control Brussels, 6 April 2011 MOVE E2/EMM D(2011) 1. TITLE

More information

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN PBN Performance Based Navigation - PBN & Airspace Concepts - Introduction to PBN 1 Learning Objectives PBN Concept within the context of an Airspace (Operational) Concept. Introduction to PBN 2/37 Components

More information

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point: Gen

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point: Gen Page 1 of 6 1 INTRODUCTION Each route shall be assigned a designator that is unique for that aerodrome. The designator shall be defined in accordance with Annex 11, Appendix 3. In addition, the first 4

More information

PBN/TF/7 DRAFT Appendix D to the Report D-1

PBN/TF/7 DRAFT Appendix D to the Report D-1 DRAFT STATUS OF IMPLEMENTATION TASKS LIST PBN Task Force C4/1 The APAC PBN TF encourages States to consider the GO Team visit. On-going. States are encouraged to consider the GO Team visit as required.

More information

CFIT-Procedure Design Considerations. Use of VNAV on Conventional. Non-Precision Approach Procedures

CFIT-Procedure Design Considerations. Use of VNAV on Conventional. Non-Precision Approach Procedures OCP-WG-WP 4.18 OBSTACLE CLEARANCE PANEL WORKING GROUP AS A WHOLE MEETING ST. PETERSBURG, RUSSIA 10-20 SEPTEMBER 1996 Agenda Item 4: PANS-OPS Implementation CFIT-Procedure Design Considerations Use of VNAV

More information

Safety and Airspace Regulation Group. 31 May Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY.

Safety and Airspace Regulation Group. 31 May Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY. Safety and Airspace Regulation Group 31 May 2018 Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY 1 Introduction 1.1 This Policy Statement (PS) presents CAA policy and guidance to Air Navigation

More information

INTERNATIONAL FEDERATION OF AIR TRAFFIC CONTROLLERS ASSOCIATIONS. Agenda Item: B.5.12 IFATCA 09 WP No. 94

INTERNATIONAL FEDERATION OF AIR TRAFFIC CONTROLLERS ASSOCIATIONS. Agenda Item: B.5.12 IFATCA 09 WP No. 94 INTERNATIONAL FEDERATION OF AIR TRAFFIC CONTROLLERS ASSOCIATIONS 48 th ANNUAL CONFERENCE - Dubrovnik, 20 th to 24 th April 2009 Agenda Item: B.5.12 IFATCA 09 WP No. 94 Study Go Around Procedures When on

More information

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT PRE-PLANNING PHASE Nomination of the State Focal Point of Contact Appointment of the South Africa PBN Project Manager and Team Define the goals and objectives of Project Define the Terms of Reference for

More information

CHAPTER 7 AEROPLANE COMMUNICATION AND NAVIGATION EQUIPMENT

CHAPTER 7 AEROPLANE COMMUNICATION AND NAVIGATION EQUIPMENT CHAP 7-1 CHAPTER 7 COMMUNICATION AND NAVIGATION EQUIPMENT 7.1 COMMUNICATION EQUIPMENT 7.1.1 An aeroplane shall be provided with radio communication equipment capable of: a) conducting two-way communication

More information

RNP AR APCH Approvals: An Operator s Perspective

RNP AR APCH Approvals: An Operator s Perspective RNP AR APCH Approvals: An Operator s Perspective Presented to: ICAO Introduction to Performance Based Navigation Seminar The statements contained herein are based on good faith assumptions and provided

More information

From AIS to AIM. COMSOFT AIS to AIM Lima, Peru Context and Overview Isabel Zambrano Rodriguez

From AIS to AIM. COMSOFT AIS to AIM Lima, Peru Context and Overview Isabel Zambrano Rodriguez From AIS to AIM COMSOFT AIS to AIM Lima, Peru 24-28.11.2014 Context and Overview Isabel Zambrano Rodriguez Context: Challenges to AIS Worldwide AIS throughout the world face a number of challenges : Air

More information

GENERAL INFO NOTICE 1. BACKGROUND

GENERAL INFO NOTICE 1. BACKGROUND GENERAL INFO NOTICE 1. BACKGROUND Precision-RNAV (P-RNAV) is the natural progression from Basic RNAV (B-RNAV) which became mandatory in European Airspace in April 1998 for en-route operations. Initial

More information

TWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line.

TWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line. International Civil Aviation Organization WORKING PAPER 31/10/12 English only TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 5: Efficient flight paths through trajectory-based

More information

Implementation challenges for Flight Procedures

Implementation challenges for Flight Procedures Implementation challenges for Flight Procedures A Data-house perspective for comprehensive Procedure Design solution: A need today Sorin Onitiu Manager Business Affairs, Government & Military Aviation,

More information

Título ponencia: Introduction to the PBN concept

Título ponencia: Introduction to the PBN concept Título ponencia: Introduction to the PBN concept Organizado por: Index Introduction Background PBN Concept PBN Operations Conclusions Introduction Subject This presentation addresses the Performance-Based

More information

It is essential that planning take full account of air safety and efficiency of operations.

It is essential that planning take full account of air safety and efficiency of operations. Airspace Protection Airspace Protection It is essential that planning take full account of air safety and efficiency of operations. 7.1 INTRODUCTION Obstacles near an airport, whether they are natural

More information

AERONAUTICAL INFORMATION SERVICES TO AERONAUTICAL INFORMATION MANAGEMENT STUDY GROUP (AIS-AIMSG)

AERONAUTICAL INFORMATION SERVICES TO AERONAUTICAL INFORMATION MANAGEMENT STUDY GROUP (AIS-AIMSG) AIS-AIMSG/9-SN/12 20/04/2014 AERONAUTICAL INFORMATION SERVICES TO AERONAUTICAL INFORMATION MANAGEMENT STUDY GROUP (AIS-AIMSG) NINETH MEETING Tokyo, Japan, 21 to 25 April 2014 Agenda Item 4 Aeronautical

More information

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood.

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood. RNP OPERATIONS 1. Introduction Planes were made as a means of transport. To successfully fly from a location A to a location B, pilots were first and foremost navigators. Originally relying on visual landmarks

More information

PBN and RNAV concepts

PBN and RNAV concepts PBN and RNAV concepts Rabat, 16/27-03-2015 Target: Learn basic concept on PBN and RNAV. NOT FOR COMMERCIAL PURPOSES 2 Concepts Part 1: PBN concept Part 2: RNAV, RNP Part 3: FTE (Flight Technical Error)

More information

European Aviation Safety Agency

European Aviation Safety Agency Annexes I and II to ED Decision 2018/013/R European Aviation Safety Agency Acceptable Means of Compliance and Guidance Material to Commission Regulation (EU) No 1332/2011 and Commission Implementing Regulation

More information

Flight Operations Inspector Manual

Flight Operations Inspector Manual 1. Purpose of the job aid APPLICATION TO CONDUCT RNP APCH OPERATIONS a) To provide information on the relevant documents. b) To provide a record of the operator application, the inspector comments and

More information

PBN and airspace concept

PBN and airspace concept PBN and airspace concept 07 10 April 2015 Global Concepts Global ATM Operational Concept Provides the ICAO vision of seamless, global ATM system Endorsed by AN Conf 11 Aircraft operate as close as possible

More information

GENERAL REPORT. Reduced Lateral Separation Minima RLatSM Phase 2. RLatSM Phase 3

GENERAL REPORT. Reduced Lateral Separation Minima RLatSM Phase 2. RLatSM Phase 3 IBAC TECHNICAL REPORT SUMMARY Subject: NAT Operations and Air Traffic Management Meeting: North Atlantic (NAT) Procedures and Operations Group Meeting 2 Reported by Tom Young POG2 took place at the ICAO

More information

4.1 This document outlines when a proposal for a SID Truncation may be submitted and details the submission requirements.

4.1 This document outlines when a proposal for a SID Truncation may be submitted and details the submission requirements. Safety and Airspace Regulation Group 13 May 2014 Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY 1 Introduction 1.1 This Policy Statement (PS) is intended to provide guidance to ANSPs

More information

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI - 110003 CIVIL AVIATION REQUIREMENT SECTION 8 - AIRCRAFT OPERATIONS SERIES 'S',

More information

INTERNATIONAL CIVIL AVIATION ORGANIZATION FIRST MEETING OF DIRECTORS OF CIVIL AVIATION OF THE CARIBBEAN REGION (CAR/DCA/1)

INTERNATIONAL CIVIL AVIATION ORGANIZATION FIRST MEETING OF DIRECTORS OF CIVIL AVIATION OF THE CARIBBEAN REGION (CAR/DCA/1) CAR DCA/1 20/09/02 INTERNATIONAL CIVIL AVIATION ORGANIZATION FIRST MEETING OF DIRECTORS OF CIVIL AVIATION OF THE CARIBBEAN REGION (CAR/DCA/1) (Grand Cayman, Cayman Islands, 8-11 October 2002) Agenda Item

More information

Work Programme of ICAO Panels and Study Groups

Work Programme of ICAO Panels and Study Groups SIP/2009-WP/16 Performance framework Work Programme of ICAO Panels and Study Groups H.V. SUDARSHAN, Regional Programme Officer International Civil Aviation Organization Workshop on the Development of National

More information

Promoting EGNSS Operational Adoption in BLUEMED FAB CYPRUS

Promoting EGNSS Operational Adoption in BLUEMED FAB CYPRUS Promoting EGNSS Operational Adoption in BLUEMED FAB CYPRUS The objective of the project was EGNOS enabled APV SBAS (LPV) approach procedures, and related implementation at Larnaca and Paphos International

More information

AN INTRODUCTION TO PANS-AERODROMES (Doc 9981)

AN INTRODUCTION TO PANS-AERODROMES (Doc 9981) AN INTRODUCTION TO PANS-AERODROMES (Doc 9981) ADCI TF/1-PPT/5 Joseph CHEONG, Technical Officer, Aerodromes Section, ICAO Montreal REFERENCES: PANS - AERODROMES ANWP-8322 ANWP-8379 ANWP-8669 (not available)

More information

PBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

PBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613) PBN Syllabus Helicopter Training Topic phase Theoretical PBN concept training (as described in ICAO Doc 9613) PBN principles PBN components PBN scope Navigation specifications RNAV and RNP Navigation functional

More information

EASA NPA on SERA Part ENAV Response sheet. GENERAL COMMENTS ON NPA PACKAGE Note: Specific comments are provided after the General Comments

EASA NPA on SERA Part ENAV Response sheet. GENERAL COMMENTS ON NPA PACKAGE Note: Specific comments are provided after the General Comments EASA NPA on SERA Part ENAV Response sheet GENERAL COMMENTS ON NPA PACKAGE te: Specific comments are provided after the General Comments 1 SERA Parts C and D ENAV still misses clarity on the whole scope

More information

UK Implementation of PBN

UK Implementation of PBN UK Implementation of PBN Geoff Burtenshaw Directorate of Airspace Policy UK Civil Aviation Authority 1 UK airspace context Presentation Overview Future Airspace Strategy (FAS) (FAS) Industry Implementation

More information

Flight Evaluation and Validation of RNP AR/SAAAR Instrument Flight Procedures

Flight Evaluation and Validation of RNP AR/SAAAR Instrument Flight Procedures Flight Evaluation and Validation of RNP AR/SAAAR Instrument Flight Procedures Donald P. Pate Consultant Aviation Airspace Consulting, Inc. Edmond, OK, USA E-mail: donppate1@yahoo.com ABSTRACT With the

More information

PBN AIRSPACE CONCEPT WORKSHOP. SIDs/STARs/HOLDS. Continuous Descent Operations (CDO) ICAO Doc 9931

PBN AIRSPACE CONCEPT WORKSHOP. SIDs/STARs/HOLDS. Continuous Descent Operations (CDO) ICAO Doc 9931 International Civil Aviation Organization PBN AIRSPACE CONCEPT WORKSHOP SIDs/STARs/HOLDS Continuous Descent Operations (CDO) ICAO Doc 9931 Design in context Methodology STEPS TFC Where does the traffic

More information

SULAYMANIYAH INTERNATIONAL AIRPORT MATS CHAPTER 11

SULAYMANIYAH INTERNATIONAL AIRPORT MATS CHAPTER 11 KURDISTAN REGIONAL GOVERNMENT SULAYMANIYAH INTERNATIONAL AIRPORT MATS CHAPTER 11 SEPARATION STANDARDS & APPLICATIONS International and Local Procedures ( First Edition ) April 2012 Ff Prepared By Fakhir.F.

More information

PBN Performance. Based Navigation. Days 1, 2 & 3. ICAO PBN Seminar Seminar Case Studies Days 1,2,3. Seminar Case Studies

PBN Performance. Based Navigation. Days 1, 2 & 3. ICAO PBN Seminar Seminar Case Studies Days 1,2,3. Seminar Case Studies PBN Performance Based Navigation Seminar Case Studies Days 1, 2 & 3 1 Overview 2 Case Study - Day 1 Case Study - Day 2 Case Study - Day 3 3 Case Study - Day 1 Learning Objectives Identify navigation performance

More information

ICAO updates. ICAO European and North Atlantic Office. 12 September 2013 Page 1

ICAO updates. ICAO European and North Atlantic Office. 12 September 2013 Page 1 ICAO updates ICAO European and North Atlantic Office 12 September 2013 Page 1 ICAO State Letters and Amendments to ICAO Annexes Reference # Title and date issued 2013/19 Adoption of Amendment 14 to Annex

More information

PBN and Procedure Design training

PBN and Procedure Design training PBN and Procedure Design training 2 PBN and Procedure Design training PBN and Procedure Design training Contents Get your Procedure Designers ready for PBN Implementation 5 Online and Classroom Training

More information

Participant Presentations (Topics of Interest to the Meeting) GASP SAFETY PERFORMANCE INDICATORS. (Presented by the Secretariat) EXECUTIVE SUMMARY

Participant Presentations (Topics of Interest to the Meeting) GASP SAFETY PERFORMANCE INDICATORS. (Presented by the Secretariat) EXECUTIVE SUMMARY PA RAST/31 WP/03 19/02/18 Thirty First Pan America Regional Aviation Safety Team Meeting (PA RAST/31) of the Regional Aviation Safety Group Pan America (RASG PA) South Florida, United States, 20 to 22

More information

IRELAND SAFETY REGULATION DIVISION

IRELAND SAFETY REGULATION DIVISION NOTICE TO AIR NAVIGATION SERVICE PROVIDERS IRELAND SAFETY REGULATION DIVISION NR S.016 ISSUE 1 DATE 03.03.10 IRISH AVIATION AUTHORITY AVIATION HOUSE HAWKINS STREET DUBLIN 2 Tel +353 1 6718655 Fax +353

More information

WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY. Ermenando Silva APEX, in Safety Manager ACI, World

WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY. Ermenando Silva APEX, in Safety Manager ACI, World WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY Ermenando Silva APEX, in Safety Manager ACI, World Aerodrome Manual The aim and objectives of the aerodrome manual and how it is to be used by operating

More information

Instrument Proficiency Check Flight Record

Instrument Proficiency Check Flight Record Instrument Proficiency Check Flight Record Date: Flight Time: Sim. Inst. Time: Pilot Name: Aircraft Type: Aircraft Tail Number: Act. Inst. Time: Instructor Name: Holding Procedures Task Notes N/A Satisfactory

More information

PBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

PBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613) PBN Syllabus Aeroplane Training Topic phase Theoretical PBN concept training (as described in ICAO Doc 9613) PBN principles PBN components PBN scope Navigation specifications RNAV and RNP Navigation functional

More information

AIS-AIM Study Group Working Status

AIS-AIM Study Group Working Status International Civil Aviation Organization AIS-AIM Study Group Working Status Roberta Luccioli TO/AIM Seminario de la OACI sobre la Transicion al AIM Fases1 3 Outline Development and Implementation of AIS

More information

RNP 2 JOB AID REQUEST TO CONDUCT RNP 2 OPERATIONS

RNP 2 JOB AID REQUEST TO CONDUCT RNP 2 OPERATIONS RNP 2 Job Aid SRVSOP RNP 2 JOB AID REQUEST TO CONDUCT RNP 2 OPERATIONS 1. Introduction This Job Aid was developed by the Latin American Regional Safety Oversight Cooperation System (SRVSOP) to provide

More information

Aerodrome Safety. H.V. SUDARSHAN International Civil Aviation Organization

Aerodrome Safety. H.V. SUDARSHAN International Civil Aviation Organization NPF/SIP/2010-WP/19 Aerodrome Safety H.V. SUDARSHAN International Civil Aviation Organization Workshop on the development of National Performance Framework for Air Navigation Systems (Nairobi, 6-10 December

More information

USE OF RADAR IN THE APPROACH CONTROL SERVICE

USE OF RADAR IN THE APPROACH CONTROL SERVICE USE OF RADAR IN THE APPROACH CONTROL SERVICE 1. Introduction The indications presented on the ATS surveillance system named radar may be used to perform the aerodrome, approach and en-route control service:

More information

SESAR Active ECAC INF07 REG ASP MIL APO USE INT IND NM

SESAR Active ECAC INF07 REG ASP MIL APO USE INT IND NM SESAR Active ECAC INF07 REG ASP MIL APO USE INT IND NM Subject matter and scope * The extension of the applicability area to non-eu ECAC States that have not signed an aviation agreement with EU, as well

More information

AMENDMENT No. 8 TO THE INTERNATIONAL STANDARDS AND RECOMMENDED PRACTICES AERODROMES ANNEX 14 TO THE CONVENTION ON INTERNATIONAL CIVIL AVIATION

AMENDMENT No. 8 TO THE INTERNATIONAL STANDARDS AND RECOMMENDED PRACTICES AERODROMES ANNEX 14 TO THE CONVENTION ON INTERNATIONAL CIVIL AVIATION AMENDMENT No. 8 TO THE INTERNATIONAL STANDARDS AERODROMES ANNEX 14 TO THE CONVENTION ON INTERNATIONAL CIVIL AVIATION VOLUME I AERODROME DESIGN AND OPERATIONS The amendment to Annex 14, Volume I contained

More information

AERODROME METEOROLOGICAL OBSERVATION AND FORECAST STUDY GROUP (AMOFSG)

AERODROME METEOROLOGICAL OBSERVATION AND FORECAST STUDY GROUP (AMOFSG) AMOFSG/8-IP/6 23/12/09 AERODROME METEOROLOGICAL OBSERVATION AND FORECAST STUDY GROUP (AMOFSG) EIGHTH MEETING Melbourne, Australia, 15 to 18 February 2010 Agenda Item 5: Observing and forecasting at the

More information

Overview of Evolution to Performance Based Navigation. ICAO PBN Seminar Overview of Evolution to Performance Based Navigation

Overview of Evolution to Performance Based Navigation. ICAO PBN Seminar Overview of Evolution to Performance Based Navigation Overview of Evolution to Performance Based Navigation 1 Overview Learning Objectives: at the end of this presentation you should: Understand what are the two main elements of Performance Based Navigation

More information

Combined ASIOACG and INSPIRE Working Group Meeting, 2013 Dubai, UAE, 11 th to 14 th December 2013

Combined ASIOACG and INSPIRE Working Group Meeting, 2013 Dubai, UAE, 11 th to 14 th December 2013 IP/2 Combined ASIOACG and INSPIRE Working Group Meeting, 2013 Dubai, UAE, 11 th to 14 th December 2013 Agenda Item 2: Action Item from ASIOACG/7 Indian Ocean RNP4 (Presented by Airservices Australia) SUMMARY

More information

MetroAir Virtual Airlines

MetroAir Virtual Airlines MetroAir Virtual Airlines NAVIGATION BASICS V 1.0 NOT FOR REAL WORLD AVIATION GETTING STARTED 2 P a g e Having a good understanding of navigation is critical when you fly online the VATSIM network. ATC

More information

AN-Conf/12-WP/162 TWELFTH THE CONFERENCE. The attached report

AN-Conf/12-WP/162 TWELFTH THE CONFERENCE. The attached report 29/11/12 TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 REPORT OF THE COMMITTEE TO THE CONFERENCE ON AGENDA ITEM 2 The attached report has been approved by thee Committee for submission

More information

RNAV - RNP. July 2010

RNAV - RNP. July 2010 RNAV - RNP July 2010 July 2010 Issue 1 Page 1 of 6 1 Who Issues approval to fly in P-RNAV Airspace? a) National Authority b) Euro Control c) JAA d) ICAO 2 A Fixed Published Route is? a) Alternative / Reserve

More information

P-RNAV GENERAL INFO NOTICE. 1. Background

P-RNAV GENERAL INFO NOTICE. 1. Background GENERAL INFO NOTICE 1. Background Precision-RNAV (P-RNAV) is the natural progression from Basic RNAV (B-RNAV) which became mandatory in European airspace in April of 1998 for enroute operations. Initial

More information

Consideration will be given to other methods of compliance which may be presented to the Authority.

Consideration will be given to other methods of compliance which may be presented to the Authority. Advisory Circular AC 139-10 Revision 1 Control of Obstacles 27 April 2007 General Civil Aviation Authority advisory circulars (AC) contain information about standards, practices and procedures that the

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization 17/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 4: Optimum Capacity and Efficiency through global collaborative

More information

Implementation of PBN in Armenian airspace

Implementation of PBN in Armenian airspace Implementation of PBN in Armenian airspace PBN implementation plan, based on the specifications of the airspace of the Republic of Armenia, has been developed in accordance with Resolution A36-23, approved

More information

Open Questions & Collecting Lessons Learned

Open Questions & Collecting Lessons Learned Open Questions & Collecting Lessons Learned 2nd joint ICAO EUR PBN TF EUROCONTROL RAiSG meeting Rick Farnworth EUROCONTROL 12-14 March 2014 Summary Objective List of Open Questions Options for making Information

More information

PBN Operational Approval Oceanic and Remote En Route Navigation Specifications

PBN Operational Approval Oceanic and Remote En Route Navigation Specifications PBN Operational Approval Oceanic and Remote En Route Navigation Specifications Navigation Specifications Applicable to Oceanic/Remote RNAV 10 (RNP 10) RNP 4 RNP 2 A-RNP 2 Prior Guidance Material RNP 10

More information

CRITICAL IMPLEMENTATION REQUIREMENTS FOR PBN, AIM QMS, MET QMS AND AERODROME CERTIFICATION. (Presented by the Secretariat)

CRITICAL IMPLEMENTATION REQUIREMENTS FOR PBN, AIM QMS, MET QMS AND AERODROME CERTIFICATION. (Presented by the Secretariat) E/CAR/DCA/25 WP/10 International Civil Aviation Organization 13/11/13 North American, Central American and Caribbean Office (NACC) Twenty-fifth Meeting of Directors of Civil Aviation of the Eastern Caribbean

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization AN-Conf/12-WP/8 7/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 3: Interoperability and data through globally

More information

Air Navigation Bureau ICAO Headquarters, Montreal

Air Navigation Bureau ICAO Headquarters, Montreal Performance Based Navigation Introduction to PBN Air Navigation Bureau ICAO Headquarters, Montreal 1 Performance Based Navigation Aviation Challenges Navigation in Context Transition to PBN Implementation

More information

WORKING PAPER IVATF/2-WP/21 10/6/11. International UPDATEDD ASH RELATED SUMMARY. At the 1.1. to 30. first meeting. Coordination Group to. (e.g. 1.

WORKING PAPER IVATF/2-WP/21 10/6/11. International UPDATEDD ASH RELATED SUMMARY. At the 1.1. to 30. first meeting. Coordination Group to. (e.g. 1. International Civil Aviation Organization IVATF/2-WP/21 10/6/11 WORKING PAPER INTERNATIONAL VOLCANIC ASH TASK FORCE (IVATF) SECOND MEETING Montréal, 11 to 15 July 2011 Agenda Item 5: Report of the International

More information

SECURITY OVERSIGHT AGENCY June 2017 ALL WEATHER (CAT II, CAT III AND LOW VISIBILITY) OPERATIONS

SECURITY OVERSIGHT AGENCY June 2017 ALL WEATHER (CAT II, CAT III AND LOW VISIBILITY) OPERATIONS ADVISORY CIRCULAR CIVIL AVIATION SAFETY AND CAA:AC-OPS052 SECURITY OVERSIGHT AGENCY June 2017 1.0 PURPOSE ALL WEATHER (CAT II, CAT III AND LOW VISIBILITY) OPERATIONS This Order provides guidance to the

More information

GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION

GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION ANSS AC NO. 1 of 2017 31.07. 2017 Air Space and Air Navigation Services Standard ADVISORY CIRCULAR Subject: Procedures to follow in case

More information

Montreal, 15. (Presented SUMMARY

Montreal, 15. (Presented SUMMARY DGP-WG/2011-IP/4 18/10/12 DANGEROUS GOODS PANEL (DGP) MEETING OF THE WORKING GROUP OF THE WHOLE Montreal, 15 to 19 October 2012 Agenda Item 6: Other business REGULATORY FRAMEWORK FOR REMOTELY PILOTED AIRCRAFT

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization 16/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 5: Efficient flight paths through trajectory-based operations

More information

Aerodrome Obstacle Survey Information Checks

Aerodrome Obstacle Survey Information Checks United Kingdom Overseas Territories Aviation Circular OTAC 139-20 Aerodrome Obstacle Survey Information Checks Issue 2.00 26 May 2017 Effective on issue GENERAL Overseas Territories Aviation Circulars

More information

ATM 4 Airspace & Procedure Design

ATM 4 Airspace & Procedure Design ATM 4 Airspace & Procedure Design 1. Introduction 1.1. The proper planning and design of routes, holding patterns, airspace structure and ATC sectorisation in both terminal and en-route airspace can be

More information

Don-Jacques OULD FERHAT VP Airspace and Airlines Services. Airbus. PBN Safety programs

Don-Jacques OULD FERHAT VP Airspace and Airlines Services. Airbus. PBN Safety programs Don-Jacques OULD FERHAT VP Airspace and Airlines Services Airbus PBN Safety programs Long term cooperation with China Complex projects in China RNP AR at Kathmandu airport Cochin : First RNP APCH in India

More information

CONFERENCE ON THE ECONOMICS OF AIRPORTS AND AIR NAVIGATION SERVICES

CONFERENCE ON THE ECONOMICS OF AIRPORTS AND AIR NAVIGATION SERVICES International Civil Aviation Organization 30/5/08 WORKING PAPER CONFERENCE ON THE ECONOMICS OF AIRPORTS AND AIR NAVIGATION SERVICES Montréal, 15 to 20 September 2008 Agenda Item 2: Specific issues related

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization 14/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 4: Optimum Capacity and Efficiency through global collaborative

More information

Gestão de Tráfego Aéreo 2015/2016 Exam Name Student ID Number. I (5.5/20, 0.5 each)

Gestão de Tráfego Aéreo 2015/2016 Exam Name Student ID Number. I (5.5/20, 0.5 each) Gestão de Tráfego Aéreo 2015/2016 Exam 2016.01.04 Name Student ID Number I (5.5/20, 0.5 each) What is each contracting state of ICAO required to provide? [ ] Modern radio navigation facilities for aeroplanes

More information

NEW CALEDONIA PBN PLAN

NEW CALEDONIA PBN PLAN NEW CALEDONIA PBN PLAN SUMMARY This document presents the performance-based navigation (PBN) deployment program in the New Caledonia airspace sector of NANDI Flight Information Region (FIR NFFF) as well

More information

CHAPTER 5 SEPARATION METHODS AND MINIMA

CHAPTER 5 SEPARATION METHODS AND MINIMA CHAPTER 5 SEPARATION METHODS AND MINIMA 5.1 Provision for the separation of controlled traffic 5.1.1 Vertical or horizontal separation shall be provided: a) between IFR flights in Class D and E airspaces

More information

Review of air navigation matters 2.3 Air navigation specific activities: Aerodromes and Ground Aids (AGA)

Review of air navigation matters 2.3 Air navigation specific activities: Aerodromes and Ground Aids (AGA) C/CAR WG/7 - WP/08 International Civil Aviation Organization 16/06/09 Revised North American, Central American and Caribbean Office (NACC) Seventh Central Caribbean Working Group Meeting (C/CAR WG/7) Mexico

More information