1 NextGen Priorities: Multiple Runway Operations & RECAT May 2018 Presented by Paul Strande & Jeffrey Tittsworth Federal Aviation Administration

2 National Airspace System Today Air traffic services for the world s largest and busiest airspace. Air traffic controllers track aircraft and keep them separated as they fly between navigation aids on the ground. Radar periodically updates the location of aircraft. Controllers communicate using radios and telephones. Nav aids are located where geography allows and do not provide the most direct routes. Controllers often add distance between aircraft to ensure safety. Weather causes 75 percent of delays. 2

3 NextGen Modernization Largest modernization of ATC systems since start of FAA in st Wave Focus on base CNS-A infrastructure (R+D 2000, Implementation ) Communications: Digital communications with pilots and between FAA systems/facilities Navigation: Precise GPS routes/procedures in all airspace domains Surveillance: Expanded high update rate surveillance used by controllers/pilots Automation: Every ATC domain (En-Route, Terminal, Tower Command Ctr.), plus decision support tools 2nd Wave Focus on operational integration (R+D 2018, Implementation ) Trajectory Management: Aircraft controlled by time not distance Aircraft is a full participant in integrated system Information sharing between FAA/user system enable new applications 3

4 Delivering Major NextGen Investments Legacy System Radar Voice Communications Disparate Information NextGen Satellite Voice & Digital Communications Automated Decision Support Tools Tower controller Terminal En-route Terminal Tower NextGen Automatic Dependent Surveillance-Broadcast (ADS-B), System Wide Information Management (SWIM), Data Communications, National Airspace System (NAS) Voice System (NVS), Terminal Flight Data Manager (TFDM) Foundational En Route Automation Modernization (ERAM) Terminal Automation Modernization/Replacement (TAMR) 4

5 Building the Future NAS Beyond 2025 Foundational Infrastructure Expanded NextGen Realize NextGen Leverage NextGen En Route Automation Modernization Terminal Automation Modernization& Replacement Automation Dependent Surveillance-Broadcast (ADSB) Out infrastructure SWIM NAC Priorities Expanded PBN Initial Data Comm Increased surface efficiency Expanded MultipleRunway Operations DeliveringNAS information NextGen Weather Equip 2020 Community engagement Accommodate unmanned aircraft systems (UAS) Accommodate commercial space operations NAS Voice System ADS-B In Data Communications TFDM Integrate UAS Integrate commercial space operations Align aircraft equipage Software applications Transparent, Sustainable, Agile, and Resilient NAS community/stakeholderengagement, tech refresh,cybersecurity,cost containment Enhanced service delivery Expand equipage Advanced applications for NextGen systems More easily address new capabilities Beyond

6 NextGen Priorities: Building Partnerships Progress to date FAA s continued collaboration with the aviation industry through the NextGen Advisory Committee (NAC) has led to the successful implementation of numerous Joint Implementation Plan commitments Continuing collaboration Lessons learned during interviews with participants validated the effectiveness of the process and agreement on its continued value FAA and industry have continued working together to update the plan with additional priority commitments, and are currently working on updates for Measuring results FAA and industry are collaborating in a Joint Analysis Team that studies the results from capability implementations to reach agreement on a common statement of facts 6

7 NextGen Priorities Overview Data Communications Data Comm is a program aimed at transitioning from an analog voice system of communication between controllers and pilots to a digital communication system. Multiple Runway Operations MRO improves access to parallel runways, including closely spaced runways, and can increase basic runway capacity and throughput by reducing separation between aircraft based on improved wake recategorization standards. Performance-Based Navigation PBN is a framework for defining performance requirements in navigation specifications Convention al Current Ground- Based NAVAID s Everywhere RNAV Waypoints Seamless Vertical Path Curved Paths Required RNP Narrower protected areas Surface Surface activities are designed to enhance the efficiency of operations and procedures at airports on the airport surface. Limited Design Flexibility Increased Airspace Efficiency Optimized Use of Airspace 7 7

8 Multiple Runway Operations (MRO) Improves access to parallel runways, including those that are closely spaced, and can increase basic runway capacity and throughput by reducing separation between aircraft based on improved wake recategorization standards. Wake RECAT Wake RECAT improves same runway capacity (e.g., 12L and 12R) but does not affect the ability to perform independent or dependent approaches to runways spaced >=2500 ft Independent & Dependent Approaches 12 L 12 R Dependent Approaches with Wake Mitigation 2500 Feet L R Wake RECAT also improves independent departures from runways spaced <2500 ft apart >= 2500 ft < 2500 ft 8

9 Current ICAO Wake Turbulence Separations Heavy to Heavy Leading aircraft Trailing aircraft B747 A306 This is Safe 4 NM Separation This is Overly Conservative. A306 B747 A result of the Breadth of the Heavy Category 9 9

10 Safety Example Wake Turbulence Separations Upper Heavy to Lower Heavy Leading aircraft Trailing aircraft 4 NM Separation B747 A306 This Is Safe (Current ICAO) Lower Heavy to Upper Heavy 2.5 NM Separation A306 B747 This Is Also Safe (RECAT) 10 10

11 Example RECAT Separations 11

12 RECAT Implementations 12

13 Closely Spaced Parallel Operations (CSPO) Simultaneous Approaches Prior CSPO Achieved 4300 ft SIPIA 3600 ft 5000 ft 5000 ft SIPIA Triples 3900 ft 3900 ft SIPIA with Offset 3000 ft SIPIA Simultaneous Independent Parallel Instrument Approaches 13

14 Closely Spaced Parallel Operations (CSPO) Dependent Operations Prior CSPO/Wake Office Achieved 1.5 NM 2500 ft 4300 ft Dependent Stagger CSPRs 2500 ft 3600 ft 1.0 NM 2.0 NM 4300 ft Dependent Stagger 3600 ft 8300 ft 1.5 NM Req Wake Separation 2500 ft Dependent Stagger CSPRs with wake 2500 ft Reduced Separation 14

15 Collision Risk Analysis Overview FAA conducts collision risk analysis in support of NAS operations. Data is collected from real time IMC NAS operations, flight tests and from pilot and controller human in the loop simulations to determine Probability Density Functions for pilot and controller reaction times, blunder angles and severity Total System Error, Navigation System Error, and Flight Technical Error Surveillance and automation system accuracies, processing delays and display capabilities

16 Test Criteria Violation Volume 500 ft Radius Sphere Developed by the Multiple Parallel Approach Project (MPAP) Technical Working Group in the 1990s 265 ft Radius ± 80 ft Cylinder to accommodate two Airbus A380 aircraft laterally and vertically on SIPIA. Developed by AFS-450 under the RTCA TF5 Blunder Recommendation Note that the outer surface of the TCV Shape, either the sphere or the cylinder, is the location of the CG of the other aircraft

17 Data Collection Human-In-The-Loop Simulations CSPO utilizes Air Traffic Controller Human-In-The-Loop (HITL) Data Collection Efforts to obtain the required Controller Response Time for blundering aircraft during a Simultaneous Independent and Dependent Approaches. The Data Collection Efforts also record subjective data from the controllers related to their comfort and perceived workload. 17

18 CSPO Automation Final Monitor Aid Visual NTZ Warning Alert Accompanied by an audio alert with the Target Call Sign NTZ Boundary turns Red

19 Dependent Staggered Approaches to Parallel Runways Spaced < 2500 (FAA Order C Appendix A) The procedure permits any aircraft type trailing on instrument approach to one runway to be diagonally separated by a minimum of 1.0 NM from a leading small or large aircraft on instrument approach to the parallel runway. Standard radar or wake turbulence separation is applied between the trailing aircraft and the lead aircraft of the next pair

20 CSPO Implementations 20

FAA: ASBU Deployment Status. ASBU Prepared by: Midori Tanino, ATO International NextGen Lead Date: August, 2016

FAA: ASBU Deployment Status. ASBU Prepared by: Midori Tanino, ATO International NextGen Lead Date: August, 2016 FAA: ASBU Deployment Status For: ASBU WS @NACC Prepared by: Midori Tanino, ATO International NextGen Lead Date: August, 2016 1 Delivering NextGen Improvements Legacy System Radar Inefficient Routes Voice

More information

New York Aviation Management Association Conference

New York Aviation Management Association Conference New York Aviation Management Association Conference Presented by: Carmine W. Gallo Federal Aviation Administration Eastern Region Regional Administrator September 14, 2016 1 The What is and Benefits of

More information

Next Generation Air Transportation System. Edward L. Bolton, Jr. Assistant Administrator for NextGen 17 November 2015

Next Generation Air Transportation System. Edward L. Bolton, Jr. Assistant Administrator for NextGen 17 November 2015 Next Generation Air Transportation System Edward L. Bolton, Jr. Assistant Administrator for NextGen 17 November 2015 1 Delivering NextGen Improvements Legacy System Radar Inefficient Routes Voice Communications

More information

Federal Aviation Administration. Air Traffic 101. By: Michael Valencia & Dianna Johnston Date: Feb. 26, 2017

Federal Aviation Administration. Air Traffic 101. By: Michael Valencia & Dianna Johnston Date: Feb. 26, 2017 Presented to: UC Davis Aviation Symposium By: Michael Valencia & Dianna Johnston Date: Overview Part 1 Air Traffic Controllers History Safety and Navigation Terminology Air Traffic Facility Types Equipment

More information

South Dakota Airports Conference

South Dakota Airports Conference South Dakota Airports Conference Federal Aviation Presented to: By: Date: Conference Attendees Barry D. Cooper March 18, 2015 Legislation: FAA Reauthorization Annual Appropriation Sequester Federal Aviation

More information

Minnesota Airports Conference

Minnesota Airports Conference Minnesota Airports Conference Federal Aviation Administration Presented to: By: Date: Conference Attendees Barry D. Cooper April 17, 2015 World Air Traffic Control as the Sun Rises Legislation: FAA Reauthorization

More information

TWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line.

TWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line. International Civil Aviation Organization WORKING PAPER 31/10/12 English only TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 5: Efficient flight paths through trajectory-based

More information

Wake Turbulence Evolution in the United States

Wake Turbulence Evolution in the United States Wake Turbulence Evolution in the United States Briefing to WakeNet Europe Paris May 15, 2013 Wake Turbulence Program ATO Terminal Services May 2013 Outline Operational overview of wake turbulence effect

More information

Navigation at the. Federal Aviation Administration Crossroads

Navigation at the. Federal Aviation Administration Crossroads Navigation at the Crossroads To: Stanford 2010 PNT Symposium By: Leo Eldredge GNSS Program Manager Date: Peak Aircraft Traffic Over The US 5000 aircraft 689 M passengers 36 B pounds cargo 2 If We Do Nothing

More information

U.S. Next Generation Air Transportation System

U.S. Next Generation Air Transportation System U.S. Next Generation Air Transportation System (NextGen) August 15, 2011 Bangkok, Thailand David S. Burkholder U.S. The Current System is not Performing Adequately Even with economy issues, demand remains

More information

Air Traffic Management

Air Traffic Management Air Traffic Management Transforming Air Traffic Management T rans f orming A ir Today s airspace users are grappling with the air traffic control system s inability to manage an ever-growing amount of

More information

FAA GBAS Program Update January 29, 2010

FAA GBAS Program Update January 29, 2010 US-India Aviation Cooperation Program FAA GBAS Program Update January 29, 2010 Carlos A. Rodriguez FAA GBAS Program Manager Major milestone completed in the history of the FAA GBAS program FAA completed

More information

Appendix E NextGen Appendix

Appendix E NextGen Appendix Appendix E NextGen Appendix NEXTGEN BACKGROUND This appendix is intended to supplement the information provided in the chapter to give additional technological background to NextGen. ADS-B Services ADS-B,

More information

ENRI International Workshop on ATM/CNS

ENRI International Workshop on ATM/CNS NextGen Next Generation Air Transportation System ENRI International Workshop on ATM/CNS Presented by: Jay Merkle Manager, System Engineering Integration, NextGen and Operations Planning Date: 12 November

More information

Required Navigation Performance (RNP) in the United States

Required Navigation Performance (RNP) in the United States Required Navigation Performance (RNP) in the United States Overview FAA Roadmap for Performance-Based Navigation Moving to Performance-Based Navigation (RNAV and RNP) Definitions Operational attributes

More information

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis Appendix B ULTIMATE AIRPORT CAPACITY & DELAY SIMULATION MODELING ANALYSIS B TABLE OF CONTENTS EXHIBITS TABLES B.1 Introduction... 1 B.2 Simulation Modeling Assumption and Methodology... 4 B.2.1 Runway

More information

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN PBN Performance Based Navigation - PBN & Airspace Concepts - Introduction to PBN 1 Learning Objectives PBN Concept within the context of an Airspace (Operational) Concept. Introduction to PBN 2/37 Components

More information

PBN ROUTE SPACING AND CNS REQUIREMENTS (Presented by Secretariat)

PBN ROUTE SPACING AND CNS REQUIREMENTS (Presented by Secretariat) International Civil Aviation Organization The First Meeting of South China Sea Major Traffic Flow Review Group (SCS-MTFRG/1) Kuala Lumpur, Malaysia, 19-20 January 2015 Agenda Item 5: Discuss strategy for

More information

Federal Aviation Administration Flight Plan Presented at the Canadian Aviation Safety Seminar April 20, 2004

Federal Aviation Administration Flight Plan Presented at the Canadian Aviation Safety Seminar April 20, 2004 Federal Aviation Administration Flight Plan 2004-2008 Presented at the Canadian Aviation Safety Seminar April 20, 2004 Challenges Reducing an Already Low Commercial Accident Rate Building an Air Traffic

More information

Learning Objectives. By the end of this presentation you should understand:

Learning Objectives. By the end of this presentation you should understand: Designing Routes 1 Learning Objectives By the end of this presentation you should understand: Benefits of RNAV Considerations when designing airspace routes The basic principles behind route spacing The

More information

Wake Turbulence Standards

Wake Turbulence Standards Recategorization of ICAO Wake Turbulence Standards RECAT Phase I Overview Joint FAA/EUROCONTROL Project Three year study (25 meetings) RECAT Team Comprised of worldwide wake turbulence and aviation experts

More information

Wake Vortex R&D. Status Briefing. NBAA Convention. Federal Aviation Administration. By: Steve Lang Date: September 2007

Wake Vortex R&D. Status Briefing. NBAA Convention. Federal Aviation Administration. By: Steve Lang Date: September 2007 Wake Vortex R&D Status Briefing NBAA Convention By: Steve Lang Date: September 2007 Topics for Today Wake Turbulence Program Overview Near Term Achievements The Future Wake Program Activities Near-Term

More information

LONG BEACH, CALIFORNIA

LONG BEACH, CALIFORNIA LONG BEACH, CALIFORNIA 1 LONG BEACH, CALIFORNIA Airport Capacity Session Kent Duffy Senior Airport Planner Federal Aviation Administration kent.duffy@faa.gov 2 Agenda FAA Airport Capacity Guidance Airport

More information

Don-Jacques OULD FERHAT VP Airspace and Airlines Services. Airbus. PBN Safety programs

Don-Jacques OULD FERHAT VP Airspace and Airlines Services. Airbus. PBN Safety programs Don-Jacques OULD FERHAT VP Airspace and Airlines Services Airbus PBN Safety programs Long term cooperation with China Complex projects in China RNP AR at Kathmandu airport Cochin : First RNP APCH in India

More information

Name of Customer Representative: Bruce DeCleene, AFS-400 Division Manager Phone Number:

Name of Customer Representative: Bruce DeCleene, AFS-400 Division Manager Phone Number: Phase I Submission Name of Program: Equivalent Lateral Spacing Operation (ELSO) Name of Program Leader: Dr. Ralf Mayer Phone Number: 703-983-2755 Email: rmayer@mitre.org Postage Address: The MITRE Corporation,

More information

NextGen Independent Assessment and Recommendations

NextGen Independent Assessment and Recommendations M P 1 4 0 4 4 0 M I T R E P R O D U C T NextGen Independent Assessment and Recommendations Sponsor: The Federal Aviation Administration Dept. No.: F094 Project No.: 0214DL01-IF Outcome No.: 1 PBWP Reference:

More information

Air Navigation Bureau ICAO Headquarters, Montreal

Air Navigation Bureau ICAO Headquarters, Montreal Performance Based Navigation Introduction to PBN Air Navigation Bureau ICAO Headquarters, Montreal 1 Performance Based Navigation Aviation Challenges Navigation in Context Transition to PBN Implementation

More information

What are we trying to achieve with this presentation:

What are we trying to achieve with this presentation: ATC Guild (India) What are we trying to achieve with this presentation: A high level breakdown of the Indian Aviation and ATM scenario An overview of global ATM initiatives Global ATC systems market Indian

More information

2012 Performance Framework AFI

2012 Performance Framework AFI 2012 Performance Framework AFI Nairobi, 14-16 February 2011 Seboseso Machobane Regional Officer ATM, ESAF 1 Discussion Intro Objectives, Metrics & Outcomes ICAO Process Framework Summary 2 Global ATM Physical

More information

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez International Civil Aviation Organization PBN Airspace Concept Victor Hernandez Overview Learning Objective: at the end of this presentation you should Understand principles of PBN Airspace Concept 2 Gate

More information

34 th Airline/ATS Safety Forum

34 th Airline/ATS Safety Forum 34 th Airline/ATS Safety Forum Colleen Kitson, Senior ATS Specialist Outline RNP1 - including Albury Future applications Workshop Background ICAO Global Air Navigation Plan specifies PBN as the highest

More information

Russian Federation ATM modernization program

Russian Federation ATM modernization program Russian Federation ATM modernization program Alexander Vedernikov Deputy Director of Federal Air Transport Agency 20-21 March, 2012, Moscow Main strategic directions of Russian Air Navigation System development

More information

NEXTGEN HUMAN FACTORS ACCOMPLISHMENTS AND CHALLENGES IN THE FUTURE. Edmundo A. Sierra, Jr. Federal Aviation Administration Washington, D.C.

NEXTGEN HUMAN FACTORS ACCOMPLISHMENTS AND CHALLENGES IN THE FUTURE. Edmundo A. Sierra, Jr. Federal Aviation Administration Washington, D.C. NEXTGEN HUMAN FACTORS ACCOMPLISHMENTS AND CHALLENGES IN THE FUTURE Edmundo A. Sierra, Jr. Federal Aviation Administration Washington, D.C. The Federal Aviation Administration (FAA), under the Next Generation

More information

ART Workshop Airport Capacity

ART Workshop Airport Capacity ART Workshop Airport Capacity Airport Research Bob Graham Head of Airport Research 21 st September 2016 Madrid Expectations The issues and opportunities for future research New solutions / directions for

More information

PBN and airspace concept

PBN and airspace concept PBN and airspace concept 07 10 April 2015 Global Concepts Global ATM Operational Concept Provides the ICAO vision of seamless, global ATM system Endorsed by AN Conf 11 Aircraft operate as close as possible

More information

Wake Turbulence Recategorization (RECAT) ATC Human Factors Issues During Implementation. Terminal Services

Wake Turbulence Recategorization (RECAT) ATC Human Factors Issues During Implementation. Terminal Services Wake Turbulence Recategorization (RECAT) ATC Human Factors Issues During Implementation Presented to: WakeNet Europe By: Joel Forrest, Human Solutions, Inc. Date: May 13, 2014 Terminal Services Overview

More information

SESAR Solutions. Display Options

SESAR Solutions. Display Options SESAR Solutions Outputs from the SESAR Programme R&I activities which relate to an Operational Improvement (OI) step or a small group of OI steps and its/their associated enablers, which have been designed,

More information

Establishing a Risk-Based Separation Standard for Unmanned Aircraft Self Separation

Establishing a Risk-Based Separation Standard for Unmanned Aircraft Self Separation Establishing a Risk-Based Separation Standard for Unmanned Aircraft Self Separation Roland E. Weibel, Matthew W.M. Edwards, and Caroline S. Fernandes MIT Lincoln laboratory Surveillance Systems Group Ninth

More information

Atlanta NextGen PBN Activities

Atlanta NextGen PBN Activities Atlanta NextGen PBN Activities Presentation to: Name: Date: EWG Ops SC Meeting Jim Arrighi RNAV/RNP Group Jim Allerdice A80 May 18, 2010 0 0 Atlanta Performance Based Navigation Project Planning Seven

More information

ICAO Big Data Project ADS-B Data as a source for analytical solutions for traffic behaviour in airspace

ICAO Big Data Project ADS-B Data as a source for analytical solutions for traffic behaviour in airspace ICAO Big Data Project ADS-B Data as a source for analytical solutions for traffic behaviour in airspace ICAO/IATA/CANSO PBN/2 San Jose December 8, 2016 Big Data process Quantitative Quantitative / Qualitative

More information

Noise Programs & NextGen Briefing. Stan Shepherd, Manager Airport Noise Programs

Noise Programs & NextGen Briefing. Stan Shepherd, Manager Airport Noise Programs Noise Programs & NextGen Briefing Stan Shepherd, Manager Airport Noise Programs 1 Presentation Overview Noise Information Hotline Increased Operations Economic Impacts Noise Contours Noise Mitigation Programs

More information

Trajectory Based Operations

Trajectory Based Operations Trajectory Based Operations Far-Term Concept Proposed Trade-Space Activities Environmental Working Group Operations Standing Committee July 29, 2009 Rose.Ashford@nasa.gov Purpose for this Presentation

More information

Federal Aviation. Administration. FAA Overview. Federal Aviation. Administration

Federal Aviation. Administration. FAA Overview. Federal Aviation. Administration Presented to: AFCEA International Los Angeles By: William C. Withycombe Regional Administrator, Western-Pacific Region Date: Overview! Major Safety Initiatives! Organizational Structure! Destination 2025!

More information

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES AFCAC/ICAO Joint Workshop Walter White ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES 24 JUNE 2014 Airbus ProSky Corporate Presentation 29/06/2014 PERFORMANCE-BASED NAVIGATION The implementation of Performance-Based

More information

PBN Performance. Based Navigation. Days 1, 2 & 3. ICAO PBN Seminar Seminar Case Studies Days 1,2,3. Seminar Case Studies

PBN Performance. Based Navigation. Days 1, 2 & 3. ICAO PBN Seminar Seminar Case Studies Days 1,2,3. Seminar Case Studies PBN Performance Based Navigation Seminar Case Studies Days 1, 2 & 3 1 Overview 2 Case Study - Day 1 Case Study - Day 2 Case Study - Day 3 3 Case Study - Day 1 Learning Objectives Identify navigation performance

More information

Airplane Navigation Capabilities

Airplane Navigation Capabilities Airplane Navigation Capabilities Increasing Operational Safety & Efficiency June 19, 2008 The statements contained herein are based on good faith assumptions and provided for general information purposes

More information

Operators may need to retrofit their airplanes to ensure existing fleets are properly equipped for RNP operations. aero quarterly qtr_04 11

Operators may need to retrofit their airplanes to ensure existing fleets are properly equipped for RNP operations. aero quarterly qtr_04 11 Operators may need to retrofit their airplanes to ensure existing fleets are properly equipped for RNP operations. 24 equipping a Fleet for required Navigation Performance required navigation performance

More information

Overview of Evolution to Performance Based Navigation. ICAO PBN Seminar Overview of Evolution to Performance Based Navigation

Overview of Evolution to Performance Based Navigation. ICAO PBN Seminar Overview of Evolution to Performance Based Navigation Overview of Evolution to Performance Based Navigation 1 Overview Learning Objectives: at the end of this presentation you should: Understand what are the two main elements of Performance Based Navigation

More information

Aviation System Block Upgrades (ASBU), Blocks 0 and 1

Aviation System Block Upgrades (ASBU), Blocks 0 and 1 ATC Global Federal Aviation Aviation System Block Upgrades (ASBU), Blocks 0 and 1 Presented by: B. Bagstad, FAA ATO International Date: September, 2014 Aviation System Block Upgrades (ASBU) ASBU is a systems

More information

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis Saint Petersburg-Clearwater International Airport Airspace & Instrument Approach Analysis February 23, 2005 Jeppesen Boeing Jeppesen Government / Military Services Group Airspace Services Division AIRSPACE

More information

FLIGHT PATH FOR THE FUTURE OF MOBILITY

FLIGHT PATH FOR THE FUTURE OF MOBILITY FLIGHT PATH FOR THE FUTURE OF MOBILITY Building the flight path for the future of mobility takes more than imagination. Success relies on the proven ability to transform vision into reality for the betterment

More information

Interval Management A Brief Overview of the Concept, Benefits, and Spacing Algorithms

Interval Management A Brief Overview of the Concept, Benefits, and Spacing Algorithms Center for Advanced Aviation System Development Interval Management A Brief Overview of the Concept, Benefits, and Spacing Algorithms Dr. Lesley A. Weitz Principal Systems Engineer The MITRE Corporation,

More information

ATNS. Performance Based Navigation Roadmap SOUTH AFRICA

ATNS. Performance Based Navigation Roadmap SOUTH AFRICA ATNS Performance Based Navigation Roadmap SOUTH AFRICA ATNS/HO/CO9/30/02/01 SOUTH AFRICA PBN ROADMAP Page 1 of 19 July 28, 2009 Table of Contents 1. Introduction... 3 2. Background... 3 3. Performance

More information

RNP AR and Air Traffic Management

RNP AR and Air Traffic Management RNP AR and Air Traffic Management BOEING is a trademark of Boeing Management Company. Copyright 2009 Boeing. All rights reserved. Expanding the Utility of RNP AR Sheila Conway RNP AR User s Forum Wellington,

More information

A Standard for Equivalent Lateral Spacing Operations Parallel and Reduced Divergence Departures

A Standard for Equivalent Lateral Spacing Operations Parallel and Reduced Divergence Departures A Standard for Equivalent Lateral Spacing Operations Parallel and Reduced Divergence Departures Dr. Ralf H. Mayer Dennis J. Zondervan Albert A. Herndon Tyler Smith 9 th USA/EUROPE Air Traffic Management

More information

THE NATIONAL ACADEMIES PRESS

THE NATIONAL ACADEMIES PRESS THE NATIONAL ACADEMIES PRESS This PDF is available at http://nap.edu/24791 SHARE NextGen for Airports, Volume 5: Airport Planning and Development DETAILS 84 pages 8.5 x 11 PAPERBACK ISBN 978-0-309-44631-0

More information

Boeing Air Traffic Management Overview and Status

Boeing Air Traffic Management Overview and Status Boeing Air Traffic Management Overview and Status ENRI International Workshop on ATM/CNS EIWAC 2010 November 10-15, 2010 Tokyo, Japan Matt Harris Avionics Air Traffic Management Boeing Commercial Airplanes

More information

Mr. Chairman, Members of the Committee, I am Chet Fuller, President GE Aviation

Mr. Chairman, Members of the Committee, I am Chet Fuller, President GE Aviation Mr. Chairman, Members of the Committee, I am Chet Fuller, President GE Aviation Systems, Civil. Thank you for the opportunity to testify before the Subcommittee today on the issue of Area Navigation (RNAV)

More information

Implementation challenges for Flight Procedures

Implementation challenges for Flight Procedures Implementation challenges for Flight Procedures A Data-house perspective for comprehensive Procedure Design solution: A need today Sorin Onitiu Manager Business Affairs, Government & Military Aviation,

More information

NextGen Trajectory-Based Operations Status Update Environmental Working Group Operations Standing Committee

NextGen Trajectory-Based Operations Status Update Environmental Working Group Operations Standing Committee NextGen Trajectory-Based Operations Status Update Environmental Working Group Operations Standing Committee May 17, 2010 Rose Ashford Rose.Ashford@nasa.gov 1 Outline Key Technical Concepts in TBO Current

More information

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit Seychelles Civil Aviation Authority Telecomm & Information Services Unit 12/15/2010 SCAA 1 WORKSHOP EXERCISE Workshop on the development of National Performance Framework 6 10 Dec 2010 10/12/2010 SCAA

More information

Surveillance and Broadcast Services

Surveillance and Broadcast Services Surveillance and Broadcast Services NextGen's ADS-B - the FAA's Plan to Modernize our National Air Transportation System, and What It Means to You To: Texas General Aviation Summit By: Tim Schroeder, SBS

More information

Surveillance and Broadcast Services

Surveillance and Broadcast Services Surveillance and Broadcast Services Benefits Analysis Overview August 2007 Final Investment Decision Baseline January 3, 2012 Program Status: Investment Decisions September 9, 2005 initial investment decision:

More information

Considerations for. RNP to xls. Operations. Juergen Ruppert. Regional Director Air Traffic Optimisation Services GE Aviation

Considerations for. RNP to xls. Operations. Juergen Ruppert. Regional Director Air Traffic Optimisation Services GE Aviation Considerations for RNP to xls Operations Juergen Ruppert Regional Director Air Traffic Optimisation Services GE Aviation RNP to ILS 2 Content Why RNP to XLS What is the technology How does it work now?

More information

Operational implementation of new ATM automated systems and integration of the existing systems ADS-B IMPLEMENTATION IN GUYANA. (Presented by Guyana)

Operational implementation of new ATM automated systems and integration of the existing systems ADS-B IMPLEMENTATION IN GUYANA. (Presented by Guyana) International Civil Aviation Organization SAM/IG/22-IP/19 South American Regional Office 12/11/2018 Twenty Second Workshop/Meeting of the SAM Implementation Group (SAM/IG/22) - Regional Project RLA/06/901

More information

ATM STRATEGIC PLAN VOLUME I. Optimising Safety, Capacity, Efficiency and Environment AIRPORTS AUTHORITY OF INDIA DIRECTORATE OF AIR TRAFFIC MANAGEMENT

ATM STRATEGIC PLAN VOLUME I. Optimising Safety, Capacity, Efficiency and Environment AIRPORTS AUTHORITY OF INDIA DIRECTORATE OF AIR TRAFFIC MANAGEMENT AIRPORTS AUTHORITY OF INDIA ATM STRATEGIC PLAN VOLUME I Optimising Safety, Capacity, Efficiency and Environment DIRECTORATE OF AIR TRAFFIC MANAGEMENT Version 1 Dated April 08 Volume I Optimising Safety,

More information

Key Issues for the Critical Path Approach, Landing and Go-Arounds

Key Issues for the Critical Path Approach, Landing and Go-Arounds Key Issues for the Critical Path Approach, Landing and Go-Arounds Moderator John Allen Vice-President, Chief Safety Officer, JetBlue Airways Panelists Atholl Buchan Head, Flight Operations Regulatory Affairs,

More information

Nav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation

Nav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation Nav Specs and Procedure Design Module 12 Activities 8 and 10 European Airspace Concept Workshops for PBN Implementation Learning Objectives By the end of this presentation you should understand: The different

More information

ICAO Air Navigation Panels/Study Groups Work Programme

ICAO Air Navigation Panels/Study Groups Work Programme NPF/SIP/2010-WP/24 ICAO Air Navigation Panels/Study Groups Work Programme SAULO DA SILVA International Civil Aviation Organization Workshop on the development of National Performance Framework for Air

More information

Beijing, 18 h of September 2014 Pierre BACHELIER Head of ATM Programme. Cockpit Initiatives. ATC Global 2014

Beijing, 18 h of September 2014 Pierre BACHELIER Head of ATM Programme. Cockpit Initiatives. ATC Global 2014 Beijing, 18 h of September 2014 Pierre BACHELIER Head of ATM Programme Cockpit Initiatives for ATM ATC Global 2014 Page 2 Cockpit Initiatives for ATM Airbus vision on ATM transformation Airbus position

More information

Controller Training Case Study Implementation of new RNP AR APCH for RWY07 (North Circuit) at HKIA

Controller Training Case Study Implementation of new RNP AR APCH for RWY07 (North Circuit) at HKIA Controller Training Case Study Implementation of new RNP AR APCH for RWY07 (North Circuit) at HKIA Disclaimer This presentation is for information purposes only. It should not be relied on as the sole

More information

STATEMENT OF THE NATIONAL BUSINESS AVIATION ASSOCIATION ED BOLEN PRESIDENT AND CEO BEFORE THE COMMITTEE ON TRANSPORTATION AND INFRASTRUCTURE

STATEMENT OF THE NATIONAL BUSINESS AVIATION ASSOCIATION ED BOLEN PRESIDENT AND CEO BEFORE THE COMMITTEE ON TRANSPORTATION AND INFRASTRUCTURE STATEMENT OF THE NATIONAL BUSINESS AVIATION ASSOCIATION ED BOLEN PRESIDENT AND CEO BEFORE THE COMMITTEE ON TRANSPORTATION AND INFRASTRUCTURE AVIATION SUBCOMMITTEE U.S. HOUSE OF REPRESENTATIVES REGARDING

More information

Safety Enhancement RNAV Safe Operating and Design Practices for STARs and RNAV Departures

Safety Enhancement RNAV Safe Operating and Design Practices for STARs and RNAV Departures Safety Enhancement Action: Implementers: Statement of Work: Safety Enhancement 213.5 RNAV Safe Operating and Design Practices for STARs and RNAV Departures To mitigate errors on Standard Terminal Arrival

More information

TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22)

TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22) INTERNATIONAL CIVIL AVIATION ORGANIZATION TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22) Bangkok, Thailand, 5-9 September 2011 Agenda

More information

Enterprise Integration: A Framework for Connecting the Dots

Enterprise Integration: A Framework for Connecting the Dots Enterprise Integration: A Framework for Connecting the Dots Enterprise Integration A Framework for Connecting the Dots resented by Ronald L. Stroup Chief System Engineer NextGen Air Ground Integration

More information

USE OF RADAR IN THE APPROACH CONTROL SERVICE

USE OF RADAR IN THE APPROACH CONTROL SERVICE USE OF RADAR IN THE APPROACH CONTROL SERVICE 1. Introduction The indications presented on the ATS surveillance system named radar may be used to perform the aerodrome, approach and en-route control service:

More information

PBN Operational Approval Oceanic and Remote En Route Navigation Specifications

PBN Operational Approval Oceanic and Remote En Route Navigation Specifications PBN Operational Approval Oceanic and Remote En Route Navigation Specifications Navigation Specifications Applicable to Oceanic/Remote RNAV 10 (RNP 10) RNP 4 RNP 2 A-RNP 2 Prior Guidance Material RNP 10

More information

APPENDIX F AIRSPACE INFORMATION

APPENDIX F AIRSPACE INFORMATION APPENDIX F AIRSPACE INFORMATION Airspace Use DEFINITION OF AIRSPACE Airspace, or that space which lies above a nation and comes under its jurisdiction, is generally viewed as being unlimited. However,

More information

PBN and RNAV concepts

PBN and RNAV concepts PBN and RNAV concepts Rabat, 16/27-03-2015 Target: Learn basic concept on PBN and RNAV. NOT FOR COMMERCIAL PURPOSES 2 Concepts Part 1: PBN concept Part 2: RNAV, RNP Part 3: FTE (Flight Technical Error)

More information

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES Page 1 of 8 1. PURPOSE 1.1. This Advisory Circular provides guidance to personnel involved in construction of instrument and visual flight procedures for publication in the Aeronautical Information Publication.

More information

Performance Based Navigation (PBN) Implementation Plan Republic of Mauritius

Performance Based Navigation (PBN) Implementation Plan Republic of Mauritius Performance Based Navigation (PBN) Implementation Plan Republic of Mauritius Table of Contents Para Description Page Number 1 Introduction 1 2 Back ground 1 3 Performance Based Navigation 2 4 RNAV Current

More information

Leader/Follower Static Pairwise (RECAT Phase II) RECATEGORIZATION WORKSHOP June 20, 2011

Leader/Follower Static Pairwise (RECAT Phase II) RECATEGORIZATION WORKSHOP June 20, 2011 Leader/Follower Static Pairwise (RECAT Phase II) RECATEGORIZATION WORKSHOP June 20, 2011 Recategorization is a Three Phase Effort Phase I is Static 6 Category Separation Phase II is static pair-wise separation

More information

Next Generation Airspace Developments: Key Operational Trends and Enablers

Next Generation Airspace Developments: Key Operational Trends and Enablers Next Generation Airspace Developments: Key Operational Trends and Enablers ICNS 2013, Day 1 Plenary Nikos Fistas EUROCONTROL Herdon, VA, 23/04/13 Agenda Key goals of future European ATM system 4D Trajectory

More information

Título ponencia: Introduction to the PBN concept

Título ponencia: Introduction to the PBN concept Título ponencia: Introduction to the PBN concept Organizado por: Index Introduction Background PBN Concept PBN Operations Conclusions Introduction Subject This presentation addresses the Performance-Based

More information

Gestão de Tráfego Aéreo 2015/2016 Exam Name Student ID Number. I (5.5/20, 0.5 each)

Gestão de Tráfego Aéreo 2015/2016 Exam Name Student ID Number. I (5.5/20, 0.5 each) Gestão de Tráfego Aéreo 2015/2016 Exam 2016.01.04 Name Student ID Number I (5.5/20, 0.5 each) What is each contracting state of ICAO required to provide? [ ] Modern radio navigation facilities for aeroplanes

More information

FAA RECAT Phase I Operational Experience

FAA RECAT Phase I Operational Experience FAA RECAT Phase I Operational Experience WakeNet-Europe Workshop 2015 April 2015 Amsterdam, The National Aerospace Laboratory (NLR) Tittsworth (FAA Air Traffic Organization) Pressley (NATCA / IFATCA) Gallo

More information

Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures. Controller Pilot Symposium 24 October 2018

Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures. Controller Pilot Symposium 24 October 2018 Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures Controller Pilot Symposium 24 October 2018 Our airspace Flight Information Regions London & Scottish FIRs: 1m km 2 11% of Europe s

More information

Outmaneuvered AIRFLOW

Outmaneuvered AIRFLOW Today s portable sensors and data-analysis techniques enable scientists worldwide to visualize dimensions, measure velocities and track positions of wake vortices generated by specific variants of large

More information

IATA User Requirements for Air Traffic Services (URATS) NAVIGATION. MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, February 2018

IATA User Requirements for Air Traffic Services (URATS) NAVIGATION. MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, February 2018 IATA User Requirements for Air Traffic Services (URATS) NAVIGATION MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, 11 13 February 2018 IATA at 30,000 ft Mission to represent, lead and serve the airline industry

More information

RACOON PROJECT Daniele Teotino - ENAV. RACOON Project Manager Head of SESAR JU Activity Coordination

RACOON PROJECT Daniele Teotino - ENAV. RACOON Project Manager Head of SESAR JU Activity Coordination RACOON PROJECT Daniele Teotino - ENAV RACOON Project Manager Head of SESAR JU Activity Coordination RACOON in a Nutshell SESAR JU Very Large Scale Demonstration First Italian initiative on Remote TWR solutions

More information

Packaging Tomorrow s Aviation System

Packaging Tomorrow s Aviation System International Civil Aviation Organization Second Briefing on ICAO s Aviation System Block Upgrades Issued: July 2012 The 30 000 Feet View Air traffic growth expands two-fold once every 15 years Growth

More information

NextGen and ASPIRE Environmental Initiatives

NextGen and ASPIRE Environmental Initiatives ICAO Colloquium on ICAO Colloquium on Aviation Aviation Climate Change andand Climate Change NextGen and ASPIRE Environmental Initiatives Presented to: By: Date: ICAO Colloquium Maria A. DiPasquantonio

More information

Approach Specifications

Approach Specifications Approach Specifications RNP Approach (RNP APCH) and Baro-VNAV Approach Specifications RNP APCH and Baro-VNAV 1 Overview Learning Objectives: At the end of this presentation, you should: Understand the

More information

Near Term Potential for System Capacity Gains from RNP and RNAV Procedures

Near Term Potential for System Capacity Gains from RNP and RNAV Procedures National Airspace System Performance Workshop Near Term Potential for System Capacity Gains from RNP and RNAV Procedures By Bill Dunlay Leigh Fisher Associates 1 Purpose and Agenda Briefly describe features

More information

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7 European Airspace Concept Workshops for PBN Implementation Design in Context TFC Where does the traffic come from? And when? RWY Which

More information

Unmanned Aircraft Systems (UAS) Integration Research

Unmanned Aircraft Systems (UAS) Integration Research Unmanned Aircraft Systems (UAS) Integration Research Presented to: Presented by: UAS Midwest Kerin Olson UAS Integration Research Strategy Lead FAA UAS Integration Office Date: FAA UAS Integration Office

More information

PBN Operational Approval Continental En Route Navigation Specifications

PBN Operational Approval Continental En Route Navigation Specifications PBN Operational Approval Continental En Route Navigation Specifications Navigation Specifications Applicable to Continental En-route operations RNAV 5 RNAV 2 RNP 2 A-RNP RNP 0.3 2 RNAV 5 Flight Phase Navigation

More information

Transitioning to ICAO Flight Plan why, when, what, how

Transitioning to ICAO Flight Plan why, when, what, how Transitioning to ICAO Flight Plan why, when, what, how Warbirds and Warriors, EQY 22 August 2017 Christophe Masiero Carolina Aero Club christophe.masiero@gmail.com 704 502 7520 Agenda Introduction Background

More information

FAA NextGENProgram & NEAR Laboratory. Massood Towhidnejad, PhD Director of NEAR lab

FAA NextGENProgram & NEAR Laboratory. Massood Towhidnejad, PhD Director of NEAR lab FAA NextGENProgram & NEAR Laboratory Massood Towhidnejad, PhD Director of NEAR lab www.near.aero towhid@erau.edu U.S. Air Traffic System World s Most Demanding 689M Passengers/Year 36B Pounds of Cargo/Year

More information

Honeywell.com PBN Concepts Krakow, Poland

Honeywell.com PBN Concepts Krakow, Poland PBN Concepts Krakow, Poland EPKK (KRK) Current Operational Environment Current Operational Environment : Runways: 07/25 8,366 ft (2550m) Approaches: ILS or LOC 25 RNAV (GNSS) 07, 25 VOR 07, 25 NDB 25 Departure

More information