Transmission Investment Programme
|
|
- Scarlett Miller
- 5 years ago
- Views:
Transcription
1 3 rd December 2015 Transmission Investment Programme 1
2 Strategic Transmission Upgrades 2
3 1. Beauly / Denny SPT scope is: 20km of new 400/275kV overhead line, a major new substation at Denny and significant consequential works on 132kV and lower voltage assets New line is now complete and in service: 275kV circuit from Braco to Denny commissioned on 12 November kV circuit from Fort Augustus to Denny commissioned on 19th November 2015 Final Beauly Denny tower erected Wirescape and visual mitigation work will continue through to 2018: 15 km of 132kV tower lines will be undergrounded Multiple smaller visual mitigation projects, agreed with local stakeholders Project increases the transfer capability across the B4 boundary (SHETL to SPT) by approximately 1200 MW Denny substation 3
4 2. South West Scotland Phase 1: 275kV Coylton New Cumnock: OHL and substation construction complete Commissioning planned for Q Phases 2 to 4: Progress being made on discharge of pre-construction conditions: Routes B and C - 100% D&G Council, 85% EAC Council. Expecting complete 12/ 2015 Route D 23% D&G Council, 0% EA Council. Expecting complete 02/ 2016 Land agreements in place for 65% of OHL routes, agreements in principle reached with landowners for remaining 35% Planning applications made for 5 quarries, decisions on 4 due in November, 1 in December. Leases to be concluded. Quarries required to be operational by end Jan Substations: Leases concluded for Dunhill and Blackhill substations. Heads of Terms agreed for Blackcraig Access issues for Glenglass to be resolved Land purchase agreed for Margree. Servitudes outstanding with 2 access road landowners Tree cutting, overhead line and numerous substation contracts in place Largest project by spend in SPT 2016 investment programme Coylton 275kV Substation New 275kV overhead line, Coylton to New Cumnock 4
5 2. South West Scotland Key Dates Dec 2015: Discharge remaining consent conditions stages 2 & 3 and D&G area of stage 4 Jan 2016: Commence OHL Construction works including quarry operations. Feb 2016: Discharge remaining consent conditions EAC area of stage 4. Q1 2016: Commence substation construction works at Blackhill / Glenglass and Margree collector sites. Q1 2016: Commission stage 1 OHL and New Cumnock substation. Q3 2016: Connection of Dersalloch Windfarm. Q1 2017: Stage 2 OHL works complete and connection of Brockloch Rig Windfarm. Q2 2017: Stage 3 and 4 OHL works complete. Q2 2017: Complete Blackhill / Glenglass and Margree collector sites. Q2/Q3 2017: Commission Afton / Pencloe / Whiteside Hill / Ulzieside / Margree and Blackcraig windfarms. 5
6 3. 3.3GW Interconnector Upgrade Installation of capacitors at 4 substation sites increases Scotland/England interconnection capacity, with minimal overhead line work from 2.8GW to 3.3GW Three installations now complete and commissioned Elvanfoot, Windyhill and Moffat substations Interconnection capacity increased to circa 3.1GW Final site at advanced stage of completion Longannet substation Installation complete, commissioning in progress Fully operational early 2016, subject to outage availability Elvanfoot MSCDN 6
7 4. Series Compensation and East/West Upgrade (4.4GW) Increases Scotland/England interconnection capacity by 1.1GW through installation of 4 Series Compensation units at 3 sites and raising the operational voltage on the main overhead line through the Central Belt from 275kV to 400kV Series Compensation: Construction of all 4 units now complete West Coast units (Moffat and Gretna) available for operation by end 2015 East Coast units (Eccles) to be commissioned in Q due to outage constraints East/West 400kV Upgrade: Overhead line re-conductoring between Strathaven and Wishaw complete Construction of new 400kV substation nearing completion commissioning planned for early January 2016 Eastern section of upgrade affected by outage constraints and land agreements for new cables to Torness. Expected to complete October 2016 Moffat Series Compensation Unit Wishaw 400kV GIS switchgear 7
8 6. Western Link HVDC and Hunterston Kintyre Western Link HVDC: Increases Scotland s import and export capacity by 2.2GW Construction of convertor station at Hunterston progressing well. Main buildings nearing completion ahead of plant installation from early kV GIS at convertor already installed 400kV GIS substation at Hunterston East (connection point for HVDC and H-K links) commissioned Nov 2015 Deep sea cable laying underway first 118km campaign to complete early December Working towards commissioning of link in Summer 2017 Hunterston to Kintyre Subsea Link (SPT element): 220kV AC link between Crossaig, Kintyre and Hunterston Cables installed and tested. Substation construction at both ends now complete. First circuit due to be operational 12 / 2015 with second following on 01/
9 8. Dumfries and Galloway Strategic Reinforcement Project First round of public consultation on proposed overhead line route corridors and substation sites undertaken June to August 2015 Over 1600 responses received and currently being analysed. Report on consultation to be published in early Key themes include: underground and subsea alternatives, impact on visual amenity in areas distant from current line, localised concerns at a number of specific locations Timeline: Extensive engagement underway with stakeholders / elected officials Needs case under development for submission to Ofgem in early 2016 Second consultation round planned for summer 2016 Application for consents to be made 2019 Construction period from 2020 to
South West Scotland Developer Forum
South West Scotland Developer Forum 10 th June 2016 Grand Central Hotel, Glasgow www.spenergynetworks.co.uk 1 Agenda Introduction Pearse Murray System Design Diyar Kadar SPD Update Elaine Forsyth Land
More informationManaging Director of Transmission. Report for the year 2012
Managing Director of Transmission Report for the year 2012 Introduction (1) Special Condition 2I of SP Transmission s licence requires it to appoint a Managing Director of Transmission (MDT) to be responsible
More informationSouthwest Scotland Transport Mitigation Forum. 5 May 2015 Dumfries Arms Hotel, Cumnock
Southwest Scotland Transport Mitigation Forum 5 May 2015 Dumfries Arms Hotel, Cumnock In attendance David Elliot (Cumnock Community Council) Beth Griffin (Ochiltree Community Council) Alex Baird (Ochiltree
More informationThe Electric Power System
The Electric Power System - Bosnia and Herzegovina - Bosnia and Herzegovina Power System 1 2 Basic facts Area: 51.197 km 2 Population: 3.791.622 Number of electricity consumers: 1.505.015 Number of TSOs:
More informationStatement of Community Consultation
Statement of Community Consultation www.scottishpowerrenewables.com PROPOSED OFFSHORE WINDFARM How to have your say on East Anglia TWO Offshore Windfarm Prepared and published in accordance with Section
More informationSESSION 1: Q&A summary of session with Will Apps (Head of Energy Development) and Helen Elphick (Senior Development Manager)
Meeting Potential new offshore wind leasing - industry event: Q&A summary Date/time Wednesday 25 July 2018 Venue Glaziers Hall, 9 Montague Close, London Bridge, SE1 9DD Chair Presenters Clare Collard,
More informationPORT MORESBY POWER PROJECT - UPDATE PNG Mining & Petroleum Investment Conference. 4 th December 2018
PORT MORESBY POWER PROJECT - UPDATE PNG Mining & Petroleum Investment Conference 4 th December 2018 CONTENTS NiuPower Recap Port Moresby Power Station Project Current Status Where to Now Port Moresby Power
More informationBD- Legacy Steering Group Agenda
BD- Legacy Steering Group Agenda 1. Apologies and Substitutions 2. Minutes from Previous Meeting 3. Matters Arising 4. Project Update 5. AOCB - Landscaping Mitigation - Other Mitigation Works BEAULY to
More informationEnoch Hill Wind Farm Environmental Statement
//6km/8km/ distance indicators from the proposed A1) South Kyle A4) Benbrack South Kyle wind farm may be Benbrack wind farm may be Enoch and South Kyle may be Enoch and Benbrack may be South Kyle and Benbrack
More informationCIGRE - IEC 2019 Conference on EHV and UHV (AC & DC) Hakodate, Japan April 23-26, 2019
CIGRE - IEC 2019 Conference on EHV and UHV (AC & DC) Hakodate, Japan April 23-26, 2019 Ver. 10/07/2018 1 Date and Place April 23-26, 2019 About The 2019 Conference New Trends in Advanced Technologies for
More informationAppendix. Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Gatwick Airport Limited
Gatwick Airport Limited Response to Airports Commission Consultation Appendix 37 Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Further information
More informationLorg Wind Farm. Addendum To Pre-Application Consultation Report
Lorg Wind Farm Addendum To Pre-Application Consultation Report November 2015 Lorg Wind Farm Pre-Application Consultation Report Addendum Contents 1. Introduction... 1 Summary of Non-Statutory Consultation...
More informationBla ck Law G rid Co nnection. Study Area. Figure 6.1. West Lothian. North Lanarkshire. South Lanarkshire. 1km from proposed Cable Route
Bla ck Law G rid Co nnection West Lothian Study rea 1km from proposed Cable Route 2km from proposed OHL Route Local uthority Boundary North Lanarkshire Black Law Windfarm Extension Substation Overhead
More informationPERTH AND KINROSS COUNCIL. 20 June 2018
PERTH AND KINROSS COUNCIL 20 June 2018 Planning Reference 18/00200/FLN - Section 42 of the Town and Country Planning (Scotland) Act 1997 to modify condition 3 (landscaping) of planning permission 12/00948/FLM
More informationTullibody Action Group Vision for New Civic Centre
Tullibody Action Group Vision for New Civic Centre August 2017 Prepared by Sandra Macaskill, Caskieco, M 07986 163002 E Caskieco@aol.com CaskieCo 1 1. Introduction 1.1. Tullibody Action Group (TAG) came
More informationElectric System Serving Pierce County Current system and future investments. Janet Olsen Steve Botts
Electric System Serving Pierce County Current system and future investments Janet Olsen Steve Botts Project Manager Real Estate t / Rights-of-Way April 13, 2011 Presentation overview Information requested
More informationAIRSPACE PRINCIPLES CONSULTATION DOCUMENT JANUARY 2018
AIRSPACE PRINCIPLES CONSULTATION DOCUMENT JANUARY 2018 Page 2 Contents Contents 1. Introduction 2. Airspace change process 3. Redesigning our airspace 4. Airspace design principles 5. Have your say Page
More informationFuture Network Requirements
Future Network Requirements Presenters: Mahesh Narotam, Manager Portfolio Planning and Optimisation Daniel Andersen, Manager Network Strategy Roslyn Stewart, Senior Portfolio Planning Engineer May 2017
More informationMarine Energy in the Channel Islands. Dr. John Sharp, Alderney Commission, Mat Desforges (Guernsey), Dr. Louise Magris (Jersey), Roger Olsen (Sark)
Marine Energy in the Channel Islands. Dr. John Sharp, Alderney Commission, Mat Desforges (Guernsey), Dr. Louise Magris (Jersey), Roger Olsen (Sark) The Channel Islands Alderney, Guernsey, Jersey and Sark
More informationGRAIN BELT EXPRESS CLEAN LINE
GRAIN BELT EXPRESS CLEAN LINE ROUTE SELECTION STUDY Prepared For Clean Line Energy Partners LLC Prepared By Louis Berger 201 TABLE OF CONTENTS List of Figures... v List of Tables... vi Acronyms and Abbreviations...
More informationElectric System Serving Pierce County Current system and future investments
Electric System Serving Pierce County Current system and future investments Janet Olsen Project Manager Steve Botts Real Estate / Rights-of-Way April 13, 2011 Presentation overview Information requested
More informationNorthfield to Ingle Farm #2 66 kv Sub transmission line
Header Reasonableness Test RT 011/11 Northfield to Ingle Farm #2 66 kv Sub transmission line RT011-11 Northfield to Inglefarm Page 1 of 8 Reasonableness Test: Northfield to Ingle Farm 66 kv line DISCLAIMER
More informationCIGRE - IEC 2019 Conference on EHV and UHV (AC & DC) Hakodate, Japan April 23-26, 2019
CIGRE - IEC 2019 Conference on EHV and UHV (AC & DC) Hakodate, Japan April 23-26, 2019 Ver. 21/12/2018 1 Date and Place April 23-26, 2019 About The 2019 Conference New Trends in Advanced Technologies for
More informationBrisbane Metro Infrastructure Association of Queensland 14 February 2018
Brisbane Metro Infrastructure Association of Queensland 14 February 2018 Agenda Brisbane Metro project update Packaging and procurement overview Panel discussion Audience Q&A The journey so far Planning
More informationA63 Castle Street, Hull HullBID Network Lunch 24 August 2017
A63 Castle Street, Hull HullBID Network Lunch 24 August 2017 James D Leeming Senior Project Manager What we will cover today? Introduction to Highways England and the Road Investment Strategy A63 Scheme
More informationStrategic Transport Forum
Strategic Transport Forum Friday 16 th March 2018 www.englandseconomicheartland.com Item 3: Innovation www.englandseconomicheartland.com Innovation work stream - EEH 1. Policy modelling 2. MaaS 3. EEH
More informationIndustry briefing NOVEMBER 2017
Industry briefing NOVEMBER 2017 SYDNEY METRO AUSTRALIA S BIGGEST PUBLIC TRANSPORT PROJECT A new stand-alone railway, this 21st century network will revolutionise the way Sydney travels. Services start
More informationPlanning Resilient Transmission Networks in Chile
Planning Resilient Transmission Networks in Chile Juan C. Araneda Transmission Planning Manager 1 CHILEAN NATIONAL POWER SYSTEM 2018 SEN 3,100 km Installed Capacity: Peak Demand: 24,000 MW 11,000 MW Source:
More informationCongestion Charging The history, planning and implementation
Congestion Charging The history, planning and implementation Presentation to Bogota Transport Planning Workshop Simon Buxton & Jon Hodges Transport for London 9 April 2013 Why was Congestion Charging necessary?
More informationHugo Klingenberg Senior Manager Network Development ElectraNet Adelaide, South Australia Lodged via
Hugo Klingenberg Senior Manager Network Development ElectraNet Adelaide, South Australia 5000 Lodged via email consultation@electranet.com.au. Friday, 21 July 2017 Dear Mr Klingenberg, RE: Eyre Peninsula
More informationAPEC Papua New Guinea 2018 Preparations APEC AUTHORITY BRIEFING. Update: 7 September 2017
APEC Papua New Guinea 2018 Preparations APEC AUTHORITY BRIEFING Update: 7 September 2017 PRESENTATION Today s presentation will include: Brief outline of APEC policies and PNG proposed policy initiatives
More informationMONTHLY REPORT Issue No. R02-18 February 2018
Southern African Power Pool Energising the region for economic development 1 MONTHLY REPORT Issue No. R02-18 February CONTENTS Meetings, Workshops and Conferences.. 1 50 th SAPP Management Committee Meetings...
More informationPSP 75 Lancefield Road. Northern Jacksons Creek Crossing Supplementary Information
PSP 75 Lancefield Road Northern Jacksons Creek Crossing Supplementary Information September 2017 The northern crossing of Jacksons Creek proposed within the Lancefield Road PSP is a key part of the ultimate
More informationCreating Connections in Niagara Region
Creating Connections in Niagara Region GERRY CHAPUT, CHIEF CAPITAL OFFICER - METROLINX ERIN MOROZ, DIRECTOR OF COMMUNICATIONS AND COMMUNITY RELATIONS - METROLINX METROLINX PRESENTATION TO NIAGARA REGION
More informationFirst proposed route Purangi Estuary to Hot Water Beach. Stella Evered Reserve. Purangi Estuary
Great Walks Project First proposed route Purangi Estuary to Hot Water Beach PACIFIC OCEAN Cathedral Cove Hahei Hereheretaura Ngati Hei Pa site Stella Evered Reserve Proposed Carpark Lees Rd Blow Hole site
More informationPerformance of Wind Farms in Thailand
Performance of Wind Farms in Thailand Based on Mott MacDonald s in country experience Sasaraj Laoharatchapruek Bangkok, 06 June 2018 Sasaraj Laoharatchapruek Renewable Energy Consultant Bangkok Based Experience
More informationAPEC Papua New Guinea 2018 Preparations APEC AUTHORITY BRIEFING. Update: 22 August 2017
APEC Papua New Guinea 2018 Preparations APEC AUTHORITY BRIEFING Update: 22 August 2017 PRESENTATION Today s presentation will include: Brief outline of APEC policies and PNG proposed policy initiatives
More informationYorkshire s Offshore, Renewable Energy and Operations and Maintenance Centre. 7 th October 2014
Yorkshire s Offshore, Renewable Energy and Operations and Maintenance Centre 7 th October 2014 Contents About Dalby Offshore Proposal summary New Industry Operations and Maintenance in the Renewables Industry
More informationTHE HIGHLAND COUNCIL. Acting Head of Development Management Highland. Purpose/Executive Summary
Agenda item Report no 4 PLN/012/19 THE HIGHLAND COUNCIL Committee: North Planning Applications Committee Date: 5 March 2019 Report Title: Report By: Major Development Update Acting Head of Development
More informationSTRONGER CHRISTCHURCH INFRASTRUCTURE REBUILD TEAM (SCIRT) REAAA
STRONGER CHRISTCHURCH INFRASTRUCTURE REBUILD TEAM (SCIRT) REAAA 21 st August 2012 Context Legend Areas of observed liquefaction! Port Hills area Approx Scale 1:50,000 0 500 1000 1500 2000 2500 (m) Notes:
More informationTHE NEXT STAGES FOR DELIVERING HEATHROW EXPANSION
EXPANSION UPDATE THE NEXT STAGES FOR DELIVERING HEATHROW EXPANSION DECEMBER 2017 In October 2016, the Government announced that a north west runway at Heathrow is its preferred scheme for the expansion
More informationCAPABILITY STATEMENT TRANSPORT
CAPABILITY STATEMENT TRANSPORT Who is Zinfra? Zinfra is a leading power, gas, water and telco infrastructure service provider. We offer a comprehensive range of design, construction and maintenance services
More informationFacilities Review & Shared Services Programme Board. Name Title Organisation. (DS) Douglas Seago Programme Director Scottish Government (Chair)
Minutes Meeting Date Facilities Review & Shared Services Programme Board Wednesday 29th October from 10.00am Location JAMES WATT A, Atlantic Quay - Scottish Government, 5 Atlantic Quay, 150 Broomielaw,
More informationHISTORY OF THE CENTRAL EYRE IRON PROJECT (CEIP)
HISTORY OF THE CENTRAL EYRE IRON PROJECT (CEIP) BEN HAVELBERG PROPHECY WARRAMBOO SAGA Also to cause him much ridicule was his ability of prophesying the weather by the moon and the stars. The Polda water
More informationSouth Fremantle Solar Farm Agenda 1 March 2018
South Fremantle Solar Farm Agenda 1 March 2018 INTRODUCTION (CoF) Format of session Project background and process Community concerns Environmental requirements THE PROJECT (Epuron) Epuron credentials
More informationBOROUGH OF POOLE TRANSPORTATION ADVISORY GROUP 16 MARCH 2017
Agenda item 6 BOROUGH OF POOLE TRANSPORTATION ADVISORY GROUP 16 MARCH 2017 REPORT OF HEAD OF GROWTH AND INFRASTRUCTURE SAFEZONE AVERAGE SPEED CAMERA SITE ON SPRINGDALE ROAD, IN BROADSTONE, POOLE AND CORFE
More informationCREATING CONNECTIONS IN DURHAM REGION
CREATING CONNECTIONS IN DURHAM REGION PETER ZUK CHIEF CAPITAL OFFICER, METROLINX DURHAM REGION COMMITTEE OF THE WHOLE SEPTEMBER 6, 2017 CONGESTION COSTS OUR ECONOMY REGIONAL TRANSFORMATION 3 METROLINX:
More informationICN Gateway Breakfast (SA) Jon Whelan A/Manager Project Delivery 9 July 2015
ICN Gateway Breakfast (SA) Jon Whelan A/Manager Project Delivery 9 July 2015 78 km running between Old Noarlunga and Gawler Adelaide s North South Corridor Torrens Road to River Torrens [due for completion
More informationTerms of Reference: Introduction
Terms of Reference: Assessment of airport-airline engagement on the appropriate scope, design and cost of new runway capacity; and Support in analysing technical responses to the Government s draft NPS
More informationTECHPORT AUSTRALIA - AUSTRALIA S PREMIER NAVAL INDUSTRY HUB
TECHPORT AUSTRALIA - AUSTRALIA S PREMIER NAVAL INDUSTRY HUB TECHPORT AUSTRALIA TECHPORT AUSTRALIA - AUSTRALIA S PREMIER NAVAL INDUSTRY HUB TECHPORT AUSTRALIA Techport Australia is the nation s premier
More informationIslay Offshore Wind Farm
MAP: Proposed location of the Islay Offshore wind farm site SSE Renewables entered into an agreement for lease with the Crown Estate in October 2011 to develop a 690MW offshore wind farm 13km off the west
More informationUpdated Transmission Expansion Plan for the Puget Sound Area to Support Winter South-to-North Transfers. Approved by PSAST on
Updated Transmission Expansion Plan for the Puget Sound Area to Support Winter South-to-North Transfers Approved by PSAST on 4-25-11 Overview Why the Update? Proposed Transmission Expansion Plan TCRM &
More informationWelcome. Green Line in Your Community
Welcome Green Line in Your Community Today s session will provide you with information on options The City is exploring for connecting the Green Line in the Beltline to the future Inglewood/Ramsay station.
More informationThe Wallumbilla Hub: Integrating Queensland s Pipeline Infrastructure to Meet the Changing Demands of the East Coast Gas Grid
The Wallumbilla Hub: Integrating Queensland s Pipeline Infrastructure to Meet the Changing Demands of the East Coast Gas Grid Craig Clarke, Manager Construction Engineering APGA Annual Convention, Gold
More informationAs part of our transport vision, Leeds City Council, working with the West Yorkshire Combined Authority and Leeds Bradford Airport Company, is
As part of our transport vision, Leeds City Council, working with the West Yorkshire Combined Authority and Leeds Bradford Airport Company, is considering options for improving surface access and connectivity
More informationPERTH AND KINROSS COUNCIL. Housing and Health Committee. 25 May Perth and Kinross Local Housing Strategy
PERTH AND KINROSS COUNCIL 7 16/234 Housing and Health Committee 25 May 2016 Perth and Kinross Local Housing Strategy 2016-2021 Report by Director (Housing and Social Work) PURPOSE OF REPORT This report
More informationRealistic Assessment of SADC Energy Demand and Supply Up to By Prof M Elmissiry ENERGY SECTOR NEPAD, Midrand South Africa
Realistic Assessment of SADC Energy Demand and Supply Up to 2015 By Prof M Elmissiry ENERGY SECTOR NEPAD, Midrand South Africa PRESENTATION OUTLINES 1-SAPP UTILITIES CURRENT SUPPLY /DEMAND SITUATION 2-PROJECTED
More informationCommittee. Presentation Outline
CW-33-15 11/9/2015 Community and Corporate Services Committee November 10, 2015 1 Presentation Outline Background Vision and Objectives Study Process and Timeline Public and Stakeholder Engagement Organization
More informationMEETING THE CHALLENGES OF FLOODS AND BUSHFIRES THE Energex EXPERIENCE
MEETING THE CHALLENGES OF FLOODS AND BUSHFIRES THE Energex EXPERIENCE Presenters: Colin Lee & Russell Gordon, ENERGEX 1 November 18 th 2015 2 ENERGEX S Footprint Electricity distributor SEQ $12B+ assets
More informationSection II. Planning & Public Process Planning for the Baker/Carver Regional Trail began in 2010 as a City of Minnetrista initiative.
Section II Planning & Public Process Planning for the began in 2010 as a City of initiative. city staff began discussions with the Park District on the possibility of a north/south regional trail connection
More informationNorth Herts District Council Local Plan Timeline for Response to Council s Request for Strategic Housing Land Land to the North of the Grange,
North Herts District Council Local Plan Timeline for Response to Council s Request for Strategic Housing Land Land to the North of the Grange, Letchworth Garden City Introduction As part of central government
More informationConstruction Open Evening
Construction Open Evening 16 February 2017 www.gov.uk/hs2 Forward Look www.gov.uk/hs2 Euston Station and Approach four week look ahead Week 1 Commencing 13 February 42 Water Main trial trenches Albany
More informationAPSE Parks Seminar 2016 Make Haigh while the sun shines! Developing and delivering a sustainable solution for Wigan s Destination Parks.
APSE Parks Seminar 2016 Make Haigh while the sun shines! Developing and delivering a sustainable solution for Wigan s Destination Parks. The Haigh Woodland Park Case Study Keith L Bergman. Strategic Development
More informationPre-application submission for Committee: Phase 4 development at West Hendon
Pre-application submission for Committee: Phase 4 development at West Hendon 1. Development Details Phase 4 of the West Hendon Estate Regeneration. 2. Background The redevelopment of the West Hendon Estate
More informationStakeholder Briefing The Bays Precint Urban Transformation Program
Stakeholder Briefing The Bays Precint Urban Transformation Program November 2014 Our Lifecycle Approach 3 Our Ambition & Narrative Our Ambition Statement for UrbanGrowth NSW is - Transforming City Living
More information.org.uk. Regional. Transport. Strategy. Revised June Serving Dumfries and Galloway. South West of Scotland Transport Partnership
South West of Scotland Transport Partnership.org.uk Regional Transport Strategy Revised June 2008 Serving Dumfries and Galloway South West of Scotland Transport Partnership.org.uk SOUTH WEST OF SCOTLAND
More informationUpdate on the development of the Regional Real Time Passenger Information (RTPI) System
Agenda Item 11 Update on the development of the Regional Real Time Passenger Information (RTPI) System Committee Strategy and Programmes Date of meeting 23 November 2018 Date of report 30 October 2018
More informationPerth and Kinross Council Development Control Committee 27 August 2008 Recommendation by Development Quality Manager
Perth and Kinross Council Development Control Committee 27 August 2008 Recommendation by Development Quality Manager 5(7) 08/414 Erection of kennels and cattery at Baltree Farm, Hatchbank, Kinross, KY13
More informationcommunication tower means a tower or structure built to support equipment used to transmit communication signals;
Ontario Ministry of Natural Resources Subject Communication Tower Sites on Crown Land Compiled by - Branch Lands & Waters Section Land Management Policy PL 4.10.02 Replaces Directive Title Communication
More informationFUTURE AIRSPACE CHANGE
HEATHROW EXPANSION FUTURE AIRSPACE CHANGE UPDATE SEPTEMBER 2018 On 25 June 2018, Parliament formally backed Heathrow expansion, with MPs voting in support of the Government s Airports National Policy Statement
More informationA1/3 Page D - 3 Issue 7 AL19 30/03/2007
SARG Management System ANNEX D to A1/3 ASSESSMENT 1. The proposal was initiated by Framework Briefing in June 2012 and was developed over a considerable period. The initial consultation took place between
More informationGreater Shepparton City Council Planning Scheme Amendment C192 and C193 VicRoads Submission to Traffic Conclave
Greater Shepparton City Council Planning Scheme Amendment C192 and C193 VicRoads Submission to Traffic Conclave Prepared by: Raelene Stratton Team Leader Integrated Transport and Land Use, North Eastern
More informationBlack Mountain Substation Project - Report on Consultation Activity
B-4 Brian Parent Manager, Revenue Requirements FortisBC Inc. Regulatory Affairs Department 5 th Floor, 1628 Dickson Avenue Kelowna BC V1Y 9X1 Ph: 250 717-0851 Fax: 1 800-717-0801 regulatory@fortisbc.com
More informationC. APPROACH FOR IDENTIFYING THE BEST ROUTES FOR THE NEEDED TRANSMISSION SYSTEM IMPROVEMENTS
C. APPROACH FOR IDENTIFYING THE BEST ROUTES FOR THE NEEDED TRANSMISSION SYSTEM IMPROVEMENTS CL&P s approach for identifying the best routes for the needed transmission system improvements included a determination
More informationRangitīkei District Council
Rangitīkei District Council Assets and Infrastructure Committee Meeting Agenda Thursday 9 August 2018 9:30 AM Contents 1 Welcome...3 2 Council Prayer...3 3 Apologies/leave of Absence...3 4 Members conflict
More informationLake Windermere Westside Legacy Trail. A multi-use non-motorized paved trail promoting health, wealth and outdoor appreciation
Lake Windermere Westside Legacy Trail A multi-use non-motorized paved trail promoting health, wealth and outdoor appreciation Jan 26, 2015 Executive Summary The Lake Windermere Westside Legacy Trail will
More informationFurther Scottish Leasing Round (Saltire Prize Projects) Discussion Paper on Proposed Geographic Areas March 2010
Further Scottish Leasing Round (Saltire Prize Projects) Discussion Paper on Proposed Geographic Areas March 2010 1 Introduction 1.1 The Saltire Prize The purpose of the Saltire Prize is to stimulate innovation
More informationEQUATORIAL LAUNCH AUSTRALIA
EQUATORIAL LAUNCH AUSTRALIA East Arnhem Land Arnhem Space Centre Copyright: East Arnhem Land Tourist Association Scott Wallis Founder & Chief of Space July 2018 Arnhem Space Centre Solid launch vehicle
More informationWest of Duddon Sands Offshore Wind Farm
West of Duddon Sands Offshore Wind Farm Ørsted Welcome to West of Duddon Sands West of Duddon Sands Offshore Wind Farm was officially inaugurated in autumn 2014, after completing construction ahead of
More informationBuilding the transportation network we need for the future in Niagara Region
Building the transportation network we need for the future in Niagara Region Niagara@metrolinx.com Metrolinx.com/Niagara Metrolinxengage.com INSERT FOOTER 1 WHO IS METROLINX? Metrolinx was created in 2006
More informationSudbury to Hudson Transmission Reliability Project
An independent assessment of routing options Sudbury to Hudson Transmission Reliability Project and use of a rail-banked corridor for this purpose Prepared by: NorthEast Logistics Systems, LLC August 29,
More informationMemorandum. Pauline Medrano Mitchell Rasansky Steve Salazar. Power Transmission Lines in the Trinity River Corridor Follow-up CITY OF DALLAS
Memorandum CITY OF DALLAS DATE April 18, 2008 TO Trinity River Corridor Project Committee Members: David A. Neumann (Chairman) Mayor Pro Tern Dr. Elba Garcia (Vice-Chair) Deputy Mayor Pro Tern Dwaine Caraway
More informationDraft Marine and Harbour Facilities Strategy
Draft Marine and Harbour Facilities Strategy Vision The Coromandel peninsula is a destination of choice for safe, sustainable and accessible marine and harbour facilities that are fit for purpose to meet
More informationScotland: The location of choice for Spanish companies in Offshore Wind
Scotland: The location of choice for Spanish companies in Offshore Wind Anusha Appadoo International Senior Executive II CONFERENCIA INTERNACIONAL DE ENERGÍAS OFFSHORE Agenda Introduction to Scottish Development
More informationMATL Reference. MATL Path 83 Transfer Capability with Seasonal SOL Effects. Document. 1. Purpose
1. Purpose This document outlines the transfer capability on MATL Path 83 for both long-term capability and for current seasonal capabilities adjusted for known System Operating Limits (SOLs), such as
More informationSupplemental Information for Application for Transportation and Utility Systems and Facilities on Federal Lands
Supplemental Information for Application for Transportation and Utility Systems and Facilities on Federal Lands Introductory Note: This application is filed by PATH Allegheny Transmission Company, LLC
More informationPlanning Approval Consistency Assessment Form
Integrated Management System Planning Approval Consistency Assessment Form SM ES-FT-414 Sydney Metro Integrated Management System (IMS) Applicable to: Document Owner: System Owner: Status: Sydney Metro
More informationFLL Master Plan Update Technical Advisory Committee (TAC) Briefing #1. September 28, 2016
FLL Master Plan Update Technical Advisory Committee (TAC) Briefing #1 September 28, 2016 TAC Committee Role: Internal Stakeholders To provide input on the master planning analysis from the technical and
More informationPOLICY SUBMISSION NETWORK RAIL SCOTLAND RAIL ROUTE UTILISATION STRATEGY. January
POLICY SUBMISSION NETWORK RAIL SCOTLAND RAIL ROUTE UTILISATION STRATEGY January 2011 www.scdi.org.uk SCDI is an independent and inclusive economic development network which seeks to influence and inspire
More informationThe original needs analysis carried out in 2001 identified three options for acquiring or leasing land for the crèche:
5. REDCLIFFS/SUMNER COMMUNITY CRÈCHE RELOCATION Officer responsible Author Property Manager Kevin Mara, DDI 941 6401 The purpose of this report is to update the Council on the status of this project, in
More informationM A T L Reference. MATL Path 83 Transfer Capability with Seasonal SOL Affects. Document. 1. Purpose
1. Purpose This document outlines the Transfer Capability on MATL Path 83 for both long-term capability and for current seasonal capabilities adjusted for known System Operating Limits (SOLs), such as
More informationMinutes. ACTION: Ian Frost to provide the economic values study from Wandsworth at the next meeting.
Meeting title / subject: Date: 4 th December 2014 Venue: Heathrow Academy, CR3 Attendees: Name Organisation Fraser Brown (acting chairman) HEX Ian Frost HAL Derek Lawrence AOC Andrew Genever Network Rail
More informationBaslow Sports Field Trust Minutes of the Trustees Committee Meeting
Baslow Sports Field Trust Minutes of the Trustees Committee Meeting Present: Apologies: Date: Peter Holt (Chairman), Neil Mantell (Treasurer), Alan Wilson (Secretary), Peter Barlow, Chris Brown, Tony Buckham,
More informationCalifornia State University Long Beach Policy on Unmanned Aircraft Systems
California State University, Long Beach June 14, 2016 Policy Statement: 16-04 California State University Long Beach Policy on Unmanned Aircraft Systems The following policy statement was recommended by
More informationClick to edit Master title style
Click to edit Master title style OPERATION PHAKISA Heading heading heading TRANSNET NATIONAL PORTS AUTHORITY (TNPA) B2B NETWORKING FORUM 28 JUNE 2016 Date HYATT REGENCY HOTEL, ROSEBANK Contents Transnet
More informationLarge Disturbances During 2014 in Power System of Serbia
Large Disturbances During 2014 in Power System of Serbia (32 nd Conference of CIGRE Serbia, Zlatibor, 17.-21. May 2015) by Gojko Dotlić SO3 SU3 SR NS3 SANDORFALVA ZR2 Power Transmission System of Serbia
More informationPresentation to NHS HE Forum. NHSScotland Update. Edinburgh 16th October 2012
Presentation to NHS HE Forum NHSScotland Update Edinburgh 16th October 2012 National Information Systems Group, NHS National Services Scotland Topics SWAN N3 Replacement Video Conferencing SWAN (N3 Replacement)
More informationThe Electric Power System
The Electric Power System - Republic of Macedonia - Macedonian Power System 1 2 Basic facts Area: 25.713 km 2 Population: ~ 2.069.172 Number of electricity consumers: 695.279 (DSO) Number of TSOs: 1 MEPSO
More informationAppendix - Storm Eva. 26/27 December 2015
Appendix - Storm Eva 26/27 December 2015 1 Storm Eva Rainfall 48hr UK RAINFALL TOTALS 9am 25 DEC 9am 27 DEC 2015 SITE AREA STONYHURST LANCASHIRE 100 SHAP CUMBRIA 86.4 SPADEADAM CUMBRIA 79.4 PRESTON, MOOR
More informationSarawia Street Laxon Terrace Rail Level Crossing Removal
Sarawia Street Laxon Terrace Rail Level Crossing Removal Recommendations It is recommended that the Board: Receives the report. Executive summary The removal of the Sarawia Street to Laxon Terrace rail
More information