Transmission Investment Programme

Size: px
Start display at page:

Download "Transmission Investment Programme"

Transcription

1 3 rd December 2015 Transmission Investment Programme 1

2 Strategic Transmission Upgrades 2

3 1. Beauly / Denny SPT scope is: 20km of new 400/275kV overhead line, a major new substation at Denny and significant consequential works on 132kV and lower voltage assets New line is now complete and in service: 275kV circuit from Braco to Denny commissioned on 12 November kV circuit from Fort Augustus to Denny commissioned on 19th November 2015 Final Beauly Denny tower erected Wirescape and visual mitigation work will continue through to 2018: 15 km of 132kV tower lines will be undergrounded Multiple smaller visual mitigation projects, agreed with local stakeholders Project increases the transfer capability across the B4 boundary (SHETL to SPT) by approximately 1200 MW Denny substation 3

4 2. South West Scotland Phase 1: 275kV Coylton New Cumnock: OHL and substation construction complete Commissioning planned for Q Phases 2 to 4: Progress being made on discharge of pre-construction conditions: Routes B and C - 100% D&G Council, 85% EAC Council. Expecting complete 12/ 2015 Route D 23% D&G Council, 0% EA Council. Expecting complete 02/ 2016 Land agreements in place for 65% of OHL routes, agreements in principle reached with landowners for remaining 35% Planning applications made for 5 quarries, decisions on 4 due in November, 1 in December. Leases to be concluded. Quarries required to be operational by end Jan Substations: Leases concluded for Dunhill and Blackhill substations. Heads of Terms agreed for Blackcraig Access issues for Glenglass to be resolved Land purchase agreed for Margree. Servitudes outstanding with 2 access road landowners Tree cutting, overhead line and numerous substation contracts in place Largest project by spend in SPT 2016 investment programme Coylton 275kV Substation New 275kV overhead line, Coylton to New Cumnock 4

5 2. South West Scotland Key Dates Dec 2015: Discharge remaining consent conditions stages 2 & 3 and D&G area of stage 4 Jan 2016: Commence OHL Construction works including quarry operations. Feb 2016: Discharge remaining consent conditions EAC area of stage 4. Q1 2016: Commence substation construction works at Blackhill / Glenglass and Margree collector sites. Q1 2016: Commission stage 1 OHL and New Cumnock substation. Q3 2016: Connection of Dersalloch Windfarm. Q1 2017: Stage 2 OHL works complete and connection of Brockloch Rig Windfarm. Q2 2017: Stage 3 and 4 OHL works complete. Q2 2017: Complete Blackhill / Glenglass and Margree collector sites. Q2/Q3 2017: Commission Afton / Pencloe / Whiteside Hill / Ulzieside / Margree and Blackcraig windfarms. 5

6 3. 3.3GW Interconnector Upgrade Installation of capacitors at 4 substation sites increases Scotland/England interconnection capacity, with minimal overhead line work from 2.8GW to 3.3GW Three installations now complete and commissioned Elvanfoot, Windyhill and Moffat substations Interconnection capacity increased to circa 3.1GW Final site at advanced stage of completion Longannet substation Installation complete, commissioning in progress Fully operational early 2016, subject to outage availability Elvanfoot MSCDN 6

7 4. Series Compensation and East/West Upgrade (4.4GW) Increases Scotland/England interconnection capacity by 1.1GW through installation of 4 Series Compensation units at 3 sites and raising the operational voltage on the main overhead line through the Central Belt from 275kV to 400kV Series Compensation: Construction of all 4 units now complete West Coast units (Moffat and Gretna) available for operation by end 2015 East Coast units (Eccles) to be commissioned in Q due to outage constraints East/West 400kV Upgrade: Overhead line re-conductoring between Strathaven and Wishaw complete Construction of new 400kV substation nearing completion commissioning planned for early January 2016 Eastern section of upgrade affected by outage constraints and land agreements for new cables to Torness. Expected to complete October 2016 Moffat Series Compensation Unit Wishaw 400kV GIS switchgear 7

8 6. Western Link HVDC and Hunterston Kintyre Western Link HVDC: Increases Scotland s import and export capacity by 2.2GW Construction of convertor station at Hunterston progressing well. Main buildings nearing completion ahead of plant installation from early kV GIS at convertor already installed 400kV GIS substation at Hunterston East (connection point for HVDC and H-K links) commissioned Nov 2015 Deep sea cable laying underway first 118km campaign to complete early December Working towards commissioning of link in Summer 2017 Hunterston to Kintyre Subsea Link (SPT element): 220kV AC link between Crossaig, Kintyre and Hunterston Cables installed and tested. Substation construction at both ends now complete. First circuit due to be operational 12 / 2015 with second following on 01/

9 8. Dumfries and Galloway Strategic Reinforcement Project First round of public consultation on proposed overhead line route corridors and substation sites undertaken June to August 2015 Over 1600 responses received and currently being analysed. Report on consultation to be published in early Key themes include: underground and subsea alternatives, impact on visual amenity in areas distant from current line, localised concerns at a number of specific locations Timeline: Extensive engagement underway with stakeholders / elected officials Needs case under development for submission to Ofgem in early 2016 Second consultation round planned for summer 2016 Application for consents to be made 2019 Construction period from 2020 to

South West Scotland Developer Forum

South West Scotland Developer Forum South West Scotland Developer Forum 10 th June 2016 Grand Central Hotel, Glasgow www.spenergynetworks.co.uk 1 Agenda Introduction Pearse Murray System Design Diyar Kadar SPD Update Elaine Forsyth Land

More information

Managing Director of Transmission. Report for the year 2012

Managing Director of Transmission. Report for the year 2012 Managing Director of Transmission Report for the year 2012 Introduction (1) Special Condition 2I of SP Transmission s licence requires it to appoint a Managing Director of Transmission (MDT) to be responsible

More information

Southwest Scotland Transport Mitigation Forum. 5 May 2015 Dumfries Arms Hotel, Cumnock

Southwest Scotland Transport Mitigation Forum. 5 May 2015 Dumfries Arms Hotel, Cumnock Southwest Scotland Transport Mitigation Forum 5 May 2015 Dumfries Arms Hotel, Cumnock In attendance David Elliot (Cumnock Community Council) Beth Griffin (Ochiltree Community Council) Alex Baird (Ochiltree

More information

The Electric Power System

The Electric Power System The Electric Power System - Bosnia and Herzegovina - Bosnia and Herzegovina Power System 1 2 Basic facts Area: 51.197 km 2 Population: 3.791.622 Number of electricity consumers: 1.505.015 Number of TSOs:

More information

Statement of Community Consultation

Statement of Community Consultation Statement of Community Consultation www.scottishpowerrenewables.com PROPOSED OFFSHORE WINDFARM How to have your say on East Anglia TWO Offshore Windfarm Prepared and published in accordance with Section

More information

SESSION 1: Q&A summary of session with Will Apps (Head of Energy Development) and Helen Elphick (Senior Development Manager)

SESSION 1: Q&A summary of session with Will Apps (Head of Energy Development) and Helen Elphick (Senior Development Manager) Meeting Potential new offshore wind leasing - industry event: Q&A summary Date/time Wednesday 25 July 2018 Venue Glaziers Hall, 9 Montague Close, London Bridge, SE1 9DD Chair Presenters Clare Collard,

More information

PORT MORESBY POWER PROJECT - UPDATE PNG Mining & Petroleum Investment Conference. 4 th December 2018

PORT MORESBY POWER PROJECT - UPDATE PNG Mining & Petroleum Investment Conference. 4 th December 2018 PORT MORESBY POWER PROJECT - UPDATE PNG Mining & Petroleum Investment Conference 4 th December 2018 CONTENTS NiuPower Recap Port Moresby Power Station Project Current Status Where to Now Port Moresby Power

More information

BD- Legacy Steering Group Agenda

BD- Legacy Steering Group Agenda BD- Legacy Steering Group Agenda 1. Apologies and Substitutions 2. Minutes from Previous Meeting 3. Matters Arising 4. Project Update 5. AOCB - Landscaping Mitigation - Other Mitigation Works BEAULY to

More information

Enoch Hill Wind Farm Environmental Statement

Enoch Hill Wind Farm Environmental Statement //6km/8km/ distance indicators from the proposed A1) South Kyle A4) Benbrack South Kyle wind farm may be Benbrack wind farm may be Enoch and South Kyle may be Enoch and Benbrack may be South Kyle and Benbrack

More information

CIGRE - IEC 2019 Conference on EHV and UHV (AC & DC) Hakodate, Japan April 23-26, 2019

CIGRE - IEC 2019 Conference on EHV and UHV (AC & DC) Hakodate, Japan April 23-26, 2019 CIGRE - IEC 2019 Conference on EHV and UHV (AC & DC) Hakodate, Japan April 23-26, 2019 Ver. 10/07/2018 1 Date and Place April 23-26, 2019 About The 2019 Conference New Trends in Advanced Technologies for

More information

Appendix. Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Gatwick Airport Limited

Appendix. Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Gatwick Airport Limited Gatwick Airport Limited Response to Airports Commission Consultation Appendix 37 Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Further information

More information

Lorg Wind Farm. Addendum To Pre-Application Consultation Report

Lorg Wind Farm. Addendum To Pre-Application Consultation Report Lorg Wind Farm Addendum To Pre-Application Consultation Report November 2015 Lorg Wind Farm Pre-Application Consultation Report Addendum Contents 1. Introduction... 1 Summary of Non-Statutory Consultation...

More information

Bla ck Law G rid Co nnection. Study Area. Figure 6.1. West Lothian. North Lanarkshire. South Lanarkshire. 1km from proposed Cable Route

Bla ck Law G rid Co nnection. Study Area. Figure 6.1. West Lothian. North Lanarkshire. South Lanarkshire. 1km from proposed Cable Route Bla ck Law G rid Co nnection West Lothian Study rea 1km from proposed Cable Route 2km from proposed OHL Route Local uthority Boundary North Lanarkshire Black Law Windfarm Extension Substation Overhead

More information

PERTH AND KINROSS COUNCIL. 20 June 2018

PERTH AND KINROSS COUNCIL. 20 June 2018 PERTH AND KINROSS COUNCIL 20 June 2018 Planning Reference 18/00200/FLN - Section 42 of the Town and Country Planning (Scotland) Act 1997 to modify condition 3 (landscaping) of planning permission 12/00948/FLM

More information

Tullibody Action Group Vision for New Civic Centre

Tullibody Action Group Vision for New Civic Centre Tullibody Action Group Vision for New Civic Centre August 2017 Prepared by Sandra Macaskill, Caskieco, M 07986 163002 E Caskieco@aol.com CaskieCo 1 1. Introduction 1.1. Tullibody Action Group (TAG) came

More information

Electric System Serving Pierce County Current system and future investments. Janet Olsen Steve Botts

Electric System Serving Pierce County Current system and future investments. Janet Olsen Steve Botts Electric System Serving Pierce County Current system and future investments Janet Olsen Steve Botts Project Manager Real Estate t / Rights-of-Way April 13, 2011 Presentation overview Information requested

More information

AIRSPACE PRINCIPLES CONSULTATION DOCUMENT JANUARY 2018

AIRSPACE PRINCIPLES CONSULTATION DOCUMENT JANUARY 2018 AIRSPACE PRINCIPLES CONSULTATION DOCUMENT JANUARY 2018 Page 2 Contents Contents 1. Introduction 2. Airspace change process 3. Redesigning our airspace 4. Airspace design principles 5. Have your say Page

More information

Future Network Requirements

Future Network Requirements Future Network Requirements Presenters: Mahesh Narotam, Manager Portfolio Planning and Optimisation Daniel Andersen, Manager Network Strategy Roslyn Stewart, Senior Portfolio Planning Engineer May 2017

More information

Marine Energy in the Channel Islands. Dr. John Sharp, Alderney Commission, Mat Desforges (Guernsey), Dr. Louise Magris (Jersey), Roger Olsen (Sark)

Marine Energy in the Channel Islands. Dr. John Sharp, Alderney Commission, Mat Desforges (Guernsey), Dr. Louise Magris (Jersey), Roger Olsen (Sark) Marine Energy in the Channel Islands. Dr. John Sharp, Alderney Commission, Mat Desforges (Guernsey), Dr. Louise Magris (Jersey), Roger Olsen (Sark) The Channel Islands Alderney, Guernsey, Jersey and Sark

More information

GRAIN BELT EXPRESS CLEAN LINE

GRAIN BELT EXPRESS CLEAN LINE GRAIN BELT EXPRESS CLEAN LINE ROUTE SELECTION STUDY Prepared For Clean Line Energy Partners LLC Prepared By Louis Berger 201 TABLE OF CONTENTS List of Figures... v List of Tables... vi Acronyms and Abbreviations...

More information

Electric System Serving Pierce County Current system and future investments

Electric System Serving Pierce County Current system and future investments Electric System Serving Pierce County Current system and future investments Janet Olsen Project Manager Steve Botts Real Estate / Rights-of-Way April 13, 2011 Presentation overview Information requested

More information

Northfield to Ingle Farm #2 66 kv Sub transmission line

Northfield to Ingle Farm #2 66 kv Sub transmission line Header Reasonableness Test RT 011/11 Northfield to Ingle Farm #2 66 kv Sub transmission line RT011-11 Northfield to Inglefarm Page 1 of 8 Reasonableness Test: Northfield to Ingle Farm 66 kv line DISCLAIMER

More information

CIGRE - IEC 2019 Conference on EHV and UHV (AC & DC) Hakodate, Japan April 23-26, 2019

CIGRE - IEC 2019 Conference on EHV and UHV (AC & DC) Hakodate, Japan April 23-26, 2019 CIGRE - IEC 2019 Conference on EHV and UHV (AC & DC) Hakodate, Japan April 23-26, 2019 Ver. 21/12/2018 1 Date and Place April 23-26, 2019 About The 2019 Conference New Trends in Advanced Technologies for

More information

Brisbane Metro Infrastructure Association of Queensland 14 February 2018

Brisbane Metro Infrastructure Association of Queensland 14 February 2018 Brisbane Metro Infrastructure Association of Queensland 14 February 2018 Agenda Brisbane Metro project update Packaging and procurement overview Panel discussion Audience Q&A The journey so far Planning

More information

A63 Castle Street, Hull HullBID Network Lunch 24 August 2017

A63 Castle Street, Hull HullBID Network Lunch 24 August 2017 A63 Castle Street, Hull HullBID Network Lunch 24 August 2017 James D Leeming Senior Project Manager What we will cover today? Introduction to Highways England and the Road Investment Strategy A63 Scheme

More information

Strategic Transport Forum

Strategic Transport Forum Strategic Transport Forum Friday 16 th March 2018 www.englandseconomicheartland.com Item 3: Innovation www.englandseconomicheartland.com Innovation work stream - EEH 1. Policy modelling 2. MaaS 3. EEH

More information

Industry briefing NOVEMBER 2017

Industry briefing NOVEMBER 2017 Industry briefing NOVEMBER 2017 SYDNEY METRO AUSTRALIA S BIGGEST PUBLIC TRANSPORT PROJECT A new stand-alone railway, this 21st century network will revolutionise the way Sydney travels. Services start

More information

Planning Resilient Transmission Networks in Chile

Planning Resilient Transmission Networks in Chile Planning Resilient Transmission Networks in Chile Juan C. Araneda Transmission Planning Manager 1 CHILEAN NATIONAL POWER SYSTEM 2018 SEN 3,100 km Installed Capacity: Peak Demand: 24,000 MW 11,000 MW Source:

More information

Congestion Charging The history, planning and implementation

Congestion Charging The history, planning and implementation Congestion Charging The history, planning and implementation Presentation to Bogota Transport Planning Workshop Simon Buxton & Jon Hodges Transport for London 9 April 2013 Why was Congestion Charging necessary?

More information

Hugo Klingenberg Senior Manager Network Development ElectraNet Adelaide, South Australia Lodged via

Hugo Klingenberg Senior Manager Network Development ElectraNet Adelaide, South Australia Lodged via Hugo Klingenberg Senior Manager Network Development ElectraNet Adelaide, South Australia 5000 Lodged via email consultation@electranet.com.au. Friday, 21 July 2017 Dear Mr Klingenberg, RE: Eyre Peninsula

More information

APEC Papua New Guinea 2018 Preparations APEC AUTHORITY BRIEFING. Update: 7 September 2017

APEC Papua New Guinea 2018 Preparations APEC AUTHORITY BRIEFING. Update: 7 September 2017 APEC Papua New Guinea 2018 Preparations APEC AUTHORITY BRIEFING Update: 7 September 2017 PRESENTATION Today s presentation will include: Brief outline of APEC policies and PNG proposed policy initiatives

More information

MONTHLY REPORT Issue No. R02-18 February 2018

MONTHLY REPORT Issue No. R02-18 February 2018 Southern African Power Pool Energising the region for economic development 1 MONTHLY REPORT Issue No. R02-18 February CONTENTS Meetings, Workshops and Conferences.. 1 50 th SAPP Management Committee Meetings...

More information

PSP 75 Lancefield Road. Northern Jacksons Creek Crossing Supplementary Information

PSP 75 Lancefield Road. Northern Jacksons Creek Crossing Supplementary Information PSP 75 Lancefield Road Northern Jacksons Creek Crossing Supplementary Information September 2017 The northern crossing of Jacksons Creek proposed within the Lancefield Road PSP is a key part of the ultimate

More information

Creating Connections in Niagara Region

Creating Connections in Niagara Region Creating Connections in Niagara Region GERRY CHAPUT, CHIEF CAPITAL OFFICER - METROLINX ERIN MOROZ, DIRECTOR OF COMMUNICATIONS AND COMMUNITY RELATIONS - METROLINX METROLINX PRESENTATION TO NIAGARA REGION

More information

First proposed route Purangi Estuary to Hot Water Beach. Stella Evered Reserve. Purangi Estuary

First proposed route Purangi Estuary to Hot Water Beach. Stella Evered Reserve. Purangi Estuary Great Walks Project First proposed route Purangi Estuary to Hot Water Beach PACIFIC OCEAN Cathedral Cove Hahei Hereheretaura Ngati Hei Pa site Stella Evered Reserve Proposed Carpark Lees Rd Blow Hole site

More information

Performance of Wind Farms in Thailand

Performance of Wind Farms in Thailand Performance of Wind Farms in Thailand Based on Mott MacDonald s in country experience Sasaraj Laoharatchapruek Bangkok, 06 June 2018 Sasaraj Laoharatchapruek Renewable Energy Consultant Bangkok Based Experience

More information

APEC Papua New Guinea 2018 Preparations APEC AUTHORITY BRIEFING. Update: 22 August 2017

APEC Papua New Guinea 2018 Preparations APEC AUTHORITY BRIEFING. Update: 22 August 2017 APEC Papua New Guinea 2018 Preparations APEC AUTHORITY BRIEFING Update: 22 August 2017 PRESENTATION Today s presentation will include: Brief outline of APEC policies and PNG proposed policy initiatives

More information

Yorkshire s Offshore, Renewable Energy and Operations and Maintenance Centre. 7 th October 2014

Yorkshire s Offshore, Renewable Energy and Operations and Maintenance Centre. 7 th October 2014 Yorkshire s Offshore, Renewable Energy and Operations and Maintenance Centre 7 th October 2014 Contents About Dalby Offshore Proposal summary New Industry Operations and Maintenance in the Renewables Industry

More information

THE HIGHLAND COUNCIL. Acting Head of Development Management Highland. Purpose/Executive Summary

THE HIGHLAND COUNCIL. Acting Head of Development Management Highland. Purpose/Executive Summary Agenda item Report no 4 PLN/012/19 THE HIGHLAND COUNCIL Committee: North Planning Applications Committee Date: 5 March 2019 Report Title: Report By: Major Development Update Acting Head of Development

More information

STRONGER CHRISTCHURCH INFRASTRUCTURE REBUILD TEAM (SCIRT) REAAA

STRONGER CHRISTCHURCH INFRASTRUCTURE REBUILD TEAM (SCIRT) REAAA STRONGER CHRISTCHURCH INFRASTRUCTURE REBUILD TEAM (SCIRT) REAAA 21 st August 2012 Context Legend Areas of observed liquefaction! Port Hills area Approx Scale 1:50,000 0 500 1000 1500 2000 2500 (m) Notes:

More information

THE NEXT STAGES FOR DELIVERING HEATHROW EXPANSION

THE NEXT STAGES FOR DELIVERING HEATHROW EXPANSION EXPANSION UPDATE THE NEXT STAGES FOR DELIVERING HEATHROW EXPANSION DECEMBER 2017 In October 2016, the Government announced that a north west runway at Heathrow is its preferred scheme for the expansion

More information

CAPABILITY STATEMENT TRANSPORT

CAPABILITY STATEMENT TRANSPORT CAPABILITY STATEMENT TRANSPORT Who is Zinfra? Zinfra is a leading power, gas, water and telco infrastructure service provider. We offer a comprehensive range of design, construction and maintenance services

More information

Facilities Review & Shared Services Programme Board. Name Title Organisation. (DS) Douglas Seago Programme Director Scottish Government (Chair)

Facilities Review & Shared Services Programme Board. Name Title Organisation. (DS) Douglas Seago Programme Director Scottish Government (Chair) Minutes Meeting Date Facilities Review & Shared Services Programme Board Wednesday 29th October from 10.00am Location JAMES WATT A, Atlantic Quay - Scottish Government, 5 Atlantic Quay, 150 Broomielaw,

More information

HISTORY OF THE CENTRAL EYRE IRON PROJECT (CEIP)

HISTORY OF THE CENTRAL EYRE IRON PROJECT (CEIP) HISTORY OF THE CENTRAL EYRE IRON PROJECT (CEIP) BEN HAVELBERG PROPHECY WARRAMBOO SAGA Also to cause him much ridicule was his ability of prophesying the weather by the moon and the stars. The Polda water

More information

South Fremantle Solar Farm Agenda 1 March 2018

South Fremantle Solar Farm Agenda 1 March 2018 South Fremantle Solar Farm Agenda 1 March 2018 INTRODUCTION (CoF) Format of session Project background and process Community concerns Environmental requirements THE PROJECT (Epuron) Epuron credentials

More information

BOROUGH OF POOLE TRANSPORTATION ADVISORY GROUP 16 MARCH 2017

BOROUGH OF POOLE TRANSPORTATION ADVISORY GROUP 16 MARCH 2017 Agenda item 6 BOROUGH OF POOLE TRANSPORTATION ADVISORY GROUP 16 MARCH 2017 REPORT OF HEAD OF GROWTH AND INFRASTRUCTURE SAFEZONE AVERAGE SPEED CAMERA SITE ON SPRINGDALE ROAD, IN BROADSTONE, POOLE AND CORFE

More information

CREATING CONNECTIONS IN DURHAM REGION

CREATING CONNECTIONS IN DURHAM REGION CREATING CONNECTIONS IN DURHAM REGION PETER ZUK CHIEF CAPITAL OFFICER, METROLINX DURHAM REGION COMMITTEE OF THE WHOLE SEPTEMBER 6, 2017 CONGESTION COSTS OUR ECONOMY REGIONAL TRANSFORMATION 3 METROLINX:

More information

ICN Gateway Breakfast (SA) Jon Whelan A/Manager Project Delivery 9 July 2015

ICN Gateway Breakfast (SA) Jon Whelan A/Manager Project Delivery 9 July 2015 ICN Gateway Breakfast (SA) Jon Whelan A/Manager Project Delivery 9 July 2015 78 km running between Old Noarlunga and Gawler Adelaide s North South Corridor Torrens Road to River Torrens [due for completion

More information

Terms of Reference: Introduction

Terms of Reference: Introduction Terms of Reference: Assessment of airport-airline engagement on the appropriate scope, design and cost of new runway capacity; and Support in analysing technical responses to the Government s draft NPS

More information

TECHPORT AUSTRALIA - AUSTRALIA S PREMIER NAVAL INDUSTRY HUB

TECHPORT AUSTRALIA - AUSTRALIA S PREMIER NAVAL INDUSTRY HUB TECHPORT AUSTRALIA - AUSTRALIA S PREMIER NAVAL INDUSTRY HUB TECHPORT AUSTRALIA TECHPORT AUSTRALIA - AUSTRALIA S PREMIER NAVAL INDUSTRY HUB TECHPORT AUSTRALIA Techport Australia is the nation s premier

More information

Islay Offshore Wind Farm

Islay Offshore Wind Farm MAP: Proposed location of the Islay Offshore wind farm site SSE Renewables entered into an agreement for lease with the Crown Estate in October 2011 to develop a 690MW offshore wind farm 13km off the west

More information

Updated Transmission Expansion Plan for the Puget Sound Area to Support Winter South-to-North Transfers. Approved by PSAST on

Updated Transmission Expansion Plan for the Puget Sound Area to Support Winter South-to-North Transfers. Approved by PSAST on Updated Transmission Expansion Plan for the Puget Sound Area to Support Winter South-to-North Transfers Approved by PSAST on 4-25-11 Overview Why the Update? Proposed Transmission Expansion Plan TCRM &

More information

Welcome. Green Line in Your Community

Welcome. Green Line in Your Community Welcome Green Line in Your Community Today s session will provide you with information on options The City is exploring for connecting the Green Line in the Beltline to the future Inglewood/Ramsay station.

More information

The Wallumbilla Hub: Integrating Queensland s Pipeline Infrastructure to Meet the Changing Demands of the East Coast Gas Grid

The Wallumbilla Hub: Integrating Queensland s Pipeline Infrastructure to Meet the Changing Demands of the East Coast Gas Grid The Wallumbilla Hub: Integrating Queensland s Pipeline Infrastructure to Meet the Changing Demands of the East Coast Gas Grid Craig Clarke, Manager Construction Engineering APGA Annual Convention, Gold

More information

As part of our transport vision, Leeds City Council, working with the West Yorkshire Combined Authority and Leeds Bradford Airport Company, is

As part of our transport vision, Leeds City Council, working with the West Yorkshire Combined Authority and Leeds Bradford Airport Company, is As part of our transport vision, Leeds City Council, working with the West Yorkshire Combined Authority and Leeds Bradford Airport Company, is considering options for improving surface access and connectivity

More information

PERTH AND KINROSS COUNCIL. Housing and Health Committee. 25 May Perth and Kinross Local Housing Strategy

PERTH AND KINROSS COUNCIL. Housing and Health Committee. 25 May Perth and Kinross Local Housing Strategy PERTH AND KINROSS COUNCIL 7 16/234 Housing and Health Committee 25 May 2016 Perth and Kinross Local Housing Strategy 2016-2021 Report by Director (Housing and Social Work) PURPOSE OF REPORT This report

More information

Realistic Assessment of SADC Energy Demand and Supply Up to By Prof M Elmissiry ENERGY SECTOR NEPAD, Midrand South Africa

Realistic Assessment of SADC Energy Demand and Supply Up to By Prof M Elmissiry ENERGY SECTOR NEPAD, Midrand South Africa Realistic Assessment of SADC Energy Demand and Supply Up to 2015 By Prof M Elmissiry ENERGY SECTOR NEPAD, Midrand South Africa PRESENTATION OUTLINES 1-SAPP UTILITIES CURRENT SUPPLY /DEMAND SITUATION 2-PROJECTED

More information

Committee. Presentation Outline

Committee. Presentation Outline CW-33-15 11/9/2015 Community and Corporate Services Committee November 10, 2015 1 Presentation Outline Background Vision and Objectives Study Process and Timeline Public and Stakeholder Engagement Organization

More information

MEETING THE CHALLENGES OF FLOODS AND BUSHFIRES THE Energex EXPERIENCE

MEETING THE CHALLENGES OF FLOODS AND BUSHFIRES THE Energex EXPERIENCE MEETING THE CHALLENGES OF FLOODS AND BUSHFIRES THE Energex EXPERIENCE Presenters: Colin Lee & Russell Gordon, ENERGEX 1 November 18 th 2015 2 ENERGEX S Footprint Electricity distributor SEQ $12B+ assets

More information

Section II. Planning & Public Process Planning for the Baker/Carver Regional Trail began in 2010 as a City of Minnetrista initiative.

Section II. Planning & Public Process Planning for the Baker/Carver Regional Trail began in 2010 as a City of Minnetrista initiative. Section II Planning & Public Process Planning for the began in 2010 as a City of initiative. city staff began discussions with the Park District on the possibility of a north/south regional trail connection

More information

North Herts District Council Local Plan Timeline for Response to Council s Request for Strategic Housing Land Land to the North of the Grange,

North Herts District Council Local Plan Timeline for Response to Council s Request for Strategic Housing Land Land to the North of the Grange, North Herts District Council Local Plan Timeline for Response to Council s Request for Strategic Housing Land Land to the North of the Grange, Letchworth Garden City Introduction As part of central government

More information

Construction Open Evening

Construction Open Evening Construction Open Evening 16 February 2017 www.gov.uk/hs2 Forward Look www.gov.uk/hs2 Euston Station and Approach four week look ahead Week 1 Commencing 13 February 42 Water Main trial trenches Albany

More information

APSE Parks Seminar 2016 Make Haigh while the sun shines! Developing and delivering a sustainable solution for Wigan s Destination Parks.

APSE Parks Seminar 2016 Make Haigh while the sun shines! Developing and delivering a sustainable solution for Wigan s Destination Parks. APSE Parks Seminar 2016 Make Haigh while the sun shines! Developing and delivering a sustainable solution for Wigan s Destination Parks. The Haigh Woodland Park Case Study Keith L Bergman. Strategic Development

More information

Pre-application submission for Committee: Phase 4 development at West Hendon

Pre-application submission for Committee: Phase 4 development at West Hendon Pre-application submission for Committee: Phase 4 development at West Hendon 1. Development Details Phase 4 of the West Hendon Estate Regeneration. 2. Background The redevelopment of the West Hendon Estate

More information

Stakeholder Briefing The Bays Precint Urban Transformation Program

Stakeholder Briefing The Bays Precint Urban Transformation Program Stakeholder Briefing The Bays Precint Urban Transformation Program November 2014 Our Lifecycle Approach 3 Our Ambition & Narrative Our Ambition Statement for UrbanGrowth NSW is - Transforming City Living

More information

.org.uk. Regional. Transport. Strategy. Revised June Serving Dumfries and Galloway. South West of Scotland Transport Partnership

.org.uk. Regional. Transport. Strategy. Revised June Serving Dumfries and Galloway. South West of Scotland Transport Partnership South West of Scotland Transport Partnership.org.uk Regional Transport Strategy Revised June 2008 Serving Dumfries and Galloway South West of Scotland Transport Partnership.org.uk SOUTH WEST OF SCOTLAND

More information

Update on the development of the Regional Real Time Passenger Information (RTPI) System

Update on the development of the Regional Real Time Passenger Information (RTPI) System Agenda Item 11 Update on the development of the Regional Real Time Passenger Information (RTPI) System Committee Strategy and Programmes Date of meeting 23 November 2018 Date of report 30 October 2018

More information

Perth and Kinross Council Development Control Committee 27 August 2008 Recommendation by Development Quality Manager

Perth and Kinross Council Development Control Committee 27 August 2008 Recommendation by Development Quality Manager Perth and Kinross Council Development Control Committee 27 August 2008 Recommendation by Development Quality Manager 5(7) 08/414 Erection of kennels and cattery at Baltree Farm, Hatchbank, Kinross, KY13

More information

communication tower means a tower or structure built to support equipment used to transmit communication signals;

communication tower means a tower or structure built to support equipment used to transmit communication signals; Ontario Ministry of Natural Resources Subject Communication Tower Sites on Crown Land Compiled by - Branch Lands & Waters Section Land Management Policy PL 4.10.02 Replaces Directive Title Communication

More information

FUTURE AIRSPACE CHANGE

FUTURE AIRSPACE CHANGE HEATHROW EXPANSION FUTURE AIRSPACE CHANGE UPDATE SEPTEMBER 2018 On 25 June 2018, Parliament formally backed Heathrow expansion, with MPs voting in support of the Government s Airports National Policy Statement

More information

A1/3 Page D - 3 Issue 7 AL19 30/03/2007

A1/3 Page D - 3 Issue 7 AL19 30/03/2007 SARG Management System ANNEX D to A1/3 ASSESSMENT 1. The proposal was initiated by Framework Briefing in June 2012 and was developed over a considerable period. The initial consultation took place between

More information

Greater Shepparton City Council Planning Scheme Amendment C192 and C193 VicRoads Submission to Traffic Conclave

Greater Shepparton City Council Planning Scheme Amendment C192 and C193 VicRoads Submission to Traffic Conclave Greater Shepparton City Council Planning Scheme Amendment C192 and C193 VicRoads Submission to Traffic Conclave Prepared by: Raelene Stratton Team Leader Integrated Transport and Land Use, North Eastern

More information

Black Mountain Substation Project - Report on Consultation Activity

Black Mountain Substation Project - Report on Consultation Activity B-4 Brian Parent Manager, Revenue Requirements FortisBC Inc. Regulatory Affairs Department 5 th Floor, 1628 Dickson Avenue Kelowna BC V1Y 9X1 Ph: 250 717-0851 Fax: 1 800-717-0801 regulatory@fortisbc.com

More information

C. APPROACH FOR IDENTIFYING THE BEST ROUTES FOR THE NEEDED TRANSMISSION SYSTEM IMPROVEMENTS

C. APPROACH FOR IDENTIFYING THE BEST ROUTES FOR THE NEEDED TRANSMISSION SYSTEM IMPROVEMENTS C. APPROACH FOR IDENTIFYING THE BEST ROUTES FOR THE NEEDED TRANSMISSION SYSTEM IMPROVEMENTS CL&P s approach for identifying the best routes for the needed transmission system improvements included a determination

More information

Rangitīkei District Council

Rangitīkei District Council Rangitīkei District Council Assets and Infrastructure Committee Meeting Agenda Thursday 9 August 2018 9:30 AM Contents 1 Welcome...3 2 Council Prayer...3 3 Apologies/leave of Absence...3 4 Members conflict

More information

Lake Windermere Westside Legacy Trail. A multi-use non-motorized paved trail promoting health, wealth and outdoor appreciation

Lake Windermere Westside Legacy Trail. A multi-use non-motorized paved trail promoting health, wealth and outdoor appreciation Lake Windermere Westside Legacy Trail A multi-use non-motorized paved trail promoting health, wealth and outdoor appreciation Jan 26, 2015 Executive Summary The Lake Windermere Westside Legacy Trail will

More information

Further Scottish Leasing Round (Saltire Prize Projects) Discussion Paper on Proposed Geographic Areas March 2010

Further Scottish Leasing Round (Saltire Prize Projects) Discussion Paper on Proposed Geographic Areas March 2010 Further Scottish Leasing Round (Saltire Prize Projects) Discussion Paper on Proposed Geographic Areas March 2010 1 Introduction 1.1 The Saltire Prize The purpose of the Saltire Prize is to stimulate innovation

More information

EQUATORIAL LAUNCH AUSTRALIA

EQUATORIAL LAUNCH AUSTRALIA EQUATORIAL LAUNCH AUSTRALIA East Arnhem Land Arnhem Space Centre Copyright: East Arnhem Land Tourist Association Scott Wallis Founder & Chief of Space July 2018 Arnhem Space Centre Solid launch vehicle

More information

West of Duddon Sands Offshore Wind Farm

West of Duddon Sands Offshore Wind Farm West of Duddon Sands Offshore Wind Farm Ørsted Welcome to West of Duddon Sands West of Duddon Sands Offshore Wind Farm was officially inaugurated in autumn 2014, after completing construction ahead of

More information

Building the transportation network we need for the future in Niagara Region

Building the transportation network we need for the future in Niagara Region Building the transportation network we need for the future in Niagara Region Niagara@metrolinx.com Metrolinx.com/Niagara Metrolinxengage.com INSERT FOOTER 1 WHO IS METROLINX? Metrolinx was created in 2006

More information

Sudbury to Hudson Transmission Reliability Project

Sudbury to Hudson Transmission Reliability Project An independent assessment of routing options Sudbury to Hudson Transmission Reliability Project and use of a rail-banked corridor for this purpose Prepared by: NorthEast Logistics Systems, LLC August 29,

More information

Memorandum. Pauline Medrano Mitchell Rasansky Steve Salazar. Power Transmission Lines in the Trinity River Corridor Follow-up CITY OF DALLAS

Memorandum. Pauline Medrano Mitchell Rasansky Steve Salazar. Power Transmission Lines in the Trinity River Corridor Follow-up CITY OF DALLAS Memorandum CITY OF DALLAS DATE April 18, 2008 TO Trinity River Corridor Project Committee Members: David A. Neumann (Chairman) Mayor Pro Tern Dr. Elba Garcia (Vice-Chair) Deputy Mayor Pro Tern Dwaine Caraway

More information

Draft Marine and Harbour Facilities Strategy

Draft Marine and Harbour Facilities Strategy Draft Marine and Harbour Facilities Strategy Vision The Coromandel peninsula is a destination of choice for safe, sustainable and accessible marine and harbour facilities that are fit for purpose to meet

More information

Scotland: The location of choice for Spanish companies in Offshore Wind

Scotland: The location of choice for Spanish companies in Offshore Wind Scotland: The location of choice for Spanish companies in Offshore Wind Anusha Appadoo International Senior Executive II CONFERENCIA INTERNACIONAL DE ENERGÍAS OFFSHORE Agenda Introduction to Scottish Development

More information

MATL Reference. MATL Path 83 Transfer Capability with Seasonal SOL Effects. Document. 1. Purpose

MATL Reference. MATL Path 83 Transfer Capability with Seasonal SOL Effects. Document. 1. Purpose 1. Purpose This document outlines the transfer capability on MATL Path 83 for both long-term capability and for current seasonal capabilities adjusted for known System Operating Limits (SOLs), such as

More information

Supplemental Information for Application for Transportation and Utility Systems and Facilities on Federal Lands

Supplemental Information for Application for Transportation and Utility Systems and Facilities on Federal Lands Supplemental Information for Application for Transportation and Utility Systems and Facilities on Federal Lands Introductory Note: This application is filed by PATH Allegheny Transmission Company, LLC

More information

Planning Approval Consistency Assessment Form

Planning Approval Consistency Assessment Form Integrated Management System Planning Approval Consistency Assessment Form SM ES-FT-414 Sydney Metro Integrated Management System (IMS) Applicable to: Document Owner: System Owner: Status: Sydney Metro

More information

FLL Master Plan Update Technical Advisory Committee (TAC) Briefing #1. September 28, 2016

FLL Master Plan Update Technical Advisory Committee (TAC) Briefing #1. September 28, 2016 FLL Master Plan Update Technical Advisory Committee (TAC) Briefing #1 September 28, 2016 TAC Committee Role: Internal Stakeholders To provide input on the master planning analysis from the technical and

More information

POLICY SUBMISSION NETWORK RAIL SCOTLAND RAIL ROUTE UTILISATION STRATEGY. January

POLICY SUBMISSION NETWORK RAIL SCOTLAND RAIL ROUTE UTILISATION STRATEGY. January POLICY SUBMISSION NETWORK RAIL SCOTLAND RAIL ROUTE UTILISATION STRATEGY January 2011 www.scdi.org.uk SCDI is an independent and inclusive economic development network which seeks to influence and inspire

More information

The original needs analysis carried out in 2001 identified three options for acquiring or leasing land for the crèche:

The original needs analysis carried out in 2001 identified three options for acquiring or leasing land for the crèche: 5. REDCLIFFS/SUMNER COMMUNITY CRÈCHE RELOCATION Officer responsible Author Property Manager Kevin Mara, DDI 941 6401 The purpose of this report is to update the Council on the status of this project, in

More information

M A T L Reference. MATL Path 83 Transfer Capability with Seasonal SOL Affects. Document. 1. Purpose

M A T L Reference. MATL Path 83 Transfer Capability with Seasonal SOL Affects. Document. 1. Purpose 1. Purpose This document outlines the Transfer Capability on MATL Path 83 for both long-term capability and for current seasonal capabilities adjusted for known System Operating Limits (SOLs), such as

More information

Minutes. ACTION: Ian Frost to provide the economic values study from Wandsworth at the next meeting.

Minutes. ACTION: Ian Frost to provide the economic values study from Wandsworth at the next meeting. Meeting title / subject: Date: 4 th December 2014 Venue: Heathrow Academy, CR3 Attendees: Name Organisation Fraser Brown (acting chairman) HEX Ian Frost HAL Derek Lawrence AOC Andrew Genever Network Rail

More information

Baslow Sports Field Trust Minutes of the Trustees Committee Meeting

Baslow Sports Field Trust Minutes of the Trustees Committee Meeting Baslow Sports Field Trust Minutes of the Trustees Committee Meeting Present: Apologies: Date: Peter Holt (Chairman), Neil Mantell (Treasurer), Alan Wilson (Secretary), Peter Barlow, Chris Brown, Tony Buckham,

More information

California State University Long Beach Policy on Unmanned Aircraft Systems

California State University Long Beach Policy on Unmanned Aircraft Systems California State University, Long Beach June 14, 2016 Policy Statement: 16-04 California State University Long Beach Policy on Unmanned Aircraft Systems The following policy statement was recommended by

More information

Click to edit Master title style

Click to edit Master title style Click to edit Master title style OPERATION PHAKISA Heading heading heading TRANSNET NATIONAL PORTS AUTHORITY (TNPA) B2B NETWORKING FORUM 28 JUNE 2016 Date HYATT REGENCY HOTEL, ROSEBANK Contents Transnet

More information

Large Disturbances During 2014 in Power System of Serbia

Large Disturbances During 2014 in Power System of Serbia Large Disturbances During 2014 in Power System of Serbia (32 nd Conference of CIGRE Serbia, Zlatibor, 17.-21. May 2015) by Gojko Dotlić SO3 SU3 SR NS3 SANDORFALVA ZR2 Power Transmission System of Serbia

More information

Presentation to NHS HE Forum. NHSScotland Update. Edinburgh 16th October 2012

Presentation to NHS HE Forum. NHSScotland Update. Edinburgh 16th October 2012 Presentation to NHS HE Forum NHSScotland Update Edinburgh 16th October 2012 National Information Systems Group, NHS National Services Scotland Topics SWAN N3 Replacement Video Conferencing SWAN (N3 Replacement)

More information

The Electric Power System

The Electric Power System The Electric Power System - Republic of Macedonia - Macedonian Power System 1 2 Basic facts Area: 25.713 km 2 Population: ~ 2.069.172 Number of electricity consumers: 695.279 (DSO) Number of TSOs: 1 MEPSO

More information

Appendix - Storm Eva. 26/27 December 2015

Appendix - Storm Eva. 26/27 December 2015 Appendix - Storm Eva 26/27 December 2015 1 Storm Eva Rainfall 48hr UK RAINFALL TOTALS 9am 25 DEC 9am 27 DEC 2015 SITE AREA STONYHURST LANCASHIRE 100 SHAP CUMBRIA 86.4 SPADEADAM CUMBRIA 79.4 PRESTON, MOOR

More information

Sarawia Street Laxon Terrace Rail Level Crossing Removal

Sarawia Street Laxon Terrace Rail Level Crossing Removal Sarawia Street Laxon Terrace Rail Level Crossing Removal Recommendations It is recommended that the Board: Receives the report. Executive summary The removal of the Sarawia Street to Laxon Terrace rail

More information