M A T L Reference. MATL Path 83 Transfer Capability with Seasonal SOL Affects. Document. 1. Purpose

Size: px
Start display at page:

Download "M A T L Reference. MATL Path 83 Transfer Capability with Seasonal SOL Affects. Document. 1. Purpose"

Transcription

1 1. Purpose This document outlines the Transfer Capability on MATL Path 83 for both long-term capability and for current seasonal capabilities adjusted for known System Operating Limits (SOLs), such as adjacent system constraints that limit the Available Transfer Capability and operating configurations for MATL that reduce the Available Transfer Capability. MATL s Path 83 Transfer Capability adjusted for such SOLs becomes the basis for the current year s short-term ATC. 2. References MATL 2007 Phase II Path Rating Study Report MATL 2012 Phase II Path Rating Study Report MATL Summer 2013 SOL Study Report MATL 301- Normal Operations Planning MATL ATCID 3. Responsibility MATL is an independent merchant transmission-only company based in Calgary, Alberta, Canada doing business in Canada as Montana Alberta Tie LTD and in the United States as MATL LLP, collectively referred to as MATL. MATL retains the responsibility of performing seasonal studies to determine its System Operating Limit (SOL) in accordance with the Peak RC methodology for the operations horizon. 4. Long Term Capability MATL Path 83 is a 345 km, 240/230kV, 330 MVA transmission line designed for continuous power transfers of up to 325 MW north-to-south and 300 MW south-to-north metered at MATL 120S. Based on the Phase II Path Rating studies approved by the PRG and accepted by the WECC PCC, MATL Path 83 is able to achieve the following ratings metered at MATL 120S substation: MATL Path 83 Transfer Direction North-to-south South-to-north MATL 120S 325 MW 300 MW MATL Path 83 southbound long term capability identified in the table above is contingent upon seasonally studying the limitation identified in section 5. Page 1 of 16

2 5. Limiting Conditions Conditions limiting the availability of will be analyzed seasonally by determining the System Operating Limit (SOL) in accordance with the Peak RC methodology for the operations horizon. Based on the seasonal studies reviewed by the NOPSG and submitted to the Peak RC, MATL Path 83 is able to achieve the following seasonal limits with all circuit equipment in service. As a result, any combination of operation within these maximum limits is acceptable under normal operating conditions. The SOL on MATL is adjusted in accordance with additional study work for conditions when MATL s equipment such as its series compensation at Hay Lake and Marias are out of service. Under certain import and export scenarios where the direction of the flows on WECC designated Path 1 and MATL Path 83 are in opposite direction with respect to Alberta s market, MATL s SOL may be reduced due to the Phase Shifting Transformer (PST) reaching its angle limit. Imports into Alberta MATL SOL Northbound Maximum northbound flow at MATL 120S into the Alberta Interconnected Electric System (MW) Maximum northbound flow into Alberta at the CA-USA border (MW) AB.MT.MATL Normal Operations Hay Lake and Marias series compensation out of service MATL radially connected to the NWMT system N/A N/A 189 Maximum northbound flow at Great Falls into the MATL Interconnected System (MW) MATL.NWMT 1 For metered flows at CA-USA border as Balancing Authority boundary interchange between AESO and NWMT. Page 2 of 16

3 Imports into Montana MATL SOL Southbound Maximum southbound flow at MATL 120S into the MATL Interconnected System (MW) Maximum southbound flow into Montana at the CA-USA border (MW) AB.MT.MATL Maximum southbound flow at Great Falls into Montana (MW) MATL.NWMT Normal Operations Hay Lake and Marias series compensation out of service MATL radially connected to the NWMT system N/A N/A Northbound Limit The studies identified that there is a limitation on the maximum simultaneous import into Alberta between Path 1 and MATL Path 83. However, the allocation of imports into Alberta will be determined by AESO as per their Available Transfer Capability (ATC) and Transfer Path Management rule. The rule ensures that the total flow on Path 1 and MATL Path 83 is less than the sum of Path 1 and MATL Path 83 simultaneous limits. 5.2 Southbound Limit For southbound flows into Montana at Great Falls, MATL Path 83 is able to achieve its full capability as documented in the WECC Path Rating studies unless real-time constraints necessitate curtailment. 5.3 North Terminal vs. Border POR/POD For Transmission Service requests under the MATL Tariff, the north terminal is the MATL 120S substation 240 kv bus near Lethbridge, Alberta. However, the POR/POD to be used for the MATL Line north end must be represented at the Canada-USA Border identified as a POR/POD with point name of AB.MT.MATL. This enables the Alberta portion of the MATL Line to be internalized within the AESO market and AESO Balancing Authority Area, which is in conformance with AESO procedures and Alberta governance. The Alberta portion of the MATL Line is further described in MATL s Procedure MATL-814 MATL Line Losses in Alberta posted on MATL s OASIS under the Business Practices folder. The Available Transfer Capability (ATC) for the MATL Line is posted on under the System Data prompt. Sample diagrams of the MATL PORs/PODs are illustrated in Section 6 below. Page 3 of 16

4 6. ATC computation in the Scheduling Horizon MATL computes all scheduled energy flows and transmission service requests in its calculations to update its Available Transfer Capability (ATC) in real-time. The sum of existing firm commitments along with Capacity Benefit Margin (CBM) and Transmission Reliability Margin (TRM) are subtracted from the Total Transfer Capability (TTC) to determine MATL s ATC at any given time during the Scheduling Horizon. All TSRs and scheduled energy tags are attested against the ATC to decide if a request for a new TSR or the request to schedule energy will be approved or rejected. To determine the remaining ATC that would be available for new TSRs, MATL continuously and simultaneously decrements the TTC on each segment of the MATL Line for each confirmed and pending TSR. The same procedure is used to determine non-firm ATC, including the release of transmission capacity from unscheduled energy in the Scheduling Horizon. If the recalculated ATC is negative for either segment of the MATL Line, MATL s curtailment manager software will curtail schedules as necessary to restore ATC from a negative value. 6.1 Northbound Flows Example As depicted by the flows in Figure 1 below, MATL s firm ATC is 0 MW for a scenario where AESO s ATC into Alberta on MATL is 300 MW and existing firm commitment of 300 MW is in place between MATL and its customers. On the contrary, non-firm ATC is 61 MW as a result of unscheduled firm commitment released as non-firm capacity in the Scheduling Horizon. Page 4 of 16

5 MATL 120S AESO ATC = 300 MW POD: AB.MT.MATL Canada/US Border MATL TTC = 300 MW MATL firm ATC = 0 MATL non-firm ATC = 61 MW 239 MW POR: WWA Hay Lake 189 MW (Firm) RimRock 50 MW (Firm) POR: MATL.NWMT Great Falls Figure 1: MATL's Northbound ATC in Scheduling Horizon Page 5 of 16

6 6.2 Southbound Example As depicted by the flows in Figure 2 below, MATL s firm ATC is 200 MW for a scenario where the TTC into Montana on MATL is 300 MW and existing firm scheduled commitment of 100 MW is in place between MATL and its customers. Similarly, non-firm ATC is also 200 MW since there is no unscheduled firm commitment that can be released as non-firm capacity in the Scheduling Horizon. MATL 120S POR: AB.MT.MATL Canada/US Border 50 MW (Firm) POR: WWA Hay Lake 50 MW (Firm) RimRock 100 MW POD: MATL.NWMT Great Falls MATL TTC = 300 MW MATL Firm ATC = 200 MW MATL non-firm ATC = 200 MW NWE ATC = 300 MW Figure 2: MATL's Southbound ATC in Scheduling Horizon Page 6 of 16

7 7. Management of ATC and SOL on Path 83 MATL Line The POR/POD for MATL s north terminal is represented at the Canada-USA Border with point name of AB.MT.MATL. This POR/POD point also represents the interchange between the MATL and AESO system. Similarly, Path 83 MATL line south end terminal is represented at the Great Falls substation with point name of MATL.NWMT. The ATC values posted on these two terminals represents the transfer capability of the MATL line at any given time. As depicted in Figure 3, MATL manages these terminals to ensure that the path is not limited for the Hay Lake connected wind customer under scenarios when an external constraint is identified by either NWE or AESO. When MATL is radially connected to the NWMT system, the POR/POD for MATL s north terminal is WWA. This POR/POD point represents the interconnection point for the Rim Rock wind facility. The POR/POD for MATL s south terminal is the Great Falls substation with point name of MATL.NWMT. The ATC values posted on these two terminals represents the transfer capability of the MATL line at any given time. When MATL is operated radially, the ATC has been identified as 189 MW based on the maximum generation output from the Rim Rock facility. Technical studies have confirmed that MATL can operate safely and reliably in this operating configuration with this maximum loading level. Page 7 of 16

8 AESO System Import ATC = AESO s Real-Time Value MATL System Export ATC = AESO s Real-Time Value POR/POD: AB.MT.MATL Canada/US Border Export ATC = AESO s Real-Time Value Import ATC = 325 MW POR/POD: WWA POD: MATL.WWA Hay Lake RimRock MATL System NWE System Export ATC = 325 MW POR/POD: MATL.NWMT Great Falls Import ATC = 325 MW Export ATC = 300 MW Import ATC = 300 MW Legend MATL AESO NWE Figure 3: Management of ATC and SOL on MATL Page 8 of 16

9 7.1 Southbound Constraint Identified by AESO MATL export ATC into Alberta at AB.MT.MATL is automatically adjusted by OATI s Curtailment Management software by utilizing real-time ATC values provided by the AESO. However, MATL s import ATC at the AESO end is set to 325 MW regardless of any constraints in Alberta system. This ensures that the Hay Lake connected wind customer is not restricted to export southbound into Montana due to possible real-time constraints in Alberta. This is further illustrated in Figure-4.0 for a scenario when AESO s export ATC is 100 MW and MATL s export ATC is 325 MW into Montana. Page 9 of 16

10 AESO System Real Flows <= 100 MW Import ATC = AESO s Real-Time Value MATL System Export ATC = 100 MW POR/POD: AB.MT.MATL Canada/US Border Export ATC = AESO s Real-Time Value Import ATC = 325 MW POR/POD: WWA POD: MATL.WWA Hay Lake Real Flows = Maximum Capacity (189 MW) RimRock Real Flows <= 289 MW MATL System NWE System Export ATC = 325 MW POR/POD: MATL.NWMT Great Falls Import ATC = 325 MW Export ATC = 300 MW Import ATC = 300 MW Legend MATL AESO NWE Figure 4: Southbound Constraint Example Page 10 of 16

11 7.2 Northbound Constraint Identified by NWE MATL export ATC into Montana at MATL.NWMT is set to 300 MW as per the SOL studies coordinated with NWE. Similarly, the import ATC into MATL at the NWE end is set to 325 MW regardless of any constraints in Montana system. This ensures that the Hay Lake connected wind customer is not restricted to export northbound into Alberta due to possible real-time constraints in Montana. This is further illustrated in Figure-5.0 for a scenario when NWE s export ATC is 100 MW and MATL s import ATC is 325 MW northbound into Alberta. Note: MATL ATC posting does not ensure transmission capacity is available through adjacent scheduling segments. Page 11 of 16

12 AESO System Import ATC = AESO s Real-Time Value MATL System Export ATC = AESO s Real-Time Value POR/POD: AB.MT.MATL Canada/US Border Import ATC = AESO s Real-Time Value Export ATC = 325 MW Real Flows <= 289 MW POR/POD: WWA POD: MATL.WWA Hay Lake Real Flows = Maximum Capacity (189 MW) RimRock MATL System NWE System Export ATC = 100 MW POR/POD: MATL.NWMT Great Falls Import ATC = 325 MW Export ATC = 300 MW Import ATC = 300 MW Real Flows <= 100 MW Legend MATL AESO NWE Figure 5: Northbound Constraint Example Page 12 of 16

13 8. Definitions and Acronyms Unless the context otherwise indicates, any word or expression defined in the NERC Standards shall have that meaning when capitalized in this Operating Procedure. The following additional terms are capitalized in this Operating Procedure when used as defined below: Term PRG WECC PCC AESO MATL NOPSG NWE SOGF WECC Peak RC Definition Project Review Group WECC Planning Coordination Committee Alberta Electric System Operator Montana Alberta Tie Limited Northwest Operations Planning Study Group NorthWestern Energy South of Great Falls (NWE) Western Electricity Coordinating Council Peak Reliability - Reliability Coordinator 9. Change Procedure for Operating Procedures MATL will update this document based on the seasonal SOL studies performed consistent with the Peak RC methodology. Page 13 of 16

14 Change History Version No Reason for Change Changed By Date 0.1 Prepared initial draft based on Path Rating and SOL study results 1.1 Provide Great Falls terminal representation in provided tables. Aekam Sodhi Darrel Gunst Minor modifications to section 5 Aekam Sodhi Clarification of Purpose statement and footnotes. Added maximum flows at CA-USA border 1.4 Added section 6 that describes the computation of ATC in the Scheduling Horizon; 1.4a Added Sec. 5.3 North Terminal vs. Border POR/POD. 1.5 Updated section 5 as per southbound SOL values confirmed by NorthWestern Energy Removed footnotes 1 and 2 as requested by AESO 1.6 Added section-7 on Management of ATC and SOL on Path 83 MATL Line 1.7 Modifications to section-7 Kevin Burns 1.8 Added note in section 7.2 as per NorthWestern Energy Added language on real-time constraints in section 5.2 as per NorthWestern Energy 1.9 Updated SOL table to include scenario when MATL series compensation is out of service 2.0 Included a description of MATL radially connected to the NWMT system, which is a new operating configuration for MATL, in sections 5 and 7 Darrel Gunst Aekam Sodhi Darrel Gunst Aekam Sodhi Aekam Sodhi Larry Monday Aekam Sodhi Aekam Sodhi Michael Manarovici 2.1 Replaced WECC RC with Peak RC Michael Manarovici Page 14 of 16

15 2.2 Minor corrections to the tables in section 5 Michael Manarovici 2.3 Minor corrections to the table in section 5 and section 7 Michael Manarovici Page 15 of 16

16

MATL Reference. MATL Path 83 Transfer Capability with Seasonal SOL Effects. Document. 1. Purpose

MATL Reference. MATL Path 83 Transfer Capability with Seasonal SOL Effects. Document. 1. Purpose 1. Purpose This document outlines the transfer capability on MATL Path 83 for both long-term capability and for current seasonal capabilities adjusted for known System Operating Limits (SOLs), such as

More information

VAR-501-WECC-3 Power System Stabilizer. A. Introduction

VAR-501-WECC-3 Power System Stabilizer. A. Introduction A. Introduction 1. Title: Power System Stabilizer (PSS) 2. Number: VAR-501-WECC-3 3. Purpose: To ensure the Western Interconnection is operated in a coordinated manner under normal and abnormal conditions

More information

Transmission Reliability Margin. Implementation Document (TRMID)

Transmission Reliability Margin. Implementation Document (TRMID) Transmission Reliability Margin Implementation Document (TRMID) Reference: NERC Standard MOD-008-1 Document #: TRMID Rev. 3 Effective Date: 31 January 2016 Original signed by Bob Cielen APPROVED BY: Bob

More information

A. Introduction Title: Power System Stabilizer (PSS) 2. Number: VAR 501 WECC

A. Introduction Title: Power System Stabilizer (PSS) 2. Number: VAR 501 WECC A. Introduction 1. 1. Title: Power System Stabilizer (PSS) 2. 3. 2. Number: VAR 501 WECC 2 3. Purpose: To ensure the Western Interconnection is operated in a coordinated manner under normal and abnormal

More information

MEMORANDUM. Open Section Background. I-66 Open Section Study Area. VDOT Northern Virginia District. I-66 Project Team. Date: November 5, 2015

MEMORANDUM. Open Section Background. I-66 Open Section Study Area. VDOT Northern Virginia District. I-66 Project Team. Date: November 5, 2015 MEMORANDUM To: VDOT Northern Virginia District From: I-66 Project Team Date: November 5, 2015 Subject: Open Section Background The purpose of this technical memorandum is to provide narrative and technical

More information

Updated Transmission Expansion Plan for the Puget Sound Area to Support Winter South-to-North Transfers. Approved by PSAST on

Updated Transmission Expansion Plan for the Puget Sound Area to Support Winter South-to-North Transfers. Approved by PSAST on Updated Transmission Expansion Plan for the Puget Sound Area to Support Winter South-to-North Transfers Approved by PSAST on 4-25-11 Overview Why the Update? Proposed Transmission Expansion Plan TCRM &

More information

Special Pricing Rule Updates

Special Pricing Rule Updates Special Pricing Rule Updates Michael DeSocio Manager, Energy Market Design New York Independent System Operator MIWG June 28, 2013 NYISO KCC Conference Center 2013 New York Independent System Operator,

More information

Attachment F1 Technical Justification - Applicability WECC-0107 Power System Stabilizer VAR-501-WECC-3

Attachment F1 Technical Justification - Applicability WECC-0107 Power System Stabilizer VAR-501-WECC-3 Power System Stabilizer Applicability in the WECC System Study Progress Report to WECC-0107 Drafting Team Shawn Patterson Bureau of Reclamation April 2014 Introduction Power System Stabilizers (PSS) are

More information

Wrapper Instruction Register (WIR) Specifications

Wrapper Instruction Register (WIR) Specifications Wrapper Instruction Register (WIR) Specifications Mike Ricchetti, Fidel Muradali, Alan Hales, Lee Whetsel, Eddie Rodriguez WIR Tiger Team May 5th at VTS2000 Architecture Task Force, 2000 Presentation Outline

More information

A. Introduction Title: Power System Stabilizer (PSS)

A. Introduction Title: Power System Stabilizer (PSS) A. Introduction 1. 1. Title: Power System Stabilizer (PSS) 2. 3. 2. Number: VAR-501-WECC-2 3. Purpose: To ensure the Western Interconnection is operated in a coordinated manner under normal and abnormal

More information

A New Way to Work in the ERCOT Market

A New Way to Work in the ERCOT Market Siemens Energy, Inc. Power Technology Issue 111 A New Way to Work in the ERCOT Market Joseph M. Smith Senior Staff Business Development Specialist joseph_smith@siemens.com In recent months The Electric

More information

Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update

Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update Ultimate ASV, Runway Use and Flight Tracks 4th Working Group Briefing 8/13/18 Meeting Purpose Discuss Public Workshop input

More information

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by Interstate 90 and Mercer Island Mobility Study APRIL 2017 Commissioned by Prepared by Interstate 90 and Mercer Island Mobility Study Commissioned by: Sound Transit Prepared by: April 2017 Contents Section

More information

Appendix D Explanation of Route Changes. Prepared by: Idaho Power Company 1221 W Idaho Street Boise, ID 83702

Appendix D Explanation of Route Changes. Prepared by: Idaho Power Company 1221 W Idaho Street Boise, ID 83702 Appendix D Explanation of Route Changes Prepared by: Idaho Power Company W Idaho Street Boise, ID 80 Map Label ID 6 Route Reference Added November 0 Horn Butte Substation Added November 0 Horn Butte Eliminated

More information

AIRBUS FlyByWire How it really works

AIRBUS FlyByWire How it really works AIRBUS FlyByWire How it really works Comparison between APOLLO s and Phoenix PSS Airbus FlyByWire implementation for FS2002 Copyright by APOLLO Software Publishing The FlyByWire control implemented on

More information

Runway Length Analysis Prescott Municipal Airport

Runway Length Analysis Prescott Municipal Airport APPENDIX 2 Runway Length Analysis Prescott Municipal Airport May 11, 2009 Version 2 (draft) Table of Contents Introduction... 1-1 Section 1 Purpose & Need... 1-2 Section 2 Design Standards...1-3 Section

More information

TABLE OF CONTENTS. Coral Springs Charter High School and Middle School Job No Page 2

TABLE OF CONTENTS. Coral Springs Charter High School and Middle School Job No Page 2 Job No. 15-019 Page 2 TABLE OF CONTENTS 1.0 INTRODUCTION... 4 2.0 EXISTING CONDITIONS... 5 3.0 TRAFFIC GENERATION... 7 4.0 TRIP DISTRIBUTION... 8 5.0 FUTURE CONDITIONS... 8 6.0 SITE ACCESS...13 7.0 CONCLUSION...13

More information

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) Part 173 FLIGHT CHECKING ORGANISATION APPROVAL Published by Air Safety Support International Ltd Air Safety Support International Limited 2005 ISBN 0-11790-410-4

More information

PBN AIRSPACE CONCEPT WORKSHOP. SIDs/STARs/HOLDS. Continuous Descent Operations (CDO) ICAO Doc 9931

PBN AIRSPACE CONCEPT WORKSHOP. SIDs/STARs/HOLDS. Continuous Descent Operations (CDO) ICAO Doc 9931 International Civil Aviation Organization PBN AIRSPACE CONCEPT WORKSHOP SIDs/STARs/HOLDS Continuous Descent Operations (CDO) ICAO Doc 9931 Design in context Methodology STEPS TFC Where does the traffic

More information

Northfield to Ingle Farm #2 66 kv Sub transmission line

Northfield to Ingle Farm #2 66 kv Sub transmission line Header Reasonableness Test RT 011/11 Northfield to Ingle Farm #2 66 kv Sub transmission line RT011-11 Northfield to Inglefarm Page 1 of 8 Reasonableness Test: Northfield to Ingle Farm 66 kv line DISCLAIMER

More information

Report on Geographic Scope of Market-based Measures (MBMS)

Report on Geographic Scope of Market-based Measures (MBMS) Report on Geographic Scope of Market-based Measures (MBMS) Analysis of proposed approaches for the coverage of international aviation emissions under a market-based measure This report is intended to address

More information

JACKSONVILLE CENTER AND SAVANNAH TRACON. LETTER OF AGREEMENT EFFECTIVE: December 22, 2006

JACKSONVILLE CENTER AND SAVANNAH TRACON. LETTER OF AGREEMENT EFFECTIVE: December 22, 2006 SUBJECT: APPROACH CONTROL SERVICE EFFECTIVE: December 22, 2006 1. PURPOSE. This agreement between Jacksonville Center and SAV TRACON covers approach control service for airports within TRACON delegated

More information

FUEL MANAGEMENT FOR COMMERCIAL TRANSPORT

FUEL MANAGEMENT FOR COMMERCIAL TRANSPORT FUEL MANAGEMENT FOR COMMERCIAL TRANSPORT 1. Introduction An aeroplane shall carry a sufficient amount of usable fuel to complete the planned flight safely and to allow for deviation from the planned operation.

More information

NORTH FRASER PERIMETER ROAD WEST CORRIDOR DEFINITION STUDY

NORTH FRASER PERIMETER ROAD WEST CORRIDOR DEFINITION STUDY NORTH FRASER PERIMETER ROAD WEST CORRIDOR DEFINITION STUDY MAY 2011 SW1132SWD NORTH FRASER PERIMETER ROAD WEST CORRIDOR DEFINITION STUDY TABLE OF CONTENTS 1.0 INTRODUCTION... 1 2.0 CURRENT TRAVEL PATTERNS

More information

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7 European Airspace Concept Workshops for PBN Implementation Design in Context TFC Where does the traffic come from? And when? RWY Which

More information

Analysis of en-route vertical flight efficiency

Analysis of en-route vertical flight efficiency Analysis of en-route vertical flight efficiency Technical report on the analysis of en-route vertical flight efficiency Edition Number: 00-04 Edition Date: 19/01/2017 Status: Submitted for consultation

More information

Frequently Asked Questions

Frequently Asked Questions What is VBS? The Vehicle Booking System is a slot allocation system designed to manage the flow of traffic in and out of the terminal. Why have a VBS? The idea of the VBS is to smooth the peaks and troughs

More information

Measuring the Business of the NAS

Measuring the Business of the NAS Measuring the Business of the NAS Presented at: Moving Metrics: A Performance Oriented View of the Aviation Infrastructure NEXTOR Conference Pacific Grove, CA Richard Golaszewski 115 West Avenue Jenkintown,

More information

C. APPROACH FOR IDENTIFYING THE BEST ROUTES FOR THE NEEDED TRANSMISSION SYSTEM IMPROVEMENTS

C. APPROACH FOR IDENTIFYING THE BEST ROUTES FOR THE NEEDED TRANSMISSION SYSTEM IMPROVEMENTS C. APPROACH FOR IDENTIFYING THE BEST ROUTES FOR THE NEEDED TRANSMISSION SYSTEM IMPROVEMENTS CL&P s approach for identifying the best routes for the needed transmission system improvements included a determination

More information

CURRENT SHORT-RANGE TRANSIT PLANNING PRACTICE. 1. SRTP -- Definition & Introduction 2. Measures and Standards

CURRENT SHORT-RANGE TRANSIT PLANNING PRACTICE. 1. SRTP -- Definition & Introduction 2. Measures and Standards CURRENT SHORT-RANGE TRANSIT PLANNING PRACTICE Outline 1. SRTP -- Definition & Introduction 2. Measures and Standards 3. Current Practice in SRTP & Critique 1 Public Transport Planning A. Long Range (>

More information

POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW

POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW RNAV STAR updates and RNP AR approaches at Edmonton International Airport NAV CANADA 77 Metcalfe Street Ottawa, Ontario K1P 5L6 January 2018 The information

More information

Traffic Analysis Final Report

Traffic Analysis Final Report SR-71 Widening Project Project Approval/Environmental Documentation Traffic Analysis Final Report Prepared for Caltrans District 7 August 2012 6 Hutton Centre Drive, Suite 700 Santa Ana, California 92707

More information

Surveillance and Broadcast Services

Surveillance and Broadcast Services Surveillance and Broadcast Services Benefits Analysis Overview August 2007 Final Investment Decision Baseline January 3, 2012 Program Status: Investment Decisions September 9, 2005 initial investment decision:

More information

International Civil Aviation Organization. Agenda Item 6: Free Route Airspace Concept implementations within the EUR Region FREE ROUTE AIRSPACE DESIGN

International Civil Aviation Organization. Agenda Item 6: Free Route Airspace Concept implementations within the EUR Region FREE ROUTE AIRSPACE DESIGN International Civil Aviation Organization AIRARDTF/2 IP03 Second Meeting of the Advanced Inter-Regional ATS Route Development Task Force (AIRARDTF/02) Astana, Kazakhstan, 26-27 October 2017 Agenda Item

More information

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES Recurring topics emerged in some of the comments and questions raised by members of the

More information

UC Berkeley Working Papers

UC Berkeley Working Papers UC Berkeley Working Papers Title The Value Of Runway Time Slots For Airlines Permalink https://escholarship.org/uc/item/69t9v6qb Authors Cao, Jia-ming Kanafani, Adib Publication Date 1997-05-01 escholarship.org

More information

GUERNSEY ADVISORY CIRCULARS. (GACs) EXTENDED DIVERSION TIME OPERATIONS GAC 121/135-3

GUERNSEY ADVISORY CIRCULARS. (GACs) EXTENDED DIVERSION TIME OPERATIONS GAC 121/135-3 GUERNSEY ADVISORY CIRCULARS (GACs) GAC 121/135-3 EXTENDED DIVERSION TIME OPERATIONS Published by the Director of Civil Aviation, Guernsey First Issue August 2018 Guernsey Advisory Circulars (GACs) are

More information

Air Traffic Flow Management (ATFM) in the SAM Region METHODOLOGY ADOPTED BY BRAZIL TO CALCULATE THE CONTROL CAPACITY OF ACC OF BRAZILIAN FIR

Air Traffic Flow Management (ATFM) in the SAM Region METHODOLOGY ADOPTED BY BRAZIL TO CALCULATE THE CONTROL CAPACITY OF ACC OF BRAZILIAN FIR International Civil Aviation Organization SAM/IG/6-IP/03 South American Regional Office 21/09/10 Sixth Workshop/Meeting of the SAM Implementation Group (SAM/IG/6) - Regional Project RLA/06/901 Lima, Peru,

More information

Safety / Performance Criteria Agreeing Assumptions Module 10 - Activities 5 & 6

Safety / Performance Criteria Agreeing Assumptions Module 10 - Activities 5 & 6 Safety / Performance Criteria Agreeing Assumptions Module 10 - Activities 5 & 6 European Airspace Concept Workshops for PBN Implementation Why have safety and performance criteria? Measure performance

More information

The Challenge of Surface Conditions. AST: A New Solution to a Global Aviation Problem. Benefits and Business Value to Airports and Operators

The Challenge of Surface Conditions. AST: A New Solution to a Global Aviation Problem. Benefits and Business Value to Airports and Operators The Challenge of Surface Conditions AST: A New Solution to a Global Aviation Problem Benefits and Business Value to Airports and Operators 2 3 Runway excursions are among the most-frequently reported accidents

More information

1 Introduction 2 2 Acknowledgements 2 3 Differences between Green Star SA rating tools 2 4 About the Calculator 2 5 How to Use the Calculator 2

1 Introduction 2 2 Acknowledgements 2 3 Differences between Green Star SA rating tools 2 4 About the Calculator 2 5 How to Use the Calculator 2 Green Star SA COMMUTING MASS TRANSPORT GUIDE 1 Introduction 2 2 Acknowledgements 2 3 Differences between Green Star SA rating tools 2 4 About the Calculator 2 5 How to Use the Calculator 2 5.1 Step 1:

More information

Opspecs Revision status TABLE OF CONTENTS, LIST OF EFFECTIVE PAGES, AND RATINGS AUTHORITY. Page revision

Opspecs Revision status TABLE OF CONTENTS, LIST OF EFFECTIVE PAGES, AND RATINGS AUTHORITY. Page revision Section/division AIRWORTHINESS: AIRCRAFT MAINTENANCE ORGANISATION Form Number: CA 145-19a Telephone number: 011-545-1000 Email: airworthiness@caa.co.za Physical address Ikhaya Lokundiza, 16 Treur Close,

More information

REGULATION No. 10/2011 ON APPROVAL OF FLIGHT PROCEDURES INCLUDING SID-s AND STAR-s. Article 1 Scope of Application

REGULATION No. 10/2011 ON APPROVAL OF FLIGHT PROCEDURES INCLUDING SID-s AND STAR-s. Article 1 Scope of Application Republika e Kosovës Republika Kosovo Republic of Kosovo Autoriteti i Aviacionit Civil i Kosovës Autoritet Civilnog Vazduhoplovstva Kosova Civil Aviation Authority of Kosovo Director General of Civil Aviation

More information

Advisory Circular. 1.1 Purpose Applicability Description of Changes... 2

Advisory Circular. 1.1 Purpose Applicability Description of Changes... 2 Advisory Circular Subject: Part Design Approvals Issuing Office: Standards Document No.: AC 521-007 File Classification No.: Z 5000-34 Issue No.: 01 RDIMS No.: 5612108-V33 Effective Date: 2012-03-16 1.1

More information

APPLICANTS PROPOSED TOUR SCHEDULE & PROTOCOL

APPLICANTS PROPOSED TOUR SCHEDULE & PROTOCOL APPLICANTS PROPOSED TOUR SCHEDULE & PROTOCOL Pursuant to Paragraph 18 of the Procedural Order issued by the Chairman of the Power Plant and Transmission Line Siting Committee (the Committee ) on August

More information

Official Journal of the European Union L 146/7

Official Journal of the European Union L 146/7 8.6.2007 Official Journal of the European Union L 146/7 COMMISSION REGULATION (EC) No 633/2007 of 7 June 2007 laying down requirements for the application of a flight message transfer protocol used for

More information

Notification to Suppliers

Notification to Suppliers Notification to Suppliers Engagement of Auditors Regarding Certification for the PSO Levy Reference CER/17/021 Date Published 22/02/2017 Closing Date N.A. Executive Summary In the 2016/17 Public Service

More information

DEPARTMENT OF CIVIL AVIATION Airworthiness Notices EXTENDED DIVERSION TIME OPERATIONS (EDTO)

DEPARTMENT OF CIVIL AVIATION Airworthiness Notices EXTENDED DIVERSION TIME OPERATIONS (EDTO) EXTENDED DIVERSION TIME OPERATIONS (EDTO) 1. APPLICABILITY 1.1 This notice is applicable to operator engaged in Commercial Air Transport Operations beyond the threshold time established by DCA for EDTO

More information

Official Journal of the European Union L 186/27

Official Journal of the European Union L 186/27 7.7.2006 Official Journal of the European Union L 186/27 COMMISSION REGULATION (EC) No 1032/2006 of 6 July 2006 laying down requirements for automatic systems for the exchange of flight data for the purpose

More information

Analysis of ATM Performance during Equipment Outages

Analysis of ATM Performance during Equipment Outages Analysis of ATM Performance during Equipment Outages Jasenka Rakas and Paul Schonfeld November 14, 2000 National Center of Excellence for Aviation Operations Research Table of Contents Introduction Objectives

More information

EASTERN MILES MEMBERSHIP TERMS AND CONDITIONS

EASTERN MILES MEMBERSHIP TERMS AND CONDITIONS EASTERN MILES MEMBERSHIP TERMS AND CONDITIONS TERMS AND CONDITIONS To protect the rights of the members and frequent flyers program of Eastern Miles, China Eastern Airlines Ltd. constitutes these terms

More information

FUTENMA REPLACEMENT FACILITY BILATERAL EXPERTS STUDY GROUP REPORT. August 31, 2010

FUTENMA REPLACEMENT FACILITY BILATERAL EXPERTS STUDY GROUP REPORT. August 31, 2010 FUTENMA REPLACEMENT FACILITY BILATERAL EXPERTS STUDY GROUP REPORT August 31, 2010 MANDATE AND SCOPE OF WORK: In order to achieve the earliest possible relocation of Marine Corps Air Station Futenma, the

More information

POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW

POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW RNAV STAR updates and RNP AR approaches at Halifax Stanfield International Airport NAV CANADA 77 Metcalfe Street Ottawa, Ontario K1P 5L6 November 2017 The information

More information

AGREEMENT FOR OPERATION OF THE AIR TRAFFIC CONTROL TOWER AT THE TRUCKEE TAHOE AIRPORT

AGREEMENT FOR OPERATION OF THE AIR TRAFFIC CONTROL TOWER AT THE TRUCKEE TAHOE AIRPORT AGREEMENT FOR OPERATION OF THE AIR TRAFFIC CONTROL TOWER AT THE TRUCKEE TAHOE AIRPORT This AGREEMENT FOR OPERATION OF THE AIR TRAFFIC CONTROL TOWER SERVICES AT TRUCKEE TAHOE AIRPORT ( Agreement ) is made

More information

rtc transit Before and After Studies for RTC Transit Boulder highway UPWP TASK Before Conditions

rtc transit Before and After Studies for RTC Transit Boulder highway UPWP TASK Before Conditions rtc transit Before and After Studies for RTC Transit UPWP TASK 3403-11-14 Before Conditions Report Boulder highway June 2011 Before and After Studies for RTC Transit BOULDER HIGHWAY BEFORE STUDY UPWP Task

More information

Airline Schedule Development Overview Dr. Peter Belobaba

Airline Schedule Development Overview Dr. Peter Belobaba Airline Schedule Development Overview Dr. Peter Belobaba Istanbul Technical University Air Transportation Management M.Sc. Program Network, Fleet and Schedule Strategic Planning Module 18 : 1 April 2016

More information

Transportation Engineering -II Dr. Rajat Rastogi Department of Civil Engineering Indian Institute of Technology - Roorkee

Transportation Engineering -II Dr. Rajat Rastogi Department of Civil Engineering Indian Institute of Technology - Roorkee Transportation Engineering -II Dr. Rajat Rastogi Department of Civil Engineering Indian Institute of Technology - Roorkee Lecture - 36 Aprons & Aircraft Parking Dear students, today s lecture we are going

More information

Planning. Proposed Development at the Southeast Corner of Lakeshore Road West and Brookfield Road Intersection FINAL.

Planning. Proposed Development at the Southeast Corner of Lakeshore Road West and Brookfield Road Intersection FINAL. Project No. 121-22908 N o v e m b e r 2 0 1 2 Traffic Impact Study Transportation Planning th GENIVAR Inc., 600 Cochrane Drive, 5 Floor, Markham, Ontario L3R 5K3 Telephone: 905.475.7270 Fax: 905.475.5994

More information

SERVICE BULLETIN TIME LIMITS/MAINTENANCE CHECKS - AIRBORNE INSTRUMENT AIR SYSTEM COMPONENT REPLACEMENT SCHEDULE

SERVICE BULLETIN TIME LIMITS/MAINTENANCE CHECKS - AIRBORNE INSTRUMENT AIR SYSTEM COMPONENT REPLACEMENT SCHEDULE Beech TITLE: TIME LIMITS/MAINTENANCE CHECKS - AIRBORNE INSTRUMENT AIR SYSTEM COMPONENT REPLACEMENT SCHEDULE SYNOPSIS OF CHANGE This Service Bulletin has been revised at the request of the Federal Aviation

More information

USE OF RADAR IN THE APPROACH CONTROL SERVICE

USE OF RADAR IN THE APPROACH CONTROL SERVICE USE OF RADAR IN THE APPROACH CONTROL SERVICE 1. Introduction The indications presented on the ATS surveillance system named radar may be used to perform the aerodrome, approach and en-route control service:

More information

Defining and Managing capacities Brian Flynn, EUROCONTROL

Defining and Managing capacities Brian Flynn, EUROCONTROL Defining and Managing capacities Brian Flynn, EUROCONTROL Some Capacity Guidelines Capacity is what you know you can handle today Capacity = safe throughput capability of an individual or small team All

More information

Memorandum of Understanding

Memorandum of Understanding Memorandum of Understanding In Accordance with Section V of the U.S./Canada Bilateral Aviation Safety Agreement Implementation Procedures for Design Approval, Production Activities, Export Airworthiness

More information

Using PBN for Terminal and Extended Terminal Operations

Using PBN for Terminal and Extended Terminal Operations Using PBN for Terminal and Extended Terminal Operations Navigation Performance Data Analysis and its Effect on Route Spacing Dijana Trenevska EUROCONTROL 27 June 2017 Content Background and Objective Data

More information

Technical Standard Order

Technical Standard Order Department of Transportation Federal Aviation Administration Aircraft Certification Service Washington, DC TSO-C145a Effective Date: 09/19/02 Technical Standard Order Subject: AIRBORNE NAVIGATION SENSORS

More information

SPADE-2 - Supporting Platform for Airport Decision-making and Efficiency Analysis Phase 2

SPADE-2 - Supporting Platform for Airport Decision-making and Efficiency Analysis Phase 2 - Supporting Platform for Airport Decision-making and Efficiency Analysis Phase 2 2 nd User Group Meeting Overview of the Platform List of Use Cases UC1: Airport Capacity Management UC2: Match Capacity

More information

RED ATLAS PRODUCT BROCHURE. From Nevalee Business Solutions

RED ATLAS PRODUCT BROCHURE. From Nevalee Business Solutions RED ATLAS PRODUCT BROCHURE From Nevalee Business Solutions CONTENTS OVERVIEW... 3 FUNCTIONS... 3 BACKGROUND... 3 ATC... 4 OPERATIONS... 5 ACCOUNTS... 6 REPORTING... 7 CONSULTING... 8 2 OVERVIEW Red Atlas

More information

Today s flight path. 1. WestJet s Story 2. Background 3. Approach 4. Results and Recommendations 5. Questions?

Today s flight path. 1. WestJet s Story 2. Background 3. Approach 4. Results and Recommendations 5. Questions? Today s flight path 1. WestJet s Story 2. Background 3. Approach 4. Results and Recommendations 5. Questions? Optimization of a Planned Schedule Operations Research Simio User Group Meeting May 10 th,

More information

AIRSPACE STRUCTURE. In aeronautics, airspaces are the portion of the atmosphere controlled by a country above its territory.

AIRSPACE STRUCTURE. In aeronautics, airspaces are the portion of the atmosphere controlled by a country above its territory. AIRSPACE STRUCTURE 1. Introduction In aeronautics, s are the portion of the atmosphere controlled by a country above its territory. There are two kinds of : Controlled is of defined dimensions within which

More information

IRTI/TF/1. DRAFT ICAO Position FOR WRC-15 Agenda Item 5 (WP/09)

IRTI/TF/1. DRAFT ICAO Position FOR WRC-15 Agenda Item 5 (WP/09) International Civil Aviation Organization DRAFT ICAO Position FOR WRC-15 Agenda Item 5 (WP/09) Presented by Prosper Zo o Minto o, ICAO RO/CNS, Secretary of NAFISAT Supervisory Committee, in coordination

More information

Chapter 1 EXECUTIVE SUMMARY

Chapter 1 EXECUTIVE SUMMARY Chapter 1 EXECUTIVE SUMMARY Contents Page Aviation Growth Scenarios................................................ 3 Airport Capacity Alternatives.............................................. 4 Air Traffic

More information

AUTORIDAD DEL CANAL DE PANAMÁ EXECUTIVE VICE PRESIDENCY FOR OPERATIONS

AUTORIDAD DEL CANAL DE PANAMÁ EXECUTIVE VICE PRESIDENCY FOR OPERATIONS AUTORIDAD DEL CANAL DE PANAMÁ EXECUTIVE VICE PRESIDENCY FOR OPERATIONS 3654-A (OPXI) ADVISORY TO SHIPPING No. A-29- August 31, TO : All Shipping Agents, Owners, and Operators SUBJECT: Modifications to

More information

Memorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other:

Memorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other: Memorandum Date: March 23, 2018 To: Transportation Authority Board From: Eric Cordoba Deputy Director Capital Projects Subject: 4/10/18 Board Meeting: San Francisco Freeway Corridor Management Study Update

More information

The following criteria shall be applied within the boundaries of the AO District:

The following criteria shall be applied within the boundaries of the AO District: Sec. 419 (a) Purpose AIRPORT OVERLAY DISTRICT (AO) The purpose of the Airport Overlay District is to regulate and restrict the height of structures, objects, or natural growth, regulate the locations of

More information

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES Page 1 of 8 1. PURPOSE 1.1. This Advisory Circular provides guidance to personnel involved in construction of instrument and visual flight procedures for publication in the Aeronautical Information Publication.

More information

A. CONCLUSIONS OF THE FGEIS

A. CONCLUSIONS OF THE FGEIS Chapter 11: Traffic and Parking A. CONCLUSIONS OF THE FGEIS The FGEIS found that the Approved Plan will generate a substantial volume of vehicular and pedestrian activity, including an estimated 1,300

More information

Human Powered Flight THE KREMER HUMAN-POWERED AIRCRAFT FOR SPORT

Human Powered Flight THE KREMER HUMAN-POWERED AIRCRAFT FOR SPORT Human Powered Flight Rules and Regulations for THE KREMER HUMAN-POWERED AIRCRAFT FOR SPORT THE ROYAL AERONAUTICAL SOCIETY 4 Hamilton Place, London, W1V OBQ Telephone +44 (0)20 7670 4345 Fax +44 (0)20 7670

More information

ORDINANCE NO. _2013-

ORDINANCE NO. _2013- ORDINANCE NO. _2013- AN ORDINANCE OF THE TOWNSHIP OF CONEWAGO, DAUPHIN COUNTY, PENNSYLVANIA, PROVIDING FOR AIRPORT ZONING REGULATIONS WITHIN THE AIRPORT ZONING OVERLAY DISTRICT CREATED BY THIS ORDINANCE

More information

Special edition paper Development of a Crew Schedule Data Transfer System

Special edition paper Development of a Crew Schedule Data Transfer System Development of a Crew Schedule Data Transfer System Hideto Murakami* Takashi Matsumoto* Kazuya Yumikura* Akira Nomura* We developed a crew schedule data transfer system where crew schedule data is transferred

More information

TEAM INTEGRATED ENGINEERING, INC. TRAVEL PROCEDURES FOR REST AND RELAXATION (R&R)

TEAM INTEGRATED ENGINEERING, INC. TRAVEL PROCEDURES FOR REST AND RELAXATION (R&R) Page i TEAM INTEGRATED ENGINEERING, INC. TRAVEL PROCEDURES FOR REST AND RELAXATION (R&R) Date: 1 June 2009 Revision 1: 2 November 2010 Approved by: TEAM IE, Inc. Directorates The travel procedures created

More information

RE: Draft AC , titled Determining the Classification of a Change to Type Design

RE: Draft AC , titled Determining the Classification of a Change to Type Design Aeronautical Repair Station Association 121 North Henry Street Alexandria, VA 22314-2903 T: 703 739 9543 F: 703 739 9488 arsa@arsa.org www.arsa.org Sent Via: E-mail: 9AWAAVSDraftAC2193@faa.gov Sarbhpreet

More information

AIR/GROUND SIMULATION OF TRAJECTORY-ORIENTED OPERATIONS WITH LIMITED DELEGATION

AIR/GROUND SIMULATION OF TRAJECTORY-ORIENTED OPERATIONS WITH LIMITED DELEGATION AIR/GROUND SIMULATION OF TRAJECTORY-ORIENTED OPERATIONS WITH LIMITED DELEGATION Thomas Prevot Todd Callantine, Jeff Homola, Paul Lee, Joey Mercer San Jose State University NASA Ames Research Center, Moffett

More information

COMMUTING MASS TRANSPORT CALCULATOR GUIDE Version 1.0

COMMUTING MASS TRANSPORT CALCULATOR GUIDE Version 1.0 COMMUTING MASS TRANSPORT CALCULATOR GUIDE Version 1.0 Green Star SA Multi Unit Residential v1 Commuting Mass Transport Calculator Guide First Released: 27 th October 2011 Last Update: 27 th October 2011

More information

EUROPEAN MILITARY AIRWORTHINESS REQUIREMENTS EMAR 21 SECTION A

EUROPEAN MILITARY AIRWORTHINESS REQUIREMENTS EMAR 21 SECTION A EUROPEAN MILITARY AIRWORTHINESS REQUIREMENTS EMAR 21 SECTION A CERTIFICATION OF; MILITARY AIRCRAFT AND RELATED PRODUCTS, PARTS AND APPLIANCES, AND DESIGN AND Edition Number 1.0 Edition Date 18 April 2012

More information

Office of the President University Policy

Office of the President University Policy Office of the President University Policy SUBJECT: Effective Date: Policy Number: Unmanned Aircraft Systems (UAS) 8-21-17 10.1 Supersedes: Page Of New 1 4 Responsible Authority: Vice President, Research

More information

ANALYSIS OF THE CONTRIUBTION OF FLIGHTPLAN ROUTE SELECTION ON ENROUTE DELAYS USING RAMS

ANALYSIS OF THE CONTRIUBTION OF FLIGHTPLAN ROUTE SELECTION ON ENROUTE DELAYS USING RAMS ANALYSIS OF THE CONTRIUBTION OF FLIGHTPLAN ROUTE SELECTION ON ENROUTE DELAYS USING RAMS Akshay Belle, Lance Sherry, Ph.D, Center for Air Transportation Systems Research, Fairfax, VA Abstract The absence

More information

Treasure Island Supplemental Information Report Addendum

Treasure Island Supplemental Information Report Addendum 1 1 1 1 0 1 0 1 0 1 Treasure Island Supplemental Information Report Addendum Introduction Purpose The purpose of this Supplemental Information Report (SIR) Addendum is to determine if the current land

More information

PSEG Long Island. Community Distributed Generation ( CDG ) Program. Procedural Requirements

PSEG Long Island. Community Distributed Generation ( CDG ) Program. Procedural Requirements PSEG Long Island Community Distributed Generation ( CDG ) Program Procedural Requirements Effective Date: April 1, 2016 Table of Contents 1. Introduction... 1 2. Program Definitions... 1 3. CDG Host Eligibility

More information

MEMORANDUM. Lynn Hayes LSA Associates, Inc.

MEMORANDUM. Lynn Hayes LSA Associates, Inc. MEMORANDUM To: Lynn Hayes LSA Associates, Inc. Date: May 5, 217 From: Zawwar Saiyed, P.E., Senior Transportation Engineer Justin Tucker, Transportation Engineer I Linscott, Law & Greenspan, Engineers LLG

More information

TENTS, CANOPIES AND TEMPORARY MEMBRANE STRUCTURES

TENTS, CANOPIES AND TEMPORARY MEMBRANE STRUCTURES INFORMATION BULLETIN TENTS, CANOPIES AND TEMPORARY MEMBRANE STRUCTURES Code Reference: Title 19 California Code of Regulations California Fire Code (CFC), 2001 Edition, Article 32 California Building Code

More information

Helicopter Performance. Performance Class 2 - The Concept. Jim Lyons

Helicopter Performance. Performance Class 2 - The Concept. Jim Lyons Helicopter Performance Performance Class 2 - The Concept Jim Lyons Aim of the Presentation Establishes the derivation of PC2 from the ICAO Standard and explains the necessary extensions Examines the basic

More information

EUROPEAN MILITARY AIRWORTHINESS REQUIREMENTS. EMAR 21 (SECTION A and B)

EUROPEAN MILITARY AIRWORTHINESS REQUIREMENTS. EMAR 21 (SECTION A and B) EUROPEAN MILITARY AIRWORTHINESS REQUIREMENTS EMAR 21 (SECTION A and B) CERTIFICATION OF; MILITARY AIRCRAFT AND RELATED PRODUCTS, PARTS AND APPLIANCES, AND DESIGN AND Edition Number 1.0 (Combined) Edition

More information

Pilot RVSM Training Guidance Material

Pilot RVSM Training Guidance Material Pilot RVSM Training Guidance Material Captain Souhaiel DALLEL IFALPA RVP AFI WEST RVSM Pilot Procedures ICAO requires states to establish for flight crews specific: Initial training programs and Recurrent

More information

APPENDIX D MSP Airfield Simulation Analysis

APPENDIX D MSP Airfield Simulation Analysis APPENDIX D MSP Airfield Simulation Analysis This page is left intentionally blank. MSP Airfield Simulation Analysis Technical Report Prepared by: HNTB November 2011 2020 Improvements Environmental Assessment/

More information

FLIGHT CONTROLS- RUDDER CABLE PULLEY BRACKET INSPECTION/REPAIR

FLIGHT CONTROLS- RUDDER CABLE PULLEY BRACKET INSPECTION/REPAIR Beechcraft TITLE: FLIGHT CONTROLS- RUDDER CABLE PULLEY BRACKET INSPECTION/REPAIR 1. Planning Information A. Effectivity (1) Airplanes BEECHCRAFT Model 36 Bonanza, Serials E-3506 through E-3629 and E-3631

More information

ACI-NA BUSINESS TERM SURVEY APRIL 2017

ACI-NA BUSINESS TERM SURVEY APRIL 2017 ACI-NA BUSINESS TERM SURVEY APRIL 2017 Airport/Airline Business Working Group Randy Bush Tatiana Starostina Dafang Wu Assisted by Professor Jonathan Williams, UNC Agenda Background Rates and Charges Methodology

More information

SERVICE BULLETIN EQUIPMENT/FURNISHINGS - PILOT AND COPILOT SHOULDER HARNESS GUIDE RETAINING WASHER INSPECTION AND/OR REPLACEMENT SYNOPSIS OF CHANGE

SERVICE BULLETIN EQUIPMENT/FURNISHINGS - PILOT AND COPILOT SHOULDER HARNESS GUIDE RETAINING WASHER INSPECTION AND/OR REPLACEMENT SYNOPSIS OF CHANGE TITLE: EQUIPMENT/FURNISHINGS - PILOT AND COPILOT SHOULDER HARNESS GUIDE RETAINING WASHER INSPECTION AND/OR REPLACEMENT SYNOPSIS OF CHANGE This Service Bulletin has been revised at the direction of the

More information

Schedule 2.2 Termination Services

Schedule 2.2 Termination Services Schedule 2.2 Termination Services Page 1 of 7 Table of Contents 1 Termination Services... 3 2 Mobile Call Termination Service... 3 2.1 The Service:... 3 2.2 Availability of Service:... 4 2.3 Type of Traffic:...

More information

CONTROLLED AIRSPACE CONTAINMENT POLICY

CONTROLLED AIRSPACE CONTAINMENT POLICY Safety and Airspace Regulation Group (SARG) 17 January 2014 Policy Statement 1 Overview CONTROLLED AIRSPACE CONTAINMENT POLICY 1.1 UK airspace design policy for ATS Routes, SIDs and STARs is based upon

More information

ERIE ATCT STANDARD OPERATING PROCEDURES

ERIE ATCT STANDARD OPERATING PROCEDURES ORDER ERI ATCT 7110.10I ERIE ATCT STANDARD OPERATING PROCEDURES August 1, 2014 VATUSA CLEVELAND ARTCC VIRTUAL AIR TRAFFIC SIMULATION NETWORK VIRTUAL AIR TRAFFIC SIMULATE NETWORK UNITED STATES DIVISION

More information

CENTRAL AIR TRAFFIC FLOW MANAGEMENT ( C-ATFM ) INDIA CATFM. ATFM Global Symposium /22/2017 ATFM Global Symposium 2017

CENTRAL AIR TRAFFIC FLOW MANAGEMENT ( C-ATFM ) INDIA CATFM. ATFM Global Symposium /22/2017 ATFM Global Symposium 2017 CATFM CENTRAL AIR TRAFFIC FLOW MANAGEMENT ( C-ATFM ) INDIA 1 ATFM Global Symposium-2017 Topics Topics. The Need C-ATFM Network C-ATFM Operations Current Status and Activities Challenges in Implementation

More information