1 Special Pricing Rule Updates Michael DeSocio Manager, Energy Market Design New York Independent System Operator MIWG June 28, 2013 NYISO KCC Conference Center 2013 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY

2 Agenda Background Unified Pricing Examples RT BPCG for Imports Proposed Tariff Updates The Plan Appendix Proxy Generator Bus Prices OASIS Posting Updates Financial Impact Charges Review Next Steps 2013 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 2

3 Background In 2010 and 2011 with Enhanced Interregional Transaction Coordination Phase 1, HQ 15 minute scheduling, and Phase 4, CTS with ISONE, the NYISO updated its special pricing rules for Proxy Generator Buses and created 50+ pricing rules These rules do not cover all potential scheduling scenarios that will be available to market participants The existing pricing rules do not address CTS-enabled designated Scheduled Lines or CTS-enabled Non-Competitive Proxy Generator Buses During the NYISO s review of these special pricing rules, the NYISO determined the rules can be distilled down to a core set of universally applicable pricing rules These universally applicable pricing rules provide an incremental improvement over today s rules by maintaining a consistent real-time Reference Bus Price across all internal and external buses 2013 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 3

4 Unified Pricing Examples On the next few slides, the examples are illustrative of varying RTD and RTC LBMPs where the RTC LBMP is not a perfect prediction of the RTD LBMP. These examples were placed together at the request of NYISO stakeholders and are based on the original set of examples that can now be found in the Appendix. The NYISO expects that the proposed unified pricing rules should not substantively change the outcomes of the real-time energy market 2013 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 4

5 Example Unified Pricing (A) Non-Competitive Bus Import Constrained TODAY'S RULES Max(RTC15 LBMP, Rolling RTC LBMP, Min(RTD LBMP, 0)) A B C D MAX(B,C,MIN(D,0)) DA LBMP RTC15 LBMP Rolling RTC LBMP RTD LBMP RT LBMP $ $ (951.00) $ (951.00) $ $ - $ $ 8.00 $ 8.00 $ $ 8.00 $ $ $ $ $ $ $ 1, $ 1, $ 2, $ 1, $ $ (142.00) $ (142.00) $ (16.09) $ (16.09) PROPOSED UNIFIED RULES LBMP=REF+INTERNAL CONGESTION+EXTERNAL INTERFACE CONGESTION+LOSSES BORDER LBMP=REF+INTERNAL CONGESTION+LOSSES A B C D =A+B+C+D (E) =A+B+C (F) G IF E>MIN(F,0) THEN G+D ELSE MIN(G, 0) EXTERNAL REFERENCE INTERNAL INTERFACE BORDER Example BUS PRICE CONGESTION LOSSES CONGESTION RTC LBMP LBMP RTD LBMP RT LBMP 1 $ $ $ 3.00 $ (999.00) $ (951.00) $ $ $ - 2 $ $ $ 3.00 $ (40.00) $ 8.00 $ $ $ $ $ $ 3.00 $ - $ $ $ $ $ $ 2, $ 3.00 $ (999.00) $ 1, $ 2, $ 2, $ 1, $ (90.00) $ $ 3.00 $ (70.00) $ (142.00) $ (72.00) $ (16.09) $ (16.09) 2013 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 5

6 Example Unified Pricing (B) Non-Competitive Bus Export Constrained TODAY'S RULES Min(RTC15 LBMP, Rolling RTC LBMP, Max(RTD LBMP, SCUC LBMP)) A B C D MIN(B,C,MAX(D,0)) DA LBMP RTC15 LBMP Rolling RTC LBMP RTD LBMP RT LBMP $ $ 1, $ 1, $ $ $ $ $ $ $ $ $ $ $ $ $ $ 3, $ 3, $ 2, $ 2, $ $ (2.00) $ (2.00) $ (82.18) $ (2.00) PROPOSED UNIFIED RULES LBMP=REF+INTERNAL CONGESTION+EXTERNAL INTERFACE CONGESTION+LOSSES BORDER LBMP=REF+INTERNAL CONGESTION+LOSSES A B C D =A+B+C+D (E) =A+B+C (F) G IF E<MAX(F,0) THEN G+D ELSE G EXTERNAL REFERENCE INTERNAL INTERFACE BORDER Example BUS PRICE CONGESTION LOSSES CONGESTION RTC LBMP LBMP RTD LBMP RT LBMP 6 $ $ $ 3.00 $ $ 1, $ $ $ $ $ $ 3.00 $ $ $ $ $ $ $ $ 3.00 $ - $ $ $ $ $ $ 2, $ 3.00 $ $ 3, $ 2, $ 2, $ 2, $ (90.00) $ $ 3.00 $ $ (2.00) $ (72.00) $ (82.18) $ (12.18) 2013 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 6

7 Background RT BPCG Eligibility of RT BPCG for Imports at Non-Competitive Proxy Generator Buses and Proxy Generator Buses associated with designated Scheduled Lines is limited for an hour when: The Rolling RTC is export constrained due to a NYCA Ramp Constraint; and The Rolling RTC is export constrained due to an Interface ATC or Interface Ramp Constraint for a quarter hour This settlement change was part of the set of changes proposed with the original special pricing rules that were designed to eliminate large settlement windfalls due to significant price distortions as discussed at the May 23 rd MIWG 2013 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 7

8 Background RT BPCG (2) The RT BPCG non-eligibility was created to protect against the following potential outcome: Consider RTC is export constrained at a Non-Competitive Proxy Generator Bus and the RTC LBMP is $900 due to that export constraint Due to the high RTC LBMP, expensive import transactions were scheduled to counter the export constraint. Those imports were bid at $800. The special pricing rules fire due to the export constraint in RTC and the RT LBMP is set at the RTD LBMP which equals $50. The imports that bid $800 and were scheduled are due a RT BPCG, even though a distorted LBMP was the cause of those imports being scheduled. In this case, the presence of the export constraint renders the import non-eligible for the RT BPCG 2013 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 8

9 Proposal RT BPCG Remove limitation of RT BPCG ineligibility at Non- Competitive Proxy Generator Buses and Proxy Generator Buses associated with designated Scheduled Lines due to NYCA Ramp Constraints With the introduction of 15 minute scheduling at the PJM Proxy Generator Buses, NYCA Ramp is competed for by all intra-hour transactions and no longer a concern as a source of price distortion Narrow the RT BPCG ineligibility at 15 minute scheduled Non-Competitive Proxy Generator Buses and Proxy Generator Buses associated with designated Scheduled Lines due to a quarter hour Interface ATC or Interface Ramp export constraint to apply only to that quarter hour 2013 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 9

10 Long Term Plan - RT BPCG Long Term Plan In early 2014, remedy the non-eligibility rules for Non-Competitive Proxy Generator Buses and designated Scheduled Lines to ensure consistent pricing and settlement rules. In late 2014, implement CTS with PJM and eliminate real-time make whole payments for imports from PJM In late 2015, implement CTS with ISO-NE and eliminate real-time make whole payments for imports from ISO-NE In , eliminate real-time make whole payments for imports from HQ In , eliminate real-time make whole payments for imports from IESO This allows for the time to work with our other neighbors on the proposed changes to ensure that there are no unintended consequences 2013 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 10

11 Proposed Tariff Actual Proposed Tariff Language can be found separately Updated MST Section 4.5 to revise the calculation of the Financial Impact Charge Updated MST Section adding the new unified pricing rules and eliminating the current pricing rules for Proxy Generator Buses Updated MST Section to revise the duration of ineligibility of RT BPCG during export constrained periods for Non-Competitive Proxy Generator Buses and Designated Scheduled Lines 2013 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 11

12 The Plan Goals for 2013 The NYISO has a CTS internal system build out initiative underway where it intends to create a common set of special pricing rules that can be applied to all Proxy Generator Buses, including CTS-enabled designated Scheduled Lines and CTSenabled Non-Competitive Proxy Generator Buses. Goals for 2014 The NYISO intends to implement the revise special pricing rules early in the year. The NYISO, in conjunction with PJM, intends to implement the CTS scheduling capabilities at the NY-PJM interfaces by the end of the year. This is the CTS with PJM initiative New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 12

13 The Plan (2) The changes included with this early 2014 implementation would include updates to: Special Pricing Rules Financial Impact Charges RT BPCG Eligibility for Imports The NYISO is not seeking approval of the long term plan at this time OASIS Postings Price Verification/Corrections 2013 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 13

14 Appendix A: Special Pricing for Proxy Generator Buses 2013 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 14

15 Background Current Pricing For 15 minute transaction scheduling, Real-Time Proxy Generator Bus prices are based on comparing DAM, RTC15, Rolling RTC, RTD and Zero For Competitive Buses the RT price is based on either the RTC15 or Rolling RTC price for specific RTC constraints For Non-Competitive Buses the RT price is based on comparison of the DAM, RTC15, Rolling RTC, RTD and Zero for specific RTC constraints For designated Scheduled Lines the RT price is based on comparison of the DAM, RTC15, Rolling RTC, RTD and Zero for specific RTC constraints 2013 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 15

16 Background Current Pricing For CTS transaction scheduling, fold the RTC external interface congestion* into the RTD prices when appropriate to create the Real-Time Prices for Proxy Generator Buses Competitive Buses For specific Rolling RTC constraints increment/decrement the RTD LBMP by the RTC external interface congestion from the specific constraint(s) to determine the Real-Time LBMP *RTC external interface congestion is the congestion associated with NYCA Ramp, Interface Ramp and/or Interface ATC Constraints that impact the specific Proxy Generator Bus 2013 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 16

17 Background Non-Competitive Pricing In 2002, the NYISO established rules for External Transaction Settlements at Non-Competitive Proxy Buses g_materials/ /agenda9_trans_settle_proxy_buses.pdf The rules were created to address the possibility of significant price distortions at external proxy buses that lack competitive import or export alternative offers 2013 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 17

18 Background Non-Competitive Pricing Non-competitive external proxy buses can cause inefficient market results in several ways. The external interface is derated in RTC to a point where the day-ahead scheduled flows cannot be maintained; Wheel Transactions are scheduled in RTC at levels that can only be accommodated by scheduling counterflow on the interface. When counterflow that was relied on to develop the interface schedule is not available in real-time, the remaining export transactions can benefit through large payments based on large negative RTC LBMPs which are no longer offset by the charges that would have been collected from the counterflow transaction. At an external proxy bus where there are insufficient competitive alternatives the described scenarios may result in the scheduling of inefficient transactions that do not reflect a competitive market result New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 18

19 Background Non-Competitive Pricing In 2002, real-time proxy bus prices were set using the endstate ECA B logic (current pricing rules for competitive proxy generator buses). When an external interface or DNI constraint is not binding in RTC, the real-time external proxy bus price is set by RTD. When an external interface or DNI constraint is binding in RTC, the real-time external proxy bus price is set by RTC regardless of whether the interface is import or export constrained. In each of these scenarios there is a binding external interface constraint and the prices generated by RTC would set the real-time price without the additional Non-Competitive rules New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 19

20 Background Non-Competitive Example TTC in the DAM is 1000 MW. In Real-Time, the limit must be reduced to 499 MW for reliability reasons. Company X offers all of its Day-Ahead scheduled imports at -$500/MWh. There are no competing import or export bids submitted by other market participants so the NYISO scheduling software is forced to reduce the 999 MW day-ahead scheduled import by 500 MW setting a price of -$500/MWh in RTC. Illustration of Real-Time flows and prices: 2013 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 20

21 Background Non-Competitive Example In the example, the real-time settlement under the competitive pricing rules (ECA-b) would cost New York ISO participants $275,000. $250,000 is paid to Company X to buy out of their day-ahead scheduled imports. 500 MW at -$500/MWh. $25,000 is paid to internal New York generators that are dispatched up to meet New York load. 500 MW at $50/MWh. There are no counter-parties to these transactions so these costs would show up in Schedule One energy, congestion and loss residual accounts New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 21

22 Proposal Unified Pricing Establish a unified set of special pricing rules for Proxy Generator Buses This unified set of special pricing rules would provide greater certainty for Proxy Generator Bus prices and would create a universally applicable set of Special Pricing Rules for all Proxy Generator Buses 2013 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 22

23 Proposal Unified Pricing (2) Competitive Buses leverage the current pricing rules for Variably Scheduled Proxy Generator Buses that are economically scheduled once every 15 minutes and extend those rules to handle Proxy Generator Buses that are economically scheduled only once per hour Remove existing special pricing rules that compare the RTC15 and Rolling RTC LBMPs 2013 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 23

24 Proposal Unified Pricing (3) Non-Competitive Buses and Designated Scheduled Lines establish special pricing rules similar to the rules set forth in the CTS design where the RTD LBMP is incremented/decremented by the RTC external interface congestion when appropriate Remove existing special pricing rules that compare the RTC15 LBMP, Rolling RTC LBMP, RTD LBMP and the DAM LBMP/Zero 2013 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 24

25 Unified Pricing Rules LBMP Review LBMP = Reference Bus Price + Marginal Cost of Congestion + Marginal Cost of Losses Marginal Cost of Congestion can be broken down into congestion from internal constraints and congestion from external interface constraints Marginal Cost of Congestion = Marginal Cost of Internal Congestion + Marginal Cost of External Interface Congestion 2013 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 25

26 Unified Pricing Rules (2) Therefore, the Proxy Generator Bus LBMP is LBMP = Reference Bus Price + Marginal Cost of Internal Congestion + Marginal Cost of External Interface Congestion + Marginal Cost of Losses Finally, the LBMP at the NYCA Border for the Proxy Generator Bus (Border LBMP) is LBMP = Reference Bus Price + Marginal Cost of Internal Congestion + Marginal Cost of External Interface Congestion + Marginal Cost of Losses 2013 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 26

27 Unified Pricing Rules (3) HQ Chateauguay Bus IESO Bruce Bus NE Sandy Pond Bus NYISO Reference Bus Border LBMP for NE Sandy Pond Bus External Interface Congestion for NE Sandy Pond Bus PJM Keystone Bus 2013 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 27

28 Unified Pricing Rules (4) For Competitive Proxy Buses that are economically scheduled once per hour (Rule 1) RT LBMP = RTD LBMP + RTC15 External Interface Congestion For Competitive Proxy Buses that are economically scheduled once every 15 minutes (Rule 2) RT LBMP = RTD LBMP + Rolling RTC External Interface Congestion 2013 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 28

29 Unified Pricing Rules (5) For Non-Competitive Proxy Buses that are economically scheduled once per hour When RTC15 has External Interface Congestion due to Interface ATC/Ramp Constraints in the Import Direction (Rule 3) If (RTC15 Border LBMP + RTC15 External Interface Congestion) > Min(RTC15 Border LBMP, 0) Then RT LBMP = RTD LBMP + RTC15 External Interface Congestion Else RT LBMP = Min(RTD LBMP, 0) When RTC15 has External Interface Congestion due to Interface ATC/Ramp Constraints in the Export Direction (Rule 4) If (RTC15 Border LBMP + RTC15 External Interface Congestion) < Max(RTC15 Border LBMP, 0) Then RT LBMP = RTD LBMP + RTC15 External Interface Congestion Else RT LBMP = RTD LBMP 2013 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 29

30 Unified Pricing Rules (6) For Non-Competitive Proxy Buses that are economically scheduled once every 15 minutes When the Rolling RTC has External Interface Congestion due to Interface ATC/Ramp Constraints in the Import Direction (Rule 5) If (Rolling RTC Border LBMP + Rolling RTC External Interface Congestion) > Min(Rolling RTC Border LBMP, 0) Then RT LBMP = RTD LBMP + Rolling RTC External Interface Congestion Else RT LBMP = Min(RTD LBMP, 0) When the Rolling RTC has External Interface Congestion due to Interface ATC/Ramp Constraints in the Export Direction (Rule 6) If (Rolling RTC Border LBMP + Rolling RTC External Interface Congestion) < Max(Rolling RTC Border LBMP, 0) Then RT LBMP = RTD LBMP + Rolling RTC External Interface Congestion Else RT LBMP = RTD LBMP 2013 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 30

31 Unified Pricing Rules (7) For designated Scheduled Lines that are economically scheduled once per hour When RTC15 has External Interface Congestion due to Interface ATC Constraints in the Import Direction (Rule 7) If (RTC15 Border LBMP + RTC15 External Interface Congestion) > Min(RTC15 Border LBMP, 0) Then RT LBMP = RTD LBMP + RTC15 External Interface Congestion Else RT LBMP = Min(RTD LBMP, 0) When RTC15 has External Interface Congestion due to Interface ATC Constraints in the Export Direction (Rule 8) If (RTC15 Border LBMP + RTC15 External Interface Congestion) < Max(RTC15 Border LBMP, 0) Then RT LBMP = RTD LBMP + RTC15 External Interface Congestion Else RT LBMP = RTD LBMP 2013 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 31

32 Unified Pricing Rules (8) For designated Scheduled Lines that are economically scheduled once every 15 minutes When the Rolling RTC has External Interface Congestion due to Interface ATC Constraints in the Import Direction (Rule 9) If (Rolling RTC Border LBMP + Rolling RTC External Interface Congestion) > Min(Rolling RTC Border LBMP, 0) Then RT LBMP = RTD LBMP + Rolling RTC External Interface Congestion Else RT LBMP = Min(RTD LBMP, 0) When the Rolling RTC has External Interface Congestion due to Interface ATC Constraints in the Export Direction (Rule 10) If (Rolling RTC Border LBMP + Rolling RTC External Interface Congestion) < Max(Rolling RTC Border LBMP, 0) Then RT LBMP = RTD LBMP + Rolling RTC External Interface Congestion Else RT LBMP = RTD LBMP 2013 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 32

33 Example - Unified Pricing On April 29, 2013 from 16:15 to 16:30, the PJM Keystone Interface ATC constraint was binding in the Rolling RTC The external interface congestion associated with this external interface constraint was $8.39 The RTC Keystone LBMP was $45.45 Keystone is a competitive Proxy Generator Bus The RTD Keystone Bus LBMPs for the 16:15 16:30 period were: 16:15 to 16:20 $ :20 to 16:25 $ :25 to 16:30 $ New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 33

34 Example - Unified Pricing (2) The Real-Time settlement LBMPs for the Keystone Bus using the current special pricing rules for the 16:15 16:30 period were: 16:15 to 16:20 $ :20 to 16:25 $ :25 to 16:30 $45.45 The Real-Time settlement LBMPs for the Keystone Bus using the unified special pricing rules (Rule 2) for the 16:15 16:30 period would have been: 16:15 to 16:20 $ $8.39 = $ :20 to 16:25 $ $8.39 = $ :25 to 16:30 $ $8.39 = $ New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 34

35 Example - Unified Pricing (3) On April 29, 2013 from 16:15 to 16:30, the PJM Keystone Interface ATC constraint was binding in the Rolling RTC The external interface congestion associated with this external interface constraint was $8.39 The Rolling RTC Keystone LBMP was $45.45 The DAM Keystone LBMP was $31.87 for HB16 The RTD Keystone Bus LBMPs for the 16:15 16:30 period were: 16:15 to 16:20 $ :20 to 16:25 $ :25 to 16:30 $ New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 35

36 Example - Unified Pricing (4) Assume Keystone is a non-competitive, 15 minute scheduled, Proxy Generator Bus for this example Keystone is Export Constrained Rolling RTC LBMP Keystone External Interface Congestion Keystone = RTC Border LBMP Keystone $ $8.39 = $37.06 Apply Pricing Rule 5 Test Rolling RTC LBMP < Max(RTC Border LBMP, 0) $45.45 < Max($37.06, $0) Does not pass 2013 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 36

37 Example - Unified Pricing (5) In the example, proposed unified special Pricing Rule 5 sets the Real-Time LBMP equal to the RTD LBMPs for each of the three RTD intervals. The Real-Time settlement LBMPs for the Keystone Bus using the unified special pricing rules for the 16:15 16:30 period would be: 16:15 to 16:20 $ :20 to 16:25 $ :25 to 16:30 $35.04 Note: Since the DAM LBMP for Keystone was $31.87 that the current noncompetitive pricing rules would also result in using the RTD LBMPs above If the DAM LBMP was greater than the RTD LBMPs above, the current noncompetitive pricing rules would have set the real-time LBMPs to the DAM LBMP. The proposed unified special pricing rules do not have any conditions that would set the real-time LBMPs to the DAM LBMP New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 37

38 Example Unified Pricing (6) Non-Competitive Bus Import Constrained TODAY'S RULES Max(RTC15 LBMP, Rolling RTC LBMP, Min(RTD LBMP, 0)) A B C D MAX(B,C,MIN(D,0)) DA LBMP RTC15 LBMP Rolling RTC LBMP RTD LBMP RT LBMP $ $ (951.00) $ (951.00) $ $ - $ $ 8.00 $ 8.00 $ $ 8.00 $ $ $ $ $ $ $ 1, $ 1, $ 2, $ 1, $ $ (142.00) $ (142.00) $ (72.00) $ (72.00) PROPOSED UNIFIED RULES LBMP=REF+INTERNAL CONGESTION+EXTERNAL INTERFACE CONGESTION+LOSSES BORDER LBMP=REF+INTERNAL CONGESTION+LOSSES A B C D =A+B+C+D (E) =A+B+C (F) IF E>MIN(F,0) THEN E ELSE MIN(F, 0) EXTERNAL REFERENCE INTERNAL INTERFACE Example BUS PRICE CONGESTION LOSSES CONGESTION RTC LBMP BORDER LBMP RT LBMP 1 $ $ $ 3.00 $ (999.00) $ (951.00) $ $ - 2 $ $ $ 3.00 $ (40.00) $ 8.00 $ $ $ $ $ 3.00 $ - $ $ $ $ $ 2, $ 3.00 $ (999.00) $ 1, $ 2, $ 1, $ (90.00) $ $ 3.00 $ (70.00) $ (142.00) $ (72.00) $ (72.00) 2013 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 38

39 Example Unified Pricing (7) Non-Competitive Bus Export Constrained TODAY'S RULES Min(RTC15 LBMP, Rolling RTC LBMP, Max(RTD LBMP, SCUC LBMP)) A B C D MIN(B,C,MAX(D,0)) DA LBMP RTC15 LBMP Rolling RTC LBMP RTD LBMP RT LBMP $ $ 1, $ 1, $ $ $ $ $ $ $ $ $ $ $ $ $ $ 3, $ 3, $ 2, $ 2, $ $ (2.00) $ (2.00) $ (72.00) $ (2.00) PROPOSED UNIFIED RULES LBMP=REF+INTERNAL CONGESTION+EXTERNAL INTERFACE CONGESTION+LOSSES BORDER LBMP=REF+INTERNAL CONGESTION+LOSSES A B C D =A+B+C+D (E) =A+B+C (F) IF E<MAX(F,0) THEN E ELSE F EXTERNAL REFERENCE INTERNAL INTERFACE Example BUS PRICE CONGESTION LOSSES CONGESTION RTC LBMP BORDER LBMP RT LBMP 6 $ $ $ 3.00 $ $ 1, $ $ $ $ $ 3.00 $ $ $ $ $ $ $ 3.00 $ - $ $ $ $ $ 2, $ 3.00 $ $ 3, $ 2, $ 2, $ (90.00) $ $ 3.00 $ $ (2.00) $ (72.00) $ (2.00) 2013 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 39

40 Appendix B: OASIS Postings 2013 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 40

41 Background Today, the NYISO produces and posts publically Hour- Ahead Market ( HAM ) prices See the NYISO OASIS The term Hour-Ahead Market ( HAM ) is not a defined term The NYISO MST discusses RTC postings See the NYISO MST Section RTC will make decisions and post information in a series of fifteen-minute runs which are described below New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 41

42 Background (2) With CTS, special pricing rules will be modified to fold RTC Proxy Generator Bus constraints into RTD LBMPs, when appropriate See the NYISO MST, Att B, Section from Dec 2011 CTS Filing 2013 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 42

43 Proposal HAM Prices Realign Real-Time postings to provide stakeholders with Authoritative and Intuitive Real-Time Energy Market information Combine the NYISO OASIS RTM and HAM postings into one cohesive set of RTM postings Settlement Postings RTM/HAM LBMPs Zonal and Generator Ancillary Services Combine Real-Time & Hour-Ahead Analysis and Visualization Postings Pricing Data Mart Combine RTM & HAM prices Zone Maps and Graphs 2013 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 43

44 Proposal Real-Time Prices Update Real-Time Price Postings to include look ahead information from RTC Real-Time Price Postings would include current Real-Time Price from RTD (including application of unified pricing rules) and advisory Real-Time Prices from RTC, which would be subsequently overwritten by the final Real-Time Price These postings include: RTM LBMP Zonal and Generator Custom Reports Public Data Mart 2013 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 44

45 Proposal Other Postings Prescheduled ATC/TTC Rename to Long Term ATC/TTC ATC/TTC Change DAM and HAM within the report to Day-Ahead and Hour-Ahead Update DAM ATC to show ATC from the final SCUC pass Make use of RT, Real-Time, Day-Ahead, DAM consistent within the Market & Operational Data postings Standardize Terms using Real-Time, Hour-Ahead and Day- Ahead Remove use of the term HAM 2013 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 45

46 Appendix C: Financial Impact Charges 2013 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 46

47 Background - FIC The Financial Impact Charge (FIC) applies to transactions scheduled at all Proxy Generator Buses The FIC only applies to transactions that receive a non-zero schedule from RTC for any part of the hour The FIC is assessed for external transactions on an interval by interval basis as: For Imports: Max((RTC Schedule RT Schedule)*[Max((RTD LBMP RTC LBMP),0),0) For Exports: Max((RTC Schedule RT Schedule)*[Max((RTC LBMP RTD LBMP),0),0) For Wheel-Throughs: Assessed as both a failed import and failed export 2013 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 47

48 Proposal - FIC To align the proposed unified pricing rules with the FIC, the FIC will be based on the RT marginal cost of congestion at relevant Proxy Generator Bus price as follows: The FIC will be assessed for external transactions on an interval by interval basis as: For Imports: Max((RTC Schedule RT Schedule)*Max(RT Congestion,0),0) For Exports: Max((RTC Schedule RT Schedule)*Min(RT Congestion,0)*-1,0) For Wheel-Throughs: Assessed as both a failed import and failed export RT Congestion for the Proxy Generator Bus = RT Marginal Cost of Congestion = Marginal Cost of Internal Congestion + Marginal Cost of External Interface Congestion 2013 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 48

49 Next Steps Review Tariff Updates at the June 6, 2013 MIWG If necessary, bring updates to additional MIWG meetings Request Approval of Tariff Language at August 2013 BIC Request Approval of Tariff Language at August 2013 MC File Tariff Language early Q New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 49

50 2013 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION PURPOSES ONLY 50

Get a higher Return On Investment with Wärtsilä

Get a higher Return On Investment with Wärtsilä Get a higher Return On Investment with Wärtsilä Wärtsilä reciprocating engine technology outperforms gas turbines in the ISO-NE market Joseph Ferrari www.industrialinfo.com Wärtsilä Wärtsilä Founded in

More information

MATL Reference. MATL Path 83 Transfer Capability with Seasonal SOL Effects. Document. 1. Purpose

MATL Reference. MATL Path 83 Transfer Capability with Seasonal SOL Effects. Document. 1. Purpose 1. Purpose This document outlines the transfer capability on MATL Path 83 for both long-term capability and for current seasonal capabilities adjusted for known System Operating Limits (SOLs), such as

More information

M A T L Reference. MATL Path 83 Transfer Capability with Seasonal SOL Affects. Document. 1. Purpose

M A T L Reference. MATL Path 83 Transfer Capability with Seasonal SOL Affects. Document. 1. Purpose 1. Purpose This document outlines the Transfer Capability on MATL Path 83 for both long-term capability and for current seasonal capabilities adjusted for known System Operating Limits (SOLs), such as

More information

Release Notes Business Rules Version 10x Up to Spring 2019 Release for SIBR/BSAP/RC-BSAP

Release Notes Business Rules Version 10x Up to Spring 2019 Release for SIBR/BSAP/RC-BSAP Release Notes Business Rules Version 10x Up to Spring 2019 Release for SIBR/BSAP/RC-BSAP Revision History Date Version By Description 11/27/2018 1.0 WT Initial Draft for Spring 2019 set. RC Base Schedule

More information

Price-Setting Auctions for Airport Slot Allocation: a Multi-Airport Case Study

Price-Setting Auctions for Airport Slot Allocation: a Multi-Airport Case Study Price-Setting Auctions for Airport Slot Allocation: a Multi-Airport Case Study An Agent-Based Computational Economics Approach to Strategic Slot Allocation SESAR Innovation Days Bologna, 2 nd December

More information

Section A: Scheme Summary

Section A: Scheme Summary Section A: Scheme Summary Name of Scheme: PMO Scheme Code: Lead Organisation: Senior Responsible Officer: Lead Promoter Contact: Case Officer: North East Calderdale Transformational Programme WYTF-PA4-054

More information

TransAction Overview. Introduction. Vision. NVTA Jurisdictions

TransAction Overview. Introduction. Vision. NVTA Jurisdictions Introduction Vision NVTA Jurisdictions In the 21 st century, Northern Virginia will develop and sustain a multimodal transportation system that enhances quality of life and supports economic growth. Investments

More information

Working Draft: Time-share Revenue Recognition Implementation Issue. Financial Reporting Center Revenue Recognition

Working Draft: Time-share Revenue Recognition Implementation Issue. Financial Reporting Center Revenue Recognition March 1, 2017 Financial Reporting Center Revenue Recognition Working Draft: Time-share Revenue Recognition Implementation Issue Issue #16-6: Recognition of Revenue Management Fees Expected Overall Level

More information

Update on Step by Step Energy Methodology and Initial Econometric Results April 4, 2013 Presentation to ICAP WG

Update on Step by Step Energy Methodology and Initial Econometric Results April 4, 2013 Presentation to ICAP WG Update on Step by Step Energy Methodology and Initial Econometric Results April 4, 2013 Presentation to ICAP WG Step 1 Develop Econometric Forecasts of LBMP by Zone for 2014-2015, 2015-20162016 and 2016-20172017

More information

Unlocking the Value of Flexible Generation

Unlocking the Value of Flexible Generation Unlocking the Value of Flexible Generation PJM SUMMIT September 7 th 2016 Matti Rautkivi 1 Wärtsilä INTERNAL 9/8/2016 Project IRR Unleveraged project IRR in PJM with simple cycle machine! Project IRR PJM

More information

Heathrow Airport Property Rents 2016/17 Consultation Document

Heathrow Airport Property Rents 2016/17 Consultation Document Heathrow Airport Property Rents 2016/17 Consultation Document Date: 17 th June 2016 Prepared by: Heathrow Airport Limited Status: Final Page 1 of 13 Contents 1.0 Introduction 2.0 Heathrow Property Rents

More information

FACILITATION PANEL (FALP)

FACILITATION PANEL (FALP) International Civil Aviation Organization WORKING PAPER FALP/10-WP/19 Revised 29/8/18 FACILITATION PANEL (FALP) TENTH MEETING Montréal, 10-13 September 2018 Agenda Item 6: Other matters FACILITATION FOR

More information

COORDINATED BALANCING AREAS

COORDINATED BALANCING AREAS COORDINATED BALANCING AREAS WGAS/SG I&P Den Hague, 2016/04/13 Contents Introduction Analysis on Key Requirements Evaluation of CoBA Designs Conclusions Page 1 Introduction Background and Motivation Structuring

More information

Mathcad Prime 3.0. Curriculum Guide

Mathcad Prime 3.0. Curriculum Guide Mathcad Prime 3.0 Curriculum Guide Live Classroom Curriculum Guide Mathcad Prime 3.0 Essentials Advanced Functionality using Mathcad Prime 3.0 Mathcad Prime 3.0 Essentials Overview Course Code Course Length

More information

Heathrow Airport Property Rents 2013/14 Consultation Document

Heathrow Airport Property Rents 2013/14 Consultation Document Heathrow Airport Property Rents 2013/14 Consultation Document Date: 5 th July 2013 Prepared By: Heathrow Airport Limited Status: Final Page 1 of 11 Heathrow Airport Property Rents Consultation Heathrow

More information

Carbon Adder and Cost Allocation

Carbon Adder and Cost Allocation Carbon Adder and Cost Allocation Aleks Mitreski Aleksandar.mitreski@brookfieldrenewable.com November 10, 2016 Brookfield Renewable A Leader in Renewable Power Generation Brookfield Renewable 2 One of the

More information

Revalidation: Recommendations from the Task and Finish Group

Revalidation: Recommendations from the Task and Finish Group Council meeting 12 January 2012 01.12/C/03 Public business Revalidation: Recommendations from the Task and Finish Group Purpose This paper provides a report on the work of the Revalidation Task and Finish

More information

SAMTRANS TITLE VI STANDARDS AND POLICIES

SAMTRANS TITLE VI STANDARDS AND POLICIES SAMTRANS TITLE VI STANDARDS AND POLICIES Adopted March 13, 2013 Federal Title VI requirements of the Civil Rights Act of 1964 were recently updated by the Federal Transit Administration (FTA) and now require

More information

DANUBE FAB real-time simulation 7 November - 2 December 2011

DANUBE FAB real-time simulation 7 November - 2 December 2011 EUROCONTROL DANUBE FAB real-time simulation 7 November - 2 December 2011 Visitor Information DANUBE FAB in context The framework for the creation and operation of a Functional Airspace Block (FAB) is laid

More information

SECTOR ASSESSMENT (SUMMARY): Transport, and Information and Communication Technology - Air Transport 1

SECTOR ASSESSMENT (SUMMARY): Transport, and Information and Communication Technology - Air Transport 1 Air Transport Connectivity Enhancement Project (RRP BHU 44239-013) SECTOR ASSESSMENT (SUMMARY): Transport, and Information and Communication Technology - Air Transport 1 Sector Road Map 1. Sector Performance,

More information

According to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the elements that affect airfield capacity include:

According to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the elements that affect airfield capacity include: 4.1 INTRODUCTION The previous chapters have described the existing facilities and provided planning guidelines as well as a forecast of demand for aviation activity at North Perry Airport. The demand/capacity

More information

Integrated SWIM. Federal Aviation Administration Presented to: Interregional APAC/EUR/MID Workshop>

Integrated SWIM. Federal Aviation Administration Presented to: Interregional APAC/EUR/MID Workshop> Integrated SWIM Administration Services Presented to: Interregional APAC/EUR/MID Workshop> By: Jeri Groce; SWIM Program Manager Date: 4 October, 2017 Agenda Introduction Business Services SWIM Services

More information

LINCOLNSHIRE PARKING POLICY DRAFT

LINCOLNSHIRE PARKING POLICY DRAFT LINCOLNSHIRE PARKING POLICY DRAFT Draft 17/11/11 1 of 7 1. Introduction This document sets out and explains the County Councils Parking Policy. The County Council is planning to apply for powers to take

More information

A MAGAZINE FOR AIRLINE EXECUTIVES 2011 Issue No. 1. T a k i n g y o u r a i r l i n e t o n e w h e i g h t s. America aviation

A MAGAZINE FOR AIRLINE EXECUTIVES 2011 Issue No. 1. T a k i n g y o u r a i r l i n e t o n e w h e i g h t s. America aviation A MAGAZINE FOR AIRLINE EXECUTIVES 2011 Issue No. 1 T a k i n g y o u r a i r l i n e t o n e w h e i g h t s SkyTeam: Caring More About You A Conversation With É Leo van Wijk, Chairman, SkyTeam Pg. 10

More information

Appendix 8: Coding of Interchanges for PTSS

Appendix 8: Coding of Interchanges for PTSS FILE NOTE DATE 23 October 2012 AUTHOR SUBJECT Geoffrey Cornelis Appendix 8: Coding of Interchanges for PTSS 1. Introduction This notes details a proposed approach to improve the representation in WTSM

More information

MEMORANDUM. Open Section Background. I-66 Open Section Study Area. VDOT Northern Virginia District. I-66 Project Team. Date: November 5, 2015

MEMORANDUM. Open Section Background. I-66 Open Section Study Area. VDOT Northern Virginia District. I-66 Project Team. Date: November 5, 2015 MEMORANDUM To: VDOT Northern Virginia District From: I-66 Project Team Date: November 5, 2015 Subject: Open Section Background The purpose of this technical memorandum is to provide narrative and technical

More information

TERMS OF REFERENCE. Drone Advisory Committee (DAC) Role Name or Title Organization. Director, UAS Integration Office. Director, UAS Integration Office

TERMS OF REFERENCE. Drone Advisory Committee (DAC) Role Name or Title Organization. Director, UAS Integration Office. Director, UAS Integration Office TERMS OF REFERENCE Drone Advisory Committee (DAC) Committee Leadership Role Name or Title Organization Chairman Lead Designated Federal Officer Subcommittee Oversight Oversight Brian Krzanich Administrator

More information

A New Way to Work in the ERCOT Market

A New Way to Work in the ERCOT Market Siemens Energy, Inc. Power Technology Issue 111 A New Way to Work in the ERCOT Market Joseph M. Smith Senior Staff Business Development Specialist joseph_smith@siemens.com In recent months The Electric

More information

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis Appendix B ULTIMATE AIRPORT CAPACITY & DELAY SIMULATION MODELING ANALYSIS B TABLE OF CONTENTS EXHIBITS TABLES B.1 Introduction... 1 B.2 Simulation Modeling Assumption and Methodology... 4 B.2.1 Runway

More information

LINCOLNSHIRE PARKING POLICY DRAFT

LINCOLNSHIRE PARKING POLICY DRAFT LINCOLNSHIRE PARKING POLICY DRAFT Draft 23/05/11 1 of 7 1. Introduction This document sets out and explains the County Councils Parking Policy. The County Council is planning to apply for powers to take

More information

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization REPORT FOR ACTION 12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization Date: April 27, 2018 To: Toronto and East York Community Council From: Senior Strategic Director,

More information

Performance Indicator Horizontal Flight Efficiency

Performance Indicator Horizontal Flight Efficiency Performance Indicator Horizontal Flight Efficiency Level 1 and 2 documentation of the Horizontal Flight Efficiency key performance indicators Overview This document is a template for a Level 1 & Level

More information

Efficiency and Automation

Efficiency and Automation Efficiency and Automation Towards higher levels of automation in Air Traffic Management HALA! Summer School Cursos de Verano Politécnica de Madrid La Granja, July 2011 Guest Lecturer: Rosa Arnaldo Universidad

More information

Energy Networks Association

Energy Networks Association The Voice of the Networks Energy Networks Association Consultation on Radio Teleswitch Broadcasting Provision from 1 January 2018 June 2016 Consultation on Radio Teleswitch Broadcasting Provision from

More information

NATS. SAIP AD3 Jersey Interface Change Stage 1 Assessment Meeting. Friday 2 nd February x NATS presenters.

NATS. SAIP AD3 Jersey Interface Change Stage 1 Assessment Meeting. Friday 2 nd February x NATS presenters. NATS SAIP AD3 Jersey Interface Change Stage 1 Assessment Meeting Friday 2 nd February 2018 3x NATS presenters Agenda Revised Statement of need Background Issues and benefits arising from proposed change

More information

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub Report to: Greater Cambridge Partnership Joint Assembly 18 January 2018 Lead officer: Chris Tunstall GCP Director of Transport A10 Foxton level crossing bypass and travel hub 1. Purpose 1.1 The list of

More information

Sunshine Coast Airport Master Plan September 2007

Sunshine Coast Airport Master Plan September 2007 Sunshine Coast Airport Master Plan September 2007 Contents CONTENTS... I ACKNOWLEDGEMENT... II DISCLAIMER... III 1 EXECUTIVE SUMMARY...IV 1 INTRODUCTION... 1 2 AVIATION DEMAND FORECAST... 5 3 AIRCRAFT

More information

Queenstown aerodrome price proposal for night operations and building upgrade. For aircraft over five tonnes

Queenstown aerodrome price proposal for night operations and building upgrade. For aircraft over five tonnes Queenstown aerodrome price proposal for night operations and building upgrade. For aircraft over five tonnes 29 October 2014 1 Purpose This document outlines Airways proposed price increase for new lights

More information

Air Transportation Optimization. Information Sharing for Global Benefits

Air Transportation Optimization. Information Sharing for Global Benefits Air Transportation Optimization Information Sharing for Global Benefits % of total inefficiencies Executive Summary Is there a better way for the air transport community to resolve system inefficiencies

More information

London Borough of Barnet Traffic & Development Design Team

London Borough of Barnet Traffic & Development Design Team London Borough of Barnet Traffic & Development Design Team AERODROME ROAD PEDESTRIAN FACILITY AND BUS STOP INTRODUCTION FEASIBILITY REPORT Job Number: 60668 Doc Ref: S106/12-13/60668 Author: Manoj Kalair

More information

TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22)

TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22) INTERNATIONAL CIVIL AVIATION ORGANIZATION TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22) Bangkok, Thailand, 5-9 September 2011 Agenda

More information

NewGen ISS IATA EasyPay

NewGen ISS IATA EasyPay NewGen ISS IATA EasyPay A briefing document for PAPGJC V1.1, October 2016 Page 0 of 10 1. Refresher on IATA EasyPay Main features IATA EasyPay is a new industry payment method; its main features are the

More information

Advisory Circular. 1.1 Purpose Applicability Description of Changes... 2

Advisory Circular. 1.1 Purpose Applicability Description of Changes... 2 Advisory Circular Subject: Part Design Approvals Issuing Office: Standards Document No.: AC 521-007 File Classification No.: Z 5000-34 Issue No.: 01 RDIMS No.: 5612108-V33 Effective Date: 2012-03-16 1.1

More information

E190 REPLACEMENT & FLEET UPDATE JULY 11, 2018

E190 REPLACEMENT & FLEET UPDATE JULY 11, 2018 1 E190 REPLACEMENT & FLEET UPDATE JULY 11, 2018 SAFE HARBOR This presentation contains forward-looking statements within the meaning of the Private Securities Litigation Reform Act of 1995, Section 27A

More information

RNP AR APCH Approvals: An Operator s Perspective

RNP AR APCH Approvals: An Operator s Perspective RNP AR APCH Approvals: An Operator s Perspective Presented to: ICAO Introduction to Performance Based Navigation Seminar The statements contained herein are based on good faith assumptions and provided

More information

LAMP 2 - FASI(S) Network

LAMP 2 - FASI(S) Network Future Airspace Strategy Implementation South: ATS Route Network managed by NERL under London Airspace Management Programme 2 LAMP 2 - FASI(S) Network Stage 1 Assessment Meeting Friday 23 rd February 2018

More information

Mathcad Prime Curriculum Guide

Mathcad Prime Curriculum Guide Mathcad Prime Curriculum Guide Web Based Curriculum Guide Mathcad Prime 1.0 - Application Orientation Mathcad Prime 1.0 - Plotting Mathcad Prime 1.0 - Working With Units Mathcad Prime 1.0 - Solving Equations

More information

PASSENGER SHIP SAFETY. Damage stability of cruise passenger ships. Submitted by the Cruise Lines International Association (CLIA) SUMMARY

PASSENGER SHIP SAFETY. Damage stability of cruise passenger ships. Submitted by the Cruise Lines International Association (CLIA) SUMMARY E MARITIME SAFETY COMMITTEE 93rd session Agenda item 6 MSC 93/6/6 11 March 2014 Original: ENGLISH PASSENGER SHIP SAFETY Damage stability of cruise passenger ships Submitted by the Cruise Lines International

More information

Heathrow Airport Property Rents Consultation Document

Heathrow Airport Property Rents Consultation Document Heathrow Airport Property Rents Consultation Document Date: 26 th May 2011 Prepared By: Heathrow Airport Limited Status: Final Page 2 of 12 Heathrow Airport Property Rents Consultation Heathrow Property

More information

Safety Enhancement SE ASA Design Virtual Day-VMC Displays

Safety Enhancement SE ASA Design Virtual Day-VMC Displays Safety Enhancement SE 200.2 ASA Design Virtual Day-VMC Displays Safety Enhancement Action: Implementers: (Select all that apply) Statement of Work: Manufacturers develop and implement virtual day-visual

More information

Export Subsidies in High-Tech Industries. December 1, 2016

Export Subsidies in High-Tech Industries. December 1, 2016 Export Subsidies in High-Tech Industries December 1, 2016 Subsidies to commercial aircraft In the large passenger aircraft market, there are two large firms: Boeing in the U.S. (which merged with McDonnell-Douglas

More information

Rethink Vancouver. Tourism Industry Summit. March 31, 2011

Rethink Vancouver. Tourism Industry Summit. March 31, 2011 Rethink Vancouver Tourism Industry Summit March 31, 2011 SUMMIT INTRODUCTION James Terry, Chairman Rethink Vancouver Advisory Council SIX QUESTIONS FOR TODAY S DISCUSSION 1. Should there be a larger shared

More information

Airport Slot Capacity: you only get what you give

Airport Slot Capacity: you only get what you give Airport Slot Capacity: you only get what you give Lara Maughan Head Worldwide Airport Slots 12 December 2018 Good afternoon everyone, I m Lara Maughan head of worldwide airports slots for IATA. Over the

More information

Advisory Circular. 1.1 Purpose Applicability Description of Changes... 2

Advisory Circular. 1.1 Purpose Applicability Description of Changes... 2 Advisory Circular Subject: Issuing Office: Standards Document No.: AC 521-006 File Classification No.: Z 5000-34 Issue No.: 01 RDIMS No.: 5611040-V40 Effective Date: 2012-03-16 1.1 Purpose... 2 1.2 Applicability...

More information

Total Airport Management Solution DELIVERING THE NEXT GENERATION AIRPORT

Total Airport Management Solution DELIVERING THE NEXT GENERATION AIRPORT Total Airport Management Solution DELIVERING THE NEXT GENERATION AIRPORT Benefits of Total Airport Management Greater end-to-end visibility across landside and airside operations More accurate passenger

More information

Memorandum. Roger Millar, Secretary of Transportation. Date: April 5, Interstate 90 Operations and Mercer Island Mobility

Memorandum. Roger Millar, Secretary of Transportation. Date: April 5, Interstate 90 Operations and Mercer Island Mobility Memorandum To: From: The Honorable Dow Constantine, King County Executive; The Honorable Ed Murray, City of Seattle Mayor; The Honorable Bruce Bassett, City of Mercer Island Mayor; The Honorable John Stokes,

More information

DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, FloridaExpressLanes.com

DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, FloridaExpressLanes.com DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, 2017 FloridaExpressLanes.com This page intentionally left blank. TABLE OF CONTENTS List of Figures... ii List of Tables.... ii

More information

CENTRAL AIR TRAFFIC FLOW MANAGEMENT ( C-ATFM ) INDIA CATFM. ATFM Global Symposium /22/2017 ATFM Global Symposium 2017

CENTRAL AIR TRAFFIC FLOW MANAGEMENT ( C-ATFM ) INDIA CATFM. ATFM Global Symposium /22/2017 ATFM Global Symposium 2017 CATFM CENTRAL AIR TRAFFIC FLOW MANAGEMENT ( C-ATFM ) INDIA 1 ATFM Global Symposium-2017 Topics Topics. The Need C-ATFM Network C-ATFM Operations Current Status and Activities Challenges in Implementation

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: SUBJECT: Resubmitted: November 18, 2013 October 23, 2013 TTC Fare Policy - Requests for Fare Discounts ACTION ITEM RECOMMENDATION It

More information

5.1 Traffic and Transportation

5.1 Traffic and Transportation 5.1 When it opens in 2009, the Bellevue Nickel Improvement Project will increase the number of vehicles able to travel through the study area, improve travel speeds, and improve safety by reducing the

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization 17/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 4: Optimum Capacity and Efficiency through global collaborative

More information

Operational Evaluation of a Flight-deck Software Application

Operational Evaluation of a Flight-deck Software Application Operational Evaluation of a Flight-deck Software Application Sara R. Wilson National Aeronautics and Space Administration Langley Research Center DATAWorks March 21-22, 2018 Traffic Aware Strategic Aircrew

More information

1.0 BACKGROUND NEW VETERANS CHARTER EVALUATION OBJECTIVES STUDY APPROACH EVALUATION LIMITATIONS... 7

1.0 BACKGROUND NEW VETERANS CHARTER EVALUATION OBJECTIVES STUDY APPROACH EVALUATION LIMITATIONS... 7 New Veterans Charter Evaluation Plan TABLE CONTENTS Page 1.0 BACKGROUND... 1 2.0 NEW VETERANS CHARTER EVALUATION OBJECTIVES... 2 3.0 STUDY APPROACH... 3 4.0 EVALUATION LIMITATIONS... 7 5.0 FUTURE PROJECTS...

More information

Predicting Flight Delays Using Data Mining Techniques

Predicting Flight Delays Using Data Mining Techniques Todd Keech CSC 600 Project Report Background Predicting Flight Delays Using Data Mining Techniques According to the FAA, air carriers operating in the US in 2012 carried 837.2 million passengers and the

More information

NZQA registered unit standard version 3 Page 1 of 6

NZQA registered unit standard version 3 Page 1 of 6 Page 1 of 6 Title Demonstrate knowledge of, and competencies for, mountain flying for a commercial pilot licence (helicopter) Level 5 Credits 8 Purpose People credited with this unit standard are able,

More information

Heathrow Airport Property Rents 2017/18 Decision Document

Heathrow Airport Property Rents 2017/18 Decision Document Heathrow Airport Property Rents 2017/18 Decision Document Date: 10th November 2017 Prepared by: Heathrow Airport Limited Status: Final Contents 1.0 Introduction and Consultation Programme... 3 Purpose...

More information

EVENT CENTRE / ARENA COMPLEX

EVENT CENTRE / ARENA COMPLEX EVENT CENTRE / ARENA COMPLEX BUSINESS CASE ANALYSIS PRESENTATION TO COUNCIL JANUARY 14, 2019 PART A: PROJECT RECAP PART B: DETAILED ASSESSMENT OF THE FACILITY OPTIONS PART C: COMPARING THE OPTIONS PART

More information

FAQs Optional Payment Charge (OPC)

FAQs Optional Payment Charge (OPC) FAQs Optional Payment Charge (OPC) Version: 2.0 Author: Lufthansa Group Updated: Lufthansa, 20 th March 2012 1 Background & Basic Information... 1 1.1 What is the meaning of Optional Payment Charge (OPC)?...

More information

WORLDWIDE AIR TRANSPORT CONFERENCE: CHALLENGES AND OPPORTUNITIES OF LIBERALIZATION. Montreal, 24 to 29 March 2003

WORLDWIDE AIR TRANSPORT CONFERENCE: CHALLENGES AND OPPORTUNITIES OF LIBERALIZATION. Montreal, 24 to 29 March 2003 26/2/03 English only WORLDWIDE AIR TRANSPORT CONFERENCE: CHALLENGES AND OPPORTUNITIES OF LIBERALIZATION Montreal, 24 to 29 March 2003 Agenda Item 1: Preview 1.1: Background to and experience of liberalization

More information

Distributed Multi-Nodal ATFM Project Overview & Progress. ICAO MID ATFM/TF/1 & ICAO World Cup 2022 TF/ Sep 2018

Distributed Multi-Nodal ATFM Project Overview & Progress. ICAO MID ATFM/TF/1 & ICAO World Cup 2022 TF/ Sep 2018 Distributed Multi-Nodal ATFM Project Overview & Progress ICAO MID ATFM/TF/1 & ICAO World Cup 2022 TF/1 23 27 Sep 2018 Introduction DISTRIBUTED MULTI-NODAL AIR TRAFFIC FLOW MANAGEMENT What We Are Trying

More information

Feasibility Study Federal Inspection Service Facility at Long Beach Airport

Feasibility Study Federal Inspection Service Facility at Long Beach Airport Feasibility Study Federal Inspection Service Facility at Long Beach Airport 13 December 2016 Long Beach City Council PLEASE NOTE: The information, analysis, assessments and opinions contained in this presentation

More information

FAA Draft Order CHG Designee Policy. Comments on the Draft Order published online for public comment

FAA Draft Order CHG Designee Policy. Comments on the Draft Order published online for public comment FAA Draft Order 8900.1 CHG Designee Policy Comments on the Draft Order published online for public comment Submitted to the FAA via email at katie.ctr.bradford@faa.gov Submitted by the Modification and

More information

CAIRNS RECTANGULAR PITCH STADIUM NEEDS STUDY PART 1 CAIRNS REGIONAL COUNCIL DRAFT REPORT SEPTEMBER 2011

CAIRNS RECTANGULAR PITCH STADIUM NEEDS STUDY PART 1 CAIRNS REGIONAL COUNCIL DRAFT REPORT SEPTEMBER 2011 CAIRNS RECTANGULAR PITCH STADIUM NEEDS STUDY PART 1 CAIRNS REGIONAL COUNCIL DRAFT REPORT SEPTEMBER 2011 CAIRNS RECTANGULAR PITCH STADIUM NEEDS STUDY PART 1 Cairns Regional Council September 2011 Coffey

More information

Aviation Activity Forecast

Aviation Activity Forecast To: RANDY HALL, MAYOR, CITY OF KETCHUM To: WAYNE WILLICH, MAYOR, CITY OF SUN VALLEY From: Mark Heusinkveld, Rex Edwards Cc: Cayla Morgan, Mark Perryman, Sarah Potter Date: March 26, 2009 Re: Stakeholder

More information

A carbon offsetting and reduction scheme for international aviation

A carbon offsetting and reduction scheme for international aviation Regulatory Impact Statement A carbon offsetting and reduction scheme for international aviation Agency Disclosure Statement The Ministry of Transport (the Ministry) has prepared this Regulatory Impact

More information

2 nd National Airspace System Infrastructure Management Conference

2 nd National Airspace System Infrastructure Management Conference The National Center of Excellence Federal Aviation Administration For Aviation Operations Research 2 nd National Airspace System Infrastructure Management Conference NAS Infrastructure in Transition University

More information

CHAPTER 5 SIMULATION MODEL TO DETERMINE FREQUENCY OF A SINGLE BUS ROUTE WITH SINGLE AND MULTIPLE HEADWAYS

CHAPTER 5 SIMULATION MODEL TO DETERMINE FREQUENCY OF A SINGLE BUS ROUTE WITH SINGLE AND MULTIPLE HEADWAYS 91 CHAPTER 5 SIMULATION MODEL TO DETERMINE FREQUENCY OF A SINGLE BUS ROUTE WITH SINGLE AND MULTIPLE HEADWAYS 5.1 INTRODUCTION In chapter 4, from the evaluation of routes and the sensitive analysis, it

More information

Appendix F International Terminal Building Main Terminal Departures Level and Boarding Areas A and G Alternatives Analysis

Appendix F International Terminal Building Main Terminal Departures Level and Boarding Areas A and G Alternatives Analysis Appendix F International Terminal Building Main Terminal Departures Level and Boarding Areas A and G Alternatives Analysis ITB MAIN TERMINAL DEPARTURES LEVEL & BOARDING AREAS A & G ALTERNATIVES ANALYSIS

More information

sdrftsdfsdfsdfsdw Comment on the draft WA State Aviation Strategy

sdrftsdfsdfsdfsdw Comment on the draft WA State Aviation Strategy sdrftsdfsdfsdfsdw Comment on the draft WA State Aviation Strategy 1 P a g e 2 P a g e Tourism Council WA Comment on the Draft WA State Aviation Strategy Introduction Tourism Council WA supports the overall

More information

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012 1. Introduction The Federal Aviation Administration (FAA) recommends that airport master plans be updated every 5 years or as necessary to keep them current. The Master Plan for Joslin Field, Magic Valley

More information

Evaluation of Pushback Decision-Support Tool Concept for Charlotte Douglas International Airport Ramp Operations

Evaluation of Pushback Decision-Support Tool Concept for Charlotte Douglas International Airport Ramp Operations Evaluation of Pushback Decision-Support Tool Concept for Charlotte Douglas International Airport Ramp Operations Miwa Hayashi, Ty Hoang, Yoon Jung NASA Ames Research Center Waqar Malik, Hanbong Lee Univ.

More information

American Institute of Aeronautics and Astronautics

American Institute of Aeronautics and Astronautics Speech by Jeff Hmara to the American Institute of Aeronautics and Astronautics Tuesday April 25, 2002 FREE FLIGHT 1500 K Street, NW Suite 500 Washington, DC 20005 WHAT IS FREE FLIGHT?...3 CORE CAPABILITIES...3

More information

Welcome to this introduction to the Airman Certification Standards, or ACS, concept. This presentation has two goals.

Welcome to this introduction to the Airman Certification Standards, or ACS, concept. This presentation has two goals. Welcome to this introduction to the Airman Certification Standards, or ACS, concept. This presentation has two goals. First is to provide basic information on a new, industry-developed Airman Certification

More information

Operations Control Centre perspective. Future of airline operations

Operations Control Centre perspective. Future of airline operations Operations Control Centre perspective Future of airline operations This brochure was developed based on the results provided by the OCC project as part of the SESAR programme. This project was managed

More information

For personal use only

For personal use only asx release 21 October 2015 Presentation to Morgans Queensland Conference Please find attached the presentation that Transurban CEO Scott Charlton will be delivering at today s Morgans Queensland Conference.

More information

Performance Metrics for Oceanic Air Traffic Management. Moving Metrics Conference Pacific Grove, California January 29, 2004 Oceanic Metrics Team

Performance Metrics for Oceanic Air Traffic Management. Moving Metrics Conference Pacific Grove, California January 29, 2004 Oceanic Metrics Team Performance Metrics for Oceanic Air Traffic Management Moving Metrics Conference Pacific Grove, California January 29, 2004 Oceanic Metrics Team Agenda Metrics Team Michele Merkle, FAA AUA-600 Lynne Hamrick,

More information

easyjet response to the European Commission consultation on the aviation package for improving the competitiveness of the EU aviation sector

easyjet response to the European Commission consultation on the aviation package for improving the competitiveness of the EU aviation sector easyjet response to the European Commission consultation on the aviation package for improving the competitiveness of the EU aviation sector Introduction easyjet started flying in 1995. Since then we have

More information

Surveillance and Broadcast Services

Surveillance and Broadcast Services Surveillance and Broadcast Services Benefits Analysis Overview August 2007 Final Investment Decision Baseline January 3, 2012 Program Status: Investment Decisions September 9, 2005 initial investment decision:

More information

Changi Airport A-CDM Handbook

Changi Airport A-CDM Handbook Changi Airport A-CDM Handbook Intentionally left blank Contents 1. Introduction... 3 2. What is Airport Collaborative Decision Making?... 3 3. Operating concept at Changi... 3 a) Target off Block Time

More information

Inland Queensland Roads Action Plan

Inland Queensland Roads Action Plan Inland Queensland Roads Action Plan Creating jobs. Driving Productivity. Attracting Investment Glenys Schuntner IQ-RAP Secretariat RDA Townsville and North West Queensland Chief Executive Officer Overview

More information

Assessing Benefits for Airborne Flight Planners as Part of the Future NAS

Assessing Benefits for Airborne Flight Planners as Part of the Future NAS 2 nd USA/EUROPE AIR TRAFFIC MANAGEMENT R&D SEMINAR Orlando,1 st - 4 th December 1998 Assessing Benefits for Airborne Flight Planners as Part of the Future NAS Monica Hughes National Aeronautics and Space

More information

Performance monitoring report for 2014/15

Performance monitoring report for 2014/15 Performance monitoring report for 20/15 Date of issue: August 2015 Gatwick Airport Limited Summary Gatwick Airport is performing well for passengers and airlines, and in many aspects is ahead of the performance

More information

PROPOSED AQUATIC FACILITY FEES. Dallas Park and Recreation Board December 15, 2016

PROPOSED AQUATIC FACILITY FEES. Dallas Park and Recreation Board December 15, 2016 PROPOSED AQUATIC FACILITY FEES Dallas Park and Recreation Board December 15, 2016 Purpose To review and consider the fees for the new Family Aquatic Centers scheduled to open in 2018 and 2019 2 Background

More information

Airport Capacity, Airport Delay, and Airline Service Supply: The Case of DFW

Airport Capacity, Airport Delay, and Airline Service Supply: The Case of DFW Airport Capacity, Airport Delay, and Airline Service Supply: The Case of DFW Faculty and Staff: D. Gillen, M. Hansen, A. Kanafani, J. Tsao Visiting Scholar: G. Nero and Students: S. A. Huang and W. Wei

More information

UC Berkeley Working Papers

UC Berkeley Working Papers UC Berkeley Working Papers Title The Value Of Runway Time Slots For Airlines Permalink https://escholarship.org/uc/item/69t9v6qb Authors Cao, Jia-ming Kanafani, Adib Publication Date 1997-05-01 escholarship.org

More information

Virgin Atlantic Airways Limited Global BSP Agency Debit Memo Policy

Virgin Atlantic Airways Limited Global BSP Agency Debit Memo Policy Virgin Atlantic Airways Limited Global BSP Agency Debit Memo Policy Introduction In accordance with IATA Resolution 850m, the Virgin Atlantic Airways Ltd Global BSP Agency Debit Memo Policy clarifies the

More information

PERFORMANCE MEASURE INFORMATION SHEET #16

PERFORMANCE MEASURE INFORMATION SHEET #16 PERFORMANCE MEASURE INFORMATION SHEET #16 ARROW LAKES RESERVOIR: RECREATION Objective / Location Recreation/Arrow Lakes Reservoir Performance Measure Access Days Units Description MSIC 1) # Access Days

More information

FUTURE AIRSPACE CHANGE

FUTURE AIRSPACE CHANGE HEATHROW EXPANSION FUTURE AIRSPACE CHANGE UPDATE SEPTEMBER 2018 On 25 June 2018, Parliament formally backed Heathrow expansion, with MPs voting in support of the Government s Airports National Policy Statement

More information

AFI REGIONAL DATA LINK MONITORING AGENCY (DL/CMRA)

AFI REGIONAL DATA LINK MONITORING AGENCY (DL/CMRA) AFI REGIONAL DATA LINK MONITORING AGENCY (DL/CMRA) APIRG Infrastructure and Information Management Sub-Group (IIM/SG) 27-30 June 2017 Nairobi Josiah BACKOBI Regional Manager Safety & Flight Operations

More information

Integration of Pedestrian Traffic Signal Control within SCOOT-UTC Systems

Integration of Pedestrian Traffic Signal Control within SCOOT-UTC Systems Traffic Advisory Leaflet 2/09 April 2009 Integration of Pedestrian Traffic Signal Control within SCOOT-UTC Systems Introduction SCOOT 1,2,3 (Split Cycle and Offset Optimisation Technique) is an adaptive

More information