Get a higher Return On Investment with Wärtsilä

Size: px
Start display at page:

Download "Get a higher Return On Investment with Wärtsilä"

Transcription

1 Get a higher Return On Investment with Wärtsilä Wärtsilä reciprocating engine technology outperforms gas turbines in the ISO-NE market Joseph Ferrari Wärtsilä

2 Wärtsilä Founded in 1834 Headquarters in Helsinki Finland Net Sales 4.7 billion (2013) ~ 18,700 people worldwide Reciprocating, or Internal Combustion Engines 182+ GW installed globally 58+ GW installed power plants (2.7+GW in the US) 2

3 ISO-NE Wärtsilä solutions maximize returns for investors. Results are focused on Equity IRR, but have parallels and meaning for Utility Cooperative Municipal and Industrial investors as well. 3

4 WHAT WE LL COVER Wärtsilä Strengths, Conditions and Business Case Zonal Analysis (ISO-NE zone, tech pricing & parameters, etc.) Investment benefits Wärtsilä brings - By trading strategy (DA, DART, DART+AS) and - Relative to other gas-fired options Extending results to the rest of ISO-NE Incentivizing Flexibility impact of true Real Time Market Settlement 4

5 STRENGTHS, CONDITIONS AND BUSINESS CASE Reciprocating engine Strength Market conditions Business case Operational FLEXIBILITY Volatility Optimization of market operations Dual Fuel (on the fly) 2-5 min start 20% MSL Ramp to full load < 1 min No start costs Min up time ~ 0, min down time 5 min 5

6 COMPARATIVE ANALYSIS STRESSING VALUE OF FLEXIBILITY Traditional 20 year analyses focuses on DA energy Lucrative potential for revenues from - Real Time - Ancillary Services Units with greater flexibility more able to capture these revenue streams. - Wärtsilä customers in other markets take full advantage of this We show financial performance for units - In DAY AHEAD (DA) Market only - In Day Ahead + Real Time (DART) markets - In DART plus Ancillary Services (DARTAS) Comparative: Results for Wärtsilä relative to that of other gas-fired solutions (Simple and Combined Cycle GTs) 6

7 WHAT PART OF ISO-NE? Ascend Analytics (Colorado). 7

8 MODELING APPROACH BACK-CAST Use Simulation tool to find average costs and revenues from (inclusive) 20 YEAR FORWARD Average Costs and Revenues (from backcast) used as common values for next 20 years (considered indicative). EQUITY IRR Calculated for the projected 20 year project / financing timespan 8

9 MODELING APPROACH Back-cast 20 yr. forward Technical input Heat rates (GTPro) Part load heat rates Variable O&M cost Capacity derating Start-up times Start-up costs Market input Day-ahead prices Real Time Market prices Ancillary service prices Daily gas price Modeling platform Excel tool for backcast analysis 5 minute granularity to analyze the real time market Optimize the operation of asset against the LMP and offer capacity optimally between energy and A/S Assumes that capacity fits into the merit if it is feasible to operate the plant Takes into account temperature derating on hourly level Market model outputs Running hours and number of starts 5 minute dispatch profile Revenue per market Operating costs (fuel, VOM, start-up costs) Gross margin from the market + operations Investment inputs Investment cost Fixed Operation & Maintenance costs Capital structure Financial model Project feasibility Project IRR Equity IRR Cash flows Cost of capital Site input Elevation Hourly temperature data Capacity market income 9

10 CAPACITY OPTIONS & INVESTMENT COSTS Looking at 50 to 200 MW simple cycle projects, EPC (everything inside the fence) and assuming all options are dual fuel. Wärtsilä 18V50DF 900 $/kw 100 MW Aero GTs 900 $/kw 40 MW Aero GTs 925 $/kw And assuming in large part they d be considered against a larger 1x1 Frame CCGT (318 MW) 1100 $/kw For all the investment cost was EPC plus a 15% adder for Owners Cost 10

11 ADDITIONAL INVESTMENT INPUTS Factor Value Equity/Debt 30%/70% Debt interest 5% Loan term 20 years Tax rate 37.5 % FOM 10 $/kw-yr 11

12 TECHNICAL INPUTS Unit 18V50DF 40 MW Aero GT 100 MW Aero GT 300 MW CCGT Output (Unit) 16.8 MW 41 MW 102 MW 318 MW Heat Rate 8,400 Btu/KWh 9,365 Btu/KWh 9,105 Btu/KWh 7,000 Btu/kWh Minimum stable load 20% 40% 40% 40% Heat Rate at minimum stable load 11,267 Btu/KWh 12,534 Btu/KWh 12,190 Btu/KWh 8,170 Btu/kWh Start-up time to full load 5 min 10 min 10 min 60 min Start-up cost (maintenance) 0 USD/start 0 USD/start 0 USD/start 25,000 USD/start VOM 5.5 USD/MWh 4.0 USD/MWh 4.0 USD/MWh 1 USD/MWh FOM 10 USD/kW/year 10 USD/kW/year 10 USD/kW/year 10 USD/kW-yr Estimated Water (gal / MWh) 0 0 (dry) 75 (Sprint) Water injected 30 dry IC 140 wet IC 5 ACC 250 Cooling tower 12

13 CAPACITY PRICING / PAYMENTS Finalized capacity auction results confirm resources, prices fo New England power system in From page 2: Used in this analysis 10 $/kw-mo (y 1-7) 7 $/kw-mo (y 8-20) 13

14 RESULTS Day Ahead (DA), Energy Only Day Ahead + Real Time (DART) Energy DART + Ancillary Services (Regulation), (DARTAS) 14

15 Wärtsilä 40 MW GT 100 MW GT 1x1 CCGT Wärtsilä 40 MW GT 100 MW GT 1x1 CCGT Wärtsilä 40 MW GT 100 MW GT 1x1 CCGT Wärtsilä 40 MW GT 100 MW GT 1x1 CCGT Wärtsilä 40 MW GT 100 MW GT 1x1 CCGT Operating Hours Number of Starts OPERATING PROFILES (DA) Day Ahead Energy Average As expected: Operating Hours a function of efficiency Number of Starts a function of Flexibility 15

16 ( $ per MW installed ) GROSS MARGINS (MARKET REVENUE / MW INSTALLED) Average Gross Margin (Day Ahead Energy) Wärtsilä 40 MW GT 100 MW GT 1x1 CCGT 16

17 DAY AHEAD 12 X WÄRTSILÄ 18V50DF 17

18 DAY AHEAD 2 X 100 MW AERO GTS 18

19 DAY AHEAD 5 X 40 MW AERO GTS 19

20 DAY AHEAD 1 X 1 FRAME CCGT 20

21 EQUITY IRR DAY AHEAD SUMMARY, EQUITY IRRs ISO-NE, WCMASS 15.8% 14.4% 11.6% 13% W50DF 100 MW GT 40 MW GT Frame CCGT 21

22 RESULTS Day Ahead (DA), Energy Only Day Ahead + Real Time (DART) Energy DART + Ancillary Services (Regulation), (DARTAS) 22

23 Wärtsilä 40 MW GT 100 MW GT 1x1 CCGT Wärtsilä 40 MW GT 100 MW GT 1x1 CCGT Wärtsilä 40 MW GT 100 MW GT 1x1 CCGT Wärtsilä 40 MW GT 100 MW GT 1x1 CCGT Wärtsilä 40 MW GT 100 MW GT 1x1 CCGT Operating Hours Number of Starts OPERATING PROFILES (DA + RT, OR DART) Day Ahead + Real Time Energy Average 23

24 ( $ per MW installed ) GROSS MARGINS (MARKET REVENUE / MW INSTALLED) Average Gross Margin (Day Ahead + Real Time Energy) Wärtsilä 40 MW GT 100 MW GT 1x1 CCGT 24

25 EQUITY IRR DART SUMMARY, EQUITY IRRs ISO-NE, WCMASS 19.4% 16.9% 13.9% 14% W50DF 100 MW GT 40 MW GT Frame CCGT 25

26 RESULTS Day Ahead (DA), Energy Only Day Ahead + Real Time (DART) Energy DART + Ancillary Services (Regulation), (DARTAS) 26

27 NOTE ON ANCILLARY SERVICES Reserve (spin & nonspin) as per Forward Reserve Market (not included in this analysis). Regulation is per 5-min market with hourly settlement Due to limited data availability (historical) this analysis looks at RegCP relative to energy prices and assumes plant dispatches for Energy + Reg if the revenue is greater than that from energy alone. Therefore revenue benefits from AS (Regulation) in the ISO-NE market is Conservative (under-valued). Figures from: 27

28 Wärtsilä 40 MW GT 100 MW GT 1x1 CCGT Wärtsilä 40 MW GT 100 MW GT 1x1 CCGT Wärtsilä 40 MW GT 100 MW GT 1x1 CCGT Wärtsilä 40 MW GT 100 MW GT 1x1 CCGT Wärtsilä 40 MW GT 100 MW GT 1x1 CCGT Operating Hours Number of Starts OPERATING PROFILES (DART+AS, OR DARTAS) DA+RT Energy + Regulation Average 28

29 ( $ per MW installed ) GROSS MARGINS (MARKET REVENUE / MW INSTALLED) Average Gross Margin (DART + Regulation) Wärtsilä 40 MW GT 100 MW GT 1x1 CCGT 29

30 EQUITY IRR DARTAS SUMMARY, EQUITY IRRs These returns (especially for Wärtsilä) are indicative and conservative as they only represent the $/MWh dispatch against RegCP. ISO-NE, WCMASS 20.8% 17.6% 14.3% 15% W50DF 100 MW GT 40 MW GT Frame CCGT 30

31 OF NOTE WÄRTSILÄ DF SOLUTIONS VS. SG What if your site/application does not need Dual Fuel Capability? Wärtsilä would offer 18V50SG Higher unit output (18.4 MW net vs MW) Lower heat rate (8130 Btu/kWh HHV net, vs. 8400) Lower Capex $50 to 100/kW less expensive) Gas turbine alternatives may also be lower Capex, but their gas performance would not improve. Returns for a pure gas Wärtsilä offering would be Higher than indicated in this analysis Have even greater returns relative to gas turbine options 31

32 APPLICATION TO OTHER ZONES IN ISO-NE? Reciprocating engine Strength Operational FLEXIBILITY Includes Efficiency- What other zones have similar market pricing? Market conditions Volatility Which Zones w/similar market pricing have similar volatility? Business case Optimization of market operations Similar Pricing & Volatility indicates similar business case. 32

33 DAY AHEAD ZONAL STATS Observations 1) DA Pricing going up ( ) 2) DA Volatility going up ( ) 3) Not clear which zones similar to WCMASS 33

34 REAL TIME ZONAL STATS Observations 1) RT Pricing going up ( ) 2) RT Volatility going up ( ) 3) Not clear which zones similar to WCMASS 34

35 WHICH ZONES? Highest prices & volatility (DA & RT) revenues influence financial outcomes (IRRs) Look just at 2014: Zonal prices and volatility relative to WCMASS 2014 Statistics CT CA ME NEMASSBOST NH RI SEMASS VT WCMASS Avg. DA price (Zone/WCMASS) Volatility DA price (Zone/WCMASS) Avg. RT price (Zone/WCMASS) Volatility RT price (Zone/WCMASS) Similarity Metric

36 ZONES WITH EXPECTED MARKET OUTCOMES SIMILAR TO WCMASS Indicated areas would have similar outcomes- in which ICEs provide greater return on investment relative to simple or combined cycle GTs CA = Control Area - everything in ISO-NE except northern Maine, connected to Canada. So the similarity of CA implies much of New England would benefit from fast, flexible ICEs 36

37 INCENTIVIZING FLEXIBILITY IN ISO-NE ISO-NE Initiative: Subhourly Real-Time Settlement Key Project Project Overview * The ISO is evaluating a move to a subhourly settlement interval for generation resources, external transactions, dispatchable asset-related demand resources, and demand-response resources in the real-time markets. The real-time markets (energy, reserve, and regulation) are settled hourly, even though the ISO calculates real-time locational marginal prices (LMPs) every five minutes. Existing settlement rules tend to undercompensate certain resources, particularly more flexible generation and storage assets that respond quickly when system events result in tight operating conditions and there are significant midhour price changes. Compensating resources at the more granular, five-minute price would help improve price formation by ensuring that the price suppliers are paid for real-time performance is a more accurate market signal of the power system s current operating conditions. * From: 37

38 EXAMPLE OF VALUE 5-MIN RT SETTLEMENT WOULD BRING TO FLEXIBLE GENERATION Focal Zone = WCMASS Node ID 4355 (randomly chosen) Month = January 2015 Data collected Hourly average RT pricing ($/MWh) Actual 5-min RT pricing ($/MWh) Gross Revenue using hourly Avg RT settlement (the old way) vs. Gross Revenue using proposed 5-min RT settlement (the new way) 38

39 VISUAL EXAMPLE (REPRESENTATIVE) RT Dispatch 39

40 VISUAL EXAMPLE (REPRESENTATIVE) 182 $/MW with proposed 5-min settlement 103 $/MW with existing hourly settlement 40

41 VISUAL EXAMPLE (REPRESENTATIVE) RT Commit DA commit 330 $/MW, hourly settlement 419 $/MW, 5-min RT settlement 41

42 5-MIN RT SETTLEMENT BENEFITS WÄRTSILÄ'S GREATER FLEXIBILITY Gross revenues for Wärtsilä with proposed 5-min RT settlement 26% increase RT revenue 7% increase in total revenue 40-50% greater revenue than aeroderivative GTs 42

43 Conclusions Wärtsilä maximizes returns in ISO-NE compared to other gas-fired options. In a (load serving) context, translates to Wärtsilä minimizing cost Trends mirrored in other markets as well (Alberta, ERCOT, NYISO, PJM, SPP) The value of flexibility is increasing in the market place Increasing renewable penetration = more volatility New and existing Ancillary Services need flexible capacity In ISO-NE transition to 5-min RT settlement will increase revenues, more so for units with greater flexibility (5-min start, small min up/down times, no start costs, coupled with high efficiency, e.g. Wärtsilä!) Markets recognize the value of flexibility, and it should be incorporated into investment analyses. 43

44 Joseph Ferrari Market Development Analyst

Unlocking the Value of Flexible Generation

Unlocking the Value of Flexible Generation Unlocking the Value of Flexible Generation PJM SUMMIT September 7 th 2016 Matti Rautkivi 1 Wärtsilä INTERNAL 9/8/2016 Project IRR Unleveraged project IRR in PJM with simple cycle machine! Project IRR PJM

More information

Multi fuel capability, high efficiency, and creating flexibility with Generation Resources: Internal Combustion Engines

Multi fuel capability, high efficiency, and creating flexibility with Generation Resources: Internal Combustion Engines WÄRTSILÄ Multi fuel capability, high efficiency, and creating flexibility with Generation Resources: Internal Combustion Engines John Robbins John.robbins@Wartsila.com Office 503 432 8335 Cell 503 720

More information

WÄRTSILÄ. Dan Johnson

WÄRTSILÄ. Dan Johnson WÄRTSILÄ Dan Johnson California and the West as a whole Expectations for 2020 in WECC? WA: 15% x 2020* OR: 25%x 2025* (large utilities) CA: 33% x 2020 NV: 25% x 2025* Renewable Portfolio Standard Policies

More information

Towards a 100% renewable energy future: WÄRTSILÄ Energy Solutions

Towards a 100% renewable energy future: WÄRTSILÄ Energy Solutions Towards a 100% renewable energy future: WÄRTSILÄ Energy Solutions Marco Golinelli, Director Energy Solutions X Conferenza Nazionale per l Efficienza Energetica THIS IS WÄRTSILÄ A global leader in smart

More information

Carbon Adder and Cost Allocation

Carbon Adder and Cost Allocation Carbon Adder and Cost Allocation Aleks Mitreski Aleksandar.mitreski@brookfieldrenewable.com November 10, 2016 Brookfield Renewable A Leader in Renewable Power Generation Brookfield Renewable 2 One of the

More information

Evaluation of Alternative Aircraft Types Dr. Peter Belobaba

Evaluation of Alternative Aircraft Types Dr. Peter Belobaba Evaluation of Alternative Aircraft Types Dr. Peter Belobaba Istanbul Technical University Air Transportation Management M.Sc. Program Network, Fleet and Schedule Strategic Planning Module 5: 10 March 2014

More information

POWER PLANTS FOCUS ON GAS

POWER PLANTS FOCUS ON GAS POWER PLANTS FOCUS ON GAS VESA RIIHIMÄKI President, Power Plants & Executive Vice President 1 Wärtsilä 14 November 2013 VESA RIIHIMÄKI Wind, solar and gas expected to grow strongly 2010 Hydro 20% Bioenergy

More information

Wärtsilä North America, Inc

Wärtsilä North America, Inc Wärtsilä North America, Inc December, 2012 Wayne M. Elmore Regional Director, Power Plants Sales 1 Wärtsilä Wärtsilä Corporation an overview Solutions for 18,000 professionals in over 70 countries Energy

More information

Revving Up the Latest Reciprocating Engine Technologies

Revving Up the Latest Reciprocating Engine Technologies Revving Up the Latest Reciprocating Engine Technologies March 7, 2018 Garrett Meyer Performance Engineer Reciprocating engine power plants appear in surprising places. 2 What is the technology? 3 A reciprocating

More information

WÄRTSILÄ CORPORATION INTERIM REPORT JANUARY-MARCH April 2018 Jaakko Eskola, President & CEO. Wärtsilä PUBLIC

WÄRTSILÄ CORPORATION INTERIM REPORT JANUARY-MARCH April 2018 Jaakko Eskola, President & CEO. Wärtsilä PUBLIC WÄRTSILÄ CORPORATION INTERIM REPORT JANUARY-MARCH 218 24 April 218 Jaakko Eskola, President & CEO 1 Wärtsilä PUBLIC 24 April 218 Q1 Result presentation ORDER INTAKE AND NET SALES DEVELOPED WELL IN THE

More information

SAS Q3 2017/ August 2018

SAS Q3 2017/ August 2018 SAS Q3 2017/2018 31 August 2018 Strong earnings in peak season POSITIVES Record number of passengers Total revenue up MSEK 936 vs. LY Currency adjusted yield up 1.1% vs. LY EB point sale up 27% vs. LY

More information

WÄRTSILÄ CORPORATIONO O

WÄRTSILÄ CORPORATIONO O WÄRTSILÄ CORPORATIONO O Handelsbanken Nordic Large Cap Seminar 12 September 2011 CHRISTOPH VITZTHUM GROUP VICE PRESIDENT, SERVICES 1 Wärtsilä This is Wärtsilä SHIP POWER POWER PLANTS SERVICES 2 Wärtsilä

More information

Thank you for participating in the financial results for fiscal 2014.

Thank you for participating in the financial results for fiscal 2014. Thank you for participating in the financial results for fiscal 2014. ANA HOLDINGS strongly believes that safety is the most important principle of our air transportation business. The expansion of slots

More information

Packed to perfection. FAST, FUNCTIONAL AND FLEXIBLE For industrial self-generation, small utilities, industrial and IPP customers who do not

Packed to perfection. FAST, FUNCTIONAL AND FLEXIBLE For industrial self-generation, small utilities, industrial and IPP customers who do not POWER CUBES 2 Packed to perfection Are you looking for a great package deal for power generation in the 5-30 MW range? With our GasCube and OilCube power generation solutions for smaller power plants,

More information

Bank of America Merrill Lynch Global Transportation Conference. June 16, 2010

Bank of America Merrill Lynch Global Transportation Conference. June 16, 2010 Bank of America Merrill Lynch Global Transportation Conference June 16, 2010 FORWARD-LOOKING STATEMENT Certain information in this presentation and statements made during this presentation, including any

More information

WÄRTSILÄ CORPORATION RESULT PRESENTATION JANUARY Björn Rosengren, President & CEO. Wärtsilä

WÄRTSILÄ CORPORATION RESULT PRESENTATION JANUARY Björn Rosengren, President & CEO. Wärtsilä WÄRTSILÄ CORPORATION RESULT PRESENTATION 2014 29 JANUARY 2015 Björn Rosengren, President & CEO Wärtsilä Highlights 2014 good performance in challenging markets Order intake EUR 5,084 million, +5% Net sales

More information

2010 ANNUAL GENERAL MEETING. May 4, 2010

2010 ANNUAL GENERAL MEETING. May 4, 2010 2010 ANNUAL GENERAL MEETING May 4, 2010 FORWARD-LOOKING STATEMENT Certain information in this presentation and statements made during this presentation, including any question and answer session, may contain

More information

Special Pricing Rule Updates

Special Pricing Rule Updates Special Pricing Rule Updates Michael DeSocio Manager, Energy Market Design New York Independent System Operator MIWG June 28, 2013 NYISO KCC Conference Center 2013 New York Independent System Operator,

More information

SAS Q2 2017/2018 TELECONFERENCE

SAS Q2 2017/2018 TELECONFERENCE SAS Q2 2017/2018 TELECONFERENCE 30 May 2018 Earnings as expected despite negative currency effect POSITIVES + Total revenue up MSEK 73 vs. LY + Currency adjusted yield up 0.6% vs. LY + EB-point sale revenue

More information

SAS Q1 2016/

SAS Q1 2016/ SAS Q1 2016/2017 08.03.2017 Weak Q1 as expected new structural actions underway Q1 in summary Positives + Currency adjusted passenger revenue up 5% + Strong development of ancillary revenues + Passengers

More information

GATWICK AIRPORT JOINS VINCI AIRPORTS December 2018

GATWICK AIRPORT JOINS VINCI AIRPORTS December 2018 GATWICK AIRPORT JOINS VINCI AIRPORTS December 2018 Asset presentation Gatwick is the 2 nd largest airport in the UK and the 8 th busiest in Europe with 46 mpax Key features 46 mpaxin FY18, in the wealthiest

More information

Wärtsilä Scrubber Retrofit

Wärtsilä Scrubber Retrofit Wärtsilä Scrubber Retrofit Wärtsilä Marine Solutions / Environmental Solutions 1 Wärtsilä 4 November 2016 Wärtsilä Scrubber Retrofit 2016 RETROFITTING ALTERNATIVES EQUIPMENT ONLY SITE ADVISORY INSTALLATION

More information

Air Transport Industry

Air Transport Industry Air Transport Industry Structure, Economics, Operations Northwestern University Transportation Center April 28, 2016 Peter L. Smith Context The Presenter BA Harvard, MST Northwestern, MBA Foster School

More information

Overview of Boeing Planning Tools Alex Heiter

Overview of Boeing Planning Tools Alex Heiter Overview of Boeing Planning Tools Alex Heiter Istanbul Technical University Air Transportation Management M.Sc. Program Network, Fleet and Schedule Strategic Planning Module 16: 31 March 2016 Lecture Outline

More information

Wärtsilä Energy Solutions

Wärtsilä Energy Solutions Wärtsilä Energy Solutions Dr. Georgios Livanos 5th Energy Symposium, Nicosia, Cyprus 1 Wärtsilä 2.11.2017 Energy Solutions 2016 ENERGY SOLUTIONS Market trends and drivers Economic growth and improving

More information

FORWARD-LOOKING STATEMENT

FORWARD-LOOKING STATEMENT CIBC 9th Annual Eastern Institutional Investor Conference September 23, 21 FORWARDLOOKING STATEMENT Certain information in this presentation and statements made during this presentation, including any

More information

DEVELOPMENT IN ENGINE TECHNOLOGY FOR THE FUTURE MARINE MARKET. ELIAS BOLETIS Director, Programs & Technologies Propulsion WÄRTSILÄ CORPORATION

DEVELOPMENT IN ENGINE TECHNOLOGY FOR THE FUTURE MARINE MARKET. ELIAS BOLETIS Director, Programs & Technologies Propulsion WÄRTSILÄ CORPORATION DEVELOPMENT IN ENGINE TECHNOLOGY ELIAS BOLETIS Director, Programs & Technologies Propulsion FOR THE FUTURE MARINE MARKET WÄRTSILÄ CORPORATION 1 Wärtsilä - Strategy - How we see the future - Engine development

More information

Oct-17 Nov-17. Travel is expected to grow over the coming 6 months; at a slower rate

Oct-17 Nov-17. Travel is expected to grow over the coming 6 months; at a slower rate Analysis provided by TRAVEL TRENDS INDEX OCTOBER 2018 CTI reading of 51.6 in October 2018 indicates that travel to or within the U.S. grew 3.2% in October 2018 compared to October 2017. LTI predicts travel

More information

Abstract. Introduction

Abstract. Introduction COMPARISON OF EFFICIENCY OF SLOT ALLOCATION BY CONGESTION PRICING AND RATION BY SCHEDULE Saba Neyshaboury,Vivek Kumar, Lance Sherry, Karla Hoffman Center for Air Transportation Systems Research (CATSR)

More information

WÄRTSILÄ CORPORATION INTERIM REPORT JANUARY-SEPTEMBER October 2018 Jaakko Eskola, President & CEO. Wärtsilä PUBLIC

WÄRTSILÄ CORPORATION INTERIM REPORT JANUARY-SEPTEMBER October 2018 Jaakko Eskola, President & CEO. Wärtsilä PUBLIC WÄRTSILÄ CORPORATION INTERIM REPORT JANUARY-SEPTEMBER 218 23 October 218 Jaakko Eskola, President & CEO 1 Wärtsilä PUBLIC 23 October 218 Interim Report January-September 218 GOOD DEVELOPMENT IN NET SALES

More information

SAS AB Q December 2018

SAS AB Q December 2018 SAS AB Q4 2018 4 December 2018 Q4 financial highlights Q4 POSITIVES Q4-18 CHANGE VS. Q4-17 Record number of passengers Total revenue up SEK 1bn vs. LY Yield (nominal) up 5.1% vs. LY RASK (nominal) up 7.0%

More information

Price-Setting Auctions for Airport Slot Allocation: a Multi-Airport Case Study

Price-Setting Auctions for Airport Slot Allocation: a Multi-Airport Case Study Price-Setting Auctions for Airport Slot Allocation: a Multi-Airport Case Study An Agent-Based Computational Economics Approach to Strategic Slot Allocation SESAR Innovation Days Bologna, 2 nd December

More information

WÄRTSILÄ CORPORATION HALF YEAR FINANCIAL REPORT July 2018 Jaakko Eskola, President & CEO. Wärtsilä PUBLIC

WÄRTSILÄ CORPORATION HALF YEAR FINANCIAL REPORT July 2018 Jaakko Eskola, President & CEO. Wärtsilä PUBLIC WÄRTSILÄ CORPORATION HALF YEAR FINANCIAL REPORT 218 19 July 218 Jaakko Eskola, President & CEO 1 Wärtsilä PUBLIC 19 July 218 Half year financial report 218 GOOD DEVELOPMENT IN ORDERS RECEIVED 2 Highlights

More information

UBS 14 th Global Emerging Markets Conference. New York, November 2016

UBS 14 th Global Emerging Markets Conference. New York, November 2016 UBS 14 th Global Emerging Markets Conference New York, November 2016 This presentation may include forward-looking comments regarding the Company s business outlook and anticipated financial and operating

More information

Airplane Value Analysis Alex Philip

Airplane Value Analysis Alex Philip Airplane Value Analysis Alex Philip Istanbul Technical University Air Transportation Management M.Sc. Program Fundamentals of Airline Management Module 7: 14 October 2015 Financial evaluation of projects

More information

INSERÇÃO DE NOVAS FONTES RENOVÁVEIS NO PLANEJAMENTO ENERGÉTICO NACIONAL

INSERÇÃO DE NOVAS FONTES RENOVÁVEIS NO PLANEJAMENTO ENERGÉTICO NACIONAL INSERÇÃO DE NOVAS FONTES RENOVÁVEIS NO PLANEJAMENTO ENERGÉTICO NACIONAL The Role of Flexible Power Plants 1 Wärtsilä 15 May 2014 The Role of Flexible Power Plants/ Wärtsilä Brasil WÄRTSILÄ CORPORATION

More information

Mr. Adel Al-Banwan Deputy CEO

Mr. Adel Al-Banwan Deputy CEO The 8th Forum for Listed Companies and Analysts ALAFCO Aviation Lease and Finance Co. Mr. Adel Al-Banwan Deputy CEO (18 th April 2016) ALAFCO Aviation Lease and Finance Company K.S.C.P. ALAFCO Aviation

More information

WÄRTSILÄ CORPORATION HALF YEAR FINANCIAL REPORT JANUARY-JUNE July 2017 Jaakko Eskola, President & CEO. Wärtsilä PUBLIC

WÄRTSILÄ CORPORATION HALF YEAR FINANCIAL REPORT JANUARY-JUNE July 2017 Jaakko Eskola, President & CEO. Wärtsilä PUBLIC WÄRTSILÄ CORPORATION HALF YEAR FINANCIAL REPORT JANUARY-JUNE 217 2 July 217 Jaakko Eskola, President & CEO 1 Wärtsilä PUBLIC 2 July 217 Half year financial report 217 Highlights Q2/217 Order intake EUR

More information

Jan-18. Dec-17. Travel is expected to grow over the coming 6 months; at a slower rate

Jan-18. Dec-17. Travel is expected to grow over the coming 6 months; at a slower rate Analysis provided by TRAVEL TRENDS INDEX DECEMBER 2018 CTI reading of 51.8 in December 2018 indicates that travel to or within the U.S. grew 3.6% in December 2018 compared to December 2017. LTI predicts

More information

STAYING TRUE. BofAML Global Transportation Conference. May

STAYING TRUE. BofAML Global Transportation Conference. May STAYING TRUE BofAML Global Transportation Conference May 19 2011 FORWARD-LOOKING STATEMENT Certain information in this presentation and statements made during this presentation, including any question

More information

Capital Metro is the first stage of a light rail network that will have a transformative effect on Canberra. capitalmetro.act.gov.

Capital Metro is the first stage of a light rail network that will have a transformative effect on Canberra. capitalmetro.act.gov. Artist impression Nullabor Avenue Harrison Business Case overview Capital Metro is the first stage of a light rail network that will have a transformative effect on Canberra. capitalmetro.act.gov.au Why

More information

WÄRTSILÄ S STRONG FINANCIAL POSITION. RAIMO LIND Executive Vice President, CFO

WÄRTSILÄ S STRONG FINANCIAL POSITION. RAIMO LIND Executive Vice President, CFO WÄRTSILÄ S STRONG FINANCIAL POSITION Executive Vice President, CFO 1 Wärtsilä 29 March 212 Contents Topic 3 Growth over the cycle fulfils targeted levels 4 Net sales emphasis on high growth areas 5 Net

More information

WÄRTSILÄ CORPORATION

WÄRTSILÄ CORPORATION WÄRTSILÄ CORPORATION INTERIM REPORT JANUARY-JUNE 215 17 JULY 215 Björn Rosengren, President & CEO Wärtsilä Highlights Q2/215 Order intake EUR 1,159 million, +2% Net sales EUR 1,23 million, +1% Book-to-bill.94

More information

1Q 2017 EARNINGS PRESENTATION APRIL 25, 2017

1Q 2017 EARNINGS PRESENTATION APRIL 25, 2017 1 1Q 2017 EARNINGS PRESENTATION APRIL 25, 2017 SAFE HARBOR This presentation contains forward-looking statements within the meaning of the Private Securities Litigation Reform Act of 1995, Section 27A

More information

WÄRTSILÄ Wärtsilä Value creation Sector in circular economy Main products:

WÄRTSILÄ Wärtsilä Value creation Sector in circular economy Main products: WÄRTSILÄ Wärtsilä Finland Est. 1834 Revenue 5 B www.wartsila.com Sector Mechanical Engineering Value creation in circular economy Maintenance Repair http://www.wartsila.com/ Contact person: Ville Sulonen,

More information

A RECURSION EVENT-DRIVEN MODEL TO SOLVE THE SINGLE AIRPORT GROUND-HOLDING PROBLEM

A RECURSION EVENT-DRIVEN MODEL TO SOLVE THE SINGLE AIRPORT GROUND-HOLDING PROBLEM RECURSION EVENT-DRIVEN MODEL TO SOLVE THE SINGLE IRPORT GROUND-HOLDING PROBLEM Lili WNG Doctor ir Traffic Management College Civil viation University of China 00 Xunhai Road, Dongli District, Tianjin P.R.

More information

ASSET MANAGEMENT AND AUTOMATION: ANDRITZ DIGITAL SOLUTIONS AND CASE STUDIES

ASSET MANAGEMENT AND AUTOMATION: ANDRITZ DIGITAL SOLUTIONS AND CASE STUDIES HYDRO ASSET MANAGEMENT AND AUTOMATION: ANDRITZ DIGITAL SOLUTIONS AND CASE STUDIES DIEGO ALIPRANDI SALTO GRANDE HPP AUGUST 27 TH 2018 COMPREHENSIVE EXPERTISE OF ANDRITZ HYDRO We are a global supplier of

More information

Hawker 800XP Versus Falcon 2000 SAMPLE

Hawker 800XP Versus Falcon 2000 SAMPLE Hawker 8XP Versus Falcon 2 SAMPLE This report is a sample report which assumes the following: 1. Cash buyer - no financing 2. Owner flown hours 15/year 3. Charter flown hours 2/year 4. Fuel is priced using

More information

Norwegian Air Shuttle ASA

Norwegian Air Shuttle ASA Norwegian Air Shuttle ASA Q4 2017 Presentation 15 February 2018 Highlights Q4 2017 Added one 737-800 and two 787-9s to operations Financed the first aircraft with a combination of UKEF and JOLCO Agreed

More information

THIRTEENTH AIR NAVIGATION CONFERENCE

THIRTEENTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization AN-Conf/13-WP/22 14/6/18 WORKING PAPER THIRTEENTH AIR NAVIGATION CONFERENCE Agenda Item 1: Air navigation global strategy 1.4: Air navigation business cases Montréal,

More information

Analysts and Investors conference call. Q results. 15 May 2013

Analysts and Investors conference call. Q results. 15 May 2013 Analysts and Investors conference call Q1 2013 results 15 May 2013 Management summary Key messages of Q1 2013 +6% +9% +3.3%p. Q1 2013 operational KPIs are in line with 109.7 116.2 6.5 7.1 82.3 85.6 expectations,

More information

Investor Update April 23, 2009

Investor Update April 23, 2009 JetBlue Airways Investor Relations (718) 709-2202 ir@jetblue.com Investor Update April 23, 2009 This investor update provides our investor guidance for the second quarter ending June 30, 2009 and full

More information

INTERIM REPORT JANUARY-JUNE 2013

INTERIM REPORT JANUARY-JUNE 2013 INTERIM REPORT JANUARY-JUNE 213 BJÖRN ROSENGREN, PRESIDENT & CEO 18 JULY 213 Wärtsilä Highlights Q2/213 NEW PIC Order intake EUR 1,71 million, -11% Net sales EUR 1,152 million, +5% Book-to-bill.93 EBITA

More information

Airlines Demand Forecasting Leveraging Ancillary Service Revenues

Airlines Demand Forecasting Leveraging Ancillary Service Revenues Airlines Demand Forecasting Leveraging Ancillary Service Revenues An approach by TCG Digital Traditional Revenue Management and Demand Forecasting The year 1978 started off the transformation of the Airlines

More information

SPADE-2 - Supporting Platform for Airport Decision-making and Efficiency Analysis Phase 2

SPADE-2 - Supporting Platform for Airport Decision-making and Efficiency Analysis Phase 2 - Supporting Platform for Airport Decision-making and Efficiency Analysis Phase 2 2 nd User Group Meeting Overview of the Platform List of Use Cases UC1: Airport Capacity Management UC2: Match Capacity

More information

WÄRTSILÄ CORPORATION

WÄRTSILÄ CORPORATION WÄRTSILÄ CORPORATION INTERIM REPORT JANUARY-JUNE 214 18 JULY 214 Björn Rosengren, President & CEO Wärtsilä Highlights Q2/214 NEW PIC Order intake EUR 1,163 million, +9% Net sales EUR 1,132 million, -2%

More information

Corporate Presentation National Bank Transportation and Logistics Conference March 24, 2010

Corporate Presentation National Bank Transportation and Logistics Conference March 24, 2010 Corporate Presentation National Bank Transportation and Logistics Conference March 24, 2010 Forwardlooking statement Certain information in this presentation and statements made during this presentation,

More information

INVESTOR PRESENTATION. May 2015

INVESTOR PRESENTATION. May 2015 INVESTOR PRESENTATION May 2015 Forward-looking Statements This presentation contains forward-looking statements within the meaning of the Private Securities Litigation Reform Act of 1995 that reflect the

More information

FORECASTING FUTURE ACTIVITY

FORECASTING FUTURE ACTIVITY EXECUTIVE SUMMARY The Eagle County Regional Airport (EGE) is known as a gateway into the heart of the Colorado Rocky Mountains, providing access to some of the nation s top ski resort towns (Vail, Beaver

More information

2012 RESULT PRESENTATION

2012 RESULT PRESENTATION 212 RESULT PRESENTATION BJÖRN ROSENGREN, PRESIDENT & CEO 25 JANUARY 213 Wärtsilä Net sales back to growth with stable profitability 212 development Order intake EUR 4,94 million, +9% Net sales EUR 4,725

More information

Managing through disruption

Managing through disruption 28 July 2016 Third quarter results for the three months ended 30 June 2016 Managing through disruption 3 months ended Like-for-like (ii) m (unless otherwise stated) Change 30 June 2016 30 June 2015 change

More information

Progressing towards profitable growth

Progressing towards profitable growth Progressing towards profitable growth Jaakko Eskola President & CEO 1 Wärtsilä 29 September 2016 Jaakko Eskola OUR STRATEGIC GROWTH AGENDA Focused on fostering a high performance culture committed to continuous

More information

STAYING TRUE. Scotia Capital Transportation & Aerospace Conference. November 15, 2011

STAYING TRUE. Scotia Capital Transportation & Aerospace Conference. November 15, 2011 STAYING TRUE Scotia Capital Transportation & Aerospace Conference November 15, 2011 FORWARD-LOOKING STATEMENT Certain information in this presentation and statements made during this presentation, including

More information

Guidance on criteria for assessing the financial resources of new applicants and holders of operating licences

Guidance on criteria for assessing the financial resources of new applicants and holders of operating licences Consumer Protection Group Risk Analysis Department Guidance on criteria for assessing the financial resources of new applicants and holders of operating licences Version 10 (20 April 2010) 1 Introduction

More information

The Economic Impact of Tourism in The Appalachian Region of Ohio. June 2016

The Economic Impact of Tourism in The Appalachian Region of Ohio. June 2016 The Economic Impact of Tourism in The Appalachian Region of Ohio June 2016 Appalachian Region tourism summary Total Tourism Impact Appalachian Region, Ohio Sales Wages Taxes Employment $5.3 billion $1.3

More information

The Economic Impact of Tourism in Buncombe County, North Carolina

The Economic Impact of Tourism in Buncombe County, North Carolina The Economic Impact of Tourism in Buncombe County, North Carolina 2017 Analysis September 2018 Introduction and definitions This study measures the economic impact of tourism in Buncombe County, North

More information

A SMARTER HOTEL INVESTMENT

A SMARTER HOTEL INVESTMENT A SMARTER HOTEL INVESTMENT MICROTEL 1 LETTER FROM THE MASTERBUILT TEAM 2 THE MICROTEL INN & SUITES BY WYNDHAM STORY 3 MASTERBUILT HOTELS AND WYNDHAM HOTEL GROUP 4 MICROTEL INN & SUITES BY WYNDHAM: A SMARTER

More information

Investor Relations Update January 25, 2018

Investor Relations Update January 25, 2018 General Overview Investor Relations Update Accounting Changes On January 1, 2018, the company adopted two new Accounting Standard Updates: (ASUs): ASU 2014-9: Revenue from Contracts with Customers (the

More information

PERFORMANCE REPORT NOVEMBER 2017

PERFORMANCE REPORT NOVEMBER 2017 PERFORMANCE REPORT NOVEMBER 2017 Note: New FY2018 Goal/Target/Min or Max incorporated in the Fixed Route and Connection Dashboards. Keith A. Clinkscale Performance Manager INTRODUCTION/BACKGROUND In June

More information

An Industry White Paper

An Industry White Paper Credit Ratings and Cash Reserves: How They Influence the Borrowing Costs of Airports: An Industry White Paper ACI-NA Finance Committee January 25, 2011 ACI-NA Finance Committee i This Industry White Paper

More information

Collaborative Decision Making By: Michael Wambsganss 10/25/2006

Collaborative Decision Making By: Michael Wambsganss 10/25/2006 Collaborative Decision Making By: Michael Wambsganss 10/25/2006 TFM History De-regulation: leads to new demand patterns High fuel prices Air Traffic Controller s Strike*** TFM is born (mid 80s: eliminate

More information

WÄRTSILÄ CORPORATION RESULT PRESENTATION January 2018 Jaakko Eskola, President & CEO. Wärtsilä PUBLIC

WÄRTSILÄ CORPORATION RESULT PRESENTATION January 2018 Jaakko Eskola, President & CEO. Wärtsilä PUBLIC WÄRTSILÄ CORPORATION RESULT PRESENTATION 2017 31 January 2018 Jaakko Eskola, President & CEO 1 Wärtsilä PUBLIC 31 January 2018 Full year result presentation 2017 2017 A YEAR OF SOLID SALES AND STRONG ORDER

More information

Corporate presentation CIBC Whistler Institutional Investor Conference January 21, 2010

Corporate presentation CIBC Whistler Institutional Investor Conference January 21, 2010 Corporate presentation CIBC Whistler Institutional Investor Conference January 21, 2010 Forwardlooking statement Certain information in this presentation and statements made during this presentation, including

More information

INVESTOR PRESENTATION. Imperial Capital Global Opportunities Conference September 2015

INVESTOR PRESENTATION. Imperial Capital Global Opportunities Conference September 2015 INVESTOR PRESENTATION Imperial Capital Global Opportunities Conference September 2015 Forward-looking Statements This presentation contains forward-looking statements within the meaning of the Private

More information

WÄRTSILÄ CORPORATION RESULT PRESENTATION January 2017 Jaakko Eskola, President & CEO. Wärtsilä PUBLIC

WÄRTSILÄ CORPORATION RESULT PRESENTATION January 2017 Jaakko Eskola, President & CEO. Wärtsilä PUBLIC WÄRTSILÄ CORPORATION RESULT PRESENTATION 216 27 January 217 Jaakko Eskola, President & CEO 1 Wärtsilä PUBLIC 27 January 217 Result presentation 216 Highlights 216 Order intake stable at EUR 4,927 million

More information

CREDIT SUISSE GLOBAL INDUSTRIALS CONFERENCE DECEMBER 4, 2014

CREDIT SUISSE GLOBAL INDUSTRIALS CONFERENCE DECEMBER 4, 2014 CREDIT SUISSE GLOBAL INDUSTRIALS CONFERENCE DECEMBER 4, 2014 1 1 SAFE HARBOR This presentation contains statements of a forward-looking nature which represent our management's beliefs and assumptions concerning

More information

GOLDEN ARMOR SELF STORAGE 8216 Route 16 Framersville Station, NY United States

GOLDEN ARMOR SELF STORAGE 8216 Route 16 Framersville Station, NY United States Property Report GOLDEN ARMOR SELF STORAGE Presented by: Gary Greco 252 North Street Buffalo, New York 14201 Office: Mobile: (716) 583-0815 Fax: (716) 393-2680 The information above has been obtained from

More information

49 May-17. Jun-17. Travel is expected to grow over the coming 6 months; at a slower rate

49 May-17. Jun-17. Travel is expected to grow over the coming 6 months; at a slower rate Analysis provided by TRAVEL TRENDS INDEX MAY 2018 CTI reading of 51.7 in May 2018 shows that travel to or within the U.S. grew 3.4% in May 2018 compared to May 2017. LTI predicts moderating travel growth

More information

Aloha Stadium Conceptual Redevelopment Report. April 5, 2017

Aloha Stadium Conceptual Redevelopment Report. April 5, 2017 Aloha Stadium Conceptual Redevelopment Report April 5, 2017 THE HISTORY OF ALOHA STADIUM A Hawaii landmark since 1975 Aloha Stadium has stood for over 40 years and effectively achieved its mission as a

More information

ABX. Holdings, Inc. BB&T Transportation Conference. February 2008

ABX. Holdings, Inc. BB&T Transportation Conference. February 2008 ABX Holdings, Inc. BB&T Transportation Conference February 2008 1 Safe Harbor Statement Except for historical information contained herein, the matters discussed in this presentation contain forward-looking

More information

Business Aviation: Operations and Service Quality by Provider Organisations. Macao, September Captain Scott Macpherson

Business Aviation: Operations and Service Quality by Provider Organisations. Macao, September Captain Scott Macpherson Business Aviation: Operations and Service Quality by Provider Organisations Macao, September 2013 Captain Scott Macpherson Business Aviation: Operations and Service Quality by Provider Organizations Today

More information

Corporate Productivity Case Study

Corporate Productivity Case Study BOMBARDIER BUSINESS AIRCRAFT Corporate Productivity Case Study April 2009 Marketing Executive Summary» In today's environment it is critical to have the right tools to demonstrate the contribution of business

More information

Oct-17 Nov-17. Sep-17. Travel is expected to grow over the coming 6 months; at a slightly faster rate

Oct-17 Nov-17. Sep-17. Travel is expected to grow over the coming 6 months; at a slightly faster rate Analysis provided by TRAVEL TRENDS INDEX SEPTEMBER 2018 CTI reading of.8 in September 2018 indicates that travel to or within the U.S. grew 1.6% in September 2018 compared to September 2017. LTI predicts

More information

Q Earnings Financial Results for the Third Quarter Ended December 31, January 29, 2015 OMRON Corporation

Q Earnings Financial Results for the Third Quarter Ended December 31, January 29, 2015 OMRON Corporation Q3 2014 Earnings Financial Results for the Third Quarter Ended December 31, 2014 January 29, 2015 OMRON Corporation Contents 1. Summary 2. Q1-Q3 Results P. 2 P. 4 3. Full-Year Forecast P. 13 4. Corporate

More information

Marriott International, Inc. : Travel and Tourism - Company Profile, SWOT and Financial Analysis

Marriott International, Inc. : Travel and Tourism - Company Profile, SWOT and Financial Analysis Marriott International, Inc. : Travel and Tourism - Company Profile, SWOT and Financial Analysis Marriott International, Inc. : Travel and Tourism - Company Profile, SWOT and Financial Analysis The Business

More information

Key Performance Indicators

Key Performance Indicators Key Performance Indicators The first section of this document looks at key performance indicators (KPIs) that are relevant in SkyChess. KPIs are useful as a measure of productivity, which can be sub-divided

More information

H1 RESULTS 2007 Jón Karl Ólafsson, CEO

H1 RESULTS 2007 Jón Karl Ólafsson, CEO H1 RESULTS 2007 Jón Karl Ólafsson, CEO Agenda 01 Highlights 02 Financial results 03 Outlook 04 New organizational chart 05 Q & A H1 Highlights Aggressive fleet growth characterizes H1 results 12 aircraft

More information

WÄRTSILÄ CORPORATION INTERIM REPORT JANUARY-SEPTEMBER October 2016 Jaakko Eskola, President & CEO. Wärtsilä PUBLIC

WÄRTSILÄ CORPORATION INTERIM REPORT JANUARY-SEPTEMBER October 2016 Jaakko Eskola, President & CEO. Wärtsilä PUBLIC WÄRTSILÄ CORPORATION INTERIM REPORT JANUARY-SEPTEMBER 216 25 October 216 Jaakko Eskola, President & CEO 1 Wärtsilä PUBLIC 25 October 216 Q3 result presentation Highlights Q3/216 Order intake EUR 1,139

More information

Validation of Runway Capacity Models

Validation of Runway Capacity Models Validation of Runway Capacity Models Amy Kim & Mark Hansen UC Berkeley ATM Seminar 2009 July 1, 2009 1 Presentation Outline Introduction Purpose Description of Models Data Methodology Conclusions & Future

More information

Annual & Hourly Cost Detail

Annual & Hourly Cost Detail King Air 350i Annual & Hourly Cost Detail GENERAL PARAMETERS Min Crew / Max Passengers 2 / 8 Seats Full Range (NM / SM) 1404.00 / 1615.69 Normal Cruise Speed (KTS / MPH) 302.25 / 347.82 Average Pre-Owned

More information

WÄRTSILÄ CORPORATION INTERIM REPORT JANUARY-SEPTEMBER October 2017 Jaakko Eskola, President & CEO. Wärtsilä PUBLIC

WÄRTSILÄ CORPORATION INTERIM REPORT JANUARY-SEPTEMBER October 2017 Jaakko Eskola, President & CEO. Wärtsilä PUBLIC WÄRTSILÄ CORPORATION INTERIM REPORT JANUARY-SEPTEMBER 217 25 October 217 Jaakko Eskola, President & CEO 1 Wärtsilä PUBLIC 25 October 217 Q3 Result presentation 217 Highlights Q3/217 Order intake EUR 1,354

More information

Handelsbanken Nordic Large Cap Seminar

Handelsbanken Nordic Large Cap Seminar Handelsbanken Nordic Large Cap Seminar BJÖRN ROSENGREN, PRESIDENT AND CEO 10 SEPTEMBER 2012 Wärtsilä This is Wärtsilä POWER PLANTS SHIP POWER SERVICES 2 Wärtsilä Global net sales - top 10 countries Norway

More information

The Economic Impact of Tourism in The Appalachian Region of Ohio. June 2014

The Economic Impact of Tourism in The Appalachian Region of Ohio. June 2014 The Economic Impact of Tourism in The Appalachian Region of Ohio June 2014 Appalachia Region Tourism Summary Total Tourism Impact Appalachian Region Sales Wages Taxes Employment $4.9 billion $1.2 billion

More information

Link btwn Oper & Finance

Link btwn Oper & Finance Link btwn Oper & Finance 2016 Fall - SOM Lecture Topic 3 Dohoon Kim Value Equation Why firms? or why invest? (economic) Value creation Economic Value (EV) = investment x (ROIC WACC) ROIC (Return On Invested

More information

E190 REPLACEMENT & FLEET UPDATE JULY 11, 2018

E190 REPLACEMENT & FLEET UPDATE JULY 11, 2018 1 E190 REPLACEMENT & FLEET UPDATE JULY 11, 2018 SAFE HARBOR This presentation contains forward-looking statements within the meaning of the Private Securities Litigation Reform Act of 1995, Section 27A

More information

Westover Metropolitan Airport Master Plan Update

Westover Metropolitan Airport Master Plan Update Westover Metropolitan Airport Master Plan Update June 2008 INTRODUCTION Westover Metropolitan Airport (CEF) comprises the civilian portion of a joint-use facility located in Chicopee, Massachusetts. The

More information

INTERIM REPORT JANUARY-JUNE 2012 BJÖRN ROSENGREN, PRESIDENT & CEO 18 JULY 2012

INTERIM REPORT JANUARY-JUNE 2012 BJÖRN ROSENGREN, PRESIDENT & CEO 18 JULY 2012 INTERIM REPORT JANUARY-JUNE 212 BJÖRN ROSENGREN, PRESIDENT & CEO 18 JULY 212 Highlights Q2/212 Order intake EUR 1,198 million, +2% Net sales EUR 1,99 million, +6% Book-to-bill 1.9 (1.13) EBIT EUR 113 million,

More information

INTERNAL AUDIT REPORT

INTERNAL AUDIT REPORT REPORT SLOA III Airline Agreement Compliance with Calculation of Rates Limited Operational Audit January 1, 2013 December 31, 2014 ISSUE DATE: February 10, 2015 REPORT NO. 2015-04 TABLE OF CONTENTS TRANSMITTAL

More information

Total Airport Management Solution DELIVERING THE NEXT GENERATION AIRPORT

Total Airport Management Solution DELIVERING THE NEXT GENERATION AIRPORT Total Airport Management Solution DELIVERING THE NEXT GENERATION AIRPORT Benefits of Total Airport Management Greater end-to-end visibility across landside and airside operations More accurate passenger

More information

MAXIMIZING INVESTMENT AND UTILIZATION

MAXIMIZING INVESTMENT AND UTILIZATION MAXIMIZING INVESTMENT AND UTILIZATION November 2013 Luis Ajamil Bermello, Ajamil & Partners Two perspectives How to increase use of the facility OPTIMIZATION How to improve the capacity of the facility

More information