EMILIO MITRE CHANNEL / PARANA RIVER: MARTIN GARCIA CHANNEL
|
|
- Chrystal Harrison
- 5 years ago
- Views:
Transcription
1 Please find attached draft restrictions and other useful informations at the main Argentinean Ports, for July 08th, Tdy s max sailing draft from: Santa Fe: 7.51 / 24'07'' FW Diamante: 8.80 / 28'1' FW San Lorenzo: / FW (Except for: see attached berths) Rosario: / FW (Except for: see attached berths) Villa Constitucion: / FW (Except for: see attached berths) San Nicolás: / FW Ramallo: / FW San Pedro: / 32'1' FW Del Guazú: / 01'' FW Ibicuy: / 01'' FW Lima / Las Palmas / Zarate: / 06'' FW Campana: 10,51 / 06'' FW (Except for: see attached berths) Water Density FW gr/cm3 Necochea: / 43' (Except for: see attached berths) Water Density BW gr/cm3 Bahia Blanca: / (Except for: see attached berths) Water Density SW gr/cm3 Fray Bentos: 5.80 / 19' FW Nueva Palmira: 8.84 / 29' via Martin Garcia or / 06'' FW via Emilio Mitre Punta Pereira: 7.60 / 24' FW Water Density FW gr/cm3 Montevideo: / BW Water Density BW 1.015/1.020 gr/cm3 Draft forecast and recommendation: The max allowed draft at the Parana Ports is expected to increase to 35'03'' / 35'06'' range by mid July and remain in this range during the second half of the month. Max recommended draft is 06'' ft/fw (including bunker supply, if any) in order to minimize the time waiting for suitable tides to cross the critical points in the navigation Escobar / Zona Comun / Recalada PStn (check with us before fixing). EMILIO MITRE CHANNEL / PARANA RIVER: Navigation normal. MARTIN GARCIA CHANNEL: Navigation normal. Temporary restriction of Max draft 29 fw (subject to ship s beam, see attached)
2 Will keep you informed. Best regards, Antares Servicios Maritimos S.A. As Agents Tel: (5411) Fax: (5411) TLX: ANTARS S (via Sweden) antares@antaresshipping.com ISO9001 by Lloyd's Register QA
3 07'' 1' 07'' 03'' 03'' 1' 05'' 05'' 06'' 06'' 06'' 09'' 09'' 03'' 09'' 01'' 05'' 02'' 3, Antares Servicios Maritimos S.A. Address: Bartolome Cruz rd floor - Suite 'A' (B1636DVH) Olivos - Pcia. De Buenos Aires - Argentina Tel: / Fax: antares@antaresshipping.com MAXIMUM ENTRANCE / SAILING DRAFTS ALLOWED BY COASTGUARD: PIE Jul 08th, ' 28' 22' 32' SANTA FE PORT: 7,51 24' 07'' FW DIAMANTE PORT: 8,80 28' 1' FW SAN LORENZO PORT: Renova, Dreyfus, Noble, M. Alumbrera,Terminal 6 (South/North) Alto Parana & Quebracho: 10,58 FW Mosaic 10,24 07'' FW PASA 6,80 22' 03'' FW Nidera, El Transito, Pampa & Dempa: 10,58 FW Chacabuco, PESA, ACA, Akzo Nobel, Vicentin & San Benito: 10,58 FW ROSARIO PORT: Unit III, Open Berths & Unit VI & VII: 10,58 FW Villa Gobernador Galvez: 10,58 FW Punta Alvear: 10,58 FW FTS Parana Iron: 10,58 FW Gral. Lagos: 10,58 FW Arroyo Seco: 10,58 FW VILLA CONSTITUCIÓN PORT: Acindar: 10,58 FW Elevator: 10,14 03'' FW SAN NICOLAS PORT: Puerto Nuevo (South/Center/North) 10,58 FW Elevator: 10,58 FW AES Alicura: 10,58 FW Ing. Buitrago: 10,58 FW RAMALLO PORT: 10,58 FW SAN PEDRO PORT: 10,02 32' 1' FW DEL GUAZU PORT: 10,20 05'' FW IBICUY: 10,20 05'' FW LIMA: Delta Dock: 10,40 01" FW LAS PALMAS: Las Palmas: 10,52 06" FW ZARATE: 10,52 06'' FW CAMPANA: Siderca: 10,15 03" FW 3 32' 32' 31' 31' 22' 26' 18' 23' 3 42' 42' 39' 36' Euroamerica: 10,52 06'' FW Depsa: 9,15 3 FW Exxon: 10,38 FW Maripasa: 10,52 06'' FW Sol Petroleo: 9,76 32' FW Rhasa: 9,76 32' FW Tagsa: 10,06 FW BUENOS AIRES Terbasa (*) 10,08 00" FW DOCK SUD Shell A' (*) max LOA 230 UKC 0,45m 9,50 31' 02" FW Shell A (*) max LOA 220 UKC 0,45m 9,70 31' 09'' FW Shell B (*) max LOA 210 UKC 0,45m 9,70 31' 09'' FW YPF C (*) Double defenses max LOA 150 UKC 0,30m 6,10 x 7,30 2 x 23' FW YPF F (*) Double defenses max LOA 200 UKC 0,30m 5,50 x 6,50 18' x 21'03'' FW Propaneros Basin (*) max LOA 200 UKC 0,30m 6,80 22' 03'' FW Site 7 (*) Single defenses max LOA 200 UKC 0,45m 8,50 x 9,00 27'1' x 29'06'' FW Site 7 (*) Double defenses max LOA 200 UKC 0,45m 8,40 x 9,40 27'06'' x 31' FW LA PLATA YPF (*) 7,93 26' FW Copetro (**) 9, " FW Siderar Pto Rocca (**) 5,49 18' FW Berth 18/19 7,02 23' FW Berth 9 9,15 3 FW NECOCHEA Berth 1 (Open Berth) 13,10 42' BW Berth 2/3 (ACA Terminal) 13,10 42' BW Berth 4/5 (Quequen Terminal) 13,10 42' 11" BW Berth 6 10,30 09'' BW Berth 7/8 12,19 39' BW Berth 9/10 11,00 36' 01'' BW BAHIA BLANCA (Average Tide 3,80/4,40m) UTE / Toepfer (*) 13,72 SW Cargill (*) 13,72 SW TBB Pier 5/6 (*) 13,72 SW 42' 19' 29' 24' TBB Pier 7/8 (*) 10,38 00" SW TBB Pier 9 (*) 13,72 SW Profertil (*) 13,72 SW Dreyfus (*) 13,72 SW Moreno Pier 2/3 (*) 12,82 42' SW Galvan Pier 5 (*) 10,38 SW FRAY BENTOS (URUGUAY) 5,80 19' FW NUEVA PALMIRA & PUNTA DEL ARENAL FTS (URUGUAY) By Martin Garcia Channel 8,84 29' FW By E.Mitre Channel 10,21 05'' FW PUNTA PEREIRA (URUGUAY) 7,60 24' FW MONTEVIDEO (URUGUAY) (*) 10,42 02'' BW Meters Feet w (*) High tide/naabsa Clause (**) High tide (***) Check with us before fixing
4 FORTHCOMING NATIONAL HOLIDAYS: THURSDAY JULY 09 TH INDEPENDENCE DAY 'SUPARA' CUSTOMS PERSONELL UNION ACTION NATIONWIDE PLEASE NOTE THAT CUSTOMS UNION INFORMED THAT ACTIONS ARE SCHEDULED DUE TO NON-FULFILLMENT OF THE SALARY RAISES AGREEMENT. ALL PORT OPERATIONS WILL BE SUSPENDED DURING THE FOLLOWING DATES: JULY 10TH, 11TH, 12TH, 16TH, 17TH, 18TH, 19TH. NECOCHEA/QUEQUEN PORT CUSTOMS HOUSE DECLARATION - SHIP'S STORE LIST PLEASE NOTE THAT AFTER MEETING HELD AT NECOCHEA/QUEQUEN PORT CUSTOMS VERBALLY NOTIFIED THAT AS FROM JUNE 17TH, 2015, EVERY SHIP COMING FROM ABROAD, OR ARGENTINEAN PORT, MUST PRESENT THE STORE LIST TRANSLATED TO SPANISH. THE USUAL PRESENTATION OF IMO FORMS IN ENGLISH MUST BE DONE AS WELL. IT IS SUGGESTED THAT SAID STORE LIST IS PRESENTED TO THE AGENCIES BY AT LEAST 72 HOURS BEFORE ARRIVAL FOR CHECKING. MARITIME LABOUR CONVENTION (MLC): FM MAY 28 TH, 2015, WHEN PORT STATE BOARD FOR A RANDOM INSPECTION WILL ALSO CHECK THE ACTUAL LABOUR CONDITIONS OF THE CREW IN COMPLIANCE WITH THE INTERNATIONAL CONVENTION. MAINLY ACCOMODATION, HOURS OF WORK AND REST, HEALTH ACCIDENT PREVENTION, MANNING LEVELS, NON- PAYMENT OF WAGES, FOOD AND CATERING. LOSS PREVENTION ARTICLES FROM P&I ARE AVAILABLE. DRAFT SURVEY BY ARGENTINE CUSTOMS AUTHORITIES: CUSTOMS HOUSE PERFORM DRAFT SURVEYS IN MOST OPERATIONS TO DETERMINE THE QUANTITIES OF CARGOES EXPORTED OR IMPORTED. CAUSING DELAYS. THE OFFICIAL QUANTITIES (BS/L) ARE DETERMINED BY SHORE SCALE AT THE PORTS. WHEN THE DIFFERENCE BETWEEN DRAFT SURVEY AND SHORE SCALE IS LESS THAN 0.6 PERCENT SHIPPERS HAVE THE OPTION TO STATE IN THE MATE RECEIPTS THE DRAFT SURVEY OR SHORE SCALE FIGURES. WHEN THE DIFFERENCE IS MORE THAN 0.6 PERCENT THE QUANTITIES ARE DETERMINED BY DRAFT SURVEY FIGURES, UNLESS OTHERWISE INSTRUCTED BY CUSTOMS. TUGBOAT SERVICE / S.O.M.U. / ITF A- THE USE OF TUGBOATS IS COMPULSORY AT FOLLOWING PORTS/TERMINAL: - SAN LORENZO: EL TRANSITO, NIDERA, PAMPA, DEMPA: LOA 160, TO 210M ONE TUG TO UNBERTH AND TURN DOWNRIVER. LOA 210M TO 230M TWO TUGS. ALSO FOR VICENTIN, ACA, AKZO NOBEL, CHACABUCO AND SAN BENITO WHEN THE MANEUVER MUST BE PERFOMRED AT THE CENTER MANEUVER AREA. - SAN LORENZO: FM MARCH 01 ST, 2015: ONE TUG TO UNBERTH AND TURN DOWNRIVER FOR SHIPS WITH: LEFT HAND FIXED BLADE PROPELLER OR RIGHT HAND VARIABLE PITCH PROPELLER (CPP). EXCEPT FOR SHIPS WITH WORKING BOW THRUSTER. - VILLA CONSTITUCION: GRAIN ELEVATOR: ONE TUG TO BERTH/UNBERTH. LOA 180M, OR OVER, TWO TUGS PER MANEUVER. - SAN NICOLAS: NEW PORT, ELEVATOR, AES ALICURA: PILOTS SUGGEST: ONE TUG TO BERTH/UNBERTH FOR LOA 180M, OR OVER, AND/OR DRAFT OVER 9.0M. - DEL GUAZU: LOA OVER 160M ONE TUG TO UNBERTH. - CAMPANA: LOA OVER 157M ONE TUG TO UNBERTH AND TURN DOWNRIVER.UNLESS FIRST TWO HOURS NAVIGATION IS DONE UPRIVER TO TURN AT KM BUENOS AIRES - DOCK SUD - LA PLATA - NECOCHEA. GRANTED 12 CONTINUOUS HOURS PER DAY, WORK-TO-RULE. - BAHIA BLANCA COMPULSORY REQUIREMENT TO BE GRANTED THE TUGBOAT SERVICE BY THE SEAMEN UNION (S.O.M.U.): PRESENTATION BY OF THE ITF CARD AND SPECIAL AGREEMENT. THE DOCUMENTS ARE CHECKED WITH THE ITF REPRESENTATIVES, INTERNATIONAL SEAMEN WORKERS FEDERATION. RIVER PLATE / EMILIO MITRE / PARANA RIVER: A) CRITICAL POINTS TO BE CONSIDERED IN THE NAVIGATION FROM SANTA FE TO RECALADA PILOTS STATION:
5 DEPTHS OF THE RIVER PASSAGES FROM SANTA FE TO SAN PEDRO AREA: IS A RESULT OF THE DEPTH AT ZERO TIDE + RIVER HEIGHTS. *RIVER HEIGHTS ARE DAILY INFORMED BY COASTGUARD AT 1000HRS ALONG WITH THE MAX DEPARTURE DRAFTS ALLOWED FROM UPRIVER PORTS. EFFECTIVE DEPTH ON JUL 08 TH RIVER PASSAGE DENOMINATION DEPTH AT DATUM LOCATION/KM 9,37M SANTA FE / DIAMANTE TRAGADERO 5,90M KM 582,5 8,95M DIAMANTE / SAN MARTIN PARANACITO 5,20M KM 491,5 9,53M DIAMANTE / SAN MARTIN ABAJO CORRENTOSO 5,80M KM 474,8 12,20M SAN MARTIN/SAN LORENZO BELLA VISTA 8,50M KM 450,2 12,71M SAN LORENZO / ROSARIO BORGHI 9,10M KM 437,8 12,73M ROSARIO EP.C.DE LOS MUELLES / BORGHI 9,30M KM 418,5 12,24M ROSARIO CANAL MUELLES PUERTO ROSARIO 8,80M KM 418,1 12,13M ROSARIO EP. AB. ALVEAR / ALVEAR 8,90M KM 400,6 12,21M ROSARIO / SAN NICOLAS PARAGUAYO 9,10M KM 390,4 11,79M ROSARIO / SAN NICOLAS YAGUARON 9,20M KM 352,0 11,96M SAN NICOLAS TONELERO ISLA NUEVA 9,50M KM 338,1 11,40M SAN NICOLAS LAS HERMANAS BI 9,10M KM 321,8 11,97M SAN NICOLAS ARRIBA OBLIGADO 9,80M KM 309,9 11,94M SAN NICOLAS ABAJO LOS RATONES 10,00M KM 287,6 13,82M SAN PEDRO EP.BIFURCACION/AB.LOS RATONES 12,00M KM 273,5 RIVER HEIGHTS (MTS) ON JUL 08 TH : IGUAZU 15,20 CORRIENTES 4,33 SANTA FE 3,58 DIAMANTE 3,80 SAN MARTIN 3,70 ROSARIO 3,41 VILLA CONSTITUCION 2,84 SAN NICOLAS 2,60 RAMALLO 2,33 SAN PEDRO 1, DEPTHS OF THE RIVER PASSAGES FROM SAN PEDRO AREA TO RECALADA PSTN: IS A RESULT OF THE DEPTH AT ZERO TIDE + RIVER HEIGHT, AFFECTED BY OCEAN TIDES. *RIVER HEIGHTS ARE INFORMED BY COASTGUARD EVERY HOUR. TWO HIGH TIDES AND TWO LOW TIDES ARE EXPERIENCED EVERY 24HRS. RIVER PASSAGE DENOMINATION. DEPTH AT DATUM LOCATION/KM ESCOBAR / ZONA COMUN CANAL ING EMILIO MITRE 10,50M KM 36,8 ZONA COMUN / RECALADA PASO BANCO CHICO 10,90M KM 76,6 ZONA COMUN / RECALADA CANAL INTERMEDIO 10,70M KM 99,0 ZONA COMUN / RECALADA CANAL PUNTA INDIO 10,50M KM 153,8 WITH WINDS FROM N-NW-W TIDES WOULD BE LOWER. WITH WINDS FROM S-SE-E TIDES WOULD BE HIGHER COASTGUARD SAFETY UNDER KEEL CLEARANCE (UKC): 0,60CMS. ONE CENTIMETER UKC SHALL BE ADDED FOR EACH CENTIMETER OF SHIP DRAFT BEYOND 10.36M (34FEET) UPTO 10.67M (35FEET). EMILIO MITRE CHANNEL: MAX ALLOWED LOA 230M. RECALADA / MONTEVIDEO PILOT STATION: OPEN SINCE JULY 04TH 0730HRS LT. ZONA COMUN PILOT STATION: OPEN SINCE JULY 08TH 0840HRS LT. MARTIN GARCIA CHANNEL TEMPORARY RESTRICTIONS: SINCE NOVEMBER 09 TH, 2014, THE NAVIGATION IS ALLOWED WITH THE FOLLOWING TEMPORARY DRAFT/BEAM RESTRICTIONS: WITH TIDES NOT INFERIOR TO 0,60M.8,84 M FW (29 00 ) UPTO 32,6 M BEAM.8,00 M FW (26 03 ) UPTO 35,0 M BEAM.7,50 M FW (24 07 ) UPTO 44,0 M BEAM
6 THE C.A.R.P. (COMISION ADMINISTRADORA DEL RIO DE LA PLATA) CONTINUES WITH THE DREDGING, WIDENING AND DEEPING OF THE CHANNEL. IT IS EXPECTED TO RESTORE THE ORIGINAL CONDITIONS BY THE END OF 2015, AND MAX DRAFT BE BACK TO 9,75 M FW (32 00 ) WITH BELOW RESTRICTIONS: LOA BEAM MAX DRAFT/FEET/FRESH WATER 230M TO 245M MAX 32.6M M TO 255M MAX 32.6M M TO 255M 32.6M TO 35.0M M TO 266M 35.0M TO 41.0M M TO 277M 41.0M TO 44.0M 28 00
EMILIO MITRE CHANNEL / PARANA RIVER: MARTIN GARCIA CHANNEL
Please find attached draft restrictions and other useful informations at the main Argentinean Ports, for June 03rd, 2015. Tdy s max sailing draft from: Santa Fe: 7.19 / 23'07'' FW Diamante: 8.46 / 27'
More informationEMILIO MITRE CHANNEL / PARANA RIVER: Navigation normal.
Please find attached draft restrictions and other useful informations at the main Argentinean Ports, for December 28th, 2015. Tdy s max sailing draft from: Santa Fe: 9.76 / 32' FW Diamante: 10.79 / 35'04''
More informationDraft forecast and recommendation:
Please find attached draft restrictions and other useful information at the main Argentinean Ports, for May 22ND, 2017. Tdy s max sailing draft from: Santa Fe: 8.95 / 29'04'' FW Diamante: 9.82 / 32'02''
More informationWill keep you informed. Best regards,
Please find attached draft restrictions and other useful informations at the main Argentinean Ports, for July 20th, 2016. Tdy s max sailing draft from: Santa Fe: 8.95 / 29'04'' FW Diamante: 9.71 / 1' FW
More informationPARANA RIVER / EMILIO MITRE CHANNEL / MARTIN GARCIA CHANNEL / RIVER PLATE: Navigation normal.
Please find here below the Daily Draft restriction and forecast report, also find attached the critical points locations, Port News and useful information of the main Ports in Argentina and Uruguay. Report
More informationPARANA RIVER / EMILIO MITRE CHANNEL / MARTIN GARCIA CHANNEL / RIVER PLATE: Navigation normal.
Please find here below the Daily Draft restriction and forecast report, also find attached the critical points locations, Port News and useful information of the main Ports in Argentina and Uruguay. Report
More informationPARANA RIVER / EMILIO MITRE CHANNEL / MARTIN GARCIA CHANNEL: Navigation normal.
Please find attached Parana River Ports max departure drafts for August 09th, 2014 Tdy s max sailing draft from: Santa Fe: 8.97 / 29'05'' FW Diamante: 10.22 / 06'' FW San Lorenzo: 11.47 / FW (Except for:
More informationPARANA RIVER / EMILIO MITRE CHANNEL / MARTIN GARCIA CHANNEL: Navigation normal.
Please find attached Parana River Ports max departure drafts for September 18th, 2014 Tdy s max sailing draft from: Santa Fe: 7.70 / 25'03'' FW Diamante: 8.96 / 29' FW San Lorenzo: 10.49 / FW (Except for:
More informationPARANA RIVER / EMILIO MITRE CHANNEL:
Please find attached Parana River Ports max departure drafts for November 05th, 2014 Tdy s max sailing draft from: Santa Fe: 7.78 / 25' FW Diamante: 9.00 / 29' FW San Lorenzo: 11.13 / FW (Except for: see
More informationPARANA RIVER / EMILIO MITRE CHANNEL / MARTIN GARCIA CHANNEL: Navigation normal.
Please find attached Parana River Ports max departure drafts for June 27th, 2014 Tdy s max sailing draft from: Santa Fe: 8.41 / 27'07'' FW Diamante: 9.70 / 31'09'' FW San Lorenzo: 10.66 / FW (Except for:
More informationPARANA RIVER / EMILIO MITRE CHANNEL / MARTIN GARCIA CHANNEL: Navigation normal.
Please find attached Parana River Ports max departure drafts for April 11th, 2014 Tdy s max sailing draft from: Santa Fe: 7.76 / 25' FW Diamante: 8.97 / 29' FW San Lorenzo: 10.96 / FW (Except for: see
More informationM.O.P. (HYDROMETIC SECTION) REPORT RIVER DEPTHS REPORTED:
ARGENTINA DRAFTS REPORT / DEPTHS REPORT JANUARY 24th 2019 M.O.P. (HYDROMETIC SECTION) REPORT SANTA FE/DIAMANTE 9,91 MTRS (PASO TRAGADERO) DIAMANTE/SAN MARTIN 9,70 MTRS (PASO ABAJO CORRENTOSO) SAN MARTIN/ROSARIO
More informationMAXIMUM RATE OF RIVER AND PORT PILOTAGE SERVICES. In accordance with the provisions of Article 1 of Annex I of Decree No. 2694/91,
(Free translation) MAXIMUM RATE OF RIVER AND PORT PILOTAGE SERVICES The maximum rates (hereinafter "rates") are established for the services of Pilotage for the whole country. In accordance with the provisions
More informationAGENCIA MARITIMA NABSA S.A.
AGENCIA MARITIMA NABSA S.A. BUENOS AIRES 16-Oct-18 CIRC. NBR 194 MJL ABBREVIATIONS: WHEAT (WH), WHEAT BRAN PELLETS (WHBP), SOYABEANS (SB), BYPRODUCTS (BYP), CAN (CANOLA), HYPRO (H) POLLARD PELLETS (PP),
More informationLessons to be learned by the 5 countries of the River Plate Basin (R.P.B.), from River Management and Collaboration of the River Rhine
SMART RIVERS 2015 Lessons to be learned by the 5 countries of the River Plate Basin (R.P.B.), from River Management and Collaboration of the River Rhine Zuidwijk, A. Ocampo, J. ; Savarese, A. Buenos Aires,
More informationAGENCIA MARITIMA NABSA S.A.
AGENCIA MARITIMA NABSA S.A. BUENOS AIRES 29-Nov-18 CIRC. NBR 224 MJL ABBREVIATIONS: WHEAT (WH), WHEAT BRAN PELLETS (WHBP), SOYABEANS (SB), BYPRODUCTS (BYP), CAN (CANOLA), HYPRO (H) POLLARD PELLETS (PP),
More informationARGENTINA. Marine Rescue Co-ordination Centre: Bahía Blanca (PREFECTURA NAVAL) Region: III Position: 38 43'S 62 6'W
Marine Rescue Co-ordination Centre: Bahía Blanca (PREFECTURA NAVAL) Position: 38 43'S 62 6'W Call Sign: L2N Area Covered: South Atlantic - Atlantic area of Argentina from Claromecó to the mouth of the
More informationPaper 15 - Lessons to be learned by Mercosur countries from River Management and collaboration of the River Rhine
Paper 15 - Lessons to be learned by Mercosur countries from River Management and collaboration of the River Rhine Zuidwijk A.; Ocampo J.; Savarese A. Email (1 st author): azuidwijk@yahoo.com.ar ABSTRACT:
More informationWAITING TIMES BASIS A VESSEL ARRIVING AT HER RESPECTIVE PILOT STATION T-O-D-A-Y
BUENOS AIRES 1-Jul-18 CIRC. NBR 126 MJL ABBREVIATIONS: WHEAT (WH), WHEAT BRAN PELLETS (WHBP), SOYABEANS (SB), BYPRODUCTS (BYP), CAN (CANOLA), HYPRO (H) POLLARD PELLETS (PP), SUNFLOWER PELLETS (SUNP). SUNFLOWER
More informationPOSITION OF VSLS - APRIL 06th, Berth Vessel Status Ops Tons Commodity Destination/Origin Coord Customer Note
San Lorenzo - Argentina POSITION OF VSLS - APRIL 06th, 2018. Renova BELL BAY Alongside load 25475 Sbm New Zealand Glencore Renova BELL BAY Alongside load 5280 Shp New Zealand Glencore Renova MARITIME FAITH
More informationPOSITION OF VSLS - AUGUST 14th, San Lorenzo - Argentina. Berth Vessel Status Ops Tons Commodity Destination/Origin Coord Customer Note
POSITION OF VSLS - AUGUST 14th, 2018. San Lorenzo - Argentina Renova North BARGES Alongside load 1260 Maize Uruguay Vicentín Renova North BARGES Alongside load 1890 Shp Uruguay Vicentín Renova North BEST
More informationThe River Plate Experience; Maintenance Dredging by Means of Privatisation
The River Plate Experience Alan Lievens The River Plate Experience; Maintenance Dredging by Means of Privatisation Abstract At the beginning of the 1990s the Latin American continent needed to implement
More informationSANTANDER PORT CONTROL PROCEDURE
SANTANDER PORT CONTROL PROCEDURE 1.- GEOGRAPHICAL APPLICATION LIMITS This procedure is applicable to all ships and crafts navigating in areas I and II of the Port of Santander, and also in the anchorage
More information3.3 COST ESTIMATION OF THE MAIN PROJECTS. (1) Main projects. 1) Improvement of export corridor
3.3 COST ESTIMATION OF THE MAIN PROJECTS (1) Main projects 1) Improvement of export corridor The promotion of exports is indispensable for the development of the Paraguayan economy, and improvement of
More informationVERSION DATE OF ISSUE DESCRIPTION PREPARED CHECKED APPROVED Technical note HHP DKA OYBE
DRAMMENREGIONENS VIRKESTERMINALER DEVELOPMENT OF NEW TIMBER TERMINAL NAVIGATION AND BERTH LOCATION STUDY ADDRESS COWI A/S Parallelvej 2 2800 Kongens Lyngby Denmark TEL +45 56 40 00 00 FAX +45 56 40 99
More informationPort Handbook SANSOUCI PUERTO SANTO DOMINGO
TITLE: Port Handbook ENGLISH VERSION Page 1 of 14 Port Handbook SANSOUCI PUERTO SANTO DOMINGO Latitude: 18 28.000 N LONG 069 53.000 W World Port Index No: 11040. D.R Chart: 25449 B.A Chart: 467 D.M.A Chart:
More informationTerms, conditions and prices
Terms, conditions and prices 2017 PORT OF ALTA valid from January 1th - Expires Des 31th 2017 page 1 CRUISE QUAYS IN ALTA QUAY LENGTH DRAFT BEAM HEIGHT Terminalquay 169 m 8,4 m Unlimited Marinequay 63
More informationBerth Vessel Status Ops Tons Commodity Destination/Origin Coord Customer Note
POSITION OF VSLS - NOVEMBER 09th, 2018. San Lorenzo - Argentina Renova North CALYPSO N Alongside discha 41980 Sbs United States Cofco Int. Renova North POLA LADOGA Announced - ETA at Port 11/11/2018 discha
More informationArgentina Control of unregistered work in the construction industry. An experience based on social dialogue and active involvement of stakeholders
Argentina Control of unregistered work in the construction industry An experience based on social dialogue and active involvement of stakeholders Construction Industry System Building Industry Records
More informationDOCKING AND ROUTING PLAN
DOCKING AND ROUTING PLAN TABLE OF CONTENT Contents Table of content... 2 1 Introduction... 3 1.1 Background... 3 1.2 Document Scope... 3 1.3 Harbour dues... 3 2 ROUTING TO SHIPYARD... 4 2.1 General...
More informationServing the Tampa Bay Maritime Community Since Celebrating over 125 Years of Service
Serving the Tampa Bay Maritime Community Since 1886 Celebrating over 125 Years of Service Tampa Bay Pilots Association Piloting is an essential service of such paramount importance that its continued existence
More informationNotice To Mariner No. 147 PORT OF FUJAIRAH & VHFL TERMINAL BERTH CONSTRUCTION & DESIGN CRITERIA
To: Attn: From: All Agents / Bunkering Companies / De-Sloping Companies / National Transport Authority / Federal Environment Agency / Hydrographic Office-UK General Manager / Operations Manager Capt. Tamer
More informationForth Ports Limited. Ruling Depths & Under Keel Clearances
Forth Ports Limited - Forth Vessels are scheduled into / out of ports on the Forth & Tay in accordance with the under keel clearance criteria specified in this section of the Marine Guidelines & Port Information.
More informationAlexandria Port, Egypt
Alexandria Port, Egypt Source: This information has been extracted from the WFP Logistics Capacity Assessment for Egypt. This LCA is a work in progress and not all sections are complete. This material
More informationEnglish Edition. Issue 02/12 CDF 26/10/11
2012 English Edition SOUTH AMERICA Issue 02/12 CDF 26/10/11 IMPORTANT INFORMATION Documentation It is the sole responsibility of the passenger to have all personal documentation as well as of the vehicle
More informationEcosystem context in the Environmental Impact Assessment of the Dredging Operations in the Argentina s Santa Fe
Ecosystem context in the Environmental Impact Assessment of the Dredging g Operations in the Argentina s Santa Fe Confluencia Waterway (Paraná River) Authors: Claudio Daniele (Estudio de Ambiente y Desarrollo
More informationInfrastructure Report Uruguay 2014
Page 1 Market Research Infrastructure Report Uruguay 2014 Prepared by Your guide to doing business in Latin America Miryam Lazarte, Founder & CEO Page 2 EXECUTIVE SUMMARY Despite Uruguay's small size and
More informationHellesylt. GEIRANGERFJORD CRUISE PORT
NAME OF PORT Region/City/Port : Geirangerfjord cruise port WEB: Official Port Address: 6216 Geiranger Hellesylt www.stranda-hamnevesen.no GEIRANGERFJORD CRUISE PORT IMO registered Port Facilities Hellesylt:
More informationTARIFF PORT: RIO HAINA
GENERAL TARIFF Conditions -All rates are expressed in USD dollars except where RD$ shown explicitly. -All rates are exempt of 18% ITBIS/VAT unless specified in the tariff below Basic Agency Fees (covering
More informationPULAU SEBAROK - VOPAK TERMINAL (OSV) MAX DISPL. (tonnes) MAX LOA(m) 45, ,000 80, ,000 13,000 12, ,000 19,500 19,500
PULAU SEBAROK - VOPAK TERMINAL (OSV) JETTY DEPTH A/S(m) APPROACH DEPTH(m) MAX LOA(m) MAX DISPL. (tonnes) REMARKS OSV2 11.7 264 45,800 OSV3 16.9 370 210,000 see para. 3 under General Information OSV4 12.9
More informationBulk Singapore (all details are about)
Bulk Singapore (all details are about) GENERAL INFORMATION Compiling date 29/10/2012 (Last updated date 30/10/2012) Head Owner s full style Disponent Owner full style Managing company MAIN PARTICULAR Name
More informationAdvice to Ship Masters Southbound Transits
Advice to Ship Masters Southbound Transits Prepared By SeaBird Marine Services (Latest version: October 2014) Page 1 of 13 Table of Contents This document is revised periodically. For latest updates, please
More informationInternational Federation of Shipmasters Associations IFSMA. 44th Annual General Assembly (AGA) ARGENTINA
International Federation of Shipmasters Associations IFSMA 44th Annual General Assembly (AGA) BUENOS AIRES ARGENTINA Argentine Merchant Marine changes and Recent Maritime Law BEFORE 1991 NATIONAL STATE
More informationArgentina. Packages to Iguazú falls, Salta, Mendoza, Puerto Madryn, Bariloche, Calafate and Ushuaia.
2018 Argentina Packages to Iguazú falls, Salta, Mendoza, Puerto Madryn, Bariloche, Calafate and Ushuaia. Contact information: Address: Av. Santa Fe 1292 / Buenos Aires, Argentina Phone: 5411-4816-7070
More informationTRINIDAD OFFSHORE CALLING INSTRUCTIONS
TRINIDAD OFFSHORE CALLING INSTRUCTIONS A. SUPPLIER FULL STYLE & CONTACT DETAILS AEGEAN BUNKERING (TRINIDAD) LTD Tel: +1 868 627 3005 Fax: +1 868 627 3007 E-mail: operations@aegean.tt #3 French Street Woodbrook,
More informationADVICE ON MOZAMBIQUE PORTS. P&I ASSOCIATES (PTY) LTD
ADVICE ON MOZAMBIQUE PORTS. P&I ASSOCIATES (PTY) LTD All the ports in Mozambique are owned by CFM (Caminhos de Ferro de Mozambique). Many of the ports have been given to private companies to manage the
More informationNavigation and operation 20. port procedures manual 22. communication 22. port security 23. Services
SERVICES Navigation and operation 20 port procedures manual 22 communication 22 DGTRAC Dangerous Goods Tracking 23 port security 23 Services navigation and operation Harbour Master Under the Transport
More informationDirections Governing Ship Mooring Operations of Taichung Port
Directions Governing Ship Mooring Operations of Taichung Port Promulgated per Order Zong-Gang-Wu-Zi No. 6789 on July 11, 1994. Amended per Order Zong-Gang-Wu-Zi No. 0930012828 on December 29, 2004 for
More informationSection 4 / Rev Page 1 of 5
Section 4 / Rev.6.0 2011-12-31 Page 1 of 5 Section 4 / Rev.6.0 2011-12-31 Page 2 of 5 AES Andres Latitude: 18º 24,4 N Longitude: 069º 37,6 W D.R: Chart 008 B.A. Chart 467 D.M.A. Chart 25849 Plan A Admiralty
More informationSuez Canal Transit. Characteristics of the current canal lengths
Suez Canal Transit The Suez Canal connects the Mediterranean Sea and the Red Sea and extends for a total length of 192 kilometres. The Mediterranean entrance is situated at Port Said and the Red Sea entrance
More informationPIANC-World Congress Panamá City, Panamá, 2018
Contractual Model for Dredging Projects to Avoid Disputes: Case Studies of the application of Performance Based Contracts in dredging projects around the world. ABSTRACT Prieto-Portar, L. 1, Prins, J.
More informationEnvironmental Impact Assessment of the dredging operations and aids to navigation works in the Argentina s Santa Fe Confluencia waterway.
of the dredging operations and aids to navigation works in the Argentina s Santa Fe Confluencia waterway. LIC. CLAUDIO DANIELE cdaniele@estudioayd.com.ar Presented by Ing. Martín Civeira Study area Argentina
More informationCONTROLLING DEPTHS and GUIDELINES
updated November 4, 2014 CONTROLLING DEPTHS and GUIDELINES May 05 Alliance East (UGG) 12.6m 212m May 05 Alliance West (UGG) 9.8m 212m 1987 Allied Shipyard 2.7m Dec 09 BC Sugar Refinery 8.5m 130m Oct 02
More informationArrival and Departure Instructions
Arrival and Departure Instructions TO GALAPAGOS You should aim to arrive at Guayaquil or Quito airport 2 hours before your flight. There are several steps to go through once you arrive at the airport:
More informationREPORT OF THE INVESTIGATION INTO THE BOTTOM CONTACT OF THE M.V. CIELO DI MONACO AT GREENORE PORT ON 28th SEPTEMBER 2015
REPORT OF THE INVESTIGATION INTO THE BOTTOM CONTACT OF THE M.V. CIELO DI MONACO AT GREENORE PORT ON 28th SEPTEMBER 2015 REPORT NO. MCIB/250 (No.8 OF 2016) The Marine Casualty Investigation Board (MCIB)
More informationVessel s name: MV TANAIS DREAM
Vessel s name: MV TANAIS DREAM Main Details Place and Date of built 23.01.2013 IMARBI SHIPBUILDING CO.,LTD / IMARBI, JAPAN Flag: BELIZE Port of Registry and Official N.: BELIZE CITY 371330076 IMO N.: 9283899
More informationPORT INFORMATION AND GUIDE TO PORT ENTRY
PORT INFORMATION AND GUIDE TO PORT ENTRY Port Authority Fowey Harbour Commissioners Address and Contact details Harbour Office Albert Quay Fowey CORNWALL PL23 1AJ TEL:- 00 44 (0)1726832471 FAX:- 00 44
More informationWWNWS3/3/2-VI Meeting 3 17 August MSI Self Assessment NAVAREA VI SUMMARY
WWNWS WWNWS3/3/2-VI Meeting 3 17 August 2011 MSI Self Assessment NAVAREA VI Submitted by ARGENTINA SUMMARY Executive Summary: Overview of activities undertaken within NAVAREA VI since WWNWS2 Action to
More informationMadagascar. Ports description
Madagascar Ports description Toamasina (Tamatave) Access Specification Map reference number and Description 1 Mole A - General cargo Length (m) Draught (m) East 110 6.50 Head 59 7.5 West 192 5 Remarks
More informationRed Lilly (all details are about)
Red Lilly (all details are about) GENERAL INFORMATION Compiling date (Last updated date 30/10/2012) Head Owner s full style Disponent Owner full style Managing company MAIN PARTICULAR Name Red Lilly Ex-names
More information(Note: This Declaration must be attached to the ship s Maritime Labour Certificate)
Maritime Labour Convention, 2006 Declaration of Maritime Labour Compliance Part I (Note: This Declaration must be attached to the ship s Maritime Labour Certificate) Issued under the authority of:... (insert
More informationARGENTINA, BRAZIL & URUGUAY TOUR Tango, Candombe, & Samba ITINERARY
ARGENTINA, BRAZIL & URUGUAY TOUR Tango, Candombe, & Samba 11 DAYS / 10 NIGHTS Experience the best of Argentina, Brazil and Uruguay and enjoy great dance shows with live music on this Tango, Candomble &
More informationPublic Works Research Institute
Public Works Research Institute INTERNATIONAL WORKSHOP ON WATER HAZARD AND RISK MANAGEMENT SOME EXPERIENCES OF FLOOD MANAGEMENT IN ARGENTINA VÍCTOR POCHAT National Director for Water Policies,Coordination
More informationINDEX. ARCHITECTURE Formosa
PRINCIPAL WORKS INDEX SANITATION & DRINKING WATER --------------------------------------------------------------------------------------- 3 WATER TREATMENT PLANTS -------------------------------------------------------------------------------------------
More informationREPORT BY THE NAVAL HYDROGRAPHIC SERVICE
IHO Hydrographic Committee on Antarctica (HCA) 13 th Meeting, Cádiz, Spain, 3-5 December 2013 REPORT BY THE NAVAL HYDROGRAPHIC SERVICE MINISTERIO DE DEFENSA SERVICIO DE HIDROGRAFIA NAVAL Tel.: (54-11)
More informationBOARD OF TRUSTEES OF THE GALVESTON WHARVES Tariff Circular No. 6
16th Revised Page 25 ISSUED: MAY 22, 2018 EFFECTIVE: JULY 1, 2018 DOCKAGE (I)(GS) 410 Except as otherwise provided herein, or as otherwise specified in Leases, Operating and Berthing Agreements or Terminal
More informationEfficiency that delivers GENERAL PRESENTATION UCSD FRONTERA FRIDAY APRIL 1 ST. 2016
Puerto Port of De Ensenada Efficiency that delivers GENERAL PRESENTATION UCSD FRONTERA FRIDAY APRIL 1 ST. 2016 HINTERLAND In 2014, the port handled more than 2 millions tons for the industrial, maquila,
More informationDalian VTS Guide for Users
Dalian VTS Guide for Users 3 rd Edition DALIAN MARITIME SAFETY ADMINISTRATION OF P.R.CHINA DALIAN VESSEL TRAFFIC SERVICE CENTER Introduction The aim of this Guide is to provide vessel traffic service users
More informationPaper xx - Waterways Management in Bahía Blanca Estuary
Paper xx - Waterways Management in Bahía Blanca Estuary BESSONE Gerardo Area de Dragado y Balizamiento (Consorcio de Gestión del Puerto de Bahía Blanca) (1 st author): gbessone@puertobahiablanca.com ABSTRACT:
More informationTerms, conditions and prices Trondheim Port Authority Valid from 1 January 2018
Terms, conditions and prices 2018 Trondheim Port Authority Valid from 1 January 2018 Cruise quays QUAY LENGTH DRAFT AIRDRAFT BEAM HEIGHT QUAYSIDE Quay 68 96m 13m Unlimited Unlimited 4m Quay 30 280m 8m
More informationChannel and Facility Guidelines
Channel and 54 Handling Guidelines for Vessel Movement Tampa Bay Main Channel Draft of 38-03 plus tide at any time, to a maximum of 40-03. Drafts of over 38-03 feet must be started in at least 4 hours
More informationThe Panama Canal Expansion: Myths and Realities for the North American Economy
2015 Center for Transportation Studies Research Conference, University of Minnesota The Panama Canal Expansion: Myths and Realities for the North American Economy Jean-Paul Rodrigue Professor, Dept. of
More informationJamaica Investment Forum 2018 th. Montego Bay
Jamaica Investment Forum 2018 th th June 12-14, 2018 Montego Bay West Indies Petroleum ( WIP or the Company ) is a 100% Jamaican owned company formed in 2013 specifically to enter the bunkering market
More informationPORT OF MATAMOROS ADMINISTRACIÓN PORTUARIA INTEGRAL DE TAMAULIPAS, S.A. DE C.V. H. MATAMOROS, TAMAULIPAS.
ADMINISTRACIÓN PORTUARIA INTEGRAL DE TAMAULIPAS, S.A. DE C.V. H. MATAMOROS, TAMAULIPAS. 2018 STRATEGIC LOCATION Port of Matamoros sits on the Gulf of Mexico in the northern part of the state of Tamaulipas,
More informationARGENTINA HOCKEY TOUR. Departure from place of origin to Buenos Aires, Argentina. DAY 1 Buenos Aires
ARGENTINA HOCKEY TOUR Departure from place of origin to Buenos Aires, Argentina. DAY 1 Buenos Aires Arrive at the International airport of Ezeiza, Buenos Aires A tour leader of Cecilia Tours will receive
More informationTARIFF OF HARBOUR DUES
PORT OF GDYNIA AUTHORITY S.A. JOINT-STOCK COMPANY TARIFF OF HARBOUR DUES Valid from 1 July 2007 The Tariff established by the Port of Gdynia Authority, S.A. under Resolution no. 168/II/2004 of 18 August
More informationREPORT BY THE NAVAL HYDROGRAPHIC SERVICE
IHO Hydrographic Committee on Antarctica (HCA) 15th Meeting, Niteroi, Brazil 26-28 June 2018 REPORT BY THE NAVAL HYDROGRAPHIC SERVICE MINISTERIO DE DEFENSA SERVICIO DE HIDROGRAFIA NAVAL Tel.: (54-11) 4301-0061/67
More informationSOLD - 404mt dwt Cargo Vessel Listing ID:
Australia - Chile - Indonesia - Great Britain - New Zealand - Panama - Philippines - South Korea - Thailand - USA E: sales@seaboats.net (sales) - E: admin@seaboats.net (accounts) SOLD - 404mt dwt Cargo
More informationIndicative Territorial Planning
INITIATIVE INITIATIVE FOR FOR THE THE INTEGRATION INTEGRATION OF OF REGIONAL REGIONAL INFRAESTRUCTURE INFRAESTRUCTURE IN IN SOUTH SOUTH AMERICA AMERICA Indicative Territorial Planning IIRSA PROJECT PORTFOLIO
More informationHOLIDAY WORK 08:30-16:30 08:30-16:30 08:30-16:30 08:30-16:30 08:30-16:30 IMPOSSIBLE
PORT KAGOSHIMA SHIBUSHI YATSUSHIRO BERTH PACIFIC TANIYAMA WHARF SHIBUSHI SILO ZEN-NOH SILO WAKAHAMA CHUO GAIKO WHARF NO.5 GRAIN TERMINAL NO.1 & 8 (PUBLIC) NO.1 (PUBLIC) (PUBLIC) DRAFT / L.O.A. 11.90 M
More informationMinistry of Social Affairs and Health, Finland N.B. Unofficial translation. Legally valid only in Finnish and Swedish
Ministry of Social Affairs and Health, Finland N.B. Unofficial translation. Legally valid only in Finnish and Swedish No. 395/2012 Adopted in Helsinki on 15 June 2012 Act on the Working and Living Environment
More informationNOTICE 01/2012 NOTICE TO SHIPOWNERS, SHIPPING AGENTS, MASTERS, PORT PILOTS, BUNKER VESSEL OPERATORS, PORT TERMINAL OPERATORS AND PORT COMMUNITY
PORT KELANG AUTHORITY NOTICE 01/2012 NOTICE TO SHIPOWNERS, SHIPPING AGENTS, MASTERS, PORT PILOTS, BUNKER VESSEL OPERATORS, PORT TERMINAL OPERATORS AND PORT COMMUNITY 1. DECLARATION OF NEW PORT LIMITS,
More informationDetailed Itinerary DAY 1 DAY 2
Into Chile Ways (from Ushuaia) Recommended Time: 17 Days Start: Ushuaia, Argentina End: Bariloche, Argentina Countries Visited: Argentina, Chile Detailed Itinerary DAY 1 Tierra del Fuego National Park
More informationCOMMONWEALTH OF THE BAHAMAS MINISTRY OF PUBLIC WORKS & TRANSPORT NASSAU HARBOUR PORT IMPROVEMENT PROJECT. Nassau Harbour Port Improvement Project
COMMONWEALTH OF THE BAHAMAS MINISTRY OF PUBLIC WORKS & TRANSPORT NASSAU HARBOUR PORT IMPROVEMENT PROJECT AUGUST 2009 OVERALL VIEW OF NASSAU HARBOUR AERIAL VIEW OF NASSAU HARBOUR PROJECT HISTORY 1960 s
More informationArgentina Solar Eclipse Tour 2020
Argentina Solar Eclipse Tour 2020 Exclusive tour designed for Tropical Sails Corp to Argentina for the December 14, 2020 Total Solar Eclipse. Day 1 07 DEC: USA Departure from USA to Buenos Aires Overnight
More informationWELCOME TO THE PORT OF OSLO PORT HANDBOOK
WELCOME TO THE PORT OF OSLO PORT HANDBOOK GENERAL INFORMATION - PORT OF OSLO Ingvar M. Mathisen Port Director/CEO +47 997 40 050 imm@oslohavn.no Jens Petter Christensen Port Captain +47 905 60 309 jpc@oslohavn.no
More informationThe Panama Canal: A Challenge to Efficiency in the 21st Century
The Panama Canal: A Challenge to Efficiency in the 21st Century Intertanko Chemical Conference April 8, 2008 Silvia de Marucci Leader, Liquid Bulk Segment smarucci@pancanal.com Physical Profile of the
More informationMARCH 2014 HYDROGRAPHIC REPORT
DEPARTMENT OF THE ARMY GALVESTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1229 GALVESTON, TEXAS 77553-1229 MARCH 2014 HYDROGRAPHIC REPORT CHANNELS WITH PROJECT DEPTHS 25 FEET OR OVER A report of the depths
More informationPreparing for Larger Cruise Vessels. Gary Ledford AAPA Facilities Engineering Seminar November 17, 2009
Preparing for Larger Cruise Vessels Gary Ledford AAPA Facilities Engineering Seminar November 17, 2009 Bigger is Better (for the cruise lines) Current Ships New Ships LOA (ft) 965 1116-1180 Beam (ft) 106
More information1. Part. cishipping.com. (15 February 2012)
DECLARATION OF MARITIME LABOUR COMPLIANCE - PART I 1. Part I of the Declaration of Maritime Labour Compliance has to be completed by the flag state and summarises the way in which the provisions of the
More informationIts climate is very mild, with almond trees in full bloom in December. Its temperature very seldom drops below 12 degrees centigrade.
Preliminary design of a new marina and artificial beach related to an urban development M. Poole Perez-Pardo Nautilus Servicios Tecnicos, S.L. Consulting Engineers, Camino Alto, 26 La Morale]a, 28109 Alcobendas,
More informationIsle of Man Ship Registry Maritime Labour Notice
Isle of Man Ship Registry Maritime Labour Notice Inspection, Certification & Definitions Ref: MLN 5.1.3 / 5.1.4 (Rev 2) Issued: 21 Nov 17 1. Introduction Commercial ships registered with the Isle of Man,
More informationLIFTing HEAVY CARGO FOR WORLDWIDE TRANSPORT
LIFTing HEAVY CARGO FOR WORLDWIDE TRANSPORT Newbuilding Happy D-type Happy Delta, Happy Diamond, Happy Dover, Happy Dragon, Happy Dynamic HATCH OPENINGS AND ALLOWABLE LOADS CRANES PRINCIPAL DIMENSIONS
More informationLIFTing HEAVY CARGO FOR WORLDWIDE TRANSPORT
LIFTing HEAVY CARGO FOR WORLDWIDE TRANSPORT Newbuilding Happy D-type Happy Delta, Happy Diamond, Happy Dover, Happy Dragon, Happy Dynamic HATCH OPENINGS AND ALLOWABLE LOADS CRANES PRINCIPAL DIMENSIONS
More informationMaster Plan of Costa Rica Atlantic Coast Limon - Moin. November, 2008 Costa Rica
Master Plan of Costa Rica 2009-2030 Atlantic Coast Limon - Moin November, 2008 Costa Rica America Main Maritimes routes Costa Rica is located in a strategic position next to Panama Canal and its future
More informationReducing emissions through innovative tug design
Reducing emissions through innovative tug design The new Wärtsilä Eco-Friendly tug Asian Tug Technology & Salvage Conference 18 th -19 th September 2017 1 Wärtsilä PUBLIC 12.10.2017 FACTOR TRENDS: ENVIRONMENT
More informationCIAIM-08/2017 REPORT. Grounding of the vessel TIDE NAVIGATOR at the Port of Vilanova i la Geltrú on 2 August 2016
Grounding of the vessel TIDE NAVIGATOR at the Port of Vilanova i la Geltrú on 2 August NOTICE This report was written by the Maritime Accident and Incident Investigation Commission (CIAIM), which is regulated
More informationBOARD OF TRUSTEES OF THE GALVESTON WHARVES Tariff Circular No. 6
15 th Revised Page 25 ISSUED: NOVEMBER 27, 2017 EFFECTIVE: JANUARY 1, 2018 DOCKAGE (I) (C)(GS) 410 Except as otherwise provided herein, or as otherwise specified in Leases, Operating and Berthing Agreements
More informationPORT OF MIIDURANNA PORT RULES
PORT OF MIIDURANNA PORT RULES Est. 2017 I General data of the Port. 1. Business form of the Port Authority. The owner and the keeper of Port of Miiduranna is AS Miiduranna Sadam. Address: Miiduranna tee
More informationPORT INFORMATION HANDBOOK
PORT INFORMATION HANDBOOK DISCLAIMER This Guide was compiled by Malacca Port Authority. The information contained in this Guide is produced in good faith and while every effort has been made to ensure
More information