MUSKOKA AIRPORT CROSS-WIND RUNWAY RELOCATION FEASIBILITY STUDY GRAVENHURST, ON FINAL REPORT. Prepared for:

Size: px
Start display at page:

Download "MUSKOKA AIRPORT CROSS-WIND RUNWAY RELOCATION FEASIBILITY STUDY GRAVENHURST, ON FINAL REPORT. Prepared for:"

Transcription

1 CROSS-WIND RUNWAY RELOCATION FEASIBILITY STUDY GRAVENHURST, ON FINAL REPORT Prepared for: Mr. Mark Stirling Airport Manager Muskoka Airport 1011 Airport Road Gravenhurst, Ontario P1P 1R1 Tel: (705) Prepared by: Mr. James Lindsey, M.Sc, C.M. Aviation Consultant GENIVAR, formerly PSMI 5915 Airport Road, Suite 400 Mississauga, ON Tel: x307 Fax: December, 2011 PSMI No

2 Table of Contents Page 1.0 INTRODUCTION AND GUIDING PRINCIPLES Introduction Study Objectives Study Methodology Transport Canada Regulations EXISTING CONDITIONS RUNWAY Physical Characteristics Operational Characteristics Airport Usability Aeronautical Zoning SITE SELECTION CRITERIA General Runway Length and Critical Aircraft Mix Topographical Conditions Airport Equipment and Navigational Aids Objects Airport Usability Factor AIRPORT SITE INSPECTION General Topographical Observations Airport Equipment and Navigational Aids Off-Site Obstructions Runway Threshold Field Assessment Runway Alignment Assessment PROPOSED RUNWAY Runway Alignment and Threshold Location Runway Length Airport Usability Factor 10 December, 2011 i GENIVAR, formerly PSMI

3 5.4 Object Removals and Relocations Airport Equipment Electronic Navigational Aids Tree Removals Physical Characteristics Aeronautical Zoning BUDGETARY COST ESTIMATE PREVAILING WIND CONDITIONS General Prevailing Winds vs. Airport Usability Historical Prevailing Wind Conditions Airport Usability Factor Summary CONCLUSIONS AND RECOMMENDATIONS Conclusions Recommendations Closing Observations 21 LIST OF FIGURES Figure 1 Historical Year-Round Wind Conditions ( ) Figure 2 Historical Daytime Summer Wind Conditions ( ) Figure 3 Historical Year-Round Wind Direction/Velocity ( ) Figure 4 Historical Daytime Summer Wind Direction/Velocity ( ) LIST OF TABLES Table 1 Physical Characteristics Runway Table 2 Aeronautical Zoning Physical Characteristics 12 Table 3 Budgetary Cost Estimate 14 Table 4 Windrose Airport Usability Code A Aircraft 19 LIST OF APPENDICES Appendix A Airport Layout & Proposed Runway Appendix B Budgetary Cost Estimate Appendix C Windrose analysis December, 2011 ii GENIVAR, formerly PSMI

4 1.0 Introduction and Guiding Principles 1.1 INTRODUCTION The Muskoka Airport (Airport) is a certified regional airport located in Bracebridge, ON, operated by The District Municipality of Muskoka through the Planning and Economic Development Department. The Airport is served by two (2) runways; Runway and Runway The primary runway; Runway is an asphalt runway measuring 6,000 ft x 150 ft serving the majority of the air traffic. The secondary runway; Runway is a turf cross-wind runway measuring 2,180 ft x 100 ft and serves the recreational aircraft community with light aircraft. The adjacent diagram sourced from the Canada Flight Supplement shows the existing site conditions of the Muskoka Airport. The co-ordinates for the Airport as found in the Canadian Flight Supplement are: N44 58'29.0" W79 18'12.0" The Airport has recently undertaken a number of studies and assessments related to airfield development and usability. The latest study was completed by GENIVAR in November 2010 to assess the existing airport usability factor using a windrose usability study. The purpose of this study was to assess if the Airport could meet Transport Canada 95% airport usability guidelines with only a single runway; Runway The motivation behind the study was that Runway restricts the expansion of an airside development area west of Runway Recently, a tenant expressed interest in constructing additional hangars in support of pending contracts for aircraft painting and refurbishing. Without the closure or relocation of Runway 09-27, alternative and more costly options would be required to support the proposed development. The study determined that Runway 18-36, achieves a usability factor of 95.48% during year-round conditions, meeting Transport Canada guidelines. However, during day-time summer conditions, the period of time where Runway is available to light recreational aircraft, the airport usability factor is only 93.66%. Therefore, a secondary cross-wind runway is recommended to support day-time summer operations by light recreational aircraft. December, GENIVAR, formerly PSMI

5 As a result, in May 2011, the Airport commissioned GENIVAR to assess the physical and operational feasibility of relocating Runway to enable the construction of the proposed hangar development. 1.2 STUDY OBJECTIVES GENIVAR, formerly Pryde Schropp McComb, Inc. was retained by the Muskoka Airport to complete a Cross-Wind Runway Relocation Feasibility Study. The objective of this study was to determine if Runway could be relocated such that it would permit the construction of the proposed hangar development while maintaining Transport Canada certification standards and airport usability factor recommendations. 1.3 STUDY METHODOLOGY Based on the foregoing objective, the following summarizes the methodology in which this study was undertaken: Collection and review of background information; including: o Airport Operations Manual o Airport Development Plan and Airport Master Plan o Meteorological Data from o Electronic airport base plans and digital imagery. Review the existing airport usability factor for both year-round conditions and day-time summer conditions. Undertake meetings with Airport staff and complete site inspection. Determine preferred runway alignment based on Transport Canada standards and recommendations for the sitting and orientation of the Runway. Complete an updated airport usability factor for the proposed runway system. Prepare a conceptual layout design; and, Prepare a summary report with recommendations. 1.4 TRANSPORT CANADA REGULATIONS The Cross-Wind Runway Relocation Feasibility Study was completed in accordance with Transport Canada standards and recommendations per TP312 Aerodrome Standards and Recommended Practices (4 th Edition) and TP1247 Aviation Land Uses in the Vicinity of Airports (8 th Edition). December, GENIVAR, formerly PSMI

6 2.0 Existing Conditions Runway PHYSICAL CHARACTERISTICS Runway is a turf cross-wind runway, oriented 080 T (091 M) & 260 T (271 M) and measures 2,180ft x 100ft (644.5m x 30.5m). According to Transport Canada certification standards, Runway has a reference code and operational classification of Code 1A non-instrument. A site plan of the Airport is enclosed in Appendix A. Runway was observed to be in good condition with only minor undulations and irregularities noted. The runway threshold and edges are identified by red/white markers and is regularly maintained by airport staff throughout the operational season. 2.2 OPERATIONAL CHARACTERISTICS Runway is typically operational in late April / early May and maintained until late October. During a normal season, Runway is utilized by approximately itinerant aircraft movements (i.e flights). 2.3 AIRPORT USABILITY The usability factor for Runway was calculated as part of the November 2010 Airport Windrose Usability Study for daytime summer conditions with Code A aircraft that have a maximum cross-wind component of 10 knots. Based on the above criteria, the usability factor for Runway was calculated to be 93.97%. When combined with Runway 18-36, the usability factor increases to 96.97% under a two (2) runway system for Code A and C aircraft. 2.4 AERONAUTICAL ZONING Runway has federal Airport Zoning Regulations enacted through SOR/ to protect its Obstacle Limitation Surfaces. Due to the physical characteristics of the operational (per certification) Obstacle Limitation Surfaces compared to the registered (per the Airport Zoning Regulations), Runway is under protected close into the runway threshold, but is over protected further out. This difference is traced back to the length of the runway strip, whereby the actual length of the runway is longer than what is protected under the Airport Zoning Regulations. However, since the Airport has control over the lands under the approaches, this close in impact is not significant and can be internally mitigated. December, GENIVAR, formerly PSMI

7 3.0 Site Selection Criteria 3.1 GENERAL As discussed in Section 1.2, the intent of this assignment is to assess the feasibility of relocating the existing turf Runway 09-27, in an effort to minimize the cost of expanding commercial developments at the Airport. Therefore, this objective is to provide a replacement to the existing Runway which meets Transport Canada standards for certified airports, while also meeting the same operational objectives at the least possible cost. 3.2 RUNWAY LENGTH AND CRITICAL AIRCRAFT MIX The existing Runway has a length of 2,180 ft (655 m), which is capable of serving light recreational general aviation aircraft (i.e. Cessna 172 or C172). In order to satisfy the requirements for this aircraft type, a runway of similar length is recommended, but no less than what is required for the departure of a Cessna 172 under normal conditions. Using the Pilots Operating Handbook (POH) for a C172, the take-off ground roll was calculated to be 1,100 ft from a dry grass runway with an elevation of 925 ft and a reference temperature of 25 C the operating conditions for the Muskoka Airport. Therefore, the runway length of the relocated turf-runway would be ideally 2,180 ft but no less than 1,100 ft to satisfy the operational requirements for the critical aircraft mix. 3.3 TOPOGRAPHICAL CONDITIONS In order to minimize construction costs, where possible the runway should be located on level ground free of major changes in elevation and not crossing ditches, water bodies or other features which will require major earthworks. 3.4 AIRPORT EQUIPMENT AND NAVIGATIONAL AIDS In order to minimize construction costs, where possible the runway should be located and oriented such that modifications or relocations to airport equipment and navigational aids is minimized. 3.5 OBJECTS Objects located off-site are outside of the control of the Airport, and are therefore considered fixed and should be avoided. Objects such as on-site airport equipment, navigational aids, and other vegetative features located on airport property are within the December, GENIVAR, formerly PSMI

8 control of the airport, and therefore can be modified, relocated or removed to facilitate the relocated of the turf runway. 3.6 AIRPORT USABILITY FACTOR Transport Canada recommends: The number and orientation of runways at an aerodrome should be such that the usability factor of the aerodrome is not less than 95 per cent for the aeroplanes that the aerodrome is intended to serve (TP312 4 th Edition s ). As discussed in Section 2.3, a comprehensive analysis was completed in November 2010 assessing the usability factor of the Muskoka Airport. This analysis determined that the existing two (2) runway system meets the Transport Canada criteria using a maximum cross-wind component of 10 knots during daytime summer conditions. Therefore, the proposed runway alignment should, at a minimum, meet the minimum Transport Canada recommendation. Furthermore, where possible the alignment should be such that it exceeds the existing usability factor based on either a single runway or two (2) runway system. December, GENIVAR, formerly PSMI

9 4.0 Airport Site Inspection 4.1 GENERAL On June 20, 2011 a site inspection was conducted to assess possible alignments for the proposed relocated turf-runway. A secondary site inspection was held on June 30, 2011 to validate initial observations regarding the proposed alignment and navigational aids. The primary site inspection held June 20, 2011 was completed by Mr. James Lindsey and Mr. Joshua Horst using the following equipment: Analogue inclinometer & digital laser range finder Hand-held GPS receiver Measuring wheel Digital Camera Compass Prior to undertaking the site inspection, a desktop analysis of the proposed relocated runway was completed using electronic CAD airport site plan which was previously provided by the Airport. The location and orientation of the proposed runway alignment was determined to be approximately northwest southeast based on previous planning analysis completed by both the Airport and previous consultancies as part of the Airport Master Plan. 4.2 TOPOGRAPHICAL OBSERVATIONS Initial observations from the site inspection are that the lands east of Runway and north of Runway are generally flat, level and of sandy soil conditions. The terrain falls away slightly east of the threshold of Runway 27 towards the fence line surrounding the south-eastern property boundary. No water bodies or other major topographical features were noted within the study area. The only existing structure observed within the general area is a gravel road which runs east/west between the Runway and the VHF-DF navigational aid. 4.3 AIRPORT EQUIPMENT AND NAVIGATIONAL AIDS The following airport equipment was inventoried within the subject area during the site inspection: Wind Direction Indicator Airport perimeter fencing Airport beacon December, GENIVAR, formerly PSMI

10 Also noted was a VHF-DF, an electronic navigational aid, which unlike other equipment is owned and operated by NAV CANADA. This equipment is used to guide lost aircraft to the airport using radio navigation, and is therefore sensitive to metallic objects. 4.4 OFF-SITE OBSTRUCTIONS In general, the alignment and length of the proposed relocated runway is dictated by offsite obstacles including trees at both ends of the proposed runway and the airport beacon located northwest of the north-western threshold. Tree heights were calculated using the laser range finder, and were determined to be approximately 10m 15m AGL. For the purpose of this analysis, off-site obstacles are fixed, and therefore cannot be removed or modified for the purpose of relocating Runway As a result, in order for the runway relocation to be feasible, off-site obstacles must not penetrate the approach surfaces which have a slope of 1:20 (5%) as required by Transport Canada for a Code 1A non-instrument runway. 4.5 RUNWAY THRESHOLD FIELD ASSESSMENT Following an overall inspection of the subject area based on the criteria described in Section 3.0, the approximate location of the proposed runway thresholds was assessed. The purpose of the field assessment was to identify an alignment that provides sufficient length while clearing off-site obstacles as required by Transport Canada. Using the wind direction indicator as a starting point and defined location, off-site obstacles were investigated to assess the approximate threshold location. Utilizing the analogue inclinometer, it was determined that an approach over the trees to the northwest, north of the airport beacon, is feasible based on an approach surface for a Code 1A non-instrument runway. The following pictures show both the approach (left image) and runway alignment (right image) of the north-western threshold location as determined during the site inspection. GPS coordinates of the proposed threshold was recorded for further in-depth analysis. North-western Threshold Facing Northwest (Approach) North-western Threshold Facing Southeast (Alignment) December, GENIVAR, formerly PSMI

11 Standing at the south-eastern corner of the airport, east of the threshold for Runway 27, the location of the reciprocal runway end was assessed. Using a similar method as the north-western threshold, the south-eastern threshold was determined based on the requirements to clear off-site obstacles with an additional consideration of topographical features and the estimated runway alignment relative to the wind direction indicator and airport beacon at the opposite end of the runway. Unlike the north-western threshold, there are a number of vegetative features located on airport property which can be trimmed or removed to facilitate the relocation of the turf runway. Therefore, the analysis of the south-eastern threshold included a visual assessment of the property boundary as marked by the paige-wire fencing located beyond the security/wildlife chaining fencing. The following pictures show both the approach (left image) and runway alignment (right image) of the south-eastern threshold location as determined during the site inspection. GPS coordinates of the proposed threshold was recorded for further in-depth analysis. South-eastern Threshold Facing Southeast (Approach) South-eastern Threshold Facing Northwest (Alignment) 4.6 RUNWAY ALIGNMENT ASSESSMENT Based on the two (2) threshold locations identified during the site inspection, it was determined using a compass that the alignment of the proposed relocated runway is Runway December, GENIVAR, formerly PSMI

12 5.0 Proposed Runway RUNWAY ALIGNMENT AND THRESHOLD LOCATION Immediately following the site inspection, GPS coordinates of the airport equipment, navigational aids and proposed threshold locations were digitized into the electronic CAD airport base plan. Also recorded and inputted into the CAD base plan were the approximate tree heights and height of the airport beacon. Using this information, it was determined that the alignment for the relocated Runway is 147 T/327 T (136 M/316 M); validating the field assessment of a runway designation number of per Transport Canada regulations. The following photographs show the proposed centreline alignment for Runway 14-32, including off-site obstacles impacting the location and orientation of the thresholds: Runway 14 Obstacles and Runway Centerline Alignment Airport Beacon Off-Site Trees Runway Centreline Off-Site Trees Approach Surface Elevation At Object As shown above, there are a number of trees located on the west side of Gravenhurst Parkway, which impacts the threshold location for Runway 14. Runway 32 Obstacles and Runway Centerline Alignment Off-Site Trees Runway Centreline Trees Removals Trees Removals Approach Surface Elevation At Object December, GENIVAR, formerly PSMI

13 As shown above, there are a number of trees which are located both on airport property and off airport property. Those located on airport property are located above the approach surface elevation level, and can therefore be removed. It should be noted that the exact limits of the Airport property boundary are not known, and were not clearly marked during the site inspection. Therefore, the process utilized to identify on site and off-site trees conservatively estimated the depth of the property at this location. Following a detailed site survey, it is anticipated that the threshold will shift further southeast, increasing the proposed runway length. A site plan of the proposed Runway is enclosed for reference in Appendix A. 5.2 RUNWAY LENGTH The runway length was calculated using recorded GPS coordinates captured during the site inspection and further validate following the digitization of the field observations. According to the analysis, it was determined that a runway length of 1,850ft is feasible based on the proposed threshold location and orientation for Runway As discussed above, it is anticipated that this length will increase following a more detailed site survey which would accurately identify the airport property boundary and the heights and locations of on-site and off-site obstacles. The runway length of 1,850 ft is 330 ft less than the current Runway 09-27, which is not ideal. However, this length exceeds the take-off ground roll requirements for the C172 as determined using the aircraft POH. Therefore, a runway length of 1,850 ft is sufficient to accommodate the aircraft fleet mix of small recreational general aviation aircraft. 5.3 AIRPORT USABILITY FACTOR Using the same meteorological data used in the November 2010 windrose and usability factor study, the usability factor for Runway was calculated. According to this analysis, Runway achieves a usability factor of 96.98% based on a maximum cross-wind component of 10 knots during daytime summer conditions. At 96.98%, this usability factor is substantially greater than the existing Runway at 93.97%, and furthermore exceeds Transport Canada regulations for single runway airport usability. When combined with Runway 18-36, the usability factor for the two (2) runway system increases to 98.91% which again exceeds the existing conditions at 96.97%. In fact, due to the ability for the proposed Runway to capture the high velocity winds (those greater than 10 knots) which originate from the northwest, the existing single runway usability factor for Runway exceeds the combined usability factor for Runway and Runway December, GENIVAR, formerly PSMI

14 In terms of single runway usage, from a windrose usability perspective, Runway is the preferred runway alignment and could support single runway operations according to Transport Canada recommendations. 5.4 OBJECT REMOVALS AND RELOCATIONS The following details the objects and equipment that must be removed or relocated to enable the construction and operation of the proposed relocated Runway 14-32: Airport Equipment One of the objectives in determining the alignment of Runway was to avoid the existing airport beacon. The airport beacon sits atop an old steal structure located on the west side of Gravenhurst Parkway, and has been at the Airport since its original construction. The wind direction indicator, located near the proposed threshold of Runway 14, must be relocated south to avoid the runway strips for the adjacent two (2) runways. During the site inspection, this equipment appeared to be in good condition, and therefore could be relocated rather than replaced; however new cabling would be required for the lighting system. Also, airport security fencing located at the south-eastern corner of the Airport must be relocated to clear the Obstacle Limitation Surfaces for Runway Where possible the fencing, which is fairly new and in good condition, will be reused to minimize costs Electronic Navigational Aids NAV CANADA owns and operates a VHF-DF at the Airport. As this equipment uses radio frequencies to triangulate the position of aircraft, it is sensitive to adjacent metallic objects. Transport Canada, through TP1247 Aviation Land Use in the Vicinity of Airports (8 th Edition), provides guidance on the protection against electronic interference of electronic navigational aids. Based on the proposed location and alignment of Runway 14-32, the runway will remain clear of the 45 m radius protection area; which should be clear of all objects, but is within the 90 m radius protection area; which should be clear of trees, fences and vehicles. As this equipment is owned and operated by NAV CANADA, consultation through the Land Use Program using the Land Use Proposal Submission Form should be initiated to determine if relocations or modifications to the VHF-DF is required Tree Removals As discussed above, there are a number of trees located on airport property which must be removed to accommodate the proposed Runway The majority of these trees December, GENIVAR, formerly PSMI

15 are located under the approach surface of Runway 32, however there is also a group of trees located immediately east of the threshold to Runway 32. The thresholds for Runway have been located such that trimming or removal of off-site trees is not required. Therefore, all of the trees which must be modified are on airport property and are therefore within the control of the Airport. However, in the event that additional off-site tree clearing is possible, primarily to the southeast, additional runway length is feasible. The recommended tree removals are shown in Appendix A. 5.5 PHYSICAL CHARACTERISTICS Based on the foregoing analysis, the following Table 1 summarizes the proposed physical characteristics for Runway 14-32: Table 1 Physical Characteristics Runway Criteria Runway 14 Runway 32 Runway Length 1,850 ft (564 m) Runway Width 100 ft (30.5 m) Threshold Co-ordinates N W N W Runway Orientation 136 M / 147 T 316 M / 327 T 5.6 AERONAUTICAL ZONING Similar to Runway 09-27, Runway will have a reference code and operational classification of Code 1A Non-Instrument, and therefore, will both have similar Obstacle Limitation Surfaces physical characteristics; as summarized in Table 2 below: Table 2 Aeronautical Zoning Physical Characteristics Criteria Runway 14 Runway 32 Reference Code Code 1A - NI Code 1A - NI Runway Strip Distance from Threshold 30m 30m Width (each side of CL) 30m 30m Approach Surface Length 2,500m 2,500m Divergence 10% 10% Slope 5% (1:20) 5% (1:20) Transitional Surface Slope 20% (1:5) 20% (1:5) Notes: Per TP312 Aerodrome Standards and Recommended Practices 4 th Edition. December, GENIVAR, formerly PSMI

16 However, unlike Runway 09-27, Runway will not have federal protection under the Airport Zoning Regulations. As a result, future off-site developments within 900 m of the threshold could impact the Obstacle Limitation Surfaces for Runway Beyond 900m, Approach Surface is greater than 45 m AAE (Above Aerodrome Elevation), and is therefore protected by the Outer Surface. Modifying Airport Zoning Regulations can be an expensive assignment, as land titles of all properties impacted by the changes would need to be revised. Other Airports in southern Ontario have recently undertaken this process, costing in excess of $300,000 each. In the case of the Muskoka Airport, this process would not be cost effective as Runway is a turf cross-wind runway with a relatively steep Approach Surface. A more cost effective process would be for the Airport to review development proposals and oppose applications which may impact the Obstacle Limitation Surfaces. December, GENIVAR, formerly PSMI

17 6.0 Budgetary Cost Estimate A budgetary cost estimate of the proposed runway relocation has been prepared, and is summarized in Table 3 below: Table 3 Budgetary Cost Estimate No. Item Quantity Unit Cost Total 1.0 Earthworks 1.1 Topsoil Stripping 2,820 m³ $1.00 $ 2, Excavation to Embankment 1,410 m³ $5.00 $ 7, Imported Fill 5,650 m³ $10.00 $ 56, Place Salvaged Topsoil 22,500 m² $2.00 $ 45, Place Imported Topsoil 5,625 m² $5.00 $ 28, Hydraulic Seed and Mulch 28,125m² $1.00 $ 28, Relocate Lighted Wind Direction Indicator Sub-Total: Earthworks $ 167, Relocate Wind Direction Indicator 1 ea. $7, $ 7, New Pull Pit 1 ea. $ $ New Cabling 250m $60.00 $ 15, Sub-Total: Relocated Lighted Wind Direction Indicator $ 23, Security Fence Modifications/Relocations 3.1 Remove Existing Fence 400m $2.00 $ New Security Fence 700m $70.00 $ 49, Tree Removals Sub-Total: Security Fence Modifications/Relocations $ 49, Clearing and Grubbing 3.4 ha $5, $ 17, Sub-Total: Tree Removals $ 17, Total $257, Notes: 1. Prices in 2011 Dollars 2. HST not included. 3. Pavement structure to be confirmed by geotechnical investigation & pavement design. 4. Quantities shown are preliminary. 5. Quantities to be verified by topographical survey and design process. 6. Prices do not include engineering or contingency fees. As discussed in Section 5.3.2, it may be required to modify or relocate the VHF-DF, an electronic navigational aid owned and operated by NAV CANADA. Costs associated with the modification of this equipment must be negotiated with NAV CANADA, but could run cost upwards of $150,000 should NAV CANADA force the full cost on the Airport. A detailed breakdown of the budgetary cost estimate is included in Appendix B. December, GENIVAR, formerly PSMI

18 7.0 Prevailing Wind Conditions 7.1 GENERAL During several public meetings with the District Municipality of Muskoka Planning and Economic Development Committee, local pilot groups strongly opposed the relocation of the existing Runway due to the perceived prevailing wind conditions at the Airport. The purpose of this section is to review the prevailing wind conditions at the Muskoka Airport, and discuss potential usability and safety impacts it would have on the Airport. This section is supplementary to the report titled Muskoka Airport Windrose Usability Study completed by GENIVAR, formally PSMI, in November PREVAILING WINDS VS. AIRPORT USABILITY In meteorology, prevailing winds are defined as the wind direction most frequently observed during a given period (Meteorology Today An Introduction to Weather, Climate and the Environment). However, in aviation both wind direction and velocity are used to assess the take-off and landing performance and capability of aircraft. Aircraft, due to wing design and the theory of flight, have the greatest performance when they take-off and land into the wind. However, this is rarely feasible as wind conditions are constantly changing, yet the alignment of runways are fixed. Therefore, aircraft are designed and pilots are trained to land during cross-wind conditions. There is however a maximum cross-wind component that aircraft are designed to handle and in the case of small recreational aircraft, such as those that use turf runways, it is typically 10 knots. As a result, Transport Canada, along with other International Civil Aviation organizations, recommends the use of a windrose analysis to determine the airport usability factor based on the specified maximum cross-wind component of the design aircraft. By definition a windrose indicates the percentage of time during which observed winds at the site are within corresponding orientation limits and speed limits (Airport Systems Planning, Design and Management). Therefore, prevailing winds account for direction only, while a windrose accounts for wind direction and velocity, the two (2) factors required for calculating the cross-wind component and usability factor. It should also be noted that when used in aviation, a prevailing wind study should assess both the ends of the runway. A single runway has two (2) ends in which aircraft can take-off and land, this is known as the reciprocal runway end. Therefore, when assessing prevailing winds for runways, the analysis should include both directions i.e. Runway 09 & 27, or 14 & 32. December, GENIVAR, formerly PSMI

19 By default, the windrose analysis considers both runway ends when calculating the usability factor. This is why it is the primary method used internationally to assess the usability factor of airport, regardless of their size or critical design aircraft. 7.3 HISTORICAL PREVAILING WIND CONDITIONS The following two (2) diagrams show the historical prevailing wind conditions at the Airport. The yellow area indicates the combined usability factor for both runway directions (i.e. is mirrored), whereby the peak at 120 T is equal to the peak at 300 T. Figure 1 below shows the year-round prevailing wind conditions. As shown, the prevailing winds are from the west (in degrees true), which are approximately 10 off the existing Runway However, when considering both Runway 27 and its reciprocal Runway 09, Runway is not preferred due to the low percentage of wind from the east. Under these conditions, the winds are predominantly from the southeast and the northwest, and therefore a runway alignment in this orientation is favourable. Figure 1 Historical Year-Round Wind Conditions ( ) December, GENIVAR, formerly PSMI

20 Figure 2 Historical Daytime Summer Wind Conditions ( ) An important consideration when assessing historical prevailing wind conditions is the wind velocity. Since aircraft are able to safely operate on a single runway anytime when winds are less than 10 knots, it is the winds over 10 knots which are concerning to pilots. When the winds exceed 10 knots, the pilot must utilize a runway which, by way of the cross-wind component, reduces the effective cross-wind to a velocity less than 10 knots. In the case of the Muskoka Airport, Figures 1 and 2 demonstrate that the prevailing winds, regardless of wind velocity, predominantly come from the west. However, during daytime summer conditions nearly 85% of all winds are less than 10 knots. Therefore it is the remaining 15% of the winds that must be investigated when assessing the preferred alignment of a runway. As a result, the following two (2) figures were generated to assess the wind direction when the wind velocity exceeds 10 knots. As discussed above, a single runway has two (2) approaches, therefore the below figure shows the combined wind direction/velocity percentages based on both ends (i.e. 90 & 270 ). December, GENIVAR, formerly PSMI

21 Figure 3 Historical Year-Round Wind Direction/Velocity ( ) Figure 4 Historical Daytime Summer Wind Direction/Velocity ( ) December, GENIVAR, formerly PSMI

22 As shown above, winds that are over 10 knots (shown in orange) predominantly come from the northwest/southeast. As discussed above, it is these winds that have the greatest impact on flight operations and on the usability factor. Winds that are less than 10 knots (shown in green) are accessible to Code A (light recreational aircraft) on any runway and are not impacted by changes in the runway alignment. 7.4 AIRPORT USABILITY FACTOR SUMMARY Following the assessment of the prevailing wind conditions and the direction of winds over 10 knots, it is clear why Runway achieves a greater usability factor over both Runway and Runway 14-32, which is briefly summarized below: 1. A prevailing wind analysis assesses only wind direction; however aircraft flight operations are impacted by the combination of wind direction and velocity. 2. The windrose analysis, which is used by international civil aviation authorities, uses both wind direction and velocity to assess the airport usability factor. 3. The actual prevailing winds come from the west (in degrees true) which is 10 off the alignment of Runway A single runway has two (2) approaches; however the percentage of time when winds are from the northeast and southwest is very low, resulting in the reciprocal runway having a low usability factor. 5. Winds greater than 10 knots, which are both a concern for pilots and impact the airport usability factor, have a high percentage from the northwest/southeast and a low percentage from the northeast/southwest. As a result, the usability factor for Runway is preferred over Runway and Runway 18-36, as shown below in Table 4 and enclosed in Appendix C: Table 4 Windrose Airport Usability Code A Aircraft Scenario Criteria Usability Factor A. Runway Daytime / Summer 93.79% B. Runway Daytime / Summer 93.66% J. Runway Daytime / Summer 96.98% H. Runway & Daytime Summer / Year-round 96.97% I. Runway & Daytime Summer / Year-round 98.91% Notes: 1. Based on meteorological data for the Muskoka Airport between 1990 and Combined two (2) runways based on general year-round operating conditions where Runway is available year-round, while the turf cross-wind runway is available daytime summer only. Runway is therefore preferred over Runway in terms of wind conditions and airport usability factor. December, GENIVAR, formerly PSMI

23 8.0 Conclusions and Recommendations 8.1 CONCLUSIONS Based on the foregoing, the following was determined: 1. Due to the need for immediate developable lands and economy of construction, the Airport is investigating the feasibility of relocating the existing turf cross-wind runway, Runway Runway is situated on lands that would require minimal earthworks and service extension for commercial development. 3. A previous meteorological windrose study determined that, though not required according to Transport Canada recommendations, it is recommended that Runway be maintained to support cross-wind operations for light single engine recreational aircraft. 4. This study determined that the windrose usability factor for Runway during daytime summer conditions with a maximum cross-wind component of 10 knots was 93.79%, increasing to 96.97% when combined with Runway Following a site assessment, it was determined that an alternative alignment for the cross-wind runway, in a northwest/southeast orientation is feasible. 6. This proposed Runway would measure approximately 1,950 ft x 100 ft which is sufficient to support flight operations by private recreational aircraft. 7. The alignment of the runway is such that the flight path and protection surfaces avoid the airport beacon west of the airport and other off-site obstructions. 8. A number of on-site obstructions, including trees and airport fencing, would have to be removed and/or relocated to ensure compliance with Transport Canada standards and recommendations. 9. The proposed Runway achieves a usability factor of 96.98%, increasing to 98.91% when combined with Runway Due to the wind conditions at the Muskoka Airport, and the prevalence of winds over 10 knots coming from the northwest/southeast, the usability factor exceeds those of the existing Runway and Runway The VHF-DF, a navigational aid owned and operated by NAV CANADA, might require relocation due to its proximity to the proposed Runway A budgetary cost estimate for the relocation of the turf runway was assessed at $257,720, which excludes the cost, if necessary, to relocate the VHF-DF. December, GENIVAR, formerly PSMI

24 13. Relocating the existing turf runway is therefore: a. Feasible, b. Results in greater usability of the Airport for private single engine general aviation recreational aircraft; and, c. Provides an immediate and cost effective means of increasing lands suitable for commercial development. 8.2 RECOMMENDATIONS Based on the foregoing, the following is recommended: 1. The Airport approve in principle the relocation of the turf runway. 2. The Airport initiate consultations with NAV CANADA through the submission of a Land Use Proposal submission form to assess the operational impact of Runway on the VHF-DF. 3. The Airport engage a consultant to initiate the relocation of Runway and the design and construction of the proposed Runway The Airport engage a consultant to initiate the design and construction of the taxiway and site services extension required to support the proposed commercial development. 8.3 CLOSING OBSERVATIONS The foregoing detailed analysis, which was completed in accordance with both Transport Canada standards and recommendations, and international practices, validated previous analysis and determined that relocating the turf cross-wind runway is not only feasible but would result in increased airport usability. Recently opponents have argued the existing Runway is aligned with prevailing winds and relocating the runway would result in unsafe operating conditions for private recreational aircraft. However, historical meteorological data shows this to only be partially valid and excludes the reality that wind conditions greater than 10 knots come not from the west, but from the northwest/southeast and rarely from the northeast. It is these conditions, when winds are greater than 10 knots, that are most concerning to pilots and have the potential to result in cross-wind conditions that exceed the safe operating limits of their aircraft. As a result, it is these wind conditions that have the greatest impact on the usability factor, as is demonstrated by the resulting windrose analysis. Though marginal, the Runway at 96.98% is better aligned with the wind conditions than Runway and Runway December, GENIVAR, formerly PSMI

25 All of which is respectfully submitted, GENIVAR, formerly Pryde Schropp McComb Inc. Prepared By: James P. Lindsey, M.Sc. C.M. Aviation Consultant R:\PSMI-Operations\Working_Files\Projects\ Muskoka Rwy Relocatrion Feasibility\Reports\ Muskoka Xwind Relocation Feasibility Study ver 1a doc December, GENIVAR, formerly PSMI

26 APPENDIX A AIRPORT LAYOUT & PROPOSED RUNWAY 14-32

27

28 APPENDIX B BUDGETARY COST ESTIMATE

29

30

31

32

33

34

35

36 APPENDIX C WINDROSE ANALYSIS

37

38

39

40

41

AERODROME LICENCE APPLICATION PROCESS

AERODROME LICENCE APPLICATION PROCESS 0000180111 Page 2 Why is a Licence Required? An aerodrome licence is required for a site if it is intended to facilitate operations by commercial transport aircraft, other aerial work other than rotorcraft,

More information

Consideration will be given to other methods of compliance which may be presented to the Authority.

Consideration will be given to other methods of compliance which may be presented to the Authority. Advisory Circular AC 139-10 Revision 1 Control of Obstacles 27 April 2007 General Civil Aviation Authority advisory circulars (AC) contain information about standards, practices and procedures that the

More information

Appendix C AIRPORT LAYOUT PLANS

Appendix C AIRPORT LAYOUT PLANS Appendix C AIRPORT LAYOUT PLANS Appendix C AIRPORT LAYOUT PLANS Airport Master Plan Santa Barbara Airport As part of this Airport Master Plan, the Federal Aviation Administration (FAA) requires the development

More information

CHAPTER 3 ALTERNATIVES CONSIDERED

CHAPTER 3 ALTERNATIVES CONSIDERED CHAPTER 3 ALTERNATIVES CONSIDERED 3.0 ALTERNATIVES The 2010 Stevensville Airport Master Plan contained five (5) airside development options designed to meet projected demands. Each of the options from

More information

Addendum - Airport Development Alternatives (Chapter 6)

Addendum - Airport Development Alternatives (Chapter 6) Bowers Field Addendum - Airport Development Alternatives (Chapter 6) This addendum to the Airport Development Alternatives chapter includes the preferred airside development alternative and the preliminary

More information

1.1.3 Taxiways. Figure 1-15: Taxiway Data. DRAFT Inventory TYPICAL PAVEMENT CROSS-SECTION LIGHTING TYPE LENGTH (FEET) WIDTH (FEET) LIGHTING CONDITION

1.1.3 Taxiways. Figure 1-15: Taxiway Data. DRAFT Inventory TYPICAL PAVEMENT CROSS-SECTION LIGHTING TYPE LENGTH (FEET) WIDTH (FEET) LIGHTING CONDITION 1.1.3 Taxiways EWN has an extensive network of taxiways and taxilanes connecting the terminal, air cargo, and general aviation areas with the runways as listed in Figure 1-15. A 50-foot wide parallel taxiway

More information

Chapter Six ALP Drawings. Tacoma Narrows Airport. Master Plan Update

Chapter Six ALP Drawings. Tacoma Narrows Airport. Master Plan Update Chapter Six ALP Drawings Master Plan Update The master planning process for the (Airport) has evolved through efforts in the previous chapters to analyze future aviation demand, establish airside and landside

More information

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES Page 1 of 8 1. PURPOSE 1.1. This Advisory Circular provides guidance to personnel involved in construction of instrument and visual flight procedures for publication in the Aeronautical Information Publication.

More information

Agenda: SASP SAC Meeting 3

Agenda: SASP SAC Meeting 3 Agenda: SASP SAC Meeting 3 Date: 04/12/18 Public Involvement Plan Update Defining the System Recommended Classifications Discussion Break Review current system Outreach what we heard Proposed changes Classification

More information

According to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the elements that affect airfield capacity include:

According to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the elements that affect airfield capacity include: 4.1 INTRODUCTION The previous chapters have described the existing facilities and provided planning guidelines as well as a forecast of demand for aviation activity at North Perry Airport. The demand/capacity

More information

Document prepared by MnDOT Office of Aeronautics and HNTB Corporation. MINNESOTA GO STATE AVIATION SYSTEM PLAN

Document prepared by MnDOT Office of Aeronautics and HNTB Corporation. MINNESOTA GO STATE AVIATION SYSTEM PLAN LAST UPDATE JULY 2013 Acknowledgements The preparation of this document was financed in part by a grant from the Federal Aviation Administration (Project No: 3-27-0000-07-10), with the financial support

More information

Runway Length Analysis Prescott Municipal Airport

Runway Length Analysis Prescott Municipal Airport APPENDIX 2 Runway Length Analysis Prescott Municipal Airport May 11, 2009 Version 2 (draft) Table of Contents Introduction... 1-1 Section 1 Purpose & Need... 1-2 Section 2 Design Standards...1-3 Section

More information

Merritt Island Airport

Merritt Island Airport TABLE OF CONTENTS CHAPTER 1 INTRODUCTION... 1-1 INTRODUCTION AND PROJECT OVERVIEW... 1-1 General Guidelines... 1-1 Prior Planning Documentation... 1-2 Key Issues... 1-2 Goals and Objectives... 1-2 Regulatory

More information

Overview ICAO Standards and Recommended Practices for Aerodrome Safeguarding

Overview ICAO Standards and Recommended Practices for Aerodrome Safeguarding Overview ICAO Standards and Recommended Practices for Aerodrome Safeguarding References The Convention on International Civil Aviation (Chicago Convention) ICAO SARPS Annex 14 Vol. I, 7 th Edition, July

More information

CATCODE ] CATCODE

CATCODE ] CATCODE Runways. FAC: 1111 CATCODE: 111111 OPR: AFCEC/COS OCR: AF/A3O-A 1.1. Description. The runway is the paved surface provided for normal aircraft landings and take offs. Runways are classified as either Class

More information

Source: Chippewa Valley Regional Airport ASOS, Period of Record

Source: Chippewa Valley Regional Airport ASOS, Period of Record Chapter 1 Inventory Runway wind coverage is the percentage of time a runway can be used without exceeding allowable crosswind velocities. Allowable crosswind velocities vary depending on aircraft size

More information

Sample Regulations for Water Aerodromes

Sample Regulations for Water Aerodromes Sample Regulations for Water Aerodromes First Edition (unedited version) March 2015 Notice to users: This document is an unedited version which is made available to the public for convenience. Its content

More information

2009 Muskoka Airport Economic Impact Study

2009 Muskoka Airport Economic Impact Study 2009 Muskoka Airport Economic Impact Study November 4, 2009 Prepared by The District of Muskoka Planning and Economic Development Department BACKGROUND The Muskoka Airport is situated at the north end

More information

New Opportunities PUBLIC WORKSHOP. Venice Municipal. Bringing g the pieces together

New Opportunities PUBLIC WORKSHOP. Venice Municipal. Bringing g the pieces together Bringing g the PUBLIC WORKSHOP Venice Municipal Airport New Opportunities Presented for Venice City Council & Citizens of Venice September 25, 2009 Slide 1 Bringing g the Welcome & Introductions May 12th

More information

CHAPTER 1: INTRODUCTION

CHAPTER 1: INTRODUCTION CHAPTER 1: INTRODUCTION Purpose and Scope The information presented in this report represents the study findings for the 2016 Ronan Airport Master Plan prepared for the City of Ronan and Lake County, the

More information

Staff Instruction. Aerial Assessment Requirements Prior to Heliport Certification

Staff Instruction. Aerial Assessment Requirements Prior to Heliport Certification Staff Instruction Subject: Aerial Assessment Requirements Prior to Heliport Certification Issuing Office: Standards Document No.: SI 305-001 File Classification No.: Z 5000-32 Issue No.: 01 RDIMS No.:

More information

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES INTRODUCTION An Airport Master Plan provides an evalua on of the airport s avia on demand and an overview of the systema c airport development that will best meet those demands. The Master Plan establishes

More information

GCAA ADVISORY CIRCULAR

GCAA ADVISORY CIRCULAR GUYANA CIVIL AVIATION AUTHORITY 73 High Street Kingston Georgetown GUYANA TEL. NOs: (592) 225 6822, 225 0778, 227 8111 FAX: (592) 225 6800 E-mail: director-general@gcaa-gy.org GCAA ADVISORY CIRCULAR AERODROME

More information

Billy Bishop Toronto City Airport; Porter Airlines Proposal Review; Interim Results/Findings, Airbiz, 26 June 2013

Billy Bishop Toronto City Airport; Porter Airlines Proposal Review; Interim Results/Findings, Airbiz, 26 June 2013 Billy Bishop Toronto City Airport - Outstanding Questions for Transport Canada EXECUTIVE SUMMARY Transport Action has reviewed the reports published by Airbiz and LPS Avia Consulting and found that they

More information

The following criteria shall be applied within the boundaries of the AO District:

The following criteria shall be applied within the boundaries of the AO District: Sec. 419 (a) Purpose AIRPORT OVERLAY DISTRICT (AO) The purpose of the Airport Overlay District is to regulate and restrict the height of structures, objects, or natural growth, regulate the locations of

More information

Flying Cloud Airport (FCM) Zoning Process: Informing a Mn/DOT Path Forward

Flying Cloud Airport (FCM) Zoning Process: Informing a Mn/DOT Path Forward : Informing a Mn/DOT Path Forward A Review of the Flying Cloud Airport (FCM) Joint Airport Zoning Board (JAZB) Process and the Draft Airport Zoning Ordinance B A RPZ RPZ A B C Zone Chad E. Leqve Director

More information

FACILITY REQUIREMENTS SUMMARY OF KEY ISSUES OVERVIEW

FACILITY REQUIREMENTS SUMMARY OF KEY ISSUES OVERVIEW FACILITY REQUIREMENTS SUMMARY OF KEY ISSUES OVERVIEW This summary is intended to provide a brief overview of the key issues associated with conformance to FAA standards at Methow Valley State Airport.

More information

AD 2. AERODROMES. For the ICAO location indicators used for Canadian aerodromes, refer to the following publications:

AD 2. AERODROMES. For the ICAO location indicators used for Canadian aerodromes, refer to the following publications: AIP CANADA (ICAO) PART 3 AERODROMES (AD) AD 2. AERODROMES AD 2.1 Aerodrome Location Indicator and Name For the ICAO location indicators used for Canadian aerodromes, refer to the following publications:

More information

CHAPTER 1 BACKGROUND AND PROPOSED ACTION

CHAPTER 1 BACKGROUND AND PROPOSED ACTION CHAPTER 1 BACKGROUND AND PROPOSED ACTION 1.0 INTRODUCTION An Environmental Assessment (EA) evaluates the effects of a proposed Federal action on the surrounding environment and is prepared in compliance

More information

The purpose of this Demand/Capacity. The airfield configuration for SPG. Methods for determining airport AIRPORT DEMAND CAPACITY. Runway Configuration

The purpose of this Demand/Capacity. The airfield configuration for SPG. Methods for determining airport AIRPORT DEMAND CAPACITY. Runway Configuration Chapter 4 Page 65 AIRPORT DEMAND CAPACITY The purpose of this Demand/Capacity Analysis is to examine the capability of the Albert Whitted Airport (SPG) to meet the needs of its users. In doing so, this

More information

FIJI ISLANDS AERONAUTICAL INFORMATION CIRCULAR

FIJI ISLANDS AERONAUTICAL INFORMATION CIRCULAR ANR 31 REFERS FIJI ISLANDS AERONAUTICAL INFORMATION CIRCULAR Civil Aviation Authority of Fiji Private Bag (NAP0354), Nadi Airport Fiji Tel: (679) 6721 555; Fax (679) 6721 500 Website: www.caafi.org.fj

More information

Chapter 4.0 Alternatives Analysis

Chapter 4.0 Alternatives Analysis Chapter 4.0 Alternatives Analysis Chapter 1 accumulated the baseline of existing airport data, Chapter 2 presented the outlook for the future in terms of operational activity, Chapter 3 defined the facilities

More information

DEPARTMENT: CIVIL ENGINEERING SEMESTER: III SUBJECT CODE / Name: CE2303/ Railway, Airport and Harbors Engineering 2 MARK QUESTIONS AND ANSWERS

DEPARTMENT: CIVIL ENGINEERING SEMESTER: III SUBJECT CODE / Name: CE2303/ Railway, Airport and Harbors Engineering 2 MARK QUESTIONS AND ANSWERS DEPARTMENT: CIVIL ENGINEERING SEMESTER: III SUBJECT CODE / Name: CE2303/ Railway, Airport and Harbors Engineering 2 MARK QUESTIONS AND ANSWERS 1.Define wind Coverage (AUC NOV/DEC 2010),(AUC NOV/DEC 2011)

More information

Hartford-Brainard Airport Potential Runway Closure White Paper

Hartford-Brainard Airport Potential Runway Closure White Paper Hartford-Brainard Airport Potential Runway 11-29 Closure White Paper June 2012 In recent years there has been discussion regarding the necessity of Runway 11-29 to the Hartford- Brainard Airport (HFD)

More information

Re: Findings Regarding Possible Impacts of Proposed Rockfort Quarry on Aviation Activities at Brampton Airport

Re: Findings Regarding Possible Impacts of Proposed Rockfort Quarry on Aviation Activities at Brampton Airport Mr. Christopher J. Tzekas, Partner, WeirFoulds LLP, The Exchange Tower, Suite 1600, P.O. Box 480, 130 King Street West, Toronto, Ontario, M5X 1J5. May 8, 2010. Re: Findings Regarding Possible Impacts of

More information

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development plans

More information

Stephanie Sinnott, Executive Director, Finance, Office of the City Manager

Stephanie Sinnott, Executive Director, Finance, Office of the City Manager Public Report To: From: Finance Committee Stephanie Sinnott, Executive Director, Finance, Office of the City Manager Paul D. Ralph, BES, RPP, MCIP, Commissioner, Development Services Department Report

More information

Advisory Circular CT

Advisory Circular CT (CAA logo, name of the country, etc.) Advisory Circular CT-42-009 SUBJECT: Airport Movement Area and Related Facilities Maintenance DATE: MM/YYYY ASSOCIATED RULES According with (name of the country) Civil

More information

Frequently Asked Questions and Answers Bowman Field Airport Area Safety Program

Frequently Asked Questions and Answers Bowman Field Airport Area Safety Program Frequently Asked Questions and Answers Bowman Field Airport Area Safety Program 1. What is the proposed Bowman Field Airport Area Safety Program? The proposed Bowman Field Airport Area Safety Program has

More information

STAFF REPORT. Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan. MEETING DATE: November 19, 2015 AGENDA ITEM: 7D

STAFF REPORT. Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan. MEETING DATE: November 19, 2015 AGENDA ITEM: 7D STAFF REPORT SUBJECT: Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan MEETING DATE: AGENDA ITEM: 7D STAFF CONTACT: Peter Imhof, Andrew Orfila RECOMMENDATION: Adopt findings

More information

Overview ICAO Standards and Recommended Practices for Aerodrome Mapping Data reported to AIM

Overview ICAO Standards and Recommended Practices for Aerodrome Mapping Data reported to AIM Overview ICAO Standards and Recommended Practices for Aerodrome Mapping Data reported to AIM References ICAO SARPS Annex 14 Vol. I, 7 th Edition, July 2016 ICAO SARPS Annex 15, 15 th Edition, July 2016

More information

APPENDIX X: RUNWAY LENGTH ANALYSIS

APPENDIX X: RUNWAY LENGTH ANALYSIS APPENDIX X: RUNWAY LENGTH ANALYSIS Purpose For this Airport Master Plan study, the FAA has requested a runway length analysis to be completed to current FAA AC 150/5325-4B, Runway Length Requirements for

More information

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan TABLE OF CONTENTS CHAPTER 1 INTRODUCTION 10 Project Background 1-1 11 Mission Statement and Goals 1-1 12 Objectives of this Sustainable Master Plan 1-2 CHAPTER 2 INVENTORY 20 Airport Background 2-1 201

More information

AERODROME SAFETY COORDINATION

AERODROME SAFETY COORDINATION AERODROME SAFETY COORDINATION Julio Garriga, RO/TA International Civil Aviation Organization North American, Central American and Caribbean Office ICAO NACC Regional Office Page 1 Coordination of the aerodrome

More information

B GEORGIA INFRASTRUCTURE REPORT CARD AVIATION RECOMMENDATIONS DEFINITION OF THE ISSUE. Plan and Fund for the Future:

B GEORGIA INFRASTRUCTURE REPORT CARD AVIATION RECOMMENDATIONS DEFINITION OF THE ISSUE. Plan and Fund for the Future: 2014 GEORGIA INFRASTRUCTURE REPORT CARD B + RECOMMENDATIONS Plan and Fund for the Future: While the system continues to enjoy excess capacity and increased accessibility it still needs continued focus

More information

APPENDIX D FEDERAL AVIATION REGULATIONS, PART 77

APPENDIX D FEDERAL AVIATION REGULATIONS, PART 77 APPENDIX D FEDERAL AVIATION REGULATIONS, PART 77 Subparts A through C PART 77 - OBJECTS AFFECTING NAVIGABLE AIRSPACE Subpart A General 77.1 Scope. 77.2 Definition of terms. 77.3 Standards. 77.5 Kinds of

More information

TABLE OF CONTENTS 1.0 INTRODUCTION...

TABLE OF CONTENTS 1.0 INTRODUCTION... Advisory Circular Subject: Publication of the Level of Service with Respect to Departure Below RVR 2600 (½ Statute Mile) Issuing Office: Civil Aviation, Standards Document No.: AC 302-001 File Classification

More information

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport Executive Summary MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport As a general aviation and commercial service airport, Fort Collins- Loveland Municipal Airport serves as an important niche

More information

CHAPTER 7 AEROPLANE COMMUNICATION AND NAVIGATION EQUIPMENT

CHAPTER 7 AEROPLANE COMMUNICATION AND NAVIGATION EQUIPMENT CHAP 7-1 CHAPTER 7 COMMUNICATION AND NAVIGATION EQUIPMENT 7.1 COMMUNICATION EQUIPMENT 7.1.1 An aeroplane shall be provided with radio communication equipment capable of: a) conducting two-way communication

More information

Aeronautical Studies (Safety Risk Assessment)

Aeronautical Studies (Safety Risk Assessment) Advisory Circular Aeronautical Studies (Safety Risk Assessment) FIRST EDITION GEORGIAN CIVIL AVIATION AGENCY Chapter LIST OF EFFECTIVE PAGES Pages Amend. No Date of Issue List of effective pages 2 0.00

More information

Control of Cranes and Other Temporary Obstacles

Control of Cranes and Other Temporary Obstacles United Kingdom Overseas Territories Aviation Circular OTAC 139-27 140-11 171-8 172-11 178-10 Control of Cranes and Other Temporary Obstacles Issue 1 1 June 2018 Effective on issue GENERAL Overseas Territories

More information

Table of Contents. Overview Objectives Key Issues Process...1-3

Table of Contents. Overview Objectives Key Issues Process...1-3 Table of Contents Chapter One Introduction Overview...1-1 Objectives...1-1 Key Issues...1-2 Process...1-3 Chapter Two Inventory of Existing Conditions Airport Setting...2-1 Locale...2-1 Airport Surroundings...2-5

More information

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved TABLE OF CONTENTS Description Page Number LIST OF ACRONYMS... a CHAPTER ONE INTRODUCTION General... 1-1 Study Objectives... 1-1 Public Involvement... 1-2 Issues to Be Resolved... 1-2 CHAPTER TWO EXISTING

More information

STAFF REPORT. Airport Land Use Plan Consistency Review: Old Town Village Mixed Use Project City of Goleta. MEETING DATE: June 18, 2015 AGENDA ITEM: 5M

STAFF REPORT. Airport Land Use Plan Consistency Review: Old Town Village Mixed Use Project City of Goleta. MEETING DATE: June 18, 2015 AGENDA ITEM: 5M STAFF REPORT SUBJECT: Airport Land Use Plan Consistency Review: Old Town Village Mixed Use Project City of Goleta MEETING DATE: AGENDA ITEM: 5M STAFF CONTACT: Peter Imhof, Andrew Orfila RECOMMENDATION:

More information

ERIE INTERNATIONAL AIRPORT MASTER PLAN TABLE OF CONTENTS

ERIE INTERNATIONAL AIRPORT MASTER PLAN TABLE OF CONTENTS EXECUTIVE SUMMARY ERIE INTERNATIONAL AIRPORT MASTER PLAN TABLE OF CONTENTS PAGE NO. CHAPTER 1-INTRODUCTION... 1-1 1.01 General...1-1 1.02 Purpose and Scope of Study...1-1 1.03 The Planning Process...1-2

More information

MESA COUNTY DEPARTMENT OF PUBLIC WORKS Administration - Building - Engineering Road and Bridge Traffic - Planning - Solid Waste Management

MESA COUNTY DEPARTMENT OF PUBLIC WORKS Administration - Building - Engineering Road and Bridge Traffic - Planning - Solid Waste Management MESA COUNTY DEPARTMENT OF PUBLIC WORKS Administration - Building - Engineering Road and Bridge Traffic - Planning - Solid Waste Management 200 S. Spruce St. P.O. Box 20,000 Grand Junction, Colorado 81502-5022

More information

ICAO Standards. Airfield Information Signs. ICAO Annex 14, 4th Edition Aerodrome Design and Operations

ICAO Standards. Airfield Information Signs. ICAO Annex 14, 4th Edition Aerodrome Design and Operations ICAO Standards Airfield Information Signs ICAO Annex 14, 4th Edition Aerodrome Design and Operations Federal Aviation Administration U.S. Department of Transportation February 2004 ICAO Standards This

More information

DRAFT MASTER PLAN UPDATE

DRAFT MASTER PLAN UPDATE DRAFT MASTER PLAN UPDATE CHAPTER VI: AIRPORT LAYOUT PLAN NARRATIVE DRAFT REPORT APRIL 2017 PREPARED BY: Table of Contents WESTCHESTER COUNTY AIRPORT 6 AIRPORT LAYOUT PLAN NARRATIVE REPORT... 6-1 6.1 AGIS

More information

Electronic Terrain and Obstacle Data

Electronic Terrain and Obstacle Data International Civil Aviation Organization Electronic Terrain and Obstacle Data David Lewtas Chief, Aeronautical Information Unit (MET/AIM) 24 November 2010 ICAO CAR AIM Seminar Kingston, Jamaica 22-24

More information

Procedures for Air Navigation Services Aerodromes (PANS-AGA) ICAO Doc. 9981

Procedures for Air Navigation Services Aerodromes (PANS-AGA) ICAO Doc. 9981 Procedures for Air Navigation Services Aerodromes (PANS-AGA) ICAO Doc. 9981 Introduction The First Edition of Doc. 9981 was approved by the President of the Council on 20 October 2014 The document becomes

More information

HEAD-UP DISPLAY (HUD), EQUIVALENT DISPLAYS AND VISION SYSTEMS

HEAD-UP DISPLAY (HUD), EQUIVALENT DISPLAYS AND VISION SYSTEMS ATT 2.B-1 ATTACHMENT 2.B HEAD-UP DISPLAY (HUD), EQUIVALENT DISPLAYS AND VISION SYSTEMS Supplementary to 2.2.2.2, 2.4.15.1, 3.4.2.7 and 3.6.12 Introduction The material in this attachment provides guidance

More information

AIR NAVIGATION ORDER

AIR NAVIGATION ORDER CLEARANCE AREAS AND OBSTACLE LIMITATION SURFACES AT AIR NAVIGATION ORDER VERSION : 2.0 DATE OF IMPLEMENTATION : 15-02-2013 OFFICE OF PRIME INTEREST : AERODROME STANDARDS BRANCH. (Directorate of Airspace

More information

Safety, Infrastructure, and Tenant Improvement Project. Public Hearing Informational Brochure February 26, 2013

Safety, Infrastructure, and Tenant Improvement Project. Public Hearing Informational Brochure February 26, 2013 New York State Department of Transportation Safety, Infrastructure, and Tenant Improvement Project Public Hearing Informational Brochure February 26, 2013 This DEIS/Draft EA evaluates the potential impacts

More information

Lopez Island Airport Master Plan Update. Public Meeting June 15, 2017

Lopez Island Airport Master Plan Update. Public Meeting June 15, 2017 Lopez Island Airport Master Plan Update Public Meeting June 15, 2017 Master Plan Update Team Reid Middleton/Everett, WA Shannon Kinsella, Project Manager Melania Haagsma, Project Engineer Mead & Hunt/Tulsa,

More information

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis Appendix B ULTIMATE AIRPORT CAPACITY & DELAY SIMULATION MODELING ANALYSIS B TABLE OF CONTENTS EXHIBITS TABLES B.1 Introduction... 1 B.2 Simulation Modeling Assumption and Methodology... 4 B.2.1 Runway

More information

ACTION TRANSMITTAL

ACTION TRANSMITTAL Transportation Advisory Board of the Metropolitan Council of the Twin Cities ACTION TRANSMITTAL 2018-16 DATE: February 9, 2018 TO: Transportation Advisory Board FROM: Technical Advisory Committee PREPARED

More information

Sunshine Coast Airport Master Plan September 2007

Sunshine Coast Airport Master Plan September 2007 Sunshine Coast Airport Master Plan September 2007 Contents CONTENTS... I ACKNOWLEDGEMENT... II DISCLAIMER... III 1 EXECUTIVE SUMMARY...IV 1 INTRODUCTION... 1 2 AVIATION DEMAND FORECAST... 5 3 AIRCRAFT

More information

Porter Airlines Runway Extension Study. Billy Bishop Toronto City Centre Airport

Porter Airlines Runway Extension Study. Billy Bishop Toronto City Centre Airport Porter Airlines Runway 08-26 Extension Study Billy Bishop Toronto City Centre Airport Porter Airlines Runway 08-26 Extension Study Billy Bishop Toronto City Centre Airport (BBTCA) Prepared for: Mr Andrew

More information

Preliminary Findings of Proposed Alternative

Preliminary Findings of Proposed Alternative Preliminary Findings of Proposed Alternative The attached drawing provides a schematic layout of the proposed alternative that will be discussed on July 27, 2010. A full report will follow and should be

More information

ICAO Aerodrome s Manual. AERODROME S INSPECTOR WORKSHOP St. Maarten, MAHO June 2012

ICAO Aerodrome s Manual. AERODROME S INSPECTOR WORKSHOP St. Maarten, MAHO June 2012 ICAO Aerodrome s Manual AERODROME S INSPECTOR WORKSHOP St. Maarten, MAHO 11-15 June 2012 Objectives - Identify the requirements listed in Annex 14 regarding the development and maintenance of an aerodrome

More information

105 SKY KING TAXI-WAY - SPICEWOOD, TEXAS

105 SKY KING TAXI-WAY - SPICEWOOD, TEXAS S P I C E W O O D A I R P O R T 8 8 R H A N G A R F O R L E A S E 105 SKY KING TAXI-WAY - SPICEWOOD, TEXAS Available for immediate lease 7,200 SF (90 x 80 ) Class A Aircraft Hangar W / Climate Controlled

More information

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35 Runway 17-35 Airport Master Plan Runway 12-30 Brookings Regional Airport Table of Contents Table of Contents Chapter 1: Master Plan Goals... 1-1 1.1. Introduction... 1 1.2. Objective 1 Identify improvements

More information

ADVISORY CIRCULAR ON CALCULATION OF DECLARED DISTANCES

ADVISORY CIRCULAR ON CALCULATION OF DECLARED DISTANCES Page 1 of 6 1. PURPOSE This Advisory circular (AC) provides guidance to operators to calculated declared distances at aerodrome for safe use of runway and promulgation of aeronautical data to the aeronautical

More information

March 2016 Safety Meeting

March 2016 Safety Meeting March 2016 Safety Meeting AC 61 98C Subject: Currency Requirements and Guidance for the Flight Review and Instrument Proficiency Check Date: 11/20/15 AC No: 61-98C Initiated by: AFS-800 Supercedes: AC

More information

ADVISORY CIRCULAR AC-AD-005

ADVISORY CIRCULAR AC-AD-005 GHANA CIVIL AVIATION AUTHORITY ADVISORY CIRCULAR AC-AD-005 AERODROME QUALITY DATA SYSTEM GENERAL Ghana Civil Aviation Authority (GCAA) Advisory Circulars from Aerodrome Safety and Standards (ASAS) contain

More information

STAFF REPORT. Airport Land Use Consistency Determination Betteravia Plaza. MEETING DATE: January 21, 2016 AGENDA ITEM: 8D

STAFF REPORT. Airport Land Use Consistency Determination Betteravia Plaza. MEETING DATE: January 21, 2016 AGENDA ITEM: 8D STAFF REPORT SUBJECT: Airport Land Use Consistency Determination Betteravia Plaza MEETING DATE: AGENDA ITEM: 8D STAFF CONTACT: Andrew Orfila RECOMMENDATION: Adopt findings for the Betteravia Plaza project

More information

GRANDE PRAIRIE AIRPORT. Reduced Visibility Operations Plan

GRANDE PRAIRIE AIRPORT. Reduced Visibility Operations Plan GRANDE PRAIRIE AIRPORT Reduced Visibility Operations Plan Amended November 8, 2017 Distribution List: (Updates to the Reduced Visibility Operations Plan will be circulated to this list.) Name and Title

More information

CHAPTER FOUR AIRPORT ALTERNATIVES

CHAPTER FOUR AIRPORT ALTERNATIVES 4.0 INTRODUCTION CHAPTER FOUR The goal of the master planning process is to provide the City of New Smyrna Beach with an assessment of the adequacy and capabilities of the Airport as well as to identify

More information

CIVIL AVIATION REGULATIONS SURINAME PART 17 - AERONAUTICAL TELECOMMUNICATIONS VERSION 5.0

CIVIL AVIATION REGULATIONS SURINAME PART 17 - AERONAUTICAL TELECOMMUNICATIONS VERSION 5.0 CIVIL AVIATION REGULATIONS SURINAME PART 17 - AERONAUTICAL TELECOMMUNICATIONS VERSION 5.0 January 2018 AMENDMENTS Location Date Amended by Description CONTENTS 17.1 GENERAL... 4 17.1.1 Applicability...

More information

AIRCRAFT ACCIDENT REPORT AND EXECUTIVE SUMMARY

AIRCRAFT ACCIDENT REPORT AND EXECUTIVE SUMMARY Section/division Accident and Incident Investigation Division Form Number: CA 12-12a AIRCRAFT ACCIDENT REPORT AND EXECUTIVE SUMMARY Reference: CA18/2/3/8798 Aircraft Registration ZU-EFG Date of Accident

More information

AVIATION PLANNING AND DEVELOPMENT Oakland International Airport 530 Water Street Oakland, CA 94607

AVIATION PLANNING AND DEVELOPMENT Oakland International Airport 530 Water Street Oakland, CA 94607 AVIATION PLANNING AND DEVELOPMENT Oakland International Airport 530 Water Street When Do I Need to File an FAA Form 7460-1? Objects Affecting Navigable Airspace (14CFR77) June 2013 Background The Federal

More information

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES Recurring topics emerged in some of the comments and questions raised by members of the

More information

APPENDIX D MSP Airfield Simulation Analysis

APPENDIX D MSP Airfield Simulation Analysis APPENDIX D MSP Airfield Simulation Analysis This page is left intentionally blank. MSP Airfield Simulation Analysis Technical Report Prepared by: HNTB November 2011 2020 Improvements Environmental Assessment/

More information

USE OF 3D GIS IN ANALYSIS OF AIRSPACE OBSTRUCTIONS

USE OF 3D GIS IN ANALYSIS OF AIRSPACE OBSTRUCTIONS USE OF 3D GIS IN ANALYSIS OF AIRSPACE OBSTRUCTIONS A project by by Samuka D. W. F19/1461/2010 Supervisor; Dr D. N. Siriba 1 Background and Problem Statement The Airports in Kenya are the main link between

More information

Westover Metropolitan Airport Master Plan Update

Westover Metropolitan Airport Master Plan Update Westover Metropolitan Airport Master Plan Update June 2008 INTRODUCTION Westover Metropolitan Airport (CEF) comprises the civilian portion of a joint-use facility located in Chicopee, Massachusetts. The

More information

Aerodrome Standards and Requirements Aeroplanes at or below 5700 kg MCTOW Non Air Transport Operations

Aerodrome Standards and Requirements Aeroplanes at or below 5700 kg MCTOW Non Air Transport Operations Advisory Circular AC139-7 & AC91-15 Aerodrome Standards and Requirements Aeroplanes at or below 5700 kg MCTOW Non Air Transport Operations Revision 4 18 December 2009 General Civil Aviation Authority Advisory

More information

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 1 - Introduction This report describes the development and analysis of concept alternatives that would accommodate

More information

WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY. Ermenando Silva APEX, in Safety Manager ACI, World

WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY. Ermenando Silva APEX, in Safety Manager ACI, World WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY Ermenando Silva APEX, in Safety Manager ACI, World Aerodrome Manual The aim and objectives of the aerodrome manual and how it is to be used by operating

More information

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 10 Preferred Inaugural Airport Concept 10.0 Introduction The Preferred Inaugural Airport Concept for SSA was developed by adding the preferred support/ancillary facilities selected in Section 9

More information

THE CIVIL AVIATION ACT (No. 21 of 2013 THE CIVIL AVIATION (OPERATION OF AIRCRAFT) (AMENDMENT) REGULATIONS, 2015

THE CIVIL AVIATION ACT (No. 21 of 2013 THE CIVIL AVIATION (OPERATION OF AIRCRAFT) (AMENDMENT) REGULATIONS, 2015 LEGAL NOTICE. THE CIVIL AVIATION ACT (No. 21 of 2013 THE CIVIL AVIATION (OPERATION OF AIRCRAFT) (AMENDMENT) REGULATIONS, 2015 Citation GN. No. of 20 Citation 1. These Regulations may be cited as the Civil

More information

AERONAUTICAL SURVEYS & INSTRUMENT FLIGHT PROCEDURES

AERONAUTICAL SURVEYS & INSTRUMENT FLIGHT PROCEDURES AERONAUTICAL SURVEYS & INSTRUMENT FLIGHT PROCEDURES Current as of November 2012 ALASKA AVIATION SYSTEM PLAN UPDATE Prepared for: State of Alaska Department of Transportation & Public Facilities Division

More information

ORDINANCE NO. _2013-

ORDINANCE NO. _2013- ORDINANCE NO. _2013- AN ORDINANCE OF THE TOWNSHIP OF CONEWAGO, DAUPHIN COUNTY, PENNSYLVANIA, PROVIDING FOR AIRPORT ZONING REGULATIONS WITHIN THE AIRPORT ZONING OVERLAY DISTRICT CREATED BY THIS ORDINANCE

More information

SITE ELEVATION AMSL...Ground Elevation in feet AMSL STRUCTURE HEIGHT...Height Above Ground Level OVERALL HEIGHT AMSL...Total Overall Height AMSL

SITE ELEVATION AMSL...Ground Elevation in feet AMSL STRUCTURE HEIGHT...Height Above Ground Level OVERALL HEIGHT AMSL...Total Overall Height AMSL ******************************************** * Federal Airways & Airspace * * Summary Report * ******************************************** File: User Assigned File Name Latitude: NAD83 Coordinate Longitude:

More information

UNITED KINGDOM AERONAUTICAL INFORMATION CIRCULAR

UNITED KINGDOM AERONAUTICAL INFORMATION CIRCULAR UNITED KINGDOM AERONAUTICAL INFORMATION CIRCULAR AIC 127/2006 (Pink 110) 7 December NATS Limited Aeronautical Information Service Control Tower Building, London Heathrow Airport Hounslow, Middlesex TW6

More information

PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project

PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project GENERAL AIRPORT INFORMATION AIRPORT USERS Airport ownership: Public, owned by the Pullman-Moscow Regional Airport Board Year opened: February

More information

PLUME RISE ASSESSMENTS

PLUME RISE ASSESSMENTS Advisory Circular AC 139-5(1) NOVEMBER 2012 PLUME RISE ASSESSMENTS CONTENTS Page 1. References 1 2. Purpose 2 3. Status of this advisory circular 2 4. Acronyms 2 5. Definitions 3 6. Background 3 7. Key

More information

Aerodrome Obstacle Survey Information Checks

Aerodrome Obstacle Survey Information Checks United Kingdom Overseas Territories Aviation Circular OTAC 139-20 Aerodrome Obstacle Survey Information Checks Issue 2.00 26 May 2017 Effective on issue GENERAL Overseas Territories Aviation Circulars

More information

FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT ENVIRONMENTAL IMPACT STATEMENT DRAFT

FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT ENVIRONMENTAL IMPACT STATEMENT DRAFT D.3 RUNWAY LENGTH ANALYSIS Appendix D Purpose and Need THIS PAGE INTENTIONALLY LEFT BLANK Appendix D Purpose and Need APPENDIX D.3 AIRFIELD GEOMETRIC REQUIREMENTS This information provided in this appendix

More information

APPENDIX B: NPIAS CANDIDATE AIRPORT ANALYSIS

APPENDIX B: NPIAS CANDIDATE AIRPORT ANALYSIS APPENDIX B: NPIAS CANDIDATE AIRPORT ANALYSIS The National Plan of Integrated Airport Systems (NPIAS) is the Federal Aviation Administration s (FAA) national airport plan. The NPIAS includes nearly 3,500

More information

II. Purpose and Need. 2.1 Background

II. Purpose and Need. 2.1 Background II. 2.1 Background The Metropolitan Washington Airports Authority is preparing an Environmental Assessment of potential environmental impacts associated with proposed enhancements to the Runway 4-22 and

More information