TRANSPORT INFRASTRUCTURE

Size: px
Start display at page:

Download "TRANSPORT INFRASTRUCTURE"

Transcription

1 TRANSPORT INFRASTRUCTURE Existing Transport Infrastructure: Planned Transport Infrastructure: The framework for the construction of Tokyo s transport infrastructure began with the preparations for the 1964 Tokyo Olympic Games, and improvements steadily continue to this day. Roads The roads in Tokyo, including the main Tokyo Metropolitan motorways running through the centre of the city, have evolved as a highly intricate network of roads, totalling 236km of motorways and 1,275km of arterial routes. In addition to the improvement of roads, advanced traffic information systems such as the Intelligent Transport Systems ITS deliver real-time information on traffic congestion and travel time from traffic control centres to information boards along the motorways and ordinary roads. The same data is also transmitted by beacon transmitters and by FM/AM radio stations to car navigation systems and car radios. Railways and Subways Tokyo s comprehensive network of railways and subways provides a total of 1,035km of tracks and carries 23 million passengers daily. Trains run at a frequency of every 2-3 minutes during rush hour, and commuters from the suburbs can travel smoothly into the city centre without the hassle of transferring. The accuracy and convenience of Tokyo s rail system equals the best in the world. Stations and train cars are equipped with air conditioning, and improvements that are currently underway include the introduction of state-of-the-art trains with real-time electronic information systems, the installation of platform doors at stations to prevent passengers from falling on to the tracks, and the extension of multiple tracks. Tokyo s rail infrastructure meets one of the highest global standards, and it continues to expand and develop to deliver added safety and comfort as well as increased passenger capacity. Equal opportunity legislation in Japan requires all public transport infrastructures to meet the needs of people with disabilities. The promotion of universal design in existing infrastructure is being progressively improved. Tokyo has been planning various enhancements in its transport infrastructure in order to further mature as a model of a sustainable metropolis. Three ring roads are presently under construction in the Tokyo Greater Metropolitan Area, and the main routes will be completed by the opening of the 2016 Olympic Games. Along the Tokyo Bay waterfront, where the Olympic Stadium, a number of competition venues, the Olympic Village, and the IBC/MPC will be clustered, construction of the arterial routes have been proceeding, augmenting the existing transport infrastructure. The ongoing improvements in transport infrastructure will alleviate the city centre congestion and, as a result, will also have positive environmental effects. Additional Transport Infrastructure: There are no plans to finance any over-and-above major transport infrastructure for the Olympic Games. Because of the present scale of Tokyo s transport system and the enhancements already planned under Tokyo s Big Change - The 10-Year Plan, the emphasis will be on specific arrangements. (Please refer to Chart 3 in the appendices.) 29 TOKYO 2016 TOKYO

2 AIRPORT Main International Airport: The main airport for the Tokyo Olympic Games will be Narita International Airport the gateway into Japan with the ability to transport 35 million passengers each year on flights to and from 96 major cities around the world. Other Airports: Aside from Narita International Airport, another airport in the Tokyo area is Tokyo International Airport, also known as Haneda Airport. Haneda Airport is the hub for Japanese domestic air travel. With 190,000 flights landing and taking off every year, efficient and safe transport is provided by the world s highest standard air traffic services system at Narita International Airport. The extension of one of the runways will be completed by 2010, increasing take-off and landing capacity by 10%. Narita International Airport is located approximately 60km from Tokyo s city centre, and presently there are two railway routes and an express limousine bus operation connecting the airport and the city centre with a travel time ranging from 50 minutes to 1½ hours depending upon which part of Tokyo s extensive city centre is to be reached. Current travel time to the location of the proposed Olympic Stadium and Olympic Village in central Tokyo is 1 hour. During the Olympic Games, comprehensive traffic measures will be implemented to ensure the Olympic Family a comfortable journey to and from the airport. With the completion of a New Narita Express Railway Line by 2010, the journey between the airport and the city centre will be reduced to just over 30 minutes. The construction of a fourth runway at Haneda Airport will be completed in 2010 which will increase take-off and landing capacity by 40% in comparison with Taking advantage of this increase, regular service of international flights is to be implemented. Located only 10km to the city centre and connected by two railway lines and motorways, Haneda Airport is easily accessible from central Tokyo. Thus, Haneda Airport will also function as a key international arrival point and will also offer immigration services for Olympic-related personnel. In addition to Narita and Haneda, there are 13 airports within a 500km radius of Tokyo with international service, including Chubu International Airport and Kansai International Airport. The airports are readily accessible from Tokyo, as they are connected to Tokyo by domestic flights and the shinkansen bullet train that offer quick and comfortable travel. Venues outside of Tokyo where Football will be held can be easily accessed by using the Kansai International Airport, Osaka International Airport, and New Chitose Airport. Accessibility provisions for people with disabilities are implemented in the universal design of the above airports for ultimate comfort in travel. Airport Capacities (Year 2005): Runways Gates Terminal Capacity Narita International Airport ,000 passengers/day (42 million/year) Tokyo International Airport (Haneda Airport) ,000 passengers/day (63 million/year) Chubu International Airport has 1 runway and carries 34,000 passengers/day. Kansai International Airport has 2 runways and carries 45,000 passengers/day. Osaka International Airport has 2 runways and carries 52,000 passengers/day. New Chitose Airport has 2 runways and carries 49,000 passengers/day. 31 TOKYO 2016 TOKYO

3 MAPS B Please refer to Map B, B1 to B5 in the appendices. 33 TOKYO 2016 TOKYO

4 TRANSPORT CHALLENGES Challenges and Solutions: Every major city throughout the world has a transport challenge in common - traffic congestion. Tokyo is no exception. The major cause of this traffic congestion is attributed to commercial vehicles that go straight through Tokyo en route to their destinations. In order to re-route and disperse through traffic, the national government and its affiliated organisations are presently constructing three ring roads within the Tokyo Greater Metropolitan Area. Improvements on regular roads, such as upgrading arterial routes, expanding road width, and installing advanced traffic signal systems, are also underway. The steady implementation of the ongoing and planned measures to improve the roadways will dramatically alleviate Tokyo s traffic congestion by 2016 and will significantly increase average travelling speed within the city. During the period of the Tokyo 2016 Olympic and Paralympic Games, impact on regular traffic and daily activities in Tokyo must be kept to a minimum. Extensive demand management measures will be adopted to encourage the use of public transport during the Olympic Games. These efforts will also produce positive environmental effects. General Transport and Mobility Concept: Almost all the competition venues will be located within an 8km radius from the Olympic Stadium and with the efficient, safe, and comfortable transport system already in place, the travel time between the Olympic Village, the IBC/MPC, and the competition venues can generally be maintained within 20 minutes. Transport planning will be coordinated by all relevant public and private agencies including representatives from the Tokyo Metropolitan Police Department and prefectural police forces, road administrations, and transport companies. The emphasis in transport planning will be on demand management (to release capacity within the system); specific transport management arrangements; and the provision of information systems (including wayfinding ) to help Olympic visitors to effectively use the transport systems. Transport operations at Games time will be coordinated from a command centre involving all of the above agencies and with access to the Intelligent Transport Systems ITS. Olympic lanes will be designated, where appropriate, to ensure efficient, reliable transport for the Olympic family. An exclusive shuttle bus service will transport athletes and team officials to their respective competition venues in accordance with the competition schedule. A shuttle bus service for the accredited media will be operated around the clock. Spectators and workforces will use the rail, subway, bus, and any other available public transport systems. All transport provided will use zero- or low-emission vehicles in an effort to provide an environmentally-friendly Olympic Games. Necessary measures will be implemented to assure convenient access at each airport for the Olympic Family. In response to the foreseen demands and requirements, flexible public transport measures will be implemented on the days of the Opening and Closing Ceremonies, i.e., the increase in frequency and the extension of service hours beyond the usual procedures. Using the IC chip-embedded pre-paid system widely applied in Tokyo s public transport system, Games tickets including transport fares will be offered to the public. The organisational ability of Japan has been proven through the successful hosting of such major international sports events as the 1998 Nagano Olympic Winter Games and the 2002 FIFA World Cup. The comprehensive experience and know-how gained in the field of mass transport through these events will be put to full use during the Olympic Games, providing a smooth and reliable transport operation without interrupting the daily lives of the local citizens. 35 TOKYO 2016 TOKYO

5 DISTANCES AND JOURNEY TIMES Please refer to Chart 4 in the appendices. Please note that this chart presents travel times in current 2007 conditions. It does not indicate the travel times anticipated in These will benefit from infrastructure improvements proposed in Tokyo s Big Change - The 10-Year Plan, and the transport management measures outlined in Theme 18. The maximum travel time in 2016 from the Olympic Village to any venue within the Olympic park will be 20 minutes. 37 TOKYO 2016 TOKYO

ANA HOLDINGS Financial Results for the Three Months ended June 30, 2015

ANA HOLDINGS Financial Results for the Three Months ended June 30, 2015 ANA HOLDINGS NEWS ANA HOLDINGS Financial Results for the Three Months ended June 30, 2015 TOKYO, July 29, 2015 ANA HOLDINGS (hereinafter ANA HD ) today reports its financial results for the three months

More information

Planning and development of urban transportation system Experience from Tokyo

Planning and development of urban transportation system Experience from Tokyo Planning and development of urban transportation system Experience from Tokyo Sept 22, 2016 Bureau of Urban Development Tokyo Metropolitan Government Takahiro ANZAI Contents 1 Outline of Tokyo Railway

More information

Feature: Priority Initiative 01 Railway Network Expansion

Feature: Priority Initiative 01 Railway Network Expansion Feature: Priority Initiative 01 Railway Network Expansion Following on from the March 2015 opening of the Hokuriku Shinkansen Line from Nagano to Kanazawa, March 2016 saw the opening of the Hokkaido Shinkansen

More information

TERMINAL DEVELOPMENT PLAN

TERMINAL DEVELOPMENT PLAN 5.0 TERMINAL DEVELOPMENT PLAN 5.0 TERMINAL DEVELOPMENT PLAN Key points The development plan in the Master Plan includes the expansion of terminal infrastructure, creating integrated terminals for international,

More information

ASSEMBLY 39TH SESSION

ASSEMBLY 39TH SESSION International Civil Aviation Organization WORKING PAPER A39-WP/278 25/8/16 ASSEMBLY 39TH SESSION TECHNICAL COMMISSION Agenda Item 36: Aviation safety and air navigation implementation support SUGGESTION

More information

Transportation >Tokyo Metropolitan Area Network

Transportation >Tokyo Metropolitan Area Network REVIEW OF OPERATIONS Transportation >Tokyo Metropolitan Area Network JR East s greatest strength is having a service area that includes the Tokyo metropolitan area, which accounts for about one-third of

More information

TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22)

TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22) INTERNATIONAL CIVIL AVIATION ORGANIZATION TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22) Bangkok, Thailand, 5-9 September 2011 Agenda

More information

Quality Transport - Key to enhance Connectivity and Sustainability -

Quality Transport - Key to enhance Connectivity and Sustainability - UNESCAP Regional EGM on Policy Options for Sustainable Transport Development, 27-29 Nov 2013, Incheon, Republic of Korea Quality Transport - Key to enhance Connectivity and Sustainability - 28 November,

More information

Improvements for Business Aviation in Japan

Improvements for Business Aviation in Japan Ministry of Land, Infrastructure, Transport and Tourism Civil Aviation Bureau Improvements for Business Aviation in Japan Ministry of Land, Infrastructure, Transport and Tourism October 21, 2014 NBAA2014

More information

ANA HOLDINGS Financial Results for the Year ended March 31, 2016

ANA HOLDINGS Financial Results for the Year ended March 31, 2016 ANA HOLDINGS NEWS ANA HOLDINGS Financial Results for the Year ended March 31, 2016 TOKYO, April 28, 2016 ANA HOLDINGS (hereafter ANA HD ) today reports its consolidated financial results for fiscal year

More information

Chapter 4 Noise. 1. Airport noise

Chapter 4 Noise. 1. Airport noise Chapter 4 Noise 1. Airport noise Airport noise includes the following: 1) Flight noise (engine noise during takeoff and landing) 2) Ground noise (i) Aircraft engine operation noise on the ground (ii) APU

More information

Railway Master Plan in Tokyo (2016)

Railway Master Plan in Tokyo (2016) Railway Master Plan in Tokyo (2016) Future vision of railway network in Tokyo and necessary policies 7 July, 2017 Topic 1.Review of Railway Master Plan(2000) 2.New Railway Master Plan (2016) 3.Future vision

More information

MEET AND GREET AFTER ACTION REPORT

MEET AND GREET AFTER ACTION REPORT MEET AND GREET AFTER ACTION REPORT Table of Contents 1. Overview... 3 1.1. Functional Goal... 3... 3... 3 1.2. Summary of Activity... 3... 3... 4 1.3. Dates of Operation... 4... 4... 5 2. Structure...

More information

Osaka International Airport Terminal Renovation Project Begins

Osaka International Airport Terminal Renovation Project Begins September 2, 2014 Osaka International Airport Terminal Renovation Project Begins Speedy & Smart Urban Advanced Airport ITM New Kansai International Airport Co. Ltd. (NKIAC) announced today the start of

More information

BUSINESS PARK. 8 Parkview Drive, Sydney Olympic Park FOR LEASE

BUSINESS PARK. 8 Parkview Drive, Sydney Olympic Park FOR LEASE 1 2 4 3 BUSINESS PARK 8 Parkview Drive, Sydney Olympic Park OFFICE SPACE available FOR LEASE Imagine a workplace within a world class business park providing an ambiance which promotes greater productivity

More information

The Ever Evolving Naha Airport (Outline of Naha Airport Passenger Terminal Building) Naha Airport Building Co., Ltd.

The Ever Evolving Naha Airport (Outline of Naha Airport Passenger Terminal Building) Naha Airport Building Co., Ltd. The Ever Evolving Naha Airport (Outline of Naha Airport Passenger Terminal Building) August 2018 Naha Airport Building Co., Ltd. 1. Current Naha Airport Hours of Operation: 24 hours Runway: One 3,000 meter

More information

Safe, Timely & Comfortable Move for Better Future ~Japan-India Cooperation on Railway Sector ~

Safe, Timely & Comfortable Move for Better Future ~Japan-India Cooperation on Railway Sector ~ Safe, Timely & Comfortable Move for Better Future ~Japan-India Cooperation on Railway Sector ~ IRC (Int l Rail Conference) 2017 @Pragati Maidan, Oct. 11 th, 2017 Takema SAKAMOTO Chief Representative Japan

More information

Japan Rail Pass Fact Sheet

Japan Rail Pass Fact Sheet Discover Japan's futuristic cities, ancient temples, traditional culture and stunning natural landmarks. The Japan Rail Pass represents the ideal way to explore Japan and enjoy all this fascinating country

More information

Thank you for participating in the financial results for fiscal 2014.

Thank you for participating in the financial results for fiscal 2014. Thank you for participating in the financial results for fiscal 2014. ANA HOLDINGS strongly believes that safety is the most important principle of our air transportation business. The expansion of slots

More information

Commission on the Promotion of Business Jets. Interim Report

Commission on the Promotion of Business Jets. Interim Report Commission on the Promotion of Business Jets Interim Report June 2011 Contents Introduction 1 1. Current Situation Regarding Business Jets 2 2. Specific Initiatives to Promote Business Jets 7 3. Working

More information

High-Speed Rail Operations in Japan Takao NISHIYAMA

High-Speed Rail Operations in Japan Takao NISHIYAMA High-Speed Rail Operations in Japan Takao NISHIYAMA Director of Japan Railways Group New York Office New York, NY, U.S.A. Introduction Transportation Planning Train Variation and Efficiency Contents Risk

More information

Ministry of Land, Infrastructure, Transport and Tourism. Civil Aviation Bureau. Improvements in Business Aviation in Japan

Ministry of Land, Infrastructure, Transport and Tourism. Civil Aviation Bureau. Improvements in Business Aviation in Japan Ministry of Land, Infrastructure, Transport and Tourism Civil Aviation Bureau Improvements in Business Aviation in Japan Ministry of Land, Infrastructure, Transport and Tourism April 2016 ABACE2016 Asian

More information

ANA HOLDINGS Financial Results for FY2014

ANA HOLDINGS Financial Results for FY2014 ANA HOLDINGS NEWS ANA HOLDINGS Financial Results for FY2014 TOKYO, April 30, 2015 ANA HOLDINGS (hereafter ANA HD ) today reports its consolidated financial results for fiscal year 2014 (April-March). Highlights

More information

Japanese Laws Related to Airport Development and the Need to Revise Them

Japanese Laws Related to Airport Development and the Need to Revise Them Journal of Air Law and Commerce Volume 65 Issue 1 Article 7 1999 Japanese Laws Related to Airport Development and the Need to Revise Them Isaku Shibata Follow this and additional works at: https://scholar.smu.edu/jalc

More information

Aims and Developments in Osaka World Expo Bid. Contents

Aims and Developments in Osaka World Expo Bid. Contents September 22, 2017 Lecture 2: Aims and Developments in Osaka World Expo Bid Contents 1. What is a World Exposition? 2. Why Hold a World Expo Now? 3. Theme of the 2025 Osaka World Expo 4. Event Outline,

More information

TRAVEL AND TOURISM 9395/31 Paper 3 International Business & Leisure Travel Services May/June 2014 INSERT 1 hour 30 minutes

TRAVEL AND TOURISM 9395/31 Paper 3 International Business & Leisure Travel Services May/June 2014 INSERT 1 hour 30 minutes www.xtremepapers.com Cambridge International Examinations Cambridge International Advanced Level *0911616421-I* TRAVEL AND TOURISM 9395/31 Paper 3 International Business & Leisure Travel Services May/June

More information

TRANSPORTATION & INFRASTRUCTURE OPPORTUNITIES IN JAPAN

TRANSPORTATION & INFRASTRUCTURE OPPORTUNITIES IN JAPAN TRANSPORTATION & INFRASTRUCTURE OPPORTUNITIES IN JAPAN DISCOVER TRANSPORTATION & INFRASTRUCTURE MARKET IN JAPAN BUSINESS SWEDEN, JANUARY 2018 DISCOVER TRANSPORTATION & INFRASTRUCTURE MARKET IN JAPAN BUSINESS

More information

ANA HOLDINGS Financial Results for the Three Months Ended June 30, 2018

ANA HOLDINGS Financial Results for the Three Months Ended June 30, 2018 ANA HOLDINGS NEWS ANA HOLDINGS Financial Results for the Three Months Ended June 30, 2018 TOKYO, July 31, 2018 ANA HOLDINGS INC. (hereinafter ANA HD ) today reports its financial results for the three

More information

TRANSPORTATION BUSINESS SUPPORTS JR EAST AS A STABLE PROFIT RESOURCE

TRANSPORTATION BUSINESS SUPPORTS JR EAST AS A STABLE PROFIT RESOURCE REVIEW OF OPERATIONS TRANSPORTATION TRANSPORTATION BUSINESS SUPPORTS JR EAST AS A STABLE PROFIT RESOURCE Through a continuous process of service innovation and efficiency improvement, JR East s transportation

More information

AWMFT2015 Transportation Information

AWMFT2015 Transportation Information AWMFT2015 Transportation Information 1. Haneda Airport Suwa-city, Nagano 1) General Information Taxi or train is a convenient way to go to the Suwa city. Price and required time. Taxi Train Price 10,900

More information

Release of Tokaido Sanyo Shinkansen Reservation App

Release of Tokaido Sanyo Shinkansen Reservation App November 6, 2017 West Japan Railway Company Central Japan Railway Company Release of Tokaido Sanyo Shinkansen Reservation App JR Central and JR West released a new free smartphone app, the Tokaido Sanyo

More information

Chapter 1 EXECUTIVE SUMMARY

Chapter 1 EXECUTIVE SUMMARY Chapter 1 EXECUTIVE SUMMARY Contents Page Aviation Growth Scenarios................................................ 3 Airport Capacity Alternatives.............................................. 4 Air Traffic

More information

ANA Reports Record Profits for FY2012

ANA Reports Record Profits for FY2012 ANA HOLDINGS NEWS ANA Reports Record Profits for FY2012 TOKYO April 30, 2013 - ANA Holdings today reports consolidated financial for the fiscal year ended March, 2013. Financial and Operational Highlights

More information

Android App Japan Connected-free Wi-Fi is newly-launched

Android App Japan Connected-free Wi-Fi is newly-launched News Release November 8, 2013 NTT Broadband Platform, Inc. Android App Japan Connected-free Wi-Fi is newly-launched NTT Broadband Platform, Inc. (hereinafter referred to as NTTBP ) has started offering

More information

Japan Railways Successful Financing Models

Japan Railways Successful Financing Models Japan Railways Successful Financing Models March 26, 2009 Masashi Hiraishi First Secretary, Embassy of Japan in India Contents 1. Financial scheme for the construction of new line in Japan 2. Integrated

More information

High Speed Rail & SHINKANSEN Nobukazu NAGAI Railway Bureau, MLIT May 11, 2015

High Speed Rail & SHINKANSEN Nobukazu NAGAI Railway Bureau, MLIT May 11, 2015 High Speed Rail & SHINKANSEN Nobukazu NAGAI Railway Bureau, MLIT May 11, 2015 Topics 1. Why high speed rail (HSR) is preferred 2. Japan s experience in HSR project 3. HSR era has come to Sweden 4. JOIN

More information

OKAYAMA The City of Momotaro OKAYAMA

OKAYAMA The City of Momotaro OKAYAMA OKAYAMA The City of Momotaro OKAYAMA Main Features of Okayama 1. Good access 2. Charm of the region 3. Impressive travel plans unique to Okayama 1. Good access (1) (Access to Okayama City) Regular flights

More information

Introduction of HANEDA and Infrastructure investment by Japan. Oct 18, 2014 Japan Airport Terminal Co., Ltd.

Introduction of HANEDA and Infrastructure investment by Japan. Oct 18, 2014 Japan Airport Terminal Co., Ltd. Introduction of HANEDA and Infrastructure investment by Japan Oct 18, 2014 Japan Airport Terminal Co., Ltd. INDEX 1. Overview of HANEDA Airport and Functional Enhancement of Japan s Metropolitan Airports

More information

FUTURE TRANSPORT STRATEGY AND GREATER SYDNEY SERVICES AND INFRASTRUCTURE PLAN. Western Parkland City

FUTURE TRANSPORT STRATEGY AND GREATER SYDNEY SERVICES AND INFRASTRUCTURE PLAN. Western Parkland City FUTURE TRANSPORT STRATEGY AND GREATER SYDNEY SERVICES AND INFRASTRUCTURE PLAN Western Parkland City 2 Transport for NSW Future Transport Strategy and Greater Sydney Services and Infrastructure Plan Western

More information

Heathrow Consultation January March 2018

Heathrow Consultation January March 2018 A briefing from HACAN Heathrow Consultation January March 2018 Heathrow launched its biggest ever consultation on 17 th January. It closes on 28 th March. In reality, it is two consultations running in

More information

Asian Breeze (20) ( 亜細亜の風 )

Asian Breeze (20) ( 亜細亜の風 ) Asian Breeze (20) ( 亜細亜の風 ) Happy New Year to you all 23 February, 2012 A Happy New Year may sound little too late, but the "Spring Festival," the literal translation of the Chinese name of( 春節 ), was

More information

Japan Rail Pass Price List. February 2013

Japan Rail Pass Price List. February 2013 Japan Rail Pass Price List February 2013 Table of Contents Explore Japan with Japan Rail Pass...3 Japan Rail Pass Price List...6 Japan Rail Pass...6 Japan Rail Kyusu Pass...6 Japan Rail Northen Kyusu Pass...6

More information

Dr. Tamotsu Aoki Kyoto, Japan Tokyo Narita International Airort (NRT) KYOTO TOKYO Tokyo Haneda International Airport (HDN) Kansai International

Dr. Tamotsu Aoki Kyoto, Japan Tokyo Narita International Airort (NRT) KYOTO TOKYO Tokyo Haneda International Airport (HDN) Kansai International ICOM 2019 KYOTO Dr. Tamotsu Aoki Chair, Japanese National Committee for ICOM Director General, The National Art Center, Tokyo Dear Friends of ICOM, It is with immense pleasure and pride that I ask you

More information

Agenda 11. Strathclyde Bus Alliance progress update. Date of meeting 9 December 2016 Date of report 15 November 2016

Agenda 11. Strathclyde Bus Alliance progress update. Date of meeting 9 December 2016 Date of report 15 November 2016 Agenda 11 Strathclyde Bus Alliance progress update Date of meeting 9 December 2016 Date of report 15 November 2016 Report by Assistant Chief Executive (Operations) 1. Object of report The object of this

More information

The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands.

The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands. The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands. Connecting People Building Opportunities 198 Brisbane Airport Corporation CHAPTER 10

More information

e- Check in project at Narita Airport

e- Check in project at Narita Airport ACI Airport Service Quality & Facilitation Conference e- Check in project at Narita Airport 1 April, 2008 Narita International Airport Co. ISAO KOTAKE i-kotake@naa.jp 1 Contents 1. Facts on Narita Airport

More information

JAPAN OUTLOOK. 1- KANSAI deal 2-KOBE deal 4- Future projects

JAPAN OUTLOOK. 1- KANSAI deal 2-KOBE deal 4- Future projects JAPAN OUTLOOK 1- KANSAI deal 2-KOBE deal 4- Future projects 1. THE KANSAI DEAL Kansai Deal at a Glance Assets & Transactions Key Features Kansai Airports International - KIX Opening in 1994 and located

More information

ANA HOLDINGS Management Strategy Update

ANA HOLDINGS Management Strategy Update ANA HOLDINGS NEWS ANA HOLDINGS Management Strategy Update TOKYO, April 28, 2017 - ANA HOLDINGS (hereafter ANA HD ) today provides an update to its FY2016-2020 Mid-Term Management Strategy, set out in January

More information

Accessible Transport The London 2012 Legacy. Mark Dyer Olympic Delivery Authority

Accessible Transport The London 2012 Legacy. Mark Dyer Olympic Delivery Authority Accessible Transport The London 2012 Legacy Mark Dyer Olympic Delivery Authority Agenda Introduction Improving public transport infrastructure Best use of existing infrastructure Complementary modes Better

More information

Development of Transportation Networks

Development of Transportation Networks 1 Development of Railway Networks We promote the improvement of railway networks. Some of our activities include the construction of new shinkansen lines to develop the axis of national transportation,

More information

FACILITATION PANEL (FALP)

FACILITATION PANEL (FALP) International Civil Aviation Organization WORKING PAPER FALP/10-WP/19 Revised 29/8/18 FACILITATION PANEL (FALP) TENTH MEETING Montréal, 10-13 September 2018 Agenda Item 6: Other matters FACILITATION FOR

More information

Basic Policies on Operation of National Airports Utilizing Skills of the Private Sector

Basic Policies on Operation of National Airports Utilizing Skills of the Private Sector (TRANSLATION)(for Reference Only) Basic Policies on Operation of National Airports Utilizing Skills of the Private Sector I. The Purpose and Objectives in Operating etc. National Airports etc. by Utilizing

More information

Improving Safety at Level Crossings - JR East Developments

Improving Safety at Level Crossings - JR East Developments Signalling Seminar in TOKYO 7 th April. 2016 Improving Safety at Level Crossings - JR East Developments Takashi Kawano (MIRSE) East Japan Railway Company Contents 1. Present Situations of Level Crossings

More information

How to get to Shin-Osaka Washington Hotel Plaza from Kansai International Airport or Osaka (Itami) Airport Nobuyoshi Yabuki, Osaka University

How to get to Shin-Osaka Washington Hotel Plaza from Kansai International Airport or Osaka (Itami) Airport Nobuyoshi Yabuki, Osaka University How to get to Shin-Osaka Washington Hotel Plaza from Kansai International Airport or Osaka (Itami) Airport Nobuyoshi Yabuki, Osaka University 1. From Kansai International Airport to JR Shin-Osaka Station

More information

5 Rail demand in Western Sydney

5 Rail demand in Western Sydney 5 Rail demand in Western Sydney About this chapter To better understand where new or enhanced rail services are needed, this chapter presents an overview of the existing and future demand on the rail network

More information

An Interview with President Ohashi

An Interview with President Ohashi An Interview with President Ohashi Progress in Implementing the Medium-Term Corporate Plan Q1 Please give us an overview of the airline industry in the year ended March 31, 21, and tell us about the progress

More information

3rd Asia Pacific Conference on Luminescence and Electron Spin Resonance dating: including

3rd Asia Pacific Conference on Luminescence and Electron Spin Resonance dating: including 3rd Asia Pacific Conference on Luminescence and Electron Spin Resonance dating: including non-dating applications of Luminescence and ESR Nov. 18-22, 2012 Last Circular (supplementary information only)

More information

TRANSPRTATION in Japan has been NRMALIZED except part of the devastated area Material 1

TRANSPRTATION in Japan has been NRMALIZED except part of the devastated area Material 1 TRANSPRTATION in Japan has been NRMALIZED except part of the devastated area Material 1 Overview Major International Airports: Normal operation (excluding Sendai Airport) Shinkansen Express Train : Normal

More information

ANA Holdings Financial Results for FY2013

ANA Holdings Financial Results for FY2013 ANA HOLDINGS NEWS ANA Holdings Financial Results for FY2013 TOKYO April 30, 2014 - ANA Holdings (hereafter ANA HD ) today reports its consolidated financial for fiscal year 2013 (April, 2013 March, 2014).

More information

AA.com CONTACTS: American Airlines Japan Airlines Yuko Kato, Weber Shandwick Sze Hunn Yap, Public Relations Tokyo, Japan Tokyo, Japan 03-5427-7378 03-5460-3109 ykato@webershandwick.com sze_hunn.yap@jal.com

More information

CENTRAL JAPAN RAILWAY (JRC) A TOTAL SYSTEM APPROACH TO HIGH- SPEED RAIL PRESENTED BY: RICHARD P. LAWLESS CEO, U.S.-JAPAN HIGH-SPEED RAIL

CENTRAL JAPAN RAILWAY (JRC) A TOTAL SYSTEM APPROACH TO HIGH- SPEED RAIL PRESENTED BY: RICHARD P. LAWLESS CEO, U.S.-JAPAN HIGH-SPEED RAIL CENTRAL JAPAN RAILWAY (JRC) A TOTAL SYSTEM APPROACH TO HIGH- SPEED RAIL PRESENTED BY: RICHARD P. LAWLESS CEO, U.S.-JAPAN HIGH-SPEED RAIL 1 Who we are Central Japan Railway Company (JRC) is the world s

More information

Information Concerning the Tohoku District/Pacific Coast Earthquake

Information Concerning the Tohoku District/Pacific Coast Earthquake Information Concerning the Tohoku District/Pacific Coast Earthquake Throughout Japan, the effects of the March 11, 2011 earthquake are severe and ongoing. We urge that Japanese nationals in California/Nevada

More information

Ridership Growth Strategy (RGS) Status Update

Ridership Growth Strategy (RGS) Status Update For Information Ridership Growth Strategy (RGS) Status Update Date: July 10, 2018 To: TTC Board From: Deputy Chief Executive Officer Summary The TTC s Ridership Growth Strategy (RGS), with all its components,

More information

JAL Group Announces its FY Medium-Term Business Plan

JAL Group Announces its FY Medium-Term Business Plan JAL Group Announces its FY2006-2010 Medium-Term Business Plan -Mobilize the Group s Strengths to Regain Trust - Tokyo, Thursday March 2, 2006: The JAL Group today announced its medium-term business plan

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization AN-Conf/12-WP/8 7/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 3: Interoperability and data through globally

More information

ANA HOLDINGS Financial Results for the Six Months Ended September 30, 2018

ANA HOLDINGS Financial Results for the Six Months Ended September 30, 2018 ANA HOLDINGS NEWS ANA HOLDINGS Financial Results for the Six Months Ended September 30, 2018 TOKYO, Nov. 2, 2018 ANA HOLDINGS INC. (hereinafter ANA HD ) today reports its financial results for the six

More information

REVITALISATION OF OUTBOUND TOURISM

REVITALISATION OF OUTBOUND TOURISM REVITALISATION OF OUTBOUND TOURISM Revitalisation of Outbound Tourism YEARLY STATUS REPORT: Good Progress The Government continues to allocate substantial funds to promote Japan as a tourist destination.

More information

Outline of Proposal for Program A (No Program B currently)

Outline of Proposal for Program A (No Program B currently) General Information Name of University/ Institution City and Country Full Postal Address Telephone Number Fax Number University Official Website UMAP Contact Person Outline of Proposal for Program A (No

More information

SAPPORO: CAPITAL OF TEXAS?

SAPPORO: CAPITAL OF TEXAS? SAPPORO: CAPITAL OF TEXAS? FAST FACTS Similar To Metropolitan (Labor Market) Population 2,300,000 Portland Urbanized Area* Population 2,100,000 St. Louis, Curitiba, Baltimore Urbanized Land Area: Square

More information

ANA Group Announces Its Fiscal Year 2018 Flight Schedule. ~Responding to the increasing demand in inbound tourism~

ANA Group Announces Its Fiscal Year 2018 Flight Schedule. ~Responding to the increasing demand in inbound tourism~ ANA NEWS ANA Group Announces Its Fiscal Year Flight Schedule ~Responding to the increasing demand in inbound tourism~ TOKYO, January 18, ANA announces its fiscal year flight schedule, which reflects the

More information

AIRSPACE. Aviation Consultancy at its best. Specialist aviation support to help solve problems for airports and airport developers

AIRSPACE. Aviation Consultancy at its best.  Specialist aviation support to help solve problems for airports and airport developers AIRSPACE Enabling Excellence in Aviation Aviation Consultancy at its best. Specialist aviation support to help solve problems for airports and airport developers www.cyrrus.co.uk AIRSPACE Airspace is a

More information

Draft Greater Sydney Region Plan

Draft Greater Sydney Region Plan Draft Greater Sydney Region Plan Submission_id: 31221 Date of Lodgment: 13 Dec 2017 Origin of Submission: Online Organisation name: Infrastructure Group Organisation type: Other First name: Jacob Ibrahim

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization AN-Conf/12-WP/6 7/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Agenda Item 2: Aerodrome operations improving airport performance 2.2: Performance-based

More information

RIVERSIDE PLAZA PROFESSIONAL OFFICE AT THE GATEWAY TO RIO RANCHO & ALBUQUERQUE

RIVERSIDE PLAZA PROFESSIONAL OFFICE AT THE GATEWAY TO RIO RANCHO & ALBUQUERQUE PROFESSIONAL AT THE GATEWAY TO RIO RANCHO & ALBUQUERQUE AVAILABLE SUITES + + Suite 210 4,914± RSF + + Suite 225 1,100± RSF + + Suite 260 2,617± RSF LEASE RATE + + $16.50/RSF/YR Full Service PROPERTY FEATURES

More information

Toronto 2015 Pan Am/Parapan Am Games Temporary Traffic By-law Amendments for High Occupancy Vehicle Lanes (Supplementary Report)

Toronto 2015 Pan Am/Parapan Am Games Temporary Traffic By-law Amendments for High Occupancy Vehicle Lanes (Supplementary Report) STAFF REPORT ACTION REQUIRED Toronto 2015 Pan Am/Parapan Am Games Temporary Traffic By-law Amendments for High Occupancy Vehicle Lanes (Supplementary Report) Date: March 25, 2015 To: From: Wards: Reference

More information

Project Data Sheet BASIC PROJECT DATA. Rehabilitation and Development of Transport and Navigation on the Sava River Waterway. Full project title:

Project Data Sheet BASIC PROJECT DATA. Rehabilitation and Development of Transport and Navigation on the Sava River Waterway. Full project title: BASIC PROJECT DATA Full project title: Short project title: (acronym) Rehabilitation and Development of Transport and Navigation on the Sava River Waterway Project logo: Project website: www.savacommission.org

More information

ANA s Scenario for Future Growth

ANA s Scenario for Future Growth An Interview with the President s Scenario for Future Growth In the fiscal year ended March 31, 2000, faced a challenging operating environment marked by intensifying competition among airlines. There

More information

Norfolk International Airport

Norfolk International Airport Norfolk International Airport Master Plan Update Technical Advisory Committee Meeting #1 Community Advisory Committee Meeting #1 January 24, 2018 Agenda Project Background Introductions Overview of Airport

More information

4 Transport projects underway in Western Sydney

4 Transport projects underway in Western Sydney 4 Transport projects underway in Western Sydney About this chapter This chapter provides an overview of the Australian and NSW government s significant investments in road, bus and rail infrastructure

More information

ANA Group Announces Its Fiscal Year 2019 Flight Schedule

ANA Group Announces Its Fiscal Year 2019 Flight Schedule ANA NEWS ANA Group Announces Its Fiscal Year Flight Schedule ANA plans to accelerate growth by expanding its international network. New state-of-the-art aircraft will be introduced to further improve passenger

More information

20-Year Forecast: Strong Long-Term Growth

20-Year Forecast: Strong Long-Term Growth 20-Year Forecast: Strong Long-Term Growth 10 RPKs (trillions) 8 Historical Future 6 4 2 Forecast growth annual rate 4.8% (2005-2024) Long-Term Growth 2005-2024 GDP = 2.9% Passenger = 4.8% Cargo = 6.2%

More information

CIVIL AVIATION AUTHORITY, PAKISTAN OPERATIONAL CONTROL SYSTEMS CONTENTS

CIVIL AVIATION AUTHORITY, PAKISTAN OPERATIONAL CONTROL SYSTEMS CONTENTS CIVIL AVIATION AUTHORITY, PAKISTAN Air Navigation Order No. : 91-0004 Date : 7 th April, 2010 Issue : Two OPERATIONAL CONTROL SYSTEMS CONTENTS SECTIONS 1. Authority 2. Purpose 3. Scope 4. Operational Control

More information

The 1 ST GCC-KOREA Trade & Investment Forum

The 1 ST GCC-KOREA Trade & Investment Forum The 1 ST GCC-KOREA Trade & Investment Forum June 10, 2013 COEX, Seoul, South Korea KITA- FGCCC Korea International Trade Association Federation of GCC Chambers Welcome to the 1st GCC-KOREA Trade & Investment

More information

Bus and Community Transport Services in Wales

Bus and Community Transport Services in Wales Bus and Community Transport Services in Wales Call for evidence The Enterprise and Business Committee of the National Assembly for Wales is carrying out an inquiry into Bus and Community Transport Services

More information

Study on the Urban Development Plan in the Station Areas (Nakhon Sawan & Phitsanulok)

Study on the Urban Development Plan in the Station Areas (Nakhon Sawan & Phitsanulok) [ August, 2018 ] PREPARATORY SURVEY BANGKOK-CHIANGMAI HIGH SPEED RAIL DEVELOPMENT PROJECT PHASE 1 STAGE 2 Study on the Urban Development Plan in the Station Areas (Nakhon Sawan & Phitsanulok) JIC OCG NK

More information

Education for Pedestrians at Level Crossings. Taro KITAMURA Takuji HONZAWA Transport Safety Department East Japan Railway Company

Education for Pedestrians at Level Crossings. Taro KITAMURA Takuji HONZAWA Transport Safety Department East Japan Railway Company Education for Pedestrians at Level Crossings Taro KITAMURA Takuji HONZAWA Transport Safety Department East Japan Railway Company 1 Contents 1. Outline of JR East 2. JR East Group Safety Plan 2018 (five-year

More information

MEETING DATE: February 17, 2010 SUBJECT: ACTION ITEM TORONTO TRANSIT COMMISSION REPORT NO. ACCESSIBLE TRANSIT SERVICES PLAN: 2009 STATUS REPORT

MEETING DATE: February 17, 2010 SUBJECT: ACTION ITEM TORONTO TRANSIT COMMISSION REPORT NO. ACCESSIBLE TRANSIT SERVICES PLAN: 2009 STATUS REPORT TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: February 17, 2010 SUBJECT: ACCESSIBLE TRANSIT SERVICES PLAN: 2009 STATUS REPORT ACTION ITEM RECOMMENDATION It is recommended that the Commission forward

More information

ANA HOLDINGS Announces Mid-Term Corporate Strategy for FY ~Strengthening the foundations of the business and looking into the future~

ANA HOLDINGS Announces Mid-Term Corporate Strategy for FY ~Strengthening the foundations of the business and looking into the future~ ANA HOLDINGS NEWS ANA HOLDINGS Announces Mid-Term Corporate Strategy for FY2018-2022 ~Strengthening the foundations of the business and looking into the future~ TOKYO, February 1, 2018 ANA HOLDINGS (hereinafter

More information

Why the. Building for growth. West Metro. is vital

Why the. Building for growth. West Metro. is vital Information summary West Building for growth World class public transport solutions for high demand challenges can transform the way a global city like Sydney lives, works and breathes. Sydney s busiest

More information

visits4u Case Studies: Historical Centre of Athens Athens, Greece

visits4u Case Studies: Historical Centre of Athens Athens, Greece visits4u Case Studies: Historical Centre of Athens Athens, Greece Historical Centre of Athens Athens, Greece Title: The Historical Centre of Athens as an Accessible Destination Description Tourism in Greece

More information

Organization of Multiple Airports in a Metropolitan Area

Organization of Multiple Airports in a Metropolitan Area Organization of Multiple Airports in a Metropolitan Area Se-il Mun and Yusuke Teraji Kyoto University Full paper is downloadable at http://www.econ.kyoto-u.ac.jp/~mun/papers/munap081109.pdf 1 Multiple

More information

Toward More Competitive Economy and Society

Toward More Competitive Economy and Society Chapter 5: Toward More Competitive Economy and Society Developing wide-based transport networks Developing highways Japan is lagging behind the U.S. and European countries in terms of highway development.

More information

Number of airlines more than 90

Number of airlines more than 90 Facts about YOKOHAMA, Japan City Profile Yokohama is a beautiful port city conveniently located 30 minutes from Metropolitan Tokyo by road or rail. As the first Japanese port to open its gate to the world

More information

Jetstar Airways will introduce B787 in its regular service from the Kansai International Airport

Jetstar Airways will introduce B787 in its regular service from the Kansai International Airport Jun 30, 2013 Jetstar Airways will introduce B787 in its regular service from the Kansai International Airport Jetstar Airways (JQ) is pleased to announce that it will introduce the Boeing B787 (Dreamliner)

More information

Policy Transport. Policy highlights. Our plan

Policy Transport. Policy highlights. Our plan Policy 2017 Our plan Policy highlights National is committed to building the world-class infrastructure to ensure New Zealand continues to grow. Record investment in transport Delivering the Roads of National

More information

AUCKLAND $1.2 BILLION $1.9 BILLION $149 MILLION 15% SPEND $5.7 BILLION

AUCKLAND $1.2 BILLION $1.9 BILLION $149 MILLION 15% SPEND $5.7 BILLION AUCKLAND AUCKLAND $5.7 BILLION FORECAST TOTAL AUCKLAND INVESTMENT The next 10 years are expected to underline Auckland s performance as the fastest growing major city in Australasia. The city is expected

More information

THE TOBU KYURYO LINE (POPULAR NAME:LINIMO) A MAGNETIC LEVITATION SYSTEM

THE TOBU KYURYO LINE (POPULAR NAME:LINIMO) A MAGNETIC LEVITATION SYSTEM THE TOBU KYURYO LINE (POPULAR NAME:LINIMO) A MAGNETIC LEVITATION SYSTEM Yoshio YUYAMA Executive Director, Road Construction Composition of Department of Construction Aichi Prefecture Government 3-1-2,

More information

Establishment of Kansai Airports Kobe and Signing of Project Agreement for Kobe Airport Concession

Establishment of Kansai Airports Kobe and Signing of Project Agreement for Kobe Airport Concession September 26, 2017 ORIX Corporation VINCI Airports S.A.S. Kansai Airports Establishment of Kansai Airports Kobe and Signing of Project Agreement for Kobe Airport Concession The consortium made up of ORIX

More information

BNA Master Plan Update Community Advisory Committee Meeting No. 5

BNA Master Plan Update Community Advisory Committee Meeting No. 5 A Six Sigma Organization BNA Master Plan Update Community Advisory Committee Meeting No. 5 September 19, 2012 Introductions MNAA Staff RW Armstrong Team Albersman & Armstrong, Ltd. Atkins North America,

More information

2017 POLICY DOCUMENT. M1 Action Plan. Putting Queenslanders First

2017 POLICY DOCUMENT. M1 Action Plan. Putting Queenslanders First 2017 POLICY DOCUMENT Putting 2 Contents Message from the Premier 3 Our Commitment 4 The Newman-Nicholls Legacy 5 The Palaszczuk 6 Government s Record Our Plans: Putting 8 Call: 07 3844 8101 Mail: PO Box

More information