1 Kiggavik Project Environmental Impact Statement Tier 1 Appendix 1B Cumulative Effects December 2011
2 TABLE OF CONTENTS SECTION PAGE B-1 PROJECT INCLUSION LIST 1-3 B-2 FAR FUTURE SCENARIO 2-4 B-3 MAPS 3-6 AREVA Resources Canada Inc. Kiggavik Project EIS December 2011 Page i Tier 1 - Appendix 1B Cumulative Effects Table of Contents
3 LIST OF TABLES Table B-2.1 Potential Future Development Scenario LIST OF FIGURES Figure X1 Local Land Use Figure X2 Regional Land Use AREVA Resources Canada Inc. Kiggavik Project EIS December 2011 Page ii Tier 1 - Appendix 1B Cumulative Effects List of Tables and Figures
4 B-1 PROJECT INCLUSION LIST AREVA Resources Canada Inc. Kiggavik Project EIS December 2011 Page 1-3 Appendix 1B Cumulative Effects
5 Project Inclusion List ID Activity Region Comodity Project Name Company Location Distance from Kiggavik (km) Project Status Description EN001 Surface Wells Nunavut - various various - MI001 Nunavut Turqavik-Aberdeen Cameco AREVA Resources Canada Ltd. Deep Rose and Aberdeen s 74 Uranium deposit. Early exploratory drilling and mapping completed. Field season expected in Estimated Operating Period Potential Interaction with Kiggavik Potential Cumulative Effects MI002 Nunavut Amer East Bayswater Uranium Itza, Amer West, Amer East 150 Uranium deposit. Mineral claims are settled. Field work has not begun. MI003 Nunavut Amer Amer 135 Exploratory drilling begun in 1969, drill program expected to begin 2010 MI004 Nunavut Amer West Bayswater Uranium Itza, Amer West, Amer East 150 Uranium deposit. Mineral claims are settled. Field work has not begun. MI005 Nunavut Baker Basin Aurora Energy Resources Incorporated Baker 65 Early drilling program begun in 2008 and 2009 MI006 Nunavut Bugs Ur-Energy Incorporated Christopher Island Exploratory work has been done but there is uncertainty of resources on property MI007 Nunavut Chesterfield Inlet Shear Minerals Limited Chesterfield Inlet Diamond exploratory program completed in 2010 MI008 Nunavut Churchill Gold Shear Minerals Limited Chesterfield Inlet area A drill program was conducted in 2006, no exploratory work has been scheduled since MI009 Nunavut Churchill (S) Shear Minerals Limited Chesterfield Inlet area Work in 2009 focused on refining diamond deposit areas MI010 Nunavut Churchill West Shear Minerals Limited Chesterfield Inlet area Work in 2009 focused on refining diamond deposit areas MI011 Nunavut Diamond North Project Diamonds North Resources Limited Wager Bay area Claims staked in 2009, no future work has been reported MI012 Nunavut Ferguson Starfield Resources Incorporated Ferguson area 160 Surveys, sampling and drilling has occurred on site since MI013 Nunavut Ferguson (Di) Starfield Resources Incorporated Ferguson area 160 A limited drilling program was conducted in 2009 MI014 Nunavut Greyhound Aura Silver Resources Incorporated Greyhound 40 An electromagnetic survey was conducted in 2009, a drill program is expected in 2010 MI015 Nunavut Hawk (South Baker Project) Dubawni area Air surveys and a drilling program for uranium were conducted in 2008 and 2009 MI016 Nunavut Indigo Indicator Minerals Incorporated Garry area MI017 Nunavut Itza (Canada Uranium Joint Venture) MI018 Nunavut JG MI019 Nunavut MI020 Nunavut Judge Sissons (North Thelon Project) Kam (South Baker Project) Bayswater Uranium Itza area 150 Dubawni area Prospecting permits aquired in 2008, no work has been publically reported Mineral claims were obtained in 2008 but field work has not begun Air surveys and a drilling program for uranium were conducted in 2008 and 2009 Forum Uranium Baker area 50 Air and ground surveys were conducted in Dubawni area Air surveys and a drilling program for uranium were conducted in 2008 and 2009 MI021 Nunavut Kiyuk Evolving Gold Nueltin area A small field program was done in 2009 sampling drill cores. MI022 Nunavut L1 (South Baker Project) Dubawni area Air surveys and a drilling program for uranium were conducted in 2008 and 2009 MI023 Nunavut Lac Cinquante (Angilak) Kivalliq Energy Nowleye area 275 Exploratory drilling was conducted in 2009 and will continue in 2010
6 ID Activity Region Comodity Project Name Company Location Distance from Kiggavik (km) Project Status Description Estimated Operating Period Potential Interaction with Kiggavik Potential Cumulative Effects MI024 Nunavut Meadowbank Agnico-Eagle Mines Ltd. Baker area 75 Site construction will begin in years a) increased noise, vehicle traffic, dust ; b) increased shipping traff potential for spills, potential effects on marine wildlife MI027 Nunavut Muskox Agnico-Eagle Mines Ltd. Baker area Mineral claims on this property but no work being pursued MI028 Nunavut Nanuq Peregrine Diamonds Limited Wager Bay area Drill program implemented in 2009 and will be repeated in 2010 MI029 Nunavut Nanuq North Indicator Minerals Incorporated Wager Bay area Exploration work was conducted in Future work is postponed while partners resolve dispute on future program MI030 Nunavut Napajut Shear Minerals Limited Arviat area airbourne surveys conducted in A prospecting program is scheduled for MI031 Nunavut Nueltin Cameco Nueltin Drilling, mapping, prospecting done in A short drilling program followed in MI032 Nunavut Nutaaq Forum Uranium Baker area Geological sampling conducted in Future work will depend on results MI033 Nunavut Parker Agnico-Eagle Mines Ltd. Aberdeen area Property claims staked in MI034 Nunavut MI035 Nunavut Permit 1 (Canada Uranium Joint Venture) Permit 2 (Canada Uranium Joint Venture) MI036 Nunavut Qilalugaq Bayswater Uranium Bayswater Uranium Stornoway Diamond Aberdeen area Aberdeen area Repulse Bay area Mineral claims and land position consolidation occurred in 2008 and 2009 Mineral claims and land position consolidation occurred in 2008 and 2009 Sampling conducted in Field progams were postponed in MI037 Nunavut Ruby Hill Western Energy Aberdeen area Prospecting occurred in 2008, field programs were postponed in MI038 Nunavut Schultz (North Thelon Project) Forum Uranium Baker area Exploration program in 2008 included air and ground surveys and mapping. Exploration continued in MI039 Nunavut Southampton Vale Inco Limited Coral Harbour area Prospecting permits acquired in 2009 MI040 Nunavut Southampton Island 1 Anglo American Exploration (Canada) Limited Coral Harbour area Prospecting permits acquired in 2009 followed by an airbourne geophysical survey MI041 Nunavut Southampton Island 2 Anglo American Exploration (Canada) Limited Coral Harbour area Prospecting permits acquired in 2009 followed by an airbourne geophysical survey MI042 Nunavut St. Tropez Claims AREVA Resources Canada Inc. Baker area Preliminary surveys have been completed (aerial surveys but no drilling) 8 years a) increased noise, vehicle traffic, dust ; b) increased shipping traff potential for spills, potential effects on marine wildlife MI043 Nunavut SW Hawk (South Baker Project) Ennadai Area A drilling program was conducted in 2008 MI051 Manitoba Boulder Uranium Crescent Resources Corp. Boulder Exploratory drilling program in MI053 Manitoba North East Wollaston CanAlaska Ventures Ltd. Quasso Exploratory surveys conducted in MI054 Manitoba Misty CanAlaska Ventures Ltd. Lac Brochet Mineral Exploration License 166B, 209B, 236B, 247B, B, 362B exploration to be undertaken by Great Western Minerals Group Ltd. MI055 Manitoba Eppler Whetsone Minerals Inc. Eppler Exploratory drilling program for copper-zinc in 2006
7 ID Activity Region Comodity Project Name Company Location Distance from Kiggavik (km) Project Status Description Estimated Operating Period Potential Interaction with Kiggavik Potential Cumulative Effects MI056 Manitoba Hearne Uranium Hinterland Metals Inc. Churchill Exploratory drilling program in 2007 MI057 Manitoba Seal River De Beers Canada Seal River exploratory MI059 Manitoba Crosswell River Peregrine Diamonds Limited Crosswell River - MI060 Manitoba Weir River Peregrine Diamonds Limited Weir River A 2,700 line kilometer fixed-wing airborne magnetic survey was completed over the Weir River property in March, 2007 and follow-up ground magnetic surveys were completed over 10 anomalies later in the year. In April 2008, one high priority magnetic anomaly was drilled without intersecting kimberlite. MI062 Saskatche wan Key Cameco Key Uranium mine in production since 1983, mining has now moved to McArthur River but site will be used for regional processing 25 years MI063 Saskatche wan McArthur River Cameco McArthur River Uranium mine became operational in years MI064 Saskatche wan Cigar Cameco Cigar Uranium mine is under construction with operation expected to begin in years MI065 Saskatche wan Midwest Mine Areva Resources Canada Inc. Athabasca basin on hold MI066 Saskatche wan McClean Cameco McClean Uranium mine in operation since years MI067 Saskatche wan Rabbit Cameco Rabbit Uranium mine in operation since 1975, Cigar ore is expected to be processed from McClean and Rabbit facilities 4 years MI074 Nunavut Aura Consolidated Gold Project Angikuni area Exploration for gold, silver, copper in MI075 Nunavut Cache Alix Resources Corp. Whale Cove area Exploration conducted intermittently since 1960s; further exploaration was planned for Alix in negotiations with Nunavut Tunngavik Inc. to expand Cache proerty to 5000 hectares. MI076 Nunavut Mallery Project Mallery Gold deposit. Two-phase exploration program initiated in MI077 Nunavut SY Project Corsa Capital Ltd. 250 km W of Whale Cove Exploration conducted in 2007, and planned again for 2008 (no results reported). MI078 Nunavut Ukaliq (North Thelon Project) Kiggavik North MI079 Nunavut (North Thelon Project) Kiggavik South MI080 Nunavut (North Thelon Project) Tanqueray Block MI081 Nunavut (North Thelon Project) Forum Uranium Baker area Forum Uranium Baker area Forum Uranium Baker area Forum Uranium Baker area Exploration conducted in Drill programs to be conducted in Exploration conducted in Drill programs to be conducted in Exploration conducted in Drill programs to be conducted in Exploration conducted in Drill programs to be conducted in MI089 Nunavut Melville Gold AngloGold Ashanti Holdings Plc Committee Bay area Aerial reconaissance work completed in 2010 in preparation for more detailed follow-up exploratory work. MI090 Nunavut Roche Bay Advanced Explorations Inc. Parry Bay/Hall Beach area Exploration conducted in MI091 Nunavut Anuri (Committee Bay Gold Project) North Country Gold Corp. Committee Bay area Exploration ongoing; drilling planned for 2011.
8 ID Activity Region Comodity Project Name Company Location Distance from Kiggavik (km) Project Status Description Estimated Operating Period Potential Interaction with Kiggavik Potential Cumulative Effects MI092 Nunavut Inuk (Committee Bay Gold Project) North Country Gold Corp. Committee Bay area Exploration ongoing; drilling planned for MI093 Nunavut Raven (Committee Bay Gold Project) North Country Gold Corp. Committee Bay area Exploration ongoing; drilling planned for MI094 Nunavut MI095 Nunavut Three Bluffs (Committee Bay Gold Project) West Plains (Committee Bay Gold Project) North Country Gold Corp. Committee Bay area Exploration ongoing; drilling planned for North Country Gold Corp. Committee Bay area Exploration ongoing; drilling planned for MI096 Nunavut Amaruk Diamonds North Resources Limited Kugaaruk area Exploration conducted in 2010; drilling anticipated for MI097 Nunavut Halkett Inlet Gold Project Diamonds North Resources Limited Halkett Inlet Exploration conducted in 2010; chip sampling, prospecting, geophysical surveys and exploratory drilling anticipated for MI098 Nunavut Contwoyto IOL Concessions Golden River Resoures Hackett River area Exploration conducted in 2004 and Exploration planned for 2010 but no information released. MI099 Nunavut Yava Savant Explorations Ltd. Hackett River area Last exploration reported carried out in MI100 Nunavut Wishbone Sabina Gold & Silver Hackett River area Early-stage exploration project; further work deferred to MI101 Nunavut Blue Caribou Skybridge Development Corp. Beechey Exploratory drilling in Town of Baker Nunavut - - Baker 75 Population of 1,728 (2006 Census) - MU001 Commercial Caribou Nunavut - - Coral Harbour OT003 Harvest OT004 Fish Plant Nunavut - - Whale Cove OT005 OT006 Hunts by communities along the Hudson Bay coast Annual Bowhead Hunt Nunavut - - Nunavut from south of Arviat to the Foxe Basin, in the Hudson Strait and around Baffin Island. Annual Narwhal Hunt Nunavut - - Nunavut PA001 Park Nunavut - Ukkusiksalik National Park Repulse Bay, Wager Bay PA002 PA Based on monthly harvest estimates ( ) the mean annual number harvested is 74. Harvesting occurs mainly in July. Traditional hunting grounds, contains 500 archeological sites Park Nunavut - Thelon Wildlife Sanctuary NWT and NU 98 Developed to preserved wildlife populations - Protected Area Nunavut - Beverly Caribou Protected Area Nunavut ~150 Caribou Protected Area - PA004 Protected Area Nunavut - Oamanirjuaq Caribou Protected Area PA012 RO004 Protected Area Nunavut - Queen Maud Gulf Migratory Bird Sanctuary Road Nunavut - Nuna M&T Services Ltd. Nunavut ~160 Caribou Protected Area - Near Bathurst Inlet, Nunavut Baker to Meadow Bank TO001 Canoeing Nunavut - Canoe Arctic Inc. Thelon and Back river systems TO008 Nature tours Nunavut - Come Along Tours and Outfitting TO009 TO010 TO012 Dog sled excursions Nature tours and outfitters Wetland of international importance under Ramsar Convention and Canada's largest protected area. Covers marine and terrestrial areas. 108 all-weather Access Road. Construction completed in Outdoor tourism and adventure packages from various locations Rankin Inlet, Nunavut Nature, boat tours and dog sled excursions Nunavut - Tumi Tours Rankin Inlet, Nunavut Dog sled excursions Nunavut - Nature Tours Nunavut - Edwin Evo Outfitting and Naturalist Tours Great Canadian Wilderness Adventures Baker, Nunavut 80 Baker, Nunavut 80 Run various wildlife expeditions for photographers to Thelon Wildlife Sanctuary from Baker Baker is linked to Kiggavik by the proposed All Weather North road potential for pollution, habitat disturbance,
9 ID Activity Region Comodity Project Name Company Location Distance from Kiggavik (km) Project Status Description Goose Hunting Nunavut - N/A Nunavut Traditional Use Area - Areas TR006 TR007 Fishing Areas Nunavut - N/A Nunavut Traditional Use Area - MI103 Nunavut Jericho Diamond Mine Shear Minerals Limited Contwoyto, near Cambridge Bay MI025 Nunavut Meliadine East Agnico-Eagle Mines Ltd. Rankin Inlet area 295 MI026 Nunavut Meliadine West Agnico-Eagle Mines Ltd. Rankin Inlet area 295 MI082 Nunavut Mary River MI083 Nunavut Hope Bay - Doris North Phase 1 Baffinland Iron Mines Hope Bay Ltd. / Newmont Mary River Hope Bay Operating mine, purchased from Tahara in 2010 Exploratory drilling program in Currently under NIRB review for proposed mine Preliminary project description and mine development application assembled in Currently under NIRB review for proposed mine Exploration and metallurgical testing conducted in 2009 and Feasibility study started in Currently under NIRB review for proposed mine Exploratory drilling and baseline studies conducted in Currently under NIRB review for proposed mine Estimated Operating Period Potential Interaction with Kiggavik Shipping routes. No physical interaction. Potential Cumulative Effects MI084 Nunavut Hope Bay - Doris North Phase 2 Hope Bay Ltd. / Newmont Hope Bay Project description -to describe plans for future deposits and possible mine expansion - planned for submission in Currently under NIRB review for proposed mine No physical interaction. MI085 Nunavut Hackett River MI086 Nunavut MI087 Nunavut George (Back River Project) Goose (Back River Project) Sabina Gold & Silver Sabina Gold & Silver Sabina Gold & Silver MI088 Nunavut Izok MMG Resources Inc. EN002 Oil and Gas Lease Hackett River George Goose Izok, High area Exploration conducted in Exploration conducted in Exploration conducted in Exploration conducted in Further exploration expected in Currently under NIRB review for proposed mine (High ) Nunavut - various various locations Far Future - No physical interaction. EN003 Hydroelectric Dams Nunavut - Qulliq Energy Anna Maria Port Armshow River (long) Armshow River (right) Cantley Bay Jaynes Inlet McKeand River North Far Future Proposed hyrdo dam locations include Anna Maria Port, Armshow River (long), Armshow River (Right ), Cantley Bay, Janyes Inlet, McKeand River (N) - MA01 Port Terminals Nunavut - - South Shore 88 Far Future - - MI052 Manitoba uranium Kasmere Virginia Energy Resources Inc. (formerly Santoy resources) Kasmere Far Future permits acquired in 2005 Linked to marine development, caribou ranges encompass both projects a) Increased noise, vehicle traffic, dust ; b) Increased shipping traffic, potential for spills, potential effects on marine mammals MI058 Manitoba Churchill Uranium RJK Explorations Ltd. Churchill Far Future not active. Permit was not granted due to concerns over conflict with polar bear tourism industry. MI068 Manitoba - Indicator Explorations Ltd. Tadoule Far Future Mineral Exploration License B MI070 Manitoba - Whetstone Minerals Inc. Churchill Far Future Mineral Exploration License 72B, 148B MI071 Manitoba - Nuinsco Resources Lac Brochet Far Future Mineral Exploration License 363B
10 ID Activity Region Comodity Project Name Company Location Distance from Kiggavik (km) Project Status Description Estimated Operating Period Potential Interaction with Kiggavik Potential Cumulative Effects MI072 Manitoba - John D. Charlton Tadoule Far Future Mineral Exploration License 408B MI073 Manitoba - Manitor Minerals Inc. Tadoule Far Future Mineral Exploration License 278B, 298B MI102 RO005 RO006 RO001 Uranium Nunavut Garry Uravan Minerals Inc. Thelon Basin 170 Future Case Road Nunavut - Starfield Resouces Incorporated Road Nunavut - Agnico Eagle Road Nunavut - - RO002 Road Nunavut - - Churchill to Arviat; Arviat to Ferguson, Ferguson to Rankin Inlet Rankin Inlet to Meliadine project 25km NW of Rankin Inlet. Baker to Thorn Baker to Thorn 150 Future case Future Case NIRB is conducting a Part 5 public review. On hold, prohibited from gaining access to explore the site. Looking to seek a permit to continue with exploration. Proposed Winter Road. One section of proposed Manitoba to Nunavut road running from Gillam, MB, via Chruchill to Arviat, NU. Associated with Feguson property All-weather Access Road. Currently under NIRB review for proposed mine 53 N/A Proposed Winter Road - 53 N/A All Weather Access Road (south) - - RO003 Road Nunavut - - Baker to Thorn 53 N/A All Weather Access Road (north) - Linked to marine development, caribou ranges encompass both projects MI061 Saskatche wan Cluff Areva Resources Canada Inc. Cluff Past Uranium Mine ended production in 2002 and are nearing completion of decomissioning 22 years
11 B-2 FAR FUTURE SCENARIO A potential future development scenario presented in Table B-2.1 includes the following concepts/assumptions: Additional uranium deposits would be identified within a 200 km radius of the Kiggavik site; All deposits within a certain economic radius would be milled at a single mill. For the purposes of this assessment it is assumed that all deposits within 200 km of Kiggavik would be milled at the Kiggavik mill and therefore extend the life of the Project; Additional deposits found would be milled at the proposed maximum production rate of 4,000 tonnes U/yr. An expansion of the mill to increase production rate is not considered likely due to logistical constraints; An increase in tailings capacity would be required if sufficient resources were found to continue milling beyond the capacity of the three TMFs. An additional TMF could consist of a purpose-built pit or and elevated in-pit facility; It is currently believed that the winter road and the north all-season road with cable ferry cannot fully support two operations west of the Thelon. As a result, if a second mining/milling facility was constructed a bridge over the Thelon River, to provide yearround access would likely be required; Logistical restrictions through the Narrows could also limit the amount of development accessed through Baker given a limited number of high tides and the number of vessels that can pass the Narrows during high tide. The proposed Nunavut-Manitoba road would increase accessibility, however, costs of road transport tend to be higher than marine and economics would be impacted. Should a second uranium mill be proposed, approved and constructed it is assumed to be located outside of the identified 200 km radius. A non-uranium operation is assumed located within the Kiggavik RSA. The Meadowbank gold operation is used as the model for this. AREVA Resources Canada Inc. Kiggavik Project EIS December 2011 Page 2-4 Appendix 1B Cumulative Effects
12 It is assumed that additional resources are found in the Meadowbank area and that Meadowbank continues operation. Table B-2.1 Potential Future Development Scenario Component Uranium mines Uranium mills Gold mines Gold mills Access Roads Exploration Locations 3 mines within 200 km of Kiggavik Kiggavik mill 1 mine within Kiggavik RSA Meadowbank region Meadowbank Additional mill within Kiggavik RSA Meadowbank Additional mill within Kiggavik RSA Induced exploration near the access road(s) and in the Kiggavik area AREVA Resources Canada Inc. Kiggavik Project EIS December 2011 Page 2-5 Appendix 1B Cumulative Effects
13 B-3 MAPS AREVA Resources Canada Inc. Kiggavik Project EIS December 2011 Page 3-6 Appendix 1B Cumulative Effects
14 Traditional Use Area of Significance Camping Area Fishing Area Goose Hunting Area Muskox Hunting Area Mineral Exploration Base Metals REE Uranium Operating Mine [ Gold Transportation Marine Transportation Route Baker Municiple Road Meadowbank All Weather Road Parks and Protected Areas Park / Protected Area Project Case Kiggavik Project Project Site / Project Road Proposed Barge Route Proposed Shipping Route North All Season Road North Winter Road South Winter Road Kiggavik Mineral Lease Base Features Community Regional Boundary Aberdeen Thelon Basin Aberdeen Turqavik Schultz Kiggavik St. Tropez Claims Schultz Kiggavik Ukaliq Judge Sissons Sissons Nutaaq Qikiq qtarju a l Tanqueray Option T h elon Ri ver [ Meadowbank Greyhound Whi tehills 0 Baker ³ Kiggavik S i k R iv e r Baker Mallery Princess Mary Pitz Baker Basin Projection: Canada Lambert Conformal Conic Creator: R Stohmann Date: 10/13/2011 Scale: 1:600,000 File: _Areva_Figure01_Local.mxd Data Sources: Natural Resources Canada, Geobase, Nation Topographic Database, AREVA Resources Canada Inc., Stantec Inc. FIGURE X1 Local Land Use ENVIRONMENTAL IMPACT STATEMENT VOLUME XX AREVA Resources Canada Inc - P.O. Box th Street West - Saskatoon, SK - S7K 3X5
15 160 0'0"W 150 0'0"W 140 0'0"W A Wildlife Cumulative Effects Assessment Area O R C Operating Mine ( ( ( ( Diamond Gold Nickel-copper-PGEs Uranium E C T A 130 0'0"W 120 0'0"W 110 0'0"W 100 0'0"W 90 0'0"W 80 0'0"W 70 0'0"W 60 0'0"W 50 0'0"W 40 0'0"W 30 0'0"W I C N Mineral Exploration Transportation All Weather Road Marine Transportation Route Sirmilik National Park Nu Gulf ne l Yellowknife Base Features Community [ Kimmirut Hudson Whale Cove Arviat Oamanirjuaq Caribou Protected Area S A S K(( Fort McMurray Grande Prairie Projection: Canada Lambert Conformal Conic Creator: R Stohmann Date: 10/13/2011 Scale: 1:13,250,000 File: _Areva_Figure02_Regional.mxd Data Sources: Natural Resources Canada, Geobase, Nation Topographic Database, AREVA Resources Canada Inc., Stantec Inc. Labrador City 120 0'0"W Thompson ( Edmonton Sanikiluaq 130 0'0"W MAN ( Bay Quebec Hudson Fort St John ait AB 50 0'0"N Str Chesterfield Inlet Rankin Inlet Prince Rupert # # BC Cape Dorset Coral Harbour Proposed Shipping Route s / River Regional Boundary Iqaluit t Thelon Wildlife Sanctuary ( Baker i Repulse Bay Foxe Basin a Project Kiggavik [ Proposed Barge Route Beverly Caribou Protected Area Ukkusiksalik National Park # Project Case r Northwest Te r r i t o r i e s Proposed Road Proposed Shipping Route ( Queen Maud Gulf Bird Sanctuary Pangnirtung t Transportation Bathurst Inlet # Hall Beach Kugaaruk Auyuittuq National Park S Proposed Mine # Umingmaktok # s # Base Metals # Gold # Iron Gjoa Haven a Qikiqtarjuaq i Igloolik v Cambridge Bay B oothia Taloyoak D navut of Kugluktuk Clyde River # Parks and Protected Areas National Park Park / Protected Area Isabella Bay (Proposed NWA) Pond Inlet Arctic Bay an Sound Ch 60 0'0"N Oil and Gas - Surface Well YK E Resolute Prince Leopold L a n caster Island Energy Future Case R re ' C li nto c k Sea M lu ait Beaufort G Coburg Island NWA Grise Fiord 'C tr M S Base Metals Coal Diamonds Gemstones Gold Iron Lithium Nickel-copper-PGEs REE Uranium N A D 60 0'0"N E L N 50 0'0"N 170 0'0"W 110 0'0"W 100 0'0"W 90 0'0"W 80 0'0"W 70 0'0"W FIGURE X2 Regional Land Use ENVIRONMENTAL IMPACT STATEMENT VOLUME XX AREVA Resources Canada Inc - P.O. Box th Street West - Saskatoon, SK - S7K 3X5
Nunavut Communities. Arctic Bay people. Arviat - 2,611 people. Baker Lake - 2,164 people. Cambridge Bay - 1,684 people
Arctic Bay - 875 people Arctic Bay, or Ikpiarjuk the pocket, is surrounded by hills. Located on northern Baffin Island, it is a great place to experience the sights of sea mammals. Arctic Bay is connected
More informationGovernment of Nunavut
Government of Nunavut Tunngasugitti -- Welcome to Nunavut! City - Population Arctic Bay - 823 Arviat - 2,318 Baker Lake - 1,872 Cambridge Bay - 1,608 Cape Dorset - 1,363 Chesterfield Inlet - 313 Clyde
More informationNunavut Communities Snapshot
Nunavut Communities Snapshot Benchmarking Document 2015 Dr. Jackie Dawson Associate Professor Canada Research Chair in Environment, Society, and Policy Department of Geography University of Ottawa 1 2
More informationPresentation to MASS17 OCTOBER 2017
Presentation to MASS17 OCTOBER 2017 Since 1967, the Woodward Group of Companies has been involved in the fuels and shipping business throughout eastern and northern Canada Average annual CPP throughput
More informationAIM and PBN Airport Community Benefits. IAAE Saskatoon, May 2013
AIM and PBN Airport Community Benefits IAAE Saskatoon, May 2013 1 AIM Fit for Purpose Information Chain Business Plan PBN Overview Implementation 2 AIM to IM FIT FOR PURPOSE Aeronautical Terrain and Obstacles
More informationQIKIQTAALUK REGION. There is a weather station as well as the Polar Continental Shelf Project research camp located within the community.
QIKIQTAALUK REGION Resolute Bay Population: 258 The second northernmost community in Canada, Resolute Bay (Qausuittuq) is located in the High Arctic on the south coast of Cornwallis Island. The gateway
More informationThe Grays Bay Road and Port Project. Arctic Gateway Connecting Nunavut to the World
The Grays Bay Road and Port Project Arctic Gateway Connecting Nunavut to the World Project Overview The Grays Bay Road and Port Project (GBRP) is a transportation system that, once completed, will connect
More informationTo Nunavut via Churchill II: Port and Water
To Nunavut via Churchill II: Port and Water Paul D. Larson, Ph.D. CN Professor of SCM Director, Transport Institute University of Manitoba larson@cc.umanitoba.ca Delta Hotel, Winnipeg September 29, 2010
More information^-.^.^TK'^^.?' ".. Information and Exercises. about. The Territories. Yukon Territory Northwest Territories. Nunavut Territory.
^-.^.^TK'^^.?' ".. Information and Exercises about The Territories Yukon Territory Northwest Territories Nunavut Territory Whitehorse, Yukon fyukon TERRITORY ] Key Words: taiga- northern forest area boreal-
More informationSensitive Start Year Project Name N 2008 Central Barrens - BHP Preliminary Caribou Observation Survey (2008) N 2000 Central Barrens - Grizzly Bear
N 2008 Central Barrens - BHP Preliminary Caribou Observation Survey (2008) N 2000 Central Barrens - Grizzly Bear #592 GPS tracking records Lac de Gras 2000-2003 N 1988 Central Barrens - Grizzly Bear Captures
More informationNorthern Mining News
Northern Mining News Volume 4, No. 7 August 2011 In this issue: NWT Maintains 3 rd Place in Global Diamond Production...2 Future of diamond prices looks bright...2 Mining: Digging Canada Out of Debt!...3
More informationHudson Bay Lowlands Proposed Protected Areas
Hudson Bay Lowlands Proposed Protected Areas Hudson Bay Lowlands Proposed Protected Areas The Protected Areas Initiative has identified portions of the Hudson Bay Lowlands region that have significant
More informationRudy Kellar Vice-President Operations Presentation to 2011 NATA AGM 12 April 2011 Yellowknife, NT
NAV CANADA UPDATE Rudy Kellar Vice-President Operations Presentation to 2011 NATA AGM 12 April 2011 Yellowknife, NT Outline Corporate Overview Surveillance in the North NWS integration ADS-B AIS Update
More informationMatch the names below with their locations on the map by writing the correct letter in the blank.
P r e v i e w Match the names below with their locations on the map by writing the correct letter in the blank. Physical Features of Canada 60ºN 70ºN 80ºN A R C T I C O C E A N 130ºW 120ºW 110ºW 90ºW 70ºW
More informationINTRODUCTION ITINERARY ARCTIC - BAFFIN ISLAND TRIP CODE ACTSBIJ DEPARTURE. 22-Jul-2019 DURATION. 12 Days LOCATIONS. Arctic
INTRODUCTION We journey up the wild east coast of Baffin Island, discovering deep fjords, soaring mountains and immense glacial systems. A variety of birdlife and marine wildlife sometimes even polar bears
More informationFor personal use only
ABN 52 007 626 575 Date 23 rd May 2016 The Manager Market Announcements Office ASX Ltd 4th Floor, 20 Bridge Street Sydney NSW 2000 ASX Code: JRV JOINT VENTURE WITH AUSTRALIAN MINES LIMITED (ASX: AUZ) The
More informationAircraft Movement Statistics: Airports Without Air Traffic Control Towers (TP 141)
Catalogue no. 51-008-X Aircraft Movement Statistics: Airports Without Air Traffic Control Towers (TP 141) November 2010 How to obtain more information For information about this product or the wide range
More informationCaribou Monitoring & Mitigation Agnico Eagle s Experience Jamie Quesnel, Environment Manager Stéphane Robert, Director Regulatory Affairs Nunavut
Caribou Monitoring & Mitigation Agnico Eagle s Experience Jamie Quesnel, Environment Manager Stéphane Robert, Director Regulatory Affairs Nunavut Mining Symposium April 4, 2017 Building a Long-Term Strategic
More informationSTEP 1: Label the following provinces and territories on the lines provided. Be sure to label your map NEATLY.
CGC 1P Map of Canada STEP 1: Label the following provinces and territories on the lines provided. Be sure to label your map NEATLY. Label the following provinces and territories in BLOCK LETTERS: Alberta
More informationFor personal use only
22 November 2018 ASX : ARV FRANKFURT : ATY US OTCQB : ARTTF GOLD, COBALT AND COPPER IN THE WEST PILBARA ARTEMIS RESOURCES LIMITED IS AN AUSTRALIAN MINERAL DEVELOPER ADVANCING ITS WEST PILBARA BASE, BATTERY
More informationB is for British Columbia. A is For Alberta
C is for Canada A is For Alberta Alberta is one of the only provinces in Canada with 2 NHL teams. Edmonton, the capital of Alberta is the home of the West Edmonton Mall, which is the largest shopping mall
More information2016 Registered Organizations
9806415 Arctic Circle Survailence Arctic Inspiration Prize Aarluk Consulting Arctic Beverages LP Arctic Cooperatives Atuqtuarvik Corporation Arctic Fishery Alliance Arctic Infrastructure Limited Partnership
More informationFor personal use only
ASX ANNOUNCEMENT 30 APRIL 2015 QUARTERLY ACTIVITIES REPORT HIGHLIGHTS PROJECTS Over 2,000m of RC drilling planned at SA Titan Gold & IOCG Project Drilling planned to test strong EM conductor for high grade
More informationGlobal Trends in the Natural Resource Sector
Global Trends in the Natural Resource Sector C W Goodyear Chief Executive Officer 10 th St. Petersburg International Economic Forum St. Petersburg, 13 June 2006 1990 Industry structure BHP Rio Tinto Anglo
More informationCANADA: ITS LAND, RESOURCES, & ECONOMY PRE-TEST
PRE-TEST Name Directions: In the blank space, write a "T" if the statement is true and an "F" if the statement is false. 1. Canada has 11 geographic regions. 2. The cordillera is found in central Canada.
More informationOut of the Northwest Passage
EXPEDITION CRUISE Out of the Northwest Passage SEPTEMBER 2 18, 2019 SEPTEMBER 7 23, 2020 Aboard the Ocean Endeavour (p.18) From $9,995 to $25,095 usd per person (details p.26) Starts: Calgary, AB Ends:
More informationCandelaria and Ojos del Salado Chile
TSX : LUN OMX : LUMI 2016 Candelaria Key Facts Open Pit and Underground Mine Copper, gold, and silver 2016 estimate 130,000-132,000 tonnes copper Cash costs of $1.35 per lb copper after by-product credits
More informationIndustry Capability Network (ICN) Kevin Peters - CEO Garry Ross Regional Consultant Elena Tsangari Project Support
Industry Capability Network (ICN) Kevin Peters - CEO Garry Ross Regional Consultant Elena Tsangari Project Support The ICN is a proactive business organisation that identifies, develops and matches opportunities
More informationFor personal use only
ASX Announcement 15 May 2012 ARTEMIS ACQUIRES STRATEGIC WEST PILBARA GOLD AND BASE METALS ASSETS About Artemis Resources Artemis Resources is an ASX-listed mineral exploration company with a focus on gold:
More informationVictoria International Airport Your Gateway to the World
Victoria International Airport Your Gateway to the World Not for profit corporation Incorporated under Part II of Canada Corporation Act Revenue invested in airport 60 year lease with option for 20 more
More informationTHE NORTHWEST PASSAGE:West to East
THE NORTHWEST PASSAGE:West to East Detailed Itinerary Feb 21/17 The Northwest Passage remains one of the world s last true frontiers, and this expedition takes you to its heart. Visit remote northern communities
More informationAs outlined in the Tatshenshini-Alsek Park Management Agreement, park management will:
Management Strategy General Strategy The priority management focus for the park is to ensure that its internationally significant natural, cultural heritage and recreational values are protected and that
More informationHANNAN CONTINUES DRILL SUCCESS OUTSIDE RESOURCE AREA AT KILBRICKEN, IRELAND Drill Results Include 8.0% ZnEQ and 10.
1305 1090 West Georgia Street, Vancouver, BC, V6E 3V7 Phone: +1 604 685 9316 / Fax: +1 604 683 1585 NEWS RELEASE November 27, 2017 HANNAN CONTINUES DRILL SUCCESS OUTSIDE RESOURCE AREA AT KILBRICKEN, IRELAND
More informationNakina Moraine Provincial Park. Interim Management Statement. Ontario. Ministry of Natural Resources
Nakina Moraine Provincial Park Interim Management Statement Ontario Ministry of Natural Resources 1999, Queen's Printer for Ontario Printed in Ontario, Canada Additional copies of this publication can
More informationGold Mining an Industry in Transition. Melbourne Mining Club 7 June Ian Smith Managing Director and CEO Newcrest Mining Limited NEWCREST 1
Gold Mining an Industry in Transition Melbourne Mining Club 7 June 2007 Ian Smith Managing Director and CEO Newcrest Mining Limited NEWCREST 1 Gold Production ('000 t) Cumulative Gold Production Since
More informationKinross Gold Corporation Merrill Lynch Global Metals, Mining & Steel Conference May 13 15, 2008
DELIVERING DISCIPLINED GROWTH 1 Cautionary Statements All statements, other than statements of historical fact, contained or incorporated by reference in this presentation, including any information as
More informationSUBMISSION TO THE NUNAVUT WILDLIFE MANAGEMENT BOARD FOR
SUBMISSION TO THE NUNAVUT WILDLIFE MANAGEMENT BOARD FOR Information: Decision: X Issue: Approval of the Ukkusiksalik Nation Park of Canada Management Plan and associated prohibition of sport fishing by
More informationBAFFIN ISLAND JEWEL OF THE HIGH
BAFFIN ISLAND JEWEL OF THE HIGH ARCTIC 24 JULY TO 05 AUGUST 2017 12 NIGHTS / 13 DAYS Overview Baffin Island is one of the last great wilderness regions on the planet and the focus of this outstanding expedition.
More informationSand Lakes Provincial Park. Draft Management Plan
Sand Lakes Provincial Park Draft Management Plan 2 Sand Lakes Provincial Park Table of Contents 1. Introduction... 3 2. Background... 3 3. Park Purpose... 5 4. Park Management Guidelines... 6 Appendix...
More informationFor personal use only
QUARTERLY ACTIVITIES REPORT PERIOD ENDED 30 JUNE 2015 ASX Announcement ASX Code: VXR Released: 31 July 2015 Venturex Resources Limited (ASX: VXR) is pleased to report its activities for the June 2015 Quarter.
More informationFor personal use only
Suite 4, Level 3 South Shore Centre 85 South Perth Esplanade South Perth WA 6151 TEL +61 8 6313 3800 FAX +61 8 6313 3888 ABN 38 108 779 782 ASX ANNOUNCEMENT 04 July 2012 Completion of Asset Sale Agreement
More informationGREENLAND TO. 14 days Departure September
GREENLAND TO NUNAVUT Churchill 14 days Departure September 02 2019 2 www.churchillcruises.com GREENLAND TO NUNAVUT Churchill 14 days Departure September 02 2019 Navigating north from Kangerlussuaq along
More informationORION METALS LIMITED (ASX: ORM) ACTIVITIES REPORT FOR QUARTER ENDING 31 st August 2014.
ORION METALS LIMITED (ASX: ORM) ACTIVITIES REPORT FOR QUARTER ENDING 31 st August 2014. EXPLORATION ACTIVITIES Orion s efforts towards project growth, evaluation, and rationalisation have been the focus
More informationNumaykoos Lake Provincial Park. Management Plan
Numaykoos Lake Provincial Park Management Plan 2 Numaykoos Lake Provincial Park Table of Contents 1. Introduction... 3 2. Background... 3 3. Park Purpose... 5 4. Park Management Guidelines... 6 Appendix...
More informationPRESS RELEASE CANADIAN ZINC SUPPORTS EXPANSION OF NAHANNI NATIONAL PARK
PRESS RELEASE CZN-TSX CZICF-OTCBB FOR IMMEDIATE RELEASE CANADIAN ZINC SUPPORTS EXPANSION OF NAHANNI NATIONAL PARK PRAIRIE CREEK MINE EXCLUDED FROM ENLARGED PARK ACCESS RIGHTS TO BE PROVIDED BY NEW LEGISLATION
More informationGenius Properties / Cerro de Pasco Resources Merger Opportunity. June 2018
Genius Properties / Cerro de Pasco Resources Merger Opportunity June 2018 Forward-looking Statement This presentation contains forward-looking statements within the meaning of the United States Private
More informationWallace Lake Provincial Park. Management Plan
Wallace Lake Provincial Park Management Plan 2 Wallace Lake Provincial Park Table of Contents 1. Introduction... 3 2. Park History... 3 3. Park Attributes... 4 3.1 Natural... 4 3.2 Recreational... 4 4.
More informationINVESTMENT SUMMARY. A Compelling Lithium-in-Brine Opportunity, Mexico. A High-Grade Past-Producing Silver/Gold Mine, New Mexico
INVESTMENT SUMMARY A Compelling Lithium-in-Brine Opportunity, Mexico A High-Grade Past-Producing Silver/Gold Mine, New Mexico AUGUST 2017 INTRODUCTION One World Minerals Inc. (OWM) is a lithium exploration
More informationBHP Billiton: A Strategy of Diversification
Olympic Dam, Australia BHP Billiton: A Strategy of Diversification Andrew Mackenzie Chief Executive Non-Ferrous 9 June 2010 Disclaimer Reliance on Third Party Information The views expressed here contain
More informationLorena Gold Project Malachite AGM 29 November 2017
Lorena Gold Project Malachite AGM 29 November 2017 Disclaimer and Competent Person Statement Disclaimer This presentation may contain forward looking statements that are subject to risk factors associated
More informationADVENTURE IS A TRAIN RIDE AWAY. We can get you there. The rest is up to you.
ADVENTURE IS A TRAIN RIDE AWAY We can get you there. The rest is up to you. CANADA BY RAIL / VIA RAIL CANADA CANADA BY RAIL / VIA RAIL CANADA WHERE WILL YOU GO NEXT? VIA Rail s 40th anniversary is the
More informationOntario. Tide Lake Provincial Nature Reserve. Interim Management Statement. Ministry of Natural Resources
Ontario Tide Lake Provincial Nature Reserve nterim Management Statement Ministry of Natural Resources Tide Lake Provincial Nature Reserve nterim Management Statement Ontario Ministry of Natural Resources
More informationNorth Atlantic Ziplines Inc.
Environmental Assessment Registration Document North Atlantic Ziplines Inc. North Atlantic Ziplines General Delivery Tors Cove, NF A0A 4A0 Document completed by Rob Carter in cooperation with Universal
More information"THE STATE OF QUALITY MEASURES IN CANADA KATHLEEN FLANAGAN
"THE STATE OF QUALITY MEASURES IN CANADA KATHLEEN FLANAGAN October 10, 2013 OVERVIEW Context ECEC in Canada Who uses quality measurement tools? How are they used? Unique examples Governance: Shift to
More informationHigh Arctic Explorer CANADIAN ARCTIC: 2018 TRIP NOTES A JOURNEY INTO THE REMOTE HEART OF THE CANADIAN ARCTIC. Expedition Highlights
CANADIAN ARCTIC: 2018 TRIP NOTES High Arctic Explorer 14 23 AUG 2018 9 NIGHTS / 10 DAYS STARTS RESOLUTE A JOURNEY INTO THE REMOTE HEART OF THE CANADIAN ARCTIC. The great appeal of this voyage is the immediate
More informationCanada s Regions. The Regions of Canada. Provinces and Territories. Population. The National Capital. Central Canada
44 Your Canadian Citizenship Study Guide Canada s Regions Canada is the second largest country on earth 10 million square kilometres. Three oceans line Canada s frontiers: the Pacific Ocean in the west,
More informationPOLAR BEARS & BELUGA WHALES
POLAR BEARS & BELUGA WHALES Summer is alive and well in Canada s Arctic, and the perfect time to spot the thousands of congregating beluga whales in the Hudson Bay. Go boating alongside belugas, and observe
More informationDECEMBER 2017 QUARTERLY ACTIVITIES REPORT
DECEMBER 2017 QUARTERLY ACTIVITIES REPORT Completion of 1.3Moz WA gold merger and $5.33m capital raising allows Spitfire to hit the ground running in 2018 Scheme of arrangement between Aphrodite Gold and
More informationInuit Adventure: Narwhals & other Wildlife of Baffin Island
Inuit Adventure: Narwhals & other Wildlife of Baffin Island Naturetrek Tour Itinerary 2013 Outline itinerary Day 1 Arrive Ottawa. Day 2 Fly Pond Inlet. Day 3 Travel to the floe edge. Day 4/8 Explore the
More informationEXPLORE MORE OF CANADA THAN EVER IMAGINED DISCOVER CANADA ON THE MOST EXTENSIVE TRAVEL ITINERARY
CANADA CIRCUMNAVIGATION VOYAGE 2018 ONE OCEAN EXPEDITIONS A PROUDLY CANADIAN COMPANY FEATURING VIA RAIL & FAIRMONT HOTELS 24 JULY 17 SEPT 2018 56 NIGHTS / 57 DAYS EMBARK LOUISBOURG, NS DISEMBARK HALIFAX,
More informationDecember 2017 Quarterly Report
ASX Announcement 31 January 2018 ASX: CRB December 2017 Quarterly Report KEY POINTS Continuation of work including final design criteria and front end engineering following Demonstration Plant test work
More informationNewcrest & the Gold Sector. Brisbane Mining Club 26 April Ian Smith Managing Director and CEO NEWCREST
Newcrest & the Gold Sector Brisbane Mining Club 26 April 2007 Ian Smith Managing Director and CEO Total refined gold production throughout history ( ~ 130,000 tonnes ) would form a 20 metre cube ( a six
More informationRamelius Resources Limited ASX:RMS
Ramelius Resources Limited ASX:RMS INVESTOR PRESENTATION March 2012 1 Forward Looking and Competent Persons Statements Forward looking statements This presentation contains certain forward looking statements
More informationAustralian Mines increases Marymia ground holding
11 June 2015 Australian Mines increases Marymia ground holding Australian Mines Limited ( Australian Mines or the Company ) is pleased to advise shareholders that it has entered into a farm-in and joint
More informationQuinto Resources Inc. (TSX-V: QIT)
Quinto Resources Inc. () Corporate Presentation November 2017 Disclaimer This presentation contains certain forward-looking statements, including, but not limited to, statements regarding the Company s
More informationWallace Lake Provincial Park. Draft Management Plan
Wallace Lake Provincial Park Draft Management Plan Wallace Lake Provincial Park Draft Management Plan Table of Contents 1. Introduction... 3 2. Park History... 3 3. Park Attributes... 4 3.1 Natural...
More informationMakivik Corporation. The Nunavik Region. Adam Lewis, Director of Economic Development, Economic Development Department, Makivik Corporation
Makivik Corporation The Nunavik Region Adam Lewis, Director of Economic Development, Economic Development Department, Makivik Corporation Nunavik Comprises the northern third of the province of Quebec,
More informationgrowth discipline value 2009 Annual General Meeting
growth discipline l value 2009 Annual General Meeting cautionary statement on forward-looking information All statements, other than statements of historical fact, contained or incorporated by reference
More informationASX ANNOUNCEMENT 25 JANUARY 2008 FURTHER HIGH GRADE INTERCEPTS FROM THE KOKA GOLD DEPOSIT, ERITREA
ASX ANNOUNCEMENT 25 JANUARY 2008 FURTHER HIGH GRADE INTERCEPTS FROM THE KOKA GOLD DEPOSIT, ERITREA Zara Joint Venture, Eritrea (Dragon Mining Limited - 20% interest) Koka Gold Deposit Dragon Mining Limited,
More informationQuestions and Answers related to Caribou and the Winter Road
Updated December 18, 2009 Questions and Answers related to Caribou and the Winter Road Question: Does the operation of the winter road have an effect on the Bathurst Caribou Herd? Answer: Commercial use
More informationFor personal use only
For the period ended 30 September 2014 HIGHLIGHTS STORMONT (TASMANIA) JOINT VENTURE GOLD PROJECT MINING AND PRODUCTION COMPLETED. LORENA GOLD PROJECT CONSTRUCTION CONTINUES TO ADVANCE. COMMISSIONING EXPECTED
More informationPerspectives on Partnerships and Opportunities in the North
Perspectives on Partnerships and Opportunities in the North The Nunavik Region Andy Moorhouse, Vice President, Economic Development Department, Makivik Corporation Makivik Corporation Inuit birthright
More informationParks Canada Northwest Passage
Parks Canada Northwest Passage Early Booking Bonus: Make a new booking by January 19, 2019 and save 10% on your basic cruise price. The Northwest Passage remains one of the world s last true frontiers,
More informationReal Property Institute of Canada: Marine Infrastructure National Workshop January 28, 2014
Arctic Canada 1 Public Works and Government Services Canada (PWGSC) Real Property Institute of Canada: Marine Infrastructure National Workshop January 28, 2014 Jerome MacGillivray, P. Eng John Davidson,
More informationTHE NORTHWEST PASSAGE:West to East
THE NORTHWEST PASSAGE:West to East Detailed Itinerary May 10/17 The Northwest Passage remains one of the world s last true frontiers, and this expedition takes you to its heart. In Canada s vast northern
More informationJUNE 2017 QUARTERLY ACTIVITIES REPORT
ASX RELEASE 25 JULY 2017 JUNE 2017 QUARTERLY ACTIVITIES REPORT Cash flow positive result for the quarter even after significant development activities and repayment of Nullagine deferred royalties to the
More informationState of the Economy St. John's Metro
State of the Economy St. John's Metro Published by: Department of Economic Development, Tourism & Culture City of St. John's Email: business@stjohns.ca Although every effort has been made to ensure the
More informationLAS OPEÑAS DRILLING COMMENCED
ASX Announcement 17 October 2012 LAS OPEÑAS DRILLING COMMENCED LAS OPEÑAS, ARGENTINA Diamond drilling program commenced Targeting both high-grade epithermal veins and breccia bodies CERRO VERDE, CHILE
More informationHuman Geography of Canada
Human Geography of Canada History and Government of Canada Like the United States, people migrated across Beringia into Canada, these people were the ancestors of the Inuit (Eskimos) 16 th and 17 th centuries,
More informationNorthwest Passage: Franklin s Legend
Northwest Passage: Franklin s Legend For centuries, fortune-seekers risked their lives to find the Northwest Passage, the fabled sea route between Europe and Asia. It was considered the greatest geographical
More informationInformation Requirement iv (Sec. 93)
I. PETROLEUM PROJECTS MAJOR PROJECTS 1. Service Contract 38 Malampaya Gas-to-Power Project Offshore Palawan Shell Philippines Exploration BV Shell Philippines Exploration BV (Operator) 45% Chevron MalampayaLLC
More informationMARCH 2018 QUARTERLY ACTIVITIES REPORT
X AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT 27 April 2018 MARCH 2018 QUARTERLY ACTIVITIES REPORT Syndicated prepares for new phase of drilling at Monument Gold Project drilling commences in early April
More informationActivities Report for the quarter ended 30 th June 2011
Activities Report for the quarter ended 30 th June 2011 Admiralty Resources NL (ASX: ADY) Issued capital 606,518,966 shares (as of 30 June 2011) 606,518,966 shares (current) Top 20 Shareholders : 50.50%
More informationKIVALLIQ 2017 VISITORS GUIDE CALENDAR OF EVENTS COMMUNITY PROFILES KIVALLIQ REGION MAP
KIVALLIQ 2017 VISITORS GUIDE CALENDAR OF EVENTS COMMUNITY PROFILES KIVALLIQ REGION MAP CONTENTS 04 Welcome to the Kivalliq Region 06 Kivalliq Quick Facts 07 Staying Here 09 Climate 11 Taste 13 Arts &
More informationPolar Bear Migration Fly-In Photo Safari. 8 Days
Polar Bear Migration Fly-In Photo Safari 8 Days Polar Bear Migration FlyIn Photo Safari Fly into the heart of Canada's "polar bear alley" and enjoy a perfect vantage point from the safety of an expertly
More informationThe Nunavik Inuit Land Claims Agreement Impact Assessment Process. Presented at the Kuujjuaq Mining Forum, April 2017.
The Nunavik Inuit Land Claims Agreement Impact Assessment Process Presented at the Kuujjuaq Mining Forum, April 2017. The Nunavik Inuit Land Claims Agreement The Nunavik Inuit Land Claims Agreement (NILCA)
More informationSteel River Provincial Park. Interim Management Statement. Ministry of Natural Resources. Ontario. Ministry of Natural Resources.
Steel River Provincial Park Interim Management Statement Ontario Ministry of Natural Resources (j) Ontario Ministry of Natural Resources Additional copies of this publication are obtainable only from:
More informationMANAGEMENT DIRECTION STATEMENT June, 1999
Thompson River District MANAGEMENT DIRECTION STATEMENT June, 1999 for Roche Lake Provincial Park Ministry of Environment Lands and Parks BC Parks Division Table of Contents I. Introduction A. Setting
More informationdedicated to being world class Denver Gold Forum September 28, 2004 Robert M. Buchan President & Chief Executive Officer
dedicated to being world class Denver Gold Forum September 28, 2004 Robert M. Buchan President & Chief Executive Officer Forward Looking Statement Certain statements set forth in this presentation constitute
More informationRoberts Bank Terminal 2 Project
OCTOBER 2012 Roberts Bank Terminal 2 Project The Roberts Bank Terminal 2 Project is a proposed new multi-berth container terminal at Roberts Bank in Delta, B.C. that would provide 2.4 million TEUs (twenty-foot
More informationProposal to Redevelop Lower Kananaskis River-Barrier Lake. Bow Valley Provincial Park. Frequently Asked Questions
Proposal to Redevelop Lower Kananaskis River-Barrier Lake Bow Valley Provincial Park Frequently Asked Questions What is being proposed? What are the details of the proposal? Where is the project area located?
More informationAfrican Gold Group, Inc.
-1- BCE Place, Canada Trust Tower, 27 th Floor, 161 Bay Street, Toronto, Canada M5J 2S1 e.mail : info@africangoldgroup.com website : www.africangoldgroup.com African Gold Group, Inc. TSX-V: AGG AFRICAN
More informationBaffin Island Jewel of the High Arctic
CANADIAN ARCTIC: 2018 TRIP NOTES Baffin Island Jewel of the High Arctic 03 14 AUG 2018 11 NIGHTS / 12 DAYS STARTS IN IQALUIT DISCOVER THE STUNNING WILDERNESS OF CANADA'S JEWEL BAFFIN ISLAND Baffin Island
More informationClearwater Lake Provincial Park. Draft Management Plan
Clearwater Lake Provincial Park Draft Management Plan Clearwater Lake Provincial Park Draft Management Plan Table of Contents 1. Introduction... 3 2. Park History... 4 3. Park Attributes... 4 3.1 Location/Access...4
More informationFor personal use only
ASX / Media Announcement 10 November 2017 Artemis Resources Limited ARBN: 80 107 051 749 Level 3, IBM Building, 1060 Hay Street, West Perth, WA Australia, 6006 PO Box R933 Royal Exchange NSW Australia,
More informationHaoma Mining NL A.B.N
Haoma Mining NL A.B.N 12 008 676 177 Registered Office & Head Office: Level 1, 401 Collins Street, Melbourne, Vic., 3000, GPO Box 2282U, Melbourne, Vic., 3001. Telephone (03) 9629 6888, Facsimile (03)
More informationCanada Print Article World Book Advanced
Page 1 of 7 Back Print this page Canada The land Map Canada provinces Canada covers most of the northern half of North America. It borders Alaska on the northwest and the rest of the continental United
More informationFocus Begins Accelerated Development of the Mount into New Stand Alone Mining Operation
Focus Begins Accelerated Development of the Mount into New Stand Alone Mining Operation Outstanding exploration and trial mining results from The Mount deposit pave way to create a 2 nd operational centre
More informationRegion of Waterloo Planning, Development and Legislative Services Region of Waterloo International Airport Office of Economic Development
Region of Waterloo Planning, Development and Legislative Services Region of Waterloo International Airport Office of Economic Development To: Chair Tom Galloway and Members of the Planning and Works Committee
More informationFor personal use only
ASX Release 31 July, 2012 MONTERAY MINING GROUP Tel: +61 7 5538 2558 Fax: +61 7 5526 8922 info@monteraymining.com.au www.monteraymining.com.au Contact: KEVIN DART Chairman kjdart@charpac.com.au JOHN HANNAFORD
More information