1 Exhibit J-1. Stakeholder Group Information Packets J-13 CEC Application

2 THIS PAGE INTENTIONALLY LEFT BLANK J-14 CEC Application

3 Rosemont 138-kV Transmission Line Project Stakeholder Group Handbook J-15 CEC Application

4 THIS PAGE INTENTIONALLY LEFT BLANK J-16 CEC Application

5 MEMBERSHIP ROSEMONT 138-KV TRANSMISSION LINE PROJECT STAKEHOLDER GROUP The purpose of the Stakeholder Group is to establish a group representing a range of opinions in a forum small enough to allow for thorough education of the participants, detailed discussion of issues, and informal dialogue. EPG, Inc. (EPG) contacted various individuals/organizations for selection of the members that would assist (TEP) and EPG in identifying issues and concerns relevant to the proposed project. Representation of a cross-section of the region includes federal, state, county, and municipal agencies that have administrative jurisdiction within the project area; industry/business; and citizens on behalf of their neighborhoods. Members were selected based on their knowledge of the project area, capability to commit the time required to participate in the Stakeholder Group throughout the planning process, and willingness to participate in an impartial manner. ROSTER OF STAKEHOLDER GROUP MEMBERS Federal Bev Everson (beverson@fs.fed.us)/teresa AnnCiapusci (tciapusci@fs.fed.us), Coronado National Forest Cindy Alvarez (Cindy_alvarez@blm.gov)/Dan Moore (Daniel_J_Moore@blm.gov), Bureau of Land Management, Tucson State Tim Bolton (tbolton@land.az.gov), Arizona State Land Department Steve Husman (husman@ag.arizona.edu), Santa Rita Experimental Range City/Town Chris Kaselemis (chris.kaselemis@tucsonaz.gov), City of Tucson Orlanthia Henderson (ohenderson@ci.sahuarita.az.us)/john Neuneubel (jneunuebel@ci.sahuarita.az.us), Town of Sahuarita Eddie Peabody (emerald5@cox.net), Planning and Zoning Committee, Green Valley Coordinating Council Industry/Business Bob Iannarino (biannarino@diamondven.com)/mark Weinberg (mweinberg@diamondven.com)/ken Abrahams (kabrahams@diamondven.com), Diamond Ventures Nan Walden (nswalden@greenvalleypecan.com), Farmers Investment Company Citizens at Large Marshall Magruder (marshall@magruder.org) StakeholderGroupRoster 1 EPG Rosemont138kVTransmissionLineProject February12,2009 TucsonElectricPower J-17 CEC Application

6 PROJECT TEAM Ed Beck Shannon Breslin Lee Aitken Larry Lucero EPG, Inc. Phone (602) Lauren Weinstein Jaime Wood Chelsa Johnson Emily Belts Rosemont Copper Kathy Arnold Laurie Woodall, KR Saline StakeholderGroupRoster 2 EPG Rosemont138kVTransmissionLineProject February12,2009 TucsonElectricPower J-18 CEC Application

7 ROSEMONT 138-KV TRANSMISSION LINE PROJECT ROLES AND RESPONSIBILITIES STAKEHOLDER GROUP Role The Rosemont 138-kV Project Stakeholder Group (SG) has been established to participate with the study team in the planning process for the proposed project. The SG is an important link to the community; therefore, the SG members should consider the views of the individual group members as well as the views of their representative organizations/communities. Responsibilities Specifically, input will be sought from the SG members on the following: Issues, ideas, and concerns held by the SG members and/or members of the community/organization in which they are involved Resource information and studies Criteria by which alternative(s) are identified Alternative routes identified Impact assessment and mitigation Route selection process Review and comment on study results at key points Consistency is very important. We ask that you attend all of the SG meetings planned (four) throughout the process. Meetings will be organized to maximize the time available (approximately 2 hours). If a SG member would like a particular topic addressed, contact Chelsa Johnson or Lauren Weinstein at EPG ( ) prior to the meeting. Regular communication by SG members with their organizations, agencies, or communities is encouraged. Members of the SG accept the responsibility to keep their associates and constituency groups informed of the progress of the discussions and to seek advice and comments. Attendance at public open house meetings is encouraged. Information disseminated by SG members can be attributed only to an individual and not the entire group. Stakeholder Group Roles & Responsibilities EPG 1 Rosemont 138-kV Transmission Line Project February 12, 2009 J-19 CEC Application

8 EPG Role EPG is conducting the environmental and public planning process to site a proposed 138-kV transmission line required to meet future electrical demand for the proposed Rosemont operations. Facilitating the public involvement portion of the planning process includes working with the SG and conducting other activities to inform and involve the community. Responsibilities Notify members of SG of meeting dates and times. Host and facilitate all meetings. Identify and track all issues discussed at SG meetings. Provide information on any decisions made by the project study team in response to issues raised by SG. Provide relevant technical information to SG in conjunction with the planning process. Consider and incorporate the SG s views in the planning process. TUCSON ELECTRIC POWER Role During the public planning process, (TEP) will be the technical advisor to the SG. TEP will also serve as the lead contact with the media. Responsibilities Provide a description of the project. Provide an explanation of the purpose of and need for the project. Provide information, TEP policy, and/or relevant data sufficient to address issues and concerns raised by the SG and public. Provide technical information (e.g., engineering, system planning) sufficient to enhance the SG s understanding of the project. Select alternative(s) to be carried forward for detailed environmental impact analysis. Select preferred route(s) to be carried forward in the CEC application and before the Arizona Power Plant and Transmission Line Siting Committee based on the various Stakeholder Group Roles & Responsibilities EPG 2 Rosemont 138-kV Transmission Line Project February 12, 2009 J-20 CEC Application

9 decision elements: environmental, public acceptability, permits, engineering, right-ofway acquisition, cost, purpose and need ROSEMONT COPPER COMPANY Role During the public planning process, Rosemont Copper Company (RCC) will work with TEP to provide technical data as necessary, ensure power requirements are well defined and that all options for receiving power are identified. RCC will also provide assistance for TEP s identification and selection of route options to be carried forward for detailed environmental impact analyses. Responsibilities Provide resource information and studies. Monitor meetings and participate, as necessary or as requested. Stakeholder Group Roles & Responsibilities EPG 3 Rosemont 138-kV Transmission Line Project February 12, 2009 J-21 CEC Application

10 THIS PAGE INTENTIONALLY LEFT BLANK J-22 CEC Application

11 Rosemont 138-kV Transmission Line Project Agenda Stakeholder Group Meeting #1 February 12, 2009, 11:00am 1:30pm Unisource building, 2 nd Floor Conference Room One South Church Street Tucson, Arizona Welcome and introductions Agenda Roles and responsibilities of stakeholder group Electric systems - basics Planned facilities and study area Purpose and need for the project - TEP s system planning process Planning process and public participation activities Environmental studies - Inventory - Siting criteria - Opportunities and constraints Comments and questions Next meeting Action Items S:\EPG\projects\Rosemont Copper\TEP Rosemont Line\Public Participation\Stakeholder group\meeting #1\Agenda meeting #1a.doc J-23 CEC Application

12 THIS PAGE INTENTIONALLY LEFT BLANK J-24 CEC Application

13 ROSEMONT 138-KV TRANSMISSION LINE PROJECT Presentation Agenda J-25 CEC Application

14 Stakeholder Group Purpose Stakeholder Group - Roles and Responsibilities J-26 CEC Application

15 Project Overview Project Overview (continued) J-27 CEC Application

16 Purpose and Need Project Description J-28 CEC Application

17 Proposed Structure Type(s) System Option A J-29 CEC Application

18 System Option B System Option C J-30 CEC Application

19 System Option D Planning Process J-31 CEC Application

20 Planning Process (continued) Anticipated Project Schedule J-32 CEC Application

21 Environmental Studies Overview Preliminary Alternatives Identification J-33 CEC Application

22 Sensitivity Levels Potential Opportunities J-34 CEC Application

23 Potential Constraints Agency and Public Participation Activities J-35 CEC Application

24 Agency and Public Participation Activities Agency and Public Participation Activities J-36 CEC Application

25 Agency and Public Participation Activities TEP Decision Elements J-37 CEC Application

26 Comments and Questions Next Steps J-38 CEC Application

27 TASK 1 TASK 2 TASK 3 TASK 4 TASK 5 TASK 6 SITING CRITERIA, DEFINE STUDY AREA, AND SECONDARY DATA COLLECTION OPPORTUNITIES/CONSTRAINTS ANALYSIS AND ALTERNATIVES IDENTIFICATION DETAILED INVENTORY AND ALTERNATIVES ASSESSMENT ALTERNATIVES SELECTION AND RESOURCE SURVEYS PREPARATION AND FILING OF CEC APPLICATION CEC HEARINGS ENGINEERING Review and approve preliminary alternatives siting criteria Review and approve project study area Finalize project purpose and need statement Finalize project description Provide typical structure design(s) and substation layout Finalize engineering alternatives (e.g., rebuilding existing structures) Review and approve final alternatives Review impact assessment criteria Review alternatives assessment results Develop and review mitigation measures and plan Identify preferred engineering alternative(s) Review visual simulations Select preferred route and alternative(s) to be presented in CEC application, in coordination with customer: Rosemont Copper Prepare CEC application Print and file CEC application Review and approve application File and notice application Prepare and provide testimony for Arizona Power Plant and Transmission Line Siting Committee Review and approve supplemental CEC application filing (as necessary) Prepare draft CEC Form of Order Prepare for and attend ACC hearing ENVIRONMENTAL PLANNING Develop preliminary alternatives siting criteria Review preliminary alternatives Prepare study area base map Collect and map secondary environmental data Identify environmental opportunities and constraints Identify and finalize alternatives Collect additional data for alternatives Conduct field surveys to support resources inventory Develop impact assessment criteria Conduct alternatives impact assessment and mitigation planning Compare and rank alternatives Prepare visual simulations Identify preferred environmental alternative(s) Document alternative comparison and selection results Conduct cultural resource survey of preferred alternative SHPO consultation Prepare cultural resource survey report Prepare environmental portions of CEC application Assist with filing and noticing application Prepare and provide testimony for Arizona Power Plant and Transmission Line Siting Committee Prepare testimony slides for supplemental CEC application filing Prepare virtual route tour (optional) Assist with preparation of draft CEC Form of Order Prepare for and attend ACC hearing PUBLIC INVOLVEMENT Conduct community leader briefings Identify and contact stakeholders Prepare project fact sheet #1 Review project purpose and need and description Track and respond to comments Prepare for and conduct stakeholder group meeting #1 Develop mailing list Prepare and distribute newsletter #1 Prepare for and conduct public open house #1 Prepare for and conduct stakeholder group meeting #2 Prepare and distribute newsletter #2 Prepare for and conduct public open house #2 Review alternatives Track and respond to comments Prepare for and conduct stakeholder group meeting #3 Track and respond to comments Prepare for and conduct stakeholder group meeting #4 Prepare and distribute newsletter #3 Prepare for and conduct public open house meeting #3 Review alternative assessment and selection Track and respond to comments Prepare stakeholder and public involvement summary to support CEC application Track and respond to comments Prepare hearing notice and post signs in project area (announcing CEC application filing and hearings) Track and respond to comments TIMELINE September February 2009 February - April 2009 April - May 2009 May - July 2009 May - July 2009 July - October 2009 February 12, 2009 Planning Process and Responsibilities Certificate of Environmental Compatibility (CEC) Application Rosemont 138-kV Transmission Line Project J-39 CEC Application

28 THIS PAGE INTENTIONALLY LEFT BLANK J-40 CEC Application

29 Applicant Files Ten-Year Plan With ACC Solicit/Document Agency and Public Input 180 days 30 to 60 days Prepare Application for CEC File Application for CEC Public Notice (Newspaper) Within 10 Days After Filing Siting Committee Hearing(s) Begin Days After Notice Siting Committee Deliberation & Decision CEC Granted * Siting Committee Submits CEC to ACC ACC Hearing Decision to Affirm, Deny, or Modify at Open Meeting Held Days After Notice Construct Pre-Application Conference Applicant/ ACC Staff Post Project Notification Signs Siting Committee Field Review Request Briefs/ Oral Arguments ACC Review (May Add Conditions) Reconsideration Requests Within 30 Days After Decision Siting Committee Review Pre-Hearing Conference ACC Request for Briefs/Arguments File Construction, Operations, Mitigation/ Monitoring Plans ACC Staff Review Public Comment Hearing(s) Review Request (By Any Party to Proceeding Within 15 Days) Post Project Approval Signs on Site Required activity by Statue (ARS ) or Rules of Practice and Procedure (R ) Typical requirement Applicant Responds to Data Requests Intervenors File 10 Days Prior to Hearing Applicant and Intervenors Prepare and Provide Testimony Periodic Self Certification Filings * Decision within 180 days after receipt of application (R ), subject to extension ACC: CEC: Siting Committee: Arizona Corporation Commission Certificate of Environmental Compatibility Arizona Power Plant & Transmission Line Siting Committee February 2009 Arizona Power Plant and Transmission Line Siting Process Certificate of Environmental Compatibility Rosemont 138-kV Transmission Line Project J-41 CEC Application

30 THIS PAGE INTENTIONALLY LEFT BLANK J-42 CEC Application

31 N:\projects\Rosemont Copper\TEP_Lopez\mxds\RMC_Base_Hillshade_92.mxd R. 12 E. R. 13 E. R. 14 E. R. 15 E. R. 16 E. R. 17 E. 15 Drexel Heights Mission Rd. Sp Railroad Sp Railroad Tucson Intl Alvernon Way Swan Rd. Craycroft Rd. 01 Wilmot Rd. 06 Tucson Vail Houghton Rd. 36 Loma Alta Old Spanish Trl DRAFT Rosemont 138-kV Transmission Line Project Jurisdiction and Ownership San Xavier Indian Reservation Summit Nogales Colossal Cave Rd Legend Land Managing Areas 16 Pima Mine Rd. Sahuarita Rd. Pacific Railroad AS&R Pump 19 South Loop South Sahuarita Sp Railroad tu Sahuarita Rd. Corona de Tucson 36 Wentworth Rd. Vail Sonoita Hwy Pantano Rd U. Forest Service Bureau of Land Management National Park Service Indian Reservation Arizona State Land Local Park (Pima County) Unincorporated Pima County Planning Jurisdictions Green Valley Planning Area Sahuarita Incorporated Boundary Tucson Incorporated Boundary Special Management Areas Mt. Wrightson Wilderness Santa Rita Experimental Range Las Cienegas National Conservation Area Cienega Creek Natural Preserve 17 Pacific Railroad Sahuarita Fort Huachuca Breaker East Sahuarita Kolb Rd. Rosemont Copper Facilities Patented Claims Claim Boundary Private Lands Arizona Duval Mine Rd Green Valley Cyprus Interceptor Cyprus Esperanza Wells Green Valley Cyprus Raw Water Supply Canoa White House Canyon Rd S a n t a R i t a E x p e r i m e n t a l R a n g e Santa Rita Rd. 01 CORONADO NATIONAL FOREST Box Canyon Rd. Rosemont Greaterville UV 83 Empire Ranch Rd. Sonoita Hwy 01 LAS CIENEGAS NATIONAL CONSERVATION AREA General Reference Features Existing Substation Proposed Rosemont Substation Sources Existing 345-kV Transmission Line Existing 230-kV Transmission Line Existing 138-kV Transmission Line Existing 115-kV Transmission Line Existing 46-kV Transmission Line Gas Pipeline (12" or greater) Gas Pipeline (Less than 12") National Forest Boundary 15 8 Project Location Arizona Mex ic o 17 I PHOENIX TUCSON StreetMap USA 2008; TEP 2008; EPG, 2008, Pima County 2008, Rosemont Copper Company Project Area Boundary County Boundary Interstate Highway Secondary Road Railroad Lake River / Wash Township Boundary Section Boundary Miles Madera Canyon Rd. Amado Pima County Santa Cruz County Sonoita Working Draft February 19, 2009 J-43 CEC Application

32 THIS PAGE INTENTIONALLY LEFT BLANK J-44 CEC Application

33 Sp Railroad R. 13 E. R. 14 E. R. 15 E. R. 16 E. R. 17 E. R. 12 E. Loma Alta Houghton Rd. Wilmot Rd. Craycroft Rd. Swan Rd. Alvernon Way Sp Railroad Drexel Heights Rosemont 138-kV Tucson Intl Transmission Line Project Old Spanish Trl Colossal Cave Rd Mission Rd. 31 Vail Tucson Nogales Legend San Xavier Indian Reservation Summit 16 Vail Sp Railroad Pantano Rd. tu 89 AS&R Pump 8 DRAFT E isting Land Use Land Use Agriculture Commercial Industrial Parks/Preservation Public Lands Public/Quasi-Public Recreation Pima Mine Rd. Residential South Loop South School/Educational Facilities Railroad Utilities Vacant Sonoita Hwy Wentworth Rd. Pacific k School Sahuarita 19 San Xavier Indian Reservation Sahuarita Rd. Davis Monthan Air Force Base Compatible Use Zone Corona de Tucson Sahuarita Rd. Tucson International Airport Instrument Approach Height Zone Fort East Huachuca Sahuarita Breaker Railroad Kolb Rd. Sahuarita Pacific 17 General Reference Features Project Area Boundary County Boundary Existing Substation Proposed Rosemont Substation CORONADO NATIONAL FOREST Interstate Existing 345-kV Transmission Line 06 S a n t a R i t a m e n t a E x p e r i l R a n g e Highway Existing 230-kV Transmission Line Arizona Secondary Road Existing 138-kV Transmission Line Railroad Existing 115-kV Transmission Line Cyprus Esperanza Wells Lake Existing 46-kV Transmission Line Santa Rita Rd. Duval Mine Rd. River / Wash Gas Pipeline (12" or greater) Township Boundary Gas Pipeline (Less than 12") Section Boundary National Forest Boundary UV 83 Rosemont Green Valley 18 Project Location 15 Green Valley Cyprus Interceptor White House Canyon Rd. Cyprus Raw Water Supply PHOENIX Empire Ranch Rd. TUCSON Arizona 19 Mex ic o Box Canyon Rd. LAS CIENEGAS NATIONAL CONSERVATION AREA Greaterville Sources 19 StreetMap USA 2008; TEP 2008; EPG 2008; City of Tucson 2008 Canoa I Miles Sonoita Hwy Madera Canyon Rd. Working Draft February 23, 2009 Sonoita Pima County Santa Cruz County 01 Amado N:\projects\Rosemont Copper\TEP_Lopez\mxds\RMC_Base_Hillshade_92.mxd J-45 CEC Application

34 THIS PAGE INTENTIONALLY LEFT BLANK J-46 CEC Application

35 ROSEMONT 138-KV SITING PROJECT General Siting Criteria Opportunity and Constraint Analysis An analysis of the individual resources sensitivity to the construction and operation of a transmission line will be conducted. Sensitivity is that measure of the probable adverse response of each resource to direct and indirect impacts associated with the construction, operation, maintenance, and abandonment of the proposed transmission line. Criteria to be used in this determination included the following considerations: Resource Value: A measure of rarity, high intrinsic value or worth, singularity or diversity of a resource within the study area or region. Protective Status: A measure of the formal concern expressed for a resource either through legal protection or by designation of special status. Present or Future Uses: A measure of the level of conflict based on policies of land management agencies and/or use. The resources will then be mapped according to their respective sensitivity levels (including levels that fall in between the major categories), as follows: Incompatible Areas where either legal status (i.e., designated wilderness or jurisdictional policy [e.g., active airports]) would prohibit, or most likely prohibit, the location of transmission facilities. Location of exclusion (or incompatibility) will be considered to be undesirable for location of transmission lines. High Sensitivity Areas Areas determined to be less suitable because of unique, highly valued, complex, historic or protected resources and significant potential conflict with use, or areas posing substantial hazards to construction and operation of the transmission line. Locations of high sensitivity will be considered least desirable for siting the transmission line. Moderate Sensitivity Areas Areas of potential environmental impact because of important, valued resources; resources assigned special status; some conflict with current or planned use. Locations of moderate sensitivity will be considered less desirable for siting the transmission line. Low Sensitivity Areas Areas where the resource conflicts that have been identified through the regional environmental study process are minimal. These areas of low sensitivity will be considered as minimal sensitivity or opportunities for locating the lines, particularly in existing power line corridors. Opportunities: Existing and future linear features such as transmission lines, highways/roads, and canals are typically considered opportunities for siting and constructing future transmission lines. Opportunities are considered within the context of the sensitive resources throughout the study area. For example, an existing transmission line corridor may provide an opportunity to construct a new transmission line while minimizing environmental effects; however, there may also be adjacent or underlying environmental resources (e.g., residences or archaeological sites) that pose constraints which need to be considered during the siting, permitting, and construction of a new transmission line. Rosemont138kVTransmissionProject 1 EPG GeneralSitingCriteria DRAFT21009 J-47 CEC Application

36 THIS PAGE INTENTIONALLY LEFT BLANK J-48 CEC Application

37 FACILITY SITING CRITERIA WORK SHEET DRAFT SENSITIVITY LEVELS ROSEMONT 138-KV TRANSMISSION LINE Stakeholder Group Resource Category Proposed Sensitivity Level Suggested Sensitivity Level Rationale For Suggested Change Existing Land Use and Visual Resources Future Land Use and Visual Resources J-49 CEC Application

38 FACILITY SITING CRITERIA WORK SHEET DRAFT SENSITIVITY LEVELS ROSEMONT 138-KV TRANSMISSION LINE Stakeholder Group Resource Category Proposed Sensitivity Level Suggested Sensitivity Level Rationale For Suggested Change Cultural Resources Biological Resources J-50 CEC Application

39 FACILITY SITING CRITERIA WORK SHEET DRAFT SENSITIVITY LEVELS ROSEMONT 138-KV TRANSMISSION LINE Stakeholder Group Resource Category Proposed Sensitivity Level Suggested Sensitivity Level Rationale For Suggested Change Existing Opportunities Future (Planned) Opportunities J-51 CEC Application

40 THIS PAGE INTENTIONALLY LEFT BLANK J-52 CEC Application

41 Agenda Stakeholder Group Meeting #2 July 22, 2009, 11:00am 2:00pm Unisource building, 2 nd Floor Conference Room One South Church Street Tucson, Arizona Welcome and introductions Agenda Planning process review Engineering studies Public comments received Environmental studies - Final siting criteria - Opportunities and constraints analysis Preliminary link alternative identification Next steps Comments and questions S:\EPG\projects\Rosemont Copper\TEP Rosemont Line\Public Participation\Stakeholder group\meeting #2\Agenda meeting #2.doc J-53 CEC Application

42 THIS PAGE INTENTIONALLY LEFT BLANK J-54 CEC Application

43 MEMBERSHIP ROSEMONT 138KV TRANSMISSION LINE PROJECT STAKEHOLDER GROUP Revised from February 2009 The purpose of the Stakeholder Group is to establish a group representing a range of opinions in a forum small enough to allow for thorough education of the participants, detailed discussion of issues, and informal dialogue. EPG, Inc. (EPG) contacted various individuals/organizations for selection of the members that would assist (TEP) and EPG in identifying issues and concerns relevant to the proposed project. Representation of a cross-section of the region includes federal, state, county, and municipal agencies that have administrative jurisdiction within the project area; industry/business; and citizens on behalf of their neighborhoods. Members were selected based on their knowledge of the project area, capability to commit the time required to participate in the Stakeholder Group throughout the planning process, and willingness to participate in an impartial manner. ROSTER OF STAKEHOLDER GROUP MEMBERS Federal Kent Ellett (kellett@fs.fed.us), representative for the transmission line on behalf of the Coronado National Forest o Bev Everson (beverson@fs.fed.us) o Teresa AnnCiapusci (tciapusci@fs.fed.us) Linda Hughes (Linda_hughes@blm.gov), representative for the transmission line on behalf of the Bureau of Land Management, Tucson o Cindy Alvarez (Cindy_alvarez@blm.gov) o Dan Moore (Daniel_J_Moore@blm.gov) Mark Harting (mark.harting@aztucs.ang.af.mil, markkonharting@gmail.com), representative for Davis Monthan AFB airspace management State Tim Bolton (tbolton@land.az.gov), Arizona State Land Department Steve Husman (husman@ag.arizona.edu), Santa Rita Experimental Range City/Town Chris Kaselemis (chris.kaselemis@tucsonaz.gov), City of Tucson Orlanthia Henderson (ohenderson@ci.sahuarita.az.us), Town of Sahuarita Eddie Peabody (emerald5@cox.net), Planning and Zoning Committee, Green Valley Coordinating Council StakeholderGroupRoster 1 EPG Rosemont138kVTransmissionLineProject July22,2009 TucsonElectricPower J-55 CEC Application

44 Industry/Business Bob Iannarino Weinberg Abrahams Diamond Ventures Nan Walden Robertson Farmers Investment Company Citizens Marshall Magruder Elizabeth Webb PROJECT TEAM Ed Beck Shannon Breslin Lee Aitkin Larry Lucero Erik Bakken Cory Pintor EPG, Inc. Phone (602) Lauren Weinstein Jaime Wood Chelsa Johnson Emily Belts Rosemont Copper Kathy Arnold Laurie Woodall, KR Saline StakeholderGroupRoster 2 EPG Rosemont138kVTransmissionLineProject July22,2009 TucsonElectricPower J-56 CEC Application

45 ROSEMONT 138KV TRANSMISSION LINE PROJECT Presentation Agenda J-57 CEC Application

46 Planning Process Engineering Studies J-58 CEC Application

47 Public Comments Received Environmental Studies Resource Data Collected - Land use Cultural l Visual and recreation Biological J-59 CEC Application

48 Resource Sensitivity Levels Overview Low: Low-moderate: Moderate: Resource Sensitivity Levels Overview (continued) Moderate-high: High: Incompatible: J-60 CEC Application

49 Opportunities and Constraints Transmission Line Siting Criteria (page 1 of 2) J-61 CEC Application

50 Transmission Line Siting Criteria (page 2 of 2) Opportunities J-62 CEC Application

51 Constraints Key Terms Defined Right-of-way: Corridor: Preliminary link: Link node: Route or routes: J-63 CEC Application

52 Preliminary Link Alternative Identification Link Alternative Screening and Route Identification J-64 CEC Application

53 TEP Decision Elements Next Steps J-65 CEC Application

54 Questions and Comments J-66 CEC Application

55 SENSITIVITY OF RESOURCES Resource Category Sensitivity Level* Existing Land Use Resources Existing Recreation Resources Existing Visual Resources Visual Classifications BLM (VRM), Forest Service Concern Level Roads Future Land Use Resources Future Recreation Resources J-67 CEC Application

56 Existing Cultural Resources Existing Biological Resources Pima County Conservation Lands System Opportunities Existing Linear Facilities Future (Planned) Linear Facilities J-68 CEC Application

57 TASK 1 TASK 2 TASK 3 TASK 4 TASK 5 TASK 6 SITING CRITERIA, DEFINE STUDY AREA, AND SECONDARY DATA COLLECTION OPPORTUNITIES/CONSTRAINTS ANALYSIS AND LINK ALTERNATIVES IDENTIFICATION DETAILED INVENTORY AND LINK ALTERNATIVES ASSESSMENT ROUTE ALTERNATIVES SELECTION AND RESOURCE SURVEYS PREPARATION AND FILING OF CEC APPLICATION CEC HEARINGS ENGINEERING Review and approve preliminary alternatives siting criteria Review and approve project study area Finalize project purpose and need statement Finalize project description Provide typical structure design(s) and substation layout Finalize engineering alternatives (e.g., rebuilding existing structures) Review and approve final link alternatives Review impact assessment criteria Review link alternatives assessment results Develop and review mitigation measures and plan Review route alternatives Identify preferred engineering route alternative(s) Review visual simulations Select preferred route and alternative(s) to be presented in CEC application, in coordination with customer: Rosemont Copper Prepare CEC application Print and file CEC application Review and approve application File and notice application Prepare and provide testimony for Arizona Power Plant and Transmission Line Siting Committee Review and approve supplemental CEC application filing (as necessary) Prepare draft CEC Form of Order Prepare for and attend ACC hearing ENVIRONMENTAL PLANNING Develop preliminary alternatives siting criteria Review preliminary alternatives Prepare study area base map Collect and map secondary environmental data Identify environmental opportunities and constraints Identify and finalize link alternatives Collect additional data for link alternatives Conduct field surveys to support resources inventory Develop impact assessment criteria Conduct link alternatives impact assessment and mitigation planning Develop route alternatives Compare and rank route alternatives Prepare visual simulations Identify preferred environmental route alternative(s) Document route alternative comparison and selection results Conduct cultural resource survey of preferred route alternative SHPO consultation Prepare cultural resource survey report Prepare environmental portions of CEC application Assist with filing and noticing application Prepare and provide testimony for Arizona Power Plant and Transmission Line Siting Committee Prepare testimony slides for supplemental CEC application filing Prepare virtual route tour (optional) Assist with preparation of draft CEC Form of Order Prepare for and attend ACC hearing PUBLIC INVOLVEMENT Conduct community leader briefings Identify and contact stakeholders Prepare project fact sheet #1 Review project purpose and need and description Track and respond to comments Prepare for and conduct stakeholder group meeting #1 Develop mailing list Prepare and distribute newsletter #1 Prepare for and conduct public open house #1 Prepare for and conduct stakeholder group meeting #2 Prepare and distribute newsletter #2 Prepare for and conduct public open house #2 Review link alternatives Track and respond to comments Prepare for and conduct stakeholder group meeting #3 Review link alternative impact assessment and preliminary routes Track and respond to comments Prepare for and conduct stakeholder group meeting #4 Prepare and distribute newsletter #3 Prepare for and conduct public open house meeting #3 Review route alternatives Track and respond to comments Prepare stakeholder and public involvement summary to support CEC application Track and respond to comments Prepare hearing notice and post signs in project area (announcing CEC application filing and hearings) Track and respond to comments TIMELINE* st Quarter st - 3 rd Quarter rd - 4 th Quarter th Quarter st -2 nd Quarter nd Quarter 2010 *Timeline is estimated July 2009 Planning Process and Responsibilities J-69 CEC Application

58 THIS PAGE INTENTIONALLY LEFT BLANK J-70 CEC Application

59 Madera Canyon Rd. Mexico N:\projects\Rosemont Copper\TEP_Lopez\mxds\RMC_Base_Hillshade.mxd R. 13 E. R. 14 E. R. 15 E. R. 16 E. R. 17 E. Vail 16 Pima Mine Rd. 89 Summit Country Club Rd. Sahuarita Wilmot Rd. Sahuarita Rd. Houghton Rd. Wentworth Rd. UV 83 Sonoita Hwy M arsh Station Rd. DRAFT Rosemont 138kV Transmission Line Project Preliminary Transmission Link Alternatives with Jurisdiction and Ownership Legend 10 Link Identification Number Link Node Preliminary Alternative Link Corona de Tucson Coppercut Trail Land Managing Areas U. Forest Service 17 El Toro Rd. Sahuarita 19 La Villita Rd. Fort Huachuca Breaker East Sahuarita Main Ave. Kolb Rd. Rd Harrison Rd. Via Loma del Venado CORONADO NATIONAL Bureau of Land Management Indian Reservation Arizona State Land Local Park (Pima County) Unincorporated Pima County Planning Jurisdictions Green Valley Planning Area Sahuarita Incorporated Boundary Special Management Areas Mt. Wrightson Wilderness Santa Rita Experimental Range Las Cienegas National Conservation Area 18 Duval Mine Rd. Continental Rd. Arizona Green Valley 19 Green Valley White House Canyon Rd. 70 SANTA RITA EXPERIMENTAL RANGE 100 Helvetia Rd. Santa Rita Rd Rd Rosemont 210 FOREST Rosemont Copper Facilities Private Lands Claim Boundary Notes: Not all of the preliminary alternative links shown on the map will be constructed. Project study area boundary has been updated as of July 2009 General Reference Features Existing Substation Proposed Switchyard/Substation Existing 345kV Transmission Line Existing 230kV Transmission Line Existing 138kV Transmission Line Existing 115kV Transmission Line Existing 46kV Transmission Line National Forest Boundary Updated Project Study Area Boundary Project Location County Boundary Interstate Highway Secondary Road Railroad River / Wash Township Boundary Section Boundary 06 Rd 411 Rd Box Canyon Rd. 180 LAS CIENEGAS NATIONAL CONSER- VATION Empire Ranch Rd PHOENIX Greaterville AREA 8 Arizona TUCSON Sources Sonoita Hwy StreetMap USA 2008; TEP 2008; EPG, 2008, Pima County 2008, Rosemont Copper Company 2008 I Miles Pima County Santa Cruz County Sonoita Working Draft July 20, 2009 J-71 CEC Application

60 THIS PAGE INTENTIONALLY LEFT BLANK J-72 CEC Application

61 Agenda Stakeholder Group Meeting #3 December 10, 2009, 11:00am 2:00pm Unisource building, 2 nd Floor Conference Room One South Church Street Tucson, Arizona Welcome Project Status Public and Agency Comments Environmental Impact Assessment Methodology Alternative Routes Next Steps Comments and Questions S:\EPG\projects\Rosemont Copper\TEP Rosemont Line\Public Participation\Stakeholder group\meeting #3\Agenda meeting #3.docx J-73 CEC Application

62 THIS PAGE INTENTIONALLY LEFT BLANK J-74 CEC Application

63 ROSEMONT 138KV TRANSMISSION LINE PROJECT Presentation Agenda J-75 CEC Application

64 Planning Process Public Comments Received J-76 CEC Application

65 Agency Comments Received Other Comments J-77 CEC Application

66 Detailed Inventory and Assessment Environmental Studies Resource Data Collected Land use Cultural l Visual and Recreation Biological J-78 CEC Application

67 Resource Impacts Land use impacts Cultural resource impacts Visual resource impacts Biological resource impacts Access Levels Definitions Access (Construction and Operation) Levels and Ground Disturbance Defined Access Level Disturbance Definition Typical Crossing Conditions J-79 CEC Application

68 Impact Assessment Criteria Study Area Photos J-80 CEC Application

69 Alternative Route Identification Switchyard/Substation Sites Analyzed J-81 CEC Application

70 Summary of Alternative Routes Construction and Operation Alternatives Maps J-82 CEC Application

71 Alternative Route Families (combining construction and operation) Maps Preliminary Environmental Alternative Evaluation Table Example J-83 CEC Application

72 Preliminary Alternative Comparison Summary Table Example Alternative Route Evaluation J-84 CEC Application

73 Next Steps Comments and Questions J-85 CEC Application

74 THIS PAGE INTENTIONALLY LEFT BLANK J-86 CEC Application

75 N:\projects\Rosemont Copper\TEP_Lopez\mxds\RMC_Base_Hillshade_insets.mxd R. 13 E. R. 14 E. R. 15 E. R. 16 E. R. 17 E d. rita Rd. ine Rd. Amado Pima Mine Rd. Inset B Santa Santa Rita Rita Rd Rd Arizona Green Valley Pacific Company RR RD Duval Mine Rd. Continental Rd. 130 El Toro Rd Sahuarita La Villita Rd. Green Valley Pima County Santa Cruz County tu 89 Sp Railroad Summit Fort Huachuca Breaker Proposed Switchyard/ Substation Country Club Rd. Sahuarita East Sahuarita 10 Inset A White House Canyon Rd. 60 Madera Canyon Rd. 55 SANTA RITA EXPERIMENTAL RANGE Rd 411 Wilmot Rd Santa Rita Rd. Helvetia Rd. Main Ave. Sahuarita Rd. Kolb Rd. 120 Rd 413 Rd Inset B Rd 417 Sycamore Leaf Rd. Dawn Rd. Harrison Rd. Houghton Rd. Corona de Tucson Via Loma del Vena do CORONADO NATIONAL FOREST Rosemont 210 Box Canyon Rd. Tucson 185 Wentworth Rd. Greaterville Coppercut Trail UV 83 Vail Inset A Santa Rita Rd 15 Sonoita Hwy LAS CIENEGAS NATIONAL CONSER- VATION AREA Marsh Station Rd. Sonoita Hwy Sonoita 25 Empire Ranch Rd. 45 Rosemont 138kV Transmission Line Project Legend 10 Sources Working Draft December 9, Project Location Arizon a Mexico 17 I PHOENIX Miles TUCSON StreetMap USA 2008; TEP 2008; EPG, 2008, Pima County 2008, Rosemont Copper Company 2008 DRAFT Preliminar Route Alternatives North Route Family Link Identification Number Link Node Preliminary Alternative Link General Reference Features Existing Substation Proposed Switchyard/Substation Existing 345kV Transmission Line Existing 230kV Transmission Line Existing 138kV Transmission Line Existing 115kV Transmission Line Existing 46kV Transmission Line National Forest Boundary Updated Project Study Area Boundary County Boundary Interstate Highway Secondary Road Railroad River / Wash Township Boundary Section Boundary J-87 CEC Application

76 THIS PAGE INTENTIONALLY LEFT BLANK J-88 CEC Application

77 N:\projects\Rosemont Copper\TEP_Lopez\mxds\RMC_Base_Hillshade_insets.mxd R. 13 E. R. 14 E. R. 15 E. R. 16 E. R. 17 E d. rita Rd. ine Rd. Amado Pima Mine Rd. Inset B Santa Santa Rita Rita Rd Rd Arizona Green Valley Pacific Company RR RD Duval Mine Rd. Continental Rd. 130 El Toro Rd Sahuarita La Villita Rd. Green Valley Pima County Santa Cruz County tu 89 Sp Railroad Summit Fort Huachuca Breaker Proposed Switchyard/ Substation Country Club Rd. Sahuarita East Sahuarita 10 Inset A White House Canyon Rd. 60 Madera Canyon Rd. 55 SANTA RITA EXPERIMENTAL RANGE Rd 411 Wilmot Rd Santa Rita Rd. Helvetia Rd. Main Ave. Sahuarita Rd. Kolb Rd. 120 Rd 413 Rd Inset B Rd 417 Sycamore Leaf Rd. Dawn Rd. Harrison Rd. Houghton Rd. Corona de Tucson Via Loma del Vena do CORONADO NATIONAL FOREST Rosemont 210 Box Canyon Rd. Tucson 185 Wentworth Rd. Greaterville Coppercut Trail UV 83 Vail Inset A Santa Rita Rd 15 Sonoita Hwy LAS CIENEGAS NATIONAL CONSER- VATION AREA Marsh Station Rd. Sonoita Hwy Sonoita 25 Empire Ranch Rd. 45 Rosemont 138kV Transmission Line Project Legend 10 Sources Working Draft December 9, Project Location Arizon a Mexico 17 I PHOENIX Miles TUCSON StreetMap USA 2008; TEP 2008; EPG, 2008, Pima County 2008, Rosemont Copper Company 2008 DRAFT Preliminar Route Alternatives Santa Rita Road Family Link Identification Number Link Node Preliminary Alternative Link General Reference Features Existing Substation Proposed Switchyard/Substation Existing 345kV Transmission Line Existing 230kV Transmission Line Existing 138kV Transmission Line Existing 115kV Transmission Line Existing 46kV Transmission Line National Forest Boundary Updated Project Study Area Boundary County Boundary Interstate Highway Secondary Road Railroad River / Wash Township Boundary Section Boundary J-89 CEC Application

78 THIS PAGE INTENTIONALLY LEFT BLANK J-90 CEC Application

79 N:\projects\Rosemont Copper\TEP_Lopez\mxds\RMC_Base_Hillshade_insets.mxd R. 13 E. R. 14 E. R. 15 E. R. 16 E. R. 17 E d. rita Rd. ine Rd. Amado Pima Mine Rd. Inset B Santa Santa Rita Rita Rd Rd Arizona Green Valley Pacific Company RR RD Duval Mine Rd. Continental Rd. 130 El Toro Rd Sahuarita La Villita Rd. Green Valley Pima County Santa Cruz County tu 89 Sp Railroad Summit Fort Huachuca Breaker Proposed Switchyard/ Substation Country Club Rd. Sahuarita East Sahuarita 10 Inset A White House Canyon Rd. 60 Madera Canyon Rd. 55 SANTA RITA EXPERIMENTAL RANGE Rd 411 Wilmot Rd Santa Rita Rd. Helvetia Rd. Main Ave. Sahuarita Rd. Kolb Rd. 120 Rd 413 Rd Inset B Rd 417 Sycamore Leaf Rd. Dawn Rd. Harrison Rd. Houghton Rd. Corona de Tucson Via Loma del Vena do CORONADO NATIONAL FOREST Rosemont 210 Box Canyon Rd. Tucson 185 Wentworth Rd. Greaterville Coppercut Trail UV 83 Vail Inset A Santa Rita Rd 15 Sonoita Hwy LAS CIENEGAS NATIONAL CONSER- VATION AREA Marsh Station Rd. Sonoita Hwy Sonoita 25 Empire Ranch Rd. 45 Rosemont 138kV Transmission Line Project Legend 10 Sources Working Draft December 9, Project Location Arizon a Mexico 17 I PHOENIX Miles TUCSON StreetMap USA 2008; TEP 2008; EPG, 2008, Pima County 2008, Rosemont Copper Company 2008 DRAFT Preliminar Route Alternatives Adjacent 46kV Family Link Identification Number Link Node Preliminary Alternative Link General Reference Features Existing Substation Proposed Switchyard/Substation Existing 345kV Transmission Line Existing 230kV Transmission Line Existing 138kV Transmission Line Existing 115kV Transmission Line Existing 46kV Transmission Line National Forest Boundary Updated Project Study Area Boundary County Boundary Interstate Highway Secondary Road Railroad River / Wash Township Boundary Section Boundary J-91 CEC Application

80 THIS PAGE INTENTIONALLY LEFT BLANK J-92 CEC Application

81 N:\projects\Rosemont Copper\TEP_Lopez\mxds\RMC_Base_Hillshade_insets.mxd R. 13 E. R. 14 E. R. 15 E. R. 16 E. R. 17 E. Indian Reservation C arita Rd d. Mine Rd. Amado Arizona Pima Mine Rd. Inset B [_ Santa Santa Rita Rita Rd Rd Pacific Company RR RD Duval Mine Rd. Continental Rd. 130 El Toro Rd. Green Valley [_ Sahuarita [_[_ La Villita Rd. Green Valley Pima County Santa Cruz County tu 89 Summit Sp Railroad Fort Huachuca Breaker Proposed Switchyard/ Substation Country Club Rd. Sahuarita 10 Inset A [_ East Sahuarita White House Canyon Rd. 60 [_ Madera Canyon Rd. 55 SANTA RITA EXPERIMENTAL RANGE Rd 411 Wilmot Rd. [_ [_ Helvetia Rd. Main Ave. Sahuarita Rd. Santa Rita Rd. Kolb Rd. 120 Rd 413 Rd Inset B [_ [_[_ 155 [_ Rd 417 [_ [_ Sycamore Leaf Rd. Dawn Rd. Harrison Rd. Houghton Rd. Corona de Tucson [_ Tucson Via Loma del Vena do CORONADO NATIONAL FOREST Rosemont 210 Box Canyon Rd. 185 Wentworth Rd. Greaterville Coppercut Trail Vail UV 83 Inset A Santa Rita Rd 15 Sonoita Hwy LAS CIENEGAS NATIONAL CONSER- VATION AREA Marsh Station Rd. Sonoita Hwy Sonoita 25 [_ [_ Empire Ranch Rd. 45 Rosemont 138kV Transmission Line Project Legend Sources Working Draft February 1, Project Location Arizon a Mexico 17 I PHOENIX Miles TUCSON StreetMap USA 2008; TEP 2008; EPG, 2008, Pima County 2008, Rosemont Copper Company 2008 DRAFT Optional Stakeholder Group Fieldtrip Januar 25, 2010 [_ 10 General Reference Features Field Trip Stop Field Trip Route Link Identification Number Link Node Preliminary Alternative Link Existing Substation Proposed Switchyard/Substation Existing 345kV Transmission Line Existing 230kV Transmission Line Existing 138kV Transmission Line Existing 115kV Transmission Line Existing 46kV Transmission Line National Forest Boundary Updated Project Study Area Boundary County Boundary Interstate Highway Secondary Road Railroad River / Wash Township Boundary Section Boundary J-93 CEC Application

82 THIS PAGE INTENTIONALLY LEFT BLANK J-94 CEC Application

83 Agenda Stakeholder Group Meeting #4 March 5, :00am 2:00pm Unisource building, board room One South Church Street Tucson, Arizona Welcome Project Status Impact Assessment Alternative Route Evaluation Alternative Routes Next Steps Comments and Questions S:\EPG\projects\Rosemont Copper\TEP Rosemont Line\Public Participation\Stakeholder group\meeting #4\Agenda meeting #4.docx J-95 CEC Application

84 THIS PAGE INTENTIONALLY LEFT BLANK J-96 CEC Application

85 ROSEMONT 138KV TRANSMISSION LINE PROJECT Presentation Agenda J-97 CEC Application

86 Public Comments Received Agency/Stakeholder Group Comments Received J-98 CEC Application

87 Public Involvement Summary Field trip J-99 CEC Application

88 Revised Alternative Links Impact Assessment Summary Land use impacts Cultural resource impacts Visual resource impacts Santa Rita Road was designated scenic by Pima County February 2010 Biological resource impacts J-100 CEC Application

89 Simulations Alternative Route Family Comparison J-101 CEC Application

90 Key Considerations for Alternative Routes Next Steps J-102 CEC Application

91 N:\projects\Rosemont Copper\TEP_Lopez\mxds\RMC_Base_Hillshade_insets.mxd R. 13 E. R. 14 E. R. 15 E. R. 16 E. R. 17 E. Indian Reservation C arita Rd d. Mine Rd. Amado Arizona Pima Mine Rd. Inset B Santa Santa Rita Rita Rd Rd Pacific Company RR RD Duval Mine Rd. Continental Rd. 130 El Toro Rd. Green Valley 135 Sahuarita La Villita Rd. Green Valley Pima County Santa Cruz County tu 89 Summit Sp Railroad Fort Huachuca Breaker Proposed Switchyard/ Substation Country Club Rd. Sahuarita East Sahuarita Inset A White House Canyon Rd. 60 Madera Canyon Rd. 55 SANTA RITA EXPERIMENTAL RANGE Rd 411 Wilmot Rd Santa Rita Rd. Helvetia Rd. Main Ave. Sahuarita Rd. Kolb Rd. 120 Rd 413 Rd Inset B Rd 417 Sycamore Leaf Rd. Dawn Rd. Harrison Rd. Houghton Rd. Corona de Tucson Tucson Via Loma del Vena do CORONADO NATIONAL FOREST Rosemont 210 Box Canyon Rd. 185 Wentworth Rd. Greaterville Coppercut Trail Vail UV 83 Inset A Santa Rita Rd Sonoita Hwy LAS CIENEGAS NATIONAL CONSER- VATION AREA Marsh Station Rd. Sonoita Hwy Sonoita 25 Empire Ranch Rd. Rosemont 138kV Transmission Line Project General Reference Features Existing Substation Proposed Switchyard/Substation Existing 345kV Transmission Line Existing 230kV Transmission Line Existing 138kV Transmission Line Existing 115kV Transmission Line Existing 46kV Transmission Line National Forest Boundary Sources Updated Project Study Area Boundary Working Draft February 5, Project Location Arizon a Mexico 17 I PHOENIX Miles TUCSON StreetMap USA 2008; TEP 2008; EPG, 2008, Pima County 2008, Rosemont Copper Company 2008 DRAFT Preliminar Transmission Line Link Alternatives with Jurisdiction and Ownership Legend 10 Link Identification Number Link Node Preliminary Alternative Link Land Managing Areas U. Forest Service Bureau of Land Management Indian Reservation Arizona State Land Local Park (Pima County) Unincorporated Pima County Planning Jurisdictions Green Valley Planning Area Sahuarita Incorporated Boundary Special Management Areas Mt. Wrightson Wilderness Santa Rita Experimental Range Las Cienegas National Conservation Area Rosemont Copper Facilities Private Lands Claim Boundary Notes: Not all of the preliminary alternative links shown on the map will be constructed. Project study area boundary has been updated as of July 2009 All links are preliminary and may be modified based on agency and public input. County Boundary Interstate Highway Secondary Road Railroad River / Wash Township Boundary Section Boundary J-103 CEC Application

92 THIS PAGE INTENTIONALLY LEFT BLANK J-104 CEC Application

93 N:\projects\Rosemont Copper\TEP_Lopez\mxds\RMC_Base_Hillshade_insets_display.mxd R. 13 E. R. 14 E. R. 15 E. R. 16 E. R. 17 E. C d. Sahuarita Rd. Duval Mine Rd. Amado Arizona Inset B Pima Mine Rd. El Toro Rd. Green Valley RD Sahuarita La Villita Rd. Pima County Santa Cruz County tu 89 Summit Sahuarita Country Club Rd. 25 Inset A 20 Sahuarita Rd. Fort East Sahuarita Huachuca Breaker Proposed Switchyard/ Substation Green Valley White House Canyon Rd. SANTA RITA EXPERIMENTAL RANGE Rd 411 Madera Canyon Rd. Helvetia Rd. Wilmot Rd Santa Rita Rd. Main Ave. 120 Rd Rd Rd 417 Inset B Dawn Rd Harrison Rd Houghton Rd. 160 Tucson CORONADO NATIONAL FOREST Rosemont 210 Wentworth Rd. Greaterville 185 Inset A Santa Rita Rd Vail UV 83 Sonoita Hwy Marsh Station Rd. LAS CIENEGAS NATIONAL CONSERVATION AREA Sonoita 25 Sonoita Hwy Rosemont 138kV Transmission Line Project Preliminar Route Alternatives Legend North Route Family - Option #3 10 General Reference Features March 2, 2010 I Miles DRAFT Permanent Link (20, 25, 55, 85, 90, 95, 140, 170, 160, 190, 210) Link Identification Number Link Node Preliminary Alternative Link Existing Substation Proposed Switchyard/Substation Existing 345kV Transmission Line Existing 230kV Transmission Line Existing 138kV Transmission Line Existing 115kV Transmission Line Existing 46kV Transmission Line National Forest Boundary Updated Project Study Area Boundary County Boundary Interstate Highway Secondary Road Railroad River / Wash Township Boundary Project Location 15 8 Ariz on a Mexico Mexico 17 Sources StreetMap USA 2008; TEP 2008; EPG, 2008, Pima County 2008, Rosemont Copper Company PHOENIX TUCSON 19 J-105 CEC Application

94 THIS PAGE INTENTIONALLY LEFT BLANK J-106 CEC Application

95 N:\projects\Rosemont Copper\TEP_Lopez\mxds\RMC_Base_Hillshade_insets_display.mxd R. 13 E. R. 14 E. R. 15 E. R. 16 E. R. 17 E. C d. Sahuarita Rd. Duval Mine Rd. Amado Arizona Inset B Pima Mine Rd. El Toro Rd. Green Valley RD Sahuarita La Villita Rd. Pima County Santa Cruz County tu 89 Summit Sahuarita Country Club Rd. 25 Inset A 20 Sahuarita Rd. Fort East Sahuarita Huachuca Breaker Proposed Switchyard/ Substation Green Valley White House Canyon Rd. SANTA RITA EXPERIMENTAL RANGE Rd 411 Madera Canyon Rd. Helvetia Rd. Wilmot Rd Santa Rita Rd. Main Ave. 120 Rd Rd Rd 417 Inset B Dawn Rd Harrison Rd Houghton Rd. 160 Tucson CORONADO NATIONAL FOREST Rosemont 210 Wentworth Rd. Greaterville 185 Inset A Santa Rita Rd Vail UV 83 Sonoita Hwy Marsh Station Rd. LAS CIENEGAS NATIONAL CONSERVATION AREA Sonoita 25 Sonoita Hwy Rosemont 138kV Transmission Line Project Preliminar Route Alternatives Legend North Route Family - Option #8 10 General Reference Features Permanent Link (20, 25, 55, 85, 90, 95, 140) Temporary Link (120, 130, 135) Link Identification Number Link Node Preliminary Alternative Link Temporary Interconnection March 3, 2010 I Miles DRAFT Existing Substation Proposed Switchyard/Substation Existing 345kV Transmission Line Existing 230kV Transmission Line Existing 138kV Transmission Line Existing 115kV Transmission Line Existing 46kV Transmission Line National Forest Boundary Updated Project Study Area Boundary County Boundary Interstate Highway Secondary Road Railroad River / Wash Township Boundary Project Location 15 8 Ariz on a Mexico Mexico 17 Sources StreetMap USA 2008; TEP 2008; EPG, 2008, Pima County 2008, Rosemont Copper Company PHOENIX TUCSON 19 J-107 CEC Application

96 THIS PAGE INTENTIONALLY LEFT BLANK J-108 CEC Application

97 N:\projects\Rosemont Copper\TEP_Lopez\mxds\RMC_Base_Hillshade_insets_display.mxd R. 13 E. R. 14 E. R. 15 E. R. 16 E. R. 17 E. C d. Sahuarita Rd. Duval Mine Rd. Amado Arizona Inset B Pima Mine Rd. El Toro Rd. Green Valley RD Sahuarita La Villita Rd. Pima County Santa Cruz County tu 89 Summit Sahuarita Country Club Rd. 25 Inset A 20 Sahuarita Rd. Fort East Sahuarita Huachuca Breaker Proposed Switchyard/ Substation Green Valley White House Canyon Rd. SANTA RITA EXPERIMENTAL RANGE Rd 411 Madera Canyon Rd. Helvetia Rd. Wilmot Rd Santa Rita Rd. Main Ave. 120 Rd Rd Rd 417 Inset B Dawn Rd Harrison Rd Houghton Rd. 160 Tucson CORONADO NATIONAL FOREST Rosemont 210 Wentworth Rd. Greaterville 185 Inset A Santa Rita Rd Vail UV 83 Sonoita Hwy Marsh Station Rd. LAS CIENEGAS NATIONAL CONSERVATION AREA Sonoita 25 Sonoita Hwy Rosemont 138kV Transmission Line Project Preliminar Route Alternatives Legend North Route Family - Option #10 10 General Reference Features Permanent Link (20, 25, 55, 85, 90, 95, 140) Temporary Link (120, 105, 155) Link Identification Number Link Node Preliminary Alternative Link Temporary Interconnection March 2, 2010 I Miles DRAFT Existing Substation Proposed Switchyard/Substation Existing 345kV Transmission Line Existing 230kV Transmission Line Existing 138kV Transmission Line Existing 115kV Transmission Line Existing 46kV Transmission Line National Forest Boundary Updated Project Study Area Boundary County Boundary Interstate Highway Secondary Road Railroad River / Wash Township Boundary Project Location 15 8 Ariz on a Mexico Mexico 17 Sources StreetMap USA 2008; TEP 2008; EPG, 2008, Pima County 2008, Rosemont Copper Company PHOENIX TUCSON 19 J-109 CEC Application

98 THIS PAGE INTENTIONALLY LEFT BLANK J-110 CEC Application

99 N:\projects\Rosemont Copper\TEP_Lopez\mxds\RMC_Base_Hillshade_insets_display.mxd R. 13 E. R. 14 E. R. 15 E. R. 16 E. R. 17 E. C d. Sahuarita Rd. Duval Mine Rd. Amado Arizona Inset B Pima Mine Rd. El Toro Rd. Green Valley RD Sahuarita La Villita Rd. Pima County Santa Cruz County tu 89 Summit Sahuarita Country Club Rd. 25 Inset A 20 Sahuarita Rd. Fort East Sahuarita Huachuca Breaker Proposed Switchyard/ Substation Green Valley White House Canyon Rd. SANTA RITA EXPERIMENTAL RANGE Rd 411 Madera Canyon Rd. Helvetia Rd. Wilmot Rd Santa Rita Rd. Main Ave. 120 Rd Rd Rd 417 Inset B Dawn Rd Harrison Rd Houghton Rd. 160 Tucson CORONADO NATIONAL FOREST Rosemont 210 Wentworth Rd. Greaterville 185 Inset A Santa Rita Rd Vail UV 83 Sonoita Hwy Marsh Station Rd. LAS CIENEGAS NATIONAL CONSERVATION AREA Sonoita 25 Sonoita Hwy Rosemont 138kV Transmission Line Project Preliminar Route Alternatives Legend General Reference Features March 2, 2010 I Miles DRAFT Santa Rita Road Family - Option #1 10 Permanent Link (20, 25, 60, 100, 105, 155, 140, 170, 160, 190, 210) Link Identification Number Link Node Preliminary Alternative Link Existing Substation Proposed Switchyard/Substation Existing 345kV Transmission Line Existing 230kV Transmission Line Existing 138kV Transmission Line Existing 115kV Transmission Line Existing 46kV Transmission Line National Forest Boundary Updated Project Study Area Boundary County Boundary Interstate Highway Secondary Road Railroad River / Wash Township Boundary Project Location 15 8 Ariz on a Mexico Mexico 17 Sources StreetMap USA 2008; TEP 2008; EPG, 2008, Pima County 2008, Rosemont Copper Company PHOENIX TUCSON 19 J-111 CEC Application

100 THIS PAGE INTENTIONALLY LEFT BLANK J-112 CEC Application

101 N:\projects\Rosemont Copper\TEP_Lopez\mxds\RMC_Base_Hillshade_insets_display.mxd R. 13 E. R. 14 E. R. 15 E. R. 16 E. R. 17 E. C d. Sahuarita Rd. Duval Mine Rd. Amado Arizona Inset B Pima Mine Rd. El Toro Rd. Green Valley RD Sahuarita La Villita Rd. Pima County Santa Cruz County tu 89 Summit Sahuarita Country Club Rd. 25 Inset A 20 Sahuarita Rd. Fort East Sahuarita Huachuca Breaker Proposed Switchyard/ Substation Green Valley White House Canyon Rd. SANTA RITA EXPERIMENTAL RANGE Rd 411 Madera Canyon Rd. Helvetia Rd. Wilmot Rd Santa Rita Rd. Main Ave. 120 Rd Rd Rd 417 Inset B Dawn Rd Harrison Rd Houghton Rd. 160 Tucson CORONADO NATIONAL FOREST Rosemont 210 Wentworth Rd. Greaterville 185 Inset A Santa Rita Rd Vail UV 83 Sonoita Hwy Marsh Station Rd. LAS CIENEGAS NATIONAL CONSERVATION AREA Sonoita 25 Sonoita Hwy Rosemont 138kV Transmission Line Project Preliminar Route Alternatives Legend General Reference Features March 2, 2010 I Miles DRAFT Santa Rita Road Family - Option #3 10 Permanent Link (20, 25, 60, 100, 130, 135, 95, 140, 170, 160, 190, 210) Link Identification Number Link Node Preliminary Alternative Link Existing Substation Proposed Switchyard/Substation Existing 345kV Transmission Line Existing 230kV Transmission Line Existing 138kV Transmission Line Existing 115kV Transmission Line Existing 46kV Transmission Line National Forest Boundary Updated Project Study Area Boundary County Boundary Interstate Highway Secondary Road Railroad River / Wash Township Boundary Project Location 15 8 Ariz on a Mexico Mexico 17 Sources StreetMap USA 2008; TEP 2008; EPG, 2008, Pima County 2008, Rosemont Copper Company PHOENIX TUCSON 19 J-113 CEC Application

102 THIS PAGE INTENTIONALLY LEFT BLANK J-114 CEC Application

103 N:\projects\Rosemont Copper\TEP_Lopez\mxds\RMC_Base_Hillshade_insets_display.mxd R. 13 E. R. 14 E. R. 15 E. R. 16 E. R. 17 E. C d. Sahuarita Rd. Duval Mine Rd. Amado Arizona Inset B Pima Mine Rd. El Toro Rd. Green Valley RD Sahuarita La Villita Rd. Pima County Santa Cruz County tu 89 Summit Sahuarita Country Club Rd. 25 Inset A 20 Sahuarita Rd. Fort East Sahuarita Huachuca Breaker Proposed Switchyard/ Substation Green Valley White House Canyon Rd. SANTA RITA EXPERIMENTAL RANGE Rd 411 Madera Canyon Rd. Helvetia Rd. Wilmot Rd Santa Rita Rd. Main Ave. 120 Rd Rd Rd 417 Inset B Dawn Rd Harrison Rd Houghton Rd. 160 Tucson CORONADO NATIONAL FOREST Rosemont 210 Wentworth Rd. Greaterville 185 Inset A Santa Rita Rd Vail UV 83 Sonoita Hwy Marsh Station Rd. LAS CIENEGAS NATIONAL CONSERVATION AREA Sonoita 25 Sonoita Hwy Rosemont 138kV Transmission Line Project Preliminar Route Alternatives Legend General Reference Features March 2, 2010 I Miles DRAFT Santa Rita Road Family - Option #7 10 Permanent Link (20, 25, 60, 100, 105, 155, 140) Temporary Link (120) Link Identification Number Link Node Preliminary Alternative Link Temporary Interconnection Existing Substation Proposed Switchyard/Substation Existing 345kV Transmission Line Existing 230kV Transmission Line Existing 138kV Transmission Line Existing 115kV Transmission Line Existing 46kV Transmission Line National Forest Boundary Updated Project Study Area Boundary County Boundary Interstate Highway Secondary Road Railroad River / Wash Township Boundary Project Location 15 8 Ariz on a Mexico Mexico 17 Sources StreetMap USA 2008; TEP 2008; EPG, 2008, Pima County 2008, Rosemont Copper Company PHOENIX TUCSON 19 J-115 CEC Application

104 THIS PAGE INTENTIONALLY LEFT BLANK J-116 CEC Application

105 N:\projects\Rosemont Copper\TEP_Lopez\mxds\RMC_Base_Hillshade_insets_display.mxd R. 13 E. R. 14 E. R. 15 E. R. 16 E. R. 17 E. C d. Sahuarita Rd. Duval Mine Rd. Amado Arizona Inset B Pima Mine Rd. El Toro Rd. Green Valley RD Sahuarita La Villita Rd. Pima County Santa Cruz County tu 89 Summit Sahuarita Country Club Rd. 25 Inset A 20 Sahuarita Rd. Fort East Sahuarita Huachuca Breaker Proposed Switchyard/ Substation Green Valley White House Canyon Rd. SANTA RITA EXPERIMENTAL RANGE Rd 411 Madera Canyon Rd. Helvetia Rd. Wilmot Rd Santa Rita Rd. Main Ave. 120 Rd Rd Rd 417 Inset B Dawn Rd Harrison Rd Houghton Rd. 160 Tucson CORONADO NATIONAL FOREST Rosemont 210 Wentworth Rd. Greaterville 185 Inset A Santa Rita Rd Vail UV 83 Sonoita Hwy Marsh Station Rd. LAS CIENEGAS NATIONAL CONSERVATION AREA Sonoita 25 Sonoita Hwy Rosemont 138kV Transmission Line Project Preliminar Route Alternatives Legend General Reference Features March 2, 2010 I Miles DRAFT Santa Rita Road Family - Option #9 10 Permanent Link (20, 25, 60, 100, 130, 135, 95, 140) Temporary Link (120) Link Identification Number Link Node Preliminary Alternative Link Temporary Interconnection Existing Substation Proposed Switchyard/Substation Existing 345kV Transmission Line Existing 230kV Transmission Line Existing 138kV Transmission Line Existing 115kV Transmission Line Existing 46kV Transmission Line National Forest Boundary Updated Project Study Area Boundary County Boundary Interstate Highway Secondary Road Railroad River / Wash Township Boundary Project Location 15 8 Ariz on a Mexico Mexico 17 Sources StreetMap USA 2008; TEP 2008; EPG, 2008, Pima County 2008, Rosemont Copper Company PHOENIX TUCSON 19 J-117 CEC Application

106 THIS PAGE INTENTIONALLY LEFT BLANK J-118 CEC Application

107 N:\projects\Rosemont Copper\TEP_Lopez\mxds\RMC_Base_Hillshade_insets_display.mxd R. 13 E. R. 14 E. R. 15 E. R. 16 E. R. 17 E. C d. Sahuarita Rd. Duval Mine Rd. Amado Arizona Inset B Pima Mine Rd. El Toro Rd. Green Valley RD Sahuarita La Villita Rd. Pima County Santa Cruz County tu 89 Summit Sahuarita Country Club Rd. 25 Inset A 20 Sahuarita Rd. Fort East Sahuarita Huachuca Breaker Proposed Switchyard/ Substation Green Valley White House Canyon Rd. SANTA RITA EXPERIMENTAL RANGE Rd 411 Madera Canyon Rd. Helvetia Rd. Wilmot Rd Santa Rita Rd. Main Ave. 120 Rd Rd Rd 417 Inset B Dawn Rd Harrison Rd Houghton Rd. 160 Tucson CORONADO NATIONAL FOREST Rosemont 210 Wentworth Rd. Greaterville 185 Inset A Santa Rita Rd Vail UV 83 Sonoita Hwy Marsh Station Rd. LAS CIENEGAS NATIONAL CONSERVATION AREA Sonoita 25 Sonoita Hwy Rosemont 138kV Transmission Line Project Preliminar Route Alternatives Legend Adjacent 46kV Family - Option #1 10 General Reference Features March 3, 2010 I Miles DRAFT Permanent Link (30, 110, 120, 105, 155, 140) Link Identification Number Link Node Preliminary Alternative Link Temporary Interconnection Existing Substation Proposed Switchyard/Substation Existing 345kV Transmission Line Existing 230kV Transmission Line Existing 138kV Transmission Line Existing 115kV Transmission Line Existing 46kV Transmission Line National Forest Boundary Updated Project Study Area Boundary County Boundary Interstate Highway Secondary Road Railroad River / Wash Township Boundary Project Location 15 8 Ariz on a Mexico Mexico 17 Sources StreetMap USA 2008; TEP 2008; EPG, 2008, Pima County 2008, Rosemont Copper Company PHOENIX TUCSON 19 J-119 CEC Application

108 THIS PAGE INTENTIONALLY LEFT BLANK J-120 CEC Application

109 N:\projects\Rosemont Copper\TEP_Lopez\mxds\RMC_Base_Hillshade_insets_display.mxd R. 13 E. R. 14 E. R. 15 E. R. 16 E. R. 17 E. C d. Sahuarita Rd. Duval Mine Rd. Amado Arizona Inset B Pima Mine Rd. El Toro Rd. Green Valley RD Sahuarita La Villita Rd. Pima County Santa Cruz County tu 89 Summit Sahuarita Country Club Rd. 25 Inset A 20 Sahuarita Rd. Fort East Sahuarita Huachuca Breaker Proposed Switchyard/ Substation Green Valley White House Canyon Rd. SANTA RITA EXPERIMENTAL RANGE Rd 411 Madera Canyon Rd. Helvetia Rd. Wilmot Rd Santa Rita Rd. Main Ave. 120 Rd Rd Rd 417 Inset B Dawn Rd Harrison Rd Houghton Rd. 160 Tucson CORONADO NATIONAL FOREST Rosemont 210 Wentworth Rd. Greaterville 185 Inset A Santa Rita Rd Vail UV 83 Sonoita Hwy Marsh Station Rd. LAS CIENEGAS NATIONAL CONSERVATION AREA Sonoita 25 Sonoita Hwy Rosemont 138kV Transmission Line Project Preliminar Route Alternatives Legend Adjacent 46kV Family - Option #2 10 General Reference Features March 2, 2010 I Miles DRAFT Permanent Link (30, 110, 120, 130, 135, 95, 140) Link Identification Number Link Node Preliminary Alternative Link Temporary Interconnection Existing Substation Proposed Switchyard/Substation Existing 345kV Transmission Line Existing 230kV Transmission Line Existing 138kV Transmission Line Existing 115kV Transmission Line Existing 46kV Transmission Line National Forest Boundary Updated Project Study Area Boundary County Boundary Interstate Highway Secondary Road Railroad River / Wash Township Boundary Project Location 15 8 Ariz on a Mexico Mexico 17 Sources StreetMap USA 2008; TEP 2008; EPG, 2008, Pima County 2008, Rosemont Copper Company PHOENIX TUCSON 19 J-121 CEC Application

110 THIS PAGE INTENTIONALLY LEFT BLANK J-122 CEC Application

111 N:\projects\Rosemont Copper\TEP_Lopez\mxds\RMC_Base_Hillshade_insets_display.mxd R. 13 E. R. 14 E. R. 15 E. R. 16 E. R. 17 E. C d. Sahuarita Rd. Duval Mine Rd. Amado Arizona Inset B Pima Mine Rd. El Toro Rd. Green Valley RD Sahuarita La Villita Rd. Pima County Santa Cruz County tu 89 Summit Sahuarita Country Club Rd. 25 Inset A 20 Sahuarita Rd. Fort East Sahuarita Huachuca Breaker Proposed Switchyard/ Substation Green Valley White House Canyon Rd. SANTA RITA EXPERIMENTAL RANGE Rd 411 Madera Canyon Rd. Helvetia Rd. Wilmot Rd Santa Rita Rd. Main Ave. 120 Rd Rd Rd 417 Inset B Dawn Rd Harrison Rd Houghton Rd. 160 Tucson CORONADO NATIONAL FOREST Rosemont 210 Wentworth Rd. Greaterville 185 Inset A Santa Rita Rd Vail UV 83 Sonoita Hwy Marsh Station Rd. LAS CIENEGAS NATIONAL CONSERVATION AREA Sonoita 25 Sonoita Hwy Rosemont 138kV Transmission Line Project Preliminar Route Alternatives Legend Adjacent 46kV Family - Option #4 10 General Reference Features March 2, 2010 I Miles DRAFT Permanent Link (30, 110, 150, 170, 160, 190, 210) Link Identification Number Link Node Preliminary Alternative Link Existing Substation Proposed Switchyard/Substation Existing 345kV Transmission Line Existing 230kV Transmission Line Existing 138kV Transmission Line Existing 115kV Transmission Line Existing 46kV Transmission Line National Forest Boundary Updated Project Study Area Boundary County Boundary Interstate Highway Secondary Road Railroad River / Wash Township Boundary Project Location 15 8 Ariz on a Mexico Mexico 17 Sources StreetMap USA 2008; TEP 2008; EPG, 2008, Pima County 2008, Rosemont Copper Company PHOENIX TUCSON 19 J-123 CEC Application

112 THIS PAGE INTENTIONALLY LEFT BLANK J-124 CEC Application

113 N:\projects\Rosemont Copper\TEP_Lopez\mxds\RMC_Base_Hillshade_insets_display.mxd R. 13 E. R. 14 E. R. 15 E. R. 16 E. R. 17 E. C d. Sahuarita Rd. Duval Mine Rd. Amado Arizona Inset B Pima Mine Rd. El Toro Rd. Green Valley RD Sahuarita La Villita Rd. Pima County Santa Cruz County tu 89 Summit Sahuarita Country Club Rd. 25 Inset A 20 Sahuarita Rd. Fort East Sahuarita Huachuca Breaker Proposed Switchyard/ Substation Green Valley White House Canyon Rd. SANTA RITA EXPERIMENTAL RANGE Rd 411 Madera Canyon Rd. Helvetia Rd. Wilmot Rd Santa Rita Rd. Main Ave. 120 Rd Rd Rd 417 Inset B Dawn Rd Harrison Rd Houghton Rd. 160 Tucson CORONADO NATIONAL FOREST Rosemont 210 Wentworth Rd. Greaterville 185 Inset A Santa Rita Rd Vail UV 83 Sonoita Hwy Marsh Station Rd. LAS CIENEGAS NATIONAL CONSERVATION AREA Sonoita 25 Sonoita Hwy Rosemont 138kV Transmission Line Project Preliminar Route Alternatives Legend Adjacent 46kV Family - Option #6 10 General Reference Features March 2, 2010 I Miles DRAFT Permanent Link (30, 110, 120, 105, 155, 140, 170, 160, 190, 210) Link Identification Number Link Node Preliminary Alternative Link Existing Substation Proposed Switchyard/Substation Existing 345kV Transmission Line Existing 230kV Transmission Line Existing 138kV Transmission Line Existing 115kV Transmission Line Existing 46kV Transmission Line National Forest Boundary Updated Project Study Area Boundary County Boundary Interstate Highway Secondary Road Railroad River / Wash Township Boundary Project Location 15 8 Ariz on a Mexico Mexico 17 Sources StreetMap USA 2008; TEP 2008; EPG, 2008, Pima County 2008, Rosemont Copper Company PHOENIX TUCSON 19 J-125 CEC Application

114 THIS PAGE INTENTIONALLY LEFT BLANK J-126 CEC Application

115 Agenda Stakeholder Group Meeting #5 October 27, :00am 2:00pm Unisource building One South Church Street Tucson, Arizona Welcome Project Status Preferred and Alternative Routes likely to be carried forward Next Steps Comments and Questions S:\EPG\projects\Rosemont Copper\TEP Rosemont Line\Public Participation\Stakeholder group\meeting #5\Agenda meeting #5.docx J-127 CEC Application

116 THIS PAGE INTENTIONALLY LEFT BLANK J-128 CEC Application

117 MEMBERSHIP ROSEMONT 138KV TRANSMISSION LINE PROJECT STAKEHOLDER GROUP Revised October 2010 The purpose of the Stakeholder Group is to establish a group representing a range of opinions in a forum small enough to allow for thorough education of the participants, detailed discussion of issues, and informal dialogue. EPG, Inc. (EPG) contacted various individuals/organizations for selection of the members that would assist (TEP) and EPG in identifying issues and concerns relevant to the proposed project. Representation of a cross-section of the region includes federal, state, county, and municipal agencies that have administrative jurisdiction within the project area; industry/business; and citizens on behalf of their neighborhoods. Members were selected based on their knowledge of the project area, capability to commit the time required to participate in the Stakeholder Group throughout the planning process, and willingness to participate in an impartial manner. ROSTER OF STAKEHOLDER GROUP MEMBERS Federal Jim Copeland (jcopeland@fs.fed.us), representative for the transmission line on behalf of the Coronado National Forest (replacement for Kent Ellett) o Bev Everson (beverson@fs.fed.us) o Mindee Roth (mroth@fs.fed.us) Linda Hughes (Linda_hughes@blm.gov), representative for the transmission line on behalf of the Bureau of Land Management, Tucson o Cindy Alvarez (Cindy_alvarez@blm.gov) o Dan Moore (Daniel_J_Moore@blm.gov) Kurt Tek (kurt.tek@ang.af.mil), representative for Arizona Air National Guard State Tim Bolton (tbolton@land.az.gov), Arizona State Land Department Steve Husman (husman@ag.arizona.edu), Santa Rita Experimental Range City/Town Chris Kaselemis (chris.kaselemis@tucsonaz.gov), City of Tucson Orlanthia Henderson (ohenderson@ci.sahuarita.az.us), Town of Sahuarita Eddie Peabody (emerald5@cox.net), Planning and Zoning Committee, Green Valley Coordinating Council StakeholderGroupRoster 1 EPG Rosemont138kVTransmissionLineProject October27,2010 TucsonElectricPower J-129 CEC Application

118 Industry/Business Bob Iannarino Weinberg Abrahams Diamond Ventures Nan Walden Robertson Farmers Investment Company Citizens Marshall Magruder Elizabeth Webb PROJECT TEAM Ed Beck Shannon Breslin Cheryl Hall Larry Lucero Erik Bakken Cory Pintor EPG, Inc. Phone (602) Lauren Weinstein Paul Trenter Chelsa Johnson Rosemont Copper Kathy Arnold Laurie Woodall, KR Saline StakeholderGroupRoster 2 EPG Rosemont138kVTransmissionLineProject October27,2010 TucsonElectricPower J-130 CEC Application

119 ROSEMONT 138KV TRANSMISSION LINE PROJECT Presentation Agenda J-131 CEC Application

120 Planning Process Chart Public Comments Received J-132 CEC Application

121 Agency Comments Received Additional Agency Comments Received (summer 2010) J-133 CEC Application

122 Alternative Route Maps Key Considerations for Alternative Routes J-134 CEC Application

123 Preferred Route Alternative 1 J-135 CEC Application

124 Alternative 2 Alternative 3 J-136 CEC Application

125 Alternative 4 Next Steps J-137 CEC Application

126 THIS PAGE INTENTIONALLY LEFT BLANK J-138 CEC Application

127 N:\projects\Rosemont Copper\TEP_Lopez\mxds\RMC_Base_Hillshade.mxd R. 13 E. R. 14 E. R. 15 E. R. 16 E. R. 17 E. Vail Summit 16 Pima Mine Rd. Country Club Rd. Wilmot Rd. Houghton Rd. Wentworth Rd. UV 83 Sonoita Hwy Marsh Station Rd. Rosemont 138kV Transmission Line Project Transmission Line Alternative Routes tu 89 Sahuarita Sahuarita Rd. Via Loma del Venado Legend Preferred Route Alternative Route 1 Corona de Tucson Coppercut Trail Alternative Route 2 Alternative Route 3 17 El Toro Rd. Sahuarita 19 La Villita Rd. Duval Mine Rd. Fort Huachuca Breaker 20 East Sahuarita Main Ave. Kolb Rd. Harrison Rd. Alternative Route 4 Construction Power Options Link Node Construction Power Interconnection Updated Project Study Area Boundary Santa Rita Experimental Range Coronado National Forest Proposed Switchyard/ Substation Rd 424 CORONADO NATIONAL FOREST Notes: Not all of the preliminary alternative links shown on the map will be constructed. Project study area boundary has been updated as of July Arizona Green Valley Green Valley White House Canyon Rd. SANTA RITA EXPERIMENTAL RANGE Rd 411 Santa Rita Rd. Helvetia Rd. Rd Rd Rosemont 210 Box Canyon Rd. Greaterville Empire Ranch Rd. General Reference Features Existing Substation County Boundary Proposed Switchyard/Substation Interstate Existing 345kV Transmission Line Highway Existing 230kV Transmission Line Secondary Road Existing 138kV Transmission Line Railroad Existing 115kV Transmission Line Existing 46kV Transmission Line 15 8 Project Location Arizon a 17 PHOENIX 40 TUCSON 19 Mexico 19 Sources StreetMap USA 2008; TEP 2008; EPG 2008; Pima County 2008; Arizona Game and Fish Department 2001 Madera Canyon Rd. Sonoita Hwy I Miles Pima County Santa Cruz County Sonoita October 25, 2010 J-139 CEC Application

128 THIS PAGE INTENTIONALLY LEFT BLANK J-140 CEC Application

129 N:\projects\Rosemont Copper\TEP_Lopez\mxds\RMC_Base_Hillshade_insets_display.mxd R. 13 E. R. 14 E. R. 15 E. R. 16 E. R. 17 E. C d. Sahuarita Rd. Duval Mine Rd. Amado Arizona Inset B Pima Mine Rd. El Toro Rd. Green Valley RD Sahuarita La Villita Rd. Pima County Santa Cruz County tu 89 Summit Sahuarita Country Club Rd. 25 Inset A 20 Sahuarita Rd. Fort East Sahuarita Huachuca Breaker Proposed Switchyard/ Substation Green Valley White House Canyon Rd. SANTA RITA EXPERIMENTAL RANGE Rd 411 Madera Canyon Rd. 100 Santa Rita Rd. Helvetia Rd. Wilmot Rd. Main Ave. Rd Rd Rd 417 Inset B Dawn Rd Harrison Rd Houghton Rd. 160 Tucson CORONADO NATIONAL FOREST Rosemont 210 Wentworth Rd. Greaterville 185 Inset A Santa Rita Rd Vail UV 83 Sonoita Hwy Sonoita Marsh Station Rd. 25 Sonoita Hwy Rosemont 138kV Transmission Line Project Legend 10 October 25, 2010 Preferred Route I Miles DRAFT Operation Power (20, 25, 60, 100, 105, 155, 140) Construction Power Options (120, 170, 160, 190, 210) Construction Power Interconnection Link Identification Number Link Node Preliminary Alternative Link General Reference Features Existing Substation Proposed Switchyard/Substation Existing 345kV Transmission Line Existing 230kV Transmission Line Existing 138kV Transmission Line Existing 115kV Transmission Line Existing 46kV Transmission Line National Forest Boundary Updated Project Study Area Boundary County Boundary Interstate Highway Secondary Road Railroad River / Wash Township Boundary Project Location 15 8 Ariz on a Mexico Mexico 17 Sources StreetMap USA 2008; TEP 2008; EPG, 2008, Pima County 2008, Rosemont Copper Company PHOENIX TUCSON 19 J-141 CEC Application

130 THIS PAGE INTENTIONALLY LEFT BLANK J-142 CEC Application

131 N:\projects\Rosemont Copper\TEP_Lopez\mxds\RMC_Base_Hillshade_insets_display.mxd R. 13 E. R. 14 E. R. 15 E. R. 16 E. R. 17 E. C d. Sahuarita Rd. Duval Mine Rd. Amado Arizona Inset B Pima Mine Rd. El Toro Rd. Green Valley RD Sahuarita La Villita Rd. Pima County Santa Cruz County tu 89 Summit Sahuarita Country Club Rd. 25 Inset A 20 Sahuarita Rd. Fort East Sahuarita Huachuca Breaker Proposed Switchyard/ Substation Green Valley White House Canyon Rd. SANTA RITA EXPERIMENTAL RANGE Rd 411 Madera Canyon Rd. 100 Santa Rita Rd. Helvetia Rd. Wilmot Rd. Main Ave. Rd Rd Rd 417 Inset B Dawn Rd Harrison Rd Houghton Rd. 160 Tucson CORONADO NATIONAL FOREST Rosemont 210 Wentworth Rd. Greaterville 185 Inset A Santa Rita Rd Vail UV 83 Sonoita Hwy Sonoita Marsh Station Rd. 25 Sonoita Hwy Rosemont 138kV Transmission Line Project Legend 10 October 25, 2010 Alternative 1 I Miles DRAFT Operation Power (20, 25, 60, 100, 130, 135, 95, 140) Construction Power Options (120, 170, 160,190, 210) Construction Power Interconnection Link Identification Number Link Node Preliminary Alternative Link General Reference Features Existing Substation Proposed Switchyard/Substation Existing 345kV Transmission Line Existing 230kV Transmission Line Existing 138kV Transmission Line Existing 115kV Transmission Line Existing 46kV Transmission Line National Forest Boundary Updated Project Study Area Boundary County Boundary Interstate Highway Secondary Road Railroad River / Wash Township Boundary Project Location 15 8 Ariz on a Mexico Mexico 17 Sources StreetMap USA 2008; TEP 2008; EPG, 2008, Pima County 2008, Rosemont Copper Company PHOENIX TUCSON 19 J-143 CEC Application

132 THIS PAGE INTENTIONALLY LEFT BLANK J-144 CEC Application

133 N:\projects\Rosemont Copper\TEP_Lopez\mxds\RMC_Base_Hillshade_insets_display.mxd R. 13 E. R. 14 E. R. 15 E. R. 16 E. R. 17 E. C d. Sahuarita Rd. Duval Mine Rd. Amado Arizona Inset B Pima Mine Rd. El Toro Rd. Green Valley RD Sahuarita La Villita Rd. Pima County Santa Cruz County tu 89 Summit Sahuarita Country Club Rd. 25 Inset A 20 Sahuarita Rd. Fort East Sahuarita Huachuca Breaker Proposed Switchyard/ Substation Green Valley White House Canyon Rd. SANTA RITA EXPERIMENTAL RANGE Rd 411 Madera Canyon Rd. 100 Santa Rita Rd. Helvetia Rd. Wilmot Rd. Main Ave. Rd Rd Rd 417 Inset B Dawn Rd Harrison Rd Houghton Rd. 160 Tucson CORONADO NATIONAL FOREST Rosemont 210 Wentworth Rd. Greaterville 185 Inset A Santa Rita Rd Vail UV 83 Sonoita Hwy Sonoita Marsh Station Rd. 25 Sonoita Hwy Rosemont 138kV Transmission Line Project Legend 10 October 25, 2010 Alternative 2 Operation Power (30, 110, 120, 105, 155, 140) Construction Power Option (170, 160, 190, 210) I Miles DRAFT Construction Power Interconnection Link Identification Number Link Node Preliminary Alternative Link General Reference Features Existing Substation Proposed Switchyard/Substation Existing 345kV Transmission Line Existing 230kV Transmission Line Existing 138kV Transmission Line Existing 115kV Transmission Line Existing 46kV Transmission Line National Forest Boundary Updated Project Study Area Boundary County Boundary Interstate Highway Secondary Road Railroad River / Wash Township Boundary Project Location 15 8 Ariz on a Mexico Mexico 17 Sources StreetMap USA 2008; TEP 2008; EPG, 2008, Pima County 2008, Rosemont Copper Company PHOENIX TUCSON 19 J-145 CEC Application

134 THIS PAGE INTENTIONALLY LEFT BLANK J-146 CEC Application

135 N:\projects\Rosemont Copper\TEP_Lopez\mxds\RMC_Base_Hillshade_insets_display.mxd R. 13 E. R. 14 E. R. 15 E. R. 16 E. R. 17 E. C d. Sahuarita Rd. Duval Mine Rd. Amado Arizona Inset B Pima Mine Rd. El Toro Rd. Green Valley RD Sahuarita La Villita Rd. Pima County Santa Cruz County tu 89 Summit Sahuarita Country Club Rd. 25 Inset A 20 Sahuarita Rd. Fort East Sahuarita Huachuca Breaker Proposed Switchyard/ Substation Green Valley White House Canyon Rd. SANTA RITA EXPERIMENTAL RANGE Rd 411 Madera Canyon Rd. 100 Santa Rita Rd. Helvetia Rd. Wilmot Rd. Main Ave. Rd Rd Rd 417 Inset B Dawn Rd Harrison Rd Houghton Rd. 160 Tucson CORONADO NATIONAL FOREST Rosemont 210 Wentworth Rd. Greaterville 185 Inset A Santa Rita Rd Vail UV 83 Sonoita Hwy Sonoita Marsh Station Rd. 25 Sonoita Hwy Rosemont 138kV Transmission Line Project Alternative 3 Legend 10 General Reference Features October 25, 2010 I Miles DRAFT Operation Power (30, 110, 120, 130, 135, 95, 140) Construction Power Option (170, 160, 190, 210) Construction Power Interconnection Link Identification Number Link Node Preliminary Alternative Link Existing Substation Proposed Switchyard/Substation Existing 345kV Transmission Line Existing 230kV Transmission Line Existing 138kV Transmission Line Existing 115kV Transmission Line Existing 46kV Transmission Line National Forest Boundary Updated Project Study Area Boundary County Boundary Interstate Highway Secondary Road Railroad River / Wash Township Boundary Project Location 15 8 Ariz on a Mexico Mexico 17 Sources StreetMap USA 2008; TEP 2008; EPG, 2008, Pima County 2008, Rosemont Copper Company PHOENIX TUCSON 19 J-147 CEC Application

136 THIS PAGE INTENTIONALLY LEFT BLANK J-148 CEC Application

137 N:\projects\Rosemont Copper\TEP_Lopez\mxds\RMC_Base_Hillshade_insets_display.mxd R. 13 E. R. 14 E. R. 15 E. R. 16 E. R. 17 E. C 16 d. Pima Mine Rd. La Villita Rd. Summit Country Club Rd. Wilmot Rd. Dawn Rd. Houghton Rd. Tucson Wentworth Rd. Vail Marsh Station Rd. DRAFT Rosemont 138kV Transmission Line Project Alternative 4 Legend Sahuarita Rd. Duval Mine Rd. Arizona El Toro Rd. Green Valley Sahuarita 19 tu 89 Sahuarita Sahuarita Rd. Fort East Sahuarita Huachuca Breaker Proposed Switchyard/ Substation Green Valley White House Canyon Rd. SANTA RITA EXPERIMENTAL RANGE Rd Santa Rita Rd. Helvetia Rd. Main Ave. Rd Rd Rd Harrison Rd CORONADO NATIONAL FOREST 190 Rosemont 210 UV 83 Sonoita Hwy 10 General Reference Features Operation Power (30, 110, 150, 170, 160, 190, 210) Link Identification Number Link Node Preliminary Alternative Link Existing Substation Proposed Switchyard/Substation Existing 345kV Transmission Line Existing 230kV Transmission Line Existing 138kV Transmission Line Existing 115kV Transmission Line Existing 46kV Transmission Line National Forest Boundary Updated Project Study Area Boundary County Boundary Interstate Highway Secondary Road Railroad River / Wash Township Boundary Project Location Greaterville Ariz on a Mexico Mexico PHOENIX TUCSON 19 Amado Pima County Santa Cruz County Madera Canyon Rd. Sonoita Sonoita Hwy Sources StreetMap USA 2008; TEP 2008; EPG, 2008, Pima County 2008, Rosemont Copper Company 2008 I Miles October 25, 2010 J-149 CEC Application

138 THIS PAGE INTENTIONALLY LEFT BLANK J-150 CEC Application

139 Agenda Stakeholder Group Meeting #6 May 12, :30am 1:00pm Unisource building One South Church Street Tucson, Arizona Welcome Project Status Construction Power Options Removed Next Steps Comments and Questions S:\EPG\projects\Rosemont Copper\TEP Rosemont Line\Public Participation\Stakeholder group\meeting #6\Agenda meeting #6.docx J-151 CEC Application

140 THIS PAGE INTENTIONALLY LEFT BLANK J-152 CEC Application

141 ROSEMONT 138KV TRANSMISSION LINE PROJECT Presentation Agenda J-153 CEC Application

142 Project Status Construction Power Options Removed J-154 CEC Application

143 Alternative Routes Map Next Steps J-155 CEC Application

144 THIS PAGE INTENTIONALLY LEFT BLANK J-156 CEC Application

145 Harrison Rd N:\projects\Rosemont Copper\TEP_Lopez\mxds\CEC_insets.mxd R. 13 E. R. 14 E. R. 15 E. R. 16 E. R. 17 E. 16 Pima Mine Rd. Pacific Railroad Pacific Railroad Sp Railroad Summit Country Club Rd. Sahuarita Wilmot Rd. Houghton Rd. Via Wentworth Rd. Vail Sonoita Hwy Marsh Station Rd. DRAFT Rosemont 138kV Transmission Line Project Preferred Route and Alternatives Figure 1 Legend Preferred Route Alternative Route Railroad Pacific El Toro Rd. Duval Mine Rd. Continental Rd. Pacific Railroad Arizona Green Valley Pacific Sahuarita 19 Railroad La Villita Rd. Pacific Railroad Green Valley tu 89 Fort Huachuca Breaker Proposed Toro Switchyard East Sahuarita 30 White House Canyon Rd. 60 SANTA RITA EXPERIMENTAL RANGE Helvetia Rd. Santa Rita Rd. Main Ave. Sahuarita Rd. 120 Kolb Rd. Rd 424 Inset A Rd Sycamore Leaf Rd Corona de Tucson 140 CORONADO NATIONAL FOREST Loma del Vena do Rosemont Substation Copp ercut Trail UV 83 Alternative Route 2 Alternative Route 3 Alternative Route 4 10 Link Identification Number Link Node Alternative Link Note:The alternative routes shown on the map are a graphical representation. Land Managing Areas U. Forest Service Bureau of Land Management Arizona State Land Unincorporated Pima County Planning Jurisdictions Green Valley Planning Area Sahuarita Incorporated Boundary Special Management Areas Coronado National Forest Santa Rita Experimental Range Las Cienegas National Conservation Area Rosemont Copper Facilities Private Lands Claim Boundary Rosemont Mine Plan of Operations Boundary Under NEPA Process General Reference Features Existing Substation Proposed Switchyard/Substation Existing 345kV Transmission Line Existing 230kV Transmission Line Existing 138kV Transmission Line Existing 115kV Transmission Line Existing 46kV Transmission Line Project Study Area Boundary 15 Project Location County Boundary Interstate Highway Secondary Road Railroad Township Boundary Section Boundary 19 Inset A Santa Santa Rita Rita Rd Rd 120 RD 424 Railroad Pacific Madera Canyon Rd. Rd 411 Rd 413 Box Canyon Rd. Greaterville Substation LAS CIENEGAS NATIONAL CONSER- VATION AREA Sonoita Hwy Empire Ranch Rd. Sources 8 Arizo na Mexic o 17 I PHOENIX 40 TUCSON StreetMap USA 2008; TEP 2008; EPG 2008, Pima County 2008, Rosemont Copper Company Miles Contour Interval = 100 feet Pima County Santa Cruz County Sonoita Working Draft May 11, 2011 J-157 CEC Application

Rosemont Copper Project EIS Cooperating Agency Coordination Meeting 04/15/2010 Agenda

Rosemont Copper Project EIS Cooperating Agency Coordination Meeting 04/15/2010 Agenda Rosemont Copper Project EIS Cooperating Agency Coordination Meeting 04/15/2010 Agenda Location: Federal Building, 300 West Congress, Tucson, Arizona, Room 4B Facilitator: Teresa Ann Ciapusci, Cooperating

More information

PLANNING CONSIDERATIONS

PLANNING CONSIDERATIONS 12TH NOGALES PARK TUCSON ALVERNON SWAN WILMOT CAMPBELL DREXEL COUNTRY CLUB LEGEND RESERVE LAND AREA (APPROXIMATE) POTENTIAL FUTURE HSR TO AIRPORT TRANSIT CONNECTIONS VALENCIA PIMA COUNTY CITY OF TUCSON

More information

APPLICANTS PROPOSED TOUR SCHEDULE & PROTOCOL

APPLICANTS PROPOSED TOUR SCHEDULE & PROTOCOL APPLICANTS PROPOSED TOUR SCHEDULE & PROTOCOL Pursuant to Paragraph 18 of the Procedural Order issued by the Chairman of the Power Plant and Transmission Line Siting Committee (the Committee ) on August

More information

White Mountain National Forest Saco Ranger District

White Mountain National Forest Saco Ranger District United States Department of Agriculture Forest Service White Mountain National Forest 33 Kancamagus Highway Conway, NH 03818 Comm: (603) 447-5448 TTY: (603) 447-3121 File Code: 1950 Date: February 26,

More information

Bradley Brook Relocation Project. Scoping Notice. Saco Ranger District. United States Department of Agriculture Forest Service

Bradley Brook Relocation Project. Scoping Notice. Saco Ranger District. United States Department of Agriculture Forest Service Bradley Brook Relocation Project United States Department of Agriculture Forest Service Scoping Notice White Mountain National Forest February 2011 For Information Contact: Jenny Burnett White Mountain

More information

White Mountain National Forest Saco Ranger District

White Mountain National Forest Saco Ranger District United States Department of Agriculture Forest Service White Mountain National Forest Saco Ranger District 33 Kancamagus Highway Conway, NH 03818 Comm: (603) 447-5448 TTY: (603) 447-3121 File Code: 1950

More information

COMMERCIAL/RETAIL PAD(S) AVAILABLE

COMMERCIAL/RETAIL PAD(S) AVAILABLE COMMERCIAL/RETAIL PAD(S) AVAILABLE EXCLUSIVE LISTING SWC 22ND STREET & HOUGHTON ROAD TUCSON, ARIZONA Case Park OVERVIEW Excellent commercial corner opportunity Across from planned Fry s Marketplace One

More information

Mercer Island should continue to press Renton for public input on noise and other environmental effects of the options then under consideration.

Mercer Island should continue to press Renton for public input on noise and other environmental effects of the options then under consideration. Renton was required by the Federal Aviation Administration to complete work on its Airport Master Plan in a timely manner, the MOU adds that the noise study must be completed at the earliest time possible.

More information

Section II. Planning & Public Process Planning for the Baker/Carver Regional Trail began in 2010 as a City of Minnetrista initiative.

Section II. Planning & Public Process Planning for the Baker/Carver Regional Trail began in 2010 as a City of Minnetrista initiative. Section II Planning & Public Process Planning for the began in 2010 as a City of initiative. city staff began discussions with the Park District on the possibility of a north/south regional trail connection

More information

California State University Long Beach Policy on Unmanned Aircraft Systems

California State University Long Beach Policy on Unmanned Aircraft Systems California State University, Long Beach June 14, 2016 Policy Statement: 16-04 California State University Long Beach Policy on Unmanned Aircraft Systems The following policy statement was recommended by

More information

2015 PURDUE ROAD SCHOOL March 11, 2015

2015 PURDUE ROAD SCHOOL March 11, 2015 2015 PURDUE ROAD SCHOOL March 11, 2015 Runway Protection Zone (RPZ) Definition It is a trapezoidal shape formed off the end of a runway and its geometry it a function of the airport s aircraft approach

More information

Daisy Dean Trail 628/619 ATV Trail Construction

Daisy Dean Trail 628/619 ATV Trail Construction Background and Purpose and Need The Daisy Dean ATV Trail Construction Project is located in the Little Belt Mountains, Musselshell Ranger District, Lewis and Clark National Forest approximately 32 miles

More information

C. APPROACH FOR IDENTIFYING THE BEST ROUTES FOR THE NEEDED TRANSMISSION SYSTEM IMPROVEMENTS

C. APPROACH FOR IDENTIFYING THE BEST ROUTES FOR THE NEEDED TRANSMISSION SYSTEM IMPROVEMENTS C. APPROACH FOR IDENTIFYING THE BEST ROUTES FOR THE NEEDED TRANSMISSION SYSTEM IMPROVEMENTS CL&P s approach for identifying the best routes for the needed transmission system improvements included a determination

More information

TONGASS NATIONAL FOREST

TONGASS NATIONAL FOREST TONGASS NATIONAL FOREST UNITED STATES DEPARTMENT OF AGRICULTURE-FOREST SERVICE Contact: Dennis Neill Phone: 907-228-6201 Release Date: May 17, 2002 SEIS Questions and Answers Q. Why did you prepare this

More information

Electric System Serving Pierce County Current system and future investments. Janet Olsen Steve Botts

Electric System Serving Pierce County Current system and future investments. Janet Olsen Steve Botts Electric System Serving Pierce County Current system and future investments Janet Olsen Steve Botts Project Manager Real Estate t / Rights-of-Way April 13, 2011 Presentation overview Information requested

More information

Continental Divide National Scenic Trail Legislative History and Planning Guidance

Continental Divide National Scenic Trail Legislative History and Planning Guidance Continental Divide National Scenic Trail Legislative History and Planning Guidance Legislation, Policy, and Direction Regarding National Scenic Trails The National Trails System Act, P.L. 90-543, was passed

More information

Electric System Serving Pierce County Current system and future investments

Electric System Serving Pierce County Current system and future investments Electric System Serving Pierce County Current system and future investments Janet Olsen Project Manager Steve Botts Real Estate / Rights-of-Way April 13, 2011 Presentation overview Information requested

More information

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES Recurring topics emerged in some of the comments and questions raised by members of the

More information

A GUIDE TO MANITOBA PROTECTED AREAS & LANDS PROTECTION

A GUIDE TO MANITOBA PROTECTED AREAS & LANDS PROTECTION A GUIDE TO MANITOBA PROTECTED AREAS & LANDS PROTECTION Manitoba Wildands December 2008 Discussions about the establishment of protected lands need to be clear about the definition of protection. We will

More information

Thornton Water Project. Larimer County Route Study and Project Update September 12, 2017

Thornton Water Project. Larimer County Route Study and Project Update September 12, 2017 Thornton Water Project Larimer County Route Study and Project Update September 12, 2017 Purpose of Meeting Provide information on the Thornton Water Project Present the results of the pipeline routing

More information

Federal Aviation Administration. Airport Land Use Compatibility Advisory Circular ACI-NA / FAA. FAA HQ Washington, DC March 27, 2013

Federal Aviation Administration. Airport Land Use Compatibility Advisory Circular ACI-NA / FAA. FAA HQ Washington, DC March 27, 2013 Airport Land Use Compatibility Advisory Circular ACI-NA / FAA FAA HQ Washington, DC March 27, 2013 The purpose of this meeting is to discuss FAA s update of the Airport Compatible Land Use Advisory Circular.

More information

Official Journal of the European Union L 186/27

Official Journal of the European Union L 186/27 7.7.2006 Official Journal of the European Union L 186/27 COMMISSION REGULATION (EC) No 1032/2006 of 6 July 2006 laying down requirements for automatic systems for the exchange of flight data for the purpose

More information

DIRECTOR S ORDER #41: Wilderness Preservation and Management

DIRECTOR S ORDER #41: Wilderness Preservation and Management These are relevant sections about Wilderness Management Plans from National Park Service 2006 Management Policies, Director s Orders #41 and Reference Manual 41. National Park Service U.S. Department of

More information

Decision Memo for Desolation Trail: Mill D to Desolation Lake Trail Relocation

Decision Memo for Desolation Trail: Mill D to Desolation Lake Trail Relocation for Salt Lake County, Utah Uinta-Wasatch-Cache National Forest Salt Lake Ranger District 1. Background The present location of the Desolation Trail (#1159) between Mill D and Desolation Lake follows old

More information

As outlined in the Tatshenshini-Alsek Park Management Agreement, park management will:

As outlined in the Tatshenshini-Alsek Park Management Agreement, park management will: Management Strategy General Strategy The priority management focus for the park is to ensure that its internationally significant natural, cultural heritage and recreational values are protected and that

More information

Comments On Proposed Future Bond Projects PR153 TORTOLITA MOUNTAIN PARK FM103 PR185 RD HP110 RD RD MOORE MARANA TANGERINE ña Ca SHANNON CAMINO RD RD O

Comments On Proposed Future Bond Projects PR153 TORTOLITA MOUNTAIN PARK FM103 PR185 RD HP110 RD RD MOORE MARANA TANGERINE ña Ca SHANNON CAMINO RD RD O Comments On Proposed Future Bond Projects PR153 TORTOLITA MOUNTAIN PARK FM103 PR185 HP110 MOORE MARANA TANGERINE ña Ca SHANNON CAMINO O HAY M AG CO RT AR O INA EE PR103 - Rillito Racetrack - Conversion

More information

Airspace Establishment Project Frequently Asked Questions Permanent SUA and Environmental Assessment March 2019

Airspace Establishment Project Frequently Asked Questions Permanent SUA and Environmental Assessment March 2019 OVERVIEW OF PERMANENT SPECIAL USE AIRSPACE ESTABLISHMENT AND MODIFICATIONS AT MARINE AIR GROUND TASK FORCE TRAINING COMMAND, TWENTYNINE PALMS, CA 1. What is Special Use Airspace (SUA)? Special Use Airspace

More information

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012 1. Introduction The Federal Aviation Administration (FAA) recommends that airport master plans be updated every 5 years or as necessary to keep them current. The Master Plan for Joslin Field, Magic Valley

More information

With the first portion of this process complete, we anticipate the general timeline for the remainder of the process to be:

With the first portion of this process complete, we anticipate the general timeline for the remainder of the process to be: THE CITY OF FIRE RESCUE E D M O N T O N FIRE RESCUE SERVICES 10351 96 Street Edmonton, Alberta T5H 2H5 April 19, 2013 Dear Rossdale residents: As many of you know, Fire Rescue Services is currently in

More information

Procedures for Approval of Master Minimum Equipment List

Procedures for Approval of Master Minimum Equipment List Circular No. 1-009 Procedures for Approval of Master Minimum Equipment List October 3, 2000 First issue (KOKU-KU-KI-1193) April 8, 2011 Amended (KOKU-KU-KOU-1399, KOKU-KU-KI-1209) June 30, 2011 Amended

More information

1 DOCKET NO. L-OOOOOYY

1 DOCKET NO. L-OOOOOYY ~ 3 4 I 1 2 4 5 6 7 8 9 1 11 12 13 14 15 16 17 18 19 2 21 22 23 24 25 26 27 28 AND TRANSMISSION LINE SITING [N THE MATTER OF THE APPLICATION 3F SUNZIA TRANSMISSION LLC, IN ZONFORMANCE WITH THE REQUIREMENTS

More information

Decision Memo Broken Wheel Ranch Equestrian Outfitter Special-Use Permit Proposed Action

Decision Memo Broken Wheel Ranch Equestrian Outfitter Special-Use Permit Proposed Action Decision Memo Broken Wheel Ranch Equestrian Outfitter Special-Use Permit USDA Forest Service Mississippi Bluffs Ranger District, Shawnee National Forest Jackson and Union Counties, Illinois Proposed Action

More information

COMMISSION IMPLEMENTING REGULATION (EU)

COMMISSION IMPLEMENTING REGULATION (EU) 18.10.2011 Official Journal of the European Union L 271/15 COMMISSION IMPLEMENTING REGULATION (EU) No 1034/2011 of 17 October 2011 on safety oversight in air traffic management and air navigation services

More information

ROUTE ANALYSIS PROCESS

ROUTE ANALYSIS PROCESS ROUTE ANALYSIS PROCESS Progress to Date: 1. Recorded and labeled all routes received from PAT Meetings. 2. Determined opportunity, avoidance and exclusion areas crossed by PAT proposed routes. 3. Routes

More information

PSP 75 Lancefield Road. Northern Jacksons Creek Crossing Supplementary Information

PSP 75 Lancefield Road. Northern Jacksons Creek Crossing Supplementary Information PSP 75 Lancefield Road Northern Jacksons Creek Crossing Supplementary Information September 2017 The northern crossing of Jacksons Creek proposed within the Lancefield Road PSP is a key part of the ultimate

More information

Sawtooth National Forest Fairfield Ranger District

Sawtooth National Forest Fairfield Ranger District United States Department of Agriculture Forest Service Sawtooth National Forest Fairfield Ranger District P.O. Box 189 Fairfield, ID. 83327 208-764-3202 Fax: 208-764-3211 File Code: 1950/7700 Date: December

More information

Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update

Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update Ultimate ASV, Runway Use and Flight Tracks 4th Working Group Briefing 8/13/18 Meeting Purpose Discuss Public Workshop input

More information

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010 COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, XXX Draft COMMISSION REGULATION (EU) No /2010 of [ ] on safety oversight in air traffic management and air navigation services (Text with EEA relevance)

More information

TRIP SUMMARY 02/10/2017. Route ID: Intersession AM - CHS/EHS/VHS/AP/PHS - Wilm

TRIP SUMMARY 02/10/2017. Route ID: Intersession AM - CHS/EHS/VHS/AP/PHS - Wilm Route ID: 20.60 Intersession AM - CHS/EHS/VHS/AP/PHS - Wilm Run Description: WILMOT & KOLB 7:45 AM 7:5 AM 7:53 AM 8:00 AM 8:03 AM 8:25 AM 8:25 AM 8:28 AM 8:28 AM KOLB & OLD VAIL (RV SALES CENTER) WILMOT

More information

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge Public Consultation Centre (PCC) No. 3 Please Sign-in Cambridge City Hall November 21, 2017 2:00 to 8:00pm Preston Memorial Auditorium

More information

Windmills & Airspace Can We Work Together?

Windmills & Airspace Can We Work Together? May 29, 2008 Windmills & Airspace Can We Work Together? J. Randolph Babbitt C O N F I D E N T I A L www.oliverwyman.com Windmills & Airspace Overview of Airspace Issues For Wind Turbine Sites The FAA s

More information

Santa Cruz North Interior

Santa Cruz North Interior Santa Cruz North Interior The Santa Cruz North Interior planning area includes the area commonly referred to as the San Lorenzo Valley. The greatest amount of development occurs in the communities of Boulder

More information

A Master Plan is one of the most important documents that can be prepared by an Airport.

A Master Plan is one of the most important documents that can be prepared by an Airport. The Master Plan A Master Plan is one of the most important documents that can be prepared by an Airport. A Master Plan is a visionary and a strategic document detailing planning initiatives for the Airport

More information

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 10 Preferred Inaugural Airport Concept 10.0 Introduction The Preferred Inaugural Airport Concept for SSA was developed by adding the preferred support/ancillary facilities selected in Section 9

More information

Sam Imperati Facilitator

Sam Imperati Facilitator Sam Imperati Facilitator 1 Introductions 1) Facilitator Introduction a) Name b) Occupation c) Role 2) Chair and Member Introductions: a) Name b) Affiliations c) Occupation 3) Project Team Introductions:

More information

Rockin River Ranch State Park

Rockin River Ranch State Park Rockin River Ranch State Park Public Meeting No. 3 August 16 th, 2017 Arizona State Parks and Trails (ASPT) Welcome Executive Director Sue Black Park budget = $4 million Balance of recreation uses, environment,

More information

Memorandum. Federal Aviation Administration. Date: June 19, Richard Doucette, Environmental Protection Specialist. From: To:

Memorandum. Federal Aviation Administration. Date: June 19, Richard Doucette, Environmental Protection Specialist. From: To: Federal Aviation Administration Memorandum Date: June 19, 2008 From: To: Subject: Richard Doucette, Environmental Protection Specialist LaVerne Reid, Airports Division Manager John Donnelly, Regional Counsel

More information

Airport Planning Area

Airport Planning Area PLANNING AREA POLICIES l AIRPORT Airport Planning Area LOCATION AND CONTEXT The Airport Planning Area ( Airport area ) is a key part of Boise s economy and transportation network; it features a multi-purpose

More information

Comparison Between Old and New ALUC Plans

Comparison Between Old and New ALUC Plans A P P E N I X H Comparison Between Old and New ALUC Plans OVERVIEW This Placer County Airport Land Use Compatibility Plan (ALUCP) sets forth land use compatibility criteria for the environs of Auburn Municipal,

More information

Final Environmental Impact Statement for the Merced Wild and Scenic River. Comprehensive Management Plan, Yosemite National Park, Madera and Mariposa

Final Environmental Impact Statement for the Merced Wild and Scenic River. Comprehensive Management Plan, Yosemite National Park, Madera and Mariposa This document is scheduled to be published in the Federal Register on 02/26/2014 and available online at http://federalregister.gov/a/2014-04061, and on FDsys.gov DEPARTMENT OF THE INTERIOR 4312-FF NATIONAL

More information

CHAPTER 6 NOISE EXPOSURE

CHAPTER 6 NOISE EXPOSURE CHAPTER 6 NOISE EXPOSURE FAA requires that the NEM submitted for review represent the aircraft noise exposure for the year of submittal (in this case 2008) and for a future year (2013 for OSUA). However,

More information

Santa Cruz North Interior

Santa Cruz North Interior Santa Cruz North Interior The Santa Cruz North Interior planning area includes the area commonly referred to as the San Lorenzo Valley. The greatest amount of development occurs in the communities of Boulder

More information

2 THE MASTER PLAN 23

2 THE MASTER PLAN 23 2 THE MASTER PLAN 23 THE MASTER PLAN 2.1 Purpose of the Master Plan A Master Plan provides the airport operator, the Commonwealth, State and Local Governments, the local community, aviation industries

More information

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) TDD (651)

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) TDD (651) DATE: March 27, 2012 METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN 55101 Phone (651) 602-1000 TDD (651) 291-0904 TO: Metropolitan Parks and Open Space Commission FROM: Arne Stefferud, Planning

More information

ACTION: Notice of a new task assignment for the Aviation Rulemaking Advisory Committee

ACTION: Notice of a new task assignment for the Aviation Rulemaking Advisory Committee This document is scheduled to be published in the Federal Register on 09/18/2015 and available online at http://federalregister.gov/a/2015-23433, and on FDsys.gov [4910-13] DEPARTMENT OF TRANSPORTATION

More information

Logo Department Name Agency Organization Organization Address Information 5700 North Sabino Canyon Road

Logo Department Name Agency Organization Organization Address Information 5700 North Sabino Canyon Road Logo Department Name Agency Organization Organization Address Information United States Forest Coronado National Forest 5700 North Sabino Canyon Road Department of Service Santa Catalina Ranger District

More information

January 14, Orange County Transportation Authority Attn: M2 NCCP/HCP 550 South Main Street P.O. Box Orange, CA

January 14, Orange County Transportation Authority Attn: M2 NCCP/HCP 550 South Main Street P.O. Box Orange, CA Equestrian Trails, Inc. Corral 357 P.O. Box 1026 Trabuco Canyon, CA 92678 http://saddlebackcanyonriders.com/ President: James Iacono... 714-612-1789 January 14, 2016 Orange County Transportation Authority

More information

CHAPTER 1: INTRODUCTION

CHAPTER 1: INTRODUCTION CHAPTER 1: INTRODUCTION Purpose and Scope The information presented in this report represents the study findings for the 2016 Ronan Airport Master Plan prepared for the City of Ronan and Lake County, the

More information

PROPOSED ACTION South 3000 East Salt Lake City, UT United States Department of Agriculture

PROPOSED ACTION South 3000 East Salt Lake City, UT United States Department of Agriculture United States Department of Agriculture Forest Service Uinta-Wasatch-Cache National Forest Salt Lake Ranger District 6944 South 3000 East Salt Lake City, UT 84121 801-733-2660 File Code: 1950/2300 Date:

More information

Lecture 08, 22 Sep 2003 Role Playing. Conservation Biology ECOL 406R/506R University of Arizona Fall Kevin Bonine

Lecture 08, 22 Sep 2003 Role Playing. Conservation Biology ECOL 406R/506R University of Arizona Fall Kevin Bonine Lecture 08, 22 Sep 2003 Role Playing Conservation Biology ECOL 406R/506R University of Arizona Fall 2003 Kevin Bonine 1. Role Playing Exercise 2. Exam Wed -group portion outside - ~40 minutes individual,

More information

CHAPTER FOUR RECOMMENDED NOISE COMPATIBILITY PROGRAM MEASURES

CHAPTER FOUR RECOMMENDED NOISE COMPATIBILITY PROGRAM MEASURES CHAPTER FOUR RECOMMENDED NOISE COMPATIBILITY PROGRAM MEASURES This chapter provides the detailed descriptions of the recommended Part 150 noise abatement, land use management, and program management measures

More information

Policy PL Date Issued February 10, 2014

Policy PL Date Issued February 10, 2014 Subject RENEWABLE ENERGY ON CROWN LAND Compiled by Renewable Energy Program, Biodiversity Branch Replaces Policy Directives Waterpower Site Release Crown Land Onshore Windpower Development - Crown Land

More information

NYS Snowmobile Trails Grant-in-Aid Program Trail System Prior Approval Application Packet Phase I

NYS Snowmobile Trails Grant-in-Aid Program Trail System Prior Approval Application Packet Phase I NYS Snowmobile Trails Grant-in-Aid Program Trail System Prior Approval Application Packet Phase I Application Deadline: June 30, 2010 Snowmobile Unit New York State Office of Parks, Recreation and Historic

More information

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES INTRODUCTION An Airport Master Plan provides an evalua on of the airport s avia on demand and an overview of the systema c airport development that will best meet those demands. The Master Plan establishes

More information

Bloor Street West Rezoning Application for a Temporary Use By-law Final Report

Bloor Street West Rezoning Application for a Temporary Use By-law Final Report STAFF REPORT ACTION REQUIRED 3741 3751 Bloor Street West Rezoning Application for a Temporary Use By-law Final Report Date: June 12, 2007 To: From: Wards: Reference Number: Etobicoke York Community Council

More information

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 1 - Introduction This report describes the development and analysis of concept alternatives that would accommodate

More information

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY March 19, 2018 AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY TYPE OF ITEM: Action STATEMENT OF ISSUE The Wakulla Environmental Institute (WEI) Trail is one of several trails

More information

STAFF REPORT. Airport Land Use Plan Consistency Review: Old Town Village Mixed Use Project City of Goleta. MEETING DATE: June 18, 2015 AGENDA ITEM: 5M

STAFF REPORT. Airport Land Use Plan Consistency Review: Old Town Village Mixed Use Project City of Goleta. MEETING DATE: June 18, 2015 AGENDA ITEM: 5M STAFF REPORT SUBJECT: Airport Land Use Plan Consistency Review: Old Town Village Mixed Use Project City of Goleta MEETING DATE: AGENDA ITEM: 5M STAFF CONTACT: Peter Imhof, Andrew Orfila RECOMMENDATION:

More information

Airlake Airport 2035 Long Term Comprehensive Plan (LTCP)

Airlake Airport 2035 Long Term Comprehensive Plan (LTCP) Airlake Airport 2035 Long Term Comprehensive Plan (LTCP) Public Informational Meetings August 9 & 10, 2017 Draft LTCP Overview Briefing Agenda Airport Role & Context Existing Conditions & Previous Plan

More information

1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET

1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET Report No. 3 of the Regional Council Meeting of March 28, 2013 1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET The recommends: 1. Receipt

More information

David Johnson. Tom, Attached please find the final scoping letter and figures for your review. David

David Johnson. Tom, Attached please find the final scoping letter and figures for your review. David David Johnson From: Sent: To: Cc: Subject: Attachments: David Johnson Tuesday, April 12, 2011 4:33 PM Thomas Malecek Dave Dyer; Jason Marks (jmarks@segroup.com) VWC Scoping Letter

More information

14 CFR PART 150 NOISE AND LAND USE COMPATIBILITY STUDY

14 CFR PART 150 NOISE AND LAND USE COMPATIBILITY STUDY 14 CFR PART 150 NOISE AND LAND USE COMPATIBILITY STUDY Technical Committee Meeting #3 March 7, 2018 1 Agenda Introductions Review of the Role of the TC Meeting Facilitator Review of Prior TC Meetings Public

More information

BACKCOUNTRY TRAIL FLOOD REHABILITATION PROGRAM

BACKCOUNTRY TRAIL FLOOD REHABILITATION PROGRAM BACKCOUNTRY TRAIL FLOOD REHABILITATION PROGRAM Backcountry Trail Flood Rehabilitation A June 2013 Flood Recovery Program Summary In June 2013, parts of Southern Alberta were devastated from significant

More information

Section 3.6 Recreation

Section 3.6 Recreation 3.6 RECREATION This section evaluates the potential impacts of the proposed project on recreation within MTRP. The evaluation is based on field observations, a review of maps of MTRP and the MTRP Master

More information

Chapter 1 Introduction and Project Overview

Chapter 1 Introduction and Project Overview Chapter 1 Introduction and Project Overview Kittitas County in cooperation with the Federal Aviation Administration (FAA) is updating the Airport Master Plan for Bowers Field Airport (FAA airport identifier

More information

Wilderness Areas Designated by the White Pine County bill

Wilderness Areas Designated by the White Pine County bill Wilderness Areas Designated by the White Pine County bill SEC. 321. SHORT TITLE. This subtitle may be cited as the `Pam White Wilderness Act of 2006'. SEC. 322. FINDINGS. Congress finds that-- The White

More information

PBN/TF/7 DRAFT Appendix D to the Report D-1

PBN/TF/7 DRAFT Appendix D to the Report D-1 DRAFT STATUS OF IMPLEMENTATION TASKS LIST PBN Task Force C4/1 The APAC PBN TF encourages States to consider the GO Team visit. On-going. States are encouraged to consider the GO Team visit as required.

More information

1803 West Hwy 160 Monte Vista, CO (719) TTY (719)

1803 West Hwy 160 Monte Vista, CO (719) TTY (719) USDA Forest Service Rio Grande National Forest http://www.fs.fed.us/r2/riogrande 1803 West Hwy 160 Monte Vista, CO 81144 (719)852-5941 TTY (719)852-6271 USDI Bureau of Land Management San Luis Valley Center

More information

Burke Lakefront Airport (BKL) Master Plan Update

Burke Lakefront Airport (BKL) Master Plan Update Burke Lakefront Airport () Master Plan Update Public Workshop August 2, 2007 City of Cleveland Department of Port Control (DPC) City of Cleveland DPC Studies Currently In Progress Market Assessment & Feasibility

More information

FLIGHT OPERATIONS PANEL (FLTOPSP)

FLIGHT OPERATIONS PANEL (FLTOPSP) International Civil Aviation Organization FLTOPSP/1-WP/3 7/10/14 WORKING PAPER FLIGHT OPERATIONS PANEL (FLTOPSP) FIRST MEETING Montréal, 27 to 31 October 2014 Agenda Item 4: Active work programme items

More information

A21 TONBRIDGE TO PEMBURY DUALLING. Statement of Case

A21 TONBRIDGE TO PEMBURY DUALLING. Statement of Case A21 TONBRIDGE TO PEMBURY DUALLING Statement of Case In Respect of Applications for the Demolition of Listed Buildings Under the Provisions of the Planning (Listed Buildings and Conservation Areas) Act

More information

Restoration Advisory Board Rule Handbook

Restoration Advisory Board Rule Handbook wreath Text stars Restoration Advisory Board Rule Handbook Office of the Secretary of Defense March 2007 Page intentionally left blank. RAB Rule Handbook Executive Summary The Department of Defense (DoD)

More information

UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT MANUAL TRANSMITTAL SHEET

UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT MANUAL TRANSMITTAL SHEET Form 1221-2 (June 1969) UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT MANUAL TRANSMITTAL SHEET Release 8-83 Date Subject 8353 Trail Management Areas Secretarially Designated (Public)

More information

Concept Curtin Precinct Map and Code

Concept Curtin Precinct Map and Code Concept Curtin Precinct Map and Code Proposed changes from the revised Curtin Group Centre Draft Master Plan recommendations Disclaimer: This document is intended to show the proposed changes to the existing

More information

Alternative 3 Prohibit Road Construction, Reconstruction, and Timber Harvest Except for Stewardship Purposes B Within Inventoried Roadless Areas

Alternative 3 Prohibit Road Construction, Reconstruction, and Timber Harvest Except for Stewardship Purposes B Within Inventoried Roadless Areas Roadless Area Conservation FEIS Summary Table S-1. Comparison of Key Characteristics and Effects by Prohibition Alternative. The effects summarized in this table A would occur in inventoried roadless areas

More information

SUMMER VILLAGE OF SILVER SANDS. Municipal Development Plan

SUMMER VILLAGE OF SILVER SANDS. Municipal Development Plan SUMMER VILLAGE OF SILVER SANDS Municipal Development Plan Bylaw 253-2014 Adopted August 22, 2014 Summer Village of Silver Sands Municipal Development Plan Bylaw No. 253-2014 Page 2 1 INTRODUCTION 1.1 SETTING

More information

FEDERAL HIGHWAY ADMINISTRATION NEVADA DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL IMPACT STATEMENT RE-EVALUATION

FEDERAL HIGHWAY ADMINISTRATION NEVADA DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL IMPACT STATEMENT RE-EVALUATION FEDERAL HIGHWAY ADMINISTRATION NEVADA DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL IMPACT STATEMENT RE-EVALUATION Project Name: Boulder City/US 93 Corridor Study (Boulder City Bypass) Project Location: The

More information

AGENCY SCOPING MEETING

AGENCY SCOPING MEETING AGENCY SCOPING MEETING Environmental Impact Statement (EIS) Conducted for the Friedman Memorial Replacement Airport in the Wood River Region of South Central Idaho December 4, 2007 1:00 p.m. 4:00 p.m.

More information

Proposed Action. Payette National Forest Over-Snow Grooming in Valley, Adams and Idaho Counties. United States Department of Agriculture

Proposed Action. Payette National Forest Over-Snow Grooming in Valley, Adams and Idaho Counties. United States Department of Agriculture United States Department of Agriculture Forest Service January 2012 Proposed Action Payette National Forest Over-Snow Grooming in Valley, Adams and Idaho Counties Payette National Forest Valley, Adams

More information

Pacific Northwest National Scenic Trail. USDA-Forest Service Pacific Northwest and Northern Regions April 2014

Pacific Northwest National Scenic Trail. USDA-Forest Service Pacific Northwest and Northern Regions April 2014 Pacific Northwest National Scenic Trail USDA-Forest Service Pacific Northwest and Northern Regions April 2014 Today s trip 1. What is a National Scenic Trail 2. About the Pacific Northwest Trail 3. Planning

More information

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point : Gen

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point : Gen Page 1 of 8 1. INTRODUCTION 1.1. This material has been prepared to provide step-by-step guidance on the application of performance-based navigation (PBN) in developing an Airspace Change Proposal (ACP).

More information

This is an electronic copy. Format and font may vary from the official version. Attachments may not appear. BEFORE THE PUBLIC UTILITY COMMISSION

This is an electronic copy. Format and font may vary from the official version. Attachments may not appear. BEFORE THE PUBLIC UTILITY COMMISSION ENTERED FEB 28 2003 This is an electronic copy. Format and font may vary from the official version. Attachments may not appear. BEFORE THE PUBLIC UTILITY COMMISSION OF OREGON WA 47 In the Matter of the

More information

Airport Land Use Compatibility Plan (ALUCP) Update. Public Information Meeting #4 June 8 & 9, 2016

Airport Land Use Compatibility Plan (ALUCP) Update. Public Information Meeting #4 June 8 & 9, 2016 Airport Land Use Compatibility Plan (ALUCP) Update Public Information Meeting #4 June 8 & 9, 2016 Agenda 1. Study Process 2. Noise Complaint Patterns 3. Proposed Overflight Areas (AOA) 4. Proposed Land

More information

Final General Management Plan/Wilderness Study/Environmental Impact Statement:

Final General Management Plan/Wilderness Study/Environmental Impact Statement: This document is scheduled to be published in the Federal Register on 03/11/2016 and available online at http://federalregister.gov/a/2016-05542, and on FDsys.gov DEPARTMENT OF THE INTERIOR 4312-FF National

More information

STAFF REPORT. Airport Land Use Consistency Determination Betteravia Plaza. MEETING DATE: January 21, 2016 AGENDA ITEM: 8D

STAFF REPORT. Airport Land Use Consistency Determination Betteravia Plaza. MEETING DATE: January 21, 2016 AGENDA ITEM: 8D STAFF REPORT SUBJECT: Airport Land Use Consistency Determination Betteravia Plaza MEETING DATE: AGENDA ITEM: 8D STAFF CONTACT: Andrew Orfila RECOMMENDATION: Adopt findings for the Betteravia Plaza project

More information

Official Journal of the European Union L 7/3

Official Journal of the European Union L 7/3 12.1.2010 Official Journal of the European Union L 7/3 COMMISSION REGULATION (EU) No 18/2010 of 8 January 2010 amending Regulation (EC) No 300/2008 of the European Parliament and of the Council as far

More information

INGHAM COUNTY TRAILS AND PARKS TASK FORCE MEETING 2

INGHAM COUNTY TRAILS AND PARKS TASK FORCE MEETING 2 INGHAM COUNTY TRAILS AND PARKS TASK FORCE MEETING 2 October 22, 2015 Mannik and Smith Group Michigan Trails & Greenways Alliance AGENDA FOR TONIGHT 1. Project Approach, Process and Timeframe 2. Public

More information

Rogue River Access and Management Plan Draft Alternatives

Rogue River Access and Management Plan Draft Alternatives Rogue River Access and Management Plan Draft Alternatives The Rogue River Access and Management Plan was initiated in December, 2011 and is being led by Jackson County Parks (JCP) and Oregon Department

More information

RUSHMORE CONNECTOR TRAIL PROPOSAL

RUSHMORE CONNECTOR TRAIL PROPOSAL PURPOSE AND NEED Background The U.S. Forest Service, Black Hills National Forest (Forest Service) has received a special use permit application from the State of South Dakota Department of Game, Fish and

More information

MESA COUNTY DEPARTMENT OF PUBLIC WORKS Administration - Building - Engineering Road and Bridge Traffic - Planning - Solid Waste Management

MESA COUNTY DEPARTMENT OF PUBLIC WORKS Administration - Building - Engineering Road and Bridge Traffic - Planning - Solid Waste Management MESA COUNTY DEPARTMENT OF PUBLIC WORKS Administration - Building - Engineering Road and Bridge Traffic - Planning - Solid Waste Management 200 S. Spruce St. P.O. Box 20,000 Grand Junction, Colorado 81502-5022

More information