1 Chapter 7 Planning and implementation of transportation enhancements and diversifying modes of transportation will become increasingly critical to the continued economic development, quality of life, and vitality of Beckley. Enhancement of the City s existing major thoroughfares is also a critical issue. Element How people and goods move into, through, and out of a community today and in the future is very important in any comprehensive master plan. Planning and implementation of transportation enhancements and diversifying modes of transportation will become increasingly critical to the continued economic development, quality of life, and vitality of Beckley. improvements have been significant over the course of the past several decades and will remain a significant need for Beckley in the next 20 years. The Beckley Comprehensive Plan, prepared in 1962 by Michael Baker, indicated the greatest traffic volumes in the City on Route 16, with a maximum volume of just over 14,000 vehicles per day. Traffic volume for the same route is estimated to reach between 40,000 and 60,000 vehicles daily by the year There are several transportation improvements which will have a very significant impact on the way people move into, through, and out of the City. These include the Coalfields Expressway, the Crosstown Connector, the East Beckley Bypass, and the proposed bike trail. They will also create major new opportunities for new development areas which the City should guide and capitalize on as a means of improving economic vitality and increasing the availability of a diverse housing stock. Enhancement of the City s existing major thoroughfares is also a critical issue discussed below. A new public transportation system is also discussed as a means of connecting the City s residents to new employment opportunities. Summary of City Multi-Modal Plan The Beckley/Raleigh County Multi-Modal Plan, completed in 1998 and adopted in early 2000, was undertaken to address the critical transportation issues that have arisen since the prior Plan for Raleigh County was originally completed in The planning team consisted of a Technical Coordinating Committee, Citizens Involvement Advisory Task Force, representatives of the Planning Division of the West Virginia Department of, and a consultant. The Multi- Modal Plan is intended to be used as a tool to aid in transportation decision-making regarding specific projects and to assist in guiding the overall development of the City and County for the next 25 years. Existing Modes The City of Beckley is located within 500 miles of half of the U.S. population, 12 of the nation s top retail markets, and 22% of the top industrial markets. For these reasons, the transportation system in and surrounding Beckley is very important, and is considered one of its greatest strengths. The existing transportation network in Beckley consists of two interstate highways, a federal route, numerous state routes, a CSX rail line, and the Raleigh County Memorial Airport. This network provides the City direct linkage to State, national, and world markets. Interstate Linkages Two major interstate highways in proximity to the City of Beckley include: I-77 (West Virginia Turnpike), which opened in 1958, is a north-south highway located along the western edge of the City. The interchange for Beckley, which is located at West Virginia (WV) Route 3 (Harper Road), provides access to the City on the east and to Raleigh County to the west. Two other interchanges located nearby include the following: At WV Route 16 in Mabscott, located along the southwest border of Beckley Page 79

2 Chapter 7 At Corridor L (US 19), located north of the City I-64, which opened in 1987, located south of Beckley is primarily an east-west route which turns south at US 19 and ends at its interchange with I-77. Another interchange is located east of Beckley at Airport Road, providing access to the Raleigh County Memorial Airport. U.S. Highways US 19 is the next major route located in Beckley. The interchange of US 19 with I-64 provides primary access to the east side of the City (also known as N. Eisenhower Drive), ending at Corridor L, north of Beckley. Corridor L is the northern route of US 19 and a major intrastate route that provides connection to I-79 northeast of Charleston and on to Virginia. South of Beckley, US 19 connects to the southern states. State Routes There are four state routes which travel through Beckley: WV Route 16, WV Route 3, WV Route 41, and WV Route 210. WV Route 16 (Robert C. Byrd Drive) follows a north-south route through the center of Beckley, joining with US 19 in the northern portion of the City. This route through the City is a 4/5 lane road except for a short three-lane portion north of WV Route 3. WV Route 3 (Harper Road) is one of the few east-west routes through Beckley. East of I-77, WV Route 3 is known as Harper Road, changing to 2 nd Street in Downtown, Fayette Street in the southeast portion of the City, and Ritter Road in the County. WV Route 41 travels through the City, overlaps US 19 for a short distance, and turns northeast along Stanaford Road into the County. WV Route 210 (Kanawha Street) is a short route through the City connecting WV Route 16 northeast of the Downtown area with US 19 via Eisenhower Drive. Other Major Roads Utilized in Beckley Two other roads were identified by the Multi-Modal Plan as major routes through Beckley. The Maxwell Hill Road/Rural Acres Drive connects northwest Beckley with the US 19/WV Route 41 intersection. Ragland Road connects US 19/WV Route 16 to WV Route 41. Railroad CSX owns and operates the active rail line located along the southern portion of the City following the Piney and Big Whitestick Creeks. Airport The Raleigh County Memorial Airport opened in 1952 and is considered one of the nicest airports in the State and a major gateway into Beckley and southern West Virginia. This airport is located on 3,000 acres approximately 1.5 miles from I-64 and 3 miles from the I-64/I-77 interchange and 3.5 miles east of Beckley. The Airport has the third longest runway in West Virginia, with the primary runway 6,750 feet in length and the crosswind runway 5,000 feet in length, both with pilotactivated lighting. One runway is 150 feet wide and the other is 100 feet wide, with parallel taxiways. Since the Airport does not have a control tower, approaching aircraft are handled via the Charleston approach control radar. The Airport s main terminal and restaurant accommodates passenger (commercial and corporate) service. Commercial passenger... transportation improvements which will have a very significant impact... include the Coalfields Expressway, the Crosstown Connector, the East Beckley Bypass, and the proposed bike trail. They will also create major new opportunities for new development areas... Page 80 P

3 Chapter 7 Future Network Map Page 81

4 Chapter 7 This page left intentionally blank. Page 82 P

5 Chapter 7 Special care should be given to assure an attractive arrival experience for visitors arriving at the airport and traveling into Beckley. service is provided by US Air Express (operated by Colgan Air, Inc.), which offers seven commercial flights to Washington s Dulles Airport each week. Corporate charter service is also available, and, as of June 1999, a charter helicopter service is offered. The fixed base operator provides major/ minor aircraft repair and maintenance in addition to fuel. The Airport is able to accommodate 60 aircraft (general and corporate jets) in 20 T-hangars and seven corporate hangars. Car rental is available, and limousine rental became available in Freight (UPS and Federal Express) and cargo aircraft also utilize the Raleigh County Memorial Airport. The Raleigh County Airport Industrial Park and Research Center is a 218-acre industrial park adjacent to the Airport, with approximately 40 acres open for development. Another 278 acres of undeveloped land is available for future industrial use or another industrial park. Special care should be given to assure an attractive arrival experience for visitors arriving at the airport and traveling into Beckley. Significant Areas of Traffic Congestion and Short-term Solutions The Multi-Modal Plan identified several key areas where traffic congestion occurs on a routine basis. In addition, it offered short term operational and minor roadway improvements to improve capacity and safety until major improvements can address the overcapacity volume of roadway use. The three major areas of congestion identified were: Eisenhower Drive (US 19) at the intersection with Stanaford Road (WV Route 41), and extending south through The Raliegh County Memorial Airport represents a significant transporation asset Page 83

6 Chapter 7 Beaver. Recommended operational and minor roadway improvements include: 1) Conduct an access management study to plan for improvements to existing capacity and safety in the two-and threelane sections; and 2) Analyze the traffic signal operations between WV Route 3 and the WV Route 41 Stanaford Road intersection to ensure that the phasing, timing, and detector placements are resulting in the most efficient possible operation, even though the road intersections are too far apart for coordinated timing to be practical at this time. Harper Road (WV Route 3) from I-77 into Downtown Beckley. Recommended operational and minor roadway improvements include: 1) Improved traffic signal operation and coordination; 2) Widening and/or restriping existing twolane sections to three lanes wherever practical to minimize the interference, delays and hazards caused by left-turn movements; 3) Access management where feasible to reduce side friction resulting from, in some cases, almost continuous property access rather than specific driveways; and 4) General upgrading of signing and striping at intersections. The section of the Robert C. Byrd Drive (WV Route 16) from Harper Road (WV Route 3) north to Kanawha Street (WV Route 210) in the unincorporated area of Sprague. Two basic operational recommendations for minor roadway improvements include: 1) Coordinate all traffic signals less than one-half mile apart into multiple timing program systems; and 2) Upgrade signal operation so that lower volume side streets and minor movements are actuated and that phasing, timing, and detector placement are reviewed to assure the most efficient operation. In addition, it was recommended that an access management study be conducted and plan developed to improve safety and reduce friction where access driveways already exist, and to protect the access in less developed areas. The potential long-term economic impact of these projects is very significant for the City of Beckley and includes opening new areas for development with greatly enhanced access to the Interstate Highway system. Harper Road has significant congestion problems Page 84 P

7 Chapter 7 Projected 2020 Traffic Volumes on Routes Preferred in Multi-Modal Plan Page 85

8 Chapter 7 Proposed Major Improvement Projects The primary recommendations of the Multi-Modal Plan (1998) for major transportation improvements are indicated in the preceding Future Network map and include the following: Construct a limited access, four lane East Beckley Bypass to be located east of Eisenhower Drive (US 19) extending from Corridor L on the north end to Eisenhower Drive on the south end, just south of the Pinecrest Business Park (recommended speed of 50 m.p.h. with access points limited to the existing US Route 19/I-64 interchange, the Cross Town Connector, Stanaford Road-Ragland Road, and Corridor L); Construct an East Beckley Bypass Extension that will connect US 19 south of Beaver at Airport Road to the I-64/US 19 interchange; Construct a Cross-Town Connector that will run parallel to WV Route 3 from Harper Road to the proposed east end of the East Beckley Bypass (recommended speed of 35 m.p.h. parkway with few intersections and no private property access between intersections). The Cross-Town Connector should include generous amounts of open space and recreational uses such as walking trails and bike paths. This could be accomplished through a combination of setback requirements and open space dedication requirements for developers; Construct a Route 3 Connector to extend from the Coalfields Expressway to WV Route 3 near Tamarack and to the end of the Cross-Town Connector; Widen US 19 from the Bypass Extension to the divergence of WV Route 3 and US 19 in Shady Spring; Widen Harper Road (WV Route 3) at the interchange with I-77 (West Virginia Turnpike); and Improve the intersection of Eisenhower Drive (US 19) and Stanaford Road (WV Route 41) by constructing additional lanes and improving the signal system. If the preferred improvements to the roadways in Beckley take place, the 1998 Multi-Modal Plan projected 2020 traffic volumes as are shown on the following map. Two decisions that have been made recently (and are not shown on the traffic volume map) are: to have the Coalfields Expressway intersect I-77 at the I-77/I-64 junction; and to widen I-77 rather than construct the WV Route 3 Connector which would have extended the Cross Town Connector from the Tamarack area of Harper Road to Sophia. It is thought the proposed Coalfields Expressway connection to the I-64/I-77 junction will provide some relief to WV Route 16 into Beckley, as motorists attempting to reach destinations in north Beckley areas will have the option of using the East Beckley Bypass or the widened I-77 link to the Cross Town Connector. The potential long-term economic impact of these projects is very significant for the City of Beckley and includes opening new areas for development with greatly enhanced access to the Interstate Highway system. The Cross-Town Connector will help create an important high-end residential development opportunity which could attract a more economically diverse population into the City limits. The following chapter includes a more detailed discussion of housing conditions currently found in the City of Beckely. Chapter 9 makes specific development recommendations with regard to the Cross-Town Connector. Many feel the construction of the Coalfields Expressway is the only viable solution to the economic problems of Southern West Virginia. Page 86 P

9 Coalfields Expressway The Coalfields Expressway is the proposed highway that will link I-64/77 in Beckley, West Virginia with US 23 in Pound, Virginia. The Intermodal Surface Efficiency Act (ISTEA) identified the Coalfields Expressway as a congestion relief project and the National Highway System Designation Act (NHSDA) identified it as a Congressional High Priority Corridor, including it on the National Highway System. The preferred alternative chosen will follow WV Route 16 through Raleigh and Wyoming Counties and WV Route 83 in McDowell County. In 1996, the West Virginia Legislature formed the Coalfields Expressway Authority and appointed an executive director in This public corporation s main purpose is to act as an advisory board for the highway, advocating the highway s construction, and promoting economic development associated with the development of this roadway. Many feel the construction of the Coalfields Expressway is the only Chapter 7 viable solution to the economic problems of Southern West Virginia which have lost coal-related jobs. The West Virginia Department of designated the Coalfields Expressway as US 121 in May The 61-mile Expressway is planned to be a four-lane partially-controlled access highway with at-grade intersections. Presently, construction is anticipated to begin in Spring 2000, taking approximately ten years to complete. The estimated cost of the expressway is approximately $1.2 billion with West Virginia s 20% share of the amount coming from gasoline taxes and road construction bonds that the Legislature and West Virginia voters have approved. In 1998, Congress passed the Efficiency Act for the 21 st Century (TEA 21) which earmarked an additional $22.7 million to the highway, and an original $50 million appropriated by the Federal government in 1991 is available for use. A total of $100 million is available to date. Figure 7-2 Coalfields Expressway Alighment Page 87

10 Chapter 7 The Appalachian Regional Commission (ARC), established by Congress in 1965, oversees the Appalachian Development Highway System (ADHS). The ADHS is a 3,440 mile network of highways that provide transportation access to the Appalachian Region, which includes all of West Virginia and portions of 12 states from Mississippi to New York. The purpose of this system is to foster and promote the economic and social development of the Appalachian Region. To date, 26 corridors are 75% complete. Due to funding and economic development issues, efforts are currently underway to incorporate the Coalfields Expressway into the Appalachian Development Highway System (ADHS). Once a part of the system, the Coalfields Expressway must then be constructed to Appalachian Highway Development Standards. The Coalfields Expressway Authority has endorsed a preferred route which begins at two locations in Raleigh County, south of Beckley. One access point to the Coalfields Expressway is at the intersection of I-64 with I-77, south of Beckley, which travels southwest toward another access point at WV Route 16 (Robert C. Byrd Highway) near Sophia. The route then continues southwesterly through Wyoming and McDowell Counties, ending west of SR 83 in Buchanan County, Virginia. The Coalfields Expressway route will intersect with the King Coal Highway in McDowell County. An industrial park is proposed at this location, and efforts are currently underway to promote the area as a potential site for a federal prison. Another industrial park is already under construction approximately two miles to the east in Wyoming County. The area along the Coalfields Expressway offers prime opportunity for economic development for all counties, and Beckley should take advantage of its proximity to the City. An excellent location for commercial/ industrial development will be the area between the Coalfields Expressway intersections with I-77/I-64 and WV Route 16, south of Beckley. If the City acts now and partners with the various economic development agencies in addition to the Coalfields Expressway Authority, this area could be marketed and development could begin in conjunction with the construction of the expressway. Research on development that occurs along a major roadway have been conducted by the Appalachian Regional Commission. The Appalachian Development Highways Economic Impact Studies was prepared in 1998 to examine the economic impact of twelve completed ADHS corridors on the Region s economy. The results showed that the ADHS provides opportunity for people in this area, especially the rural areas: By 1995, an estimated net increase of 16,000 jobs have been created which would not have existed without completed portions of the ADHS. The ADHS has made the Regional a better place to invest, live, and work; In 1995, a net increase in value added to the Region was $1 billion and is anticipated to increase to $2.9 billion by the year 2015; Economic opportunity has expanded because the Region is more efficient and easily accessible; and Users and nonusers of the highway system have benefitted from the creation of new and better paying jobs. Approximately 54 percent of the demand for transit is currently met in the County. Page 88 P

11 Chapter 7 As the population of Beckley ages, the number of people needing an alternative form of transportation, other than their automobile, will rise. When developing a mass transit system, transit services should be designed to accommodate... disadvantaged riders. Bike Since bicycles are permitted on state roads, the West Virginia Department of has installed several Share the Road signs along existing roadways, making them accessible for bicycle use. The State is also in the process of developing a statewide trail system. Through the efforts of a Bicycle Facilities Subcommittee and the West Virginia Department of, a Bicycle Plan was developed in the Multi-Modal Plan to serve the major points of interest and traffic generators in Beckley. The Bicycle Plan proposes development of a trail along a 6.4 mile length of CSX rail line where service will soon be abandoned. This line begins in the Mabscott area south of Beckley and will proceed through the central portion of the City, serving the Downtown area. The trail will then move eastward to the Eisenhower Avenue/shopping center area, turning north and then northwestwardly to the Cranberry and Prosperity areas. The trail will come close to the Woodrow Wilson High School on Stanaford Road and could serve as a trunk line for students to use in combination with an improved Stanaford Road. This would enable students to ride bicycles to school rather than drive their cars which add to the existing congestion of the area. Once the rail has been abandoned, it will be necessary for the City of Beckley and/or the State to acquire the rail right-of-way to ensure trail development. Two other opportunities exist for the development of bicycle trails; within the rights-of-way of the proposed East Beckley Bypass and the Cross Town Connector. These two proposed paths could also connect with the CSX right-of-way providing bicyclists with the opportunity to reach other areas of the City. Funding sources for the development of a bicycle trail system are available through the Federal-Aid Highway Program, Federal Transit Program, Highway Safety Programs, and Federal/State Matching Requirements. Transit Plan The City of Beckley does not provide residents with a public transit system. The Beckley Transit Feasibility Study Update (1995) was commissioned by the State of West Virginia Public Division and the City of Beckley. The Study identified three transit needs for the City, which include: Service development for disadvantaged citizens. Congestion management for Beckley and Raleigh County. Services which support economic development goals of the community. The estimated transit demand for Raleigh County was approximately 741,584 trips per year. Of this total, the transit need for Beckley was approximately 202,750 trips. The Study indicates that existing transportation services available in Beckley and Raleigh County represent approximately 400,000 trips per year. Based on the demand estimation calculations performed in the Study, approximately 54% of the demand for transit is currently met in the County. Some of the transit demand needs of Beckley residents is satisfied by social service providers (agencies, hospitals, and churches) and the County s taxi service. The Raleigh County Community Action Association offers public transportation services to seniors, the handicapped, and the general public throughout the County. Transit services operate on Monday through Friday, from 7:30 A.M. to 5 P.M. on designated routes in Page 89

12 Chapter 7 the City of Beckley and the County. A Dial-a-Ride van service anywhere in Beckley and surrounding areas is also available on a daily basis between 7:30 A.M. and 3:30 p.m., although the service requires 24-hour notice. Round-trip fares for both services within the City are $3; outside the City, $4, with $1 added for each additional stop. One-way trips are available for half the price of a round trip. Special arrangements can be made for transportation outside Raleigh County, and the buses are sometimes made available for charter to such places as Charleston or the state fair. When the Multi-Modal Study began, a two-bus pilot project was underway; however, this project was discontinued following an unfavorable levy vote by residents in Despite this outcome, it is imperative for the City and County to work together to develop some type of mass transportation system for the elderly, disabled, and low-income population on a regular basis. As the population of Beckley ages, the number of people needing an alternative form of transportation, other than their automobile, will rise. Based on this information, the Study identified several criteria which must be met by a transit system that will service the City of Beckley: The transit system must target the East Beckley, East Park, and South Beckley neighborhoods. The majority of the disadvantaged population live in these areas. In order to capture frequent trip destinations to public and government offices and health care facilities, the system should also target Uptown and the North Eisenhower Drive (US 19) area. Regular service to and from the retail and service areas, where a high concentration of riders will travel, should also be provided. The system should provide options for park-and-ride services for County residents traveling to the Uptown area. This will help to reduce traffic and parking congestion. The demographic analysis conducted in the Study indicates high concentrations of elderly and low-income individuals in East Beckley, East Park, and South Beckley. Traditionally, the most frequent users of transit are the elderly, handicapped, and low income. When developing a mass transit system, transit services should be designed to accommodate the disadvantaged riders in addition to the destination of travelers. Three major issues in the development of priorities for transit service destination include: 1) the large number of health care facilities and the trips these facilities generate; 2) the retail shopping developments in the City; and 3) the traffic patterns in Downtown Beckley. Page 90 P

Airport Planning Area

Airport Planning Area PLANNING AREA POLICIES l AIRPORT Airport Planning Area LOCATION AND CONTEXT The Airport Planning Area ( Airport area ) is a key part of Boise s economy and transportation network; it features a multi-purpose

More information

Aviation, Rail, & Trucking 6-1

Aviation, Rail, & Trucking 6-1 6-1 This chapter describes the services, facilities, and condition of air, rail, and trucking as components of the transportation system. These three intermodal areas have an impact on the factors to be

More information

Non-Motorized Transportation

Non-Motorized Transportation Non-Motorized Transportation Non-motorized facilities are important components to the transportation system. They provide an environmentally-friendly, low-cost mode of travel. Some of the facilities can

More information

Current and Forecast Demand

Current and Forecast Demand Existing Facilities Jacksonville International Airport (JIA) is served by a number of airside and landside facilities. There are two runways that serve the airport in an open V configuration. The Annual

More information

Major Projects Overview

Major Projects Overview Major Projects Overview Miami-Dade Expressway Authority February 2018 About MDX MDX operates 5 roads in Miami Dade County SR 924, SR 112, SR 836, SR 874 and SR 878 MDX Primary Source of Revenue: User Fees-Tolls

More information

Blueways: Rivers, lakes, or streams with public access for recreation that includes fishing, nature observation, and opportunities for boating.

Blueways: Rivers, lakes, or streams with public access for recreation that includes fishing, nature observation, and opportunities for boating. Parks, Open Space and Trails PRINCE WILLIAM COUNTY 2008 COMPREHENSIVE PLAN TRAILS PLAN CONTENTS The components of the trails plan are: Intent Definitions Goals, Policies, and Action Strategies Trails Map

More information

Lake Erie Commerce Center Traffic Analysis

Lake Erie Commerce Center Traffic Analysis LOCATION: East of NYS Route 5 at Bayview Road Town of Hamburg Erie County, New York PREPARED BY: Wendel Companies 140 John James Audubon Parkway Suite 200 Amherst, New York 14228 January 2012 i ii Table

More information

University Region Non-Motorized Plan 2015

University Region Non-Motorized Plan 2015 Non-Motorized Transportation Non-motorized facilities are important components to the transportation system. They provide an environmentally-friendly, low-cost mode of travel. Some of the facilities can

More information

A. From I-68 in Monongalia County, West Virginia to SR 6119 in Fayette County, Pennsylvania 1

A. From I-68 in Monongalia County, West Virginia to SR 6119 in Fayette County, Pennsylvania 1 Mon-Fayette Transportation Project A. From I-68 in Monongalia County, West Virginia to SR 6119 in Fayette County, Pennsylvania 1 The Mon/Fayette Transportation Project (MFTP) from I-68 in West Virginia

More information

TERMINAL DEVELOPMENT PLAN

TERMINAL DEVELOPMENT PLAN 5.0 TERMINAL DEVELOPMENT PLAN 5.0 TERMINAL DEVELOPMENT PLAN Key points The development plan in the Master Plan includes the expansion of terminal infrastructure, creating integrated terminals for international,

More information

The Transportation Corridor Overlay District

The Transportation Corridor Overlay District The Transportation Corridor Overlay District The Transportation Corridor Overlay District is a policy framework under which certain potentially beneficial development proposals may be considered, given

More information

Other Principle Arterials Minor Arterial Major Collector Minor Collector Local

Other Principle Arterials Minor Arterial Major Collector Minor Collector Local CHAPTER 10 TRANSPORTATION Introduction The system of public roads in East Pikeland Township is decidedly rural in character. Since the 1984, the road network has remained much the same, with the addition

More information

WESTERN EL DORADO COUNTY SHORT AND LONG-RANGE TRANSIT PLAN Executive Summary

WESTERN EL DORADO COUNTY SHORT AND LONG-RANGE TRANSIT PLAN Executive Summary WESTERN EL DORADO COUNTY SHORT AND LONG-RANGE TRANSIT PLAN Executive Summary Prepared for the El Dorado County Transportation Commission Prepared by The El Dorado County Transportation Commission (EDCTC)

More information

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport Executive Summary MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport As a general aviation and commercial service airport, Fort Collins- Loveland Municipal Airport serves as an important niche

More information

2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016

2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016 2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016 Project numbers do not signify ranking they are for mapping identification purposes only. 1. 15th Street East The

More information

CHAPTER 1 EXECUTIVE SUMMARY

CHAPTER 1 EXECUTIVE SUMMARY CHAPTER 1 EXECUTIVE SUMMARY 1 1 EXECUTIVE SUMMARY INTRODUCTION William R. Fairchild International Airport (CLM) is located approximately three miles west of the city of Port Angeles, Washington. The airport

More information

FNORTHWEST ARKANSAS WESTERN BELTWAY FEASIBILITY STUDY

FNORTHWEST ARKANSAS WESTERN BELTWAY FEASIBILITY STUDY FNORTHWEST ARKANSAS WESTERN BELTWAY FEASIBILITY STUDY EXECUTIVE SUMMARY The 2030 Northwest Arkansas Regional Transportation Plan developed by the Northwest Arkansas Regional Planning Commission (NWARPC)

More information

Frequently Asked Questions on the Route 29 Solutions Improvements Projects

Frequently Asked Questions on the Route 29 Solutions Improvements Projects Frequently Asked Questions on the Route 29 Solutions Improvements Projects Background What are the Route 29 Solutions improvement projects? These projects include the Route 29/250 Interchange ( Best Buy

More information

Clackamas County Development Agency

Clackamas County Development Agency Clackamas County Development Agency Development Services Building, 150 Beavercreek Rd., Oregon City, OR 97045 www.clackamas.us/transportation/renewal 503-742-4323 The Clackamas County Board of Commissioners

More information

DRAFT GENERAL IMPLEMENTATION PLAN AND SPECIFIC IMPLEMENTATION PLAN MIDDLETON MUNICIPAL AIRPORT MOREY FIELD. Revised 12/12/03

DRAFT GENERAL IMPLEMENTATION PLAN AND SPECIFIC IMPLEMENTATION PLAN MIDDLETON MUNICIPAL AIRPORT MOREY FIELD. Revised 12/12/03 DRAFT GENERAL IMPLEMENTATION PLAN AND SPECIFIC IMPLEMENTATION PLAN MIDDLETON MUNICIPAL AIRPORT MOREY FIELD Revised 12/12/03 As recommended for approval by the Plan Commission General Project Description

More information

5.1 Traffic and Transportation

5.1 Traffic and Transportation 5.1 When it opens in 2009, the Bellevue Nickel Improvement Project will increase the number of vehicles able to travel through the study area, improve travel speeds, and improve safety by reducing the

More information

CHAPTER FOUR: TRANSPORTATION

CHAPTER FOUR: TRANSPORTATION CHAPTER FOUR: TRANSPORTATION Barron County Comprehensive Plan: Transportation Page 61 Background Transportation facilities have a significant influence on land use, development and quality of life for

More information

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES INTRODUCTION An Airport Master Plan provides an evalua on of the airport s avia on demand and an overview of the systema c airport development that will best meet those demands. The Master Plan establishes

More information

MESA COUNTY DEPARTMENT OF PUBLIC WORKS Administration - Building - Engineering Road and Bridge Traffic - Planning - Solid Waste Management

MESA COUNTY DEPARTMENT OF PUBLIC WORKS Administration - Building - Engineering Road and Bridge Traffic - Planning - Solid Waste Management MESA COUNTY DEPARTMENT OF PUBLIC WORKS Administration - Building - Engineering Road and Bridge Traffic - Planning - Solid Waste Management 200 S. Spruce St. P.O. Box 20,000 Grand Junction, Colorado 81502-5022

More information

16. Other Transportation Modes

16. Other Transportation Modes Charlotte-Douglas International Airport ranks as one of the top ten airports in the country by many metrics. 16. Other Transportation Modes The transportation needs of the residents and workers within,

More information

Vista Field Airport. Master Plan Update. February, Prepared for: Port of Kennewick One Clover Island Kennewick, Washington

Vista Field Airport. Master Plan Update. February, Prepared for: Port of Kennewick One Clover Island Kennewick, Washington Vista Field Airport February, 2006 Prepared for: Port of Kennewick One Clover Island Kennewick, Washington 99336 Prepared by: J-U-B ENGINEERS, Inc. 2810 W. Clearwater Avenue, Suite 201 Kennewick, Washington

More information

AUCKLAND $1.2 BILLION $1.9 BILLION $149 MILLION 15% SPEND $5.7 BILLION

AUCKLAND $1.2 BILLION $1.9 BILLION $149 MILLION 15% SPEND $5.7 BILLION AUCKLAND AUCKLAND $5.7 BILLION FORECAST TOTAL AUCKLAND INVESTMENT The next 10 years are expected to underline Auckland s performance as the fastest growing major city in Australasia. The city is expected

More information

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013 FREDERICK COUNTY STATE HIGHWAY ADMINISTRATION -- Frederick County -- Line 1 PROJECT: I-7, Baltimore National Pike INTERSTATE CONSTRUCTION PROGRAM DESCRIPTION: Widen I-7 east of MD 355 to east of MD 144

More information

DEVELOPMENT OF TOE MIDFIELD TERMINAL IROJECT CAPACITY ENHANCEMENT REPORT DEPARTMENT OF AVIATION TOM FOERSTER CHAIRMAN BARBARA HAFER COMMISSIONER

DEVELOPMENT OF TOE MIDFIELD TERMINAL IROJECT CAPACITY ENHANCEMENT REPORT DEPARTMENT OF AVIATION TOM FOERSTER CHAIRMAN BARBARA HAFER COMMISSIONER PETE FLAHERTY COMMISSIONER TOM FOERSTER CHAIRMAN DEPARTMENT OF AVIATION BARBARA HAFER COMMISSIONER STEPHEN A. GEORGE DIRECTOR ROOM M 134, TERMINAL BUILDING GREATER PITTSBURGH INTERNATIONAL AIRPORT PITTSBURGH,

More information

Score. Category. Access Aesthetics Community Resources

Score. Category. Access Aesthetics Community Resources NO BUILD ALTERNATIVE The No Build Alternative is the do nothing option that is used for comparison to the build alternatives. The screening assumes no new facilities are constructed as part of the I-93

More information

Chapter 2 FINDINGS & CONCLUSIONS

Chapter 2 FINDINGS & CONCLUSIONS Chapter 2 FINDINGS & CONCLUSIONS 2.01 GENERAL Dutchess County acquired the airport facility in 1947 by deed from the War Assets Administration. Following the acquisition, several individuals who pursued

More information

Business Growth (as of mid 2002)

Business Growth (as of mid 2002) Page 1 of 6 Planning FHWA > HEP > Planning > Econ Dev < Previous Contents Next > Business Growth (as of mid 2002) Data from two business directories was used to analyze the change in the number of businesses

More information

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT December 2018 Project Summary Boulder County, Colorado, in partnership with the City of Boulder, is evaluating options for multi-use

More information

2. Goals and Policies. The following are the adopted Parks and Trails Goals for Stillwater Township:

2. Goals and Policies. The following are the adopted Parks and Trails Goals for Stillwater Township: D. PARKS AND TRAILS 1. Introduction Stillwater Township s population is relatively low, with most residents living on rural residences on large lots. The need for active park space has been minimal in

More information

Westover Metropolitan Airport Master Plan Update

Westover Metropolitan Airport Master Plan Update Westover Metropolitan Airport Master Plan Update June 2008 INTRODUCTION Westover Metropolitan Airport (CEF) comprises the civilian portion of a joint-use facility located in Chicopee, Massachusetts. The

More information

FORECASTING FUTURE ACTIVITY

FORECASTING FUTURE ACTIVITY EXECUTIVE SUMMARY The Eagle County Regional Airport (EGE) is known as a gateway into the heart of the Colorado Rocky Mountains, providing access to some of the nation s top ski resort towns (Vail, Beaver

More information

Summary of Committee Discussion/Questions Metropolitan Transportation Services Senior Planner Russ Owen presented this item.

Summary of Committee Discussion/Questions Metropolitan Transportation Services Senior Planner Russ Owen presented this item. Committee Report Business Item No. 2017-191 Transportation Committee For the Metropolitan Council meeting of September 13, 2017 Subject: Final Crystal Airport 2035 Long Term Comprehensive Plan (LTCP) Proposed

More information

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by Interstate 90 and Mercer Island Mobility Study APRIL 2017 Commissioned by Prepared by Interstate 90 and Mercer Island Mobility Study Commissioned by: Sound Transit Prepared by: April 2017 Contents Section

More information

REGION OF WATERLOO INTERNATIONAL AIRPORT AIRPORT MASTER PLAN EXECUTIVE SUMMARY MARCH 2017

REGION OF WATERLOO INTERNATIONAL AIRPORT AIRPORT MASTER PLAN EXECUTIVE SUMMARY MARCH 2017 REGION OF WATERLOO INTERNATIONAL AIRPORT AIRPORT MASTER PLAN EXECUTIVE SUMMARY MARCH 2017 Contact: Chris Wood, Airport General Manager cwood@regionofwaterloo.ca (519) 648-2256 ext. 8502 Airport Master

More information

Arlington County Board Meeting Project Briefing. October 20, 2015

Arlington County Board Meeting Project Briefing. October 20, 2015 Arlington County Board Meeting Project Briefing October 20, 2015 Project Map 2 Project Context Only Interstate in the Country limited to HOV only traffic during rush hours Stoplight at the end of I-66

More information

The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands.

The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands. The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands. Connecting People Building Opportunities 198 Brisbane Airport Corporation CHAPTER 10

More information

Susan Jones Moses Susan Jones Moses and Associates Glen Weisbrod Economic Development Research Group

Susan Jones Moses Susan Jones Moses and Associates Glen Weisbrod Economic Development Research Group Susan Jones Moses Susan Jones Moses and Associates Glen Weisbrod Economic Development Research Group 2 SHRP2 C03: Interactions between Transportation Capacity, Economic Systems, and Land Use Economic Development

More information

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No.

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No. Georgetown-Lewes Rail/Trail Study Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No. 47) August 22, 2011 Presentation Outline Background Benefits Statewide

More information

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY March 19, 2018 AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY TYPE OF ITEM: Action STATEMENT OF ISSUE The Wakulla Environmental Institute (WEI) Trail is one of several trails

More information

SOUTH INTERCHANGE AREA

SOUTH INTERCHANGE AREA Santaquin City General Plan 1 Location and Characteristics The South Interchange Area of Santaquin is located west of Interstate 15 and south of 500 South (Figure 1). It includes properties already annexed

More information

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 10 Preferred Inaugural Airport Concept 10.0 Introduction The Preferred Inaugural Airport Concept for SSA was developed by adding the preferred support/ancillary facilities selected in Section 9

More information

A number of goals were identified during the initial work on this Big Lake Transportation Plan.

A number of goals were identified during the initial work on this Big Lake Transportation Plan. C. Transportation General Background Information Big Lake s transportation system includes all the roads, paths and facilities that allow the movement of private vehicles, trains and planes, as well as

More information

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications Individual HIGHWAYS Bridge - On State System SR46598 P-4 Region 4 Bridge - On System Pool CDOT Region 4 Bridge Federal National Highway Performance Program - - 956 483 719 719 2,877 State State Highway

More information

US 380 FEASIBILITY STUDY

US 380 FEASIBILITY STUDY US 380 FEASIBILITY STUDY Denton County CSJ(s): 0135-10-061, 0135-10-062 Public Meeting(s): January 15 & 22, 2019 WELCOME US 380 Denton County Feasibility Study DALLAS DISTRICT PUBLIC MEETING January 15

More information

Wellington $312 $49 $456 OVERVIEW WELLINGTON REGIONAL SUMMARY

Wellington $312 $49 $456 OVERVIEW WELLINGTON REGIONAL SUMMARY National Land Transport Programme 2015 18 Wellington WELLINGTON REGIONAL SUMMARY OVERVIEW The Wellington region is made up of a number of cities, urban areas and supporting rural hinterland. The city is

More information

Basic Project Information

Basic Project Information FY 2015-16 PROJECT DESCRIPTION FORM (2C) Submitting Agency: Loudoun County Basic Project Information Project Title: Loudoun County Parkway (VA Route 607) U.S. 50 to Creighton Rd. (2C) Project Type (check

More information

CHAPTER FOUR AIRPORT ALTERNATIVES

CHAPTER FOUR AIRPORT ALTERNATIVES 4.0 INTRODUCTION CHAPTER FOUR The goal of the master planning process is to provide the City of New Smyrna Beach with an assessment of the adequacy and capabilities of the Airport as well as to identify

More information

St. Paul Downtown Airport (STP)

St. Paul Downtown Airport (STP) Reliever Airports: NOISE ABATEMENT PLAN St. Paul Downtown Airport (STP) 1 INTRODUCTION The noise abatement plan for the St. Paul Downtown Airport (STP) was prepared in recognition of the need to make the

More information

Site Location and Setting

Site Location and Setting Memorandum Date: To: From: Subject: Kristy Le, Gary Black Steve Orem Santa Teresa County Park Historic Area Traffic and Parking Study Hexagon Transportation Consultants, Inc. has completed a traffic and

More information

Current Airport Roles

Current Airport Roles Chapter Four: Current Airport Roles Introduction Current airport roles are defined differently from national, state, and local perspectives. The Federal Aviation Administration (FAA) has established two

More information

Dulles Corridor Metrorail Project Update Dulles Area Transportation Association August 25, 2009

Dulles Corridor Metrorail Project Update Dulles Area Transportation Association August 25, 2009 Dulles Corridor Metrorail Project Update Dulles Area Transportation Association August 25, 2009 Patty Nicoson President Dulles Corridor Rail Association Proposed Toll Rate Increase on Dulles Toll Road

More information

2008 DEKALB COUNTY TRANSPORTATION PLAN (UPDATE)

2008 DEKALB COUNTY TRANSPORTATION PLAN (UPDATE) 2008 DEKALB COUNTY TRANSPORTATION PLAN (UPDATE) TABLE OF CONTENTS Introduction 1 Transportation Planning Activities 2 Identification of Problem Areas and Recommended Solutions 7 DeKalb County Projects

More information

user s guide to Transportation Improvements in Astoria Planning Efforts outside Astoria for more information, contact:

user s guide to Transportation Improvements in Astoria Planning Efforts outside Astoria for more information, contact: The Miles Crossing/ Jeffers Garden transportation plan (underway), will identify needed improvements to the Warrenton Astoria Highway and local street improvements to serve expected growth in the Miles

More information

ANCLOTE COASTAL TRAIL ALTERNATIVES ANALYSIS STUDY

ANCLOTE COASTAL TRAIL ALTERNATIVES ANALYSIS STUDY ANCLOTE COASTAL TRAIL ALTERNATIVES ANALYSIS STUDY PASCO COUNTY MPO JULY 2015 PROJECT OVERVIEW... INTRODUCTION EXECUTIVE SUMMARY CONTEXT... TAMPA BAY AREA, PINELLAS, & PASCO COUNTY S MULTI-USE TRAIL PLANS

More information

PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40

PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40 PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40 Project Description The primary purpose of this project is to improve the major

More information

Gardner: overview. Santa Fe, Oregon, and California National Historic Trails UNINCORPORATED JOHNSON COUNTY OLATHE UNINCORPORATED JOHNSON COUNTY

Gardner: overview. Santa Fe, Oregon, and California National Historic Trails UNINCORPORATED JOHNSON COUNTY OLATHE UNINCORPORATED JOHNSON COUNTY Santa Fe, Oregon, and California ational Historic Trails : overview 99: p.134 100: p.135 GARDER JUCTIO 102: p.137 56: p.126 EDGERTO Burlington orthern Intermodal and Logistics 98: p.133 101: p.136 S Waverly

More information

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012 1. Introduction The Federal Aviation Administration (FAA) recommends that airport master plans be updated every 5 years or as necessary to keep them current. The Master Plan for Joslin Field, Magic Valley

More information

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge Public Consultation Centre (PCC) No. 3 Please Sign-in Cambridge City Hall November 21, 2017 2:00 to 8:00pm Preston Memorial Auditorium

More information

TBARTA: 2015 Master Plan and Tampa Bay Express Project

TBARTA: 2015 Master Plan and Tampa Bay Express Project TBARTA: 2015 Master Plan and Tampa Bay Express Project The Real Story Who: Tampa Bay Area Regional Transportation Authority What: Develop and implement a Regional Transportation Master Plan for the seven-county

More information

SouthwestFloridaInternational Airport

SouthwestFloridaInternational Airport SouthwestFloridaInternational Airport SouthwestFloridaInternationalAirportislocatedinLee CountyalongtheGulfCoastofSouthFlorida,tenmiles southeastofthefortmyerscentralbusinessdistrict. Theprimaryhighwayaccesstotheairportfrom

More information

2016 Regional Transportation Alternatives Program (TAP) Grant Application

2016 Regional Transportation Alternatives Program (TAP) Grant Application 2016 Regional Transportation Alternatives Program (TAP) Grant Application PROJECT TITLE: Yelm-Tenino Trail Extension Feasibility Study TRPC use only GENERAL PROJECT INFORMATION Agency or Organization City

More information

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT 5.8 FUNDING TRAILS DEVELOPMENT The City has been successful in establishing dedicated local funding sources as well as applying for grants to develop the City s trail system, having received nearly $2.4

More information

B GEORGIA INFRASTRUCTURE REPORT CARD AVIATION RECOMMENDATIONS DEFINITION OF THE ISSUE. Plan and Fund for the Future:

B GEORGIA INFRASTRUCTURE REPORT CARD AVIATION RECOMMENDATIONS DEFINITION OF THE ISSUE. Plan and Fund for the Future: 2014 GEORGIA INFRASTRUCTURE REPORT CARD B + RECOMMENDATIONS Plan and Fund for the Future: While the system continues to enjoy excess capacity and increased accessibility it still needs continued focus

More information

SUPPORT THE ROUTE 58 PPTA: A Good Investment in Virginia

SUPPORT THE ROUTE 58 PPTA: A Good Investment in Virginia Project Profile: SUPPORT THE ROUTE 58 PPTA: A Good Investment in Virginia In 1989, the General Assembly established the Route 58 Corridor Development Program to enhance economic development potential across

More information

Chapter 6: POLICY AND PROCEDURE RECOMMENDATIONS

Chapter 6: POLICY AND PROCEDURE RECOMMENDATIONS Chapter 6 POLICY AND PROCEDURE RECOMMENDATIONS FOR SRRA Below are seven policy elements that should be considered for adoption by the Southwest Regional Recreation Authority of Virginia: 1. Develop strategies

More information

At the time, the portion of the line through Eagle County remains wholly under the ownership of Union Pacific Railroad (UP).

At the time, the portion of the line through Eagle County remains wholly under the ownership of Union Pacific Railroad (UP). Chapter 5 The Railroad Corridor as a Trail Corridor The intent of this chapter is to identify how the rail corridor, if available for lease or purchase in all or part, could be incorporated into the core

More information

Agenda: SASP SAC Meeting 3

Agenda: SASP SAC Meeting 3 Agenda: SASP SAC Meeting 3 Date: 04/12/18 Public Involvement Plan Update Defining the System Recommended Classifications Discussion Break Review current system Outreach what we heard Proposed changes Classification

More information

Florida Department of TRANSPORTATION. First Coast Expressway

Florida Department of TRANSPORTATION. First Coast Expressway Florida Department of TRANSPORTATION First Coast Expressway What is the (FCE)? Multi-lane, limited access toll expressway Connects I-10 in Duval County to I-95 in St. Johns County How does FCE connect

More information

CHAPTER 1: INTRODUCTION

CHAPTER 1: INTRODUCTION CHAPTER 1: INTRODUCTION Purpose and Scope The information presented in this report represents the study findings for the 2016 Ronan Airport Master Plan prepared for the City of Ronan and Lake County, the

More information

Chapter 1 Introduction

Chapter 1 Introduction Chapter 1 Introduction Introduction and Purpose The Airport Master Planning process evaluates an airport s physical facilities, establishes a forecast for future demand, and identifies a development plan

More information

LENOIR COUNTY COMPREHENSIVE TRANSPORTATION PLAN: APRIL 2018 MUNICIPAL AND COUNTY PRESENTATIONS. 2. Recommendations

LENOIR COUNTY COMPREHENSIVE TRANSPORTATION PLAN: APRIL 2018 MUNICIPAL AND COUNTY PRESENTATIONS. 2. Recommendations 2. Recommendations This chapter presents recommendations for each mode of transportation in the 2018 Lenoir County CTP as shown in Figure 1. More detailed information on each recommendation is tabulated

More information

Document prepared by MnDOT Office of Aeronautics and HNTB Corporation. MINNESOTA GO STATE AVIATION SYSTEM PLAN

Document prepared by MnDOT Office of Aeronautics and HNTB Corporation. MINNESOTA GO STATE AVIATION SYSTEM PLAN LAST UPDATE JULY 2013 Acknowledgements The preparation of this document was financed in part by a grant from the Federal Aviation Administration (Project No: 3-27-0000-07-10), with the financial support

More information

Greater Orlando Aviation Authority

Greater Orlando Aviation Authority Greater Orlando Aviation Authority Orlando International Airport & Orlando Executive Airport Budgets Fiscal Year 2017-2018 Greater Orlando Aviation Authority Orlando, Florida Greater Orlando Aviation Authority

More information

CHAPTER 4: ALTERNATIVES

CHAPTER 4: ALTERNATIVES MSP Long Term Comprehensive Plan Update Metropolitan Airports Commission 4.1 INTRODUCTION CHAPTER 4: ALTERNATIVES Several alternatives were developed and evaluated based on their capability to meet the

More information

U.S. 33 Ravenswood Connector

U.S. 33 Ravenswood Connector U.S. 33 Ravenswood Connector Project History When I-77 was planned to pass less than five miles east of Ravenswood, West Virginia in Jackson County, officials began taking steps to acquire an Ohio River

More information

McLean Citizens Association Transportation Committee Project Briefing

McLean Citizens Association Transportation Committee Project Briefing McLean Citizens Association Transportation Committee Project Briefing November 10, 2015 Project Map 2 Project Context Only Interstate in the Country limited to HOV only traffic during rush hours Stoplight

More information

Union Square. & Park Place. Project Summary Submitted by DeHoff Development Company

Union Square. & Park Place. Project Summary Submitted by DeHoff Development Company Union Square & Park Place Submitted by DeHoff Development Company December 18, 2012 encompass a 250-acre, mixed-use corporate campus that includes office, hotel, retail and residential components. The

More information

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content Gold Coast Rapid Transit Chapter twelve Social impact Chapter content Social impact assessment process...235 Existing community profile...237 Consultation...238 Social impacts and mitigation strategies...239

More information

Southwest LRT Alignment Video Narration

Southwest LRT Alignment Video Narration Southwest LRT Alignment Video Narration September 2015 Southwest Light Rail Transit, a proposed extension of the METRO Green Line, will serve Minneapolis, St. Louis Park, Hopkins, Minnetonka and Eden Prairie.

More information

Chapter 4.0 Alternatives Analysis

Chapter 4.0 Alternatives Analysis Chapter 4.0 Alternatives Analysis Chapter 1 accumulated the baseline of existing airport data, Chapter 2 presented the outlook for the future in terms of operational activity, Chapter 3 defined the facilities

More information

Transportation Supporting Dulles Airport

Transportation Supporting Dulles Airport Transportation Supporting Dulles Airport Committee for Dulles Economic Development and Transportation Committee July 12, 2018 Tom Biesiadny, Director Fairfax County Multiple Transportation Improvements

More information

COMMERCIAL AND GENERAL AVIATION

COMMERCIAL AND GENERAL AVIATION Existing Facilities Daytona Beach International Airport is served by a number of airside and landside facilities. The airport has three asphalt runways: Runway 07L/25R (10,500 feet long by 150 feet wide),

More information

LAX Specific Plan Amendment Study (SPAS) Final EIR and Related Actions. Board of Airport Commissioners February 5, 2013

LAX Specific Plan Amendment Study (SPAS) Final EIR and Related Actions. Board of Airport Commissioners February 5, 2013 LAX Specific Plan Amendment Study (SPAS) Final EIR and Related Actions Board of Airport Commissioners February 5, 2013 1 Background The LAX Master Plan Program serves as the airport s long range development

More information

The San Diego Region s Air Transportation Future

The San Diego Region s Air Transportation Future The San Diego Region s Air Transportation Future June 22, 2006 1 Ryan N. Hall, Airport System Planner II San Diego County Regional Airport Authority Presentation Overview 1. The law 2. The ballot measure

More information

SECTION 5 ALTERNATIVE DEVELOPMENT CONCEPT ANALYSES

SECTION 5 ALTERNATIVE DEVELOPMENT CONCEPT ANALYSES SECTION 5 ALTERNATIVE DEVELOPMENT CONCEPT ANALYSES 5.1 INTRODUCTION This section investigates Airfield Development Alternatives, generalized Land Use Alternatives, and more detailed General Aviation Alternatives.

More information

1.2 Corridor History and Current Characteristics

1.2 Corridor History and Current Characteristics SECTION 1 Description and Background of Study Area 1.1 Introduction This preliminary engineering report was prepared for the Alaska Department of Transportation and Public Facilities (ADOT&PF). It is part

More information

TRAFFIC IMPACT STUDY REPORT FOR PROPOSED OFFICE PROJECT AT 959 SEWARD STREET IN HOLLYWOOD SNYDER PARTNERS

TRAFFIC IMPACT STUDY REPORT FOR PROPOSED OFFICE PROJECT AT 959 SEWARD STREET IN HOLLYWOOD SNYDER PARTNERS DRAFT TRAFFIC IMPACT STUDY REPORT FOR PROPOSED OFFICE PROJECT AT 959 SEWARD STREET IN HOLLYWOOD Prepared for: SNYDER PARTNERS Prepared by: Crain & Associates 2007 Sawtelle Boulevard, Suite 4 Los Angeles,

More information

State Route 8 Corridor. Northern Summit County s Path to Success

State Route 8 Corridor. Northern Summit County s Path to Success State Route 8 Corridor Northern Summit County s Path to Success Construction Guide: 2008-2009 State Route 8 corridor work description State Route 8 Corridor 10 projects $262 million With its close proximity

More information

Existing Facilities. Current and Forecast Demand

Existing Facilities. Current and Forecast Demand Existing Facilities Albert Whitted Airport is owned and operated by the City of St. Petersburg ( City ). The airport property encompasses approximately 119 acres. The airport is served by two intersecting

More information

4. Safety Concerns Potential Short and Medium-Term Improvements

4. Safety Concerns Potential Short and Medium-Term Improvements NH Route 104 Access Management Study Page 19 4. Safety Concerns Potential Short and Medium-Term Improvements Potential safety improvement strategies are listed by priority based on field observations by

More information

NORTHEAST CARLTON COUNTY BICYCLE ROUTE PLAN

NORTHEAST CARLTON COUNTY BICYCLE ROUTE PLAN NORTHEAST CARLTON COUNTY BICYCLE ROUTE PLAN 5/31/2014 and St. Louis River Trail Plan Update Produced by the Arrowhead Regional Development Commission (ARDC) in Partnership with the State Health Improvement

More information

N4 Carrick-on-Shannon to Dromod Road Project. 2.1 Introduction

N4 Carrick-on-Shannon to Dromod Road Project. 2.1 Introduction Chapter 2 Need for the Scheme 2.1 Introduction The National Primary Route N4, Dublin to Sligo is a strategic corridor from Dublin to the northwest and border counties (See RCSR 101 in Volume 2). The National

More information

CHAPTER FIVE PROSPECTS FOR FUTURE ECONOMIC DEVELOPMENT

CHAPTER FIVE PROSPECTS FOR FUTURE ECONOMIC DEVELOPMENT CHAPTER FIVE PROSPECTS FOR FUTURE ECONOMIC DEVELOPMENT 5.1 GENERAL The recommended type and location of future land uses in Alpine should, in part, consider potential opportunities for future economic

More information

BNA Master Plan Update Community Advisory Committee Meeting No. 5

BNA Master Plan Update Community Advisory Committee Meeting No. 5 A Six Sigma Organization BNA Master Plan Update Community Advisory Committee Meeting No. 5 September 19, 2012 Introductions MNAA Staff RW Armstrong Team Albersman & Armstrong, Ltd. Atkins North America,

More information

Why we re here: For educational purposes only

Why we re here: For educational purposes only Transportation 2050 Why we re here: For educational purposes only Transportation 2050 Bus Elements PUBLIC TRANSIT DEPARTMENT City of Phoenix Citizens Committee on the Future of Phoenix Transportation (CCFPT)