1 APPROACH TO XI th FIVE YEAR PLAN IN RESPECT OF COMMUNICATION SECTOR UNDER PWD ARUNACHAL PRADESH GOVERNMENT OF ARUNACHAL PRADESH PUBLIC WORKS DEPARTMENT ITANAGAR P :

2 1 APPROACH TO XIth FIVE YEAR PLAN IN RESPECT OF COMMUNICATION SECTOR UNDER PWD ARUNACHAL PRADESH I. ARUNACHAL PRADESH-AN OVERVIEW 1.1 Land and climate Arunachal Pradesh is a infrastructure deficient frontier state. Lying in the north-eastern tip of the Indian subcontinent it is bounded by long international borders of about 1628 Km with Bhutan to the west, China to the north, Myanmar to the east. It also shares interstate boundary with Assam and Nagaland in the south. With an area of 83,743 sq.km, it is the largest geographical entity in the whole of North-Eastern region. The State s topography is predominantly hilly and it is traversed by many major rivers and their tributaries, all discharging into the Brahmaputra. About 82% of the geographical area of the state is under the cover of forests which support a diverse spectrum of flora and fauna. The state receives high precipitation with annual rainfall exceeding 2500 mm and substantial snow melt in the upper reaches. 1.2 People It is a Schedule Tribe majority state with ethnically diverse 25 major tribes. With total population of 1.10 million (as per the 2001 census) the density of population stands as persons per sq.km, the thinnest in the country. Over 75% of the people live in villages which are widely scattered with many located in remote interiors close to the international borders. There has been a tendency for in migration of people from rural pockets in remote areas to urban centres and potential growth centres which have seen galloping increases in population. The high growth rare of urban population could also signal influx of people from outside. 1.3 Economy Earlier the economy was largely driven by a vibrant forest based industry. A roaring timber industry of logging, sawing, veneering and ply making saw a premature demise due to the Supreme Court order restricting such operations.

3 2 Subsistence agriculture is the main occupation of the indigenous people. There has been substantial development in horticulture with apples, oranges, pineapples, kiwi fruits, large etc. grown in various pockets of the state. The potential for further growth is unlimited. Tea plantation is coming up in a big way in Tirap, Changlang, Lohit, Lower Dibang Valley and East Siang districts. The great potential for cultivation of medicinal and aromatic plants is yet to be tapped. The state is also endowed with immense potential for development of hydropower, estimated to be around 50,000 MW, the third of the country. It also has deposits of coal, oil, limestone, graphite, etc. There is also great potential for development of tourism sector in the state. The great rivers, the high mountains, dense forest with species rich flora and fauna, and the ethnically divers people - all these could support adventure tourism, eco tourism, cultural tourism. Tourism industry in the state, however, is yet to take off mainly because of the problem caused by communication bottleneck. 1.4 Problems of communication The major stumbling block standing on the path to development of Arunachal Pradesh is the bottleneck in communication. In the absence of other mode of transport, road is the only reliable means of communication in the state. But the road development in Arunachal Pradesh is yet to reach take off stage. With the density of road standing at Km/sq.km, (national average 84 Km/100 sq.km and NE average 60 km/100 sq.km) the state has the lowest road development index in the country. A large number of administrative centres and the majority of the villages in the state still remain unconnected. In places where there is a landing ground or a helipad, there could be limited air service through helicopters of the Pawan Hans Ltd. or IAF services however, are restricted to supply of essential commodities, evacuation of patients, VIP movement or defense needs.

4 3 The remote locations not linked by road are also served through a network of porter/mule tracks. With construction materials and essential items carted through head loads, development efforts in these areas are prohibitively costly and the progress extremely slow. 1.5 Vulnerability to natural hazard Forming a part of Zone-V, in the seismological map of the country, the state is highly vulnerable to earthquakes. Many major earthquake have been seen in the state including the one of more than 8 point on the Richer scale that occurred on During major calamities like earthquakes, landslides, or floods, the road communication could be snapped or remain severely affected, leading to problem of reaching essential commodities and relief materials to the affected areas and people. Further, disturbance of road communication will also be adversely affect other development activities.

5 4 II. DEVELOPMENT IN COMMUNICATION SECTOR - PRESENT STATUS 2.1 Roads under different agencies From a near clean slate state at the time of Independence, with just a few dirt tracks barely totaling 160 Km in length, the Arunachal Pradesh can now boast of Km of road network developed by various agencies like the State PWD, the BRO, the Rural Works Department, the Department of Environment and Forest etc. through different programme such as State Plan, North Eastern Council, Central Road Fund, Rural Infrastructure Development Fund, National Highways, General Staff Road, China Study Group road etc. The agency wise break up of road lengths are given below: Table 2.1 Roads in Arunachal Pradesh under different agencies. Sl.No Agency Length in Km Category of road Source of funding 1) PWD NH/MDR/ODR State Plan/ NEC/CRF/NH 2) BRO NH/ODR/MDR NH/GS/CSG 3) RWD/Forest ODR/VR State Plan/ PMGSY/Project Total Note: NH-National Highway, MDR-Major District Road, ODR-Ordinary District Road, VR-Village Road. With other modes of communication like railways, air services, inland water transport almost non existent, road is the harbinger of all developments in the state, and the means for delivering services in the social sector programmes like in the health, the education and poverty alleviation. Road development in Arunachal Pradesh also assumes a national importance because of the strategic needs of the defense forces guarding the long international borders with the three neighboring countries of Bhutan, China and Myanmar. 2.2 Density of road With a large geographical area of 83,734 sq.km the state has an average road density of Km per 100 sq.km which is the lowest in the country (National

6 5 average 84 Km per 100 sq.km and the North-Eastern average 60 Km per 100 sq.km). 2.3 General deficiencies of roads Much of the existing road network is just able to provide marginal connectivity only because of the general shortcomings like the need of bridges on major water gaps, inadequate provision of cross drainage structures and weak pavement. The pavement profiles of the roads under PWD are as follows: 1) Earthen Km 2) Metalled Km 3) Carpetted Km Future road development plans will have to provide for taking care of these deficiencies. 2.4 Connectivity positions Out of 157 administrative centres in the state as many as 30 still remain unconnected. A list of the administrative centres showing their connectivity positions is enclosed as Annexure 2.1. Then again, out of the 3880 villages (as per 2001 Census), 2489 are yet to be connected. The connectivity status of the villages in the state are shown below in Table 2.2. Table 2.2: Connectivity status of villages in Arunachal Pradesh S No Population No of habitations connected Left out habitation Total habitation < Total It may be seen that 76% of the villages in the state has populations less than 250, which is the threshold population for qualifying under PMGSY programme in hilly or desert states or areas. 2.5 Higher cost of construction and maintenance Because of the hilly topography with fragile slopes; the needs for multitude of bridges over numerous rivers and streams; the large number of culverts and

7 6 lengthy drains required for discharging high surface runoff from heavy rainfalls and snowmelt; and also the vulnerability to earthquake and other natural calamities like landslides, floods etc., construction and maintenance of roads in the hilly state of Arunachal Pradesh is not only cost intensive but also difficult. 2.6 Lack of inter district connectivity A state having vast area with arial distance of over 600 Km from eastern to western tip and the distance from the plains of Assam to the international border on the north being more than 150 Km, at places and with the added problem of poor road infrastructure, communication from one district of Arunachal Pradesh to another often involves incursion into the territory of Assam, the geographical hub of the North East region, with which this state shares interstate boundary of over 700 Km. It thus involves avoidable extra cost and travel time. Travel through Assam, on the other hand, is also uncertain and often unsafe due to floods, frequent bandhs etc. Hence, there is an urgent need for inter district highway network within the territory of Arunachal Pradesh. This aspect will need special attention in the future plans. 2.7 Porter tracks and foot bridges The PWD continues to maintain over 5150 Km porter/mule tracks and more than 5400 mtrs of foot suspension bridges located on these tracks. Though, as per Business Allocation Rules of the Government of Arunachal Pradesh, the subject should be under the Rural Works Department, the efforts to hand over these tracks to RWD for further maintenance and upkeepment has not been successful mainly for want of clear administrative direction. 2.8 Landing ground and helipads In the past some 13 landing grounds were developed at different locations of Arunachal Pradesh. Of these, ten LGs, viz. Ziro, Daporijo, Along, Mechuka, Pasighat, Tuting, Yingkiong, Anini, Tezu and Vijaynagar catered to services of fixed winged planes like Fokker Friendship, others, carribows and later 20 seater Dornier aircrafts, since discontinued. Presently AN-32 planes are operating defense sorties to three LG viz. Mechuka, Tuting and Vijaynagar.

8 7 Some 100 helipads of different capacities catering to MI-8, MI-17 and Chetak helicopters were also constructed. Besides these, some helipads have also been developed by Border Roads and the Army.

9 8 III. 10 TH PLAN UNDER STATE SECTOR PERFORMANCE REVIEW 3.1 The development activities undertaken by PWD Arunachal Pradesh through State Plan under Communication sector falls under two sub-heads: a) 5054 & Road & Bridge b) 5053 & Civil Aviation ROAD & BRIDGE SECTOR PROGRAMME 3.2 Plan size of 10 th Plan Against actual releases totaling Rs crores under Road & Bridge sector of PWD during 9 th Plan, the corresponding size of 10 th Plan was agreed at Rs crores. Against this the actual allocations conveyed upto worked out to Rs crores only. Including the anticipated outlay for the final 10 th Plan outlay could stand at Rs crore only. 3.3 Yearwise outlay and expenditure The yearwise allocations and expenditures during 10th Plan including the anticipated expenditure for are indicated in the Table 3.1. It is observed that the outlays and expenditures under different Annual Plans during 10 th Plan period matched evenly. However, in the spread of outlays and expenditures against different schemes and sub-heads, it could have been a different story. 3.4 Physical targets and achievements The yearwise physical targets and achievements during different Annual Plan periods of 10th Plan upto the financial year are given in Table 3.2. As can be seen from the Table, that the physical achievements on ground have generally failed to match the yearly targets set. The reasons for this mismatch need to be ascertained though no definite trend is discernible immediately.

10 9 3.5 Funding programme under State Plan. Funding of works under Road & Bridge sector through State Plan consist of the following: 1) Normal grant 2) Central Road Fund (CRF) 3) Rural Infrastructure Development Fund (RIDF) 3.6 Programme under Normal grants Till the end of 8 th Plan, most of the road network developed by PWD had been funded as normal free grants without being tied to earmarked programmes. From the onset of 9 th Plan, the free grant component of the State Plan reduced drastically with good chunk of funds being earmarked as ACA under CRF or loans under RIDF from NABARD. Then again, because of the large geographical area and poor road infrastructure in existence, the funds available under State Plan, especially the unearmarked normal grants, have not been near adequate to meet the ever increasing demands. Maintenance load. Erosion of Plan funds also occurred due to the need to earmark funds for revenue type expenditure for maintenance of assets. This had to be resorted to because of non-allocation of maintenance funds under Non- Plan. Funds earmarked for maintenance works by apportioning Plan funds had been pegged around Rs crores per year. The allocations against individual schemes under free grant thus have tended to get diluted because of the depletion of resource. This has adversely affected the physical achievements on ground thereby causing time and cost overrun. Porter tracks and foot bridges. Besides the normal Roads and Bridge programmes, the PWD has also been undertaking construction and maintenance of porter/mule tracks and foot bridges under state plan through normal grant only without any designated allocations. There are around 100 porter/mule tracks with aggregate length of over 4150 Km. There are also a large number of foot suspension bridges with total length of over 5400 m,

11 10 located mostly in the inaccessible areas in the remote upper reaches. The 30 unconnected administrative centres of the State and numerous villages unlinked by road are served through these porter/mule tracks. Spillover schemes. There are as many as 1031 schemes likely to spill over to 11 th Plan. Of these 88 are last mile schemes with investment of above 80%. There are also 160 schemes with financial progress from 60% to 80%. Adequate funds could not be mobilized for completion of these schemes because of the general resource constraints under State Plan. An analysis of the ongoing schemes is given in Annexure 3.1. Inclusion of new schemes. Public pressure also tended to cause aberration in planning process with induction of new schemes in the face of many ongoing schemes. A solution of this problem could come only through strong political will. Problem of revised estimates. There are also over 445 schemes needing revised or re-revised sanctions. The process of obtaining revised sanction is getting more complicated because of the long time overrun and lack of clarity about the procedure often dictated by the State Finance. 3.7 Programme under CRF The Central Road Fund is a designated fund for development of road infrastructure and other related activities like road safety, research in the field of highway and transportation, capacity building etc. The fund is generated through cess on consumption of petrol and diesel. The CRF is administered through the Ministry of Shipping, Road Transport and Highways, Government of India. Allocations are made as ACA and actual releases are made against submission of UC. The programme is subgrouped into three categories (1) Normal or state category with 100% funding from the Ministry (2) Inter State Connectivity (ISC) category with 100% support from GOI and (3) Economically Important (EI) category with 50% of the cost funded by the Centre and 50% borne by the State Government as state share.

12 11 So far 30 schemes under CRF normal category have been taken up under PWD at total sanctioned cost of Rs crores. Besides these, one scheme under ISC category and one schemes under EI category are being executed by the Department. Another scheme for construction of bridges on Dambuk-Paglam road has been accepted in principle for funding under ISC category. Of the 30 state category schemes, 13 schemes have been completed. The total investment upto including the anticipated expenditure during would worked out to Rs crores. The one ISC category scheme is nearing completion. As many as 4 state category CRF schemes are also likely to be completed during The remaining 13 schemes under state category, the one under EI category and one under new the ISC category scheme are likely to spill over beyond 10 th Plan. Details of the 33 schemes taken up under the three category of CRF are given in Annexure 3.2 enclosed. 3.8 Programme under RIDF Rural Infrastructure Development Fund (RIDF) is a loan scheme of the Centre for infrastructure development in rural areas. It is administered through the National Bank of Agricultural and Rural Development (NABARD). Under different tranches of RIDF loans from RIDF V to RIDF-XI, the PWD Arunachal Pradesh took up 22 road and bridge projects at a total cost of Rs crores, with a loan component of Rs crores. Out of these, 7 projects costing Rs crores (with a loan component of Rs crores) have been completed and the remaining 14 schemes are in different stages of completion with one scheme being abandoned. Some 6 schemes will be completed during As many as 8 schemes are expected to spill over beyond 10 th Plan with financial implication of Rs crores. Details of the sanctioned RIDF projects are enclosed as Annexure: Other minor programme Besides above normal programmes under 5054 & 3054 Road and Bridge sector under State Plan, some minor road and bridge schemes are also taken up under

13 12 State Plan through funding from the Department of Tirap & Changlang (DOTC). The scheme selected are need based and planned for completion within a year and should normally not spill over. However, it is seen that priorities and investment decisions change with change of Legislators. CIVIL AVIATION SECTOR 3.10 Landing grounds and helipads PWD also undertakes construction works of landing ground and helipad under Civil Aviation sector with funds administered by Civil Aviation Department. During the 10 th Plan period upto budget coverage to the tune of Rs lacs (Eastern Zone only) was received.

14 13 IV 10 TH PLAN PROGRAMMES UNDER EXTERNAL FUNDING-PERFORMANCE REVIEW 4.1 Programme under external funding Under external funding outside the State Plan the following programmes were taken up during 10 th Plan. 1) North Eastern Council (NEC) 2) Non-lapsable Central Pool of Resources (NLCPR) 3) National Highways 4) Special Accelerated Road Development Programme 5) Additional Central Assistance 6) Project Specific Assistance 7) Rashtriya Swam Vikash Yojana (RSVY) 4.2 NEC Programme Completed projects. Till the end of 8 th Plan as many as 17 projects in Arunachal Pradesh covering 1 bridge and 16 roads with aggregate length of Km had been completed combinely by the PWD and BRO under funding from NEC. Details of the roads are enclosed as Annexure: 4.1. Maintenance obligation. Over the years, some cross transfers of roads have taken place between the PWD and BRO. A few roads have also been included under General Staff (GS) road programme of the Defense Ministry. Thus at the end of 10 th Plan ( ) there will be 12 completed NEC roads in Arunachal Pradesh with total length of Km and maintenance obligation of Rs crores per annum (taking the maintenance Rs.1.80 crores per Km per year based on the norms as recommended by the Ministry of Shipping, Road Transport and Highways). 9 th Plan projects. During the 9 th Plan as many as four road projects were taken up. The details are given in Table 4.2 below. Of these the first project has been completed. The remaining three projects taken up under the Prime Minister s Initiative for NE region shall be completed by March 2007.

15 14 Sl. No Table 4.1 Status of Schemes taken up during the 9th Plan under NEC (Fin. Fig. in Rs. Lakhs) Cumulative Financial Name of the Scheme Approved Cost Achievement upto Tenth Plan(upto March 2006) Release of Fund Expenditure Present Physical Status A Ninth Plan and Pre-Ninth Plan Schemes 1 Dirok- Deomali Road Completed completed (SH:C/O of 6(six) Bridges PDC 2 Margerita- Changlang Road (37.48 Km) Road Completed and Bridge Works in progress. 03/ Khonsa-Hukanjuri-Naharkatia Road (35.00 Km) Road Completed and Bridge Works in progress. 03/ Jote- Balijan Road (47 Km) TOTAL In advanced stage of construction. 03/ th Plan projects. Under 10 th Plan initially 13 projects were identified for Survey & Investigation. The list is enclosed as Annexure:4.2. Of these finally only four projects were shortlisted as given in Table 4.2 below. One of the possible reasons for heavy decrease in the number of projects finally selected from the list earlier approved for S & I works could be NEC s preponderance with interstate category of projects over economic importance category. Out of the four projects finally approved, EFC clearances have been obtained in respect of the first two projects. As regards, the remaining two projects, EFC clearance from GOI are still under process. All these four projects are likely to spill over beyond 10 th Plan.

16 15 Table 4.2. Sl. No Status of Schemes taken up during the 10th Plan under NEC Name of the Scheme Approved Cost Financial Achievement during Tenth Plan (upto March 2006) Release of Expenditure Fund PDC (Fin Fig in Rs.Lakhs) Present Status 1 Pasighat-Ledum-Tene-Koyu Road (60.00 Km) In Progress 2 Laimekuri-Nari-Telam-Rema Camp (61.00 Km) In Progress 3 Upgradation of Digboi-Pengri- Bordumsa-Namchik (Miao) Mahadevpur Road (40 Km) (76.00 Km) EFC Awaited 4 Seppa-Chyangtajo (Phase-I:0-34 Km) (81.00 Km) EFC Awaited TOTAL National Highway Present programme. The coverage of NH programme in Arunachal Pradesh is rather poor. The total length of the three existing National Highways in the State viz. NH-52, NH-52A and NH-153 is limited to Km. Of this Km covering NH-52 and NH-52 is under the BRO and the remaining Km pertaining to NH-153 is under PWD. The details are given in Table 4.3 below. Table: 4.3 Details of existing NH in Arunachal Pradesh. S No Reach covered Length Agency NH No in KM I. NH 52 - Jonai to Sitpani 1) Jonai-Pasighat-Ranaghat-Mebo-Dambuk-Bomjur Project NH-52 ( to km ) Udayak BRO 2) Bomjir-Iphipani-Roing(Meka)-Koronu-Paya ( to do- NH km) 3) Paya-Digaru (km to ) do- NH-52 4) Digaru-Tezu ( to km) do- NH-52 5) Tezu-Tohogam ( to km) do- NH-52 6) Tohogam-Brahmakund ( to km) do- NH-52 7) Brahmakund-Tri junction-chowkham ( to do- NH km) 8) Chowkham-Sitapani ( to km) do- NH-52 Sub Total

17 16 II. NH 52A - Banderdewa to Gohpur 1) Banderdewa-Itanagar Project NH-52A Vartak BRO 2) Itanagar-Gohpur do- NH-52A Sub Total III. NH Jairampur-Pangshu pass PWD, AP NH-153 Total Originally the NH-52A was under State PWD. Subsequently it was transferred to BRO under a directive from the then Ministry of Surface Transport (MOST), now MOSRT&H. Later the NH-153 covering a part of the old Stillwell Road from Jairampur to Pangshu Pass has been entrusted to PWD Arunachal Pradesh. The works are being executed through Direct Payment system. Barring the construction of bridges, the other works covering cross drainage structure and widening and pavement are in an advanced stage. The total outlay received against this work till March 2006 works out to Rs crores. The details of works undertaken against NH-153 are given in Annexure: Projects under NLCPR The Non-lapsable Central Pool of Resources is a facility under the Central Government created by pooling of the resources of the Central Ministries/Department accrued due to shortfall in expenditure from the mandatory 10% of the gross budgetary support (GBS) to be utilized in NE region. During the financial year , the Ministry of DONER sanctioned 13 road and bridge projects to a total cost of Rs crores under NLCPR. Proposals have been submitted for obtaining confirmatory AA & ES of the State Government. Tendering and mobilization processes have been initiated. Actual implementation of these schemes will begin in earnest from the current FY. Thus all these projects are likely to spill over beyond The details of the projects are enclosed as Annexure:4.4.

18 Projects under SARDP-NE Programme and phases. The Special Accelerated Road Development Programme for the North Eastern Region (SARDP-NE) is a new initiative of the Central Government for development of road infrastructure in NE region, covering both NH and state roads. The programme originally consisted of three phases viz. A, B and C. Phase A consisted of programme for four laning or two laning of selected stretches of existing NH network to be undertaken through the National Highways Authority of India (NHAI) as BOT projects. Under Phase B all district headquarters and the state capitals in the North-East are to be linked by double lane or improved single lane roads to the nearest National Highway network. As many 11 road and bridge projects from Arunachal Pradesh with aggregate length of 1757 Km and at total projected cost of Rs.1757 crores were included under Phase B. The list is enclosed as Annexure: 4.5. Of these three roads of length 92 Km belonged to the PWD while the remaining roads and bridges were GS roads under BRO. The Phase C programme consisted originally of the 8 roads in border areas of Arunachal Pradesh which had been submitted before the Foreign Secretary during his visit to Aruanchal Pradesh during 26 and 27 August, The original list of 8 roads of aggregate length 1243 Km including the Indo Myanmar road and two inter-basin roads estimated to cost Rs.1272 crores are enclosed under Annexure:4.6. Later, one road under Phase C viz. Road from Lumla to Tashigaon via Dudumghar (36 Km) was transferred under Phase A. The remaining seven other projects of Phase C were finally merged with Phase B. Non of the projects selected has however, been started on ground. There is lack of clarity about the agencies to take up the different projects. Mainly because of this the preparation of DPR has been slow.

19 Other programme Besides the above programmes, some road construction are being taken up under One Time Additional Central Assistance and Special Plan Assistance. The schemes under these programmes are selected on a need based manner and are to be completed within a period of one year. Works have also been taken up under Rashtriya Swas Vikash Yojana (RSVY) programme in Upper Subansiri District. A few road and bridge projects were also taken up in Upper Subansiri District under funding from the Ministry of Tribal Welfare, GOI.

20 19 V. 11 th PLAN PROGRAMMES UNDER STATE SECTOR 5.1 Focus areas ROAD & BRIDGE SECTOR During 11 th Plan the thrust will have to be on increasing the coverage of road network in the state, especially to those unconnected administrative centres and villages by raising the road density from the present level of Km per 100 sq. Km. As per the goal of Road Development Vision 2020, it is proposed to step up the road density from the present level to 25 Km per 100 Sq. Km by 2020, the horizon year of the perspective plan. This would mean that by end of the perspective plan the State should possess a road length of Km. Thus, some 5317 Km of new roads ( ) will have to be added by middle of the13th Plan. Then again, assuming equal distribution of new roads to be added over the three Five Year Plan periods viz. 11 th, 12 th, and 13 th Plan, some 2127 Km of new roads will have to be constructed during 11 th Plan. Further, taking the current share of PWD roads in the total road network in the state as the basis, (about 42.85%), the new constructions to be taken up under the State agency will work out to about 911 Km. Thus by the end of 11 th Plan period the road density in the state is expected to go up to Km/100 sq.km. 5.2 Projected size of 11 th Plan Against new projects. For 911 Km of new road the investment required will work out to around Rs.911 crore (taking a conservative rate of Rs.100 lakhs per Km). Then again about 30% of this is expected to be made available from external funding sources. Hence the actual budgetary provision required for construction of new roads and bridges under PWD through State Plan, during 11 th Plan period, will work out to about Rs.638 crores. For completion of spillover schemes. Then again considering the fact that a large number of 10 th Plan schemes are expected to spill over to 11 th Plan, an adequate resource support has to be made for completing the spillover schemes of 10 th Plan. The details of fund requirement for completing these schemes are as follows:

21 20 a) For completion of last-mile schemes : Rs crores (physical progress above 60%) b) For completion of balance spillover schemes: Rs crores c) For completion of spillover schemes where Revised sanction is required: Rs crores Total: Rs crores Say Rs crores. Details can be seen from Annexure 3.1. Improvement of existing deficient roads. On the other hand about 25% of the existing fair weather roads under the Department (about 3445 Km) will require improvement/upgradation to provide minimum connectivity with at least one layer of GSB or WBM, adequate number of CD structures and minimum required bridges. The total cost involved would work out to Rs.215 crore lakhs/km). The total outlay required for 11 th Plan will workout to Rs crores. 5.3 Normal grant The average allocation under unearmarked normal grants during 10 th Plan stood at 36%. It may be pointed out that maintenance obligation, the spillover schemes from the previous plan periods are to be met up from normal grants. Hence there is a need to enhance the allocations under normal grants. Out of the estimated total outlay of Rs crores during 11 th Plan it is propose that Rs crore (74%) will be as normal grant. 5.4 CRF programme Spillover projects. Incomplete schemes from 10 th Plan, including 13 schemes under State category, one Inter State Connectivity (ISC) category and two of Economic Importance (EI) category, will spill over to 11 th Plan. The details of schemes can be seen from Annexure 3.2. The fund requirement for completing the projects will work out to about Rs crores. Resource base. As per the present trend with annual accrual standing at about Rs crore (during ) the total availability of fund under CRF during

22 21 the 11 th Plan period with an annual mark up of about 10%, is expected to be around Rs crore. The balance of Rs crore after meeting up the obligation towards completing the ongoing projects could be deployed for funding new projects. New projects. Some 36 new schemes have been identified for funding under CRF. The list is enclosed as Annexure 5.1. It is expected that for future programme under CRF, schemes will be selected from this list. 5.5 RIDF Programme Spillover projects. Out of the 22 ongoing schemes under RIDF, some 8 projects are expected spill over to 11 th Plan. The financial implication would work out to a tune of about Rs crores. Details can be seen from Annexure 3.3. Resource base. The allocation in State Plan under RIDF has remained static at about Rs crore each year. Taking a modest increment of 5% per year, the outlay under RIDF for 11 th Plan could be assumed as Rs crore. Thus the fund available for new projects, after meeting up the obligations for spill over projects from 10 th Plan will work out to about Rs crores. New projects. A list containing new projects has been prepared for funding under RIDF. The projects selected for implementation during 11 th Plan would be selected from this tentative list. The details are given in Annexure Total outlay and breakup As seen from above the size of 11 th Plan against R&B sector under State sector will work out to about Rs crores. Considering the present trend of funding for different programmes under State Plan the break of the outlay could be as follows : (i) Free grant: Rs crore ( 74 %) (ii) CRF : Rs crore ( 11%) (iii) RIDF loan etc: Rs crore (15 %)

23 Phasing of outlay The total outlay of Rs crore for 11 th Plan is proposed to be phased over five Annual Plans as follows:- Annual Plan Funding 1) Normal grant Total (Rs. crores) ) CRF ) RIDF Total:

24 23 VI. 11 TH PLAN - EXTERNALLY FUNDED PROGRAMME 6.1 Besides the normal programme under State Plan, an increasing number of projects under Transport and Communication sector are being funded through Central programmes like NH, NEC, NLCPR, SARDP-NE etc. During 11 th Plan funding through the Central programmes will come to play a vital role in the development of infrastructure under T&C sector. 6.2 Road & Bridge projects under NEC The North Eastern Council will continue to play an important role in building roads and bridges in Arunachal Pradesh during 11 th Plan. The main focus of the programme will be completion of spill over schemes. Besides these, a few priority green field projects will also be initiated during the Plan period. Ongoing schemes. All the ongoing projects from 9 th Plan are proposed to be completed before the onset of 11 th Plan. On the other hand all the four projects initiated during 10 th Plan projects are likely spill over to 11 th Plan. Of these, two projects viz. Interstate road from Laimekuri in Assam to Nari-Telam-Rema camp (65 Km - 61 Km in AP) and Upgradation of Pasighat-Ledum-Tene-Koyu road (60 Km) are in progress. The remaining two roads viz. Upgradation of Pengri- Namchik-Mahadevpur road (40 Km) and Seppa-Chayangtajo road (81 Km) are yet to receive EFC. The financial involvement for completion of these four projects from 10 th Plan will be around Rs crores. New projects identified. Apart from the above works, some 18 new road projects have been identified for inclusion under 11 th Plan of NEC. The list is enclosed as Annexure 6.1. The total projected cost of these 18 new roads would work out to Rs crores. The final selection of the new R&B projects to be taken up during 11 th Plan of the Council could be done on the basis of this list. A need for change in approach for selection of projects. As a selection criteria, the NEC gives priority on inter state road projects over roads of economic importance. As a general policy objective the approach of NEC could be considered as admirable. However, when seen against practical needs on ground, the flaw in the Council s policy becomes apparent. Under the present

25 24 dispensation the number of projects that can be sanctioned against a given state will depend on how many and how long are the interstate boundaries shared by the state with its neighbours. More the number of neighbouring states and larger the length of boundaries shared, more would be the projects and plan allocations likely to accrue to the state. Besides above population of a state is also taken as one of the criteria for deciding the size of investment package. Under this scenario, Assam being in the hub of the NE region and with highest population stands to cover the maximum number of projects. And that is what has been happening in the past and likely to continue unless there is a paradigm shift in the funding pattern of the NEC. For a vast state like Arunachal Pradesh having an area of sq.km. and distance between the eastern and western tips being over 600 km and expanse of territory from foothills to the international border being more than 150 km, preponderance with interstate nature of projects will restrict the location of schemes only to the areas in the vicinity of the interstate border with Assam with which it shares boundary of over 700 km. Thus, under this situation other parts of the state specially those towards the border areas will never be able to benefit from development initiatives under NEC. Hence, there is a need to have a fresh look on the interstate concept and base the selection of projects on more realistic parameters like economic importance, as is being done for new member state of Sikkim. Resource base and phasing Taking the outlay of Rs crores under Transport and Communication sector during 10 th Plan as the base and adopting a modest mark up of 15% the resource base for Arunachal Pradesh under 11 th Plan of NEC could be taken as Rs crores. This may be phased over five Annual Plans as follows: Total

26 Development of Airports under NEC The funding for development of airports in Arunachal Pradesh during 11 th Plan is expected to be done jointly under the NEC and the AAI as done in the case of other projects in NE region during 10 th Plan and earlier. Ongoing projects. The two airports at Pasighat and Tezu for 50 seater aircrafts, taken up during 9 th Plan were subsequently abandoned with further funding stopped for want of EFC clearance. These two airports will have to be revived and completed during 11 th Plan. The updated expected completion cost of the two airports will be about Rs crores for Tezu airport and Rs crores for Pasighat airport. New projects. The thrust for development in Civil Aviation sector in the State, however, will be focused on establishment of a new airport near Itanagar, roughly expected to cost around Rs.200 crores. Supports will also be necessary for S&I and consultancy services. There will also be need to explore the possibility and viability for development of new airports at other potential sites like at Yiklet near Yingkiong in Upper Siang district and Roing in Lower Dibang Valley. Improvement of existing landing grounds. The existing landing grounds at Ziro, Daporijo, Along, Mechuka, Tuting, Alinye and Vijaynagar, which had earlier been air linked with services of Vayudoot through 20 seater. Dornier aircrafts, also need to be improved with better infrastructure support for operation of hopping services with small capacity fixed winged planes that will supplement the service of the present air network in the NE region with 50 seater ATR crafts. 6.4 Bus/Truck Terminus & Transit facilities under NEC With Arunachal Pradesh being solely dependent on road network for communication, provision of terminal and way side facilities are important needs of the road users. Presently there is near complete lack of such facilities.

27 26 Interstate Bus/Truck Terminus. The 10 th Plan of NEC had a provision of Rs.3.03 crores was made for construction of interstate bus terminus (ISBT) at Itanagar. However, it could not be utilized mainly for want of suitable land. But the bus/truck terminals are essential needs that the State capital town can hardly do without. The proposal will have to be revived during 11 th Plan. The cost of proposed ISBT to be located at Itanagar or Naharlagun will work out to about Rs crores. Wayside amenities. We need wayside amenities with hygienic eating places and clean comfort facilities at the 17 entry gates located at isolated places viz. Balemu, Foothills, Bhalukpong, Seijosa, Balijan, Hollongi, Gumto, Kimin, Likabali, Ruksin, Santipur, Sunpura, Dirok gate, namchik gate, Namdang gate, Hukanjuri and Ranglua. The cost of providing these transit facilities will work out to about Rs.8.50 crores. 6.5 National Highway One of the major goals of 20 Years Road Plan of India (Lucknow Plan ), was to bring every part of the country within the distance of 50 Km from a National Highway. Under this scenario, the NH network in Arunachal Pradesh would work out to a minimum length of 1675 Km. Against this backdrop the three NHs in the State, viz. NH-52, NH-52A and NH-153 have a combined length of Km only. Then again the existing NH network covers only a small fringe area of the State close to the border with Assam. A ban on declaration of new NH during 10 th Plan prevented any signified effort towards proposing new NH in the state. Hence, during the 11 th Plan period efforts will have to be intensified to increase the coverage of NH network in the State. The target length of NH in the state at the end of 11 th Plan could be pegged at 850 Km, twice the present length. The thrust will be on inter district connectivity and better linkage from NH-52, running along the north bank of Brahmaputra in Assam. East-West Highway. Construction of East-West Highway, a National Highway within the territory of Arunachal Pradesh providing inter-district connectivity is a long cherished dream of the people in the State. The importance of this road

28 27 has also been reflected in Shukla Commission Report ( ). A concept note on this proposal was submitted to the Government of India. The proposal envisages a National Highway running in east-west direction along the middle belt of the State covering areas with higher concentration of population and more productivity in terms of agriculture and horticulture. The project consists of two sectors viz. (i) Western sector and (ii) Eastern sector. The Western sector will cover the road stretch starting from Balipara on NH-52 in Assam and terminating on NH-52 at Pasighat in East Siang district covering important places like Bhalukpong, Nichipu, Seppa, Sagalee, Doimukh, Nirjuli (Itanagar), Yazali, Ziro, Daporijo, Along and Pangin over a distance of about 939 Km. The Eastern sector, on the other hand, will cover a length of 320 Km from Mahadevpur on NH-52 to Bimlapur in Assam via Bordumsa, Namchik, Jairampur, Changlang, Khonsa, Longding and Ranglua. Details of different segments under the two sectors of the East-West Highways envisaged are shown in Annexure 6.2 enclosed. The new NH will be developed by upgrading the existing road network of ODR and MDR categories to NH standards, and constructing bridges over missing water gaps where required. The total cost of the project at today s price level is estimated to be around Rs crores. The upgradation work is proposed to be taken up in phases and stages starting from Itanagar towards Seppa via Sagalee, Rilo, Pijirang etc. and Itanagar to Ziro via Hoj and Yazali. It is proposed that both the segments will be submitted before the Ministry of Shipping, Road Transport and Highways for declaration as NH during 11 th Plan. 6.6 Road & Bridge projects under NLCPR Sanctioned projects. As many 13 road and bridge projects were sanctioned by the Ministry of DONER under Non-lapsable Central Pool of Resources (NLCPR) during and fund to the extant of Rs crores (about 30% of the total cost) was released as first instalments. The expenditure till the end of is expected to be limited to releases under first instalment. The

29 28 balance works costing about Rs crores will spill over to 11 th Plan. The list of sanctioned schemes can be seen from Annexure 4.4. New works proposed. A list of 31 new schemes with total projected cost of Rs crore has been forwarded by the State Government to Ministry of DONER, Government of India. A copy is enclosed as Annexure 6.3. This list will form the basis for further selection of projects under NLCPR during 11 th Plan. 6.7 Projects under SARDP-NE The projects in Arunachal Pradesh under the Special Accelerated Road Development Programme in NE region (SARDP-NE) formulated in is yet to take off. With preparation of DPRs yet to gather momentum, all the projects under the programme are expected to spill over to 11 th Plan. Detailed list of the projects under SARDP-NE can be seen from Annexure 4.5 & 4.6. The total financial implication involved for implementing SARDP-NE, Phases A & B, will work out to about Rs crores. Pending decision on implementing agencies. The question on the implementing agency or the agencies to be entrusted with the works under SARDP-NE is yet to be fully resolved. The Government of Arunachal Pradesh was of the view that execution of the projects should be entrusted to both the BRO and State PWD on a principle of as-is-where-is basis, with the respective owner agency carrying out the work pertaining to the road (or the portion of a road) under the agency concerned. In the case of green field projects which are yet to be started the work could be entrusted to BRO. On the other hand, the GOI, seems to have intended that the entire programme would be placed solely under the BRO. BRO s capacity overstretched. It may be noted that BRO is already heavily engaged with construction roads under the General Staff and China Study Group programmes of the Ministry of Defence (MOD). It is also involved with upgradation works of a number of National Highways like NH-52, NH-52A etc. under the MOSRT&H. Thus the ability of BRO to take up additional workloads

30 29 under SARDP-NE is debatable. Moreover, since it is the avowed objective of the Central Government to decentralize development activities in the country, participation of the state agencies in implementation of SARDP-NE, an important programme of GOI for infrastructure development in NE region, could be a major step towards mainstreaming of a fringe state like Arunachal Pradesh. The issues involved need to be resolved if need be with the intervention of the PMO. 6.8 Border Trade Routes In the past, limited cross border trading activities were carried out generally under barter system through various traditional land routes between Arunachal Pradesh and the neighbouring countries like Bhutan, Tibet and Burma. However, trade through these routes could not be sustained mainly due to nonexistence of required support facilities, poor condition of roads, and, to an extent, due to souring of relationship among the neighbouring countries. Now in the backdrop of changing global economic scenario, there is an emerging need to re-open these trade routes. There are seven such identified trade routes between India and the three neighbouring countries which could be reopened with enabling conditions as good roads and necessary cross border facilities. The list is enclosed as Annexure 6.4. An investment to the tune of about Rs crore would be required for developing necessary communication facilities to these potential cross border trade centres. 6.9 Roads to Tourist Destinations Approved Travel Circuits. There are eight approved tourist circuits in Aruanchal Pradesh. The main routes and their extensions and spurs serving these circuits require various improvement and upgradation measures. Some of these improvement needs are covered under different programmes like NH, CRF, SARDP-NE etc. The approximate cost for undertaking construction, improvement or upgradation of roads pertaining to these approved tourist circuits will work out to around Rs crores. The details of these routes are given in Annexure 6.5.

31 30 Identified new Travel Circuits. As many as six prospective new Tourist Circuits have been identified. They cover areas which are not covered by the existing approved circuits. These new circuits are expected to supplement and enhance the tourist flow into the state by enlarging the available options. The detailed list of the proposed new Tourist Circuit are given in Annexure Urban roads The urban population has grown at a accelerated rate of 158% during (against a national average of 36.09%) and % during This high growth rate could reflect a phenomenon of in-migration of people from the rural areas to the urban pockets in search of better facilities of health, education, commercial and socio-economic activities. It could also indicate an influx from outside the State, particularly in Itanagar and Naharlagun, which have recorded high decadal growth rates of % and 87.31% during and , respectively. Such influxes into the urban locations has necessitated the improvement and upgradation of the existing road infrastructure of the Urban Centres. Declared Urban Centres. The Government of Arunachal Pradesh has notified 22 towns as Urban Centres viz. Tawang, Bomdila, Dirang, Seppa, Sagalee, Itanagar Capital Complex including Naharlagun, Nirjuli, Doimukh and Banderdewa, Ziro, Daporijo, Basar, Along, Pasighat, Yingkiong, Roing, Tezu, Namsai, Hawai, Khonsa, Deomali, Jairampur, Changlang, Miao and Longding. The total length of roads in these Urban Centres works out to Km. The cost for improving the existing roads along with development of side drains, footpath etc. works out to Rs crores Lakhs Rs.60 Lakhs per Km. The details are given in Annexure 6.7. Potential Growth Centres. Then again, 30 other potential Growth Centres have been identified in the State. The investment required for improving the existing road network in these Potential Growth Centres aggregating to a total length of Km will work out to about Rs crores. The details are given in Annexure 6.8.

Accelerated Road Development Programme (SARDP-NE) and Border Highways under Border Area Development Programme (BADP) in Arunachal Pradesh

Accelerated Road Development Programme (SARDP-NE) and Border Highways under Border Area Development Programme (BADP) in Arunachal Pradesh Accelerated Road Development Programme (SARDP-NE) and Border Highways under Border Area Development Programme (BADP) in Arunachal Pradesh Suggested modifications by Government of Arunachal Pradesh December

More information

Development of Road Infrastructure in India

Development of Road Infrastructure in India Development of Road Infrastructure in India By Nirmal Jit Singh Director General (Road Development & Special Secretary) Ministry of Road Transport & Highways Road Network in India Total Road Length about

More information

LIST OF RETAINED PROJECTS FROM PRIORITY LIST OF to PENDING FOR SANCTION FOR FUNDING UNDER NLCPR INDICATING IT S LATEST STATUS.

LIST OF RETAINED PROJECTS FROM PRIORITY LIST OF to PENDING FOR SANCTION FOR FUNDING UNDER NLCPR INDICATING IT S LATEST STATUS. Sl. No. LIST OF RETAINED PROJECTS FROM PRIORITY LIST OF 2003-04 to 2009-10 PENDING FOR SANCTION FOR FUNDING UNDER NLCPR INDICATING IT S LATEST STATUS. Departments/Name of Projects and name of Assembly

More information

Helicopter Connectivity in North East

Helicopter Connectivity in North East Helicopter Connectivity in North East By: Pawan Hans Ltd. PAWAN HANS LTD. 1 Pawan Hans at a Glance PAWAN HANS LTD. - National Helicopter Carrier Equity Capital - Rs. 245.616 crores; GOI Rs.125.266 crores

More information

SECTOR ASSESSMENT (SUMMARY): Transport, and Information and Communication Technology - Air Transport 1

SECTOR ASSESSMENT (SUMMARY): Transport, and Information and Communication Technology - Air Transport 1 Air Transport Connectivity Enhancement Project (RRP BHU 44239-013) SECTOR ASSESSMENT (SUMMARY): Transport, and Information and Communication Technology - Air Transport 1 Sector Road Map 1. Sector Performance,

More information

Ministry of Development of North Eastern Region

Ministry of Development of North Eastern Region Ministry of Development of North Eastern Region Connecting India s North East with the mainstream: Joint Efforts with other line Ministries 7 Railway projects consisting of 3 New Lines and 4 Doublings

More information

GOVERNMENT OF ARUNACHAL PRADESH PUBLIC WORKS DEPARTMENT

GOVERNMENT OF ARUNACHAL PRADESH PUBLIC WORKS DEPARTMENT GOVERNMENT OF ARUNACHAL PRADESH PUBLIC WORKS DEPARTMENT SPECIAL ASSISTANCE PACKAGE (SAP) ANNUAL OPERATING PLAN 2007-2008 VOLUME H COMMUNICATION SECTOR NON-LAPSABLE CENTRAL POOL OF RESOURCES (NLCPR) STATE

More information

Development of Ski Resorts in the Indian Himalayas

Development of Ski Resorts in the Indian Himalayas Development of Ski Resorts in the Indian Himalayas AMITABH SHARMA SKI HIMALAYAS # 1 Pocket 52, C.R Park New Delhi 110019 +91-9816055555 Email : amitabhsharma_manali@rediffmail.com The Himalayas are a vast

More information

AIRPORT MODERNISATION IN INDIA By K Roy Paul Secretary, Ministry of Civil Aviation, India and Chairman, Air-India Limited

AIRPORT MODERNISATION IN INDIA By K Roy Paul Secretary, Ministry of Civil Aviation, India and Chairman, Air-India Limited - 1 - AIRPORT MODERNISATION IN INDIA By K Roy Paul Secretary, Ministry of Civil Aviation, India and Chairman, Air-India Limited With phenomenal growth in air traffic, the importance of air transport in

More information

NATIONAL AIRSPACE POLICY OF NEW ZEALAND

NATIONAL AIRSPACE POLICY OF NEW ZEALAND NATIONAL AIRSPACE POLICY OF NEW ZEALAND APRIL 2012 FOREWORD TO NATIONAL AIRSPACE POLICY STATEMENT When the government issued Connecting New Zealand, its policy direction for transport in August 2011, one

More information

Policy PL Date Issued February 10, 2014

Policy PL Date Issued February 10, 2014 Subject RENEWABLE ENERGY ON CROWN LAND Compiled by Renewable Energy Program, Biodiversity Branch Replaces Policy Directives Waterpower Site Release Crown Land Onshore Windpower Development - Crown Land

More information

CAIRNS RECTANGULAR PITCH STADIUM NEEDS STUDY PART 1 CAIRNS REGIONAL COUNCIL DRAFT REPORT SEPTEMBER 2011

CAIRNS RECTANGULAR PITCH STADIUM NEEDS STUDY PART 1 CAIRNS REGIONAL COUNCIL DRAFT REPORT SEPTEMBER 2011 CAIRNS RECTANGULAR PITCH STADIUM NEEDS STUDY PART 1 CAIRNS REGIONAL COUNCIL DRAFT REPORT SEPTEMBER 2011 CAIRNS RECTANGULAR PITCH STADIUM NEEDS STUDY PART 1 Cairns Regional Council September 2011 Coffey

More information

Sunshine Coast Airport Master Plan September 2007

Sunshine Coast Airport Master Plan September 2007 Sunshine Coast Airport Master Plan September 2007 Contents CONTENTS... I ACKNOWLEDGEMENT... II DISCLAIMER... III 1 EXECUTIVE SUMMARY...IV 1 INTRODUCTION... 1 2 AVIATION DEMAND FORECAST... 5 3 AIRCRAFT

More information

Welcome HAI Delegates

Welcome HAI Delegates Welcome HAI Delegates We fly for you Presentation by Dr. B P Sharma PAWAN HANS LIMITED Helicopter Industry: Indian Prospective MoCA-GoI New Civil Aviation Policy Pawan Hans Ltd-A Mini Ratna CPSE: A Profile

More information

ACI EUROPE POSITION. A level playing field for European airports the need for revised guidelines on State Aid

ACI EUROPE POSITION. A level playing field for European airports the need for revised guidelines on State Aid ACI EUROPE POSITION A level playing field for European airports the need for revised guidelines on State Aid 16 June 2010 1. INTRODUCTION Airports play a vital role in the European economy. They ensure

More information

Major Scheme Business Case Summary Report for Programme Entry

Major Scheme Business Case Summary Report for Programme Entry Paper A Heart of South West Local Transport Board Major Scheme Business Case Summary Report for Programme Entry M5 Junction 25, Taunton July 2016 1 SCHEME SUMMARY Scheme Name M5 Junction 25, Taunton Date

More information

List of schemes under SPA during to be monitored Sl. Name of Project No TAWANG DISTRICT

List of schemes under SPA during to be monitored Sl. Name of Project No TAWANG DISTRICT List of schemes under SPA during 0- to be monitored Sl. Approved SPA Executing Name of Project No. Cost Released Department Western Rs. In lakhs TAWANG DISTRICT C/o Cement Concrete Pavement, CC Drain,

More information

PHD Aviation Summit: Indian Civil Aviation Benefit Beyond Borders. February 18 th, Presented To:

PHD Aviation Summit: Indian Civil Aviation Benefit Beyond Borders. February 18 th, Presented To: KNOWLEDGE PARTNER PHD Aviation Summit: Indian Civil Aviation Benefit Beyond Borders February 18 th, 2016 Presented To: Shri Ashok Gajapathi Raju Pusapati Hon ble Minister of Civil Aviation Indian aviation

More information

SUMMER VILLAGE OF SILVER SANDS. Municipal Development Plan

SUMMER VILLAGE OF SILVER SANDS. Municipal Development Plan SUMMER VILLAGE OF SILVER SANDS Municipal Development Plan Bylaw 253-2014 Adopted August 22, 2014 Summer Village of Silver Sands Municipal Development Plan Bylaw No. 253-2014 Page 2 1 INTRODUCTION 1.1 SETTING

More information

Catchment and Lake Research

Catchment and Lake Research LARS 2007 Catchment and Lake Research Multilateral versus bilateral agreements for the establishment of river based organizations: comparison of legal, economic and social benefits in the Zambian experience.

More information

Development of infrastructure

Development of infrastructure Chapter 23 TOURISM Tourism has emerged as one of world's largest industries and a fastest growing sector of the world economy; tourism receipts account for a little over 8% of world export of goods and

More information

Regional summary - Wellington

Regional summary - Wellington Regional summary Wellington Regional summary - Wellington This is a summary of data relevant to transportation in this region, viewed from a Land Transport NZ perspective. It s purpose is to inform the

More information

Road Network in India, Public Private Partnership Financing & Case Study Narendra Sharma, SE(PPP), MoRT&H

Road Network in India, Public Private Partnership Financing & Case Study Narendra Sharma, SE(PPP), MoRT&H Road Network in India, Public Private Partnership Financing & Case Study 20.04.2018 Narendra Sharma, SE(PPP), MoRT&H Functions of Ministry of Road Transport and Highways, Govt. of India Formulation of

More information

The Corporation of the City of Kawartha Lakes Council Report

The Corporation of the City of Kawartha Lakes Council Report The Corporation of the City of Kawartha Lakes Council Report Report Number ENG2017-008 Date: September 12, 2017 Time: 2:00 p.m. Place: Council Chambers Ward Community Identifier: All Subject: Author Name

More information

HEAD OF ECONOMIC PROMOTION AND PLANNING Nathan Spilsted, Senior Planning Officer Tel:

HEAD OF ECONOMIC PROMOTION AND PLANNING Nathan Spilsted, Senior Planning Officer   Tel: 7. TRAVELLER SITES ALLOCATIONS DOCUMENT REPORT OF: Contact Officer: Wards Affected: Key Decision: Report to: HEAD OF ECONOMIC PROMOTION AND PLANNING Nathan Spilsted, Senior Planning Officer Email: nathan.spilsted@midsussex.gov.uk

More information

National Conference on

National Conference on National Conference on Rural Roads th 26 August 2014 Ashok Hotel, Chanakyapuri, New Delhi Ministry of Rural Development Conference on Rural Roads Indian Construction Equipment Manufacturers Association

More information

5 Rail demand in Western Sydney

5 Rail demand in Western Sydney 5 Rail demand in Western Sydney About this chapter To better understand where new or enhanced rail services are needed, this chapter presents an overview of the existing and future demand on the rail network

More information

Welcome. Sustainable Eco-Tourism in the face of Climate Change. Presented by Jatan Marma

Welcome. Sustainable Eco-Tourism in the face of Climate Change. Presented by Jatan Marma Welcome Sustainable Eco-Tourism in the face of Climate Change Presented by Jatan Marma Definition Sustainable Development: is a process to meet the needs of the present without compromising the ability

More information

COMMUNITY BASED TOURISM DEVELOPMENT (A Case Study of Sikkim)

COMMUNITY BASED TOURISM DEVELOPMENT (A Case Study of Sikkim) COMMUNITY BASED TOURISM DEVELOPMENT (A Case Study of Sikkim) SUMMARY BY RINZING LAMA UNDER THE SUPERVISION OF PROFESSOR MANJULA CHAUDHARY DEPARTMENT OF TOURISM AND HOTEL MANAGEMENT KURUKSHETRA UNIVERSITY,

More information

Growing Regional Victoria 2018 Victorian Election Priorities GROWING REGIONAL VICTORIA 2018 VICTORIAN ELECTION PRIORITIES

Growing Regional Victoria 2018 Victorian Election Priorities GROWING REGIONAL VICTORIA 2018 VICTORIAN ELECTION PRIORITIES GROWING REGIONAL VICTORIA 2018 VICTORIAN ELECTION PRIORITIES Message from the Chair, Cr Margaret O Rourke Regional Cities Victoria Growing Regional Victoria Regional Cities Victoria (RCV) is uniquely positioned

More information

Peter Sorensen Director, Europe Safety, Operations & Infrastructure To represent, lead and serve the airline industry

Peter Sorensen Director, Europe Safety, Operations & Infrastructure To represent, lead and serve the airline industry Future of ATM Peter Sorensen Director, Europe Safety, Operations & Infrastructure To represent, lead and serve the airline industry 1 1 Air Traffic Management (ATM) Management of aircraft and airspace

More information

INFRASTRUCTURE DEVELOPMENT IN THE NORTH-EAST

INFRASTRUCTURE DEVELOPMENT IN THE NORTH-EAST INFRASTRUCTURE DEVELOPMENT IN THE NORTH-EAST INTERNATIONAL CONFERENCE ON CROSS-BORDER CONNECTIVITY NEW DELHI, MAY 12, 2014 Dr. Manoj Singh, Adviser (Transport) PLANNING COMMISSION, GOVERNMENT OF INDIA

More information

STANSTED AIRPORT PLANNING APPLICATION UTT/18/0460/FUL SECTION 106 CONDITIONS TO BE REQUIRED IF PLANNING APPLICATION IS APPROVED

STANSTED AIRPORT PLANNING APPLICATION UTT/18/0460/FUL SECTION 106 CONDITIONS TO BE REQUIRED IF PLANNING APPLICATION IS APPROVED STANSTED MOUNTFITCHET PARISH COUNCIL STANSTED AIRPORT PLANNING APPLICATION UTT/18/0460/FUL SECTION 106 S TO BE REQUIRED IF PLANNING APPLICATION IS APPROVED 1 INTRODUCTION 1.1 Stansted Mountfitchet Parish

More information

ASHGABAT, TURKMENISTAN

ASHGABAT, TURKMENISTAN Republic of Zambia MINISTRY OF TRANSPORT AND COMMUNICATIONS STATEMENT BY H.E. BRIAN MUSHIMBA MINISTER OF TRANSOPORT AND COMMUNICATION, REPUBLIC OF ZAMBIA AND GLOBAL CHAIR OF THE GROUP OF LLDCS Delivered

More information

QUALITY OF SERVICE OF CELLULAR MOBILE IN LUTYENS AND NDMC AREAS OF DELHI A STUDY

QUALITY OF SERVICE OF CELLULAR MOBILE IN LUTYENS AND NDMC AREAS OF DELHI A STUDY QUALITY OF SERVICE OF CELLULAR MOBILE IN LUTYENS AND NDMC AREAS OF DELHI A STUDY I. Introduction 1. TRAI had received a number of complaints from consumers regarding call drops, poor coverage etc. in Delhi,

More information

Stimulating Airports is Stimulating the Economy

Stimulating Airports is Stimulating the Economy Stimulating Airports is Stimulating the Economy House of Commons Standing Committee on Finance Pre-budget 2010 Submission August 14 th, 2009 Executive Summary Atlantic Canada Airports Association s (ACAA)is

More information

SAMTRANS TITLE VI STANDARDS AND POLICIES

SAMTRANS TITLE VI STANDARDS AND POLICIES SAMTRANS TITLE VI STANDARDS AND POLICIES Adopted March 13, 2013 Federal Title VI requirements of the Civil Rights Act of 1964 were recently updated by the Federal Transit Administration (FTA) and now require

More information

Morocco. Tourism in the economy. Tourism governance and funding. Ref. Ares(2016) /06/2016

Morocco. Tourism in the economy. Tourism governance and funding. Ref. Ares(2016) /06/2016 Ref. Ares(2016)3120133-30/06/2016 II. PARTNER COUNTRY PROFILES MOROCCO Morocco Tourism in the economy Tourism is one of the main economic drivers in Morocco. The Moroccan tourism sector performed well

More information

Promoting Tourism as an Engine of Inclusive Growth and Sustainable Growth in Africa. Egyptian Minister of Tourism YEHIA RASHED

Promoting Tourism as an Engine of Inclusive Growth and Sustainable Growth in Africa. Egyptian Minister of Tourism YEHIA RASHED Promoting Tourism as an Engine of Inclusive Growth and Sustainable Growth in Africa Egyptian Minister of Tourism YEHIA RASHED JULY 21, 2016 International tourism highlights (2015): Introduction: Tourism

More information

DAA Response to Commission Notice CN2/2008

DAA Response to Commission Notice CN2/2008 22 nd September 2008 DAA Response to Commission Notice CN2/2008 1 DAA welcomes the opportunity to respond to the Commission notice CN2/2008 which discusses the interaction between the regulations governing

More information

2.2 For these reasons the provision of tourist signing will only be considered:

2.2 For these reasons the provision of tourist signing will only be considered: TOURIST SIGNING POLICY 2015 1. DEFINITION 1.1 A tourist destination is defined as a permanently established attraction which attracts or is used by visitors to an area and is open to the public without

More information

Sources of Information

Sources of Information Sources of Information Bureau of Immigration: Embarkment and Disembarkment information is collected from 24 Airports, 17 Seaports and 31 Land Checkposts. International Passenger Surveys: Provide Information

More information

STATEMENT OF PROBLEMS OF THE PROJECT

STATEMENT OF PROBLEMS OF THE PROJECT Strategic planning and the development of Vladivostok city local economic policy Andrey Velichko (Far Eastern State University, Vladivostok city, Russia) the presenter Alexandr Abramov, Yuriy Avdeev, Denis

More information

ROADS April Contents. Advantage India. Market overview. Investments. Regulatory framework. Opportunities. Industry associations

ROADS April Contents. Advantage India. Market overview. Investments. Regulatory framework. Opportunities. Industry associations ROADS April 2010 ROADS April 2010 Contents Advantage India Market overview Investments Regulatory framework Opportunities Industry associations 2 ADVANTAGE INDIA Advantage India With the largest road network

More information

Consultation on Draft Airports National Policy Statement: new runway capacity and infrastructure at airports in the South East of England

Consultation on Draft Airports National Policy Statement: new runway capacity and infrastructure at airports in the South East of England Tony Kershaw Honorary Secretary County Hall Chichester West Sussex PO19 1RQ Telephone 033022 22543 Website: www.gatcom.org.uk If calling ask for Mrs. Paula Street e-mail: secretary@gatcom.org.uk 22 May

More information

ENVIRONMENT ACTION PLAN

ENVIRONMENT ACTION PLAN ENVIRONMENT ACTION PLAN 2015 16 Airservices Australia 2015 This work is copyright. Apart from any use as permitted under the Copyright Act 1968, no part may be reproduced by any process without prior written

More information

REPORT 2014/111 INTERNAL AUDIT DIVISION. Audit of air operations in the United Nations Operation in Côte d Ivoire

REPORT 2014/111 INTERNAL AUDIT DIVISION. Audit of air operations in the United Nations Operation in Côte d Ivoire INTERNAL AUDIT DIVISION REPORT 2014/111 Audit of air operations in the United Nations Operation in Côte d Ivoire Overall results relating to the effective management of air operations in the United Nations

More information

2001/02 Financial review of the Ministry of Transport. Report of the Transport and Industrial Relations Committee

2001/02 Financial review of the Ministry of Transport. Report of the Transport and Industrial Relations Committee 2001/02 Financial review of the Ministry of Transport Report of the Transport and Industrial Relations Committee December 2002 2 Ministry of Transport Recommendation The Transport and Industrial Relations

More information

Performance Criteria for Assessing Airport Expansion Alternatives for the London Region

Performance Criteria for Assessing Airport Expansion Alternatives for the London Region Performance Criteria for Assessing Airport Expansion Alternatives for the London Region Jagoda Egeland International Transport Forum at the OECD TRB Annual Meeting 836 - Measuring Aviation System Performance:

More information

Whangarei Airport. Prepared by Carine Andries 10/20173

Whangarei Airport. Prepared by Carine Andries 10/20173 Whangarei Airport Prepared by Carine Andries 10/20173 March 2010 TABLE OF CONTENTS 1 2 3 INTRODUCTION... 3 AIRPORT ROLE AND FUNCTION... 3 AIRPORT FEATURES AND CAPACITY... 3 3.1 3.2 3.3 3.4 3.5 3.5.1 3.5.2

More information

11 th Annual Conference Road Development in India Telangana State Initiatives

11 th Annual Conference Road Development in India Telangana State Initiatives 11 th Annual Conference Road Development in India Telangana State Initiatives 24 th August 2016 New Delhi Bikshapathi Kondai Engineer in Chief R&B, Telangana State New Telangana State - Infrastructure

More information

Department of Legislative Services Maryland General Assembly 2009 Session

Department of Legislative Services Maryland General Assembly 2009 Session Department of Legislative Services Maryland General Assembly 2009 Session SB 650 FISCAL AND POLICY NOTE Senate Bill 650 (Senators Pipkin and Astle) Finance and Budget and Taxation Medevac Helicopter Improvement

More information

The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands.

The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands. The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands. Connecting People Building Opportunities 198 Brisbane Airport Corporation CHAPTER 10

More information

Response to the London Heathrow Airport Expansion Public Consultation

Response to the London Heathrow Airport Expansion Public Consultation Response to the London Heathrow Airport Expansion Public Consultation Summary This report sets out the response to the Heathrow Airport s consultation on airport expansion and airspace change. The consultation

More information

PERTH-ADELAIDE CORRIDOR STRATEGY

PERTH-ADELAIDE CORRIDOR STRATEGY INTRODUCTION The Royal Automobile Association of SA Inc (RAA), the State s principal advocate for motorists on a broad range of motoring-related issues, represents the views of more than 560,000 South

More information

Nanaji Deshmukh Scheme of Construction of Hostels for DNTs Boys and Girls. (Centrally Sponsored Scheme)

Nanaji Deshmukh Scheme of Construction of Hostels for DNTs Boys and Girls. (Centrally Sponsored Scheme) Nanaji Deshmukh Scheme of Construction of Hostels for DNTs Boys and Girls (Centrally Sponsored Scheme) (Effective from 2014-15) 1. Background The Government had constituted a National Commission for Denotified,

More information

Estimation of Tourism Employment through Tourism Satellite Account Indian Experience

Estimation of Tourism Employment through Tourism Satellite Account Indian Experience Estimation of Tourism Employment through Tourism Satellite Account Indian Experience Dr. R. N. Pandey Additional Director General Ministry of Tourism Govt. of India E-Mail: rajnath56.pandey@gmail.com Importance

More information

Theme A ECOTOURISM DEVELOPMENT IN TANZANIA : THE SUSTAINABILITY CHALLENGE

Theme A ECOTOURISM DEVELOPMENT IN TANZANIA : THE SUSTAINABILITY CHALLENGE Theme A STATEMENT BY MR. PHILEMON L. LUHANJO, PERMANENT SECRETARY, MINISTRY OF NATURAL RESOURCES AND TOURISM-TANZANIA, AT THE SUMMIT OF CELEBRATION OF THE INTERNATIONAL YEAR OF ECOTOURISM, QUEBEC CANADA,

More information

Benefits of NEXTT. Nick Careen SVP, APCS. Will Squires Project Manager, Atkins. Anne Carnall Program Manager, NEXTT

Benefits of NEXTT. Nick Careen SVP, APCS. Will Squires Project Manager, Atkins. Anne Carnall Program Manager, NEXTT Benefits of NEXTT Nick Careen SVP, APCS Anne Carnall Program Manager, NEXTT Will Squires Project Manager, Atkins 12 December 2018 1 Our industry continues to grow Our forecasts predict there will be 8.2

More information

BY NHIDCL. 25 t h MAY, 2018

BY NHIDCL. 25 t h MAY, 2018 DEVELOPMENT OF ROAD INFRASTRUCTURE BY NHIDCL 25 t h MAY, 2018 NATIONAL HIGHWAYS & INFRASTRUCTURE DEVEOPMENT CORPORATION LTD. FAST PACE CONSTRUCTION OF NATIONAL HIGHWAYS AND OTHER INFRASTRUCTURE IN NE REGION

More information

(a) it has been licensed for the purpose, and save in accordance with the conditions prescribed in such licence; or

(a) it has been licensed for the purpose, and save in accordance with the conditions prescribed in such licence; or PART - XI Aerodromes 78. Licensing of Aerodromes (1) No aerodrome shall be used as a regular place of landing and departure by a scheduled air transport service or for a series of landings and departures

More information

3. Coach Supporting Statement

3. Coach Supporting Statement 3. Coach Supporting Statement Content 1. Setting the Scene 2. Vision 3. Coaches and the Shared Priorities 4. Issues 5. Delivery Programme in the first Plan Period 2001/02 2005/06 6. Good Practice 7. Strategy

More information

EXPLANATORY STATEMENT

EXPLANATORY STATEMENT THE LONDON TO FISHGUARD TRUNK ROAD (A40) (PENBLEWIN TO SLEBECH PARK IMPROVEMENT) ORDER 200- AND THE LONDON TO FISHGUARD TRUNK ROAD (A40) (PENBLEWIN TO SLEBECH PARK IMPROVEMENT SIDE ROADS) ORDER 200-1.

More information

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES Recurring topics emerged in some of the comments and questions raised by members of the

More information

The Himalayan Future Transition, Equity and Ecological Stability. Jayanta Bandyopadhyay

The Himalayan Future Transition, Equity and Ecological Stability. Jayanta Bandyopadhyay The Himalayan Future Transition, Equity and Ecological Stability Jayanta Bandyopadhyay Himalaya the Mountain of Diversity The Himalaya has been mentioned in many writings, both ancient and modern, scientific

More information

INTERNAL AUDIT DIVISION REPORT 2017/051. Audit of the aviation safety programme in the African Union-United Nations Hybrid Operation in Darfur

INTERNAL AUDIT DIVISION REPORT 2017/051. Audit of the aviation safety programme in the African Union-United Nations Hybrid Operation in Darfur INTERNAL AUDIT DIVISION REPORT 2017/051 Audit of the aviation safety programme in the African Union-United Nations Hybrid Operation in Darfur There was a need to effectively address issues identified and

More information

LYNDHURST NEW URBAN DEVELOPMENT AREA STRUCTURE PLAN. Lyndhurst New Urban Development Area Structure Plan OUTCOMES AND PERFORMANCE STANDARDS

LYNDHURST NEW URBAN DEVELOPMENT AREA STRUCTURE PLAN. Lyndhurst New Urban Development Area Structure Plan OUTCOMES AND PERFORMANCE STANDARDS APPENDIX 15.1-3 LYNDHURST NEW URBAN DEVELOPMENT AREA STRUCTURE PLAN Purpose of the Structure Plan Lyndhurst New Urban Development Area Structure Plan OUTCOMES AND PERFORMANCE STANDARDS LSP-P1 The District

More information

REMOTELY PILOTED AIRCRAFT SYSTEMS SYMPOSIUM March Detect and Avoid. DI Gerhard LIPPITSCH. ICAO RPAS Panel Detect & Avoid Rapporteur

REMOTELY PILOTED AIRCRAFT SYSTEMS SYMPOSIUM March Detect and Avoid. DI Gerhard LIPPITSCH. ICAO RPAS Panel Detect & Avoid Rapporteur REMOTELY PILOTED AIRCRAFT SYSTEMS SYMPOSIUM 23-25 March 2015 Detect and Avoid DI Gerhard LIPPITSCH ICAO RPAS Panel Detect & Avoid Rapporteur Remotely Piloted Aircraft Systems (RPAS) Symposium, 23 25 March

More information

INTERNATIONAL CIVIL AVIATION ORGANIZATION

INTERNATIONAL CIVIL AVIATION ORGANIZATION INTERNATIONAL CIVIL AVIATION ORGANIZATION Implementation of ICAO Universal Safety Oversight Audit Programme (USOAP) Corrective Action Plan Revised Plan of Action for Malawi JULY 2013 - 2 - REVISED ICAO

More information

Ecotourism as Market based Conservation Scheme. EQUATIONS, India

Ecotourism as Market based Conservation Scheme. EQUATIONS, India Ecotourism as Market based Conservation Scheme EQUATIONS, India Initiating Developing The Scheme used for. directing private sector investment for conservation and for resolving environmental problems

More information

43. DEVELOPMENT AND DISTRIBUTION OF TOURISM

43. DEVELOPMENT AND DISTRIBUTION OF TOURISM Tourism Tourism is one of the world s largest industries. In many regions it is also the greatest source of revenue and employment. Tourism demand is based on the values and needs of modern tourists, while

More information

PLANNING THE SUNBURY GROWTH CORRIDOR

PLANNING THE SUNBURY GROWTH CORRIDOR SUNBURY GROWTH CORRIDOR NOVEMBER 2016 PLANNING THE SUNBURY GROWTH CORRIDOR Sunbury Planning Background The Victorian Planning Authority, in consultation with Hume City Council, is undertaking a number

More information

The Next International Cruise Tourism Hub

The Next International Cruise Tourism Hub The Next International Cruise Tourism Hub Contents Market Scenario and Projections Demand & Supply Factors Current Scenario in India Vision & Formulation of Task Force Standard Operating Procedures Ministry

More information

Chapter 1: Project Overview & Justification 1.1 Project Overview

Chapter 1: Project Overview & Justification 1.1 Project Overview EIA Airport Hotel Ltd- Development of Holiday Inn Airport Hotel at Plaine Magnien Page 8 HOLIDAY INN AIRPORT HOTEL Plaine Magnien ENVIRONMENTAL IMPACT ASSESSMENT Chapter 1: Project Overview & Justification

More information

L 342/20 Official Journal of the European Union

L 342/20 Official Journal of the European Union L 342/20 Official Journal of the European Union 24.12.2005 COMMISSION REGULATION (EC) No 2150/2005 of 23 December 2005 laying down common rules for the flexible use of airspace (Text with EEA relevance)

More information

Chile. Tourism in the economy. Tourism governance and funding

Chile. Tourism in the economy. Tourism governance and funding Chile Tourism in the economy Tourism in Chile has experienced a sustained rise in recent years and has become one of the sectors delivering the fastest growth and employment generation. It has been estimated

More information

Terms of Reference (ToR) for a Short-Term assignment

Terms of Reference (ToR) for a Short-Term assignment Terms of Reference (ToR) for a Short-Term assignment Technical assistance requested Expert for climate change mitigation and adaptation Project Title Outline of the Climate Adaptation Strategy and basin-wide

More information

IOW Ramblers Submission Paper to the Sept 2016 ROW Improvement Plan Consultation.

IOW Ramblers Submission Paper to the Sept 2016 ROW Improvement Plan Consultation. IOW Ramblers Submission Paper to the Sept 2016 ROW Improvement Plan Consultation. The current Island Rights of Way Improvement Plan is a comprehensive document and much of its content is still relevant

More information

Chapter 4.0 Alternatives Analysis

Chapter 4.0 Alternatives Analysis Chapter 4.0 Alternatives Analysis Chapter 1 accumulated the baseline of existing airport data, Chapter 2 presented the outlook for the future in terms of operational activity, Chapter 3 defined the facilities

More information

DEPARTMENT: CIVIL ENGINEERING SEMESTER: III SUBJECT CODE / Name: CE2303/ Railway, Airport and Harbors Engineering 2 MARK QUESTIONS AND ANSWERS

DEPARTMENT: CIVIL ENGINEERING SEMESTER: III SUBJECT CODE / Name: CE2303/ Railway, Airport and Harbors Engineering 2 MARK QUESTIONS AND ANSWERS DEPARTMENT: CIVIL ENGINEERING SEMESTER: III SUBJECT CODE / Name: CE2303/ Railway, Airport and Harbors Engineering 2 MARK QUESTIONS AND ANSWERS 1.Define wind Coverage (AUC NOV/DEC 2010),(AUC NOV/DEC 2011)

More information

Census Rationale. Census Objectives

Census Rationale. Census Objectives Census Rationale The Dhaka Transport Coordination Board (DTCB) has identified ten major corridors in Dhaka city to be transformed into NMT free corridors. After the withdrawal of NMT from the first corridor,

More information

8 CROSS-BOUNDARY AGREEMENT WITH BRAMPTON TRANSIT

8 CROSS-BOUNDARY AGREEMENT WITH BRAMPTON TRANSIT 8 CROSS-BOUNDARY AGREEMENT WITH BRAMPTON TRANSIT The Transportation Services Committee recommends the adoption of the recommendations contained in the following report dated May 27, 2010, from the Commissioner

More information

Your Transport Levy Your Transport Future. Sunshine Coast Council Transport Levy Annual Report

Your Transport Levy Your Transport Future. Sunshine Coast Council Transport Levy Annual Report Your Transport Levy Your Transport Future Sunshine Coast Council Transport Levy Annual Report 2016-2017 www.sunshinecoast.qld.gov.au T 07 5475 7272 F 07 5475 7277 Locked Bag 72 Sunshine Coast Mail Centre

More information

Connectivity continues to remain one of the biggest concerns for north Chennai residents with thousands of commuters struggling every day

Connectivity continues to remain one of the biggest concerns for north Chennai residents with thousands of commuters struggling every day Employment North Chennai is primarily an industrial area and is governed by business and trader community, locomotive workshops, government offices and port related activities. Chennai Port and Ennore

More information

N4 Carrick-on-Shannon to Dromod Road Project. 2.1 Introduction

N4 Carrick-on-Shannon to Dromod Road Project. 2.1 Introduction Chapter 2 Need for the Scheme 2.1 Introduction The National Primary Route N4, Dublin to Sligo is a strategic corridor from Dublin to the northwest and border counties (See RCSR 101 in Volume 2). The National

More information

Tulsa Airports Improvement Trust Strategic Plan Update

Tulsa Airports Improvement Trust Strategic Plan Update Tulsa Airports Improvement Trust Strategic Plan Update 2016-2026 TABLE OF CONTENTS I. Background II. III. IV. Existing Conditions and Future Requirements Mission, Vision, & Goals Strengths, Weakness, Opportunities

More information

CHRISTCHURCH MOTORWAYS. Project Summary Statement February 2010

CHRISTCHURCH MOTORWAYS. Project Summary Statement February 2010 CHRISTCHURCH MOTORWAYS Project Summary Statement February 2010 Table of Contents 1. Purpose of Document 2. Strategic Context 3. Benefits 4. Project Scope and Economics 5. Implementation Plan 1 ROADS OF

More information

Westover Metropolitan Airport Master Plan Update

Westover Metropolitan Airport Master Plan Update Westover Metropolitan Airport Master Plan Update June 2008 INTRODUCTION Westover Metropolitan Airport (CEF) comprises the civilian portion of a joint-use facility located in Chicopee, Massachusetts. The

More information

Year on year average room rate and room supply

Year on year average room rate and room supply Average Occupancy Goa: The tourism destination The smallest state in India spread over 3,702 sq.km with beautiful pristine coastline, serene lush green forests, hospitable people and a uniquely rich culture.

More information

Airport Planning Area

Airport Planning Area PLANNING AREA POLICIES l AIRPORT Airport Planning Area LOCATION AND CONTEXT The Airport Planning Area ( Airport area ) is a key part of Boise s economy and transportation network; it features a multi-purpose

More information

Strategic Transport Forum 21 st September 2018

Strategic Transport Forum 21 st September 2018 Strategic Transport Forum 21 st September 2018 Agenda Item 4: Heathrow Airport Expansion: Surface Access Strategy Update Recommendation: It is recommended that the Forum consider the update provided by

More information

an engineering, safety, environmental, traffic and economic assessment of each option to inform a preferred route option choice; 3) Development and as

an engineering, safety, environmental, traffic and economic assessment of each option to inform a preferred route option choice; 3) Development and as Page: 42 Infrastructure Services REPORT TO ABERDEENSHIRE COUNCIL COMMITTEE 26 APRIL 2018 A96 ABERDEEN TO INVERNESS DUALLING POSITION STATEMENT 1 Recommendations Aberdeenshire Council is recommended to:

More information

OUR COUNTRY INDIA L OCATIONAL SETTING

OUR COUNTRY INDIA L OCATIONAL SETTING 7 India is a country of vast geographical expanse. In the north, it is bound by the lofty Himalayas. The Arabian Sea in the west, the Bay of Bengal in the east and the Indian Ocean in the south, wash the

More information

ECONOMIC IMPACT OF SPIRITUAL TOURISM ON UTTARAKHAND

ECONOMIC IMPACT OF SPIRITUAL TOURISM ON UTTARAKHAND CHAPTER 6 ECONOMIC IMPACT OF SPIRITUAL TOURISM ON UTTARAKHAND Tourism has been globally recognized as one of the important economic activities. Selected countries enjoy the privilege of being a hub of

More information

The future of airport capacity in Europe

The future of airport capacity in Europe The future of airport capacity in Europe Olivier Jankovec, Director General, ACI EUROPE Regional Airline Conference, Malta - 10 April 2008 Agenda The capacity crunch: an unavoidable reality What are the

More information

Outline. (1) JICA and India. (2) Infrastructure Development. (3) Cross-Border Connectivity

Outline. (1) JICA and India. (2) Infrastructure Development. (3) Cross-Border Connectivity 1 Outline (1) JICA and India (2) Infrastructure Development (3) Cross-Border Connectivity 2 Outline (1) JICA and India (2) Infrastructure Development (3) Cross-Border Connectivity 3 About JICA JICA is

More information

AIRPORT NOISE AND CAPACITY ACT OF 1990

AIRPORT NOISE AND CAPACITY ACT OF 1990 AIRPORT NOISE AND CAPACITY ACT OF 1990 P. 479 AIRPORT NOISE AND CAPACITY ACT OF 1990 SEC. 9301. SHORT TITLE This subtitle may be cited as the Airport Noise and /Capacity Act of 1990. [49 U.S.C. App. 2151

More information

Biosphere Reserves of India : Complete Study Notes

Biosphere Reserves of India : Complete Study Notes Biosphere Reserves of India : Complete Study Notes Author : Oliveboard Date : April 7, 2017 Biosphere reserves of India form an important topic for the UPSC CSE preparation. This blog post covers all important

More information

SUSTAINABLE AIR TRANSPORT IN THE FUTURE TEN-T

SUSTAINABLE AIR TRANSPORT IN THE FUTURE TEN-T SUSTAINABLE AIR TRANSPORT IN THE FUTURE TEN-T This document is part of a series of technical support documents to the green paper "TEN-T : A policy review Towards a better integrated trans-european transport

More information

Report of the Strategic Director of Place to the meeting of Executive to be held on 11 September 2018

Report of the Strategic Director of Place to the meeting of Executive to be held on 11 September 2018 Report of the Strategic Director of Place to the meeting of Executive to be held on 11 September 2018 Subject: M Arrangements for the establishment of a West Yorkshire Urban Traffic Management Control

More information