Chapter 1: Project Overview & Justification 1.1 Project Overview

Size: px
Start display at page:

Download "Chapter 1: Project Overview & Justification 1.1 Project Overview"

Transcription

1 EIA Airport Hotel Ltd- Development of Holiday Inn Airport Hotel at Plaine Magnien Page 8 HOLIDAY INN AIRPORT HOTEL Plaine Magnien ENVIRONMENTAL IMPACT ASSESSMENT Chapter 1: Project Overview & Justification 1.1 Project Overview The SSR International Airport is expanding to accommodate expected growth in passenger numbers and air freight. Long term passenger demand is forecast to reach some 5.3 million passengers in A new dedicated passenger terminal is under construction to satisfy the forecast passenger growth. The development of a hotel complex development is consistent with international standard of providing for tourist and hospitality related development in the vicinity of the airport to meet the demand of transit passengers waiting for their connection flights as well as short stay passengers. Airport Hotel Ltd., based on market research that indicates a hotel from around 120 to 160 rooms could be suitable close to the Airport, directed at mid-market accommodation (4-4½ stars). The facilities should include a restaurant, day-use conference room, meeting rooms and board rooms, sports and fitness centre, a wellness centre and swimming pool. The style of rooms in the hotel should be predominately standard level rooms, with some deluxe rooms and limited suites. Furthermore the hotel complex should be sited and designed so that it does not breach the Obstacle Limitation Surfaces (OLS) associated with airport runways, be located close to the Airport Terminal, with a number of flights arriving and departing daily and the hotel locality within 5 minute drive time to the coast. Airport Hotel Ltd has identified a site close to the airport terminal for the development of an internationally branded 4 star airport hotel with the Intercontinental Hotel Group owner of the Holiday Inn Hotel Brand. In the main the hotel Project will consist of inter alia: One hundred and forty (140) rooms including three (3) accessible rooms, two(2) Senior Suites and seven (7) Executive Suites Seven (7) subdividing Conference rooms + one (1) Banqueting room, all with garden break out A la carte Restaurant with large view terrace Bar lounge with large view terrace North-west facing pool Terrace with stepped, rim-flow pool Sports and fitness centre Health and Spa 1.2 Hotel Concept Holiday Inn is one of the world s largest hotel brands and is synonymous with consistency and reliability of standards and service. The new-generation Holiday Inn concept combines this reputation with state-of-the art modern design. 1 source: Outline Planning Scheme for Grand Port Savanne District Council Area- Approved Version (September 2006)

2 EIA Airport Hotel Ltd- Development of Holiday Inn Airport Hotel at Plaine Magnien Page 9 Whilst carrying a global brand name, the development team is committed to creating a 4-star hotel product that is quintessentially Mauritian in design and in character, and one that harnesses sustainable design initiatives to create a new, modern Mauritian vernacular that touches the earth as lightly as possible. The unique quality of the Site, including its botanical diversity, has influenced the hotel design so that the hotel concept is more a resort than an airport hotel. Sustainable Design Initiatives Some design and sustainable initiatives that are considered desirable: A design to maximize access to natural light, south east winds for natural ventilation and to ensure adequate sound proofing from airport noise; A Health and Fitness Centre, catering to traveller s wellness concerns; A proportion of rooms with openable windows; Ability to separately turn on/off air-conditioning or use natural ventilation in recognition of local tropical climate; Use of recycled water for irrigation of landscaped areas; Rainwater collection and storage for irrigation of landscaped areas; Waste heat recovery with supplementation of solar energy for hot water production; Renewable energy using PV solar panels for outdoor lighting; and Consideration of sustainable initiatives such as minimal laundering of towels, dual flush toilets and waterless urinal systems; and Low energy lightings 1.3 Justification of the Airport Hotel The Project will form part of the Resort or Hotel infrastructure required to accommodate the targeted tourist population of 2 million p.a., although, since the worldwide economic dislocation of 2008 / 2009, the tourist arrivals in Mauritius is growing at a slower rate. The recent World Financial Crisis does not appear to have induced any change in the Government's Policy with regard to tourism sector although the hotel operators are still very much concerned on the recovery period. Inasmuch as the airport capacity and the accommodation capacity are concerned, the Airport is being upgraded and modernised Tourism Development in Mauritius Tourism is an important pillar of the Mauritian Economy with the decline of key sectors like the Sugar and the Textile sectors. The number of tourists visiting Mauritius has been increasing at a rate of 3.6% on average from 2002 to Key indicators pertaining to hotel occupancy are summarised below 2. 2 Source Central Statistics Office

3 EIA Airport Hotel Ltd- Development of Holiday Inn Airport Hotel at Plaine Magnien Page Number of Tourists Number of Hotels Number of rooms Number of beds Room occupancy rate (%) Bed Occupancy rate (%) In 2006, there were 99 registered hotels in operation, with a total room capacity of 10,666 and 21,403 bed places. The average room occupancy rate for all hotels was 66% while bed occupancy rate averaged 59%. Growth in tourist arrival has increased by 7.3% in 2010 after a decrease of 6.4% in 2009 due to the world financial crisis and recession in the EURO zone, our main tourism market. With the persistent financial and economic woes of the EURO zone countries, growth rate has only been +3.2% in As part of the market diversification strategy, Asian markets particularly tourists from India and China appear promising. 1.4 Legal and Administrative Framework Environment Protection Act 2002 as amended in 2008 The Airport Hotel Project is not a scheduled undertaking that requires either a Preliminary Environmental Report or an Environmental Impact Assessment according to the Environment Protection (Amendment of Schedule) Regulations However the Ministry of Environment & Sustainable Development has declared the proposed Airport Project an undertaking requiring an EIA Licence as per Section 17 of the EPA. The correspondences are given in Appendix B Environmental Regulations The Environmental Regulations and guidelines set out under the Environmental Protection Act and directly relevant to the Project are: Environment Protection (Standards for Air) Regulations 1998 Environment Protection (Standards for effluent discharge) Regulations Environment Protection (Standards for effluent for use in irrigation) Regulation 2003 Environment Protection (Environmental Standards for Noise) Regulation National Development Strategy 2003 The National Development Strategy that sets out the Development Strategy and Policies and in particular those of the Planning Policy Guidelines will govern the Project impacts on Public Utilities and the conformity with the judicious development and conservation of land resources. Two main themes are followed. To achieve balanced development and create compact settlement forms. 3 Regulations made by the Minister under Sections 34 and 74 of the Environment Protection Act 1991

4 EIA Airport Hotel Ltd- Development of Holiday Inn Airport Hotel at Plaine Magnien Page 11 Strategic Policy SP16- Coastal Developments and Tourism is reinforced by Policy TM 1 of the NDS which outlines the concept of a sequential approach to tourism development which first focuses in existing settlements resorts and major campement sites within the designated Tourism Zones. The proposed development although does not fall within the specifically identified tourism zones of the Development Strategy Map, can arguably be referred as an extension of the Mahébourg Tourism Zone which includes Blue Bay Planning Policy Guidance 2004 Parameters such as building setbacks from High Water Mark, height of buildings above Ground Level, Land Occupancy, are governed by the Planning Policy Guidance of the Ministry of Housing and Lands The Grand Port/Savanne DCA Outline Planning Scheme 2006 The Grand Port/Savanne District Council Area Outline Planning Scheme is the main reference against which development permit applications are evaluated. The outline planning schemes exist for all the district council areas, having their basis from the Planning Policy Guidance and incorporating district specific constraints and requirements. The Promoters have applied for an Outline Planning Permission from the District Council as per Town and Country Planning Act 1954 (as amended). The clearance has been obtained as per attachment in Appendix B Road Traffic Act The construction of any direct access to existing public road requires the clearance of the Road Development Authority (RDA) and the Traffic Management and Road Safety Unit (TMRSU) of the Ministry of Public Infrastructure, Land Transport & Shipping Land Conversion Permit The Site is occupied by a house that used to be the residence of the Administrator of the Mon Tresor Mon Desert Sugar Factory. Hence the land does not fall under the purview of the Sugar Industry Efficiency Act 2001 (as amended) that would have required a land conversion permit Maurice Ile Durable Project (MID) Maurice Ile Durable (MID) is a long term vision aimed at promoting sustainable development in Mauritius. Policies and strategies for the MID vision are presently being developed SSR International Airport Safeguarding Development within the environs of the SSR International Airport is controlled in accordance with the Plaisance Airport (Building Restrictions) Act 1964 and Annex 14 to the Convention on International Civil Aviation (1944). The areas subject to building control and restriction around the SSR International Airport are illustrated in detail on the Airport Safeguarding Area Restriction Inset Plan 4. These include areas affected by existing and future operations and also previously defined safeguarding areas. Five 4 source: Outline Planning Scheme for Grand Port Savanne District Council Area- Approved Version (September 2006)

5 EIA Airport Hotel Ltd- Development of Holiday Inn Airport Hotel at Plaine Magnien Page 12 zones 5 have been defined by the competent authority, i.e. the Director of Civil Aviation (DCA) as follows: Approach Areas: no new building or structure is permitted within the Approach Area without a No Objection Certificate from the Director of Civil Aviation (DCA) Transitional Surface: there are restrictions on new buildings and structures and hence a No Objection Certificate from the Director of Civil Aviation would be required for development within this zone Inner Horizontal Surface: a No Objection Certificate from the Director of Civil Aviation is required for any new development within this zone; the height of any such development is restricted to m above Mean Sea Level (MSL) Conical Surface: restrictions vary according to location, however a No Objection Certificate from the Director of Civil Aviation is required for any new development in this zone Areas Outside Obstacle Limitation Surface: within a radius of 11 km from the threshold of Runway 14 as shown on the Restriction Inset Plan, any new building or structure exceeding 15.20m in height requires a No Objection Certificate from the Director of Civil Aviation. The Project Site is just outside the SSR International Airport Boundary (IA1) and well outside the SSR International Airport Safeguarding Area (IA1, IA2). However as the Project Site is within the Inner Horizontal Surface Zone, a no objection certificate from the DCA is required. 1.5 Project Milestones The milestones for the Hotel Project Development is summarised below. Milestones Date Application for EIA licence July 2012 Application for Building and Land use Permit October 2012 Architectural tender Drawings July 2012 MEP Tender Drawings July 2012 Structural Tender Drawings August 2012 Floating of Tender for various works September 2012 Award of Work Contracts November 2012 Start of Hotel Construction November 2012 End of Hotel Construction December Implementation Schedule HIAH intends to start the hotel construction works in November The duration of the works associated with the Airport Hotel is estimated at 13 months. The opening of the hotel is scheduled for the peak season of December source: Outline Planning Scheme for Grand Port Savanne District Council Area- Approved Version (September 2006)

AERODROME LICENCE APPLICATION PROCESS

AERODROME LICENCE APPLICATION PROCESS 0000180111 Page 2 Why is a Licence Required? An aerodrome licence is required for a site if it is intended to facilitate operations by commercial transport aircraft, other aerial work other than rotorcraft,

More information

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport Executive Summary MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport As a general aviation and commercial service airport, Fort Collins- Loveland Municipal Airport serves as an important niche

More information

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES Recurring topics emerged in some of the comments and questions raised by members of the

More information

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT DIRECTORATE E - Air Transport E.2 - Single sky & modernisation of air traffic control Brussels, 6 April 2011 MOVE E2/EMM D(2011) 1. TITLE

More information

The Sunshine Coast is part of the global community and generates wealth through export, high-value industries and new investment.

The Sunshine Coast is part of the global community and generates wealth through export, high-value industries and new investment. 3.2 Strategic intent 3.2.1 Shaping growth an overview In 2031, the Sunshine Coast is renowned for its vibrant economy, ecological values, unique character and strong sense of community. It is Australia

More information

Sustainable Procurement Policy for Heathrow Airport Limited

Sustainable Procurement Policy for Heathrow Airport Limited Sustainable Procurement Policy for Heathrow Airport Limited Date of policy: May 2017 Author: Dianne Armstrong / Chris Allen Approved by: Exec David Ferroussat Procurement Director Pete Hughes - Head of

More information

Abruzzo Airport. Commercial Policy Development Routes

Abruzzo Airport. Commercial Policy Development Routes Abruzzo Airport Commercial Policy Development Routes Abruzzo Airport's main objective is to stimulate the development of air traffic by encouraging carriers to operate new routes and upgrade existing ones,

More information

COMMISSION OF THE EUROPEAN COMMUNITIES COMMUNICATION FROM THE COMMISSION. Developing an EU civil aviation policy towards Brazil

COMMISSION OF THE EUROPEAN COMMUNITIES COMMUNICATION FROM THE COMMISSION. Developing an EU civil aviation policy towards Brazil COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 5.5.2010 COM(2010)210 final COMMUNICATION FROM THE COMMISSION Developing an EU civil aviation policy towards Brazil COMMUNICATION FROM THE COMMISSION Developing

More information

Overview ICAO Standards and Recommended Practices for Aerodrome Safeguarding

Overview ICAO Standards and Recommended Practices for Aerodrome Safeguarding Overview ICAO Standards and Recommended Practices for Aerodrome Safeguarding References The Convention on International Civil Aviation (Chicago Convention) ICAO SARPS Annex 14 Vol. I, 7 th Edition, July

More information

SOUTH WORCESTERSHIRE DEVELOPMENT PLAN - PREFERRED OPTIONS 2011: SCHEDULE OF ISSUES AND RECOMMENDED RESPONSES Row No.

SOUTH WORCESTERSHIRE DEVELOPMENT PLAN - PREFERRED OPTIONS 2011: SCHEDULE OF ISSUES AND RECOMMENDED RESPONSES Row No. 1. Inadequate justification Existing retail floor space is underused so no point in extending retail floor space. Instead, would prefer to have sympathetic housing development in the City Centre to attract

More information

Capacity declaration Amsterdam Airport Schiphol; winter 2017/2018. Environmental capacity; available number of slots for Commercial Aviation

Capacity declaration Amsterdam Airport Schiphol; winter 2017/2018. Environmental capacity; available number of slots for Commercial Aviation Capacity declaration Amsterdam Airport Schiphol; winter 2017/2018 Environmental capacity; available number of slots for Commercial Aviation The number of slots available for landing and take-off operations

More information

SECTOR ASSESSMENT (SUMMARY): Transport, and Information and Communication Technology - Air Transport 1

SECTOR ASSESSMENT (SUMMARY): Transport, and Information and Communication Technology - Air Transport 1 Air Transport Connectivity Enhancement Project (RRP BHU 44239-013) SECTOR ASSESSMENT (SUMMARY): Transport, and Information and Communication Technology - Air Transport 1 Sector Road Map 1. Sector Performance,

More information

FLIGHT OPERATIONS PANEL (FLTOPSP)

FLIGHT OPERATIONS PANEL (FLTOPSP) International Civil Aviation Organization FLTOPSP/1-WP/3 7/10/14 WORKING PAPER FLIGHT OPERATIONS PANEL (FLTOPSP) FIRST MEETING Montréal, 27 to 31 October 2014 Agenda Item 4: Active work programme items

More information

Sunshine Coast Airport Master Plan September 2007

Sunshine Coast Airport Master Plan September 2007 Sunshine Coast Airport Master Plan September 2007 Contents CONTENTS... I ACKNOWLEDGEMENT... II DISCLAIMER... III 1 EXECUTIVE SUMMARY...IV 1 INTRODUCTION... 1 2 AVIATION DEMAND FORECAST... 5 3 AIRCRAFT

More information

Draft Planning Controls Planning Scheme Amendment GC81

Draft Planning Controls Planning Scheme Amendment GC81 Draft Planning Controls Planning Scheme Amendment GC81 Peita Tapper Senior Planner, Planning Services What the planning controls do? The draft planning controls translate the objectives and strategies

More information

Reference: 06/13/0594/F Parish: Fritton & St Olaves Officer: Mrs M Pieterman Expiry Date:

Reference: 06/13/0594/F Parish: Fritton & St Olaves Officer: Mrs M Pieterman Expiry Date: Schedule of Planning Applications Committee Date: 21 st January 2014 Reference: 06/13/0594/F Parish: Fritton & St Olaves Officer: Mrs M Pieterman Expiry Date: 20-01-2014 Applicant: Proposal: Site: Lord

More information

Draft Executive Summary

Draft Executive Summary Draft Executive Summary The Juneau Tourism Plan development process was undertaken by Egret Communications and ARA Consulting in April 2001, under contract with the City and Borough of Juneau, Alaska.

More information

Tourism and Wetlands

Tourism and Wetlands CONVENTION ON WETLANDS (Ramsar, Iran, 1971) 43 rd Meeting of the Standing Committee Gland, Switzerland, 31 October 4 November 2011 DOC. SC43-27 Tourism and Wetlands Action requested. The Standing Committee

More information

PLANNING STATEMENT FORMER HSBC BANK, 18 HIGH STREET, AMESBURY

PLANNING STATEMENT FORMER HSBC BANK, 18 HIGH STREET, AMESBURY PLANNING STATEMENT FORMER HSBC BANK, 18 HIGH STREET, AMESBURY 21 Dec 17 Introduction Amesbury has a vibrant nightlife with three public houses, two hotel bars and a nightclub within the town centre as

More information

It is essential that planning take full account of air safety and efficiency of operations.

It is essential that planning take full account of air safety and efficiency of operations. Airspace Protection Airspace Protection It is essential that planning take full account of air safety and efficiency of operations. 7.1 INTRODUCTION Obstacles near an airport, whether they are natural

More information

Insights into Tourism Branding

Insights into Tourism Branding DATE : AUGUST 2010 Created for CNN's TASK Group by Anita Mendiratta all rights reserved PAGE 1 GOING GREEN - COMMITTING BEYOND THE COLOUR Since the turn of the century the colour green has taken on a whole

More information

BABIA GÓRA DECLARATION ON SUSTAINABLE TOURISM DEVELOPMENT IN MOUNTAIN AREAS

BABIA GÓRA DECLARATION ON SUSTAINABLE TOURISM DEVELOPMENT IN MOUNTAIN AREAS BABIA GÓRA DECLARATION ON SUSTAINABLE TOURISM DEVELOPMENT IN MOUNTAIN AREAS The participants of the International Workshop for CEE Countries Tourism in Mountain Areas and the Convention on Biological Diversity",

More information

The results of the National Tourism Development Strategy Assessments

The results of the National Tourism Development Strategy Assessments The results of the National Tourism Development Strategy Assessments - 2012 (I) The assessment tool In 2012 the Sustainable Tourism Working Group of the CEEweb for Biodiversity prepared a guidance for

More information

TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22)

TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22) INTERNATIONAL CIVIL AVIATION ORGANIZATION TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22) Bangkok, Thailand, 5-9 September 2011 Agenda

More information

TOURISM GOVERNANCE IN SLOVENIA

TOURISM GOVERNANCE IN SLOVENIA MINISTRSTVO ZA GOSPODARSTVO REPUBLIKA SLOVENIJA THE REPUBLIC OF SLOVENIA TOURISM GOVERNANCE IN SLOVENIA Marjan Hribar, MSc. Director General of Tourism Directorate Ministry of the Economy Chairman of the

More information

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012 1. Introduction The Federal Aviation Administration (FAA) recommends that airport master plans be updated every 5 years or as necessary to keep them current. The Master Plan for Joslin Field, Magic Valley

More information

NANAIMO AIRPORT LAND USE AND DEVELOPMENT PRINCIPLES

NANAIMO AIRPORT LAND USE AND DEVELOPMENT PRINCIPLES NANAIMO AIRPORT LAND USE AND DEVELOPMENT PRINCIPLES Nanaimo Airport Commission (the Commission ) Nanaimo Airport ( YCD ) is owned by the Nanaimo Airport Commission, incorporated under the Canada Not-for-Profit

More information

Aviation Data and Analysis Seminar February Economics of Airports and Air Navigation Services Providers

Aviation Data and Analysis Seminar February Economics of Airports and Air Navigation Services Providers Aviation Data and Analysis Seminar 20-23 February 2017 Economics of Airports and Air Navigation Services Providers 250 7000 6000 200 5000 150 4000 Growth of air transport World recession SARS Freight Tonne

More information

MSc Tourism and Sustainable Development LM562 (Under Review)

MSc Tourism and Sustainable Development LM562 (Under Review) MSc Tourism and Sustainable Development LM562 (Under Review) 1. Introduction Understanding the relationships between tourism, environment and development has been one of the major objectives of governments,

More information

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub Report to: Greater Cambridge Partnership Joint Assembly 18 January 2018 Lead officer: Chris Tunstall GCP Director of Transport A10 Foxton level crossing bypass and travel hub 1. Purpose 1.1 The list of

More information

4 Rights and duties in connection with the conduct of petroleum activities

4 Rights and duties in connection with the conduct of petroleum activities Guidelines for application for Acknowledgment of Compliance (AoC) for mobile facilities intended for use in the petroleum activities on the Norwegian Continental Shelf (Unofficial translation), issued

More information

The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands.

The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands. The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands. Connecting People Building Opportunities 198 Brisbane Airport Corporation CHAPTER 10

More information

STRATEGY OF DEVELOPMENT 2020 OF THE CCI SYSTEM IN UKRAINE

STRATEGY OF DEVELOPMENT 2020 OF THE CCI SYSTEM IN UKRAINE STRATEGY OF DEVELOPMENT 2020 OF THE CCI SYSTEM IN UKRAINE CONTENTS 1. Preconditions of formation of the Strategy of development of the CCI system...4 2. Conceptual grounds of the Strategy...5 3. Mission,

More information

NATIONAL AIRSPACE POLICY OF NEW ZEALAND

NATIONAL AIRSPACE POLICY OF NEW ZEALAND NATIONAL AIRSPACE POLICY OF NEW ZEALAND APRIL 2012 FOREWORD TO NATIONAL AIRSPACE POLICY STATEMENT When the government issued Connecting New Zealand, its policy direction for transport in August 2011, one

More information

Mackay Region. Destination Tourism Strategy

Mackay Region. Destination Tourism Strategy Mackay Region Destination Tourism Strategy 2012 2016 Mackay Region The Mackay region offers an abundance of natural attractions including national parks, gorges, the Great Barrier Reef, numerous islands

More information

ENTRY, DEPARTURE AND TRANSIT OF AIRCRAFT 1. GENERAL 2. INTERNATIONAL SCHEDULED FLIGHTS GEN SEP 2012 AIP HUNGARY

ENTRY, DEPARTURE AND TRANSIT OF AIRCRAFT 1. GENERAL 2. INTERNATIONAL SCHEDULED FLIGHTS GEN SEP 2012 AIP HUNGARY GEN 1.2-1 GEN 1.2 ENTRY, DEPARTURE AND TRANSIT OF AIRCRAFT 1. GENERAL 1.1 All flights into, from or over Hungary and landing within it's territory shall be carried out in accordance with the provisions

More information

The overarching aim of this strategy is to ensure that Devon can achieve its potential to be a first class visitor destination.

The overarching aim of this strategy is to ensure that Devon can achieve its potential to be a first class visitor destination. Devon Tourism Strategy 2013-2016 1.0 Introduction This strategy, produced by the Devon Tourism Partnership (), aims to provide an overarching guiding framework for the development of the tourism sector

More information

Response to the London Heathrow Airport Expansion Public Consultation

Response to the London Heathrow Airport Expansion Public Consultation Response to the London Heathrow Airport Expansion Public Consultation Summary This report sets out the response to the Heathrow Airport s consultation on airport expansion and airspace change. The consultation

More information

Chapter 1: Introduction Draft

Chapter 1: Introduction Draft Chapter 1: Draft TABLE OF CONTENTS 1... 4 1.6.1 Stakeholder Engagement Plan... 10 Chapter 1 Page 2 TABLE OF EXHIBITS Exhibit 1.1-1 ABIA Annual Growth Since 1993... 5 Exhibit 1.4-1: ABIA Location Map...

More information

DIRECTIVE 2002/30/EC OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

DIRECTIVE 2002/30/EC OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL L 85/40 DIRECTIVE 2002/30/EC OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 26 March 2002 on the establishment of rules and procedures with regard to the introduction of noise-related operating restrictions

More information

Massachusetts Port Authority Sustainable Design Standards and Guidelines. AAPA Annual Convention Galveston, TX October 28, 2009

Massachusetts Port Authority Sustainable Design Standards and Guidelines. AAPA Annual Convention Galveston, TX October 28, 2009 Massachusetts Port Authority Sustainable Design Standards and Guidelines AAPA Annual Convention Galveston, TX Overview of Massachusetts Port Authority Independent State Authority Governor appoints Board

More information

AIRPORT PLANNING. Joseph K CHEONG. Lima, September 2018

AIRPORT PLANNING. Joseph K CHEONG. Lima, September 2018 AIRPORT PLANNING Joseph K CHEONG Technical Officer, Airport Operations & Infrastructure, ICAO HQ Secretary, Aerodrome Design and Operations Panel Lima, September 2018 TOPICS THE AVIATION SYSTEM CHICAGO

More information

Memorandum of Understanding with ACT Government

Memorandum of Understanding with ACT Government MEDIA RELEASE 8 April 2015 Memorandum of Understanding with ACT Government The ACT Government and Canberra Airport today entered into a new Memorandum of Understanding (MoU) on key areas of common interest

More information

Preparatory Course in Business (RMIT) SIM Global Education. Bachelor of Applied Science (Aviation) (Top-Up) RMIT University, Australia

Preparatory Course in Business (RMIT) SIM Global Education. Bachelor of Applied Science (Aviation) (Top-Up) RMIT University, Australia Preparatory Course in Business (RMIT) SIM Global Education Bachelor of Applied Science (Aviation) (Top-Up) RMIT University, Australia Brief Outline of Modules (Updated 18 September 2018) BUS005 MANAGING

More information

EU ECOLABEL USER MANUAL TOURIST ACCOMMODATION Commission Decision for the award of the EU Ecolabel for tourist accommodation (2017/175/EC)

EU ECOLABEL USER MANUAL TOURIST ACCOMMODATION Commission Decision for the award of the EU Ecolabel for tourist accommodation (2017/175/EC) Check-List This checklist (in blue table) summarises the documentation to be provided for each mandatory criterion. The documentation described below has to be submitted to the Competent Body. Applicant

More information

Appendix C AIRPORT LAYOUT PLANS

Appendix C AIRPORT LAYOUT PLANS Appendix C AIRPORT LAYOUT PLANS Appendix C AIRPORT LAYOUT PLANS Airport Master Plan Santa Barbara Airport As part of this Airport Master Plan, the Federal Aviation Administration (FAA) requires the development

More information

Financial Scrutiny Unit Briefing Tourism in Scotland

Financial Scrutiny Unit Briefing Tourism in Scotland The Scottish Parliament and Scottish Parliament Infor mation C entre l ogos. Financial Scrutiny Unit Briefing Tourism in Scotland Jim Dewar 2 June 2011 11/35 This briefing provides information on the legislative

More information

PPR REGULATIONS FOR BUSINESS AND GENERAL AVIATION AT EINDHOVEN AIRPORT

PPR REGULATIONS FOR BUSINESS AND GENERAL AVIATION AT EINDHOVEN AIRPORT PPR REGULATIONS FOR BUSINESS AND GENERAL AVIATION AT EINDHOVEN AIRPORT Eindhoven, September 2017 Contents Scope of application p. 3 Definitions p. 3 Capacity p. 3 Distribution of PPRs p. 4 PPR applications

More information

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES INTRODUCTION An Airport Master Plan provides an evalua on of the airport s avia on demand and an overview of the systema c airport development that will best meet those demands. The Master Plan establishes

More information

YHA Green SPIRIT Plan

YHA Green SPIRIT Plan YHA Green SPIRIT Plan 2011 2014 EMS 0.0.0 www.yha.org.uk Contents YHA and the Environment 03 The Green SPIRIT Plan 04 Measuring Our Impact 05 What We Already Do 07 Our Customers 09 Our People 10 Our Resources

More information

Fraser Coast. Destination Tourism Strategy

Fraser Coast. Destination Tourism Strategy Fraser Coast Destination Tourism Strategy 2012 2016 Fraser Coast The Fraser Coast is home to two of the great icons of Queensland tourism, the world heritage listed Fraser Island and the whale watching

More information

Certification Specifications and Acceptable Means of Compliance for Aircraft Noise CS-36

Certification Specifications and Acceptable Means of Compliance for Aircraft Noise CS-36 European Aviation Safety Agency Certification Specifications and Acceptable Means of Compliance for Aircraft Noise Amendment 3 29 January 2013 CONTENTS (general layout) AIRCRAFT NOISE PREAMBLE BOOK 1 NOISE

More information

OVERVIEW OF ICAO S ACTIVITIES IN AIR TRANSPORT

OVERVIEW OF ICAO S ACTIVITIES IN AIR TRANSPORT OVERVIEW OF ICAO S ACTIVITIES IN AIR TRANSPORT Presentation by Mrs. Folasade Odutola, Director, Air Transport Bureau International Civil Aviation Organization 1 Chicago Convention, 1944 The aims and objectives

More information

Chile. Tourism in the economy. Tourism governance and funding

Chile. Tourism in the economy. Tourism governance and funding Chile Tourism in the economy Tourism in Chile has experienced a sustained rise in recent years and has become one of the sectors delivering the fastest growth and employment generation. It has been estimated

More information

All aviation except commercial aviation. Including but not limited to business aviation, air taxi operations and technical flights.

All aviation except commercial aviation. Including but not limited to business aviation, air taxi operations and technical flights. Capacity declaration Amsterdam Airport Schiphol: Summer 2019 1. Definitions The following definitions apply: Commercial Aviation: General Aviation: Night departure slot: Night arrival slot: Night slot:

More information

A Master Plan is one of the most important documents that can be prepared by an Airport.

A Master Plan is one of the most important documents that can be prepared by an Airport. The Master Plan A Master Plan is one of the most important documents that can be prepared by an Airport. A Master Plan is a visionary and a strategic document detailing planning initiatives for the Airport

More information

USE OF 3D GIS IN ANALYSIS OF AIRSPACE OBSTRUCTIONS

USE OF 3D GIS IN ANALYSIS OF AIRSPACE OBSTRUCTIONS USE OF 3D GIS IN ANALYSIS OF AIRSPACE OBSTRUCTIONS A project by by Samuka D. W. F19/1461/2010 Supervisor; Dr D. N. Siriba 1 Background and Problem Statement The Airports in Kenya are the main link between

More information

SALVADOR DECLARATION. Adopted in the city of Salvador de Bahia on 16 November 2009 by the XVIII ACI LAC Annual General Regional Assembly

SALVADOR DECLARATION. Adopted in the city of Salvador de Bahia on 16 November 2009 by the XVIII ACI LAC Annual General Regional Assembly SALVADOR DECLARATION Adopted in the city of Salvador de Bahia on 16 November 2009 by the XVIII ACI LAC Annual General Regional Assembly 1 IN CONSIDERATION: That the Airports Council International for Latin

More information

CHAPTER 6 NOISE EXPOSURE

CHAPTER 6 NOISE EXPOSURE CHAPTER 6 NOISE EXPOSURE FAA requires that the NEM submitted for review represent the aircraft noise exposure for the year of submittal (in this case 2008) and for a future year (2013 for OSUA). However,

More information

MASTER PLAN 2010 ADDENDUM REPORT

MASTER PLAN 2010 ADDENDUM REPORT December 2013 ACKNOWLEDGEMENT This Master Plan Addendum Report has been prepared with the assistance of technical input and planning advice provided by Airport Master Planning Consultants Pty Ltd. COPYRIGHT

More information

Iceland. Tourism in the economy. Tourism governance and funding

Iceland. Tourism in the economy. Tourism governance and funding Iceland Tourism in the economy Tourism has been among the fastest-growing industries in Iceland in recent years and has established itself as the third pillar of the Icelandic economy. Domestic demand

More information

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis Appendix B ULTIMATE AIRPORT CAPACITY & DELAY SIMULATION MODELING ANALYSIS B TABLE OF CONTENTS EXHIBITS TABLES B.1 Introduction... 1 B.2 Simulation Modeling Assumption and Methodology... 4 B.2.1 Runway

More information

Netherlands. Tourism in the economy. Tourism governance and funding

Netherlands. Tourism in the economy. Tourism governance and funding Netherlands Tourism in the economy The importance of domestic and inbound tourism for the Dutch economy is increasing, with tourism growth exceeding the growth of the total economy in the last five years.

More information

NSW PRE-BUDGET STATEMENT FUTURE ECONOMY FUTURE JOBS

NSW PRE-BUDGET STATEMENT FUTURE ECONOMY FUTURE JOBS 2017-18 NSW PRE-BUDGET STATEMENT FUTURE ECONOMY FUTURE JOBS Executive Summary The 2017-18 NSW State Budget presents an opportunity for the NSW Government to future-proof the tourism and transport sectors.

More information

SUSTAINABLE DEVELOPMENT PLAN 2015

SUSTAINABLE DEVELOPMENT PLAN 2015 LAND USE SUSTAINABLE DEVELOPMENT PLAN 2015 EAST MINILANDS EAST MINILANDS SUSTAINABLE DEVELOPMENT SUSTAINABLE DEVELOPMENT DHL eastmidlandsairport.com OUR AIRPORT FOREWORD by Andy Cliffe Managing Director

More information

OIC/COMCEC-FC/33-17/D(16) TOURISM CCO BRIEF ON

OIC/COMCEC-FC/33-17/D(16) TOURISM CCO BRIEF ON TOURISM OIC/COMCEC CCO BRIEF ON TOURISM COMCEC COORDINATION OFFICE 0 May 2017 CCO BRIEF ON TOURISM Tourism industry is an important socio-economic tool for both developed and developing countries. It has

More information

REQUEST FOR EXPRESSIONS OF INTEREST FOR INDIVIDUAL CONSULTANT

REQUEST FOR EXPRESSIONS OF INTEREST FOR INDIVIDUAL CONSULTANT REQUEST FOR EXPRESSIONS OF INTEREST FOR INDIVIDUAL CONSULTANT AFRICAN DEVELOPMENT BANK Statistics Department (ECST) Avenue Joseph Anoma 01 B.P. 1387, Abidjan 01 Côte d Ivoire Email: b.adingra@afdb.org;

More information

Airports and UAS: Integrating UAS into Airport Infrastructure and Planning

Airports and UAS: Integrating UAS into Airport Infrastructure and Planning ACRP Problem Statement 17-03-09 Recommended Allocation: $500,000 Airports and UAS: Integrating UAS into Airport Infrastructure and Planning ACRP Staff Comments This is one of four UAS-themed problem statements

More information

Copyrighted material - Taylor & Francis

Copyrighted material - Taylor & Francis 444 CHAPTER ELEVEN The public sector and tourism BOX 11.2: CASE STUDY: THE SCOTTISH TOURISM FRAMEWORK FOR ACTION 2002 2005 AND SCOTTISH TOURISM THE NEXT DECADE: A FRAMEWORK FOR TOURISM CHANGE 2006 2015

More information

1. Purpose and scope. a) the necessity to limit flight duty periods with the aim of preventing both kinds of fatigue;

1. Purpose and scope. a) the necessity to limit flight duty periods with the aim of preventing both kinds of fatigue; ATTACHMENT A. GUIDANCE MATERIAL FOR DEVELOPMENT OF PRESCRIPTIVE FATIGUE MANAGEMENT REGULATIONS Supplementary to Chapter 4, 4.2.10.2, Chapter 9, 9.6 and Chapter 12, 12.5 1. Purpose and scope 1.1 Flight

More information

2 THE MASTER PLAN 23

2 THE MASTER PLAN 23 2 THE MASTER PLAN 23 THE MASTER PLAN 2.1 Purpose of the Master Plan A Master Plan provides the airport operator, the Commonwealth, State and Local Governments, the local community, aviation industries

More information

Tulsa Airports Improvement Trust Strategic Plan Update

Tulsa Airports Improvement Trust Strategic Plan Update Tulsa Airports Improvement Trust Strategic Plan Update 2016-2026 TABLE OF CONTENTS I. Background II. III. IV. Existing Conditions and Future Requirements Mission, Vision, & Goals Strengths, Weakness, Opportunities

More information

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content Gold Coast Rapid Transit Chapter twelve Social impact Chapter content Social impact assessment process...235 Existing community profile...237 Consultation...238 Social impacts and mitigation strategies...239

More information

N4 Carrick-on-Shannon to Dromod Road Project. 2.1 Introduction

N4 Carrick-on-Shannon to Dromod Road Project. 2.1 Introduction Chapter 2 Need for the Scheme 2.1 Introduction The National Primary Route N4, Dublin to Sligo is a strategic corridor from Dublin to the northwest and border counties (See RCSR 101 in Volume 2). The National

More information

Security Programme Zone for General Aviation Facilities at Airports

Security Programme Zone for General Aviation Facilities at Airports Aviation Security Panel (AVSECP) Fourteenth Meeting Montreal, September 3 to 6, 2002 Agenda Item 4: Security Programme Zone for General Aviation Facilities at Airports (Presented by the International Business

More information

Safety Regulatory Oversight of Commercial Operations Conducted Offshore

Safety Regulatory Oversight of Commercial Operations Conducted Offshore Page 1 of 15 Safety Regulatory Oversight of Commercial Operations Conducted Offshore 1. Purpose and Scope 2. Authority... 2 3. References... 2 4. Records... 2 5. Policy... 2 5.3 What are the regulatory

More information

The Strategic Commercial and Procurement Manager

The Strategic Commercial and Procurement Manager Item 3 To: Procurement Sub Committee On: 8 June 2016 Report by: The Strategic Commercial and Procurement Manager Heading: Renfrewshire Council s Community Benefit Strategy 2016 1. Summary 1.1. The purpose

More information

PROPOSED INVERCARGILL CITY DISTRICT PLAN. Decision No. 28G. Invercargill Airport Ltd Designations

PROPOSED INVERCARGILL CITY DISTRICT PLAN. Decision No. 28G. Invercargill Airport Ltd Designations PROPOSED INVERCARGILL CITY DISTRICT PLAN Decision No. 28G Invercargill Airport Ltd Designations Hearings Committee Councillor Darren Ludlow (Chair) Councillor Neil Boniface Councillor Graham Sycamore Keith

More information

Chapter 1 EXECUTIVE SUMMARY

Chapter 1 EXECUTIVE SUMMARY Chapter 1 EXECUTIVE SUMMARY Contents Page Aviation Growth Scenarios................................................ 3 Airport Capacity Alternatives.............................................. 4 Air Traffic

More information

The Challenges for the European Tourism Sustainable

The Challenges for the European Tourism Sustainable The Challenges for the European Tourism Sustainable Denada Olli Lecturer at Fan S. Noli University, Faculty of Economy, Department of Marketing, Branch Korça, Albania. Doi:10.5901/mjss.2013.v4n9p464 Abstract

More information

Air Operator Certification

Air Operator Certification Civil Aviation Rules Part 119, Amendment 15 Docket 8/CAR/1 Contents Rule objective... 4 Extent of consultation Safety Management project... 4 Summary of submissions... 5 Extent of consultation Maintenance

More information

AIR NAVIGATION ORDER

AIR NAVIGATION ORDER CLEARANCE AREAS AND OBSTACLE LIMITATION SURFACES AT AIR NAVIGATION ORDER VERSION : 2.0 DATE OF IMPLEMENTATION : 15-02-2013 OFFICE OF PRIME INTEREST : AERODROME STANDARDS BRANCH. (Directorate of Airspace

More information

Greece. Tourism in the economy. Tourism governance and funding

Greece. Tourism in the economy. Tourism governance and funding Greece Tourism in the economy Tourism is an important economic sector in Greece. Tourism directly contributed EUR 8.5 billion to the Greek economy in 2013, equivalent to 5.3% of GDP. Tourism is also an

More information

Content. Study Results. Next Steps. Background

Content. Study Results. Next Steps. Background Content Background Study Results Next Steps 2 ICAO role and actions in previous crisis time Background October 1973 oil crisis: oil price increased by 400% and oil production decreased by 240% Early 1974:

More information

Austria. Tourism in the economy. Tourism governance and funding

Austria. Tourism in the economy. Tourism governance and funding Austria Tourism in the economy According to the Tourism Satellite Account, the direct value-added effects of tourism in 2014 totalled EUR 18.1 billion, or 5.5% of GDP. About 270 500 full-time job equivalents

More information

SECURITY OVERSIGHT AGENCY May 2017 EXTENDED DIVERSION TIME OPERATIONS (EDTO)

SECURITY OVERSIGHT AGENCY May 2017 EXTENDED DIVERSION TIME OPERATIONS (EDTO) ADVISORY CIRCULAR CIVIL AVIATION SAFETY AND CAA-AC-OPS031A SECURITY OVERSIGHT AGENCY May 2017 1.0 PURPOSE EXTENDED DIVERSION TIME OPERATIONS (EDTO) 1.1 This advisory circular (AC) provides guidance to

More information

Tourism Development of the RA Vision Strategy Action plan 2017

Tourism Development of the RA Vision Strategy Action plan 2017 Tourism Development of the RA Vision Strategy Action plan 2017 State Committee for Tourism of the Ministry of Economic Development and Investment of Armenia AGENDA Statistics State policy goals, objectives

More information

Boise Municipal Code. Chapter DEFINITIONS

Boise Municipal Code. Chapter DEFINITIONS Chapter 12-03 DEFINITIONS Sections: 12-03-01 ADMINISTRATOR 12-03-02 AIRPORT DESIGNATIONS 12-03-03 AIRPORT HAZARD 12-03-04 AIRPORT HEIGHT LIMITATIONS 12-03-05 AIRPORT REFERENCE POINT 12-03-06 AIRPORT INSTRUMENT

More information

Aerodrome Obstacle Survey Information Checks

Aerodrome Obstacle Survey Information Checks United Kingdom Overseas Territories Aviation Circular OTAC 139-20 Aerodrome Obstacle Survey Information Checks Issue 2.00 26 May 2017 Effective on issue GENERAL Overseas Territories Aviation Circulars

More information

LYNDHURST NEW URBAN DEVELOPMENT AREA STRUCTURE PLAN. Lyndhurst New Urban Development Area Structure Plan OUTCOMES AND PERFORMANCE STANDARDS

LYNDHURST NEW URBAN DEVELOPMENT AREA STRUCTURE PLAN. Lyndhurst New Urban Development Area Structure Plan OUTCOMES AND PERFORMANCE STANDARDS APPENDIX 15.1-3 LYNDHURST NEW URBAN DEVELOPMENT AREA STRUCTURE PLAN Purpose of the Structure Plan Lyndhurst New Urban Development Area Structure Plan OUTCOMES AND PERFORMANCE STANDARDS LSP-P1 The District

More information

Old Limberlost Sports Club, Butlers Road, Handsworth Wood, Birmingham, B20 2NT

Old Limberlost Sports Club, Butlers Road, Handsworth Wood, Birmingham, B20 2NT Committee Date: 07/03/2013 Application Number: 2012/07986/PA Accepted: 29/11/2012 Application Type: Variation of Condition Target Date: 24/01/2013 Ward: Handsworth Wood Old Limberlost Sports Club, Butlers

More information

Schedule of Planning Applications Committee Date: 23 May Reference: 06/18/0064/F Great Yarmouth Officer: Mr J Beck Expiry Date:

Schedule of Planning Applications Committee Date: 23 May Reference: 06/18/0064/F Great Yarmouth Officer: Mr J Beck Expiry Date: Schedule of Planning Applications Committee Date: 23 May 2018 Reference: 06/18/0064/F Great Yarmouth Officer: Mr J Beck Expiry Date: 24-04-2018 Applicant: Proposal: Site: Mr Mavroudis Clear weather hoardings

More information

DRAFT. Master Plan RESPONSIBLY GROWING to support our region. Summary

DRAFT. Master Plan RESPONSIBLY GROWING to support our region. Summary Master Plan GROWING 2017-2037 RESPONSIBLY to support our region Summary DRAFT 2 1 Introduction Over the next three decades, Southern Ontario is set to experience significant growth its population will

More information

Implementation Strategy for the Lethbridge Destination Management Organization (LDMO)

Implementation Strategy for the Lethbridge Destination Management Organization (LDMO) Implementation Strategy for the Lethbridge Destination Management Organization (LDMO) IMPLEMENTATION AND TRANSITION STRATEGY LDMO MANDATE: To establish a destination management organization that provides

More information

Flying Cloud Airport (FCM) Zoning Process: Informing a Mn/DOT Path Forward

Flying Cloud Airport (FCM) Zoning Process: Informing a Mn/DOT Path Forward : Informing a Mn/DOT Path Forward A Review of the Flying Cloud Airport (FCM) Joint Airport Zoning Board (JAZB) Process and the Draft Airport Zoning Ordinance B A RPZ RPZ A B C Zone Chad E. Leqve Director

More information

Crown Corporation BUSINESS PLANS FOR THE FISCAL YEAR Trade Centre Limited. Table of Contents. Business Plan

Crown Corporation BUSINESS PLANS FOR THE FISCAL YEAR Trade Centre Limited. Table of Contents. Business Plan Crown Corporation BUSINESS PLANS FOR THE FISCAL YEAR 2014 2015 Trade Centre Limited Business Plan 2014 2015 Table of Contents Message from the CEO and the Chair... Mission... Planning Context... Strategic

More information

GUERNSEY ADVISORY CIRCULARS. (GACs) EXTENDED DIVERSION TIME OPERATIONS GAC 121/135-3

GUERNSEY ADVISORY CIRCULARS. (GACs) EXTENDED DIVERSION TIME OPERATIONS GAC 121/135-3 GUERNSEY ADVISORY CIRCULARS (GACs) GAC 121/135-3 EXTENDED DIVERSION TIME OPERATIONS Published by the Director of Civil Aviation, Guernsey First Issue August 2018 Guernsey Advisory Circulars (GACs) are

More information

Chapter 1: Introduction

Chapter 1: Introduction Chapter 1: TABLE OF CONTENTS 1... 4 1.1 Master Plan Study Content... 4 1.2 Purpose and Scope of Master Plan Study... 4 1.3 Airport History and Role... 6 1.4 Airport Location and Service Area... 6 1.5 ABIA

More information

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan TABLE OF CONTENTS CHAPTER 1 INTRODUCTION 10 Project Background 1-1 11 Mission Statement and Goals 1-1 12 Objectives of this Sustainable Master Plan 1-2 CHAPTER 2 INVENTORY 20 Airport Background 2-1 201

More information

INFORMATION AND GUIDANCE TRAINING REQUIREMENTS FOR PERSONNEL ON SHIPS OPERATING IN POLAR WATERS

INFORMATION AND GUIDANCE TRAINING REQUIREMENTS FOR PERSONNEL ON SHIPS OPERATING IN POLAR WATERS INFORMATION AND GUIDANCE TRAINING REQUIREMENTS FOR PERSONNEL ON SHIPS OPERATING IN POLAR WATERS Amendments to the International Convention on Standards of Training, Certification and Watchkeeping for Seafarers

More information